Loading...
HomeMy WebLinkAboutSW3200201_Supplement-EZ Form_20200319SUPPLEMENT-EZ COVER PAGE FORMS LOADED PROJECT INFORMATION 1 I Project Name Dollar General - Newton (Store #21479) 2 Project Area (ac) 2.11 3 Coastal Wetland Area ac 0 4 Surface Water Area ac 0 5 Is this iproject High or Low Density? High 6 Does this project use an off -site SCM? No COMPLIANCE WITH 02H .1003(4) 7 Width of vegetated setbacks provided(feet) NIA 8 Will the vegetated setback remain vegetated? Yes 9 Is BUA other that as listed in .1 003(4) c-d out of the setback? Yes 10 Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMs: 11 Infiltration System 0 12 Bioretention Cell 0 13 Wet Pond 0 14 Stormwater Wetland _ 0 15 Permeable Pavement 0 16 Sand Filter 1 17 Rainwater Harvesting RWH 0 18 Green Roof 0 19 Level Spreader -Filter Strip (LS-FS) 0 20 Disconnected Impervious Surface (DIS) 0 21 ITreatment Swale 0 22 Dry Pond 0 23 StormFilter 0 24 Silva Cell 0 25 Sayfliter 0 26 Filterra 0 FORMS LOADED DESIGNER CERTIFICATION 27 Name and Title: Justin Church, PE 1 Principal Engineer 28 Organization: BREC. P.A. 29 Street address: 1520 Meadowview Drive 30 City, State, Zip: Wilkesboro, NC 28697 31 Phone number(s): 336.844-4088 32 1 Email: justin@brec.biz Certification Statement: I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the information provided in the form is, to the best of my knowled a and belief, true, accurate, and complete; and that the engineering plans, specifications, operation and maintenance agreementd other supporting information are consistent with the information provided here. \yy11411{f11y� �,•�,\H CAROB''%, =p SSsio SEAL _ 035736 _ GST/N C . CH Je •``• '''f!„ 1136*1 of 3 l4 �cao Date , DRAINAGE AREAS 1 Is this a high density project? Yes 2 If so, number of drainage areas/SCMs 1 3 Is all/part of this project subject to previous rule versions? No FORMS LOADED AREA INFORMATION Entire Site 1 4 T pe of SCM N/A Sand Filter 5 Total BUA in project (sq ft 29724 sf 29512 sf 6permitting) New BUA on subdivided lots (subject to s ft N/A N/A 7permitting) New BUA outside of subdivided lots (subject to sf 29724 sf 29512 sf 8 Offsite - total area (sq ft 57064 sf sf 9 Offsite BUA (sq ft 33347 sf sf 10 Breakdown of new BUA outside subdivided lots: Parking (sq ft 19474 sf 19262 sf Sidewalk (sq ft 1290 sf 1290 sf Roof (sq ft 8960 sf 8960 sf Roadway s ft sf sf Future (sq ft sf sf Other, please specify in the comment box below (sq ft sf sf 11 New infiltrating permeable pavement on subdivided lots (sq ft sf sf 12 New infiltrating permeable pavement outside of subdivided lots (sq ft sf sf 13 Exisitng BUA that will remain (not subject to ermitting) (sq ft sf sf 14 Existing BUA that is already permitted (sq ft sf sf 15 Existing BUA that will be removed (sq ft sf sf 16 Percent BUA 33% 68 0 17 IDesign storm inches N/A 1 in 18 IDesign volume of SCM cu ft N/A 1794 cf 19 lCalculation method for design volume N/A Schueler ADDITIONAL INFORMATION 20 Please use this space to provide any additional information about the drainage area(s): DRAINAGE AREA INFORMATION Entire Site 1 4 T pe of SCM N/A 5 Total BUA from project (sq ft) 6 1995 rules S L 2006-246 2008 rules 2017 rules 7 New BUA on subdivided lots (subject to permitting) (sq ft) 1995 rules S L 2006-246 2008 rules 2017 rules New BUA outside of subdivided lots (subject to permitting) (sf) 1995 rules S L 2006-246 2008 rules 8 2017 rules 9 Offsite - total area (sq ft) 1995 rules S L 2006-246 2008 rules 2017 rules 10 Offsite BUA (sq ft) 1995 rules S L 2006-246 2008 rules 2017 rules 11 IDesign storm (inches) 1995 rules SL 2006-246 2008 rules _ 2017 rules 11 Design storm (inches) 1995 rules SL 2006-246 2008 rules - 2017 rules 12 Breakdown of new BUA: - Parkin (sq ft - - Sidewalk (sq ft) - - Roof s ftL_ - Roadwa s ft - Future (sq ft - Other, please specify in the comment box below (sq ft 13 New Infiltrating permeable pavement on subdivided lots (sq ft - 14 New Infiltrating permeable pavement outside of 1 subdivided lots (so ft) 15 _ Exisltng BUA that will remain (not subject to permittin (sq it 16 Existin BUA that is ahead ermined s ft 17 ExistingBUA that will be removed (sq ft) 18 Percent BUA 19 _ Design volume of SCM cu ft 20 Calculation method for design volume ADDITIONAL INFORMATION 21 Please use this space to provide any additional information about the drainage area(s): SAND FILTER 23 Volume that can be retained In the sediment chamber cubic feet) 1049 cf 24 Will there be a permanent pool In the sediment chamber? :Yes 26 Bottom --of sedimen —chamber (fmsl) 1031.00. . 26 Area of the sediment chamber (square feet) 887 sf 27_ Physical depth of the sediment chamber (inches) 24.0 in 28 Pending depth in the sediment chamber, above any permanent pool (Inches) 12.0 in 29 Elevation of top of weir between chambers (fmsl) 1033 Sand Chamber 30 Volume that can be retained in the sand chamber (cubic feet) 1061 bf 31 Bottom of the sand chamber (fmsl) -1032. 00 32 Area of the sand chamber (square feet) 889 sf 33 Physical depth of the sand chamber (Inches) 12,0 in 34 Pending depth in the sand chamber, above any permanent pool (inches) 12.0 in 36 Elevation of the bypass device (fmsl) 1033 .. 36 _ Type of bypass device Weir 37 Mechanism for distributing flow over the sand surface stone dam - 38 _ an specification for sand chamber astm c33 39 Depth above underdrain pipe (inches) 18 in 40 Will the media be maintained to drain at least two Inches per hour at the sand surface? Yes 41 Is at least one clean -out pipe —provided at the low point of each underdrain line? - Yes q2 Will clean -out pipes be capped? Yes Sand Filter 4 8:44 AM 3/19/2020