Loading...
HomeMy WebLinkAbout20160372 Ver 2_Mitigation Plans_20180529Action History (UTC -05:00) Eastern Time (US & Canada) Submit by Anonymous User 5/29/2018 3:06:07 PM (Message Start Event) Approve by Montalvo, Sheri A 5/30/2018 12:01:22 PM (Initial Review- Sheri Montalvo) • The task was assigned to Montalvo, Sheri A 5/29/2018 3:06 PM D# * 20160372 Version* 2 Select Reviewer:* Mac Haupt Mitigation Project Submittal - 5/29/2018 Type of Mitigation Project:* V Stream r Wetlands PF Buffer I— Nutrient Offset (Select all that apply) Is this a Prospectus, Technical Proposal or a a yes a No New Site? * Project Contact Information Company/Owner:* KCI Associates, Inc Contact Name:* Tim Morris Email Address:* tim.morris@kci.com Project Information ...................................................................................................................................... Project Name:* Stony Fork Project Type:* r DMS f Mitigation Bank County:* Johnston Document Information File Upload: StonyFork_97085_FDMP_2018.pdf 33.57MB Rease upload only one RDF of the conplete file that needs to be subrritted... Signature Print Name:* Lindsay Crocker Signature: MITIGATION PLAN  Stony Fork Restoration Site  Johnston County, North Carolina   DMS Project Number 97085  DMS Contract 6830 SAW-2016-00875 DWR #2016-0372 Neuse River Basin  Cataloging Unit 03020201  Prepared for:  NC Department of Environmental Quality  Division of Mitigation Services  1652 Mail Service Center   Raleigh, NC 27699   April 24, 2018  Prepared by:  KCI Associates of North Carolina, PC  4505 Falls of Neuse Rd, Suite 400  Raleigh, NC 27609  (919) 783‐9214 KCI Project Staff: Tim Morris, Alex French, Adam Spiller, Joe Sullivan, and Kristin Knight‐Meng  This mitigation plan has been written in conformance with the requirements of the following:   Federal rule for compensatory mitigation project sites as described in the Federal Register Title 33 Navigation and Navigable Waters Volume 3 Chapter 2 Section § 332.8 paragraphs (c)(2) through (c)(14). NCDEQ Division of Mitigation Services In‐Lieu Fee Instrument signed and dated July 28, 2010 NCAC Rule 15A NCAC 02B .0295, effective November 1, 2015, for riparian buffer mitigation. These documents govern NCDMS operations and procedures for the delivery of compensatory mitigation.          Date:                   April 24, 2018    To:    Lindsay Crocker, Project Manager  DMS Review Team Members: Periann Russell and Greg Melia    From:  Tim Morris, Project Manager  KCI Associates of North Carolina, P.A.    Subject:  Stony Fork Restoration Site      Draft Mitigation Plan Review   Neuse River Basin ‐ 03020201  Johnston County, North Carolina  Contract No. #6830  DMS Project #97085    Dear Ms. Crocker,   Please see below our responses to your comments received January 12, 2018 on the draft of the Stony  Fork Mitigation Plan. We have addressed your comments in the final report and have outlined our changes  below. In addition, there are further changes we needed to make that are described after the DMS  comments. We are including 3 hard copies of the final report along with a CD with a PDF of the plan and  this letter.   1. This Mitigation Plan is 82 SMU and 76,088 BMU under contract amounts.  Ensure that these  amounts are correct as the future payments will be reduced accordingly (see notes below on  new IRT policies).  We have revised the final mitigation units to 6,682 SMUs and 482,608 BMUs. The stream credits  are reduced from the proposal stage due to land title issues associated with the Critcher Farms  subdivision at the bottom of the site and removal of a portion of T2 that was not jurisdictional.  We also removed the additional stream credits calculated from extra buffer widths after Jeff  Jurek indicated they would not be approved for this site. The BMUs were reduced due to the  limitation on preservation credits that we didn’t originally take into account.     2. Page 3, last sentence of first paragraph‐ this sentence is not clear.  Please revise to make more  sense.  We were trying to relay that problem areas throughout this CU outweigh assets in the most  recent document. We have reworded it to say:  “The CU’s problem areas scored higher than the  assets (98 compared to 36), indicating there is more disturbed land than intact resources  (NCDENR, EEP 2015).”      3. Page 8. Will the ponds above T2 be removed as part of the residential development? If so, do  you know what stormwater BMPs will be installed with the development?  No, the ponds will remain and be used as part of the residential development stormwater system.  During the residential construction, additional sediment traps will be used to capture sediment.     A note has been added about the ponds at the bottom of Section 3.1.2.     4. Page 13, last paragraph, please add that DWR also provided a stream determination and the  date.  We added this note about the stream determination from July 8, 2016.       5. Page 14, Table 3. The T1 and T2 drainage areas are very small, especially for a coastal plain  stream  (even though it is western coastal plan).  Both streams may currently be intermittent due  to their  depth, so are you sure you can maintain at least intermittent flow following restoration?  The DWR  stream scores are very low and if the ‘strong” bed and bank indicators are the result of  mechanical  straightening and cleaning, that strong indicator is misleading.  The project streams were initially evaluated during a drier period, when all but a portion of the project  streams were classified as intermittent. We believe these streams will have sufficient hydrology for  intermittent status.     6. Section 6‐ general comment: something is going on with your numbering in this section, it  moves from 6.1‐6.7 and then goes backwards.  Check and update in text and table of contents.  This has been corrected.    7. Section 6.7, provide a discussion or clarification of why you chose the on‐site and nearby  reference locations‐ are these cross sections reference quality for the stream design?  The  selection of these four cross sections needs to be better justified.  Yes, these reference cross‐sections exhibited stable bankfull indicators in the field that were used  to determine bankfull area and discharge values. The design cross‐sections were developed using  these values, but the exact shapes of the sections were dictated by other typical Piedmont and  Coastal Plain reference values like those found in Harman et al 2011. A more detailed explanation  has been added to this section.     8. Section 6.7 Figure 8‐ provide a legend to label the red and blue regression lines.  It appears that  these are only 3 cross sections on the red (reference sites).  Is the fourth included?  Yes, References Cross‐Sections 2 and 3 have similar drainage areas, so they appear as one data point.  We added a sentence explaining this in the first paragraph of this section.     9. Table 8, SF1 sinuosity is showing 1.3 in pre‐condition, but I recall that area is very straightened.  Double check this is correct.  This value is correct. While the majority of the reach is channelized, there is a section in the middle  that has unstable bends with high sinuosity that affects the overall average for the reach.     10. Page 25, Section 6.5 Sediment. Please state clearly the intent for the sediment regime for the  constructed channel. Since this project lies in the coastal plain, sand and/or sand bed channels  are expected. Currently, these channels are receiving fine sediment, likely predominately sand,  because of bank erosion, where the banks are dominantly sand (is this correct?). If the channel    substrate is composed of silt and clay (as stated in the first paragraph), and excess shear is  preventing deposition of the courser fraction of sediment (sand and small gravel), will your  design and design discharge provide for sediment input, transport and deposition?  Yes, we believe the channel will develop a stable sediment regime once the on‐site bank erosion is  stabilized. The size of sediment input is not expected to change, but the quantity is expected to be  less following restoration. The stable cross‐section will also be able to accommodate more sediment  deposition on the floodplain. Some seeding is expected in the project riffles, but to ensure that riffle  degradation does not occur in the period immediately following restoration, we will be adding the  larger material to protect the riffle beds.    11. Page 25. Reference to pebble counts and tables in section 12 – Were pebble counts used for  determination of sediment > 2mm? How did you measure a sediment size of 0.091, 0.2, 0.39?  Yes, pebble counts were the main source of sediment sampling. Sand is measured using a sand  gauge card, which allows the user to calibrate their determination of sand size with provided size  samples on the card (very coarse 1‐ 2 mm, coarse 0.5‐1 mm, medium 0.25‐0.5 mm, fine 0.125‐0.25  mm, and very fine sand 0.0625‐0.125 mm, and silt less than 0.0625).     12. Page 26, table 7.  All the predicted grain size movement values (in the proposed sections) are  much greater the D84 values.  Is this intentional and if so, please explain how this condition will  not result in total bed scour during effective discharges (based on the proposed D50 and D84  values).    Given the small sediment sizes in this system, there is a discrepancy between the D84 and the predicted  grain size movement in the restored channel. This is a frequent occurrence with projects of similar  sediment regimes. To accommodate for this condition, the riffles will be stabilized with material large  enough to withstand channel stresses. This means that sediment transport will occur as the natural  sediment washes in to seed these riffles and is then transporte d through the system. As this occurs, both  the riffle bed features and the transport of fine sediment through the system will be maintained as the  project matures.     13. Page 26.  The explanation of need for ‘riffle reinforcement’ suggests that all sediment sizes less  than the grade control material will be moved at all effective discharges as well as .5 to 1 year  frequency discharges.  Does this mean the constructed channel bed will be composed of silt and  clay, retaining little to sand or gravel?  This section is not clear and the discussion is not consistent  with the data you have provided.  We do expect a large portion of the sand and gravel material inputs from upstream to be mobilized  during stream events. However, over time this material should accumulate within the gaps of the  larger riffle grade control material.     14. P. 26, text indicates that all riffles are rock.  Will you incorporate wood here?  We have added in wood into our detail for the riffles. The use of wood will be balanced against the  expected flow duration in each location, since embedded wood is prone to rotting if it experiences  frequent wet/dry cycles.     15. P. 31, DMS recommends limiting black willow, or more heavily relying on other lives stakes as it  tends to become dominant in a system and could clog channel.  We are proposing a mixture of species including two willows and one dogwood. In addition, we  strategically place live stakes such that they will not overwhelm the channel (eg minimal to no live  stakes on inner meander bends).      16. P. 35, 8.0, text states monitoring UT West Branch…do you mean this to say Stony Fork?  Yes, this has been corrected.     17. P. 36 top paragraph‐ must have year 4 monitoring for vegetation to receive riparian buffer credit  (required Monitoring in years 1‐5).  Also need to update last sentence on page 37 and Table 20  (Vegetation Monitoring frequency) to reflect this update.  Might want to add a separate section  for  Riparian Buffer monitoring to clarify?  We have added that Year 4 monitoring will take place for riparian buffer mitigation.    18. Page 37, Table 20 – Believe it is intended to be 0.02 acres for vegetation; also add visual  assessment parameter to include the occurrence of bank erosion, beaver, etc.  This has been corrected to state 0.02 acre plot. Also, we added in Year 4 for vegetation monitoring  as well as the visual assessment.     19. Please provide a brief narrative in the document that describes what changes occurred from the  Technical Proposal IRT site visit and the Mitigation Plan stages.  Specifically, describe the  additional  jurisdictional stream features added (T3). There appears to be a loss of stream in the  upper section  of tributary T2 from the mitigation plan (in addition to the eastern section of the  project area).  Can  you provide a brief description of why those areas were dropped to insert in  the mitigation plan?  Please also provide description of if buffers were widened from the  Technical proposal stage and  justify use of this methodology, if applicable.  Of relevance, KCI was  encouraged to increase the  buffer  in  some  areas  if  possible during  the  IRT  post‐contract  review;  consider  including  in  justification.  We have added the following to Section 6.11, Project Assets. “The total stream mitigation credits  (SMCs) are slightly different than those outlined in the initial proposal. SMCs were removed at the  bottom of the site due to land title issues associated with the Critcher Farms subdivision. The upper  portion of T2 was eliminated from the project, since it was not a jurisdictional stream, but an additional  tributary, Tributary 3, was added to the project once it was determined it was jurisdictional. The buffer  mitigation  credits  (BMCs)  were  reduced  from  the  contracted  amount  due  to  the  limitation  on  preservation credits once the final restoration, enhancement, and preservation BMCs were tabulated.”  Plan Sheets:   Sheet 7 of 15: what is the future right of way depicted here?  This refers to the subdivision road that will be constructed through here to support a proposed  development. The first phase will be on the northern side of Stony Fork, which will be built soon.  The second phase will be on the southern side of Stony Fork and will be constructed at a later  date to be determined.      Plan Sheet Legend. Please clarify why ‘riffle enhancement’ is being used in a newly constructed  stream.  We have found that riffle enhancements are necessary in many newly constructed streams with  fine‐grained material to prevent bed degradation shortly after construction. Many new riffles are  not seeded quickly enough with incoming sediment to protect them from the stresses experienced  from large flow events. Over time, natural sediment (sand and fine gravels) will fill in the void  space in the enhancement rock.    Please justify the need for step‐pool features adjacent to enhance riffle features.  The step pools are used to both provide a stable grade transition in steeper sections and to    create pool habitat.    Please justify the need for size and frequency of rock/boulder structures.  These structures are needed to provide additional stability wit hin the channel, generally in sections  where the site conditions dictate a steeper slope or where further bed or bank protection is needed.  We will incorporate as much wood as we can, although as mentioned above, we will be selective  where we place it, since wood can be prone to rotting if it experiences frequent wet/dry cycles  (such as in an intermittent channel).      Additional Changes by KCI  Since the draft mitigation plan submittal, several items in the mitigation plan were changed based on  developments in the project.   ‐ We removed the extra credit calculations based on stream buffer widths beyond 50’ following  feedback from Jeff Jurek and revised the total credit to 6,682 SMCs.   ‐ NCDOT unexpectedly installed a new culvert under Federal Road at the beginning of the project.  As a result, we recently resurveyed this area and adjusted the profile slightly in the first reach  (SF1) to 0.9% slope from 1.0% slope. The new culvert also starts further back than the prior one,  so the stationing was adjusted to 9+93 instead of 10+00 for the beginning of the project.   ‐ We also adjusted the riparian buffer mitigation amounts. KCI performed additional GPS  mapping on‐site following privet removal to determine the boundaries of buffer restoration  versus enhancement on T2‐2. I met Katie Merritt from NCDWR for a field visit at the site to  confirm these boundaries on 3/29/2018, and they issued a letter on 4/16/2018 confirming the  revised buffer calls.     Please contact me if you have any questions or would like clarification concerning these responses.       Sincerely,        Tim Morris  Project Manager      Draft Mitigation Plan    Stony Fork Restoration Site  April 24, 2018        DMS Project Number 97085  i    TABLE OF CONTENTS    1.0  PROJECT INTRODUCTION............................................................................................................ 1  2.0  WATERSHED APPROACH AND SITE SELECTION .......................................................................... 3  3.0  BASELINE AND EXISTING CONDITIONS ....................................................................................... 6  3.1   Watershed Processes and Resource Conditions ........................................................................ 6  3.1.1 Landscape Characteristics ..................................................................................................... 6  3.1.2 Land Use/Land Cover and Chronology of Impacts ................................................................ 8  3.1.3 Watershed Disturbance and Response ............................................................................... 12  3.1.4 Site Photographs ................................................................................................................. 17  4.0  FUNCTIONAL UPLIFT POTENTIAL .............................................................................................. 20  5.0  MITIGATION PROJECT GOALS AND OBJECTIVES ....................................................................... 21  6.0  DESIGN APPROACH AND MITIGATION WORK PLAN................................................................. 22  6.1   Stony Fork (SF) .......................................................................................................................... 22  6.2   Tributary 1 (T1) ......................................................................................................................... 22  6.3   Tributary 2 (T2) ......................................................................................................................... 22  6.4   Tributary 3 (T3) ......................................................................................................................... 23  6.5   Riparian Buffer Mitigation ........................................................................................................ 23  6.6   Crossings ................................................................................................................................... 