HomeMy WebLinkAbout20020730 Ver 3_2015 Work Plans & Application_MP-1_20200327DBM MP-1
APPLICATION for
Major Development Permit
(last revised 12127/06)
North Carolina DIVISION OF COASTAL MANAGEMENT
Business Name
Nc Department Of Cultural Resources
Project Name (if applicable)
LISS NC Hull Repair and Battleship Park Improvements
Applicant 1: First Name
Tony
MI
Last Name
Romaine
Applicant 2: First Name
MI
Last Name
If additional applicants, please attach an additional page(s) with names listed.
Mailing Address
4605 Mail Service Center
PC Box
City
Raleigh
State
NC
ZIP
27699-46,05
Country
Phone No.
ext.
FAX No.
Street Address (if different from above)
City
State
ZIP
Email
tromain@ncmail.net
Business Name
S&ME, Inc.
RECEIVED
Agent/ Contractor 1: First Name
MI
Last Name
Paul
Masten
Agent/ Contractor 2: First Name
MI
Last Name
Ed
Woloszyn
Mailing Address
PC Box
City
State
3006 Hall Waters Drive, Suite 100
Wilmington
NC
ZIP
Phone No. 1
Phone No. 2
28405
910 - 799 - 9945
ext.
919 - 872 - 2660
ext.
FAX No.
Contractor #
910 799 9958
Street Address (if different from above)
City
State
ZIP
Email
pmasten@smeinc.com, ewoloszyn@smeinc.com
<Form continues on back>
RECEIVED
DCM WI[.MiNGTON, NC
252-808-2803 .. 1-808-4RC0Mt-ST .. vv to Ynr.ra: era �e �tzearsu �an�gas rm �: an 4,nad
,Form DCM MP-1 (Page 2 of 5)
APPLICATION for
Major Development Permit
County (can be multiple) Street Address State Rd. #
New Hanover 101 USS North Carolina Battleship Road
Subdivision Name City State Zip
N/A Wilmington INC
Phone No. Lot No.(s) (if many, attach additional page with list)
ext. I I I ,
a. In which INC river basin is the project located? b. Name of body of water nearest to proposed project
Cape Fear River USS INC Battleship boat basin
c. Is the water body identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site.
❑Natural ®Manmade ❑Unknown Cape Fear River
e. Is proposed work within city limits or planning jurisdiction? f. If applicable, list the planning jurisdiction or city limit the proposed
®Yes ❑No work falls within.
New Hanover County
4 5fte?Description.
a.
Total length of shoreline on the tract (ft.)
b. Size of entire tract (sq.ft.)
Approximatley 3,900 linear feet
49 acres
c.
Size of individual lot(s)
d. Approximate elevation of tract above NHW (normal high water) or
NWL (normal water level)
(If many lot sizes, please attach additional page with a list)
2-3 feet NNHW or ❑NWL
e.
Vegetation on tract
Developed/landscaped areas contain common grass species and live oak trees. Undeveloped areas contain black
needlerush, common reed, salt grass and smooth cordgrass.
f.
Man-made features and uses now on tract
The site contains gravel and asphalt parking and driveway areas, the USS NC battleship located within a man-made boat
basin with associated visitor center, a stone and concrete bulkhead along the south shoreline of the boat basin and along
the Cape Fear River shoreline, a finger pier and boat slip for a private ferry operation, a maintenance equipment storage
area with a metal storage container, a covered picnic shelter, and a basketball court.
g.
Identify and describe the existing land uses adjacent to the proposed project site.
The Cape Fear River and associated wetlands are adjacent to the north and east. Undeveloped land consisting mainly of
wetland is adjacent to the south. U.S. Highway 421 is adjacent to the west with undeveloped land consisting mainly of
wetland across the highway.
h.
How does local government zone the tract?
I. Is the proposed project consistent with the applicable zoning?
B-2, Business
(Attach zoning compliance certificate, if applicable) DEC
❑No DNA
j.
Is the proposed activity part of an urban waterfront redevelopment proposal? NYes ❑No (ir`
k.
