Loading...
HomeMy WebLinkAbout20091261 Ver 1_More Info Received_20091201oq - I a OF WATER O? °G Office Use Only: Corps action ID no. A DWQ project no. Form Version 1.3 Dec 10 2008 Pre-Construction Notification PCN Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: El Section 404 Permit El Section 10 Permit 1 b. Specify Nationwide Permit (NWP) number: 29 or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? ? Yes ® No 1 d. Type(s) of approval sought from the DWQ (check all that apply): ® 401 Water Quality Certification - Regular ? Non-404 Jurisdictional General Permit ? 401 Water Quality Certification - Express ? Riparian Buffer Authorization 1 e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ? Yes ? No For the record only for Corps Permit: ? Yes ? No 1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu fee program. ® Yes ? No 1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ® Yes ? No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ? Yes ® No 2. Project Information 2a. Name of project: Chanda's Ridge 2b. County: Onslow 2c. Nearest municipality / town: Jacksonville no 2 ( "'= lip 2d. Subdivision name: Chanda's Ridge I , it 2e. NCDOT only, T.I.P. or state project no: OE C 3. Owner Information DENR- WATER OVALITY INETMIM AND ST 3a. Name(s) on Recorded Deed: Soundtracts Properties, Inc. 3b. Deed Book and Page No. 3129/222 3c. Responsible Party (for LLC if applicable): Donald Fose 3d. Street address: 107 S. Sea Lily Ct. 3e. City, state, zip: Hampstead, NC 28443 3f. Telephone no.: 3g. Fax no.: 3h. Email address: Page 1 of 2 PCN Form - Version 1.3 December 10, 2008 Version 4. Applicant Information (if different from owner) 4a. Applicant is: ® Agent ? Other, specify: 4b. Name: 4c. Business name (if applicable): 4d. Street address: 4e. City, state, zip: 4f. Telephone no.: 4g. Fax no.: 4h. Email address: 5. Agent/Consultant Information (if applicable) 5a. Name: Gene Young 5b. Business name (if applicable): Applied Resource Management 5c. Street address: 257 Transfer Station Road 5d. City, state, zip: Hampstead, NC 28443 5e. Telephone no.: 910-270-2919 5f. Fax no.: 910-270-2988 5g. Email address: gene_arm@bellsouth.net Page 2 of 2 PCN Form - Version 1.3 December 10, 2008 Version B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): 302A-66, 67, 68, 71-Onslow Co. Tax ID 1 b. Site coordinates (in decimal degrees): Latitude: 34.705581 Longitude: - 77.64794 (DD.DDDDDD) (-DD.DDDDDD) 1 c. Property size: 26.33 acres 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to Moore's Creek proposed project: 2b. Water Quality Classification of nearest receiving water: C;SW 2c. River basin: Cape Fear 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: This site originally contained a single family residence in the rear of the property and was accessed by an existing fill road across the wetland area. 3b. List the total estimated acreage of all existing wetlands on the property: approx. 9.12 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: approximately 1600 Ft. 3d. Explain the purpose of the proposed project: The purpose of the project is residential construction of 30 single family homes. This will include the construction of a road right of way to access the properties at the rear of the lot. 3e. Describe the overall project in detail, including the type of equipment to be used: This project is to involve the construction of 30 single family residences. The development plan will call for upgrading the existing road that crosses the wetland areas. The road construction is to be done in accordance with standard construction practices. The road is to be stabilized with retaining walls in the wetland areas and is to utilize areas already under current use. The existing culvert is to be replaced with a larger diameter pipe to allow greater flow as needed. The ares of impact is to be limited to 0.48 acres as shown on the attached plans. The supply line for the wastewater systems are to be installed under the wetland areas by directional bore method to avoid any impact to wetland areas. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / i ®Yes ? No ? Unknown project ( ncluding all prior phases) in the past? Comments: 4b. If the Corps made the jurisdictional determination, what type f ? Preliminary ®Final o determination was made? 4c. If yes, who delineated the jurisdictional areas? Agency/Consultant Company: Applied Resource Name (if known): Dave Bailey Managenet Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation . 11/12/09 5. Project History 5a. Have permits or certifications been requested or obtained for ? Yes ? No ®Unknown this project (including all prior phases) in the past? 5b. If yes, explain in detail according to "help file" instructions. Page 3 of 3 PCN Form - Version 1.3 December 10, 2008 Version 6. Future Project Plans 6a. Is this a phased project? ? Yes ® No 6b. If yes, explain. Page 4 of 4 PCN Form - Version 1.3 December 10, 2008 Version C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ® Wetlands ? Streams - tributaries ? Buffers ? Open Waters ? Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number - Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ - non-404, other) (acres) Temporary T W1 ®P ? T fill unknown ? Yes ® No ® Corps ? DWQ 0.49 W2 ? P ? T N/A ? Yes ? Corps ? No ? DWQ W3 ? P ? T N/A ? Yes ? Corps ? No ? DWQ W4 ? P ? T N/A ? Yes ? Corps ? No ? DWQ W5 ? P ? T N/A ? Yes ? Corps ? No ? DWQ W6 ? P ? T N/A ? Yes ? Corps ? No ? DWQ 2g. Total wetland impacts 0.49 2h. Comments: The fill area is to access residential units with an upgrade to an existing access road that crosses the wetland area. 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number - (PER) or (Corps - 404, 10 stream length Permanent (P) or intermittent DWQ - non-404 width (linear Temporary (T) (INT)? , other) (feet) feet) S1 ® P ? T crossing N/A ® PER ® Corps 3 89 ?INT ? DWQ S2 ? P ? T N/A N/A ? PER ? INT ? Corps ? DWQ N/A N/A S3 ? P ? T N/A N/A ? PER ? Corps N/A N/A ? INT ? DWQ S4 ? P ? T N/A N/A ? PER ? Corps N/A N/A ? INT ? DWQ S5 ? P ? T N/A N/A ? PER ? Corps N/A N/A ? INT ? DWQ S6 ? P ? T N/A N/A ? PER ? Corps N/A N/A ? INT ? DWQ 3h. Total stream and tributary impacts 89LF 3i. Comments: Existing culvert is to be upgraded to allow for the upgraded access road and more efficient water flow. Page 5 of 5 PCN Form - Version 1.3 December 10, 2008 Version 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. 4b. 4c. 4d. 4e. Open water Name of waterbody impact number - (if applicable) Type of impact Waterbody type Area of impact (acres) Permanent (P) or Temporary T 01 ? P ? T N/A N/A N/A N/A 02 ?P?T 03 ?P?T 04 ?P?T 4f. Total open water impacts 4g. Comments: 5. Pond or Lake Construction If and or lake construction proposed, then complete the chart below. 5a. 5b. 5c. 5d. 5e. Pond ID Proposed use or purpose Wetland Impacts (acres) Stream Impacts (feet) Upland b (acres) num er of pond Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 K Total 5g. Comments: 5h. Is a dam high hazard permit required? ? Yes ? No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If an impacts require mitigation, then you MUST fill out Section D of this form. 6a. ? Neuse ? Tar-Pamlico ? Other: Project is in which protected basin? ? Catawba ? Randleman 6b. 6c. 6d. 6e. 6f. 6g. Buffer impact number - Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) or for Stream name mitigation (square feet) (square feet) Temporary T impact re uired. B1 ?P?T ?Yes ? No B2 ?P?T ?Yes ? No B3 ?P?T ?Yes ? No 6h. Total buffer impacts 6i. Comments: Page 6 of 6 PCN Form - Version 1.3 December 10, 2008 Version D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. The proposed right of way shows avoidance by utilizing an existing access way through the wetland area. This preserves the forrested wetland areas and upgrades the existing drive that is currently bisecitng the wetland area. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. Construction of the road will be only that which is required by Onslow County and NC DOT to allow emergency vehicles access into the residental areas. The supply line for the wastewater systems shall be installed by directional bore under the wetlands. The access points for maintenance of the supply line shall be located in the upland areas. This will eliminate any impact to the wetland areas. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ® Yes ? No 2b. If yes, mitigation is required by (check all that apply): ? DWQ ® Corps 2c. If yes, which mitigation option will be used for this project? ? Mitigation bank ®Payment to in-lieu fee program ? Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: Hoffman Forest Wetland Mitigation Bank (HFWMB) 3b. Credits Purchased (attach receipt and letter) 7 Type Non-Riparian Quantity 0.48 acres 3c. Comments: Please see attached email train from Glenn Catts with HFWMB accepting these credits. In conjunction with the mitigation bank, the remainder of the wetlands outside the impact areas are to be put into a restrictive convenant for preservation. 4. Complete if Making a Payment to In-lieu Fee Program 4a. Approval letter from in-lieu fee program is attached. ? Yes 4b. Stream mitigation requested: n/a linear feet 4c. If using stream mitigation, stream temperature: ? warm ? cool ?cold 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non-riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 7 of 7 PCN Form - Version 1.3 December 10, 2008 Version 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) - required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ? Yes ® No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund). 