Loading...
HomeMy WebLinkAboutNCC190283_MODIFICATION Supporting Documents_202003235f 11111111 19 Ik (I&! . k TTI ESTES DR 5 15 �5 x Q� Z 7� o� F R GPM�RCrou� p RriLErG1 f o Sy S01 FINLEY GOLF COURSE RD �ULBR�N RD E�Rp�AM 15 pRpJEMer IM VICINITY MAP - KEI\Ifi I 500 FINLEY GOLF COURSE RD CHAPEL HILL, NORTH CAROLINA 27514 CONSTRUCTION DRAWINGS SCO #19-20380-01 PROJECT NUMBER: EDF-19000 DATE: MARCH 20,2020 THE UNIVERSITY OF NORTH CAROLINA AT CHAPEL HILL FACILITIES PLANNING & DESIGN 103 AIRPORT DRIVE GILES F. HORNEY BLDG CHAPEL HILL., NORTH CAROLINA 27599 CONTACT: DAVID ROTMAN., AIA Know what's below. Cal I before you dig. 919-835-9988 CONTRACTOR SHALL CONTACT NC 811 AND UNC UTILITY LOCATE AT 919-962-8394 PRIOR TO ANY EXCAVATION ACTIVITIES CONTRACTOR SHALL NOTIFY "NC811" (811) OR (1-800-632-4949) AT LEAST 3 FULL BUSINESS DAYS PRIOR TO BEGINNING CONSTRUCTION OR EXCAVATION TO HAVE EXISTING UTILITIES LOCATED. CONTRACTOR SHALL CONTACT ANY LOCAL UTILITIES THAT PROVIDE THEIR OWN LOCATOR SERVICES INDEPENDENT OF "NC811". REPORT ANY DISCREPANCIES TO THE ENGINEER IMMEDIATELY. SHEET INDEX C1.00 EXISTING CONDITIONS C1.01 EXISTING CONDITIONS - GOLF POND C2.00 SITE PLAN C6.00 EROSION CONTROL & DEMOLITION PLAN C6.01 EROSION CONTROL NOTES C9.00A STORMWATER CONTROL MEASURE 'A' PLAN VIEW C9.01A STORMWATER CONTROL MEASURE'A' DETAILS C9.026 STORMWATER CONTROL MEASURE'B' PLAN VIEW C9.0313 STORMWATER CONTROL MEASURE 'B' DETAILS C9.0413 STORMWATER CONTROL MEASURE 'B' DETAILS C9.05 STORMWATER CONTROL MEASURE DETAILS GOLF POND 'J The John R. McAdams Company, Inc. 2905 Meridian Parkway Durham, NC 27713 phone 919. 361. 5000 fax 919. 361. 2269 license number: C-0293 www.mcadamsco.com CONTACT DARYL RIGGINS, PE riggins@mcadamsco.com PHONE: 919.361.5000 CLIENT THE UNIVERSITY OF NORTH CAROLINA FACILITIES PLANNING & DESIGN 103 AIRPORT DRIVE GILES F. HORNEY BUILDING CHAPEL HILL, NORTH CAROLINA 27599 PROJECT DIRECTORY ;I c. ._ 4, :CA REVISIONS No. DATE CONSTRUCTION DRAWINGS FOR: N.T.S. T11 FINAL- RELEASED FOR CONSTRUCTION UNC CHAPEL HILL- KENAN STADIUM OFFSITE STORMWATER TREATMENT CHAPEL HILL, NORTH CAROLINA 27514 PROJECT NUMBER: EDF-19000 EXISTING CLUBHOUSE Q EXISTING BOC \ I \ UNIVERSITY OF NORTH CAROLINA PIN:9798333326 I 270,27' I EXISTING BOC \ \ D ! 275.42' EXISTING BOC I r_- _--- 274 f f 273 272 1 EX 5T NG BOC �j\ 266.95' EXISTING BO / e �\ FEMA EFFECTIVE \ 1 1 '262 0.2%ACIF 1 FEMA EFFECTIVE 1 1 �\ 1% ACF 1 - / 265.56' EXISTING BOC - � 1 1 267 \� �s -- ----- 1 �.- 266 EXISTINCURB CUT -_ - ♦ ` \ F EXISTING BOC 1 ' 265.78' � EXISTING BOC _ � 265 EXISTING ASPHALT 13'-- PAVEMENT r EXISTING BOC ~ __ 26A.65'TING BOC EXISTING SIGN \ ._ TO BE REMOVED AND RESET) 1 \ \ \ \\ A\ 1 \ \ \\ E OIO EXIS \ \ \ (�Cm CM - EXISTING BOC - -- \ \ \Ilk 1 GENERAL NOTES: 1 1. EXISTING CONDITIONS INFORMATION FROM: I EXISTING CONDITIONS COMPLETED BY THE JOHN R. MCADAMS COMPANY / 2. TOPOGRAPHY AND SPOT ELEVATIONS SHOWN ARE FROM AN ACTUAL FIELD SURVEY COMPLETED BY THE JOHN R. MCADAMS (MCADAMS). MCADAMS DID NOT PHYSICALLY LOCATE ANYTHING OTHER THAN THE ' TOPOGRAPHIC INFORMATION (CONTOURSAND SPOT ELEVATIONS SHOWN). 3. ALL OTHER INFORMATION, INCLUDING, BUT NOT LIMITED TO, PLANIMETRICS, UTILITIES, INVERTS AND / BUILDING INFORMATION (SHOWN FOR REFERENCE) WAS COMPLIED FROM AUTOCAD FILES PROVIDED TO MCADAMS FROM OTHERS. MCADAMS MAKES NO WARRANTY ABOUT THE ACCURACY OF THE INFORMATION SHOWN PROVIDED BY OTHERS. ' 4. PRIOR TO CONSTRUCTION, THE SITE CONTRACTOR SHALL FIELD VERIFY ALL SUBSURFACE INFORMATION IN THE PROJECT AREA TO ENSURE ITS ACCURACY AND DETERMINE ITS ACTUAL FIELD LOCATION. / 5. BEARINGS FOR THESE EXISTING CONDITIONS ARE BASED ON NAD83(2011) UNC CHAPEL HILL CONTROL MONUMENTS. / 6. AREA BY COORDINATE GEOMETRY. 7. FLOOD NOTE: THIS PROPERTY IS NOT LOCATED IN A SPECIAL FLOOD HAZARD ZONE. IT IS LOCATED IN ZONE / "X" AS DEFINED BY F.E.M.A F.I.R.M COMMUNITY PANEL #3710979800L DATER JANUARY 19, 2019. 8. UTILITY STATEMENT: ' 8.1. THE UNDERGROUND UTILITIES SHOWN HAVE BEEN LOCATED FROM FIELD SURVEY INFORMATION AND EXISTING DRAWINGS. THE SURVEYOR MAKES NO GUARANTEE THATTHE UNDERGROUND UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN SERVICE OR ABANDONED. THE ' SURVEYOR FURTHER DOES NOT WARRANTTHAT THE UNDERGROUND UTILITIES SHOWN ARE IN THE EXACT LOCATION INDICATED ALTHOUGH HE DOES CERTIFY THAT THEY ARE LOCATED AS ACCURATELY AS POSSIBLE FROM INFORMATION AVAILABLE. THE SURVEYOR HAS NOT PHYSICALLY LOCATED THE I UNDERGROUND UTILITIES. 9. THE SURVEY PERFORMED AND MAP PREPARED WITHOUT BENEFIT EASEMENTS WHICH MAYBE DISCLOSED ' BY A FULL AND ACCURATE TITLE SEARCH. 10. SEWER CONNECTIVITY FROM OWASA WATER AND SEWERASBUILT DRAWINGS. 271.26' EXISTING BOC I / 1 \ \ 268.81' / I \� EXISTING BOC 1 \ V PROPERTY LINE J I I f j 1I �j III I � I jl -161 - I I ! 266.89' �S EXISTING BL C 266 -� /( -IT I I � I _ h 30' EXISTING OWASA I SANITARY SEWER OTHERS) CLEARANCE (PROVIDED BY 264 / I - / / 2 .53 ISTIN 'BOC I 263.64' �' I � l EXISTING 1 OC E� iST]ING DI WO B.E MOVE RIM=2 3. 0' 11 1 ~' ate, p 1 1 EXISTING-BOJC + E r/ I `, I I N ti 261.75' EXISTING METAL BUILDING r,� vd, , �! Y, 1 I EXISTING OVERHEAD UTILITY 11 1 1 0 ` \ J I I EXISTING DI RIM 263.13D <u 1 INV OUT=262.64' HO dQ Z� y f ! ( vc._.i '- 51? — I r ' E S G3"CPP ! o A�' ' I ASSUMED LOCATION OF EXISTING BLIND -� I JUNCTION BOX)(TO BE VERIFIED IN FIELD) I12! HO EXISTING USED OIL TANK I � � f7 I I � EXISTING DI INV-GUT=261.90' f av ! _�( n-�G3n�� �, J 5 k 1 8 I UNIVERSITY OF NORTH CAROLINA o� $ I I / I PIN:9798518134 y 5 \ 4j EXISTING DI RIM=2�44'` / \ ~ \ / 4"INV IN=26 54 1 \ ASSUMED IIjV IN=257.55' �� + ` ♦, INV OUT=�7.55' `• 1 I EXISTING METAL BUILDING EXISTING CONCRETE SIDEWALK TO BE REMOVED AND REPLACED _ EXISTING IRRIGATION - EXISTING IRRIGATION CONTROL VALVE (TYP.) CONTROL VALVE f UNIVERSITY OF NORTH CAROLINA PIN:9798333326 EXISTING LEGEND DRAINAGE MANHOLE Ca DROP INLET IRRIGATION CONTROL VALVE Q SEWER MANHOLE OO CLEANOUT — CONTOUR MAJOR CONTOUR MINOR - SANITARY SEWER EASEMENT ss SEWER LINE - so STORM LINE - c G— GAS LINE - - -- - uE UNDERGROUND ELECTRICAL LINE -- — UT UNDERGROUND TELEPHONE LINE UNK UNKNOWN UTILITY LINE OtP TREE PINE @E TREE ELM #CM TREE CREPE MYRTLE sZ Ho TREE HOLLY s�C TREE CEDAR @MG TREE MAGNOLIA GRAPHIC SCALE 0 10 20 40 1 inch = 20 ft. 'J McADAMS The John R. McAdams Company, Inc. 2905 Meridian Parkway Durham, NC 27713 phone 919. 361. 5000 fax 919. 361. 2269 license number: C-0293 www.mcadamsco.com CLIENT THE UNIVERSITY OF NORTH CAROLINA FACILITIES PLANNING & DESIGN 103 AIRPORT DRIVE GILES F. HORNEY BUILDING CHAPEL HILL, NORTH CAROLINA 27599 H r� LLZ 0 W (D Uj n N ocO0 Q oU� LL U t� OC z —' a0� zW�(DO Imm U �- z Q Q LU Z �J= J W ~-w ��z Q U U0 � U � o V V z D REVISIONS N0, DATE PLAN INFORMATION .Z#� 1 X� i ► I�� � T�I�IfI�', FILENAME EDF19000-XC1 CHECKED BY RAS DRAWN BY SCB SCALE 1"=20' DATE 03.20.2020 SHEET EXISTING CONDITIONS C1800 FINAL- RELEASED FOR CONSTRUCTION IN, 1 EXISTING LEGEND ® DRAINAGE MANHOLE YARD INLET \ I CONTOUR MAJOR L I - CONTOUR MINOR \o�� SD STORMLINE- SURVEYED \ t� SD STORM LINE - OBSERVED \ \ \ \ EXISTING STRUCTURE r (` \ \ _ 1 \ , !\ y EDGE OF PAVEMENT I r --�—\ \\ �♦ / �' / ! I 1 rill ,���� .��\� = '�� I \\ �\ C0U, 1 � \ 1 l \ \\\ EXISTING POND � � \ \ / i 1 � 1 �� \ \ — \ � � _ _ ✓ J \ �` ! � EXISTING `, 5 X 5 RISER RIM=262.91 ♦ � \ ✓ 1 ``\ \ \\\ \ / \ \ � \ 4' W X V H ORIFICE INV. = 261.36 \ \ ♦ ( \ ` \ \ \ \ \ \ \ 1 30" HPDE INV. OUT= 257.61` 10"PVC INV, IN = 257.41' 26 ILI� EXISTING 15" X 15" YI RIM =256.96 TOPOGRAPHIC SURVEY \ t' Ill / BOUNDARY 266 (y 1 l` /� l I 1 '�. I I I �� // 11 I I f 1] jl !� ]` 1 � � 1 1 \\ \1 \�_ \\�\\ // // /� \\\\ 1� !1 �a �\ ; �1\ ♦\_ / / ♦ — — — 1 1 1 I 1 1 i I / / 1 / APPROXIMATE LOCATION I - - - - - - - / \ � � OF 30 HDPE SPILLWAY PIPE — — — — — — — \--------------- 1 UNC FINLEY- ' � I GOLF COURSE EXISTING 30" HPDE FES ESTIMATED INV. =250,00' GENERAL NOTES: 1. EXISTING CONDITIONS INFORMATION FROM: EXISTING CONDITIONS COMPLETED BY THE JOHN R. MCADAMS COMPANY 2. TOPOGRAPHY AND SPOT ELEVATIONS SHOWN ARE FROM AN ACTUAL FIELD SURVEY COMPLETED BY THE JOHN R. MCADAMS (MCADAMS). MCADAMS DID NOT PHYSICALLY LOCATE ANYTHING OTHER THAN THE TOPOGRAPHIC INFORMATION (CONTOURS AND SPOT ELEVATIONS SHOWN), 3. CCDATA. DATA OUTSIDE OF TOPOGRAPHIC SURVEY BOUNDARY 15 GENERATED FROM ORANGE COUNTYIS 4. ALL OTHER INFORMATION, INCLUDING, BUT NOT LIMITED TO, PLANIMETRICS, UTILITIES, INVERTS AND BUILDING INFORMATION (SHOWN FOR REFERENCE) WAS COMPLIED FROM AUTOCAD FILES PROVIDED TO MCADAMS FROM OTHERS. MCADAMS MAKES NO WARRANTY ABOUT THE ACCURACY OF THE INFORMATION SHOWN PROVIDED BY OTHERS. S. PRIOR TO CONSTRUCTION, THE SITE CONTRACTOR SHALL FIELD VERIFY ALL SUBSURFACE INFORMATION IN 11 Ij l� ]4 11 / 1} fr 11 / 1 I / // l} I / - \ \ \ THE PROJECT AREA TO ENSURE ITS ACCURACY AND DETERMINE ITS ACTUAL FIELD LOCATION. 6. BEARINGS FOR THESE EXISTING CONDITIONS ARE BASED ON NAD83(2011) UNC CHAPEL HILL CONTROL MONUMENTS. 7, AREA BY COORDINATE GEOMETRY. 8. UTILITY STATEMENT: 8.1. THE UNDERGROUND UTILITIES SHOWN HAVE BEEN LOCATED FROM FIELD SURVEY INFORMATION AND EXISTING DRAWINGS. THE SURVEYOR MAKES NO GUARANTEE THAT THE UNDERGROUND UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN SERVICE OR ABANDONED. THE SURVEYOR FURTHER DOES NOT WARRANTTHAT THE UNDERGROUND UTILITIES SHOWN ARE IN THE \ 1 1 r \ } ( EXACT LOCATION INDICATED ALTHOUGH HE DOES CERTIFY THAT THEY ARE LOCATED AS ACCURATELY GRAPHIC SCALE / // \ I I 1 r / / Y / / / I \ AS POSSIBLE FROM INFORMATION AVAILABLE. THE SURVEYOR HAS NOT PHYSICALLY LOCATED THE G ' \ 0 25 50 100 UNDERGROUND UTILITIES. \ / 1 f J I I / 1 % ` ' - 9. THE SURVEY PERFORMED AND MAP PREPARED WITHOUT BENEFIT EASEMENTS WHICH MAYBE DISCLOSED 1 inch = 50 ft. BY A FULL AND ACCURATE TITLE SEARCH. 'J McADAMS The John R. McAdams Company, Inc, 2905 Meridian Parkway Durham, NC 27713 phone 919. 361. 5000 fax 919, 361, 2269 license number: C-0293 www.mcadamsco.com CLIENT THE UNIVERSITY OF NORTH CAROLINA FACILITIES PLANNING & DESIGN 103 AIRPORT DRIVE GILES F. HORNEY BUILDING CHAPEL HILL, NORTH CAROLINA 27599 W i LLM F LLMz Q uj Un G z LU � cn Lf) DN a Q Uj D z OJ Q p U z LL J = 00� ZW��O U }. z aQ�LU 2 �J= W w ��Q_ �G z Q � ao U U 0 =o U z M 'CA S�v; REVISIONS NO. DATE PLAN INFORMATION PROJECT NO, EDF-19000 FILENAME EDF19000-POND CHECKED BY RAS DRAWN BY SCB SCALE 1"=150' DATE 03.20.2020 SHEET EXISTING CONDITIONS GOLF POND is 1 FINAL - RELEASED FOR CONSTRUCTION �\ FEMA EFFECTIVE ` 0.2%ACF 11 FEMA EFFECTIVE 1 �\ 1% ACF EXISTING CLUBHOUSE A m \ �r o r� 1 G 1 ` � 1 \ I �r I i \' I I I t \ \ \ UNIVERSITY OF NORTH CAROLINA PIN:9798333326 / f 274 — j 273 272 1 `\ 271 �- =9 \. 267 / I I 1 ' �~ ----- —7------------ UNIVERSITY OF NORTH CAROLINA PIN:9798333326 l \ \ / ! 1 270 f r— 1 , / 1I1 I 26 1 I li - 1 SS LEGEND - l 1 1 -- I I? PROPOSED LOCATION — 1 ! , PROPOSED LOCATION OF FILTERRA BIOSCAPE UNITS OF SCM'A' � 1 NEW CURB T�� BE IN ALLED / , I TF FILT RRA (SEE SHEET 9.01A FOR DETAIL) INSTA' l 1 INLLATIOITI01� _-� 26j PROPOSED LOCATION ! [ ! I 1 EXISTING LEGEND ti OF SCM'B' 1 30' EXISTING OWASA E 0 ~ ~ �� - (SEE SWEET 9.03B FOR DETAIL) SANITARY SEWER (ID DRAINAGE MANHOLE HO C „� ^ ti �~ r �l / I CLEARANCE (PROVIDED BY `/ 264 I — — r / OTHERS) 0 DROP INLET CM S CM -- ---— �— - 1 �"`� � � IRRIGATION CONTROL VALVE N E WN tJURB 5Q SEWER MANHOLE AND TIE TO EXISTIN GE'4 P VWERT. CO CLEANOUT \ I SEE�I�EET�C§.03¢j 1 alas 1� , 04- t EXISTING METAL BUILDING 1 1 t 1 11 1\ \ I EXISTING SHED EXISTING SIDEWALK TO BE �1 REMOVED AND REPLACED (SEE SHEET9.03B FOR DETAIL) I I 1 EXISTING METAL BUILDING 40 LF 8" 5DR 35 PVC @ 0.93% 1 A \1 IRRIGATION CONTROL VALVES I 'v I / TO BE PROTECTED DURING S° / I v T HE INSTALLATION PROCESS ! / t I l t 1 1 1 If ! I r TI/ ! I � I ` � 1 HO J B-101 I I 1 I \ \ 1 i4)P ;r RIM= 2fi3175' IL !I 3" CPP INV IN, - NKNOWN 8" PVC I V I 259.50' ASSUMED LOCAION OF EXISTING , o� 8" PVC I V/1� = 259.40' BLIND JUNCTION BOX (CONTRACTOR IO'lfERIFY I.N.F IELD) art ��� / UNDERGROUND UTILITIES TO sty BE LOCATED AND PROTECTED ) -- _j ` L EXISTING USED y� DURING THE INSTALLATION 57 LF 8 OIL TANK I Q / SDR 35 PVC @ 2.61% PROCESS � � ' � RELOCATE AND RESET GUY �� 263 f~� 441 WIRE DURING CONSTRUCTION O / EXISTING DI UNIVERSITY OF NORTH CAROLINA RIM=262.44' PIN;9798518134 4 INV IN=260.54' --'� - ASSUMED 8" PVC,INV IN=257.654--�� ' � � Q INV OUT=255Q � l 1 \ \ 1 _zsy It `` _ 266 15LF6"SDR35PVC @1.00% \ \ A\ 1 \\\\\ n CONTOUR MAJOR — — — — — — CONTOUR MINOR — SANITARY SEWER EASEMENT ss SEWER LINE ,B STORM LINE —c G— GAS LINE UE UNDERGROUND ELECTRICAL LINE - --- uT UNDERGROUND TELEPHONE LINE UNK-- -- UNKNOWN UTILITY LINE 541P TREE PINE Zt TREE ELM 5�CM TREE CREPE MYRTLE #)Ho TREE HOLLY #C TREE CEDAR #MG TREE MAGNOLIA 0 GRAPHIC SCALE 0 10 20 40 1 inch = 20 ft. McADAMS The Jahn R. McAdams Company, Inc. 2905 Meridian Parkway Durham, NC 27713 phone 919. 