HomeMy WebLinkAboutNCC191276_NOT Closeout Documents_20200313North Carolina Department of Environmental Quality
Land Resources: 943 Washington Square Mall, Washington, NC 27889 (252) 946-6481
County: Dare Project: Cape Hatteras EC Transmission River basin: Pasquotank
Person financially responsible: Cape Hatteras Electric Cooperative - Mark Rhyne, Project #: DARE-2020-001
Manager of Engineering
Address: 47109 Light Plant Road, Buxton, NC 27920
1. Project Location: NC-12, Rodanthe
Pictures: No
2. Weather and soil conditions: 70 degrees, fog, wet Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below:
5. Violations:
6. Is the site in compliance with the NPDES Permit? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply)
Degree of damage:
8. Contact made with (name): Mark Rhyne & Briana Eddy (via email) Title:
Inspection report: Sent Report Date given/sent: February 27, 2020
9. Corrective action needed: None.
10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self -
monitoring or self -inspections are required. Project is released. Termination of coverage under
the NPDES General Stormwater Permit for Construction Activities should be requested by the
permittee via a Notice of Termination.
Reported by: Scott Graboski Others present:
Date of inspection: February 26, 2020 Time arriving on site: 12:00 PM Time leaving site: 12:10 PM
cc: