HomeMy WebLinkAboutNCG030636_Renewal Issuance Notification Letter_20181115ROY COOPER NORTH CAROLINA
Governor Environmental Quality
MICHAEL S. REGAN
Secretary
WILLIAM E. (TOBY) VINSON, JR.
Interim Director
November 15, 2018
System Logistics Corporation
Attn: Franco DeAngelis
115 Vista Blvd
Arden, NC 28704
Subject: NPDES Stormwater Permit Coverage Renewal COC #NCG030636
Dear Permittee:
For coverage under Stormwater General Permit NCG030000, the Division of Energy, Mineral,
and Land Resources (DEMLR) is notifying you that your reissued Certificate of Coverage
(COC) is available. This permit is reissued pursuant to the requirements of North Carolina
General Statute 143-215.1 and the Memorandum of Agreement between the state of North
Carolina and the U.S. Environmental Protection Agency, dated October 15, 2007 (or as
subsequently amended.)
You must access and print a copy of your new Certificate of Coverage (COC) via this website:
https:Hedocs.deq.nc. gov/Forms/S W -COC -Renewal
Also, you must obtain a copy of the new NCG030000 General Permit from our website here:
https:Hdeq.nc. gov/about/divisions/energy-mineral-land-resources/nl2des-stormwater-g_l2s. In
addition to the full permit, the 2018 print package on the website includes revised monitoring
forms.
The General Permit authorizes discharges of stormwater, and it specifies your obligations with
respect to discharge controls, management, monitoring, and record keeping. Please review the
new permit to familiarize yourself with all changes in the reissued permit. Significant changes
to the General Permit are outlined in documents available on the website above. Your
facility has six months from receipt of the permit to update your Stormwater Pollution
Prevention Plan (SPPP) to reflect any new permit requirements.
NORTHCAROUNAD_EAom//
Department of Environmental Duality f
m
North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
512 North Salisbury Street 1 1612 Mail Service Center I Raleigh, North Carolina 27699-1612
919.707.9200
How does the new General Permit affect Tier Status?
The first sampling period in this General Permit begins on January 1, 2019. Tier 3 actions in
Part IV of your permit are triggered by benchmark exceedances on four occasions beginning on
the effective date of this permit and do not count prior exceedances. Likewise, Tier 2 actions
are triggered by two consecutive benchmark exceedances beginning on the effective date of
this permit and do not count prior exceedances. However, if your facility is already in Tier 2
(monitoring stormwater discharges monthly) or Tier 3, you must continue monthly monitoring
until relieved through conditions of the permit or by DEMLR staff approval.
When does electronic DMR reporting start?
We are working toward on -boarding permittees with NPDES stormwater permits into the DEQ's
eDMR system next year. Permittees will receive notification when our eDMR system is
ready for registration to begin reporting monitoring data electronically. If you have any
questions about the status, please contact Bethany Georgoulias at (919) 707-3641.
Your coverage under the General Permit is transferable only through the specific action of
DEMLR. This permit does not affect the legal requirements to obtain other permits which may
be required by the N.C. Department of Environmental Quality (DEQ), nor does it relieve the
permittee from responsibility for compliance with any other applicable federal, state, or local
law, rule, standard, ordinance, order, judgment, or decree.
If you have any questions regarding this permit package please contact the DEMLR Stormwater
Program at (919) 707-9220.
Sincerely,
for William E. (Toby) Vinson, Jr., P.E., CPM
Interim Director, Division of Energy, Mineral, and Land Resources
cc: Stormwater Program permit file