Loading...
HomeMy WebLinkAbout20200376 Ver 1_PCN Form Submission_20200313DWR mrlslon of Water Resources Pre -Construction Notification (PCN) Form September 29, 2018 Ver 3 Initial Review Has this project met the requirements for acceptance in to the review process?* r Yes r No Is this project a public transportation project?* C Yes r No Change only if needed. BIMS # Assigned * Version#* 20200376 1 Is a payment required for this project?* r No payment required What amout is owed?* r Fee received IT $240.00 r Fee needed - send electronic notification r $570.00 Reviewing Office * Winston-Salem Regional Office - (336) 776- Select Project Reviewer* 9800 Sue Homewood:eads\slhomewood Information for Initial Review 1a. Name of project: Broken Saddle Culvert Replacement Project 1a. Who is the Primary Contact?* Wendi Hartup 1b. Primary Contact Email:* wkhartup@toknc.com Date Submitted 3/13/2020 Nearest Body of Water Reedy Fork Basin Cape Fear Water Classification WS-III; NSW Site Coordinates 1c. Primary Contact Phone:* (336)564-1613 Latitude: Longitude: 36.12472222 -80.05638889 A. Processing Information County (or Counties) where the project is located: Forsyth Is this project a public transportation project?* r Yes r No 1a. Type(s) of approval sought from the Corps: W Section 404 Permit (wetlands, streams and waters, Clean Water Act) r Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) 1b. What type(s) of permit(s) do you wish to seek authorization? W Nationwide Permit (NWP) r Regional General Permit (RGP) r Standard (IP) 1c. Has the NWP or GP number been verified by the Corps? r Yes r No Nationwide Permit (NWP) Number: NWP Numbers (for multiple NWPS): 1d. Type(s) of approval sought from the DWR: W 401 Water Quality Certification - Regular r Non-404 Jurisdictional General Permit r Individual Permit 03 - Maintenance le. Is this notification solely for the record because written approval is not required? For the record only for DWR401 Certification: For the record only for Corps Permit: r 401 Water Quality Certification - E)press r Riparian Buffer Authorization 1f. Is this an after -the -fact permit application?* r Yes r No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? r Yes r No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? r Yes r No Acceptance Letter Attachment 1h. Is the project located in any of NC's twenty coastal counties? r Yes r No 1j. Is the project located in a designated trout watershed? r Yes r No B. Applicant Information 1d. Who is applying for the permit? r Owner W Applicant (other than owner) le. Is there an Agent/Consultant for this project?* r Yes r No 2. Owner Information 2a. Name(s) on recorded deed: Robert K. Campbell & Marilyn B. Campbell 2b. Deed book and page no.: DB 1630, PG 2577 2c. Responsible party: 2d.Address Street Address 0 Corjon Rd Address Line 2 City Kernersville Postal / Zip Code 27284 2e. Telephone Number: (919)999-9999 2g. Email Address:* mhorstman@wkdickson.com 2a. Name(s) on recorded deed: Michael Lee Cable 2b. Deed book and page no.: DB 1700 PG 2476 State / Province / Region NC Country USA 2f. Fax Number: r Yes r No r Yes r No 2c. Responsible party: 2d.Address Street Address 307 Broken Saddle Lane Address Line 2 City Kernersville Postal / Zip Code 27284 2e. Telephone Number: (999)999-9999 2g. Email Address:* mhorstman@wkdickson.com 2a. Name(s) on recorded deed: Michael E. Polinsky & Darcy J. Polinsky 2b. Deed book and page no.: DB 3330 PG 1146 2c. Responsible party 2d.Address Street Address 337 Marylebone Dr Address Line 2 city Kernersville Postal / Zip Code 27284 2e. Telephone Number: (999)999-9999 2g. Email Address:* mhorstman@,Akdickson.com 2a. Name(s) on recorded deed: Paul Morrison & Tammy Morrison 2b. Deed book and page no.: DB 2181 PG 694 2c. Responsible party 2d.Address Street Address 341 Marylebone Dr Address Line 2 City Kernersville Postal / Zip Code 27284 2e. Telephone Number: (999)999-9999 2g. Email Address:* mhorstman@wkdickson.com 3. Applicant Information (if different from owner) 3a. Name: Marc Thomas Fbrstman 3b. Business Name: WK Dickson 3c.Address State / Province / legion NC Country USA 21'. Fax Number: State / Province / Region NC Country USA 2f. Fax Number: State/ Province/ Fbgion NC Country USA 21'. Fax Number: Street Address 720 Corporate Center Drive Address Line 2 aty Raleigh Postal / Zip Code 27607 3d. Telephone Number: (919)256-5642 3f. Email Address:* mhorstman@vvkdickson.com 4. Agent/Consultant (if applicable) 4a. Name: Marc Horstman 4b. Business Name: WK Dickson 4c.Address Street Address 720 Corporate Center Drive Address Line 2 city Raleigh Postal / Zip Code 27607 4d. Telephone Number: (919)256-5642 4f. Email Address:* mhorstman@wkdickson.com Agent Authorization Letter* Cable- 0 Broken Saddle- Signed.pdf Cable- 307 Broken Saddle- Signed.pdf Campbell- 0 Corjon- Signed.pdf Morrison- 341 Marylebon- Signed.pdf Polinsky- 337 Marylebone- Signed.pdf State / Rovince / Ifgion NC Country USA 3e. Fax Number: Slate / Fnwince / Legion NC Country USA 4e. Fax Number: 242.84KB 248.06KB 259.88KB 1.51 MB 1.13MB C. Project Information and Prior Project History U 1. Project Information 1b. Subdivision name: ff appropriate) 1c. Nearest municipality/ town: Kernersville 2. Project Identification 2a. Property Identification Number: 2b. Property size: 2c. Project Address Street Address Address Line 2 City State / Rwnce / Region Postal / Zip Code Country 3. Surface Waters 3a. Name of the nearest body of water to proposed project:* Reedy Fork 3b. Water Resources Classification of nearest receiving water:* WS-III; NSW 3c. What river basin(s) is your project located in?* Cape Fear 3d. Please provide the 12-digit HUC in which the project is located. 030300020101 4. Project Description and History 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* The Broken Saddle Culvert Replacement project is located in Kernersville, NC and is bound by Broken Saddle Lane and Marylebone Drive as shown in Figure 1. The existing watershed encompasses 104 acres of high- to low -density residential areas with some commercial areas. The proposed project extends approximately 250 linear feet along the unnamed tributary to Reedy Fork located under Broken Saddle Lane and Marylebone Drive. WK Dickson personnel conducted an on -site field assessment of the Waters of the US on July 9th, 2019. 4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?* r Yes r No r Unknown 4d. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR) USGS.pdf 1.2MB 4e. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR) Soils.pdf 1.23MB 4f. List the total estimated acreage of all existing wetlands on the property: 4g. List the total estimated linear feet of all existing streams on the property: 250 4h. Explain the purpose of the proposed project:* The proposed project purpose is to replace the existing undersized 60-foot long 24" corrugated metal pipe (CMP) lined reinforced concrete pipe (RCP) culvert under Broken Saddle Lane to provide adequate flow and to stabilize the channel. The existing culvert is undersized and causes significant ponding that is adversely effecting the residents located upstream Historic observations and reports of flooding at private properties in the vicinity of the Broken Saddle Lane culvert has been recorded. During a field visit by WK Dickson personnel, a citizen claimed the water rose 70-inches at 716 Corjon Road during a large summer event. High water marks on the structure validated this claim. 41. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:* The existing Broken Saddle Lane culvert will be replaced with a 60-foot long 48" RCP. The new culvert will be placed in the horizontal footprint of the existing culvert. The proposed design a custom headwall and endwall. A plunge pool is proposed on the downstream end of the endwall to mimic the existing stream bed elevations and prevent erosion and scouring downstream of the enlarged culvert. Boulder toe walls are incorporated into the banks of the stream to protect the adjacent sewer and minimize erosion to the stream banks. The proposed project includes improvements upstream and downstream of the Marylebone Drive culvert. This culvert is adequately sized for the Town's design storm, however the downstream channel bed has experienced scouring and a large pool has formed, separating the channel bed from the culvert invert. The proposed improvements include extending the culvert with 60" CMP and adding a 22.5-degree bend followed by a custom endwall. The culvert extension is intended to protect adjacent utilities and private structures from being damaged due to bank erosion. A buried riffle grade control is proposed downstream of the endwall to provide stability to the channel bed. 4j. Please upload project drawings for the proposed project. 2019-07-16_BrokenSaddle_PermittingSet.pdf 10.99MB 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the property or proposed impact areas?* r Yes r No Comments: Refer to uploaded stream identification and SAM forms. 5b. If the Corps made a jurisdictional determination, what type of determination was made?* r Preliminary r Approved r Not Verified r Unknown r N/A Corps AID Number: 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Mark Senior Agency/Consultant Company: WK Dickson Other: 5d1. Jurisdictional determination upload Broken Saddle NCDWQ Stream Identification and SAM.pdf 6. Future Project Plans 6a. Is this a phased project?* r Yes r No 955.86KB r Unknown Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? D. Proposed Impacts Inventory 1. Impacts Summary 1a. Where are the impacts associated with your project? (check all that apply): r Wetlands W Streams -tributaries r Open Waters r Pond Construction 3. Stream Impacts F Buffers 3a. Reason for impact (?) 3b.lmpact type * 3c. Type of impact* 3d. S. name* 3e. Stream Type * 3f. Type of 3g. S. width * 3h. Impact F (?) Jurisdiction* length* S1 Grading 9 Permanent Stabilization Unnamed Trib Perennial Corps P 10 10 Average (feet) (linearfeet) S2 Plunge pool & boulder walls 9 P Permanent Stabilization Unnamed Trib Perennial Corps P 15 70 Average (feet) (linearfeet) S3 Riffle grade control Temporary Fill Unnamed Trib Perennial Corps 15 10 Average (feet) (linearfeet) S4 Grading 9 Permanent Stabilization Unnamed Trib Perennial Corps P 15 9 Average (feet) (liriearfeet) S5 Culvert extension and Permanent Culvert Unnamed Trib Perennial Cor P s 15 40 headwall Average (feet) (lin�rfeet) S6 Riffle grade control Temporary Fill Unnamed Trib Perennial Corps 15 10 Average (feet) (lir�rfeet) 31. Total jurisdictional ditch impact in square feet: 31. Total permanent stream impacts: 129 31. Total stream and ditch impacts: 149 3j. Comments: E. Impact Justification and Mitigation 1. Avoidance and Minimization 31. Total temporary stream impacts: 20 la. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: During the planning and design phase of the project, efforts were made to avoid impacts to the greatest extent possible. Certain unavoidable impacts are necessary to fulfill the purpose and need of the project. Stream impacts have been reduced by limiting the size of the project area and with construction techniques that include headwalls and embedding the culverts. Installations of grade control structures below ORWMs are limited in placement and size to the minimum necessary to ensure channel stability. Also, to reduce permanent impacts to jurisdictional waters, epsting channel substrates will be restored following construction. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: To minimize impacts to surface water resources during the project construction and maintenance, an erosion and sedimentation control plan will be included in the project's design plans. Soft stabilization practices including installation of grade control structures, coir matting installation, and seeding will be used throughout the project. All erosion control measures will be placed in accordance with the Erosion Control Regulations. Local stormvater and erosion control regulations will be followed on the project site. Local stormwater and erosion control regulations will be followed on the project site. The stabilized stream banks will be planted with native vegetation. Ongoing on -site construction inspection will ensure that construction contractors are following all DEQ-approved plans. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? r Yes r No 2b. If this project DOES NOT require Compensatory Mitigation, explain why: This is an infrastructure rehabilitation project. F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? r Yes r No If no, explain why: The project is located in the Cape Fear river basin. 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?* r Yes r No 2b. Does this project meet the requirements for low density projects as defined in 15ANCAC 02H .1003(2)? r Yes r No 2c. Does this project have a stormwater management plan (SMP) reviewed and approved under a state stormwater program or state -approved local government stormwater program? r Yes r No 3. Stormwater Requirements 3a. Select whether a completed stormwater management plan (SMP) is included for review and approval or if calculations are provided to document the project will not cause degradation of downstream surface waters.* r Stormwater Management r Antidegradation Plan Calculations 3b. Stormwater Management Plan 3c. Antidegradation Calculations: Comments: This is an infrastructure maintenance project and does not require a storrrrvvater management plan. G. Supplementary Information 1. Environmental Documentation la. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?* r Yes r No 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental Policy Act (NEPA/SEPA)?* r Yes r No Comments:* This is an infrastructure maintenance project and does not require an environmental document pursuant to the requirements of the NEPA/SEPA. 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)? * r Yes r No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project result in additional development, which could impact nearby downstream water quality?* r Yes f• No 3b. If you answered "no," provide a short narrative description. This is a stormwater maintenance project to upgrade under -performing structures and restabilize stream banks. Secondary and cumulative impacts due to development are not a>pected to increase since the subdivision is already developed. The improvements are designed to provide stornmater structure improvement and prevent flooding events. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project?* r Yes r No r N/A 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat?* r Yes r No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* r Yes r No 5c. If yes, indicate the USFWS Field Office you have contacted. Asheville 5d. Is another Federal agency involved?* r Yes r No r Unknown 5e. Is this a DOT project located within Division's 1-8? r' Yes r No 5f. Will you cut anytrees in order to conduct the work in waters of the U.S.? r Yes r No 5g. Does this project involve bridge maintenance or removal? r Yes r No 5h. Does this project involve the construction/installation of a wind turbine(s)?* r Yes r No 51. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.? r Yes r No 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? https://ecos.fws.gov/ecp/report/table/critical-habitat. html Consultation Documentation Upload Critical Habitat for Threatened & Endangered Species [USFWS].pdf 532.69KB 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* (- Yes r No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* https://www.fisheries.noaa.gov/resource/map/essential-fish-habitat-ni apper 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?* (- Yes r No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources?* North Carolina State Historic Preservation Office 7c. Historic or Prehistoric Information Upload NCHPO.pdf 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-yearfloodplain?* r Yes r No 8c. What source(s) did you use to make the floodplain determination?* hftps://fris.nc.gov/fris/ Miscellaneous Comments Miscellaneous attachments not previously requested. Impacts.pdf Signature * 17 By checking the box and signing below, I certify that: 328.67KB J 976.81 KB u I have given true, accurate, and complete information on this form; I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • I intend to electronically sign and submit the PCN form. Full Name: Marc Thomas Horstman Signature Date 3/13/2020 AUTUMN I H, RVESJJT DR R EKF CRD`RD-, ,- /\•`� 'PFpy � fogsy7H xD TV ak O i D _"j o J y Ct�' FIRST �Ye--�1, ��\� ai RITIAN �J KERN_ERSVILLE } Mid: C• �r - BR SIDE ,%'' CO 'LINE_D - - ` y M TESSORISc m - ad sr BNHAMER ST �j v O r O I i _ 11i }off o KERNERSVILLE ST : Elem ONEL50N KfNS N I J" IL Galdcn' i tN 1�N Rey PVNEVIEIV D ryTQ-= �NST ,t I c 42I so N f M WAIN o _ — — ltHDSPY S IJ I 1 OLD GREENSBORO RD 4'1 i s m h p + - Lp fNDUSTRIALFig Oft Olt �n $ l s _ USGS�The National Map: National Boundaries Dataset, National Elevation Dataset; Geographic Names Information System, National Hydrography I1,1040 R— 1 Dataset; National Land Cover Database, National Structures Dataset, and 1 National` Transportation Dataset; U.S. Census Bureau - TIGER/Line; HERE `-- Road Data �WK N Figure 2 - USGS Map 2,000 1,000 0 2,000 � Broken Saddle Lane DICKSON wW M Feet community infrastructure consultants S Culvert Replacement Project 1 inch = 2,000 feet Legend Culverts Stream Centerline Map Unit Symbol 0 BtE 0 CaB• - CIB 0 CoA 0 Gu 0 HaA 0 NaB NaC 0 PcF2 - PpC2 - PpD2 0 TdC UJ a a CO C�aB -NaB -tea r i r �. -. . AiL- CIB - 1 I im ti PhWK Figure 3 - Soils Map 200 100 0 200 WDICKSON W+t Broken Saddle Lane Feet community infrastructure consultants S Culvert Replacement Project 1 inch = 200 feet Impact S1 - 10 LF Temporary � r t-- .fit Existing Culverts Impact 0 Permanent 0 Temporary PhWK N Impact Map WDICKSON W Broken Saddle Lane community infrastructure consultants sCulvert Replacement Project be 60 30 0 1 inch = 60 feet 60 Feet NC DWQ Stream Identification Form Version 4.11 Date: 7 9 /� Project/Site: Latitude: 3� Evaluator�` 1,� o� ✓ County: �j,tlyT�� Longitude: . Total Points: Stream Determination (circl a Other Stream is at least intermittent q if>_ 19 or perennial if>_ 30" .3/ Ephemeral Intermittent erennial p e. Quad Name: g' A. Geomorphology (Subtotal = ZO, f �) Absent Weak Moderate Stron ,a. Continuity of channel bed and bank 0 1 2 3 2. Sinuosity of channel along thalweg 0 1 2) 3 3. In -channel structure: ex. riffle -pool, step -pool, ripple -pool sequence 0 1 3 4. Particle size of stream substrate 0 1' 2 3 5. Active/relict floodplain 0 2 3 6. Depositional bars or benches 0 1 2 7. Recent alluvial deposits 0 1 2 8. Headcuts 0 1 2 3 9. Grade control 0 0.5 1 1.5 10. Natural valley 0 0.5 1 1. 