361. 5000 fax 919. 361. 2269 license number: C-0293 www.mcadamsco.com CLIENT THE UNIVERSITY OF NORTH CAROLINA FACILITIES PLANNING & DESIGN 103 AIRPORT DRIVE GILES F. HORNEY BUILDING CHAPEL HILL, NORTH CAROLINA 27599 W H LL LrL. Z Q Liu o V 1 L U I` N < �WQD—j z oC �00 U � FM z u_ 0C) ZLu �— (D 0 H Utz aQ�w 2 IocJ= W OoV �0 U Ln V F- z D C6l 049073 yr,,�*Z'CCA�� 1 ►``��`. REVISIONS NO. DATE PLAN INFORMATION PROJECT NO. EDF-19000 FILENAME EDF19000-S1 CHECKED BY RAS DRAWN BY SCB SCALE 1"=20' DATE 03.20,2020 SHEET SITE PLAN C Soo FINAL - RELEASED FOR CONSTRUCTION c L c i i DEMOLITION LEGEND CONSTRUCTION SEQUENCE: 1. CONTACT UNC EHS AT (919) 883-7163 OR (919) 962-5507 TO SCHEDULE AND HOLD A PRE -CONSTRUCTION MEETING BEFORE INSTALLATION OF E&SC MEASURES AND AGAIN ONCE E&SC MEASURES ARE IN PLACE. THIS MEETING SHOULD BE HELD A MINIMUM OF ONE WEEK PRIOR TO BEGINNING ANY LAND -DISTURBANCE ACTIVITIES. THIS CONFERENCE SHOULD BE ATTENDED BY UNC EHS, A REPRESENTATIVE OF THE STORM DRAINAGE STRUCTURES FINANCIALLY RESPONSIBLE PARTY AND/OR THE GENERAL CONTRACTOR, GRADING SUB -CONTRACTOR, EROSION CONTROL SUB -CONTRACTOR, AND THE NC DIVISION OF ENVIRONMENTAL QUALITY (RALEIGH OFFICE TO BE REMOVED _ 919-791-4200). NOTE: INSTALL A RURAL TYPE MAILBOX ON THE SITE TO HOLD A COPY OF THE APPROVED EROSION CONTROL PLAN AND TO PROVIDE A PLACE FOR INSPECTORS TO LEAVE INSPECTION REPORT, COMPLIANCE NOTICES, ETC. REMOVED STORM DRAINAGE TO BE ` 2. INSTALL TREE PROTECTION FENCING AS SHOWN ON THESE PLANS. ` 3. INSTALL TEMPORARY CONSTRUCTION ENTRANCE, INLET PROTECTION, AND REMAINING PERIMETER EROSION CONTROL MEASURE AS SHOWN ON THESE PLANS. _ ¢ CURB TO BE REMOVED - 4. PROVIDE ALL DISTURBED AREAS WITH GROUND COVER WITHIN 14 CALENDAR DAYS AFTER COMPLETION OF ANY PHASE OF CLEARING, GRUBBING OR OR GRADING. THE SEEDING, SEEDBED PREPARATION, MULCH AND/OR ROLLED EROSION CONTROL PRODUCT INSTALLATION MUST BE IN ACCORDANCE WITH THE SEEDING SCHEDULE PROVIDED IN THIS S&E PLAN. NOTE: SLOPES IN EXCESS OF 3H:1V SHALL BE STABILIZED WITHIN 7 DAYS AND FOR MODERATE SLOPES (SLOPES LESS THAN 3HAV) SHALL BE STABILIZED WITHIN 10 DAYS. )KE TREES TO BE REMOVED -_ 5. AT THE CONCLUSION OF BUILDING OR IF LAND -DISTURBING ACTIVITY IS STOPPED FOR MORE THAN 14 CONSECUTIVE CALENDAR DAYS, PERMANENT VEGETATIVE COVER SHALL BE INSTALLED. EROSION CONTROL LEGEND W SFSF - SF T—TP—TP —iD LD— SILT FENCE OUTLET INLET PROTECTION INLET PROTECTION FOR EXISTING STRUCTURES SILT FENCE TREE PROTECTION FENCE LIMITS OF DISTURBANCE I 6. ONCE ENTIRE SITE IS STABILIZED, REQUEST FINAL APPROVAL FROM EROSION CONTROL OFFICER AND CONTACT NCDEQ DEMLR AT (919) 791-4200 FOR FINAL INSPECTION. cn ~� LIMITS OF 1 1 m �� cn _ DISTURBANCE 1 m � (n EROSION CONTROL NOTES: 1 1 I } 1 1. EROSION AND SEDIMENTATION CONTROL DEVICES MUST BE INSTALLED PRIOR TO 1 THE START OF CLEARING, DEMOLITION, GRADING, AND/OR CONSTRUCTION. 1 1 \ 1 PARKING, STAGING, AND STORAE AREA 2• ANY LAND CLEARING, CONSTRUCTION, OR DEVELOPMENT INVOLVING THE MOVEMENT OF EARTH SHALL BE IN ACCORDANCE WITH THE APPROVED E&SC PLAN " AND THE SUPERINTENDENT IN -CHARGE OR CONTRACTOR SHALL BE ON SITE ON ALL 1 \ 1 DAYS WHEN CONSTRUCTION OR GRADING ACTIVITY TAKES PLACE. 1 \ 3. CONCRETE WASHOUT SHALL BE A MINIMUM OF 50 FEET FROM ANY STREAM. - LIMITS OF SILT FENCE OUTLET AT ALL LOW POINTS 6 1 � � ~I� � � ~ DISTURBANCE, ` (TYP.) 1 1 y �� I (TYP.) � `� LD • 1 1 �_ s i y l I EXISTING 14" ELM (TO BE PROTECTED 9 \ P", \ 1 `� DURING DEMOLITION/CONSTRUCTION ��1 1 ACTIVITIES) Pj _TP \ 1 EXISTING ASPHALT 11 PAVEMENT \ 1 \\ 11 y w��r r"• I I O 1 AL .`F: C REMOVE STORE S LD^ SF 5 \ %0 f / 1 ` Y- AND RESET SIGN r.D Lb 1 w STAGING, A�D STORAGE, EXISTING LEGEND QD DRAINAGE MANHOLE E) DROP INLET IRRIGATION CONTROL VALVE S SEWER MANHOLE eU CLEANOUT — CONTOUR MAJOR -- - CONTOUR MINOR - SANITARY SEWER EASEMENT SEWER LINE STORM LINE —c-- GAS LINE ue UNDERGROUND ELECTRICAL LINE UNDERGROUND TELEPHONE LINE uNK UNKNOWN UTILITY LINE (@P TREE PINE @E TREE ELM @CM TREE CREPE MYRTLE MO TREE HOLLY 5�G TREE CEDAR (@MG TREE MAGNOLIA ! I �Lo 1 1 "T EN �rl �r l Fi -- ---. -- - -- — - r - - - I ,Ds� SF \ 1 1 _ — s C M C M — _ — — — — — — — — — — \ 1 y Ao s� F ! j -=� a_y _ •' . — EXISTING DI 1 \ TO BE REMOVED) T E PROTECTION c -- i RIM=263.40 ! 30' EXISTING OWASA / 1 FCE (TYp,) _ �INV OUT=261.75' SANITARY SEWER ! \ 1 \ SILT FENCE -�� _ � L � --` � � 1 11 1 \ \ (TYP.) I L _C p ,1 ~—�/ �L� CLEARANCE (PROVIDED BY 4 / 1 I IVI OTHERS) y EXISTING SIDEWALK TO BE '� 1 REMOVED AND REPLACED \ I 1 11 \ \ \ (SEE SHEET 9.03B FOR DETAIL) -9 EXISTING CONCRETE I 1 \ SIDEWALK ± I I I I 1 1 \ \ I / f EXISTING SHED �► � G 1� j EXISTING METAL i \ ! f \BUILDING II I� \ \ I I \ TEM ORAJINLET 5 ! PROECT10,1►1 (TYP 1 \ ! 1,� \c� H C I I 0\ I� jj LVICTI NI!_ 1UDIF_'ATIf1hl i g cn exlsrr 1 E!' i"fi 1 1 ASSUMED LOG JUNCTION BOX 1 l \ 1 , / 1 1 \ \ \ I �r \ I �\( EXISTING USED EXISTING 12 MOLLY (TO BE PROT OIL TANK ` I DURING DEMOLITION/CONSTRUC Know wnafs below. Cal I before you dig. TOTAL DISTURBED AREA = 0.21 AC. CONTRACTOR SHALL NOTIFY "NC81 I" (811) OR (1-800-632-4949) AND UNC UTILITY LOCATION SERVICES AT (1-919-962-8394) AT LEAST 3 FULL BUSINESS DAYS PRIOR TO BEGINNING CONSTRUCTION OR EXCAVATION TO HAVE EXISTING UTILITIES LOCATED. CONTRACTOR SHALL CONTACT ANY LOCAL UTILITIES THAT PROVIDE THEIR OWN LOCATOR SERVICES INDEPENDENT OF "NC81111. REPORT ANY DISCREPANCIES TO THE ENGINEER IMMEDIATELY. MEN ACTIVITIES) _ TREE F FENCE VIED LO Tf N OF EXISTING E (TO BE VERIFICD IN FIELD) - / EXISTING DI RIM=262.44' I /T b? 4" INV IN=260.54' ASSUMED INV IN=257.55' INV 00=257.5.5' 9D \ 07` / Q7 -- SILT FEN6 OUTLET - ° AT ALL LbW POINTS \ (TYP.) = / VO 3" CPP s/ -- so fn SD SD \I ! EXISTING/DI I FI / RIM=263113' m` SF -y INV 0UT=262.04'PUfL1 I I \ ET / I N POINTS ,141 P 1 EXISTING DI' J ' RIM=262.90' rr SILT FENCE f (TYP.) 0 GRAPHIC SCALE 0 5 10 20 1 inch = 10 ft. 'J McADAMS The John R. McAdams Company, Inc. 2905 Meridian Parkway Durham, NC 27713 phone 919. 361. 5000 fax 919. 361. 2269 license number: C-0293 www.mcadamsco.com CLIENT THE UNIVERSITY OF NORTH CAROLINA FACILITIES PLANNING & DESIGN 103 AIRPORT DRIVE GILES F. HORNEY BUILDING CHAPEL HILL, NORTH CAROLINA 27599 W u Z QW o V V �ZLU Ln U.)� .I... � a Q W Q D z 0 J 0 a oU LL V J = 00E- Z0 z a � LU J W ~—W �LLa. 5C z Q ao= o� U Ln 0 V � U z M CA S� 11I11110" REVISIONS NO. DATE PLAN INFORMATION PROJECT NO. EDF-19000 FILENAME EDF19000-EC1 CHECKED BY RAS DRAWN BY SCB SCALE 1""=10" DATE 03.20.2020 SHEET EROSION CONTROL AND DEMOLITION PLAN FINAL - RELEASED FOR CONSTRUCTION I MONITORING NOTES 1, CONTRACTOR SHALL FOLLOW ALL INSPECTION AND MONITORING REQUIREMENTS OF THE APPROVED EROSION AND SEDIMENT CONTROL PERMIT. 2, CONTRACTOR SHALL FOLLOW ALL INSPECTION REQUIREMENTS AS SHOWN ON SHEET D-2. EROSION CONTROL NOTES 1. CONTACT UNC EHS AT (919) 883-7163 OR (919) 962-5507 TO SCHEDULE AND HOLD A PRE -CONSTRUCTION MEETING BEFORE INSTALLATION OF ESC MEASURES AND AGAIN ONCE ESC MEASURES IN PLACE. 2. CONTRACTOR SHALL FOLLOW THE UNC SPILL PREVENTION CONTROL AND COUTERMEASURE (SPCC) PLAN CONSTRUCTION SITE GUIDELINES. 3. SOIL TRACKED ONTO ROAD SHALL BE REMOVED USING A DRY REMOVAL METHOD ONLY. NO SOIL IS ALLOWED TO BE WASHED INTO STORM DRAIN. 4. CONTRACTOR SHALL LOCATE AND VERIFY THE LOCATION AND DEPTH OF ALL EXISTING UTILITIES PRIOR TO BEGINNING CONSTRUCTION AND NOTIFY THE ENGINEER OF ANY DISCREPANCIES/ CONFLICTS. S. THE CONTRACTOR SHALL NOTIFY "NORTH CAROLINA ONE CALL" (811 OR 1-800-632-4949) AT LEAST 72 HOURS BEFORE BEGINNING ANY EXCAVATION OR UTILITY WORK TO HAVE EXISTING UTILITIES LOCATED IN ADDITION TO STIPULATIONS OUTLINED IN DEMOLITION NOTE 42. 6, EROSION CONTROL DURING SITE CONSTRUCTION WILL BE ACCOMPLISHED BY USE OF SILT FENCING AND SILT FENCE OUTLETS. DEVICES MUST BE EMPTIED WHEN SEDIMENT ACCUMULATION HAS REACHED 6" DEPTH. 7. CONTRACTOR TO VERIFY SILT FENCE OUTLET PLACEMENT AT LOW POINTS AS THEY EXIST OR DEVELOP. ADDITIONAL SILT FENCE OUTLETS MAY BE REQUIRED TO PREVENT EROSION DURING AND AFTER CONSTRUCTION AND LAND DISTURBANCE ACTIVITIES. IF ADDITIONAL SILT FENCE OUTLETS ARE NECESSARY, CONTRACTOR TO ADD ADDITIONAL SILT FENCE OUTLETS PER ENGINEER, NCDENR EROSION CONTROL INSPECTOR, OR OWNER DIRECTION. 8. ALL EROSION CONTROL MEASURES ARE DESIGNED PER CRITERIA ESTABLISHED BY THE NC EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL. 9. CONSTRUCTION SEQUENCING 15 CRITICAL TO THE SUCCESS OF EFFECTIVE EROSION CONTROL FOR THIS PROJECT. REFER TO THE CONSTRUCTION SEQUENCE FOR PHASING OF THE CONSTRUCTION AND INSTALLATION OF EROSION CONTROL DEVICES, 10. CONTRACTOR SHALL REFER TO SHEETS C-13 & C-14 FOR EROSION CONTROL DETAILS INCLUDING TREE PROTECTION FENCING, SILT FENCING, SEEDBED PREPARATION AND TEMPORARY SEEDING SCHEDULE ETC. 11. IF THE CONTRACTOR CHOOSESTO ADD POLYACRYLAMIDE (PAM) TO AID IN THE SETTLING OF SUSPENDED SOLIDS FROM STORMWATER DISCHARGE, THEYSHALL FOLLOW THE GUIDELINES BELOW: A. PAMs MUST NOT BE APPLIED DIRECTLY TO SURFACE WATERS OF THE STATE. B. THE APPROPRIATE PAM SHALL BE CHOSEN FOR THE SOIL TYPE AT THE SITE. C. USE ONLY PAMs THAT PASS THE CHRONIC TOXICITY TESTING REQUIREMENTS, ESTABLISHED BY THE NCDEQ DIVISION OF WATER QUALITY. D. BEFORE SPECIFYING USE OF POWDER OR LIQUID APPLICATION OF PAMs TO A SETTLING BASIN OR RUN-OFF CONVEYANCE, SUBMIT THE PARTICULAR PRODUCT'S LABEL, APPLICATION INSTRUCTIONS, AND MSDS TO THE NCDEQ DIVISION OF WATER QUALITY AQUATIC TOXICOLOGY UNIT FOR EVALUATION AND DETERMINATION OF THE PRODUCT'S SAFE APPLICATION RATE. E. DOSING SYSTEMS USING PUMPS SHOULD BE CHECKED DAILY. F, FLOC LOGS SHOULD BE CHECKED AT LEAST WEEKLY OR AFTER A RAINFALL Ol"A INCH OR GREATER TO MAKE SURE THE LOGS REMAIN IN PLACE, ARE MOIST, AND ARE NOT COVERED IN SEDIMENT. CONTRACTOR'S INSPECTION REQUIREMENTS OF EROSION CONTROL MEASURES: 3) SELF INSPECTION AND REPORTING REQUIREMENTS MINIMUM SELF -INSPECTION AND REPORTING REQUIREMENTS ARE AS FOLLOWS UNLESS OTHERWISE APPROVED IN WRITING BYTHE DIVISION OF WATER QUALITY, A) A RAIN GAUGE SHALL BE MAINTAINED IN GOOD WORKING ORDER ON THE SITE UNLESS ANOTHER RAIN -MONITORING DEVICE HAS BEEN APPROVED BY THE DIVISION OF WATER QUALITY. B) A WRITTEN RECORD OF THE DAILY RAINFALL AMOUNTS SHALL BE RETAINED AND ALL RECORDS SHALL BE MADE AVAILABLE TO DIVISION OF WATER QUALITY OR AUTHORIZED AGENT UPON REQUEST. IF NO DAILY RAIN GAUGE OBSERVATIONS ARE MADE DURING WEEKEND OR HOLIDAY PERIODS, AND NO INDIVIDUAL -DAY RAINFALL INFORMATION 15 AVAILABLE, THE CUMULATIVE RAIN MEASUREMENT FOR THOSE UN -ATTENDED DAYS WILL DETERMINE IF A SITE INSPECTION IS NEEDED. ( NOTE: IF NO RAINFALL OCCURRED THE PERMITTEE MUST RECORD "ZERO" I C) EROSION AND SEDIMENTATION CONTROL MEASURES SHALL BE INSPECTED TO ENSURE THAT THEY ARE OPERATING CORRECTLY. INSPECTION RECORDS MUST BE MAINTAINED FOR EACH iNSPECTION EVENT AND FOR EACH MEASURE. AT A MINIMUM, INSPECTION OF MEASURES MUST OCCUR AT THE FREQUENCY INDICATED BELOW: I) ALL EROSION AND SEDIMENTATION CONTROL MEASURES MUST BE INSPECTED BY OR UNDER THE DIRECTION OF THE PERMITTEE AT LEAST ONCE EVERY SEVEN CALENDAR DAYS, AND ii) ALL EROSION AND SEDIMENT CONTROL MEASURES MUST BE INSPECTED BY OR UNDER THE DIRECTION OF THE PERMITTEE WITHIN 24 HOURS AFTER ANY STORM EVENT OR GREATER THAN 0.50 INCHES OF RAIN PER 24 HOUR PERIOD. D) ONCE LAND DISTURBANCE HAS BEGUN ON THE SITE, STORMWATER RUNOFF DISCHARGE OUTFALLS SHALL BE INSPECTED BY OBSERVATION FOR EROSION, SEDIMENTATION AND OTHER STORMWATER DISCHARGE CHARACTERISTICS SUCH AS CLARITY, FLOATING SOLIDS AND OIL SHEENS. INSPECTIONS OF THE OUTFALLS SHALL BE MADE AT LEAST ONCE EVERY SEVEN CALENDAR DAYS AND WITHIN 24 HOURS AFTER ANY STORM EVENT OF GREATER THAN 0.50 INCHES OF RAIN PER 24 HOUR PERIOD. E) INSPECTIONS ARE ONLY REQUIRED TO BE MADE DURING NORMAL BUSINESS HOURS. WHEN ADVERSE WEATHER CONDITIONS WOULD CAUSE THE Y SAFETY OF THE INSPECTION PERSON NEL TO BE IN JEOPARDY THE INSPECTION CAN BE DELAYED UNTIL THIS DEEMED SAFE TO PERFORM THESE DUTIES. (TIMES WHEN INSPECTION WERE DELAYED BECAUSE OF SAFETY ISSUES SHOULD BE NOTED IN THE INSPECTION RECORD). IF THE INSPECTION CANNOT BE DONE ON THAT DAY, IT MUST BE COMPLETED ON THE FOLLOWING BUSINESS DAY, F) TWENTY-FOUR HOUSE REPORTING FOR VISIBLE SEDIMENT DEPOSITION 1) THE PERMITTEE SHALL REPORT TO THE DIVISION OF WATER QUALITY CENTRAL OFFICE OR THE APPROPRIATE REGIONAL OFFICE ANY VISIBLE SEDIMENT BEING DEPOSITED IN ANY STREAM OR WETLAND OR ANY NONCOMPLIANCE WHICH MAY ENDANGER HEALTH OR THE ENVIRONMENT. (SEE SECTION