HomeMy WebLinkAbout20200376 Ver 1_PCN Form Submission_20200313DWR
mrlslon of Water Resources
Pre -Construction Notification (PCN) Form
September 29, 2018 Ver 3
Initial Review
Has this project met the requirements for acceptance in to the review process?*
r Yes
r No
Is this project a public transportation project?*
C Yes r No
Change only if needed.
BIMS # Assigned * Version#*
20200376 1
Is a payment required for this project?*
r No payment required What amout is owed?*
r Fee received IT $240.00
r Fee needed - send electronic notification r $570.00
Reviewing Office *
Winston-Salem Regional Office - (336) 776- Select Project Reviewer*
9800 Sue Homewood:eads\slhomewood
Information for Initial Review
1a. Name of project:
Broken Saddle Culvert Replacement Project
1a. Who is the Primary Contact?*
Wendi Hartup
1b. Primary Contact Email:*
wkhartup@toknc.com
Date Submitted
3/13/2020
Nearest Body of Water
Reedy Fork
Basin
Cape Fear
Water Classification
WS-III; NSW
Site Coordinates
1c. Primary Contact Phone:*
(336)564-1613
Latitude:
Longitude:
36.12472222
-80.05638889
A. Processing Information
County (or Counties) where the project is located:
Forsyth
Is this project a public transportation project?*
r Yes r No
1a. Type(s) of approval sought from the Corps:
W Section 404 Permit (wetlands, streams and waters, Clean Water Act)
r Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act)
1b. What type(s) of permit(s) do you wish to seek authorization?
W Nationwide Permit (NWP)
r Regional General Permit (RGP)
r Standard (IP)
1c. Has the NWP or GP number been verified by the Corps?
r Yes r No
Nationwide Permit (NWP) Number:
NWP Numbers (for multiple NWPS):
1d. Type(s) of approval sought from the DWR:
W 401 Water Quality Certification - Regular
r Non-404 Jurisdictional General Permit
r Individual Permit
03 - Maintenance
le. Is this notification solely for the record because written approval is not required?
For the record only for DWR401 Certification:
For the record only for Corps Permit:
r 401 Water Quality Certification - E)press
r Riparian Buffer Authorization
1f. Is this an after -the -fact permit application?*
r Yes r No
1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts?
r Yes r No
1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts?
r Yes r No
Acceptance Letter Attachment
1h. Is the project located in any of NC's twenty coastal counties?
r Yes r No
1j. Is the project located in a designated trout watershed?
r Yes r No
B. Applicant Information
1d. Who is applying for the permit?
r Owner W Applicant (other than owner)
le. Is there an Agent/Consultant for this project?*
r Yes r No
2. Owner Information
2a. Name(s) on recorded deed:
Robert K. Campbell & Marilyn B. Campbell
2b. Deed book and page no.:
DB 1630, PG 2577
2c. Responsible party:
2d.Address
Street Address
0 Corjon Rd
Address Line 2
City
Kernersville
Postal / Zip Code
27284
2e. Telephone Number:
(919)999-9999
2g. Email Address:*
mhorstman@wkdickson.com
2a. Name(s) on recorded deed:
Michael Lee Cable
2b. Deed book and page no.:
DB 1700 PG 2476
State / Province / Region
NC
Country
USA
2f. Fax Number:
r Yes r No
r Yes r No
2c. Responsible party:
2d.Address
Street Address
307 Broken Saddle Lane
Address Line 2
City
Kernersville
Postal / Zip Code
27284
2e. Telephone Number:
(999)999-9999
2g. Email Address:*
mhorstman@wkdickson.com
2a. Name(s) on recorded deed:
Michael E. Polinsky & Darcy J. Polinsky
2b. Deed book and page no.:
DB 3330 PG 1146
2c. Responsible party
2d.Address
Street Address
337 Marylebone Dr
Address Line 2
city
Kernersville
Postal / Zip Code
27284
2e. Telephone Number:
(999)999-9999
2g. Email Address:*
mhorstman@,Akdickson.com
2a. Name(s) on recorded deed:
Paul Morrison & Tammy Morrison
2b. Deed book and page no.:
DB 2181 PG 694
2c. Responsible party
2d.Address
Street Address
341 Marylebone Dr
Address Line 2
City
Kernersville
Postal / Zip Code
27284
2e. Telephone Number:
(999)999-9999
2g. Email Address:*
mhorstman@wkdickson.com
3. Applicant Information (if different from owner)
3a. Name:
Marc Thomas Fbrstman
3b. Business Name:
WK Dickson
3c.Address
State / Province / legion
NC
Country
USA
21'. Fax Number:
State / Province / Region
NC
Country
USA
2f. Fax Number:
State/ Province/ Fbgion
NC
Country
USA
21'. Fax Number:
Street Address
720 Corporate Center Drive
Address Line 2
aty
Raleigh
Postal / Zip Code
27607
3d. Telephone Number:
(919)256-5642
3f. Email Address:*
mhorstman@vvkdickson.com
4. Agent/Consultant (if applicable)
4a. Name:
Marc Horstman
4b. Business Name:
WK Dickson
4c.Address
Street Address
720 Corporate Center Drive
Address Line 2
city
Raleigh
Postal / Zip Code
27607
4d. Telephone Number:
(919)256-5642
4f. Email Address:*
mhorstman@wkdickson.com
Agent Authorization Letter*
Cable- 0 Broken Saddle- Signed.pdf
Cable- 307 Broken Saddle- Signed.pdf
Campbell- 0 Corjon- Signed.pdf
Morrison- 341 Marylebon- Signed.pdf
Polinsky- 337 Marylebone- Signed.pdf
State / Rovince / Ifgion
NC
Country
USA
3e. Fax Number:
Slate / Fnwince / Legion
NC
Country
USA
4e. Fax Number:
242.84KB
248.06KB
259.88KB
1.51 MB
1.13MB
C. Project Information and Prior Project History U
1. Project Information
1b. Subdivision name:
ff appropriate)
1c. Nearest municipality/ town:
Kernersville
2. Project Identification
2a. Property Identification Number: 2b. Property size:
2c. Project Address
Street Address
Address Line 2
City State / Rwnce / Region
Postal / Zip Code Country
3. Surface Waters
3a. Name of the nearest body of water to proposed project:*
Reedy Fork
3b. Water Resources Classification of nearest receiving water:*
WS-III; NSW
3c. What river basin(s) is your project located in?*
Cape Fear
3d. Please provide the 12-digit HUC in which the project is located.
030300020101
4. Project Description and History
4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:*
The Broken Saddle Culvert Replacement project is located in Kernersville, NC and is bound by Broken Saddle Lane and Marylebone Drive as shown in Figure 1. The existing watershed
encompasses 104 acres of high- to low -density residential areas with some commercial areas. The proposed project extends approximately 250 linear feet along the unnamed tributary
to Reedy Fork located under Broken Saddle Lane and Marylebone Drive. WK Dickson personnel conducted an on -site field assessment of the Waters of the US on July 9th, 2019.
4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?*
r Yes r No r Unknown
4d. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR)
USGS.pdf
1.2MB
4e. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR)
Soils.pdf 1.23MB
4f. List the total estimated acreage of all existing wetlands on the property:
4g. List the total estimated linear feet of all existing streams on the property:
250
4h. Explain the purpose of the proposed project:*
The proposed project purpose is to replace the existing undersized 60-foot long 24" corrugated metal pipe (CMP) lined reinforced concrete pipe (RCP) culvert under Broken Saddle
Lane to provide adequate flow and to stabilize the channel. The existing culvert is undersized and causes significant ponding that is adversely effecting the residents located upstream
Historic observations and reports of flooding at private properties in the vicinity of the Broken Saddle Lane culvert has been recorded. During a field visit by WK Dickson personnel, a
citizen claimed the water rose 70-inches at 716 Corjon Road during a large summer event. High water marks on the structure validated this claim.
41. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:*
The existing Broken Saddle Lane culvert will be replaced with a 60-foot long 48" RCP. The new culvert will be placed in the horizontal footprint of the existing culvert. The proposed
design a custom headwall and endwall. A plunge pool is proposed on the downstream end of the endwall to mimic the existing stream bed elevations and prevent erosion and scouring
downstream of the enlarged culvert. Boulder toe walls are incorporated into the banks of the stream to protect the adjacent sewer and minimize erosion to the stream banks.
The proposed project includes improvements upstream and downstream of the Marylebone Drive culvert. This culvert is adequately sized for the Town's design storm, however the
downstream channel bed has experienced scouring and a large pool has formed, separating the channel bed from the culvert invert. The proposed improvements include extending the
culvert with 60" CMP and adding a 22.5-degree bend followed by a custom endwall. The culvert extension is intended to protect adjacent utilities and private structures from being
damaged due to bank erosion. A buried riffle grade control is proposed downstream of the endwall to provide stability to the channel bed.
4j. Please upload project drawings for the proposed project.
2019-07-16_BrokenSaddle_PermittingSet.pdf 10.99MB
5. Jurisdictional Determinations
5a. Have the wetlands or streams been delineated on the property or proposed impact areas?*
r Yes
r No
Comments:
Refer to uploaded stream identification and SAM forms.
5b. If the Corps made a jurisdictional determination, what type of determination was made?*
r Preliminary r Approved r Not Verified r Unknown r N/A
Corps AID Number:
5c. If 5a is yes, who delineated the jurisdictional areas?
Name (if known): Mark Senior
Agency/Consultant Company: WK Dickson
Other:
5d1. Jurisdictional determination upload
Broken Saddle NCDWQ Stream Identification and SAM.pdf
6. Future Project Plans
6a. Is this a phased project?*
r Yes r No
955.86KB
r Unknown
Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity?
D. Proposed Impacts Inventory
1. Impacts Summary
1a. Where are the impacts associated with your project? (check all that apply):
r Wetlands W Streams -tributaries
r Open Waters r Pond Construction
3. Stream Impacts
F Buffers
3a. Reason for impact (?)
3b.lmpact type *
3c. Type of impact*
3d. S. name*
3e. Stream Type *
3f. Type of
3g. S. width *
3h. Impact
F
(?)
Jurisdiction*
length*
S1
Grading
9
Permanent
Stabilization
Unnamed Trib
Perennial
Corps
P
10
10
Average (feet)
(linearfeet)
S2
Plunge pool & boulder walls
9 P
Permanent
Stabilization
Unnamed Trib
Perennial
Corps
P
15
70
Average (feet)
(linearfeet)
S3
Riffle grade control
Temporary
Fill
Unnamed Trib
Perennial
Corps
15
10
Average (feet)
(linearfeet)
S4
Grading
9
Permanent
Stabilization
Unnamed Trib
Perennial
Corps
P
15
9
Average (feet)
(liriearfeet)
S5
Culvert extension and
Permanent
Culvert
Unnamed Trib
Perennial
Cor P s
15
40
headwall
Average (feet)
(lin�rfeet)
S6
Riffle grade control
Temporary
Fill
Unnamed Trib
Perennial
Corps
15
10
Average (feet)
(lir�rfeet)
31. Total jurisdictional ditch impact in square feet:
31. Total permanent stream impacts:
129
31. Total stream and ditch impacts:
149
3j. Comments:
E. Impact Justification and Mitigation
1. Avoidance and Minimization
31. Total temporary stream impacts:
20
la. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project:
During the planning and design phase of the project, efforts were made to avoid impacts to the greatest extent possible. Certain unavoidable impacts
are necessary to fulfill the purpose and need of the project. Stream impacts have been reduced by limiting the size of the project area and with
construction techniques that include headwalls and embedding the culverts. Installations of grade control structures below ORWMs are limited in
placement and size to the minimum necessary to ensure channel stability. Also, to reduce permanent impacts to jurisdictional waters, epsting channel
substrates will be restored following construction.
1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques:
To minimize impacts to surface water resources during the project construction and maintenance, an erosion and sedimentation control plan will be
included in the project's design plans. Soft stabilization practices including installation of grade control structures, coir matting installation, and seeding
will be used throughout the project. All erosion control measures will be placed in accordance with the Erosion Control Regulations. Local stormvater
and erosion control regulations will be followed on the project site. Local stormwater and erosion control regulations will be followed on the project site.
The stabilized stream banks will be planted with native vegetation. Ongoing on -site construction inspection will ensure that construction contractors
are following all DEQ-approved plans.
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State?
r Yes
r No
2b. If this project DOES NOT require Compensatory Mitigation, explain why:
This is an infrastructure rehabilitation project.
F. Stormwater Management and Diffuse Flow Plan (required by DWR)
1. Diffuse Flow Plan
1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules?
r Yes r No
If no, explain why:
The project is located in the Cape Fear river basin.
2. Stormwater Management Plan
2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?*
r Yes r No
2b. Does this project meet the requirements for low density projects as defined in 15ANCAC 02H .1003(2)?
r Yes r No
2c. Does this project have a stormwater management plan (SMP) reviewed and approved under a state stormwater program or state -approved local government stormwater
program?
r Yes r No
3. Stormwater Requirements
3a. Select whether a completed stormwater management plan (SMP) is included for review and approval or if calculations are provided to document the project will not cause
degradation of downstream surface waters.*
r Stormwater Management r Antidegradation
Plan Calculations
3b. Stormwater Management Plan
3c. Antidegradation Calculations:
Comments:
This is an infrastructure maintenance project and does not require a storrrrvvater management plan.
G. Supplementary Information
1. Environmental Documentation
la. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?*
r Yes r No
1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina)
Environmental Policy Act (NEPA/SEPA)?*
r Yes r No
Comments:*
This is an infrastructure maintenance project and does not require an environmental document pursuant to the requirements of the NEPA/SEPA.
2. Violations (DWR Requirement)
2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or
Riparian Buffer Rules (15A NCAC 2B .0200)? *
r Yes r No
3. Cumulative Impacts (DWR Requirement)
3a. Will this project result in additional development, which could impact nearby downstream water quality?*
r Yes f• No
3b. If you answered "no," provide a short narrative description.
This is a stormwater maintenance project to upgrade under -performing structures and restabilize stream banks. Secondary and cumulative impacts
due to development are not a>pected to increase since the subdivision is already developed. The improvements are designed to provide stornmater
structure improvement and prevent flooding events.
4. Sewage Disposal (DWR Requirement)
4a. Is sewage disposal required by DWR for this project?*
r Yes r No r N/A
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or habitat?*
r Yes r No
5b. Have you checked with the USFWS concerning Endangered Species Act impacts?*
r Yes r No
5c. If yes, indicate the USFWS Field Office you have contacted.
Asheville
5d. Is another Federal agency involved?*
r Yes r No r Unknown
5e. Is this a DOT project located within Division's 1-8?
r' Yes r No
5f. Will you cut anytrees in order to conduct the work in waters of the U.S.?
r Yes r No
5g. Does this project involve bridge maintenance or removal?
r Yes r No
5h. Does this project involve the construction/installation of a wind turbine(s)?*
r Yes r No
51. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.?
r Yes r No
5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat?
https://ecos.fws.gov/ecp/report/table/critical-habitat. html
Consultation Documentation Upload
Critical Habitat for Threatened & Endangered Species [USFWS].pdf 532.69KB
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as an Essential Fish Habitat?*
(- Yes r No
6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?*
https://www.fisheries.noaa.gov/resource/map/essential-fish-habitat-ni apper
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?*
(- Yes r No
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?*
North Carolina State Historic Preservation Office
7c. Historic or Prehistoric Information Upload
NCHPO.pdf
8. Flood Zone Designation (Corps Requirement)
8a. Will this project occur in a FEMA-designated 100-yearfloodplain?*
r Yes r No
8c. What source(s) did you use to make the floodplain determination?*
hftps://fris.nc.gov/fris/
Miscellaneous
Comments
Miscellaneous attachments not previously requested.
Impacts.pdf
Signature
*
17 By checking the box and signing below, I certify that:
328.67KB
J
976.81 KB
u
I have given true, accurate, and complete information on this form;
I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act");
• I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act");
• I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND
• I intend to electronically sign and submit the PCN form.
Full Name:
Marc Thomas Horstman
Signature
Date
3/13/2020
AUTUMN
I H, RVESJJT DR
R EKF CRD`RD-,
,-
/\•`� 'PFpy � fogsy7H xD
TV ak O i
D
_"j o J y Ct�' FIRST
�Ye--�1, ��\� ai RITIAN
�J KERN_ERSVILLE
} Mid: C• �r
- BR SIDE ,%'' CO 'LINE_D - -
` y M TESSORISc
m
- ad sr
BNHAMER ST �j v
O
r O I i _ 11i
}off o
KERNERSVILLE ST
: Elem ONEL50N
KfNS
N I
J" IL Galdcn'
i
tN
1�N Rey
PVNEVIEIV D ryTQ-= �NST ,t
I
c
42I
so N f M WAIN
o _ —
— ltHDSPY
S IJ I 1 OLD GREENSBORO RD
4'1 i
s
m
h p +
-
Lp fNDUSTRIALFig Oft
Olt
�n $ l s _
USGS�The National Map: National Boundaries Dataset, National Elevation
Dataset; Geographic Names Information System, National Hydrography
I1,1040 R— 1 Dataset; National Land Cover Database, National Structures Dataset, and
1 National` Transportation Dataset; U.S. Census Bureau - TIGER/Line; HERE
`-- Road Data
�WK N Figure 2 - USGS Map 2,000 1,000 0 2,000
�
Broken Saddle Lane DICKSON wW
M Feet
community infrastructure consultants S Culvert Replacement Project 1 inch = 2,000 feet
Legend
Culverts
Stream Centerline
Map Unit Symbol
0 BtE
0 CaB•
- CIB
0 CoA
0 Gu
0 HaA
0 NaB
NaC
0 PcF2
- PpC2
- PpD2
0 TdC
UJ
a
a
CO
C�aB
-NaB -tea
r
i r
�. -. .
AiL-
CIB
- 1
I im ti
PhWK Figure 3 - Soils Map 200 100 0 200
WDICKSON W+t Broken Saddle Lane Feet
community infrastructure consultants S Culvert Replacement Project 1 inch = 200 feet
Impact S1 - 10 LF
Temporary
� r
t-- .fit
Existing Culverts
Impact
0 Permanent
0 Temporary
PhWK N Impact Map
WDICKSON W
Broken Saddle Lane
community infrastructure consultants sCulvert Replacement Project
be
60 30 0
1 inch = 60 feet
60
Feet
NC DWQ Stream Identification Form Version 4.11
Date: 7 9 /�
Project/Site:
Latitude: 3�
Evaluator�` 1,� o�
✓
County: �j,tlyT��
Longitude: .
Total Points:
Stream Determination (circl a
Other
Stream is at least intermittent q
if>_ 19 or perennial if>_ 30" .3/
Ephemeral Intermittent erennial
p
e. Quad Name:
g'
A. Geomorphology (Subtotal = ZO, f �)
Absent
Weak
Moderate
Stron
,a. Continuity of channel bed and bank
0
1
2
3
2. Sinuosity of channel along thalweg
0
1
2)
3
3. In -channel structure: ex. riffle -pool, step -pool,
ripple -pool sequence
0
1
3
4. Particle size of stream substrate
0
1'
2
3
5. Active/relict floodplain
0
2
3
6. Depositional bars or benches
0
1
2
7. Recent alluvial deposits
0
1
2
8. Headcuts
0
1
2
3
9. Grade control
0
0.5
1
1.5
10. Natural valley
0
0.5
1
1.
11. Second or greater order channel
No 0
Yes = 3
artificial ditches are not rated; see discussions in manual
B. Hydrology (Subtotal = -:ix )
12. Presence of Baseflow
0
1
2
0>
13. Iron oxidizing bacteria
0
1
2
3
14. Leaf litter
1.5
65
0.5
0
15. Sediment on plants or debris
0
0.5
1
1.
16. Organic debris lines or piles
0
0.5
1
1.
17. Soil -based evidence of high water table?
No 0)Yes
= 3
C. Biology (Subtotal = ___Z1.l' ) " ` C
18. Fibrous roots in streambed
3
2
1
0
19. Rooted upland plants in streambed
3
2
1
0
20. Macrobenthos (note diversity and abundance)
0
1
a
3
21. Aquatic Mollusks
1
2
3
22. Fish
0
0.5
1
1.5
23. Crayfish
0
0.5
1
1.5
24. Amphibians
0
0.5
1
1.
25. Algae
0
0.5
1
1.
26. Wetland plants in streambed
FACW = 0.75; OBL
Other = 0 J
.perennial streams may also be identified using other methods. See p. 35 of manual. L
z
Notes: lam, ,. ,, /
/=•• ,
Sketch:
,rv,4-/
T,.
6.
T +,V
user manual version z.i
INSTRUCTIONS: Attach a sketch of the assessment area and photographs. Attach a copy of the USGS 7-5-minute topographic
quadrangle, and circle the location of the stream reach under evaluation. If multiple stream reaches will be evaluated on the same
property, identify and number all reaches on the attached map, and include a separate form for each reach. See the NC SAM User
Manual for detailed descriptions and explanations of requested information. Record in the "Notes/Sketch" section if any supplementary
measurements were performed. Seethe NC SAM User Manual for examples of additional measurements that maybe relevant.
NOTE EVIDENCE OF STRESSORS AFFECTING THE ASSESSMENT AREA (do not need to be within the assessment area).
PROJECT / SITE INFORMATION:
1. Project name (if any): Broken Saddle Culverts 2. Date of evaluation: 7/9/2109
3. Applicantlowner name: Town of Kernersville 4. Assessor name/organization: Mark Senior / WK Dickson
5. County: Forsyth 6. Nearest named water body
7. River Basin: Cape Fear on USGS 7-5-minute quad: Reedy Fork
8. Site coordinates (decimal degrees, at lower end of assessment reach): 36.1238625-80.0556250
STREAM INFORMATION: (depth and width can be approximations)
9. Site number (show on attached map): 1 10. Length of assessment reach evaluated (feet): 600
11. Channel depth from bed (in riffle, if present) to top of bank (feet): 3 r Unable to assess channel depth.
12. Channel width at top of bank (feet): 6 13. Is assessment reach a swamp stream? r Yes r No
14. Feature type: {o Perennial flow r Intermittent flow r Tidal Marsh Stream
STREAM RATING INFORMATION:
15. NC SAM Zone: r Mountains (M) {: Piedmont (P) r Inner Coastal Plain (1) { Outer Coastal Plain (0)
16. Estimated geomorphic \1.
J
valley shape (skip for {o a
Tidal Marsh Stream): (more sinuous stream, flatter valley slope) (less sinuous stream, steeper valley slope)
17. Watershed size: (skip r Size 1 (< 0.1 mi`) {: Size 2 (0.1 to < 0.5 mi`) r Size 3 (0.5 to < 5 mi`) r Size 4 (>_ 5 miz)
for Tidal Marsh Stream)
ADDITIONAL INFORMATION:
18. Were regulatory considerations evaluated? {o Yes r No If Yes, check all that appy to the assessment area.
r Section 10 water r Classified Trout Waters r Water Supply Watershed ( r I r II {o III r IV r V)
r Essential Fish Habitat r Primary Nursery Area r High Quality Waters/Outstanding Resource Waters
r Publicly owned property r NCDWR riparian buffer rule in effect r Nutrient Sensitive Waters
r Anadromous fish r 303(d) List r CAMA Area of Environmental Concern (AEC)
r Documented presence of a federal and/or state listed protected species within the assessment area.
List species:
r Designated Critical Habitat (list species):
19. Are additional stream information/supplementary measurements included in "Notes/Sketch" section or attached? r Yes No
1. Channel Water- assessment reach metric (skip for Size 1 streams and Tidal Marsh Streams)
{: A Water throughout assessment reach.
{ B No flow, water in pools only.
{ C No water in assessment reach.
2. Evidence of Flow Restriction - assessment reach metric
{: A At least 10 % of assessment reach in -stream habitat or riffle -pool sequence is adversely affected by a flow restriction or fill to the
point of obstructing flow or a channel choked with aquatic macrophytes or ponded water or impounded on flood or ebb within
the assessment reach (examples: undersized or perched culverts, causeways that constrict the channel, tidal gates).
{ B Not A
3. Feature Pattern - assessment reach metric
A A majority of the assessment reach has altered pattern (examples: straightening, modification above or below culvert).
. B Not A.
4. Feature Longitudinal Profile - assessment reach metric
(: A Majority of assessment reach has a substantially altered stream profile (examples: channel down -cutting, existing damming,
overwidening, active aggradation, dredging, and excavation where appropriate channel profile has not reformed from any of
these disturbances).
{ B Not
5. Signs of Active Instability - assessment reach metric
Consider only current instability, not past events from which the stream has currently recovered. Examples of instability include
active bank failure, active channel down -cutting (head -cut), active widening, and artificial hardening (such as concrete, gabion, rip -rap).
r A < 10 % of channel unstable
r B 10 to 25 % of channel unstable
{: C > 25 % of channel unstable
6. Streamside Area Interaction - streamside area metric
Consider for the Left Bank (LB) and the Right Bank (RB).
LB RB
{ A { A Little or no evidence of conditions that adversely affect reference interaction
{ B { B Moderate evidence of conditions (examples: berms, levees, down -cutting, aggradation, dredging) that adversely affect
reference interaction (examples: limited streamside area access, disruption of flood flows through streamside area,
leaky or intermittent bulkheads, causeways with floodplain constriction, minor ditching [including mosquito ditching])
{: C {: C Extensive evidence of conditions that adversely affect reference interaction (little to no floodplain/intertidal zone access
[examples: causeways with floodplain and channel constriction, bulkheads, retaining walls, fill, stream incision,
disruption of flood flows through streamside area] or too much floodplain/intertidal zone access [examples:
impoundments, intensive mosquito ditching]) or floodplain/intertidal zone unnaturally absent or assessment reach is a
man-made feature on an interstream divide
7. Water Quality Stressors - assessment reachlintertidal zone metric
Check all that apply.
7 A Discolored water in stream or intertidal zone (milky white, blue, unnatural water discoloration, oil sheen, stream foam)
7o B Excessive sedimentation (burying of stream features or intertidal zone)
7 C Noticeable evidence of pollutant discharges entering the assessment reach and causing a water quality problem
(✓ D Odor (not including natural sulfide odors)
7 E Current published or collected data indicating degraded water quality in the assessment reach. Cite source in the "Notes/Sketch"
section.
r F Livestock with access to stream or intertidal zone
r G Excessive algae in stream or intertidal zone
r H Degraded marsh vegetation in the intertidal zone (removal, burning, regular mowing, destruction, etc.)
P, I Other: adjacent sewer main (explain in "Notes/Sketch" section)
r J Little to no stressors
8. Recent Weather -watershed metric
For Size 1 or 2 streams, D1 drought or higher is considered a drought; for Size 3 or4 streams, D2 drought or higher is considered a
drought.
{ A Drought conditions and no rainfall or rainfall not exceeding 1 inch within the last 48 hours
{ B Drought conditions and rainfall exceeding 1 inch within the last 48 hours
{: C No drought conditions
9 Large or Dangerous Stream- assessment reach metric
Yes (i No Is stream is too large or dangerous to assess? If Yes, skip to Metric 13 (Streamside Area Ground Surface Condition).
