HomeMy WebLinkAbout20191658 Ver 2_BR-0002 Revision_20200324Wanucha, Dave
From:
Turchy, Michael A
Sent:
Monday, March 23, 2020 8:33 PM
To:
Loretta (Lori) Beckwith; Wanucha, Dave
Cc:
Hemphill, Jeffrey L
Subject:
BR-0002 Revision
Attachments:
BR-0002 Revision March 24 2020.pdf
Hi Lori and Dave,
I just wanted to give you a heads up that a modification/revision request is heading your way for BR-0002. Our
engineers had concerns with the wall parallel to Buffalo Creek scouring.
The wall has been moved 5 feet further away from Buffalo Creek. They also relocated a cross pipe farther away
from the stream.
Permanent impacts will decrease by 3', but temporary will increase by 31 feet.
When I was reviewing this, I had a really hard time trying to see the changes, so I created a "before and after"
drawing comparison and attached to this email.
Feel free to let Jeff or I know if you have any questions.
Thanks,
Michael
Michael Turchy
Environmental Coordination and Permitting
North Carolina Department of Transportation
919 789-1102 mobile
919 707-6157 office
1598 Mail Service Center
Raleigh, NC 27699-1598
1000 Birch Ridge Drive
Raleigh, NC 27610
it all correspondence ;,,lcuirdeinc.e Cxu aird frur�r ffils ,weirder is sulcjeclu ffic IN C I':"ulc Ic. IRcc;urds I ow aird i°r ay be disclosed lu ffilyd Icartiu;,,,
1