HomeMy WebLinkAbout20200065 Ver 1_R-4707 Stream Impact Total Revision (WBS 36599_1_5)_20200323Carpenter, Kristi
From: Norton, April R
Sent: Saturday, March 21, 2020 10:33 AM
To: Turchy, Michael A
Cc: David.E.Bailey2@usace.army.mil; Carpenter,Kristi
Subject: R-4707 Stream Impact Total Revision (WBS 36599.1.5)
Follow Up Flag: Follow up
Flag Status: Flagged
Hi Michael. The stream impacts listed on R-4707 are correct, however, the totals did not include the Utility
impacts. Please see the below table with the correct total impacts. The below changes do not impact
mitigation requirements. Please let me know if you have any questions, or if you prefer a complete revision to
the 401.
Permanent Fill
Temporary Fill
Permanent
Temporary
Stream Impacts
in Perennial
in Perennial
Fill in
Fill in
Bank
Total Stream
Requiring
Site
Stream
Stream
Intermittent
Intermittent
Stabilization
Impact
Mitigation
(linear ft)
(linear ft)
Stream
Stream
(linear ft)
(linear ft)
(linear ft)
(linear ft)
(linear ft)
1
0
0
79
10
10
99
0
3A
314
5
0
0
73
392
314
3B
1040
15
0
0
19
1074
1040
3B
31
10
0
0
0
41
0
(Utilities)
3C
0
8
0
0
0
8
0
5
156
12
0
0
0
168
0
TOTAL
1541
50
79
10
102
1782
1354
Total Stream Impacts for Project: 1,782