HomeMy WebLinkAbout20020730 Ver 3_30-15 Battleship Renewal Cover Letter_20200327,•_,_�. ROY COOPER
? Governor
MICHAEL S. REGAN
Secretary
BRAXTON DAVIS
NORTH CAROLINA Director, Division ofCoastal
Environmental Quit; Management
March 27, 2020
MEMORANDUM
FROM: Curt Weychert, Assistant Major Permit Coordinator
NCDEQ - Division of Coastal Management
400 Commerce Ave., Morehead City, NC 28557
Fax: 252-247-3330 (Courier 04-16-33)
curt.weycherta-ncdenr.gov
SUBJECT: CAMA Maior Permit Renewal Review
Applicant: NC Dept. of Cultural Resources/USS NC Battleship Permit No: 30-15
Project Location: USS North Carolina Battleship Memorial Facility, on the west bank of the Cape
Fear River, on Eagle Island, New Hanover County
This project does not qualify for a renewal under CRC rule 15A NCAC 07J.0404(b). However, 15A NCAC 07J.
0404(c) allows the Division of Coastal Management to circulate the request to the state agencies to determine
if any changes in circumstances or in development standards warrant a new application and CAMA
major permit review. DCM is not aware of any proposed changes to the previously authorized project.
Please indicate below your agency's position or viewpoint on the proposed renewal request and return this
form to Curt Wevchert at the address above by April 17, 2020. If you have any questions regarding the
proposed project, contact Tara MacPherson (910)-796-7266. When appropriate, in-depth comments with
supporting data is requested.
REPLY: This agency has no objection to the renewal request as proposed.
**Additional comments may be attached**
This agency has determined that circumstances or development standards have
changed and warrant a new CAMA major permit application review. See attached.
PRINT NAME _
AGENCY
SIGNATURE
DATE
State of North Carolina I Environmental Quality I Coastal Management
400 Commerce Ave. Morehead City, NC 28557 (252) 808-2808