6h. Comments: Page 8 of 8 PCN Form - Version 1.3 December 10, 2008 Version E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1 a . Does the project include or is it adjacent to protected riparian buffers identified ? Yes ® No within one of the NC Riparian Buffer Protection Rules? 1 b . If yes, then is a diffuse flow plan included? If no, explain why. _ El Yes [ 1 No Comments: 2. Stormwater Management Plan 2a . What is the overall percent imperviousness of this project? 24% 2b . Does this project require a Stormwater Management Plan? ® Yes ? No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: 2d . If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: stormwater runoff will be transported via grass lined swales. All points of stormwater discharge will be designed such that the water velocity will be less than or equal to 2 fps. The stormwater plan will adhere to the less than 25% impervious criteria. ? Certified Local Government 2e . Who will be responsible for the review of the Stormwater Management Plan? ® DWQ Stormwater Program ? DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? ? Phase II 3b. Which of the following locally-implemented stormwater management programs ? NSW ? USMP apply (check all that apply): ? Water Supply Watershed ? Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ? Yes ? No attached? 4. DWQ Stormwater Program Review ® Coastal counties 4a. Which of the following state-implemented stormwater management programs apply ? HQW ? ORW (check all that apply): ? Session Law 2006-246 ? Other: 4b. Has the approved Stormwater Management Plan with proof of approval been attached? ? Yes ? No 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ? Yes ? No 5b. Have all of the 401 Unit submittal requirements been met? ? Yes ? No Page 9 of 9 PCN Form - Version 1.3 December 10, 2008 Version F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1 a. Does the project involve an expenditure of public (federal/state/local) funds or the ? Yes ® No use of public (federal/state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ? Yes ? No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) ? Yes ? No Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ? Yes ® No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after-the-fact permit application? ? Yes ® No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ? Yes ® No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. This residential development is utilizing the entire property to the fullest extent allowable according to wastewater rules. There are no more homes or lots anticipated therefore this impact is the only impact that is anticipated. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. Sewage is to be handled by individual wastewater systems on-site and use of a remote off-site wastewater system areas for approximately 11 units. The off-site drainfields will be accessed by supply lines that connect the septic and pump tanks to the remote drainfields.. Page 10 of 10 PCN Form -Version 1.3 December 10, 2008 Version S. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or ? Yes ? No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ? Yes ? No impacts? 5c. If yes, indicate the USFWS Field Office you have contacted. ? Raleigh ? Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ? Yes ® No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? NC Marine Fisheries website 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state federal or tribal , governments have designated as having historic or cultural preservation ? Yes ® No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? NC State Historic Preservation website 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? ® Yes ? No 8b. If yes, explain how project meets FEMA requirements: 8c. What source(s) did you use to make the floodplain determination? Onslow County GIS Gene Young 1 W -- q ' Applicant/Agent s Printed Name Ap Sig a ure ? Date f (Agent's signature is variz on rom the applicant Page 11 of 11 PCN Form - Version 1.3 December 10, 2008 Version -_ _ TV 80 GRAPHIC SCALE WETLAND IMPACT= APPROXIMATELY 0.49 AC STREAM IMPACT = 89LF 72 88 84 60 SOUTHWIND /N// VPAT nn w -ov -40 -20 0 20 40 72 68 84 60 WETLAND CROSSING A T CULVERT C2 CHANDA'S PLACE CHANDA'S RIDGE ONSLOW COUNTY-NC f01omm IOHMFGI Mvu Ncvw Nc w"Waft v W7/6-MSVM oD-uo mv= GUFFMM* 0101103M -LAW CLOVELCIrldW SANDRA FAITH MATZA PIN 430400788472 DH 1448 PG 97 ZONE - R-30M