HomeMy WebLinkAboutNCC193213_Modification Review_20200330Action History (UTC-05:00) Eastern Time (US & Canada)
Subrrit by Anonymous User 3/30/2020 10:47:07 AM (ADD TO FILE Submittal)
Approve by Georgoulias, Bethany 3/30/2020 11:00:18 AM (Construction COC ADD TO FILE Review- NCC193213)
• The task was assigned to Georgoulias, Bethany. The due date is: April 2, 2020 5:00 PM
3/30/2020 10:47 AM
Y. ,
NORTH CAPCLINA
Emlremmentel Quality
Certificate of NCC193213
Coverage (COC) Enter the Certificate of Coverage N nber (Use capital letters)
No.*
Information associated with this permit
Project Name
Wallace 115kV Substation - Permanent Flood Mitigation
Address
4467 S NC 11 HWY, Wallace, NC
County
Duplin
Latitude
34.7230
Longitude
-77.9809
Permittee Listed
Duke Energy Progress, LLC
Legally Responsible
Timothy Same
Individual
NC Reference No.
NCG01-2019-3213
E&SC Plan ID
DUPLI-2020-013
Original NOI
19593
Tracking No.*
Date COC Issued*
01/02/2020
Prior Rescission
This field will populate only ff OOChas already been rescinded.
Date
Modification Information:
Reason for f Closed -Out Lots/Outparcels in E&SC Plan
Modification* r Additional Lots/Outparcels Approved - E&SC Revised
r Other Revision(s) to E&SC Plan
r Multiple Reasons (List)
Addional ivbre infornation if necessary
Explanation Added LOD for Mobile Substation.
You must upload supporting documentation below. Do not upload E&SC Plans unless specific plan
sheets are the only documentation with approval for revised acres of disturbance, etc. (only upload applicable
sheets).
Supporting Upload Supporting Documentation (%vised ERSC Approval, (lose -Out Doc, etc.)
Documentation DUPLI-2020-013 Approval Revised 3-27-2020.pdf 290.09KB
Mast be FDFforrrat
North Carolina General Statute 143-215.66 (1) provides that:
Anyperson who knowinglymakes anyfalse statement, representation, or certification in anyapplication, record, report, plan, or other
documentfiled or required to be maintained under this Article or a rule implementing this Article; or who knowinglymakes a false statement
of a material fact in a rulemaking proceeding or contested case underthis Article; orwho falsifies, tampers with, or knowingly renders
inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the
Commission implementing this Article shall be guiltyofa Class 2 misdemeanor which mayinclude a fine notto exceed ten thousand
dollars ($10,000).
17 I, as an authorized representative, hereby request modification to coverage
under the NPDES Stormwater Permit for the subject project site. I am familiar
with the information contained in this request and to the best of my knowledge
and belief such information is true, complete and accurate.
*This form must be signed by a responsible corporate officer that owns or operates the construction activity, such as a
president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B,
Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B,
Item (6) of that permit.
Signature
Type Name* Tim Same
Title * Manager
Organization* Duke Energy
Date * 03/30/2020
Email Address* Brian.Lo\Mher@duke-energy.com
Email for Confirrration
Telephone Number* 9195467169
Contact Nbrrber if we need to reach you
Review Date 03/30/2020
Request Date 20200330
Formatted
Review Date 20200330
Formatted