Loading...
HomeMy WebLinkAbout20081615 Ver 3_More Info Received_20120126January 24 2012 MEMORANDUM TO Cyndi Karoly Supervisor 401 Oversight & Express Permits Unit Division of Water Quality Surface Water Protection Ds- upits 0.3 P-. � &--a Dee Freeman Secretary FROM Doug Huggett NC DENR DCM Mayor Permits Coordinator 400 Commerce Ave Morehead City NC 28557 (Courier 11- 12 -09) SUBJECT CAMA/Dredge & Fill Mayor Permit Application Review Applicant Town of Topsail Beach /Nourishment Project (MM #22 09) Project Location Northern half of the beachfront area of the Town of Topsail Beach and a 97001f section of New Topsail Inlet Topsail Creek & Banks Channel in and adjacent to the Atlantic Ocean in Topsail Beach NC Pender Co Proposed Project Applicant proposes to perform maintenance dredging within New Topsail Inlet Topsail Creek and Banks Channel and utilize the spoil material for beach nourishment along the ocean front shoreline of Topsail Beach Please indicate below your agency s position or viewpoint on the proposed project and return this form by February 3, 2012 If you have any questions regarding the proposed project contact Jason Dail (910)796 -7221, when appropriate in depth comments with supporting data is requested REPLY This agency has no objection to the project as proposed This agency has no comment on the proposed project This agency approves of the project only if the recommended changes are incorporated See attached This agency objects to the project for reasons described in the attached comments SIGNED DATE D ]AN 262012 400 Commerce Ave Morehead City NC 28557 3421 DENR WATER Phone 252 808 2808 \ FAX 252 247 3330 Internet www nccoastal management net QilALR1' An Equal Opportunity Affirmative Action Employer Ti i[" l AahlrallY DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT APPLICANT'S NAME Town of Topsail Beach 2 LOCATION OF PROJECT SITE The project site includes the northern half of the beachfront area of the Town of Topsail Beach and a 9 700 linear foot section of New Topsail Inlet Topsail Creek and Banks Channel in and adjacent to the Atlantic Ocean in Topsail Beach Pender County Photo Index — 2006 25 (6585 6589) Oceanfront & 25 6590 Inlet 2000 25 (323 327) Oceanfront & 25 322 Inlet 1995 25 (3 05 310) Oceanfront & 25 304 Inlet State Plane Coordinates — GPS File P 093010A X 2407901 Y 220652 Lat 34 °20 55 07441 N Long 77 °38 55 14895 W 3 INVESTIGATION TYPE CAMA / D &F 4 INVESTIGATIVE PROCEDURE Dates of Site Visit — 10/15/2011 Was Applicant Present — No 5 PROCESSING PROCEDURE Application Received — Completed on 1/23/2012 Office — Wilmington 6 SITE DESCRIPTION (A) Local Land Use Plan — Town of Topsail Beach Classification From LUP No Classification/Developed (B) AEC(s) Involved EW PT ES OH IH (C) Water Dependent Yes (D) Intended Use Public (E) Wastewater Treatment Existing — Not applicable (N /A) Planned None (F) Type of Structures Existing — Commercial and Residential Planned — No structures planned (G) Estimated Annual Rate of Erosion 2 /year Source — 1998 LTAASCR Update 7 HABITAT DESCRIPTION [AREA] DREDGED FILLED OTHER (A) Vegetated Wetlands (B) Non Vegetated Wetlands +/ 1,294,000 sq ft +/ 2,918,520 sq (Open water) (29 acres or 153,450 ft ( +/ 67 acres) yds3) (wet sand beach spoil deposition) (C) Other (Highground) 434,440 sq ft 654,500 sq ft (9 97 acres (DA 203) (reserved (Dry beach spoil for disposal of deposition) unsuitable material) (D) Total Area Disturbed 5 301 460 ft' (121 ac ) with 32 500 sq ft (0 74 ac ) reserved for unsuitable fill (E) Primary Nursery Area No (F) Water Classification SA Open No 8 PROJECT SUMMARY The applicant proposes to perform maintenance dredging within New Topsail Inlet Topsail Creek and Banks Channel and utilize the spoil material for beach nourishment along the ocean front shoreline of Topsail Beach Town of Topsail Beach Page Two 9 PROJECT DESCRIPTION The protect site includes a section of Banks Channel New Topsail Inlet and Topsail Creek and the northern half of the oceanfront shoreline of Topsail Beach The disposal area for the project would begin approximately 1 500 feet north of the Jolly Roger Pier (Haywood Avenue) and extend to an area approximately 2 100 feet south of the Topsail Beach/Surf City Town line immediately adjacent to the Atlantic Ocean, in Topsail Beach Pender County To get to the site from Wilmington take US HWY 17 N to NC Hwy 210 (which is located at the Lowe s Home Improvement on US HWY 17) Turn right onto NC Hwy 210 and continue across the Surf City Swing Bridge to the stoplight Take a right at the stoplight onto NC Hwy 50 and continue until you reach the Topsail Beach/Surf City Town line The protect site encompasses approximately 2 1 miles of oceanfront beach beginning at a location in close proximity to the Surf City /Topsail Beach Town line and terminating near Haywood Avenue The Topsail Inlet channel alignment project (from where the sand is being removed) is located along the southern and western sides of Topsail Beach New Topsail Inlet (also referred to as Topsail Inlet) is located at the southern tip of Topsail Island Current elevation of the project area ranges from approximately —15 NAVD to approximately 23 NAVD relative to the Normal Water Level (NWL) The project site is adjacent to commercial and residential properties as well as infrastructure for the Town including NC Hwy 50 Hutaff Island borders the project to the south the Atlantic Ocean to the east and Banks Channel to the west The highground portion of the property is vegetated primarily with American Beach Grass (Ammophda brevthgulata) and Sea Oats (Uniola paniculata) The long term annual erosion rate for the Town of Topsail Beach is 2 /year per the Division of Coastal Management s 1998 Annual Erosion Rate maps and the 100 year storm recession is approximately 150 giving a total Ocean Hazard AEC of 270 as measured from the First Line of Stable Natural Vegetation (FLSNV) PROJECT HISTORY/BACKGROUND The Town of Topsail Beach currently has an active CAMA Mayor Permit Permit #22 09 (originally issued on 2/27/2009) which authorized beach nourishment to be carried out one time along the entire reach of Topsail Beach utilizing spoil material generated from' Borrow Area X which is located along the eastern side of the ebb shoal delta After the initial project was completed the applicant modified CAMA Mayor Permit #22 09 on 12/1/2010 for another round of beach nourishment Under this modification Borrow Area X was eliminated as a source site and portions of the AIWW Topsail Creek and Banks Channel were added Permit #22 09 is scheduled to expire on December 31 2012 Because the applicant currently holds an active CAMA/Dredge and Fill permit for the proposed activities this request should be considered a mayor modification to the existing permit (also stated in the application) Prior to issuance of Permit #22 09 the Town of Topsail Beach performed its beach nourishment under CAMA Mayor Permit #145 98 Permit #145 98 was originally issued on October 29 1998 and subsequently modified on 9/27/99 2/21/00 3/20/00 and 9/23/01 The permit was renewed on 2/26/02 and other modifications were authorized on 5/7/04 12/20/06, 1/13/06 3/17/07 and 12/17/07 It appears the Town has performed beach bulldozing /re nourishment approximately 13 times since Permit #145 98 was originally issued Historically, the US Army Corps of Engineers ( USACE) has maintained New Topsail Inlet (also referred to as Topsail Inlet) as a marked navigation channel providing commercial and recreational access to the Atlantic Ocean Over the years and with adequate funding the USACE has been able to maintain the federal channel with their side cast dredge fleet Traditionally they have maintained a depth of 10 0 MLW (8 + 2 overcut) using the side cast dredge however periodic maintenance has become less frequent due to budget constraints the shallow depth of the inlet and the amount of material that s held in the inlet system by the side cast Town of Topsail Beach Page Three operations According to the application package the USACE has had to dredge the inlet (via side cast) approximately four (4) times per year in order to maintain navigability at a tune of 235 000 cubic yards (cy) per year In the event the Corp is not capable of maintaining the inlet the Town of Topsail Beach would like to obtain approval to perform the maintenance work and utilize the material for beach nourishment The Town of Topsail Beach s Land Use Plan does not have the dry sand beach classified however the upland areas of this project are classified as Developed The waters of the project site are classified as SA by the NC Division of Water Quality The NC Division of Marine Fisheries has NOT designated this area of Topsail Sound / Atlantic Ocean as a Primary Nursery Area (PNA) and the waters are CLOSED to the harvesting of shellfish PROPOSED PROJECT The applicant proposes to perform maintenance dredging within New Topsail Inlet Topsail Creek and Banks Channel and utilize the spoil material for beach nourishment along the ocean front shoreline of Topsail Beach According to the application package approximately 153 450 cubic yards (cy) of material would be removed from the system (in Topsail Inlet Topsail Creek and Banks Channel) and placed on the ocean front beach from Haywood Avenue to the Topsail Beach/Surf City town line (around Catherine Avenue) The dimensions /extent of the dredge limits (from all three locations) would measure approximately 9 700 (L) x 80 150 (W) to a depth of approximately 8 0 plus a 2 0 overcut measured at Mean Low Water (MLW) The dredge limits would include four sections total two within the inlet one in Topsail Creek and one cut in Banks Channel Essentially the entire extent of the dredging project would occur from the midpoint of the USACE s Range 9 project (Topsail Banks Channel — FID 316) located at 34 °21 26 23'N 77 °38 4105 W to an area landward of the ebb shoal delta located at approximately 34 °20 24 59'N 77 °39 53 04 W Please refer to Sheet 19 of 28 in the application package for an approximate location of the channel alignment A cut with side slopes of 3 1 would follow the centerline of the channel or thalweg of the inlet at the time of construction The applicant states that should the inlet shift or encroach into any wetland areas prior to the time of construction the channel would be shifted away from the marsh in order to avoid any potential impacts As proposed beach quality sand removed from New Topsail Inlet would be disposed of on the oceanfront beach within the town limits of Topsail Beach essentially spanning the entire northern half of Town s oceanfront shoreline According to the applicant the overall beach berm width would be dependent on the total volume of material available at the time of construction however the estimated calculations (10 861 in length x 200 in width) should be sufficient to accept the amount of material being removed As noted the project would mimic recent nourishment events along Topsail Beach with the exception of the unsuitable fill that was deposited on the beach during the last project The applicant states that the beach berm elevation would be built to 5 0 NAVD88 with a 25 1 beach face profile Accordingly this profile ratio would create a more natural contour thereby reducing scarping and allowing higher storm tides to wash up onto the berm rather than eroding the beach The application package indicates that the majority of material being removed from New Topsail Inlet would be compatible with the native beach however unanticipated setbacks and unsuitable materials are always a concern In the unlikely event that unsuitable (non beach quality) material is encountered the applicant proposes to scrape the undesired material from the oceanfront and temporarily stage it at the Town owned Bush Marina located at 912 S Anderson Blvd All unsuitable material withheld during the project would be staged at the marina until the maintenance is completed At that time the material would be used to repair boat wake induced erosion at the USACE Disposal Area (DA) 203 outside of the USACE right of way Town of Topsail Beach Page Four Currently the island is in need of repair along the Topsail Creek side and any shell and/or sand not suitable for the beach would be used to rebuild/reform the dike wall and escarpment A triangular portion of the island is available pending USACE approval and a small rectangular section within that triangle has been depicted as needing stabilization The area measures approximately 500 in length x 65 in width or approximately 32 500 sq ft For additional information on the location and size of DA 203, please refer to Figure 1, on Page 19 of the application package Logistically the project would involve the use of a 24 class hydraulic dredge As proposed the pipeline would span along the western side of the island along Banks Channel and traverse the island via existing under road sleeves at Drum Street Smith Street and Queen s Grant The beach disposal would consist only of beach berm and slope construction with no disturbance to any vegetation within the dune system Theoretically the project should align with the existing federal dredging project and should remain consistent with the existing Topsail Beach nourishment work In order to complete the project the Town would need to acquire property easements from all oceanfront property owners Currently, the Town is in the process of doing so in anticipation of the thirty year inlet and sound management plan These easements are under review and the Town is expected to release the easement package to the residents in the near future In any event the Town is aware that easements will be required prior to project start up on any private property The geotechmcal data and sediment characteristic information indicates that an appropriate amount of samples were collected at adequate intervals Based on the information presented in the application package the applicant was able to meet the sediment criteria established under current CRC Rules As proposed this project would consist of no more than 5 94% silt 5 17% gravel and 26% shell (calcium carbonate) Actual calculations of those materials found in New Topsail Inlet through borings collected during October 2011 are 0 37% fine (silt) 2 11 % gravel and 117% shell (calcium carbonate) Refer to Table 1 on Page 18 of the application package for tabular information on grain size analysis These calculations represent 13 separate sections with one vibracore representing each section In summary the proposed beach fill project and channel dredging activities would remain within the Town limits and within the footprint of the previously dredged federal channel As proposed the entire project would overlap previously impacted areas along the oceanfront as well as previously dredged areas within Topsail Creek New Topsail Inlet and Banks Channel 10 ANTICIPATED IMPACTS The proposed maintenance dredging would disturb approximately 1 294 000 ft 2 of previously excavated shallow bottom area and the proposed beach nourishment activities would result in the disturbance of approximately 434 440 ft 2 of oceanfront beach above NHW Approximately 2 918 520 ft of shallow bottom area below NHW would also filled as a result of nourishment activities In addition approximately 32 000 ft 2 of high ground has been reserved for unsuitable material at the USACE DA 203 Submitted by J Dail Date January 23 2012 Office Wilmington � T�w"c�p1L TOPSAIL BEACH NOURISHMENT PROJECT MAJOR MODIFICATION APPLICATION NCDENR PERMIT #22 -09 JANUARY 1 2, 201 1 Gahagan & Bryant Associates of NC,PLLC. 295 -A North Green Meadows Drive Wilmington, North Carolina 28405 910.313.3338 (3BA ENGINEERS '*' SURVEYORS Topsail Beach Nourishment Project Major Permit Application Table of Contents 1.0 Division of Coastal Management Form MP -1 ............................. ..............................3 Agent Authorization Form ........................................................... ..............................9 2.0 Division of Coastal Management From MP -2 ............................ .............................10 3.0 Project Narrative .................................................................. .............................14 3.1 Project Location ............................................................. .............................15 3.2 Project Background .......................................................... .............................15 3.3 Applicant's Stated Purpose ................................................. .............................16 3.4 Project Description .......................................................... .............................16 3.5 Disposal Area Location ..................................................... .............................16 3.6 Inlet Channel Sediment Characteristics .................................. .............................17 3.7 Unsuitable Material Handling ............................................. .............................19 3.8 Dredging Logistics .......................................................... .............................19 3.9 Property Easements ......................................................... .............................20 3.10 Beach Construction ......................................................... .............................20 4.0 New Topsail Inlet Permit Drawings ........................................ .............................22 5.0 Appendix A ...................................................................... .............................51 Section1 Vibracore Logs ....................................................... .............................52 Section 2 Vibracore Grain Size Distribution ............................... ............................... 83 Section 3 Vibracore Granularmetric Reports .. ............................... ............................127 Section 4 Vibracore Photographs ............... ............................... ............................171 SECTION 1.0 North Carolina Division of Coastal Management Form MP -1 Agent Authorization Form ON MP -1 APPLICATION for Major Development Permit (last revised 12/27/06) North Carolina DIVISION OF COASTAL MANAGEMENT 1. Primary Applicant/ Landowner Information Business Name Town Of Topsail Beach Project Name (if applicable) New Topsail Inlet Maintenance Dredging Applicant 1: First Name Tim MI Last Name Holloman Applicant 2: First Name MI Last Name If additional applicants, please attach an additional page(s) with names listed. Mailing Address 820 S. Anderson Blvd. PO Box City Topsail Beach State NC ZIP 28465 Country Phone No. 910 - 328 - 5841 ext. FAX No. 910 - 328 - 1560 Street Address (if different from above) City State ZIP Email townmanager @topsailbeach.org 2. Agent(Contractor Information Business Name Gahagan & Bryant Associates Of North Carolina, PLLC Agent/ Contractor 1: First Name MI Last Name Chris L Gibson Agent/ Contractor 2: First Name MI Last Name Jamie C Pratt Mailing Address PO Box City State 295 -A N. Green Meadows Dr. Wilmington NC ZIP Phone No. 1 Phone No. 2 28405 910 - 313 - 3338 ext. 910 - 279 - 4777 ext. FAX No. Contractor # 910 313 6822 Street Address (if different from above) City State ZIP Email clgibson @gba- inc.com <Form continues on back> 252 - 808 -2808 :: 1- 888- 4RCOAST 4: www.nccoastaimanagement.net Form DCM MP -1 (Page 2 of 5) APPLICATION for Major Development Permit 3. Project Location County (can be multiple) Street Address State Rd. # Pender b. Size of entire tract (sq.ft.) Subdivision Name City State Zip Town of Topsail Beach NC 28465- Phone No. Lot No.(s) (if many, attach additional page with list) 910 - 328 - 5841 ext. I I I , a. In which NC river basin is the project located? b. Name of body of water nearest to proposed project Cape Fear River Atlantic Ocean, New Topsail Inlet, Topsail Creek, AIWW, Banks Channel c. Is the water body identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site. ®Natural ❑Manmade ❑Unknown Atlantic Ocean e. Is proposed work within city limits or planning jurisdiction? f. If applicable, list the planning jurisdiction or city limit the proposed ®Yes ❑No work falls within. Town of Topsail Beach 4. Site Description a. Total length of shoreline on the tract (ft.) b. Size of entire tract (sq.ft.) Inlet Channel: 4,700', Topsail Creek: 2,700', Banks Inlet: 705,189 sq. ft., Topsail Creek: 387,205 sq. ft., Banks Channel: 2,300' Channel: 190,980 sq. ft. Beach: 10,861 ft Beach: 3,745,102 sq. ft. c. Size of individual lot(s) d. Approximate elevation of tract above NHW (normal high water) or NWL (normal waterlevel) (If many lot sizes, please attach additional page with a list) -1.5 to -23.2 NGVD ❑NHW or ®NWL e. Vegetation on tract Beach contains normal upland beach grasses and sedges. f. Man -made features and uses now on tract Man -made features include dune cross walks, vehicular cross - overs, and sand fencing on the beach and channel markers within the inlet, Topsail Creek, and Banks Channel. Uses include recreational activities on the beach and commercial and recreational boating within the proposed dredge channels. g. Identify and describe the existing land uses adjacent to the proposed project site. Residential and commercial development on Topsail Island. Natural wildlife preserve on Hutaff Island to the south of New Topsail Inlet. h. How does local government zone the tract? i. Is the proposed project consistent with the applicable zoning? Residential and Commercial (Attach zoning compliance certificate, if applicable) ❑Yes ❑No ®NA j. Is the proposed activity part of an urban waterfront redevelopment proposal? ❑Yes ®No k. Hasa professional archaeological assessment been done for the tract? If yes, attach a copy. ®Yes ❑No ❑NA If yes, by whom? USACE as part of a GRR in the 1990's. Documentation has been requested, but no significant artifacts were found. 252 - 808 -2808 :: 1- 888- 4RCOAST 4: www.nccoastaimanagement.net Form DCM MP -1 (Page 3 of 5) APPLICATION for Major Development Permit I. Is the proposed project located in a National Registered Historic District or does it involve a ❑Yes ®No ❑NA National Register listed or eligible property? <Form continues on next page> m. (i) Are there wetlands on the site? ❑Yes ®No (ii) Are there coastal wetlands on the site? ❑Yes ®No (iii) If yes to either (i) or (ii) above, has a delineation been conducted? ❑Yes ®No (Attach documentation, if available) n. Describe existing wastewater treatment facilities. Properties within the Town of Topsail Beach are on septic systems. o. Describe existing drinking water supply source. Properties within the Town of Topsail Beach are on a city water supply. p. Describe existing storm water management or treatment systems. N/A 5. Activities and Impacts a. Will the project be for commercial, public, or private use? ®Commercial ®Public /Government ® Private /Community b. Give a brief description of purpose, use, and daily operations of the project when complete. See attached project description. c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where it is to be stored. See attached project description. d. List all development activities you propose. Hydraulic maintenance dredging within shoaled areas of the federal navigation channel of New Topsail Inlet, Topsail Creek, and Banks Channel. Dredged beach - quality material will be disposed of on the oceanfront shoreline within the jurisdictional boundaries of the Town of Topsail Beach, increasing recreational beach area and providing storm protection to oceanfront homes and personal property. e. Are the proposed activities maintenance of an existing project, new work, or both? maintenance of an existing project f. What is the approximate total disturbed land area resulting from the proposed project? 