Natural In -stream Habitat Types - assessment reach metric
10a. . Yes No Degraded in -stream habitat over majority of the assessment reach (examples of stressors include excessive
sedimentation, mining, excavation, in -stream hardening [for example, rip -rap], recent dredging, and snagging)
(evaluate for size 4 Coastal Plain streams only, then skip to Metric 12)
10b. Check all that occur (occurs if > 5 % coverage of assessment reach) (skip for Size 4 Coastal Plain streams)
r A Multiple aquatic macrophytes and aquatic mosses m w r F 5 % oysters or other natural hard bottoms
(include liverworts, lichens, and algal mats) F_ m r G Submerged aquatic vegetation
Fe B Multiple sticks and/or leaf packs and/or emergent o U) Cr H Low -tide refugia (pools)
vegetation r 0 r I Sand bottom
F., C Multiple snags and logs (including lap trees) r m r J 5 % vertical bank along the marsh
F., D 5 % undercut banks and/or root mats and/or roots O r K Little or no habitat
in banks extend to the normal wetted perimeter
r E Little or no habitat
*********************************REMAINING QUESTIONS ARE NOT APPLICABLE FOR TIDAL MARSH STREAMS****************************
11. Bedform and Substrate -assessment reach metric (skip for Size 4 Coastal Plain streams and Tidal Marsh Streams)
1 la. r Yes (* No Is assessment reach in a natural sand -bed stream? (skip for Coastal Plain streams)
11 b. Bedform evaluated. Check the appropriate box(es).
r A Riffle -run section (evaluate 11c)
r B Pool -glide section (evaluate 11d)
r C Natural bedform absent (skip to Metric 12, Aquatic Life)
11c. In riffles sections, check all that occur below the normal wetted perimeter of the assessment reach -whether or not submerged.
Check at least one box in each row (skip for Size 4 Coastal Plain Streams and Tidal Marsh Streams). Not Present (NP) _
absent, Rare (R) = present but <- 10%, Common (C) _ > 10-40%, Abundant (A) _ > 40-70%, Predominant (P) _ > 70%. Cumulative
percentages should not exceed 100 % for each assessment reach.
NP R C A P
(. r r r r Bedrock/saprolite
fo r r r r Boulder (256 - 4096 mm)
Cobble (64 - 256 mm)
Gravel (2 - 64 mm)
Sand (.062 - 2 mm)
r G r r r Silt/clay(<0.062mm)
r r (. r r Detritus
r r (. r r Artificial (rip -rap, concrete, etc.)
11d. (- Yes {" No Are pools filled with sediment? (skip for Size 4 Coastal Plain streams and Tidal Marsh Streams)
12. Aquatic Life - assessment reach metric (skip for Size 4 Coastal Plain streams and Tidal Marsh Streams)
12a. {: Yes (" No Was an in -stream aquatic life assessment performed as described in the User Manual?
If No, select one of the following reasons and skip to Metric 13. r No Water r Other:
12b. (. Yes r No Are aquatic organisms present in the assessment reach (look in riffles, pools, then snags)? If Yes, check
all that apply. If No, skip to Metric 13.
1 >1 Numbers over columns refer to "individuals" for size 1 and 2 streams and "taxa" for size 3 and 4 streams.
r r Adult frogs
r r Aquatic reptiles
r r Aquatic macrophytes and aquatic mosses (include liverworts, lichens, and algal mats)
r r Beetles (including water pennies)
r r Caddisfly larvae (Trichoptera [f])
r r Asian clam (Corbicula )
r r Crustacean (iso pod/am ph ipod/crayfish/sh rim p)
r r Damselfly and dragonfly larvae
r r Dipterans (true flies)
r r Mayfly larvae (Ephemeroptera [E])
r r Megaloptera (alderfly, fishfly, dobsonfly larvae)
r r Midges/mosquito larvae
r r Mosquito fish (Gambusia) or mud minnows (Umbra pygmaea)
r r Mussels/Clams (not Corbicula )
F r Other fish
F r Salamanders/tadpoles
F_ r Snails
F r Stonefly larvae (Plecoptera [P])
F r Tipulid larvae
F r Worms/leeches
13. Streamside Area Ground Surface Condition - streamside area metric (skip for Tidal Marsh Streams and B valley types)
Consider for the Left Bank (LB) and the Right Bank (RB). Consider storage capacity with regard to both overbank flow and
upland runoff.
LB RB
i A i`" A Little or no alteration to water storage capacity over a majority of the streamside area
t " B i-o B Moderate alteration to water storage capacity over a majority of the streamside area
is C i ' C Severe alteration to water storage capacity over a majority of the streamside area (examples include: ditches, fill,
soil, compaction, livestock disturbance, buildings, man-made levees, drainage pipes)
14. Streamside Area Water Storage - streamside area metric (skip for Size 1 streams, Tidal Marsh Streams, and B valley types)
Consider for the Left Bank (LB) and the Right Bank (RB) of the streamside area.
LB RB
i" A ; A Majority of streamside area with depressions able to pond water >_ 6 inches deep
i- B is B Majority of streamside area with depressions able to pond water 3 to 6 inches deep
is C i C Majority of streamside area with depressions able to pond water < 3 inches deep
15. Wetland Presence - streamside area metric (skip for Tidal Marsh Streams)
Consider for the Left Bank (LB) and the Right Bank (RB). Do not consider wetlands outside of the streamside area or within the
normal wetted perimeter of assessment reach.
LB RB
( Y { Y Are wetlands present in the streamside area?
{: N N
16. Baseflow Contributors - assessment reach metric (skip for size 4 streams and Tidal Marsh Streams)
Check all contributors within the assessment reach or within view of and draining to the assessment reach.
(- A Streams and/or springs (jurisdictional discharges)
Fv B Ponds (include wet detention basins, do not include sediment basins or dry detention basins)
(- C Obstruction that passes some flow during low -flow periods within assessment area (beaver dam, bottom -release dam)
(- D Evidence of bank seepage or sweating (iron oxidizing bacteria in water indicates seepage)
F- E Stream bed or bank soil reduced (dig through deposited sediment if present)
F- F None of the above
17. Baseflow Detractors - assessment area metric (skip for Tidal Marsh Streams)
Check all that apply.
I- A Evidence of substantial water withdrawals from the assessment reach (includes areas excavated for pump installation)
F_ B Obstruction not passing flow during low flow periods affecting the assessment reach (ex: watertight dam, sediment deposit)
F-' C Urban stream (>_ 24 % impervious surface for watershed)
r D Evidence that the stream -side area has been modified resulting in accelerated drainage into the assessment reach
F- E Assessment reach relocated to valley edge
i- F None of the above
18. Shading - assessment reach metric (skip for Tidal Marsh Streams)
Consider aspect. Consider "leaf -on" condition.
i-" A Stream shading is appropriate for stream category (may include gaps associated with natural processes)
is B Degraded (example: scattered trees)
C Stream shading is gone or largely absent
19. Buffer Width - streamside area metric (skip for Tidal Marsh Streams)
Consider "vegetated buffer" and "wooded buffer" separately for left bank (LB) and right bank (RB) starting at the top
of bank out to the first break.
Vegetated Wooded
LB RB LB RB
i A i A (` A i^' A > 100-feet wide or extends to the edge of the watershed
t " B i ' B B is B From 50 to < 100-feet wide
is C C C C C C From 30 to < 50-feet wide
i` D i`' D D { D From 10 to < 30-feet wide
i` E t- E {: E { E < 10-feet wide or no trees
20. Buffer Structure - streamside area metric (skip for Tidal Marsh Streams)
Consider for left bank (LB) and right bank (RB) for Metric 19 ("Vegetated" Buffer Width).
LB RB
{ A f- A Mature forest
( B is B Non -mature woody vegetation or modified vegetation structure
C: C i_" C Herbaceous vegetation with or without a strip of trees < 10 feet wide
C` D D Maintained shrubs
{ E ; E Little or no vegetation
21. Buffer Stressors - streamside area metric (skip for Tidal Marsh Streams)
Check all appropriate boxes for left bank (LB) and right bank (RB). Indicate if listed stressor abuts stream (Abuts), does not abut but
is within 30 feet of stream (< 30 feet), or is between 30 to 50 feet of stream (30-50 feet).
If none of the following stressors occurs on either bank, check here and skip to Metric 22: 7
Abuts < 30 feet 30-50 feet
LB RB LB RB LB RB
i A i A C` A C` A C A i _' A Row crops
(: B { B (` B r B r B ;" B Maintained turf
C` C { C C` C r C ('' C C Pasture (no livestock)/commercial horticulture
{ D { D D i- D f` D i__ D Pasture (active livestock use)
22. Stem Density — streamside area metric (skip for Tidal Marsh Streams)
Consider for left bank (LB) and right bank (RB) for Metric 19 ("Wooded" Buffer Width).
LB RB
(' A (' A Medium to high stem density
{ B B Low stem density
(? C r C No wooded riparian buffer or predominantly herbaceous species or bare ground
23. Continuity of Vegetated Buffer— streamside area metric (skip for Tidal Marsh Streams)
Consider whether vegetated buffer is continuous along stream (parallel). Breaks are areas lacking vegetation > 10-feet wide.
LB RB
(- A (: A The total length of buffer breaks is < 25 percent.
r B r B The total length of buffer breaks is between 25 and 50 percent-
r. C r C The total length of buffer breaks is > 50 percent.
24. Vegetative Composition —First 100 feet of streamside area metric (skip for Tidal Marsh Streams)
Evaluate the dominant vegetation within 100 feet of each bank or to the edge of the watershed (whichever comes first) as it contributes
to assessment reach habitat.
LB RB
( A r A Vegetation is close to undisturbed in species present and their proportions. Lower strata composed of native
species, with non-native invasive species absent or sparse-
r B (o B Vegetation indicates disturbance in terms of species diversity or proportions, but is still largely composed of native
species. This may include communities of weedy native species that develop after clear -cutting or clearing or
communities with non-native invasive species present, but not dominant, over a large portion of the expected strata or
communities missing understory but retaining canopy trees.
{: C r C Vegetation is severely disturbed in terms of species diversity or proportions. Mature canopy is absent or communities
with non-native invasive species dominant over a large portion of expected strata or communities composed of planted
stands of non -characteristic species or communities inappropriately composed of a single species or no vegetation.
25. Conductivity — assessment reach metric (skip for all Coastal Plain streams)
25a. (- Yes (. No Was a conductivity measurement recorded?
If No, select one of the following reasons. r No Water r Other:
25b. Check the box corresponding to the conductivity measurement (units of microsiemens per centimeter).
("A <46 rB 46to<67 rC 67to<79 rD 79to<230 rE >_ 230
Notes/Sketch:
NC SAM Stream Rating Sheet
Accompanies User Manual Version 2.1
Stream Site Name Broken Saddle Culverts Date of Evaluation 7/9/2109
Stream Category Pa2 Assessor Name/Organization Mark Senior / WK Dickson
Notes of Field Assessment Form(Y/N) NO
Presence of regulatory considerations (Y/N) YES
Additional stream information/supplementary measurements included (Y/N)
NC SAM feature type (perennial, intermittent, Tidal Marsh Stream) Perennial
USACE/ NCDWR
Function Class Rating Summary All Streams Intermittent
(1) Hydrology LOW
(2) Baseflow HIGH
(2) Flood Flow LOW
(3) Strearrside Area Attenuation LOW
(4) Floodplain Access LOW
(4) Wooded Riparian Buffer LOW
(4) Microtopography LOW
(3) Stream Stability MEDIUM
(4) Channel Stability LOW
(4) Sediment Transport HIGH
(4) Stream Geomorphology MEDIUM
(2) Stream'IntertidalZone Interaction NA
(2) Longitudinal Tidal Flow NA
(2) Tidal Marsh Stream Stability NA
(3) Tidal Marsh Channel Stability NA
(3) Tidal Marsh Stream Geomorphology NA
(1) Water Quality MEDIUM
(2) Baseflow HIGH
(2) Strearrside Area Vegetation LOW
(3) Upland Pollutant Filtration LOW
(3) Thermoregulation MEDIUM
(2) Indicators of Stressors YES
(2) Aquatic Life Tolerance HIGH
(2) Intertidal Zone Filtration NA
(1) Habitat LOW
(2) In -stream Habitat MEDIUM
(3) Baseflow HIGH
(3) Substrate HIGH
(3) Stream Stability LOW
(3) In -stream Habitat MEDIUM
(2) Stream -side Habitat LOW
(3) Stream -side Habitat LOW
(3) Thermoregulation MEDIUM
(2) Tidal Marsh In -stream Habitat NA
(3) Flow Restriction NA
(3) Tidal Marsh Stream Stability NA
(4) Tidal Marsh Channel Stability NA
(4) Tidal Marsh Stream Geomorphology NA
(3) Tidal Marsh In -stream Habitat NA
(2) Intertidal Zone Habitat NA
Overall LOW
Broken Saddle Lane
Brawn RtS
t-ri
o
A
f arm*e�¢�� �
•
a s1ii•,an
dIJ v� 41141 Or
FY3927 House
FY2u2t House
FYDM5
V1+Ind
FY113384 HenFy Clap Edwsrds
House 1582
4
■Y392-2 House
yr
4
Bost 51
ro
' 2 Y
a A
G
z
Neil +�451
'4 4
41-0
VIP • °�� $ti
§e 41
4b
L
41
w Ar.
April 1, 2019
NR Points
w NR Individual Listing
0 NR Listing, Gone
NRHD Center Point
CIO
s
P` e13% wS
r C&Pe 0,
9 o LPFY392B House
a 1'
m Ken ¢ar (breerM 0,' ISFY3929 House
WT
FO RSY- cTH d 4W 0
Vt GUI
c 0� 60 i F(bW House
° FY3931 House
o I
9
1�
7
park Lawn cl
U.
C
A* Gave.$ Sj,
V-3]
I
w FY3932 House
Oi
r4
Gar
FY'34 1 Home
LI
3
f3
�
s
E{J
1:18,056
0 0.13 0.25 0.5 mi
0 0.2 0.4 0.8 km
State of North Carolina DOT, Esri, HERE, Garmin, INCREMENT P, NGA
4/1 /2019
Critical Habitat for Threatened & Endangered Species [USFWS]
Lriticai rianrtat Tor i nreatenea & tnaangerea Species Lusrws
Final Linear Features n
p�4y�L
Final Polygon Features o` n
s � �
C E
3 Y C
+nt,bell f`.ardens Rd
Proposed Linear Features
Proposed Polygon Caryon did
Features
c
,y C
Kensal Cre, r?pr
� I
c
a
y � O
fi
GraVelawn Dr
to S Sd J
I
S1i 1
h-
A specific geographic area(s) that contains features essential for the conservation of a threatened or endangered species � 1
600ft
and that may require special management and protection.
U.S. Fish and Wildlife Service I State of North Carolina DOT, Esri, HERE, Garmin, INCREMENT P, Intermap, USGS, METI/NASA, EPA, USDA
https://fws.maps.arcgis.com/home/webmap/print.html 1 /1
-•.vip��s� �
Q
?
�L
I �1
7rY
Gvr6errs o�
��
Qd.
MQxy
�•�
1�
- �ha
z
��
PROJECT
LOCATION
S�
i
.,
L'
�[
FIEO
I
-sygOP
Sh fields Bd
ems
� CF
K2i.rersville
Medial
Cr ntEr
C,
Steen Rd
6* rh- Rd
VICINITY MAP
NTS
INDEX OF SHEETS
SHEET NUMBER
SHEET TITLE
1
COVER
2
GENERAL NOTES & LEGEND
3
BROKEN SADDLE LN CULVERT PLAN & PROFILE
4
MARYLEBONE DR CULVERT PLAN & PROFILE
5
DETAILS
6
DETAILS
7
EROSION CONTROL COVER
8
EROSION CONTROL PLANS
9
EROSION CONTROL PLANS
10
EROSION CONTROL DETAILS
11
EROSION CONTROL DETAILS
12
NPDES STABILIZATION PLAN
13
EROSION CONTROL SPECIFICATIONS AND MAINTENANCE
14
STRUCTURAL DETAILS
15
CUSTOM STRUCTURE 1 DETAIL
16
CUSTOM STRUCTURE 2 DETAIL
17
CUSTOM STRUCTURE 3 DETAIL
18
CUSTOM STRUCTURE 4 DETAIL
DRAWN BY: M. SMALLING CAD FILE PATH:
0:AProjects\Kernersville\2018039400RA - Corjon Road
Drainage Study\CADD\Plan Set
PROJECT MANAGER: PROJECT DATE:
M. HORSTMAN JULY 2019
PLANS AND SURVEY PREPARED BY:
o
Y DWK
DICKSON
community infrastructure consultants
0
LL 1 PLOT DATE: 7/16/2019
720 CORPORATE CENTER DRIVE
RALEIGH, NC 27607
(919) 782-0495
Office Locations:
Tennessee
Georgia
North Carolina
South Carolina
NC LICENSE NO. F-0374
O�F� �C!M E�R� ffhrE�R� �V 3�11�L n"Le E
BROKEN SADDLE LANE CULVERT
REPLACEMENT
rR
LI�� g�ti
COD
KENSAL GREEN DR
CORJON RD
s r
tiO
m
O
C�
r
2 'n
O r
c O
n
Z (, • m
O
z R,
z 37
Spv PRE G1
LE�GN�S��R
LOCATION & SHEET LAYOUT MAP
1" = 250'
Know what's below.
Call before you dig.
ZOw
0UO
OJU
Ozw
aoQ
z00ww_
�ma
U=W
OOm
OQ
. o
Fro
w
ozw
F -o
�
Wo
UZ
0
zz
z
°om
= Y J
U_Q
~pS
OYD
w��
D1.
0
zwa
0.,
z
OOQ
o°z
OwC7
w
wQQ
¢�z
w0
�To
wFz
w�a
=a�
0zo
Y
Q Q QoQ m
w
z°w
3:7
OZD
Uz0 -U
Zw
07T
YU~
U
p00
Yz
-=
0,d
,00
0
=zw
Eo=
aF7
wl
0
oow
GENERAL NOTES:
1. CONTRACTOR IS TO REFER TO EROSION AND SEDIMENT CONTROL SHEETS AND INSTALL APPROPRIATE MEASURES
BEFORE BEGINNING ANY WORK.
2. CONTRACTOR IS TO DISPOSE OF ALL MATERIAL REMOVED OFFSITE IN A SAFE AND LEGAL MANNER.
3. ALL DEWATERING REQUIRED TO EXECUTE WORK SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. SEE PROJECT
MANUAL FOR FURTHER DETAIL.
4. SEE SPECIFICATION SECTION 02 00 00 FOR DESCRIPTION OF SUITABLE BACKFILL MATERIAL AND COMPACTION
REQUIREMENTS. CONTRACTOR SHALL PROVIDE SUITABLE MATERIAL AS NECESSARY TO ACHIEVE FINAL PROJECT
GRADES.
5. CONTRACTOR TO VERIFY LOCATION OF EXISTING UTILITIES PRIOR TO CONSTRUCTION.
6. TREES AND BUSHES OUTSIDE OF LIMITS OF DISTURBANCE SHALL NOT BE DISTURBED.
7. CONTRACTOR SHALL COMPLY WITH OSHA 29 CFR. PART 1926 SUBPART P, EXCAVATIONS, 29 CFR PART 1910.146, AND
PERMIT REQUIRED CONFINED SPACES.
8. LIMITS OF DISTURBANCE IS SHOWN ON THE PLANS AND SHALL BE MAINTAINED AT ALL TIMES. ANY DAMAGE TO PRIVATE
PROPERTY CAUSED BY CONTRACTOR SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO REPAIR OR REPLACE TO
ORIGINAL OR SUPERIOR CONDITION.
9. CONTRACTOR'S WORK MUST REMAIN INSIDE THE LIMITS OF DISTURBANCE NOTED ON THESE PLANS AT ALL TIMES.
EXISTING CONDITIONS NOTES
1. TREES AND SHRUBS THAT THE CONTRACTOR IS REQUIRED TO REMOVE ARE SHOWN ON THE PLANS. THE CONTRACTOR
SHALL SAVE ALL OTHER TREES AND SHRUBS OUTSIDE THE LIMITS OF DISTURBANCE UNLESS OTHERWISE DIRECTED BY
THE ENGINEER.
2. LIMITS OF DISTURBANCE SHALL BE "VISI-BARRIER" HIGH DENSITY POLYETHYLENE FABRIC, ORANGE, FOUR FEET IN
HEIGHT, OR, TEMPORARY SILT FENCE. INSTALL PER MANUFACTURERS SPECIFICATIONS WHERE SHOWN ON THE PLANS.
3. IF REQUIRED, THE CONTRACTOR SHALL RELOCATE ALL MAIL BOXES AS REQUIRED BY SECTION 107-12 OF THE NCDOT
STANDARD SPECIFICATIONS FOR ROADS AND STRUCTURES. COORDINATE THIS WORK WITH THE U.S. POSTAL SERVICE.
4. THE CONTRACTOR SHALL IMMEDIATELY REPORT TO THE TOWN OF KERNERSVILLE ANY DISCREPANCIES FOUND
BETWEEN ACTUAL CONDITION AND CONSTRUCTION DOCUMENTS AND SHALL WAIT FOR INSTRUCTION FROM THE TOWN
INSPECTOR PRIOR TO PROCEEDING.
PAVING NOTES
1. SIDEWALK SHALL BE FOUR INCHES THICK, AND SIX INCHES THICK AT DRIVEWAY CROSSINGS, IF APPLICABLE.
2. IF REQUIRED, THE CONTRACTOR SHALL IMMEDIATELY RESTORE ALL DRIVEWAYS AND DRIVES TO MAIL BOXES AS GOOD
AS OR BETTER THAN ORIGINAL CONDITION. CONTRACTOR SHALL MAINTAIN ALL DRIVEWAYS OR MAIL BOX DRIVES UNTIL
SAID DRIVES ARE ACCEPTED BY THE ENGINEER AS BEING AS GOOD AS OR BETTER THAN THEIR ORIGINAL CONDITION.
3. IF REQUIRED, THE CONTRACTOR SHALL SET AND ADJUST PROPOSED CURB ELEVATIONS AS NECESSARY TO ENSURE
PROPER LONGITUDINAL GRADE FOR DRAINAGE. THE CONTRACT SHALL RETAIN EXISTING PAVEMENT, UNLESS
OTHERWISE NOTED.
4. ALL CALLOUTS FOR REMOVAL AND REPLACEMENT OF PAVEMENT INCLUDE THE TOTAL AMOUNT TO BE REMOVED AND
REPLACED PER CONTINUOUS SECTION. REMOVAL AND REPLACEMENT AREAS ARE HATCHED APPROPRIATELY AS
NOTED ON EACH SHEET.
5. PROPOSED PAVING SHALL BE COMPLETED AS INDICATED ON THE PLANS AND IN ACCORDANCE WITH DIVISIONS 6 AND 7
OF THE SPECIFICATIONS.
GRADING & DRAINAGE NOTES
1. PIPE INVERT ELEVATIONS HAVE PRECEDENCE OVER SLOPES. HOWEVER, SLOPES SHALL NOT BE DECREASED FROM
THOSE SHOWN ON PLAN WITHOUT PRIORAPPROVAL FROM THE ENGINEER.
2. POSITIVE DRAINAGE SHALL BE PROVIDED ON ALL GRADED AREAS, ESPECIALLY AREAS TO BE PAVED, THROUGHOUT
CONSTRUCTION.
3. PIPE LENGTHS INDICATED ON PLAN ARE APPROXIMATE ONLY.
4. NO SOIL DISTURBANCE OR COMPACTION, CONSTRUCTION MATERIALS, TRAFFIC, TRENCHING, OR OTHER LAND
DISTURBING ACTIVITY SHALL BE PERMITTED BEYOND LIMITS OF DISTURBANCE WITHOUT PRIOR APPROVAL FROM THE
OWNER.
5. EXISTING AND PROPOSED CONTOURS ARE SHOWN ON THE PLAN AT V INTERVALS.
6. ALL PROPOSED GRADES ARE FINISH GRADES.
7. GRADES, ELEVATIONS AND LOCATION SHOWN ARE APPROXIMATE. AS DIRECTED BY THE ENGINEER, THEY MAY BE
ADJUSTED TO ACCOMMODATE UNFORESEEN CONDITIONS.
8. WEEP HOLES ARE TO BE CONSTRUCTED IN ALL DRAINAGE STRUCTURES. WEEP HOLES SHOULD BE 8' ON CENTER WITH
A MINIMUM OF 1 WEEP HOLE PER WALL. WEEP HOLES ARE TO BE COVERED ON THE OUTSIDE OF THE STRUCTURE BY A
BAG MADE OF FILTER FABRIC FILLED WITH #78 STONE. THERE WILL BE NO SEPARATE PAYMENT FOR THIS WORK.
9. LIMITS OF PROPOSED SLOPES ARE INDICATED IN THE PLANS, DETAILS AND STANDARD DRAWINGS. THE MAXIMUM FILL
SLOPE SHALL NOT EXCEED A 2:1 (HORIZONTAL TO VERTICAL) UNLESS DESIGNATED BY THE ENGINEER. CUT SLOPES
GREATER THAN 2:1 WILL BE USED ONLY AS DIRECTED BY THE ENGINEER AND AT THE SPECIFIC LOCATIONS SHOWN ON
THE PLANS.
WARRANTY NOTES
UTILITY NOTES
1. CONSTRUCTION METHODS AND MATERIALS SHALL BE IN ACCORDANCE WITH KERNERSVILLE PUBLIC UTILITIES STANDARDS AND
SPECIFICATIONS, UNLESS OTHERWISE NOTED.
2. ALL CONTRACTORS WORKING ON KERNERSVILLE PROJECTS ARE REQUIRED TO OWN A COPY OF THE DESIGN MANUAL AND SHALL
KEEP A COPY ON THE JOB SITE AT ALL TIMES.
3. CONTRACTOR IS FULLY RESPONSIBLE FOR CONTACTING ALL APPROPRIATE PARTIES AND ASSURING THAT UTILITIES ARE LOCATED
PRIOR TO THE COMMENCEMENT OF CONSTRUCTION. CALL NC ONE -CALL AT 811 FOR UTILITY LOCATING SERVICES 48 HOURS PRIOR
TO COMMENCEMENT OF ANY WORK. CONTRACTOR SHALL VERIFY LOCATION AND DEPTH OF ALL EXISTING UTILITIES PRIOR TO
CONSTRUCTION.
4. CONTRACTOR SHALL BE RESPONSIBLE FOR CORRECTING ANY DAMAGES TO EXISTING UTILITIES, STORM DRAINAGE, AND OTHER
FACILITIES WHETHER SAID ITEMS ARE SHOWN ON PLANS OR NOT.
5. CONTRACTOR SHALL NOTIFY THE TOWN OF KERNERSVILLE UTILITY COORDINATOR OF IMPENDING WORK. THE UTILITY
COORDINATOR SHALL BE CONTACTED 48 HOURS PRIOR TO CONSTRUCTION.
6. IN THE EVENT OF CONFLICTS WITH EXISTING UTILITIES OR IF FURTHER VERIFICATION OF FACILITIES OR TEMPORARY DISRUPTION
OF SERVICE IS NECESSARY, THE CONTRACTOR SHALL CONTACT THE APPROPRIATE UTILITY COMPANY AND SHALL FULLY
COORDINATE ANY NECESSARY MODIFICATIONS WITH THE ENGINEER AND THE APPROPRIATE UTILITY.
7. IF UTILITIES WILL NEED TO BE RELOCATED DUE TO EXCAVATION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE RELOCATION
COST OF THE WATER AND SEWER ONLY.
8. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH TOWN OF KERNERSVILLE AND/OR NCDOT STANDARD SPECIFICATIONS AND
NORTH CAROLINA DEPARTMENT OF TRANSPORTATION STANDARDS AND DETAILS. CONTRACTOR SHALL CONTACT NCDOT DIV. 4,
DIST. 2 OFFICE PRIOR TO ANY WORK WITHIN NCDOT RIGHT-OF-WAY. A COPY OF ALL APPROVED ENCROACHMENT AGREEMENTS
SHALL BE KEPT ONSITE DURING ALL CONSTRUCTION ACTIVITIES. CONTRACTOR IS RESPONSIBLE FOR COMPLETING ANY
NECESSARY ENCROACHMENT AGREEMENTS AND ALL CORRESPONDENCE WITH THE NCDOT AND THE TOWN OF KERNERSVILLE
ASSOCIATED WITH THESE AGREEMENTS.
9. ANY MONUMENT DISTURBED DURING CONSTRUCTION SHALL BE REPLACED BY THE CONTRACTOR IN ACCORDANCE WITH THE
CONTRACT DOCUMENTS.
10. MINIMUM SEPARATIONS BETWEEN EXISTING AND PROPOSED UTILITIES SHALL BE AS SPECIFIED IN THE TOWN OF KERNERSVILLE
STANDARD SPECIFICATIONS. IF UTILITY SEPARATION CONFLICTS OCCUR DURING CONSTRUCTION, THE CONTRACTOR SHALL
COORDINATE REQUIRED ADJUSTMENTS WITH THE ENGINEER PRIOR TO PROCEEDING WITH WORK. THE CONTRACTOR SHALL WORK
AROUND EXISTING UTILITIES.
11. THE LOCATIONS OF EXISTING UTILITIES SHOWN ON THE PLANS ARE FOR THE USE OF THE CONTRACTOR IN PROVIDING
PROTECTIONS FOR THE UTILITIES DURING CONSTRUCTION OPERATION. THE TOWN, DESIGN CONSULTANT, AND/OR AGENT SHALL
NOT BE HELD RESPONSIBLE FOR THE ACCURACY OR LOCATION, SIZE, DEPTH OR COMPLETENESS OF THE INFORMATION. BEFORE
BEGINNING CONSTRUCTION, THE CONTRACTOR SHALL CONTACT EACH OF THE UTILITY OWNERS IN THE AREA OF CONSTRUCTION
RELATIVE TO THEIR UTILITY LOCATIONS. THE CONTRACTOR SHALL PROTECT ALL UTILITIES FROM DAMAGE CAUSED BY
CONSTRUCTION OPERATIONS AND/OR RELATED WORK OF THE CONTRACTOR OR HIS AGENTS. THE CONTRACTOR SHALL HOLD THE
TOWN HARMLESS FOR ANY INCONVENIENCE OR DELAY CAUSED BY THE OPERATIONS OF OTHERS PERFORMING THE ABOVE WORK.
NECESSARY ADJUSTMENT OR RELOCATION OF EXISTING UTILITIES, EXCEPT FOR CONTRACT ITEMS, WILL BE PERFORMED BY THE
UTILITY SERVICE PROVIDER. THE CONTRACTOR SHALL COORDINATE HIS WORK WITH OTHERS IN ORDER TO PROVIDE
SATISFACTORY PROGRESS OF THE PROJECT.
12. THE CONTRACTOR SHALL COMPLETE SOFT DIGS IN ORDER TO VERIFY DEPTH AND LOCATION OF EXISTING GAS MAINS AND REPORT
FINDINGS TO THE OWNER PRIOR TO CONSTRUCTION.
13. A TOWN REPRESENTATIVE MUST BE PRESENT PRIOR TO AND DURING ANY CONSTRUCTION WITHIN THE AREA OF EXISTING GAS
MAINS.
14. THE CONTRACTOR SHALL COORDINATE THE ADJUSTMENT OR RELOCATION OF GAS MAINS WITH THE TOWN. THE TOWN MUST BE
NOTIFIED TWO WEEKS IN ADVANCE OF CONSTRUCTION. ALL ADJUSTMENTS AND RELOCATIONS WILL BE PERFORMED BY THE TOWN.
15. THE CONTRACTOR SHALL SUPPORT AND PROTECT ANY EXISTING UNDERGROUND UTILITIES ENCOUNTERED DURING TRENCH
EXCAVATION AND/OR PIPE INSTALLATION. CONTRACTOR TO USE EXTREME CAUTION WHEN WORKING IN AREAS NEAR POWER
TRANSMISSION LINES.
16. WHERE SANITARY SEWERS AND WATER LINES ARE ENCOUNTERED, THE CONTRACTOR SHALL USE CARE IN WORKING AROUND OR
NEAR THEM. IF AN EXISTING SEWER OR WATER LINE IS DAMAGED, THE CONTRACTOR SHALL IMMEDIATELY REPLACE THE SEWER OR
WATER LINE WITH PC 350 DUCTILE IRON PIPE AT HIS EXPENSE IN ACCORDANCE WITH TOWN OF KERNERSVILLE UTILITY
SPECIFICATIONS. THE CONTRACTOR SHALL REPLACE A MINIMUM OF 10 FEET OF SANITARY SEWER LINE AND/OR WATER LINE WITH
PC 350 DUCTILE IRON PIPE WHEN DRAINAGE PIPE COMES WITHIN 18 INCHES OF SAID LINES VERTICALLY OR 10 FEET HORIZONTALLY.
17. ALL WATER VALVES, WATER BOXES, WATER METER BOXES, WATER VAULTS, SANITARY SEWER MANHOLES, AND CLEANOUTS IN THE
CONSTRUCTION AREA ARE TO BE ADJUSTED TO THE FINISHED GRADE BY THE CONTRACTOR.
18. IF THE WATER METERS ARE TO BE RELOCATED HORIZONTALLY, THEY SHALL BE MOVED TO AN AREA BEHIND THE PROPOSED CURB.
IF RELOCATED METER IS IN DRIVE OR SIDEWALK, CONTRACTOR WILL PROVIDE AND INSTALL CONCRETE METER BOXES.
19. WATER AND SEWER LINES ARE TO REMAIN ACTIVE AT ALL TIMES DURING CONSTRUCTION. IF THIS IS NOT POSSIBLE, THEN
CONTRACTOR SHALL FOLLOW TOWN OF KERNERSVILLE SPECIFICATIONS AND NOTIFY THE OWNER PRIOR TO THE SCHEDULED
SERVICE INTERRUPTIONS.
20. IF REQUIRED, SEWER LATERALS ARE TO BE RECONNECTED PER TOWN OF KERNERSVILLE SPECIFICATIONS.
21. ALL MANHOLE TOPS AND VALVE BOXES SHALL BE CONSTRUCTED FLUSH TO FINAL GRADE. WATER METER BOXES AND SANITARY
SEWER SERVICES DISTURBED BY CONSTRUCTION SHALL BE SET TO GRADE IN ACCORDANCE WITH TOWN OF KERNERSVILLE
STANDARDS.
ABBREVIATIONS
ALL ENCAPSULATED SOIL LIFT VEGETATION, INCLUDING THE LIVE STAKES, BARE ROOT AND BANK STABILIZATION PLANTINGS,
# .....................................
NUMBER
MONO ......................... MONOLITHIC
a
INSTALLED BY THE CONTRACTOR SHALL BE ASSESSED BY THE ENGINEER OR REPRESENTATIVE THEREOF AT THE END OF THE
ABAND ............................
ABANDONED
mph ...........................
MILES PER HOUR
a
SAME PLANTING SEASON THEY WERE INSTALLED. 100% OF THIS VEGETATION MUST BE INSTALLED CORRECTLY AND STILL BE
A.....•••••••••••••••••••••••••••••••
AIR CONDITIONER
MTL............................METAL
°
ALIVE AT THE TIME THIS ASSESSMENT IS COMPLETED. IF DEAD PLANT MATERIAL IS FOUND, THE CONTRACTOR IS
A. ..................................
ALGEBRAIC DIFFERENCE
N ...............................
NORTH/NORTHING NAD
RESPONSIBLE FOR REPLACING THAT MATERIAL BEFORE THE COMPLETION OF THAT PLANTING SEASON (MARCH 15). AT THE
ASPH...............................ASPHALT
APPROX
83 .............................
NORTH AMERICAN DATUM 1983
COMPLETION OF ONE FULL GROWING SEASON FOLLOWING PLANTING, LIVE STAKES, BARE ROOTS AND CONTAINER PLANTS
...........................APPROXIMATELY
B/C.................................
BACK OF CURB
NTS ...........................
O/H
NOT TO SCALE
OVER HEAD
o
PLANTED BY THE CONTRACTOR WILL BE ASSESSED BY THE ENGINEER AGAIN. THE TOTAL PLANTED MATERIAL MUST HAVE AT
BIT
...........................
LEAST 85 PERCENT OF ALL STEMS SURVIVE (15 PERCENT MORTALITY). IF THE CONTRACTOR DOES NOT MEET THIS
...................................BITUMINOUS
BM...................................BENCH
MARK
OC .............................
PAVT .........................
ON CENTER
PAVEMENT
REQUIREMENT AS DETERMINED BY THE ENGINEER, THE CONTRACTOR SHALL REMOVE THE DEAD PLANT MATERIAL AND
BOC.................................
BOTTOM OF CHANNEL
PC .............................
PRESSURE CLASS
o
PLANT NEW VEGETATION AT THE CONTRACTOR'S EXPENSE. THE NEWLY PLANTED VEGETATION WILL BEGIN A NEW
BRG.................................
BEARING
PERM ........................
PERMANENT
°
WARRANTY PERIOD TO BE ASSESSED AT THE CONCLUSION OF THE NEXT FULL GROWING SEASON. ANY CONTAINERIZED
CB ...................................
CATCH BASIN
PG .............................
PAGE
VEGETATION THAT WAS SUBSTITUTED SHALL BE SUBJECT TO THIS WARRANTY; HOWEVER, IF REPLACEMENT IS REQUIRED,
C&G.................................CURB
AND GUTTER
PI..............................
POINT OF INT
THE CONTRACTOR MAY REMOVE THE DEAD PLANT MATERIAL AND PLANT NEW VEGETATION OF THE SAME SPECIES. THIS
CL....................................CLEARANCE
PK .............................
PK NAIL SET
m
WARRANTY IS INCIDENTAL TO THE OVERALL PROJECT.
C/L ................................CENTER
LINE
PP ............................
POWER POLE
CMP.................................CORRUGATED
MTL PIPE
PROP
PROPOSED
CMPA...............................CORRUGATED
MTL PIPE ARCH
........................
PSE ...........................
PERM SW ESMT
CONC...............................CONCRETE
PT.............................
POINT OF TANGENCY
CONST.............................
CONSTRUCTION
PVI............................
POINT OF VERT INT
DCB.................................
DOUBLE CATCH BASIN
PUE...........................
PERM UTILITY ESMT
DB...................................DEED
BOOK
r................................
RADIUS
a
DBL.................................
DOUBLE
RCBC.........................
REINFORCED CONC BOX
DI ....................................
DROP INLET
CULVERT
a
DIA..................................
DIAMETER
RCP ...........................
REINFORCED CONC PIPE
DW...................................
DRIVEWAY
RD .............................
ROAD
0
DIM ..................................
DIMENSION
RELOC .......................
RELOCATE
E.....................................
EAST/EASTING
RT .............................
RIGHT
EA ...................................
EACH
R/W \ ROW ..............
RIGHT OF WAY
ELEV................................
ELEVATION
S ...............................
SOUTH
o
EDP .................................
EDGE OF PAVEMENT
SAN...........................
SANITARY
ESMT ...............................
EASEMENT
SD .............................
STORM DRAIN
m
ETCB ...............................
ELONGATED THROAT CATCH BASIN
SDE ..........................
STORM DRAINAGE EASEMENT
EX ...................................
EXISTING
SF.............................
SQUARE FOOT S/R
F/C.................................
FACE OF CURB
FENCE.......................
SPLIT RAIL FENCE
a
FES.................................
FLARED END SECTION
SS .............................
SANITARY SEWER
o
FH...................................
FIRE HYDRANT
STA ...........................
STATION
o
F/L..................................FLOW
LINE
STD ...........................
STANDARD
FOC.................................
FIBER OPTIC CABLE
SW .............................
SIDEWALK
GV...................................
GAS VALVE
SY .............................
SQUARE YARD
HORIZ ..............................
HORIZONTAL
TAN ...........................
TANGENT
o
INT...................................INTERSECTION
TCE ...........................
TEMP CONST ESMT
INV...................................INVERT
TEMP .........................
TEMPORARY
IP.....................................IRON
PIN SET
TP .............................
TRAVERSE POINT
o
JB....................................JUNCTION
BOX
T/W ..........................
TEST WIRE
LT....................................LEFT
TYP ...........................
TYPICAL
a
Ib.....................................POUND
U/G...........................
UNDER GROUND
LP....................................LIGHT
POLE
VC ............................
VERTICAL CURVE
m
LN....................................LANE
VERT .........................
VERTICAL
s
MAX.................................MAXIMUM
VCP .........................
VITRIFIED CLAY PIPE
MH...................................MANHOLE
W ..............................
WEST
MIN ..................................
MINIMUM
W/ ............................
WITH
WM...........................
WATER METER W
Y
VAULT ......................
WATER VAULT
o
WV ............................
WATER VALVE
a
YI ..............................
YARD INLET
60p...........................
SIXTY PENNY NAIL SET
g
.................................
FOOT
w
TRAFFIC CONTROL NOTES
1. TRAFFIC CONTROL SHALL BE IN ACCORDANCE WITH THE "MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES"
(MUTCD).
2. CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING, INSTALLING, MAINTAINING AND REMOVING SIGNS,
BARRICADES, LIGHTS, ETC. IN ACCORDANCE WITH THE MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES, LATEST
EDITION. FOR LANE CLOSURES OR DETOURS ON TOWN STREETS, CONTACT THE TOWN TRAFFIC ENGINEER AT
336-996-3382 FOR APPROVAL OF APPROPRIATE INSTALLATION. FOR LANE CLOSURES OR DETOURS ON NCDOT
ROADWAYS, CONTACT THE DISTRICT ENGINEER AT 336-896-2350. CONSTRUCTION SIGNING SHALL BE CONSIDERED
INCIDENTAL TO CONSTRUCTION AND SHALL BE INCLUDED WITHIN THE UNIT PRICE OF THE OTHER WORK.
3. CONTRACTOR SHALL IMMEDIATELY RESTORE ALL MAIL BOXES, ROADWAY SIGNS, ETC. AS SOON AS POSSIBLE, BUT
AT A MINIMUM, THESE ITEMS SHOULD BE REPLACED PRIOR TO COMPLETION OF WORK ON THE DATE OF REMOVAL.
WHEN NECESSARY TO TEMPORARILY REMOVE A STOP SIGN, A TEMPORARY INSTALLATION OR FLAGMAN SHALL BE
USED IN ITS STEAD UNTIL THE PERMANENT SIGN CAN BE REPLACED.
EROSION CONTROL NOTES
1. TOTAL DISTURBED AREA: t 0.42 AC.
2. MINIMUM EROSION CONTROL MEASURES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE N.C. EROSION AND
SEDIMENT CONTROL PLANNING AND DESIGN MANUAL, U.S. DEPT. OF AGRICULTURE, U.S. SOIL CONSERVATION
SERVICE, TOWN OF KERNERSVILLE EROSION CONTROL ORDINANCE.
3. CONTRACTOR SHALL NOT DISTURB ANY AREAS OUTSIDE OF THE DESIGNATED LIMITS OF DISTURBANCE.
4. SEE SHEET 7 FOR ADDITIONAL NOTES REGARDING EROSION CONTROL, MAINTENANCE PLAN, AND VEGETATIVE PLAN.
5. ANY ONSITE STOCKPILING IS TO BE COORDINATED AND APPROVED BY A TOWN INSPECTOR. THE STOCKPILE WILL BE
PROVIDED WITH GROUND COVER 7-14 CALENDAR DAYS UPON COMPLETION OF ANY PHASE OF WORK. MULCH WILL BE
TACKED WITH EMULSIFIED ASPHALT.
6. TRENCH EXCAVATION OR SPOIL MATERIAL SHALL NOT BE PERMITTED ON PAVED ROADWAYS. THE CONTRACTOR
SHALL INCLUDE ADEQUATE COMPENSATION WITHIN HIS UNIT PRICE COST FOR THE CULVERT INSTALLATION FOR ANY
HAULING AND OFF -SITE STOCKPILING
SURVEY NOTES
1. EXISTING INFORMATION SHOWN ON THESE PLANS WAS TAKEN FROM SURVEY PROVIDED BY STEWART ENGINEERING
COMPLETED BY DUSTIN J. McCARTY L-5213 DATED MARCH 15, 2019.
2. CONTRACTOR TO VERIFY EXISTING CONDITIONS THROUGH THE CONSTRUCTION SURVEY AND STAKING PROCESS
AND REPORT ANY DISCREPANCIES TO THE OWNER PRIOR TO CONSTRUCTION.
CONSTRUCTION SEQUENCE
1. CONTRACTOR SHALL MAINTAIN A COPY OF ALL REQUIRED PERMITS AND APPROVALS ONSITE THROUGHOUT
CONSTRUCTION. CONSTRUCTION SHALL BE GENERALLY SEQUENCED AS NOTED BELOW.
2. INSTALL CONSTRUCTION ENTRANCE PER THE EROSION CONTROL PLAN ON SHEET 6.
3. INSTALL ALL PERIMETER EROSION CONTROL MEASURES, LIMITS OF DISTURBANCE AND FIELD STAKE PROPERTY
LINES. EASEMENT AND PROPERTY LINES SHALL BE STAKED EVERY 25 FEET BOTH INSIDE AND OUTSIDE LIMITS OF
DISTURBANCE.
4. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS AND REPORT ANY DISCREPANCIES BETWEEN WHAT IS
FOUND IN THE FIELD AND WHAT IS SHOWN ON THE PLANS TO THE OWNER PRIOR TO CONSTRUCTION. REWORK DUE
TO CONTRACTORS FAILURE TO VERIFY EXISTING CONDITIONS WILL BE COMPLETED AT THE EXPENSES OF THE
CONTRACTOR.
5. PRIOR TO CLEARING AND GRUBBING/CONSTRUCTION, THE CONTRACTOR SHALL REQUEST AN ON -SITE INSPECTION
OF EROSION CONTROL MEASURES WITH THE ENGINEER AND TOWN OF KERNERSVILLE ENVIRONMENTAL INSPECTOR.
UPON RECEIPT OF CERTIFICATE OF COMPLIANCE, GRUBBING/CONSTRUCTION MAY BEGIN.
6. SCHEDULE INSPECTION AND ACCEPTANCE OF INSTALLED CULVERT, OPEN CHANNEL, AND PAVEMENT.
7. REMOVE ALL EROSION CONTROL MEASURES.
EXISTING
PROPOSED
LEGEND
LOD LIMITS OF DISTURBANCE
PROPOSED MAJOR CONTOURS
PROPOSED MINOR CONTOURS
PROPOSED PIPE
PROPOSED STRUCTURE
CUSTOM HEADWALL
Know what's below.
Call before you dig.
J
Z
O
LU
LU
oc
Z
oc
LU
CL
oc
O
L
1
L.L
Q
0
VVK
DICKSON
comminity infrastructure consultants
720 CORPORATE CENTER DRIVE
RALEIGH, NC 27607
(t) 919-782-0495
(f)919-782-9672
WWW.WKDICKSON.COM
NC LICENSE NO.F-0374
PROFESSIONAL SEAL
m
Z
O= O
O a_
W0
O= �
Z LU
O
U)
W
O=
w
a
0
Z
I-
z
W
W
g
LU z
W
W
W J
> °6
J cf)
LU
U H
W O
g z
J
W
J W
0 LU
z
W
Y
m
W LLI
J
Q ~
Z
U Z
W
O Q
� 0
PROJ. MGR.: M. HORSTMAN
DESIGN BY: M. HORSTMAN
DRAWN BY: M. SMALLING
PROJ. DATE: JULY 2019
DRAWING NUMBER:
20F 18
WKD PROJ. NO.:
20180394.00. RA
O2
W
ooa
FOO
pJ0
pZW
a0¢
ElWo
�m�
o=w
p0,
�a0
-W
ozw
-o
Zdg
w00
ZZO
oom
=UQ
OY�
.o
zoz<
o.¢
o°Z
¢W(5
w¢a
¢�z
wo¢
mm
0
w�a
¢FF
=a�
0Zw
<w�
?�w
3D
dz0
o
zw Zp
o2=
00
0o
pp0
YIz
=Z
F0
00¢
0
=Zw
E0,
alr
w0
OU O,,
NOTES: WK
N/F ' \ \ �� 0')I ,
THOMAS L. HUDGINS & DDICKSON
MARY R. HUDGINS \ s Lo
I I community infrastructure consultants
I 1. CONTRACTOR SHALL VERIFY UTILITY SIZES, MATERIALS AND LOCATION PRIOR TO
D.B. 2813, PG. 3539 \ � \ \ II � I I � I / \
PIN 6886-76-9028 — J \ ANY UTILITY WORK. 720 CORPORATE CENTER DRIVE
718 CORJON RD. \ I � � 961 — — —
\ \ I I I I I 'o I \ 2. EXISTING WATER AND FIBER OPTIC LINE DEPTHS SHOWN ARE BASED ON RAt)919- NC 27607
0 18LT 9s4 I I00
\ (t)919-782-0495
\ \ I , I \ VERTICAL LOCATES AND ARE APPROXIMATE. (f)919-782-9672
\\ \ I I I I \ 3. CONTRACTOR TO PROTECT EXISTING WATER LINE DURING CULVERT
\\ \\ 1 I w \ CONSTRUCTION. www.wKDlcKsoN.coM
\ ( , � w \ 4. CONTRACTOR TO PROTECT EXISTING SEWER LINE DURING CULVERT NC LICENSE NO.F-0374
CONSTRUCTION.
22LT \ I I I I _ w Q \ 5. CONTRACTOR TO COORDINATE WITH POWER LINE OWNER TO SLEEVE POWER
\\ I I I I ° �/ �� \\ LINE DURING CONSTRUCTION.
0+00 — \ \ 13TRJE , / WM \ \
lIN
M \ /
15LT \ \ \� \ \ I I 181RE�
\ \ \Q0 \ \ I I 12TIREE / / ° — ♦ � / \ \ \� 30QA /
� O (6 / / \�✓ as
---- ---\ 15LT \ \ O� I I
\ 16TRE RIM=959.13' 2
/ m N/F � INV=952.18' O \ \\ I PROFESSIONAL SEAL
\ \ \\ O \
ROBERT K. CAMPBELL & \ \\ \ \ 1 1,6TRJE
TOP
MARILYN B. CAMPBELL 8TREE \ \ I I
D.B. 1630, PG. 2577 9S� \ OF BANK \\ \ \\ I I I ( / O I PROP. 60 LF OF 48" RCP @ 2.507\\ I Co
PIN 6886-7 0 CORJON RD. RD. \ \ O� \ �\\ • \ I I I / oLT �
g5g
I
\ \ \ .7 SEE NOTE 5 \\
INV=949.7 \\ /
8TREE \ \
\ \ \ \ _ Ao / TH - 1 to PROP. PIPE COLLAR \ / 5 1 STORY
24LT \ \ / I NCDOT 840.72 \ \\ \ Q REIr SIDENCE
0 /
.1. \ — ) , / I I0 rPROP. 10 LF OF 24 RCP \ \\
AT SAME INVERTS AND \
SLOPE AS EXIST. PIPE \
16LT \ 0— — _ _ / / / / TH 2 BOR - 2 (9 I I \ \ p ZO
\ / I 30QA \ \ 0 0-
\ ,J I C) Cr
°� ` w
1061 `` \ I I I WALL A o
N/F \ \ / / PROP. 21 LF OF BOULDER \ C/)
SUE TUCKER VANHOY & j 17LT w /
DAVID LASLEY VANHOY 4�LN�l \ \ / / / / " �,5�� TOE WALL (SEE DETAIL 1/5) \
D.B. 2518, PG. 2741
P.B. 26, PG. 33 \ •9ss // , \ - — — —
PIN 6886-75-8816 \ \0 / // \ 949.81_ —
314 BROKEN SADDLE LN. QJ12LT
\ \ \ \ 16LT / / / / O961 —
\ WALL B _
\ \ \ \ \ \ \ \ REMOVE &REPLACE 70 SY IN 9. \ \ PROP. 25 LF OF BOULDER — — — — — — — — —
\ \ \ \ \ \ 26LT OF ASPHALT PAVEMENT 00 1 / /III TOE WALL (SEE DETAIL 1/5) \
PER NCDOT 654.01 / BOR 1 I I i i I I I �� \ \ 1 Lu
\ \ \ \ \ \ \ 36LT
\ ° / / I I I I I / / / �� / \� \ \ Aa N/F \ I 1 1\
MICHAEL LEE CABLE \ I 1 O
\
970 970 RIM=960.34' 9 \ D.B. 1700, PG. 2476 I Z
I � � I/ \ I 1
EXIST. UNIDENTIFIED LINE IN=948.14' P.B. 26, PG. 33
I \ \ 9 I
IN=954.74' 6886- PG. 333
(APPROX. SIZE & I I / \ \ PIN
_ _ _ 307 BROKEN SADDLE LN. I I 1
OUT=947.84'
l EXIST. GAS LINE Q 2
QX.SIZE & \_962 J LOCATION) / �, / — ` \ \
N 965 1 w 965 I 1 / / \\O — 9 \ \ \ \ 9 \ _ WALL C
0 x I ° I / / \�� \ \ PROP. 11 LF OF BOULDER
QD I o 1 I \\ \
Lu EXIST. GRADE � wLLJ �,� o � I rn / / /\\ \
I I / / / / o / / \\ /// \ \ \ \ TOE WALL (SEE DETAIL 1/5) z Lu J
QD
°U�=� �/ \\
wL0 Cy) a-U)z O
°°� ws
N�Q
Co ��z TOP +06 g
960 o rn 0 960 WALL D OF BA 9 a_
O w Q / PROP. GRADE \ 6 uW
a OfU P O z 963 , PROP. 21 LF OF BOULDER
"`� ~ — TOE WALL (SEE DETAIL 1/5)
N EXIST. 1" FIBER. wLu
m
OPTIC LINE I I I I 1 I \. \1 J
wo 955 EXIST. 10" D P WATER /3.53' 1 955 o I II I I I III \ ° 9 \ \\ \\\ <9`' \\ \\ w U
1 11 II WALL E \ \ �`r�\�\� \ \ \ \ \\ \ �s� \ \ w
1•08' I I PROP. 14 LF OF BOULDER \ \ \\� \ w J
TOE WALL SEE DETAIL 1/5 \ \\ \ \ J o
EXIST. 2 " CM EXIST. 8 PVC SEWER , \ I , I 1 ( ) \ 1 \\� 2+00 \ \\ \ ��� \ \ J 0 p
_ \ \ Z a
PROP. PLUNGE POOL \
SEE DETAIL 2/5 \ \ II \,° \\ \ \\ \\ \\\ \ O � Z
( ) I 1 1 1 WALL F 16LT 1 \ \ \ \ W w
950 — — — — _ PROP. 10 LF OF BURIEDo 950 I I I II I 11 PROP. 17 LF OF BOULDER I \\\�� \\ \ \ \ \ \ p O
RIFFLE GRADE CONTROL
o I Lu
I I I TOE WALL (SEE DETAIL 1/5) \ > OC
(SEE DETAIL 3/5) 9LT
m m
\ \\ Lu w
= I \ I I 1 I I 8�\ 1 °� � \\\ \\ \\� \ \ � z
PROP. 60LF OF 48 RCP 2.50
@ o/o
\\ \\ I I I I I I I ` \ \ 8TREE I I \ \ \ \ \ \ \ \ \ \ \ C7
m 94 45 \ \ j I I I I I \ \ I I \\� \ \\ w z
+00 1 +00 2+009 1 I I I 1 I I I \\ o Q
I I I 10PT \ I' 8TREE I \ 0
BROKEN SADDLE LANE PROFILE 13TREE
H: 1 11=20' \ I i I I \\ I \� \ `N�
��— \\ I I I I I I\ \ \\ \ I \\ 15LT PROJ. \\ \�� PROJ. MGR.: M. HORSTMAN
, 1 —4 I I I I I I I I \ 18LT \ 8TREE I \ \\ LLJ DESIGN BY: M. HORSTMAN
V.
ow
I \ \ \ \
� DRAWN BY: M. SMALLING
PROJ. DATE: JULY 2019
O DRAWING NUMBER:
LL
30F 18
2 10 0 5 10 20
1 WKD PROJ. NO.:
LL
a
\� 20180394.00. RA
1 inch = 10 ft.