VIII OF THIS PERMIT FOR CONTRACT INFORMATION.) ANY INFORMATION SHALL BE PROVIDED ORALLY OR ELECTRONICALLY WITHIN 24 HOURS FROM THETIME THE PERMITTEE BECAME AWARE OF THE CIRCUMSTANCES. €i) A WRITTEN SUBMISSION SHALL BE PROVIDED TO THE APPROPRIATE REGIONAL OFFICE OF THE DIVISION OF WATER QUALITY WITHIN 5 DAYS OF THE TIME THE PERMITTEE BECOMES AWARE OF THE CIRCUMSTANCES. THE WRITTEN SUBMISSION SHALL CONTAIN A DESCRIPTION OF THE SEDIMENT DEPOSITION AND ACTIONS TAKEN TO ADDRESS THE CAUSE OF THE DEPOSITION. THE DIVISION OF WATER QUALITY STAFF MAY WAIVE THE REQUIREMENT FOR A WRITTEN REPORT ON A CASE -BY -CASE BASIS, G) RECORDS OF INSPECTIONS MADE DURING THE PREVIOUS 30 DAYS SHALL REMAIN ON THE SITE AND AVAILABLE FOR AGENCY INSPECTORS AT ALL TIMES DURING NORMAL WORKING HOURS, UNLESS THE DIVISION OF WATER QUALITY PROVIDES A SITE -SPECIFIC EXEMPTION BASED ON UNIQUE SITE CONDITIONS THAT MAKE THIS REQUIREMENT NOT PRACTICAL. OLDER RECORDS MUST BE MAINTAINED FOR A PERIOD OF THREE YEARS AFTER PROJECT COMPLETION AND MADE AVAILABLE UPON REQUEST. THE RECORDS MUST PROVIDE THE DETAILS OF EACH INSPECTION INCLUDING OBSERVATIONS, AND ACTIONS TAKEN iN ACCORDANCE WITH THIS PERMIT. THE PERMITTEE SHALL RECORD THE REQUIRED RAINFALL AND MONITORING OBSERVATIONS ON THE INSPECTION RECORD FORM PROVIDED BY THE DIVISION OR A SIMILAR INSPECTION FORM THAT IS INCLUSIVE OF ALL OF THE ELEMENTS CONTAINED IN THE DIVISION'S FORM. USE OF ELECTRONICALLY -AVAILABLE RECORDS, IN LIEU Of THE REQUIRED PAPER COPIES FOR INSPECTION WILL BE ALLOWED IF SHOWN TO PROVIDE EQUAL ACCESS AND UTSILITY AS THE HARD -COPY RECORDS. MINIMUM, E H) INSPECTION RECORDS MUST INCLUDE, AT A M MUM THE FOLLOWING: I) CONTROL MEASURE INSPECTIONS: INSPECTION RECORDS MUST INCLUDE AT A MINIMUM: 1) IDENTIFICATION OF THE MEASURES INSPECTED, 2) DATE AND TIME OF THE INSPECTION, 3) NAME OF THE PERSON PERFORMING THE INSPECTION, 41 INDICATION OF WHETHER THE MEASURES WERE OPERATING PROPERLY, 5) DESCRIPTION OF MAINTENANCE NEEDS FOR THE MEASURE, 6) CORRECTIVE ACTIONS TAKEN (7) DATE OF ACTIONS TAKEN, AS WELL ASTHE DATE AND AMOUNTS OF RAINFALL RECEIVED. ii) STORMWATER DISCHARGE INSPECTIONS: INSPECTION RECORDS MUST INCLUDE AT A MINIMUM: 1) IDENTIFICATION OF THE DISCHARGE OUTFALL INSPECTED, 2) DATE AND TIME OF THE INSPECTION, 3) NAME OF THE PERSON PERFORMING THE INSPECTION, 4) EVIDENCE OF INDICATORS OF STORMWATER POLLUTION SUCH AS OIL SHEEN, FLOATING OR SUSPENDED SOLIDS OR DISCOLORATION, 5) INDICATION OF VISIBLE SEDIMENT LEAVING THE SITE 6) ACTIONS TAKEN TO CORRECT/PREVENT SEDIMENTATION AND 7) DATE OF ACTIONS TAKEN, iii) VISIBLE SEDIMENTATION FOUND OUTSIDE THE SITE LIMITS: INSPECTION RECORDS MUST INCLUDE: 1) AN EXPLANATION AS TO THE ACTIONS TAKEN TO CONTROL FUTURE RELEASES, 2) ACTIONS TAKEN TO CLEAN UP OR STABILIZE THE SEDIMENT THAT HAS LEFT THE SITE LIMITS AND 3) THE DATE OF ACTIONS TAKEN. iv) VISIBLE SEDIMENTATION FOUND W STREAMS OR WETLANDS: ALL INSPECTION SHOULD INCLUDE EVALUATION OF STREAMS OR WETLANDS ONSITE OR OFFSITF (WHERE ACCESSIBLE) TO DETERMINE IF VISIBLE SEDIMENTATION HAS OCCURRED. 1) VISIBLE STREAM TURBIDITY - IF THE DISCHARGE FORM A SITE RESULTS IN AN INCREASE IN VISIBLE STREAM TURBIDITY, INSPECTION RECORDS MUST RECORD THAT EVIDENCE AND ACTIONS TAKEN TO REDUCE SEDIMENT CONTRIBUTION. SITES DISCHARGING TO STREAMS NAMED ON THE STATE-S 303(D) LIST AS IMPAIRED FOR SEDIMENT -RELATED CAUSES MAY BE REQUIRED TO PERFORM ADDITIONAL MONITORING, INSPECTIONS OR APPLICATION OF MORE -STRINGENT MANAGEMENT PRACTICES IF IT IS DETERMINED THAT THE ADDITIONAL REQUIREMENTS ARE NEEDED TO ASSURE COMPLIANCE WITH THE FEDERAL OR STATE IMPAIRED -WATERS CONDITIONS. IF A DISCHARGE COVERED BY THIS PERMIT ENTERS A STREAM SEGMENT THAT IS LISTED ON THE IMPAIRED STREAM LIST FOR SEDIMENT -RELATED CAUSES, AND A TOTAL MAXIMUM DAILY LOAD (TMDL) HAS BEEN PREPARED FOR THOSE POLLUTANTS, THE PERMITTEE MUST IMPLEMENT MEASURES TO ENSURE THAT THE DISCHARGE OF POLLUTANTS FROM THE SITE IS CON51STENT WITH THE ASSUMPTIONS AND MEETS THE REQUIREMENTS OF THE APPROVED TMDL. THE DIVISION OF WATER QUALITY 303(D) LIST CAN BE FOUND AT: HTTP://H20.ENR.STATE,NC. US/TMDL/GENERAL_303D.HTM/ DEMLR Monitoring Form Rev.080120t3 Page I of 2 INSPECTION AND MONITORING RECORDS FOR ACTIVITIES UNDER STORMWATER GENERAL PERMIT NC6010000 AND SELF -INSPECTION RECORDS FOR LAND DISTURBING ACTIVITIES PER G.S. 113A-54.1 Project Name Land quality or Local Program Pmjet M Financially Responsible County PartFRP I Permittes INSPECTOR ame mp Dyer Inspector Type (Mark) x FRPJParmlttee r11one Numlier mat 66 AgentfDrsignse DADT I A- o..t..i..a nests PART t Rr Currant Phasa of Prnlect Day I Deta Rain Am! (inches) Dally Rainfall Required, except for Holidays or Weekends. If no rain, indicate with a "taro" M T W Th F Sat (optional) Sun (Optional) oA- 41. P-1-,sn1„.,f -4 1-----4. Phase of Grading check the applicable box(es) X Installatior of perimeter erasion and sediment control measures clearing and grubbing of existing ground cover Completion of any phase of grading of slopes or fills Instailatlon of storm drainage facilldes Completion of all land-dlsturb+ng activity, conslruedon or development Permanent ground cover sufficlani to restrain erosion has been established Jay this signature, I cartlfy In accordance with the NCG010000 permit & G.S. 113A-54.1 that this report Is accurate and complete to the best of my knowledge. Financially Responsible Party I Permitee or Agent I Designee Date GROUND STABILIZATION TIMEFRAMES. Site Area Descri teen Perimeter dikes, swiles and slopes Stabilization_ Timeframe Exceptions 7 Da s None H!qh Qualit _Water HQW)iZones Slopes Steeper than 3:1 7 Days None If slopes are 10' or less in length and are not steeper than 2:1 14 days are allowed 7 Days Slopes 3:1 or flatter 14 Da" 7 days for slopes greater than 50' in length All other areas with slopes flatter than 4:1 14 Days None except for perimeters and HQW Zones "For an adltabla copy of this form as a Ward doc and other Information, see nllo,llporlel,nGdunr.argrwsl�NrLeLc5lgn, PERMANENT SEEDING SCHEDULE NOTE: CONTRACTOR TO PLANT IN ACCORDANCE WITH UNC APPROVED SPECIES LIST AND FOLLOW ANY OTHER UNC PLANTING REQUIREMENTS. ANY LESPEDEZA SPECIES ARE NOT ALLOWED ON CAMPUS. Practice Standards and Specifications Table 6.24c Permanent Seeding Recommendations -- Piedmont Region Percentage of Opfimal Planting Soil Drainage Shade Common Name Scientific Name Cultivars Type' Mix Dates Adaptation Tolerance Height Switchgrass Panicum ftatum Blackwell -- well draped Sbelter--well drained Warm 10-15% Dec.1-fipr.1 CultYar Poor 6 Kanlcfw- poatyttained Season Dependent Carthage -- well drained Swilicligrass Panicum virgalum Warm 10-15% Dec.1 - Maya Cultvar Poor 6 Alamo - poorly -drained Season Dependent Indiangrass Sorghash im Warm Well -drained to 10-30°� Dec.1 Apr.1 Poor 6 nutans Rurrsey, Osage, Cheyenne Season Droughty hldiangrass Sorghastmm Wan" Well -drained to 10-3D°fa Dec 1 -May 1 Poor 6 ntltans Lornata Season Droughty Deeriongue Dirhantlelium Warm Poody-drained to 5-25% Dec.1 -Apr.1 Moderato 2 clandestnum Tioga Season Droughty Big Bluestein Arldropogon Warm Well -drained la 10 3()°fa Dec_ 1 Apr.1 Poor 6 gerardii Roundtree, Kew, Earl Season Droughly Little Bluestein Schizachyrium Walm Well -drained to 10-30% Dec.1 -Api.1 Poor 4 scopadum Cimarron Season Droughty Warm Poorly -drained to 1-10°!° Dec.1 Apr.1 Moderate 5 SweetWoodreed Cinnaarundinarea season Well -drained Warm 5-25/a Dec.1 Apr 1 Poorly drained Poor 5 Rice Culgrass Leersia oryatides Season Warm 10-20% Dec.1 -Apr. Well drained Pear 3.5 RedlopPanicgrass Panicum ngidulum Season Warm 10-20°/a Dec,1 -Apr 1 Poorly -drained Moderate 3.5 Beaked Panicgfass Panicum anceps Season Warm Well -drained to 5-10°o Dec.1 Apr.1 Poor 2.5 Purple lop Tridens tavus Season Droughty Eastern Tripsacum Warm Well -drained to 5-1 (M Dec- l-Apr- 1 Poor 45 Gam magrass dacNoides Season Poory-drained Chasmanlhium Cold Feb. 15-Apr..1, Well -drained to 1-10°9 Moderate 4 Indian Woodoats latlalium Season Aug- 15- Oct. 15 Dfwghty. Cold Feb. 15-Apr 1, Well -drained to 5-25°h ModeJate 3 Virginia Wild ldrye Elymusvirginicus Season Aug -15- Oct. 15 Droughty Eastern Bottle- Cold Feb. 15-Apr.1, Well -drained to 510%n Moderate 3 brush Grass Elymushyshix Season Aug. 15 - Oct. 15 Droughty Cold 1('20°� Feb. 15 - Apr. 1, Poorly -drained Poor 2.5 Rough Ben 1grass Agrostisscabra Season Aug. 15 - Oct. 15 Cold Feb-15 -Apr-1, 0 2-5fa Well drained Moderate 35 WinterBentgrass Agrostlshyemalis Season Mg- 15- Oct 15 Rec.1-May1„ 1hfetlarld 1 "10°y Poorly -drained Poe 4 Soft Rush Juneus efrusus Sep. l -Nov i . Dec-1 M a 1; yr ' :Welland 1-1[)°!a ran Pooned Poar. 3 Shaliow*o e, , honerlund.a Sep.1-Nov. 1 Dec 1446y1,, W nd Weiland - 1= 1tJ56 Poo -drained or Po Foxedge Catexwlpinoidea Sep.1 Nov.1 I!LealihotyRosh I.Juncurs'coriacplus Wetland 2-5 Dec..1-May 1; PriodyHlraint d. Poor 2 .. Sep 1-Nov:1,'. * Pick at least four species, including one from each type, 6�FlL1i Rev. 5113 APPLICATION RATE 200 LB/AC SOIL AMENDMENTS FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 4,000 LB/AC GROUND AGRICULTURE LIMESTONE AND 1000 LB/AC 10-10-10 FERTILIZER. MULCH APPLY 4000 LB/AC STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL. MAINTENANCE INSPECT AND REPAIR MULCH FREQUENTLY. REFERTILIZE IN LATE WINTER OF THE FOLLOWING YEAR; USE SOIL TESTS OR APPLY 150 LB/AC 10-10-10 FERTILIZER. MOW REGULARLY TO A HEIGHT OF 2-4 INCHES. SEEDBED PREPARATION AREAS TO BE SEEDED TO BE SCARIFIED 4" DEEP. A FIRM, WELL PULVERIZED, UNIFORM SEEDBED SHOULD BE PROVIDED. FERTILIZER SHALL BE PLACED DURING SCARIFICATION AS FOLLOWS: LIME: 45 LBS / 1,000 SF PHOSPHOROUS: 20 LBS / 1,000 SF FERTILIZER: 17 LBS / 1,000 SF DEMLR Monitoring Form Rev. 08012013 Page 2 of2 PART 2A: EROSION AND SEDIMENTATION CONTROL MEASURES: Measures must be inspected at least ONCE PER 7 CALENDAR DAYS AND WITHIN 1A UnI IDC nc A DAIMCAI I FVFMT r_RF A TFR THAT° n 51Nr�W OPP *A WeV ID PFRInM Erosion and Sedimentation Control Measures Inspected Inspection _ Date.. DeaGrtbe Actions Needed Carre Should he Date Corremed Measura ID or i.ocptlon and Description 'Operating. Properly? (YIN) Any Repair or Maintenance Needed? Y!N New Measures ns ! lied " possibltive e next storm _ads t and as Possible and before the next storm event Pmoosed 0imansrans A Dimensions SignIficari Deviation fram Plan? (Y/IVY 11" "New erosion and sedimentation control measures Installed since the Iasi inspection should be documented here or by initialing and dating each measure or practice shown on a copy of the approved erosion and sedimentation control plan. List Dimensions of Measures such as Sediment Basins and Riprap Aprons PART 2B: STORMWATER D CHARGE OUTFAL S SDOs : SDOs must be inspected at least ONCE PER 7 CALENDAR DAYS AND WITHIN • A U^kMC nC A CnIMeA, I CVCUV PIDCATCD TYAM A S I►PU DCD 7A IJn11D oeolnn Stormwater Discharge Outfalls Inspected Inspection Report Visible Sedimentation to streams or wetlands to e ted Corrected Any Vl8lbls Any Increase Any $iormweter Sedimentation in Stream Visible Any visiple oil Date Land Quality Within 24 Hours Discharge Oulfali in Streams, Turbidity Froslon sheen, floating or hip:ftportal.ncdanr.orglwebflrldlvision-contacts or Wetlands of from below suspended solids or Describe Actions Needed Locatlon Outside, Site Discharge? SDO? ?ID discoloration(YIN) Corractive actions should be Performed as soon as possible and before the next Morin event Limits? (YIN) (YIN) (YIN) MA nr 7n. r]0r•.1 Imo GTADII 19A71nM u..-4 M .--n.,.1-a �4a -- -1. ok -- ..r r_.