115 ❑Sq.Ft or ®Acres g. Will the proposed project encroach on any public easement, public accessway or other area ®Yes ❑No ❑NA that the public has established use of? h. Describe location and type of existing and proposed discharges to waters of the state. Surface runoff. i. Will wastewater or stormwater be discharged into a wetland? ❑Yes ®No ❑NA If yes, will this discharged water be of the same salinity as the receiving water? ❑Yes ❑No ❑NA 252 - 808 -2808 :: 1- 888- 4RCOAST 5: www.nccoastaimanagement.net Form DCM MP -1 (Page 4 of 5) APPLICATION for Major Development Permit j. Is there any mitigation proposed? ❑Yes ®No ❑NA If yes, attach a mitigation proposal. <Form continues on back> 6. Additional Information In addition to this completed application form, (MP -1) the following items below, if applicable, must be submitted in order for the application package to be complete. Items (a) — (f) are always applicable to any major development application. Please consult the application instruction booklet on how to properly prepare the required items below. a. A project narrative. b. An accurate, dated work plat (including plan view and cross - sectional drawings) drawn to scale. Please give the present status of the proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish between work completed and proposed. c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. e. The appropriate application fee. Check or money order made payable to DENR. f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Name See attached Project Narrative Phone No. Address Name Phone No. Address Name Phone No. Address g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. NCDENR Permit # 22 -09; Town of Topsail Beach; Issued USACE Action ID SAW- 2006 - 40848; Town of Topsail Beach; 11/29/2010 Issued 12/10/2010 DWQ Certification # 3777; Town of Topsail Beach; Issued 11/17/2010 h. Signed consultant or agent authorization form, if applicable. i. Wetland delineation, if necessary. j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner) k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1 -10), if necessary. If the project involves expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. 7. Certification and Permission to Enter on Land I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow -up monitoring of the project. I further certify that the information provided in this application is truthful to the best of my knowledge. Date Print Name Signature Please indicate application attachments pertaining to your proposed project. 252 - 808 -2808 :: 1- 888- 4RCOAST is www.nccoastaimanagement.net Form DCM MP -1 (Page 5 of 5) ®DCM MP -2 Excavation and Fill Information ❑DCM MP -3 Upland Development ❑DCM MP -4 Structures Information ❑DCM MP -5 Bridges and Culverts APPLICATION for Major Development Permit 252 - 808 -2808 :: 1- 888- 4RCOAST $: www.nccoastaimanagement.net A X-ry% CEN North Carolina department of Environment and Natural Resources Division of Coastal Management Beverly Eaves Perdue, Governor James H. Gregson, Director Dee Freeman, Secretary Date 0104()II Name of Property Owner Applying for Permit: liM �uti)Mcin lour„ vQ Tv �,i P' eyc% Town M-M eC it Mailing Address: `6 a,v 5, A,,derS >„ uid. JV C �69 1 certify that i have authorized (agent) to act on my behalf, for the purpose of applying for and obtaining all LAMA Permits necessary to install or construct (activity) ( Iq `Ta 5Z. 3„ \x at (my property located at) lv,,rs, are This certification is valid thru (date) Deto-Y -,lac" 3�1 aO16 Property Owner Signature �P//, Date 400 Commerce Avenue, Morehead City, North Carolina 28557 Phone: 252 -808 -28081 FAX: 252- 247 -3330 i Internet: www.nccoastaimanagement.net An Equal opportunity 1 Affirmative Action Employer - 50% Recycled! 10% Post Consumer Paper SECTION 2.0 North Carolina Division of Coastal Management Form MP -2 11t Form DCM MP -2 EXCAVATION and FILL (Except for bridges and culverts) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP -1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. Describe below the purpose of proposed excavation and /or fill activities. All values should be given in feet. 1. EXCAVATION ❑This section not applicable a. Amount of material to be excavated from below NHW or NWL in b. Type of material to be excavated. cubic yards. Beach quality sand 153,450 CY (90,700 from New Topsail Inlet, 52,850 from Topsail Creek, and 9,900 from Banks Channel) C. (i) Does the area to be excavated include coastal wetlands /marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB ❑WL ®None (ii) Describe the purpose of the excavation in these areas: d. High - ground excavation in cubic yards. 252 - 808 -2808 :: 1- 888- 4RCOAST :: www.nccoastaimanagement.net revised: 12/26/06 Access Other Channel Canal Boat Basin Boat Ramp Rock Groin Rock (excluding (NLW or Breakwater shoreline NWL ) stabilization Topsail Creek: 2,700' Length Inlet: 4,700' Banks Channel: 2,300' Topsail Creek & Inlet: 150' Width Banks Channel: 80' Topsail Creek: -7.0' MLW Inlet: -9.8' Avg. Existing MLW NA NA Depth Banks Channel: -8.0' MLW Topsail Creek & Inlet: 8 +2' Final Project MLW NA NA Depth Banks Channel: 7 +2' MLW 1. EXCAVATION ❑This section not applicable a. Amount of material to be excavated from below NHW or NWL in b. Type of material to be excavated. cubic yards. Beach quality sand 153,450 CY (90,700 from New Topsail Inlet, 52,850 from Topsail Creek, and 9,900 from Banks Channel) C. (i) Does the area to be excavated include coastal wetlands /marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB ❑WL ®None (ii) Describe the purpose of the excavation in these areas: d. High - ground excavation in cubic yards. 252 - 808 -2808 :: 1- 888- 4RCOAST :: www.nccoastaimanagement.net revised: 12/26/06 Form DCM MP -2 (Excavation and Fill, Page 2 of 3) 2. DISPOSAL OF EXCAVATED MATERIAL ❑This section not applicable a. Location of disposal area. b. Dimensions of disposal area. Town of Topsial Beach oceanfront beach 10,861 linear feet of beach with an average berm width of 40' and a 1:25 beach face slope from the berm to existing grade C. (i) Do you claim title to disposal area? d. (i) Will a disposal area be available for future maintenance? ❑Yes ®No ❑NA ®Yes ❑No ❑NA (ii) If no, attach a letter granting permission from the owner. (ii) If yes, where? Oceanfront beach of the Town of Topsail Beach e. (i) Does the disposal area include any coastal wetlands /marsh f. (i) Does the disposal include any area in the water? (CW), submerged aquatic vegetation (SAV), shell bottom (SB), ®Yes ❑No ❑NA or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. (ii) If yes, how much water area is affected? ❑CW ❑SAV ❑SB 67.5 acres below high water line OWL ®None (ii) Describe the purpose of disposal in these areas: a. Type of shoreline stabilization: b. Length: ❑Bulkhead ❑ Riprap ❑Breakwater /Sill ❑Other: Width: c. Average distance waterward of NHW or NWL: d. Maximum distance waterward of NHW or NWL: e. Type of stabilization material: f. (i) Has there been shoreline erosion during preceding 12 months? ❑Yes ❑No ❑NA (ii) If yes, state amount of erosion and source of erosion amount information. g. Number of square feet of fill to be placed below water level. h. Type of fill material. Bulkhead backfill Riprap Breakwater /Sill Other i. Source of fill material. 4. OTHER FILL ACTIVITIES ®This section not applicable (Excluding Shoreline Stabilization) a (i) Will fill material be brought to the site? ❑Yes ❑No ❑NA b If yes, (ii) Amount of material to be placed in the water (iii) Dimensions of fill area (iv) Purpose of fill 5. GENERAL (i) Will fill material be placed in coastal wetlands /marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB OWL ❑None (ii) Describe the purpose of the fill in these areas: 252 - 808 -2808 :: 1- 888- 4RCOAST :: www.nccoastaimanagemeni.net revised: 12/26/06 Form DCM MP -2 (Excavation and Fill, Page 3 of 3) a. How will excavated or fill material be kept on site and erosion controlled? Utilization of temorary training dikes during beachfill placement C. (i) Will navigational aids be required as a result of the project? ❑Yes ®No ❑NA (ii) If yes, explain what type and how they will be implemented. January 11, 2011 Date Topsail Beach Nourishment Project Project Name Town of Topsail Beach Applicant Name Applicant Signature b. What type of construction equipment will be used (e.g., dragline, backhoe, or hydraulic dredge)? hydraulic dredge, bulldozer, front end loader d. (i) Will wetlands be crossed in transporting equipment to project site? ❑Yes ®No ❑NA (ii) If yes, explain steps that will be taken to avoid or minimize environmental impacts. 252 - 808 -2808 :: 1- 888- 4RCOAST :: wwwmccoastalmanagemeni.net revised: 12/26/06 SECTION 3.0 Topsail Beach Nourishment Project Project Narrative 14 3.0 PROJECT NARRATIVE 3.1 Project Location The project site is located on the southern end of Topsail Island, just south of the Town Limits of the Town of Topsail Beach. New Topsail Inlet is a federally maintained navigation channel bounded to the north by Topsail Island, the south by Hutaff (Lea) Island, the west by Banks Channel, Topsail Creek and the AIWW, and the east by the Atlantic Ocean. The proposed disposal area is within the town limits of the Town of Topsail Beach, located at the south end of Topsail Island. The island is accessible to the public by highways 50 and 210, with Highway 50 being the only entry road to the Town of Topsail Beach. The geographic coordinates are Latitude 34 °20'24.78 "N and Longitude 77 039'56.15 "W. The proposed disposal area encompasses the northern section of town limits, extending from approximately 1500 feet north of the Jolly Roger Fishing Pier (Haywood Avenue) to approximately 2100 feet south of the Topsail Beach /Surf City town line (Catherine Avenue.) 3.2 Project Background The Town of Topsail Beach completed their first beach nourishment project in April of 2011, placing just under 1 million cubic yards of sand on their oceanfront beach. Borrow areas for this project included Topsail Creek, Banks Channel, the 'cut through' section of New Topsail Inlet, as well as Disposal Areas 203 and 189. During the summer of 2011, Hurricane Irene impacted the area causing significant beach erosion to the recently completed beach nourishment project. Post storm surveys of Topsail Beach indicate that 279,800 cubic yards of sand were lost from the managed portion of the littoral system due to both long -shore and cross -shore transport during Hurricane Irene. Disaster evaluations by FEMA determined that the Town was eligible for Federal assistance to renourish erosion caused by Hurricane Irene and funding for a 279,800 CY beachfill project has been issued to the Town. This application serves a dual purpose - primarily it will allow for storm related erosion repairs on Topsail Beach as well as reduce shoaling within Topsail Creek, Banks Channel, and New Topsail Inlet. Volume estimates of the shoals within these channels are approximately 155,000 cubic yards which will complete 55% of the post Irene FEMA project. The northern section of previously nourished beach within the Town of Topsail Beach was hardest hit and therefore will be the focus of this project. The project will restore the Town's beach to the pre -storm conditions and the fill template on the oceanfront beach is identical to the beach constructed during the winter 2010 -2011 project. The borrow areas for the proposed project will also focus on the channels used for the previous 2010- 2011 nourishment project. Shoaling within Topsail Creek, Banks channel and the 'cut through' in New Topsail Inlet will be the primary focus for borrow areas. The entire New Topsail Inlet channel has recently become a hot topic due to extensive shoaling creating hazardous navigation conditions and rendering the channel impassible in areas for vessels. A survey completed by GBA on December 30, 2011 and January 3 -4, 2012 reveals an inlet channel that is in fairly good shape, aside from 2 sections of shoaling within the COLREGS demarcation line. The 'cut through' area which connects Banks Channel to Topsail Creek has completely shoaled in and is impassable in a johnboat at low tide. Additionally, the flood shoal in encroaching into the channel curve near Hutaff Island, causing a very narrow channel and creating extremely hazardous navigation. This section of inlet channel is added to the dredge areas previously used to allow for safe navigation through all of the back channels in Topsail Beach. As with the 2011 project, the dredge footprint and depths will remain consistent with the federally maintained channel dimensions and depths. I 3.3 Applicant's Stated Purpose The purpose of the proposed project is to restore the oceanfront beach within the Town of Topsail Beach to pre- Hurricane Irene conditions. FEMA money has been provided to renourish the beach with 279,800 cubic yards of sand. The applicant will utilize the same borrow areas as the winter 2010 -2011 beach nourishment project as well as adding hot -spot shoaling within New Topsail Inlet near Hutaff Island. The dredge dimensions and depths remain consistent with the previous project as well as the federally maintained navigation channel dimensions and dredge depths. Given the location of the federal navigation channels and inlet channel, all dredged material is beach quality and will be disposed of on the oceanfront beach within the Town of Topsail Beach. The proposed project yields a double benefit as safe navigation of the inlet and connecting channels will be created, while beach quality sand removed from the channel alignment and placed on Topsail Beach will restore the beach and afford greater protection to the oceanfront houses. 3.4 Project Description Due to the urgent need for dredging within New Topsail Inlet and connecting channels, construction is proposed for the spring of 2012. The project will involve dredging beach quality sand from the federal navigation channel footprint within New Topsail Inlet and Topsail Creek currently designated as 150' wide, 10' (8 +2' MLW) deep and 3:1 side slopes. The centerline of the proposed channel shall be defined as the thalweg of the inlet at the time of construction; however, if the deepest water of the inlet encroaches on a marsh shoreline, the channel will be shifted away from the marsh in order to eliminate any wetland impacts. The project will also remove the shoal that has developed in Banks Channel, federally designed as a 80' wide, 9' (7 +2' MLW) deep and 3:1 side slope channel. This centerline is designated by established PI points and is show in the permit plan drawings. Volume reports utilizing current bathymetric soundings within the proposed channel alignment estimate that approximately 155,000 cubic yards of sand needs to be removed to achieve the designed 8 +2' MLW channel depth in the Inlet and Topsail Creek and the 7 +2' MLW depth of Banks Channel. The majority of the shoaling is within New Topsail Inlet with just over 67,000 cy in the cut through, and 23,700 cy in the Hutaff curve. Shoaling within the Topsail Creek template totals 52,850 cy and the Banks Channel template contains approximately 9,900 cy. These volumes are consistent with last year's project and historical dredging by the USACE in these areas. 3.5 Disposal Area Location Beach quality sand removed from New Topsail Inlet will be disposed of on a 10,861 foot stretch of the oceanfront beach within the town limits of the Town of Topsail Beach. Due to the limited volume within the Federally Maintained Navigation Channels, and to address areas of erosion within the Town of Topsail Beach jurisdictional limits, beachfill will concentrate on an area beginning 1500 feet north of the Jolly Roger Fishing Pier, and end about 2100 feet south of the Town of Topsail Beach /Surf City town line. Overall designed beach berm width will depend upon the total volume available at the time of the project. The fill will mimic the recent beach nourishment project completed by the Town of Topsail Beach between November 2010 and April 2011. The beach berm elevation will be built to 5.0' NAVD88 with a 25:1 beach face slope. This beach shape creates a 'natural' beach shape, greatly reduces scarping and allows high storm tides to wash up onto the berm rather than erode the beach. IG: 3.6 Inlet Channel Sediment Characteristics A total of 12 vibracores and 7 grab samples were collected from New Topsail Inlet by American Vibracore Services (AVS) between the dates of September 27, 2011 and October 6, 2011. The coring involved vibrating a 14.5 foot long and 4 inch diameter aluminum pipe into the substrate, collecting sediment inside the pipe as it advances down. Once the entire length of the pipe was in the ground, the core was retrieved, capped, and labeled with the designated core identifier. The vibracores covered the channel from the beginning, near the USACE dock, seaward to the oceanfront extent of Topsail Island. Seaward of this area, safety concerns prohibited any vibracores from being collected. The shallow nature of the ebb shoal necessitated that a small vessel be used, however breaking waves over the ebb shoal created serious safety concerns and despite several attempts, on separate days, to obtain cores on the shoal were tried, conditions never improved. In lieu of vibracores, grab samples were collected across the ebb shoal. While these samples only represent the surficial sediments across this area and can only describe the top 1 foot or so of the current in situ sediment. However, in 2007, Coastal Planning and Engineering (CPE) collected multiple reconnaissance vibracores seaward of the ebb shoal and surrounding New Topsail Inlet area. These cores can be used to ascertain that extensive layers of fine or unsuitable material do not exist within grade and the design template. Copies of the core descriptions, grain size distribution curves, granularmetric spreadsheets and photographs of the CPE cores are included in this report. Please note that the CPE cores are in the NAVD88 datum whereas the current investigation is using MLW. There is a 2.5' difference in the two datums. The predetermined core locations were staked out using Real Time Kinematic (RTK) GPS and final sample positions and water elevations were logged using RTK -GPS. The water elevation was used to calculate the current tide reading at the sample location while a survey rod was used to determine the total distance from the seafloor to the water surface. By combining the water elevation and the distance between water surface and seafloor, the top of hole (TOH) elevation could be established for each core. Utilizing an electric vibrating motor, cores were vibrated vertically through the strata, to the full extent of the core barrel or refusal, capped and extracted. The overall penetration for the core was recorded, as well as the start and end times for the coring procedure. The top and bottom of the pipe was marked as well as the core identifier, and overall length. Upon completion, the cores were taken to the GBA geotechnical lab for splitting, core description, sampling, drying and sieve analysis. Individual core sections were cut open and one half of the core was wrapped, taped and archived as an undisturbed section while the other half of the core was described and representative samples were removed for grain size and composition analysis. A portion of the removed sample, representing a distinct stratigraphic layer within the vibracore, was composited and sent off for carbonate analysis. The remaining portion of each sample was dried and sieved to determine grain size throughout the core. Grain size distribution was adjusted via weighted average to compensate for the varying accretion within the channel template. These characteristics determine a weighted average for the critical criteria of each core, thereby allowing a corrected overall grain size, sorting and silt percentage for the entire navigation channel. The channel was broken into thirteen separate compartments, where one vibracore represented the sediment within that segment of channel. The areas were delineated by the midpoint of the straight line distance between two adjacent cores. Volume analysis was performed within the channel for each core compartment to determine the amount of sediment each core represented. Once the total volume of sediment represented by each core was calculated, an overall composite for the channel could be calculated and used for comparison to the geotechnical analysis for the native beach. 17 In order to maintain the integrity of current beach parameters, the North Carolina Coastal Resources Commission (CRC) has established standards to prevent large amounts of coarse material (cobbles, large shells and shell hash) as well as excessive fine grained material (silt and clay) being placed on the beach. Silt and clay (sediment size equal to or less than 0.063 mm), gravel (material with a diameter equal to or greater than 4.76 mm), and granular sediment (2.0 mm to 4.76 mm) are limited to 5% over the native beach. The calcium carbonate (shell) fraction of the borrow material is limited to no more than 15% over the native. Previous work and submissions (Topsail Beach Nourishment Project, completed April 2011) by the Town of Topsail Beach have identified the native beach characteristics for the proposed nourishment area to have a mean grain size of 0.24 mm (2.05 phi), 0.94% silt, 0.17% gravel, 0.82% granular and 11.0% calcium carbonate. Based on current criteria established by the North Carolina CRC, dredged material being placed on the beach must consist of sediment encompassed within 5.0% of the native material — in this case no more than 5.94% silt, 5.17% gravel and 26% shell content. Using methodologies described above, an overall composite for the New Topsail Inlet navigation channel was calculated based upon available material and representative statistics from the vibracore analysis. These numbers can be used to directly compare New Topsail Inlet with Topsail Beach's native sand. Table 1: Weighted average grain size statistics for New Topsail Inlet compared to the Topsail Beach native sand. The sediment within the design template for New Topsail Inlet is nearly identical to the native sand found on the beach. Due to the inlet hydrodynamics and associated sorting of the sand that occurs with these wave and current activities, it is to be expected that the sand is of good quality and closely mimics the native. It should be noted that although the current vibracore study could not extend over