Loading...
HomeMy WebLinkAbout20200065 Ver 1_R-4707 Stream Impact Total Revision (WBS 36599_1_5)_20200323Carpenter, Kristi From: Norton, April R Sent: Saturday, March 21, 2020 10:33 AM To: Turchy, Michael A Cc: David.E.Bailey2@usace.army.mil; Carpenter,Kristi Subject: R-4707 Stream Impact Total Revision (WBS 36599.1.5) Follow Up Flag: Follow up Flag Status: Flagged Hi Michael. The stream impacts listed on R-4707 are correct, however, the totals did not include the Utility impacts. Please see the below table with the correct total impacts. The below changes do not impact mitigation requirements. Please let me know if you have any questions, or if you prefer a complete revision to the 401. Permanent Fill Temporary Fill Permanent Temporary Stream Impacts in Perennial in Perennial Fill in Fill in Bank Total Stream Requiring Site Stream Stream Intermittent Intermittent Stabilization Impact Mitigation (linear ft) (linear ft) Stream Stream (linear ft) (linear ft) (linear ft) (linear ft) (linear ft) 1 0 0 79 10 10 99 0 3A 314 5 0 0 73 392 314 3B 1040 15 0 0 19 1074 1040 3B 31 10 0 0 0 41 0 (Utilities) 3C 0 8 0 0 0 8 0 5 156 12 0 0 0 168 0 TOTAL 1541 50 79 10 102 1782 1354 Total Stream Impacts for Project: 1,782