HomeMy WebLinkAbout20061942 Ver 1_DCM Permit_20070314U.`r ~ C~ ~ - l °t ~l- 2 ~i K ~Zd ~
Permit Class Permit Number
NEW 25-07
STATE OF NORTH CAROLINA
Department of Environment and Natural Resources
and §~~ f _ _.
Coastal Resources Commission °
t,~,,
~~l~it ~~~,K x ~ 2~»~r
for ~ rt ~t~r ;,;; , ~~s,,.; 1
X Major Development in an Area of Environmental Concern
pursuant to NCGS 113A-118
Excavation and/or filling pursuant to NCGS 113-229
Issued to Gregory Moore, P.O. Box 979, Cary, NC 27512
Authorizing development in Carteret County at Bo>?ue Sound, at 121 Camp Morehead Drive
as requested in the permittee's application dated 8/30/06, including
attached workplan drawings (~, both dated revised 12/7/06
This pernlit, issued on March 8, 2007 , is subject to compliance with the application (where consistent
with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may
be subject to fines, imprisonment or civil action; or may cause the permit to be null and void.
Pier Extension and Docking Facility
1) Unless specifically altered herein, this permit authorizes only the 320' x 6' extension to the existing pier,
a 10' x 20' "L" platform, one 4' x 16' finger pier, one 4' x 20' finger pier, and one boatlift, all as
depicted in the attached permit application and workplan drawings.
2) This permit authorizes only the docks, piers, and other structures and uses located in or over the water
that are expressly and specifically set forth in the permit application. No other structure, whether
floating or stationary, shall become a permanent part of this docking facility without permit
modification. No non-water dependent uses of structures shall be conducted on, in or over public trust
waters without permit modification.
(See attached sheets for Additional Conditions)
This permit action may be appealed by the pcrmittce or
other qualified persons within twenty (20) days of the issuing
date. An appeal requires resolution prior to work initiation or
continuance as the case may be.
This permit must be accessible on-site to Department
personnel when the project is inspected for compliance.
Any maintenance work or project modification not covered
hereunder requires further Division approval.
All work must cease when the permit expires on
December 31, 2010
In issuing this permit, the State of North Carolina agrees
that your project is consistent with the North Carolina Coastal
Management Program.
Signed by the authority. of the Secretary of DENR and the
Chairman of the Coastal Resources Coirunission.
~ ~ ~~~
~ Charles S. Jones, Director
ivision of Coastal Management
This permit and its conditions are hereby accepted.
Signature of Permittee
Gregory Moore
ADDITIONAL CONDITIONS
Permit #25-07
Page 2 of 3
3) No sewage, whether treated or untreated, shall be discharged at any time from any boats using the
docking facility. Any sewage discharge at the docking facility shall be considered a violation of this
permit for which the permittee is responsible. This prohibition shall be applied and enforced throughout
the entire existence of the permitted structure
4) The pier and associated structures shall have a minimum setback, distance of 15 feet between any parts
of the structure and the adjacent property owner's riparian access corridor, which is determined by
drawing a line parallel to the channel, then drawing a line perpendicular to the channel line that
intersects with the shore at the point where the upland property line meets the water's edge.
5) In order to ensure compliance with Condition No. 4 of the permit, the permittee shall conduct an as-built
survey that depicts the constructed docking facility and adjacent riparian corridors within 60 days of
completion of construction of these portions of the project. A copy of this survey shall also be
submitted to the Division of Coastal Management within 60 days of project completion.
NOTE: Failure to provide the survey required in Condition No. 5 shall be considered a violation of this
LAMA permit.
6) No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable
waters at or adjacent to the authorized work.
7) The permittee shall maintain the authorized work in good condition and in conformance with the terms
and conditions of this permit. The permittee is not relieved of this requirement if he abandons the
permitted activity without having it transferred to a third party.
8) This permit does not authorize the interference with any existing or proposed Federal project, and the
permittee shall not be entitled to compensation for damage to the authorized structure or work, or injury
which may be caused from existing or future operations undertaken by the United States in the public
interest.
9) The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S.
Coast Guard, through regulation or otherwise, on the authorized facilities. At a minimum, permanent
reflectors shall be attached to the structure in order to make it more visible during hours of darkness or
inclement weather.
NOTE: The permittee is cautioned that this permit does not authorize the placement of tie piles in
association with the docking facility. Furthermore, due to the proximity of the AIWW, boats
utilizing the docking facility wilt be subject to frequent wavewash from passing vessels. The
issuance of this permit does not relieve the permittee from taking all proper steps to ensure the
integrity of the structure and the safety of moored boats. The permittee shall not hold the State
of North Carolina or the United States liable for any damage to the structure or moored boats.
r 1
Gregory Moore
ADDITIONAL CONDITIONS
General
Permit #25-07
Page 3 of 3
10) The permittee understands and agrees that, if future operations by the United States requires the
removal, relocation, or other alteration of the structure or work authorized by this permit, or if in the
opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause
unreasonable obstruction to free navigation of the navigable waters, the permittee shall be required,
upon due notice from the Corps of Engineers, to remove, relocate or alter the structural work or
obstructions caused thereby, without expense to the United States or the state of North Carolina. No
claim shall be made against the United States or the state of North Carolina on account of any such
removal or alteration.
11) Excavation of shallow bottom habitat or submerged aquatic vegetation, including "kicking" with boat
propellers, is not authorized.
NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits,
approvals or authorizations that may be required, including but not limited to a building permit
from the Town of Morehead City.
NOTE: Future development of the permittee's property may require a modification of this permit.
Contact a representative of the Division at (252) 808-2808 prior to the commencement of any
such activity for this determination. The permittee is further advised that many non-water
dependent activities are not authorized within 30 feet of the normal high water level.
NOTE: The N.C. Division of Water Quality has authorized the proposed project under General Water
Quality Certification No. 3494 (DWQ Project No. 061942), which was issued on 1/31/07.
NOTE: The U.S. Army Corps of Engineers authorized the proposed project under General Permit No.
197800056 (COE Action Id. No. SAW-2007-00619-016), which was issued on 2/14/07.