23  6.7   Design Discharge Determination .............................................................................................. 24  6.8  Sediment ................................................................................................................................... 25  6.9   Morphological Essential Parameters Tables ............................................................................. 27  6.10  Planting ..................................................................................................................................... 30  6.11  Project Assets ........................................................................................................................... 31  7.0  PERFORMANCE STANDARDS .................................................................................................... 35  8.0  MONITORING PLAN .................................................................................................................. 35  9.0  ADAPTIVE MANAGEMENT PLAN ............................................................................................... 39  10.0  LONG‐TERM MANAGEMENT PLAN ........................................................................................... 39  11.0  REFERENCES .............................................................................................................................. 40  12.0  APPENDICES .............................................................................................................................. 43  12.1  Plan Sheets................................................................................................................................ 45  12.2  Data Analysis/Supplemental Information and Maps................................................................ 63  12.3  Buffer Mitigation .................................................................................................................... 113  12.4  Site Protection Instrument ..................................................................................................... 131  12.5  Credit Release Schedule ......................................................................................................... 135  12.6  Financial Assurance ................................................................................................................ 139  12.7  DWR Stream Identification Forms .......................................................................................... 143  12.8  Approved Jurisdictional Determination .................................................................................. 153  12.9  Approved FHWA Categorical Exclusion Form ......................................................................... 161              Draft Mitigation Plan             Stony Fork Restoration Site  April 24, 2018                         DMS Project Number 97085 ii      FIGURES    Figure 1. Project Site Vicinity Map ................................................................................................................ 2  Figure 2. Project Site Watershed Maps ........................................................................................................ 4  Figure 3. Project Site / LWP Watershed Map ............................................................................................... 5  Figure 4. Soil Survey Map .............................................................................................................................. 7  Figure 5. Land Use/Land Cover Map ............................................................................................................. 9  Figure 6A. Historic Aerials ........................................................................................................................... 10  Figure 6B. Historic Aerials ........................................................................................................................... 11  Figure 7. Current Conditions Plan View Map .............................................................................................. 16  Figure 8. Local Regional Curve for Stony Fork ............................................................................................ 24  Figure 9. Project Asset Map ........................................................................................................................ 34  Figure 10. Proposed Monitoring Plan ......................................................................................................... 38            TABLES    Table 1. Credit Summary ............................................................................................................................... 1  Table 2. Existing Stream Bank Height and Entrenchment Ratios ............................................................... 12  Table 3. Project Attribute Table .................................................................................................................. 14  Table 4. Project Goals, Objectives, and Functional Outcomes ................................................................... 21  Table 5. Local Regional Curve Data ............................................................................................................. 24  Table 6. Local XS Flow Compared to USGS Regression for North Carolina................................................. 25  Table 7. Sediment Summary for Project Reaches ....................................................................................... 26  Table 8. Morphological Essential Parameters for SF1 ................................................................................ 27  Table 9. Morphological Essential Parameters for SF2 ................................................................................ 27  Table 10. Morphological Essential Parameters for SF3 .............................................................................. 28  Table 11. Morphological Essential Parameters for T1 ................................................................................ 28  Table 12. Morphological Essential Parameters for T2‐1 ............................................................................. 29  Table 13. Morphological Essential Parameters for T2‐2 ............................................................................. 29  Table 14. Morphological Essential Parameters for T2‐3 ............................................................................. 30  Table 15. Morphological Essential Parameters for T3 ................................................................................ 30  Table 16. Project Asset Table ...................................................................................................................... 32  Table 17. Length and Summations by Mitigation Category ........................................................................ 33  Table 18. Overall Assets Summary .............................................................................................................. 33                    Draft Mitigation Plan               Stony Fork Restoration Site  April 24, 2018                  DMS Project Number 97085 1    1.0 PROJECT INTRODUCTION    The Stony Fork Restoration Site (SFRS) is a full‐delivery stream and riparian buffer mitigation project being  developed for the North Carolina Division of Mitigation Services (DMS) in the Neuse River Basin (03020201  8‐digit cataloging unit) in Johnston County, North Carolina. The site’s natural hydrologic regime has been  substantially modified through the relocation and straightening of the existing stream channels and  clearing of riparian buffer. This site offers the chance to restore impacted agricultural lands to a stable  stream ecosystem with a functional riparian buffer and floodplain access.    The SFRS is situated in southwestern Johnston County. SFRS is located approximately 5.5 miles north of  Benson,  NC  in  Johnston  County.  Specifically,  the  site  is  0.2  mile  west  on  Elevation  Road  from  its  intersection with Federal Road (SR‐1331). The center of the site is at approximately 35°26'55.0"N and  78°31'18.5"W in the Benson USGS Quadrangle. The site location is shown in Figure 1.    The SFRS will restore a stable stream ecosystem along Stony Fork and five of its tributaries (T1, T1A, T1B,  T2, and T3) with a combination of stream restoration and enhancement with primarily a Priority 1  approach to reconnect the streams with an active floodplain. Riparian buffer restoration, enhancement,  and preservation under the Neuse Buffer Rule (NCAC Rule 15A NCAC 02B .029) will also take place at the  site. Invasive Chinese privet (Ligustrum sinense) and kudzu will be both physically cleared and chemically  treated from the project site as part of the stream and buffer mitigation. Once site grading is complete,  the riparian buffer will be planted with native tree species. The site will be monitored for seven years or  until the success criteria are met.  Table 1. Credit Summary  Stony Fork Restoration Site, Johnston County  DMS Contract 6830; DMS Project Number 97085  Mitigation Credits   Stream Riparian  Wetland  Non‐ riparian  Wetland  Buffer  Nitrogen  Nutrient  Offset  Phosphorous  Nutrient  Offset  Type  R  RE  R  RE  R  RE  R  RE    Linear  Feet/Acres 6,501 lf  405 lf  452,362 sf  537,208 sf    Credits  6,501  181  427,635  54,973    TOTAL CREDITS  6,682    482,608    R=Restoration  RE=Restoration Equivalent                o o o ooo o o oo o o o o oooo o o o o o o o o ooo o o o oo o o o o o ooo o o o oooo o o o oo o ooo o ooo o o o o o o o o o o oooo o o oo o oo o o o o o o o o oo o o o o o o o o oooooooo ooo oooooo oooooo oooooooooooooooooooooooooooooooooooooo oooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooooo o oo o o o oo o o o oo o o o o o ooo o oo o oo o o oo o o o o o o oo o o ooo o oooo o o o o oo ooo o o o o o o o o o o ooo o o oo o o o o o o o o o o oo o o o o o o oo o o o o oo o o o o oo o o o o o o o o o o o o o ÊÚ §¨¦40 §¨¦95 50 27 242 242 £¤301 BENSON B l a c k Creek ÊÚ WAKE JOHNSTON WAYNE NASH SAMPSON HARNETT WILSON ÊÚ Project Site Location County Boundary Major Roads Minor Roads o Airports (none within a 5-mi radius) Major Rivers and Streams Cities and Towns Elevation RdFederal RdÜ 0 10.5 Miles FIGURE 1. VICINITY MAP, STONY FORK RESTORATION SITE, JOHNSTON COUNTY, NC 2   Draft Mitigation Plan               Stony Fork Restoration Site  April 24, 2018                  DMS Project Number 97085 3    2.0 WATERSHED APPROACH AND SITE SELECTION  The SFRS is located within the Upper Neuse River Basin (03020201), where population growth and rapid  development have produced a significant need for restoration projects. DMS updated the priorities for  the Neuse 01 cataloging unit (CU) in 2015 due to extensive mitigation needs and changes in watershed  conditions since the 2010 report. The project 14‐digit CU is included as a targeted local watershed (TLW),  which  faces  challenges  such  as  a  high  percentage  of  agricultural  land/animal  operations,  disturbed  riparian buffer, and increasing impervious surface from development. The amount of problems identified  were scored higher than the amount of assets available in the most recent 14‐digit CU ranking (NCDENR,  EEP 2015).    The Neuse River Basin Restoration Priorities are maintaining and enhancing water quality, restoring  hydrology, and improving fish and wildlife habitat (NCEEP, 2010). The project will support the following  basin priorities:  ‐ Managing stormwater runoff  ‐ Improving/restoring riparian buffers  ‐ Reducing sediment loading  ‐ Improving stream stability    The project watershed for the SFRS is comprised of 0.79 square mile (497 acres). The project aims to  uphold the goals consistent with several CU‐wide watershed improvement objectives by restoring stream  hydraulics,  improving/restoring  riparian  buffers,  improving  stream  stability  and  reducing  sediment  loading (NCDENR, EEP 2010). Stony Fork (27‐52‐6‐2) has been rated by Division of Water Resources (DWR)  as Class C, Nutrient Sensitive Waters, and is not on the 2016 303(d) list. However, Hannah Creek (27‐52‐ 6a), 4.2 miles downstream of the site, is listed as impaired for dissolved oxygen. There are no other DMS  mitigation projects currently located in the 03020201150010 watershed cataloging unit. The project  watershed is shown in a map in Figure 2, and another map illustrating the project’s watershed location in  relation to the 03020201150010 watershed identified in the TLW is shown in Figure 3.    There are no conservation or protected areas located adjacent to the project site, but it will connect with  the forested buffer immediately adjacent to the project and improve and restore the existing forested  buffer on the site itself. The site is approximately 4.5 miles upstream of the Hannah Creek Swamp Natural  Heritage Area.     Copyright:© 2013 National Geographic Society, i-cubed Ü 0 2,0001,000 Feet FIGURE 2. PROJECT WATERSHED, STONY FORK RESTORATION SITE, JOHNSTON COUNTY, NC Proposed StreamsProposed EasementProject Watershed (497 ac)Source: USGS DRG,Benson Quad (1973). 4 HU03020201150010 HU03030006020010 HU03020201130030 HU03020201150030 HU03020201150020 HU03020201130020 Sources: Esri, HERE, DeLorme, Intermap, increment P Corp., GEBCO,USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, OrdnanceSurvey, Esri Japan, METI, Esri China (Hong Kong), swisstopo,MapmyIndia, © OpenStreetMap contributors, and the GIS User Community Ü 0 21Miles FIGURE 3. PROJECT SITE/LWP WATERSHED, STONY FORK RESTORATION SITE, JOHNSTON COUNTY, NC Proposed Easement Project Watershed (497 ac) 14-digit HUC Boundaries HUC 03020201150010 (TLW) 5   Draft Mitigation Plan               Stony Fork Restoration Site  April 24, 2018                  DMS Project Number 97085 6    3.0 BASELINE AND EXISTING CONDITIONS    3.1   Watershed Processes and Resource Conditions    3.1.1 Landscape Characteristics  The site lies within the Rolling Coastal Plain (Level IV 65m) ecoregion of the Southeastern Plains. The  Rolling Coastal Plain is mostly irregular plains with broad interstream areas and a mosaic of cropland,  pasture, woodland, and forest. While the natural vegetation was historically longleaf pine, oak‐hickory  and mixed pine forests are more abundant now. The geology of this area is typified by Cretaceous or  Tertiary‐age sands, silts and clays (Griffith et al 2002).     Many of the stream reaches have been ditched to a clay bottom and are overlaid with a sediment  transport regime of sand and small gravel. While gravel is the predominant bed material, sand is entering  the system from bank erosion both upstream and on‐site. The floodplain for Stony Fork is unconfined in  most areas, although it is currently disconnected from the existing stream.     According to the Soil Survey of Johnston County, all of the project streams and floodplain areas are  underlain by Bibb sandy loam (Bb). The official Map Unit Name is Bibb sandy loam, 0 to 2 percent slopes,  frequently flooded. These soils are poorly drained floodplain soils that are usually linear, associated with  streams, and frequently found along the toe of slopes. The soil survey for the project area is shown in  Figure 4.     BbGeB GeD FaB UcB FaA CoC CoB GeB Ra GeD UcB GeB NoA FaB GeB UcB MaB NoB GeB GeD FaA GeD Bb UcC W NoB GeB CoC FaB FaB FaA FaB GeB WaB W CoC GeB UcC FaB NoA Ü 0 1,000500Feet FIGURE 4. NRCS SOIL SURVEY, STONY FORK RESTORATION SITE, JOHNSTON COUNTY, NC NRCS Soil SurveyProposed Easement Bb - Bibb sandy loam, 0-2% FaB - Faceville sandy loam, 2-6% GeB - Gilead sandy loam, 2-8% Ged - Gilead sandy loam, 8-15% UcC - Uchee loamy coarse sand, 6-12% Source: NRCS Web Soil Survey; NCOneMap Orthoimagery 2013 7   Draft Mitigation Plan               Stony Fork Restoration Site  April 24, 2018                  DMS Project Number 97085 8    3.1.2 Land Use/Land Cover and Chronology of Impacts  The project watershed for the SFRS is comprised of 0.78 square mile (497 acres). Current land use in the  project watershed (Figure 5) was derived from the 2013 orthoimagery and consists of agriculture/open  space (53% / 262 ac), forest (31% / 150 ac), rural development (9% / 42 ac), residential (5% / 24 ac), and  roads/impervious (3% / 13 ac), and water. The current adjacent land use has a negative impact on water  quality of the project streams. This is evidenced by direct run off from agricultural open space along parts  of the stream where there is no riparian buffer. The top of T2 will receive stormwater from a residential  development currently being constructed. Impervious surfaces within the project watershed include  Federal Road, which is immediately adjacent to the project, and I‐40, which is just 1,400 linear feet  upstream  of  the  project.  KCI’s  measurement  of  the  total  impervious area for the watershed is  approximately 5%, which is based on the land use delineated from the 2013 orthoimagery and based on  published average impervious values for land use categories (Center for Watershed Protection 2003).  Development pressure in the watershed is high as evidenced by the new development mentioned above  that is being constructed to the northeast and southeast of the project streams. The existing ponds above  T2 will remain and be incorporated into the stormwater system o f the new development. A new aluminum  arched culvert will be installed across Stony Fork to access th e southeastern part of the development and  will be incorporated into our project design in the existing easement exception.   The SFRS has undergone significant modifications that have altered the site hydrology and vegetation.  Historic aerials were examined for any information about how the site has changed over recent history.  Historic aerials were obtained from the NRCS, USGS EarthExplorer, and Google Earth for 1938, 1949, 1960,  1972, 1980, 1998, 2005, and 2013. Selected historic aerials are presented in Figures 6A and 6B.    The site was systematically impacted over the twentieth century with channelization and clearing. In the  earliest aerial photo from 1938, the upstream part of the project appears forested, but the channel is  straight, indicating that it had been ditched prior to this photo. Also, the nearby Federal Road is on a  different alignment, which suggests that when it was realigned to its current position, there may have  been further manipulation of Stony Fork. The ponds upstream of T2 had not been built yet in this photo.  Additionally, the portion of Stony Fork that currently flows through an existing dense stand of kudzu is  flowing south of that area. In the 1949 aerial, there has been more clearing along the periphery of the  project area and the straightened streams are easily identifiable throughout the site. Stony Fork at the  downstream end of the project has been ditched between two fields.     