-.dine Areas Where Land Disturbance Has Been Completed or Temporarily Stopped Time Limit for Ground Cover 7 days or 14 da Is Ground Cover Sufficient to Restrain Erosion? YIN inspection Date - Describe Actions Needed Date Corrected TEMPORARY SEEDING SCHEDULE Table 6.24a Temoorary Seedine Recommendations Common Plane Scientific Name Rate per Acre optimal Plantkig Dates M011,1110ains PiedIllmi tt Gnadat Plain Rye grain Secale oereaki 30 Its Aug, 15 - May 15 Aug. 15 - May 1 Aug. 15 - Apr, 15 Me* Tritimm aes6ivum 306s Aug, 15 -May 15 Aug. 15 -May i Aug. IS - Apr. 15 German millet &etch itedica INN May 15-Aug. 15 May 1-Aug.15i Apr. 15 - Aug. 15 BrGwlntop millet Uroc:hton raamoss 10 IN May 15 -Aug. 16 May 1-Mg. 15 Apr„ 15 -Aug. 15 SOIL AMENDMENTS FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2,000 LB/AC GROUND AGRICULTURE LIMESTONE AND 750 LB/AC 10-10-10 FERTILIZER (FROM AUG 15 - DEC 30, INCREASE 10.10-10 FERTILIZER TO 1000 LB/AC). MULCH APPLY 4000 LB/AC STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL. MAINTENANCE JAN 1- AUG 15: REFERTILIZE IF GROWTH IS NOT FULLY ADEQUATE, RESEED, REFERTILIZE, AND MULCH IMMEDIATELY FOLLOWING EROSION OR OTHER DAMAGE. AUG 15 - DEC 30: REPAIR AND REFERTILIZE DAMAGED AREAS IMMEDIATELY. TOP DRESS WITH 50 LB/AC OF NITROGEN IN MARCH. IF IT IS NECESSARY TO EXTEND TEMPORARY COVER BEYOND JUNE 15, OVERSEED WITH 50 LB/AC KOBE LESPEDEZA IN LATE FEBRUARY OR EARLY MARCH. NOTE: USE THE TEMPORARY SEEDING SCHEDULE ONLY WHEN DATE 15 NOT CORRECT TO USE THE PERMANENT SEEDING SCHEDULE TREE PROTECTION NOTES BEFORE WORK BEGINS: TREE TO MINIMIZE COMPACTION. A TARP OR PLYWOOD BENEATH THE PILE WILL PREVENT CUTTING INTO SOIL SURFACE WITH BACKHOE OR DOZER BLADE WHEN REFILLING THE TRENCH, 1. AGREEMENT WILL BE REACHED WITH GENERAL CONTRACTOR, UNC FACILITIES DEPARTMENT, AND UNIVERSITY ARBORIST ON SPECIFIC TREES THAT WILL BE PRESERVED. COMMUNICATION BETWEEN GENERAL CONTRACTOR, UNC FACILITIES DEPARTMENT, 3. REFILL OPEN TRENCHES AS SOON AS POSSIBLE. ROOT DEATH CAN OCCUR IN 10 MINUTES IN UNFAVORABLE WEATHER AND UNIVERSITY ARBORIST IS ESSENTIAL FOR SUCCESS UNTIL PROJECT IS COMPLETED. CONDITIONS, EXPOSED ROOTS IN OPEN TRENCHES MUST BE KEEP MOIST WITH A HOSE OR SPRINKLER. 2, CONSIDER AND AGREE UPON SITE ACCESS ROUTES AS THEY RELATE TO DESIGNATED TREES. 4. RAISING THE GRADE MORE THAN 6" AROUND A TREE TO BE PRESERVED WILL REQUIRE A RETAINING WALL BEYOND THE EXISTING DRIP LINE. 3. CONSTRUCTION FENCING WILL BE ERECTED JUST BEYOND THE DRIP LINE OF DESIGNATED TREES AND WILL NOT BE REMOVED UNTIL COMPLETION OF PROJECT, S. IF GRADE MUST BE LOWERED, TERRACING AS FAR FROM THE TREE TRUNK AS POSSIBLE WILL BE REQUIRED TO PRESERVE AS MANY ROOTS AS POSSIBLE. THIS CAN BE DONE IN STEPS FOR A MORE NATURAL GRADE. WHEN THE GRADE MUST BE LOWERED 4. WOOD CHIPS AT A DEPTH OF 6-12" SHALL BE USED IN ROOTING ZONE, BEYOND CONSTRUCTION FENCING, WHERE EQUIPMENT COMPLETELY, CONSTRUCTION OF AN ISLAND ATTHE DRIP LINE WILL BE REQUIRED, TRAFFIC OCCURS, FOR EFFECTIVE WEIGHT DISPERSAL. THIS MUST BE REMOVED WITH CARE AS THE PROJECT PROCEEDS. 6. A HEAVY PLASTIC TARP MUST BE SPREAD IN CONCRETE MIXING AREAS AND AREAS WHERE SHEETROCK WILL BE CUT. THE 5. HEAVY EQUIPMENT WILL BE PARKED AWAY FROM THE ROOT ZONE OF THESE TREES. TEMPORARY "CONSTRUCTION PARKING" ALKALINITY OF THESE MATERIALS CAN CHANGE SOIL PH. SIGNS WILL BE ERECTED TO DIRECT OPERATORS. NO SIGNS WILL BE NAILED TO TREES. 7, PAINT BRUSHES AND TOOLS WILL NOT BE CLEANED OVER TREE ROOTS. 6. WATER AND UTILITY LINES WILL BE ROUTED AROUND ROOTS OF DESIGNATED TREES WHEN POSSIBLE. TUNNELING WILL BE MANDATORY WITHIN THE DRIP LINE OF TREES TO BE PRESERVED, TO PREVENT CUTTING OF LARGE ROOTS. 8. CHEMICAL WASTES (PAINT THINNER ETC.) WILL BE DISPOSED OF PROPERLY AND NOT DRAINED ON SITE, DURING CONSTRUCTION: 9. EVEN WHEN BARRIERS ARE ERECTED, ACCIDENTAL BREAKS AND SCRAPES MAY OCCUR. WATCH FOR DAMAGE AND REPORTTHIS TO LANDSCAPE SERVICES PROMPTLY. DO NOT ATTEMPT PRUNING OR REPAIR WORK. CAMPUS ARBORIST WILL DETERMINE BEST 1. WHEN EXCAVATING, AVOID CUTTING ROOTS LARGER THAN 2". WHEN THIS 15 NOT POSSIBLE, SHOVE L BY HAND AND SAW THE EXTENT OF INJURY. METHODS AS THEY RELATE TO THE EXTE ROOT. ACCIDENTALLY BROKEN OR CRUSHED ROOTS MUST BE CUT CLEANLY BETWEEN THE WOUND AND THE TRUNKTO PREVENT DECAY. POST CONSTRUCTION: 2. KEEP TRENCHES OUTSIDE THE DRIP LINE OF THE TREES TO BE PRESERVED. SOIL MUST BE PILED ON THE SIDE AWAY FROM THE 1. CONTRACTOR WILL BE HELD RESPONSIBLE FOR ANY VIOLATION OF POINTS LISTED, WITH PENALTIES AND (OR) FINES AS SPECIFIED. UNC Spill Prevention Control and Countermeasure (SPCC) Plan Construction Site Guidelines Management of all fuel or oil in containers 55 gallons or greater in size shall be conducted in accordance with the Spill Prevention Control and Countermeasure (SPCC) requirements of the Code of Federal Regulations, Title 40, Part 112 (40 CFR 112). These containers of fuel and oil are also subject to the requirements of the UNC SPCC Plan. Some general requirements are as follows: • All containers shall be in good shape without significant rusting, pitting, or other evidence of deterioration or damage. • Berms and/or other barriers shall be used to protect stored fuel and oil containers from damage due to construction activities. • Adequatc secondary containment shall be provided for all containers. • Containers of fuel and oil shall be located on level and stable ground and not in close proximity to storm Sewer inlets. • Facility lighting shall be sufficient to discover discharges occLUTing during the hours of darkness and to prevent discharges from occurring through acts of vandalism. • Fuel and oil delivery and transfer procedures shall be in accordance with the Fuel Transfer Procedures as referenced in the UNC SPCC Plan. • Signage shall be provided to warn facility personnel of above -ground piping and/or fuel transfer operations. All fuel and oil tanks shall comply with the following: • Tanks shall be double walled with at least 110% secondary containment of the primary tank volume. • Tanks shall be equipped with a direct vision gauge that clearly indicates the liquid level within the primary tank_ • Tanks shall be equipped with overfill prevention equipment consisting of either a high liquid level alarm or high liquid level flow cutoff device set at 95% of the primary tank volume- • Tank openings shall be securely capped and/or locked when not in use. • Motor control for fuel dispensing shall be locked in the off position, except when fueling is being conducted and will only be accessible to authorized personnel. • A method to gauge the interstitial space between the primary and secondary tank walls using an automatic detection device with audible alarm or manual gauging using a probe device shall be available. • A spill kit with sufficient sorbent, booms, and other cleanup materials shall be located in close proximity to each fuel tank or drum. The spill kits shall be sized to prevent all potential discharges related to the fuel tank or fuel loading activities from reaching storm sewer inlets. Weekly inspections shall be conducted to inspect containers of fuel and oil that are 55 gallons or greater in size for signs of damage, deterioration, and oil discharges. Deficiencies shall be promptly remedied. Inspections shall be documented in writing, and records of the inspections shall be available for review by UNC personnel. Additional SPCC requirements are contained in 40 CFR 112 and the UNC SPCC Plan. The UNC Department of Environment, Health & Safety can be contacted for more information on the UNC SPCC Plan at 919-962-5507. 'J McADAMS The Jahn R, McAdams Company, Inc, 2905 Meridian Parkway Durham, INC 27713 phone 919. 361. 5000 fax 919. 361, 2269 license number: C-0293 www.mcadamsco.com CLIENT THE UNIVERSITY OF NORTH CAROLINA FACILITIES PLANNING & DESIGN 103 AIRPORT DRIVE GILES F. HORNEY BUILDING CHAPEL HILL, NORTH CAROLINA 27599 W LL Z 0 W ❑ �z LU ... Ln D/N�r1�// f V 1..1� illlllllli� z .J °C o 0 U fY d LL V JI W -°� Z �-- (DO �U�� aQDwJ Z J = �-- z w W UCL 1 p0� p� o 0 U Lr) U F 1 Z M REVISIONS NO. DATE PLAN INFORMATION PROJECT NO. EDF-19000 FILENAME EDF19000-EC1 CHECKED BY RAS DRAWN BY SCB SCALE I"=10' DATE 03.20.2020 SHEET EROSION CONTROL NOTES FINAL - RELEASED FOR CONSTRUCTION C6e0l i STORMWATER CONTROL M EASU RE W CONSTRUCTION SPECIFICATIONS GENERAL NOTES 1. ANY DISCREPANCIES IN THE PLANS AND NOTES SHALL BE BROUGHT TO THE DESIGN ENGINEER'S ATTENTION IMMEDIATELY. 2. THIS STORMWATER CONTROL MEASURE WILL BE REQUIRED TO BE CERTIFIED BY UNC STORMWATER. THE CONTRACTOR SHALL MAKE HIMSELF FAMILIAR WITH ALL OF THE OBSERVATION, TESTING, AND CERTIFICATION REQUIREMENTS OF UNC STORMWATER. UNC STORMWATER REQUIRES EXTENSIVE OBSERVATION, TESTING, AND CERTIFICATION BY BOTH THE DESIGN ENGINEER AND THE GEOTECHNICAL ENGINEER PRIOR TO AND DURING CONSTRUCTION. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO ENSURE THAT OBSERVATION, TESTING, AND CERTIFICATION EFFORTS ARE COORDINATED WITH THE DESIGN ENGINEER AND THE GEOTECHNICAL ENGINEER. NO CERTIFICATES OF OCCUPANCY SHALL BE ISSUED BY UNC STORMWATER UNTIL THIS FACILITY IS ACCEPTED. 3. PRIOR TO ANY CONSTRUCTION OR PLACEMENT OF ANY BACKFILL, THE ONSITE GEOTECHNICAL ENGINEER SHALL INSPECT THE EXCAVATION AREA FOR THE SYSTEM WITHIN THIS AREA TO ASSESS WHETHER SUITABLE SOILS EXIST AT THE SUBGRADE LEVEL. IF THE CONTRACTOR CONSTRUCTS SYSTEM PRIOR TO INSPECTION, THEN THIS AREA SHALL BE UNCOVERED AND TESTED (TO THE ENGINEER'S AND OWNER'S APPROVAL) AT THE CONTRACTOR'S EXPENSE. 4. UNC STORMWATER SHALL BE CONTACTED FOR INSPECTIONS AT 919-923-8700 OR 919-962-2131 DURING IMPORTANT POINTS IN CONSTRUCTION. 5. THE FILTERRA SYSTEM SHALL NOT BE USED AS A TEMPORARY EROSION CONTROL DEVICE DURING CONSTRUCTION. 6. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO ADHERE TO ALL CURRENT OSHA REGULATIONS FOR CONFINED SPACE ENTRY. 7. CONTRACTOR RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES PRIOR TO EXCAVATION ACTIVITIES. 7.1. CONTACT UNC UTILITY LOCATE AT 919-962-8394 IN ADDITION TO NORTH CAROLINA 811 PRIOR TO EXCAVATION. STORMWATER SYSTEM GENERAL FURNISHING & INSTALLATION SPECIFICATIONS 1. CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS, EQUIPMENT AND INCIDENTALS NECESSARY TO INSTALL THE FILTERRA SYSTEM, APPURTENANCES AND INCIDENTALS IN ACCORDANCE WITH THE DRAWINGS AND AS SPECIFIED HEREIN. D 2, FILTERRA SYSTEM SHALL UTILIZE THE PHYSICAL, CHEMICAL AND BIOLOGICAL MECHANISMS OF AN ENGINEERED BIOFILTRATION MEDIA, PLANT AND MICROBE COMPLEX TO REMOVE POLLUTANTS TYPICALLY FOUND IN URBAN STORMWATER RUNOFF. THE TREATMENT SYSTEM SHALL BE A FULLY EQUIPPED, PRE -CONSTRUCTED, DROP -IN -PLACE UNIT DESIGNED FOR APPLICATIONS IN THE URBAN LANDSCAPE TO TREAT CONTAMINATED RUNOFF FROM IMPERVIOUS SURFACES. 3. BIORETENTION SYSTEM SHALL BE CAPABLE OF STAND-ALONE STORMWATER TREATMENT. NO PRETREATMENT TO BIOFILTRATION MEDIA SHALL BE REQUIRED. 4. THE BIORETENTION SYSTEM SHALL BE OF A TYPE THAT HAS BEEN INSTALLED AND IN USE FOR A MINIMUM OF FIVE (5) CONSECUTIVE YEARS PRECEDING THE DATE OF INSTALLATION OF THE SYSTEM. THE MANUFACTURER SHALL HAVE BEEN, DURING THE SAME CONSECUTIVE FIVE (5) YEAR PERIOD, ENGAGED IN THE ENGINEERING DESIGN AND PRODUCTION OF SYSTEMS DEPLOYED FOR THE TREATMENT OF STORM WATER RUNOFF AND WHICH HAVE A HISTORY OF SUCCESSFUL PRODUCTION, ACCEPTABLE TO THE ENGINEER OF RECORD AND/OR THE APPROVING JURISDICTION. 5. AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM) REFERENCE SPECIFICATIONS 5.1, ASTM C857: STANDARD PRACTICE FOR MINIMUM STRUCTURAL DESIGN LOADING FOR UNDERGROUND PRECAST CONCRETE UTILITY STRUCTURES 5.2. ASTM C858: STANDARD SPECIFICATION OF UNDERGROUND PRECAST CONCRETE UTILITY STRUCTURES 5.3. ASTM C990: STANDARD SPECIFICATION FOR JOINTS FOR PRECAST BOX SECTIONS USING PREFORMED FLEXIBLE JOINT SEALANTS 5.4. ASTM C109: STANDARD TEST METHOD FOR COMPRESSIVE STRENGTH OF HYDRAULIC CEMENT MORTARS 6. MANUFACTURER OR AUTHORIZED SUPPLIER TO SUBMIT SHOP DRAWINGS FOR BIORETENTION SYSTEM WITH THE VAULT, ENGINEERED BIOFILTRATION MEDIA AND ACCESSORY EQUIPMENT. DRAWINGS SHALL INCLUDE PRINCIPAL DIMENSIONS, ENGINEERED BIOFILTRATION MEDIA PLACEMENT, LOCATION OF PIPING AND UNIT FOUNDATION. 6.1. MANUFACTURER OR AUTHORIZED SUPPLIER SHALL SUBMIT INSTALLATION INSTRUCTIONS TO THE CONTRACTOR. 6.2. MANUFACTURER OR AUTHORIZED SUPPLIER SHALL SUBMIT OPERATIONS AND MAINTENANCE MANUAL TO THE CONTRACTOR. 6.3. BEFORE INSTALLATION OF THE BIORETENTION SYSTEM, CONTRACTOR SHALL OBTAIN THE WRITTEN APPROVAL OF THE ENGINEER OF RECORD FOR THE SYSTEM DRAWINGS. 7. NO PRODUCT SUBSTITUTIONS SHALL BE ACCEPTED UNLESS SUBMITTED 10 DAYS PRIOR TO PROJECT BID DATE, OR AS DIRECTED BY THE EN GINEER OF RECORD. TO PROJECT DESIGNS, P SUBMISSIONS FOR SUBSTITUTIONS REQUIRE REVIEW AND APPROVAL BY THE ENGINEER OF RECORD, FOR HYDRAULIC PERFORMANCE, I M A , EQUIVALENT TREATMENT PERFORMANCE, AND ANY REQUIRED PROJECT PLAN AND REPORT (HYDROLOGY/HYDRAULIC, WATER QUALITY, STORMWATER POLLUTION) MODIFICATIONS THAT WOULD BE REQUIRED BY THE APPROVING JURISDICTIONS/AGENCIES, CONTRACTOR TO COORDINATE WITH THE ENGINEER OF RECORD ANY APPLICABLE MODIFICATIONS TO THE PROJECT ESTIMATES OF COST, BONDING AMOUNT DETERMINATIONS, PLAN CHECK FEES FOR CHANGES TO APPROVED DOCUMENTS, AND/OR ANY OTHER REGULATORY REQUIREMENTS RESULTING FROM THE PRODUCT SUBSTITUTION. STATEMENT OF RESPONSIBILITY 1. ALL REQUIRED MAINTENANCE AND INSPECTIONS OF THIS FACILITY SHALL BE THE RESPONSIBILITY OF UNC CHAPEL HILL, PER THE EXECUTED OPERATION AND MAINTENANCE AGREEMENT FOR THIS FACILITY. PLEASE NOTE IT SHALL BE THE RESPONSIBILITY OF THE OWNER AND CONTRACTOR TO COMPLY WITH ALL CURRENT OSHA REGULATIONS IN RELATION TO CONSTRUCTION AND ON -GOING MAINTENANCE OF THE PROPOSED WATER QUALITY VAULT, EXISTING GRADE I'M !ll"IT\, nlccln Arno 6" PVC INV ELEV. = 261.00 (TO DAYLIGHT) PROPOSED GRADE STORMWATER SYSTEM MATERIAL SPECIFICATIONS 1. THE BIORETENTION SYSTEM SHALL MEET MINIMUM DIMENSIONS AS SHOWN ON THIS SHEET, AND MEET SPECIFICATIONS PROVIDED BY THE MANUFACTURER. THE SYSTEM IS TO BE DESIGNED BY OTHERS. SHOP DRAWINGS OF THE SYSTEM SHALL BE PROVIDED TO THE DESIGN ENGINEER FOR REVIEW. 2. ALL POURED CONCRETE SHALL BE MINIMUM 3000 PSI (28 DAY) UNLESS OTHERWISE NOTED. 3. ALL INTERNAL COMPONENTS INCLUDING ENGINEERED BIOFILTRATION MEDIA, UNDERDRAIN STONE, PVC UNDERDRAIN PIPING, MULCH, DISSIPATION STONE, AND VEGETATION MUST BE INCLUDED AS PART OF THE BIORETENTION SYSTEM AND SHALL BE PROVIDED BY THE MANUFACTURER. 3.1. ENGINEERED BIOFILTRATION MEDIA SHALL CONSIST OF BOTH ORGANIC AND INORGANIC COMPONENTS. STORMWATER SHALL BE DIRECTED TO FLOW VERTICALLY THROUGH THE MEDIA PROFILE, SATURATING THE FULL MEDIA PROFILE WITHOUT DOWNSTREAM FLOW CONTROL. 3.2. UNDERDRAIN STONE SHALL BE OF SIZE AND SHAPE TO PROVIDE ADEQUATE BRIDGING BETWEEN THE MEDIA AND STONE FOR THE PREVENTION OF MIGRATION OF FINE PARTICLES. UNDERDRAIN STONE MUST ALSO BE ABLE TO CONVEY THE DESIGN FLOW RATE OF THE SYSTEM WITHOUT RESTRICTION AND BE APPROVED FOR USE IN THE BIORETENTION SYSTEM BY THE MANUFACTURER. 3.3, PVC UNDERDRAIN PIPING SHALL BE SDR35 WITH PERFORATION PATTERN DESIGNED TO CONVEY SYSTEM DESIGN FLOW RATE WITHOUT RESTRICTION. 3.4. MULCH SHALL BE DOUBLE SHREDDED WOOD OR BARK MULCH APPROVED FOR USE WITH THE BIORETENTION SYSTEM BY THE MANUFACTURER. 3.5. VEGETATION SHALL COMPLY WITH THE TYPE AND SIZE REQUIRED BY THE APPROVED DRAWINGS AND SHALL BE ALIVE AND FREE OF OBVIOUS SIGNS OF DISEASE. 3.6. DISSIPATION STONE SHALL BE 3"-6" DIAMETER WASHED STONES OR COBBLES. 4. PRECAST CONCRETE VAULT SHALL BE PROVIDED BY MANUFACTURER OR AUTHORIZED SUPPLIER ACCORDING TO ASTM C857 AND C858. 4.1. VAULT JOINT SEALANT SHALL BE CONSEAL C5-101 OR APPROVED EQUAL. JOINTS SHALL BE SEALED WITH PREFORMED JOINT SEALING COMPOUND CONFORMING TO ASTM C 990, 4.2. IF INTERIOR CONCRETE BAFFLE WALLS ARE PROVIDED, BAFFLE WALLS SHALL BE CAST -IN OR SEALED TO THE INTERIOR VAULT WALLS AND FLOOR WITH A POLYURETHANE CONSTRUCTION SEALANT RATED FOR USE BELOW THE WATERLINE, SIKAFLEX 1A OR EQUAL, CONTRACTOR TO PROVIDE SEALANT MATERIAL AND INSTALLATION UNLESS COMPLETED PRIOR TO SHIPMENT. 5. ALL CONTRACTOR -PROVIDED COMPONENTS SHALL MEET THE REQUIREMENTS OF THIS SECTION, THE PLANS SPECIFICATIONS AND CONTRACT DOCUMENTS. IN THE CASE OF CONFLICT, THE MORE STRINGENT SPECIFICATION SHALL APPLY. 5.1. CRUSHED ROCK BASE MATERIAL SHALL BE SIX-INCH MINIMUM LAYER OF %-INCH MINUS ROCK. COMPACT UNDISTURBED SUB -GRADE MATERIALS TO 95% OF MAXIMUM DENSITY AT+/-2% OF OPTIMUM MOISTURE CONTENT. UNSUITABLE MATERIAL BELOW SUB -GRADE SHALL BE REPLACED TO ENGINEER'S APPROVAL. 5.2. CONCRETE SHALL HAVE AN UNCONFINED COMPRESSIVE STRENGTH AT 28 DAYS OF AT LEAST 3000 PSI, WITH %-INCH ROUND ROCK, A 4-INCH SLUMP MAXIMUM, AND SHALL BE PLACED WITHIN 90 MINUTES OF INITIAL MIXING. 5.3. SILICONE SEALANT SHALL BE PURE RiV SILICONE CONFORMING TO FEDERAL SPECIFICATION NUMBER TT 5001543A OR TT 500230C OR EN GINEER APPROVED. 5.4. GROUT SHALL BE NON -SHRINK GROUT MEETING THE REQUIREMENTS OF CORPS OF ENGINEERS CRD--0588. SPECIMENS MOLDED, CURED AND TESTED IN ACCORDANCE WITH ASTM C-109 SHALL HAVE MINIMUM COMPRESSIVE STRENGTH OF 6,200 PSI. GROUT SHALL NOT EXHIBIT VISIBLE BLEEDING. CONSTRUCTION SEQUENCE 1. EXCAVATIONS LEFT UNATTENDED DURING THE CONSTRUCTION PROCESS SHALL BE MARKED APPROPRIATELY AND REMAIN IN COMPLIANCE WITH OSHA REQUIREMENTS. 2. SET PRECAST VAULT ON CRUSHED ROCK BASE MATERIAL THAT HAS BEEN PLACED IN MAXIMUM 6-INCH LIFTS, LOOSE THICKNESS, AND COMPACTED TO AT LEAST 95-PERCENT OF THE MAXIMUM DRY DENSITY AS DETERMINED BY THE STANDARD PROCTOR COMPACTION TEST, ASTM D698, AT MOISTURE CONTENT OF +/-2% OF OPTIMUM WATER CONTENT. 3. INLET AND OUTLET PIPES SHALL BE ATTACHED TO PROVIDED COUPLERS OR GROUTED IN AND CONNECTED TO PRECAST CONCRETE VAULT ACCORDING TO ENGINEER'S REQUIREMENTS AND SPECIFICATIONS. ALL CONNECTIONS TO BE WATER TIGHT. 4. ALL THROAT AND GRATE PROTECTION COVERS SHALL REMAIN IN PLACE UNTIL THE SYSTEM IS ACTIVATED. 5. CONTRACTOR TO CAST -IN -PLACE THROAT INLET TO CONVEY STORMWATER INTO BIORFTFNTION SYSTEM ACCORDING TO MANUFACTURER'S REQUIREMENTS AND SPECIFICATIONS. N RACTOR INSTALLED IN THE VAULT T 6. ENGINEERED BIOFILTRATION MEDIA SHALL BE DELIVERED, U NLESS OTHERWISE AGREED UPON WITH THE MANUFACTURER. CO SHALL TAKE APPROPRIATE ACTION TO PROTECT THE MEDIA FROM SEDIMENT AND OTHER DEBRIS DURING CONSTRUCTION. THE METHOD ULTIMATELY SELECTED SHALL BE AT CONTRACTOR'S DISCRETION AND CONTRACTOR'S RISK. 6.1. IF MEDIA IS SHIPPED SEPARATELY FROM VAULT, MANUFACTURER OR A MANUFACTURER'S CERTIFIED REPRESENTATIVE SHALL INSTALL MEDIA INTO THE VAULT OR BE PRESENT TO SUPERVISE INSTALLATION IN ORDER TO ENSURE PROPER INSTALLATION. 7. THE BIORETENTION SYSTEM SHALL NOT BE PLACED IN OPERATION (ACTIVATED) UNTIL THE PROJECT SITE IS CLEAN AND STABILIZED (CONSTRUCTION EROSION CONTROL MEASURES NO LONGER REQUIRED). THE PROJECT SITE INCLUDES ANY SURFACE THAT CONTRIBUTES STORM DRAINAGE TO THE SYSTEM. ALL IMPERMEABLE SURFACES SHALL BE CLEAN AND FREE OF DIRT AND DEBRIS. ALL CATCH BASINS, MANHOLES AND PIPES SHALL BE FREE OF DIRT AND SEDIMENT. ACTIVATION SHALL BE PROVIDED BY MANUFACTURER OR AUTHORIZED SUPPLIER. 8. EACH CORRECTLY INSTALLED SYSTEM SHALL BE MAINTAINED BY MANUFACTURER OR AUTHORIZED SUPPLIER FOR A MINIMUM PERIOD OF ONE YEAR. THE COST OF THIS SERVICE SHALL BE INCLUDED IN THE PRICE OF THE SYSTEM. 8.1. ANNUAL MAINTENANCE CONSISTS OF A MAXIMUM OF TWO [21 SCHEDULED VISITS. 8.2. EACH ROUTINE MAINTENANCE VISIT SHALL CONSIST OF ONLY THE FOLLOWING ITEMS: SYSTEM INSPECTION; REMOVAL OF FOREIGN DEBRIS, SILT, LOOSE PLANT MATERIAL AND TRASH; MULCH REMOVAL; ENGINEERED BIOFILTRATION MEDIA EVALUATION; PLANT HEALTH EVALUATION AND PRUNING; REPLACEMENT OF MULCH; DISPOSAL OF ALL MAINTENANCE REFUSE ITEMS; AND UPDATING OF MAINTENANCE RECORDS 9, TO ENSURE LONGTERM PERFORMANCE OF THE BIORETENTION SYSTEM, CONTINUING ANNUAL MAINTENANCE PROGRAMS SHOULD BE PERFORMED OR PURCHASED BY THE OWNER PER THE LATEST OPERATION AND MAINTENANCE MANUAL. BACKFILL MATERIAL NOTES 1, THE ON -SITE GEOTECHNICAL ENGINEER SHALL SPECIFY THE BACKFILL MATERIAL FOR THE SIORETENTION SYSTEM. 2. THE BACKFILL MATERIAL SHOULD BE FREE OF ROCKS, FROZEN LUMPS, AND OTHER FOREIGN MATTER THAT COULD CAUSE HARD SPOTS WITHIN THE BACKFILL MATERIAL, OR THAT COULD DECOMPOSE AND CREATE VOIDS. 3. HIGHLY PLASTIC SILTS, HIGHLY PLASTIC CLAYS, ORGANIC SILTS, ORGANIC CLAYS, AND PEATS SHOULD NOT BE USED AS A BACKFILL MATERIAL. 4. THE BACKFILL MATERIAL SHOULD BE PLACED IN 6" LOOSE LIFTS AND COMPACTED TO 95%OF THE STANDARD PROCTOR MAXIMUM DRY DENSITY (ASTM-D698). THE FILL SOILS SHALL BE COMPACTED AT A MOISTURE CONTENT WITHIN +/- TWO PERCENT OF ITS OPTIMUM MOISTURE CONTENT. RIM OF FILTERRA UNIT TO SIT FILTERRA BIORETENTION UNIT CROSS-SECTION A -A' N.T.S. 13'x7' FILTERRA BIOSCAPE VAULT RIM ELEV. = 264.90 INV. OUT = 261.15 11 � T / OF BANCE(TYP) 1 l 1 � � 1 266 _ � a 1 1 G M 1 1 �' ~` (n 1 1 `• • s` 1 li 1�\ \ 1 ♦ ♦ \ 1 NEW CURB TO BE INSTALLED \ ELEVATED CURB CUT LIP I 1 \ass ATTHE TIME OF FILTERRA • (SEE SIT EETC9.01A) 1 INSTALLATION EXISTING CURB CUT 1 SCM A ♦ `♦ 1 264.65' �- \ \ ` GR 13'xT FILTERRA BIOSCAPE VAULT ♦ ` , ` ! RIM ELEV. = 264.90 VELOCITY DISSIPATOR ♦ ♦ 6 264.57' INV FLEV. = 261.15 CLASS W RIPRAP \ ` EXISTING BOC ZZ 6.0' L X 3.0' W X 22" THICK INTENDED TO SIT 4" ABOVE CURB AND FLUSH WITH GRADE (SEE SHEET C9.01A) VELOCITY DISSIPATOR •► Ci , f ' ~' 1 CLA55'B' RIPRAP 1 264.01'GR 264.90 � .�- 2.0' L X 2.0' W X 9" THICK 1 264.90' RIM \ � RIM ' � 'f - '1 264.78 + 1 A' c EXISTING BOC A4.90' 264.90' \ RI 0 G NQ \ RIM 1 f \ I \ �ZD 1 1 1 \ \ \ '.n LD ! 1 61, PVC \ \ \ \ 1\ 264.37' is \\ ] NV ELEV. = 261.00 (TO DAYLIGHT) \ 1 1 r'�- GR 26478' \ .] j ] \ 1 s'1\ \ \ \ GR j 15 LF 6" SDR 35 PVC @ 1.00% \ 3 �0CP 1 I \ has \ 1 \ \ \ \ ► \ \ \ \ I s ', V ►\ �1 A \ \ � 1 ] FEMA EFFECTIVE 0.2%ACF FEMA EFFECTIVE I 1 I \ \ 1 1% ACF I EX. METAL BUILDING G \ \\ 1 \ ` � \ EXISTING \ 1 \\ SHED j _f ..� M I, ► 1,ti l I l Il � I � ►+ ►I ► I l 1 1 l ` 1+ EXISTING IRRIGATION Vq I I CONTROL VALVE I 1 � STORMWATER CONTROL MEASURE 'A' PLAN VIEW N GRAPHIC SCALE 5 10 20 1 inch = 10 ft. McADAMS The John R. McAdams Company, Inc. 2905 Meridian Parkway Durham, NC 27713 phone 919. 361. 5000 fax 919. 361. 2269 license number: C-0293 www.mcadamsco.com CLIENT THE UNIVERSITY OF NORTH CAROLINA FACILITIES PLANNING & DESIGN 103 AIRPORT DRIVE GILES F. HORNEY BUILDING CHAPEL HILL, NORTH CAROLINA 27599 W u Z ®W ❑ iV 21� Q Q z_ J Q ® U W L. v� CMG z J W OOP Z �.. CD O QQ�LU Z or J = J W ~LU Ln=CL �C z Q 00 0 0 Lr) z D RRTfQI Bilotti" REVISIONS NO. DATE PLAN INFORMATION PROJECT NO. EDF-19000 FILENAME EDF19000-SWA CHECKED BY RAS DRAWN BY SCB SCALE 1"=10' DATE 03.20,2020 SHEET STORMWATER CONTROL. MEASURE W PLAN VIEW C9000 4 FINAL - RELEASED FOR CONSTRUCTION AS WITH ALL OPEN TOP BIORETENTION SYSTEMS, FILTERRA BIOSCAPE IS OPEN TO THE ATMOSPHERE WITH A MEDIA SURFACE RECESSED BELOW FINISHED GRADE, CONTRACTOR OR OWNER IS RESPONSIBLE FOR PROVIDING ANY REQUIRED SAFETY MEASURES AROUND SYSTEM PERIMETER, TO MAINTAIN AESTHETICS, REMOVAL OF HEAVY STORMWATER DEBRIS MAY BE NECESSARY BETWEEN REGULAR FILTERRA SYSTEM MAINTENANCE EVENTS. INI-LI UFLNINU PLAN VIEW ENERGY DISSIPATION 4" x 48" ROCK INLET OPENING PLANT PROVIDED BY CONTECH (TYP.) FLOWKIT J 06" SDR 35 PVC7 OUTLET COUPLING CAST INTO WALL ELEVATION VIEW CONCRETE LIP TO BE SET 2" ABOVE PAVEMENT ELEVATI( TOP OF WALL ELEV. = 264.90' INLET INVERT TB TP a ELEV. = 263.90' sn � OUTLET PIPE INV. ELEV. = 261.15' OUTSIDE BOTTOM ELEV. = 260,57' io MATERIALS LIST COUNT DESCRIPTION INSTALLED BY TBD PLANT. SEE GENERAL NOTE 10 CONTECH 0.84 CY MULCH. SEE GENERAL NOTE 10 CONTECH 1 ENERGY DISSIPATION ROCK LAYER CONTECH 5.90 CY FILTERRA MEDIA CONTECH 1.69 CY 112 #4 ROUND AGGREGATE UNDERDRAIN STONE CONTECH 1 FILTERRA FLOWKIT FT713A4.54 CONTECH 1 06"SDR 35 COUPLING CONTECH 3 02" PVC IRRIGATION CONDUIT CONTECH 13'-O" V-7" '4 m FLOW 4 4'-6" INLET OPENING SECTION B-B IRRIGATION SYSTEM CONDUIT 02" PVC (CAST4N) 3PLACES 0) 06" SDR 35 PVC OUTLET COUPLING CAST INTO WALL 06" UNDERDRAIN ENERGY SEE CURB INLET DISSIPATION DETAIL THIS SHEET IRRIGATION ROCK CONDUIT 10" co 3" MULCH 1'4' MEDIA 14L--- - 6" UNDERDRAIN STONE 3'-6" 06" SDR 35 PVC OUTLET COUPLING RIGHT END ELEVATION VIEW 4" (TYP.) (TYP):i q THROAT PROTECTION DEVICE CAST IN PLACE CONCRETE BY #4 REBAR DOWELS CONTRACTOR BENT AS NECESSARY CURB (NOT BY 4" INLET CONTECH) OPENING CURB INLET DETAIL CONCRETE CURB CUT LIP CONTECH PROPOSAL DRAWING CONTECH STANDARD DETAILS N.T.S. 4 4 n d CURB LINE CONCRETE LIP TO BE 5­ ABOVE PAVEMENT ELI CURB LINE ELEVATED CURB CUT LIP DETAIL N.T.S. GENERAL NOTES � 5.g 1. CONTECH TO PROVIDE ALL MATERIALS UNLESS NOTED OTHERWISE f r a �I � 2. FOR FABRICATION DRAWINGS WITH DETAILED STRUCTURE DIMENSIONS A - $ AND WEIGHTS, PLEASE CONTACT YOUR CONTECH ENGINEERED j5jjl SOLUTIONS LLC REPRESENTATIVE. www.ContechES.com 1 51 It 3. FILTERRA WATER QUALITY STRUCTURE SHALL BE IN ACCORDANCE WITH ALL DESIGN DATA AND INFORMATION CONTAINED IN THIS DRAWING. a i 4. DESIGN LOADING - PEDESTRIAN LIVE LOAD WITH H-5 (4000 LES.) WHEEL ffl- � U��A= LOAD MOUNTING THE CURB AND ADJACENT HS-20 LIVE LOAD SURCHARGE & ' t2 g ON THE WALLS OF THE STRUCTURE. c ° 5. DESIGN SPECIFICATION -ACI350ENVIRONMENTAL ENGINEERING t¢§o0 CONCRETE STRUCTURES, WITH FREEZING AND THAWING EXPOSURES. 6. CONCRETE SHALL BE TYPE II OR tIA CEMENT WITH MINIMUM STRENGTH - m 5,000 PSI AT 28 DAYS 7. JOINT SEALANT SHALL CONFORM TO ASTM C-990 OR ASTM C-443 8. EARTH COVER: 0'-0" 9. GROUND WATER ASSUMED TO BE AT OUTLET INVERT ELEVATION. ACTUAL ELEVATION TO BE CONFIRMED BY ENGINEER OF RECORD. Oz CONTECH MUST BE NOTIFIED IF ACTUAL ELEVATION IS GREATER THAN W THE OUTLET INVERT ELEVATION (STRUCTURAL CONSIDERATIONS). R 10. PLANT, MULCH AND DISSIPATION ROCKS SUPPLIED BY CONTECH AND c) DELIVERED AT TIME OF SYSTEM ACTIVATION. PLANT SELECTION SHALL Ui BE DONE BY THE ENGINEER OF RECORD IN ACCORDANCE WITH THE PROJECT PLANS AND SPECIFICATIONS. a `m 11. VAULT TO BE FILLED WITH UNDERDRAIN STONE AND ENGINEERED MEDIA PRIOR TO SHIPMENT FROM PRECASTER. PRECASTER IS TO ENSURE LIFT POINTS/LIFT METHOD ARE LOCATED ON THE OUTSIDE OF STRUCTURE AND SUFFICIENT TO ACCOUNT FOR STONE AND MEDIA WEIGHT IN ADDITION TO STRUCTURE WEIGHT 12. SOME HIDDEN LINES MAY BE OMITTED FOR CLARITY. INSTALLATION NOTES LU A. ANY SUB -BASE, BACKFILL DEPTH, AND/OR ANTI -FLOTATION PROVISIONS p ARE SITE -SPECIFIC DESIGN CONSIDERATIONS AND SHALL BE SPECIFIED BY ENGINEER OF RECORD B. CONTRACTOR TO PROVIDE EQUIPMENT WITH SUFFICIENT LIFTING AND REACH CAPACITY TO LIFT AND SET THE FILTERRA STRUCTURE. SPREADER BAR WITH SUFFICIENT CABLE IS REQUIRED FOR SAFETY AND REDUCTION OF DAMAGE TO CONCRETE STRUCTURE X Z C. CONTRACTOR TO INSTALL JOINT SEALANT BETWEEN ALL STRUCTURE SECTIONS AND ASSEMBLE STRUCTURE fX 0 D. CONTRACTOR TO SUPPLY AND INSTALL INLET PROTECTION BAR IF ❑ 1-- REQUIRED BY LOCAL JURISDICTION. I Q "--� ❑ Q E. CONTRACTOR TO TAKE APPROPRIATE MEASURES TO PROTECT FILTERRA (.) ❑ MEDIA SAY FROM CONSTRUCTION -RELATED EROSION RUNOFF Q 0 Z 2 ¢ F. CONTECH IS RESPONSIBLE FOR ACTIVATION OF THE SYSTEM WHICH INCLUDES PLANTING OF THE SPECIFIED PLANT, MULCH INSTALLATION, O Z (� > W f J CA AND PLACING OF DISSIPATION ROCK. ACTIVATION ONLY OCCURS WHEN THE SITE IS FULLY STABILIZED WITH FINAL PAVEMENT INSTALLED AND W Z W _ IZ p Q = SWEPT CLEAN OF CONSTRUCTION SEDIMENT LL Q (.0 Z W G. ANNULAR SPACE BETWEEN PIPE AND HOLE TO BE FILLED BY J 04 W I.— CONTRACTOR WITH AN APPROVED NON -SHRINK GROUT OR CONCRETE W Y a } (AS SPECIFIED). CND Q H. FABRICATION TO BE IN CONFORMANCE WITH THE LATEST EDITION AND = U U) ADDENDUM OF THE MSHA STANDARDS AND SPECIFICATIONS FOR m U V CONSTRUCTION AND MATERIALS. Q U W d I. "1 HEREBY CERTIFY THAT THE STRUCTURAL DESIGN OF THIS STRUCTURE J IS IN ACCORDANCE WITH THE APPLICABLE CODES AND THAT THIS ? _ STRUCTURE HAS BEEN DESIGNED FOR THE SPECIFIED LOADINGS AS W �-- INDICATED ON THE PLAN" M^- Q J. CONTACT CONTECH MAINTENANCE AND FIELD OPERATIONS AT «J 513-645-7770 TO SCHEDULE ACTIVATION K. IT IS RECOMMENDED THAT ALL FILTERRA UNITS BE WATERED BY IRRIGATION LINES OR SPRINKLER SYSTEMS ON A REGULAR BASIS. 2 FILTERRA UNITS MAY BE EQUIPPED WITH IRRIGATION HOLES FOR NEW OR jg e EXISTING IRRIGATION LINES UPON REQUEST Z E 0 : „r%3 h STRUCTURE WEIGHT 09 W I w �ff d = APPROXIMATE HEAVIEST PICK = 41,000 LBS. 0 Ag . STRUCTURE IS DELIVERED IN 1 PIECES v4i i _y G � �. g. MAX FOOTPRINT = 8.0' x 14.0' z a`i �I♦y� 8 " . 5 w 9 6 3g 1" DATE: 7126/ 19 DESkGNEO: DRAWN: JMR JMR CHECKED: APPROVED: PROJECT No.: SEQUENCE N., #1 623260 010 LAYOUT— SHEET: FTBSV1307 1 OF 1 CURB LINE NOTE: A GEOTEXTILE FILTER BLANKET IS TO BE INSTALLED BETWEEN THE RIP RAP AND SOIL FOUNDATION. THE FILTER BLANKET WILL CONSIST OF A MINIMUM 4" THICK LAYER OF STONE (NCDOT 457) UNDERLAIN WITH A GEOTEXTILE FABRIC OR ENGINEER -APPROVED EQUIVALENT (SEE GEOTEXTILE FABRIC MATERIAL SPEC]HCATIONS). PROPOSED GRADE 6" PVC A 1• 6" PVC INV. OUT (TO DAYLIGHT) = 261.15 2-FT (N 5EL I IuN A -A MINIMUM DIMENSIONS NCDOT CLASS B RIPRAP 21 X 2'W X 9" THICK TO BE LINED WITH GEOTEXTILE FABRIC OR ENGINEER -APPROVED EQUIVALENT 2-FT (SEE NOTE) FILTERRA OUTLET VELOCITY DISSIPATOR N.T.S. RIM OF FILTERRA UNIT TO SIT 9" THICK 4" FILTER BLANKET 13'x7' PRECAST BIORETENTION UNIT RIM ELEV. = 264.90 INV. OUT = 261.15 FILTERRA BIORETENTION UNIT CROSS-SECTION B-B' N.T.S. NOTES: 1. A FILTER BLANKET 15 TO BE INSTALLED BETWEEN THE RIPRAP AND SOIL FOUNDATION. THE FILTER BLANKET WILL CONSIST OF A MINIMUM 4" THICK LAYER OF STONE (NCDOT #57) UNDERLAIN WITH MIRAFI FILTER WEAVE 700 OR ENGINEER -APPROVED EQUIVALENT. 2. RIPRAP TO EXTEND TO TOP OF CHANNEL WITH 2:1 SIDE SLOPES THROUGHOUT THE EXTENT OF CHANNEL. EXISTING CURB MINIMUM DIMENSIONS NCDOT CLASS B RIPRAP 61 X 3'W X 22" THICK TO BE LINED WITH GEOTEXTILE FABRIC OR ENGINEER -APPROVED EQUIVALENT EXISTING CURB CUT FILTER BLANKET (SEE NOTE) 6' PLAN I CURB CUT VELOCITY DISSIPATOR N.T.S. 22" LAYER I OF CLASS B RIPRAP 4" FILTER BLANKET PROFILE VIEW 'J McADAMS The John R. McAdams Company, Inc. 2905 Meridian Parkway Durham, NC 27713 phone 919. 361. 5000 fax 919. 361. 2269 license number: C-0293 www.mcadamsco.com CLIENT THE UNIVERSITY OF NORTH CAROLINA FACILITIES PLANNING & DESIGN 103 AIRPORT DRIVE GILES F. HORNEY BUILDING CHAPEL HILL, NORTH CAROLINA 27599 W un LAM oW ❑ V J G W Ln N 0 W Q Z) z 0 d ❑U� LL V V�C1CzJ= �u 0 0 Z F— ~ a z ��J Q LU � Z �J= J W F-�Ma :�d z V 0o V Ln _0 V �- r � V Z D znq, •... N C •� REVISIONS NO. DATE PLAN INFORMATION PROJECT NO. EDF-19000 FILENAME EDF19000-SWA CHECKED BY RAS DRAWN BY SCB SCALE NITS DATE 03.20.2020 SHEET STORMWATER CONTROL MEASURE'A' DETAILS C9e01A FINAL - RELEASED FOR CONSTRUCTION STORMWATER CONTROL MEASURE 'B' CONSTRUCTION SPECIFICATIONS GENERAL NOTES 1. ANY DISCREPANCIES IN THE PLANS AND NOTES SHALL BE BROUGHT TO THE DESIGN ENGINEER'S ATTENTION IMMEDIATELY. 2. THIS STORMWATER CONTROL MEASURE WILL BE REQUIRED TO BE CERTIFIED BY UNC STORMWATER. THE CONTRACTOR SHALL MAKE HIMSELF FAMILIAR WITH ALL OF THE OBSERVATION, TESTING, AND CERTIFICATION REQUIREMENTS OF UNC STORMWATER. UNC STORMWATER REQUIRES EXTENSIVE OBSERVATION, TESTING, AND CERTIFICATION BY BOTH THE DESIGN ENGINEER AND THE GEOTECHNICAL ENGINEER PRIOR TO AND DURING CONSTRUCTION. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO ENSURE THAT OBSERVATION, TESTING, AND CERTIFICATION EFFORTS ARE COORDINATED WITH THE DESIGN ENGINEER AND THE GEOTECHNICAL ENGINEER. NO CERTIFICATES OF OCCUPANCY SHALL BE ISSUED BY UNC STORMWATER UNTIL THIS FACILITY IS ACCEPTED. 3. PRIOR TO ANY CONSTRUCTION OR PLACEMENT OF ANY BACKFILL THE ONSITE GEOTECHNICAL ENGINEER NE R SHALL INSPECT THE EXCAVATION AREA FOR THE SYSTEM WITHIN THIS AREA TO ASSESS WHETHER SUITABLE SOILS EXIST AT THE SUBGRADE LEVEL. IF THE CONTRACTOR CONSTRUCTS SYSTEM PRIOR TO INSPECTION, THEN THIS AREA SHALL BE UNCOVERED AND TESTED APPROVAL S AND OWNER'S THE ENGINEER'S AT THE CONTRACTOR'S EXPENSE. ( ) 4. UNC STORMWATER SHALL BE CONTACTED FOR INSPECTIONS AT 919-923-8700 OR 919-962-2131 DURING IMPORTANT POINTS IN CONSTRUCTION. 5. THE FILTERRA SYSTEM SHALL NOT BE USED AS A TEMPORARY EROSION CONTROL DEVICE DURING CONSTRUCTION. 6. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO ADHERE TO ALL CURRENT OSHA REGULATIONS FOR CONFINED SPACE ENTRY. 7. CONTRACTOR RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES PRIOR TO EXCAVATION ACTIVITIES. 7.1. CONTACT UNC UTILITY LOCATE AT 919-962-8394 IN ADDITION TO NORTH CAROLINA 811 PRIOR TO EXCAVATION. STORMWATER SYSTEM GENERA. FURNISHING & INSTALLATION SPECIFICATIONS 1. CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS, EQUIPMENT AND INCIDENTALS NECESSARY TO INSTALL THE FILTERRA SYSTEM, APPURTENANCES AND INCIDENTALS IN ACCORDANCE WITH THE DRAWINGS AND AS SPECIFIED HEREIN. 2. FILTERRA SYSTEM SHALL UTILIZE THE PHYSICAL, CHEMICAL AND BIOLOGICAL MECHANISMS OF AN ENGINEERED BIOFILTRATION MEDIA, PLANT AND MICROBE COMPLEX TO REMOVE POLLUTANTS TYPICALLY FOUND IN URBAN STORMWATER RUNOFF. THE TREATMENT SYSTEM SHALL BE A FULLY EQUIPPED, PRE -CONSTRUCTED, DROP -IN -PLACE UNIT DESIGNED FOR APPLICATIONS IN THE URBAN LANDSCAPE TO TREAT CONTAMINATED RUNOFF FROM IMPERVIOUS SURFACES. 3. BIORETENTION SYSTEM SHALL BE CAPABLE OF STAND-ALONE STORMWATER TREATMENT. NO PRETREATMENT TO BIOFILTRATION MEDIA SHALL BE REQUIRED. 4. THE BIORETFNTION SYSTEM SHALL BE OF A TYPE THAT HAS BEEN INSTALLED AND IN USE FOR A MINIMUM OF FIVE (5) CONSECUTIVE YEARS PRECEDING THE DATE OF INSTALLATION OF THE SYSTEM. THE MANUFACTURER SHALL HAVE BEEN, DURING THE SAME CONSECUTIVE FIVE (5) YEAR PERIOD, ENGAGED IN THE ENGINEERING DESIGN AND PRODUCTION OF SYSTEMS DEPLOYED FOR THE TREATMENT OF STORM WATER RUNOFF AND WHICH HAVE A HISTORY OF SUCCESSFUL PRODUCTION, ACCEPTABLE TO THE ENGINEER OF RECORD AND/OR THE APPROVING JURISDICTION. 5. AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM) REFERENCE SPECIFICATIONS 5.1. ASTM C857: STANDARD PRACTICE FOR MINIMUM STRUCTURAL DESIGN LOADING FOR UNDERGROUND PRECAST CONCRETE UTILITY STRUCTURES 5.2. ASTM C858: STANDARD SPECIFICATION OF UNDERGROUND PRECAST CONCRETE UTILITY STRUCTURES 5.3. ASTM C990: STANDARD SPECIFICATION FOR JOINTS FOR PRECAST BOX SECTIONS USING PREFORMED FLEXIBLE JOINT SEALANTS 5.4. ASTM C109: STANDARD TEST METHOD FOR COMPRESSIVE STRENGTH OF HYDRAULIC CEMENT MORTARS 6. MANUFACTURER OR AUTHORIZED SUPPLIER TO SUBMIT SHOP DRAWINGS FOR BIORETENTION SYSTEM WITH THE VAULT, ENGINEERED BIOFILTRATION MEDIA AND ACCESSORY EQUIPMENT. DRAWINGS SHALL INCLUDE PRINCIPAL DIMENSIONS, ENGINEERED BIOFILTRATION MEDIA PLACEMENT, LOCATION OF PIPING AND UNIT FOUNDATION. 6.1. MANUFACTURER OR AUTHORIZED SUPPLIER SHALL SUBMIT INSTALLATION INSTRUCTIONS TO THE CONTRACTOR. 6.2. MANUFACTURER OR AUTHORIZED SUPPLIER SHALL SUBMIT OPERATIONS AND MAINTENANCE MANUAL TO THE CONTRACTOR. 6.3. BEFORE INSTALLATION OF THE BIORETENTION SYSTEM, CONTRACTOR SHALL OBTAIN THE WRITTEN APPROVAL OF THE ENGINEER OF RECORD FOR THE SYSTEM DRAWINGS. 7. NO PRODUCT SUBSTITUTIONS SHALL BE ACCEPTED UNLESS SUBMITTED 10 DAYS PRIOR TO PROJECT BID DATE, OR AS DIRECTED BY THE ENGINEER OF RECORD. SUBMISSIONS FOR SUBSTITUTIONS REQUIRE REVIEW AND APPROVAL BY THE ENGINEER OF D Q A RECORD, HYDRAULIC PERFORMANCE, IMPACT TO PROJECT DESIGNS, EQUIVALENT TREATMENT PERFORMANCE, AND ANY REQUIRED PROJECT PLAN AND REPORT (HYDROLOGY/HYDRAULIC, WATER QUALITY, STORMWATER POLLUTION) MODIFICATIONS THAT WOULD BE REQUIRED BY THE APPROVING J RI DIC IONS A ENCIE Q U S T G S. CONTRACTOR TO COORDINATE WITH THE ENGINEER OF RE ANY / CORD APPLICABLE MODIFICATIONS TO THE PROJECT ESTIMATES OF COST, BONDING AMOUNT DETERMINATIONS, PLAN CHECK FEES FOR CHANGES TO APPROVED DOCUMENTS, AND/OR ANY OTHER REGULATORY REQUIREMENTS RESULTING FROM THE PRODUCT SUBSTITUTION. STATEMENT OF RESPONSIBILITY 1. ALL REQUIRED MAINTENANCE AND INSPECTIONS OF THIS FACILITY SHALL BE THE RESPONSIBILITY OF UNC CHAPEL HILL, PER THE EXECUTED OPERATION AND MAINTENANCE AGREEMENT FOR THIS FACILITY. PLEASE NOTE IT SHALL BE THE RESPONSIBILITY OF THE OWNER AND CONTRACTOR TO COMPLY WITH ALL CURRENT OSHA REGULATIONS IN RELATION TO CONSTRUCTION AND ON -GOING MAINTENANCE OF THE PROPOSED WATER QUALITY VAULT, STORMWATER SYSTEM MATERIAL SPECIFICATIONS 1. THE BIORETENTION SYSTEM SHALL MEET MINIMUM DIMENSIONS AS SHOWN ON THIS SHEET, AND MEET SPECIFICATIONS PROVIDED BY THE MANUFACTURER. THE SYSTEM IS TO BE DESIGNED BY OTHERS. SHOP DRAWINGS OF THE SYSTEM SHALL BE PROVIDED TO THE DESIGN ENGINEER FOR REVIEW. 2. ALL POURED CONCRETE SHALL BE MINIMUM 3000 PSI (28 DAY) UNLESS OTHERWISE NOTED. 3. ALL INTERNAL COMPONENTS INCLUDING ENGINEERED BIOFILTRATION MEDIA, UNDERDRAIN STONE, PVC UNDERDRAIN PIPING, MULCH, DISSIPATION STONE, AND VEGETATION MUST BE INCLUDED AS PART OF THE BIORETENTION SYSTEM AND SHALL BE PROVIDED BY THE MANUFACTURER. 3.1. ENGINEERED BIOFILTRATION MEDIA SHALL CONSIST OF BOTH ORGANIC AND INORGANIC COMPONENTS. STORMWATER SHALL BE DIRECTED TO FLOW VERTICALLY THROUGH THE MEDIA PROFILE, SATURATING THE FULL MEDIA PROFILE WITHOUT DOWNSTREAM FLOW CONTROL. 3.2. UNDERDRAIN STONE SHALL BE OF SIZE AND SHAPE TO PROVIDE ADEQUATE BRIDGING BETWEEN THE MEDIA AND STONE FOR THE PREVENTION OF MIGRATION OF FINE PARTICLES. UNDERDRAIN STONE MUST ALSO BE ABLE TO CONVEY THE DESIGN FLOW RATE OF THE SYSTEM WITHOUT RESTRICTION AND BE APPROVED FOR USE IN THE BIORETENTION SYSTEM BY THE MANUFACTURER. 3.3. PVC UNDERDRAIN PIPING SHALL BE SDR35 WITH PERFORATION PATTERN DESIGNED TO CONVEY SYSTEM DESIGN FLOW RATE WITHOUT RESTRICTION. 3.4. MULCH SHALL BE DOUBLE SHREDDED WOOD OR BARK MULCH APPROVED FOR USE WITH THE BIORETENTION SYSTEM BY THE MANUFACTURER. 3.5. VEGETATION SHALL COMPLY WITH THE TYPE AND SIZE REQUIRED BY THE APPROVED DRAWINGS AND SHALL BE ALIVE AND FREE Of OBVIOUS SIGNS OF DISEASE. 3.6. DISSIPATION STONE SHALL BE 3"- 6" DIAMETER WASHED STONES OR COBBLES. 4. PRECAST CONCRETE VAULT SHALL BE PROVIDED BY MANUFACTURER OR AUTHORIZED SUPPLIER ACCORDING TO ASTM C857 AND C858. 4.1. VAULT JOINT SEALANT SHALL BE CONSEAL CS-101 OR APPROVED EQUAL. JOINTS SHALL BE SEALED WITH PREFORMED JOINT SEALING COMPOUND CONFORMING TO ASTM C 990. 4.2. IF INTERIOR CONCRETE BAFFLE WALLS ARE PROVIDED, BAFFLE WALLS SHALL BE CAST -IN OR SEALED TO THE INTERIOR VAULT WALLS AND FLOOR WITH A POLYURETHANE CONSTRUCTION SEALANT RATED FOR USE BELOW THE WATERLINE, SIKAFLEX 1A OR EQUAL. CONTRACTOR TO PROVIDE SEALANT MATERIAL AND INSTALLATION UNLFSS COMPLETED PRIOR TO SHIPMENT. S. ALL CONTRACTOR -PROVIDED COMPONENTS SHALL MEETTHE REQUIREMENTS OF THIS SECTION, THE PLANS SPECIFICATIONS AND CONTRACT DOCUMENTS. IN THE CASE OF CONFLICT, THE MORE STRINGENT SPECIFICATION SHALL APPLY. 5.1. CRUSHED ROCK BASE MATERIAL SHALL BE SIX-INCH MINIMUM LAYER OF'/4-INCH MINUS ROCK. COMPACT UNDISTURBED SUB -GRADE MATERIALS TO 95% OF MAXIMUM DENSITY AT +/-2% OF OPTIMUM MOISTURE CONTENT. UNSUITABLE MATERIAL BELOW SUB -GRADE SHALL BE REPLACED TO ENGINEER'S APPROVAL. 5.2. CONCRETE SHALL HAVE AN UNCONFINED COMPRESSIVE STRENGTH AT 28 DAYS OF AT LEAST 3000 PSI, WITH %-INCH ROUND ROCK, A 4-INCH SLUMP MAXIMUM, AND SHALL BE PLACED WITHIN 90 MINUTES OF INITIAL MIXING. 5.3. SILICONE SEALANT SHALL BE PURE RTV SILICONE CONFORMING TO FEDERAL SPECIFICATION NUMBER TT S001543A OR TT S00230C OR ENGINEER APPROVED. 5.4. GROUT SHALL BE NON -SHRINK GROUT MEETING THE REQUIREMENTS OF CORPS OF ENGINEERS CRD-0588. SPECIMENS MOLDED, CURED AND TESTED IN ACCORDANCE WITH ASTM C-109 SHALL HAVE MINIMUM COMPRESSIVE STRENGTH OF 6,200 PSI. GROUT SHALL NOT EXHIBIT VISIBLE BLEEDING. CONSTRUCTION SEQUENCE 1, IF EXISTING STORM STRUCTURE DOWNSTREAM OF SCM 'B' IS FOUND TO HAVE APPROPRIATE INVERT OUT TO ALLOW FOR POSITIVE DRAINAGE FROM THE PRECAST BIORETENTION UNIT (INVERT AT OR LOWER THAN SPECIFIED ON SHEET C9.02), THEN THE EXISTING STORM STRUCTURE AND DOWNSTREAM PIPE CAN REMAIN AND WILL NOT BE REPLACED. 2. EXCAVATIONS LEFT UNATTENDED DURING THE CONSTRUCTION PROCESS SHALL BE MARKED APPROPRIATELY AND REMAIN IN COMPLIANCE WITH OSHA REQUIREMENTS. 3. SET PRECAST VAULT ON CRUSHED ROCK BASE MATERIAL THAT HAS BEEN PLACED IN MAXIMUM 6-INCH LIFTS, LOOSE THICKNESS, AND COMPACTED TO AT LEAST 95-PERCENT OF THE MAXIMUM DRY DENSITY AS DETERMINED BY THE STANDARD PROCTOR COMPACTION TEST, ASTM D698, AT MOISTURE CONTENT OF +/-2% OF OPTIMUM WATER CONTENT. 4. INLET AND OUTLET PIPES SHALL BE ATTACHED TO PROVIDED COUPLERS OR GROUTED IN AND CONNECTED TO PRECAST CONCRETE VAULT ACCORDING TO ENGINEER'S REQUIREMENTS AND SPECIFICATIONS. ALL CONNECTIONS TO BE WATERTIGHT. 5. ALL THROAT AND GRATE PROTECTION COVERS SHALL REMAIN IN PLACE UNTIL THE SYSTEM IS ACTIVATED. 6. CONTRACTOR TO CAST -IN -PLACE THROAT INLET TO CONVEY STORMWATER INTO BIORETENTION SYSTEM ACCORDING TO MANUFACTURER'S REQUIREMENTS AND SPECIFICATIONS. 7. N E GINEERED BIOFILTRATION MEDIA SHALL BE DELIVERED INSTALLED IN THE VAULT, UNLESS OTHERWISE AGREED UPON WITH THE MANUFACTURER. CONTRACTOR SHALLTAKE APPROPRIATE ACTION TO PROTECTTHE MEDIA FROM SEDIMENTAND OTHER DEBRIS DURING CONSTRUCTION. THE METHOD ULTIMATELY SELECTED SHALL BE AT CONTRACTOR'S DISCRETION AND CONTRACTOR'S RISK. 7.1. IF MEDIA IS SHIPPED SEPARATELY FROM VAULT, MANUFACTURER OR A MANUFACTURER'S CERTIFIED REPRESENTATIVE SHALL INSTALL MEDIA INTO THE VAULT OR BE PRESENT TO SUPERVISE INSTALLATION IN ORDER TO ENSURE PROPER INSTALLATION. 8. THE BIORETENTION SYSTEM T 5 M SHALL NO BE PLACED IN OPERATION (ACTIVATED) UNTIL THE PROJECT SITE IS CLEAN AND STABILIZED (CONSTRUCTION ERASION CONTROL MEASURES NO LONGER REQUIRED). THE PROJECT SITE INCLUDES ANY SURFACE THAT CONTRIBUTES STORM DRAINAGE TO THE SYSTEM. ALL IMPERMEABLE SURFACES SHALL BE CLEAN AND FREE OF DIRT AND DEBRIS. ALL CATCH BASINS, MANHOLES AND PIPES SHALL BE FREE OF DIRT AND SEDIMENT. ACTIVATION SHALL BE PROVIDED BY MANUFACTURER OR AUTHORIZED SUPPLIER. 9. EACH CORRECTLY INSTALLED SYSTEM SHALL BE MAINTAINED BY MANUFACTURER OR AUTHORIZED SUPPLIER FOR A MINIMUM PERIOD OF ONE YEAR. THE COST OF THIS SERVICE SHALL BE INCLUDED IN THE PRICE OF THE SYSTEM. 9.1. ANNUAL MAINTENANCE CONSISTS OF A MAXIMUM OF TWO [21 SCHEDULED VISITS. 9.2. EACH ROUTINE MAINTENANCE VISIT SHALL CONSIST OF ONLY THE FOLLOWING ITEMS: SYSTEM INSPECTION; REMOVAL OF FOREIGN DEBRIS, SILT, LOOSE PLANT MATERIAL AND TRASH; MULCH REMOVAL; ENGINEERED BIOFILTRATION MEDIA EVALUATION; PLANT HEALTH EVALUATION AND PRUNING; REPLACEMENT OF MULCH; DISPOSAL OF ALL MAINTENANCE REFUSE ITEMS; AND UPDATING OF MAINTENANCE RECORDS 10. TO ENSURE LONGTERM PERFORMANCE OF THE BIORETENTION SYSTEM, CONTINUING ANNUAL MAINTENANCE PROGRAMS SHOULD BE PERFORMED OR PURCHASED BY THE OWNER PER THE LATEST OPERATION AND MAINTENANCE MANUAL. BACKFILL MATERIAL NOTES 1, THE ON -SITE GEOTECHNICAL ENGINEER SHALL SPECIFY THE BACKFILL MATERIAL FOR THE BIORETENTION SYSTEM. 2. THE BACKFILL MATERIAL SHOULD BE FREE OF ROCKS, FROZEN LUMPS, AND OTHER FOREIGN MATTER THAT COULD CAUSE HARD SPOTS WITHIN THE BACKFILL MATERIAL, OR THAT COULD DECOMPOSE AND CREATE VOIDS. 3. HIGHLY PLASTIC SILTS, HIGHLY PLASTIC CLAYS, ORGANIC SILTS, ORGANIC CLAYS, AND PEATS SHOULD NOT BE USED AS A BACKFILL MATERIAL. 4. THE BACKFILL MATERIAL SHOULD BE PLACED IN 6" LOOSE LIFTS AND COMPACTED TO 95%OF THE STANDARD PROCTOR MAXIMUM DRY DENSITY (ASTM-D698). THE FILL SOILS SHALL BE COMPACTED AT A MOISTURE CONTENT WITHIN +/-TWO PERCENT OF ITS OPTIMUM MOISTURE CONTENT. / � 1 1 266 PROPERTY LINE LIMITS OF DISTURBANCE (TYP) w I + D Ln I � LD LD 9 265 J y r a J/, NEW C JRB TO BE IN_5TA) LED I � I AT THE'TIMF OF FILTER�q INSTALLATION L_- ` I / r 11' x 7' FILTERRA INTERNAL BYPASS CURB W/ CHAMBER RIM ELEV. = 263.91' INV ELEV. = 259.87' i INTENDED TO SIT FLUSH WITH CURB AND GRADE (SEE 264 SHEET C9.03B). 263.91' EXISTING BOC 9 263�1` --w _ RI 263-64' NOSE DOWN CU B EXISTING BOC yI r AND TIE TO FXI ING I 263. V " EDGE OF PAVEMENT I 1 J RIMa . ___�---._,� \ (SEE SHEET C9/038) S l i J e 263. 1' \ G r I EXISTING SIDEWALK TO BE RI I I I REMOVED AND REPLACED 26AV 1 (SEE SHEET 9.036 FOR DETAIL) RI j IRRIGATION CONTROL VALVES TO BE PROTECTED DURING THE INSTALLATION PROCESS i � I 1 11w �r / I 263.85' I j 1 N GR SCM B 1 it f t / 263.81' 1 \ G R i rf f i 1 1 1 / I I r 1 / ! 6 r 1 � 1 J I 40 LF 8" 5DR 35 PVC @ 0.93% f I, EXISTING IRRIGATION CONTROL VALVE (TYP.)) so 1 ' r P LNG 3" Cps - - i 11 I 263,75' f/ GR f EXISTING/DI ! RIM=263:13' r1� m �`1 INV OUT--262.64' I/ $ ASSUMED LOCATION OF EXISTING BLIND JUNCTION BOX I JB-101 (CONTRACTOR TO VERIFY IN FIELD), 9 / RIM= 263.75' / 3" CPP INV IN = UN OWN / ' 6 41 8" PVC INV IN = 25 .50' 67 LF 8" SDR 35 PVC @ 2.61% 8" PVC INV OUT 59.40' EXISTING DI� / RIM=262.90 r IM/ OUT=z�1.90' � I , UNDERGROUND UTILITIES TO 1 �r 4," �c� BE LOCATED AND PROTECTED 1 I DURING THE INSTALLATION 1 1 / PROCESS ! C?QSv cCIO cc 1/ RELOCATE AND RESET GUY WIRE DURING CONSTRUCTION / m 07 a � � r � ' r 8" CPP INV ELEV. = 257.20 50 z__ \ = I � � 1 � I / SD 5D I 1 ® 1 GpP I_ 54X� -- -FtASTING DI /kI M=262.44` 4? 4" INV IN=260.54' / ASSUMED 8" PVC INV IN=2S .65' J INV OUT=257.55' - � N T STORMWATER CONTROL MEASURE 'B' PLAN VIEW �\ \ r \l ` 30' EXISTING OWASA SANITARY GRAPHIC SCALE SEWER CLEARANCE 0 s 10 20 1 inch = 10 ft. 'J M-cADAMS Theh John R. McAdams Company, Inc. 2905 Meridian Parkway Durham, NC 27713 phone 919. 361. 5000 fax 919. 361. 2269 license number: C-0293 www.mcadamsco.com CLIENT THE UNIVERSITY OF NORTH CAROLINA FACILITIES PLANNING & DESIGN 103 AIRPORT DRIVE GILES F. HORNEY BUILDING CHAPEL HILL, NORTH CAROLINA 27599 W LL F LLM Z ® W Ln `r L J L1'j Q a � z W Q OC o� ® o Q p U W ILL U �C J 0 o ZW�(Do z Q�WJ W Lij � z J ILL Q o O U o V H 1 V z D V� 049073 �CCA • S�\ 0 REVISIONS NO. DATE PLAN INFORMATION PROJECT NO. EDF-19000 FILENAME EDF19000-SWB CHECKED BY RAS DRAWN BY SCB SCALE 1"=10' DATE 03.20.2020 SHEET STORMWATER CONTROL MEASURE'S' PLAN VIEW c9.o2B" FINAL - RELEASED FOR CONSTRUCTION I n i I F 24"0 x 4" ACCESS COVER (CAST -IN) FRONT FACE CURB 4' GAP FILLED MTH BUTYL MASTIC SEALANT BY CONTRACTOR 14'-0" 5'-4" 4'-7" OUTLET 7 CLEANOUT 0 x 8 --^ (CAST -IN) I I IE 1 I II ! o I II I I I D�a��QsQi I — — �QQba°4baoAd�Y1 I - i fl I I II I ! II I L---SIT—_ — -- ---------i-- ---`.' L4'-0" J(1) 36" x 36" CURB (CAST -IN) OPENING PLAN VIEW CONTRACTOR ELEVATION VIEW 77, 67 LF 8" SDR 35 PVC @ 2.61% SEPARATION WALL APPROXIMATE LOCATION EXISTING GRADE JB-101 RIM= 263.75' 3" CPP INV INS UNKNOWN 8" PVC INV IN= 259.50' 8" PVC INV OUT=259.40' TT_77_7 �— 3" CPP (IN) JUNCTION O CHAMBER 10"0 PVC 4'_0" 31_6" BYPASS PIPE PLAN VIEW (TOP SLAB AND MEDIA OMITTED FOR CLARITY) TERRAFLUME TRAY ENERGY DISSIPATION SEE CURB INLET ROCK LAYER DETAIL THIS SHEET R$M ! TOP OF CURB ELEV. = 263.91't T TERRAFLUME TRAY — NYLOPLAST DRAIN BASIN (SEE SHEET C9.04B) CONTRACTOR TO DETERMINE THE NEED FOR 11'0FILTERRA INTERNAL BYPASS CURB W/ CHAMBER ANGLED PVC CONNECTOR ON 10 PVC OUTLET RIM ELEV. = 263.91 INV. OUT = 259.87 PIPE DEPENDING ON EXACT LOCATION OF EXISTING BLIND JUNCTION BOX RIM OF FILTERRA UNIT TO SIT FLUSH WITH GRADE 7 7---7 7 7 7 7:7 T ���T 7T7 7 T 77 40 LF 8" SDR 35 PVC @ 0.93% FILTERRA BIORETENTION UNIT CROSS—SECTION N.T.S. MATERIALS LIST SITEDE51GNpATA�� it WATER QUALITY 0.50 COUNT DESCRIPTION INSTALLED BY i-e� �a $ 5 FLOW RATE CFS . 2.37 1 PLANT. SEE INSTALLATION NOTE G CONTECH PEAK FLOW RATE GFS DISSIPATION ROCK LAYER CONTECH 12 9 �J 1 � r 1 ENERGY g 2"0 PVC RETURN PERIOD OF PEAK FLOW NIA 0.71 CY MULCH, SEE INSTALLATION NOTE G CONTECH IRRIGATION 4.99 CY STANDARD FILTERRA MEDIA CONTECH BIOFILTRATION€ SYSTEM CONDUIT MEDIA 140 inlhr 1,43 CY 712" #4 ROUND AGGREGATE CONTECH m CAST -IN 3 PLACES ( ) INFILTRATION RATE UNDERDRAIN STONE MEDIA BAY 1 FILTERRA FLOWKIT CONTECH 1 TERRAFLUME TRAY FTIBC-48" x 18" CONTECH with 10" PIPE, FIBERGLASS O 36" x 36" TREE GRATE FRAME GALV- "'' 1 (CAST -IN) CONTECH a 0 1 36" x 36" TREE GRATE WI 6" OPENING CONTECH 0 U o 0 u_r 1 24"0 x 4" ACCESS FRAME AND CONTECH COVER EJ #41600389 lu 1 7"0 x 8" CLEANOUT (CAST -IN) CONTECH 3 2"0 PVC IRRIGATION CONDUIT CONTECH 6 0 PVC 1 SEALANT FOR JOINTS CONTRACTOR UNDERDRAIN 4 LF 2-112" x 2-1/2" x 114" CURB NOSING CONTECH (CAST -IN) a 0 t 3" MULCH - I -- I--L..-_,-- 1'-9" FILTERRA cn OUTLET PIPE INV. ELEV- _2OUTS r" MEDIA :. -.•- I 10"0 PVC 6" UNDERDRAIN FLEV.259,29' INTERNAL 6"0 PVC STONE UNDERDRAIN BYPASS PIPE RIGHT END ELEVATION VIEW GALV, STEEL NOSE PLATE CAST -IN TO TOP SLAB FRONT FACE OF CURB RB9" ' MIN" CAST -IN PLACE i CONCRETE BY CONTRACTOR #4 REBAR DOWELS SEE INSTALLATION NOTE C RIM TOP SLAB s° TERRAFLUME OUTLET PROTECTION DEVICE - LEAVE IN PLACE UNTIL SITE IS STABILIZED AND FILTERRA IS ACTIVATED STANDARD CURB INLET WITH TERRAFLUME DETAIL SCALE: N.T.S. 00 GENERAL NOTES 0 Z 1. CONTECH TO PROVIDE ALL MATERIALS UNLESS NOTED OTHERWISE O 2. FOR FABRICATION DRAWINGS WITH DETAILED STRUCTURE DIMENSIONS AND WEIGHTS, U I PLEASE CONTACT YOUR CONTECH ENGINEERED SOLUTIONS LLC REPRESENTATIVE. w U Q www.ContechES.com co ' 3. FILTERRA WATER QUALITY STRUCTURE SHALL BE IN ACCORDANCE WITH ALL DESIGN DATA Q C)> 0 I AND INFORMATION CONTAINED IN THIS DRAWING. Q O 4. STRUCTURE SHALL MEET PEDESTRIAN (300 PSF) LIVE LOAD WITH HS-20 SURCHARGE AND } rt Z Z H-5 LOAD AT THE CURB INLET, ASSUMING EARTH COVER OF 0"4" AND GROUNDWATER pp U Cy W J ELEVATION AT OR BELOW FINISH GRADE ELEVATION. ENGINEER OF RECORD TO CONFIRM J m O J ACTUAL GROUNDWATER ELEVATION. Q 5. FILTERRA STRUCTURE SHALL BE PRECAST CONCRETE CONFORMING TO ASTM C-857, ASTM z ILL CD JLL C-918AND ACI-318 LOAD FACTOR DESIGN METHOD LV i0 W cr INSTALLATION NOTES fw— m (0 Q Q A. ANY SUB -BASE, BACKFILL DEPTH, ANDIOR ANTI -FLOTATION PROVISIONS ARE SITE -SPECIFIC DESIGN CONSIDERATIONS AND SHALL BE SPECIFIED BY ENGINEER OF RECORD z (!) U B. CONTRACTOR TO PROVIDE EQUIPMENT WITH SUFFICIENT LIFTING AND REACH CAPACITY Q Z TO LIFT AND SET THE FILTERRA STRUCTURE. SPREADER BAR WITH SUFFICIENT CABLE IS 9 = Q REQUIRED FOR SAFETY AND REDUCTION OF DAMAGE TO CONCRETE STRUCTURE ()f U Z C. CONTRACTOR TO INSTALL JOINT SEALANT BETWEEN ALL STRUCTURE SECTIONS AND W W ASSEMBLE STRUCTURE 1-- i D. CONTRACTOR TO PROVIDE, INSTALL, AND GROUT INLET AND OUTLET PIPE(S). MATCH PIPE J INVERTS WITH ELEVATIONS SHOWN. ALL PIPE CENTERLINES TO MATCH PIPE OPENING CENTERLINES E. CONTRACTOR TO SUPPLY AND INSTALL INLET PROTECTION BAR IF REQUIRED BY LOCAL JURISDICTION "` g F. CONTRACTOR TO TAKE APPROPRIATE MEASURES TO PROTECT FILTERRA MEDIA BAY FROM Z ":' CONSTRUCTION -RELATED EROSION RUNOFF O FS * 6,1 G. CONTECH IS RESPONSIBLE FOR ACTIVATION OF THE SYSTEM WHICH INCLUDES PLANTING Uj 3 Lou, g" OF THE SPECIFIED PLANT, MULCH INSTALLATION, AND PLACING OF DISSIPATION ROCK. O �] ACTIVATION ONLY OCCURS WHEN THE SITE IS FULLY STABILIZED WITH FINAL PAVEMENT #A INSTALLED AND SWEPT CLEAN OF CONSTRUCTION SEDIMENT G H. CONTACT CONTECH MAINTENANCE AND FIELD OPERATIONS AT 513-645-7770 TO SCHEDULE z hj' ACTIVATION I. IT IS RECOMMENDED THAT ALL FILTERRA UNITS BE WATERED BY IRRIGATION LINES OR Z SPRINKLER SYSTEMS ON A REGULAR BASIS. FILTERRA UNITS MAY BE EQUIPPED WITH 1p IRRIGATION HOLES FOR NEW OR EXISTING IRRIGATION LINES UPON REQUEST w DATE; STRUCTURE WEIGHT 07/26/19 APPROXIMATE HEAVIEST PICK = 39.500 LBS DESIGNED: DRAWN: INCLUDES BASE SECTION, STONE AND FILTERRA MEDIA JMR JMR STRUCTURE DELIVERED IN 2 PIECES CHECKED: APPROVED: MAX. FOOTPRINT = 14' x 8' CONTECH PROJECT Na.'. SEDUENCE No, KN86293 623260 020 PROPOSAL LAYOUT LAYOUT SHEET: DRAWING FTIBC1107V1408 1 of 1 CONTECH STANDARD DETAILS N.T.S. NOTES: PLANT PROVIDED BY CONTECH UPON INSTALLATION (SEE DETAIL SHEET) RIM OF FILTERRA UNIT TO SIT FLUSH WITH CURB FINLEY GOLF COURSE ROAD 1/2" RAD. 6" 18" 3" RAID. SLOPE = 1/2"/FT- 1n r A 24" r- — STANDARD 24" CURB AND GUTTER NOTES: 1. 10' MAXIMUM BETWEEN DUMMY JOINTS. 15' MAXIMUM BETWEEN DUMMY JOINTS ON MACHINE POURS. 2. 1/2" EXPANSION JOINT EVERY W. 3. 3000 PSI CONCRETE MINIMUM, 4" SLUMP MAXIMUM. 