the ebb shoal due to safety concerns, the historic records of cores obtained by CPE in 2007 show that good material does in fact continue past the shoal. The Topsail Creek and Banks Channel portion of the project was included in the previous 2010 -2011 nourishment project and full geotechnical analysis was performed on these channels prior to construction. The material within the template in these areas was completely excavated during the previous project and recent deposition within template consists of clean quartz sand that was eroded from the oceanfront of Topsail Beach and entrained within the inlet hydrodynamic system. Copies of the vibracores and grain size analysis for these areas are included in Appendix A. Given the dynamic nature of tidal inlets, all recent deposition within all channels should be clean quartz sand with minimal clay /silt or shell deposits. Despite the very high probability of only clean quartz sand accounting for the recent shoaling within the previously dredged channels, dredging operations will be monitored extremely closely as these sections are excavated, watching for any undesirable material 18 Mean FINE SAND GRANULAR GRAVEL CARBONATE LOCATION % o /o 0 % o % (mm) ( <0.0625 mm) (0.0625 -2.00 mm) (2.00 -4.76 mm) (4.76 -76.00 mm) /� 0 New Topsail 0.30 0.37 96.38 1.14 2.11 11.7 Inlet Topsail Beach 0.24 0.94 98.06 0.82 0.17 11.0 Native CRC N/A 5.94 N/A 5.82 5.17 26.0 Threshold Table 1: Weighted average grain size statistics for New Topsail Inlet compared to the Topsail Beach native sand. The sediment within the design template for New Topsail Inlet is nearly identical to the native sand found on the beach. Due to the inlet hydrodynamics and associated sorting of the sand that occurs with these wave and current activities, it is to be expected that the sand is of good quality and closely mimics the native. It should be noted that although the current vibracore study could not extend over the ebb shoal due to safety concerns, the historic records of cores obtained by CPE in 2007 show that good material does in fact continue past the shoal. The Topsail Creek and Banks Channel portion of the project was included in the previous 2010 -2011 nourishment project and full geotechnical analysis was performed on these channels prior to construction. The material within the template in these areas was completely excavated during the previous project and recent deposition within template consists of clean quartz sand that was eroded from the oceanfront of Topsail Beach and entrained within the inlet hydrodynamic system. Copies of the vibracores and grain size analysis for these areas are included in Appendix A. Given the dynamic nature of tidal inlets, all recent deposition within all channels should be clean quartz sand with minimal clay /silt or shell deposits. Despite the very high probability of only clean quartz sand accounting for the recent shoaling within the previously dredged channels, dredging operations will be monitored extremely closely as these sections are excavated, watching for any undesirable material 18 coming out of the dredge pipe. In the event that extensive fines or shelly material is being deposited on the beach, all dredge operations will suspend immediately until the problem is remedied. The full geotechnical report, including core logs, grain size distribution curves, granularmetric tables, and core photographs can be found in Appendix A. A schematic displaying the proposed inlet channel as well as GBA vibracores, GBA grab samples, CPE vibracores and the volume boxes for each core can be found at the end of the narrative. 3.7 Unsuitable Material Handling No undesirable material was indicated by the vibracores within the designed dig depths ( -10.0' MLW in Topsail Creek and New Topsail Inlet and -9.0' MLW in Banks Channels) for the federal channels. However, the written specifications for the job will require that the contractor closely monitor the material being discharged and disposed of on the beach. In the event that excessive unsuitable, non - beach compatible material (ie abundant shell, silt or clay) is encountered, the beach will be scraped and the undesirable material removed. The removed sediment will be stockpiled at the town owned Bush Marina, and upon completion of the navigation maintenance, the shells and undesirable sediment will be used to repair boat wake induced erosion at USACE Disposal Area 203, outside of the Federal AIWW right -of -way (Figure 1). This island was used as a borrow site for the winter 2010/2011 Topsail Beach Nourishment Project and the outside perimeter near Topsail Creek has eroded due to summer boat traffic. Any shell and sand removed from Topsail Beach during this project will repair the escarpment. 7 Figure 1: Unsuitable material will be used to repair the scarped dike on DA -203, outside of the AIWW right of way 3.8 Dredging Logistics This project will involve the use of a hydraulic dredge in the 24" class. Pipeline routes will utilize Banks Channel on the west side of Topsail Island and use existing under -road sleeves at Drum Street, Smith IR Street, and in Queen's Grant to access the beach. The beach disposal consists of only beach berm and slope construction and no equipment will disturb any vegetated dune systems throughout disposal procedures. As the designed dredge channels are encapsulated by the federally maintained navigation channel, environmental impacts are minimized and there should be no new impacts beyond the existing federal channel. 3.9 Property Easements The Town of Topsail Beach is currently in the process of obtaining property easements for all oceanfront homes within the jurisdictional limits of the town. These easements have been mailed to residents with a due date of 1/16/2011. The Town understands that it will be a permit requirement that the easements are acquired prior to the start of construction on any private property. Homeowner notifications of the upcoming project were sent to all oceanfront homeowners within the town limits of the Town of Topsail Beach. Additional notifications will be sent to the adjacent homeowners on both the north and south side of the revised beachfill area. 3.10 Beach Construction Construction parameters of the beach profile and shoreline extent to be nourished along the oceanfront fill area of Topsail Beach will mimic the authorized beach plan as defined by the 2010/2011 Topsail Beach Beachfill Project (DENR Permit #22 -09, USACE Action ID# SAW- 2006 - 40848). Beach slope (25:1) and berm elevation (5.0 ft. NAVD88) will generally define the typical construction profile, as authorized. W 041 j N r , ti e o n is O rn m _ Ilk t�,'tti S� 7 16 C \ , mO Azu S .xy p z o o CL 01 0 M (n o o u1 I 6 of �ti`�'4 � low \'tee\ 3 no o d DO o Cn z Q w o z o Lo L Z n -1 B -15 u> Y � CL O D_• N _ TI- 11 -VB -14 U O U) o N TI -1 -11 •TI- 11 -VB -12 L0 0 - .. 0 - 0 0� _ ~ J °o - •n- 11 -VB -10 11- 11 -VB -13 E ¢ -If m Z o 0 C�7 =5 II DTI- •. "y ` E ao a + 11 -VS -9 • �'- _ �0 E O g-c/) a c ° o Y _N -- an ... t � D o � _ w => Atlantic Ocean o Channel Centerline n- 11 -VB -S Proposed Dredge Areas _ 0-1 V) ` -� GBA 2011 Vibracore - 0 (n O GBA 2011 Ponar Sample 0 � � D 6 U ' TI- 11 -•VB -s J TI-11-•NB -7 - 11 -VB -6 71- 11iV6- CL) Z Q- E � 6 OIL + 0 U Q U) N ` _ TI— • TBVC —o7 —o2 0 O O v Q 6 z 041 SECTION 4.0 Topsail Beach Nourishment Project 11x17 Permit Drawings 0 23 11 x 17 = HALF SCALE Federal Town of Topsail Beach Beach Nourishment Project PENDER COUNTY, NORTH CAROLINA Beach Fill and Dredging of areas including: Topsail Creek, New Topsail Inlet and Banks Channel WINTER 2012 Navigation Channel Maintenance & Beach Placement ATLANTIC INTRACOASTAL WATERWAY WV . TOPSAIL CREEK / ✓ / BANKS CHANNEL C / BEACH } j TOp5mv- I NEW TOPSAIL INLET ... ATLANTIC OCEAN TAE LE OF -ENTS TAELE OF OGNTEMT6 SHEET DESCRIPTION SHEET DESCRIPTION SHEET 1 COVER & LAYOUT VIEW SHEET 1B TOPSAIL CREEK - CROSS SECTIONS SHEET 2 TOPSAIL BEACH AND CHANNELS - CONTROL SHEET 19 NEW TOPSAIL INLET - CDNTRDL SHEET 3 BEACH - LAYOUT & BATHYMETRY (TI3 - TIS SHEET 20 NEW TOPSAIL INLET - BATHY & CONTOUR5 SHEET 4 BEACH - LAYOUT & BATHYMETRY TI5 - TI7 SHEET 21 NEW TOPSAIL INLET - BATHY & CDNTOURS SHEET 5 BEACH - LAYOUT & BATHYMETRY S - TI10 SHEET 22 NEW TOPSAIL INLET - CROSS SECTIONS SHEET B BEACH- LAYOUT & FoVA ETRY n0 - TI12 SHEET 23 NEW TOPSAIL INLET - CRD55 SECTIONS SHEET 7 BEACH - LAYOUT & HAIHYM ETRY 113 - T115 SHEET 24 NEW TOPSAIL INLET - CRDSS SECNONS SHEET 8 BEACH - LAYOUT & BATHYM ETRY 116 - TI1B SHEET 25 BANKS CHANNEL - CONTROL SHEET 9 BEACH- LAYOUT & BATHYM ETRY 11B - T1211 SHEET 28 BANKS CHANNEL - BATHYMETRY & CONTOUR5 SHEEP 10 BEACH - LAYOUT & BATFiYM ETRY 121 - T123 SHEEP 27 BANKS CHANNEL - CROSS SECTIONS SHEET 11 BEACH - LAYOUT & BAIT METRY 124 - TI25 SHEET 28 BANKS CHANNEL - CROSS SECTIONS SHEET 12 BEACH - LAYOUT & BATHYMETRY (TUB - TI27) SHEET 13 BEACH - CROSS SECTIONS SHEET 14 BEACH - CROSS SECTIONS SHEET 15 TOPSAIL CREEK - CDNTRDL SHEET to TOPSAIL CREEK - BATHYNIETRY & CONTOURS SHEET 17 TOPSAIL CREEK - CROSS SECTIONS GAHAGAN & BRYANT ASSOCIATES - OF NC, PLLC, C.O -L- #P -0743 295 -A North Green Meadows Drive Wilmington, NC 28405 EN(;INEER$ * SURVEYOR$ Tel: 910.313.3338 NOT TO SCALE DREDGE & FI LL AREAS 23 11 x 17 = HALF SCALE ALIGNMENT TABLE OF COORDINATES - TOPSAIL CREEK CE147ERUNE NAME EASTING NORTHING STATION RANGE TC -1 2,400,539.59 224,554.37 0.00 0.0 TC -2 2,400,790.74 224,289.04 370.69 0.0 TC -3 2,400,99455 224,213.71 580.96 010 TC -4 2,401,173.94 224,208.95 760.12 0.0 TC -5 2,401,525.33 224,357.41 1,141.59 0.0 TC -6 2,402,043.86 224,36a14 1,660.16 0.0 TC -7 2,402,266.40 224,206.31 1,933.58 0.0 TC -B 2,402,280.22 223,930.93 2,209.31 0.0 TC -9 2.4-02.18k54 22 633.90 Z52133 0.0 TC -10 2.401.95486 . 223 35132 2 885.51 0.0 TC -11 2,401,645.45 223,074.25 3,183.40 0.0 TC -12 NTI 2,401,667.64 222,831.86 3,426.81 0.0 TC -13 NTI 2.402.191.14 222,403171 3,963.94 0.0 TC -14 NTI 2,403,007.92 222,220.46 4,800.69 0.0 TC -15 NTI 2,403,640.53 222,150.32 5,437.37 0.0 TC -16 2,403,822.70 221,94754 5,709.74 0.0 TC -17 2,403,867.60 221,852.86 5,814.81 0.0 TC-10 2,403,897.66 221,704.10 5,966.57 0.0 TC -19 2,403,79326 2,405,BB2.67 221,4983fi 6,19728 0.0 TC -20 2,403,664,48 ARE REFERENCED 221,33588 .+ BE 0.0 TC -21 2,403,567.87 233,368.5 221.223.61 8,552.84 0.0 TC -22 2,403,31399 234,043.3 221,04929 s,ee0.14 0.0 C -23 234,711.4 19,980.1 0.0 HORIZONTAL COORDINATES ARE REFERENCED TO NA083 20,9]9.1 AOGNMENT TABLE OF COORDINATES - NEW TOPSAIL INLET CENTERONE NAME EASTING NORTHING STATION RANGE Nn -1 2,405,758.67 221.158.32 0.00 00 M1-2 2,404,969.15 220,710.95 90354 0.0 MI -3 2,404,233.71 220,268.68 1,764.83 0.0 NT-4 2,403,778.19 220,243.99 2,221.02 0.0 Nn -5 ,403,537.470 220,243.41 2,461.74 OA MI -6 2,40.3,315.40 220,292.58 2,689.19 0.0 MI -7 2,402,63328 220,444.58 3,388.04 0.0 NTI -e 2,401,980.54 220,049.49 4,151.04 On NTI -9 2,401,66681 219 680.09 4,63588 0.0 NTI -10 1 2,401,47938 219,278.46 5,078.90 0.0 NTI -11 2,401,327.09 21 8,700.45 5,676.63 0.0 NTI -12 2,401,399,18 216,255.65 6,127,04 0.0 NTI -13 2,401.57838 217.879.91 6,543 50 0.0 NTI -14 2,401,843.80 217,660.65 6,867.77 OA NTI -15 2,402,132.38 217,545.00 7,198.67 OA NTI -16 2,402,629.67 217,504.D5 7,697.64 0.0 NTI -17 2.403.657.02 217,751.30 8,754.32 0.0 NTI -18 2,404,223.30 217,657.83 9,328.26 00 NTI -19 2,405,BB2.67 215,964.B8 12,460.78 0.0 HORIZONTAL COORDINATES ARE REFERENCED TO NADB3 0.0 AOGNMENT TABLE OF COORDINATES - BANKS CHANNEL CENTERLINE NAME NAME NORTHING EASTING I NORTHING I STATION I RANGE SC -1 0.0 2.405.75B.0 221,156.1 0.0 1 0.0 Be-? 