In 1960, there was more clearing just downstream of Federal Road. This cleared field borders the ditched  portion of Stony Fork to the north. Also, the ponds upstream of T2 have been built by this point. In the  1972 aerial, some fields south of the project have reforested, and other areas north of the project that  have been cleared. The 1980 aerial looks similar to the previous aerial, with some minor changes to the  clearing limits. By 1998, there has been extensive clearing throughout the middle of the project along the  southeastern side of Stony Fork. Also, the previously cleared fields on the north side of Stony Fork at the  downstream end of the project have revegetated. The 2006 aerial looks similar to conditions today. The  area of Stony Fork around T1 has been cleared and is revegetating, likely with the kudzu present today,  and the previously large cleared area that appeared in the 1998 photo has been planted with loblolly pine.  The most recent aerial (2013) shows the rows of pine trees in the plantation and area of kudzu around T1.       NCCGIA Ü 0 2,0001,000 Feet FIGURE 5. PROJECT LANDUSE, STONY FORK RESTORATION SITE, JOHNSTON COUNTY, NC Land UseAgriculture/Open Space (52.7%)Forest (30.3%)Roads (2.5%)Residential (4.8%)Rural Development (8.4%)Water (1.3%) Source: NCOneMap Orthoimagery 2013. Project Watershed (497 ac)Project Easement (24.4 ac) 9 Image Sources: Johnston County NRCS; USGS Earth Explorer. 1938 1960 1972 1949 Ü 0 2,0001,000 Feet FIGURE 6A. HISTORIC AERIAL PHOTOGRAPHS Proposed Easement (24.4 ac) 10 NCCGIANCCGIA Image Sources: USGS Earth Explorer; Johnston County Orthoimagery; NC OneMap. 1980 2005 2013 NCCGIA 1993 Ü 0 2,0001,000 Feet FIGURE 6B. HISTORIC AERIAL PHOTOGRAPHS Proposed Easement (24.4 ac) 11   Draft Mitigation Plan               Stony Fork Restoration Site  April 24, 2018                  DMS Project Number 97085 12    3.1.3 Watershed Disturbance and Response   The project has experienced significant landscape and vegetative modifications to allow for agriculture  and timber management along the project streams of Stony Fork (SF), Tributary 1 (T1), Tributary 1A (T1A),  Tributary T1B (T1B), Tributary 2 (T2), and Tributary 3 (T3). The measured bank height ratios along the  project streams are all greater than 1.5 and the reaches have been altered through channelization as seen  in Table 2. Additional existing conditions data are included in Section 12.2.    Table 2. Existing Stream Bank Height and Entrenchment Ratios  Stream  Existing Bank Height Ratio Existing Entrenchment Ratio  SF  1.6‐2.9 1.2‐1.5 T1  4.5 1.3 T2  1.5‐4.1 1.3‐5.4   The primary hydrologic feature at the site is SF, which has been impacted by channelization and riparian  vegetation removal or alteration. This stream enters the projects from a 48”‐diameter concrete pipe from  under Federal Road. SF flows in a general west to east direction until flowing off of the project site. The  first 450 linear feet (lf) are incised with steep vertical banks, a narrow channel, and intermittent headcuts.  The channel likely was relocated, because there is no existing floodplain connection. The canopy is mostly  composed of a dense midstory of invasive Chinese privet (Ligustrum sinense).    After about 450 lf, SF begins to flow northeast; the condition changes, and the channel becomes less  incised and wider. A distinct floodplain is not actively connected to the existing channel, but is present in  this landscape position. However, the channel is still narrower than a natural system and the banks are  vertical. Chinese Privet and kudzu dominate the riparian buffer. Downstream of this point, SF channel has  been mechanically ditched in the past.     After the confluence with T2, SF continues to flow northeast until it comes along a field edge. Similar to  most other parts of SF on this project, the stream is not in the correct position in the valley and is  disconnected from the former floodplain. In some instances, the channel has one dramatically higher  bank, while the other bank is significantly lower. This is evidence of the channel having been moved to its  current location to the side of the valley. The stream continues to flow in this condition off of the project  site to the southeast.    T1 flows north to south before flowing into SF. The stream originates from one distinct seep/spring in the  hillslope to the north of SF and receives additional hydrology from degraded seeps (T1A and T1B) at the  base of the slope to the east of T1 that are currently impacted by vegetation removal and land clearing.  This tributary has been moved out of the natural position in the low point of the valley to the base of the  slope to drain the seepage from the hill slope. The riparian buffer is currently a monoculture of kudzu.    T2 begins at a headcut and is bordered by a narrow buffer of brush and trees before it meets the wood  line. Upstream land clearing, agriculture, and farm ponds have altered the hydrologic regime of the stream  and caused the tributary to become unstable. After the wood line, there are several small headcuts, and  after a larger headcut 345 feet into the wood line, the stream becomes more incised as it flows southeast  to its confluence with SF. This lower portion of T2 is disconnected from its historic floodplain.      Draft Mitigation Plan               Stony Fork Restoration Site  April 24, 2018                  DMS Project Number 97085 13    T3 flows north to south until it meets SF near the beginning of the project. This stream flows in and around  a breached farm pond. It has incised through accumulated pond sediment until it meets SF.     The riparian buffer at the SFRS has been colonized by a dense layer of invasive Chinese privet, especially  along SF. In addition, kudzu dominates the middle portion of SF and T1. There is existing native forested  buffer near the bottom of SF and at the outer margins of the easement, which consists of tulip poplar  (Liriodendron  tulipifera),  sweetgum  (Liquidambar  styraciflua), white oak (Quercus  alba),  American  sycamore (Platanus occidentalis), and green ash (Fraxinus pennsylvanica).     A jurisdictional determination was submitted to the US Army Corps of Engineers on July 12, 2016 and was  approved July 13, 2016. The approved jurisdictional determination is included in Section 12.7. NC Division  of Water Resources also provided a stream determination on July 8, 2016, which is provided in Section  12.3 in the appendices. An updated site assessment of the stream buffer along T2‐2 was completed by  DWR on March 29, 2018 and is included in the appendices as well.        Draft Mitigation Plan               Stony Fork Restoration Site  April 24, 2018                  DMS Project Number 97085 14    Table 3. Project Attribute Table  Project Name   Stony Fork Restoration Site   County   Johnston County  Project Area (acres)   24.4 ac  Project Coordinates (lat. and  long.)   35°26'55.0"N, 78°31'18.5"W  Planted Acreage (Acres of  Woody Stems Planted) 12.1  Project Watershed Summary Information  Physiographic Province   Coastal Plain  River Basin   Neuse  USGS Hydrologic Unit 8‐digit   03020201 USGS Hydrologic Unit 14‐digit 03020201150010  DWR Sub‐basin   03‐04‐04  Project Drainage Area (acres)   497 acres  Project Drainage Area  Percentage of Impervious Area   5%  CGIA Land Use Classification  Managed Herbaceous Cover 53% (262 ac), Mixed Hardwoods/Conifers 31% (150 ac), Low  Density Developed 9% (42 ac), Medium Density Residential 5% (24 ac),  Transportation/Impervious 3% (13 ac)  Existing Reach Summary Information  Parameters   Stony Fork  T1, T1A, and T1B  T2 T3  Length of reach (linear feet)  3,141  365  1,433  154  Valley  Confinement  Unconfined  Confined  Confined, then  unconfined Unconfined  Drainage area (acres)  497 acres  12 acres  150 acres  29 acres  Perennial, Intermittent,  Ephemeral Intermittent  Intermittent  Intermittent/  Perennial Intermittent  NCDWQ Water Quality  Classification C; NSW  C; NSW  C; NSW  C; NSW  Rosgen Classification  (Existing/Proposed) G4c  G4  G4  G4  Evolutionary trend (Simon)  Channelized, Stage III   Channelized, Stage  III Channelized, Stage III Modified with pond,  Stage III  FEMA classification  None  None  None  None  Existing Wetland Summary Information  Parameters       Size of Wetland (acres)    0.33 (WA and WE)  0.06 (WB)  0.14 (WC and WF)  Wetland Type   Headwater Forest  Bottomland Hardwood  Forest Non‐Tidal Freshwater Marsh  Mapped Soil Series    Gilead sandy loam  Bibb sandy loam  Bibb sandy loam  Drainage class    Moderately Well Drained  Poorly Drained  Poorly Drained  Soil Hydric Status    Non‐Hydric  Hydric  Hydric  Source of Hydrology    Surface Water  Stream Floodplain  Stream Floodplain  Restoration or Enhancement  Method N/A  N/A  N/A  **Items addressed in the Categorical Exclusion in Appendix.        Draft Mitigation Plan     Stony Fork Restoration Site  April 24, 2018   DMS Project Number 97085 15  Table 3, continued  Regulatory Considerations  Regulation Applicable? Resolved? Supporting  Documentation  Waters of the United States –  Section 404 Yes Applying for  NWP 27 JD has been obtained.  Waters of the United States –  Section 401 Yes Applying for  NWP 27  Endangered Species Act** Yes Yes USFWS  Historic Preservation Act** No Yes NCSHPO  Coastal Zone Management Act **  (CZMA)/ Coastal Area  Management Act (CAMA)  No  N/A  N/A  FEMA Floodplain Compliance No Yes N/A  Essential Fisheries Habitat** No N/A N/A  **Items addressed in the Categorical Exclusion in Appendix.  WC WE WB WF WA WD T1 Stony Fork T2 XS1 XS7 XS2 XS3 XS4 XS5 XS9 XS6 XS8 Ü 0 1,000500Feet FIGURE 7. CURRENT CONDITIONS, STONY FORK RESTORATION SITE, JOHNSTON COUNTY, NC Stream TypeIntermittent (5,481 ft)Perennial (691 ft)Outside Project Cross Sections Project Easement Jurisdictional Wetlands Orthoimagery Source: NC OneMap (2013) 16   Draft Mitigation Plan               Stony Fork Restoration Site  April 24, 2018                  DMS Project Number 97085 17    3.1.4  Site Photographs  Photo 1: Head of project at exit from culvert at Federal Rd.  Photo 2: Typical view of Stony Fork near top.  Photo 3: View of eroding banks on Stony Fork on Reach 1. Photo 4: View of 2‐acre kudzu monoculture near confluence  of T1 and Stony Fork.  Photo 5: View of flowing seep near head of T1. Photo 6: View of clay channel bottom on Stony Fork along  channelized stream.    Draft Mitigation Plan               Stony Fork Restoration Site  April 24, 2018                  DMS Project Number 97085 18      Photo 7: View of 18” headcut on Stony Fork. Photo 8. View of accelerated erosion and undercut banks on  Stony Fork.  Photo 9: View of T2 bed erosion and incision. Photo 10: Typical view of upper portion of T2 above headcut  Photo 11: View of Stony Fork downstream of mid‐project  culvert. Photo 12: View of upstream portion of T2.    Draft Mitigation Plan               Stony Fork Restoration Site  April 24, 2018                  DMS Project Number 97085 19       Photo 13: Top of T3. Photo 14. T3 as it becomes incised.  Photo 15: Another view of T3 with incised banks. Photo 16: T3 as it goes through the pond bottom near the  end of the stream near SF.     Draft Mitigation Plan               Stony Fork Restoration Site  April 24, 2018                  DMS Project Number 97085 20    4.0 FUNCTIONAL UPLIFT POTENTIAL    Based on the current stream and watershed conditions at the SFRS, there is a high potential for functional  improvements at this site. Channelization, incision, riparian vegetation removal, and invasive species  monocultures have resulted in a local system with lack of floodplain connectivity, high shear stress,  minimal bedform variation, and high amounts of sediment inputs from bank erosion and a degraded  riparian buffer.     The primary uplift for the SFRS will be achieved at the hydraulic and geomorphological functional levels.  Reestablishing floodplain connectivity with a Priority 1 Restoration will allow stream flows to access the  floodprone area more frequently, providing uplift of hydraulic functions within this system that will  distribute flood flows through a wide area instead of within a confined channel. Geomorphological  functional uplift will be achieved through channels sized to the bankfull flow, a planform and profile design  emphasizing bedform variation, and the reestablishment of a native riparian corridor with invasive species  removed. As a result, bank migration and lateral stability will be restored to a sustainable level and the  banks and bed will accommodate design flows in a stable manner. Sediment inputs will decrease due to  reduced  bank  erosion  and  sediment  transport  can  return  to  a  stable  level  that  will  accommodate  watershed inputs. Riparian plantings will further support geomorphological functionality by increasing  bank stability.    Consideration of future impacts to the area that could limit functional uplift opportunities is important  when assessing project potential. The upstream watershed is agricultural, but the vicinity is experiencing  development  pressure.  A  new  residential  development  is  being  constructed  to  the  northeast  and  southeast of the project. The project streams are sized such that the floodprone areas will accommodate  changes in hydrology as needed. The table below summarizes the project goals and objectives that will  lead to functional improvements and the monitoring tools that will be used to track these changes to the  site.         Draft Mitigation Plan               Stony Fork Restoration Site  April 24, 2018                  DMS Project Number 97085 21    5.0 MITIGATION PROJECT GOALS AND OBJECTIVES    Table 4. Project Goals, Objectives, and Functional Outcomes  Goals  Objective   Functional Level  Function‐Based Parameter  Effects  Monitoring  Measurement Tool  Restore an incised  stream to a stable  stream system with  an active floodplain  Relocate streams to  a meandering  landscape position  Hydraulics  Floodplain Connectivity  Flood Frequency  Bank Height Ratio and  Entrenchment Ratio  Install a cross‐ section sized to the  bankfull discharge  Geomorphology Bank Migration/Lateral  Stability  Cross‐Sectional  Survey  Visual Inspection of  Bank Stability  Create bedform  diversity with pools,  riffles, and habitat  structures  Geomorphology  Bed Form Diversity  Percent Riffle and  Pool  Visual Inspection of  Feature Maintenance  Restore a forested  riparian buffer to  provide bank  stability and shading  Plant the site with  native trees and  shrubs.  Geomorphology  Vegetation  Density  Species  Composition/Diversity        Draft Mitigation Plan               Stony Fork Restoration Site  April 24, 2018                  DMS Project Number 97085 22    6.0  DESIGN APPROACH AND MITIGATION WORK PLAN    The project streams were designed using a modified reference reach approach using a local regional curve  developed from stable reference cross‐sections (see Section 12.2 for reference data). In addition to the  data from the on‐site references, common reference values from Harmon et al. 2011 were also used to  aid the development of the design criteria. The proposed channel design values have been adjusted as  necessary to fit the existing site conditions based on these sources. Stable pattern data were taken from  the UT Fisher River reference in Surry County as needed.    6.1   Stony Fork (SF)  Stony Fork will be broken into three separate reaches: Stony Fork Reach 1 (SF1) from the western edge of  the project until the confluence with T1, Reach 2 (SF2) from SF1 until the confluence with T2, and Reach  3 (SF3) from SF2 until the end of the project. The first reach, SF1, begins at the culvert under Federal Road  and is 1,155 linear feet. Since the elevation of this reach is controlled by this culvert, this reach will be a  transition part of the project where the design will follow more of a Priority 2 approach. The design will  raise the channel elevation to match the channel grade with the invert of the culvert. In the lower third  of this reach, the channel will be meandered to the south of its current location and into the former  floodplain location. Invasive privet, which is extensive throughout Reach 1, will be removed from the  buffer.      From the T1 confluence, SF2 will continue with Priority 1 restoration down the valley in the historic  floodplain location. This is the longest reach on Stony Fork at 2,707 linear feet. The first half of this reach  has a narrower valley width and as a result, the proposed stream will follow along the general path of the  existing channel, while increasing the sinuosity and raising the bed elevation. The second half of this reach  will be relocated to the north of the existing channel where the valley is broader. Every effort will be made  to work around trees in this area that can provide shade to the restored stream.    After the confluence with T2, SF3 will continue to be restored by moving the stream back to the relic  floodplain in the center of the valley. The proposed stream (694 linear feet) will remain to the north of  the existing channel before tying back into the existing thalweg at the end of the project. The stream will  be remeandered around significant trees that will provide shade to the restored channel.     6.2   Tributary 1 (T1)  T1 will be restored using a Priority 1 approach for approximately 510 linear feet. The design will move the  channel west to its historic floodplain away from the toe of the hill slope. The stream will originate from  the primary spring/seep that emerges from the base of the hill and provides the hydrology for the stream.  T1 will then join Stony Fork to the west of the current location of the confluence. In addition, two  additional streams driven by seep flow will be redeveloped through restoration: T1A at 159 linear feet  and T1B at 26 linear feet.    6.3   Tributary 2 (T2)  T2 has been divided into three reaches: T2‐1 (334 linear feet of EII), T2‐2 (337 linear feet of restoration),  and T2‐3 (885 linear feet of restoration). Enhancement II for T2‐1 will involve installing a step pool to  stabilize a headcut, planting the riparian buffer with native vegetation, and removing and controlling  invasive vegetation within the easement. T2‐2 begins where several headcuts cause the stream to rapidly    Draft Mitigation Plan               Stony Fork Restoration Site  April 24, 2018                  DMS Project Number 97085 23    incise. The restoration will maintain the landscape position of the stream, but add appropriate sinuosity  and restore the streambed morphology by raising the elevation of the streambed to regain floodplain  connection. T2‐3 will continue this approach, but with a larger cross‐section to accommodate additional  drainage area.     6.4   Tributary 3 (T3)  T3 has been divided into two reaches: T3‐1 (71 linear feet of Enhancement I) and T3‐2 (58 linear feet of  restoration). The top reach will be enhanced along its existing planform up until the pond bed. After this  point, T3‐2 will be restored by constructing a stable channel and eliminating spoil piles in this area.     6.5   Riparian Buffer Mitigation  Riparian buffer mitigation will take place across the site in the form of restoration (382,463 sf / 382,463  credits), enhancement (142,777 sf / 71,388 credits), and preservation (463,565 sf / 17,508 credits) and  adhering to the Neuse Buffer Rule (NCAC Rule 15A NCAC 02B .029). The preservation area has been limited  to 25% of the total area for crediting purposes as mandated by the rule, but will still be protected as part  of the conservation easement. The calculations and maps showing the riparian buffer mitigation are  included in Section 12.3.     