11. Second or greater order channel No 0 Yes = 3 artificial ditches are not rated; see discussions in manual B. Hydrology (Subtotal = -:ix ) 12. Presence of Baseflow 0 1 2 0> 13. Iron oxidizing bacteria 0 1 2 3 14. Leaf litter 1.5 65 0.5 0 15. Sediment on plants or debris 0 0.5 1 1. 16. Organic debris lines or piles 0 0.5 1 1. 17. Soil -based evidence of high water table? No 0)Yes = 3 C. Biology (Subtotal = ___Z1.l' ) " ` C 18. Fibrous roots in streambed 3 2 1 0 19. Rooted upland plants in streambed 3 2 1 0 20. Macrobenthos (note diversity and abundance) 0 1 a 3 21. Aquatic Mollusks 1 2 3 22. Fish 0 0.5 1 1.5 23. Crayfish 0 0.5 1 1.5 24. Amphibians 0 0.5 1 1. 25. Algae 0 0.5 1 1. 26. Wetland plants in streambed FACW = 0.75; OBL Other = 0 J .perennial streams may also be identified using other methods. See p. 35 of manual. L z Notes: lam, ,. ,, / /=•• , Sketch: ,rv,4-/ T,. 6. T +,V user manual version z.i INSTRUCTIONS: Attach a sketch of the assessment area and photographs. Attach a copy of the USGS 7-5-minute topographic quadrangle, and circle the location of the stream reach under evaluation. If multiple stream reaches will be evaluated on the same property, identify and number all reaches on the attached map, and include a separate form for each reach. See the NC SAM User Manual for detailed descriptions and explanations of requested information. Record in the "Notes/Sketch" section if any supplementary measurements were performed. Seethe NC SAM User Manual for examples of additional measurements that maybe relevant. NOTE EVIDENCE OF STRESSORS AFFECTING THE ASSESSMENT AREA (do not need to be within the assessment area). PROJECT / SITE INFORMATION: 1. Project name (if any): Broken Saddle Culverts 2. Date of evaluation: 7/9/2109 3. Applicantlowner name: Town of Kernersville 4. Assessor name/organization: Mark Senior / WK Dickson 5. County: Forsyth 6. Nearest named water body 7. River Basin: Cape Fear on USGS 7-5-minute quad: Reedy Fork 8. Site coordinates (decimal degrees, at lower end of assessment reach): 36.1238625-80.0556250 STREAM INFORMATION: (depth and width can be approximations) 9. Site number (show on attached map): 1 10. Length of assessment reach evaluated (feet): 600 11. Channel depth from bed (in riffle, if present) to top of bank (feet): 3 r Unable to assess channel depth. 12. Channel width at top of bank (feet): 6 13. Is assessment reach a swamp stream? r Yes r No 14. Feature type: {o Perennial flow r Intermittent flow r Tidal Marsh Stream STREAM RATING INFORMATION: 15. NC SAM Zone: r Mountains (M) {: Piedmont (P) r Inner Coastal Plain (1) { Outer Coastal Plain (0) 16. Estimated geomorphic \1. J valley shape (skip for {o a Tidal Marsh Stream): (more sinuous stream, flatter valley slope) (less sinuous stream, steeper valley slope) 17. Watershed size: (skip r Size 1 (< 0.1 mi`) {: Size 2 (0.1 to < 0.5 mi`) r Size 3 (0.5 to < 5 mi`) r Size 4 (>_ 5 miz) for Tidal Marsh Stream) ADDITIONAL INFORMATION: 18. Were regulatory considerations evaluated? {o Yes r No If Yes, check all that appy to the assessment area. r Section 10 water r Classified Trout Waters r Water Supply Watershed ( r I r II {o III r IV r V) r Essential Fish Habitat r Primary Nursery Area r High Quality Waters/Outstanding Resource Waters r Publicly owned property r NCDWR riparian buffer rule in effect r Nutrient Sensitive Waters r Anadromous fish r 303(d) List r CAMA Area of Environmental Concern (AEC) r Documented presence of a federal and/or state listed protected species within the assessment area. List species: r Designated Critical Habitat (list species): 19. Are additional stream information/supplementary measurements included in "Notes/Sketch" section or attached? r Yes No 1. Channel Water- assessment reach metric (skip for Size 1 streams and Tidal Marsh Streams) {: A Water throughout assessment reach. { B No flow, water in pools only. { C No water in assessment reach. 2. Evidence of Flow Restriction - assessment reach metric {: A At least 10 % of assessment reach in -stream habitat or riffle -pool sequence is adversely affected by a flow restriction or fill to the point of obstructing flow or a channel choked with aquatic macrophytes or ponded water or impounded on flood or ebb within the assessment reach (examples: undersized or perched culverts, causeways that constrict the channel, tidal gates). { B Not A 3. Feature Pattern - assessment reach metric A A majority of the assessment reach has altered pattern (examples: straightening, modification above or below culvert). . B Not A. 4. Feature Longitudinal Profile - assessment reach metric (: A Majority of assessment reach has a substantially altered stream profile (examples: channel down -cutting, existing damming, overwidening, active aggradation, dredging, and excavation where appropriate channel profile has not reformed from any of these disturbances). { B Not 5. Signs of Active Instability - assessment reach metric Consider only current instability, not past events from which the stream has currently recovered. Examples of instability include active bank failure, active channel down -cutting (head -cut), active widening, and artificial hardening (such as concrete, gabion, rip -rap). r A < 10 % of channel unstable r B 10 to 25 % of channel unstable {: C > 25 % of channel unstable 6. Streamside Area Interaction - streamside area metric Consider for the Left Bank (LB) and the Right Bank (RB). LB RB { A { A Little or no evidence of conditions that adversely affect reference interaction { B { B Moderate evidence of conditions (examples: berms, levees, down -cutting, aggradation, dredging) that adversely affect reference interaction (examples: limited streamside area access, disruption of flood flows through streamside area, leaky or intermittent bulkheads, causeways with floodplain constriction, minor ditching [including mosquito ditching]) {: C {: C Extensive evidence of conditions that adversely affect reference interaction (little to no floodplain/intertidal zone access [examples: causeways with floodplain and channel constriction, bulkheads, retaining walls, fill, stream incision, disruption of flood flows through streamside area] or too much floodplain/intertidal zone access [examples: impoundments, intensive mosquito ditching]) or floodplain/intertidal zone unnaturally absent or assessment reach is a man-made feature on an interstream divide 7. Water Quality Stressors - assessment reachlintertidal zone metric Check all that apply. 7 A Discolored water in stream or intertidal zone (milky white, blue, unnatural water discoloration, oil sheen, stream foam) 7o B Excessive sedimentation (burying of stream features or intertidal zone) 7 C Noticeable evidence of pollutant discharges entering the assessment reach and causing a water quality problem (✓ D Odor (not including natural sulfide odors) 7 E Current published or collected data indicating degraded water quality in the assessment reach. Cite source in the "Notes/Sketch" section. r F Livestock with access to stream or intertidal zone r G Excessive algae in stream or intertidal zone r H Degraded marsh vegetation in the intertidal zone (removal, burning, regular mowing, destruction, etc.) P, I Other: adjacent sewer main (explain in "Notes/Sketch" section) r J Little to no stressors 8. Recent Weather -watershed metric For Size 1 or 2 streams, D1 drought or higher is considered a drought; for Size 3 or4 streams, D2 drought or higher is considered a drought. { A Drought conditions and no rainfall or rainfall not exceeding 1 inch within the last 48 hours { B Drought conditions and rainfall exceeding 1 inch within the last 48 hours {: C No drought conditions 9 Large or Dangerous Stream- assessment reach metric Yes (i No Is stream is too large or dangerous to assess? If Yes, skip to Metric 13 (Streamside Area Ground Surface Condition). Natural In -stream Habitat Types - assessment reach metric 10a. . Yes No Degraded in -stream habitat over majority of the assessment reach (examples of stressors include excessive sedimentation, mining, excavation, in -stream hardening [for example, rip -rap], recent dredging, and snagging) (evaluate for size 4 Coastal Plain streams only, then skip to Metric 12) 10b. Check all that occur (occurs if > 5 % coverage of assessment reach) (skip for Size 4 Coastal Plain streams) r A Multiple aquatic macrophytes and aquatic mosses m w r F 5 % oysters or other natural hard bottoms (include liverworts, lichens, and algal mats) F_ m r G Submerged aquatic vegetation Fe B Multiple sticks and/or leaf packs and/or emergent o U) Cr H Low -tide refugia (pools) vegetation r 0 r I Sand bottom F., C Multiple snags and logs (including lap trees) r m r J 5 % vertical bank along the marsh F., D 5 % undercut banks and/or root mats and/or roots O r K Little or no habitat in banks extend to the normal wetted perimeter r E Little or no habitat *********************************REMAINING QUESTIONS ARE NOT APPLICABLE FOR TIDAL MARSH STREAMS**************************** 11. Bedform and Substrate -assessment reach metric (skip for Size 4 Coastal Plain streams and Tidal Marsh Streams) 1 la. r Yes (* No Is assessment reach in a natural sand -bed stream? (skip for Coastal Plain streams) 11 b. Bedform evaluated. Check the appropriate box(es). r A Riffle -run section (evaluate 11c) r B Pool -glide section (evaluate 11d) r C Natural bedform absent (skip to Metric 12, Aquatic Life) 11c. In riffles sections, check all that occur below the normal wetted perimeter of the assessment reach -whether or not submerged. Check at least one box in each row (skip for Size 4 Coastal Plain Streams and Tidal Marsh Streams). Not Present (NP) _ absent, Rare (R) = present but <- 10%, Common (C) _ > 10-40%, Abundant (A) _ > 40-70%, Predominant (P) _ > 70%. Cumulative percentages should not exceed 100 % for each assessment reach. NP R C A P (. r r r r Bedrock/saprolite fo r r r r Boulder (256 - 4096 mm) Cobble (64 - 256 mm) Gravel (2 - 64 mm) Sand (.062 - 2 mm) r G r r r Silt/clay(<0.062mm) r r (. r r Detritus r r (. r r Artificial (rip -rap, concrete, etc.) 11d. (- Yes {" No Are pools filled with sediment? (skip for Size 4 Coastal Plain streams and Tidal Marsh Streams) 12. Aquatic Life - assessment reach metric (skip for Size 4 Coastal Plain streams and Tidal Marsh Streams) 12a. {: Yes (" No Was an in -stream aquatic life assessment performed as described in the User Manual? If No, select one of the following reasons and skip to Metric 13. r No Water r Other: 12b. (. Yes r No Are aquatic organisms present in the assessment reach (look in riffles, pools, then snags)? If Yes, check all that apply. If No, skip to Metric 13. 1 >1 Numbers over columns refer to "individuals" for size 1 and 2 streams and "taxa" for size 3 and 4 streams. r r Adult frogs r r Aquatic reptiles r r Aquatic macrophytes and aquatic mosses (include liverworts, lichens, and algal mats) r r Beetles (including water pennies) r r Caddisfly larvae (Trichoptera [f]) r r Asian clam (Corbicula ) r r Crustacean (iso pod/am ph ipod/crayfish/sh rim p) r r Damselfly and dragonfly larvae r r Dipterans (true flies) r r Mayfly larvae (Ephemeroptera [E]) r r Megaloptera (alderfly, fishfly, dobsonfly larvae) r r Midges/mosquito larvae r r Mosquito fish (Gambusia) or mud minnows (Umbra pygmaea) r r Mussels/Clams (not Corbicula ) F r Other fish F r Salamanders/tadpoles F_ r Snails F r Stonefly larvae (Plecoptera [P]) F r Tipulid larvae F r Worms/leeches 13. Streamside Area Ground Surface Condition - streamside area metric (skip for Tidal Marsh Streams and B valley types) Consider for the Left Bank (LB) and the Right Bank (RB). Consider storage capacity with regard to both overbank flow and upland runoff. LB RB i A i`" A Little or no alteration to water storage capacity over a majority of the streamside area t " B i-o B Moderate alteration to water storage capacity over a majority of the streamside area is C i ' C Severe alteration to water storage capacity over a majority of the streamside area (examples include: ditches, fill, soil, compaction, livestock disturbance, buildings, man-made levees, drainage pipes) 14. Streamside Area Water Storage - streamside area metric (skip for Size 1 streams, Tidal Marsh Streams, and B valley types) Consider for the Left Bank (LB) and the Right Bank (RB) of the streamside area. LB RB i" A ; A Majority of streamside area with depressions able to pond water >_ 6 inches deep i- B is B Majority of streamside area with depressions able to pond water 3 to 6 inches deep is C i C Majority of streamside area with depressions able to pond water < 3 inches deep 15. Wetland Presence - streamside area metric (skip for Tidal Marsh Streams) Consider for the Left Bank (LB) and the Right Bank (RB). Do not consider wetlands outside of the streamside area or within the normal wetted perimeter of assessment reach. LB RB ( Y { Y Are wetlands present in the streamside area? {: N N 16. Baseflow Contributors - assessment reach metric (skip for size 4 streams and Tidal Marsh Streams) Check all contributors within the assessment reach or within view of and draining to the assessment reach. (- A Streams and/or springs (jurisdictional discharges) Fv B Ponds (include wet detention basins, do not include sediment basins or dry detention basins) (- C Obstruction that passes some flow during low -flow periods within assessment area (beaver dam, bottom -release dam) (- D Evidence of bank seepage or sweating (iron oxidizing bacteria in water indicates seepage) F- E Stream bed or bank soil reduced (dig through deposited sediment if present) F- F None of the above 17. Baseflow Detractors - assessment area metric (skip for Tidal Marsh Streams) Check all that apply. I- A Evidence of substantial water withdrawals from the assessment reach (includes areas excavated for pump installation) F_ B Obstruction not passing flow during low flow periods affecting the assessment reach (ex: watertight dam, sediment deposit) F-' C Urban stream (>_ 24 % impervious surface for watershed) r D Evidence that the stream -side area has been modified resulting in accelerated drainage into the assessment reach F- E Assessment reach relocated to valley edge i- F None of the above 18. Shading - assessment reach metric (skip for Tidal Marsh Streams) Consider aspect. Consider "leaf -on" condition. i-" A Stream shading is appropriate for stream category (may include gaps associated with natural processes) is B Degraded (example: scattered trees) C Stream shading is gone or largely absent 19. Buffer Width - streamside area metric (skip for Tidal Marsh Streams) Consider "vegetated buffer" and "wooded buffer" separately for left bank (LB) and right bank (RB) starting at the top of bank out to the first break. Vegetated Wooded LB RB LB RB i A i A (` A i^' A > 100-feet wide or extends to the edge of the watershed t " B i ' B B is B From 50 to < 100-feet wide is C C C C C C From 30 to < 50-feet wide i` D i`' D D { D From 10 to < 30-feet wide i` E t- E {: E { E < 10-feet wide or no trees 20. Buffer Structure - streamside area metric (skip for Tidal Marsh Streams) Consider for left bank (LB) and right bank (RB) for Metric 19 ("Vegetated" Buffer Width). LB RB { A f- A Mature forest ( B is B Non -mature woody vegetation or modified vegetation structure C: C i_" C Herbaceous vegetation with or without a strip of trees < 10 feet wide C` D D Maintained shrubs { E ; E Little or no vegetation 21. Buffer Stressors - streamside area metric (skip for Tidal Marsh Streams) Check all appropriate boxes for left bank (LB) and right bank (RB). Indicate if listed stressor abuts stream (Abuts), does not abut but is within 30 feet of stream (< 30 feet), or is between 30 to 50 feet of stream (30-50 feet). If none of the following stressors occurs on either bank, check here and skip to Metric 22: 7 Abuts < 30 feet 30-50 feet LB RB LB RB LB RB i A i A C` A C` A C A i _' A Row crops (: B { B (` B r B r B ;" B Maintained turf C` C { C C` C r C ('' C C Pasture (no livestock)/commercial horticulture { D { D D i- D f` D i__ D Pasture (active livestock use) 22. Stem Density — streamside area metric (skip for Tidal Marsh Streams) Consider for left bank (LB) and right bank (RB) for Metric 19 ("Wooded" Buffer Width). LB RB (' A (' A Medium to high stem density { B B Low stem density (? C r C No wooded riparian buffer or predominantly herbaceous species or bare ground 23. Continuity of Vegetated Buffer— streamside area metric (skip for Tidal Marsh Streams) Consider whether vegetated buffer is continuous along stream (parallel). Breaks are areas lacking vegetation > 10-feet wide. LB RB (- A (: A The total length of buffer breaks is < 25 percent. r B r B The total length of buffer breaks is between 25 and 50 percent- r. C r C The total length of buffer breaks is > 50 percent. 