LL 0
ow
poa
FOO
pJU
pZW
a0¢
2E
Dm�
p=W
.Om
�a0
~ -W
ozw
- . o
zo.
w00
zzw
oom
=UQ
OY�
w��
.00
°Wa
o.¢
oOZ
2w(7
w¢a
¢�z
wDm
mm
0
w � Q
¢FF
=a�
0
¢0<
<w�
?� w
9D
00
'zo
ZZp
o W
Yo,
UD
pp0
YIz
�=Z
00¢
0
=Zw
�OF
mlr
wo
cU O'.
PROP. 27 LF OF 15" RCP @ 9.52% _ _I
II
960
960
�/�
v
\ \ \ \ TCL
PROP. PIPE COLLAR
NCDOT 840.72
I,\
DDICKSON
\ \
infrastructure
V pr d °
\ \ \ \ \\ T
� � 0+5
I
J
communit consultants
\
\ \ \ \ \ \ 30AR \ ss \ a \
\ sso.
I
\
EXIST.
GRADE Q 4
720 CORPORATE CENTER DRIVE
\ \ \ \ \ \ \ \ \ \ \ \ \ a
\
PROP. 5 LF OF 15" RCP @ 3.96%
RALEIGH, NC 27607
\
95 \
\ \ \ \ \ 94g \ 2 NV=950.14' °
\ \ \ \ \ T
\
955
Z 955
w
(t)919-782-0495
(f)919-782-9672
—
TGE
\ \ \\\ \\\ / 1
o o
0
W oN
WWW.WKDICKSON.COM
\ \� \\\ TOP � c9� \_
\ \\\\\\ \\\ \\\ \ \\\\\ OF BANK \\ c9j
2 + �rn
NC LICENSENO.F0374
\ 8JV T I I
\
\\s S \ \ \\
Lo
d�NoZ
O LU W Q
\\\\
\
\
950
\ (A �Z
950
\ \ 12AF�
\ Q _
\\ \\ \\L\ 1sA� \ p�� \\\\ c9 \\ �N
I
>
PROP.
GRADE
—
\ \O \\ \\ \\ \ \ \ \ \ I
I
a-
��
\ —
�� \ \\\
\o\\
0
LL
8-1
o
I
\\ \ Qo \\ / I
\
T-00
I z
�,
\ \ o \ \ g5o �' I
\
I O >'
M
M
945
945
\ \ \ 94s. \+oo
\\\ \ \\\ $� \\ \\ \\ \ // / /
II
I
I PROP.15LFOFBURIED
\ \
RIFFLE G AIDE CONTROL
I Il�jv 927
/A
I j
(SEE DE IL 3/5)
PROFESSIONAL SEAL
8JV \ \ / PROP. 14 LF OF 15" RCP @ 9.54%
/ O
I
/ / Lo
/
W
I
/
27- .97 LF OF 8" PVC — — — — 1-3 951 — \ g50 _ �\ rn
I
940 —
940
Co
_ \ -8jv�/ \
\ / \
I
ol
\ \ \ — \
4/
\
I
PROP.
22 LF OF 60" @ 0.63% PROP. 13 LF OF 60" @ 6-3
810 _ G \
\ \ 952 — — — \
�\ \ G G \ G �� \
I
PROP. 22.5' CMP BEND
I \\ GM I \ 8JV 116JV \ 8JV I
I
/�I
J J
9351
II \
Lo
�
+00
2+00 2+50935
\
MARYLEBONE DRIVE
DOWNSTREAM PROFILE
AT
EXIST. DRAINAGE PIPES I 6LS \ _
UA/CNITS _
UNITS 2LS \ � \ \
I
H : 1 "=20'
_
SEE NOTE 2 II \
-- —
T
�\
\ass \\\.
II
V. 1 "-4'
Z
o
6LS
/ \ 4 9g3
T
cc
O a
\ 4JV \ (D
4 \ \
I
W Cr
FF=960.10' I I I 0\ \
10LS
\\
I
I
z Lu
z
\
N/F \ \ \
HARVEY W. GUYE & \ \\ � P,
�!Z \
IFn
Fn
SHARON GUYE \� \
D.B.2072, PG.589 d. ` 6LS ' INy/=951
P.B. 31, PG. 152
I
w
PIN 6886-85-1675 \ LO
332 MARYLEBONE DR. �\ \ 3JV
I
\
12LT W
\I
—
\
P
I
<
I
Lu
EXISTING 20' SANITARY
SEWER EASEMENT \
\ \
\
\
k0
\ \ \
\
MICHAEL E. POLINSKY &
D D.B.3 J. , PG. 11 6
.B. 3330, PG. 1146
o
(P.B. 31,1 152)
\ I I
\
\
\ 1
P.B. 31, PG. 152
Z
\ \
O
8TREE
\
\ \\
\
PIN 6886-85-3535
337 MARYLEBONE DR.
a
\
\ \
\
\\ 0 1 I
o
N
CONTRACTOR TO
INV=951.42'
EIP
\ \
\
\ \ PROTECT EXIST.
\ \
\
\ \ DECORATIVE
1 STORY
CK
960 960
\ \
\ ' \ �, STRUCTURES
RESIDENCE
3
B
\\
t \ \ 1
LLi\
\' 1
J
J 960 -
J 960
\� \
w W
J
o
3 - w z rn
EXIST. GRADE o °ti° o
\ \
/
Lu O
Lu
m
O0-
w > z M� �; o m m
955 = - 955 p o °ram° r� Co I Co + Lo °'
i\
\ CONTRACTOR TO
\, \ \ ° PROTECT EXIST.
REMOVE 27 LF OF
g
06
a
�-- PROP.GRADE ow CO��rn LOB ..z
o x M w J o 0 CD�� O o Q a
\ \ I / GAS LINE
EXIST. TIMBER WALL
z
g'
o
C0Woq p0 �0CD Z� �zF-0ZZ
\
p \ 42QA /
\ \ I
DECK
a_
�LLJ(o _ __— 955 mm�ooQ�— 955
LLJ }
o rn I z w O- z z
LL
w
— _ g PROP. PIPE COLLAR
/
15LTLu
CC,��
2 o
O�z / �� UeLu NCDOT840.72
d `. co —
G
\
(l I \ I\ I / / \
\
G
/
/
I /
U J
W
0
950 950
\
d BENCH
\ G 9Ra
/
/ 24LT
z U
(n U)
\ / I I /
I / �
G
/
`
0
o
EXIST. 60" CMP 8" PVC
— — — — 950 — 950
/ /
I
/17
r
J
Lu
Z
\
I I // /
/ /
�''
I
z
o O
PROP. 5LF OF
RCP @ 3.96%
I M=955�08'
, \
/ / IN-949.28' \
12LI
I I /
/
OLL I I \ 8M
TIMBER
�� 28QA
/ I❑
Q m
cn J
W i
945 I 945
\
IN=947.66' \
sMG
I / 8MG WALL
L 4'WF
/ ❑ ❑ ❑ ❑ ❑ ❑ L ❑_
Y Q
a
0
PROP. 27LF OF 15" RCP 9.52%
OUT=947.63' \
\ I / \ G
w
O
@
\
I /�i
' \
/
a
g
945 \ PROP. GRADE 945
\
I I INV=�2.23'
O I
— 4 — — — — _ 946 — — —
—_ — — — — — — — — — —
>
m
I PROP. 14LF OF 15" RCP @ 9.54%
I
x°°\ \
_ _ _ _ —
LIJ
z H
o
EXIST. GRADE
60.21LFOF8"PV�c
@ 5.76/0
\ \ I I I I \\I`
\ I I \ \ \ \ — —
_
—_� _—_ ���\\\\
— = — — 2\\
U z
m
94%,
94%+00
^
\
° \ I I I I I\��\\ \ \ — — —
— _
_ _ _ _ — — — — — \�
Z
w
00 0+55942
1 +00940
�� \\\
I
12LT
o
MARYLEBONE DRIVE UPSTREAM PROFILE PROPOSED SIDE SYSTEM
O U S O
°
PROP.22LFOF60 @0.63/0
N
H: 1"=20' H: 1"=20'
\\
-__����
I 1? 3 \\\\\ s ___✓ — _ - -�' �
I I I N 1� \
— — —
—__
\\
— \ \ �s4
PROJ. MGR.: M. HORSTMAN
s
ow
��— ��—
V: 1 —4 V: 1 —4
I I IPAUL MORI�ISON & 8
` TAMMY MOR ON 9Q9\ — _
p k.B. 2181, PG. 6194 \
\
\
— 9TREE \ \ \ \ s\ \ \ \\\ \
10TREE C \ \ \ \ \ \ \ \\\ \
Uj
DESIGN BY:
M. HORSTMAN
DRAWN BY:
M. SMALLING
. f21M=951.18' _
G. 15
o o \
o TOP \ \ \ \\ \
\ \ \
NOTES:
\
631,
LL LL N-944.16'
p P 4 — —
P \
\ �q IN=94�1.96"
36QAO \ \� \
\
OF BANK \ \ \ \
PROJ. DATE:
JULY 2019
\\
uJ ARYL'EBONE DR.
\ so OUT=941Q9'---
\\ \\ \\ \
DRAWING NUMBER:
oo
1. CONTRACTOR IS RESPONSIBLE FOR ANY IMPACTS TO THE SEWER LINE.
—
iQ2.
40F
SIZE AND LOCATION OF EXISTING PLASTIC DRAINAGE PIPES SHOWN ARE ESTIMATED. CONTRACTOR TO FIELD IDENTIFY SIZE
I V
AND LOCATION OF EXISTING PLASTIC DRAINAGE PIPES. CONNECT PIPES WITH A TEE FITTING AND THEN CONNECT OUTFLOW
o
o �a
— — — 10 0 5 10
20
WKD PROJ. NO.:
a
PIPE TO HEADWALL WING.
\
\
LL
3. CMP BEND SHALL BE INCIDENTAL TO CMP INSTALLATION COST.
o PROP. 22.5° CMP BEND �� �o —
PROP. 13 LF OF 60" @ 0.63% 1 inch = 10 ft.
20180394.00.RA
LL
a SEE NOTE 3 a �o
0
ZOw
o00
OJU
pzw
aol
z00ww_
�ma
U=w
OOm
0¢
. o
F.,o
w
ozw
y-0
moo.
WUz
O
ZlU
z
°Om
=
Y J
UQ
O' �
wj��
. 0
¢0 0
zz<
0.,
z
o,z
¢w�
aG�
wQQ
¢�z
o�0
wD,
�00
wFz
w�a
=a,
ozw
Y
¢ ¢ ¢
°7
w
z°w
3:7
OZD
U-U
Zz0
w
°7_
YU~
U
omo
-�,
= oo
0
o zw
Eo=
¢�7
awl
0
oo,
o
w
HEADER
ROCK
(TYP)
2" OFFSET=
FOOTER
ROCK
(TYP)
CLASS A RIPRAP
STREAM
BANK
BENCH TOE
3' 15'
EXISTING STREAM TOE
FLOW CONSTRUCTION NOTE:
BOULDERS SHALL BE ROTATED INTO THE
PLAN VIEW BANK DURING PLACEMENT SUCH THAT THE
UPSTREAM BLOCKS OVERLAP THE DOWNSTREAM
BLOCKS BY A MINIMUM OF 1 INCH.
NOTES:
1. BOULDER WALLS SHALL BE CONSTRUCTED AS INDICATED ON
THE DETAIL AND SCHEDULE ON THIS SHEET AND AS INDICATED
ON THE APPLICABLE GRADING PLAN.
2. ALL FOOTER BOULDERS SHALL BE BURIED 1.5' BELOW GROUND
ELEV (G).
3. FOOTER BOULDERS SHALL TARGET A DIMENSION OF SX2.5'X2.5'
FOR 5' WALLS AND A DIMENSION OF 3'X2.5'X2' FOR 4' WALLS.
4. ABOVE GROUND WALL HEIGHTS OF 3.5' AND HIGHER MAY
REQUIRE A THIRD ROW OF BOULDERS.
BOULDER SIZE RANGE
TOP OF WALL ELEV (T)
BOULDERS SHALL BE
ANGULAR (SEE SIZE
RANGE BELOW) AND —\
HAVE NO MORE THAN
A 6" OVERLAP
HEADER
ROCK
(TYP)
FOOTER 2" OFFS
ROCK
(TYP)
CLASS A RIPRAP
BOULDER WALL SCHEDULE
WALL
ABOVE GROUND
WALL HEIGHT
TOTAL WALL
HEIGHT (H)
WALL
LENGTH
BOULDER
HEIGHT (B)
GROUND
ELEV (G)
TOP OF WALL
ELEV (T)
A
3.5'
5'
21'
2.5'
948't
951.50'
B
3.5'
5'
25'
2.5'
947't
950.50'
C
3.5'
5'
11'
2.5'
946't
949.50'
D
3.5'
5'
21'
2.5'
948't
951.50'
E
3.5'
5'
14'
2.5'
947't
950.50'
F
3.5'
5'
17'
2.5'
946't
949.50'
GROUND ELEV (G)SECTION VIEW
EXCAVATE/GRADE SLOPE
PER PLAN
EXISTING BANKLINE
3'
STABILIZE WITH VARIES, SEE
.1.0',` :..< : ::_` SEED, MULCH, PLANS
2.0:`,":::'.: AND EROSION
CONTROL MATTING
FC'°:.':.� DRAINAGE
1 AGGREGATE
NCDOT #57
STONE
TYPE 2
GEOTEXTILE
FABRIC TO
PREVENT
PUMPING OF
FINES
BOULDER TOE WALL STRUCTURE
DISSIPATOR POOL (Ls)
NOT TO SCALE
APRON (LA)
PLUNGE POOL DIMENSIONS
CULVERT
Ls
LA
Hs
BROKEN SADDLE LANE
20'
10,
2'
PLUNGE POOL DETAIL
5 NOT TO SCALE
BENCH TOE. SEE
FIGURE 4 IN DETAIL
4/11.
SEE BURIED RIFFLE GRADE CONTROL
DETAIL FOR APRON DETAILS
1
(_QA\/CI CI IQCTQATC
I ur ur DHINr\
LENGTH
GEOTEXTILE
FABRIC
TnD nr= PIPPI P
GEOTEXTILE
FABRIC
RIFFLE GRADE CONTROL - PLAN VIEW
GRAVEL SUBSTRATE
50 / 50 MIX OF IN SITU SOIL
AND # 5 STONE
GRAVEL SUBSTRATE
50 / 50 MIX OF IN SITU SOIL
AND # 5 STONE
W
BANKFULL ELEVATION
EROSION CONTROL MATTING
BOTH SIDES (SEE DETAIL 3/11)
UNLESS SIDE ABUTS A
CONCRETE WING WALL OR
BOULDER TOE WALL
BANKFULL
DEPTH INVERT SET AT PROFILE
0.25' GRADE n
IN.
2.5'
TYP.
GRADE CONTROL ROCK
50 / 50 MIX CLASS B / 1 RIP RAP
RIFFLE GRADE CONTROL - SECTION A -A
GRADE CONTROL ROCK
50 / 50 MIX CLASS B / 1 RIP RAP
RIFFLE GRADE CONTROL - PROFILE B-B
BANKFULL ELEVATION
DnTTnr%A nC QICCI C
BURIED RIFFLE GRADE CONTROL DETAIL
NOT TO SCALE
CHANNEL
DIMENSION AT RIFFLES
CULVERT
SHEET
LENGTH (LF)
BOTTOM WIDTH,
W (LF)
BROKEN SADDLE LANE
3
10,
14.5'
MARYLEBONE DRIVE
4
10,
15'
�o
:v cy
1
DVw
DICKSON
comminity infrastructure consultants
720 CORPORATE CENTER DRIVE
RALEIGH, NC 27607
(t) 919-782-0495
(f)919-782-9672
WWW.WKDICKSON.COM
NC LICENSE NO.F-0374
PROFESSIONAL SEAL
m
p z
O
O a
W0
fr W
z p
O
U)
w
w
0
IIIIIIII°
H
z
w
w
g
w
w
J �
� J
U �
w w
w
J
0
0
cn
z
w
Y
m
w w
J
Q ~
z
0 z
w
O Q
� o
PROJ. MGR.: M. HORSTMAN
DESIGN BY: M. SMALLING
DRAWN BY: M. SMALLING
PROJ. DATE: JULY 2019
DRAWING NUMBER:
50F 18
WKD PROJ. NO.:
20180394.00. RA
ZOw
0UO
pJU
pzw
aoQ
wWo
gF�
�ma
Uw
.=0m
.a0
1.0
w
Ozw
F .
O�
wU0
ZZ U
00w
wyJ
=UQ
~pS
0
Do.
w1 z
0za
o'z
Ow C7
a '
wkQ
¢3z
wD,
0
00
wT_z
w 2 Q
=a�
(Dzw
¢aa
Qom
w
F
zTw
-37
OZD
U-U
Zzo
w
07T
YU~
U
p00
�=z
'oo
0
=zw
U-o=
¢�7
aw0
O wp¢
Err WK
2" DDICKSON
m 4" comminity infrastructure consultants
Z X
O \W
m I W (n 720 CORPORATE CENTER DRIVE
I cn
m 1 RALEIGH, NC 27607
N v I I n n w� (t) 919-782-0495
n Pm I H N H _ (f)919-782-9672
D D D �_ — _ — j — _ — z z WWW.WKDICKSON.COM
Z 1 m Z 1 = 1 1
I — _ G) J z NC LICENSE NO.F-0374
03
o I I N I ��
X (/ o I
I s rr �O i N
fM co �� x m 0
m 3rr wo Z
O O
x O m
m 10� O
m mo r z m
z m W w
O <
m o H 2' - 31,/4
D z o
m
m N 15
N r \ � ap 11%2" 1 /32
W m W=
SAW CUT TACK EDGE I X I I m v,/� X Cn D �►� �v'
-0a ICI IH �`° m m I
V I n �rn n m W C7 �w z _
m m I �' I H m I H= H w w W w O v i\ PROFESSIONAL SEAL
EXIST. PAVWT PROPOSED PAVM'T � I p _, _ W 1"I c,
_ I••� Z 3 O (n to 0 W r
ui 1 m z 1 Cn(O H --- z - N _
m o m rn 11 1
O O v ., .+ cn O D �+ c o o v c o W O 1! J 1 }
x ]Oo (zn N m Z Nm m N� z0 rNit Z
O _ N 4" z m NDr >i pm o mz Zo y m Z v i m
W N m 0, mr r z n zm 3 zD mm N r �Ul N
M n, i z D Dw N o O m m xD n z m — � W
u: n N N 6 rr o P m o 0 H z m m o _ I \ I�I
i O m m O_ Fi o X CIm m O i �O x tDn� �� 'I 1 z T T I}
^a O N �, O Dm i D M �o i oc m0 O 2 C W=
" Z 1 y m OH -m - m--, m JJ0 m n 21I \Ul
m co co c 0 m ]o fn (q 0 O m 0 0 C, '0 r m QD
o z m z m o mr-+ mz x
Q �m N Z Z �o A o wm oZom
�� m Orr
m• 0 _000z Dm o x x
SAW CUT AND REMOVE EXIST. PAVM'T WHEREVER c D o x o cncn m w o x -N � mo
PROPOSED PAVEMENT MEETS OLD. zv N C co c `D 70 0 °0 °'° z xm O
O 37 • D3 m 3 om Ho ]0 c 21 -`•. II
C O m 01 D N r-. o m D o x r O o U
m �70 Dm m 0 m� mz. m c�i <n z m� 0W o N
Z cl)m m m 0 N O >0 O D ti w� Z .x. m e c
0 I..I C7 07 x M CO z m 0 0 � � OJ_
m N (77 O W �A N COO m m O m m o H z W= j W=
x ,' 70 77 m x x z m C -I -n
M O O CF H O W — m m xx xm V
CA 0 can cn zoo m m x c> m Z o m m — r 1
m0 a) m � ocm 2 � � o " ox D
O O rL /1 W
Z m �+ T
Z m 00 am m m w N Dx N N z I Z
1 D m Dn m w° < m H N N -n I -n 0 O
M m e 0o m o o mm N W VDi 1
U% 3 m 1 2" m z z m x A o � �_ \W W \ � O �_ — I _� W 0 a__
C c m-n Oo O a a o� z - \ - --�-- (�
3� ICI 10 IH o� n D >m 1"I om I °' Lu
oC 0
zn I C I ..mo I p WN m o — Z I z w
..v I I I z mz o a 1
I I I J�J Zm w IFn
2 \ O
mz = D = m I
W
D m D z 2 I LLI
m -_ m fr
NO. DATE REVISION 41r
PAVEMENT REMOVAL DETAIL
SHEET NO. SCALE: NOT TO SCALE DWG. BY: WKD cn
1 "18
10F1 m ROADWAY STANDARD DRAWING FOR 1-18 STATE OF ODm ROADWAY STANDARD DRAWING FOR 1"18 STATE OF 00 ROADWAY STANDARD DRAWING FOR STATE OF
DATE:5/18/2015 PATH AND FILENAME: K:\WKD Standard Details\AP026.dwg � PAVEMENT REPAIRS NORTH CAROLINA � m CONCRETE DROP INLET NORTH CAROLINA DROP INLET FRAME AND GRATES NORTH CAROLINA
f DEPT. OF TRANSPORTATION G f DEPT. OF TRANSPORTATION DEPT. OF TRANSPORTATION
0 12" THRU 30" PIPE DIVISION OF HIGHWAYS o FOR USE WITH STD. DWG.S 840.14 AND 840.15 DIVISION OF HIGHWAYS
o FOR SUPERPAVE MIX TYPES DIVISION OF HIGHWAYS „
RALEIGH, N.C. RALEIGH, N.C. RALEIGH, N.C.
w
a
0
wo 00 movc O m Z
im mo xHHcn m
rc Dcn z �-+�vm z
mW zm mm mmm m
cnm om m-i �o v '0
Cn_ D< -A37 H�0H D
Qom �c Zmcv r
=N oD m� o0<m z
DH cnr �wmo O
zz yr c» <1oo � m
0 m 0 m v -1 r m m
N H m O m w m W D W
z Hv HCo m- �m>1m m O}}
ZD nH -1v Hm m
0� Duo mm �zr0 D T
x m � m x 0 0 :0 m CC,Q m
m H m 0 H>
m Om O vzDm
Do zz r Hm -x
W U) r v m H m O
< W D m.Om
D ao cn• zz Z
r o mo
w C m O� H
p m m�m0
F, cn m x o
= m 0 x ocn*m
U
0 -1 0 -n z x W
v z cDi) mr,z� m
H cn mC H W
v co zovz
M m a -lmro
m O 00 W D !! ,,
D Om > cn 0 V
n m m-ioo
m zmm=1
o Lu
m m DOD -A
p rHcnm
cn
0 W
W
o � J
o
f \C —rl W W
II 11 z1.
0
oo
I
II g
m II w
J cn J Q
II 11 Z �
Y II m 11 Q
I
II II > w
v II > Oco Y
W
m II II m
I u i li.i
N m m
rl—— — — — —I� W Q
z
o
(� U z
o
N Z I Z 0 Q
1.
o i o
I � I
m PROJ. MGR.: M. HORSTMAN
W DESIGN BY: M. SMALLING
o
o
���� DRAWN BY: M. SMALLING
I PROJ. DATE: JULY 2019
oo DRAWING NUMBER:
o
Q
LL
60F 18
Y ap m ROADWAY STANDARD DRAWING FOR 1 "18 STATE OF ~ WKD PROD. NO.:
PIPE COLLAR NORTH CAROLINA
DEPT. OF TRANSPORTATION
y o DIVISION OF HIGHWAYS Q 20180394.00.RA
N , RALEIGH, N.C.
w 0
�I
O
W
N
A
A
W
W
N�
1
-•
N
m
O
A
O]
N
Q7
O?
07
(71
N
D
W
00
0]
W
N
N
N
N
N
N
N
N
T
W
W
W
W
N
N
N
N
N
N
N
N
71
W
W
N
N
1
O
O
O
O
O
O
O
C
(P
A
W
co
W
(31
J
W
O
Cn
N
A
O
Ut
�
V
W
O
J
O
m
(O
W
N
O
(P
m
A
O
O
O
N
m
O
(7r
O
O
N
W
�
0�0
N
O
O
A
W
Ili
A
W
W
N
--
x
O
(J1
W
O
1
J
�
1
O
(O
CO
00
J
J
�I
O
U7
W
W
1
J
?
O
H
O O
O
A
M m
z z
W W
w
w
w
D
�
H
O O
0
o
Z
Z
_
_
_
� W
O D
m Z
N
N
�
o_
o
=
O O
D
� sz°
Z
W
W NiN
N
NiN
x
=
m
rn
o rn
w
o
m
m
G)
x
�
m
o
0
w
o w0
0
N
N coO �
�
O O
o.W.
0
o TAD
r
m
r
�
W 0
o W
X
�
m
O
O
O O
O
O
(O
W v
m
Ul y
O
N
()t
O
A W
A
W
c0 '
N z
Z
3
O
O O
O
o n
O
m
Z
co
cn w
0
N
cow
COw
rr
m�
vo
0
S
0
•
0 0
o
0
0
x
��
m
�
-
N
V
0
OJ A
N O
0
W
O
o
N O
W
m
O
�
x
Zow
0UO
OJU
OZw
aoQ
z00ww_
�ma
U=W
OOM
0¢
.a0
F�0
w
ozw
w-0
��
WoUZ
O
z,
Z
0 O M
= Y J
U_Q
~OS
0
w��
. 0
¢0 0
zz<
0.,
Z
0OQ
OZZ
tr'
w
wQQ
¢�z
0� 7
w0¢
�To
wFz
w�a
=a�
0zo
Y
¢ ¢ Q O¢
w
z°w
3:7
OZD
U-U
Zz0
w
07T
YU~
U
p00
=Z
~U'
OOQ
O
=zw
Eo=
¢F7
awl
0W'
00,
5b
7
0
EROSION CONTROL NOTES:
1. REFER TO GENERAL NOTES ON SHEET 2.
2. DISTURBED AREAS:
LOCATION
SHEET
AREA (AC)
BROKEN SADDLE LANE
EC2
0.22
MARYLEBONE DRIVE
EC3
0.20
TOTAL
0.42
3. ALL AREAS DISTURBED BY THE CONTRACTORS SHALL BE SEEDED PER THE SPECIFICATIONS SHOWN BELOW:
4. MULCH: USE SPECIFIED EROSION CONTROL BLANKET TO COVER THE SIDE SLOPES OF THE CHANNEL. APPLY 3000 LB/ACRE GRAIN STRAW AND ANCHOR STRAW ON ALL OTHER DISTURBED AREAS.