2,406,735.3 2,406,057.5 222,557.4 92 2,6.4 TI -5 DA BC -3 2,993.5 2,409,5452 224,617.4 5,2332 223,582.7 0.0 BC -4 TI -8 2,411,829.9 226,186.5 8,005,4 4,992.2 0.0 8C -5 2,411,644.0 2,413,056.6 226,612.1 10,723.1 0,0 0.0 BC -6 2,416,7662 230,992.0 15,132.0 TI -11 0.0 HORIZONTAL COORDINATES ARE REFERENCED TO NAD83 7,9902 24 11 x 17 = HALF SCALE I CERTIFY THAT THESE PLANS ARE IN COMPLIANCE WITH THE APPLICABLE SECTIONS OF TITLE21, CHAPTER 56- CHRISTIAN L_ GIBSON, P_E_ NO- Q26273 DATE erway SHEET 8 SHEET 9 as Atlantic Ocean n WIN SHEET 1 SHEET 11 Beach Fill Area Aw. 4 SHEET SEAL ALIGNMENT TABLE OF COORDINATES - TOPSAIL BEACH BASELINE NAME EASTING NORTHING STATION RANGE TI -3 2,407,034.3 221,236.8 0.0 0.0 TI -4 2,407,663.4 221,755.7 995.1 0.0 TI -5 2,406,735.3 222,276.4 1,993.5 0.0 TI -5 2,409,505.8 222,913.8 2,993.5 0,0 TI -7 2,410,240.0 223,582.7 3,993.2 0.0 TI -8 2,410,949.0 224,295.2 4,992.2 0.0 TI-9 2,411,644.0 N 225,013.0 5,991.3 0,0 TI -10 2,412,350.0 225,719.9 61990.4 0.0 TI -11 2,111,121D 22 456.5 7,9902 0.0 TI -12 2,413,705.3 �_ 227,190.1 8,990.0 0.0 TI -13 2,414,454.5 227,853.9 9,991.0 0.0 TI -14 2,415,166.5 225,557-0 10,989.5 0.0 TI -15 2,415,892.5 229,240.6 11,986.7 0.0 TI -16 2,416,813.3 229,932.2 12,987.6 0.0 TI -17 2,417,330.0 ^ 230.619.1 13,986.7 0.0 TI -18 2,418,060.8 II 231,309.3 14,985.6 0.0 TI -19 2,418,798.5 231,9827 15,984.4 0.0 TI -20 2,419,530.0 to 234662.6 16,983.1 0.0 TI -21 2,42D,237.3 233,368.5 17,982.4 0.0 TI -22 2,420,974.0 234,043.3 18.981.4 0.0 TI -23 2,421,716.3 234,711.4 19,980.1 0.0 TI -24 2,422,463.0 235,375.1 20,9]9.1 0.0 TI -25 0.0 TI -26 2,423,954.5 236,704.6 22,977.1 0.0 TI -26 +839 2,424,580.5 237,263.4 23,816.3 0.0 TI -26 +976 2,424,683.1 237,355.0 23,953.8 0.0 HORIZONTAL COORDINATES ARE REFERENCED TO NAOB3 H U) % E % '+ Co wa Uo i w J 30 dd` r Z W = =N1 itl R o y Q m Ln 0 I < cy- Q J o_,_, Ln Z 0 Q a- O v 0 0 9 C m V7 IZ coo 1A r z C Q j ° = U 00 rN C O a � N aai N N L Q t u) L 7,a o EZ � _ a 3 0}j j s z D� o �_ = n. z a O a m OO 0 13 W N U In _ N L Q , R Z� 4a Z = C a CL m ^ <) O C II In� 1 II da e > m z IZ dM f!7 6 In in to H dn M � 00 % E % '+ m Z Uo i w Z E _' M{LI W - L F dd` r Z W = C C V `a 1R d Q m Ln 0 I < cy- Q J o_,_, Ln Z 0 Q a- O v C m U 1.0 NCO O r z C � C = U 00 rN a � N @7 L Q t u) L z o EZ � _ a 3 D� ON O �_ a 43 v °% a O a Q h t 3 Q 0 13 W N U In > rn _ > 3 D L Q , O O N to 3 % Z = N Q H W u _' M{LI W - L F dd` r Z W = C C V `a 1R d Q m Ln 0 I < cy- Q J o_,_, Ln Z 0 Q a- O v 0 z 41. 11 x 17 = HALF SCALE * ^ I CERTIFY THAT THESE PLANS ARE IN COMPLIANCE WITH THE APPLICABLE SECTIONS OFTITLE21, CHAPTER 56_ SEAL v_N F v y cq o , Shore 5 Line Drive :f , y w ` ' CHRISTIAN L_ GIBSON P_E_ NO- Q26273 DATE Z'v ®W N • ;. / \ 4r R Z Q N N rL U Taps ail Driv j ., c Z , r _ 51 t �' IVA kk. 1 CD w Carolina Bh 'd z o s 0 r IF v a e rl a- fp ti g. ., r ... O O_.�> E Z �� 5 r i {r , rrrr ID W ���jsr _ Spot Blvd 1 O 3 Q IV V7 L 3 C o-o can O • t\ O O rb O t' y T L d LLI � +. �' t N w a v V� O O O X r.. v > LU X H O+ L0 8, 9 W 7 Q ti +10.9 +90 s � Mw = s: �� = > Im 3,3 0,1 Q M g m +1 S,7 +12,5_;,. 11'0 .5 d Q an 3:: 1 +7,4 +5,7 +3,4 m o > +5.7 4' 6 +4.6 +2,4 J Z W ~ + '165 +2.b + 1.6 +0, 8 +0-2 e, ci < I I X +0, 9 +0.3 X +0'3 0.3 �/ 0.7 1.2 5 y cy- 0,2 0.8 1.2 1,6 y F d --J 0.6 1.4 2.4 1,3 1,7 3.1 0 2.3 2,6 3,3 3.9 Z 4 2 4.0 4,4 4.2 o a a 5,3 5 7 6.8 41. 11 x 17 = HALF SCALE 0 11 x 17 = HALF SCALE JV I CERTIFY THAT THESE PLANS ARE IN COMPLIANCE WITH SEAL N L5 3 co THE APPLICABLE SECTIONS OFTITLE21, CHAPTER 56_ « -am 0 0 u R o y O N M > m y c CHRISTIAN L GIBSON, P_E_ NO- D26273 DATE C O P ®W ai N N N J L = d m • I �� � i .+[ -.. ■ _ ■ � • � � ■ s' � 3 - y a Y.. Lam-.. I r' CJ � 3 ao \ OI Q m O arolina Bh d CL E �Y M1 OI Carolina Blvd w L ' w •. �ti4 LL I '; .F S i j ^ ,• A- -_tom i `rte_ dn Q Q N i Z Z UO t m \ S. ,:p CL N o Ande an Blvd`° T k� 0 k y _ �j O Il °' i 2 r O ti CD AE W�c�n �D` M lei � # 'Z 3 e y z v Ocean Blvd X D N o w Jai 1 NON LQ c W LU 8.9 ' -_ sad ,�__ +10.0 +7;9 ❑ > m 3,3 rM1 +15,2 I } +5.7 +7.4 0.1 1 _ ,,��„�...... _ +5,5 ti +4.5 +3 0 +2.0 +3.1 1.1 +3.4 +2.4 +1,9 +1.1 + 0.5 +1.6 +0, 4 0.9 +0,2 0.6 01,4 W U �6 1.6 Q I m 2.4 310 3.3 14: I? J o\ 2,4 2.9 3.9 W d Q I 3, 3.4 3.8 4.3 5.1 - s-- m .1 n o > ' 3.9 4.4 5.7 N?3 J Z W er ~ Z 4,2 4,9 5.5 6.5 7.4 8.1 W Q ° I Q an I 5.7 .6 6 7.9 8,6 9.5 _ h �i ti L d y a Cy- 7.7 8.8 90 8,9 0 y Q 83 9.2 9.1 H d � 8,4 X 9.1 8, 9.1 9,0 8'9 Q Z SA 8, 8 8. 9'9 8.6 9.2 9,4 9.7 10.1 9.4 9,7 10,4 1D,4 Y �1 0 11 x 17 = HALF SCALE ►Z/ 11 x 17 = HALF SCALE I CERTIFY THAT THESE PLANS ARE IN COMPLIANCE WITH SEAL L5 co THE APPLICABLE SECTIONS OF TITLE21, CHAPTER 56_ v ie1.o'i o v 9 N M m N C In rt �' L i CHRISTIAN L_ GIBSON, P_E_ NO- Q26273 DATE m H s 4 otl j t z o IL z M Z c Q m N rL CL • Channel Blvd dM (n ooV) r a Carolina Blvd L (, a .r st Q Carolina Blvd •. .,' Y t ' tit~ M c ¢va, l ry U Z % - $ 3 O • A• • ; l ; �I - + , r r I ` Q U ~ _ ,_� 'y. /U Al ^ l.:i•JW. S^` '40 l �' �� � �tii a Mme Z C O -.E Z r s r ..__ i Blvd � �� p, S. Anderson Blvd � k O p g. An�erson `7 k� O p O k� O 0 . i } O O �� Qti j 1 Er O_ -IT [� O S� o v a O } _ + 1 O' .(r \ lJ Q, V TTY J ■' I �., ' -�J Y I U E ` t Q 1 L0 Blvd tQ o a ca Ocean ❑ Ocean Blvd ° .aR /X[[ i_ ' •r �• y f �- +1tb l �I R ■ ■! \x/ +17.3 m E{ p �L w N o ° t W { +6.9 . r �,1. r7i +13,B +10,5 3 �o� �rnp CL j r +15,8 f +7.4 y V 1 +7.2 a%i N.2 N > Q p t9,0 +6.3 +5.4 +5.1 +3.8 z =» in a +4.2 +4,9 +2.9 +2,6 +3.7 +1.9 +1.5 +2.4 +1.2 +07 +1.4 +0.7 +0.6 +0.0 +0.0 0.5 +0.0 0.5 0.5 1.0 1,0 F 1.0 1.4 1.6 �ry 2.0 2.8 / \ 2.4 3,1 3,4 3.2 3.6 N 3.7 0 m 3.7 3.9 4.2 a 19 o 4.1 4.4 '^ 4.4 {V d 4.9 5.2 5.5 m n 68 72 7.5 8.0 8.0 8. D J Z - LC � U ~ I o Q W 8,3 8.5 8.6 8.5 w 8.8 = Q G ° a [L �I y_ 9,2 9,2 9.2 9.3 _ 9.2 9.3 9.3 � � m J X 9,2 9,3 9,3 9.2 9.5 9.6 Z 9 5 9.8 9 7 10.0 1 0,0 10.3 ,, 10.1 10.3 10.5 11.0 10.6 11.5 1 8 "� 12.2 " 11,8 12,5 ti 12, 13,0 13.1 ►Z/ 11 x 17 = HALF SCALE 28 11 x 17 = HALF SCALE I CERTIFY THAT THESE PLANS ARE IN COMPLIANCE WITH SEAL L5 co THE APPLICABLE SECTIONS OF TITLE21, CHAPTER 56- o y 0 ML N M 0 ML m N C [D N o v o m m d CHRISTIAN L- GIBSON, P-E- NO- Q26273 DATE C O m H ai N s to t z dz r o m S O N ' gal s �-- � k Ch annel Blvd Ib _ C'4 CL o 1 . 7 r�y - G Jkl p •p 6 �, arol in a Blvd Q Carolina Blvd 41116 a r € - Q / / r 1 F ,.., a r' '. ❑ i r. 1� If k 'IX - W . x AE 0 O J�` � Blvd o ° p p nerson Blvd F� z • S. Anderson �; 0 Q �a � r^� y O O 'DOT ��j CD O k�� � V O o ` O / + ' + � + V � ° cw i S c o � � .► o v o L � 00 Ocean Blvd E a Ocean Blvd LUa o e WW V 7 ' 1 X \ F +13.6 J X V/ W C] U 1 ''; \/ j� - /\ +17,3 +15,9 l X t m E{ w JE D 3 a' ` N o o +17,3 �� •�i ._,.. M1 �. iE ia' :y- •_ r. �� - +16,9 - +14.2 ! # T +12.4 N 6 m m Q h t z +10.5 +7.2 ~ +8.3 +6.7 IX W W U > m +12,0 I +11.8 4� +8,0 N "' > a o +5.1 +5.2 +6.8 5.6 ++3.7 z =» In � a +3.8 +4.3 +5.2 +2.6 +3.2 +4.1 +2,0 +1.5 +2.1 +3.1 +1.0 +0.7 +0.0 +1.3 +0.7 +2.1 +1.4 +0.2 0.3 0.5 +0.1 +0.7 +0 0.9 1.0 0.5 .9 3 1,4 ~ 1,6 1.4 0.8 .4 2 2.4 2.9 X 1.9 2X 1.6 2.1 /� 2.7 X W _ U 3.7 3.8 3.4 ' Q Q °° 2.9 4.3 4.2 4.0 4,4 3.3 3.8 4.5 a I? 4.4 4,9 W d ci Q 5,5 5.0 5.5 4.3 4.9 5.1 5.8 m n 6.7 8.0 6.3 5.6 `N_ 6,6 Z 8,05 .2 8,3 6,6 7.5 8,0 A N!I el I z Q o 8.8 IL I 9.1 9,0 8.3 8.7 U- 9.2 9.6 = 9,2 9,3 9,3 X 9.2 9,3 9.5 8.9 9.3 9.9 10.3 X d 9,4 9.5 9,8 1 0 8 9.5 9.6 9.6 9.7 10.0 10,2 >. 11,0 m Q 10,0 10.3 10,0 10,4 10.4 1 1.3 Z 10.6 10.7 10.3 10.9 11.6 128 11,8 11.6 11 5 12,4 12.5 13,1 12,2 13,2 + 1l 1.9 ro? 12.8 13.3 28 11 x 17 = HALF SCALE 04-1 11 x 17 = HALF SCALE + ? ! 4 �' � v i ■i 7 I CERTIFY THAT THESE PLANS ARE IN COMPLIANCE WITH SEAL THE APPLICABLE SECTIONS OFTITLE21, CHAPTER 56_ No=- •tl O L5 m 3: co N 11 C,14 m W t ei �" IF - Bridgers Ave CHRISTIANLGIBSON,P- E- NO- D26273 DATE Z'v ®W N " er Ave ,dry S er1d� 4: t ,/� -01 31j i 7 = Z E a Cj y y a j Y, v A �P 1 a • f Q a i <C 3 m m m cp p II Q _ - . ' ' � t _] � a L 1 ._ _ >� I ity �. oC _ .�, � o o In EL .❑ IWO .Y .k .„ ,� 3 3 k�O • O O ��'k� O S. Anderson Blvd O 4J O �o Q0 v o a • # �Q�' � ��� N LO m U p O p LID O ��D` Q/ N L r CD m I 4. U N Land and Extent +16.5 +19. p 0 a p to 0 +17,0 of Fill +18,8 +18,5 +17,1 1 +14.5 Ez 3 +15.8 +13.6 +12.7 + !+ 4, m E r w +15.1 +7,1 +5.1 +3,4 Fill Area See Cross Sections +3.3 6 v m Q h t W +4,5 +2.6 +1.1 +0.3 3 IZ 2In > p N = a `- +0.5 0.0 0.7 z =» N Q +0.6 �ti 0,2 Seaward Crest 0.6 1.2 0,8 Berm (5.0' NAVD 10 1;4 2.6 1.3 1.8 1,9 2.5 2.7 3.2 3.1 Seaward Toe 2,9 0 3.6 3.8 of Fill 3.4 4,2 ca 4.0 4,3 F X W v 4.0 4,1 6. m 3 7 Q 4.6 5.7 656 7.4 7,3 7.9 ._ I? Jig J on 7.9 8'4 6.8 m {Y c m H Ln 8.4 9.0 9,0 9.5 9.1 W a 9,3 N J Z o � > o 9.3 9.6 9.3 9.4 9.5 LU a z I .8 10,1 9.5 9,i 9.9 ni = ti a I� 10.2 10.3 9.5 9.7 9.9 10.1 d Q o= X 10,6 x 10.2 10,6 x 10 8 H d 10.6 10,8 10,6 11.1 11.6 12.2 Q -i 11.0 11.2 11.8 12,3 12,8 Z 11,6 12.1 12,9 13.6 13.6 14.3 12,6 13.2 14.3 15.1 14.9 �ry 15.5 1 14 , �? 1 tiz 7, 16.4 ti 1 0 04-1 11 x 17 = HALF SCALE KI17 11 x 17 = HALF SCALE ! :Y ,, , I CERTIFY THAT THESE PLANS ARE IN COMPLIANCE WITH THE APPLICABLE SECTIONS OFTITLE21, CHAPTER 56_ SEAL L5 v co •F.,� v_N H o -30 0 •� 1_` CHRISTIAN L_ GIBSON, P_E_ NO- Q26273 DATE o C Cci �in H a�i N s N m Af o 111 } r t d =z i cV N m m d O d9 @t 3 a c m S Ave c u j•�!] i Monroe Ln w CD 0 0 0 0 �I 1 v J� i'i x ����%% z! q a Q o s r/ �T/ !� S. Anderson Blvd M Qj (+r) H2 m U G O r r -R r rN. Anderson Blvd a� > o +1 Landward Extent ` U N + ,2 1 +18,2 +17,5 of Fill •p itr � +TM4 w a ON`1 i +17.8 +15.7 +15.4 +14.0 +19,7 +16,1 z° e t7 . +7-9 +12.9 + ° +4.8 Fill Area See Cross Sections +5.3 +3.9 +5,2 0 =°' ° +3. +1.6 +3.4 4 o o °m Q h F- a +'-/ 0.9 +0.2 +0.8 +0.2 Seaward Crest + 1.0 +0,3 cL 0 0 > rn N V Ln > Q D 0,4 0.8 0.6 1.1 of Berm (5.0' NAVD) 0,4 0.9 0 o `w vn 3 `m 1.3 1.6 1.3 2.3 H 2;° Seaward Toe 2.2 a 2.7 2. 9 p of Fill 3.2 �ry a� Ch 3.7 co 4.1 3.9 T 4.1 4,1 F 4'9 5.2 W 76 6.1 6.3 ' = Q m , 5 88 7,5 0.0 7,2 8.5 az C) .1 � 8,5 8,6 8,7 {a d � 8,7 8.9 8.8 9,2 8,9 9.1 X m n Ln r W 9.1 9.3 9,4 W N > o 9.2 9.3 9.8 1 0.0 9 8 9,9 {Y Q Q to 9.4 9,6 10.2 10.5 10.0 10.3 H = X 9.9 10.2 10.6 X 10.7 11,1 x 11,4 / \ 10.6 11.1 L d y Q Q 11.1 11.8 11.4 11.6 F J 11.7 12.2 12.3 -i 12.4 12.8 12.8 O 13.1 13.3 13.3 13.6 14.0 13.9 Z 14.6 14.7 14,7 15.1 15.4 15.4 16.0 16.0 16.2 16.7 16.7 16.8 17.6 17.4 a2 17, 18.2 18.1 1 B, KI17 11 x 17 = HALF SCALE Kill 11 x 17 = HALF SCALE �3z , I CERTIFY THAT THESE PLANS ARE IN COMPLIANCE WITH THE APPLICABLE SECTIONS OF TITLE21, CHAPTER 56- SEAL L co ' �. 'if *a I . •..7 ak tl 3 M Cos. m y C a rn aJa ^ Rr _ CHRISTIAN L- GIBSON, P-E- NO- Q26273 DATE CO m u H d N s N T m • • .y, m Li � i Z Q N N y G .. .may Q}►. h.. +f CL L L75 -. 'i 3 � e. 1 �I H�4 O O II � r J v o cnn In dn Zx °o om • �.� • Z O .E m + o x`Lp� o X02 0 o x o 1 + q s s s ,y ^J C a C vv 41 Ali N. And rson Blvd r = o v c e o ° N +19.7 Landward Extent. k +16,1 + +z.9 +16.0 of Fill •- E 3 +11,0 X +1.7 m + 5.2 +12.4 3� o +3.4 + 3,8 Fill Area +2,4 See Cross Sections 15 +3.0 ° C-4 ° w ° T m ° € v m Q y t a +l.o Y2 0 O? � a N "In D M +0,3 +0.4 0.4 0.2 +0.1 0,7 z = 6" In a 10.3 1.0 Seaward Crest 2,2 1'S of Berm (5.0' NAV ) 1,7 2.3 2.2 3.2 Cl 3,0 ry 3,0 3.9 N 3i9 Seaward Toe o 4,1 T X 4,3 of Fill X 3.9 H 4.2 V 5,2 W u 77 7 m 822 8.5 8.1 7.4 82 B,5 a o 8.7 B,9 8.4 8.8 8.8 d ::: r 1 9,1 9.0 9.1 W m r. n Ln awl J ZC > 98 9.3 9.4 9. �ti G I Q P 10.0 10.3 9,6 9.7 9,8 = aI 1 0.6 11.1 X 9.B \ / 10.1 x X 9.9 10.1 X d y_ Q 11,4 11,6 10.9 10,9 10,7 F Z d J 12.3 11,4 11.1 13,3 11.9 12.5 12.1 N 2 O " 13.9 13.1 Z 14.7 13,4 15.4 14.1 16,2 15,2 14,6 16,8 17, y 16 0 0 16,7 ti 15,6 z 16.1 18, 17.3 16.8 Kill 11 x 17 = HALF SCALE '4% 11 x 17 = HALF SCALE I CERTIFY THAT THESE PLANS ARE IN COMPLIANCE WITH SEAL L5 3 co cq �i THE APPLICABLE SECTIONS OF TITLE21, CHAPTER 56- « o* m -am itl 0 0 R o M 9a^r�n m V1 c o N c ai N t CHRISTIAN L- GIBSON, P-E- NO- Q26273 DATE Z'v f 2 m o L� N ti a X o}i j z G d z o m OO Li 8 N i Z c N £ , Q N O o r CLa 8 m o u i• `r o) m S ° .3 h ' ;r r t in J \ - E 3 3 E m . LPL �'••f - {� (�■� Q` Y.