Loading...
HomeMy WebLinkAboutWQ0041528_Application_20200320I FA Shaping Communities Together ether meg'" March 6, 2020 RECr=IV D/NC0ENR/DWF? Mr. Corey Basinger 610 E Center Avenue Mooresville, North Carolina 28115 RE: Fast Track Sewer System Application Plato Lee Rd Shell Building #3 City of Shelby Cleveland County, North Carolina Dear Mr. Basinger: A"" - 9 ,'_,120 wOPO;:, MOOPESVIL.i.F F1I=13,10NAL OFFICE On behalf of the City of Shelby, please find enclosed the Fast Track Sewer System Extension Application. This project involves the addition of 132 linear feet of ductile iron pipe and 585 linear feet of PVC sewer pipe to serve the proposed Plato Lee Rd Shell Building #3. The total flow for this request is 0.027 million gallons per day. The following information is included with the submittal: One (1) Original and One (1) copy of the Fast Track Sewer System Extension Application • One (1) Original and One (1) copy of the Flow Tracking for Sewer Extension Application $480 Application fee • One (1) copy of USGS Topographic Map • One (1) copy of Street Level Map trust this submittal is satisfactory and look forward to your approval. If you have any questions or require additional information, please feel free to call. Sincerely, McGILL ASSOCIATES, P.A. SCOTT BURWELL, PE Project Manager CC: Ben Yarboro, City of Shelby (via email) PA2019\19.00153-ShelbyNC-Plato Lee Industrial Park\Design\Permits\Sewer Fast Track\20-0306-Cover Letter.docx MCGILL ASSOCIATES 55 BROAD STREET, ASHEVILLE, NC 28801 / 828.252.0575 / MCGILLASSOCIATES.COM DWR Division of Water Resources State of North Carolina Department of Environmental Quality Division of Water Resources ISA NCAC 02T .0300 — FAST TRACK SEWER SYSTEM EXTENSION APPLICATION FTA 04-16 & SUPPORTING DOCUMENTATION Application Number: CCS (to be completed by DWR) All items must be completed or the application will be returned I. APPLICANT INFORMATION: 1. Applicant's name: City of Shelby (company, municipality, HOA, utility, etc.) 2. Applicant type: ❑ Individual ❑ Corporation ❑ General Partnership ❑ Federal ❑ State/County ® Municipal 3. Signature authority's name: Rick Howell per 15A NCAC 02T .0106(b) Title: City Manager 4. Applicant's mailing address: PO BOX 207 City: Shelby State: NC Zip: 28151-0207 5. Applicant's contact information: Phone number: (704) 484-6801 Email Address: rick.howell(c-ci , ofshelb, II. PROJECT INFORMATION: 1. Project name: Plato Lee Rd Shell Building #3 RECEIVED/NCDENR/DWR �dIAR — 9 2020 WOROS MOORESVILLE REGIONAL OFFICE ❑ Privately -Owned Public Utility ❑ Other 2. Application/Project status: ® Proposed (New Permit) ❑ Existing Permit/Project If a modification, provide the existing permit number: WQ00 and issued date: If new construction but part of a master plan, provide the existing permit number: WQ00 3. County where project is located: Cleveland 4. Approximate Coordinates (Decimal Degrees): Latitude: 35.31 ° Longitude:-81.62' 5. Parcel ID (if applicable): 58557 (or Parcel ID to closest downstream sewer) III. CONSULTANT INFORMATION: 1. Professional Engineer: Scott Burwell License Number: 039177 Firm: McGill Associates Mailing address: 55 Broad Street City: Asheville State: NC Zip: 28801- Phone number: (828) 252-0575 Email Address: scott.burwell@mcgillassociates.com IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION: 1. Facility Name: First Broad Wastewater Treatment Plant Permit Number: NC00024538 Owner Name: City of Shelby V. RECEIVING DOWNSTREAM SEWER INFORMATION (if different than WWTF): 1. Permit Number(s): WQ0007780 Downstream (Receiving) Sewer Size: 15 inch System Wide Collection System Permit Number(s) (if applicable): WQCS Owner Name(s): City of Shelby FORM: FTA 04-16 Pagel of 5 VI. GENERAL REQUIREMENTS 1. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached? ❑ Yes ❑No ®N/A 2. If the Applicant is a Developer of lots to be sold, has a Developer's Operational Agreement (FORM: DEV) been attached? ❑ Yes ❑No ®N/A 3. If the Applicant is a Home/Property Owners' Association, has an Operational Agreement (FORM: HOA) been attached? ❑ Yes ❑No ®N/A 4. Origin of wastewater: (check all that apply): ❑ Residential Owned ❑ Retail (stores, centers, malls) ❑ Car Wash ❑ Residential Leased ❑ Retail with food preparation/service ❑ Hotel and/or Motels ❑ School / preschool / day care ❑ Medical / dental / veterinary facilities ❑ Swimming Pool /Clubhouse ❑ Food and drink facilities ❑ Church ❑ Swimming Pool/Filter Backwash ® Businesses / offices / factories ❑ Nursing Home ❑ Other (Explain in Attachment) 5. Nature of wastewater: % Domestic/Commercial 100 % Commercial _ % Industrial (See 15A NCAC 02T .0103(20)) 4Is there a Pretreatment Program in effect? ❑ Yes ❑ No 6. Hasa flow reduction been approved under 15A NCAC 02T .0114(f)? ❑ Yes ®No ➢ If Yes, provide a copy of flow reduction approval letter 7. Summarize wastewater generated by project: Establishment Type (see 02T.0114(fl) Daily Design Flow e,b No. of Units Flow Businesses/offices/factories 25 gal/employee/shift 1100 employees 27,500 GPD gal/ GPD gal/ GPD gal/ GPD gal/ GPD gal/ GPD Total GPD a See 15A NCAC 02T .0 1 14(b), (d), (e)(,1) and (e)(2) for caveats to wastewater design flow rates (i.e., minimum flow per dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas; and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G.S. 42A-4). b Per 15A NCAC 02T .0114(c), design flow rates for establishments not identified [in table 15A NCAC 02T.01141 shall be determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data. 8. Wastewater generated by project: 27,500 GPD (per 15A NCAC 02T .0114) ➢ Do not include future flows or previously permitted allocations If permitted flow is zero, indicate why: ❑ Pump Station or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line ❑ Flow has already been allocated in Permit Number: ❑ Rehabilitation or replacement of existing sewer with no new flow expected ❑ Other (Explain): FORM: FTA 04-16 Page 2 of 5 VII. GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T .0305 & MDC (Gravity Sewers): 1. Summarize gravity sewer to be permitted: Size (inches) Length (feet) Material 8 132 DIP 8 585 PVC ➢ Section II & III of the MDC for Permitting of Gravity Sewers contains information related to design criteria ➢ Section III contains information related to minimum slopes for gravity sewer(s) ➢ Oversizing lines to meet minimum slope requirement is not allowed and a violation of the MDC VIII. PUMP STATION DESIGN CRITERIA (If Applicable) — 02T .0305 & MDC (Pump Stations/Force Mains): COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT 1. Pump station number or name: 2. Approximate Coordinates (Decimal Degrees): Latitude: Longitude: - ° 3. Design flow of the pump station: millions gallons per day (firm capacity) 4. Operational point(s) of the pump(s): gallons per minute at feet total dynamic head (TDH) 5. Summarize the force main to be permitted (for this Pump Station): Size (inches) Length (feet) Material 6. Power reliability in accordance with 15A NCAC 02T .0305(h)(1): ❑ Standby power source or pump with automatic activation and telemetry - 15A NCAC 02T .0305(h)(1)(B). ➢ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day ➢ Must be permanent to facility Or if the pump station has an average daily flow less than 15,000 gallons per day: ❑ Portable power source with manual activation, quick -connection receptacle and telemetry - 15A NCAC 02T .0305(h)(1)(C) or ❑ Portable pumping unit with plugged emergency pump connection and telemetry - 15A NCAC 02T .0305(h)(1)(C): ➢ It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant (draft agreement) and is compatible with the station. ➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided in the case of a multiple station power outage. FORM: FTA 04-16 Page 3 of 5 IX. SETBACKS & SEPARATIONS — (02B .0200 & 15A NCAC 02T .0305(p): 1. Does the project comply with all separations found in 15A NCAC 02T.0305(f) & (a) ® Yes ❑ No ➢ 15A NCAC 02T.0305(f) contains minimum separations that shall be