5. REVIEW CONSTRUCTION SEQUENCE FOR ADDITIONAL EROSION CONTROL MEASURES.
6. CONSTRUCTION ACCESS AREAS SHOWN ARE TO GUIDE CONTRACTOR DURING CONSTRUCTION. CONTRACTOR SHALL COORDINATE WITH ENGINEER IF ALTERNATIVE CONSTRUCTION ACCESS
ROUTES WILL IMPROVE EFFICIENCY OF CONSTRUCTION.
EROSION CONTROL:
1. INSTALL PERMANENT VEGETATIVE COVER AND THE LONG-TERM EROSION PROTECTION MEASURES OR STRUCTURES AS SOON AS PRACTICAL IN THE CONSTRUCTION PROCESS. APPROPRIATE
EROSION CONTROL MEASURES MUST BE PLACED BETWEEN THE DISTURBED AREA AND AFFECTED WATERWAY AND MAINTAINED UNTIL PERMANENTLY VEGETATED.
2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING ALL EROSION CONTROL MEASURES RELATED TO THE CONSTRUCTION SITE.
3. AT A MINIMUM, EROSION CONTROL MEASURES SHALL BE INSTALLED IN ACCORDANCE WITH APPLICABLE STATE AND LOCAL REGULATIONS. ADDITIONAL EROSION CONTROL MEASURES MAYBE
REQUIRED BY LOCAL GOVERNING AGENCIES.
4. CONTRACTOR MUST TAKE THE NECESSARY ACTION TO MINIMIZE THE TRACKING OF MUD ONTO THE PAVED ROADWAY FROM CONSTRUCTION AREAS. DAILY REMOVAL OF MUD/SOIL MAYBE
REQUIRED. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE IMMEDIATE REMOVAL OF ANY SOIL TRACKED INTO THE PUBLIC RIGHT-OF-WAY.
5. THE LOCATIONS OF SOME EROSION CONTROL MEASURES MAY HAVE TO BE ALTERED FROM THOSE SHOWN ON THE PLANS IF DRAINAGE PATTERNS CHANGE DURING CONSTRUCTION.
6. PROVIDE FOR HANDLING THE INCREASED RUNOFF CAUSED BY CHANGED SOIL AND SURFACE CONDITIONS. USE EFFECTIVE MEANS TO CONSERVE EXISTING ON -SITE SOIL INCLUDING THE USE OF
DIVERSION DITCHES.
7. ALL DISTURBED AREAS SHALL BE SEEDED. USE TEMPORARY PLANT COVER, MULCHING, AND/OR STRUCTURES TO CONTROL RUNOFF AND PROTECT AREAS SUBJECT TO EROSION DURING
CONSTRUCTION. CHANNEL BANKS SHALL BE SEEDED DAILY UPON COMPLETION OF FINAL GRADING.
8. ALL SEDIMENT AND EROSION CONTROLS ARE TO BE INSPECTED AT LEAST ONCE EVERY SEVEN CALENDAR DAYS AND AFTER ANY STORM EVENT OF GREATER THAN 0.5 INCHES OF PRECIPITATION
DURING ANY 24-HOUR PERIOD. MAINTENANCE OF SEDIMENT TRAPPING STRUCTURES SHALL BE PERFORMED AS NECESSARY PER THESE INSPECTIONS. SILT FENCING AND DIVERSION DITCHES
SHALL BE INSTALLED AS SHOWN ON EROSION CONTROL SHEETS.
9. STABILIZATION MEASURES SHALL BE INITIATED AT THE END OF EACH DAY IN PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITIES HAVE TEMPORARILY OR PERMANENTLY CEASED EXCEPT
WHERE CONSTRUCTION ACTIVITIES SHALL BE REINITIATED WITHIN 7 CALENDAR DAYS.
10. ALL EROSION CONTROL DEVICES SHALL BE PROPERLY MAINTAINED DURING ALL PHASES OF CONSTRUCTION UNTIL THE COMPLETION OF ALL CONSTRUCTION ACTIVITIES AND ALL DISTURBED
AREAS HAVE BEEN STABILIZED. ADDITIONAL CONTROL DEVICES MAY BE REQUIRED DURING CONSTRUCTION IN ORDER TO CONTROL EROSION AND/OR OFFSITE SEDIMENTATION. CONTRACTOR
SHALL REMOVE ALL TEMPORARY CONTROL DEVICES ONCE CONSTRUCTION IS COMPLETE AND THE SITE IS STABILIZED. A MAXIMUM OF 51 LINEAR FEET OF STREAM MAY BE DISTURBED AT ANY
ONE TIME.
11. SILT FENCING TO BE INSTALLED AROUND INDICATED SPOILS AREAS TO PREVENT LOSS OF SEDIMENT.
12. ALL NECESSARY MEASURES MUST BETAKEN TO PREVENT OIL, TAR, TRASH, AND OTHER POLLUTANTS FROM ENTERING THE ADJACENT OFFSITE AREAS.
13. CONSTRUCTION ACTIVITIES MUST AVOID TO THE GREATEST EXTENT PRACTICABLE, ENCROACHMENT INTO ANY WETLAND/STREAM AREAS NOT DESIGNATED AS IMPACT AREAS.
14. ACTIVITIES MUST AVOID DISTURBANCE OF WOODY RIPARIAN VEGETATION WITHIN THE PROJECT AREA TO THE GREATEST EXTENT PRACTICABLE. REMOVAL OF VEGETATION MUST BE LIMITED TO
ONLY THAT NECESSARY FOR CONSTRUCTION OF THE CHANNEL.
15. NO ON -SITE BURIAL OF VEGETATION OR CONSTRUCTION DEBRIS WILL BE PERMITTED.
16. ANY GRADING BEYOND THE CONSTRUCTION LIMITS SHOWN ON THE PLAN IS A VIOLATION OF THE NORTH CAROLINA EROSION CONTROL ORDINANCE, AND IS SUBJECT TO A FINE.
17. PLEASE REFERENCE PLAN SHEET DETAILS AND NCDENR STANDARDS FOR CONSTRUCTION OF EROSION CONTROL MEASURES.
18. THERE WILL BE PUMP AROUND USED ANYWHERE A CHANNEL IS DISTURBED.
19. PROVIDE SELF -INSPECTION PARAGRAPH WITH LOCATION OF WEBSITE FOR ACCESS TO INSPECTION FORM. A COPY OF THE APPROVED PLAN, PLAN APPROVAL, NPDES PERMIT AND COPIES OF
PAST 30 DAYS SELF -INSPECTION REPORTS ARE TO BE KEPT ON SITE AT ALL TIMES.
TEMPORARY AND PERMANENT VEGETATION SEEDBED PREPARATION:
1. PREPARATION OF SUBSOIL
1.1. COMPLETE OPERATIONS IN THE AREA TO BE SEEDED AND PREPARE SUBSOIL TO ELIMINATE UNEVEN AREAS AND LOW SPOTS. BRING SURFACE TO THE APPROXIMATE DESIGN CONTOURS.
1.2. SCARIFY SUBSOIL TO A DEPTH OF 3 INCHES. REMOVE WEEDS, ROOTS, STONES AND FOREIGN MATERIALS 1-1/2 INCHES IN DIAMETER AND LARGER.
2. PLACING TOPSOIL
2.1. PLACE TOPSOIL DURING DRY WEATHER AND ON DRY UNFROZEN SUBSOIL WHERE INDICATED ON DRAWINGS.
2.2. SPREAD TOPSOIL TO A MINIMUM DEPTH OF 4 INCHES. REMOVE VEGETABLE MATTER AND FOREIGN NON -ORGANIC MATERIAL FROM TOPSOIL WHILE SPREADING. GRADE SURFACE TO
PROVIDE POSITIVE DRAINAGE AND PREVENT WATER PONDING. LIGHTLY COMPACT TOPSOIL WITH AT LEAST ONE PASS OF A CULTIPACKER OR SIMILAR EQUIPMENT
2.3. MAINTAIN THE FINISHED SURFACES BY PROTECTING, AND REPLACING TOPSOIL AND SUBSOIL AS NECESSARY UNTIL THE AREA IS ACCEPTED UNDER THE CONTRACT.
3. APPLICATION OF LIME
3.1. LIMING SHALL BE DONE IMMEDIATELY AFTER GRADING HAS REACHED THE FINE GRADING STAGE, EVEN THOUGH ACTUAL SEEDING MAY NOT BE DONE UNTIL SEVERAL MONTHS LATER.
3.2. SPREAD LIME EVENLY BY MEANS OF A MECHANICAL DISTRIBUTOR.
3.3. WHEN LIME IS DISTRIBUTED BY COMMERCIAL LIMING DEALERS, SALES SLIPS SHOWING THE TONNAGE DELIVERED SHALL BE FILED WITH THE ENGINEER AND SHALL SHOW THE FULL
TONNAGE REQUIRED FOR THE ACRES TREATED.
3.4. INCORPORATE LIME IN THE TOP 2 TO 3 INCHES OF SOIL BY HARROWING, DISKING, OR OTHER APPROVED MEANS.
4. APPLICATION OF FERTILIZER
4.1. SPREAD FERTILIZER NOT MORE THAN 2 WEEKS IN ADVANCE OF SEEDING.
4.2. TO VERIFY APPLICATION RATE, DETERMINE ACREAGE TO BE FERTILIZED AND PROVIDE ENGINEER WITH TOTAL WEIGHT OF FERTILIZER APPLIED TO THE AREA.
4.3. PROVIDE MECHANICAL SPREADER FOR EVEN DISTRIBUTION AND SPREAD HALF OF THE RATE IN ONE DIRECTION, AND THE OTHER HALF AT RIGHT ANGLES TO THE FIRST. MIX THOROUGHLY
INTO UPPER 2 TO 3 INCHES OF SOIL BY DISKING, HARROWING OR OTHER APPROVED METHODS.
5. SEEDING
5.1. ACCOMPLISH SEEDING BY MEANS OF AN APPROVED POWER -DRAWN SEED DRILL, COMBINATION CORRUGATED ROLLER -SEEDER, APPROVED HAND OPERATED MECHANICAL SEEDER, OR
OTHER APPROVED METHODS TO PROVIDE EVEN DISTRIBUTION OF SEED.
5.2. DO NOT SEED WHEN GROUND IS EXCESSIVELY WET OR EXCESSIVELY DRY. AFTER SEEDING, ROLL AREA WITH A ROLLER, NOT LESS THAN 18 INCHES IN DIAMETER AND WEIGHING NOT MORE
THAN 210 POUNDS PER FOOT OF WIDTH. UPON COMPLETION OF ROLLING, WATER AREA WITH A FINE SPRAY.
5.3. IMMEDIATELY FOLLOWING SEEDING APPLY MULCH OR MATTING AS LISTED BELOW. DO NOT SEED AREAS IN EXCESS OF THAT WHICH CAN BE MULCHED ON SAME DAY.
5.4. APPLY WATER WITH A FINE SPRAY IMMEDIATELY AFTER EACH AREA HAS BEEN MULCHED. SATURATE TO 4 INCHES OF SOIL DEPTH
6. MULCHING AND MATTING
6.1. APPLY MULCH OR MATTING AS REQUIRED TO RETAIN SOIL AND GRASS, BUT NO LESS THEN THE FOLLOWING:
6.1.1. SLOPES FROM 0 TO 20 PERCENT BY SPREADING ALIGHT COVER OF MULCH OVER SEEDED AREA AT THE RATE OF NOT LESS THAN 85 LBS. PER 1000 SQ. FT. USE TACK TO PREVENT
DISRUPTION OF MULCH.
6.1.2. SLOPES GREATER THAN 20 PERCENT MULCH WITH MATTING. PIN MATTING TO THE GROUND WITH WIRE STAPLES AT 5 FOOT INTERVALS, IMMEDIATELY AFTER SEEDING.
6.2. OTHER TYPES OF MULCH AND ANCHORING METHODS MAYBE USED UPON APPROVAL BY THE ENGINEER.
7. PROTECTION
7.1. PROTECT SEEDED AREAS FROM DAMAGE BY BARRICADES, SIGNS, AND OTHER APPROPRIATE MEANS. MAINTAIN AND PROTECT SLOPES FROM WEATHER DAMAGE.
STABILIZATION
SITE AREA
STABILIZATION
TIME FRAME
AREA
DESCRIPTION
TIME FRAME
EXCEPTION
Perimeter dikes,
1
swales, ditches
7 days
None
and slopes
If slopes are 10' or
Slopes steeper
less in length and
2
than 3:1
7 days
are not steeper than
2:1, 14 days are
allowed
7 days for slopes
3
Slopes or
14 days
greater than 50' in
flatter er
length
All other area
None (except as
4
with slopes
14 days
shown in chart)
flatter than 4:1
TEMPORARY GRAVEL CONSTR.
ENTRANCE/EXIT KO
TREE REMOVAL
VICINITY MAP
SCALE: 111=60'
J
Z
0
LIJ
LIJ
z
LIJ
D_
oc
0
LL
i
LL
Q
vw
DICKSON
comminity infrastructure consultants
720 CORPORATE CENTER DRIVE
RALEIGH, NC 27607
(t) 919-782-0495
(f)919-782-9672
WWW.WKDICKSON.COM
NC LICENSE NO.F-0374
PROFESSIONAL SEAL
0o
Z
fr 0
O a_
w 0
fr
Z p
O
U)
w
w
a
0
IIIIIIIlb
I-
Z
w
w
g
tl IY
w w
i
I- 0
m U
w J
J
� I-
U Z
w O
Z U
g z
J 0
0 rr
Q Lu
Z
w
Y
m
Iii Ii i
J
z
U Z
w �
O Q
� o
PROJ. MGR.: M. HORSTMAN
DESIGN BY: M. HORSTMAN
DRAWN BY: M. SMALLING
PROJ. DATE: JULY 2019
DRAWING NUMBER:
70F 18
WKD PROJ. NO.:
20180394.00. RA
i
02
W
poa
FOO
pJU
pz
a0¢
ww9
Dm�
o=w
.Om
�a0
=N❑
~ -W
ozw
- . o
Zoe+
w00
zzw
oom
=UQ
~ON
OY�
.00
zz<
o.¢
o0
2w(5
w¢a
¢3:z
�o�
x
0
w�a
=a�
0
¢¢¢
awe
Z° w
9D
oz0
'zo
zzp
o
Y�F
U00
pp
YIz
�xz
4H
0
=zw
�0z
alr
w0
oU O'.
N/F'
THOMAS L. HUDGINS & \ s
MARY R. HU GINS \ \ I I I
D.B. 281 6 P . 3539 \ \ I I I
PIN 6886-76 028 \ I
718 CORJO RD. \ \ \ \ I I
00
18LT 9s4 \
)
\ \ S3 \ 22LT \ I I
}00 _ — \ \ 13TRJE I
0 15LT7�\
\
� s I
— — — — — — —\ 15LT \ CM
\ 1
ROBERT K. CAMPBELL & \0
TOP \\
MARILYNAMPBELL 8TREE 9 OF BANK \\\ \
D.B.B. 16 1630, PG. 2577 S� I
PIN 6886-75-8996
0 CORJON RD. \ \ \\\ \ \ I I
\ I 1
\� CM \�\
\ 950
....=949.7
8TREE \ \ \\
\ Al
� / I
I�O 1961 ---- \
I \\
14/ \
L
WM \
I Q \
M / \ ��
Q
) /
\-0 30QA /
o Cn
/ RIM=959.13' \
as
a/
iJ
INV=952.18' O \ I
o \ \ \1
I � �
\ \ _ o / C M TH 1 960\ \ \ / .a p 1 STORBRICK
/
24LT
\ \ 9 P s ` _ 2e� / � / / RESIDENCE
5g . L00 \q \
16LT — i
959 030QA \
�O /
N/F
SUE TUCKER VANHOY & 17LT
DAVID LASLEY VANHOYr�! \ / / °� /� \ \ �--
D.B. 2518, PG. 2741
P.B. 26, PG. 33 \ -956 Cm \rr�\ 949.81'
PIN 6886-75-8816 \ \ J
314 BROKEN SADDLE LN. \ \ F // / / / O (� / C M / 1` — — 958 — — — — — —
\ \ 16LT / / / /0 / \\ \ CM 1*-------
BOR
CM
\ \ \ \ \ \ \ 36LT / / / / I I Cm
o y N/F \ \ I 11 1
MICHAEL LEE CABLE \ I 1
RIM=9 0.34' 00 I / / I I I / / \ \ �� D.B. 1700, PG. 2476 I
I / / IN- 48.14' / / I I \ \ \ \ \ P.B. 26, PG. 33 I I 1
IN- 54.74' I I / \ \ \ \ \ PIN 6886-85-0983 1
IN 953.44' / / / I / \ \ /� \ \\ \ _ — _ 307 BROKEN SADDLE LN. I I \
\9PT OUT 947.84'
\ I 954 \\\ \\ /� I I // o / 962 I ° l I 1 I / \\ CM \\\ \
8TREE / '
\ I I
EROSION CONTROL LEGENDCo Cm
1
\\ \
LOD LIMITS OF DISTURBANCE
SEDIMENT FENCE (SILT FENCE) / TOP I I I I I I / / / ° OF BANK CM \ P S \\
\
�..___.,TREE PROTECTION ,o \ �- / // / // 963 I I I III
2 INV=96 3 \ I I I I ( \\ O
� / CHECK DAM ,o \
14LT \ \ J / / I I ( \ 90
PS SEEDING (PERMANENT) z \ \\ 24LT / S. \\
cM COIR FIBER MATTING EROSION CONTROL MATTING s \ \I / J o 11 I I I I I I 1 1 11 \ \ 1 \ \ \ 0s \\
wM ' II I ( 1 11 1 1 1 11 \\ 11 \�\� \\ \ �0 \\ \\
�--�_-�--A PUMP AROUND 2+00
„ 15" CID\ I I I 1 1 1 1 \ \ 1 \\ \ \ \\ \ \
O COFFER DAM �� \ / I 1 I I \ 1 1 \ 16LT
1 1I \ 1 Lo
CONSTRUCTION FENCE 9LT 01(SAFETY FENCE)
\ \
\\ \
\ I I I I 1 \ 8REE
\
TEMPORARY GRAVEL CONSTR. v- 4 68 IV 8TREE
62.60' \ \ \ 1 I \ \ \ \
ENTRANCE EXIT 10 i\ \ I I I I I \ \ \ \ I I \ \ \ \ \ \ \
TREE REMOVAL
\ \ 1 I I I I I \ 10PT \ I ' 8TREE
\ (° 1 1 I I I I I I 13TREE
\ \ \ 15LT
18LT /� i \ 8TREE \ \
10 0 5 10 20
1 inch = 10 ft.
J
z
0
w_
Lu
z
G
rLu
I..L
0
LL
L.L
0
VVK
DICKSON
community infrastructure consultants
720 CORPORATE CENTER DRIVE
RALEIGH, NC 27607
(t) 919-782-0495
(f)919-782-9672
WWW.WKDICKSON.COM
NC LICENSE NO.F-0374
PROFESSIONAL SEAL
Co
0 Z
cc 0
0 Cr
a
cc W
Lu
O_
U)
w
cc
w
a
0
IIIIII110
H-
z
w
w
U
g Lu z
� J
Lu
J �
U Z
w 0
Z
z
w 0
0 O
w
Z
w
Y
cr
ED
w Iii
J
z
w z
� 0
PROJ. MGR.: M. HORSTMAN
DESIGN BY: M. HORSTMAN
DRAWN BY: M. SMALLING
PROJ. DATE: JULY 2019
DRAWING NUMBER:
80F 18
WKD PROJ. NO.:
20180394.00. RA
i
OW
zoa
FOO
OJU
z,
ww9
o=w
oom
�a
=�o'o
ozw
- . o
zo.
w00
zzw
oom
=UQ
~ON
OY�
.N
z< zO
oww
oOZ
¢W(5
w¢a
wom
mm
0
w�a
¢FF
=a�
0Z°w
¢0<
w�
Z°w
o_gD
0
'zo
zzo
w
o�=
Yo,
UD
p00
YIz
�xz
oo¢
0
=zw
�Oz
'lr
wo
cU O'.
CL
\
a aLo
— 0+5 I EROSION CONTROL LEGEND
30AR � � 9 � �
9$0• O. \
� \ \ LOD
94s \ \ \ T 962. _ _ INV=950.14' ° LIMITS OF DISTURBANCE
A�.\ \ A / \ \ SEDIMENT FENCE (SILT FENCE) 10
TOP \o 0 \\ II I
\ \\\ \\ \\ \\\ \\ \ \\\\\ OF BANK \ c9j
_ _ _ TREE PROTECTION 3
O
10
\\ \ \ \\ \ \, 8JV / ■
\ \ \ \ \ 6LS\ \\ \ \ T I I CHECK DAM 10
\ o \ o PS
\ i
\ \ 4L P S Lo, Q I PS SEEDING (PERMANENT)
3 CM �� // I 0-4 o C cM COIR FIBER MATTING (EROSION CONTROL MATTING) 1s
/'p -OD �
'/' S° M '�- PUMP AROUND 11
,g I d
\ \ \ 00
sJV COFFER DAM r1
CM \ `\ //j// // \\ j I I W p
9s/i Il�jv-�27' / / \ I I CO M CONSTRUCTION FENCE 10
\ \ \ \ !)Jv CM / I I (SAFETY FENCE)
Lo
27- .97 LF OF 8" PVC ❑ C — 951 — �\ 95� — -� P S 0')I >
\ @0.66/0 \ ~✓/ \ \ \ I ENITRANCE/EXIRAVEL CONSTR. 10
8Jvl
\\\ \\ G \�❑ -- 952 -- — \ \ 810 G —\ I TREE REMOVAL
\ mot- G � � \ 1T' G
8JV J �
\\ GM /Y
I \ sJv II6Jv \ I `^i
----\ \ / )
AT
A/C 6LS \ \
UNITS — 2Ls I/
\\ \\ I T
6LS \\ 9S ` I
4 4JV \ �
FF=960.10' I I I d \ \ \ \
\ 01OLS
N/F \ `
HARVEY W. GUYE &
SHARON GUYE
D.B. 2072, PG. 589
6LS
P.B. 31, PG. 152 d \ \\
PIN 6886-85-1675 \ \
332 MARYLEBONE DR. \ \ \ 3Jv \ \
12LT
a I \ a o GP — \
° \
12"RCP —
A
EXISTING 20' SANITARY \
SEWER EASEMENT
(P.B. 31, PG. 152) \
EIP
INV=951.42'
8" PVC
— G
/
/
/
/
/
/
/
/
DECK
15LT
24L'
28QA
O O I 8M �. / ❑ O
TIMBER 4'WF 0
C M 8MG 8MG `�WALL / ❑ ❑ ❑ ❑ ❑ ❑ ❑—
PS I ( \ \ GMG PS--/ 46-- W
\ _ 4 _-----____-9-------- i
w
X \ \\\\ \ CM
2+50- — ` \\
\�\\ CM 12LT
T
\ I I I I N OR-3
\ I I I
0 0 I I IPAUL MORRISON &
TAMMY MOR ON 9,19
p\ k.B. 2181, PG. 6 4 \
OLL p P PIN 6M685 3404 \
/ \ uJ \ ARYLEBONE DR.
\ \ \ 19,10
/ \
0 0 ,
a 0 2LT
LL �0 a
loI M=955"108'
/ IN=947.68
IN=949.28' \ \
IN=947.66' \
OUT=947.63' \
\
\
60.21 LFOF8"P JCJ
@ 5.7 %
W I I I I
\ � I
�o I I
II I I I I
I I I
\ \\\ \ CM — CM
948 9TREE
Lu
M=951.18' \ 10TREE ` 00 \\\ \\ TOP \\\\\\ 0—
\ \ \ \\� �_�
iN�944.16' — — 36QAO \ OF BANK \ \ \
IN=941.96'
JT=941 9'I'—
--- PS — — ---------- \ \\ LL
0 10 0 5 10 20
1 inch = 10 ft. cc
DDICKSON
community infrastructure consultants
720 CORPORATE CENTER DRIVE
RALEIGH, NC 27607
(t) 919-782-0495
(f)919-782-9672
WWW.WKDICKSON.COM
NC LICENSE NO.F-0374
PROFESSIONAL SEAL
Co
0 z
cc 0
0 a
Cr
cc W
z Lu
O
W
Lu
a
0
Z
H-
z
Lu
Lu
U
g Lu z
g
� J
Lu
J �
U z
Lu 0
qZ
J z
O
Lu
t] 0
Lu
z
Lu
Y
D=
ED
LLI Lij
J
z
W >z
r
a 0
PROJ. MGR.: M. HORSTMAN
DESIGN BY: M. HORSTMAN
DRAWN BY: M. SMALLING
PROJ. DATE: JULY 2019
DRAWING NUMBER:
9 of 18
WKD PROJ. NO.:
20180394.00. RA
ZOw
000
OJU
Ozw
aoQ
z00ww_
2P
Dma
U=w
oom
0¢
. o
Fro
w
ozw
Fo-o
�
WUZ
0
z,
z
0Om
wYJ
=UQ
~OS
0
Do
z.
z<
0za
o°z
2w C7
aG'
w¢¢
¢3z
wD,
woo
0
wiz
wa
=a�
0 z w
¢aa
Qom
w
ZOw
3:7
OZD
U-U
ZZ0
w
07=
YU~
U
p00
�=z
'oo
0
=z=
w
Oo
¢w
aw0
o ww'
7
7
0
a
STEEL OR WOOD POST
WIRE FABRIC
FILTER FABRIC
OpE
L� M ��O \\// EXISTING
o f
\\/j//j GROUND LINE
cli
/\\/\\/
IT-ANCHORFABRIC
4 j~ AS SHOWN
SECTION
VARIABLE AS DIRECTED BY THE ENGINEER (10' MAX.)
TOP AND
BOTTOM STAY WIRES, ANCHOR WIRE FABRIC TO
STRAND MIN. 12" SPACING WOOD POST WITH MIN. 4
10 GA., TYP. MIN. 14 GA. FENCING STAPLES PER POST
LU W SECURELY
�
OfN UJ ANCHOR
< FABRIC TO
Z z WIRE WITH
WIRE TIES
//\//\
q O ~ MAX. WIRE FILTER FABRIC TO BE w
`y' FABRIC MESH POLYPROPYLENE NYLON, `� 1.-0
LLLJJJ OPENING SIZE POLYESTER OR POLY- u
= 36 SQ. IN. ETHYLENE YARN OF
MANUFACTURER TO BE
APPROVED BY ENGINEER
NOTES: ELEVATION
1. THE CONTRACTOR SHALL MAINTAIN ALL SILT FENCING BY REMOVING AND DISPOSING OF SILT
ACCUMULATIONS AS DIRECTED BY THE ENGINEER. FILTER FABRIC SHALL BE REPLACED WHEN IT
HAS DETERIORATED TO SUCH EXTENT THAT IT REDUCES THE EFFECTIVENESS OF THE SILT FENCE.