24. Vegetative Composition —First 100 feet of streamside area metric (skip for Tidal Marsh Streams) Evaluate the dominant vegetation within 100 feet of each bank or to the edge of the watershed (whichever comes first) as it contributes to assessment reach habitat. LB RB ( A r A Vegetation is close to undisturbed in species present and their proportions. Lower strata composed of native species, with non-native invasive species absent or sparse- r B (o B Vegetation indicates disturbance in terms of species diversity or proportions, but is still largely composed of native species. This may include communities of weedy native species that develop after clear -cutting or clearing or communities with non-native invasive species present, but not dominant, over a large portion of the expected strata or communities missing understory but retaining canopy trees. {: C r C Vegetation is severely disturbed in terms of species diversity or proportions. Mature canopy is absent or communities with non-native invasive species dominant over a large portion of expected strata or communities composed of planted stands of non -characteristic species or communities inappropriately composed of a single species or no vegetation. 25. Conductivity — assessment reach metric (skip for all Coastal Plain streams) 25a. (- Yes (. No Was a conductivity measurement recorded? If No, select one of the following reasons. r No Water r Other: 25b. Check the box corresponding to the conductivity measurement (units of microsiemens per centimeter). ("A <46 rB 46to<67 rC 67to<79 rD 79to<230 rE >_ 230 Notes/Sketch: NC SAM Stream Rating Sheet Accompanies User Manual Version 2.1 Stream Site Name Broken Saddle Culverts Date of Evaluation 7/9/2109 Stream Category Pa2 Assessor Name/Organization Mark Senior / WK Dickson Notes of Field Assessment Form(Y/N) NO Presence of regulatory considerations (Y/N) YES Additional stream information/supplementary measurements included (Y/N) NC SAM feature type (perennial, intermittent, Tidal Marsh Stream) Perennial USACE/ NCDWR Function Class Rating Summary All Streams Intermittent (1) Hydrology LOW (2) Baseflow HIGH (2) Flood Flow LOW (3) Strearrside Area Attenuation LOW (4) Floodplain Access LOW (4) Wooded Riparian Buffer LOW (4) Microtopography LOW (3) Stream Stability MEDIUM (4) Channel Stability LOW (4) Sediment Transport HIGH (4) Stream Geomorphology MEDIUM (2) Stream'IntertidalZone Interaction NA (2) Longitudinal Tidal Flow NA (2) Tidal Marsh Stream Stability NA (3) Tidal Marsh Channel Stability NA (3) Tidal Marsh Stream Geomorphology NA (1) Water Quality MEDIUM (2) Baseflow HIGH (2) Strearrside Area Vegetation LOW (3) Upland Pollutant Filtration LOW (3) Thermoregulation MEDIUM (2) Indicators of Stressors YES (2) Aquatic Life Tolerance HIGH (2) Intertidal Zone Filtration NA (1) Habitat LOW (2) In -stream Habitat MEDIUM (3) Baseflow HIGH (3) Substrate HIGH (3) Stream Stability LOW (3) In -stream Habitat MEDIUM (2) Stream -side Habitat LOW (3) Stream -side Habitat LOW (3) Thermoregulation MEDIUM (2) Tidal Marsh In -stream Habitat NA (3) Flow Restriction NA (3) Tidal Marsh Stream Stability NA (4) Tidal Marsh Channel Stability NA (4) Tidal Marsh Stream Geomorphology NA (3) Tidal Marsh In -stream Habitat NA (2) Intertidal Zone Habitat NA Overall LOW Broken Saddle Lane Brawn RtS t-ri o A f arm*e�¢�� � • a s1ii•,an dIJ v� 41141 Or FY3927 House FY2u2t House FYDM5 V1+Ind FY113384 HenFy Clap Edwsrds House 1582 4 ■Y392-2 House yr 4 Bost 51 ro ' 2 Y a A G z Neil +�451 '4 4 41-0 VIP • °�� $ti §e 41 4b L 41 w Ar. April 1, 2019 NR Points w NR Individual Listing 0 NR Listing, Gone NRHD Center Point CIO s P` e13% wS r C&Pe 0, 9 o LPFY392B House a 1' m Ken ¢ar (breerM 0,' ISFY3929 House WT FO RSY- cTH d 4W 0 Vt GUI c 0� 60 i F(bW House ° FY3931 House o I 9 1� 7 park Lawn cl U. C A* Gave.$ Sj, V-3] I w FY3932 House Oi r4 Gar FY'34 1 Home LI 3 f3 � s E{J 1:18,056 0 0.13 0.25 0.5 mi 0 0.2 0.4 0.8 km State of North Carolina DOT, Esri, HERE, Garmin, INCREMENT P, NGA 4/1 /2019 Critical Habitat for Threatened & Endangered Species [USFWS] Lriticai rianrtat Tor i nreatenea & tnaangerea Species Lusrws Final Linear Features n p�4y�L Final Polygon Features o` n s � � C E 3 Y C +nt,bell f`.ardens Rd Proposed Linear Features Proposed Polygon Caryon did Features c ,y C Kensal Cre, r?pr � I c a y � O fi GraVelawn Dr to S Sd J I S1i 1 h- A specific geographic area(s) that contains features essential for the conservation of a threatened or endangered species � 1 600ft and that may require special management and protection. U.S. Fish and Wildlife Service I State of North Carolina DOT, Esri, HERE, Garmin, INCREMENT P, Intermap, USGS, METI/NASA, EPA, USDA https://fws.maps.arcgis.com/home/webmap/print.html 1 /1 -•.vip��s� � Q ? �L I �1 7rY Gvr6errs o� �� Qd. MQxy �•� 1� - �ha z �� PROJECT LOCATION S� i ., L' �[ FIEO I -sygOP Sh fields Bd ems � CF K2i.rersville Medial Cr ntEr C, Steen Rd 6* rh- Rd VICINITY MAP NTS INDEX OF SHEETS SHEET NUMBER SHEET TITLE 1 COVER 2 GENERAL NOTES & LEGEND 3 BROKEN SADDLE LN CULVERT PLAN & PROFILE 4 MARYLEBONE DR CULVERT PLAN & PROFILE 5 DETAILS 6 DETAILS 7 EROSION CONTROL COVER 8 EROSION CONTROL PLANS 9 EROSION CONTROL PLANS 10 EROSION CONTROL DETAILS 11 EROSION CONTROL DETAILS 12 NPDES STABILIZATION PLAN 13 EROSION CONTROL SPECIFICATIONS AND MAINTENANCE 14 STRUCTURAL DETAILS 15 CUSTOM STRUCTURE 1 DETAIL 16 CUSTOM STRUCTURE 2 DETAIL 17 CUSTOM STRUCTURE 3 DETAIL 18 CUSTOM STRUCTURE 4 DETAIL DRAWN BY: M. SMALLING CAD FILE PATH: 0:AProjects\Kernersville\2018039400RA - Corjon Road Drainage Study\CADD\Plan Set PROJECT MANAGER: PROJECT DATE: M. HORSTMAN JULY 2019 PLANS AND SURVEY PREPARED BY: o Y DWK DICKSON community infrastructure consultants 0 LL 1 PLOT DATE: 7/16/2019 720 CORPORATE CENTER DRIVE RALEIGH, NC 27607 (919) 782-0495 Office Locations: Tennessee Georgia North Carolina South Carolina NC LICENSE NO. F-0374 O�F� �C!M E�R� ffhrE�R� �V 3�11�L n"Le E BROKEN SADDLE LANE CULVERT REPLACEMENT rR LI�� g�ti COD KENSAL GREEN DR CORJON RD s r tiO m O C� r 2 'n O r c O n Z (, • m O z R, z 37 Spv PRE G1 LE�GN�S��R LOCATION & SHEET LAYOUT MAP 1" = 250' Know what's below. Call before you dig. ZOw 0UO OJU Ozw aoQ z00ww_ �ma U=W OOm OQ . o Fro w ozw F -o � Wo UZ 0 zz z °om = Y J U_Q ~pS OYD w�� D1. 0 zwa 0., z OOQ o°z OwC7 w wQQ ¢�z w0 �To wFz w�a =a� 0zo Y Q Q QoQ m w z°w 3:7 OZD Uz0 -U Zw 07T YU~ U p00 Yz -= 0,d ,00 0 =zw Eo= aF7 wl 0 oow GENERAL NOTES: 1. CONTRACTOR IS TO REFER TO EROSION AND SEDIMENT CONTROL SHEETS AND INSTALL APPROPRIATE MEASURES BEFORE BEGINNING ANY WORK. 2. CONTRACTOR IS TO DISPOSE OF ALL MATERIAL REMOVED OFFSITE IN A SAFE AND LEGAL MANNER. 3. ALL DEWATERING REQUIRED TO EXECUTE WORK SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. SEE PROJECT MANUAL FOR FURTHER DETAIL. 4. SEE SPECIFICATION SECTION 02 00 00 FOR DESCRIPTION OF SUITABLE BACKFILL MATERIAL AND COMPACTION REQUIREMENTS. CONTRACTOR SHALL PROVIDE SUITABLE MATERIAL AS NECESSARY TO ACHIEVE FINAL PROJECT GRADES. 5. CONTRACTOR TO VERIFY LOCATION OF EXISTING UTILITIES PRIOR TO CONSTRUCTION. 6. TREES AND BUSHES OUTSIDE OF LIMITS OF DISTURBANCE SHALL NOT BE DISTURBED. 7. CONTRACTOR SHALL COMPLY WITH OSHA 29 CFR. PART 1926 SUBPART P, EXCAVATIONS, 29 CFR PART 1910.146, AND PERMIT REQUIRED CONFINED SPACES. 8. LIMITS OF DISTURBANCE IS SHOWN ON THE PLANS AND SHALL BE MAINTAINED AT ALL TIMES. ANY DAMAGE TO PRIVATE PROPERTY CAUSED BY CONTRACTOR SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO REPAIR OR REPLACE TO ORIGINAL OR SUPERIOR CONDITION. 9. CONTRACTOR'S WORK MUST REMAIN INSIDE THE LIMITS OF DISTURBANCE NOTED ON THESE PLANS AT ALL TIMES. EXISTING CONDITIONS NOTES 1. TREES AND SHRUBS THAT THE CONTRACTOR IS REQUIRED TO REMOVE ARE SHOWN ON THE PLANS. THE CONTRACTOR SHALL SAVE ALL OTHER TREES AND SHRUBS OUTSIDE THE LIMITS OF DISTURBANCE UNLESS OTHERWISE DIRECTED BY THE ENGINEER. 2. LIMITS OF DISTURBANCE SHALL BE "VISI-BARRIER" HIGH DENSITY POLYETHYLENE FABRIC, ORANGE, FOUR FEET IN HEIGHT, OR, TEMPORARY SILT FENCE. INSTALL PER MANUFACTURERS SPECIFICATIONS WHERE SHOWN ON THE PLANS. 3. IF REQUIRED, THE CONTRACTOR SHALL RELOCATE ALL MAIL BOXES AS REQUIRED BY SECTION 107-12 OF THE NCDOT STANDARD SPECIFICATIONS FOR ROADS AND STRUCTURES. COORDINATE THIS WORK WITH THE U.S. POSTAL SERVICE. 4. THE CONTRACTOR SHALL IMMEDIATELY REPORT TO THE TOWN OF KERNERSVILLE ANY DISCREPANCIES FOUND BETWEEN ACTUAL CONDITION AND CONSTRUCTION DOCUMENTS AND SHALL WAIT FOR INSTRUCTION FROM THE TOWN INSPECTOR PRIOR TO PROCEEDING. PAVING NOTES 1. SIDEWALK SHALL BE FOUR INCHES THICK, AND SIX INCHES THICK AT DRIVEWAY CROSSINGS, IF APPLICABLE. 2. IF REQUIRED, THE CONTRACTOR SHALL IMMEDIATELY RESTORE ALL DRIVEWAYS AND DRIVES TO MAIL BOXES AS GOOD AS OR BETTER THAN ORIGINAL CONDITION. CONTRACTOR SHALL MAINTAIN ALL DRIVEWAYS OR MAIL BOX DRIVES UNTIL SAID DRIVES ARE ACCEPTED BY THE ENGINEER AS BEING AS GOOD AS OR BETTER THAN THEIR ORIGINAL CONDITION. 3. IF REQUIRED, THE CONTRACTOR SHALL SET AND ADJUST PROPOSED CURB ELEVATIONS AS NECESSARY TO ENSURE PROPER LONGITUDINAL GRADE FOR DRAINAGE. THE CONTRACT SHALL RETAIN EXISTING PAVEMENT, UNLESS OTHERWISE NOTED. 4. ALL CALLOUTS FOR REMOVAL AND REPLACEMENT OF PAVEMENT INCLUDE THE TOTAL AMOUNT TO BE REMOVED AND REPLACED PER CONTINUOUS SECTION. REMOVAL AND REPLACEMENT AREAS ARE HATCHED APPROPRIATELY AS NOTED ON EACH SHEET. 5. PROPOSED PAVING SHALL BE COMPLETED AS INDICATED ON THE PLANS AND IN ACCORDANCE WITH DIVISIONS 6 AND 7 OF THE SPECIFICATIONS. GRADING & DRAINAGE NOTES 1. PIPE INVERT ELEVATIONS HAVE PRECEDENCE OVER SLOPES. HOWEVER, SLOPES SHALL NOT BE DECREASED FROM THOSE SHOWN ON PLAN WITHOUT PRIORAPPROVAL FROM THE ENGINEER. 2. POSITIVE DRAINAGE SHALL BE PROVIDED ON ALL GRADED AREAS, ESPECIALLY AREAS TO BE PAVED, THROUGHOUT CONSTRUCTION. 3. PIPE LENGTHS INDICATED ON PLAN ARE APPROXIMATE ONLY. 4. NO SOIL DISTURBANCE OR COMPACTION, CONSTRUCTION MATERIALS, TRAFFIC, TRENCHING, OR OTHER LAND DISTURBING ACTIVITY SHALL BE PERMITTED BEYOND LIMITS OF DISTURBANCE WITHOUT PRIOR APPROVAL FROM THE OWNER. 5. EXISTING AND PROPOSED CONTOURS ARE SHOWN ON THE PLAN AT V INTERVALS. 6. ALL PROPOSED GRADES ARE FINISH GRADES. 7. GRADES, ELEVATIONS AND LOCATION SHOWN ARE APPROXIMATE. AS DIRECTED BY THE ENGINEER, THEY MAY BE ADJUSTED TO ACCOMMODATE UNFORESEEN CONDITIONS. 8. WEEP HOLES ARE TO BE CONSTRUCTED IN ALL DRAINAGE STRUCTURES. WEEP HOLES SHOULD BE 8' ON CENTER WITH A MINIMUM OF 1 WEEP HOLE PER WALL. WEEP HOLES ARE TO BE COVERED ON THE OUTSIDE OF THE STRUCTURE BY A BAG MADE OF FILTER FABRIC FILLED WITH #78 STONE. THERE WILL BE NO SEPARATE PAYMENT FOR THIS WORK. 9. LIMITS OF PROPOSED SLOPES ARE INDICATED IN THE PLANS, DETAILS AND STANDARD DRAWINGS. THE MAXIMUM FILL SLOPE SHALL NOT EXCEED A 2:1 (HORIZONTAL TO VERTICAL) UNLESS DESIGNATED BY THE ENGINEER. CUT SLOPES GREATER THAN 2:1 WILL BE USED ONLY AS DIRECTED BY THE ENGINEER AND AT THE SPECIFIC LOCATIONS SHOWN ON THE PLANS. WARRANTY NOTES UTILITY NOTES 1. CONSTRUCTION METHODS AND MATERIALS SHALL BE IN ACCORDANCE WITH KERNERSVILLE PUBLIC UTILITIES STANDARDS AND SPECIFICATIONS, UNLESS OTHERWISE NOTED. 2. ALL CONTRACTORS WORKING ON KERNERSVILLE PROJECTS ARE REQUIRED TO OWN A COPY OF THE DESIGN MANUAL AND SHALL KEEP A COPY ON THE JOB SITE AT ALL TIMES. 3. CONTRACTOR IS FULLY RESPONSIBLE FOR CONTACTING ALL APPROPRIATE PARTIES AND ASSURING THAT UTILITIES ARE LOCATED PRIOR TO THE COMMENCEMENT OF CONSTRUCTION. CALL NC ONE -CALL AT 811 FOR UTILITY LOCATING SERVICES 48 HOURS PRIOR TO COMMENCEMENT OF ANY WORK. CONTRACTOR SHALL VERIFY LOCATION AND DEPTH OF ALL EXISTING UTILITIES PRIOR TO CONSTRUCTION. 4. CONTRACTOR SHALL BE RESPONSIBLE FOR CORRECTING ANY DAMAGES TO EXISTING UTILITIES, STORM DRAINAGE, AND OTHER FACILITIES WHETHER SAID ITEMS ARE SHOWN ON PLANS OR NOT. 5. CONTRACTOR SHALL NOTIFY THE TOWN OF KERNERSVILLE UTILITY COORDINATOR OF IMPENDING WORK. THE UTILITY COORDINATOR SHALL BE CONTACTED 48 HOURS PRIOR TO CONSTRUCTION. 6. IN THE EVENT OF CONFLICTS WITH EXISTING UTILITIES OR IF FURTHER VERIFICATION OF FACILITIES OR TEMPORARY DISRUPTION OF SERVICE IS NECESSARY, THE CONTRACTOR SHALL CONTACT THE APPROPRIATE UTILITY COMPANY AND SHALL FULLY COORDINATE ANY NECESSARY MODIFICATIONS WITH THE ENGINEER AND THE APPROPRIATE UTILITY. 7. IF UTILITIES WILL NEED TO BE RELOCATED DUE TO EXCAVATION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE RELOCATION COST OF THE WATER AND SEWER ONLY. 8. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH TOWN OF KERNERSVILLE AND/OR NCDOT STANDARD SPECIFICATIONS AND NORTH CAROLINA DEPARTMENT OF TRANSPORTATION STANDARDS AND DETAILS. CONTRACTOR SHALL CONTACT NCDOT DIV. 4, DIST. 2 OFFICE PRIOR TO ANY WORK WITHIN NCDOT RIGHT-OF-WAY. A COPY OF ALL APPROVED ENCROACHMENT AGREEMENTS SHALL BE KEPT ONSITE DURING ALL CONSTRUCTION ACTIVITIES. CONTRACTOR IS RESPONSIBLE FOR COMPLETING ANY NECESSARY ENCROACHMENT AGREEMENTS AND ALL CORRESPONDENCE WITH THE NCDOT AND THE TOWN OF KERNERSVILLE ASSOCIATED WITH THESE AGREEMENTS. 9. ANY MONUMENT DISTURBED DURING CONSTRUCTION SHALL BE REPLACED BY THE CONTRACTOR IN ACCORDANCE WITH THE CONTRACT DOCUMENTS. 10. MINIMUM SEPARATIONS BETWEEN EXISTING AND PROPOSED UTILITIES SHALL BE AS SPECIFIED IN THE TOWN OF KERNERSVILLE STANDARD SPECIFICATIONS. IF UTILITY SEPARATION CONFLICTS OCCUR DURING CONSTRUCTION, THE CONTRACTOR SHALL COORDINATE REQUIRED ADJUSTMENTS WITH THE ENGINEER PRIOR TO PROCEEDING WITH WORK. THE CONTRACTOR SHALL WORK AROUND EXISTING UTILITIES. 11. THE LOCATIONS OF EXISTING UTILITIES SHOWN ON THE PLANS ARE FOR THE USE OF THE CONTRACTOR IN PROVIDING PROTECTIONS FOR THE UTILITIES DURING CONSTRUCTION OPERATION. THE TOWN, DESIGN CONSULTANT, AND/OR AGENT SHALL NOT BE HELD RESPONSIBLE FOR THE ACCURACY OR LOCATION, SIZE, DEPTH OR COMPLETENESS OF THE INFORMATION. BEFORE BEGINNING CONSTRUCTION, THE CONTRACTOR SHALL CONTACT EACH OF THE UTILITY OWNERS IN THE AREA OF CONSTRUCTION RELATIVE TO THEIR UTILITY LOCATIONS. THE CONTRACTOR SHALL PROTECT ALL UTILITIES FROM DAMAGE CAUSED BY CONSTRUCTION OPERATIONS AND/OR RELATED WORK OF THE CONTRACTOR OR HIS AGENTS. THE CONTRACTOR SHALL HOLD THE TOWN HARMLESS FOR ANY INCONVENIENCE OR DELAY CAUSED BY THE OPERATIONS OF OTHERS PERFORMING THE ABOVE WORK. NECESSARY ADJUSTMENT OR RELOCATION OF EXISTING UTILITIES, EXCEPT FOR CONTRACT ITEMS, WILL BE PERFORMED BY THE UTILITY SERVICE PROVIDER. THE CONTRACTOR SHALL COORDINATE HIS WORK WITH OTHERS IN ORDER TO PROVIDE SATISFACTORY PROGRESS OF THE PROJECT. 12. THE CONTRACTOR SHALL COMPLETE SOFT DIGS IN ORDER TO VERIFY DEPTH AND LOCATION OF EXISTING GAS MAINS AND REPORT FINDINGS TO THE OWNER PRIOR TO CONSTRUCTION. 13. A TOWN REPRESENTATIVE MUST BE PRESENT PRIOR TO AND DURING ANY CONSTRUCTION WITHIN THE AREA OF EXISTING GAS MAINS. 14. THE CONTRACTOR SHALL COORDINATE THE ADJUSTMENT OR RELOCATION OF GAS MAINS WITH THE TOWN. THE TOWN MUST BE NOTIFIED TWO WEEKS IN ADVANCE OF CONSTRUCTION. ALL ADJUSTMENTS AND RELOCATIONS WILL BE PERFORMED BY THE TOWN. 15. THE CONTRACTOR SHALL SUPPORT AND PROTECT ANY EXISTING UNDERGROUND UTILITIES ENCOUNTERED DURING TRENCH EXCAVATION AND/OR PIPE INSTALLATION. CONTRACTOR TO USE EXTREME CAUTION WHEN WORKING IN AREAS NEAR POWER TRANSMISSION LINES. 16. WHERE SANITARY SEWERS AND WATER LINES ARE ENCOUNTERED, THE CONTRACTOR SHALL USE CARE IN WORKING AROUND OR NEAR THEM. IF AN EXISTING SEWER OR WATER LINE IS DAMAGED, THE CONTRACTOR SHALL IMMEDIATELY REPLACE THE SEWER OR WATER LINE WITH PC 350 DUCTILE IRON PIPE AT HIS EXPENSE IN ACCORDANCE WITH TOWN OF KERNERSVILLE UTILITY SPECIFICATIONS. THE CONTRACTOR SHALL REPLACE A MINIMUM OF 10 FEET OF SANITARY SEWER LINE AND/OR WATER LINE WITH PC 350 DUCTILE IRON PIPE WHEN DRAINAGE PIPE COMES WITHIN 18 INCHES OF SAID LINES VERTICALLY OR 10 FEET HORIZONTALLY. 17. ALL WATER VALVES, WATER BOXES, WATER METER BOXES, WATER VAULTS, SANITARY SEWER MANHOLES, AND CLEANOUTS IN THE CONSTRUCTION AREA ARE TO BE ADJUSTED TO THE FINISHED GRADE BY THE CONTRACTOR. 18. IF THE WATER METERS ARE TO BE RELOCATED HORIZONTALLY, THEY SHALL BE MOVED TO AN AREA BEHIND THE PROPOSED CURB. IF RELOCATED METER IS IN DRIVE OR SIDEWALK, CONTRACTOR WILL PROVIDE AND INSTALL CONCRETE METER BOXES. 19. WATER AND SEWER LINES ARE TO REMAIN ACTIVE AT ALL TIMES DURING CONSTRUCTION. IF THIS IS NOT POSSIBLE, THEN CONTRACTOR SHALL FOLLOW TOWN OF KERNERSVILLE SPECIFICATIONS AND NOTIFY THE OWNER PRIOR TO THE SCHEDULED SERVICE INTERRUPTIONS. 20. IF REQUIRED, SEWER LATERALS ARE TO BE RECONNECTED PER TOWN OF KERNERSVILLE SPECIFICATIONS. 21. ALL MANHOLE TOPS AND VALVE BOXES SHALL BE CONSTRUCTED FLUSH TO FINAL GRADE. WATER METER BOXES AND SANITARY SEWER SERVICES DISTURBED BY CONSTRUCTION SHALL BE SET TO GRADE IN ACCORDANCE WITH TOWN OF KERNERSVILLE STANDARDS. ABBREVIATIONS ALL ENCAPSULATED SOIL LIFT VEGETATION, INCLUDING THE LIVE STAKES, BARE ROOT AND BANK STABILIZATION PLANTINGS, # ..................................... NUMBER MONO ......................... MONOLITHIC a INSTALLED BY THE CONTRACTOR SHALL BE ASSESSED BY THE ENGINEER OR REPRESENTATIVE THEREOF AT THE END OF THE ABAND ............................ ABANDONED mph ........................... MILES PER HOUR a SAME PLANTING SEASON THEY WERE INSTALLED. 100% OF THIS VEGETATION MUST BE INSTALLED CORRECTLY AND STILL BE A.....••••••••••••••••••••••••••••••• AIR CONDITIONER MTL............................METAL ° ALIVE AT THE TIME THIS ASSESSMENT IS COMPLETED. IF DEAD PLANT MATERIAL IS FOUND, THE CONTRACTOR IS A. .................................. ALGEBRAIC DIFFERENCE N ............................... NORTH/NORTHING NAD RESPONSIBLE FOR REPLACING THAT MATERIAL BEFORE THE COMPLETION OF THAT PLANTING SEASON (MARCH 15). AT THE ASPH...............................ASPHALT APPROX 83 ............................. NORTH AMERICAN DATUM 1983 COMPLETION OF ONE FULL GROWING SEASON FOLLOWING PLANTING, LIVE STAKES, BARE ROOTS AND CONTAINER PLANTS ...........................APPROXIMATELY B/C................................. BACK OF CURB NTS ........................... O/H NOT TO SCALE OVER HEAD o PLANTED BY THE CONTRACTOR WILL BE ASSESSED BY THE ENGINEER AGAIN. THE TOTAL PLANTED MATERIAL MUST HAVE AT BIT ........................... LEAST 85 PERCENT OF ALL STEMS SURVIVE (15 PERCENT MORTALITY). IF THE CONTRACTOR DOES NOT MEET THIS ...................................BITUMINOUS BM...................................BENCH MARK OC ............................. PAVT ......................... ON CENTER PAVEMENT REQUIREMENT AS DETERMINED BY THE ENGINEER, THE CONTRACTOR SHALL REMOVE THE DEAD PLANT MATERIAL AND BOC................................. BOTTOM OF CHANNEL PC ............................. PRESSURE CLASS o PLANT NEW VEGETATION AT THE CONTRACTOR'S EXPENSE. THE NEWLY PLANTED VEGETATION WILL BEGIN A NEW BRG................................. BEARING PERM ........................ PERMANENT ° WARRANTY PERIOD TO BE ASSESSED AT THE CONCLUSION OF THE NEXT FULL GROWING SEASON. ANY CONTAINERIZED CB ................................... CATCH BASIN PG ............................. PAGE VEGETATION THAT WAS SUBSTITUTED SHALL BE SUBJECT TO THIS WARRANTY; HOWEVER, IF REPLACEMENT IS REQUIRED, C&G.................................CURB AND GUTTER PI.............................. POINT OF INT THE CONTRACTOR MAY REMOVE THE DEAD PLANT MATERIAL AND PLANT NEW VEGETATION OF THE SAME SPECIES. THIS CL....................................CLEARANCE PK ............................. PK NAIL SET m WARRANTY IS INCIDENTAL TO THE OVERALL PROJECT. C/L ................................CENTER LINE PP ............................ POWER POLE CMP.................................CORRUGATED MTL PIPE PROP PROPOSED CMPA...............................CORRUGATED MTL PIPE ARCH ........................ PSE ........................... PERM SW ESMT CONC...............................CONCRETE PT............................. POINT OF TANGENCY CONST............................. CONSTRUCTION PVI............................ POINT OF VERT INT DCB................................. DOUBLE CATCH BASIN PUE........................... PERM UTILITY ESMT DB...................................DEED BOOK r................................ RADIUS a DBL................................. DOUBLE RCBC......................... REINFORCED CONC BOX DI .................................... DROP INLET CULVERT a DIA.................................. DIAMETER RCP ........................... REINFORCED CONC PIPE DW................................... DRIVEWAY RD ............................. ROAD 0 DIM .................................. DIMENSION RELOC ....................... RELOCATE E..................................... EAST/EASTING RT ............................. RIGHT EA ................................... EACH R/W \ ROW .............. RIGHT OF WAY ELEV................................ ELEVATION S ............................... SOUTH o EDP ................................. EDGE OF PAVEMENT SAN........................... SANITARY ESMT ............................... EASEMENT SD ............................. STORM DRAIN m ETCB ............................... ELONGATED THROAT CATCH BASIN SDE .......................... STORM DRAINAGE EASEMENT EX ................................... EXISTING SF............................. SQUARE FOOT S/R F/C................................. FACE OF CURB FENCE....................... SPLIT RAIL FENCE a FES................................. FLARED END SECTION SS ............................. SANITARY SEWER o FH................................... FIRE HYDRANT STA ........................... STATION o F/L..................................FLOW LINE STD ........................... STANDARD FOC................................. FIBER OPTIC CABLE SW ............................. SIDEWALK GV................................... GAS VALVE SY ............................. SQUARE YARD HORIZ .............................. HORIZONTAL TAN ........................... TANGENT o INT...................................INTERSECTION TCE ........................... TEMP CONST ESMT INV...................................INVERT TEMP ......................... TEMPORARY IP.....................................IRON PIN SET TP ............................. TRAVERSE POINT o JB....................................JUNCTION BOX T/W .......................... TEST WIRE LT....................................LEFT TYP ........................... TYPICAL a Ib.....................................POUND U/G........................... UNDER GROUND LP....................................LIGHT POLE VC ............................ VERTICAL CURVE m LN....................................LANE VERT ......................... VERTICAL s MAX.................................MAXIMUM VCP ......................... VITRIFIED CLAY PIPE MH...................................MANHOLE W .............................. WEST MIN .................................. MINIMUM W/ ............................ WITH WM........................... WATER METER W Y VAULT ...................... WATER VAULT o WV ............................ WATER VALVE a YI .............................. YARD INLET 60p........................... SIXTY PENNY NAIL SET g ................................. FOOT w TRAFFIC CONTROL NOTES 1. TRAFFIC CONTROL SHALL BE IN ACCORDANCE WITH THE "MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES" (MUTCD). 2. CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING, INSTALLING, MAINTAINING AND REMOVING SIGNS, BARRICADES, LIGHTS, ETC. IN ACCORDANCE WITH THE MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES, LATEST EDITION. FOR LANE CLOSURES OR DETOURS ON TOWN STREETS, CONTACT THE TOWN TRAFFIC ENGINEER AT 336-996-3382 FOR APPROVAL OF APPROPRIATE INSTALLATION. FOR LANE CLOSURES OR DETOURS ON NCDOT ROADWAYS, CONTACT THE DISTRICT ENGINEER AT 336-896-2350. CONSTRUCTION SIGNING SHALL BE CONSIDERED INCIDENTAL TO CONSTRUCTION AND SHALL BE INCLUDED WITHIN THE UNIT PRICE OF THE OTHER WORK. 3. CONTRACTOR SHALL IMMEDIATELY RESTORE ALL MAIL BOXES, ROADWAY SIGNS, ETC. AS SOON AS POSSIBLE, BUT AT A MINIMUM, THESE ITEMS SHOULD BE REPLACED PRIOR TO COMPLETION OF WORK ON THE DATE OF REMOVAL. WHEN NECESSARY TO TEMPORARILY REMOVE A STOP SIGN, A TEMPORARY INSTALLATION OR FLAGMAN SHALL BE USED IN ITS STEAD UNTIL THE PERMANENT SIGN CAN BE REPLACED. EROSION CONTROL NOTES 1. TOTAL DISTURBED AREA: t 0.42 AC. 2. MINIMUM EROSION CONTROL MEASURES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE N.C. EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL, U.S. DEPT. OF AGRICULTURE, U.S. SOIL CONSERVATION SERVICE, TOWN OF KERNERSVILLE EROSION CONTROL ORDINANCE. 3. CONTRACTOR SHALL NOT DISTURB ANY AREAS OUTSIDE OF THE DESIGNATED LIMITS OF DISTURBANCE. 4. SEE SHEET 7 FOR ADDITIONAL NOTES REGARDING EROSION CONTROL, MAINTENANCE PLAN, AND VEGETATIVE PLAN. 5. ANY ONSITE STOCKPILING IS TO BE COORDINATED AND APPROVED BY A TOWN INSPECTOR. THE STOCKPILE WILL BE PROVIDED WITH GROUND COVER 7-14 CALENDAR DAYS UPON COMPLETION OF ANY PHASE OF WORK. MULCH WILL BE TACKED WITH EMULSIFIED ASPHALT. 6. TRENCH EXCAVATION OR SPOIL MATERIAL SHALL NOT BE PERMITTED ON PAVED ROADWAYS. THE CONTRACTOR SHALL INCLUDE ADEQUATE COMPENSATION WITHIN HIS UNIT PRICE COST FOR THE CULVERT INSTALLATION FOR ANY HAULING AND OFF -SITE STOCKPILING SURVEY NOTES 1. EXISTING INFORMATION SHOWN ON THESE PLANS WAS TAKEN FROM SURVEY PROVIDED BY STEWART ENGINEERING COMPLETED BY DUSTIN J. McCARTY L-5213 DATED MARCH 15, 2019. 2. CONTRACTOR TO VERIFY EXISTING CONDITIONS THROUGH THE CONSTRUCTION SURVEY AND STAKING PROCESS AND REPORT ANY DISCREPANCIES TO THE OWNER PRIOR TO CONSTRUCTION. CONSTRUCTION SEQUENCE 1. CONTRACTOR SHALL MAINTAIN A COPY OF ALL REQUIRED PERMITS AND APPROVALS ONSITE THROUGHOUT CONSTRUCTION. CONSTRUCTION SHALL BE GENERALLY SEQUENCED AS NOTED BELOW. 2. INSTALL CONSTRUCTION ENTRANCE PER THE EROSION CONTROL PLAN ON SHEET 6. 3. INSTALL ALL PERIMETER EROSION CONTROL MEASURES, LIMITS OF DISTURBANCE AND FIELD STAKE PROPERTY LINES. EASEMENT AND PROPERTY LINES SHALL BE STAKED EVERY 25 FEET BOTH INSIDE AND OUTSIDE LIMITS OF DISTURBANCE. 4. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS AND REPORT ANY DISCREPANCIES BETWEEN WHAT IS FOUND IN THE FIELD AND WHAT IS SHOWN ON THE PLANS TO THE OWNER PRIOR TO CONSTRUCTION. REWORK DUE TO CONTRACTORS FAILURE TO VERIFY EXISTING CONDITIONS WILL BE COMPLETED AT THE EXPENSES OF THE CONTRACTOR. 5. PRIOR TO CLEARING AND GRUBBING/CONSTRUCTION, THE CONTRACTOR SHALL REQUEST AN ON -SITE INSPECTION OF EROSION CONTROL MEASURES WITH THE ENGINEER AND TOWN OF KERNERSVILLE ENVIRONMENTAL INSPECTOR. UPON RECEIPT OF CERTIFICATE OF COMPLIANCE, GRUBBING/CONSTRUCTION MAY BEGIN. 6. SCHEDULE INSPECTION AND ACCEPTANCE OF INSTALLED CULVERT, OPEN CHANNEL, AND PAVEMENT. 7. REMOVE ALL EROSION CONTROL MEASURES. EXISTING PROPOSED LEGEND LOD LIMITS OF DISTURBANCE PROPOSED MAJOR CONTOURS PROPOSED MINOR CONTOURS PROPOSED PIPE PROPOSED STRUCTURE CUSTOM HEADWALL Know what's below. Call before you dig. J Z O LU LU oc Z oc LU CL oc O L 1 L.L Q 0 VVK DICKSON comminity infrastructure consultants 720 CORPORATE CENTER DRIVE RALEIGH, NC 27607 (t) 919-782-0495 (f)919-782-9672 WWW.WKDICKSON.COM NC LICENSE NO.F-0374 PROFESSIONAL SEAL m Z O= O O a_ W0 O= � Z LU O U) W O= w a 0 Z I- z W W g LU z W W W J > °6 J cf) LU U H W O g z J W J W 0 LU z W Y m W LLI J Q ~ Z U Z W O Q � 0 PROJ. MGR.: M. HORSTMAN DESIGN BY: M. HORSTMAN DRAWN BY: M. SMALLING PROJ. DATE: JULY 2019 DRAWING NUMBER: 20F 18 WKD PROJ. NO.: 20180394.00. RA O2 W ooa FOO pJ0 pZW a0¢ ElWo �m� o=w p0, �a0 -W ozw -o Zdg w00 ZZO oom =UQ OY� .o zoz< o.¢ o°Z ¢W(5 w¢a ¢�z wo¢ mm 0 w�a ¢FF =a� 0Zw <w� ?�w 3D dz0 o zw Zp o2= 00 0o pp0 YIz =Z F0 00¢ 0 =Zw E0, alr w0 OU O,, NOTES: WK N/F ' \ \ �� 0')I , THOMAS L. HUDGINS & DDICKSON MARY R. HUDGINS \ s Lo I I community infrastructure consultants I 1. CONTRACTOR SHALL VERIFY UTILITY SIZES, MATERIALS AND LOCATION PRIOR TO D.B. 2813, PG. 3539 \ � \ \ II � I I � I / \ PIN 6886-76-9028 — J \ ANY UTILITY WORK. 720 CORPORATE CENTER DRIVE 718 CORJON RD. \ I � � 961 — — — \ \ I I I I I 'o I \ 2. EXISTING WATER AND FIBER OPTIC LINE DEPTHS SHOWN ARE BASED ON RAt)919- NC 27607 0 18LT 9s4 I I00 \ (t)919-782-0495 \ \ I , I \ VERTICAL LOCATES AND ARE APPROXIMATE. (f)919-782-9672 \\ \ I I I I \ 3. CONTRACTOR TO PROTECT EXISTING WATER LINE DURING CULVERT \\ \\ 1 I w \ CONSTRUCTION. www.wKDlcKsoN.coM \ ( , � w \ 4. CONTRACTOR TO PROTECT EXISTING SEWER LINE DURING CULVERT NC LICENSE NO.F-0374 CONSTRUCTION. 22LT \ I I I I _ w Q \ 5. CONTRACTOR TO COORDINATE WITH POWER LINE OWNER TO SLEEVE POWER \\ I I I I ° �/ �� \\ LINE DURING CONSTRUCTION. 0+00 — \ \ 13TRJE , / WM \ \ lIN M \ / 15LT \ \ \� \ \ I I 181RE� \ \ \Q0 \ \ I I 12TIREE / / ° — ♦ � / \ \ \� 30QA / � O (6 / / \�✓ as ---- ---\ 15LT \ \ O� I I \ 16TRE RIM=959.13' 2 / m N/F � INV=952.18' O \ \\ I PROFESSIONAL SEAL \ \ \\ O \ ROBERT K. CAMPBELL & \ \\ \ \ 1 1,6TRJE TOP MARILYN B. CAMPBELL 8TREE \ \ I I D.B. 1630, PG. 2577 9S� \ OF BANK \\ \ \\ I I I ( / O I PROP. 60 LF OF 48" RCP @ 2.507\\ I Co PIN 6886-7 0 CORJON RD. RD. \ \ O� \ �\\ • \ I I I / oLT � g5g I \ \ \ .7 SEE NOTE 5 \\ INV=949.7 \\ / 8TREE \ \ \ \ \ \ _ Ao / TH - 1 to PROP. PIPE COLLAR \ / 5 1 STORY 24LT \ \ / I NCDOT 840.72 \ \\ \ Q REIr SIDENCE 0 / .1. \ — ) , / I I0 rPROP. 10 LF OF 24 RCP \ \\ AT SAME INVERTS AND \ SLOPE AS EXIST. PIPE \ 16LT \ 0— — _ _ / / / / TH 2 BOR - 2 (9 I I \ \ p ZO \ / I 30QA \ \ 0 0- \ ,J I C) Cr °� ` w 1061 `` \ I I I WALL A o N/F \ \ / / PROP. 21 LF OF BOULDER \ C/) SUE TUCKER VANHOY & j 17LT w / DAVID LASLEY VANHOY 4�LN�l \ \ / / / / " �,5�� TOE WALL (SEE DETAIL 1/5) \ D.B. 2518, PG. 2741 P.B. 26, PG. 33 \ •9ss // , \ - — — — PIN 6886-75-8816 \ \0 / // \ 949.81_ — 314 BROKEN SADDLE LN. QJ12LT \ \ \ \ 16LT / / / / O961 — \ WALL B _ \ \ \ \ \ \ \ \ REMOVE &REPLACE 70 SY IN 9. \ \ PROP. 25 LF OF BOULDER — — — — — — — — — \ \ \ \ \ \ 26LT OF ASPHALT PAVEMENT 00 1 / /III TOE WALL (SEE DETAIL 1/5) \ PER NCDOT 654.01 / BOR 1 I I i i I I I �� \ \ 1 Lu \ \ \ \ \ \ \ 36LT \ ° / / I I I I I / / / �� / \� \ \ Aa N/F \ I 1 1\ MICHAEL LEE CABLE \ I 1 O \ 970 970 RIM=960.34' 9 \ D.B. 1700, PG. 2476 I Z I � � I/ \ I 1 EXIST. UNIDENTIFIED LINE IN=948.14' P.B. 26, PG. 33 I \ \ 9 I IN=954.74' 6886- PG. 333 (APPROX. SIZE & I I / \ \ PIN _ _ _ 307 BROKEN SADDLE LN. I I 1 OUT=947.84' l EXIST. GAS LINE Q 2 QX.SIZE & \_962 J LOCATION) / �, / — ` \ \ N 965 1 w 965 I 1 / / \\O — 9 \ \ \ \ 9 \ _ WALL C 0 x I ° I / / \�� \ \ PROP. 11 LF OF BOULDER QD I o 1 I \\ \ Lu EXIST. GRADE � wLLJ �,� o � I rn / / /\\ \ I I / / / / o / / \\ /// \ \ \ \ TOE WALL (SEE DETAIL 1/5) z Lu J QD °U�=� �/ \\ wL0 Cy) a-U)z O °°� ws N�Q Co ��z TOP +06 g 960 o rn 0 960 WALL D OF BA 9 a_ O w Q / PROP. GRADE \ 6 uW a OfU P O z 963 , PROP. 21 LF OF BOULDER "`� ~ — TOE WALL (SEE DETAIL 1/5) N EXIST. 1" FIBER. wLu m OPTIC LINE I I I I 1 I \. \1 J wo 955 EXIST. 10" D P WATER /3.53' 1 955 o I II I I I III \ ° 9 \ \\ \\\ <9`' \\ \\ w U 1 11 II WALL E \ \ �`r�\�\� \ \ \ \ \\ \ �s� \ \ w 1•08' I I PROP. 14 LF OF BOULDER \ \ \\� \ w J TOE WALL SEE DETAIL 1/5 \ \\ \ \ J o EXIST. 2 " CM EXIST. 8 PVC SEWER , \ I , I 1 ( ) \ 1 \\� 2+00 \ \\ \ ��� \ \ J 0 p _ \ \ Z a PROP. PLUNGE POOL \ SEE DETAIL 2/5 \ \ II \,° \\ \ \\ \\ \\\ \ O � Z ( ) I 1 1 1 WALL F 16LT 1 \ \ \ \ W w 950 — — — — _ PROP. 10 LF OF BURIEDo 950 I I I II I 11 PROP. 17 LF OF BOULDER I \\\�� \\ \ \ \ \ \ p O RIFFLE GRADE CONTROL o I Lu I I I TOE WALL (SEE DETAIL 1/5) \ > OC (SEE DETAIL 3/5) 9LT m m \ \\ Lu w = I \ I I 1 I I 8�\ 1 °� � \\\ \\ \\� \ \ � z PROP. 60LF OF 48 RCP 2.50 @ o/o \\ \\ I I I I I I I ` \ \ 8TREE I I \ \ \ \ \ \ \ \ \ \ \ C7 m 94 45 \ \ j I I I I I \ \ I I \\� \ \\ w z +00 1 +00 2+009 1 I I I 1 I I I \\ o Q I I I 10PT \ I' 8TREE I \ 0 BROKEN SADDLE LANE PROFILE 13TREE H: 1 11=20' \ I i I I \\ I \� \ `N� ��— \\ I I I I I I\ \ \\ \ I \\ 15LT PROJ. \\ \�� PROJ. MGR.: M. HORSTMAN , 1 —4 I I I I I I I I \ 18LT \ 8TREE I \ \\ LLJ DESIGN BY: M. HORSTMAN V. ow I \ \ \ \ � DRAWN BY: M. SMALLING PROJ. DATE: JULY 2019 O DRAWING NUMBER: LL 30F 18 2 10 0 5 10 20 1 WKD PROJ. NO.: LL a \� 20180394.00. RA 1 inch = 10 ft. LL 0 ow poa FOO pJU pZW a0¢ 2E Dm� p=W .Om �a0 ~ -W ozw - . o zo. w00 zzw oom =UQ OY� w�� .00 °Wa o.¢ oOZ 2w(7 w¢a ¢�z wDm mm 0 w � Q ¢FF =a� 0 ¢0< <w� ?� w 9D 00 'zo ZZp o W Yo, UD pp0 YIz �=Z 00¢ 0 =Zw �OF mlr wo cU O'. PROP. 27 LF OF 15" RCP @ 9.52% _ _I II 960 960 �/� v \ \ \ \ TCL PROP. PIPE COLLAR NCDOT 840.72 I,\ DDICKSON \ \ infrastructure V pr d ° \ \ \ \ \\ T � � 0+5 I J communit consultants \ \ \ \ \ \ \ 30AR \ ss \ a \ \ sso. I \ EXIST. GRADE Q 4 720 CORPORATE CENTER DRIVE \ \ \ \ \ \ \ \ \ \ \ \ \ a \ PROP. 5 LF OF 15" RCP @ 3.96% RALEIGH, NC 27607 \ 95 \ \ \ \ \ \ 94g \ 2 NV=950.14' ° \ \ \ \ \ T \ 955 Z 955 w (t)919-782-0495 (f)919-782-9672 — TGE \ \ \\\ \\\ / 1 o o 0 W oN WWW.WKDICKSON.COM \ \� \\\ TOP � c9� \_ \ \\\\\\ \\\ \\\ \ \\\\\ OF BANK \\ c9j 2 + �rn NC LICENSENO.F0374 \ 8JV T I I \ \\s S \ \ \\ Lo d�NoZ O LU W Q \\\\ \ \ 950 \ (A �Z 950 \ \ 12AF� \ Q _ \\ \\ \\L\ 1sA� \ p�� \\\\ c9 \\ �N I > PROP. GRADE — \ \O \\ \\ \\ \ \ \ \ \ I I a- �� \ — �� \ \\\ \o\\ 0 LL 8-1 o I \\ \ Qo \\ / I \ T-00 I z �, \ \ o \ \ g5o �' I \ I O >' M M 945 945 \ \ \ 94s. \+oo \\\ \ \\\ $� \\ \\ \\ \ // / / II I I PROP.15LFOFBURIED \ \ RIFFLE G AIDE CONTROL I Il�jv 927 /A I j (SEE DE IL 3/5) PROFESSIONAL SEAL 8JV \ \ / PROP. 14 LF OF 15" RCP @ 9.54% / O I / / Lo / W I / 27- .97 LF OF 8" PVC — — — — 1-3 951 — \ g50 _ �\ rn I 940 — 940 Co _ \ -8jv�/ \ \ / \ I ol \ \ \ — \ 4/ \ I PROP. 22 LF OF 60" @ 0.63% PROP. 13 LF OF 60" @ 6-3 810 _ G \ \ \ 952 — — — \ �\ \ G G \ G �� \ I PROP. 22.5' CMP BEND I \\ GM I \ 8JV 116JV \ 8JV I I /�I J J 9351 II \ Lo � +00 2+00 2+50935 \ MARYLEBONE DRIVE DOWNSTREAM PROFILE AT EXIST. DRAINAGE PIPES I 6LS \ _ UA/CNITS _ UNITS 2LS \ � \ \ I H : 1 "=20' _ SEE NOTE 2 II \ -- — T �\ \ass \\\. II V. 1 "-4' Z o 6LS / \ 4 9g3 T cc O a \ 4JV \ (D 4 \ \ I W Cr FF=960.10' I I I 0\ \ 10LS \\ I I z Lu z \ N/F \ \ \ HARVEY W. GUYE & \ \\ � P, �!Z \ IFn Fn SHARON GUYE \� \ D.B.2072, PG.589 d. ` 6LS ' INy/=951 P.B. 31, PG. 152 I w PIN 6886-85-1675 \ LO 332 MARYLEBONE DR. �\ \ 3JV I \ 12LT W \I — \ P I < I Lu EXISTING 20' SANITARY SEWER EASEMENT \ \ \ \ \ k0 \ \ \ \ MICHAEL E. POLINSKY & D D.B.3 J. , PG. 11 6 .B. 3330, PG. 1146 o (P.B. 31,1 152) \ I I \ \ \ 1 P.B. 31, PG. 152 Z \ \ O 8TREE \ \ \\ \ PIN 6886-85-3535 337 MARYLEBONE DR. a \ \ \ \ \\ 0 1 I o N CONTRACTOR TO INV=951.42' EIP \ \ \ \ \ PROTECT EXIST. \ \ \ \ \ DECORATIVE 1 STORY CK 960 960 \ \ \ ' \ �, STRUCTURES RESIDENCE 3 B \\ t \ \ 1 LLi\ \' 1 J J 960 - J 960 \� \ w W J o 3 - w z rn EXIST. GRADE o °ti° o \ \ / Lu O Lu m O0- w > z M� �; o m m 955 = - 955 p o °ram° r� Co I Co + Lo °' i\ \ CONTRACTOR TO \, \ \ ° PROTECT EXIST. REMOVE 27 LF OF g 06 a �-- PROP.GRADE ow CO��rn LOB ..z o x M w J o 0 CD�� O o Q a \ \ I / GAS LINE EXIST. TIMBER WALL z g' o C0Woq p0 �0CD Z� �zF-0ZZ \ p \ 42QA / \ \ I DECK a_ �LLJ(o _ __— 955 mm�ooQ�— 955 LLJ } o rn I z w O- z z LL w — _ g PROP. PIPE COLLAR / 15LTLu CC,�� 2 o O�z / �� UeLu NCDOT840.72 d `. co — G \ (l I \ I\ I / / \ \ G / / I / U J W 0 950 950 \ d BENCH \ G 9Ra / / 24LT z U (n U) \ / I I / I / � G / ` 0 o EXIST. 60" CMP 8" PVC — — — — 950 — 950 / / I /17 r J Lu Z \ I I // / / / �'' I z o O PROP. 5LF OF RCP @ 3.96% I M=955�08' , \ / / IN-949.28' \ 12LI I I / / OLL I I \ 8M TIMBER �� 28QA / I❑ Q m cn J W i 945 I 945 \ IN=947.66' \ sMG I / 8MG WALL L 4'WF / ❑ ❑ ❑ ❑ ❑ ❑ L ❑_ Y Q a 0 PROP. 27LF OF 15" RCP 9.52% OUT=947.63' \ \ I / \ G w O @ \ I /�i ' \ / a g 945 \ PROP. GRADE 945 \ I I INV=�2.23' O I — 4 — — — — _ 946 — — — —_ — — — — — — — — — — > m I PROP. 14LF OF 15" RCP @ 9.54% I x°°\ \ _ _ _ _ — LIJ z H o EXIST. GRADE 60.21LFOF8"PV�c @ 5.76/0 \ \ I I I I \\I` \ I I \ \ \ \ — — _ —_� _—_ ���\\\\ — = — — 2\\ U z m 94%, 94%+00 ^ \ ° \ I I I I I\��\\ \ \ — — — — _ _ _ _ _ — — — — — \� Z w 00 0+55942 1 +00940 �� \\\ I 12LT o MARYLEBONE DRIVE UPSTREAM PROFILE PROPOSED SIDE SYSTEM O U S O ° PROP.22LFOF60 @0.63/0 N H: 1"=20' H: 1"=20' \\ -__���� I 1? 3 \\\\\ s ___✓ — _ - -�' � I I I N 1� \ — — — —__ \\ — \ \ �s4 PROJ. MGR.: M. HORSTMAN s ow ��— ��— V: 1 —4 V: 1 —4 I I IPAUL MORI�ISON & 8 ` TAMMY MOR ON 9Q9\ — _ p k.B. 2181, PG. 6194 \ \ \ — 9TREE \ \ \ \ s\ \ \ \\\ \ 10TREE C \ \ \ \ \ \ \ \\\ \ Uj DESIGN BY: M. HORSTMAN DRAWN BY: M. SMALLING . f21M=951.18' _ G. 15 o o \ o TOP \ \ \ \\ \ \ \ \ NOTES: \ 631, LL LL N-944.16' p P 4 — — P \ \ �q IN=94�1.96" 36QAO \ \� \ \ OF BANK \ \ \ \ PROJ. DATE: JULY 2019 \\ uJ ARYL'EBONE DR. \ so OUT=941Q9'--- \\ \\ \\ \ DRAWING NUMBER: oo 1. CONTRACTOR IS RESPONSIBLE FOR ANY IMPACTS TO THE SEWER LINE. — iQ2. 40F SIZE AND LOCATION OF EXISTING PLASTIC DRAINAGE PIPES SHOWN ARE ESTIMATED. CONTRACTOR TO FIELD IDENTIFY SIZE I V AND LOCATION OF EXISTING PLASTIC DRAINAGE PIPES. CONNECT PIPES WITH A TEE FITTING AND THEN CONNECT OUTFLOW o o �a — — — 10 0 5 10 20 WKD PROJ. NO.: a PIPE TO HEADWALL WING. \ \ LL 3. CMP BEND SHALL BE INCIDENTAL TO CMP INSTALLATION COST. o PROP. 22.5° CMP BEND �� �o — PROP. 13 LF OF 60" @ 0.63% 1 inch = 10 ft. 20180394.00.RA LL a SEE NOTE 3 a �o 0 ZOw o00 OJU pzw aol z00ww_ �ma U=w OOm 0¢ . o F.,o w ozw y-0 moo. WUz O ZlU z °Om = Y J UQ O' � wj�� . 0 ¢0 0 zz< 0., z o,z ¢w� aG� wQQ ¢�z o�0 wD, �00 wFz w�a =a, ozw Y ¢ ¢ ¢ °7 w z°w 3:7 OZD U-U Zz0 w °7_ YU~ U omo -�, = oo 0 o zw Eo= ¢�7 awl 0 oo, o w HEADER ROCK (TYP) 2" OFFSET= FOOTER ROCK (TYP) CLASS A RIPRAP STREAM BANK BENCH TOE 3' 15' EXISTING STREAM TOE FLOW CONSTRUCTION NOTE: BOULDERS SHALL BE ROTATED INTO THE PLAN VIEW BANK DURING PLACEMENT SUCH THAT THE UPSTREAM BLOCKS OVERLAP THE DOWNSTREAM BLOCKS BY A MINIMUM OF 1 INCH. NOTES: 1. BOULDER WALLS SHALL BE CONSTRUCTED AS INDICATED ON THE DETAIL AND SCHEDULE ON THIS SHEET AND AS INDICATED ON THE APPLICABLE GRADING PLAN. 2. ALL FOOTER BOULDERS SHALL BE BURIED 1.5' BELOW GROUND ELEV (G). 3. FOOTER BOULDERS SHALL TARGET A DIMENSION OF SX2.5'X2.5' FOR 5' WALLS AND A DIMENSION OF 3'X2.5'X2' FOR 4' WALLS. 4. ABOVE GROUND WALL HEIGHTS OF 3.5' AND HIGHER MAY REQUIRE A THIRD ROW OF BOULDERS. BOULDER SIZE RANGE TOP OF WALL ELEV (T) BOULDERS SHALL BE ANGULAR (SEE SIZE RANGE BELOW) AND —\ HAVE NO MORE THAN A 6" OVERLAP HEADER ROCK (TYP) FOOTER 2" OFFS ROCK (TYP) CLASS A RIPRAP BOULDER WALL SCHEDULE WALL ABOVE GROUND WALL HEIGHT TOTAL WALL HEIGHT (H) WALL LENGTH BOULDER HEIGHT (B) GROUND ELEV (G) TOP OF WALL ELEV (T) A 3.5' 5' 21' 2.5' 948't 951.50' B 3.5' 5' 25' 2.5' 947't 950.50' C 3.5' 5' 11' 2.5' 946't 949.50' D 3.5' 5' 21' 2.5' 948't 951.50' E 3.5' 5' 14' 2.5' 947't 950.50' F 3.5' 5' 17' 2.5' 946't 949.50' GROUND ELEV (G)SECTION VIEW EXCAVATE/GRADE SLOPE PER PLAN EXISTING BANKLINE 3' STABILIZE WITH VARIES, SEE .1.0',` :..< : ::_` SEED, MULCH, PLANS 2.0:`,":::'.: AND EROSION CONTROL MATTING FC'°:.':.� DRAINAGE 1 AGGREGATE NCDOT #57 STONE TYPE 2 GEOTEXTILE FABRIC TO PREVENT PUMPING OF FINES BOULDER TOE WALL STRUCTURE DISSIPATOR POOL (Ls) NOT TO SCALE APRON (LA) PLUNGE POOL DIMENSIONS CULVERT Ls LA Hs BROKEN SADDLE LANE 20' 10, 2' PLUNGE POOL DETAIL 5 NOT TO SCALE BENCH TOE. SEE FIGURE 4 IN DETAIL 4/11. SEE BURIED RIFFLE GRADE CONTROL DETAIL FOR APRON DETAILS 1 (_QA\/CI CI IQCTQATC I ur ur DHINr\ LENGTH GEOTEXTILE FABRIC TnD nr= PIPPI P GEOTEXTILE FABRIC RIFFLE GRADE CONTROL - PLAN VIEW GRAVEL SUBSTRATE 50 / 50 MIX OF IN SITU SOIL AND # 5 STONE GRAVEL SUBSTRATE 50 / 50 MIX OF IN SITU SOIL AND # 5 STONE W BANKFULL ELEVATION EROSION CONTROL MATTING BOTH SIDES (SEE DETAIL 3/11) UNLESS SIDE ABUTS A CONCRETE WING WALL OR BOULDER TOE WALL BANKFULL DEPTH INVERT SET AT PROFILE 0.25' GRADE n IN. 2.5' TYP. GRADE CONTROL ROCK 50 / 50 MIX CLASS B / 1 RIP RAP RIFFLE GRADE CONTROL - SECTION A -A GRADE CONTROL ROCK 50 / 50 MIX CLASS B / 1 RIP RAP RIFFLE GRADE CONTROL - PROFILE B-B BANKFULL ELEVATION DnTTnr%A nC QICCI C BURIED RIFFLE GRADE CONTROL DETAIL NOT TO SCALE CHANNEL DIMENSION AT RIFFLES CULVERT SHEET LENGTH (LF) BOTTOM WIDTH, W (LF) BROKEN SADDLE LANE 3 10, 14.5' MARYLEBONE DRIVE 4 10, 15' �o :v cy 1 DVw DICKSON comminity infrastructure consultants 720 CORPORATE CENTER DRIVE RALEIGH, NC 27607 (t) 919-782-0495 (f)919-782-9672 WWW.WKDICKSON.COM NC LICENSE NO.F-0374 PROFESSIONAL SEAL m p z O O a W0 fr W z p O U) w w 0 IIIIIIII° H z w w g w w J � � J U � w w w J 0 0 cn z w Y m w w J Q ~ z 0 z w O Q � o PROJ. MGR.: M. HORSTMAN DESIGN BY: M. SMALLING DRAWN BY: M. SMALLING PROJ. DATE: JULY 2019 DRAWING NUMBER: 50F 18 WKD PROJ. NO.: 20180394.00. RA ZOw 0UO pJU pzw aoQ wWo gF� �ma Uw .=0m .a0 1.0 w Ozw F . O� wU0 ZZ U 00w wyJ =UQ ~pS 0 Do. w1 z 0za o'z Ow C7 a ' wkQ ¢3z wD, 0 00 wT_z w 2 Q =a� (Dzw ¢aa Qom w F zTw -37 OZD U-U Zzo w 07T YU~ U p00 �=z 'oo 0 =zw U-o= ¢�7 aw0 O wp¢ Err WK 2" DDICKSON m 4" comminity infrastructure consultants Z X O \W m I W (n 720 CORPORATE CENTER DRIVE I cn m 1 RALEIGH, NC 27607 N v I I n n w� (t) 919-782-0495 n Pm I H N H _ (f)919-782-9672 D D D �_ — _ — j — _ — z z WWW.WKDICKSON.COM Z 1 m Z 1 = 1 1 I — _ G) J z NC LICENSE NO.F-0374 03 o I I N I �� X (/ o I I s rr �O i N fM co �� x m 0 m 3rr wo Z O O x O m m 10� O m mo r z m z m W w O < m o H 2' - 31,/4 D z o m m N 15 N r \ � ap 11%2" 1 /32 W m W= SAW CUT TACK EDGE I X I I m v,/� X Cn D �►� �v' -0a ICI IH �`° m m I V I n �rn n m W C7 �w z _ m m I �' I H m I H= H w w W w O v i\ PROFESSIONAL SEAL EXIST. PAVWT PROPOSED PAVM'T � I p _, _ W 1"I c, _ I••� Z 3 O (n to 0 W r ui 1 m z 1 Cn(O H --- z - N _ m o m rn 11 1 O O v ., .+ cn O D �+ c o o v c o W O 1! J 1 } x ]Oo (zn N m Z Nm m N� z0 rNit Z O _ N 4" z m NDr >i pm o mz Zo y m Z v i m W N m 0, mr r z n zm 3 zD mm N r �Ul N M n, i z D Dw N o O m m xD n z m — � W u: n N N 6 rr o P m o 0 H z m m o _ I \ I�I i O m m O_ Fi o X CIm m O i �O x tDn� �� 'I 1 z T T I} ^a O N �, O Dm i D M �o i oc m0 O 2 C W= " Z 1 y m OH -m - m--, m JJ0 m n 21I \Ul m co co c 0 m ]o fn (q 0 O m 0 0 C, '0 r m QD o z m z m o mr-+ mz x Q �m N Z Z �o A o wm oZom �� m Orr m• 0 _000z Dm o x x SAW CUT AND REMOVE EXIST. PAVM'T WHEREVER c D o x o cncn m w o x -N � mo PROPOSED PAVEMENT MEETS OLD. zv N C co c `D 70 0 °0 °'° z xm O O 37 • D3 m 3 om Ho ]0 c 21 -`•. II C O m 01 D N r-. o m D o x r O o U m �70 Dm m 0 m� mz. m c�i <n z m� 0W o N Z cl)m m m 0 N O >0 O D ti w� Z .x. m e c 0 I..I C7 07 x M CO z m 0 0 � � OJ_ m N (77 O W �A N COO m m O m m o H z W= j W= x ,' 70 77 m x x z m C -I -n M O O CF H O W — m m xx xm V CA 0 can cn zoo m m x c> m Z o m m — r 1 m0 a) m � ocm 2 � � o " ox D O O rL /1 W Z m �+ T Z m 00 am m m w N Dx N N z I Z 1 D m Dn m w° < m H N N -n I -n 0 O M m e 0o m o o mm N W VDi 1 U% 3 m 1 2" m z z m x A o � �_ \W W \ � O �_ — I _� W 0 a__ C c m-n Oo O a a o� z - \ - --�-- (� 3� ICI 10 IH o� n D >m 1"I om I °' Lu oC 0 zn I C I ..mo I p WN m o — Z I z w ..v I I I z mz o a 1 I I I J�J Zm w IFn 2 \ O mz = D = m I W D m D z 2 I LLI m -_ m fr NO. DATE REVISION 41r PAVEMENT REMOVAL DETAIL SHEET NO. SCALE: NOT TO SCALE DWG. BY: WKD cn 1 "18 10F1 m ROADWAY STANDARD DRAWING FOR 1-18 STATE OF ODm ROADWAY STANDARD DRAWING FOR 1"18 STATE OF 00 ROADWAY STANDARD DRAWING FOR STATE OF DATE:5/18/2015 PATH AND FILENAME: K:\WKD Standard Details\AP026.dwg � PAVEMENT REPAIRS NORTH CAROLINA � m CONCRETE DROP INLET NORTH CAROLINA DROP INLET FRAME AND GRATES NORTH CAROLINA f DEPT. OF TRANSPORTATION G f DEPT. OF TRANSPORTATION DEPT. OF TRANSPORTATION 0 12" THRU 30" PIPE DIVISION OF HIGHWAYS o FOR USE WITH STD. DWG.S 840.14 AND 840.15 DIVISION OF HIGHWAYS o FOR SUPERPAVE MIX TYPES DIVISION OF HIGHWAYS „ RALEIGH, N.C. RALEIGH, N.C. RALEIGH, N.C. w a 0 wo 00 movc O m Z im mo xHHcn m rc Dcn z �-+�vm z mW zm mm mmm m cnm om m-i �o v '0 Cn_ D< -A37 H�0H D Qom �c Zmcv r =N oD m� o0<m z DH cnr �wmo O zz yr c» <1oo � m 0 m 0 m v -1 r m m N H m O m w m W D W z Hv HCo m- �m>1m m O}} ZD nH -1v Hm m 0� Duo mm �zr0 D T x m � m x 0 0 :0 m CC,Q m m H m 0 H> m Om O vzDm Do zz r Hm -x W U) r v m H m O < W D m.Om D ao cn• zz Z r o mo w C m O� H p m m�m0 F, cn m x o = m 0 x ocn*m U 0 -1 0 -n z x W v z cDi) mr,z� m H cn mC H W v co zovz M m a -lmro m O 00 W D !! ,, D Om > cn 0 V n m m-ioo m zmm=1 o Lu m m DOD -A p rHcnm cn 0 W W o � J o f \C —rl W W II 11 z1. 0 oo I II g m II w J cn J Q II 11 Z � Y II m 11 Q I II II > w v II > Oco Y W m II II m I u i li.i N m m rl—— — — — —I� W Q z o (� U z o N Z I Z 0 Q 1. o i o I � I m PROJ. MGR.: M. HORSTMAN W DESIGN BY: M. SMALLING o o ���� DRAWN BY: M. SMALLING I PROJ. DATE: JULY 2019 oo DRAWING NUMBER: o Q LL 60F 18 Y ap m ROADWAY STANDARD DRAWING FOR 1 "18 STATE OF ~ WKD PROD. NO.: PIPE COLLAR NORTH CAROLINA DEPT. OF TRANSPORTATION y o DIVISION OF HIGHWAYS Q 20180394.00.RA N , RALEIGH, N.C. w 0 �I O W N A A W W N� 1 -• N m O A O] N Q7 O? 07 (71 N D W 00 0] W N N N N N N N N T W W W W N N N N N N N N 71 W W N N 1 O O O O O O O C (P A W co W (31 J W O Cn N A O Ut � V W O J O m (O W N O (P m A O O O N m O (7r O O N W � 0�0 N O O A W Ili A W W N -- x O (J1 W O 1 J � 1 O (O CO 00 J J �I O U7 W W 1 J ? O H O O O A M m z z W W w w w D � H O O 0 o Z Z _ _ _ � W O D m Z N N � o_ o = O O D � sz° Z W W NiN N NiN x = m rn o rn w o m m G) x � m o 0 w o w0 0 N N coO � � O O o.W. 0 o TAD r m r � W 0 o W X � m O O O O O O (O W v m Ul y O N ()t O A W A W c0 ' N z Z 3 O O O O o n O m Z co cn w 0 N cow COw rr m� vo 0 S 0 • 0 0 o 0 0 x �� m � - N V 0 OJ A N O 0 W O o N O W m O � x Zow 0UO OJU OZw aoQ z00ww_ �ma U=W OOM 0¢ .a0 F�0 w ozw w-0 �� WoUZ O z, Z 0 O M = Y J U_Q ~OS 0 w�� . 0 ¢0 0 zz< 0., Z 0OQ OZZ tr' w wQQ ¢�z 0� 7 w0¢ �To wFz w�a =a� 0zo Y ¢ ¢ Q O¢ w z°w 3:7 OZD U-U Zz0 w 07T YU~ U p00 =Z ~U' OOQ O =zw Eo= ¢F7 awl 0W' 00, 5b 7 0 EROSION CONTROL NOTES: 1. REFER TO GENERAL NOTES ON SHEET 2. 2. DISTURBED AREAS: LOCATION SHEET AREA (AC) BROKEN SADDLE LANE EC2 0.22 MARYLEBONE DRIVE EC3 0.20 TOTAL 0.42 3. ALL AREAS DISTURBED BY THE CONTRACTORS SHALL BE SEEDED PER THE SPECIFICATIONS SHOWN BELOW: 4. MULCH: USE SPECIFIED EROSION CONTROL BLANKET TO COVER THE SIDE SLOPES OF THE CHANNEL. APPLY 3000 LB/ACRE GRAIN STRAW AND ANCHOR STRAW ON ALL OTHER DISTURBED AREAS. 5. REVIEW CONSTRUCTION SEQUENCE FOR ADDITIONAL EROSION CONTROL MEASURES. 6. CONSTRUCTION ACCESS AREAS SHOWN ARE TO GUIDE CONTRACTOR DURING CONSTRUCTION. CONTRACTOR SHALL COORDINATE WITH ENGINEER IF ALTERNATIVE CONSTRUCTION ACCESS ROUTES WILL IMPROVE EFFICIENCY OF CONSTRUCTION. EROSION CONTROL: 1. INSTALL PERMANENT VEGETATIVE COVER AND THE LONG-TERM EROSION PROTECTION MEASURES OR STRUCTURES AS SOON AS PRACTICAL IN THE CONSTRUCTION PROCESS. APPROPRIATE EROSION CONTROL MEASURES MUST BE PLACED BETWEEN THE DISTURBED AREA AND AFFECTED WATERWAY AND MAINTAINED UNTIL PERMANENTLY VEGETATED. 2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING ALL EROSION CONTROL MEASURES RELATED TO THE CONSTRUCTION SITE. 3. AT A MINIMUM, EROSION CONTROL MEASURES SHALL BE INSTALLED IN ACCORDANCE WITH APPLICABLE STATE AND LOCAL REGULATIONS. ADDITIONAL EROSION CONTROL MEASURES MAYBE REQUIRED BY LOCAL GOVERNING AGENCIES. 4. CONTRACTOR MUST TAKE THE NECESSARY ACTION TO MINIMIZE THE TRACKING OF MUD ONTO THE PAVED ROADWAY FROM CONSTRUCTION AREAS. DAILY REMOVAL OF MUD/SOIL MAYBE REQUIRED. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE IMMEDIATE REMOVAL OF ANY SOIL TRACKED INTO THE PUBLIC RIGHT-OF-WAY. 5. THE LOCATIONS OF SOME EROSION CONTROL MEASURES MAY HAVE TO BE ALTERED FROM THOSE SHOWN ON THE PLANS IF DRAINAGE PATTERNS CHANGE DURING CONSTRUCTION. 6. PROVIDE FOR HANDLING THE INCREASED RUNOFF CAUSED BY CHANGED SOIL AND SURFACE CONDITIONS. USE EFFECTIVE MEANS TO CONSERVE EXISTING ON -SITE SOIL INCLUDING THE USE OF DIVERSION DITCHES. 7. ALL DISTURBED AREAS SHALL BE SEEDED. USE TEMPORARY PLANT COVER, MULCHING, AND/OR STRUCTURES TO CONTROL RUNOFF AND PROTECT AREAS SUBJECT TO EROSION DURING CONSTRUCTION. CHANNEL BANKS SHALL BE SEEDED DAILY UPON COMPLETION OF FINAL GRADING. 8. ALL SEDIMENT AND EROSION CONTROLS ARE TO BE INSPECTED AT LEAST ONCE EVERY SEVEN CALENDAR DAYS AND AFTER ANY STORM EVENT OF GREATER THAN 0.5 INCHES OF PRECIPITATION DURING ANY 24-HOUR PERIOD. MAINTENANCE OF SEDIMENT TRAPPING STRUCTURES SHALL BE PERFORMED AS NECESSARY PER THESE INSPECTIONS. SILT FENCING AND DIVERSION DITCHES SHALL BE INSTALLED AS SHOWN ON EROSION CONTROL SHEETS. 9. STABILIZATION MEASURES SHALL BE INITIATED AT THE END OF EACH DAY IN PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITIES HAVE TEMPORARILY OR PERMANENTLY CEASED EXCEPT WHERE CONSTRUCTION ACTIVITIES SHALL BE REINITIATED WITHIN 7 CALENDAR DAYS. 10. ALL EROSION CONTROL DEVICES SHALL BE PROPERLY MAINTAINED DURING ALL PHASES OF CONSTRUCTION UNTIL THE COMPLETION OF ALL CONSTRUCTION ACTIVITIES AND ALL DISTURBED AREAS HAVE BEEN STABILIZED. ADDITIONAL CONTROL DEVICES MAY BE REQUIRED DURING CONSTRUCTION IN ORDER TO CONTROL EROSION AND/OR OFFSITE SEDIMENTATION. CONTRACTOR SHALL REMOVE ALL TEMPORARY CONTROL DEVICES ONCE CONSTRUCTION IS COMPLETE AND THE SITE IS STABILIZED. A MAXIMUM OF 51 LINEAR FEET OF STREAM MAY BE DISTURBED AT ANY ONE TIME. 11. SILT FENCING TO BE INSTALLED AROUND INDICATED SPOILS AREAS TO PREVENT LOSS OF SEDIMENT. 12. ALL NECESSARY MEASURES MUST BETAKEN TO PREVENT OIL, TAR, TRASH, AND OTHER POLLUTANTS FROM ENTERING THE ADJACENT OFFSITE AREAS. 13. CONSTRUCTION ACTIVITIES MUST AVOID TO THE GREATEST EXTENT PRACTICABLE, ENCROACHMENT INTO ANY WETLAND/STREAM AREAS NOT DESIGNATED AS IMPACT AREAS. 14. ACTIVITIES MUST AVOID DISTURBANCE OF WOODY RIPARIAN VEGETATION WITHIN THE PROJECT AREA TO THE GREATEST EXTENT PRACTICABLE. REMOVAL OF VEGETATION MUST BE LIMITED TO ONLY THAT NECESSARY FOR CONSTRUCTION OF THE CHANNEL. 15. NO ON -SITE BURIAL OF VEGETATION OR CONSTRUCTION DEBRIS WILL BE PERMITTED. 16. ANY GRADING BEYOND THE CONSTRUCTION LIMITS SHOWN ON THE PLAN IS A VIOLATION OF THE NORTH CAROLINA EROSION CONTROL ORDINANCE, AND IS SUBJECT TO A FINE. 17. PLEASE REFERENCE PLAN SHEET DETAILS AND NCDENR STANDARDS FOR CONSTRUCTION OF EROSION CONTROL MEASURES. 18. THERE WILL BE PUMP AROUND USED ANYWHERE A CHANNEL IS DISTURBED. 19. PROVIDE SELF -INSPECTION PARAGRAPH WITH LOCATION OF WEBSITE FOR ACCESS TO INSPECTION FORM. A COPY OF THE APPROVED PLAN, PLAN APPROVAL, NPDES PERMIT AND COPIES OF PAST 30 DAYS SELF -INSPECTION REPORTS ARE TO BE KEPT ON SITE AT ALL TIMES. TEMPORARY AND PERMANENT VEGETATION SEEDBED PREPARATION: 1. PREPARATION OF SUBSOIL 1.1. COMPLETE OPERATIONS IN THE AREA TO BE SEEDED AND PREPARE SUBSOIL TO ELIMINATE UNEVEN AREAS AND LOW SPOTS. BRING SURFACE TO THE APPROXIMATE DESIGN CONTOURS. 1.2. SCARIFY SUBSOIL TO A DEPTH OF 3 INCHES. REMOVE WEEDS, ROOTS, STONES AND FOREIGN MATERIALS 1-1/2 INCHES IN DIAMETER AND LARGER. 2. PLACING TOPSOIL 2.1. PLACE TOPSOIL DURING DRY WEATHER AND ON DRY UNFROZEN SUBSOIL WHERE INDICATED ON DRAWINGS. 2.2. SPREAD TOPSOIL TO A MINIMUM DEPTH OF 4 INCHES. REMOVE VEGETABLE MATTER AND FOREIGN NON -ORGANIC MATERIAL FROM TOPSOIL WHILE SPREADING. GRADE SURFACE TO PROVIDE POSITIVE DRAINAGE AND PREVENT WATER PONDING. LIGHTLY COMPACT TOPSOIL WITH AT LEAST ONE PASS OF A CULTIPACKER OR SIMILAR EQUIPMENT 2.3. MAINTAIN THE FINISHED SURFACES BY PROTECTING, AND REPLACING TOPSOIL AND SUBSOIL AS NECESSARY UNTIL THE AREA IS ACCEPTED UNDER THE CONTRACT. 3. APPLICATION OF LIME 3.1. LIMING SHALL BE DONE IMMEDIATELY AFTER GRADING HAS REACHED THE FINE GRADING STAGE, EVEN THOUGH ACTUAL SEEDING MAY NOT BE DONE UNTIL SEVERAL MONTHS LATER. 3.2. SPREAD LIME EVENLY BY MEANS OF A MECHANICAL DISTRIBUTOR. 3.3. WHEN LIME IS DISTRIBUTED BY COMMERCIAL LIMING DEALERS, SALES SLIPS SHOWING THE TONNAGE DELIVERED SHALL BE FILED WITH THE ENGINEER AND SHALL SHOW THE FULL TONNAGE REQUIRED FOR THE ACRES TREATED. 3.4. INCORPORATE LIME IN THE TOP 2 TO 3 INCHES OF SOIL BY HARROWING, DISKING, OR OTHER APPROVED MEANS. 4. APPLICATION OF FERTILIZER 4.1. SPREAD FERTILIZER NOT MORE THAN 2 WEEKS IN ADVANCE OF SEEDING. 4.2. TO VERIFY APPLICATION RATE, DETERMINE ACREAGE TO BE FERTILIZED AND PROVIDE ENGINEER WITH TOTAL WEIGHT OF FERTILIZER APPLIED TO THE AREA. 4.3. PROVIDE MECHANICAL SPREADER FOR EVEN DISTRIBUTION AND SPREAD HALF OF THE RATE IN ONE DIRECTION, AND THE OTHER HALF AT RIGHT ANGLES TO THE FIRST. MIX THOROUGHLY INTO UPPER 2 TO 3 INCHES OF SOIL BY DISKING, HARROWING OR OTHER APPROVED METHODS. 5. SEEDING 5.1. ACCOMPLISH SEEDING BY MEANS OF AN APPROVED POWER -DRAWN SEED DRILL, COMBINATION CORRUGATED ROLLER -SEEDER, APPROVED HAND OPERATED MECHANICAL SEEDER, OR OTHER APPROVED METHODS TO PROVIDE EVEN DISTRIBUTION OF SEED. 5.2. DO NOT SEED WHEN GROUND IS EXCESSIVELY WET OR EXCESSIVELY DRY. AFTER SEEDING, ROLL AREA WITH A ROLLER, NOT LESS THAN 18 INCHES IN DIAMETER AND WEIGHING NOT MORE THAN 210 POUNDS PER FOOT OF WIDTH. UPON COMPLETION OF ROLLING, WATER AREA WITH A FINE SPRAY. 5.3. IMMEDIATELY FOLLOWING SEEDING APPLY MULCH OR MATTING AS LISTED BELOW. DO NOT SEED AREAS IN EXCESS OF THAT WHICH CAN BE MULCHED ON SAME DAY. 5.4. APPLY WATER WITH A FINE SPRAY IMMEDIATELY AFTER EACH AREA HAS BEEN MULCHED. SATURATE TO 4 INCHES OF SOIL DEPTH 6. MULCHING AND MATTING 6.1. APPLY MULCH OR MATTING AS REQUIRED TO RETAIN SOIL AND GRASS, BUT NO LESS THEN THE FOLLOWING: 6.1.1. SLOPES FROM 0 TO 20 PERCENT BY SPREADING ALIGHT COVER OF MULCH OVER SEEDED AREA AT THE RATE OF NOT LESS THAN 85 LBS. PER 1000 SQ. FT. USE TACK TO PREVENT DISRUPTION OF MULCH. 6.1.2. SLOPES GREATER THAN 20 PERCENT MULCH WITH MATTING. PIN MATTING TO THE GROUND WITH WIRE STAPLES AT 5 FOOT INTERVALS, IMMEDIATELY AFTER SEEDING. 6.2. OTHER TYPES OF MULCH AND ANCHORING METHODS MAYBE USED UPON APPROVAL BY THE ENGINEER. 7. PROTECTION 7.1. PROTECT SEEDED AREAS FROM DAMAGE BY BARRICADES, SIGNS, AND OTHER APPROPRIATE MEANS. MAINTAIN AND PROTECT SLOPES FROM WEATHER DAMAGE. STABILIZATION SITE AREA STABILIZATION TIME FRAME AREA DESCRIPTION TIME FRAME EXCEPTION Perimeter dikes, 1 swales, ditches 7 days None and slopes If slopes are 10' or Slopes steeper less in length and 2 than 3:1 7 days are not steeper than 2:1, 14 days are allowed 7 days for slopes 3 Slopes or 14 days greater than 50' in flatter er length All other area None (except as 4 with slopes 14 days shown in chart) flatter than 4:1 TEMPORARY GRAVEL CONSTR. ENTRANCE/EXIT KO TREE REMOVAL VICINITY MAP SCALE: 111=60' J Z 0 LIJ LIJ z LIJ D_ oc 0 LL i LL Q vw DICKSON comminity infrastructure consultants 720 CORPORATE CENTER DRIVE RALEIGH, NC 27607 (t) 919-782-0495 (f)919-782-9672 WWW.WKDICKSON.COM NC LICENSE NO.F-0374 PROFESSIONAL SEAL 0o Z fr 0 O a_ w 0 fr Z p O U) w w a 0 IIIIIIIlb I- Z w w g tl IY w w i I- 0 m U w J J � I- U Z w O Z U g z J 0 0 rr Q Lu Z w Y m Iii Ii i J z U Z w � O Q � o PROJ. MGR.: M. HORSTMAN DESIGN BY: M. HORSTMAN DRAWN BY: M. SMALLING PROJ. DATE: JULY 2019 DRAWING NUMBER: 70F 18 WKD PROJ. NO.: 20180394.00. RA i 02 W poa FOO pJU pz a0¢ ww9 Dm� o=w .Om �a0 =N❑ ~ -W ozw - . o Zoe+ w00 zzw oom =UQ ~ON OY� .00 zz< o.¢ o0 2w(5 w¢a ¢3:z �o� x 0 w�a =a� 0 ¢¢¢ awe Z° w 9D oz0 'zo zzp o Y�F U00 pp YIz �xz 4H 0 =zw �0z alr w0 oU O'. N/F' THOMAS L. HUDGINS & \ s MARY R. HU GINS \ \ I I I D.B. 281 6 P . 3539 \ \ I I I PIN 6886-76 028 \ I 718 CORJO RD. \ \ \ \ I I 00 18LT 9s4 \ ) \ \ S3 \ 22LT \ I I }00 _ — \ \ 13TRJE I 0 15LT7�\ \ � s I — — — — — — —\ 15LT \ CM \ 1 ROBERT K. CAMPBELL & \0 TOP \\ MARILYNAMPBELL 8TREE 9 OF BANK \\\ \ D.B.B. 16 1630, PG. 2577 S� I PIN 6886-75-8996 0 CORJON RD. \ \ \\\ \ \ I I \ I 1 \� CM \�\ \ 950 ....=949.7 8TREE \ \ \\ \ Al � / I I�O 1961 ---- \ I \\ 14/ \ L WM \ I Q \ M / \ �� Q ) / \-0 30QA / o Cn / RIM=959.13' \ as a/ iJ INV=952.18' O \ I o \ \ \1 I � � \ \ _ o / C M TH 1 960\ \ \ / .a p 1 STORBRICK / 24LT \ \ 9 P s ` _ 2e� / � / / RESIDENCE 5g . L00 \q \ 16LT — i 959 030QA \ �O / N/F SUE TUCKER VANHOY & 17LT DAVID LASLEY VANHOYr�! \ / / °� /� \ \ �-- D.B. 2518, PG. 2741 P.B. 26, PG. 33 \ -956 Cm \rr�\ 949.81' PIN 6886-75-8816 \ \ J 314 BROKEN SADDLE LN. \ \ F // / / / O (� / C M / 1` — — 958 — — — — — — \ \ 16LT / / / /0 / \\ \ CM 1*------- BOR CM \ \ \ \ \ \ \ 36LT / / / / I I Cm o y N/F \ \ I 11 1 MICHAEL LEE CABLE \ I 1 RIM=9 0.34' 00 I / / I I I / / \ \ �� D.B. 1700, PG. 2476 I I / / IN- 48.14' / / I I \ \ \ \ \ P.B. 26, PG. 33 I I 1 IN- 54.74' I I / \ \ \ \ \ PIN 6886-85-0983 1 IN 953.44' / / / I / \ \ /� \ \\ \ _ — _ 307 BROKEN SADDLE LN. I I \ \9PT OUT 947.84' \ I 954 \\\ \\ /� I I // o / 962 I ° l I 1 I / \\ CM \\\ \ 8TREE / ' \ I I EROSION CONTROL LEGENDCo Cm 1 \\ \ LOD LIMITS OF DISTURBANCE SEDIMENT FENCE (SILT FENCE) / TOP I I I I I I / / / ° OF BANK CM \ P S \\ \ �..___.,TREE PROTECTION ,o \ �- / // / // 963 I I I III 2 INV=96 3 \ I I I I ( \\ O � / CHECK DAM ,o \ 14LT \ \ J / / I I ( \ 90 PS SEEDING (PERMANENT) z \ \\ 24LT / S. \\ cM COIR FIBER MATTING EROSION CONTROL MATTING s \ \I / J o 11 I I I I I I 1 1 11 \ \ 1 \ \ \ 0s \\ wM ' II I ( 1 11 1 1 1 11 \\ 11 \�\� \\ \ �0 \\ \\ �--�_-�--A PUMP AROUND 2+00 „ 15" CID\ I I I 1 1 1 1 \ \ 1 \\ \ \ \\ \ \ O COFFER DAM �� \ / I 1 I I \ 1 1 \ 16LT 1 1I \ 1 Lo CONSTRUCTION FENCE 9LT 01(SAFETY FENCE) \ \ \\ \ \ I I I I 1 \ 8REE \ TEMPORARY GRAVEL CONSTR. v- 4 68 IV 8TREE 62.60' \ \ \ 1 I \ \ \ \ ENTRANCE EXIT 10 i\ \ I I I I I \ \ \ \ I I \ \ \ \ \ \ \ TREE REMOVAL \ \ 1 I I I I I \ 10PT \ I ' 8TREE \ (° 1 1 I I I I I I 13TREE \ \ \ 15LT 18LT /� i \ 8TREE \ \ 10 0 5 10 20 1 inch = 10 ft. J z 0 w_ Lu z G rLu I..L 0 LL L.L 0 VVK DICKSON community infrastructure consultants 720 CORPORATE CENTER DRIVE RALEIGH, NC 27607 (t) 919-782-0495 (f)919-782-9672 WWW.WKDICKSON.COM NC LICENSE NO.F-0374 PROFESSIONAL SEAL Co 0 Z cc 0 0 Cr a cc W Lu O_ U) w cc w a 0 IIIIII110 H- z w w U g Lu z � J Lu J � U Z w 0 Z z w 0 0 O w Z w Y cr ED w Iii J z w z � 0 PROJ. MGR.: M. HORSTMAN DESIGN BY: M. HORSTMAN DRAWN BY: M. SMALLING PROJ. DATE: JULY 2019 DRAWING NUMBER: 80F 18 WKD PROJ. NO.: 20180394.00. RA i OW zoa FOO OJU z, ww9 o=w oom �a =�o'o ozw - . o zo. w00 zzw oom =UQ ~ON OY� .N z< zO oww oOZ ¢W(5 w¢a wom mm 0 w�a ¢FF =a� 0Z°w ¢0< w� Z°w o_gD 0 'zo zzo w o�= Yo, UD p00 YIz �xz oo¢ 0 =zw �Oz 'lr wo cU O'. CL \ a aLo — 0+5 I EROSION CONTROL LEGEND 30AR � � 9 � � 9$0• O. \ � \ \ LOD 94s \ \ \ T 962. _ _ INV=950.14' ° LIMITS OF DISTURBANCE A�.\ \ A / \ \ SEDIMENT FENCE (SILT FENCE) 10 TOP \o 0 \\ II I \ \\\ \\ \\ \\\ \\ \ \\\\\ OF BANK \ c9j _ _ _ TREE PROTECTION 3 O 10 \\ \ \ \\ \ \, 8JV / ■ \ \ \ \ \ 6LS\ \\ \ \ T I I CHECK DAM 10 \ o \ o PS \ i \ \ 4L P S Lo, Q I PS SEEDING (PERMANENT) 3 CM �� // I 0-4 o C cM COIR FIBER MATTING (EROSION CONTROL MATTING) 1s /'p -OD � '/' S° M '�- PUMP AROUND 11 ,g I d \ \ \ 00 sJV COFFER DAM r1 CM \ `\ //j// // \\ j I I W p 9s/i Il�jv-�27' / / \ I I CO M CONSTRUCTION FENCE 10 \ \ \ \ !)Jv CM / I I (SAFETY FENCE) Lo 27- .97 LF OF 8" PVC ❑ C — 951 — �\ 95� — -� P S 0')I > \ @0.66/0 \ ~✓/ \ \ \ I ENITRANCE/EXIRAVEL CONSTR. 10 8Jvl \\\ \\ G \�❑ -- 952 -- — \ \ 810 G —\ I TREE REMOVAL \ mot- G � � \ 1T' G 8JV J � \\ GM /Y I \ sJv II6Jv \ I `^i ----\ \ / ) AT A/C 6LS \ \ UNITS — 2Ls I/ \\ \\ I T 6LS \\ 9S ` I 4 4JV \ � FF=960.10' I I I d \ \ \ \ \ 01OLS N/F \ ` HARVEY W. GUYE & SHARON GUYE D.B. 2072, PG. 589 6LS P.B. 31, PG. 152 d \ \\ PIN 6886-85-1675 \ \ 332 MARYLEBONE DR. \ \ \ 3Jv \ \ 12LT a I \ a o GP — \ ° \ 12"RCP — A EXISTING 20' SANITARY \ SEWER EASEMENT (P.B. 31, PG. 152) \ EIP INV=951.42' 8" PVC — G / / / / / / / / DECK 15LT 24L' 28QA O O I 8M �. / ❑ O TIMBER 4'WF 0 C M 8MG 8MG `�WALL / ❑ ❑ ❑ ❑ ❑ ❑ ❑— PS I ( \ \ GMG PS--/ 46-- W \ _ 4 _-----____-9-------- i w X \ \\\\ \ CM 2+50- — ` \\ \�\\ CM 12LT T \ I I I I N OR-3 \ I I I 0 0 I I IPAUL MORRISON & TAMMY MOR ON 9,19 p\ k.B. 2181, PG. 6 4 \ OLL p P PIN 6M685 3404 \ / \ uJ \ ARYLEBONE DR. \ \ \ 19,10 / \ 0 0 , a 0 2LT LL �0 a loI M=955"108' / IN=947.68 IN=949.28' \ \ IN=947.66' \ OUT=947.63' \ \ \ 60.21 LFOF8"P JCJ @ 5.7 % W I I I I \ � I �o I I II I I I I I I I \ \\\ \ CM — CM 948 9TREE Lu M=951.18' \ 10TREE ` 00 \\\ \\ TOP \\\\\\ 0— \ \ \ \\� �_� iN�944.16' — — 36QAO \ OF BANK \ \ \ IN=941.96' JT=941 9'I'— --- PS — — ---------- \ \\ LL 0 10 0 5 10 20 1 inch = 10 ft. cc DDICKSON community infrastructure consultants 720 CORPORATE CENTER DRIVE RALEIGH, NC 27607 (t) 919-782-0495 (f)919-782-9672 WWW.WKDICKSON.COM NC LICENSE NO.F-0374 PROFESSIONAL SEAL Co 0 z cc 0 0 a Cr cc W z Lu O W Lu a 0 Z H- z Lu Lu U g Lu z g � J Lu J � U z Lu 0 qZ J z O Lu t] 0 Lu z Lu Y D= ED LLI Lij J z W >z r a 0 PROJ. MGR.: M. HORSTMAN DESIGN BY: M. HORSTMAN DRAWN BY: M. SMALLING PROJ. DATE: JULY 2019 DRAWING NUMBER: 9 of 18 WKD PROJ. NO.: 20180394.00. RA ZOw 000 OJU Ozw aoQ z00ww_ 2P Dma U=w oom 0¢ . o Fro w ozw Fo-o � WUZ 0 z, z 0Om wYJ =UQ ~OS 0 Do z. z< 0za o°z 2w C7 aG' w¢¢ ¢3z wD, woo 0 wiz wa =a� 0 z w ¢aa Qom w ZOw 3:7 OZD U-U ZZ0 w 07= YU~ U p00 �=z 'oo 0 =z= w Oo ¢w aw0 o ww' 7 7 0 a STEEL OR WOOD POST WIRE FABRIC FILTER FABRIC OpE L� M ��O \\// EXISTING o f \\/j//j GROUND LINE cli /\\/\\/ IT-ANCHORFABRIC 4 j~ AS SHOWN SECTION VARIABLE AS DIRECTED BY THE ENGINEER (10' MAX.) TOP AND BOTTOM STAY WIRES, ANCHOR WIRE FABRIC TO STRAND MIN. 12" SPACING WOOD POST WITH MIN. 4 10 GA., TYP. MIN. 14 GA. FENCING STAPLES PER POST LU W SECURELY � OfN UJ ANCHOR < FABRIC TO Z z WIRE WITH WIRE TIES //\//\ q O ~ MAX. WIRE FILTER FABRIC TO BE w `y' FABRIC MESH POLYPROPYLENE NYLON, `� 1.-0 LLLJJJ OPENING SIZE POLYESTER OR POLY- u = 36 SQ. IN. ETHYLENE YARN OF MANUFACTURER TO BE APPROVED BY ENGINEER NOTES: ELEVATION 1. THE CONTRACTOR SHALL MAINTAIN ALL SILT FENCING BY REMOVING AND DISPOSING OF SILT ACCUMULATIONS AS DIRECTED BY THE ENGINEER. FILTER FABRIC SHALL BE REPLACED WHEN IT HAS DETERIORATED TO SUCH EXTENT THAT IT REDUCES THE EFFECTIVENESS OF THE SILT FENCE. 2. FILTER FABRIC SHALL HAVE A MINIMUM TENSILE STRENGTH (@ 20% MAX. ELONGATION) OF 30lbs/LIN. IN., WIRE FABRIC REQUIRED. 3. IF EXTRA STRENGTH FABRIC IS UTILIZED (MIN. TENSILE STRENGTH = 50 Ibs/LIN. IN. @ MAX. 20% ELONGATION), WIRE FABRIC IS OPTIONAL, MAXIMUM POST SPACING = 6 FEET. 4. POSTS SHALL BE 4" DIA. PINE, 2" DIA. OAK OR 1.33 Ib/LF STEEL UNLESS OTHERWISE APPROVED BY ENGINEER. NO. DATE REVISION TEMPORARY SILT FENCE SHEET NO. SCALE: NOT TO SCALE DWG. BY: WKD 1 OF 1 DATE: 05-15-2015 PATH AND FILENAME: K:\WKD Standard Details\EC001.dwg TEMPORARY SILT FENCE NOT TO SCALE p0 P COURSE AGGREGATE - STONE SIZE = 2"-3" z 201M/N TEMPORARY GRAVEL NO. DATE REVISION CONSTRUCTION ENTRANCE SHEET NO. SCALE: NOT TO SCALE DWG. BY: WKD 1 OF 1 DATE: 5/18/2015 PATH AND FILENAME: TEMPORARY GRAVEL CONSTRUCTION ENTRANCE NOT TO SCALE EXISTING DITCH (WIDTH VARIES) zo N ELEVATION N.C.D.O.T CLASS B EROSION CONTROL STONE 2• J v N FLOW— SECTION TEMPORARY SILT CHECK DAM NO. DATE REVISION SHEET NO. SCALE: NOT TO SCALE DWG. BY: WKD 1 OF 1 DATE: 05-15-2015 PATH AND FILENAME: K:\WKD Standard Details\EC002.dwg TEMPORARY SILT CHECKDAM NOT TO SCALE Lelxllr*1111IN:@y1:1:l s] o SECURELY ANCHOR n FABRIC TO POST WITH z WIRE TIES EXISTING GROUND LINE SFCTInN VARIABLE AS DIRECTED BY THE ENGINEER (10' MAX.) GEOTEXTILE SHALL BE ATTACHED TO WOOD POSTS WITH ONE 2" GALVANIZED WIRE STAPLE ACROSS EACH CABLE O r L FENCE TO BE ULTRAVIOLET 0 LJ POLYPROPYLENE OR u POLYETHYLENE YARN OF u MANUFACTURER TO BE APPROVED BY ENGINEER NnTFS- ELEVATION ATTACH GEOTEXTILE TO STEEL POSTS WITH WIRE OR OTHER ACCEPTABLE MEANS 0 N 1. POLYETHYLENE OR POLYPROPYLENE FENCE SHALL BE A HIGHLY VISIBLE PRECONSTRUCTED SAFETY FENCE APPROVED BY THE ENGINEER. THE FENCE MATERIAL SHALL HAVE AN ULTRAVIOLET COATING. 2. EITHER WOOD POSTS OR STEEL POSTS MAYBE USED. WOOD POSTS SHALL BE HARDWOOD WITH A WEDGE OR PENCIL TIP AT ONE END, AND SHALL BE AT LEAST 5 FT. IN LENGTH WITH A MINIMUM NOMINAL 2" X 2" CROSS SECTION. STEEL POSTS SHALL BE AT LEAST 5 FT. IN LENGTH, AND HAVE A MINIMUM WEIGHT OF 0.85 LB/FT OF LENGTH. 3. POSTS SHALL BE SET AT A MAXIMUM SPACING OF 10 FT., MAINTAINED IN A VERTICAL POSITION AND HAND SET OR SET WITH A POST DRIVER. POSTS SHALL BE INSTALLED A MINIMUM OF 2 FT. INTO THE GROUND. IF HAND SET, ALL BACKFILL MATERIAL SHALL BE THOROUGHLY TAMPED. WOOD POSTS MAY BE SHARPENED TO A DULL POINT IF POWER DRIVEN. POSTS DAMAGED BY POWER DRIVING SHALL BE REMOVED AND REPLACED PRIOR TO FINAL ACCEPTANCE. THE TOPS OF ALL WOOD POSTS SHALL BE CUT AT A 30-DEGREE ANGLE. THE WOOD POSTS MAY, AT THE OPTION OF THE CONTRACTOR, BE CUT AT THIS ANGLE EITHER BEFORE OR AFTER THE POSTS ARE ERECTED. NO.I DATE SAFETY FENCE SHEET NO. SCALE: NOT TO SCALE DWG. BY: WKD 1 OF 1 DATE: 5/18/2015 PATH AND FILENAME: 5 SAFETY FENCE 10 NOT TO SCALE REVISION MAINTENANCE NOTES: CONTINUE TO CARE FOR THE SITE UNTIL THE NEW OWNER TAKES POSSESSION. TAKE THE FOLLOWING STEPS AFTER ALL MATERIALS AND EQUIPMENT HAVE BEEN REMOVED FROM THE SI TE: • REMOVE TREE PROTECTION ZONE FENCES. • PRUNE ANY DAMAGED TREES. IN SPITE OF PRECAUTIONS, SOME DAMAGE TO PROTECTED TREES MAY OCCUR. IN SUCH CASES, REPAIR ANY DAMAGE TO THE CROWN, TRUNK, OR ROOT SYSTEM IMMEDIATELY. EXISTING • REPAIR ROOTS BY CUTTING OFF THE DAMAGED AREAS AND PAINTING THEM WITH TREE PAINT. SPREAD PEAT MOSS OR MOIST TOPSOIL OVER EXPOSED ROOTS. • REPAIR DAMAGE TO BARK BY TRIMMING AROUND THE DAMAGED AREA AS SHOWN IN FIGURE 1 BELOW, TAPER THE CUT TO PROVIDE DRAINAGE, AND PAINT WITH TREE PAINT. • CUT OFF ALL DAMAGED TREE LIMBS ABOVE THE TREE COLLAR AT THE TRUNK OR MAIN BRANCH. USE THREE SEPARATE CUTS AS SHOWN IN FIGURE 1 BELOW TO AVOID PEELING BARK FROM HEALTHY AREAS OF THE TREE. • CONTINUE MAINTENANCE CARE. PAY SPECIAL ATTENTION TO ANY STRESSED, DISEASED, OR INSECT -INFESTED TREES, REDUCE TREE STRESS CAUSED BY UNINTENDED CONSTRUCTION DAMAGE BY OPTIMIZING PLANT CARE WITH WATER, MULCH, AND FERTILIZER WHERE APPROPRIATE. CONSULT YOUR TREE EXPERT IF NEEDED. DRIP UNE- • INFORM THE PROPERTY OWNER ABOUT THE MEASURES EMPLOYED DURING CONSTRUCTION, WHY THOSE MEASURES WERE TAKEN, AND HOW THE EFFORT CAN BE CONTINUED. PROTECTIVE BARRIEF YI —I I lrt7l: w9und TrrmunOroger Inoorrezt �orreCt NOTE: DT AM 17TLIXT SYMBOL 1 3' MIN. STAKE HEIGHT ABOVE GRADE TREES TO BE SAVED WILL BE CLEARLY MARKED PRIOR TO CONSTRUCTION AND HIGH VISIBILITY FENCING IS TO BE INSTALLED AT THE DR LINE*. *DRIP LINE - THE AREA OF SOIL DIRECTLY BENEATH THE TREE EXTENDING OUT TO THE TIPS OF THE OUTERMOST BRANCHES. DRIP LINES EXTEND OVER CHANNELS OR WORK AREAS WHERE IT MAY NOT BE FEASIBLE TO PLACE PROTECTION FENCES. IN SUCH CASES THE CONTRACTOR SHALL COORDINATE WITH THE FIELD INSPECTOR TO ALTER THE PROTECTION FENCE AND/OR PROPOSED WORK (GRADING ONLY). TREE PROTECTION NOT TO SCALE J Z O Lu Lu oc Z G Lu CL oc O L L.L Q 0 VVK DICKSON comminity infrastructure consultants 720 CORPORATE CENTER DRIVE RALEIGH, NC 27607 (t) 919-782-0495 (f)919-782-9672 WWW.WKDICKSON.COM NC LICENSE NO.F-0374 PROFESSIONAL SEAL m Z fr 0 O a W 0 fr Z p O U) W fr W a 0 lZ H Z W W g 11 J WLu Q 0 W J J 0 0 � U ~ Z W 0 Z U g z Lu 0 J cf) 0 0 0 12 Q W Z W Y m W LLI J Q ~ Z 0 Z W O Q � 0 PROJ. MGR.: M. HORSTMAN DESIGN BY: M. HORSTMAN DRAWN BY: M. SMALLING PROJ. DATE: JULY 2019 DRAWING NUMBER: 10OF18 WKD PROJ. NO.: 20180394.00. RA ZOw 000 OJU Ozw aoQ z00ww_ 2P Dma U=W OOm 0¢ .ao w ozw Fo-o � WUz O z, z 0Om = Y J U_Q ~OS 0 w�� D'. ¢O0 zz< 0., z z' o tr' w wQQ ¢�z ,D w �°o wFz wa =a� 0 z w Y ¢ ¢ Q O¢ w z°w 3:7 OZD U-U z 0 w 07= YU~ U p00 �=z 'oo 0 =z= w Oo ¢w awo 00 0 I 7 7 GROUND COVER SCHEDULE SITE AREA DESCRIPTION STABILIZATION TIME FRAME STABILIZATION TIME FRAME EXCEPTIONS PERIMETER DIKES, SWALES, DITCHES AND 7 DAYS NONE FLOW SLOPES HIGH QUALITY WATER (HOW) ZONES 7 DAYS NONE SLOPES STEEPER THAN 3:1 7 DAYS IF SLOPES ARE 10' OR LESS IN LENGTH AND ARE NOT STEEPER THAN 2:1, 14 DAYS ARE ALLOWED CLASS INTAKE HOSE SLOPES 3:1 OR FLATTER 14 DAYS 7 DAYS FOR SLOPES GREATER THAN 50 FEET IN LENGTH A ALL OTHER AREAS WITH SLOPES FLATTER STONE PUMP THAN 4:1 14 DAYS NONE (EXCEPT FOR PERIMETERS AND HWQ ZONES) AROUND WORK PUMP FOR PERMANENT PLANTING AND SEEDING DETAILS, REFER TO VEGETATIVE PLAN ON SHEET 7. DE -WATERING AREA PUMP OFFER DAM PERMANENT PLANTING 2 11 & SEEDING DETAILS SILT BAG LOCATION CLASS DISCHARGE HOSE A Q STON NOTE: HOSE SHOULD BE KEPT OUTSIDE OF WORK AREA COFFER DAM TOP OF BANK STABILIZED OUTF L CLASS A STONE GEOTEXTILE FABRIC , • KEY IN EROSION DISCHARGE CONTROL MATTING 0.8' HOSE �'o, •• •••• BEYOND TOP OF BANK. EXISTING FOR KEY —IN NOTES KEY IN EROSION ••••• •• •• AND DIMENSION SEE GROUND PROPOSED CONTROL MATTING 0.8' im 15' TO 20' BANK BEYOND TOP OF BANK. EXIST DETAIL 4/11. FOR KEY —IN NOTES CHANNEL NOTES STABILIZED AND DIMENSION SEE BOTTOM 1. LINE AREA SHOWN IN EROSION CONTROL OUTFACE DETAIL 4/11. PLANS WITH EROSION CONTROL MATTING. CLASS A SEE DETAIL 4/11 FOR KEY -IN DETAILS ONLY. STONE 2. PREPARE SOIL FOR SEEDING PER CONTRACT DOCUMENTS. GEOTEXTILE FABRIC 8"OF CLASS ASTONE 3. PLACE SEED & LIGHT MULCH. EXISTING CHANNEL SILT BAG PROFILE 4. INSTALL EROSION CONTROL MATTING OVER SEED & MULCH. POLYETHYLENE MEMBRANE ON FACE 20 MIL THICK 0 II co N LL QOQ >(o� �O � 3'- 0" 1 �1 LEVEL WITH TOP OF BANK OR AS NECESSARY CLASS 1 RIP RAP, NJ BARRIER OR OTHER APPROVED MATERIAL (IF USING RIP RAP DOWNSTREAM, SLOPE NO GREATER THAN 2: 1) NOTE: SANDBAGS, CLASS 1 RIP RAP CONTRACTOR SHALL FOLLOW OR OTHER NON -ERODIBLE CONSTRUCTION SEQUENCE AS NOTED ON MATERIAL 7 CONTRACT DRAWINGS. GEOTEXTILE FABRIC COFFER DAM NOTES: 1. EXCAVATION SHALL BE PERFORMED ONLY IN DRY AND/OR ISOLATED SECTIONS OF CHANNEL. 2. COFFER DAMS SHOULD BE USED TO ISOLATE WORK AREAS FROM STREAM FLOW. 3. THE CONTRACTOR SHALL NOT DISTURB MORE AREA THAN CAN BE STABILIZED IN ONE WORKING DAY. A MAXIMUM OF 51 FEET MAY BE DISTURBED AT ANY ONE TIME. 4. THE PUMP -AROUND PUMP SHOULD ADEQUATELY CONVEY MINIMUM 450 GALLONS / MINUTE 5. PERFORMANCE q=450 GPM ONLY 6. COFFER DAM MUST BE CONSTRUCTED OF NON -ERODIBLE MATERIALS SUCH AS SANDBAGS. SEQUENCE OF CONSTRUCTION FOR TYPICAL PUMP AROUND 1. INSTALL STILLING BASIN AND STABILIZED OUTFALL USING CLASS A RIP RAP AT THE DOWNSTREAM END OF THE DESIGNATED PROJECT WORKING AREA. 2. THE CONTRACTOR WILL INSTALL THE PUMP AROUND PUMP AND THE TEMPORARY PIPING THAT WILL CONVEY THE BASE FLOW FROM UPSTREAM OF THE WORK AREA TO THE STABILIZED OUTFALL. 3. INSTALL UPSTREAM COFFER DAM AND BEGIN PUMPING OPERATIONS FOR STREAM DIVERSION. 4. INSTALL THE DOWNSTREAM COFFER DAM AND DEWATERING PUMPING APPARATUS IF NEEDED TO DEWATER THE ENTRAPPED AREA. THE PUMP AND HOSE FOR THIS PURPOSE SHALL BE OF SUFFICIENT SIZE TO DEWATER THE WORK AREA. THIS WATER WILL ALSO BE PUMPED TO AN OUTFALL STABILIZED WITH CLASS A RIP RAP. 5. THE CONTRACTOR WILL PERFORM CHANNEL WORK IN ACCORDANCE WITH THE PLAN AND FOLLOWING THE GENERAL CONSTRUCTION SEQUENCE. 6. THE CONTRACTOR WILL EXCAVATE ANY ACCUMULATED SILT AND DEWATER BEFORE REMOVAL OF THE COFFER DAM. WHEN DEWATERING AREA, ALL DIRTY WATER MUST BE PUMPED THROUGH A SILT BAG. REMOVE COFFER DAMS, PUMPS, AND TEMPORARY FLEXIBLE HOSE/PIPING STARTING WITH THE DOWNSTREAM COFFER DAM FIRST. 7. ONCE THE WORKING AREA IS COMPLETED, REMOVE ALL RIP RAP AND COFFER DAMS AND STABILIZE DISTURBED AREAS WITH SEED AND MULCH. 8 ALL WORK IN CHANNEL MUST BE COMPLETED BEFORE REMOVING COFFER DAMS. 1 PUMP AROUND 11 NOT TO SCALE 12" 3 COIR FIBER MATTING 11 NOT TO SCALE N FIGURE 1 INTITIAL ANCHOR TRENCH FIGURE 3 TERMINAL ANCHOR TRENCH J. STAPLE AT 1' INTERVALS Rl STAPLE AT 1' INTERVALS TE A (FI STAPLE AT 1' INTERVALS GURE INSTALLATION NOTES: III I I I —I I I —III —III- 411 EROSION CONTROL MATTING SHALL BE A 100% STRAW MULCH ENCASED IN A MEDIUM WEIGHT PLASTIC NETTING (BOTH SIDES) WITH A MINIMUM -III—III—III I III —III —I � 1- PERMISSIBLE SHEAR STRESS OF 1.75 LBS PER SQ FT. —I I —III I III —III- I SITE PREPARATION -1 I I i I III —I I _III. 1= I I GRADE AND COMPACT AREA. 4" REMOVE ALL ROCKS, CLODS, VEGETATION, AND OBSTRUCTIONS SO THAT MATTING WILL HAVE DIRECT CONTACT WITH THE SOIL. FIGURE 2 BANK TERMINATION PREPARE SEEDBED BY LOOSENING 3 TO 4 INCHES OF TOPSOIL ABOVE FINAL GRADE. APPLY ANY TREATMENT SUCH AS LIME OR FERTILIZERS TO THE SOIL IF NEEDED. DO NOT MULCH AREAS WHERE MAT IS TO BE INSTALLED. EXTEND 2-3' PAST TOP OF BANK SEEDING SEE SHEET 12 FOR SEEDING REQUIREMENTS. APPLY SEED TO SOIL BEFORE PLACING MATTING. FIG 1 INSTALLATION ON BANKS INITIAL ANCHOR TRENCH EXTEND MAT 2 TO 3 FEET OVER CREST OF SLOPE AND EXCAVATE A 6" x 6" TERMINAL ANCHOR TRENCH. SEE FIGURE 4. ANCHOR MAT IN TRENCH ON 1 FOOT SPACINGS, BACKFILL AND COMPACT MINIMUM OF SOIL. 6" OVERLAP OVERLAP ADJACENT MATS 6" AND ANCHOR EVERY 18" ACROSS THE OVERLAP. THE HIGHER ELEVATION MAT SHOULD BE PLACED OVER THE LOWER ELEVATION MAT. RMINAL NCHOR 0� EDGES SHOULD BE SHINGLED AWAY FROM THE FLOW OF WATER. RENCH EXISTING 3) CHANNEL LAY MAT LOOSE TO ALLOW CONTACT WITH SOIL. BOTTOM DO NOT STRETCH TIGHT. ANCHOR MAT USING U-SHAPED WIRE STAPLES OR GEOTEXTILE PINS. FIG 2 INITIAL BANK TERMINATION ANCHOR FIGURE 4 TRENCH (FIGURE 1) TRENCH AND CHECK SLOT LAYOUT EROSION CONTROL MATTING INSTALLAION NOT TO SCALE J Z O Lu Ll Z Lu CL oc O LL LL Q 0 WK DICKSON comminity infrastructure consultants 720 CORPORATE CENTER DRIVE RALEIGH, NC 27607 (t) 919-782-0495 (f)919-782-9672 WWW.WKDICKSON.COM NC LICENSE NO.F-0374 PROFESSIONAL SEAL m Z fr O O a_ W0 fr W Z Lu O U) W Lu a 0 IlllII110 H Z W W g cn 11 J W Q W o W J J 0 0 ~ Z W 0 Z 0 g Z W 0 J cf) 0 0 0 cr � Lu Z W Y m W LLI J Q � Z U Z W � 0 PROJ. MGR.: M. HORSTMAN DESIGN BY: M. HORSTMAN DRAWN BY: M. SMALLING PROJ. DATE: JULY 2019 DRAWING NUMBER: 11 OF 18 WKD PROJ. NO.: 20180394.00. RA Zow FUO OJU "w a0¢ Zoo 2E �ma U=W oom 0¢ .10 w ozw F-o oN wU0 Z`o z 00. w Y J U_Q ~OS 0Y0 w�� . 0 0 °wa 0., z °a 0zz 2w C7 tr, wQQ ¢�z ,D w 00 �Tz wa =a� ozw Y ¢ ¢ ¢ w w z°w -3:7 OZD U-U ZZ0 w °7_ YU~ U p00 �=z ,00 0 =zw E 0, a�wl 0., 00, EROSION CONTROL GENERAL CONSTRUCTION SEQUENCE: 1. STABILIZED GRAVEL ENTRANCE/EXIT AT THE SITE SHALL BE INSTALLED AS SHOWN ON THE PLANS AND DETAILS. AFTER ESTABLISHMENT OF THE CONSTRUCTION ENTRANCE/EXIT, ALL PERIMETER EROSION CONTROL MEASURES SHALL BE INSTALLED PRIOR TO CLEARING AND GRUBBING. 2. ALSO PRIOR TO CLEARING AND GRUBBING/CONSTRUCTION, THE CONTRACTOR SHALL REQUEST AN ON -SITE INSPECTION. UPON RECEIPT OF CERTIFICATE OF COMPLIANCE, CLEARING AND GRUBBING/CONSTRUCTION MAY BEGIN. 3. PERFORM GRADING OPERATIONS IN A MANNER AND SEQUENCE SO AS TO REDUCE UNNECESSARY DISTURBANCE OF SURFACE COVER. 4. CONDUCT PRE -CONSTRUCTION MEETING INCLUDING OWNER/ENGINEER, ASSOCIATED CONTRACTORS AND OTHER AFFECTED PARTIES. 5. EROSION CONTROL MEASURES MAY BE PHASED -IN TO THOSE AREAS OF THE PROJECT CURRENTLY BEING WORKED ON. THE CONTRACTOR MAY MODIFY OR RELOCATE EROSION CONTROL MEASURES TO MAKE ADJUSTMENTS FOR UNFORESEEN FIELD CONDITIONS SO LONG AS PROPER CONSTRUCTION IS MAINTAINED TO ENSURE THE INTEGRITY AND USEFULNESS OF THE PROPOSED MEASURES. ALL RELOCATION SHALL HAVE THE APPROVAL OF THE ENGINEER. ALL DISTURBED AREAS ALONG CHANNEL BANKS SHALL BE STABILIZED WITH TEMPORARY SEED AND MULCH AT THE END OF EACH DAY. 6. IF IT IS DETERMINED DURING THE COURSE OF CONSTRUCTION THAT SIGNIFICANT SEDIMENT IS LEAVING THE SITE (DESPITE THE PROPER IMPLEMENTATION AND MAINTENANCE OF EROSION CONTROL MEASURES), THE PERSON RESPONSIBLE FOR THE LAND DISTURBING ACTIVITY IS OBLIGATED TO TAKE ADDITIONAL PROTECTIVE ACTION. 7. AT LOCATIONS IN WHICH THE STREAM CHANNEL IS BEING MODIFIED, TEMPORARY COFFER DAMS AND BYPASS PUMPING WILL BE USED TO DE -WATER THE WORK AREA. 8. FOR CONSTRUCTION OF CULVERT, FOLLOW PUMP AROUND SEQUENCE SHOWN ON DETAIL 1/11. 9. WHEN THE TOE HAS BEEN SUFFICIENTLY STABILIZED TO RESTRAIN EROSION ALL TEMPORARY COFFER DAMS WILL BE REMOVED FROM THE ACTIVE STREAM CHANNEL AND NORMAL FLOW RESTORED. ACCUMULATED SEDIMENT SHALL BE DISPOSED OF IN DESIGNATED SPOILS AREA PRIOR TO REMOVAL OF TEMPORARY COFFER DAM. ALL COFFER DAMS AND BYPASS PUMPING EQUIPMENT SHALL BE REMOVED FROM THE STREAM AT THE END OF EACH DAY TO RESTORE NORMAL FLOW BACK TO THE CHANNEL. 10. THE CONTRACTOR SHALL NOT DISTURB MORE AREA THAN CAN BE STABILIZED IN ONE WORKING DAY. RESTORATION MEASURES, SEEDING AND VEGETATION WILL BE INSTALLED ALONG THE CHANNEL LENGTH AS WORK PROGRESSES. 11. ALL EXCAVATED MATERIAL MUST BE PLACED AT A MINIMUM OF 5 FT FROM CHANNEL. SILT FENCES MUST BE INSTALLED AROUND ALL STOCKPILE AREAS. 12. TEMPORARY AND PERMANENT STABILIZATION OF ALL DISTURBED GRASSED AREAS AT THE TOP OF THE CHANNEL BANKS WILL BE IN ACCORDANCE WITH THE SEEDING AND MULCHING SPECIFICATION AS SHOWN ON THE EROSION CONTROL PLANS AND IN THE PROJECT MANUAL. 13. IN GENERAL, CONSTRUCTION SHALL PROCEED FROM AN DOWNSTREAM TO UPSTREAM DIRECTION. 14. PROPOSED CHANNEL EXCAVATION AND GRADING SHALL BE PERFORMED USING EQUIPMENT FROM OUTSIDE OF THE EXISTING CHANNEL WHERE POSSIBLE. TEMPORARY CROSSINGS WILL BE USED AT LOCATIONS SPECIFIED ON THE PLANS. CROSSINGS MAY BE ADDED OR RELOCATED UPON APPROVAL FROM THE ENGINEER. 15. CONTRACTOR SHALL NOT COMPACT SOIL AROUND ROOTS OF TREES TO REMAIN, AND SHALL NOT DAMAGE SUCH TREES IN ANY WAY. 16. ROUGH GRADING OF CHANNEL SHALL BE PERFORMED PRIOR TO INSTALLATION OF ROCK STRUCTURES OR CULVERT CROSSINGS. PRIOR TO INSTALLING ROCK STRUCTURES OBTAIN APPROVAL OF THE ENGINEER ON ROUGH GRADING. 17. UPON INSTALLATION OF ROCK AND OTHER STRUCTURES, OBTAIN APPROVAL OF ENGINEER PRIOR TO FINE GRADING. 18. IT SHALL BE UNDERSTOOD THAT FAILURE TO SPECIFICALLY MENTION ANY WORK THAT WOULD NATURALLY BE REQUIRED TO COMPLETE THIS PROJECT SHALL NOT RELIEVE THE CONTRACTOR OF HIS RESPONSIBILITY TO PERFORM SUCH WORK. 19. ESTABLISH RIPARIAN VEGETATION AS SHOWN ON DETAILS AND EROSION CONTROL MATTING PER DETAIL 3/11 AND MANUFACTURER'S SPECIFICATIONS. 20.REMOVE TEMPORARY EROSION CONTROL MEASURES AFTER GROUND COVER IS ESTABLISHED AND APPROVAL IS GRANTED FROM THE CITY INSPECTORS AND THE ENGINEER. MAINTENANCE FOLLOW THE CONSTRUCTION SEQUENCE THROUGHOUT PROJECT DEVELOPMENT. ADEQUATE EROSION AND SEDIMENT CONTROL MEASURES MUST BE INSTALLED, MAINTAINED AND ADJUSTED AS NEEDED DURING THE DEMOLITION OR CLEARING AND GRUBBING PHASES AS WELL AS THROUGHOUT THE LIFE OF AND UNTIL PERMANENT VEGETATION ON THE PROJECT IS ESTABLISHED. WHEN CHANGES IN CONSTRUCTION ACTIVITIES ARE NEEDED,AMEND THE SEQUENCE SCHEDULE IN ADVANCE TO MAINTAIN MANAGEMENT CONTROL. NOTIFICATION OF LAND RESOURCES SEDIMENT AND EROSION CONTROL SELF -INSPECTION PROGRAM: THE SEDIMENTATION POLLUTION CONTROL ACT WAS AMENDED IN 2006 TO REQUIRE THAT PERSONS RESPONSIBLE FOR LAND -DISTURBING ACTIVITIES INSPECT A PROJECT AFTER EACH PHASE OF THE PROJECT TO MAKE SURE THAT THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN IS BEING FOLLOWED. RULES DETAILING THE DOCUMENTATION OF THESE INSPECTIONS TOOK EFFECT OCTOBER 1,2010. TO SIMPLIFY DOCUMENTATION OF SELF -INSPECTION REPORTS AND NPDES SELF -MONITORING REPORTS, A COMBINED FORM IS NOW AVAILABLE. THE NEW FORM WAS DEVELOPED TO SATISFY THE REQUIREMENTS OF THE SEDIMENTATION POLLUTION CONTROL ACT AND THE NPDES STORMWATER PERMIT FOR CONSTRUCTION ACTIVITIES, NCG 010000. BEGINNING AUGUST 1, 2013, THE DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES IS RESPONSIBLE FOR ADMINISTERING BOTH THE SPCA AND THE NPDES STORMWATER PERMIT FOR CONSTRUCTION ACTIVITIES, NCG 010000. THE COMBINED FORM SHOULD MAKE IT EASIER TO COMPLY WITH SELF -INSPECTION REQUIREMENTS. THE COMBINED SELF -MONITORING FORM IS AVAILABLE AS A PDF AND WORD DOCUMENT FROM THE LAND QUALITY WEB SITE, HTTP: //PORTAL. NCDEN R.ORG/WEB/LR/EROSION IF YOU HAVE QUESTIONS, PLEASE CONTACT THE LAND QUALITY SECTION AT A NCDEQ REGIONAL OFFICE AT 919-791-4200. IF THE SAME PERSON CONDUCTS THE LAND DISTURBING ACTIVITY & ANY RELATED BORROW OR WASTE ACTIVITY, THE RELATED BORROW z OR WASTE ACTIVITY SHALL CONSTITUTE PART OF THE LAND -DISTURBING ACTIVITY UNLESS THE BORROW OR WASTE ACTIVITY. IS REGULATED UNDER THE MINING ACT OF 1971, OR IS A LANDFILL REGULATED BY THE DIVISION OF WASTE MANAGEMENT. IF THE LAND -DISTURBING ACTIVITY AND ANY RELATED BORROW OR WASTE ACTIVITY ARE NOT CONDUCTED BY THE SAME PERSON, THEY SHALL BE CONSIDERED SEPARATE LAND -DISTURBING ACTIVITIES AND MUST BE PERMITTED EITHER THROUGH THE SEDIMENTATION POLLUTION 0 CONTROL ACT AS A ONE -USE BORROW SITE OR THROUGH THE MINING ACT. I MAINTENANCE PLAN: 0 a w 1. THE CONTRACTOR SHALL CHECK ALL EROSION AND SEDIMENT CONTROL PRACTICES FOR STABILITY AND OPERATION FOLLOWING EVERY RUNOFF PRODUCING RAINFALL BUT IN NO CASE LESS THAN ONCE EVERY WEEK. ANY NEEDED REPAIRS WILL BE MADE IMMEDIATELY BY THE CONTRACTOR TO MAINTAIN ALL PRACTICES AS DESIGNED. ALSO PER NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) GENERAL STORMWATER PERMIT, A RAIN GAUGE MUST BE INSTALLED ON SITE. THE RAIN GAUGE MUST BE KEPT ONSITE AND INSPECTIONS BY THE CONTRACTOR MUST BE MADE AND LOGGED AFTER EVERY HALF INCH OF RAINFALL AND ONCE A WEEK. 2. THE CONTRACTOR SHALL REMOVE SEDIMENT FROM EROSION CONTROL DEVICES WHEN STORAGE CAPACITY HAS BEEN APPROXIMATELY 50% FILLED. GROVEL WILL BE CLEANED OR REPLACED WHEN THE SEDIMENT POOLS NO LONGER DRAINS PROPERLY. 3. THE CONTRACTOR SHALL REMOVE SEDIMENT FROM BEHIND SILT FENCE WHEN IT BECOMES 0.5 FEET DEEP AT THE FENCE. SILT FENCE WILL BE REPAIRED AS NECESSARY TO MAINTAIN A BARRIER. 4. THE CONTRACTOR SHALL FERTILIZE, RESEED AS NECESSARY, AND MULCH ALL SEEDED AREAS ACCORDING TO SPECIFICATIONS IN THE VEGETATIVE PLAN TO MAINTAIN A VIGOROUS, DENSE VEGETATIVE COVER. 5. THE CONTRACTOR SHALL PROVIDE GROUND COVER ON EXPOSED SLOPES OR OTHER AREAS WITHIN 7 TO 14 DAYS OR SOONER OF COMPLETION OF ANY PHASE OF GRADING. REFER TO THE LATEST NPDES RULES DATED AUGUST 2011 FOR MORE INFORMATION ON GROUND STABILIZATION REQUIREMENTS. PERMANENT GROUND COVER IS TO BE PROVIDED FOR ALL DISTURBED AREAS WITHIN 7 TO 14 DAYS OR SOONER FOLLOWING COMPLETION OF CONSTRUCTION OR DEVELOPMENT. RIP RAP (6.15) CONSTRUCTION SPECIFICATIONS SUBGRADE PREPARATION - PREPARE THE SUBGRADE FOR RIP RAP AND FILTER TO THE REQUIRED LINES AND GRADES SHOWN ON THE PLANS. COMPACT ANY FILL REQUIRED IN THE SUBGRADE TO A DENSITY APPROXIMATING THAT OF THE SURROUNDING UNDISTURBED MATERIAL OR OVERFILL DEPRESSIONS WITH RIP RAP. REMOVE BRUSH, TREES, STUMPS AND OTHER OBJECTIONAL MATERIAL. CUT THE SUBGRADE SUFFICIENTLY DEEP THAT THE FINISHED GRADE OF THE RIP RAP WILL BE AT THE ELEVATION OF THE SURROUNDING AREA. CHANNELS SHOULD BE EXCAVATED SUFFICIENTLY TO ALLOW PLACEMENT OF THE RIP RAP IN A MANNER SUCH THAT THE FINISHED INSIDE DIMENSIONS AND GRADE OF THE RIP RAP MEET DESIGN SPECIFICATIONS. SAND AND GRAVEL FILTER BLANKET - PLACE THE FILTER BLANKET IMMEDIATELY AFTER THE GROUND FOUNDATION IS PREPARED. FOR GRAVEL, SPREAD FILTER STONE IN A UNIFORM LAYER TO THE SPECIFIED DEPTH. WHERE MORE THAN ONE LAYER OF FILTER MATERIAL IS USED, SPREAD THE LAYERS WITH MINIMAL MIXING. SYNTHETIC FILTER FABRIC - PLACE THE CLOTH FILTER DIRECTLY ON THE PREPARED FOUNDATION. OVERLAP THE EDGES BY AT LEAST 12 INCHES, AND SPACE ANCHOR PINS EVERY 3 FT ALONG THE OVERLAP. BURY THE UPSTREAM END OF THE CLOTH A MINIMUM OF 12 INCHES BELOW GROUND AND WHERE NECESSARY, BURY THE LOWER END OF THE CLOTH OR OVERLAP WITH THE NEXT SECTION AS REQUIRED. TAKE CARE NOT TO DAMAGE THE CLOTH WHEN PLACING RIP RAP. IF DAMAGE OCCURS REMOVE THE RIP RAP AND REPAIR THE SHEET BY ADDING ANOTHER LAYER OF FILTER MATERIAL WITH A MINIMUM OVERLAP OF 12 INCHES AROUND THE DAMAGED AREA. IF EXTENSIVE DAMAGE IS SUSPECTED, REMOVE AND REPLACE THE ENTIRE SHEET. WHERE LARGE STONES ARE USED OR MACHINE PLACEMENT IS DIFFICULT, A 4-LNCH LAYER OF FINE GRAVEL OR SAND MAY BE NEEDED TO PROTECT THE FILTER CLOTH. STONE PLACEMENT - PLACEMENT OF RIP RAP SHOULD FOLLOW IMMEDIATELY AFTER PLACEMENT OF THE FILTER. PLACE RIP RAP SO THAT IT FORMS A DENSE, WELL -GRADED MASS OF STONE WITH A MINIMUM OF VOIDS. THE DESIRED DISTRIBUTION OF STONES THROUGHOUT THE MASS MAYBE OBTAINED BY SELECTIVE LOADING AT THE QUARRY AND CONTROLLED DUMPING DURING FINAL PLACEMENT. PLACE RIP RAP TO ITS FULL THICKNESS IN ONE OPERATION. DO NOT PLACE RIP RAP BY DUMPING THROUGH CHUTES OR OTHER METHODS THAT CAUSE SEGREGATION OF STONE SIZES. TAKE CARE NOT TO DISLODGE THE UNDERLYING BASE OR FILTER WHEN PLACING THE STONES. THE FINISHED SLOPE SHOULD BE FREE OF POCKETS OF SMALL STONE OR CLUSTERS OF LARGE STONES. HAND PLACING MAY BE NECESSARY TO ACHIEVE THE PROPER DISTRIBUTION OF STONE SIZES TO PRODUCE A RELATIVELY SMOOTH, UNIFORM SURFACE. THE FINISHED GRADE OF THE RIP RAP SHOULD BLEND WITH THE SURROUNDING AREA. NO OVERFALL OR PROTRUSION OF RIP RAP SHOULD BE APPARENT. IT, I1IzIINzI\Ry3 INSPECT CHANNELS AT REGULAR INTERVALS AS WELL AS AFTER MAJOR RAINS, AND MAKE REPAIRS PROMPTLY. GIVE SPECIAL ATTENTION TO THE OUTLET AND INLET SECTIONS AND OTHER POINTS WHERE CONCENTRATED FLOW ENTERS. CAREFULLY CHECK STABILITY AT ROAD CROSSINGS AND LOOK FOR INDICATIONS OF PIPING, SCOUR HOLES, OR BANK FAILURES. MAKE REPAIRS IMMEDIATELY. MAINTAIN ALL VEGETATION ADJACENT TO THE CHANNEL IN A HEALTHY, VIGOROUS CONDITION TO PROTECT THE AREA FROM EROSION AND SCOUR DURING OUT -OF -BANK FLOW. CONTROL OF WEED AND BRUSH GROWTH MAY BE NEEDED IN SOME LOCATIONS. LAND GRADING (6.02) CONSTRUCTION SPECIFICATIONS 1. CONSTRUCT AND MAINTAIN ALL EROSION AND SEDIMENTATION CONTROL PRACTICES AND MEASURES IN ACCORDANCE WITH THE APPROVED SEDIMENTATION CONTROL PLAN AND CONSTRUCTION SCHEDULE. 2. REMOVE GOOD TOPSOIL FROM AREAS TO BE GRADED AND FILLED, AND PRESERVE IT FOR USE IN FINISHING THE GRADING OF ALL CRITICAL AREAS. 3. SCARIFY AREAS TO BE TOPSOILED TO A MINIMUM DEPTH OF 2 INCHES BEFORE PLACING TOPSOIL. 4. CLEAR AND GRUB AREAS TO BE FILLED TO REMOVE TREES, VEGETATION, ROOTS, OR OTHER OBJECTIONABLE MATERIAL THAT WOULD AFFECT THE PLANNED STABILITY OF THE FILL. 5. ENSURE THAT FILL MATERIAL IS FREE OF BRUSH, RUBBISH, ROCKS, LOGS, STUMPS, BUILDING DEBRIS, AND OTHER MATERIALS INAPPROPRIATE FOR CONSTRUCTING STABLE FILLS. 6. PLACE ALL FILL IN LAYERS NOT TO EXCEED 9 INCHES IN THICKNESS,AND COMPACT THE LAYERS AS REQUIRED TO REDUCE EROSION, SLIPPAGE, SETTLEMENT, OR OTHER RELATED PROBLEMS. 7. DO NOT INCORPORATE FROZEN MATERIAL OR SOFT OR HIGHLY COMPRESSIBLE MATERIALS INTO FILL SLOPES. 8. DO NOT PLACE FILL ON A FROZEN FOUNDATION, DUE TO POSSIBLE SUBSIDENCE AND SLIPPAGE. 9. KEEP DIVERSIONS AND OTHER WATER CONVEYANCE MEASURES FREE OF SEDIMENT DURING ALL PHASES OF DEVELOPMENT. 10. HANDLE SEEPS OR SPRINGS ENCOUNTERED DURING CONSTRUCTION IN ACCORDANCE WITH APPROVED METHODS. 11. PERMANENTLY STABILIZE ALL GRADED AREAS IMMEDIATELY AFTER FINAL GRADING IS COMPLETED ON EACH AREA IN THE GRADING PLAN PER NPDES SOIL STABILIZATION TIME FRAMES. 12. SHOW TOPSOIL STOCKPILES, BORROW AREAS, AND SPOIL AREAS ON THE PLANS, AND MAKE SURE THEY ARE ADEQUATELY PROTECTED FROM EROSION. INCLUDE FINAL STABILIZATION OF THESE AREAS IN THE PLAN. MAINTENANCE PERIODICALLY CHECK ALL GRADED AREAS AND THE SUPPORTING EROSION AND SEDIMENTATION CONTROL PRACTICES, ESPECIALLY AFTER HEAVY RAINFALLS. PROMPTLY REMOVE ALL SEDIMENT FROM DIVERSION AND OTHER WATER -DISPOSAL PRACTICES. IF WASHOUTS OR BREAKS OCCUR, REPAIR THEM IMMEDIATELY. PROMPT MAINTENANCE OF SMALL ERODED AREAS BEFORE THEY BECOME SIGNIFICANT GULLIES IS AN ESSENTIAL PART OF AN EFFECTIVE EROSION AND SEDIMENTATION CONTROL PLAN. GRASS -LINED CHANNELS (6.30) CONSTRUCTION SPECIFICATIONS 1. REMOVE ALL TREES, BRUSH,STUMPS, AND OTHER OBJECTIONABLE MATERIAL FROM THE FOUNDATION AREA AND DISPOSE OF PROPERLY. 2. EXCAVATE THE CHANNEL AND SHAPE IT TO NEAT LINES AND DIMENSIONS SHOWN ON THE PLANS PLUS A 0.2-FT OVERCUT AROUND THE CHANNEL PERIMETER TO ALLOW FOR BULKING DURING SEEDBED PREPARATIONS AND SOD BUILDUP. 3. REMOVE AND PROPERLY DISPOSE OF ALL EXCESS SOIL SO THAT SURFACE WATER MAY ENTER THE CHANNEL FREELY. 4. THE PROCEDURE USED TO ESTABLISH GRASS IN THE CHANNEL WILL DEPEND UPON THE SEVERITY OF THE CONDITIONS AND SELECTION OF SPECIES. PROTECT THE CHANNEL WITH MULCH OR A TEMPORARY LINER SUFFICIENT TO WITHSTAND ANTICIPATED VELOCITIES DURING THE ESTABLISHMENT PERIOD. MAINTENANCE DURING THE ESTABLISHMENT PERIOD, CHECK GRASS -LINED CHANNELS AFTER EVERY RAINFALL. AFTER GRASS IS ESTABLISHED, PERIODICALLY CHECK THE CHANNEL; CHECK IT AFTER EVERY HEAVY RAINFALL EVENT. IMMEDIATELY MAKE REPAIRS. IT IS PARTICULARLY IMPORTANT TO CHECK THE CHANNEL OUTLET AND ALL ROAD CROSSINGS FOR BANK STABILITY AND EVIDENCE OF PIPING OR SCOUR HOLES. REMOVE ALL SIGNIFICANT SEDIMENT ACCUMULATIONS TO MAINTAIN THE DESIGNED CARRYING CAPACITY. KEEP THE GRASS IN A HEALTHY, VIGOROUS CONDITION AT ALL TIMES, SINCE IT IS THE PRIMARY EROSION PROTECTION FOR THE CHANNEL. VEGETATIVE PLAN (NCDENR 6.11) SEEDING SCHEDULE: SHOULDERS, SIDE DITCHES, SLOPES (3:1) DATE TYPE PLANTING RATE AUG 15 - NOV 1 TALL FESCUE 250 LBS/ACRE NOV 1- MAR 1 TALL FESCUE 250 LBS/ACRE &ABRUZZI RYE 25 LBS/ACRE MAR 1- APR 15 TALL FESCUE 250 LBS/ACRE APR 15 - JUN 15 HULLED COMMON BERMUDAGRASS 12 LBS/ACRE JUN 15-AUG 15 TALL FESCUE 250 LBS/ACRE & BROWNTOP MILLET*** 35 LBS/ACRE OR SORGHUM-SUDAN HYBRIDS*** 30 LBS/ACRE SLOPES (3:1 TO 2:1) MAR 1-JUN 1 SERICEA LESPEDEZA (SCARIFIED) 50 LBS/ACRE AND (MAR 1- APR 15) ADD TALL FESCUE 250 LBS/ACRE (MAR 1- JUN 30) OR ADD WEEPING LOVEGRASS 5 LBS/ACRE (MAR 1- JUN 30) OR ADD HULLED COMMON BERMUDAGRASS 8 LBS/ACRE JUN 1- SEP 1 TALL FESCUE*** 250 LBS/ACRE & BROWNTOP MILLET*** 35 LBS/ACRE OR SORGHUM-SUDAN HYBRIDS*** 30 LBS/ACRE SEP 1- MAR 1 SERICEA LESPEDEZA (UNHULLED-UNSCARIFIED) 70 LBS/ACRE & TALL FESCUE 250 LBS/ACRE (NOV 1- MAR 1) ADD ABRUZZI RYE 125 LBS/ACRE CONSULT CONSERVATION ENGINEER OR SOIL CONSERVATION SERVICE FOR ADDITIONAL INFORMATION CONCERNING OTHER ALTERNATIVES FOR VEGETATION OF DENUDED. AREAS. THE ABOVE VEGETATION RATES ARE THOSE WHICH DO WELL UNDER LOCAL CONDITIONS: OTHER SEEDING RATE COMBINATIONS ARE POSSIBLE. ***TEMPORARY - RESEED ACCORDING TO OPTIMUM SEASON FOR DESIRED PERMANENT VEGETATION. DO NOT ALLOW TEMPORARY COVER TO GROW OVER 12 INCHES IN HEIGHT BEFORE MOWING, OTHERWISE, FESCUE MAY BE SHADED OUT. SEEDING SPECIFICATIONS 1. AFTER ROUGH GRADING IS COMPLETED, TILL SOIL IN AREAS TO BE SEEDED AND PLANTED TO A DEPTH OF SIX INCHES. 2. APPLY AGRICULTURAL LIME, FERTILIZER, AND SUPERPHOSPHATE TO DISTURBED AREAS TO BE VEGETATED. 2.1. 135 LBS LIMESTONE/1000 SQ FT (3 TONS/ACRE) OR BASED ON SOIL TEST 2.2. 35 LBS 10-10-10 FERTILIZER/1000 SQ FT (1500 LBS/ACRE) 2.3. 40 LBS 50% SUPERPHOSPHATE/1000 SQ FT (1750 LBS/ACRE) 3. DISK NUTRIENTS INTO SOIL TO A DEPTH OF SIX INCHES UNTIL SURFACE IS UNIFORM AND FREE OF LARGE DIRT CLODS. 4. SEEDING PERMANENT GRASS. 4.1. SEE ABOVE TABLE. 5. MULCH SEEDED AREA WITH SMALL GRAIN STRAW AT 90 LBS/1000 SQ FT (2 TONS/ACRE). SPREAD UNIFORMLY. APPROXIMATELY 1/2 OF GROUND SURFACE SHOULD BE VISIBLE TO AVOID BLOCKING SUNLIGHT TO SEEDLINGS. ON AREAS WHERE THE GROUND SURFACE EQUALS OR EXCEEDS A 3:1 SLOPE, AND IN THE INVERTS OF ALL DRAINAGE SWALES, TACK MULCH WITH ASPHALT EMULSION AT A RATE OF 450 GALLONS EMULSION PER ACRE OF STRAW. 