6.6   Crossings  There are three easement exceptions for crossings on Stony Fork.  The first culvert will be installed as part  of the current development being constructed to the southeast of the site. The second crossing will be a  rock ford crossing; this landowner will use this crossing infre quently and there are no livestock in this area.  The third crossing is an existing culvert pipe that will stay in place.            Draft Mitigation Plan               Stony Fork Restoration Site  April 24, 2018                  DMS Project Number 97085 24    6.7   Design Discharge Determination  KCI developed the design discharge values for the proposed streams by using four stable reference cross‐ sections located in the vicinity of the project: two on‐site (Ref XS1 and 4) and two downstream (Ref XS 2  and 3) from the project  on Stony Fork (see Section 12.2 for locations and  cross‐sectional data). In  comparison to other impaired portions of the site, these four reference cross‐sections have stable bankfull  features that allowed for the cross‐sectional area and discharge to be linked to the drainage area. Based  on these values, we developed a local regional curve using these cross‐sections. The rural Piedmont  regional curves were used to as a comparison for the on‐site relationships (Harman et al 1999) (although  the site is in the Coastal Plain, the Piedmont curve was deemed more suitable based on the watershed’s  characteristics). The local curve showed a linear power relationship lower than the Piedmont curve as  shown in Figure 8 and Table 5 below (Reference Cross‐Sections 2 and 3 have similar drainage areas, and  appear as one data point on the curve).       Figure 8. Local Regional Curve for Stony Fork    Table 5. Local Regional Curve Data  Cross‐Section Location Drainage Area  (Sq. Miles) Reference XS  Area (sf) XS Area  Estimate (sf)  from Piedmont  Regional Curve  Q (cfs)  from Ref XS  Q (cfs) from  Piedmont  Regional Curve  Onsite T1   (Ref XS 4) 0.23  5.0  7.9  19.5  30.9  Stony Fork Upstream   (Ref XS 1) 0.41  9.3  11.7  30.0  46.9  Onsite Stony Fork   (Ref XS 2) 0.84  17.0  19.0  51.2  78.5  Stony Fork Downstream  (Ref XS 3) 0.84  24.8  19.0  52.2  78.5  y = 89.039x0.7223 R² = 0.9069 y = 58.915x0.7535 R² = 0.9997 1 10 100 1,000 10,000 0.1 1 10 100Discharge (cfs)Drainage Area (Square Miles)   Draft Mitigation Plan               Stony Fork Restoration Site  April 24, 2018                  DMS Project Number 97085 25    To further evaluate the field measurements taken within the project, we compared the flow results for  the four cross‐sections to two different hydrologic methods. First, we compared our results to the 2‐year  recurrence interval flow calculations using the USGS Rural Peak‐Flow Regression Equations for North  Carolina in the USGS National Streamflow Statistics Program (USGS 2016). Bankfull values in the North  Carolina Piedmont average a 1.4‐year recurrence interval (Harman et al. 1999), and as such should be  lower than the 2‐year recurrence interval USGS values. Our field results are lower than the USGS values  as expected. The effective discharge equation for a 1.2 recurrence interval for the Southeastern Plains  Ecoregion (Simon et al. 2004) was also used as a comparison tool; in general, the Q1.2 values are close in  range to the reference cross‐section flow values. This comparison shows that our field calculations are  within the range of other established discharge estimates. In addition to the field‐acquired reference data,  we also used common reference values from Harman et al. 2011 as mentioned previously.    Table 6. Local XS Flow Compared to USGS Regression for North Carolina  Cross‐Section  Location  Drainage  Area (Sq.  Miles)  Field  Q  (cfs)1  USGS  Regression 2‐ year Q (cfs)2  USGS Regression  Low Prediction  (cfs)  USGS Regression  High Prediction  (cfs)  Effective  Discharge3 (cfs)  Onsite T1 (Ref XS 4) 0.23  19.5  32.5  14.8  71.4 18.0  Stony Fork  Upstream (Ref XS 1) 0.41  30  45.7  20.9  99.0  26.8  Onsite Stony Fork  (Ref XS 2) 0.84  51.2  69.9  32.1  152  43.8  Stony Fork  Downstream  (Ref XS 3)  0.84  52.2  69.9  32.1  152  43.8  1. Calculated using field bankfull dimensions and Manning’s formula.  2. Calculated using USGS NSS, North Carolina Region 4 Equations assuming impervious percentage of 5%.   3. Simon et al. 2004 equation for Southeastern Plains (Ecoregion 65) for 1.2 Recurrence Interval.     6.8  Sediment  The on‐site streams have sediment with a mixture of small gravel and sand. The project streams have a  silt/clay bed underneath the active sediment where excessive shear stresses from the confined channels  have removed existing bed material and created an unstable condition.   In order to analyze the existing sediment conditions within the project streams, two pavement samples  and nine pebble counts were performed for trend analysis. These data are provided in Section 12.2. Based  on the existing conditions data, the project sediment sizes range from sand up to small gravels. Bank  erosion is currently contributing excess sand to the system. Following project completion, the amount of  sand being contributed from on‐site erosion is expected to decrease. However, a sand component is still  anticipated for the sediment regime given that upstream agriculture and development will continue in  the upper watershed and move through Stony Fork.   Based on the collected sediment and cross‐section data, shear stress values were calculated using both  average channel boundary shear stress and a modified critical shear stress (USDA, Forest Service 2008).  The modified shear stress was calculated using the D84 values from field samples and compared to the  average channel boundary shear stress based on the existing and proposed channel dimensions and  slopes. The results are shown in the table below.            Draft Mitigation Plan               Stony Fork Restoration Site  April 24, 2018                  DMS Project Number 97085 26    Table 7. Sediment Summary for Project Reaches  XS Reach Avg Shear  Stress (lb/sf)  D50  (mm)  D84  (mm)  Sample  Type  Modif.  Critical Shear  Stress (lb/sf)  Predicted Grain  Size Movement  (mm)  Existing XS1 SF1  0.45  2.2  7.5 PC 0.042   Existing XS2 SF2  0.42  0.57  8 PC 0.015   Existing XS3 SF2  0.49  0.062  4.7 PC 0.007   Existing XS4 SF2  0.40  0.093  0.14 PC 0.001   Existing XS5 SF2  0.47  4.1  12 PC 0.080   Existing XS6 SF3  0.39  8.3  12 PC 0.137   Existing XS7 T1  0.54  0.062  0.062 PC 0.001   Existing XS8 T2‐2  0.60  0.062  0.062 PC 0.001   Existing XS9 T2‐3  1.00  0.21  2 PC 0.005        Proposed  SF1 0.39 2.2  7.5  PC  0.042  29  Proposed  SF2 0.40 0.57  8  PC  0.015  30  Proposed  SF3 0.45 8.3  12  PC  0.137  34  Proposed  T1 0.45 0.062  0.062  PC  0.001  34  Proposed  T2‐1 0.27 0.062  0.062  PC  0.001  20  Proposed  T2‐2 0.41 0.062  0.062  PC  0.001  31  Proposed  T2‐3 0.43 0.21  2  PC  0.005  32    Based on the calculated average channel boundary shear stress for the proposed channels, the stream  will have adequate stream power to transport the existing D84 material as shown by the critical shear  stress values. Due to the small size of existing site sediment, the average channel boundary shear stress  is higher than that needed to move the existing D84 (critical shear stress). While we do anticipate that  native small gravels and sand will move into the restored reaches, the results indicate the need for riffle  reinforcement to protect the newly constructed riffles from excessive scour. Proposed riffle grade control  structures have been designed with a mix of Class A, B, and 1 stone with 10% ABC stone; Class A (the  smallest among Classes A, B, and 1) has a modified critical shear stress that is large enough to withstand  all of the predicted average channel boundary stresses. The last column in the table above provides a  predicted grain size that will move at the calculated modified critical shear stress for the proposed  channel. The largest grain size predicted to be mobilized is 34 mm (1.3 inches). Given the mix of the  constructed riffle, 106 mm equates to the midrange of the Class A Stone (approximately 4 in.). It can be  expected that approximately 85% of the constructed riffle stone will be greater than this diameter.  Additionally, our experience has revealed minimal movement of constructed riffle material when it is well  mixed and placed in the stream bed in similar design conditions.            Draft Mitigation Plan               Stony Fork Restoration Site  April 24, 2018                  DMS Project Number 97085 27    6.9   Morphological Essential Parameters Tables    Table 8. Morphological Essential Parameters for SF1  Parameter Existing Condition Reference Condition Proposed  Valley Width (ft) 90‐210  N/A  90‐210  Contributing Drainage Area (acres) 175  Variable  175  Channel/Reach Classification  G4c  C4  C4  Design Discharge Width (ft)  7.2  N/A  9.7  Design Discharge Depth (ft)  0.9  N/A  0.7  Design Discharge Area (ft2)  6.4  N/A  7.0  Design Discharge Velocity (ft/s)  3.5  N/A  3.2  Design Discharge (cfs)  22  N/A  23  Water Surface Slope   0.009  N/A  0.009  Sinuosity  1.3  1.2‐1.4  1.2  Width/Depth Ratio  8.1  10‐15  13.5  Bank Height Ratio  2.9  1.0‐1.1  1.0  Entrenchment Ratio  1.2  2.5+  10.3  d16 / d35 / d50 / d84 / d95 / dip / disp (mm)  0.15/1.2/2.2/7.5/11/‐0.4/7.1  Gravel  Gravel      Table 9. Morphological Essential Parameters for SF2  Parameter Existing Condition Reference Condition Proposed  Valley Width (ft) 45‐130  N/A  45‐130  Contributing Drainage Area (acres) 264  Variable  264  Channel/Reach Classification  G4c‐G5c  C4  C4  Design Discharge Width (ft)  5‐10  N/A  11.3  Design Discharge Depth (ft)  1.0‐1.4  N/A  0.8  Design Discharge Area (ft2)  6.9‐8.9  N/A  9.4  Design Discharge Velocity (ft/s)  3.3‐3.8  N/A  3.2  Design Discharge (cfs)  24‐30  N/A  30  Water Surface Slope   0.008  N/A  0.008  Sinuosity  1.1  1.2‐1.4  1.2  Width/Depth Ratio  3.7‐11.2  10‐15  13.5  Bank Height Ratio  1.6‐2.1  1.0‐1.1  1.0  Entrenchment Ratio  1.4‐1.5  2.5+  8.8  d16 / d35 / d50 / d84 / d95 / dip / disp (mm)  0.33/0.61/1.2/6.2/9.8/0.3/5.5  Gravel  Gravel                Draft Mitigation Plan               Stony Fork Restoration Site  April 24, 2018                  DMS Project Number 97085 28    Table 10. Morphological Essential Parameters for SF3  Parameter Existing Condition Reference Condition Proposed  Valley Width (ft) 180‐230  N/A  180‐230  Contributing Drainage Area (acres) 497  Variable  497  Channel/Reach Classification  G4c  C4  C4  Design Discharge Width (ft)  10.5  N/A  12.6  Design Discharge Depth (ft)  1.2  N/A  0.9  Design Discharge Area (ft2)  12.5  N/A  11.8  Design Discharge Velocity (ft/s)  3.4  N/A  3.6  Design Discharge (cfs)  42  N/A  43  Water Surface Slope   0.006  N/A  0.008  Sinuosity  1.1  1.2‐1.4  1.2  Width/Depth Ratio  8.9  10‐15  13.5  Bank Height Ratio  2.0  1.0‐1.1  1.0  Entrenchment Ratio  1,4  2.5+  7.9  d16 / d35 / d50 / d84 / d95 / dip / disp (mm)  1.1/6.0/8.3/12/15/‐0.7/3.3  Gravel  Gravel      Table 11. Morphological Essential Parameters for T1  Parameter Existing Condition Reference Condition Proposed  Valley Width (ft) 40‐70  N/A  40‐70  Contributing Drainage Area (acres) 12  Variable  12  Channel/Reach Classification  G5  C4  C4  Design Discharge Width (ft)  3.4  N/A  5.0  Design Discharge Depth (ft)  0.3  N/A  0.4  Design Discharge Area (ft2)  0.9  N/A  1.9  Design Discharge Velocity (ft/s)  3.2  N/A  3  Design Discharge (cfs)  3  N/A  6  Water Surface Slope   0.035  N/A  0.020  Sinuosity  1.0  1.2‐1.4  1.2  Width/Depth Ratio  12.7  10‐15  13.5  Bank Height Ratio  4.5  1.0‐1.1  1.0  Entrenchment Ratio  1.3  2.5+  10.0  d16 / d35 / d50 / d84 / d95 / dip / disp (mm)  Silt‐Clay  Gravel Gravel                    Draft Mitigation Plan               Stony Fork Restoration Site  April 24, 2018                  DMS Project Number 97085 29    Table 12. Morphological Essential Parameters for T2‐1  Parameter Existing Condition Reference Condition Proposed  Valley Width (ft) 30‐100  N/A  30‐100  Contributing Drainage Area (acres) 93  Variable  93  Channel/Reach Classification  G5c  C4  C4  Design Discharge Width (ft)  4.4  N/A  5.0  Design Discharge Depth (ft)  0.8  N/A  0.4  Design Discharge Area (ft2)  3.6  N/A  1.9  Design Discharge Velocity (ft/s)  3.9  N/A  2.9  Design Discharge (cfs)  14  N/A  5  Water Surface Slope   0.014  N/A  0.012  Sinuosity  1.1  1.2‐1.4  1.2  Width/Depth Ratio  5.4  10‐15  13.5  Bank Height Ratio  4.1  1.0‐1.1  1.0  Entrenchment Ratio  1.3  2.5+  10.0  d16 / d35 / d50 / d84 / d95 / dip / disp (mm)  Silt‐Clay  Gravel Gravel      Table 13. Morphological Essential Parameters for T2‐2  Parameter Existing Condition Reference Condition Proposed  Valley Width (ft) 90‐140  N/A  90‐140  Contributing Drainage Area (acres) 135  Variable  135  Channel/Reach Classification  G5c  C4  C4  Design Discharge Width (ft)  4.4  N/A  7.6  Design Discharge Depth (ft)  0.8  N/A  0.6  Design Discharge Area (ft2)  3.6  N/A  4.3  Design Discharge Velocity (ft/s)  3.9  N/A  3.1  Design Discharge (cfs)  14  N/A  14  Water Surface Slope   0.009‐0.020  N/A  0.012  Sinuosity  1.1  1.2‐1.4  1.2  Width/Depth Ratio  5.4  10‐15  13.4  Bank Height Ratio  4.1  1.0‐1.1  1.0  Entrenchment Ratio  1.3  2.5+  6.6  d16 / d35 / d50 / d84 / d95 / dip / disp (mm)  Silt‐Clay  Gravel Gravel                    Draft Mitigation Plan               Stony Fork Restoration Site  April 24, 2018                  DMS Project Number 97085 30    Table 14. Morphological Essential Parameters for T2‐3  Parameter Existing Condition Reference Condition Proposed  Valley Width (ft) 90‐150  N/A  90‐150  Contributing Drainage Area (acres) 149  Variable  149  Channel/Reach Classification  G5c  C4  C4  Design Discharge Width (ft)  5.7  N/A  9.0  Design Discharge Depth (ft)  1.7  N/A  0.6  Design Discharge Area (ft2)  9.4  N/A  5.8  Design Discharge Velocity (ft/s)  2.1  N/A  3.4  Design Discharge (cfs)  20  N/A  20  Water Surface Slope   0.009‐0.020  N/A  0.011  Sinuosity  1.1  1.2‐1.4  1.2  Width/Depth Ratio  3.4  10‐15  13.9  Bank Height Ratio  1.5  1.0‐1.1  1.0  Entrenchment Ratio  1.8  2.5+  5.6  d16 / d35 / d50 / d84 / d95 / dip / disp (mm)  0.031/0.13/0.21/2.0/6.1/0.1/8  Gravel  Gravel      Table 15. Morphological Essential Parameters for T3  Parameter Existing Condition* Reference Condition Proposed  Valley Width (ft) 50‐90  N/A  50‐90  Contributing Drainage Area (acres) 29  Variable  29  Channel/Reach Classification  G4  C4  C4  Design Discharge Width (ft)  N/A  N/A  5.0  Design Discharge Depth (ft)  N/A  N/A  0.4  Design Discharge Area (ft2)  N/A  N/A  1.9  Design Discharge Velocity (ft/s)  N/A  N/A  1.2  Design Discharge (cfs)  N/A  N/A  2  Water Surface Slope   N/A  N/A  0.016  Sinuosity  N/A  1.2‐1.4  1.2  Width/Depth Ratio  N/A  10‐15  13.5  Bank Height Ratio  N/A  1.0‐1.1  1.0  Entrenchment Ratio  N/A  2.5+  10  d16 / d35 / d50 / d84 / d95 / dip / disp (mm)  N/A  Gravel  Gravel  *Existing channel impacted by pond bed    6.10  Planting  All unforested portions of the project easement will be planted to establish a forested riparian buffer. At  a minimum, 12.1 acres will be reforested, but additional plantings may take place beyond this area to  ensure an adequate density across the site. The planting plan is shown in the attached project plan sheets  (Section 12.1). Trees and shrubs will be planted at a density of 968 stems per acre (9 feet x 5 feet spacing)  to achieve a mature survivability of 210 stems per acre after seven years. Woody vegetation planting will    Draft Mitigation Plan               Stony Fork Restoration Site  April 24, 2018                  DMS Project Number 97085 31    be conducted during dormancy. Species to be planted may consist of the following and any substitutions  from the planting plan will be taken from this list:    Common Name  Scientific Name  River Birch Betula nigra  American Persimmon Diospyros virginiana  Green Ash Fraxinus pennsylvanica  Tulip Poplar Liriodendron tulipifera  American Sycamore Platanus occidentalis  White Oak Quercus alba  Southern Red Oak Quercus falcata  Swamp Chestnut Oak Quercus michauxii  Pin Oak  Quercus palustris  Willow Oak Quercus phellos    On the restored stream banks, live stakes will be used to provide natural stabilization. Species identified  for live staking include:     Common Name  Scientific Name  Silky Dogwood  Cornus amomum  Black Willow Salix nigra  Silky Willow Salix sericea    A custom herbaceous seed mix composed of native species will also be developed and used to further  stabilize the easement area as needed.    6.11  Project Assets  The tables below outline the anticipated project assets that will be produced from the Stony Fork project,  and Figure 9 shows the proposed mitigation assets for the site. The total stream mitigation credits (SMCs)  are slightly different than those outlined in the initial proposal. SMCs were removed at the bottom of the  site due to land title issues associated with the Critcher Farms subdivision. The upper portion of T2 was  eliminated from the project, since it was not a jurisdictional stream, but an additional tributary, Tributary  3, was added to the project once it was determined it was jurisdictional. The buffer mitigation credits  (BMCs) were reduced from the contracted amount due to the limitation on preservation credits once the  final restoration, enhancement, and preservation BMCs were tabulated.   Draft Mitigation Plan                 Stony Fork Restoration Site April 24, 2018                       DMS Project Number 97085 32  Table 16. Project Asset Table  Project Component  ‐or‐  Reach ID Existing Footage/ Acreage Stationing Restoration Footage  or Acreage Creditable Footage or Acreage Restoration Level Approach Priority Level Mitigation Ratio (X:1) MitigationCredits Notes/Comments SF1 1,235 9+93‐ 21+48 1155 1155 R PI/PII 1:1 1155  SF2 2,453 21+48‐49+50 2802 2707 R PI 1:1 2707 Crossings at STA 32+52‐33+17 (65’) and 44+49‐44+80 (31’) SF3 688 49+50‐56+74 724 694 R PI 1:1 694 Crossing at STA 55+48‐  55+78 (30’) T1 365 100+00‐105+10 510 510 R PI/PII 1:1 510  T1A 47 150+00‐151+59 159 159 R PI/PII 1:1 159  T1B 26 160+00‐160+26 26 26 R PI/PII 1:1 26  T2‐1 327 200+00‐203+34 334 334 EII N/A 2.5:1 134  T2‐2 326 203+34‐206+71 337 337 R PI/PII 1:1 337  T2‐3 780 206+71‐215+26 855 855 R PI/PII 1:1 855  T3‐1  72 300+00‐ 300+71 71  71  EI  PI/PII  1.5:1  47   T3‐2  82 300+71‐ 301+29 58  58  R  PI/PII  1:1  58   Buffer Restoration TOB to 100' 415,271  N/A  415,271  415,271  R  N/A  1:1  415,271   Buffer Restoration 101‐200' 37,091  N/A  37,091   37,091   R  N/A  3:1  12,364    Buffer Enhancement TOB to 100' 74,803  N/A  74,803  74,803  E  N/A  2:1  37,401   Buffer Preservation TOB to 100' 462,405  N/A  462,405  175,721  P  N/A  10:1  17,572 Preservation limited to no more than 25% of total buffer mitigation area.  