2. FILTER FABRIC SHALL HAVE A MINIMUM TENSILE STRENGTH (@ 20% MAX. ELONGATION) OF
30lbs/LIN. IN., WIRE FABRIC REQUIRED.
3. IF EXTRA STRENGTH FABRIC IS UTILIZED (MIN. TENSILE STRENGTH = 50 Ibs/LIN. IN. @ MAX. 20%
ELONGATION), WIRE FABRIC IS OPTIONAL, MAXIMUM POST SPACING = 6 FEET.
4. POSTS SHALL BE 4" DIA. PINE, 2" DIA. OAK OR 1.33 Ib/LF STEEL UNLESS OTHERWISE APPROVED BY
ENGINEER.
NO.
DATE
REVISION
TEMPORARY SILT FENCE
SHEET NO.
SCALE: NOT TO SCALE
DWG. BY: WKD
1 OF 1
DATE: 05-15-2015
PATH AND FILENAME: K:\WKD Standard Details\EC001.dwg
TEMPORARY SILT FENCE
NOT TO SCALE
p0
P
COURSE AGGREGATE -
STONE SIZE = 2"-3"
z
201M/N
TEMPORARY GRAVEL
NO.
DATE
REVISION
CONSTRUCTION ENTRANCE
SHEET NO.
SCALE: NOT TO SCALE
DWG. BY: WKD
1 OF 1
DATE: 5/18/2015
PATH AND FILENAME:
TEMPORARY GRAVEL CONSTRUCTION ENTRANCE
NOT TO SCALE
EXISTING DITCH
(WIDTH VARIES)
zo
N
ELEVATION
N.C.D.O.T
CLASS B EROSION
CONTROL STONE
2• J v
N
FLOW—
SECTION
TEMPORARY SILT CHECK DAM
NO.
DATE
REVISION
SHEET NO.
SCALE: NOT TO SCALE
DWG. BY: WKD
1 OF 1
DATE: 05-15-2015
PATH AND FILENAME: K:\WKD Standard Details\EC002.dwg
TEMPORARY SILT CHECKDAM
NOT TO SCALE
Lelxllr*1111IN:@y1:1:l s]
o SECURELY ANCHOR
n FABRIC TO POST WITH
z WIRE TIES
EXISTING
GROUND LINE
SFCTInN
VARIABLE AS DIRECTED BY THE ENGINEER (10' MAX.)
GEOTEXTILE SHALL BE ATTACHED TO WOOD
POSTS WITH ONE 2" GALVANIZED WIRE STAPLE
ACROSS EACH CABLE
O r L FENCE TO BE ULTRAVIOLET
0 LJ POLYPROPYLENE OR
u POLYETHYLENE YARN OF u
MANUFACTURER TO BE
APPROVED BY ENGINEER
NnTFS- ELEVATION
ATTACH GEOTEXTILE
TO STEEL POSTS
WITH WIRE OR OTHER
ACCEPTABLE MEANS
0
N
1. POLYETHYLENE OR POLYPROPYLENE FENCE SHALL BE A HIGHLY VISIBLE PRECONSTRUCTED
SAFETY FENCE APPROVED BY THE ENGINEER. THE FENCE MATERIAL SHALL HAVE AN ULTRAVIOLET
COATING.
2. EITHER WOOD POSTS OR STEEL POSTS MAYBE USED. WOOD POSTS SHALL BE HARDWOOD WITH A
WEDGE OR PENCIL TIP AT ONE END, AND SHALL BE AT LEAST 5 FT. IN LENGTH WITH A MINIMUM
NOMINAL 2" X 2" CROSS SECTION. STEEL POSTS SHALL BE AT LEAST 5 FT. IN LENGTH, AND HAVE A
MINIMUM WEIGHT OF 0.85 LB/FT OF LENGTH.
3. POSTS SHALL BE SET AT A MAXIMUM SPACING OF 10 FT., MAINTAINED IN A VERTICAL POSITION AND
HAND SET OR SET WITH A POST DRIVER. POSTS SHALL BE INSTALLED A MINIMUM OF 2 FT. INTO THE
GROUND. IF HAND SET, ALL BACKFILL MATERIAL SHALL BE THOROUGHLY TAMPED. WOOD POSTS
MAY BE SHARPENED TO A DULL POINT IF POWER DRIVEN. POSTS DAMAGED BY POWER DRIVING
SHALL BE REMOVED AND REPLACED PRIOR TO FINAL ACCEPTANCE. THE TOPS OF ALL WOOD
POSTS SHALL BE CUT AT A 30-DEGREE ANGLE. THE WOOD POSTS MAY, AT THE OPTION OF THE
CONTRACTOR, BE CUT AT THIS ANGLE EITHER BEFORE OR AFTER THE POSTS ARE ERECTED.
NO.I DATE
SAFETY FENCE
SHEET NO. SCALE: NOT TO SCALE DWG. BY: WKD
1 OF 1 DATE: 5/18/2015 PATH AND FILENAME:
5 SAFETY FENCE
10 NOT TO SCALE
REVISION
MAINTENANCE NOTES:
CONTINUE TO CARE FOR THE SITE UNTIL THE NEW OWNER TAKES POSSESSION. TAKE THE
FOLLOWING STEPS AFTER ALL MATERIALS AND EQUIPMENT HAVE BEEN REMOVED FROM THE
SI TE:
• REMOVE TREE PROTECTION ZONE FENCES.
• PRUNE ANY DAMAGED TREES. IN SPITE OF PRECAUTIONS, SOME DAMAGE TO PROTECTED
TREES MAY OCCUR. IN SUCH CASES, REPAIR ANY DAMAGE TO THE CROWN, TRUNK, OR
ROOT SYSTEM IMMEDIATELY. EXISTING
• REPAIR ROOTS BY CUTTING OFF THE DAMAGED AREAS AND PAINTING THEM WITH TREE
PAINT. SPREAD PEAT MOSS OR MOIST TOPSOIL OVER EXPOSED ROOTS.
• REPAIR DAMAGE TO BARK BY TRIMMING AROUND THE DAMAGED AREA AS SHOWN IN
FIGURE 1 BELOW, TAPER THE CUT TO PROVIDE DRAINAGE, AND PAINT WITH TREE PAINT.
• CUT OFF ALL DAMAGED TREE LIMBS ABOVE THE TREE COLLAR AT THE TRUNK OR MAIN
BRANCH. USE THREE SEPARATE CUTS AS SHOWN IN FIGURE 1 BELOW TO AVOID PEELING
BARK FROM HEALTHY AREAS OF THE TREE.
• CONTINUE MAINTENANCE CARE. PAY SPECIAL ATTENTION TO ANY STRESSED, DISEASED,
OR INSECT -INFESTED TREES, REDUCE TREE STRESS CAUSED BY UNINTENDED
CONSTRUCTION DAMAGE BY OPTIMIZING PLANT CARE WITH WATER, MULCH, AND
FERTILIZER WHERE APPROPRIATE. CONSULT YOUR TREE EXPERT IF NEEDED. DRIP UNE-
• INFORM THE PROPERTY OWNER ABOUT THE MEASURES EMPLOYED DURING CONSTRUCTION,
WHY THOSE MEASURES WERE TAKEN, AND HOW THE EFFORT CAN BE CONTINUED.
PROTECTIVE BARRIEF
YI
—I
I
lrt7l: w9und
TrrmunOroger
Inoorrezt �orreCt
NOTE:
DT AM 17TLIXT SYMBOL 1
3' MIN. STAKE
HEIGHT ABOVE
GRADE
TREES TO BE SAVED WILL BE CLEARLY MARKED PRIOR TO CONSTRUCTION AND HIGH
VISIBILITY FENCING IS TO BE INSTALLED AT THE DR LINE*.
*DRIP LINE - THE AREA OF SOIL DIRECTLY BENEATH THE TREE EXTENDING OUT TO THE
TIPS OF THE OUTERMOST BRANCHES. DRIP LINES EXTEND OVER CHANNELS OR WORK AREAS
WHERE IT MAY NOT BE FEASIBLE TO PLACE PROTECTION FENCES. IN SUCH CASES THE
CONTRACTOR SHALL COORDINATE WITH THE FIELD INSPECTOR TO ALTER THE PROTECTION
FENCE AND/OR PROPOSED WORK (GRADING ONLY).
TREE PROTECTION
NOT TO SCALE
J
Z
O
Lu
Lu
oc
Z
G
Lu
CL
oc
O
L
L.L
Q
0
VVK
DICKSON
comminity infrastructure consultants
720 CORPORATE CENTER DRIVE
RALEIGH, NC 27607
(t) 919-782-0495
(f)919-782-9672
WWW.WKDICKSON.COM
NC LICENSE NO.F-0374
PROFESSIONAL SEAL
m
Z
fr 0
O a
W 0
fr
Z p
O
U)
W
fr
W
a
0
lZ
H
Z
W
W
g
11 J
WLu
Q
0
W J
J 0
0 �
U ~
Z
W 0
Z U
g z
Lu 0
J cf)
0 0
0 12
Q W
Z
W
Y
m
W LLI
J
Q ~
Z
0 Z
W
O Q
� 0
PROJ. MGR.: M. HORSTMAN
DESIGN BY: M. HORSTMAN
DRAWN BY: M. SMALLING
PROJ. DATE: JULY 2019
DRAWING NUMBER:
10OF18
WKD PROJ. NO.:
20180394.00. RA
ZOw
000
OJU
Ozw
aoQ
z00ww_
2P
Dma
U=W
OOm
0¢
.ao
w
ozw
Fo-o
�
WUz
O
z,
z
0Om
= Y J
U_Q
~OS
0
w��
D'.
¢O0
zz<
0.,
z
z' o
tr'
w
wQQ
¢�z
,D w
�°o
wFz
wa
=a�
0 z w
Y
¢ ¢ Q O¢
w
z°w
3:7
OZD
U-U
z 0
w
07=
YU~
U
p00
�=z
'oo
0
=z=
w
Oo
¢w
awo
00
0
I
7
7
GROUND COVER SCHEDULE
SITE AREA DESCRIPTION STABILIZATION TIME FRAME STABILIZATION TIME FRAME EXCEPTIONS
PERIMETER DIKES, SWALES, DITCHES AND 7 DAYS NONE
FLOW SLOPES
HIGH QUALITY WATER (HOW) ZONES 7 DAYS NONE
SLOPES STEEPER THAN 3:1 7 DAYS IF SLOPES ARE 10' OR LESS IN LENGTH AND ARE NOT
STEEPER THAN 2:1, 14 DAYS ARE ALLOWED
CLASS INTAKE HOSE SLOPES 3:1 OR FLATTER 14 DAYS 7 DAYS FOR SLOPES GREATER THAN 50 FEET IN LENGTH
A ALL OTHER AREAS WITH SLOPES FLATTER
STONE PUMP THAN 4:1 14 DAYS NONE (EXCEPT FOR PERIMETERS AND HWQ ZONES)
AROUND
WORK PUMP FOR PERMANENT PLANTING AND SEEDING DETAILS, REFER TO VEGETATIVE PLAN ON SHEET 7.
DE -WATERING AREA
PUMP
OFFER DAM PERMANENT PLANTING
2
11 & SEEDING DETAILS
SILT BAG
LOCATION CLASS DISCHARGE HOSE
A
Q STON NOTE: HOSE SHOULD BE
KEPT OUTSIDE OF
WORK AREA
COFFER DAM TOP OF BANK
STABILIZED OUTF L
CLASS A STONE GEOTEXTILE FABRIC ,
• KEY IN EROSION
DISCHARGE CONTROL MATTING 0.8'
HOSE �'o, •• •••• BEYOND TOP OF BANK.
EXISTING FOR KEY —IN NOTES
KEY IN EROSION
••••• •• •• AND DIMENSION SEE
GROUND PROPOSED CONTROL MATTING 0.8'
im 15' TO 20' BANK BEYOND TOP OF BANK. EXIST DETAIL 4/11.
FOR KEY —IN NOTES CHANNEL NOTES
STABILIZED AND DIMENSION SEE BOTTOM 1. LINE AREA SHOWN IN EROSION CONTROL
OUTFACE DETAIL 4/11. PLANS WITH EROSION CONTROL MATTING.
CLASS A SEE DETAIL 4/11 FOR KEY -IN DETAILS ONLY.
STONE 2. PREPARE SOIL FOR SEEDING PER
CONTRACT DOCUMENTS.
GEOTEXTILE FABRIC
8"OF CLASS ASTONE 3. PLACE SEED & LIGHT MULCH.
EXISTING CHANNEL
SILT BAG PROFILE 4. INSTALL EROSION CONTROL MATTING OVER
SEED & MULCH.
POLYETHYLENE
MEMBRANE ON FACE 20
MIL THICK
0
II
co N LL
QOQ
>(o�
�O
� 3'- 0"
1
�1
LEVEL WITH TOP OF
BANK OR AS
NECESSARY
CLASS 1 RIP RAP, NJ
BARRIER OR OTHER
APPROVED MATERIAL
(IF USING RIP RAP
DOWNSTREAM, SLOPE NO
GREATER THAN 2: 1)
NOTE:
SANDBAGS, CLASS 1 RIP RAP CONTRACTOR SHALL FOLLOW
OR OTHER NON -ERODIBLE CONSTRUCTION SEQUENCE AS NOTED ON
MATERIAL 7 CONTRACT DRAWINGS.
GEOTEXTILE FABRIC
COFFER DAM
NOTES:
1. EXCAVATION SHALL BE PERFORMED ONLY IN DRY AND/OR ISOLATED SECTIONS OF
CHANNEL.
2. COFFER DAMS SHOULD BE USED TO ISOLATE WORK AREAS FROM STREAM FLOW.
3. THE CONTRACTOR SHALL NOT DISTURB MORE AREA THAN CAN BE STABILIZED IN ONE
WORKING DAY. A MAXIMUM OF 51 FEET MAY BE DISTURBED AT ANY ONE TIME.
4. THE PUMP -AROUND PUMP SHOULD ADEQUATELY CONVEY MINIMUM 450 GALLONS /
MINUTE
5. PERFORMANCE q=450 GPM ONLY
6. COFFER DAM MUST BE CONSTRUCTED OF NON -ERODIBLE MATERIALS SUCH AS
SANDBAGS.
SEQUENCE OF CONSTRUCTION FOR TYPICAL PUMP AROUND
1. INSTALL STILLING BASIN AND STABILIZED OUTFALL USING CLASS A RIP RAP AT THE
DOWNSTREAM END OF THE DESIGNATED PROJECT WORKING AREA.
2. THE CONTRACTOR WILL INSTALL THE PUMP AROUND PUMP AND THE TEMPORARY
PIPING THAT WILL CONVEY THE BASE FLOW FROM UPSTREAM OF THE WORK AREA TO
THE STABILIZED OUTFALL.
3. INSTALL UPSTREAM COFFER DAM AND BEGIN PUMPING OPERATIONS FOR STREAM
DIVERSION.
4. INSTALL THE DOWNSTREAM COFFER DAM AND DEWATERING PUMPING APPARATUS IF
NEEDED TO DEWATER THE ENTRAPPED AREA. THE PUMP AND HOSE FOR THIS
PURPOSE SHALL BE OF SUFFICIENT SIZE TO DEWATER THE WORK AREA. THIS WATER
WILL ALSO BE PUMPED TO AN OUTFALL STABILIZED WITH CLASS A RIP RAP.
5. THE CONTRACTOR WILL PERFORM CHANNEL WORK IN ACCORDANCE WITH THE PLAN
AND FOLLOWING THE GENERAL CONSTRUCTION SEQUENCE.
6. THE CONTRACTOR WILL EXCAVATE ANY ACCUMULATED SILT AND DEWATER BEFORE
REMOVAL OF THE COFFER DAM. WHEN DEWATERING AREA, ALL DIRTY WATER MUST
BE PUMPED THROUGH A SILT BAG. REMOVE COFFER DAMS, PUMPS, AND TEMPORARY
FLEXIBLE HOSE/PIPING STARTING WITH THE DOWNSTREAM COFFER DAM FIRST.
7. ONCE THE WORKING AREA IS COMPLETED, REMOVE ALL RIP RAP AND COFFER DAMS
AND STABILIZE DISTURBED AREAS WITH SEED AND MULCH.
8 ALL WORK IN CHANNEL MUST BE COMPLETED BEFORE REMOVING COFFER DAMS.
1 PUMP AROUND
11 NOT TO SCALE
12"
3 COIR FIBER MATTING
11 NOT TO SCALE
N
FIGURE 1
INTITIAL ANCHOR
TRENCH
FIGURE 3
TERMINAL ANCHOR
TRENCH
J.
STAPLE AT 1'
INTERVALS
Rl
STAPLE AT 1'
INTERVALS
TE
A
(FI
STAPLE AT 1'
INTERVALS
GURE
INSTALLATION NOTES:
III I
I I —I I I —III —III- 411
EROSION CONTROL MATTING SHALL BE A 100% STRAW MULCH ENCASED IN
A MEDIUM WEIGHT PLASTIC NETTING (BOTH SIDES) WITH A MINIMUM
-III—III—III
I
III —III —I � 1-
PERMISSIBLE SHEAR STRESS OF 1.75 LBS PER SQ FT.
—I I —III
I
III —III-
I
SITE PREPARATION
-1 I I i I
III —I
I _III.
1= I I
GRADE AND COMPACT AREA.
4"
REMOVE ALL ROCKS, CLODS, VEGETATION, AND OBSTRUCTIONS SO THAT
MATTING WILL HAVE DIRECT CONTACT WITH THE SOIL.
FIGURE 2
BANK TERMINATION
PREPARE SEEDBED BY LOOSENING 3 TO 4 INCHES OF TOPSOIL ABOVE
FINAL GRADE.
APPLY ANY TREATMENT SUCH AS LIME OR FERTILIZERS TO THE SOIL IF
NEEDED.
DO NOT MULCH AREAS WHERE MAT IS TO BE INSTALLED.
EXTEND 2-3' PAST
TOP OF BANK
SEEDING
SEE SHEET 12 FOR SEEDING REQUIREMENTS.
APPLY SEED TO SOIL BEFORE PLACING MATTING.
FIG 1
INSTALLATION ON BANKS
INITIAL ANCHOR
TRENCH EXTEND MAT 2 TO 3 FEET OVER CREST OF SLOPE AND EXCAVATE A 6" x 6"
TERMINAL ANCHOR TRENCH. SEE FIGURE 4.
ANCHOR MAT IN TRENCH ON 1 FOOT SPACINGS, BACKFILL AND COMPACT
MINIMUM OF
SOIL.
6" OVERLAP
OVERLAP ADJACENT MATS 6" AND ANCHOR EVERY 18" ACROSS THE
OVERLAP. THE HIGHER ELEVATION MAT SHOULD BE PLACED OVER THE
LOWER ELEVATION MAT.
RMINAL
NCHOR 0�
EDGES SHOULD BE SHINGLED AWAY FROM THE FLOW OF WATER.
RENCH
EXISTING
3)
CHANNEL LAY MAT LOOSE TO ALLOW CONTACT WITH SOIL.
BOTTOM DO NOT STRETCH TIGHT.
ANCHOR MAT USING U-SHAPED WIRE STAPLES OR GEOTEXTILE PINS.
FIG 2 INITIAL
BANK TERMINATION ANCHOR
FIGURE 4 TRENCH
(FIGURE 1)
TRENCH AND CHECK
SLOT LAYOUT
EROSION CONTROL MATTING INSTALLAION
NOT TO SCALE
J
Z
O
Lu
Ll
Z
Lu
CL
oc
O
LL
LL
Q
0
WK
DICKSON
comminity infrastructure consultants
720 CORPORATE CENTER DRIVE
RALEIGH, NC 27607
(t) 919-782-0495
(f)919-782-9672
WWW.WKDICKSON.COM
NC LICENSE NO.F-0374
PROFESSIONAL SEAL
m
Z
fr O
O a_
W0
fr W
Z Lu
O
U)
W
Lu
a
0
IlllII110
H
Z
W
W
g cn
11 J
W Q
W
o
W J
J 0
0 ~
Z
W 0
Z 0
g Z
W 0
J cf)
0 0
0 cr
�
Lu
Z
W
Y
m
W LLI
J
Q �
Z
U Z
W
� 0
PROJ. MGR.: M. HORSTMAN
DESIGN BY: M. HORSTMAN
DRAWN BY: M. SMALLING
PROJ. DATE: JULY 2019
DRAWING NUMBER:
11 OF 18
WKD PROJ. NO.:
20180394.00. RA
Zow
FUO
OJU
"w
a0¢
Zoo
2E
�ma
U=W
oom
0¢
.10
w
ozw
F-o
oN
wU0
Z`o
z
00.
w Y J
U_Q
~OS
0Y0
w��
. 0 0
°wa
0.,
z
°a
0zz
2w C7
tr,
wQQ
¢�z
,D w
00
�Tz
wa
=a�
ozw
Y
¢ ¢ ¢
w
w
z°w
-3:7
OZD
U-U
ZZ0
w
°7_
YU~
U
p00
�=z
,00
0
=zw
E 0,
a�wl
0.,
00,
EROSION CONTROL GENERAL CONSTRUCTION SEQUENCE:
1. STABILIZED GRAVEL ENTRANCE/EXIT AT THE SITE SHALL BE INSTALLED AS SHOWN ON THE PLANS AND DETAILS. AFTER
ESTABLISHMENT OF THE CONSTRUCTION ENTRANCE/EXIT, ALL PERIMETER EROSION CONTROL MEASURES SHALL BE INSTALLED PRIOR
TO CLEARING AND GRUBBING.
2. ALSO PRIOR TO CLEARING AND GRUBBING/CONSTRUCTION, THE CONTRACTOR SHALL REQUEST AN ON -SITE INSPECTION. UPON
RECEIPT OF CERTIFICATE OF COMPLIANCE, CLEARING AND GRUBBING/CONSTRUCTION MAY BEGIN.
3. PERFORM GRADING OPERATIONS IN A MANNER AND SEQUENCE SO AS TO REDUCE UNNECESSARY DISTURBANCE OF SURFACE COVER.
4. CONDUCT PRE -CONSTRUCTION MEETING INCLUDING OWNER/ENGINEER, ASSOCIATED CONTRACTORS AND OTHER AFFECTED PARTIES.
5. EROSION CONTROL MEASURES MAY BE PHASED -IN TO THOSE AREAS OF THE PROJECT CURRENTLY BEING WORKED ON. THE
CONTRACTOR MAY MODIFY OR RELOCATE EROSION CONTROL MEASURES TO MAKE ADJUSTMENTS FOR UNFORESEEN FIELD CONDITIONS
SO LONG AS PROPER CONSTRUCTION IS MAINTAINED TO ENSURE THE INTEGRITY AND USEFULNESS OF THE PROPOSED MEASURES.
ALL RELOCATION SHALL HAVE THE APPROVAL OF THE ENGINEER. ALL DISTURBED AREAS ALONG CHANNEL BANKS SHALL BE
STABILIZED WITH TEMPORARY SEED AND MULCH AT THE END OF EACH DAY.
6. IF IT IS DETERMINED DURING THE COURSE OF CONSTRUCTION THAT SIGNIFICANT SEDIMENT IS LEAVING THE SITE (DESPITE THE
PROPER IMPLEMENTATION AND MAINTENANCE OF EROSION CONTROL MEASURES), THE PERSON RESPONSIBLE FOR THE LAND
DISTURBING ACTIVITY IS OBLIGATED TO TAKE ADDITIONAL PROTECTIVE ACTION.
7. AT LOCATIONS IN WHICH THE STREAM CHANNEL IS BEING MODIFIED, TEMPORARY COFFER DAMS AND BYPASS PUMPING WILL BE USED
TO DE -WATER THE WORK AREA.
8. FOR CONSTRUCTION OF CULVERT, FOLLOW PUMP AROUND SEQUENCE SHOWN ON DETAIL 1/11.
9. WHEN THE TOE HAS BEEN SUFFICIENTLY STABILIZED TO RESTRAIN EROSION ALL TEMPORARY COFFER DAMS WILL BE REMOVED FROM
THE ACTIVE STREAM CHANNEL AND NORMAL FLOW RESTORED. ACCUMULATED SEDIMENT SHALL BE DISPOSED OF IN DESIGNATED
SPOILS AREA PRIOR TO REMOVAL OF TEMPORARY COFFER DAM. ALL COFFER DAMS AND BYPASS PUMPING EQUIPMENT SHALL BE
REMOVED FROM THE STREAM AT THE END OF EACH DAY TO RESTORE NORMAL FLOW BACK TO THE CHANNEL.
10. THE CONTRACTOR SHALL NOT DISTURB MORE AREA THAN CAN BE STABILIZED IN ONE WORKING DAY. RESTORATION MEASURES,
SEEDING AND VEGETATION WILL BE INSTALLED ALONG THE CHANNEL LENGTH AS WORK PROGRESSES.
11. ALL EXCAVATED MATERIAL MUST BE PLACED AT A MINIMUM OF 5 FT FROM CHANNEL. SILT FENCES MUST BE INSTALLED AROUND
ALL STOCKPILE AREAS.
12. TEMPORARY AND PERMANENT STABILIZATION OF ALL DISTURBED GRASSED AREAS AT THE TOP OF THE CHANNEL BANKS WILL BE IN
ACCORDANCE WITH THE SEEDING AND MULCHING SPECIFICATION AS SHOWN ON THE EROSION CONTROL PLANS AND IN THE PROJECT
MANUAL.
13. IN GENERAL, CONSTRUCTION SHALL PROCEED FROM AN DOWNSTREAM TO UPSTREAM DIRECTION.
14. PROPOSED CHANNEL EXCAVATION AND GRADING SHALL BE PERFORMED USING EQUIPMENT FROM OUTSIDE OF THE EXISTING CHANNEL
WHERE POSSIBLE. TEMPORARY CROSSINGS WILL BE USED AT LOCATIONS SPECIFIED ON THE PLANS. CROSSINGS MAY BE ADDED OR
RELOCATED UPON APPROVAL FROM THE ENGINEER.
15. CONTRACTOR SHALL NOT COMPACT SOIL AROUND ROOTS OF TREES TO REMAIN, AND SHALL NOT DAMAGE SUCH TREES IN ANY WAY.
16. ROUGH GRADING OF CHANNEL SHALL BE PERFORMED PRIOR TO INSTALLATION OF ROCK STRUCTURES OR CULVERT CROSSINGS.
PRIOR TO INSTALLING ROCK STRUCTURES OBTAIN APPROVAL OF THE ENGINEER ON ROUGH GRADING.
17. UPON INSTALLATION OF ROCK AND OTHER STRUCTURES, OBTAIN APPROVAL OF ENGINEER PRIOR TO FINE GRADING.
18. IT SHALL BE UNDERSTOOD THAT FAILURE TO SPECIFICALLY MENTION ANY WORK THAT WOULD NATURALLY BE REQUIRED TO
COMPLETE THIS PROJECT SHALL NOT RELIEVE THE CONTRACTOR OF HIS RESPONSIBILITY TO PERFORM SUCH WORK.
19. ESTABLISH RIPARIAN VEGETATION AS SHOWN ON DETAILS AND EROSION CONTROL MATTING PER DETAIL 3/11 AND MANUFACTURER'S
SPECIFICATIONS.
20.REMOVE TEMPORARY EROSION CONTROL MEASURES AFTER GROUND COVER IS ESTABLISHED AND APPROVAL IS GRANTED FROM THE
CITY INSPECTORS AND THE ENGINEER.
MAINTENANCE
FOLLOW THE CONSTRUCTION SEQUENCE THROUGHOUT PROJECT DEVELOPMENT. ADEQUATE EROSION AND SEDIMENT CONTROL MEASURES
MUST BE INSTALLED, MAINTAINED AND ADJUSTED AS NEEDED DURING THE DEMOLITION OR CLEARING AND GRUBBING PHASES AS WELL
AS THROUGHOUT THE LIFE OF AND UNTIL PERMANENT VEGETATION ON THE PROJECT IS ESTABLISHED. WHEN CHANGES IN CONSTRUCTION
ACTIVITIES ARE NEEDED,AMEND THE SEQUENCE SCHEDULE IN ADVANCE TO MAINTAIN MANAGEMENT CONTROL.
NOTIFICATION OF LAND RESOURCES SEDIMENT AND EROSION CONTROL SELF -INSPECTION PROGRAM:
THE SEDIMENTATION POLLUTION CONTROL ACT WAS AMENDED IN 2006 TO REQUIRE THAT PERSONS RESPONSIBLE FOR LAND -DISTURBING
ACTIVITIES INSPECT A PROJECT AFTER EACH PHASE OF THE PROJECT TO MAKE SURE THAT THE APPROVED EROSION AND
SEDIMENTATION CONTROL PLAN IS BEING FOLLOWED. RULES DETAILING THE DOCUMENTATION OF THESE INSPECTIONS TOOK EFFECT
OCTOBER 1,2010. TO SIMPLIFY DOCUMENTATION OF SELF -INSPECTION REPORTS AND NPDES SELF -MONITORING REPORTS, A COMBINED
FORM IS NOW AVAILABLE. THE NEW FORM WAS DEVELOPED TO SATISFY THE REQUIREMENTS OF THE SEDIMENTATION POLLUTION CONTROL
ACT AND THE NPDES STORMWATER PERMIT FOR CONSTRUCTION ACTIVITIES, NCG 010000. BEGINNING AUGUST 1, 2013, THE DIVISION OF
ENERGY, MINERAL, AND LAND RESOURCES IS RESPONSIBLE FOR ADMINISTERING BOTH THE SPCA AND THE NPDES STORMWATER PERMIT
FOR CONSTRUCTION ACTIVITIES, NCG 010000. THE COMBINED FORM SHOULD MAKE IT EASIER TO COMPLY WITH SELF -INSPECTION
REQUIREMENTS.
THE COMBINED SELF -MONITORING FORM IS AVAILABLE AS A PDF AND WORD DOCUMENT FROM THE LAND QUALITY WEB SITE,
HTTP: //PORTAL. NCDEN R.ORG/WEB/LR/EROSION
IF YOU HAVE QUESTIONS, PLEASE CONTACT THE LAND QUALITY SECTION AT A NCDEQ REGIONAL OFFICE AT 919-791-4200.
IF THE SAME PERSON CONDUCTS THE LAND DISTURBING ACTIVITY & ANY RELATED BORROW OR WASTE ACTIVITY, THE RELATED BORROW
z OR WASTE ACTIVITY SHALL CONSTITUTE PART OF THE LAND -DISTURBING ACTIVITY UNLESS THE BORROW OR WASTE ACTIVITY. IS
REGULATED UNDER THE MINING ACT OF 1971, OR IS A LANDFILL REGULATED BY THE DIVISION OF WASTE MANAGEMENT. IF THE
LAND -DISTURBING ACTIVITY AND ANY RELATED BORROW OR WASTE ACTIVITY ARE NOT CONDUCTED BY THE SAME PERSON, THEY SHALL
BE CONSIDERED SEPARATE LAND -DISTURBING ACTIVITIES AND MUST BE PERMITTED EITHER THROUGH THE SEDIMENTATION POLLUTION
0 CONTROL ACT AS A ONE -USE BORROW SITE OR THROUGH THE MINING ACT.
I
MAINTENANCE PLAN:
0
a
w
1. THE CONTRACTOR SHALL CHECK ALL EROSION AND SEDIMENT CONTROL PRACTICES FOR STABILITY AND OPERATION FOLLOWING
EVERY RUNOFF PRODUCING RAINFALL BUT IN NO CASE LESS THAN ONCE EVERY WEEK. ANY NEEDED REPAIRS WILL BE MADE
IMMEDIATELY BY THE CONTRACTOR TO MAINTAIN ALL PRACTICES AS DESIGNED. ALSO PER NATIONAL POLLUTANT DISCHARGE
ELIMINATION SYSTEM (NPDES) GENERAL STORMWATER PERMIT, A RAIN GAUGE MUST BE INSTALLED ON SITE. THE RAIN GAUGE MUST
BE KEPT ONSITE AND INSPECTIONS BY THE CONTRACTOR MUST BE MADE AND LOGGED AFTER EVERY HALF INCH OF RAINFALL AND
ONCE A WEEK.
2. THE CONTRACTOR SHALL REMOVE SEDIMENT FROM EROSION CONTROL DEVICES WHEN STORAGE CAPACITY HAS BEEN APPROXIMATELY
50% FILLED. GROVEL WILL BE CLEANED OR REPLACED WHEN THE SEDIMENT POOLS NO LONGER DRAINS PROPERLY.
3. THE CONTRACTOR SHALL REMOVE SEDIMENT FROM BEHIND SILT FENCE WHEN IT BECOMES 0.5 FEET DEEP AT THE FENCE. SILT
FENCE WILL BE REPAIRED AS NECESSARY TO MAINTAIN A BARRIER.
4. THE CONTRACTOR SHALL FERTILIZE, RESEED AS NECESSARY, AND MULCH ALL SEEDED AREAS ACCORDING TO SPECIFICATIONS IN THE
VEGETATIVE PLAN TO MAINTAIN A VIGOROUS, DENSE VEGETATIVE COVER.
5. THE CONTRACTOR SHALL PROVIDE GROUND COVER ON EXPOSED SLOPES OR OTHER AREAS WITHIN 7 TO 14 DAYS OR SOONER OF
COMPLETION OF ANY PHASE OF GRADING. REFER TO THE LATEST NPDES RULES DATED AUGUST 2011 FOR MORE INFORMATION ON
GROUND STABILIZATION REQUIREMENTS. PERMANENT GROUND COVER IS TO BE PROVIDED FOR ALL DISTURBED AREAS WITHIN 7 TO
14 DAYS OR SOONER FOLLOWING COMPLETION OF CONSTRUCTION OR DEVELOPMENT.
RIP RAP (6.15)
CONSTRUCTION SPECIFICATIONS
SUBGRADE PREPARATION - PREPARE THE SUBGRADE FOR RIP RAP AND FILTER TO THE REQUIRED LINES AND GRADES SHOWN ON THE
PLANS. COMPACT ANY FILL REQUIRED IN THE SUBGRADE TO A DENSITY APPROXIMATING THAT OF THE SURROUNDING UNDISTURBED
MATERIAL OR OVERFILL DEPRESSIONS WITH RIP RAP. REMOVE BRUSH, TREES, STUMPS AND OTHER OBJECTIONAL MATERIAL. CUT THE
SUBGRADE SUFFICIENTLY DEEP THAT THE FINISHED GRADE OF THE RIP RAP WILL BE AT THE ELEVATION OF THE SURROUNDING AREA.
CHANNELS SHOULD BE EXCAVATED SUFFICIENTLY TO ALLOW PLACEMENT OF THE RIP RAP IN A MANNER SUCH THAT THE FINISHED
INSIDE DIMENSIONS AND GRADE OF THE RIP RAP MEET DESIGN SPECIFICATIONS.
SAND AND GRAVEL FILTER BLANKET - PLACE THE FILTER BLANKET IMMEDIATELY AFTER THE GROUND FOUNDATION IS PREPARED. FOR
GRAVEL, SPREAD FILTER STONE IN A UNIFORM LAYER TO THE SPECIFIED DEPTH. WHERE MORE THAN ONE LAYER OF FILTER MATERIAL IS
USED, SPREAD THE LAYERS WITH MINIMAL MIXING.
SYNTHETIC FILTER FABRIC - PLACE THE CLOTH FILTER DIRECTLY ON THE PREPARED FOUNDATION. OVERLAP THE EDGES BY AT LEAST
12 INCHES, AND SPACE ANCHOR PINS EVERY 3 FT ALONG THE OVERLAP. BURY THE UPSTREAM END OF THE CLOTH A MINIMUM OF 12
INCHES BELOW GROUND AND WHERE NECESSARY, BURY THE LOWER END OF THE CLOTH OR OVERLAP WITH THE NEXT SECTION AS
REQUIRED. TAKE CARE NOT TO DAMAGE THE CLOTH WHEN PLACING RIP RAP. IF DAMAGE OCCURS REMOVE THE RIP RAP AND REPAIR
THE SHEET BY ADDING ANOTHER LAYER OF FILTER MATERIAL WITH A MINIMUM OVERLAP OF 12 INCHES AROUND THE DAMAGED AREA. IF
EXTENSIVE DAMAGE IS SUSPECTED, REMOVE AND REPLACE THE ENTIRE SHEET.
WHERE LARGE STONES ARE USED OR MACHINE PLACEMENT IS DIFFICULT, A 4-LNCH LAYER OF FINE GRAVEL OR SAND MAY BE NEEDED TO
PROTECT THE FILTER CLOTH.
STONE PLACEMENT - PLACEMENT OF RIP RAP SHOULD FOLLOW IMMEDIATELY AFTER PLACEMENT OF THE FILTER. PLACE RIP RAP SO THAT
IT FORMS A DENSE, WELL -GRADED MASS OF STONE WITH A MINIMUM OF VOIDS. THE DESIRED DISTRIBUTION OF STONES THROUGHOUT THE
MASS MAYBE OBTAINED BY SELECTIVE LOADING AT THE QUARRY AND CONTROLLED DUMPING DURING FINAL PLACEMENT. PLACE RIP RAP
TO ITS FULL THICKNESS IN ONE OPERATION. DO NOT PLACE RIP RAP BY DUMPING THROUGH CHUTES OR OTHER METHODS THAT CAUSE
SEGREGATION OF STONE SIZES. TAKE CARE NOT TO DISLODGE THE UNDERLYING BASE OR FILTER WHEN PLACING THE STONES.
THE FINISHED SLOPE SHOULD BE FREE OF POCKETS OF SMALL STONE OR CLUSTERS OF LARGE STONES. HAND PLACING MAY BE
NECESSARY TO ACHIEVE THE PROPER DISTRIBUTION OF STONE SIZES TO PRODUCE A RELATIVELY SMOOTH, UNIFORM SURFACE. THE
FINISHED GRADE OF THE RIP RAP SHOULD BLEND WITH THE SURROUNDING AREA. NO OVERFALL OR PROTRUSION OF RIP RAP SHOULD BE
APPARENT.
IT, I1IzIINzI\Ry3
INSPECT CHANNELS AT REGULAR INTERVALS AS WELL AS AFTER MAJOR RAINS, AND MAKE REPAIRS PROMPTLY. GIVE SPECIAL ATTENTION
TO THE OUTLET AND INLET SECTIONS AND OTHER POINTS WHERE CONCENTRATED FLOW ENTERS. CAREFULLY CHECK STABILITY AT ROAD
CROSSINGS AND LOOK FOR INDICATIONS OF PIPING, SCOUR HOLES, OR BANK FAILURES. MAKE REPAIRS IMMEDIATELY. MAINTAIN ALL
VEGETATION ADJACENT TO THE CHANNEL IN A HEALTHY, VIGOROUS CONDITION TO PROTECT THE AREA FROM EROSION AND SCOUR DURING
OUT -OF -BANK FLOW. CONTROL OF WEED AND BRUSH GROWTH MAY BE NEEDED IN SOME LOCATIONS.
LAND GRADING (6.02)
CONSTRUCTION SPECIFICATIONS
1. CONSTRUCT AND MAINTAIN ALL EROSION AND SEDIMENTATION CONTROL PRACTICES AND MEASURES IN ACCORDANCE WITH THE
APPROVED SEDIMENTATION CONTROL PLAN AND CONSTRUCTION SCHEDULE.
2. REMOVE GOOD TOPSOIL FROM AREAS TO BE GRADED AND FILLED, AND PRESERVE IT FOR USE IN FINISHING THE GRADING OF ALL
CRITICAL AREAS.
3. SCARIFY AREAS TO BE TOPSOILED TO A MINIMUM DEPTH OF 2 INCHES BEFORE PLACING TOPSOIL.
4. CLEAR AND GRUB AREAS TO BE FILLED TO REMOVE TREES, VEGETATION, ROOTS, OR OTHER OBJECTIONABLE MATERIAL THAT WOULD
AFFECT THE PLANNED STABILITY OF THE FILL.
5. ENSURE THAT FILL MATERIAL IS FREE OF BRUSH, RUBBISH, ROCKS, LOGS, STUMPS, BUILDING DEBRIS, AND OTHER MATERIALS
INAPPROPRIATE FOR CONSTRUCTING STABLE FILLS.
6. PLACE ALL FILL IN LAYERS NOT TO EXCEED 9 INCHES IN THICKNESS,AND COMPACT THE LAYERS AS REQUIRED TO REDUCE EROSION,
SLIPPAGE, SETTLEMENT, OR OTHER RELATED PROBLEMS.
7. DO NOT INCORPORATE FROZEN MATERIAL OR SOFT OR HIGHLY COMPRESSIBLE MATERIALS INTO FILL SLOPES.
8. DO NOT PLACE FILL ON A FROZEN FOUNDATION, DUE TO POSSIBLE SUBSIDENCE AND SLIPPAGE.
9. KEEP DIVERSIONS AND OTHER WATER CONVEYANCE MEASURES FREE OF SEDIMENT DURING ALL PHASES OF DEVELOPMENT.
10. HANDLE SEEPS OR SPRINGS ENCOUNTERED DURING CONSTRUCTION IN ACCORDANCE WITH APPROVED METHODS.
11. PERMANENTLY STABILIZE ALL GRADED AREAS IMMEDIATELY AFTER FINAL GRADING IS COMPLETED ON EACH AREA IN THE GRADING
PLAN PER NPDES SOIL STABILIZATION TIME FRAMES.
12. SHOW TOPSOIL STOCKPILES, BORROW AREAS, AND SPOIL AREAS ON THE PLANS, AND MAKE SURE THEY ARE ADEQUATELY PROTECTED
FROM EROSION. INCLUDE FINAL STABILIZATION OF THESE AREAS IN THE PLAN.
MAINTENANCE
PERIODICALLY CHECK ALL GRADED AREAS AND THE SUPPORTING EROSION AND SEDIMENTATION CONTROL PRACTICES, ESPECIALLY AFTER
HEAVY RAINFALLS. PROMPTLY REMOVE ALL SEDIMENT FROM DIVERSION AND OTHER WATER -DISPOSAL PRACTICES. IF WASHOUTS OR
BREAKS OCCUR, REPAIR THEM IMMEDIATELY. PROMPT MAINTENANCE OF SMALL ERODED AREAS BEFORE THEY BECOME SIGNIFICANT GULLIES
IS AN ESSENTIAL PART OF AN EFFECTIVE EROSION AND SEDIMENTATION CONTROL PLAN.
GRASS -LINED CHANNELS (6.30)
CONSTRUCTION SPECIFICATIONS
1. REMOVE ALL TREES, BRUSH,STUMPS, AND OTHER OBJECTIONABLE MATERIAL FROM THE FOUNDATION AREA AND DISPOSE OF
PROPERLY.
2. EXCAVATE THE CHANNEL AND SHAPE IT TO NEAT LINES AND DIMENSIONS SHOWN ON THE PLANS PLUS A 0.2-FT OVERCUT AROUND
THE CHANNEL PERIMETER TO ALLOW FOR BULKING DURING SEEDBED PREPARATIONS AND SOD BUILDUP.
3. REMOVE AND PROPERLY DISPOSE OF ALL EXCESS SOIL SO THAT SURFACE WATER MAY ENTER THE CHANNEL FREELY.
4. THE PROCEDURE USED TO ESTABLISH GRASS IN THE CHANNEL WILL DEPEND UPON THE SEVERITY OF THE CONDITIONS AND SELECTION
OF SPECIES. PROTECT THE CHANNEL WITH MULCH OR A TEMPORARY LINER SUFFICIENT TO WITHSTAND ANTICIPATED VELOCITIES
DURING THE ESTABLISHMENT PERIOD.
MAINTENANCE
DURING THE ESTABLISHMENT PERIOD, CHECK GRASS -LINED CHANNELS AFTER EVERY RAINFALL. AFTER GRASS IS ESTABLISHED,
PERIODICALLY CHECK THE CHANNEL; CHECK IT AFTER EVERY HEAVY RAINFALL EVENT. IMMEDIATELY MAKE REPAIRS. IT IS PARTICULARLY
IMPORTANT TO CHECK THE CHANNEL OUTLET AND ALL ROAD CROSSINGS FOR BANK STABILITY AND EVIDENCE OF PIPING OR SCOUR HOLES.
REMOVE ALL SIGNIFICANT SEDIMENT ACCUMULATIONS TO MAINTAIN THE DESIGNED CARRYING CAPACITY. KEEP THE GRASS IN A HEALTHY,
VIGOROUS CONDITION AT ALL TIMES, SINCE IT IS THE PRIMARY EROSION PROTECTION FOR THE CHANNEL.
VEGETATIVE PLAN (NCDENR 6.11)
SEEDING SCHEDULE:
SHOULDERS, SIDE DITCHES, SLOPES (3:1)
DATE
TYPE
PLANTING RATE
AUG 15 - NOV 1
TALL FESCUE
250 LBS/ACRE
NOV 1- MAR 1
TALL FESCUE
250 LBS/ACRE
&ABRUZZI RYE
25 LBS/ACRE
MAR 1- APR 15
TALL FESCUE
250 LBS/ACRE
APR 15 - JUN 15
HULLED COMMON BERMUDAGRASS
12 LBS/ACRE
JUN 15-AUG 15
TALL FESCUE
250 LBS/ACRE
& BROWNTOP MILLET***
35 LBS/ACRE
OR SORGHUM-SUDAN HYBRIDS***
30 LBS/ACRE
SLOPES (3:1 TO 2:1)
MAR 1-JUN 1
SERICEA LESPEDEZA (SCARIFIED)
50 LBS/ACRE
AND
(MAR 1- APR 15)
ADD TALL FESCUE
250 LBS/ACRE
(MAR 1- JUN 30)
OR ADD WEEPING LOVEGRASS
5 LBS/ACRE
(MAR 1- JUN 30)
OR ADD HULLED COMMON BERMUDAGRASS
8 LBS/ACRE
JUN 1- SEP 1
TALL FESCUE***
250 LBS/ACRE
& BROWNTOP MILLET***
35 LBS/ACRE
OR SORGHUM-SUDAN HYBRIDS***
30 LBS/ACRE
SEP 1- MAR 1
SERICEA LESPEDEZA (UNHULLED-UNSCARIFIED)
70 LBS/ACRE
& TALL FESCUE
250 LBS/ACRE
(NOV 1- MAR 1)
ADD ABRUZZI RYE
125 LBS/ACRE
CONSULT CONSERVATION ENGINEER OR SOIL CONSERVATION SERVICE FOR ADDITIONAL INFORMATION CONCERNING OTHER ALTERNATIVES FOR
VEGETATION OF DENUDED. AREAS. THE ABOVE VEGETATION RATES ARE THOSE WHICH DO WELL UNDER LOCAL CONDITIONS: OTHER SEEDING
RATE COMBINATIONS ARE POSSIBLE.
***TEMPORARY - RESEED ACCORDING TO OPTIMUM SEASON FOR DESIRED PERMANENT VEGETATION. DO NOT ALLOW TEMPORARY COVER TO
GROW OVER 12 INCHES IN HEIGHT BEFORE MOWING, OTHERWISE, FESCUE MAY BE SHADED OUT.
SEEDING SPECIFICATIONS
1. AFTER ROUGH GRADING IS COMPLETED, TILL SOIL IN AREAS TO BE SEEDED AND PLANTED TO A DEPTH OF SIX INCHES.
2. APPLY AGRICULTURAL LIME, FERTILIZER, AND SUPERPHOSPHATE TO DISTURBED AREAS TO BE VEGETATED.
2.1. 135 LBS LIMESTONE/1000 SQ FT (3 TONS/ACRE) OR BASED ON SOIL TEST
2.2. 35 LBS 10-10-10 FERTILIZER/1000 SQ FT (1500 LBS/ACRE)
2.3. 40 LBS 50% SUPERPHOSPHATE/1000 SQ FT (1750 LBS/ACRE)
3. DISK NUTRIENTS INTO SOIL TO A DEPTH OF SIX INCHES UNTIL SURFACE IS UNIFORM AND FREE OF LARGE DIRT CLODS.
4. SEEDING PERMANENT GRASS.
4.1. SEE ABOVE TABLE.
5. MULCH SEEDED AREA WITH SMALL GRAIN STRAW AT 90 LBS/1000 SQ FT (2 TONS/ACRE). SPREAD UNIFORMLY. APPROXIMATELY 1/2
OF GROUND SURFACE SHOULD BE VISIBLE TO AVOID BLOCKING SUNLIGHT TO SEEDLINGS. ON AREAS WHERE THE GROUND SURFACE
EQUALS OR EXCEEDS A 3:1 SLOPE, AND IN THE INVERTS OF ALL DRAINAGE SWALES, TACK MULCH WITH ASPHALT EMULSION AT A
RATE OF 450 GALLONS EMULSION PER ACRE OF STRAW.
6. MULCH AROUND SHRUBBERY AND TREES WITH PINE STRAW TO DEPTH OF 3 INCHES.
7. TEMPORARY COVER
7.1. 1.0 LBS BROWN TOP MLLLET/1000 SQ FT MAY THROUGH AUGUST 25. -OR- 1.0 LBS ANNUAL RYEGRASS/1000 SQ FT AUGUST 25
THROUGH APRIL.
8. REFER TO SHEET ## FOR FURTHER DETAIL ON THE TEMPORARY AND PERMANENT VEGETATION SEEDBED PREPARATION.
TOPSOILING (6.04)
CONSTRUCTION SPECIFICATIONS
MATERIALS
1. DETERMINE WHETHER THE QUALITY AND QUANTITY OF AVAILABLE TOPSOIL JUSTIFIES SELECTIVE HANDLING. QUALITY TOPSOIL HAS THE
FOLLOWING CHARACTERISTICS:
1.1. TEXTURE - LOAM, SANDY LOAM, AND SLIT LOAM ARE BEST; SANDY CLAY LOAM, SILTY CLAY LOAM, CLAY LOAM, AND LOAMY
SAND ARE FAIR. DO NOT USE HEAVY CLAY AND ORGANIC SOILS SUCH AS PEAT OR MUCK AS TOPSOIL.
1.2. ORGANIC MATTER CONTENT - (SOMETIMES REFERRED TO AS "HUMIC MATTER") SHOULD BE GREATER THAN 1.5% BY WEIGHT.
1.3. ACIDITY - PH SHOULD BE GREATER THAN 3.6 BEFORE LIMING, AND LIMING IS REQUIRED IF IT IS LESS THAN 6.0.
1.4. SOLUBLE SALTS - SHOULD BE LESS THAN 500 PPM.
1.5. SODIUM - SODIUM ADSORPTION RATIO SHOULD BE LESS THAN 12.
THE DEPTH OF MATERIAL MEETING THE ABOVE QUALIFICATIONS SHOULD BE AT LEAST 2 INCHES. SOIL FACTORS SUCH AS ROCK
FRAGMENTS, SLOPE, DEPTH TO WATER TABLE, AND LAYER THICKNESS AFFECT THE EASE OF EXCAVATION AND SPREADING OF TOPSOIL.
GENERALLY, THE UPPER PART OF THE SOIL, WHICH IS RICHEST IN ORGANIC MATTER, IS MOST DESIRABLE; HOWEVER, MATERIAL EXCAVATED
FROM DEEPER LAYERS MAY BE WORTH STORING IF IT MEETS THE OTHER CRITERIA LISTED ABOVE.
ORGANIC SOILS SUCH AS MUCKS AND PEATS DO NOT MAKE GOOD TOPSOIL. THEY CAN BE IDENTIFIED BY THEIR EXTREMELY LIGHT WEIGHT
WHEN DRY.
STRIPPING
1. STRIP TOPSOIL ONLY FROM THOSE AREAS THAT WILL BE DISTURBED BY EXCAVATION, FILLING, ROAD BUILDING, OR COMPACTION BY
EQUIPMENT. A 4 TO 6-INCH STRIPPING DEPTH IS COMMON, BUT DEPTH VARIES DEPENDING ON THE SITE. DETERMINE DEPTH OF
STRIPPING BY TAKING SOIL CORES AT SEVERAL LOCATIONS WITHIN EACH AREA TO BE STRIPPED. TOPSOIL DEPTH GENERALLY VARIES
ALONG A GRADIENT FROM HILLTOP TO TOE OF THE SLOPE. PUT SEDIMENT BASINS, DIVERSIONS, AND OTHER CONTROLS INTO PLACE
BEFORE STRIPPING.
STOCKPILING
1. SELECT STOCKPILE LOCATION TO AVOID SLOPES AND NATURAL DRAINAGEWAYS, AVOIDING TRAFFIC ROUTES. ON LARGE SITES,
RESPREADING IS EASIER AND MORE ECONOMICAL WHEN TOPSOIL IS STOCKPILED IN SMALL PILES LOCATED NEAR AREAS WHERE THEY
WILL BE USED. ALL STOCKPILE AREAS USED SHALL BE STABILIZED WITH SILT FENCE AND SEEDED PER THE LATEST NPDES RULES.
2. SEDIMENT BARRIERS - USE SEDIMENT FENCES OR OTHER BARRIERS WHERE NECESSARY TO RETAIN SEDIMENT.
3. TEMPORARY SEEDING - PROTECT TOPSOIL STOCKPILES BY TEMPORARILY SEEDING PER THE LATEST NPDES RULES.
4. PERMANENT VEGETATION - IF STOCKPILES WILL NOT BE USED WITHIN 12 MONTHS THEY MUST BE STABILIZED WITH PERMANENT
VEGETATION TO CONTROL EROSION AND WEED GROWTH.
SITE PREPARATION
1. BEFORE SPREADING TOPSOIL, ESTABLISH EROSION AND SEDIMENTATION CONTROL PRACTICES SUCH AS DIVERSIONS, BERMS, DIKES,
WATERWAYS, AND SEDIMENT BASINS.
2. GRADING - MAINTAIN GRADES ON THE AREAS TO BE TOPSOILED ACCORDING TO THE APPROVED PLAN AND DO NOT ALTER THEM BY
ADDING TOPSOIL.
