Loading...
HomeMy WebLinkAboutNCC191276_NOT Closeout Documents_20200313North Carolina Department of Environmental Quality Land Resources: 943 Washington Square Mall, Washington, NC 27889 (252) 946-6481 County: Dare Project: Cape Hatteras EC Transmission River basin: Pasquotank Person financially responsible: Cape Hatteras Electric Cooperative - Mark Rhyne, Project #: DARE-2020-001 Manager of Engineering Address: 47109 Light Plant Road, Buxton, NC 27920 1. Project Location: NC-12, Rodanthe Pictures: No 2. Weather and soil conditions: 70 degrees, fog, wet Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with the NPDES Permit? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): Mark Rhyne & Briana Eddy (via email) Title: Inspection report: Sent Report Date given/sent: February 27, 2020 9. Corrective action needed: None. 10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self - monitoring or self -inspections are required. Project is released. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities should be requested by the permittee via a Notice of Termination. Reported by: Scott Graboski Others present: Date of inspection: February 26, 2020 Time arriving on site: 12:00 PM Time leaving site: 12:10 PM cc: