Loading...
HomeMy WebLinkAboutNCC193213_Modification Review_20200330Action History (UTC-05:00) Eastern Time (US & Canada) Subrrit by Anonymous User 3/30/2020 10:47:07 AM (ADD TO FILE Submittal) Approve by Georgoulias, Bethany 3/30/2020 11:00:18 AM (Construction COC ADD TO FILE Review- NCC193213) • The task was assigned to Georgoulias, Bethany. The due date is: April 2, 2020 5:00 PM 3/30/2020 10:47 AM Y. , NORTH CAPCLINA Emlremmentel Quality Certificate of NCC193213 Coverage (COC) Enter the Certificate of Coverage N nber (Use capital letters) No.* Information associated with this permit Project Name Wallace 115kV Substation - Permanent Flood Mitigation Address 4467 S NC 11 HWY, Wallace, NC County Duplin Latitude 34.7230 Longitude -77.9809 Permittee Listed Duke Energy Progress, LLC Legally Responsible Timothy Same Individual NC Reference No. NCG01-2019-3213 E&SC Plan ID DUPLI-2020-013 Original NOI 19593 Tracking No.* Date COC Issued* 01/02/2020 Prior Rescission This field will populate only ff OOChas already been rescinded. Date Modification Information: Reason for f Closed -Out Lots/Outparcels in E&SC Plan Modification* r Additional Lots/Outparcels Approved - E&SC Revised r Other Revision(s) to E&SC Plan r Multiple Reasons (List) Addional ivbre infornation if necessary Explanation Added LOD for Mobile Substation. You must upload supporting documentation below. Do not upload E&SC Plans unless specific plan sheets are the only documentation with approval for revised acres of disturbance, etc. (only upload applicable sheets). Supporting Upload Supporting Documentation (%vised ERSC Approval, (lose -Out Doc, etc.) Documentation DUPLI-2020-013 Approval Revised 3-27-2020.pdf 290.09KB Mast be FDFforrrat North Carolina General Statute 143-215.66 (1) provides that: Anyperson who knowinglymakes anyfalse statement, representation, or certification in anyapplication, record, report, plan, or other documentfiled or required to be maintained under this Article or a rule implementing this Article; or who knowinglymakes a false statement of a material fact in a rulemaking proceeding or contested case underthis Article; orwho falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Article shall be guiltyofa Class 2 misdemeanor which mayinclude a fine notto exceed ten thousand dollars ($10,000). 17 I, as an authorized representative, hereby request modification to coverage under the NPDES Stormwater Permit for the subject project site. I am familiar with the information contained in this request and to the best of my knowledge and belief such information is true, complete and accurate. *This form must be signed by a responsible corporate officer that owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature Type Name* Tim Same Title * Manager Organization* Duke Energy Date * 03/30/2020 Email Address* Brian.Lo\Mher@duke-energy.com Email for Confirrration Telephone Number* 9195467169 Contact Nbrrber if we need to reach you Review Date 03/30/2020 Request Date 20200330 Formatted Review Date 20200330 Formatted