3. LIMING OF SUBSOIL - WHERE THE PH OF THE EXISTING SUBSOIL IS 6.0 OR LESS, OR THE SOIL IS COMPOSED OF HEAVY CLAYS,
INCORPORATE AGRICULTURAL LIMESTONE IN AMOUNTS RECOMMENDED BY SOIL TESTS OR SPECIFIED FOR THE SEEDING MIXTURE TO BE
USED. INCORPORATE LIME TO A DEPTH OF AT LEAST 2 INCHES BY DISKING.
4. ROUGHENING - IMMEDIATELY PRIOR TO SPREADING THE TOPSOIL. LOOSEN THE SUBGRADE BY DISKING OR SCARIFYING TO A DEPTH OF
AT LEAST 4 INCHES, TO ENSURE BONDING OF THE TOPSOIL AND SUBSOIL. IF NO AMENDMENTS HAVE BEEN INCORPORATED, LOOSEN
THE SOIL TO A DEPTH OF AT LEAST 6 INCHES BEFORE SPREADING TOPSOIL.
SPREADING TOPSOIL
1. DO NOT SPREAD TOPSOIL WHILE IT IS FROZEN OR MUDDY OR WHEN SUBGRADE IS WET OR FROZEN. CORRECT ANY IRREGULARITIES IN
THE SURFACE THAT RESULT FROM TOPSOILING OR OTHER OPERATIONS TO PREVENT THE FORMATION OF DEPRESSIONS OR WATER
POCKETS.
2. COMPACT THE TOPSOIL ENOUGH TO ENSURE GOOD CONTACT WITH THE UNDERLYING SOIL, BUT AVOID EXCESSIVE COMPACTION, AS IT
INCREASES RUNOFF AND INHIBITS SEED GERMINATION. LIGHT PACKING WITH A ROLLER IS RECOMMENDED WHERE HIGH -MAINTENANCE
TURF IS TO BE ESTABLISHED.
3. ON SLOPES AND AREAS THAT WILL NOT BE MOWED, THE SURFACE MAY BE LEFT ROUGH AFTER SPREADING TOPSOIL. A DISK MAY BE
USED TO PROMOTE BONDING AT THE INTERFACE BETWEEN TOPSOIL AND SUBSOIL.
4. AFTER TOPSOIL APPLICATION, FOLLOW PROCEDURE FOR SEEDBED PREPARATION, TAKING CARE TO AVOID EXCESSIVE MIXING OF
TOPSOIL INTO THE SUBSOIL.
EROSION CONTROL MATTING:
SEE DETAIL 4/11 FOR CONSTRUCTION SPECIFICATIONS.
MAINTENANCE
1. INSPECT ROLLED EROSION CONTROL MATTING AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (1/2 INCH OR GREATER) RAIN FALL
EVENT REPAIR IMMEDIATELY.
2. GOOD CONTACT WITH THE GROUND MUST BE MAINTAINED, AND EROSION MUST NOT OCCUR BENEATH THE MATTING.
3. ANY AREAS OF THE MATTING THAT ARE DAMAGED OR NOT IN CLOSE CONTACT WITH THE GROUND SHALL BE REPAIRED AND STAPLED.
4. IF EROSION OCCURS DUE TO POORLY CONTROLLED DRAINAGE, THE PROBLEM SHALL BE FIXED AND THE ERODED AREA PROTECTED.
5. MONITOR AND REPAIR THE MATTING AS NECESSARY UNTIL GROUND COVER IS ESTABLISHED.
J
z
O
Lu
Lu
z
G
Lu
D_
O
LL
i
L.L
Q
VYK
DICKSON
community infrastructure consultants
720 CORPORATE CENTER DRIVE
RALEIGH, NC 27607
(t) 919-782-0495
(f)919-782-9672
WWW.WKDICKSON.COM
NC LICENSE NO.F-0374
PROFESSIONAL SEAL
m
Q z
fr 0
O a_
W 0
fr
z Lu
O
W
Lu
0
b
W
U
z
z z
W H
W z
U Q
g �
W
OC Q
Lu z
> O
J �
U U_
W ILL
z U
W
0_
J
Q J
O
Q �
z
z O
Y U
O z
pr O
ED 0
6 i ti.i O
< �_ LuQ
z
U z
Lu
O Q
cr 0
PROJ. MGR.: M. HORSTMAN
DESIGN BY: M. HORSTMAN
DRAWN BY: M. SMALLING
PROJ. DATE: JULY 2019
DRAWING NUMBER:
120F 18
WKD PROJ. NO.:
20180394.00. RA
ZOw
0UO
OJU
Ozw
aOQ
F .F
w OwO
gF�
�ma
Uw
0=¢m
Sao
w
ozw
w o-o
�
WUZ
O
z,
z
DOm
w Y J
U_Q
~pS
OYD
w��
D'.
¢OO
zwa
0.,
z
z°
oo
2w (7
tr'
wQQ
¢�z
�
wD0 °o
wiz
wa
=a�
(Dzw
Y
¢ ¢ Qo¢ m
w
z°w
3:7
OZD
U—U
ZZD
w
07T
YU~
U
p00
�=z
0'
0
=zw
Eo=
¢F7
awl
0
00,
0
a
GENERAL STRUCTURAL NOTES:
FOUNDATIONS:
FOUNDATION DESIGN IS BASED ON ALLOWABLE SOIL BEARING PRESSURES AS STATED IN A SUBSURFACE EXPLORATION REPORT NO.
66V-0107 PREPARED BY FROEHLING & ROBERTSON, INC. DATED AUGUST 21, 2017.
II. STRUCTURAL CONCRETE:
1. CONCRETE SHALL HAVE A MINIMUM 28-DAY COMPRESSIVE STRENGTH OF 4000 PSI, UNLESS NOTED OTHERWISE.
2. NORMAL -WEIGHT CONCRETE SHALL HAVE A MAXIMUM UNIT WEIGHT OF 145 PCF, UNLESS NOTED OTHERWISE.
3. REINFORCING STEEL SHALL CONFORM TO ASTM A615, GR60, INCLUDING TIES AND STIRRUPS.
4. MINIMUM CONCRETE COVER SHALL BE AS FOLLOWS, UNLESS NOTED OTHERWISE:
A) UNFORMED SURFACES IN CONTACT WITH THE GROUND.................................................................................................. 3"
B) FORMED SURFACES EXPOSED TO EARTH OR WEATHER................................................................................................... 2"
C) FORMED SURFACES NOT EXPOSED TO EARTH OR WEATHER........................................................................................... 1 1/2"
5. FINISHES SHALL CONFORM TO REQUIREMENTS OF ACI 301.
III. MISCELLANEOUS:
1. STRUCTURAL DRAWINGS ARE INTENDED TO BE USED WITH CIVIL DRAWINGS. CONTRACTOR IS RESPONSIBLE FOR COORDINATING SUCH
REQUIREMENTS INTO THEIR SHOP DRAWINGS AND WORK.
2. NO OPENING SHALL BE MADE IN ANY STRUCTURAL MEMBER WITHOUT WRITTEN APPROVAL OF THE STRUCTURAL -ENGINEER -OF -RECORD.
3. NO CHANGE IN SIZE OR DIMENSION OF STRUCTURAL MEMBERS SHALL BE MADE WITHOUT WRITTEN APPROVAL OF THE
STRUCTURAL -ENGINEER -OF -RECORD.
4. OPENINGS 1'-4" AND LESSON ASIDE ARE GENERALLY NOT SHOWN ON THE STRUCTURAL DRAWINGS. REFER TO CIVIL DRAWINGS FOR SUCH
OPENINGS.
5. THE CONTRACTOR IS RESPONSIBLE FOR LIMITING THE AMOUNT OF CONSTRUCTION LOADS APPLIED TO THE STRUCTURAL FRAMING.
CONSTRUCTION LOADS SHALL NOT EXCEED THE DESIGN CAPACITY OF THE FRAMING AT THE TIME THE LOADS ARE APPLIED.
6. DO NOT SCALE THESE DRAWINGS; USE DIMENSIONS.
7. ELEVATIONS OF TOP SLABS SHALL BE INTERPRETED AS PLUS OR MINUS WITH THE INTENT THAT THE CONTRACTOR WILL HAVE SOME
FLEXIBILITY IN THE FIELD.
GRADES, ELEVATIONS AND LOCATION SHOWN ARE APPROXIMATE. AS DIRECTED BY THE ENGINEER, THEY MAY BE ADJUSTED TO ACCOMMODATE
UNFORESEEN CONDITIONS. WEEPHOLES ARE TO BE CONSTRUCTED IN ALL DRAINAGE STRUCTURES, WEEPHOLES SHOULD BE ON 8' CENTER WITH A
MINIMUM OF 1 WEEPHOLE PER WALL. WEEPHOLES ARE TO BE COVERED ON THE OUTSIDE OF THE STRUCTURE BY A BAG MADE OF FILTER FABRIC
FILLED WITH #78 STONE. THERE WILL BE NO SEPARATE PAYMENT FOR THIS WORK.
STATION, OFFSETS AND ELEVATIONS REFER TO THE CENTER OF DROP INLETS, MANHOLES AND JUNCTION BOXES, AND THE MIDPOINT OF THE GRATE
FOR CATCH BASINS.
BAR SIZE
Ld (INCHES)
HOOK LEG
3
13
7
4
17
9
5
21
11
6
26
14
7
37
16
8
43
18
9
53
23
10
65
25
11
78
28
DEVELOPMENTAL LENGTH FOR STANDARD REINFORCING BARS
OPENING TO BE
CREATED BY PRECAST
FILL VOID WITH
CEMENTITIOUS
NON —SHRINK GR
XISTING OR NEW
CP STORM SEWER
NOTES
1. PROVIDE 6" MINIMUM CLEARANCE BETWEEN MAINLINE JOINTS AND
PIPE OPENING.
1 PIPE TIE-IN DETAIL
13 NOT TO SCALE
e
e
SECTION 1
SAW —CUT
RCP
FLUSH
WITH
INSIDE
WALL OF
RCP/RCBC
NEW
RE
3" PVC PIPE c
4' CENTER
WEEP HOLE SECTION
DETAIL Y
NOT TO SCALE
SEALANT 1" WIDE 1/2" DEEP
1 /2'
JOINT FILLE
EXISTING
CULVERT
NEW 1 1/4" BACKER ROD
WINGWALL COMPATIBLE WITH
SEALANT
ISOLATION JOINT BETWEEN WING WALL AND CULVERT DETAIL
NOT TO SCALE
UBIC
,T OF
NE
FILTER
FABRIC
1.3xLd
SPLICES
3 x Ld
OPTIONAL WALL OR SLAB CONSTRUCTION JOINT
SEALANT 1" WIDE 1/2" D
APRON
SLAB
1 1 /4" BACKER ROD
COMPATIBLE WITH SEALANT
NOT TO SCALE
I1/2"
CULVERT
SLAB
JOINT FILLER
ISOLATION JOINT BETWEEN APRON AND CULVERT SLAB
NOT TO SCALE
J
Z
O
Lu
Lu
oc
z
G
Lu
CL
oc
O
LL
LL
Q
0
9 kaydos-daniels engineers, pllc
00-201 w morgan st raleigh60
4966 F 919 828 496
PROFESSIONAL SEAL
m
p z
D= O
O a_
W0
fr �
z Lu
O
Lu
Lu
a
0
IIIIIIIlb
H
z
Lu
Lu
g
Lu cf)
� J
H Q
Lu w
J 0
Q
U �
Lu
g
J
0 cf)
0
z
Lu
Y
m
w w
J
Q ~
z
U z
w �
O Q
� o
PROJ. MGR.: M. HORSTMAN
DESIGN BY: M. SMALLING
DRAWN BY: M. SMALLING
PROJ. DATE: JULY 2019
DRAWING NUMBER:
130F 18
WKD PROJ. NO.:
20180394.00. RA
w
02
w
ooa
FOO
OJU
pzw
a0¢
F .F
ww9
gF�
0m�
o=w
0
om
�a0
Ozw
.70
zo.
w0z
O
zzw
00om
=UQ
~ON
OY.
. w N
0
zz<
oww
F.,
�OQ
ozz
2w(5
aGN
w¢a
¢�z
wDmm
boo
w�a
¢FF
=a�
c7z°w
<w�
ZOw
9D
oz0
'zo
zzo
w
o2,
Y�F
U00
000
Y "z
�Yz
4H
0
=zw
�0z
mwo
O
cU O Imi
TOP OF WINGWALL
ELEV. = 953.00
TOP OF W
ELEV = 953
TOP OF V
ELEV = 95:
r RVrIJJLV Yu RI,F
INVERT ELEV. = 949.77
UPSTREAM HEADWALL STRUCTURE #1
NOT TO SCALE
Tnp nF HFAnwAl I
TOP OF WINGWALL
ELEV. = 953.00
ELEV=956.27
PR(
2'
2'
N
N
I
r
TOP OF HEADWALL
FI FV = 956.97
PLAN VIEW
SCALE: 3/8" = 1'-0"
)P. 48" RCP
1'-6"
#5 BENT BAR ® 12" O.C.
3'-6"
TOP / WALL
1' 956.27
#4 @ 1'-0" LONG. EA. FACE
(2) #4 —SPACE AS DIMENSIONED
#6 VERT @ 1'-0" O.C.
#4 VERT @ 1'-0" O.C.
DRILL 0 EPDXY INTO RCBC W/ HILTI
HIT—HY 200 ADHESIVE MIN. EMBED. = 5"
d
Ln Q G d k d a
f
2„
2'
rikk TOP /FTG 4—
949.77 . d d d a .
,..
a 1
d
S p. d
a a
a
N a
° 3,
CUSTOM HEADWALL
STRUCTURE 1 DETAILS
*ELEVATIONS MAY VARY DUE TO
WALL THICKNESS PER
MANUFACTURER
— (2) #5 LONG. BARS — PROP. 48" RCP
SPACE EVENLY
— (3) #5 LONG. BARS —
SPACE EVENLY
— #5 @ 12" O.C.
o d ° Ln
#5 LONG. BARS ® 12 O.C. 11' 1 SECT 0 N A
TOP / WALL
VARIES
1'-6"
#5 BENT BAR @ 12" O.C.
3'-6"
TOP / FTG.
949.35
#5 LONG. BARS @ 12" O.C.
SCALE: 1 /2" =
1'
2" CLEAR 2" CLEAR
-A
1'-0"
12" #57 STONE
a .
#5 VERT Ca? #4 CAD 1'-0"
1'-0" O.C. O.C. LONG.
#4 VERT 0
1'-0" O.C.
cf) DOWEL ® EA. VERT — MATCH
w SIZE AND SEE SCHEDULE FOR
Q ° LAP ® TOP & STD. 90- HOOK
> @ BOTT.
4"
2' d 3'
d. 4» r7
O d
a;
d O.°.
a
d
A. ° O Sd d
FAN
a
0
d
#5 0 12" O.C. EA. WAY,
TOP & BOTTOM (TYP.)
s
SECTION B—B
SCALE: 1 /2" = 1'-0"
12" #57 STONE
J
z
0
Lu
Lu
ol:
Z_
ol:
Lu
D_
0
LL
L.L
Q
ID
9 kaydos-daniels engineers, pllc
400-201 w morgan1 60
PROFESSIONAL SEAL
m
p z
cc O
0 a
cc
Lu
0
U)
w
w
a
0
IIIIIIIIZ
H
Z
W
W
U
g
O_ Q
W W
0= �
T
W W
J
U U
W �
Z
J
Q �
U
Z
W
Y
0=
ED
W LLj
J
z
U Z
Lu
0 Q
cr o
PROJ. MGR.: M. HORSTMAN
DESIGN BY: M. SMALLING
DRAWN BY: M. SMALLING
PROJ. DATE: JULY 2019
DRAWING NUMBER:
140F 18
WKD PROJ. NO.:
20180394.00. RA
i
02
w
00a
FOO
OJU
'zw
a0¢
Z .F
ww9
2E �
Dm�
o=w
0
om
�a0
Ozw
.70
zo.
wUZ
O
zzw
00om
=UQ
~ON
OY.
W � Q
LLl
. w N
ooz
zz<
o.¢
�OQ
oZz
2w(5
w¢a
¢�z
wo¢
boo
wFZ
w�a
¢FF
=a�
�Zw
¢0<
<w�
?mw
3D
oz0
'zo
zzo
W
°2_
Y�F
U00
p00
Y�z=Z
4H
0
=Zw
�0z
mwo
0
cU O Imi
PROP. 48" RCP
TOP OF WINGWALL
ELEV. = 951.50
rrwrv.Dr=v to rwr
INVERT ELEV. = 948.26
DOWNSTREAM ENDWALL STRUCTURE #2
NOT TO SCALE
Tnn nr unpin
al
Qc_o�p
PLAN VIEW
SCALE: 3/8" = 1'-0"
TOP OF WINGWALL
ELEV. = 951.50
PROPOSED 24" RCP TIE—IN
INVERT ELEV. = 949.78
-OP OF WING
:LEV = 951.50
TOP OF WING
ELEV = 951.50
CUSTOM ENDWALL
STRUCTURE 2 DETAILS
TOP / WALL
956.00
#4 @ 1'-0" LONG. EA. FACE
(2) #4 —SPACE AS DIMENSIONED
#6 VERT @ 1'-0" O.C.
#4 VERT @ 1'-0" O.C.
DRILL @ EPDXY INTO RCBC W/ HILTI
JIT—HY 200 ADHESIVE, MIN. EMBED. = 5"
*ELEVATIONS MAY VARY DUE TO
WALL THICKNESS PER
MANUFACTURER
PROP. 48" RCP
(2) #5 LONG. BARS —
SPACE EVENLY
(3) #5 LONG. BARS —
SPACE EVENLY :�
#5 @ 12" O.C.
° s
°
° \.A
°
°
12" #57 STONE
3'
SECTION A— A
SCALE: 1 /2" = 1'-0"
Ili]2FIATiTG\41
1'-6"
#5 BENT BAR @ 12" O.C.
3'-6"
TOP / FTG.
947.84
I
00
I
N
#5 LONG. BARS @ 12" O.C.
co
w
of
a
I.
s
2'
1'
2" CLEAR 2"
#5 VERT @
1'-0" O.C.
El
al.
1'-6"
#5 BENT BAR @ 12" O.C.
3'-6"
TOP / FTG
948.26
° I
°
° N
1' #5 LONG. BARS @ 12" O.C.
#4 @ 1'-0"
O.C. LONG.
#4 VERT @
1'— 0" O.C.
DOWEL @ EA. VERT — MATCH
SIZE AND SEE SCHEDULE FOR
LAP @ TOP & STD. 90- HOOK
@ BOTT.
2' 3'
c. 4" M
° ° °.°.
dk°
`4 12" #57 STONE
°
#5 @ 12" O.C. EA. WAY,
.. TOP & BOTTOM (TYP.)
SECTION B—B
SCALE: 1 /2" = 1'-0"
J
z
0
Lu
Lu
01:
cD
z
01:
Lu
D_
0
LL
L.L
Q
ID
9 kaydos-daniels engineers, pllc
PROFESSIONAL SEAL
m
p z
cc O
°C w
z o
0
U)
w
w
a
0
Z
H
z
Lu
Lu
U
g
a Q
Lu Lu
o= �
~ N
W Lu
J
U U
Lu
z
J 0
Q �
� U
z
Lu
Y
cr
ED
LLI LLj
J
Q ~
z
w z
cr o
PROJ. MGR.: M. HORSTMAN
DESIGN BY: M. SMALLING
DRAWN BY: M. SMALLING
PROJ. DATE: JULY 2019
DRAWING NUMBER:
150F 18
WKD PROJ. NO.:
20180394.00. RA
i
02
w
ooa
FOO
OJU
'zw
a0¢
Z .F
ww
� F J
0R j
0 mm
w
0
om
�a0
Ozw
.70
zo.
wUZ
O
zzw
000
=UQ
~ON
OYJ
.oc
oz
zz<
o.¢
�OQ
oZz
2w(5
aGN
w¢a
¢�z
wo¢
F°
w�a
=a�
<w�
Z° w
9D
Oz0
'zo
zzo
W
°2_
Y�F
U00
p00
Y "z=Z
oo¢
0
=Zw
�0z
mwo
0
cU O'.
TOP OF WINGWALL
ELEV. = 948.00
PROPOSED 15" RCP
INVERT ELEV. =
LAIC 1. ov LMr
INVERT ELEV. = 943.27
UPSTREAM HEADWALL STRUCTURE #3
NOT TO SCALE
TOP OF WINGWALL
ELEV. = 948.00
3TIC DRAINAGE PIPE
CONTRACTOR TO
ERIFY REQUIRED
IN AND INVERT ELEV.
1'-6"
#5 BENT BAR @ 12" O.C.
3'-6"
2'
m
2"
rikk TOP / FTG
943.27 s °
°..
°..
° ° ° °
a
°
A3'
TOP / WALL
950.00
#4 @ 1'-0" LONG. EA. FACE
(2) #4 —SPACE AS DIMENSIONED
#6 VERT @ 1'-0" O.C.
#4 VERT @ 1'-0" O.C.
DRILL @ EPDXY INTO RCBC W/ HILTI
HIT—HY 200 ADHESIVE, MIN. EMBED. _
GROUT TO 5" THICKNESS
*ELEVATIONS MAY VARY DUE TO
WALL THICKNESS PER
MANUFACTURER
EXIST. 60" CMP
(2) #5 LONG. BARS —
SPACE EVENLY
(3) #5 LONG. BARS —
SPACE EVENLY
#5 @ 12" O.C.
GROUT TO 5" THICKNESS
/ #5 LONG. BARS @ 12" O.C. SECTION A - A
1'
TOP OF WING SCALE: 1 /2 = 1'-0"
ELEV = 948.00
ELEV=v948.00 \ / FIELD VERIFY REQUIRED
LOCATION AND INVERT ELEV.
PLAN VIEW
SCALE: 3/8" = 1'-0"
12" #57 STONE
1'
2" CLEAR 2" CLEAR
;MP TOP /WALL
VARIES
#5 VERT @ ° #4 @ 1'-0"
1'-0" O.C. O.C. LONG.
4. #4 VERT @
1'-0" O.C.
V) DOWEL @ EA. VERT — MATCH
w SIZE AND SEE SCHEDULE FOR
a
LAP @ TOP & STD. 90` HOOK
> @ BOTT.
a
#5 BENT BAR @ 12" O.C. a
3'-6"
2- ° 3
°. 4„ M
4"
TOP /FTG.
942.85 °
°. -1a
I ° d o
° d .
a
°
00 a 12" #57 STONE
N c
°
#5 @ 12" O.C. EA. WAY,
A. TOP & BOTTOM (TYP.)
1'
#5 LONG. BARS @ 12" O.C. _/
6'
CUSTOM HEADWALL
STRUCTURE 3 DETAILS
SECTION B-B
SCALE: 1 /2" = 1'-0"
in
9 kaydos-daniels engineers, pllc
PROFESSIONAL SEAL
m
p z
O
O a
cc �
Lu
U)
W
w
0
b
H
Z
Lu
Lu
U
g
Q
Lu Lu
0
H c)
Lu Lu
>
J
� H
U U
Lu D
Z
Lu
J 0
o �
Q �
� U
Z
Lu
Y
0=
ED
W LLj
J
Q ~
z
U Z
w
o Q
a o
PROJ. MGR.: M. HORSTMAN
DESIGN BY: M. SMALLING
DRAWN BY: M. SMALLING
PROJ. DATE: JULY 2019
DRAWING NUMBER:
160F 18
WKD PROJ. NO.:
20180394.00. RA
i
02
w
ooa
FOO
OJU
'zw
a0¢
Z .F
ww9
gF�
0m�
o=w
0
om
�a0
Ozw
.70
zo.
wUZ
O
zzw
00om
=UQ
~ON
OY.
.oc
oz
zz<
o.¢
�OQ
oZz
2w(5
aGN
w¢a
¢�z
wDmm
boo
wFz
w�a
=a�
�Zw
<w�
?mw
3D
Oz0
'zo
zzo
w
o2,
Y�F
U00
p00
Y�z=Z
4H
0
=Zw
�0z
mwo
0
cU O'.
TOP OF WINGWALL
ELEV. = 946.00
PROP. 60" CN
r«vr. ov 1-11vir
INVERT ELEV. = 942.01
DOWNSTREAM ENDWALL STRUCTURE #4
NOT TO SCALE
(1 7 1-, -- l___^ \ \
PLAN VIEW
SCALE: 3/8" = 1'-0"
TOP OF WINGWALL
ELEV. = 946.00
TOP OF WING
ELEV = 946.00
TOP OF WING
ELEV = 946.00
CUSTOM ENDWALL
STRUCTURE 4 DETAILS
TOP / WALL
948.00
1'
#4 @ 1'-0" LONG. EA. FACE
(2) #4 —SPACE AS DIMENSIONED
#6 VERT @ 1'-0" O.C.
#4 VERT @ 1'-0" O.C.
DRILL @ EPDXY INTO RCBC W/ HILTI °
HIT—HY 200 ADHESIVE, MIN. EMBED. = 5"
GROUT TO 5" THICKNESS 2"�
*ELEVATIONS MAY VARY DUE TO
WALL THICKNESS PER
MANUFACTURER 1'-6"
Lo #5 BENT BAR @ 12" O.C.
EXIST. 60" CMP 3'-6"
(2) #5 LONG. BARS —
SPACE EVENLY
(3) #5 LONG. BARS — 2'
SPACE EVENLY
#5 @ 12" O.C.
GROUT TO 5" THICKNESS TOP / FTG
942.01
° °
°.
. O° d . Od
° Q. .
9c
N
Od
3'
12" #57 STONE
SECTION A — A 1' #5 LONG. BARS @ 12" O.C.
SCALE: 1 /2" = 1'-0"
TOP / WALL
948.00
1'-6"
#5 BENT BAR @ 12" O.C.
3'-6"
TOP / FTG.
941.59
#5 LONG. BARS @ 12" O.C.
in
I
1'
2" CLEAR 2" CLEAR
#5 VERT @
1'-0" O.C.
2'
4"1---
d
° #4 @ 1'-0"
O.C. LONG.
#4 VERT @
1'-0" O.C.
DOWEL @ EA. VERT —MATCH
SIZE AND SEE SCHEDULE FOR
LAP @ TOP & STD. 90- HOOK
@ BOTT.
3'
4"
a;
da.. agbd
.. a
#5 @ 12" O.C. EA. WAY,
TOP & BOTTOM (TYP.)
SECTION B-B
SCALE: 1 /2" = 1'-0"
12" #57 STONE
J
z
0
Lu
Lu
ol:
Z_
ol:
Lu
D_
0
LL
L.L
Q
9 kaydos-daniels engineers, pllc
400-201 w morgan1 60
PROFESSIONAL SEAL
co
O
O a
cc �
z Lu
0
U)
W
0=
w
0
IIIIIIII°
H
Z
Lu
Lu
U
g
Q
Lu Lu
o= �
W Lu
> oC
J
U U
Lu D
Z
J
o O
Q �
� U
Z
Lu
Y
cr
ED
W LLj
J
Q ~
z
U Z
w
o Q
a o
PROJ. MGR.: M. HORSTMAN
DESIGN BY: M. SMALLING
DRAWN BY: M. SMALLING
PROJ. DATE: JULY 2019
DRAWING NUMBER:
170F 18
WKD PROJ. NO.:
20180394.00. RA