Loading...
HomeMy WebLinkAbout20001048 Ver 2_Acceptance Letter_20091203AN °..° _ NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Governor Director December 3, 2009 Dee Freeman Secretary DWQ EXP # 00-1048v2 Anson County EXPRESS REVIEW ACCEPTANCE LETTER Mr. William N. Stovall NCDOC 2020 Yonkers Road Raleigh, NC 27604 Subject Property: Lanesboro Correctional Institute (formerly Anson County Correctional Facility) STORMWATER MANAGEMENT PLAN (SMP) - MODIFICATION TO TWO (2) BMPs Dear Mr. Stovall, On June 28, 2001, the Division of Water Quality (DWQ) issued a SMP APPROVAL to the NC Dept. of Corrections to satisfy a stormwater condition in the 401 Water Quality Certification issued by the DWQ on December 4, 2000. On December 3, 2009, the Division of Water Quality DWQ received a request from Mr. Jeff Thompson of Hobbs, Upchurch & Associates for acceptance into the Express Review Program regarding a modification to two (2) of the three (3) wet ponds that were permitted. This letter advises you that your project will be accepted into the Express Review Program once the following items are received: a. The application fee of $1000.00 made payable to the North Carolina Division of Water Quality [Stormwater Management Plan (SMP) fee for one (1) to two (2) drainage areas]; b. Two (2) complete and collated copies of the Express Review Stormwater Management Plan Application [ http://www.ncwaterqualily.org/ncwetlands/documents/ExpRevSWMAppV2.pdf]; Two (2) collated copies of all supporting information pertaining to this project including: i. A breakdown of the built upon or impervious areas within each drainage area. ii. Pond sizing calculations using the proposed conditions (Required permanent pool surface area and volume for the selected average depth and total impervious amount). Please include the stage-surface area-volume table from top of sediment elevation to permanent pool elevation. iii. Water quality (design) volume calculations; iv. Treatment volumes provided (or available) in the ponds between the permanent pool and the next opening (weir or orifice) above the drawdown orifice. V. Drawdown (orifice sizing) calculations for the new design volumes. vi. Signed and notarized Operation & Maintenance Agreements for the BMPs, available at hLtp://h2o.enr.state.nc.us/su/bmp _forms.htm 401 Oversight/Express Review Permitting Unit 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 Location: 2321 Crabtree Blvd., Raleigh, North Carolina 27604 Phone: 919-733-17861 FAX: 919-733-6893 Internet: http://h2o.enr.state.nc.us/ncwetlands/ One i hCarolina Nort ' 7 Wura!!ry An Equal Opportunity 1 Affirmative Action Employer Lanesboro Correctional Institute William Stovall Page 2 of 2 December 3, 2009 d. Two collated copies of full size plans (with detailed construction information) including, but not limited to, the following: i. Existing conditions map of project area; ii. Site grading plan showing existing and proposed contours, and delineated drainage areas to the BMPs; iii. Plan and cross sectional views of the BMPs showing detailed information such as forebay(s), outlet structure(s), zone or pool level elevations, bottom and top of berm elevations, access ways, etc. at appropriate scales; iv. Construction sequence including sediment and erosion control measures to ensure that the newly constructed site would be stabilized prior to sending runoff to the BMPs. e. One (1) data CD of full size plans in TIFF Group 4 format (black and white, not grayscale or color). If the plans are too large to store in TIFF format, they can be stored in PDF. Please note that a pre-application meeting is reauired prior to the submittal of vour completed application. Since this is a modification, the owner of the project is not required to be present at the pre-application meeting. The clock for this project will not start until receipt of the completed application package and required fee. If the drainage areas exceed what is indicated on the Initial Interest Form and/or the services are different you may be required to remit an additional fee. Thank you for your attention to this matter. If you have any questions or wish to discuss these matters further please do not hesitate to call Joseph Gyamfi or Lia M. Gilleski at 919-733-1786. Sincerely, l Cyndi Karoly, Supervisor 401 Oversight/Express Review Program CBK/jg cc: File copy Jeff Thompson, Hobbs, Upchurch & Associates, 8262-201 Market St., Wilmington, NC 28411