Draft Mitigation Plan     Stony Fork Restoration Site  April 24, 2018   DMS Project Number 97085 33  Table 17. Length and Summations by Mitigation Category  Restoration Level Stream   (linear feet)  Riparian Wetland  (acres)  Non‐riparian  Wetland  (acres)  Buffer (square feet)  Riverine Non‐ Riverine  Restoration 6,501 452,362  Enhancement  74,803  Enhancement I  71  Enhancement II  334  Creation   Preservation  462,405  High Quality Preservation   Table 18. Overall Assets Summary  Stony Fork Restoration Site (Project ID ‐ 97085)  Overall Assets Summary  Asset Category Overall Credits  Stream 6,682  RP Wetland  NR Wetland  Buffer 482,608  T1B Start SF1 SF2 T1 T2-3 SF3 T2-2 T2-1 T1A T3-1 T3-2 NCCGIA Ü 0 500250Feet FIGURE 9. PROJECT ASSET MAP, STONY FORK RESTORATION SITE, JOHNSTON COUNTY, NC Stream Mitigation 6,682 SMCs R (6,501 lf / 6,501 SMCs) EI (71 lf / 47 SMCs) EII (334 lf / 134 SMCs) Buffer Mitigation 482,608 total credits Buffer Restoration (452,362 sf / 427,634 credits) Buffer Enhancement (74,803 sf / 37,401 credits) Buffer Preservation (462,405 sf / 17,572 credits limited to 25% of total) Source: NC OneMap Orthoimagery 2013. 34   Draft Mitigation Plan               Stony Fork Restoration Site  April 24, 2018                  DMS Project Number 97085 35  7.0 PERFORMANCE STANDARDS    Monitoring of the site shall occur for a minimum of seven years following construction. The following  performance standards for stream mitigation are based on the Wilmington District Stream and Wetland  Compensatory Mitigation Update (NCIRT 2016) and will be used to judge site success. Buffer mitigation  must meet the standards outlined in Neuse River Basin Buffer Rule 15A NCAC 02B .0295.     Vegetation Performance  The site must achieve a woody stem density of 260 stems/acre after five years and 210 stems/acre after  seven years to be considered successful. Trees in each plot must average 7 feet in height at Year 5 and 10  feet at Year 7. A single species may not account for more than 50% of the required number of stems within  any plot. Volunteers must be present for a minimum of two growing seasons before being included  performance standards in Year 5 and Year 7. If monitoring indicates that any of these standards are not  being met, corrective actions will take place.    Stream Hydrologic Performance  During the monitoring period, a minimum of four bankfull events must be recorded within the monitoring  period. These bankfull events must occur in separate monitoring years. Bankfull events will be verified  using a minimum of one automatic stream monitoring gauge on Stony Fork to record daily stream depth  readings. Any Qgs flows at the project during the monitoring period will also be documented. All project  streams must also show a minimum of 30 continuous flow day within a calendar year (assuming normal  precipitation) for three out of four of the first four monitoring years.    Stream Geomorphology Performance  The site’s geomorphology will be monitored per the NCIRT’s 2016 guidance. Adjustment and lateral  movement  following  construction  and  as  the  channel  settles  over the monitoring period are to be  expected.  Geomorphological  measurements  of  cross‐sections  will be  used  to  determine  if  any  adjustments that occur are out of the range typically expected for this type of stream.     Riparian Buffer Performance  The vegetation within the areas proposed for riparian buffer credit must contain 260 stems per acre at  the end of five years of monitoring. There should be a minimum of four native hardwood tree species or  four native hardwood tree and native shrub species (inclusive of volunteers), with no species greater than  50% of the stems.       8.0 MONITORING PLAN    Monitoring of the Stony Fork Site shall consist of the collection and analysis of stream hydrology, stability,  and  vegetation  survivability  data  to  support  the  evaluation  of the  project  in  meeting  established  performance standards described above. The Proposed Monitoring Plan in Figure 10 shows the proposed  locations of monitoring features described below.     Vegetation Monitoring  Vegetation monitoring will take place between July 1st and leaf drop. The success of the riparian buffer  plantings will be evaluated using twelve 0.02‐acre square or rectangular plots within the enhancement    Draft Mitigation Plan               Stony Fork Restoration Site  April 24, 2018                  DMS Project Number 97085 36  and restoration buffer mitigation areas. Six plots will be permanently installed, while the remainder will  be randomly placed at the time of each monitoring visit.     In the permanent plots, the plant’s height, species, location, and origin (planted versus volunteer) will be  noted. In the random plots, species and height will be recorded. In all plots, exotic and invasive stems will  also be included in the stem counts. Additionally, a photograph will be taken of each plot. Beginning at  the end of the first growing season, KCI will monitor the planted vegetation in monitoring years 1, 2, 3, 4,  5, and 7. Riparian buffer mitigation requires monitoring in Years 1‐5, while the stream mitigation requires  monitoring in Years 1, 2, 3, 5, and 7.    Stream Hydrologic Monitoring  Bankfull events on‐site will be verified using an automatic stream monitoring gauge on SF3 as seen on  Figure 10 to record daily stream depth readings. The Qgs flow after the confluence with T2 is 45 cfs (based  on 67% of a 2‐year USGS regression flow of 67.4 cfs). The measured flows will be compared to the Qgs  value as well as the bankfull discharge. In addition, flow will recorded on T1, T2‐2, and T3.     Stream Geomorphology Monitoring  For stream monitoring, the purpose of monitoring is to evaluate the stability of the restored stream.  Following the procedures established in the USDA Forest Service Manual, Stream Channel Reference Sites  (Harrelson et al. 1994) and the methodologies utilized in the Rosgen stream assessment and classification  system (1994 and 1996), data collected will consist of detailed dimension measurements, longitudinal  profiles, and bed materials sampling.    Dimension  Sixteen permanent cross‐sections will be established at the Stony Fork Site, one set of a riffle and pool  each on SF1, SF3, T1, T2‐2, T2‐3, and T3‐2 and two sets on SF2, the longest of the project reaches. The  extents of each cross‐section will be recorded by either conventional survey or GPS. The cross‐sectional  surveys shall provide a detailed measurement of the stream and banks and will include points on the  adjacent floodplain or valley, at the top of bank, bankfull, at all breaks in slope, the edge of water, and  thalweg. Width/depth, bank height and entrenchment ratios, as well as bankfull cross‐sectional area,  width, max depth and mean depth will be calculated for each riffle cross‐section based on the survey data.  Width/depth ratios, bankfull cross‐sectional area, width, max depth and mean depth will be calculated  for each pool cross‐section. Cross‐section measurements will take place in Years 1, 2, 3, 5, and 7.    Profile  A detailed longitudinal profile will be conducted along the lengths of SF1, SF2, SF3, T1, T2‐2, T2‐3, and T3‐ 2 during the as‐built survey. Measurements will include slopes (average, pool, and riffle) as well as  calculations  of  pool‐to‐pool  spacing.  No  additional  profile  measurements  will  be  taken  during  the  monitoring period unless deemed necessary due to concerns about bed elevation adjustments.    Visual Assessment  An annual site walk will be conducted at the end of each monitoring period to document any problem  areas. Specific problem areas that could include low stem density or poor plant vigor, areas dominated by  undesirable volunteer species, prolonged inundation, native and exotic invasive species, beaver activity,  herbivory, encroachments, indicators of livestock access, or other areas of concern. The findings of the  visual assessment as well as any recommended corrective actions for problem areas will be summarized  in the monitoring reports by way of a Current Conditions Plan View (CCPV) figure.     Draft Mitigation Plan               Stony Fork Restoration Site  April 24, 2018                  DMS Project Number 97085 37    Photograph reference points (PRPs) will be established to assist in characterizing the site and to allow  qualitative evaluation of the site conditions. The location of each photo point will be marked in the  monitoring plan and the bearing/orientation of the photograph will be documented to allow for repeated  use.    Reporting  Annual monitoring data will be reported using the most current DMS monitoring template from June  2017. The monitoring report shall provide a project data chronology that will facilitate an understanding  of project status and trends, population of DMS databases for analysis, research purposes, and assist in  decision making regarding project close‐out. The report will document the monitored components and  include all collected data, analyses, and photographs. The first scheduled monitoring will be conducted  during  the  first  full  growing  season  following  project  completion. The site will be monitored for  performance standards for seven years as needed after completion of construction. Full monitoring  reports will be completed in Years 1, 2, 3, 5, and 7. Limited monitoring reports will be submitted in Years  4 (vegetation, CCPV, photos, stream gauge data, and site narrative) and 6 (CCPV, photos, stream gauge  data, and site narrative).    Table 20. Monitoring Requirements    Stony Fork Restoration Site  Required  Parameter  Quantity  Frequency  Notes  Yes Pattern and  Profile  SF1, SF2, SF3, T1, T2‐2, T2‐3,  and T3‐2  Once, during as‐ built survey  Additional measurements in later years  may be taken as necessary.  Yes Stream  Dimension  16 cross‐sections  (8 riffles, 8 pools)  Monitoring Years  1, 2, 3, 5, and 7   Yes Stream  Hydrology  4 pressure transducer  gauges Annual  Gauges on SF3, T1, T2‐2, and T3‐2  Yes  Vegetation  6 permanent and 6 random  vegetation monitoring plots  Monitoring Years  1, 2, 3, 4, 5,   and 7  Minimum size of 0.02 acre  Yes Visual  Assessment   Annual    Yes  Exotic and  nuisance  vegetation    Annual  Locations of exotic and nuisance  vegetation will be mapped  Yes Project  boundary   Semi‐annual  Locations of vegetation damage, boundary  encroachments, etc. will be mapped    ! ! ! ! ") ") ") ") ") ") NCCGIA Ü 0 500250Feet FIGURE 10. PROPOSED MONITORING PLAN, STONY FORK RESTORATION SITE, JOHNSTON COUNTY, NC !Proposed Stream Gauges (4) ")Proposed Permanent Veg Plots (6) Proposed Cross-Sections (16) Stream Restoration Stream Enhancement I Stream Enhancement II Buffer Restoration Buffer Enhancement Buffer Preservation Source: NC OneMapOrthoimagery 2013. 38   Draft Mitigation Plan               Stony Fork Restoration Site  April 24, 2018                  DMS Project Number 97085 39  9.0 ADAPTIVE MANAGEMENT PLAN    In the event the mitigation site or a specific component of the mitigation site fails to achieve the necessary  performance standards as specified in the mitigation plan, the sponsor shall notify the members of the  IRT and work with the IRT to develop contingency plans and remedial actions.      10.0 LONG‐TERM MANAGEMENT PLAN    SFRS will be transferred to the NCDEQ Stewardship Program, which shall serve as conservation easement  holder and long‐term steward for the property and will conduct periodic inspection of the site to ensure  that restrictions required in the conservation easement are upheld. Funding will be supplied by the  responsible party on a yearly basis until such time an endowment is established. The NCDEQ Stewardship  Program is developing an endowment system within the non‐reverting, interest‐bearing Conservation  Lands Conservation Fund Account. The use of funds from the Endowment Account will be governed by  North Carolina General Statue GS 113A‐232(d)(3). Interest gained by the endowment fund may be used  for the purpose of stewardship, monitoring, stewardship administration, and land transaction costs, if  applicable. The Stewardship Program will periodically install signage as needed to identify boundary  markings as needed. Any livestock or associated fencing or permanent crossings will be the responsibility  the owner of the underlying fee to maintain.    Draft Mitigation Plan               Stony Fork Restoration Site  April 24, 2018                  DMS Project Number 97085 40  11.0 REFERENCES    Center for Watershed Protection. 2003. Impacts of Impervious Cover on Aquatic Systems: Watershed  Protection Research Monograph. Center for Watershed Protection, Ellicott City, MD. Pages 1‐158     Environmental Laboratory. 1987. Corps of Engineers Wetlands Delineation Manual, Technical Report   Y‐87‐1. Vicksburg, MS: U.S. Army Engineer Waterways Experiment Station.    Griffith, G., J. Omernik, and J. Comstock. 2002. Ecoregions of North Carolina, Regional Descriptions. US   E.P.A. Last accessed 8/2017 at:  https://archive.epa.gov/wed/ecoregions/web/html/ncsc_eco.html    Harman, W.A., G.D. Jennings, J.M. Patterson, D.R. Clinton, L.O. Slate, A.G. Jessup, J. R. Everhart, and  R.E. Smith, 1999. Bankfull Hydraulic Geometry Relationships for North Carolina Streams.  Wildland Hydrology. AWRA Symposium Proceedings. Edited by D.S. Olsen and J.P. Potyondy.  American Water Resources Association. June 30 – July 2, 1999. Bozeman, MT.    Harman, W. and R. Starr. 2011. Natural Channel Design Review Checklist. US Fish and Wildlife Service,   Chesapeake Bay Field Office, Annapolis, MD and US Environmental Protection Agency, Office of  Wetlands, Oceans, and Watersheds, Wetlands Division. Washington, D.C. EPA 843‐B‐12‐005    Harman, W., R. Starr, M. Carter, K. Tweedy, M. Clemmons, K. Suggs, C. Miller. 2012. A Function‐Based  Framework for Stream Assessment and Restoration Projects. US Environmental Protection  Agency, Office of Wetlands, Oceans, and Watersheds, Washington, DC EPA 843‐K‐12‐006.    NCDEQ, Division of Mitigation Services. March 2015. 2015 Neuse 03020201 Priorities. Last accessed at   http://portal.ncdenr.org/c/document_library/get_file?uuid=340a3f58‐336b‐42bf‐bab2‐ fb663cbfd78d&groupId=60329    NCDENR, Ecosystem Enhancement Program. Feb. 2014. Annual Monitoring and Closeout Reporting     Format, Data Requirements, and Content Guidance. Last accessed at:   http://portal.ncdenr.org/c/document_library/get_file?uuid=7af33f02‐0b5d‐4e8c‐b4e5‐ 8517b3b41815&groupId=60329    NCDEQ, Division of Water Resources. Draft 2016 303(d) list. Raleigh, NC. Last accessed 11/2017 at:    https://files.nc.gov/ncdeq/Water%20Quality/Planning/TMDL/303d/2016/NC_2016_Category_5_20 160606.pdf    North Carolina Interagency Review Team. 2016. Wilmington District Stream and Wetland Compensatory  Mitigation Update. Last accessed at:   http://saw‐reg.usace.army.mil/PN/2016/Wilmington‐District‐ Mitigation‐Update.pdf    Neuse River Basin Buffer Rule 15A NCAC 02B .0295. Mitigation Program Requirements for Protection and  Maintenance of Riparian Buffers.  Last accessed at     http://reports.oah.state.nc.us/ncac/title%2015a%20‐ %20environmental%20quality/chapter%2002%20‐ %20environmental%20management/subchapter%20b/15a%20ncac%2002b%20.0295.pdf    Draft Mitigation Plan               Stony Fork Restoration Site  April 24, 2018                  DMS Project Number 97085 41  Shields, F.D., Jr. R.R. Copeland, P.C. Klingeman, M.W. Doyle, and A. Simon. 2003. Design for Stream  Restoration. Journal of Hydraulic Engineering, 129 (8): 575‐584.    Shields, Ing. A., W. P. Ott, and J. C. Van Uchelen. 1936. Application of Similarity Principles and Turbulence  Research to Bed‐load Movement. Pasadena, CA: Soil Conservation Service, California Institute of  Technology    Simon, A., W. Dickerson, and A. Heins. 2004. Suspended‐sediment transport rates at the 1.5‐year   recurrence interval for ecoregions of the United States: transport conditions at the bankfull and  effective discharge? Geomorphology 58: 243–262.    Simon, A. and M. Rinaldi. 2006. Disturbance, stream incision, and channel evolution: The roles of excess   transport capacity and boundary materials in controlling channel response. Geomorphology 79:  361–383.    Stream Mitigation Guidelines, April 2003, US Army Corps of Engineers Wilmington District.    USDA, Forest Service, National Technology and Development Program. 2008. Stream Simulation: An   Ecological Approach to Providing Passage for Aquatic Organisms at Road‐Stream Crossings.  Appendix E: Methods for Streambed Mobility/Stability Analysis. Last accessed 9/2016 at:  http://www.fs.fed.us/eng/pubs/pdf/StreamSimulation/    USDA, Natural Resources Conservation Service. 2017. Web Soil Survey. Last accessed at:       http://websoilsurvey.sc.egov.usda.gov/App/WebSoilSurvey.aspx    USGS. 2017. National Streamflow Statistics Program, Version 6.1. Database Version NSS_v6_2017‐09‐  27.mdb. Last accessed 11/2017 at: http://water.usgs.gov/software/NSS/.                                