6. MULCH AROUND SHRUBBERY AND TREES WITH PINE STRAW TO DEPTH OF 3 INCHES. 7. TEMPORARY COVER 7.1. 1.0 LBS BROWN TOP MLLLET/1000 SQ FT MAY THROUGH AUGUST 25. -OR- 1.0 LBS ANNUAL RYEGRASS/1000 SQ FT AUGUST 25 THROUGH APRIL. 8. REFER TO SHEET ## FOR FURTHER DETAIL ON THE TEMPORARY AND PERMANENT VEGETATION SEEDBED PREPARATION. TOPSOILING (6.04) CONSTRUCTION SPECIFICATIONS MATERIALS 1. DETERMINE WHETHER THE QUALITY AND QUANTITY OF AVAILABLE TOPSOIL JUSTIFIES SELECTIVE HANDLING. QUALITY TOPSOIL HAS THE FOLLOWING CHARACTERISTICS: 1.1. TEXTURE - LOAM, SANDY LOAM, AND SLIT LOAM ARE BEST; SANDY CLAY LOAM, SILTY CLAY LOAM, CLAY LOAM, AND LOAMY SAND ARE FAIR. DO NOT USE HEAVY CLAY AND ORGANIC SOILS SUCH AS PEAT OR MUCK AS TOPSOIL. 1.2. ORGANIC MATTER CONTENT - (SOMETIMES REFERRED TO AS "HUMIC MATTER") SHOULD BE GREATER THAN 1.5% BY WEIGHT. 1.3. ACIDITY - PH SHOULD BE GREATER THAN 3.6 BEFORE LIMING, AND LIMING IS REQUIRED IF IT IS LESS THAN 6.0. 1.4. SOLUBLE SALTS - SHOULD BE LESS THAN 500 PPM. 1.5. SODIUM - SODIUM ADSORPTION RATIO SHOULD BE LESS THAN 12. THE DEPTH OF MATERIAL MEETING THE ABOVE QUALIFICATIONS SHOULD BE AT LEAST 2 INCHES. SOIL FACTORS SUCH AS ROCK FRAGMENTS, SLOPE, DEPTH TO WATER TABLE, AND LAYER THICKNESS AFFECT THE EASE OF EXCAVATION AND SPREADING OF TOPSOIL. GENERALLY, THE UPPER PART OF THE SOIL, WHICH IS RICHEST IN ORGANIC MATTER, IS MOST DESIRABLE; HOWEVER, MATERIAL EXCAVATED FROM DEEPER LAYERS MAY BE WORTH STORING IF IT MEETS THE OTHER CRITERIA LISTED ABOVE. ORGANIC SOILS SUCH AS MUCKS AND PEATS DO NOT MAKE GOOD TOPSOIL. THEY CAN BE IDENTIFIED BY THEIR EXTREMELY LIGHT WEIGHT WHEN DRY. STRIPPING 1. STRIP TOPSOIL ONLY FROM THOSE AREAS THAT WILL BE DISTURBED BY EXCAVATION, FILLING, ROAD BUILDING, OR COMPACTION BY EQUIPMENT. A 4 TO 6-INCH STRIPPING DEPTH IS COMMON, BUT DEPTH VARIES DEPENDING ON THE SITE. DETERMINE DEPTH OF STRIPPING BY TAKING SOIL CORES AT SEVERAL LOCATIONS WITHIN EACH AREA TO BE STRIPPED. TOPSOIL DEPTH GENERALLY VARIES ALONG A GRADIENT FROM HILLTOP TO TOE OF THE SLOPE. PUT SEDIMENT BASINS, DIVERSIONS, AND OTHER CONTROLS INTO PLACE BEFORE STRIPPING. STOCKPILING 1. SELECT STOCKPILE LOCATION TO AVOID SLOPES AND NATURAL DRAINAGEWAYS, AVOIDING TRAFFIC ROUTES. ON LARGE SITES, RESPREADING IS EASIER AND MORE ECONOMICAL WHEN TOPSOIL IS STOCKPILED IN SMALL PILES LOCATED NEAR AREAS WHERE THEY WILL BE USED. ALL STOCKPILE AREAS USED SHALL BE STABILIZED WITH SILT FENCE AND SEEDED PER THE LATEST NPDES RULES. 2. SEDIMENT BARRIERS - USE SEDIMENT FENCES OR OTHER BARRIERS WHERE NECESSARY TO RETAIN SEDIMENT. 3. TEMPORARY SEEDING - PROTECT TOPSOIL STOCKPILES BY TEMPORARILY SEEDING PER THE LATEST NPDES RULES. 4. PERMANENT VEGETATION - IF STOCKPILES WILL NOT BE USED WITHIN 12 MONTHS THEY MUST BE STABILIZED WITH PERMANENT VEGETATION TO CONTROL EROSION AND WEED GROWTH. SITE PREPARATION 1. BEFORE SPREADING TOPSOIL, ESTABLISH EROSION AND SEDIMENTATION CONTROL PRACTICES SUCH AS DIVERSIONS, BERMS, DIKES, WATERWAYS, AND SEDIMENT BASINS. 2. GRADING - MAINTAIN GRADES ON THE AREAS TO BE TOPSOILED ACCORDING TO THE APPROVED PLAN AND DO NOT ALTER THEM BY ADDING TOPSOIL. 3. LIMING OF SUBSOIL - WHERE THE PH OF THE EXISTING SUBSOIL IS 6.0 OR LESS, OR THE SOIL IS COMPOSED OF HEAVY CLAYS, INCORPORATE AGRICULTURAL LIMESTONE IN AMOUNTS RECOMMENDED BY SOIL TESTS OR SPECIFIED FOR THE SEEDING MIXTURE TO BE USED. INCORPORATE LIME TO A DEPTH OF AT LEAST 2 INCHES BY DISKING. 4. ROUGHENING - IMMEDIATELY PRIOR TO SPREADING THE TOPSOIL. LOOSEN THE SUBGRADE BY DISKING OR SCARIFYING TO A DEPTH OF AT LEAST 4 INCHES, TO ENSURE BONDING OF THE TOPSOIL AND SUBSOIL. IF NO AMENDMENTS HAVE BEEN INCORPORATED, LOOSEN THE SOIL TO A DEPTH OF AT LEAST 6 INCHES BEFORE SPREADING TOPSOIL. SPREADING TOPSOIL 1. DO NOT SPREAD TOPSOIL WHILE IT IS FROZEN OR MUDDY OR WHEN SUBGRADE IS WET OR FROZEN. CORRECT ANY IRREGULARITIES IN THE SURFACE THAT RESULT FROM TOPSOILING OR OTHER OPERATIONS TO PREVENT THE FORMATION OF DEPRESSIONS OR WATER POCKETS. 2. COMPACT THE TOPSOIL ENOUGH TO ENSURE GOOD CONTACT WITH THE UNDERLYING SOIL, BUT AVOID EXCESSIVE COMPACTION, AS IT INCREASES RUNOFF AND INHIBITS SEED GERMINATION. LIGHT PACKING WITH A ROLLER IS RECOMMENDED WHERE HIGH -MAINTENANCE TURF IS TO BE ESTABLISHED. 3. ON SLOPES AND AREAS THAT WILL NOT BE MOWED, THE SURFACE MAY BE LEFT ROUGH AFTER SPREADING TOPSOIL. A DISK MAY BE USED TO PROMOTE BONDING AT THE INTERFACE BETWEEN TOPSOIL AND SUBSOIL. 4. AFTER TOPSOIL APPLICATION, FOLLOW PROCEDURE FOR SEEDBED PREPARATION, TAKING CARE TO AVOID EXCESSIVE MIXING OF TOPSOIL INTO THE SUBSOIL. EROSION CONTROL MATTING: SEE DETAIL 4/11 FOR CONSTRUCTION SPECIFICATIONS. MAINTENANCE 1. INSPECT ROLLED EROSION CONTROL MATTING AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (1/2 INCH OR GREATER) RAIN FALL EVENT REPAIR IMMEDIATELY. 2. GOOD CONTACT WITH THE GROUND MUST BE MAINTAINED, AND EROSION MUST NOT OCCUR BENEATH THE MATTING. 3. ANY AREAS OF THE MATTING THAT ARE DAMAGED OR NOT IN CLOSE CONTACT WITH THE GROUND SHALL BE REPAIRED AND STAPLED. 4. IF EROSION OCCURS DUE TO POORLY CONTROLLED DRAINAGE, THE PROBLEM SHALL BE FIXED AND THE ERODED AREA PROTECTED. 5. MONITOR AND REPAIR THE MATTING AS NECESSARY UNTIL GROUND COVER IS ESTABLISHED. J z O Lu Lu z G Lu D_ O LL i L.L Q VYK DICKSON community infrastructure consultants 720 CORPORATE CENTER DRIVE RALEIGH, NC 27607 (t) 919-782-0495 (f)919-782-9672 WWW.WKDICKSON.COM NC LICENSE NO.F-0374 PROFESSIONAL SEAL m Q z fr 0 O a_ W 0 fr z Lu O W Lu 0 b W U z z z W H W z U Q g � W OC Q Lu z > O J � U U_ W ILL z U W 0_ J Q J O Q � z z O Y U O z pr O ED 0 6 i ti.i O < �_ LuQ z U z Lu O Q cr 0 PROJ. MGR.: M. HORSTMAN DESIGN BY: M. HORSTMAN DRAWN BY: M. SMALLING PROJ. DATE: JULY 2019 DRAWING NUMBER: 120F 18 WKD PROJ. NO.: 20180394.00. RA ZOw 0UO OJU Ozw aOQ F .F w OwO gF� �ma Uw 0=¢m Sao w ozw w o-o � WUZ O z, z DOm w Y J U_Q ~pS OYD w�� D'. ¢OO zwa 0., z z° oo 2w (7 tr' wQQ ¢�z � wD0 °o wiz wa =a� (Dzw Y ¢ ¢ Qo¢ m w z°w 3:7 OZD U—U ZZD w 07T YU~ U p00 �=z 0' 0 =zw Eo= ¢F7 awl 0 00, 0 a GENERAL STRUCTURAL NOTES: FOUNDATIONS: FOUNDATION DESIGN IS BASED ON ALLOWABLE SOIL BEARING PRESSURES AS STATED IN A SUBSURFACE EXPLORATION REPORT NO. 66V-0107 PREPARED BY FROEHLING & ROBERTSON, INC. DATED AUGUST 21, 2017. II. STRUCTURAL CONCRETE: 1. CONCRETE SHALL HAVE A MINIMUM 28-DAY COMPRESSIVE STRENGTH OF 4000 PSI, UNLESS NOTED OTHERWISE. 2. NORMAL -WEIGHT CONCRETE SHALL HAVE A MAXIMUM UNIT WEIGHT OF 145 PCF, UNLESS NOTED OTHERWISE. 3. REINFORCING STEEL SHALL CONFORM TO ASTM A615, GR60, INCLUDING TIES AND STIRRUPS. 4. MINIMUM CONCRETE COVER SHALL BE AS FOLLOWS, UNLESS NOTED OTHERWISE: A) UNFORMED SURFACES IN CONTACT WITH THE GROUND.................................................................................................. 3" B) FORMED SURFACES EXPOSED TO EARTH OR WEATHER................................................................................................... 2" C) FORMED SURFACES NOT EXPOSED TO EARTH OR WEATHER........................................................................................... 1 1/2" 5. FINISHES SHALL CONFORM TO REQUIREMENTS OF ACI 301. III. MISCELLANEOUS: 1. STRUCTURAL DRAWINGS ARE INTENDED TO BE USED WITH CIVIL DRAWINGS. CONTRACTOR IS RESPONSIBLE FOR COORDINATING SUCH REQUIREMENTS INTO THEIR SHOP DRAWINGS AND WORK. 2. NO OPENING SHALL BE MADE IN ANY STRUCTURAL MEMBER WITHOUT WRITTEN APPROVAL OF THE STRUCTURAL -ENGINEER -OF -RECORD. 3. NO CHANGE IN SIZE OR DIMENSION OF STRUCTURAL MEMBERS SHALL BE MADE WITHOUT WRITTEN APPROVAL OF THE STRUCTURAL -ENGINEER -OF -RECORD. 4. OPENINGS 1'-4" AND LESSON ASIDE ARE GENERALLY NOT SHOWN ON THE STRUCTURAL DRAWINGS. REFER TO CIVIL DRAWINGS FOR SUCH OPENINGS. 5. THE CONTRACTOR IS RESPONSIBLE FOR LIMITING THE AMOUNT OF CONSTRUCTION LOADS APPLIED TO THE STRUCTURAL FRAMING. CONSTRUCTION LOADS SHALL NOT EXCEED THE DESIGN CAPACITY OF THE FRAMING AT THE TIME THE LOADS ARE APPLIED. 6. DO NOT SCALE THESE DRAWINGS; USE DIMENSIONS. 7. ELEVATIONS OF TOP SLABS SHALL BE INTERPRETED AS PLUS OR MINUS WITH THE INTENT THAT THE CONTRACTOR WILL HAVE SOME FLEXIBILITY IN THE FIELD. GRADES, ELEVATIONS AND LOCATION SHOWN ARE APPROXIMATE. AS DIRECTED BY THE ENGINEER, THEY MAY BE ADJUSTED TO ACCOMMODATE UNFORESEEN CONDITIONS. WEEPHOLES ARE TO BE CONSTRUCTED IN ALL DRAINAGE STRUCTURES, WEEPHOLES SHOULD BE ON 8' CENTER WITH A MINIMUM OF 1 WEEPHOLE PER WALL. WEEPHOLES ARE TO BE COVERED ON THE OUTSIDE OF THE STRUCTURE BY A BAG MADE OF FILTER FABRIC FILLED WITH #78 STONE. THERE WILL BE NO SEPARATE PAYMENT FOR THIS WORK. STATION, OFFSETS AND ELEVATIONS REFER TO THE CENTER OF DROP INLETS, MANHOLES AND JUNCTION BOXES, AND THE MIDPOINT OF THE GRATE FOR CATCH BASINS. BAR SIZE Ld (INCHES) HOOK LEG 3 13 7 4 17 9 5 21 11 6 26 14 7 37 16 8 43 18 9 53 23 10 65 25 11 78 28 DEVELOPMENTAL LENGTH FOR STANDARD REINFORCING BARS OPENING TO BE CREATED BY PRECAST FILL VOID WITH CEMENTITIOUS NON —SHRINK GR XISTING OR NEW CP STORM SEWER NOTES 1. PROVIDE 6" MINIMUM CLEARANCE BETWEEN MAINLINE JOINTS AND PIPE OPENING. 1 PIPE TIE-IN DETAIL 13 NOT TO SCALE e e SECTION 1 SAW —CUT RCP FLUSH WITH INSIDE WALL OF RCP/RCBC NEW RE 3" PVC PIPE c 4' CENTER WEEP HOLE SECTION DETAIL Y NOT TO SCALE SEALANT 1" WIDE 1/2" DEEP 1 /2' JOINT FILLE EXISTING CULVERT NEW 1 1/4" BACKER ROD WINGWALL COMPATIBLE WITH SEALANT ISOLATION JOINT BETWEEN WING WALL AND CULVERT DETAIL NOT TO SCALE UBIC ,T OF NE FILTER FABRIC 1.3xLd SPLICES 3 x Ld OPTIONAL WALL OR SLAB CONSTRUCTION JOINT SEALANT 1" WIDE 1/2" D APRON SLAB 1 1 /4" BACKER ROD COMPATIBLE WITH SEALANT NOT TO SCALE I1/2" CULVERT SLAB JOINT FILLER ISOLATION JOINT BETWEEN APRON AND CULVERT SLAB NOT TO SCALE J Z O Lu Lu oc z G Lu CL oc O LL LL Q 0 9 kaydos-daniels engineers, pllc 00-201 w morgan st raleigh60 4966 F 919 828 496 PROFESSIONAL SEAL m p z D= O O a_ W0 fr � z Lu O Lu Lu a 0 IIIIIIIlb H z Lu Lu g Lu cf) � J H Q Lu w J 0 Q U � Lu g J 0 cf) 0 z Lu Y m w w J Q ~ z U z w � O Q � o PROJ. MGR.: M. HORSTMAN DESIGN BY: M. SMALLING DRAWN BY: M. SMALLING PROJ. DATE: JULY 2019 DRAWING NUMBER: 130F 18 WKD PROJ. NO.: 20180394.00. RA w 02 w ooa FOO OJU pzw a0¢ F .F ww9 gF� 0m� o=w 0 om �a0 Ozw .70 zo. w0z O zzw 00om =UQ ~ON OY. . w N 0 zz< oww F., �OQ ozz 2w(5 aGN w¢a ¢�z wDmm boo w�a ¢FF =a� c7z°w <w� ZOw 9D oz0 'zo zzo w o2, Y�F U00 000 Y "z �Yz 4H 0 =zw �0z mwo O cU O Imi TOP OF WINGWALL ELEV. = 953.00 TOP OF W ELEV = 953 TOP OF V ELEV = 95: r RVrIJJLV Yu RI,F INVERT ELEV. = 949.77 UPSTREAM HEADWALL STRUCTURE #1 NOT TO SCALE Tnp nF HFAnwAl I TOP OF WINGWALL ELEV. = 953.00 ELEV=956.27 PR( 2' 2' N N I r TOP OF HEADWALL FI FV = 956.97 PLAN VIEW SCALE: 3/8" = 1'-0" )P. 48" RCP 1'-6" #5 BENT BAR ® 12" O.C. 3'-6" TOP / WALL 1' 956.27 #4 @ 1'-0" LONG. EA. FACE (2) #4 —SPACE AS DIMENSIONED #6 VERT @ 1'-0" O.C. #4 VERT @ 1'-0" O.C. DRILL 0 EPDXY INTO RCBC W/ HILTI HIT—HY 200 ADHESIVE MIN. EMBED. = 5" d Ln Q G d k d a f 2„ 2' rikk TOP /FTG 4— 949.77 . d d d a . ,.. a 1 d S p. d a a a N a ° 3, CUSTOM HEADWALL STRUCTURE 1 DETAILS *ELEVATIONS MAY VARY DUE TO WALL THICKNESS PER MANUFACTURER — (2) #5 LONG. BARS — PROP. 48" RCP SPACE EVENLY — (3) #5 LONG. BARS — SPACE EVENLY — #5 @ 12" O.C. o d ° Ln #5 LONG. BARS ® 12 O.C. 11' 1 SECT 0 N A TOP / WALL VARIES 1'-6" #5 BENT BAR @ 12" O.C. 3'-6" TOP / FTG. 949.35 #5 LONG. BARS @ 12" O.C. SCALE: 1 /2" = 1' 2" CLEAR 2" CLEAR -A 1'-0" 12" #57 STONE a . #5 VERT Ca? #4 CAD 1'-0" 1'-0" O.C. O.C. LONG. #4 VERT 0 1'-0" O.C. cf) DOWEL ® EA. VERT — MATCH w SIZE AND SEE SCHEDULE FOR Q ° LAP ® TOP & STD. 90- HOOK > @ BOTT. 4" 2' d 3' d. 4» r7 O d a; d O.°. a d A. ° O Sd d FAN a 0 d #5 0 12" O.C. EA. WAY, TOP & BOTTOM (TYP.) s SECTION B—B SCALE: 1 /2" = 1'-0" 12" #57 STONE J z 0 Lu Lu ol: Z_ ol: Lu D_ 0 LL L.L Q ID 9 kaydos-daniels engineers, pllc 400-201 w morgan1 60 PROFESSIONAL SEAL m p z cc O 0 a cc Lu 0 U) w w a 0 IIIIIIIIZ H Z W W U g O_ Q W W 0= � T W W J U U W � Z J Q � U Z W Y 0= ED W LLj J z U Z Lu 0 Q cr o PROJ. MGR.: M. HORSTMAN DESIGN BY: M. SMALLING DRAWN BY: M. SMALLING PROJ. DATE: JULY 2019 DRAWING NUMBER: 140F 18 WKD PROJ. NO.: 20180394.00. RA i 02 w 00a FOO OJU 'zw a0¢ Z .F ww9 2E � Dm� o=w 0 om �a0 Ozw .70 zo. wUZ O zzw 00om =UQ ~ON OY. W � Q LLl . w N ooz zz< o.¢ �OQ oZz 2w(5 w¢a ¢�z wo¢ boo wFZ w�a ¢FF =a� �Zw ¢0< <w� ?mw 3D oz0 'zo zzo W °2_ Y�F U00 p00 Y�z=Z 4H 0 =Zw �0z mwo 0 cU O Imi PROP. 48" RCP TOP OF WINGWALL ELEV. = 951.50 rrwrv.Dr=v to rwr INVERT ELEV. = 948.26 DOWNSTREAM ENDWALL STRUCTURE #2 NOT TO SCALE Tnn nr unpin al Qc_o�p PLAN VIEW SCALE: 3/8" = 1'-0" TOP OF WINGWALL ELEV. = 951.50 PROPOSED 24" RCP TIE—IN INVERT ELEV. = 949.78 -OP OF WING :LEV = 951.50 TOP OF WING ELEV = 951.50 CUSTOM ENDWALL STRUCTURE 2 DETAILS TOP / WALL 956.00 #4 @ 1'-0" LONG. EA. FACE (2) #4 —SPACE AS DIMENSIONED #6 VERT @ 1'-0" O.C. #4 VERT @ 1'-0" O.C. DRILL @ EPDXY INTO RCBC W/ HILTI JIT—HY 200 ADHESIVE, MIN. EMBED. = 5" *ELEVATIONS MAY VARY DUE TO WALL THICKNESS PER MANUFACTURER PROP. 48" RCP (2) #5 LONG. BARS — SPACE EVENLY (3) #5 LONG. BARS — SPACE EVENLY :� #5 @ 12" O.C. ° s ° ° \.A ° ° 12" #57 STONE 3' SECTION A— A SCALE: 1 /2" = 1'-0" Ili]2FIATiTG\41 1'-6" #5 BENT BAR @ 12" O.C. 3'-6" TOP / FTG. 947.84 I 00 I N #5 LONG. BARS @ 12" O.C. co w of a I. s 2' 1' 2" CLEAR 2" #5 VERT @ 1'-0" O.C. El al. 1'-6" #5 BENT BAR @ 12" O.C. 3'-6" TOP / FTG 948.26 ° I ° ° N 1' #5 LONG. BARS @ 12" O.C. #4 @ 1'-0" O.C. LONG. #4 VERT @ 1'— 0" O.C. DOWEL @ EA. VERT — MATCH SIZE AND SEE SCHEDULE FOR LAP @ TOP & STD. 90- HOOK @ BOTT. 2' 3' c. 4" M ° ° °.°. dk° `4 12" #57 STONE ° #5 @ 12" O.C. EA. WAY, .. TOP & BOTTOM (TYP.) SECTION B—B SCALE: 1 /2" = 1'-0" J z 0 Lu Lu 01: cD z 01: Lu D_ 0 LL L.L Q ID 9 kaydos-daniels engineers, pllc PROFESSIONAL SEAL m p z cc O °C w z o 0 U) w w a 0 Z H z Lu Lu U g a Q Lu Lu o= � ~ N W Lu J U U Lu z J 0 Q � � U z Lu Y cr ED LLI LLj J Q ~ z w z cr o PROJ. MGR.: M. HORSTMAN DESIGN BY: M. SMALLING DRAWN BY: M. SMALLING PROJ. DATE: JULY 2019 DRAWING NUMBER: 150F 18 WKD PROJ. NO.: 20180394.00. RA i 02 w ooa FOO OJU 'zw a0¢ Z .F ww � F J 0R j 0 mm w 0 om �a0 Ozw .70 zo. wUZ O zzw 000 =UQ ~ON OYJ .oc oz zz< o.¢ �OQ oZz 2w(5 aGN w¢a ¢�z wo¢ F° w�a =a� <w� Z° w 9D Oz0 'zo zzo W °2_ Y�F U00 p00 Y "z=Z oo¢ 0 =Zw �0z mwo 0 cU O'. TOP OF WINGWALL ELEV. = 948.00 PROPOSED 15" RCP INVERT ELEV. = LAIC 1. ov LMr INVERT ELEV. = 943.27 UPSTREAM HEADWALL STRUCTURE #3 NOT TO SCALE TOP OF WINGWALL ELEV. = 948.00 3TIC DRAINAGE PIPE CONTRACTOR TO ERIFY REQUIRED IN AND INVERT ELEV. 1'-6" #5 BENT BAR @ 12" O.C. 3'-6" 2' m 2" rikk TOP / FTG 943.27 s ° °.. °.. ° ° ° ° a ° A3' TOP / WALL 950.00 #4 @ 1'-0" LONG. EA. FACE (2) #4 —SPACE AS DIMENSIONED #6 VERT @ 1'-0" O.C. #4 VERT @ 1'-0" O.C. DRILL @ EPDXY INTO RCBC W/ HILTI HIT—HY 200 ADHESIVE, MIN. EMBED. _ GROUT TO 5" THICKNESS *ELEVATIONS MAY VARY DUE TO WALL THICKNESS PER MANUFACTURER EXIST. 60" CMP (2) #5 LONG. BARS — SPACE EVENLY (3) #5 LONG. BARS — SPACE EVENLY #5 @ 12" O.C. GROUT TO 5" THICKNESS / #5 LONG. BARS @ 12" O.C. SECTION A - A 1' TOP OF WING SCALE: 1 /2 = 1'-0" ELEV = 948.00 ELEV=v948.00 \ / FIELD VERIFY REQUIRED LOCATION AND INVERT ELEV. PLAN VIEW SCALE: 3/8" = 1'-0" 12" #57 STONE 1' 2" CLEAR 2" CLEAR ;MP TOP /WALL VARIES #5 VERT @ ° #4 @ 1'-0" 1'-0" O.C. O.C. LONG. 4. #4 VERT @ 1'-0" O.C. V) DOWEL @ EA. VERT — MATCH w SIZE AND SEE SCHEDULE FOR a LAP @ TOP & STD. 90` HOOK > @ BOTT. a #5 BENT BAR @ 12" O.C. a 3'-6" 2- ° 3 °. 4„ M 4" TOP /FTG. 942.85 ° °. -1a I ° d o ° d . a ° 00 a 12" #57 STONE N c ° #5 @ 12" O.C. EA. WAY, A. TOP & BOTTOM (TYP.) 1' #5 LONG. BARS @ 12" O.C. _/ 6' CUSTOM HEADWALL STRUCTURE 3 DETAILS SECTION B-B SCALE: 1 /2" = 1'-0" in 9 kaydos-daniels engineers, pllc PROFESSIONAL SEAL m p z O O a cc � Lu U) W w 0 b H Z Lu Lu U g Q Lu Lu 0 H c) Lu Lu > J � H U U Lu D Z Lu J 0 o � Q � � U Z Lu Y 0= ED W LLj J Q ~ z U Z w o Q a o PROJ. MGR.: M. HORSTMAN DESIGN BY: M. SMALLING DRAWN BY: M. SMALLING PROJ. DATE: JULY 2019 DRAWING NUMBER: 160F 18 WKD PROJ. NO.: 20180394.00. RA i 02 w ooa FOO OJU 'zw a0¢ Z .F ww9 gF� 0m� o=w 0 om �a0 Ozw .70 zo. wUZ O zzw 00om =UQ ~ON OY. .oc oz zz< o.¢ �OQ oZz 2w(5 aGN w¢a ¢�z wDmm boo wFz w�a =a� �Zw <w� ?mw 3D Oz0 'zo zzo w o2, Y�F U00 p00 Y�z=Z 4H 0 =Zw �0z mwo 0 cU O'. TOP OF WINGWALL ELEV. = 946.00 PROP. 60" CN r«vr. ov 1-11vir INVERT ELEV. = 942.01 DOWNSTREAM ENDWALL STRUCTURE #4 NOT TO SCALE (1 7 1-, -- l___^ \ \ PLAN VIEW SCALE: 3/8" = 1'-0" TOP OF WINGWALL ELEV. = 946.00 TOP OF WING ELEV = 946.00 TOP OF WING ELEV = 946.00 CUSTOM ENDWALL STRUCTURE 4 DETAILS TOP / WALL 948.00 1' #4 @ 1'-0" LONG. EA. FACE (2) #4 —SPACE AS DIMENSIONED #6 VERT @ 1'-0" O.C. #4 VERT @ 1'-0" O.C. DRILL @ EPDXY INTO RCBC W/ HILTI ° HIT—HY 200 ADHESIVE, MIN. EMBED. = 5" GROUT TO 5" THICKNESS 2"� *ELEVATIONS MAY VARY DUE TO WALL THICKNESS PER MANUFACTURER 1'-6" Lo #5 BENT BAR @ 12" O.C. EXIST. 60" CMP 3'-6" (2) #5 LONG. BARS — SPACE EVENLY (3) #5 LONG. BARS — 2' SPACE EVENLY #5 @ 12" O.C. GROUT TO 5" THICKNESS TOP / FTG 942.01 ° ° °. . O° d . Od ° Q. . 9c N Od 3' 12" #57 STONE SECTION A — A 1' #5 LONG. BARS @ 12" O.C. SCALE: 1 /2" = 1'-0" TOP / WALL 948.00 1'-6" #5 BENT BAR @ 12" O.C. 3'-6" TOP / FTG. 941.59 #5 LONG. BARS @ 12" O.C. in I 1' 2" CLEAR 2" CLEAR #5 VERT @ 1'-0" O.C. 2' 4"1­--- d ° #4 @ 1'-0" O.C. LONG. #4 VERT @ 1'-0" O.C. DOWEL @ EA. VERT —MATCH SIZE AND SEE SCHEDULE FOR LAP @ TOP & STD. 90- HOOK @ BOTT. 3' 4" a; da.. agbd .. a #5 @ 12" O.C. EA. WAY, TOP & BOTTOM (TYP.) SECTION B-B SCALE: 1 /2" = 1'-0" 12" #57 STONE J z 0 Lu Lu ol: Z_ ol: Lu D_ 0 LL L.L Q 9 kaydos-daniels engineers, pllc 400-201 w morgan1 60 PROFESSIONAL SEAL co O O a cc � z Lu 0 U) W 0= w 0 IIIIIIII° H Z Lu Lu U g Q Lu Lu o= � W Lu > oC J U U Lu D Z J o O Q � � U Z Lu Y cr ED W LLj J Q ~ z U Z w o Q a o PROJ. MGR.: M. HORSTMAN DESIGN BY: M. SMALLING DRAWN BY: M. SMALLING PROJ. DATE: JULY 2019 DRAWING NUMBER: 170F 18 WKD PROJ. NO.: 20180394.00. RA