HomeMy WebLinkAbout20200200 Ver 1_BR-0123 - Bridge Abandonment_20200313Wanucha, Dave
From: Cheely, Erin K
Sent: Friday, March 13, 2020 1:46 PM
To: Beckwith, Loretta A CIV USARMY CESAW (USA); Wanucha, Dave
Cc: Turchy, Michael A
Subject: BR-0123 - Bridge Abandonment
Lori and Dave,
FYI - Bridge 318 in Surry County (BR-0123) will now be abandoned rather than replaced. The bridge will not be removed
and it will be turned over to the adjacent property owner. Therefore we no longer need a permit for this
project. Apologies that we were not aware of this potential plan until this week. No action is required on your part, just
wanted to let you know for your files.
Thanks,
erin
From: Cheely, Erin K <ekcheely@ncdot.gov>
Sent: Tuesday, March 10, 2020 11:45:49 AM
To: Beckwith, Loretta A CIV USARMY CESAW (USA) <Loretta.A.Beckwith@usace.army.mil>
Cc: Turchy, Michael A <maturchv@ncdot.gov>
Subject: RE: [External] RE: BR-0123 Final Right of Way - BUILD Grant Project
Dang... sorry about that! I guess just go ahead and send it since we already have a 401 and we'll address changes as
appropriate once I find out more information.
Thanks,
erin
From: Beckwith, Loretta A CIV USARMY CESAW (USA) <Loretta.A.Beckwith@usace.army.mil>
Sent: Tuesday, March 10, 2020 11:23 AM
To: Cheely, Erin K <ekcheely@ncdot.gov>
Cc: Turchy, Michael A <maturchv@ncdot.gov>
Subject: [External] RE: BR-0123 Final Right of Way - BUILD Grant Project
Too late...
I just wrote the letter and Monte is currently reviewing it for approval. Do you want me just to send it now and we can
address any changes if they come up?
Thanks
From: Cheely, Erin K <ekcheely@ncdot.gov>
Sent: Tuesday, March 10, 2020 11:01 AM
To: Beckwith, Loretta A CIV USARMY CESAW (USA) <Loretta.A.Beckwith@usace.army.mil>
Cc: Turchy, Michael A <maturchv@ncdot.gov>
Subject: [Non-DoD Source] FW: BR-0123 Final Right of Way - BUILD Grant Project
Lori,
Not sure if you are currently working on BR-0123, but if so, hold off on this one for the moment. Apparently the plan
has changed from bridge replacement to abandonment. I will be in touch once we find out if the impacts we presented
in our application are still necessary, need to be revised, are no longer required, or will be handled by the Division.
Thanks,
erin
From: Cheely, Erin K
Sent: Tuesday, March 10, 2020 10:57 AM
To: Bowles, Jacquelyn K <jkbowles@ncdot.gov>
Cc: Peterson, Tierre R <trpeterson@ncdot.gov>; Turchy, Michael A <maturchv@ncdot.gov>; Dagnino, Carla S
<cdagn i no@ ncdot.gov>
Subject: FW: BR-0123 Final Right of Way - BUILD Grant Project
Jacquelyn,
Now that the plan for BR-0123 has changed to bridge abandonment, will the existing structure be removed (and if so,
will Raleigh be in charge of that or will the Division take it from here)? Will the impacts shown in the final permit
drawings we received (attached) still be necessary for bridge removal? If not, what impacts will still be required?
We have already submitted the permit application for this project and received a 401 Certification. I am going to reach
out to the USACE and tell them to hold off on issuing the 404 for right now until I find out how changing this project to
bridge abandonment affects the necessary impacts to the UT to SF Mitchell River. We may need to modify or just
rescind our application.
Let us know, thanks!
-erin
From: Bowles, Jacquelyn K <jkbowles@ncdot.gov>
Sent: Monday, March 9, 2020 9:06 AM
To: Turchy, Michael A <maturchv@ncdot.gov>; Dagnino, Carla S <cdagnino@ncdot.gov>
Cc: Peterson, Tierre R <trpeterson@ncdot.gov>
Subject: FW: BR-0123 Final Right of Way - BUILD Grant Project
Michael/Carla,
See the below email from Kevin. Let us know if you guys have any questions.
Jacquelyn Bowles, PE
Engineer III
Structures Management Unit
North Carolina Department of Transportation
919.707.6559 (office)
0kbowles@ncdot.gov
1000 Birch Ridge Dr.
Raleigh, NC 27610
From: Fischer, Kevin <wkfischer@ncdot.gov>
Sent: Friday, March 6, 2020 11:44 AM
To: Bowles, Jacquelyn K <jkbowles@ncdot.gov>; Muse, Carey C <ccmuse@ncdot.gov>
Cc: Peterson, Tierre R <trpeterson@ncdot.gov>; Pettyjohn, Michael A <mpettylohn@ncdot.gov>; Burton, J. Dale
<idburton@ncdot.gov>; Hanks, Brian <bhanks@ncdot.gov>; Whitaker, Barry W <bwwhitaker@ncdot.gov>; AI-Dhalimy,
Nadia A <naaldhalimv@ncdot.gov>; Lacy, Kevin <iklacyl@ncdot.gov>; SMO <SMO@ncdot.gov>; Lewis, Robert W
<rwlewisl@ncdot.gov>; Norman, Patrick A <pnorman@ncdot.gov>; Muller, Daniel (FHWA) <daniel.muller@dot.gov>;
Dragonette, Cathy A <cadragonette@ncdot.gov>; Harris, James B <jbharris@ncdot.gov>; Twohig, Anna
<atwohig@ncdot.gov>; Miles, Daneil S <dmiles@ncdot.gov>; Hatton, Rodney K <rhatton@ncdot.gov>; Patterson, C W
<cpatterson@ncdot.gov>; Thomas, Walter L <wlthomasl@ncdot.gov>; Woodard, Robert A <rwoodard@ncdot.gov>;
Mcgowan, James R <jmcgowan@ncdot.gov>; AI-Ghandour, Majed N <malghandour@ncdot.gov>; Honeycutt, Nikki T.
<Nikki.Honevcutt@stvinc.com>; Bailey, Kevin <Kevin.Bailev@stvinc.com>
Subject: RE: BR-0123 Final Right of Way - BUILD Grant Project
on
Surry County has passed a resolution requesting abandonment of SR1319 in the vicinity of Bridge 318 which was being
replaced under the BR-0123 project. Paperwork has also been submitted by the property owners accepting the
stipulations of this abandonment. Therefore the Department is stopping all work on this project including any right of
way acquisition and utility relocations. It is requested that you reach out to any firms doing work for your unit and
advise them of this stoppage and request a final billing of the project.
The BR-0123 project was receiving funding from the GREATTER Build Grant and we are working to replace it with
another project from Division 11. Once that project is approved by the Board we will place it on the 12 Month Let List
for a July letting. Please let me know if you have any questions.
Kevin Fischer, PE
Assistant State Structures Engineer — Program Management and Field Operations
Structures Management Unit
North Carolina Department of Transportation
919 707 6514 office
wkfischera-ncdot.gov
From: Bowles, Jacquelyn K <jkbowles@ncdot.gov>
Sent: Friday, January 3, 2020 8:58 AM
To: Muse, Carey C <ccmuse@ncdot.gov>
Cc: Peterson, Tierre R <trpeterson@ncdot.gov>; Fischer, Kevin <wkfischer@ncdot.gov>; Fischer, Kevin
<wkfischer@ncdot.gov>; Pettyjohn, Michael A <mpettyiohn@ncdot.gov>; Burton, J. Dale <jdburton@ncdot.gov>; Hanks,
Brian <bhanks@ncdot.gov>; Whitaker, Barry W <bwwhitaker@ncdot.gov>; AI-Dhalimy, Nadia A
<naaldhalimv@ncdot.gov>; Lacy, Kevin <iklacyl@ncdot.gov>; SMO <SMO@ncdot.gov>; Lewis, Robert W
<rwlewisl@ncdot.gov>; Norman, Patrick A <pnorman@ncdot.gov>; Muller, Daniel (FHWA) <daniel.muller@dot.gov>;
Dragonette, Cathy A <cadragonette@ncdot.gov>; Harris, James B <jbharris@ncdot.gov>; Twohig, Anna
<atwohig@ncdot.gov>; Miles, Daneil S <dmiles@ncdot.gov>; Hatton, Rodney K <rhatton@ncdot.gov>; Patterson, C W
<cpatterson@ncdot.gov>; Thomas, Walter L <wlthomasl@ncdot.gov>; Woodard, Robert A <rwoodard@ncdot.gov>;
Mcgowan, James R <jmcgowan@ncdot.gov>; AI-Ghandour, Majed N <malghandour@ncdot.gov>; Honeycutt, Nikki T.
<Nikki.Honevcutt@stvinc.com>; Bailey, Kevin <Kevin.Bailev@stvinc.com>
Subject: BR-0123 Final Right of Way - BUILD Grant Project
0
The ROW Plans for BR-0123 have been approved. Please see the following attachments:
BR-0123 Final Right of Way Distribution Letter
BR-0123 ROW Title Sheet
BR-0123 Deed & Plat Books
Completed Project Planning Document:
BlockedBlockedhttps://connect.ncdot.gov/site/Preconstruction/division/divll/BR-
0123 % 20Su rry% 20318/Protect% 20Development/BR-0123 % 20Fi na I % 20CE?d=w5b67c7e8ecf94e56862d570ffce6d40b
SMU is transmitting this letter to the Right of Way Unit as notification that the Division 11 Right of Way Office may begin
Right of Way Acquisition on BR-0123.
PLEASE NOTE: BR-0123 is a BUILD Grant project and is considered 'mission critical'.
Thank you,
Jacquelyn Bowles, PE
Engineer III
Structures Management Unit
North Carolina Department of Transportation
919.707.6559 (office)
0kbowles@ncdot.gov
1000 Birch Ridge Dr.
Raleigh, NC 27610
it all correspondence ;,,lcuirdenc e Cxu aird fror�r ffils sondcr is sulcjcclu ffic IN C I':"ulc Ic. IRcc;ords I ow aird i°r ay be disclosed lu ffilyd Icartiu;,,,
it all correspondence spoindenc e Cxu aird fror�r ffils sondcr is sulcjcclu ffic IN C I':"ulc Ic. IRcc;ords I ow aird i°r ay be disclosed lu ffilyd Icartiu;,,,
h ell correspondence spoindenc e Cxu aird fror�r ffils ,,cinder is sulcjcclu ffic IN C I':"ulc Ic. IRcc;ords I ow aird i°r ay be disclosed lu ffilyd Icartiu;,,,