4. LIQUID MEMBRANE CURING COMPOUND SHALL MEET THE REQUIREMENTS OF SECTION 1026-2 OF NCDOT STANDARDS AND SPECIFICATIONS FOR ROADS AND STRUCTURES. 5. ALL CONSTRUCTION JOINTS SHALL BE FILLED WITH FILLER AND SEALER IN ACCORDANCE WITH NCDOT ROADWAY STANDARD DETAIL 846.01. THE JOINT MATERIAL SHALL CONFORM TO SECTION 1028-2 OF THE NCDOT STANDARDS AND SPECIFICATIONS FOR ROADS AND STRUCTURES. 6. REFER TO NCDOT DETAIL 846.01 FOR CURB AND GUTTER SUPERELEVATION RATES. 24" CURB AND GUTTER N.T,S. 1, ALL CONCRETE 3000 PSI, 2. EXPANSION JOINTS ARE 50' APART MINIMUM. 3. CONTROL JOINTS EVERY FEET. 4. ALL SIDEWALKS SHALL BE CONSTRUCTED WITH TOOLED" EDGE RADIUS. S. SIDEWALK SHALL BE PLACED DIRECTLY AT BACK -OF -CURB, WITH EDGE RADIUS. CURB JOINT 6'-0" (TAPER) TOP OF CURB PAVEMENT/FINISH GRADE I ' END OF CURB ____ — T — — — — — — — — NOSE -DOWN CURB DETAIL N.T.S. LIGHT DUTY CONCRETE: PAVING ON WALKWAY REINFORCEMENT PER MATERIAL DEPTH GEOTECHICAL REQUIREMENT REINFORCEMENT IS NOT TO A STANDARD CONCRETE 6" CROSS ANY EXPANSION JOINTS SMOOTH BROOM FINISH B COMPACTED ABC 6" EXPANSION JOINT TYPE 1: 112" EXPANSION JOINT (EJI 314^ DEEP {CJ) W1 BACKER ROD & SEALANT SAWCUT CONTROL JOINT MATERIAL DEPTH EXPANSION MATERIAL CONCRETE A EXPOSED AGGREGATE 6" 1I2' X 12' SMOOTH CONCRETE DOWEL GREASE AND WRAP ONE END 36" OC " B COMPACTED ABC 6" 4 JOINT SPACING: m EXPANSION JOINTS = +J 39 O.C. CONTROL JOINTS = +f 15' O.C. vim, j— *SEE PLANS: NOTIFY ARCHITECT COMPACTED ABC Of DISCREPANCIES EXPANSION JOINT CONTROL JOINT O CONDITION COMPACTED SUBGRADE CONDITI N SECTION SECTION SIDEWALK DETAIL N.T.S. FINAL - RELEASED FOR CONSTRUCTION J McADAMS The John R. McAdams Company, Inc. 2905 Meridian Parkway Durham, NC 27713 phone 919. 361. 5000 fax 919. 361. 2269 license number: C-0293 www.mcadam5co.com CLIENT THE UNIVERSITY OF NORTH CAROLINA FACILITIES PLANNING & DESIGN 103 AIRPORT DRIVE GILES F. HORNEY BUILDING CHAPEL HILL, NORTH CAROLINA 27599 W LLM LLO Q Lu o Z LU H cV z ° J Q pU�c �■ LL U CA CSC z J uJ °Z (D 0 Q U . Q D w Z °CJ= J W ~ ,—` LL W a 00U U Ln =o V H U CA W, rrnr+rt��� REVISIONS NO. DATE PLAN INFORMATION PROJECT NO. EDF-19000 FILENAME EDF19000-SWB CHECKED BY RAS DRAWN BY SCB SCALE NTS DATE 03.20.2020 SHEET STORMWATER CONTROL MEASURE'S' DETAILS C9603 B NYLOPLAST DRAIN BASIN WITH ADD -A -BRANCH PIPE SIZE PART# MIN. BASIN SIZE 4" 6004AG _ 8" 8" 6006AG _ 10" 8" 600BAG _ 12" 10" 6010AG 15" 12" 6012AG _ 18" 15" 6015AG 24" 4" 6004AG _ 30 SPEC. TO 30" 6" 6006AG _ 30 SPEC. TO 30" 8" 6008AG _ 30 SPEC, TO 30" 10" 6010AG _ 30 SPEC. TO 30" 12" 6012AG 30 SPEC. TO 30" 15" 6015AG _ 30 SPEC. TO 30" 18" 6018AG 30 30" 4QWATERTIGHT JOINT (CORRUGATED HDPE SHOWN) n] ®VARIOUS TYPES OF INLET & OUTLET ADD -A -BRANCH ADAPTERS AVAILABLE: 4" - 18" FOR CORRUGATED HDPE (ADS N-121HANCOR DUAL WALL, ADSIHANCOR SINGLE WALL), PVC SEWER (EX; SDR 35), & PVC DWV (EX: SCH 40) 1 - ADD -A -BRANCH (PATENT NO.6349936) AVAILABLE FOR ALL 8" - 30" STRUCTURE OPTIONS (CUSTOM BASIN, ROAD & HIGHWAY, & CURB INLET) (I- FRAMES, GRATES, COVERS, HOODS, & BASE PLATES SHALL BE DUCTILE IRON PER ASTM A636 GRADE 70-50.05, WITH THE EXCEPTION OF THE BRONZE GRATES 3 - DRAIN BASIN TO BE CUSTOM MANUFACTURED ACCORDING TO PLAN DETAILS RISERS ARE NEEDED FOR BASINS OVER 84" DUE TO SHIPPING RESTRICTIONS SEE DRAWING NO. 7001-110-065 ®- DRAINAGE CONNECTION STUB JOINT TIGHTNESS SHALL CONFORM TO ASTM D3212 FOR CORRUGATED HDPE (ADS N-17JHANCOR DUAL WALL) & PVC SEWER (4"-24") 0 - ADD -A -BRANCH ADAPTERS CAN BE MOUNTED ON ANY ANGLE 0° TO 360°. TO DETERMINE MINIMUM ANGLE BETWEEN ADD -A -BRANCH ADAPTERS SEE DRAWING NO. 0110-11 U05 Z INTEGRATED DUCTILE IRON FRAME & GRATE TO 0� MATCH BASIN O.D. FRAME AND GRATE TO BE ADDED TO BE H-20 RATED 1.00" MIN Q5 ADAPTER ANGLES ADD -A -BRANCH GASKET VARIABLE 0° - 360" (SOIL TIGHT JOINT): 4CCORDING TO PLANS /T ENLARGED TO SHOW DETAIL TOP SECTION & SIDE VIEW: ENLARGED TO SHOW DETAIL THE BACKFILL MATERIAL SHALL BE CRUSHED STONE OR OTHER GRANULAR MATERIAL MEETING THE REQUIREMENTS OF CLASS I, CLASS II, OR CLASS III MATERIAL AS DEFINED IN ASTM D2321. BEDDING & BACKFILL FOR SURFACE DRAINAGE INLETS SHALL BE PLACED & COMPACTED UNIFORMLY IN ACCORDANCE WITH ASTM D2321. THIS PRINT DISCLOSES SUBJECT MATTER IN WHICH DRAWN BY EBC MATERIAL NYLOPLAST HAS PROPRIETARY RIGHTS. THE RECEIPT OR POSSESSION OF THIS PRINT DOES NOT CONFER, DATE 5-9-06 TRANSFER, OR LICENSE THE USE OF THE DESIGN OR TECHNICAL INFORMATION SHOWN HEREIN REVISED BY NMH PROJECT NO.INAME REPRODUCTION OF THIS PRINT OR ANY INFORMATION CONTAINED HEREIN, OR MANUFACTURE OF ANY ARTICLE HEREFROM, FOR THE DISCLOSURE TO OTHERS DATE 03.15.16 IS FORBIDDEN, EXCEPT BY SPECIFIC WRITTEN PERMISSION FROM NYLOPLAST. 9nnm NVi rA naT DWG SIZE A SCALE 1:25 SHEET 1 OF 1 3130 VERONA AVE BUFORD, GA 30518 Nylo last PHN (770) 932.2443 FAX (770) 932.2490 www.nyloplast-us.cl TITLE DRAIN BASIN WITH ADD•A-BRANCH QUICK SPEC INSTALLATION DETAIL DWG NO. 011&110-009 REV E NYLOPLAST DRAIN BASIN STANDARD DETAIL N.T.S. Section 2721 Engineered Surface Drainage Products GENERAL PVC surface drainage inlets shall include the drain basin type as indicated on the contract drawing and referenced within the contract specifications. The ductile iron grates for each of these fittings are to be considered an integral part of the surface drainage inlet and shall be furnished by the same manufacturer. The surface drainage inlets shall be as manufactured by Nyloplast a division of Advanced Drainage Systems, Inc., or prior approved equal. MATERIALS The drain basins required for this contract shall be manufactured from PVC pipe stock, utilizing a thermoforming process to reform the pipe stock to the specified configuration. The drainage pipe connection stubs shall be manufactured from PVC pipe stock and formed to provide a watertight connection with the specified pipe system. This joint tightness shall conform to ASTM D3212 for joints for drain and sewer plastic pipe using flexible elastomeric seals. The flexible elastomeric seals shall conform to ASTM F477. The pipe bell spigot shall be joined to the main body of the drain basin or catch basin. The raw material used to manufacture the pipe stock that is used to manufacture the main body and pipe stubs of the surface drainage inlets shall conform to ASTM D1784 cell class 12454. The grates and frames furnished for all surface drainage inlets shall be ductile iron for structure sizes 8", 10", 12", 15", 18", 24", 30" and 36" and shall be made specifically for each basin so as to provide a round bottom flange that closely matches the diameter of the surface drainage inlet. Grates for drain basins shall be capable of supporting various wheel loads as specified by Nyloplast. 12" and 15" square grates will be hinged to the frame using pins. Ductile iron used in the manufacture of the castings shall conform to ASTM A536 grade 70-50-05. Grates and covers shall be provided painted black. INSTALLATION The specified PVC surface drainage inlet shall be installed using conventional flexible pipe backfill materials and procedures. The backfill material shall be crushed stone or other granular material meeting the requirements of class 1, class 2, or class 3 material as defined in ASTM D2321. Bedding and backfill for surface drainage inlets shall be well placed and compacted uniformly in accordance with ASTM D2321. The drain basin body will be cut at the time of the final grade. No brick, stone or concrete block will be required to set the grate to the final grade height. For load rated installations, a concrete slab shall be poured under and around the grate and frame. The concrete slab must be designed taking into consideration local soil conditions, traffic loading, and other applicable design factors. For other installation considerations such as migration of fines, ground water, and soft foundations refer to ASTM D2321 guidelines. THIS PRINT DISCLOSES SUBJECT MATTER IN WHICH DRAWN BY CJA MATERIAL NYLOPLAST HAS PROPRIETARY RIGHTS, THE RECEIPT OR POSSESSION OF THIS PRINT DOES NOT CONFER, DATE 3-10.00 TRANSFER, OR LICENSE THE USE OF THE DESIGN OR TECHNICAL INFORMATION SHOWN HEREIN REVISED BY NMH PROJECT NO.INAME REPRODUCTION OF THIS PRINT OR ANY INFORMATION CONTAINED HEREIN, OR MANUFACTURE OF ANY ARTICLE HEREFROM, FOR THE DISCLOSURE TO OTHERS DATE 02.21.18 IS FORBIDDEN, EXCEPT BY SPECIFIC WRITTEN PERMISSION FROM NYLOPI ART ," °„­ —,. DWG SIZE A SCALE 1:1 3130 VERONA AVE BUFORD, GA 30518 Nylo last PHN (7701932.2443 770) 9324490 F„ wwnyloplast us c TITLE 8 IN - 36 IN DRAIN BASIN SPECIFICATIONS SHEET 1 OF i I DWG NO. 7001.110.011 REV J NYLOPLAST DRAIN BASIN SPECIFICATIONS N.T.S. 8 IN - 30 IN MINIMUM ANGLE BETWEEN ADD -A -BRANCH ADAPTERS THIS CHART DOES NOT APPLY WHEN USING AN ENVIROHOOD ADAPTER SIZE 8" BASIN 10" BASIN 12" BASIN 15" BASIN 18" BASIN 4" 4" 1190 '96° 750 600 48D 4" 6" 1000 870 690 550 4" - 8" - 102' 790 63° 4"-10" 91" 710 4'- 12" - 80° 4" -15" 4" - 18" 6"- 6" 1270 1000 780 62" 6"- 8" - 1140 880 700 6" -10" 1000 79° 6" - 12" - 87' 6" • 15" - . - - 1290 980 780 - 110° 860 950 24" BASIN 38, 43" 49° 55° 51° 700 49° 55° 61, 67" 76° 60, 660 72° 82° 10 -10, 122° 95, 72° 10"- 12" - - 103" 78" 10"- 15" - - 88° 12"-15" 940 103° 18" -18 MINIMUM ANGLE ADD -A -BRANCH ADAPTER 30" BASIN 2 327s 36, A 40° 450 360 400 440 490 550 620 44e` 490 530 5-° sr; 530 570 63° 71, 61" 67°. 750 73° 81, 870 ADD -A -BRANCH ADAPTER RAIN BASIN THIS PRINT DISCLOSES SUBJECT MATTER IN WHICH DRAWN BY EBC MATERIAL 3130 YERONAAVE NYLOPLAST HAS PROPRIETARY RIGHTS, THE RECEIPT BUFORD, GA 30518 OR POSSESSION OF THIS PRINT DOES NOT CONFER, DATE 2.17.06 PHN (770) 932.2443 TRANSFER, OR LICENSE THE USE OF THE DESIGN OR TECHNICAL Nylo r� j FAX (770) 932.2490 REVISED BY JJC PROJECT NO./NAME INFORMATION SHOWN HEREIN � l a www,nyloplast-us.com REPRODUCTION OF THIS PRINT OR ANY INFORMATION TITLE CONTAINED HEREIN, OR MANUFACTURE OF ANY ARTICLE HEREFROM, FOR THE DISCLOSURE TO OTHERS GATE 10.22.13 BIN • 30 IN MINIMUM ANGLE BETWEEN MINIMUM IS FORBIDDEN, EXCEPT BY SPECIFIC WRITTEN A0IN ADAPTERS DWG SIZE A SCALE NTS SHEET 1 OF 1 DWG NO. 0110-110•D05 REV D PERMISSION FROM NYLOPLAST. M010 WLDPLAST NYLOPLAST DRAIN BASIN BRANCH SPECIFICATIONS N.T.S. FINAL - RELEASED FOR CONSTRUCTION P 'J McADAMS The John R, McAdams Company, Inc. 2905 Meridian Parkway Durham, NC 27713 phone 919. 361. 5000 fax 919. 361. 2269 license number: C-0293 www.mcadamsco.com CLIENT THE UNIVERSITY OF NORTH CAROLINA FACILITIES PLANNING & DESIGN 103 AIRPORT DRIVE GILES F. HORNEY BUILDING CHAPEL HILL, NORTH CAROLINA 27599 W Lin H LL Z O W ^ ro � I Iw Ln � - z U-) t11 OWQ::)z oc O --J Q p U 2 Z LL U u.� o O Z (DO Hv>.z aQW J Z _ W ��w z< 1 � � � U V � =o Z D v 'A r11���1s► REVISIONS N0. DATE PLAN INFORMATION PROJECT NO. EDF-19000 FILENAME EDF19000-SWB CHECKED BY RAS DRAWN BY SCB SCALE NTS DATE 03.20.2020 SHEET TORMWATER CONTROI. MEASURE 'B' DETAILS C 004 B OUTLET STRUCTURE MATERIAL SPECIFICATIONS 1. ALL MODIFICATIONS TO THE RISER SYSTEM SHALL LEAVE THE REMAINING STRUCTURE IN A CONDITION EQUAL TO OR BETTER THAN THE EXISTING SYSTEM. ALL CUTTING AND/OR MODIFICATIONS TO THE SPILLWAY RISER SYSTEM SHALL BE DONE AS TO MINIMIZE EXPOSED REINFORCING STEEL AND MINIMIZE ADDITIONAL CONCRETE WORK. CONTRACTOR SHALL SUBMIT SHOP DRAWINGS FOR REVIEW FOR PRODUCTS OR METHODS USED TO COAT/PROTECT ANY REINFORCING STEEL EXPOSED DURING MODIFICATION ACTIVITIES AND FOR DOWELING OR SECURELY ATTACHING "FILL" CONCRETE TO SPILLWAY RISER ORIFICE OPENINGS. EXISTING MANHOLE EXISTING 4.01 X 1.0'H INVERT PROPOSED 4.0" L X 3. INVE EXISTING 10" 0 PVC INVERT IN = 257.41 EXISTING 10" 0 PVC INVERT IN = 257.41 EXISTING 4.0'L X 1.0'H AREA ORIFICE INVERT EL. = 261.36 PROPOSED 4.0" L X 3.0"H NOTCH WEI INVERT EL. = 261.3 INVERT EL. = 261.36 EXISTING 4.01 X 1.0'H AREA ORIFICE INVERT EL. = 261.36 PROPOSED 4.0" L X 3.0"H NOTCH WEIR INVERT EL. = 261.36 BOTTOM EL. = 257.41 EXISTING 10" 0 PVC INVERT IN = 257.41 .i i M=P�' 4Ip Q d -- EXISTING 30" 0 HPDE PIPE INVERT OUT = 257.61 30" 0 HPDE PIPE INVERT OUT = 257.61 'J McADAMS The John R. McAdams Company, Inc. 2905 Meridian Parkway Durham, NC 27713 phone 919. 361. 5000 fax 919. 361. 2269 license number: C-0293 www.mcadamsco.com CLIENT THE UNIVERSITY OF NORTH CAROLINA FACILITIES PLANNING & DESIGN 103 AIRPORT DRIVE GILES F. HORNEY BUILDING CHAPEL HILL, NORTH CAROLINA 27599 W W W Z Q Lu ❑ LU Ln N pWQ❑z J Q ❑ U �■■� LL V °°� Z U�- (D O � z QQ�U, z oc —' _ W ~ Z �_W zLL� V Oo =a V FM U z D REVISIONS NO. DATE PLAN INFORMATION PROJECT NO. EDF-19000 FILENAME EDF19000-POND CHECKED BY RAS DRAWN BY SCB SCALE NTS DATE 03.20.2020 SHEET STORMWATER CONTROL RISER STRUCTURE MODIFICATION DETAILS N.T.S. FINAL - RELEASED FOR CONSTRUCTION MEASURE DETAILS C9005