provided for sewer ;vsteme, Setback Parameter* Separation Required Storm sewers and other utilities not listed below vertical 24 inches Water mains vertical -water over sewer including in benched trenches 18 inches Water mains horizontal 10 feet Reclaimed water lines vertical - reclaimed over sewer 18 inches Reclaimed water lines horizontal - reclaimed over sewer 2 feet **Any private or public water supply source, including any wells, WS-I waters of Class I or Class II impounded reservoirs used as a source of drinking water 100 feet **Waters classified WS (except WS-I or WS-V), B, SA, ORW, HQW, or SB from normal high water or tide elevation and wetlands see item IX.2 50 feet **Any other stream, lake, impoundment, or ground water lowering and surface drainage ditches 10 feet Any building foundation 5 feet Any basement 10 feet Top slope of embankment or cuts of 2 feet or more vertical height 10 feet Drainage systems and interceptor drains 5 feet Any swimming pools 10 feet Final earth grade vertical 36 inches ➢ 15A NCAC 02T.0305(g) contains alternatives where separations in 02T.0305(f) cannot be achieved. ➢ **Stream classifications can be identified using the Division's NC Surface Water Classifications webpage ➢ If noncompliance with 02T.0305(f) or (g), see Section X of this application 2. Does the project comply with separation requirements for wetlands? (50 feet of separation) ® Yes ❑ No ❑ N/A ➢ See the Division's draft separation requirements for situations where separation cannot be meet ➢ No variance is required if the alternative design criteria specified is utilized in design and construction ➢ As built documents should reference the location of areas effected 3. Does the project comply with setbacks found in the river basin rules per 15A NCAC 02B .0200? ® Yes ❑ No ❑ N/A ➢ This would include Trout Buffered Streams per 15A NCAC 2B.0202 4. Does the project require coverage/authorization under a 404 Nationwide or ® Yes ❑ No individual permits or 401 Water Quality Certifications? ➢ Information can be obtained from the 401 & Buffer Permitting Branch 5. Does project comply with 15A NCAC 02T.0105(c)(6) (additional permits/certifications)? ® Yes ❑ No Per 15A NCAC 02T.0105(c)(6), directly related environmental permits or certification applications are being prepared, have been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans, stormwater management plans, etc.). 6. Does this project include any sewer collection lines that are deemed "high -priority?" Per 15A NCAC 02T.0402, "high -priority sewer" means "any aerial sewer, sewer contacting surface waters, siphon, or sewer positioned parallel to streambanks that is subject to erosion that undermines or deteriorates the sewer. ❑ Yes ❑ No ® N/A ➢ If yes, include an attachment with details for each line, including type (aerial line, size, material, and location). High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections documented per 15A NCAC 02T.0403(a)(5) or the permitee's individual System -Wide Collection permit. FORM: FTA 04-16 Page 4 of 5 /'4I CERTIFICATIONS: 1. Does the submitted system comply with 15A NCAC 02T, the Minimum Design Criteria for the Permitting of Pump Stations and Force Mains (latest version), and the Gravity Sewer Minimum Design Criteria (latest version) as applicable? ® Yes ❑ No If No, complete and submit the Variance/Alternative Design Request application (VADC 10-14) and supporting documents for review. Approval of the request is required prior to submittal of the Fast Track Application and supporting documents. 2. Professional Engineer's Certification: I, �_r,� /guo`we� l attest that this application for (Professional Engineer's name from Application Item III.1.) has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications, engineering calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains (latest version). Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design. NOTE — In accordance with General Statutes 143-215.6A and 143-215.613, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation. . , , , , , . North Carolina Professional Engineer's seal, signature, and date: �\ S O SF 03g1-77 sy�J F G I NE�'1`�'�v� `00 T E.O�`' 3. Applicant's Certification per 15A NCAC 02T .0106(b): I, Rick Howell, City Manager (Signature Authority's name & title from Application Item I.3.) attest that this application for has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. I understand that any discharge of wastewater from this non - discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties, injunctive relief, and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition of this permit be violated. I also understand that if all required parts of this application package are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation. Signature: Date3 0! FORM: FTA 04-16 Page 5 of 5 DWR Division of Water Resources State of North Carolina Department of Environmental Quality Division of Water Resources Flow Tracking for Sewer Extension Applications (FTSE 10-18) Entity Requesting Allocation: First Broad River WWTP Project Name for which flow is being requested: Plato Lee Rd Shell Building 43 More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: First Broad River WWTP b. WWTP Facility Permit #: NC00024538 c. WWTP facility's permitted flow d. Estimated obligated flow not yet tributary to the WWTP e. WWTP facility's actual avg. flow f. Total flow for this specific request g. Total actual and obligated flows to the facility h. Percent of permitted flow used All flows are in MGD 6.0 0.620 3.6 0.0275 4.25 71 % II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: (A) (B) (C) (D)=(B+C) (E)=(A-D) Design Obligated, Pump Pump Average Approx. Not Yet Total Current Station Station Firm Daily Flow** Current Tributary Flow Plus (Name or Permit Capacity, * (Firm / p fl, Avg. Daily Daily Flow, Obligated Available Number) No. MGD MGD Flow, MGD MGD Flow Capacity*** Westside 4.896 1.958 0.977 0.511 1.488 0.470 * The Firm Capacity (design flow) of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Downstream Facility Name (Sewer): Shelby Downstream Permit Number: WQ0007780 Page 1 of 6 FTSE 10-18 III. Certification Statement: I Rick Howell certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and 11 plus all attached planning assessment addendums for which I am the responsible party. Signature of this form certifies that the receiving collection system or treatment works has adequate capacity to transport and treat the proposed new wastewater. Signing Official Signature City Manager Title of Signing Official p� Page 2 of 6 FTSE 10-18 Tuvia, Ori A From: Scott Burwell <Scott.Burwell@mcgillassociates.com> Sent: Friday, March 20, 2020 9:51 AM To: Tuvia, Ori A Subject: [External] RE: Plato Lee Rd. Fast track application Ori, Yes, it is a new sewer line to serve the proposed Shell Building. Let me know if you have any other questions or need anything else. Thanks! " Mt Burwell, PE er or Pf ,,e, . Manager ;`i'• _" T Scott, bUrwellt`g me illassociates.com �,.� `; jmcgillassociates.cOrr11 From: Tuvia, Ori A <ori.tuvia@ncdenr.gov> Sent: Friday, March 20, 2020 9:18 AM To: Scott Burwell <Scott.Burwell@mcgillassociates.com> Subject: Plato Lee Rd. Fast track application Good morning Scott, The subject project application mentions in the cover letter that this will be an addition, I wanted to verify this project will be a new sewer line and not a modification to an existing one. Sincerely, Ori �. PLAN ' *d. 500 0 250 500 100� GRAPHIC SCALE DIVISION VALUE = 500 FEET 1315 e P� TO LEE RD S r yR M t� PROPOSED SHELL BUILDING #3 t (t°r i I/ILW.AM ig. I �EXISTIN SEWER LINE LA PROPOSED SEWER E TENSION; 132LF OF 8' DIP k 585 N '-^i- LITTLE BEAVER DAM CRE i DATE PLATO LEE RD SHEET I Fri Broad JANUARY 2020 SHELL BUILDING #3 me ��� 828.25.0575 PROJECT# CITY OF SHELBY EX-1 Asheville, NC28801 USGS QUADMAP 828252.0575 19.00153 NC Firm License Al C-0459 PROJECT MANAGER incgillassociales.coin S. BURWELL CLEVELAND COUNTY, NORTH CAROLINA