Draft Mitigation Plan               Stony Fork Restoration Site  April 24, 2018                  DMS Project Number 97085 42       Draft Mitigation Plan               Stony Fork Restoration Site  April 24, 2018                  DMS Project Number 97085                                                   12.0 APPENDICES      Draft Mitigation Plan               Stony Fork Restoration Site  April 24, 2018                  DMS Project Number 97085        Draft Mitigation Plan               Stony Fork Restoration Site  April 24, 2018                  DMS Project Number 97085                                                 12.1 Plan Sheets    Draft Mitigation Plan               Stony Fork Restoration Site  April 24, 2018                  DMS Project Number 97085      SF1 9+93 to 21+48 1,235 Restoration 1 to 1 1,155 1,15521+48 to 32+52 1,143 1,104 1,104SF2* 33+16 to 44+49 1,027 Restoration 1 to 1 1,133 1,13344+80 to 49+50 283 470 47049+50 to 55+48 592 598 59855+78 to 56+74 96 96 96Tributary 1 100+00 to 105+10 365 Restoration 1 to 1 510 510Tributary 1A 150+00 to 151+59 47 Restoration 1 to 1 159 159Tributary 1B 160+00 to 160+26 26 Restoration 1 to 12626Tributary 2‐1 200+00 to 203+34 326 Enhancement II 2.5 to 1 334 134Tributary 2‐2 203+34 to 206+71 318 Restoration 1 to 1 337 337Tributary 2‐3 206+71 to 215+26 820 Restoration 1 to 1 855 855Tributary 3 300+00 to 300+71 72 Enhancement I1.5 to 17147Tributary 3 300+71 to 301+29 82 Restoration 1 to 15858TOTAL STREAM CREDITS 6,682Buffer Restoration TOB to 100'N/A 415,271        Buffer Restoration TOB to 100'1 to 1 415,271          415,271     Buffer Restoration 101‐200'N/A 37,091           Buffer Restoration 101‐200'3 to 1 37,091             12,364        Buffer Enhancement TOB to 100'N/A 74,803           Buffer Enhancement TOB to 100'2 to 1 74,803             37,402        Buffer Preservation TOB to 100'N/A 175,721        Buffer Preservation TOB to 100'10 to 1 175,721          17,572.10  482,608    * Crossings have been removed from creditable linear footage for all project streams.PROJECT COMPONENTS – 6,682 STREAM CREDITS AND 482,608 BUFFER CREDITSSF3*Reach IDProposed        StationingExisting Footage or Square FeetApproachTOTAL BUFFER CREDITSMitigation RatioRestoration Footage or AreaMitigation  CreditsRestoration 1 to 1   Draft Mitigation Plan                                                      Stony Fork Restoration Site  April 24, 2018                                                     DMS Project Number 97085                                                  12.2 Data Analysis/Supplemental Information and Maps  Existing Conditions Cross‐Sections  Pebble Count Tables  Stream Morphological Tables      Draft Mitigation Plan                                                      Stony Fork Restoration Site  April 24, 2018                                                     DMS Project Number 97085         Station Elevation0.0 201.53 199.64.5 201.87 6.48.6 202.02 7.210.2 201.75 200.811.0 201.46 8.711.8 199.65 1.212.8 198.68 0.913.5 198.52 8.114.3 198.43 1.215.4 198.36 2.916.1 198.4817.2 198.6418.4 198.8621.0 201.8422.0 201.8830.3 201.5237.3 201.17Bankfull Elevation:SUMMARY DATARiver Basin:Project NameXS IDDrainage Area:Date:Field Crew:175 acresFlood Prone Width:Max Depth at Bankfull:Bankfull Width:Flood Prone Area Elevation:NeuseStony ForkXS15/26/2016T. Seelinger, A. FrenchBankfull Cross-Sectional Area:Mean Depth at Bankfull:Entrenchment Ratio:Bank Height Ratio:W / D Ratio:1981992002012022030 5 10 15 20 25 30 35 40Elevation (feet)Station (feet)Neuse River Basin, Stony Fork, XS15/26/2016BankfullFlood Prone Area65 Station Elevation0.0 198.70 194.44.1 198.56 7.07.5 198.16 7.011.9 197.19 195.616.0 196.15 10.018.0 195.67 1.320.0 195.41 1.020.6 195.23 7.020.8 193.51 1.422.3 193.52 1.723.0 193.1424.2 193.1025.1 193.0725.9 193.1026.4 193.3227.2 193.7427.9 194.5628.7 196.7530.1 197.0733.1 197.0837.0 196.7940.5 196.6443.7 196.43NeuseStony ForkXS2River Basin:Project NameXS IDDrainage Area:Bankfull Cross-Sectional Area:Date:Field Crew:190 acres5/26/2016T. Seelinger, A. FrenchW / D Ratio:Entrenchment Ratio:Bankfull Elevation:SUMMARY DATAMean Depth at Bankfull:Bank Height Ratio:Bankfull Width:Flood Prone Area Elevation:Flood Prone Width:Max Depth at Bankfull:1921931941951961971981990 5 10 15 20 25 30 35 40 45Elevation (feet)Station (feet)Neuse River Basin, Stony Fork, XS25/26/2016BankfullFlood Prone Area66 Station Elevation0.0 189.45185.24.1 189.556.910.1 189.215.013.4 188.67187.415.8 188.117.417.6 187.762.218.9 185.811.421.6 183.443.622.0 183.271.522.4 183.052.122.7 182.9623.2 183.0624.4 184.2825.3 187.4428.4 189.3629.2 190.9833.1 191.7436.4 192.0939.0 192.43Bankfull Elevation:SUMMARY DATARiver Basin:Project NameXS IDDrainage Area:Date:Field Crew:217 acresFlood Prone Width:Max Depth at Bankfull:Bankfull Width:Flood Prone Area Elevation:NeuseStony ForkXS35/26/2016T. Seelinger, A. FrenchBankfull Cross-Sectional Area:Mean Depth at Bankfull:Entrenchment Ratio:Bank Height Ratio:W / D Ratio:1821841861881901921940 5 10 15 20 25 30 35 40Elevation (feet)Station (feet)Neuse River Basin, Stony Fork, XS35/26/2016BankfullFlood Prone Area67 Station Elevation0.0 182.10 180.44.7 182.08 8.99.0 182.19 10.011.5 181.81 181.713.8 181.21 14.515.1 180.27 1.316.3 180.18 0.916.6 179.46 11.218.9 179.37 1.520.2 179.27 1.621.5 179.1722.8 179.1823.3 179.0323.9 179.3025.8 181.2428.6 183.3430.9 183.8037.3 184.06NeuseStony ForkXS4River Basin:Project NameXS IDDrainage Area:Bankfull Cross-Sectional Area:Date:Field Crew:254 acresMax Depth at Bankfull:W / D Ratio:Entrenchment Ratio:Bank Height Ratio:Bankfull Elevation:SUMMARY DATAMean Depth at Bankfull:5/26/2016T. Seelinger, A. FrenchBankfull Width:Flood Prone Area Elevation:Flood Prone Width:1781791801811821831841850 5 10 15 20 25 30 35 40Elevation (feet)Station (feet)Neuse River Basin, Stony Fork, XS45/26/2016BankfullFloodprone Area68 Station Elevation0.0 178.30 176.68.5 178.72 8.214.0 178.98 7.416.6 178.59 178.018.1 178.34 9.919.9 176.94 1.521.4 175.41 1.123.3 175.42 6.724.6 175.22 1.325.6 175.11 2.226.3 175.2227.1 175.3929.0 179.2129.9 179.3235.4 179.2740.1 179.2944.4 179.26Bankfull Elevation:SUMMARY DATARiver Basin:Project NameXS IDDrainage Area:Date:Field Crew:264 acresFlood Prone Width:Max Depth at Bankfull:Bankfull Width:Flood Prone Area Elevation:NeuseStony ForkXS55/26/2016T. Seelinger, A. FrenchBankfull Cross-Sectional Area:Mean Depth at Bankfull:Entrenchment Ratio:Bank Height Ratio:W / D Ratio:1741751761771781791800 5 10 15 20 25 30 35 40 45Elevation (feet)Station (feet)Neuse River Basin, Stony Fork, XS55/26/2016BankfullFlood Prone Area69 Station Elevation0.0 176.80 175.64.4 177.00 12.58.8 177.22 10.510.1 177.30 176.911.4 176.81 14.412.4 174.40 1.314.7 174.22 1.216.9 174.37 8.819.2 174.32 1.420.8 174.29 2.022.0 174.4723.5 178.1625.8 179.7727.8 180.1931.2 180.2634.9 179.4839.0 178.9342.3 178.7545.0 178.96River Basin:NeuseProject NameStony ForkXS IDXS6Drainage Area:414 acresDate:5/26/2016Field Crew:T. Seelinger, A. FrenchSUMMARY DATABankfull Elevation:Bankfull Cross-Sectional Area:Bankfull Width:Flood Prone Area Elevation:Flood Prone Width:Max Depth at Bankfull:Mean Depth at Bankfull:W / D Ratio:Entrenchment Ratio:Bank Height Ratio:1731741751761771781791801810 5 10 15 20 25 30 35 40 45Elevation (feet)Station (feet)Neuse River Basin, Stony Fork, XS65/26/2016BankfullFlood Prone Area70 Station Elevation0.0 199.77 197.04.1 199.60 0.97.9 199.49 3.412.0 198.93 197.414.4 198.87 4.517.2 198.33 0.418.4 197.93 0.319.5 197.21 12.820.0 196.60 1.320.8 196.75 4.521.4 196.7722.2 196.6223.1 196.9924.6 198.1026.0 198.5130.3 198.6034.5 198.2638.6 198.11Flood Prone Area Elevation:Flood Prone Width:Max Depth at Bankfull:Mean Depth at Bankfull:W / D Ratio:Drainage Area:12 acresDate:5/26/2016XS7SUMMARY DATAEntrenchment Ratio:Bank Height Ratio:Bankfull Elevation:Bankfull Cross-Sectional Area:Bankfull Width:Field Crew:T. Seelinger, A. FrenchRiver Basin:NeuseProject NameStony ForkXS ID1961971971981981991992002000 5 10 15 20 25 30 35 40Elevation (feet)Station (feet)Neuse River Basin, Stony Fork, XS75/26/2016BankfullFloodprone Area71 Station Elevation0.0 99.77 96.05.3 100.02 3.611.3 100.00 4.414.0 99.65 97.214.9 96.50 5.716.3 95.01 1.216.7 94.96 0.817.5 94.88 5.418.1 94.82 1.318.5 95.05 4.119.6 95.6822.0 100.0323.8 100.2528.7 100.1135.3 100.35River Basin:NeuseProject NameStony ForkXS IDXS8Drainage Area:93 acresDate:5/26/2016Field Crew:T. Seelinger, A. FrenchSUMMARY DATABankfull Elevation:Bankfull Cross-Sectional Area:Bankfull Width:Flood Prone Area Elevation:Flood Prone Width:Max Depth at Bankfull:Mean Depth at Bankfull:W / D Ratio:Entrenchment Ratio:Bank Height Ratio:9495969798991001010 5 10 15 20 25 30 35 40Elevation (feet)Station (feet)Neuse River Basin, Stony Fork, XS85/26/2016BankfullFlood Prone Area72 Station Elevation0.0 177.63176.76.4 177.599.411.0 177.915.713.1 178.03178.813.8 177.79>3014.7 174.812.115.6 174.671.616.5 174.853.517.5 174.865.318.5 175.021.519.2 175.2920.4 178.2322.0 178.6826.8 178.5830.7 178.57River Basin:NeuseProject NameStony ForkXS IDXS9Drainage Area:149.5 acresDate:5/26/2016Field Crew:T. Seelinger, A. FrenchSUMMARY DATABankfull Elevation:Bankfull Cross-Sectional Area:Bankfull Width:Flood Prone Area Elevation:Flood Prone Width:Max Depth at Bankfull:Mean Depth at Bankfull:W / D Ratio:Entrenchment Ratio:Bank Height Ratio:1741751751761761771771781781791791800 5 10 15 20 25 30 35Elevation (feet)Station (feet)Neuse River Basin, Stony Fork, XS95/26/2016BankfullFlood Prone Area73 Station Elevation0.0 182.75 180.64.7 182.77 9.38.5 182.35 10.111.8 181.71 182.013.5 181.06 >2015.8 180.64 1.316.4 179.53 0.919.3 179.49 11.021.4 179.29 2.022.7 179.54 1.123.3 179.7024.4 180.2626.6 180.8029.2 181.1030.9 181.48River Basin:NeuseProject NameStony ForkXS IDXS Ref1Drainage Area:263.9 acresDate:5/26/2016Field Crew:T. Seelinger, A. FrenchSUMMARY DATABankfull Elevation:Bankfull Cross-Sectional Area:Bankfull Width:Flood Prone Area Elevation:Flood Prone Width:Max Depth at Bankfull:Mean Depth at Bankfull:W / D Ratio:Entrenchment Ratio:Bank Height Ratio:1791801801811811821821831830 5 10 15 20 25 30 35Elevation (feet)Station (feet)Neuse River Basin, Stony Fork, XS Ref15/26/2016BankfullFlood Prone Area74 Station Elevation0.0 101.01 100.27.2 100.37 15.010.0 100.99 11.811.1 100.87 102.312.4 99.16 >3813.6 98.10 2.114.7 98.18 1.316.2 98.21 9.317.2 98.21 3.218.0 98.34 1.118.8 98.5019.4 99.2920.5 99.6124.0 100.3026.3 101.0230.1 100.8038.2 101.73River Basin:NeuseProject NameStony ForkXS IDXS Ref2Drainage Area:536.8 acresDate:5/26/2016Field Crew:T. Seelinger, A. FrenchSUMMARY DATABankfull Elevation:Bankfull Cross-Sectional Area:Bankfull Width:Flood Prone Area Elevation:Flood Prone Width:Max Depth at Bankfull:Mean Depth at Bankfull:W / D Ratio:Entrenchment Ratio:Bank Height Ratio:989899991001001011011021021031030510152025303540Elevation (feet)Station (feet)Neuse River Basin, Stony Fork, XS Ref25/26/2016BankfullFlood Prone Area75 Station Elevation0.0 100.94 100.08.4 101.48 15.09.8 101.44 11.711.3 100.39 102.113.5 99.56 >2515.1 99.45 2.116.1 99.09 1.317.2 98.14 9.118.1 98.09 2.119.3 97.99 1.520.0 98.1121.6 98.1422.3 98.2422.8 98.5225.3 101.8626.2 102.1929.3 102.9333.5 103.22River Basin:NeuseProject NameStony ForkXS IDXS Ref3Drainage Area:536.8 acresDate:5/26/2016Field Crew:T. Seelinger, A. FrenchSUMMARY DATABankfull Elevation:Bankfull Cross-Sectional Area:Bankfull Width:Flood Prone Area Elevation:Flood Prone Width:Max Depth at Bankfull:Mean Depth at Bankfull:W / D Ratio:Entrenchment Ratio:Bank Height Ratio:9798991001011021031040 5 10 15 20 25 30 35Elevation (feet)Station (feet)Neuse River Basin, Stony Fork, XS Ref35/26/2016BankfullFlood Prone Area76 Station Elevation0.0 100.63 98.10.8 100.49 5.92.3 98.98 7.76.3 98.49 99.410.3 98.83 22.313.3 98.52 1.315.6 97.90 0.817.8 97.57 10.018.1 96.96 2.918.7 96.87 1.219.7 96.9821.0 96.9421.6 96.8423.0 98.6224.5 99.5831.1 99.7234.5 100.6538.8 100.78River Basin:NeuseProject NameStony ForkXS IDXS Ref4Drainage Area:149.5 acresDate:5/26/2016Field Crew:T. Seelinger, A. FrenchSUMMARY DATABankfull Elevation:Bankfull Cross-Sectional Area:Bankfull Width:Flood Prone Area Elevation:Flood Prone Width:Max Depth at Bankfull:Mean Depth at Bankfull:W / D Ratio:Entrenchment Ratio:Bank Height Ratio:9797989899991001001011010510152025303540Elevation (feet)Station (feet)Neuse River Basin, Stony Fork, XS Ref45/26/2016BankfullFloodprone Area77 020406080100Particle Size Distribution Stony Fork Stream Restoration Site XS1 Particle Size (mm)% Finer Than (Cumulative)0.01 0.1 1 10 100 1000 10000 Assessment - 5/26/2016 Type 3%Silt/Clay 26%Sand 71%Gravel 0%Cobble 0%Boulder 0%Bedrock 0%Hardpan 0%Wood/Det. 0%Artificial Size (mm) 0.15D16 1.2D35 2.2D50 5.3D65 7.5D84 11D95 Size Distribution 1.1Mean (mm) 7.1Dispersion -0.4Skewness Particle Silt/Clay Millimeter Very Fine Fine Count Medium Coarse Very Coarse Very Fine Fine Fine Medium Medium Coarse Coarse Very Coarse Very Coarse Small Small Large Large Small Small Medium Lrg- Very Lrg Bedrock < 0.062 .062 - .125 .125 - .25 .25 - .50 .50 - 1 1 - 2 2 - 4 4 - 5.7 5.7 - 8 8 - 11.3 11.3 - 16 16 - 22.6 22.6 - 32 32 - 45 45 - 64 64 - 90 90 - 128 128 - 180 180 - 256 256 - 362 362 - 512 512 - 1024 1024 - 2048 >2048 S/C S A N D S G R A V E L S C O B L B L D R BDRK Total 3 10 2 4 5 5 20 6 13 20 7 4 1 10078 020406080100Particle Size Distribution Stony Fork Stream Restoration Site XS2 Particle Size (mm)% Finer Than (Cumulative)0.01 0.1 1 10 100 1000 10000 Assessment - 5/26/2016 Type 3%Silt/Clay 54%Sand 43%Gravel 0%Cobble 0%Boulder 0%Bedrock 0%Hardpan 0%Wood/Det. 0%Artificial Size (mm) 0.11D16 0.23D35 0.57D50 3.4D65 8.0D84 11D95 Size Distribution 0.9Mean (mm) 8.6Dispersion 0.2Skewness Particle Silt/Clay Millimeter Very Fine Fine Count Medium Coarse Very Coarse Very Fine Fine Fine Medium Medium Coarse Coarse Very Coarse Very Coarse Small Small Large Large Small Small Medium Lrg- Very Lrg Bedrock < 0.062 .062 - .125 .125 - .25 .25 - .50 .50 - 1 1 - 2 2 - 4 4 - 5.7 5.7 - 8 8 - 11.3 11.3 - 16 16 - 22.6 22.6 - 32 32 - 45 45 - 64 64 - 90 90 - 128 128 - 180 180 - 256 256 - 362 362 - 512 512 - 1024 1024 - 2048 >2048 S/C S A N D S G R A V E L S C O B L B L D R BDRK Total 3 4 11 19 11 8 6 3 18 12 3 1 9979 020406080100Particle Size Distribution Stony Fork Stream Restoration Site XS3 Particle Size (mm)% Finer Than (Cumulative)0.01 0.1 1 10 100 1000 10000 Assessment - 5/26/2016 Type 61%Silt/Clay 13%Sand 26%Gravel 0%Cobble 0%Boulder 0%Bedrock 0%Hardpan 0%Wood/Det. 0%Artificial Size (mm) 0.062D16 0.062D35 0.062D50 0.068D65 4.7D84 11D95 Size Distribution 0.5Mean (mm) 8.7Dispersion 1Skewness Particle Silt/Clay Millimeter Very Fine Fine Count Medium Coarse Very Coarse Very Fine Fine Fine Medium Medium Coarse Coarse Very Coarse Very Coarse Small Small Large Large Small Small Medium Lrg- Very Lrg Bedrock < 0.062 .062 - .125 .125 - .25 .25 - .50 .50 - 1 1 - 2 2 - 4 4 - 5.7 5.7 - 8 8 - 11.3 11.3 - 16 16 - 22.6 22.6 - 32 32 - 45 45 - 64 64 - 90 90 - 128 128 - 180 180 - 256 256 - 362 362 - 512 512 - 1024 1024 - 2048 >2048 S/C S A N D S G R A V E L S C O B L B L D R BDRK Total 62 3 5 3 1 1 5 3 4 1 8 3 2 10180 020406080100Particle Size Distribution Stony Fork Stream Restoration Site XS4 Particle Size (mm)% Finer Than (Cumulative)0.01 0.1 1 10 100 1000 10000 Assessment - 5/26/2016 Type 10%Silt/Clay 90%Sand 0%Gravel 0%Cobble 0%Boulder 0%Bedrock 0%Hardpan 0%Wood/Det. 0%Artificial Size (mm) 0.066D16 0.080D35 0.093D50 0.11D65 0.14D84 0.21D95 Size Distribution 0.1Mean (mm) 1.5Dispersion 0.1Skewness Particle Silt/Clay Millimeter Very Fine Fine Count Medium Coarse Very Coarse Very Fine Fine Fine Medium Medium Coarse Coarse Very Coarse Very Coarse Small Small Large Large Small Small Medium Lrg- Very Lrg Bedrock < 0.062 .062 - .125 .125 - .25 .25 - .50 .50 - 1 1 - 2 2 - 4 4 - 5.7 5.7 - 8 8 - 11.3 11.3 - 16 16 - 22.6 22.6 - 32 32 - 45 45 - 64 64 - 90 90 - 128 128 - 180 180 - 256 256 - 362 362 - 512 512 - 1024 1024 - 2048 >2048 S/C S A N D S G R A V E L S C O B L B L D R BDRK Total 10 70 20 10081 020406080100Particle Size Distribution Stony Fork Stream Restoration Site XS5 Particle Size (mm)% Finer Than (Cumulative)0.01 0.1 1 10 100 1000 10000 Assessment - 5/26/2016 Type 5%Silt/Clay 7%Sand 88%Gravel 0%Cobble 0%Boulder 0%Bedrock 0%Hardpan 0%Wood/Det. 0%Artificial Size (mm) 1.1D16 2.1D35 4.1D50 7.0D65 12D84 17D95 Size Distribution 3.7Mean (mm) 3.3Dispersion -0.1Skewness Particle Silt/Clay Millimeter Very Fine Fine Count Medium Coarse Very Coarse Very Fine Fine Fine Medium Medium Coarse Coarse Very Coarse Very Coarse Small Small Large Large Small Small Medium Lrg- Very Lrg Bedrock < 0.062 .062 - .125 .125 - .25 .25 - .50 .50 - 1 1 - 2 2 - 4 4 - 5.7 5.7 - 8 8 - 11.3 11.3 - 16 16 - 22.6 22.6 - 32 32 - 45 45 - 64 64 - 90 90 - 128 128 - 180 180 - 256 256 - 362 362 - 512 512 - 1024 1024 - 2048 >2048 S/C S A N D S G R A V E L S C O B L B L D R BDRK Total 5 1 7 23 17 10 11 13 14 5 1 10782 020406080100Particle Size Distribution Stony Fork Stream Restoration Site XS6 Particle Size (mm)% Finer Than (Cumulative)0.01 0.1 1 10 100 1000 10000 Assessment - 5/26/2016 Type 5%Silt/Clay 10%Sand 85%Gravel 0%Cobble 0%Boulder 0%Bedrock 0%Hardpan 0%Wood/Det. 0%Artificial Size (mm) 1.1D16 6.0D35 8.3D50 9.6D65 12D84 15D95 Size Distribution 3.6Mean (mm) 3.3Dispersion -0.7Skewness Particle Silt/Clay Millimeter Very Fine Fine Count Medium Coarse Very Coarse Very Fine Fine Fine Medium Medium Coarse Coarse Very Coarse Very Coarse Small Small Large Large Small Small Medium Lrg- Very Lrg Bedrock < 0.062 .062 - .125 .125 - .25 .25 - .50 .50 - 1 1 - 2 2 - 4 4 - 5.7 5.7 - 8 8 - 11.3 11.3 - 16 16 - 22.6 22.6 - 32 32 - 45 45 - 64 64 - 90 90 - 128 128 - 180 180 - 256 256 - 362 362 - 512 512 - 1024 1024 - 2048 >2048 S/C S A N D S G R A V E L S C O B L B L D R BDRK Total 6 1 9 1 10 3 8 15 40 17 4 11483 020406080100Particle Size Distribution Stony Fork Stream Restoration Site XS7 Particle Size (mm)% Finer Than (Cumulative)0.01 0.1 1 10 100 1000 10000 Assessment - 5/26/2016 Type 100%Silt/Clay 0%Sand 0%Gravel 0%Cobble 0%Boulder 0%Bedrock 0%Hardpan 0%Wood/Det. 0%Artificial Size (mm) 0.062D16 0.062D35 0.062D50 0.062D65 0.062D84 0.062D95 Size Distribution 0.1Mean (mm) 1Dispersion NaNSkewness Particle Silt/Clay Millimeter Very Fine Fine Count Medium Coarse Very Coarse Very Fine Fine Fine Medium Medium Coarse Coarse Very Coarse Very Coarse Small Small Large Large Small Small Medium Lrg- Very Lrg Bedrock < 0.062 .062 - .125 .125 - .25 .25 - .50 .50 - 1 1 - 2 2 - 4 4 - 5.7 5.7 - 8 8 - 11.3 11.3 - 16 16 - 22.6 22.6 - 32 32 - 45 45 - 64 64 - 90 90 - 128 128 - 180 180 - 256 256 - 362 362 - 512 512 - 1024 1024 - 2048 >2048 S/C S A N D S G R A V E L S C O B L B L D R BDRK Total 100 10084 020406080100Particle Size Distribution Stony Fork Stream Restoration Site XS8 Particle Size (mm)% Finer Than (Cumulative)0.01 0.1 1 10 100 1000 10000 Assessment - 5/26/2016 Type 100%Silt/Clay 0%Sand 0%Gravel 0%Cobble 0%Boulder 0%Bedrock 0%Hardpan 0%Wood/Det. 0%Artificial Size (mm) 0.062D16 0.062D35 0.062D50 0.062D65 0.062D84 0.062D95 Size Distribution 0.1Mean (mm) 1Dispersion NaNSkewness Particle Silt/Clay Millimeter Very Fine Fine Count Medium Coarse Very Coarse Very Fine Fine Fine Medium Medium Coarse Coarse Very Coarse Very Coarse Small Small Large Large Small Small Medium Lrg- Very Lrg Bedrock < 0.062 .062 - .125 .125 - .25 .25 - .50 .50 - 1 1 - 2 2 - 4 4 - 5.7 5.7 - 8 8 - 11.3 11.3 - 16 16 - 22.6 22.6 - 32 32 - 45 45 - 64 64 - 90 90 - 128 128 - 180 180 - 256 256 - 362 362 - 512 512 - 1024 1024 - 2048 >2048 S/C S A N D S G R A V E L S C O B L B L D R BDRK Total 100 10085 020406080100Particle Size Distribution Stony Fork Stream Restoration Site XS9 Particle Size (mm)% Finer Than (Cumulative)0.01 0.1 1 10 100 1000 10000 Assessment - 5/26/2016 Type 8%Silt/Clay 67%Sand 25%Gravel 0%Cobble 0%Boulder 0%Bedrock 0%Hardpan 0%Wood/Det. 0%Artificial Size (mm) 0.031D16 0.13D35 0.21D50 0.45D65 2.0D84 6.1D95 Size Distribution 0.2Mean (mm) 8Dispersion 0.1Skewness Particle Silt/Clay Millimeter Very Fine Fine Count Medium Coarse Very Coarse Very Fine Fine Fine Medium Medium Coarse Coarse Very Coarse Very Coarse Small Small Large Large Small Small Medium Lrg- Very Lrg Bedrock < 0.062 .062 - .125 .125 - .25 .25 - .50 .50 - 1 1 - 2 2 - 4 4 - 5.7 5.7 - 8 8 - 11.3 11.3 - 16 16 - 22.6 22.6 - 32 32 - 45 45 - 64 64 - 90 90 - 128 128 - 180 180 - 256 256 - 362 362 - 512 512 - 1024 1024 - 2048 >2048 S/C S A N D S G R A V E L S C O B L B L D R BDRK Total 9 15 14 25 13 9 11 4 7 6 1 11486 020406080100Particle Size Distribution Stony Fork Stream Restoration Site XS Ref 1 Particle Size (mm)% Finer Than (Cumulative)0.01 0.1 1 10 100 1000 10000 Assessment - 5/26/2016 Type 10%Silt/Clay 90%Sand 0%Gravel 0%Cobble 0%Boulder 0%Bedrock 0%Hardpan 0%Wood/Det. 0%Artificial Size (mm) 0.066D16 0.080D35 0.093D50 0.11D65 0.14D84 0.21D95 Size Distribution 0.1Mean (mm) 1.5Dispersion 0.1Skewness Particle Silt/Clay Millimeter Very Fine Fine Count Medium Coarse Very Coarse Very Fine Fine Fine Medium Medium Coarse Coarse Very Coarse Very Coarse Small Small Large Large Small Small Medium Lrg- Very Lrg Bedrock < 0.062 .062 - .125 .125 - .25 .25 - .50 .50 - 1 1 - 2 2 - 4 4 - 5.7 5.7 - 8 8 - 11.3 11.3 - 16 16 - 22.6 22.6 - 32 32 - 45 45 - 64 64 - 90 90 - 128 128 - 180 180 - 256 256 - 362 362 - 512 512 - 1024 1024 - 2048 >2048 S/C S A N D S G R A V E L S C O B L B L D R BDRK Total 10 70 20 10087 020406080100Particle Size Distribution Stony Fork Stream Restoration Site XS Ref 2 Particle Size (mm)% Finer Than (Cumulative)0.01 0.1 1 10 100 1000 10000 Assessment - 5/26/2016 Type 0%Silt/Clay 65%Sand 35%Gravel 0%Cobble 0%Boulder 0%Bedrock 0%Hardpan 0%Wood/Det. 0%Artificial Size (mm) 0.091D16 0.20D35 0.39D50 1.0D65 1.8D84 5.6D95 Size Distribution 0.4Mean (mm) 4.4Dispersion 0Skewness Particle Silt/Clay Millimeter Very Fine Fine Count Medium Coarse Very Coarse Very Fine Fine Fine Medium Medium Coarse Coarse Very Coarse Very Coarse Small Small Large Large Small Small Medium Lrg- Very Lrg Bedrock < 0.062 .062 - .125 .125 - .25 .25 - .50 .50 - 1 1 - 2 2 - 4 4 - 5.7 5.7 - 8 8 - 11.3 11.3 - 16 16 - 22.6 22.6 - 32 32 - 45 45 - 64 64 - 90 90 - 128 128 - 180 180 - 256 256 - 362 362 - 512 512 - 1024 1024 - 2048 >2048 S/C S A N D S G R A V E L S C O B L B L D R BDRK Total 11 10 22 13 11 23 5 3 2 1 1 1 10388 020406080100Particle Size Distribution Stony Fork Stream Restoration Site XS Ref 3 Particle Size (mm)% Finer Than (Cumulative)0.01 0.1 1 10 100 1000 10000 Assessment - 5/26/2016 Type 0%Silt/Clay 81%Sand 19%Gravel 0%Cobble 0%Boulder 0%Bedrock 0%Hardpan 0%Wood/Det. 0%Artificial Size (mm) 0.10D16 0.17D35 0.22D50 0.41D65 1.2D84 3.2D95 Size Distribution 0.3Mean (mm) 3.4Dispersion 0.4Skewness Particle Silt/Clay Millimeter Very Fine Fine Count Medium Coarse Very Coarse Very Fine Fine Fine Medium Medium Coarse Coarse Very Coarse Very Coarse Small Small Large Large Small Small Medium Lrg- Very Lrg Bedrock < 0.062 .062 - .125 .125 - .25 .25 - .50 .50 - 1 1 - 2 2 - 4 4 - 5.7 5.7 - 8 8 - 11.3 11.3 - 16 16 - 22.6 22.6 - 32 32 - 45 45 - 64 64 - 90 90 - 128 128 - 180 180 - 256 256 - 362 362 - 512 512 - 1024 1024 - 2048 >2048 S/C S A N D S G R A V E L S C O B L B L D R BDRK Total 7 13 37 11 13 12 3 3 1 10089 020406080100Particle Size Distribution Stony Fork Stream Restoration Site XS Ref 4 Particle Size (mm)% Finer Than (Cumulative)0.01 0.1 1 10 100 1000 10000 Assessment - 5/26/2016 Type 7%Silt/Clay 24%Sand 68%Gravel 1%Cobble 0%Boulder 0%Bedrock 0%Hardpan 0%Wood/Det. 0%Artificial Size (mm) 0.12D16 2.4D35 6.4D50 11D65 19D84 30D95 Size Distribution 1.6Mean (mm) 12.5Dispersion -0.6Skewness Particle Silt/Clay Millimeter Very Fine Fine Count Medium Coarse Very Coarse Very Fine Fine Fine Medium Medium Coarse Coarse Very Coarse Very Coarse Small Small Large Large Small Small Medium Lrg- Very Lrg Bedrock < 0.062 .062 - .125 .125 - .25 .25 - .50 .50 - 1 1 - 2 2 - 4 4 - 5.7 5.7 - 8 8 - 11.3 11.3 - 16 16 - 22.6 22.6 - 32 32 - 45 45 - 64 64 - 90 90 - 128 128 - 180 180 - 256 256 - 362 362 - 512 512 - 1024 1024 - 2048 >2048 S/C S A N D S G R A V E L S C O B L B L D R BDRK Total 7 4 6 7 4 4 3 8 8 6 14 13 9 10 2 1 10690 T1 Stony Fork T2 XSRe f 1 XSRe f 4 XSRe f 2XSRef 3 T3 T1B-T1A NCCGIA Ü 0 1,000500Feet REFERENCE CROSS-SECTION LOCATIONS Project Easement Existing Project Streams Other Streams Reference Cross-Sections Source: NC OneMap Orthoimagery 2013. Morphological CriteriaReferenceG4c G4c - G5c G4c G5 G5c C4 C4 C4 C4 C4 C4 C4 C4 C4 C40.27 0.41 0.84 0.02 0.23 1.49 ~ 0.27 0.41 0.84 0.02 0.04 0.15 0.23 0.027.2 5.0 -- 10.0 10.5 3.4 4.5 -- 5.7 14.8 -- 18.8 ~ 9.7 11.3 12.6 5.0 5.0 7.6 9.0 5.00.9 1.0 -- 1.4 1.2 0.3 0.8 -- 1.7 1.3 -- 1.8 ~ 0.7 0.8 0.9 0.4 0.4 0.6 0.6 0.46.4 6.9 -- 8.9 12.5 0.9 3.6 -- 9.4 25 ~ 7.0 9.4 11.8 1.9 1.9 4.3 5.8 1.98.1 3.7 -- 11.2 8.9 12.7 3.4 -- 5.4 9.0 -- 14.0 10 -- 15 13.5 13.5 13.5 13.5 13.5 13.4 13.9 13.51.2 1.3 -- 2.2 1.3 0.4 1.2 -- 2.1 1.9 -- 2.4 ~ 1.1 1.2 1.4 0.6 0.6 0.8 1.0 0.68.7 7.4 -- 14.5 14.4 4.5 5.7 -- 30.7 >50 ~ 100 100 100 50 50 50 50 501.2 1.4 -- 1.5 1.4 1.3 1.3 -- 5.4 >2.5 >2.5 10.3 8.8 7.9 10 10 6.6 5.6 101.3 1.1 1.1 1.0 1.1 1.3 1.2 -- 1.4 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2Pool Mean Depth (ft)*****1.6 -- 1.8 ~ 1.3 1.5 1.7 0.7 0.7 1.0 1.2 0.7Riffle Mean Depth (ft) (Dbkf) 0.9 1.0 -- 1.4 1.2 0.3 0.8 -- 1.7 1.3 -- 1.8 ~ 0.7 0.8 0.9 0.4 0.4 0.6 0.6 0.4Pool Width (ft)*****16.2 -- 18.8 ~ 13.5 15.7 17.5 7.0 7.0 10.6 12.5 7.0Riffle Width (ft) 7.2 5.0 -- 10.0 10.5 3.4 4.5 -- 5.7 14.8 -- 18.8 ~ 9.7 11.3 12.6 5.0 5.0 7.6 9.0 5.0Pool XS Area (sf)*****25.5 -- 33.4 ~ 17.6 23.3 29.2 5.0 5.0 10.1 14.8 5.0Riffle XS Area (sf) 6.4 6.9 -- 8.9 12.5 0.9 3.6 -- 9.4 25.0 ~ 7.0 9.4 11.8 1.9 1.9 4.3 5.8 1.9Pool Width / Riffle Width*****1.2 -- 1.3 1.2 -- 1.7 1.4 1.4 1.4 1.4 1.4 1.4 1.4 1.4Pool Max Depth / Dbkf***** 2.21.5 -- 3.5 3.1 3.1 3.1 3.0 3.0 2.7 3.3 3.0Bank Height Ratio 2.9 1.6 -- 2.1 2.0 4.5 1.5 -- 4.1 1.0 -- 1.2 1.0 -- 1.1 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0Mean Bankfull Velocity (V) (fps) 3.5 3.3 -- 3.8 3.4 3.2 2.1 -- 3.9 3.7 -- 4.2 3.5 -- 5 3.2 3.2 3.6 3.0 2.9 3.1 3.4 1.2Bankfull Discharge (Q) (cfs) 22.2 23.7 -- 30.2 42.1 3 13.9 -- 19.7 93 -- 105 ~ 22.7 30.4 42.8 5.6** 5.3 13.5 19.9 2.2Radius of Curvature (Rc) (ft)*****16 -- 87 ~ 20 -- 29 22 -- 33 28 -- 35 11 -- 17 12 -- 15 16 -- 23 18 -- 23 11 -- 14Belt Width (Wblt) (ft)***** 60 ~30 -- 55 37 -- 65 46 -- 77 23 -- 37 25 -- 40 28 -- 45 32 -- 54 16 -- 26Meander Length (Lm) (ft)*****66 -- 191 ~ 93 -- 132 105 -- 148 148 -- 176 58 -- 72 70 85 -- 90 92 -- 100 43-- 47Radius of Curvature / Bankfull Width*****0.9 -- 5.9 2 -- 3 2.1 -- 3.0 2.0 -- 2.9 2.2 -- 2.8 2.2 -- 3.4 2.4 -- 3.0 2.1 -- 3.0 2 .0-- 2.6 2.2 -- 2.8Meander Width Ratio (Wblt / Wbkf)***** 4.13.5 -- 8 3.1 -- 5.7 3.3 -- 5.8 3.7 -- 6.1 4.6 -- 7.4 5.0 -- 8.0 3.7 -- 5.9 3.6 -- 6.0 3.2 -- 5.2Meander Length / Bankfull Width*****3.5 -- 12.9 7 -- 14 9.6 -- 13.6 9.3 -- 13.1 11.7 -- 14.0 11.6 -- 14.4 14 11.2 -- 11.8 10.2 -- 11.1 8.6 -- 9.4Valley slope 0.011 0.009 0.007 0.028 0.013 0.006 0.005 -- 0.015 0.011 0.009 0.007 0.024 0.016 0.014 0.013 0.0019Average water surface slope 0.009 0.008 0.006 0.035 0.014 0.005 ~ 0.0090.008 0.008 0.020 0.012 0.012 0.011 0.0016Riffle slope 0.009 0.003 -- 0.008 0.006 0.035 0.009 -- 0.020 0.013 -- 0.035 ~ 0.009 -- 0.015 0.009 -- 0.015 0.01 0.014 - 0.04 0.016 0.014 0.012 -- 0.015 0.0025Pool slope*****0 -- 0.0003 ~ 0 0 0 0 0 -- 0.006 0 0 0Pool to pool spacing*****50 -- 105 ~ 55 -- 70 59 -- 84 84 -- 101 31 -- 44 32-- 40 44 -- 50 46 -- 63 21 -- 27Pool length*****14 -- 33 ~ 21 -- 46 24 -- 52 35 -- 62 11 -- 29 6 -- 16 14 -- 24 12 -- 34 7 -- 15Riffle Slope / Avg. Water Surface Slope 1.00 0.31 -- 1.00 1.00 1.001.00 -- 1.43 2.6 -- 7.0 1.2 -- 1.5 1.0 -- 1.6 1.1 -- 1.9 1.2 0.7 - 2.0 1.3 1.2 1.1 -- 1.4 1.6Pool Slope / Avg. Water Surface Slope*****0 -- 0.06 0 -- 0.2 0 0 0 0 0 0 0 0Pool to Pool Spacing / Bankfull Width*****2.7 -- 7.1 3.5 -- 7 5.6 -- 7.3 5.2 -- 7.4 6.7 -- 8.0 6.2 -- 8.8 6.4 -- 8.0 5.7 -- 6.6 5.1 -- 7.0 4.2 -- 5.4* : no data shown for pools, radius of curvature or meanders in existing stream do to channelization / lack of bed diversity** : channel sized larger for constructabilityT3Restored ReachesWidth / Depth Ratio (Wbkf / Dbkf)Bankfull Width (Wbkf) (ft)Bankfull Mean Depth (Dbkf) (ft)Stream Type (Rosgen)SF3SF1Stable Design RatiosSF1 (xs1)Profile Pattern DimensionEntrenchment Ratio (ER)Sinuosity (stream length/valley length) (K)Width of Flood Prone Area (Wfpa) (ft)Maximum Depth (dmbkf) (ft)SF2 (xs2-5)SF3 (xs6)T1 (xs7)Bankfull Cross-Sectional Area (Abkf) (ft2)Drainage Area (mi2)T2-2T2 (xs8-9)Long BranchT2-2T2-1Existing ChannelT1SF2     Draft Mitigation Plan                                                      Stony Fork Restoration Site  April 24, 2018                                                     DMS Project Number 97085                                                12.3 Buffer Mitigation         Draft Mitigation Plan                                                      Stony Fork Restoration Site  April 24, 2018                                                     DMS Project Number 97085    Location Jurisdictional Streams Restoration TypeReach ID/ ComponentBuffer Width (ft)Creditable Area (sf)*Initial Credit Ratio (x:1)% Full CreditFinal Credit Ratio (x:1)Riparian Buffer Credits (BMU)Min. 20' from TOB  to 29' 75% 1.33                       ‐ SF Min. 30' from TOB to 100' 292,954 100% 1.00            292,954 SF 101‐200' 20,075 33% 3.00                 6,692 Min. 20' from TOB  to 29' 75% 2.67                       ‐ SF Min. 30' from TOB to 100' 16,364 100% 2.00                 8,182 101‐200' 33% 6.00                       ‐ Min. 20' from TOB  to 29' 75% 1.33                       ‐ T1 Min. 30' from TOB to 100' 75,209 100% 1.00               75,209 T1 101‐200' 17,015 33% 3.00                 5,672 Min. 20' from TOB  to 29' 75% 2.67                       ‐ Min. 30' from TOB to 100' 100% 2.00                       ‐ 101‐200' 33% 6.00                       ‐ Min. 20' from TOB  to 29' 75% 1.33                       ‐ T2 Min. 30' from TOB to 100' 47,108 100% 1.00               47,108 101‐200' 33% 3.00                       ‐ Min. 20' from TOB  to 29' 75% 2.67                       ‐ T2 Min. 30' from TOB to 100' 58,439 100% 2.00               29,219 101‐200' 33% 6.00                       ‐ 527,164           465,036 175,721                   Location Jurisdictional Streams Restoration TypeReach ID/ ComponentBuffer Width (ft)Creditable Area (sf)*Initial Credit Ratio (x:1)% Full CreditFinal Credit Ratio (x:1)Riparian Buffer Credits (BMU)SF Min. 20' from TOB  to 29' 1,378 75% 13.33                    103 SF Min. 30' from TOB to 100' 334,203 100% 10.00               33,420 SF 101‐200' 9,358 33% 30.00                    309 Min. 20' from TOB  to 29' 75% 6.67                       ‐ Min. 30' from TOB to 100' 100% 5.00                       ‐ 101‐200' 33% 15.00                       ‐ Min. 20' from TOB  to 29' 75% 13.33                       ‐ T2 Min. 30' from TOB to 100' 115,847 100% 10.00               11,585 T2 101‐200' 854 33% 30.00                      28 Min. 20' from TOB  to 29' 75% 6.67                       ‐ Min. 30' from TOB to 100' 100% 5.00                       ‐ 101‐200' 33% 15.00                       ‐ 461,641                                 45,445 450,050175,72110 100% 10              17,572 988,805                510,481       702,886 482,608       TOTAL TOTAL WITH LIMITED PRESERVATIONSUBTOTAL AREA (SF): Min. 30' from TOB to 100' PreservationLIMIT OF PRESERVATION BY TOTAL AREASUBTOTALSSUBTOTALSELIGIBLE PRESERVATION AREARural SubjectRestoration1Enhancement2Rural NonsubjectRestoration1Enhancement2Rural SubjectRestoration1Enhancement2RuralSubjectPreservation10Nonsubject5RuralSubjectPreservation10Nonsubject5 Sheet 2 Sheet 3 Sheet 1 NCCGIAÜ0250125Feet Buffer Mitigation - Overview Image Source:NCOneMap 2013 Project Easement Buffer Zones TO B to less than 20 ' (No Cred it) TO B to 20-29' TO B to 30' 30-100' 101-200 ' T1 T2 ! ! ! ! NCCGIAÜ0250125Feet Buffer Mitigation - Field Points Image Source:NCOneMap 2013 Existing Project Streams Other Streams Project Easement !Field Points T1 T2 SF NCCGIAÜ010050Feet Buffer Mitigation - Sheet 1 Image Source:NCOneMap 2013 MATCHLINE WITHSHEET 2 T1 Star t Stony For kReach 1 (SF1) Stony For kReach 2 (SF2) Out of T1 watershed and beyond 200'of Stony Fork Project Easement Easement Drainage Breaks Buffer Width Zones Buffer Mitigation Buffer Restoration Buffer Enhancement Buffer Preservation NCCGIA Ü 0 10050Feet Buffer Mitigation - Sheet 2 Image Source:NCOneMap 2013 MATCHLINE WITHSHEET 1 Stony For k Reach 2 (SF2) MATCHLINE WITHSHEET 3 Project Easement Buffer Width Zones Buffer Mitigation Buffer Restoration Buffer Enhancement Buffer Preservation NCCGIAÜ010050Feet Buffer Mitigation - Sheet 3 Image Source:NCOneMap 2013 MATCHLINE WITHSHEET 2 T2 Stony For kReach 3 (SF3) Pr oject End Project Easement Easement Drainage Breaks Buffer Width Zones Buffer Mitigation Buffer Restoration Buffer Enhancement Buffer Preservation     Draft Mitigation Plan                                                      Stony Fork Restoration Site  April 24, 2018                                                     DMS Project Number 97085                                                    12.4 Site Protection Instrument      Draft Mitigation Plan                                                      Stony Fork Restoration Site  April 24, 2018                                                     DMS Project Number 97085           Draft Mitigation Plan                                                      Stony Fork Restoration Site  April 24, 2018                                                     DMS Project Number 97085                                                12.5 Credit Release Schedule         Draft Mitigation Plan                                                      Stony Fork Restoration Site  April 24, 2018                                                     DMS Project Number 97085        Draft Mitigation Plan                                                      Stony Fork Restoration Site  April 24, 2018                                                     DMS Project Number 97085    All credit releases will be based on the total credit generated as reported in the final design plans unless  otherwise documented and provided to the Interagency Review Team following construction. Under no  circumstances shall any mitigation project be debited until the necessary DA authorization has been  received for its construction or the District Engineer (DE) has otherwise provided written approval for the  project in the case where no DA authorization is required for construction of the mitigation project. The  DE, in consultation with the Interagency Review Team (IRT), will determine if performance standards have  been satisfied sufficiently to meet the requirements of the release schedules below. In cases where some  performance standards have not been met, credits may still be released depending on the specifics of the  case. Monitoring may be required to restart or be extended, depending on the extent to which the site  fails to meet the specified performance standard. The release of project credits will be subject to the  criteria described as follows:  Stream Credit Release Schedule – 7 year Timeframe  Monitoring  Year Credit Release Activity Interim  Release  Total  Released  0  Initial Allocation – see requirements below  30%  30%  1  First year monitoring report demonstrates performance  standards are being met  10%  40%  2  Second year monitoring report demonstrates performance  standards are being met  10%  50% (60%*)  3  Third year monitoring report demonstrates performance  standards are being met  10%  60% (70%*)  4  Fourth year monitoring report demonstrates performance  standards are being met  5%  65% (75%*)  5  Fifth year monitoring report demonstrates performance  standards are being met  10%  75% (85%*)  6  Sixth year monitoring report demonstrates performance  standards are being met  5%  80% (90%*)  7  Seventh year monitoring report demonstrates performance standards are  being met, and project has received close‐out approval from IRT  10%  90% (100%*)  *See Subsequent Credit Releases description below    Initial Allocation of Released Credits  The initial allocation of released credits, as specified in the mitigation plan can be released by the NCDMS  without prior written approval of the DE upon satisfactory completion of the following activities:  a. Approval of the final Mitigation Plan  b. Recordation of the preservation mechanism, as well as a title opinion acceptable to the USACE  covering the property  c. Completion  of  project  construction  (the  initial  physical  and  biological  improvements  to  the  mitigation site) pursuant to the mitigation plan; Per the NCDMS Instrument, construction means  that a mitigation sit\e has been constructed in its entirety, to include planting, and an as‐built  report has  been  produced. As‐built reports must be sealed by an engineer prior to project  closeout, if appropriate but not prior to the initial allocation of released credits.  d. Receipt of necessary DA permit authorization or written DA appr oval for projects where DA permit  issuance is not required    Subsequent Credit Releases  All subsequent credit releases must be approved by the DE, in consultation with the IRT, based on a  determination that required performance standards have been achieved. For stream project with a 7‐year  monitoring period, a reserve of 10% of a site’s total stream credits shall be released after four bank‐full      Draft Mitigation Plan                                                      Stony Fork Restoration Site  April 24, 2018                                                     DMS Project Number 97085    events  have  occurred,  in  separate  years,  provided  the  channel  is  stable  and  all  other  performance  standards are met. In the event that less than four bankfull events occur during the monitoring period,  release of these reserve credits shall be at the discretion of the IRT. As projects approach milestones  associated with credit release, the NCDMS will submit a request for credit release to the DE along with  documentation substantiating achievement of criteria required for release to occur. This documentation  will be included with the annual monitoring report.          Draft Mitigation Plan                                                      Stony Fork Restoration Site  April 24, 2018                                                     DMS Project Number 97085                                                12.6 Financial Assurance         Draft Mitigation Plan                                                      Stony Fork Restoration Site  April 24, 2018                                                     DMS Project Number 97085        Draft Mitigation Plan                                                      Stony Fork Restoration Site  April 24, 2018                                                     DMS Project Number 97085    Pursuant to Section IV H and Appendix III of the Division of Mitigation Service’s In‐Lieu Fee Instrument  dated July 28, 2010, the North Carolina Department of Environmental Quality (formerly NCDENR) has  provided the U.S. Army Corps of Engineers Wilmington District with a formal commitment to fund projects  to satisfy mitigation requirements assumed by DMS. This commitment provides financial assurance for all  mitigation projects implemented by the program.      Draft Mitigation Plan                                                      Stony Fork Restoration Site  April 24, 2018                                                     DMS Project Number 97085           Draft Mitigation Plan                                                      Stony Fork Restoration Site  April 24, 2018                                                     DMS Project Number 97085                                                12.7 DWR Stream Identification Forms      Draft Mitigation Plan                                                      Stony Fork Restoration Site  April 24, 2018                                                     DMS Project Number 97085           Draft Mitigation Plan                                                      Stony Fork Restoration Site  April 24, 2018                                                     DMS Project Number 97085           Draft Mitigation Plan                                                      Stony Fork Restoration Site  April 24, 2018                                                     DMS Project Number 97085                                                    12.8 Approved Jurisdictional Determination      Draft Mitigation Plan                                                      Stony Fork Restoration Site  April 24, 2018                                                     DMS Project Number 97085        Draft Mitigation Plan                                                      Stony Fork Restoration Site  April 24, 2018                                                     DMS Project Number 97085                                                    12.9 Approved FHWA Categorical Exclusion Form         Draft Mitigation Plan                                                      Stony Fork Restoration Site  April 24, 2018                                                     DMS Project Number 97085                             Categorical Exclusion Form for Division of Mitigation Services Projects Version 1.4 Note: Only Appendix A should to be submitted (along with any supporting documentation) as the environmental document. Part 1: General Project Infor mation Ston Fork Stream Restoration Site Johnston Count , NC 97085 KCI Technolo ies, Inc. Tim Morris 4601 Six Forks Rd, Suite 220, Ralei h, NC 27609 Stony Fork is a stream and stream buffer restoration project for the North Carolina Department of Environmental Services, Division of Mitigation Services that aims to restore and enhance over 7000 linear feet of channelized and entrenched stream channels in the Neuse River Basin. This project will occur on eight parcels of privately owned land near the Town of Benson in Johnston Count North Carolina. Date Conditional Approved By: Date D Check this box if there are outstanding issues Final Approval By: ••••• Date . ... DMS Project Manager For Division Administrator FHWA For Division Administrator FHWA \/Ar�irm 1 .:1 A/1 A/nF, 7-6-2016 Lindsay Crocker Version 1.4, 8/18/05 1 Part 2: All Projects Regulation/Question Response Coastal Zone Management Act (CZMA) 1. Is the project located in a CAMA county? Yes No 2. Does the project involve ground-disturbing activities within a CAMA Area of Environmental Concern (AEC)? Yes No N/A 3. Has a CAMA permit been secured? Yes No N/A 4. Has NCDCM agreed that the project is consistent with the NC Coastal Management Program? Yes No N/A Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) 1. Is this a “full-delivery” project? Yes No 2. Has the zoning/land use of the subject property and adjacent properties ever been designated as commercial or industrial? Yes No N/A 3. As a result of a limited Phase I Site Assessment, are there known or potential hazardous waste sites within or adjacent to the project area? Yes No N/A 4. As a result of a Phase I Site Assessment, are there known or potential hazardous waste sites within or adjacent to the project area? Yes No N/A 5. As a result of a Phase II Site Assessment, are there known or potential hazardous waste sites within the project area? Yes No N/A 6. Is there an approved hazardous mitigation plan? Yes No N/A National Historic Preservation Act (Section 106) 1. Are there properties listed on, or eligible for listing on, the National Register of Historic Places in the project area? Yes No 2. Does the project affect such properties and does the SHPO/THPO concur? Yes No N/A 3. If the effects are adverse, have they been resolved? Yes No N/A Uniform Relocation Assistance and Real Property Acquisition Policies Act (Uniform Act) 1. Is this a “full-delivery” project? Yes No 2. Does the project require the acquisition of real estate? Yes No N/A 3. Was the property acquisition completed prior to the intent to use federal funds? Yes No N/A 4. Has the owner of the property been informed: * prior to making an offer that the agency does not have condemnation authority; and * what the fair market value is believed to be? Yes No N/A Version 1.4, 8/18/05 2 Part 3: Ground-Disturbing Activities Regulation/Question Response American Indian Religious Freedom Act (AIRFA) 1. Is the project located in a county claimed as “territory” by the Eastern Band of Cherokee Indians? Yes No 2. Is the site of religious importance to American Indians? Yes No N/A 3. Is the project listed on, or eligible for listing on, the National Register of Historic Places? Yes No N/A 4. Have the effects of the project on this site been considered? Yes No N/A Antiquities Act (AA) 1. Is the project located on Federal lands? Yes No 2. Will there be loss or destruction of historic or prehistoric ruins, monuments or objects of antiquity? Yes No N/A 3. Will a permit from the appropriate Federal agency be required? Yes No N/A 4. Has a permit been obtained? Yes No N/A Archaeological Resources Protection Act (ARPA) 1. Is the project located on federal or Indian lands (reservation)? Yes No 2. Will there be a loss or destruction of archaeological resources? Yes No N/A 3. Will a permit from the appropriate Federal agency be required? Yes No N/A 4. Has a permit been obtained? Yes No N/A Endangered Species Act (ESA) 1. Are federal Threatened and Endangered species and/or Designated Critical Habitat listed for the county? Yes No 2. Is Designated Critical Habitat or suitable habitat present for listed species? Yes No N/A 3. Are T&E species present or is the project being conducted in Designated Critical Habitat? Yes No N/A 4. Is the project “likely to adversely affect” the specie and/or “likely to adversely modify” Designated Critical Habitat? Yes No N/A 5. Does the USFWS/NOAA-Fisheries concur in the effects determination? (By virtue of no-response) Yes No N/A 6. Has the USFWS/NOAA-Fisheries rendered a “jeopardy” determination? Yes No N/A Version 1.4, 8/18/05 3 Executive Order 13007 (Indian Sacred Sites) 1. Is the project located on Federal lands that are within a county claimed as “territory” by the EBCI? Yes No 2. Has the EBCI indicated that Indian sacred sites may be impacted by the proposed project? Yes No N/A 3. Have accommodations been made for access to and ceremonial use of Indian sacred sites? Yes No N/A Farmland Protection Policy Act (FPPA) 1. Will real estate be acquired? Yes No 2. Has NRCS determined that the project contains prime, unique, statewide or local important farmland? Yes No N/A 3. Has the completed Form AD-1006 been submitted to NRCS? Yes No N/A Fish and Wildlife Coordination Act (FWCA) 1. Will the project impound, divert, channel deepen, or otherwise control/modify any water body? Yes No 2. Have the USFWS and the NCWRC been consulted? Yes No N/A Land and Water Conservation Fund Act (Section 6(f)) 1. Will the project require the conversion of such property to a use other than public, outdoor recreation? Yes No 2. Has the NPS approved of the conversion? Yes No N/A Magnuson-Stevens Fishery Conservation and Management Act (Essential Fish Habitat) 1. Is the project located in an estuarine system? Yes No 2. Is suitable habitat present for EFH-protected species? Yes No N/A 3. Is sufficient design information available to make a determination of the effect of the project on EFH? Yes No N/A 4. Will the project adversely affect EFH? Yes No N/A 5. Has consultation with NOAA-Fisheries occurred? Yes No N/A Migratory Bird Treaty Act (MBTA) 1. Does the USFWS have any recommendations with the project relative to the MBTA? Yes No 2. Have the USFWS recommendations been incorporated? Yes No N/A Wilderness Act 1. Is the project in a Wilderness area? Yes No 2. Has a special use permit and/or easement been obtained from the maintaining federal agency? Yes No N/A Agency Responses North Carolina Department of Natural and Cultural Resources State Historic Preservation Office Ramona M. Bartos, Administrator Governor Pat McCrory Office of Archives and History Secretary Susan Kluttz Deputy Secretary Kevin Cherry Location: 109 East Jones Street, Raleigh NC 27601 Mailing Address: 4617 Mail Service Center, Raleigh NC 27699-4617 Telephone/Fax: (919) 807-6570/807-6599 May 12, 2016 Timothy Morris KCI Technologies Landmark Center II, Suite 220 4601 Six Forks Road Raleigh, NC 27609 Re: Stony Fork Stream Restoration, KCI 161600959, Johnston County, ER 16-0710 Dear Mr. Morris: Thank you for your letter of April 21, 2016, concerning the above project. We have conducted a review of the project and are aware of no historic resources which would be affected by the project. Therefore, we have no comment on the project as proposed. The above comments are made pursuant to Section 106 of the National Historic Preservation Act and the Advisory Council on Historic Preservation’s Regulations for Compliance with Section 106 codified at 36 CFR Part 800. Thank you for your cooperation and consideration. If you have questions concerning the above comment, contact Renee Gledhill-Earley, environmental review coordinator, at 919-807-6579 or environmental.review@ncdcr.gov. In all future communication concerning this project, please cite the above referenced tracking number. Sincerely, Ramona M. Bartos The Natural Resources Conservation Service is an agency of the Department of Agriculture’s Natural Resources mission. An Equal Opportunity Provider and Employer May 31, 2016 Timothy J. Morris Senior Environmental Scientist KCI Technologies, Inc. Landmark Center II, Suite 220 4601 Six Forks Road Raleigh, NC 27609 Dear Mr Morris: Thank you for your letter dated April 22, 2016, Subject: Request for Comments – Stony Fork Stream Restoration Project, KCI Job Number – 161600959, Johnston Co., NC. The following guidance is provided for your information. Projects are subject to the Farmland Protection Policy Act (FPPA) requirements if they may irreversibly convert farmland (directly or indirectly) to non- agricultural use and are completed by a federal agency or with assistance from a federal agency. Farmland means prime or unique farmlands as defined in section 1540(c)(1) of the FPPA or farmland that is determined by the appropriate state or unit of local government agency or agencies with concurrence of the Secretary of Agriculture to be farmland of statewide local importance. For the purpose of FPPA, farmland includes prime farmland, unique farmland, and land of statewide or local importance. Farmland subject to FPPA requirements does not have to be currently used for cropland. It can be forestland, pastureland, cropland, or other land, but not water or urban built-up land. Farmland does not include land already in or committed to urban development or water storage. Farmland already in urban development or water storage includes all such land with a density of 30 structures per 40-acre area. Farmland already in urban development also includes lands identified as urbanized area (UA) on the Census Bureau Map, or as urban area mapped with a tint overprint on the United States Geological Survey (USGS) topographical maps, or as urban-built-up on the United States Department of Agriculture (USDA) Important Farmland Maps. The area in question meets one or more of the above criteria for Farmland. Farmland area will be affected or converted. Enclosed is the Farmland Conversion Impact Rating form AD1006 with PARTS II, IV and V completed by NRCS. The corresponding agency will need to complete the evaluation, according to the Code of Federal Regulation 7CFR 658, Farmland Protection Policy Act. Natural Resources Conservation Service North Carolina State Office 4407 Bland Road Suite 117 Raleigh, NC 27609 Voice 919-873-2171 Fax 844-325-6833 Mr. Morris Page 2 If you have any questions, please contact Milton Cortes, Assistant State Soil Scientist at 919-873-2171 or by email: milton.cortes@nc.usda.gov. Again, thank you for inquiry. If we can be of further assistance, please do not hesitate to contact us. Sincerely, Milton Cortes Assistant State Soil Scientist cc: Kent Clary, State Soil Scientist, NRCS, Raleigh, NC MILTON CORTES Digitally signed by MILTON CORTES DN: c=US, o=U.S. Government, ou=Department of Agriculture, cn=MILTON CORTES, 0.9.2342.19200300.100.1.1=12001000080173 Date: 2016.05.31 15:49:42 -04'00' North Carolina Wildlife Resources Commission Gordon Myers, Executive Director Mailing Address: Habitat Conservation • 1721 Mail Service Center • Raleigh, NC 27699-1721 Telephone: (919) 707-0220 • Fax: (919) 707-0028 May 4, 2016 Mr. Timothy Morris KCI Technologies Landmark Center II, Suite 220 4601 Six Forks Road Raleigh, NC 27609 Subject: Request for Environmental Information for the Stony Fork Stream Restoration Project, KCI Project Number 161600959, Johnston County, North Carolina. Dear Mr. Morris, Biologists with the North Carolina Wildlife Resources Commission (NCWRC) have reviewed the proposed project description. Comments are provided in accordance with certain provisions of the Clean Water Act of 1977 (as amended), Fish and Wildlife Coordination Act (48 Stat. 401, as amended; 16 U.S.C. 661-667e) and North Carolina General Statutes (G.S. 113-131 et seq.). KCI Technologies of North Carolina proposes to complete a wetland restoration project for the North Carolina Division of Mitigation Services. The subject site, referred to as the Stony Fork Stream Restoration Site, is located approximately 2,000 feet south and east of the intersection of Elevation and Federal Roads. The proposed restoration work will restore hydrology and vegetation by realigning the existing stream and stabilizing the site with native vegetation. Stony Creek flows into Hannah Creek in the Neuse River basin. Stream restoration projects often improve water quality and aquatic habitat. Establishing native, forested buffers in riparian areas will help protect water quality, improve aquatic and terrestrial habitats and provide a travel corridor for wildlife species. The NCWRC recommends the use of biodegradable and wildlife-friendly sediment and erosion control devices. Silt fencing, fiber rolls and/or other products should have loose-weave netting that is made of natural fiber materials with movable joints between the vertical and horizontal twines. Silt fencing and similar products that have been reinforced with plastic or metal mesh should be avoided as they impede the movement of terrestrial wildlife species. Excessive silt and sediment loads can have detrimental effects on aquatic resources including destruction of spawning habitat, suffocation of eggs and clogging of gills. Any invasive plant species that are found onsite should be removed. Page 2 May 4, 2016 Scoping – Stony Fork Stream Restoration Project Thank you for the opportunity to review and comment on this project. If I can be of further assistance, please contact me at (910) 409-7350 or gabriela.garrison@ncwildlife.org. Sincerely, Gabriela Garrison Eastern Piedmont Habitat Conservation Coordinator Habitat Conservation Program NCNHDE-1517 April 20, 2016 Thomas Seelinger KCI Technologies, Inc. 4601 Six Forks Road Raleigh, NC 27609 tommy.seelinger@kci.com RE: Stony Fork Stream Restoration Site Dear Thomas Seelinger: The North Carolina Natural Heritage Program (NCNHP) appreciates the opportunity to provide information about natural heritage resources from our database that have been compiled for the project referenced above. A query of the NCNHP database, based on the project area mapped with your request, indicates that there are no records for rare species, important natural communities, natural areas, or conservation/managed areas within the proposed project boundary. Please note that although there may be no documentation of natural heritage elements within the project boundary, it does not imply or confirm their absence; the area may not have been surveyed. The results of this query should not be substituted for site-specific surveys where suitable habitat exists. In the event that rare species are found within the project area, please contact the NCNHP so that we may update our records. The attached ‘Potential Occurrences’ table summarizes rare species and natural communities that have been documented within a one-mile radius of the property boundary. The proximity of these records suggests that these natural heritage elements may potentially be present in the project area if suitable habitat exists and is included for reference. Tables of natural areas and conservation/managed area within a one-mile radius of the project area, if any, are also included in this report. The location of the natural areas and conservation/managed areas can be viewed online on the Natural Heritage Data Explorer found at: https://ncnhde.natureserve.org/. Please note that natural heritage element data are maintained for the purposes of conservation planning, project review, and scientific research, and are not intended for use as the primary criteria for regulatory decisions. Information provided by the NCNHP database may not be published without prior written notification to the NCNHP, and the NCNHP must be credited as an information source in these publications. Maps of NCNHP data may not be redistributed without permission. The NC Natural Heritage Program may follow this letter with additional correspondence if a Dedicated Nature Preserve (DNP), Registered Heritage Area (RHA), or Federally-listed species are documented near the project area. If you have questions regarding the information provided in this letter or need additional assistance, please contact John Finnegan at john.finnegan@ncdcr.gov or 919.707.8630. Sincerely, NC Natural Heritage Program Page 1 of 3 Natural Heritage Element Occurrences, Natural Areas, and Managed Areas Within a One-mile Radius of the Project Area Stony Fork Stream Restoration Site April 20, 2016 NCNHDE-1517 Element Occurrences Documented Within a One-mile Radius of the Project Area Taxonomic Group EO ID Scientific Name Common Name Last Observation Date Element Occurrence Status Accuracy Federal Status State Status Global Rank State Rank Dragonfly or Damselfly 33753 Somatochlora georgiana Coppery Emerald 2004-PRE Historical 5-Very Low ---Significantly Rare G3G4 S2? No Natural Areas are Documented Within a One-mile Radius of the Project Area No Managed Areas are Documented Within a One-mile Radius of the Project Area Definitions and an explanation of status designations and codes can be found at https://ncnhde.natureserve.org/content/help. Data query generated on April 20, 2016; source: NCNHP, Q4 October 2015. Please resubmit your information request if more than one year elapses before project initiation as new information is continually added to the NCNHP database. Page 2 of 3 Powered by TCPDF (www.tcpdf.org) Page 3 of 3 Affidavit of Public Notice