•• }a ■ z AE E m 1 - k O CL In .� .1 O O Z • U a •c0i W �` -V O r �j(7 O 1M� �yX c1 r1 a $j r O CD n� CD = o N. Anderson Blvd V LID r O to c�wa o I I { t X Lan and Extent X +i8 o of Fill 16.7 mr ° w p m ti 7 +15,0 i i 3 J r ` w N 6 °' I +4,6 } +15,9 o�m -Wt +2,9 +0,9 +4,6 +3,0 Fill Area See Cross Sections +15,9 +8,8 CL rn u N N L Q 6 o �� V +0'3 +3,3 3 Q V---S +0,7 0,7 Crest +0,1 12 of Berm (5.0' NAVD) 0.9 +0.5 1.7 2.3 2, 8 " �, Seaward Toe 2.4 1.6 X 3,4 0 of Fill 3,1 Ln X 2.0 V 3,8 r 4.1 3,9 a 3 2 W U 4,3 y 3.7 = 7 LU m 7. 5 5 4,2 a I? 7,6 d W 8,2 8,4 7,4 m r. n y 8,4 8,8 8,6 8,8 8,0 8.4 o > 8,9 8,9 . 8,6 W W Q C I Q 8.8 8, 9 8,9 8.6 8,6 G ci = L I 8,9 9,0 X 8, X 8.7 d y a cy- Q 9,4 9,8 9,f7 ` 9,3 8,6 8,5 so m F d J J 9,7 9'9 8,6 8'9 1 0,8 10.3 9,1 11,9 11.0 11.3 9,6 10,1 Z 12,6 13, 3 1 2,8 1 14,2 1�1 13,6 11,9 y 14,8 y� 14,3 15,3 " " 12,4 13,2 15. 16.1 14,0 '4% 11 x 17 = HALF SCALE 33 11 x 17 = HALF SCALE C " gb w ' I CERTIFY THAT THESE PLANS ARE IN COMPLIANCE WITH SEAL 1 ' L5 3 co cq X \/ �( cti X Ah THE APPLICABLE SECTIONS OF TITLE21, CHAPTER 56_ .2 4 �RvM tl s. > O] y m 1 CO ai N t CHRISTIAN L_ GIBSON, P_E_ NO- Q26273 DATE Z'v ® W N m of j s z o G d z _ z N m M V1 CL o a a _ ' Ill Ill � a a m Q •L - -_ - Qi -.. 3 G] C J .r ap 00 w < 3 - �� t .. U - •. y - � E M � N I- m w x � a a3 0 c k-J�• C��J avi w LL pz AE o CDN C r I f �� �_ - + �i �j o o p ' N N N N �, X z �� � X X N N M I ,a �� S N ar ] a �eo ° ` _ U N p Landward„-`, w U Extent ��U of Fill +17.8 LU _ Z- e + +9.2 �s +15,3 + .1¢ U EZ a'p o Fill Area See ro Sections +3.9 j 3.2 ,2 U , +5.0 +9.1 > ov T Q h L € v m a +0.8 +D.0 +2.6 +1.1 +5,6 +3,2 a 0 0 > , M N L a ward Crest +0.5 +1,6 +0,6 12 erm (5. 0' VAVD 1.9 X X X FT LO Te 1.0 0 9 2.4 2.5 2.1 Seaward Toe z 1.9 of Fill 3.7 -z 3,0 2.8 4.0 3.7 3.5 ~ 5.7 50 4.0 W v 0 6.8 7.8 7.0 4,7 5.4 tie = 7 Ld 8.5 7,7 V 'g m W N 8,7 8.4 8 756 a X 8.9 8.9 X X 8.6 . X 5 8 , 6 8.8 d ci LLI m r. Q n I L j 9.0 8.7 9 o > 8,9 8,8 8,6 8.5 9.0 W �' z Q 8.8 8.5 8 7 2 a a I I 8.9 9.4 8,3 8.4 8,9 d y �, Q 9.6 8,9 9,1 Q 10,1 10,7 9.2 9.6 1031 a. C Iwo eg J 11.6 9.9 10.6 12,6 101.2 10.8 11.5 0 13.2 40 126 12,1 Z X14,7 15.2 x 13.3 14,1 12.9 14,1 tie 15.9 16, � �� 14.8 1 48 9 167 33 11 x 17 = HALF SCALE 34 11 x 17 = HALF SCALE � e v I CERTIFY THAT THESE PLANS ARE IN COMPLIANCE WITH THE APPLICABLE SECTIONS OFTITLE21,CHAPTER56_ SEAL co X TOW1 Line n n 5 1� oN'i A o 0 O ^ m c coo aJ ms I COm aai N t N CHRISTIAN L_ GIBSON, P_E_ NO- Q26273 DATE mef N 0}j j s z n. z 0 o m c - IE Z� Q N ' O m O II } ri + [ w - •. J [� @ co a by ' dn 3 3 M y - m cr i CL co CD �J � S s-; F O i O z O O ro M 4� ••� N !�. U (� cy w N 9 .1 E N Q a 1 4 r _ V l + 23,2 +16,2 U LL=1 W +173 +21,7: a -, 03�0o a +9,1 c° m Q°, t a +3.2 8,8 , I �; N -N >' o +1.6 +0,6 X +2,4 +1.0 X �/ /� z =» In a 0,1 0.9 +0.0 2.1 1 ,1 1.9 2,D 1.9 1.7 2.8 2.3 3.5 2.8 4,0 3.9 W u 4,7 5.4 5.4 = 7 co 6.2 m 7 96 s.o Q M ) 8.5 g �y X X W Ln Ln .8 g 77 m Z o e 90 9.8 a CWC ; ' Q ° 8,9 9.1 9.0 G a w 23 9.1 a :c c"' 9,3 9.7 d J 10,1 10.6 10.3 10.8 10.6 Q 11.5 12,1 11.2 1 Z 12.9 X 1 \/ n 12, 13,0 ,0 1 13.7 14.5 tie 16,1 15.1 15.8 34 11 x 17 = HALF SCALE `).1 11 x 17 = HALF SCALE VERTICAL CONTRUCTION TOLERANCE _ +/- 0 FT I THAT THESE PLANS 16H SEAL U co -5 TCERTIFY HE APPLICABLE SECT ONSAOFTrr EO21,CHAPTER _ 30 099 +91.0 08/29/2011 3oA 30 129 +87.8 D8/29/2011 3130 30 U p 3 M M % c M -0 -0 -0 O Haywood Ave Bridgers Ave as C al n d N t N CHRISTIAN L- GIBSON, P- E- NO- 026273 DATE t U 20.0 20.0 20.0 20.0 20.0 o}i Z t z o 159 +84.4 08/29/2011 o z o m " Gaye Ave = o °w rL 10.0 10.0 10.0 - - - - - -- 10.0 10.0 0.0 I a a m 3 O - +5.0' d O m U � � N MHW Tie in at +5.0' �+5. Tie in at +_ 5.0 a m Z Q _ _ _ _ - --- ---- ------- 7_- 25 '2s - 3 3 o 6 6 ) -10 -0 -10A -10 -0 -100 -10 -0 as a dn M % E m -20.0 -20.0 -20.0 -20.0 -20.0 -zo.o o z - m 100 200 300 400 500 600 700 800 900 200 J00 400 500 600 700 900 100 200 300 400 500 600 700 800 900 Z O t + Z Z H scale 1" = 100' V scale 1" = fa' vertical Datum NAV089 le- H scale 1" _ '100' V stole 1" = f0' eol vertical Datum NAVC88 H scale 1" = 100' V scale 1" = fa' Vertml Datum : NAV0.08 ! % � i 30.0 093 +90 - 08/2 -9/201 1 30.0 30.0 119 +88:7- 08/29/2011 30.0 30.0 149 +85:6 08/29/2011 30.0 01 c o Davis Ave Rocky Mt Ave Canady Ave a a y m O C r a� 4 v � C 20 -0 200 20 -0 - 200 20 -0 200 _ O E U O % @7 U � G t L Q O 2 t C7 w w 10.0 10.0 10.0 - - - - 10.0 1010 - - - - - - - - - - - - - - - - - 10.0 O t O c O II Tie in Tie in MHW - - - - - - - - MHW at +5.D' - - - - - - MMN a{ +5 -0' N $ = 0.0 0.0 0.0 f 5e t ().a 0.0 e 0.o g - - z s MLW - O_ h E 0 > 13 > M IN U N D 3 a%1 i Q e O O N n c -10 -0 -10A -10 -0 -100 -10-0 -10 -0 Z = � � . A N -20 -0 100 200 300 400 500 600 700 800 900 -20D -20 -0 100 200 300 400 500 600 700 800 900 -20A -20 -0 100 200 300 400 500 600 700 800 900 -20 -0 H Scale 1" - 100' V Scale 1' - 1D' Vertical Datum NAVD88 H Scale 1' - 100' V Scale : 1" - 10' Vertical Datum NAVD88 H Stole 1' - 100' V Scale 1" - 10' Vertical Datum NAVD88 30.0 085 +90 08/29/201 1 30.0 30.0 1D94-89.5 D8/29/2011 30.0 30.0 139 +88.7 D8/29/2011 30.0 Crews Ave Pearson Ave Monroe Ln W U Jolly Roger Fishing Pier Z � 00 ••LLB' _ C) .� m + 20.0 20.0 20.0 20.0 20.0 20,0 J Z W d m H r. n 100 100 100 100 10-0 - - - - - - - - - - - - - - 100 z C) V. O - W I Q„ - e +5 -0' +5 0' - - in /i MHW MH* ' at +5.0 00 - - - - - - - - 00 00 - - - - @ - - 0-0 0 -Te - s7 - - - - - 00 i] = Cil fy- 00 - 7?$ -0 L CY Iwo � d J -10.0 -10.0 -10.0 -10.0 -1D.o -10.0 z -20.0 -20.0 -20.0 -20.0 -20.0 -20.0 100 200 300 400 500 600 700 800 900 100 200 300 400 500 600 700 800 900 100 200 300 400 500 600 700 800 90 0 H Scale : 1- = 100' V Scale 1• = 10' Vertical Datum NAVD88 H Scale : 1" = 100' V Stole 1" = 10' Vertical Datum MVD86 H Scale : 1• = 100' V Scale 1" = 10' Vert-ml Datum NAVDBB `).1 11 x 17 = HALF SCALE ,411 11 x 17 = HALF SCALE VERTICAL CONTRUCTION TOLERANCE _ +/- 0 FT I THAT THESE PLANS 16H SEAL U DO -5 TCERTIFY HE APPLICABLE SECT ONSAOFTrr EO21,CHAPTER _ 30 -0 189 +81.4 DB/29/2011 313.0 30 -0 219 +78.1 08/29/2011 313.0 V H W G o M % C O Nixon Ave Beechwood Dr °a N CHRISTIAN L- GIBSON, P- E- NO- D26273 DATE m U 20.0 20.0 20.0 20.0 m� <8 o c Q C-4 % j- rL 10.0 - - - 10.0 10.0 10.0 V' 3 ao p1 H a a m 3 O Te i - +5.0' d o m U E o U) at +5.0' o % MHW b Am 00 e m a ALW - - - - - - - - - - - - - - - m 3 •3 m � 6 6 ) -10 -0 -10A -10 -0 -100 mai a dn M ;,.. % E m -20.0 -20.0 -2010 -20.0 o z Q :;-- - m 0 loo zoo 300 400 s00 600 700 0 80 0 100 2130 300 400 800 600 700 Boo Z I= O t + Z Z H scale 1° _ '100 V scale 1" = f0' vertical Datum NAVOStI H scale 1° _ '100' V stole 1" = f0' vertical Datum NAVC88 % � i 30.0 179 +82.4 D8/29/2011 30.0 30.0 209 +79.1 - 08/29/2011 30.0 30.0 239 +53.8 08/29/2011 30.0 01 c Bare Foot Ln Catherine Ave Crutchfield Ave m 1.0 o y m � O C a� 4 v � C 20 -0 200 20 -0 200 20 -0 200 _ O E U O % @7 t lin L Q O 2 L C7 a2 10.0 10.0 10.0 10.0 O t T- +5.0' Tie 1n +5.0' +5.0' z 5 MHW at +5.0' - - - - MH* - - - - - MMN - - - - - - - 0 [� O N 0.0 " 7.25 0.0 13.13 a 1.2s a.o o.D 13.13 _ a s m 0 0 > 3 0" D M a%1 N > i Q e O O N n -10 -0 -1DA -10 -0 -1130 -10-0 -10 -0 Z = � � . A N -20 -0 0 100 200 300 400 500 600 700 800 -20.0 -20 -0 0 100 200 300 400 500 600 700 800 -20.0 -20 -0 0 100 200 300 400 500 600 700 800 -20 -0 H Scale 1" - 100 V Scale 1° - 1D' Vertical Datum NAVD88 H Stole 1' - 100' V Scae : 1" - 10' Vertical Datum NAVD88 H Stole 1° - 100' V Scale 1" - 10' Vertical Datum NAVD88 30.0 169 +83.1 DB/29/2011 30.0 30.0 201 +00.D 08/29/2011 30.0 30.0 229 +77.1 08/29/2011 30.0 N- Anderson Blvd Sidbury Ave Humphrey Ave W U P� Q U-) c_ .� m + 20.0 20.0 20.0 20.0 20.13 20.0 � Q d oc'� W m H 10 -0 100 10 -0 100 10 -0 100 J Z 0 V� V-1 03J W I 00 Tie in Tie in - +5 -0' at + at +5 -0' p VHW - - - - - - - - - - - - - - - - - 1A i] Cai.J CD o -o 0 -0 0 -o e i 25 a -o o -o a -o W � -2 o C F d J J 0 -10.0 -10.0 -10.0 -10.0 -1D.0 -10.0 z -20.0 -20.0 -20.0 -20.0 -20.0 -20.0 0 10D 200 300 400 500 600 700 800 0 100 200 300 400 500 600 700 800 0 100 200 300 400 500 600 700 000 H Smle 1- = 100' V Stole 1" = 10' Vertiml Datum : NAVD88 H Stole 1" = 100' V Scale 1" = 10' Vertiml Datum MVMB H Scale 1" = 100' V Scale 1" = 10' Vertml Datum NAVDBB ,411 11 x 17 = HALF SCALE ilFA 11 x 17 = HALF SCALE 1 CERTIFY THAT THESE PLANS ARE IN COMPLIANCE WITH SEAL N L Go �` THE APPLICABLESEGTIONS0FTffLE21 o U F7 Ati ,CHAPTER56_ _� 3 o wO M L d O O m c i2 H�oo ° T69 `6 Q' J m O yT° c ci 4a100 7c -11 NS CHRISTIAN L_ GIBSON, P_E_N0_Q26273 DATE Z'v ®H N N $ ME NMENT TABLE COORDINATES TOPSAIL CROK CENITERL�GE ' ? U NORTMING � = d o O m TC -1 2,400,539.6 TC-2 2,400,798.7 224,554.4 224,289.0 0.0 370.9 0.0 0.0 _ "'4y,0o 61 Z C4 O _- N TC-3 2,400.994.8 2,401.1739 224,213.7 224,209B 581.0 0.0 \x/ VOLUME TABLULATIONS `S £ \ O CL TG-4 TC -5 2,401,525.3 224,357.4 760.1 1,141.6 0.0 010 - - 7C- 12 / \ AREA, GRADE C9 3 M O ~ TC -6 2,402,043.9 224,355.1 1,6602 0.0 i -ion' MLW O N o TC -7 2,402,266.4 TC -8 2.402.2802 224,2063 223,9309 1.933.6 2,209.3 0.0 010 TC -R1 -Lt TOPSAIL CREEK 52.850 -10.0' d CL 0 tD 1- " TC -9 2,402,184.5 TC -10 2,401,954.9 223,633.9 223,3513 2,521.3 2,885.5 0.0 0,0 35100 NEW TD AIL INLET 90,750 -9,0, MLW O O > C Z 1 TG-11 2,401,845.4 223,0742 3,183.4 0.0 V 0' BANKS CHANNEL 9,880 0 * in m TC -12 2,401,867.8 222,831.9 3,426.8 0 .0 //�` 36 +00 > S c TC -13 2,402,191.1 222,403.1 3,963.9 0.0 TOTAL MATERIAL AVAL I-E 153,480 3 m 3 3 TC -14 2,403,007.9 TC -15 2,403,640.5 222,2205 222,150.3 4,8009 5,437.4 010 0.0 ODPNTfTIES ARE EKPRESSm IN CUBIC YARDS in L In in TC -16 2,403,522.7 221,947.8 5,709.7 0.0 37 +00 fn 1n TG -17 2,403,867.6 221,8529 5,814.8 0.0 TG -4.2 w TG -18 2,403,897.7 221,704.1 5,866.6 010 TC -19 2,403,793.3 TC -20 2,403,664.0 221,49 &4 221,3359 6,197.3 6,904.9 0.0 0.0 38 +00 3 TG-21 2,403,567.7 221,223.6 6,552.8 0.0 �_ TC -22 2,403,314.0 221,049.3 6,860.6 0.0 39100 E i TC-23 2,4.02.86 1.6 220 503.7 7,7110 0.0 TG13 \ / X 3 y d M a HORIZONTAL COORDINATES ARE REFERENCED TD NA083 7C -L3 / \ O c 0 O O O o Z' z 3 Q x x K 39 TC -R2 Z o� N 8 X ALIGNMENT TABLE OF CODR0INATES - TOPSAIL CREEK ORE3GE TOES p 50 D" O c m j M U f NAME LEFT TOE EASTING NORTHING NAME RIGHT TOE EASTING NORTHING pA C N Q r n TC -1-1 2,401,943.7 222,797.5 TC -R1 2,401,879.8 222,749.3 N y TC -4.2 TC -4.3 2,4.02,124.3 222,558.0 2.402,444 0 TC -R2 TC -R3 2,602,168.1 222,3872 T -113 0 mr`1 C y 3 G O TC -L4 2, 403,025.2 222,324.2 TC -R4 2,402,997.2 222,176.7 b7r� Nv m TC -L5 2, 403,091.5 222,25 0.3 TC -R5 2,403,51 &5 222,107.5 AAl1 TG -L6 2,403,911.1 222,006.6 8.0 221,86.2 TG -R6 2,403,784.8 b 4j TC -4.7 TC -L8 2,44,007.0 221,689.1 TC -R8 ,03,2 2,403,850.5 221,710.5 - C c O 13 TC -L9 2,40.3,874.2 221,430.5 TC -R9 2,403,756.1 221,5245 bA� TC_Ly j a N a' t _ HORIZONTAL COORDINATES ARE REFERENCED TO NAD83 X be 6 J CA Q X OC T� C ow 50' IZ O F a � 3 m O bQ L T 0 O Q E L 'V� h TGL5 Cl U a W N O N ` U. C po O O N V7 3 67 N � ❑ Q o° rGRLS 55 +00 d a X yb 56100 TG -R6 57+00 TC -R7 TC -4.6 s 1 1 Y TG TC -L7 I V W � LLJ +� g o + + B B g N o TG-RD � -) o ` N s9,.