Hasa professional archaeological assessment been done for the tract? If yes, attach a copy. ❑Yes NNo ❑NA
If yes, by whom?
I.
Is the proposed project located in a National Registered Historic District or does it involve a NYes ❑No ❑NA
National Register listed or eligible property?
-F.IVED
RECEIVED
<Form continues on next page> DCM WiLMINGTQN, NG
252-8€08-2808 .. 1-888-4RCOAS?' .. snr uta .ss�vsva 4x v3c r�aa�sforx¢era S. tam#
,Form DCM MP-1 (Page 3 of 5)
APPLICATION for
Major Development Permit
m. (i) Are there wetlands on the site?
®Yes [:]No
(ii) Are there coastal wetlands on the site?
®Yes ❑No
(iii) If yes to either (i) or (if) above, has a delineation been conducted?
®Yes []No
(Attach documentation, if available)
n. Describe existing wastewater treatment facilities.
Municipal wastewater treatment provided by the Cape Fear Public Utility Authority.
o. Describe existing drinking water supply source.
Municipal drinking water provided by the Cape Fear Public Utility Authority.
p. Describe existing storm water management or treatment systems.
Some runoff from the parking area flows into drop inlets and then into the ship basin.
Other areas flow into shallow drainage
ditches and culverts present on the south side of the property which drain into a tidally influenced roadside ditch present
along the north side of USS North Carolina Road.
5 Activ►#fes'airtl Im oafs
a. Will the project be for commercial, public, or private use? ®Commercial ®Public/Government
❑Private/Community
b. Give a brief description of purpose, use, and daily operations of the project when complete.
The purpose of the project is to complete the repair of the degraded steel hull as being required by the US Navy. This will be
done via installation of a permanent cofferdam around the entire ship. Future maintenance is anticipated thus the cofferdam
will remain in place. The remaining improvements are being constructed to upgrade existing facilities, and improve the
public benefit, safety and educational aspects of the battleship. Ongoing siltation issues and flooding issues will also be
addressed, at least partially. The battleship will continue to function as a public park/attraction once complete. The
proposed Memorial Walkway around the ship and covered pavilions will provide increased viewing of the battleship without
an admission fee, along with the educuational opportunity to experience the tidal marsh system along the Cape Fear River,
which will be further enhanced by the proposed Expedition Trail that will extend into the marsh north of the ship basin. The
proposed bulkhead realignment will help reduce siltation by lessening the eddying effect of the current bulkhead alignment
along the south shoreline of the ship basin. The proposed walkway/bulkhead along the Cape Fear River shoreline will
provide safer, improved public access to the shoreline. The public docking facilities will allow for access to the park for
boaters. The new visitor center will include office space for battleship employees, safer ingress/egress to the ship, and
public meeting space. The current parking lot will be paved and raised approximatley 3-4 feet with subsurface infiltrat'
IAL LIVE
chambers present beneath it for stormwater treatment. The new park will provide improved public space for concerts,
festivals and other public events.
c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of o type
of equipment and where it is to be stored. DCM-IVIHD
The hull repair will be performed using a permanent cofferdam installed around the entire ship. The cofferdam will be
installed using a vibratory hammer to drive the sheet piles into the underlying Castle Hayne formation. The weirs on the
cofferdam will be raised/closed and water present within the cofferdam will be removed prior to hull repair. The pluff mud
present will be allowed to settle and this will be the working surface. A trench will be dug around the hull to expose the
portion subject to the tidal range. The hull coatings will be removed using sandblasters with HEPA filters and sections will be
cut out and replaced. The replaced hull will be coated and painted and once dry, the weirs will be opened to allow flow
around the ship.
The Memorial Walkway and Expedition Trail will be pile -supported structures. Piles will be installed via traditional pile
installation techniques (i.e. vibatory hammer and/or a pile driving hammer) for the Walkway and most likely by hand tools for
the Trail.
The bulkhead will be sheet pile and pre -cast concrete that will be installed using mechanical equipment.
The visitor center will be a two-story building constructed of wood, metal and glass and will be pile -supported. Convential
pile driving techniques will be used to install the piles.
The parking lot will be constructed using permeable pavement with subsurface infiltration trenches for stormwat�r RECEI
treatement. The entire parking lot will be raised 3 to 4 feet to alleviate flooding. 11CM WILMI
94
CITY
ED
GTON
252-808-2808 -.CSSAs°3-4RCOAS`' ua snr vd.;v C: a; b. .+'+i 7rxe an rx q sn ra8.r;*
Q1A.
Form DEM MP-1 (Page 4 of 5)
APPLICATION for
Major Development Permit
The pile -supported structures for the floating dock will be driven using conventional pile driving techniques. The main pier
extending from the shore will be connected to the driven piles and the finger piers will be connected to the main pier. The
finger pier will be floating. The associated dock master's office and restrooms will be wood structures constructed on at -
grade concrete slabs.
The amphitheater will be constructed outside of the AEC along the Cape Fear River shoreline and will consist of a wood
structure with a raised stage.
d.
List all development activities you propose.
Development will include construction of the cofferdam, walkway and pavilions around the ship, the nature trail over the
marsh adjacent to the north, the floating dock facility at the mouth of the ship basin, the new bulkhead along the south
shoreline of the boat basin, an elevated walkway along the Northeast Cape Fear River shoreline, a new visitor center, an
amphitheater, and a renovated parking lot with stormwater treatment.
e.
Are the proposed activities maintenance of an existing project, new work, or both? Maintenance and new work
f.
What is the approximate total disturbed land area resulting from the proposed project? Approx. 6 ❑Sq.Ft or ®Acres
g.
Will the proposed project encroach on any public easement, public accessway or other area []Yes ®No ❑NA
that the public has established use of?
h.
Describe location and type of existing and proposed discharges to waters of the state.
The bulkhead realignment within the ship basin will result in filing approximately 7,153 square feet of the open water within
the basin. This is being done to facilitate tidal flow within the basin to reduce siltation, and also to match the bulkhead
elevation with the new elevation of the raised parking lot. To complete the bulkhead realignment, approximately 6,832
square feet of upland will be excavated and converted to open water.
I.
Will wastewater or stormwater be discharged into a wetland? ❑Yes ®No ❑NA
If yes, will this discharged water be of the same salinity as the receiving water? []Yes []No ®NA
j.
Is there any mitigation proposed? ❑Yes ®No ❑NA
If yes, attach a mitigation proposal.
<Form continues on back>
NC
2-808-2!808 .. 1-838—AAR Yr9.iST .. +a,v vv.sa m.aea:a sf;s@arz ;s ra y ^r .e:n2.sx�@.
.Form DCM MP-1 (Page 5 of 5)
APPLICATION for
Major Development Permit
g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates.
CAMA GP #54561, issued 6/16/10 CAMA Minor/Modification 109-78, issued 1/23/79
Excavation Permit 66-88, issued 4/7/88
h. Signed consultant or agent authorization form, if applicable.
i. Wetland delineation, if necessary.
j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner)
k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10). if necessary. If the project involves expenditure
of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act.
I understand that any permit issued in response to this application will allow only the development described in the application.
The project will be subject to the conditions and restrictions contained in the permit.
I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to
enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up
monitoring of the project.
I further c � fy tj't th$information provided in this application is truthful to the best of my knowledge.
Date / / Print Name i aaul Mkten n
Signature
Please indicate application attachments pertaining to your proposed project.
NDCM MP-2 Excavation and Fill Information ❑DCM MP-5 Bridges and Culverts
NDCM MP-3 Upland Development
NDCM MP-4 Structures Information
RECEIVFD
DEC 3 0 2014
f'1i'r 4-Wrl, rlty
RECEIVED
DCM WILMINGTON, NC
252,�BCS-2908 .. '1-38S-4HCOA°ST ,, au =,x a..r. xs e; ca B E^ss. xa niersa c�aafr,rc: i