� J TG49 rC -4.6 U o J TIC-72 Tr 20 TC -23 v2 TOP AIL C0. EK CE TERLIN LU L Z 50' _ y Q Q T -21 7G -L9 m . I-- (, J W Q LLJ L 0 ° J X o d o Lv o ° z ilFA 11 x 17 = HALF SCALE 38 11 x 17 = HALF SCALE �` g 8 I CERTIFY THAT THESE PLANS ARE IN COMPLIANCE WITH / SEAL N o L ° co F7 ° THEAPPLICABLE SECTIONS OF 1 o - 3 o wO ° u R0, M a m c co X ✓° N NGO a ° M N CL 9 J O 17 VOLUME TABLUTATIONS AREa GRADE �?" ♦ 00 S yT $ CHRISTIAN L. GIBSON, P.E. NO. Q26273 DATE Ib v O C,4 N -10.0' MLW TOPSAIL CREEK 52,850 3 Y 1g• J t z 6 r a NEW TOPSAL INLET 90,750 = z O C4 m m -9.0' MLW BANKS CHANNEL 9,880 q7, 3 a / "S N £ O \ \ M N O ~ TOTAL MATERIAL AVAILABLE 153,480 � a o gLIAN "ES ARE E<PRESSED IN CUBIC YARDS._ 35 +00 N m - ^��'. ^� 36 +00 - NN�1N- �r�w�S.:,N.t N^ a 0 * a C >' m m E O C II 3 3 3 37=N N- NM"+ryY�N in N to in VD Noyy,OU?(II .n 39100 ^NrvNN�ko i a fi ?s S X 3 N a DO - S Q QQ a Z z 3 �.r63 ss'�V27 aP .2 x K AE ` O r , Z �10. 7 fF e� tF' d M W C n N♦ � m •-� C rn 7 s V1 v m phi s 4j dA `rte �e ?° o 3 a 6 ON a t _ d ' N Q db C7 X 0o •O O O C T z C Z 6 O 01 S E 3 nq 03 O p 0 a p O j U p X OJ S• NON G e" Z = N ❑ 1 y2 ae"I� 0 rkNl� -Y1M °- P .6 f� m Nj7+00 7 SB +00 �ryb LJ 45 {OO c W Ld 75 s. m ' S z 68 6.5 .9 .0 4Z$Zyb$ ] 1).• 14.9 1 3(� ° t ]3. ]129 1]4.71[]q�.e 4'3 6$0 6. 1 4�cn; 1 7119 1 B L 17 N 11 6 116 �, 1 J 7Ai J fa 4 1 .9 ♦ 9 1 b 1 1 19 tQqpq f}1{ 737 14.0 14 13 1 13 .3 ]2. �].BD1317 6 1172,9�b 12 la 73 7. I 5 ]6. 188 9' 9 1 7.4 1 2 1 fi 7J t 197 -6 +1 •9 ig' LB•g �l. � a 75. L 4 0 1 L 3� ] 1 11 1 1 2 55 °5y )7 W _ v2 0- y, p �. S� O2 q �` # Z9 ]g,4 13. ] t j 7 .e i4 .1 .9 12. '5 14 1 9 O 9 c ° " ' 1 ° ♦� ��7r_ b 3� i23A y '143j ` '11 ♦j 1.D it s 5.9 '1 1 ♦9 � j. 68 5.3 +1.] 112 +p 77 +0.8 r0.2 `$" ° 7. 1 217 113.31` 11 b 2 �26 l4� 1 9 3.2 I1 q0 L ] l39 y 6• 3 T �9 � � ♦• .3 t0.9 OLf�fAp1 X034. 1111 ]]111 _ Lid � e .',l ♦� ♦l'9D$ i♦ ♦ b 00� •0.4 *002 0 ° p77 � NT 10.9 1aA 124 .2 �' /�� 7�r v� ♦ ♦•P 12 ♦ � SR° a \'t�?� �♦ g;♦ �y2 0 of 12 O.B 4 0.6 33 °1,2• C4 0 Q o` a CD �4 ar9Q 0 �9 sfp 41 0 d 1 av, 0 ° Qs 00 J2 ;I_ 10 �p 1 o� ti� s4� Y ys6 50• & o et ° h 38 11 x 17 = HALF SCALE .rile 11 x 17 = HALF SCALE I CERTIFY THAT THESE PLANS ARE IN COMPLIANCE WITH SEAL L5 00 THE APPLICABLE SECTIONS OFTITLE21, CHAPTER 56_ U 3: 0.0 0.0 v_ �c�M m N ° c n aJ ms I C ci a i N t 1 N Existing Grade 0.0 CHRISTIAN L. GIBSON, P.E. NO- D26273 DATE Z'v ® ca N -5.0 _50 47 +00 12/30/2011 m � s U J V A N 52 +00 12/30/2011 e d z? o m m Mafmribo m V N R 13TH OAS -5.13 -5.0 -5.0 -5.0 < i Z O 3 L O G -10.0 -10.0 o y LEFT TOE RIG TOE Q d c 3 IIIIIIIII Mill 11 I I d m U E t -100 -so ❑ so 100 a IM U) -ro.o 1a.D' -ion -10.0 I d I -1oA w R -105 $ 145 a CO Q R -105 R45 IZ 6 C 3 m S •3 6 6 0 in (n to in h -15.0 -15.0 -15.0 -15.0 H Saole -100 -50 D 50 1" = 50' V Saale : 1' = 5' 100 Vertiaol Datum : MLW H Saale -100 -50 0 50 1' = 50' V Saole : 1' = 5' 100 Vertiaol Datum : MLW r 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 3 38+00 01/03/2012 42+00 01/03/2012 46+00 12/30/2011 51+00 12/30/2011 9 I M O p N c S z QQ z 3 dn 0 Z -S.D -5.0 -5.0 -5.0 -S.D -5.0 -S.D -5.0 � ° Z 0_0 x N K X 8 ° O c 3 O -10.0 10 -10.0 -10.0 -- - - - - ------- - - - -- -- -10.0 -10.0 -10.0 -10.0 -1Do' -10.0 > ah A m O R -40 40 R -105 R45 R -105 R -105 R45 W N v to y 4 -15.0 -100 -50 0 50 100 -15A -15.0 -100 -50 0 50 100 -15A -15.0 -100 -50 0 50 100 -15A -15.0 -100 -50 0 50 100 -15A C O C} a 8 O @7 H Scale 1" = 50' V Scale 1' = 5' Vertical Datum :MLW H Scale 1" = 50' V Scale 1' = 5' Vertical Datum :MLW H Scale 1" = 50' V Scale 1' = 5' Vertical Datum MLW H Scale 1" = 50' V Scale 1" = 5' Vertical Datum MLW U ; 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 37 +00 0B 1 /03/2D12 41 +00 0S 1 /3/2D12 45 00 0S 1 /03/2D12 + 513 00 1S 2 /3D/2D11 N a ° l� 3 _ -5.0 -5.0 -5.0 -5.0 -5.0 -5.0 -5.0 -5.0 o n � •= � �Cd 4 0 v e . -100 -10 -100 -- . -10A -100 -10 -100 0.0' -100 N N ] R-40 40 R -114 R -105 R5 R -105 R4 N In 3 LA a -15.0 -15.0 -15.0 -1 11111 F -15.0 -15.0 -15.0 -15.0 -15.0 -100 -50 0 50 100 -100 -50 D 50 100 -100 -50 0 50 100 -100 -50 0 50 100 H Saale 1 = 50 V Saole : 1 = 5 Vertiaol Datum MLW H Saale 1 - - 50' V Saale : 1' = 5' Vertiaol Datum : MLW H Saole 1" = 50' V Saale : 1" = 5' Vertiaol Datum : MLW H Saale 1' = 50' V Saole : 1' = 5' Vertiaol Datum : MLW 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 36+00 01/03/2012 40+00 01/03/2012 44+00 01/03/2012 49+00 12/30/2011 -5.0 - - - - - - - - - - - -5.0 -5.0 -5.0 -5.0 -5.0 -5.0 -5.0 Ld Ld •� ' R U 10.0• o.D• -10.0 -10 -0' -ion -10.0 - - - - - - - - - - - - - - - - - - - - - -- - 10.0 -10.0 - V -10.0 -10.0 -10.0' -10.0 R -40 R40 R -124 1 R -105 R R -105 R45 Q {� N C) _ M O LU -15.0 -100 -50 O 50 100 -150 -15.0 -100 -50 0 50 100 -15.0 -15.0 -100 -50 0 50 100 -150 -15.0 -100 -50 0 50 100 -15.0 •5 I Qn LU H Scale 1" - 50' V Scale 1' - 5' Vertical Datum MLW H Scale 1" - 50' V Scale 1' - 5' Vertical Datum MLW H Scale 1" - 50' V Scale 1' - 5' Vertical Datum MLW H Scale 1" - 50' V Scale 1" - 5' Vertical Datum MLW W �' 0.0 35 +00 01/03/2012 0.0 0.0 39 +00 01/03/2012 0.0 G.0 43 +00 01/03/2012 0.0 0.0 48 +00 01/03/2012 0.0 Q = LILI V) DE 0 Z � L // /III/// -5 -0 -5.0 -5.0 -5.0 -5.0 -5.0 -5.0 -5.0 ///111 Y/YY O U, a F d 0 o ° -ro.o -10.0' -ion -10.0 -1o.a' -10.0 -ro.o -10 -ion -10.0 1D.a' -10.0 R -40 R40 R -110 R90 R -105 R45 R -105 R45 Z B B R R R -15.0 -15.0 -15.0 -15.0 -15.0 -15.0 -15.13 -15.0 -100 -50 0 50 100 -100 -50 0 50 100 -100 -50 D 5D 100 -100 -50 0 50 100 H Saale 1 = 50 V Saole : 1 = 5 Vertiaol Datum MLW H Saale 1 - - 50' V Saale : 1' = 5' Vertiaol Datum : MLW H Saole 1" = 50' V Saale : 1" = 5' Vertiaol Datum : MLW H Saale 1' = 50' V Saole : 1' = 5' Vertiaol Datum : MLW .rile 11 x 17 = HALF SCALE :111 11 x 17 = HALF SCALE I CERTIFY THAT THESE PLANS ARE IN COMPLIANCE WITH SEAL L5 00 THE APPLICABLE SECTIONS OFTITLE21, CHAPTER 56_ v_ U 3: ° 0.0 0.0 m A C OD aJ ms I C ci a i N t 1 9' N -5.0 EA.Mg Grade _50 CHRISTIAN L_ GIBSON, P_E_NO- 026273 DATE ®H IM � N o 6< O m M.fmria1 m m = \ G a DTH ARIES Li r Z c 3 O O w ~ DWN £ ) L rL -10.0 -10.0 o y O 1.- LEFT TOE RIG TOE Q d 3 11 d m U E t -100 -50 ❑ 50 100 a m O to [1 m Q 00� 3 m s 3 3 a 6 6 0 in (n in in h 0.0 0.0 0.0 0.0 3 6+00 1/3D/2011 2 60+00 12/30/2011 M O z CO dn -S.D -5.0 -5.0 -5.0 a � Z 0_0 N 8 X O O c " v a°, ¢ I�- -10.0 I I -10 -0' - 10.0 -10.0 I I -10.o' -10.0 d m3 c R -105 R45 R -105 145 N v m y a 4j in -15A -15.0 -15A O C} O 8 -100 -50 0 50 1o0 -100 -50 0 50 100 a 3 @7 H Scale 1° = 50' V Scale 1° = 5' Vertical Datum :MLW H Scale 1° = 50' V Scale 1° = 5' Vertical Datum :MLW U o.o a.o o.o 0.0 ; 55 +00 12/30/2011 59 +00 12/3D/2011 t J N a O C T N - S a w d •� n � oo `a -10.0 -10.0' -100 -10.0 -10.0' -100 U N > cl N [] R -105 W R45 R -105 R45 O O g}ln 3 ) B S z= N i a -15.0 -1510 -15.0 -15.0 -100 -50 0 50 100 -100 -50 0 50 100 H Sale 1- = 50' V Sale - 1- = 5' Vertical Ovum MLW H Sale 1- = 50' V Sale : 1- = 5- Verti.al Oalum MLW 0.0 0.0 0.0 0.0 0.0 0.0 54+00 12/30/2011 58 +00 12/30/2011 62+00 12/25/2011 -5.0 -s.o -s.o -s.o -5.0 � Ld W L' 1z :C 7 R U -10.0 -1o.0' -10.0 -10.0 -10.0' -10.0 -10.0 -10 -a' J tj � C� Q Z R -105 R4 R -105 R4 R -10 R5 S E W v _ 0- -1 1 m ` U . -150 1111117 11111 -100 -50 O 50 100 -150 -15.0 -100 -50 0 50 100 -15.0 -15.0 -100 -50 0 50 -15A 100 H Scale : 1° - 50' V Scale : 1° - 5' Vertical Datum : MLW H Scale : 1° - 50' V Scale : 1° - 5' Vertical Datum : MLW H Scale : 1" - 50' V Scale : 1° - 5' Vertical Datum : MLW A �- W 0.0 53 +00 12/30/2011 0.0 0.0 57 +00 12/3D/2011 0.0 G.0 61 +00 12/30/2011 0.0 Q 2 � V) L `w Q ey_ LO C -5.0 -5.0 -5.0 -5.0 -5.0 -5.0 O U, a ° -ro.o -10.0' -1oA -10.0 -10.0' -1oA -ro.o -ion o R -105 R45 R -105 R45 R -105 R45 Z g B B R R -15.0 -15.0 -15.0 -15.0 -15.0 -15.0 -100 -50 0 50 100 -100 -50 0 50 100 -100 -50 D 5D 100 H Sale 1- = 50' V Sale - 1- = 5' Vertical O um MLW H Sale : 1- = 50' V Sale : 1- = 5- Verti.al Datum MLW H Sale 1" = 50' V Sale : 1- = 5' Verti.al O tum = MLW :111 11 x 17 = HALF SCALE x X 11 x 17 = HALF SCALE X X 9 b M-Ra I 117 +DO o° n E x 0 / O o o x x I CERTIFY THAT THESE PLANS ARE IN COMPLIANCE WITH SEAL THE APPLICABLE SECTIONS OF TITLE21, CHAPTER 56_ CHRISTIAN L_ GIBSON, P_E_ NO- Q26273 X DATE M1 h p, `•r�.r ,i ► •i ns{,.. - t*pr,. ! Jr. kk,, r'� Y i? .f -�.I m• ,. f�3 F i 1 ir"- -' �k iP �k ��•�+�Y+iO'���� 1' I � -[��k k a,K;;•...t- ._.:'rl.. kq� .y2i`II.fI`jri i F i, ir'A - ....... .. , .,. I i ��i�,%: ..X �=i-�.1 .7�f i,k •t 7..i +1 tlF :� 1 7 �� k5, � C I � 1 , ti 41 AL A.", F COORDINATES - NEW TOPSAIL INLET CENTERLINE ING NORTHING STATION RANGE '56.67 221,156,32 0.00 0.0 159.15 220,71695 903.54 0.0 !33.71 220,268.68 1,764.83 0.0 76.19 220,24399 2,221.02 0.0 '0.470 220.24a41 2.461.74 09 N 5.40 220,29256 2,669.19 OA 133.28 220,444.58 3,386.04 0.0 160.54 220 049.49 4,15104 0.0 566.61 219,680.09 4,635.68 0.0 179.38 219,276.46 5,071190 0.0 527.09 216,700.45 5,676.53 0.0 199.16 216,25585 6•12-1.04 0.0 178.38 217,679.91 8,543.50 0.0 143.60 217,660.65 6,587.77 0.0 32.36 217,54590 7.196.67 0.0 ,29.67 217,504.05 7,697.64 0.0 157.02 217,751.30 5,754.32 0.0 27.30 217,65783 9.326.26 0.0 02.67 215,96486 12,460.76 OA COORDINATES ARE REFERENCED TO NAD63 O N U 03 m n C4 J U CP C5, V a W L 0 d ,., y � c� c L v O Elf Z a o m N c rn s. m N 0 0 z c aai N t G� s M ma o R z Z c Im £ o 0 C N C9 3 O M N O H o d m a m a U m a ,ry I I p p p � m z 00� 3 a p m V7 s 3 6 p 3 6 p ) to 3 00 O c z 0 2 O Q - O = 4 K z "D 0-13 O N 8 X G N Q U D I�- � O O O J L Q Nv m d a 4j - p c c O a 15 O N 3 a th J N Q U S O C T c AE f3 -0 6 22, C 3 3 a m � F S L a T c c O D 43 a N U, p aNi i O O N V7 3 Q) N � ❑ Q Ld Ld W V a W L 0 d ,., y � c� c L J a cn o Z a Elf Z a F w/ li m L CD � � m 0 0 z f. VOLUME TABLULATIONS AREA GRADE -LOA' MLW TOPSAIL CREEK 52,850 NEW TOPSAIL INLET 90750 -9.0' MLW BANKS CHANNEL 9,880 =AL MATERIAL AVAILABLE 153.+80 Q1ANMES ARE EXPRESSED IN C1191C YARDS XTri •- ss 00 soa°° 61 "00 1 q 62+00 - ICERTIFY THAT TH ESE PLANS ARE IN COMPLIANCE WITH SEAL N L DO THE APPLICABLE SECTIONS OFTITLE21, CHAPTER 56_ l r*_- o u 3 O N ro a J m O C O m d N t X CHRISTIAN L_ GIBSON, P_E_ NO- Q26273 DATE Z'v ® H s N V fir,' 0}j j f z O G d z O m an N C4 m Li a � � � o i Z c N O N o U m nL o II eT'+�'xtir��5 I'b 3 3 A V7 VD 2; v$ 0$7 �5 p6 1 ] A I o 1.7 1 4.Q 6171 1 ] t 4 7@ 1 3 7'4 9/ f2 16 1 9 131 L �S 2 ]g9]Jp1 N e`� ➢�A � 06 Bg3 • 1�3zb1 � �3� 0 12.1 11'H I 2 � j - 7. 17. 1 •,� 8. L l 9 17 1 1 - a 4° �y ,0 �� 11p. l 135 '3 12 1 L 1772 17. 166 19B °^ 7.9 1 174 172 lbb L 11 � � x ',5 32 1 4 a2 1 6. ERLI11 1 1 164 33 1 116 ]2• l4. .0 1 1 .7 6 1 6 IL C 1 .6 2 l 7 15:i i3 �1• �5 M m C d Z' 12 § Z Q 1'S 7 1 y' 2.b . 1Z. t3 1 L .4 11. 1; 1 5 1�•1 I5.6 9 13 q 1 t 7 6P 3 DO � 3 Z z 3 1 2A l2 1 1 1 1 1 7 14 12. ti3 5A 2°' Q` a x x K pp��6� 5p5p 12'A 7.8 rj,49 +00 .q2 �Jy', d 7.9 12 �9 i45 1 ti.9 7 3' Z a 1 12.4 13 t25 7 7 +O.B +7 +al +0. •> l.4 32 7 6P 'C14 X 1p C C LL N Q U �'� tg• 5.7 +QS O.pa OpJ� 4 �>T 9 110 9 3.4 124 92 6. M q) c: n- '�., aQ4 02 0;1 p m +B1. 46' p 2 ,I, a o 0 6 O N � 4S J �9 � .s ✓7w � U o o O a 0 96 8° t I-m X 2�• i ..ff ° ° + 5 6- 0' .g s6 Y � a T 0 A h $ 4 774 S B o a p A '4'• A8 �g� 7� 9, fig 9� 7. 0 7, 43 'J m m N O N 9s V 110.1 }l, 99 B1 81 1 1 . ^' ,. !7 Z =O » m Ln 8 82 7 28 23 � 1�� 6 91 6 4 1 1 8.6 IBC-1 .7 64+00 ri- `r77 `16 102 - °- �6 4 1 ., ] .� 1 3 {2�.Z iq 137 1 . z 3 # pg 1 1 5 65t N 0' b 9/.6 8a 55 % 8 11 6 8.4 5 ,4 5.7 4a l 2.9 8 LJ z 7 26 W J 66 �D X V A a cn 67 r00 < Q 0 I'+��'.6o '' A Z �ns`lc 69x+' l""o < 9 e gq H d CD oO° I'' ^a� bSf 6 f r 6: 42 11 x 17 = HALF SCALE 43 11 x 17 = HALF SCALE ` ?• rr� Gb8 s a� r I CERTIFY THAT THESE PLANS ARE IN COMPLIANCE WITH THE APPLICABLE SECTIONS OFTITLE21, CHAPTER 56_ SEAL P. N cq 0 o ti h _ o O .L RO 'ry m cim o 0 cal CHRISTIAN L GIBSON, P_E_ NO- D26273 DATE m � � H C.� N a•r 9,� °' g *ac p � , c `.,°° a� d� otl j z � r o C4 m =Z� c N rL l DD VOLUME TABLULATIONS AREA GRADE d d V O E i -1 .0' MLW DD MO L CREEL( 52,1550 95* -10.0' MLW NEW TOPSAIL INLET 90,750 0 * p C3 O C p 8 > m Z C II 96 +D° \ / BANKS CHANNEL - 99.8BOLw 3 m 3 •3 m TOTAL MATERIAL AVAILABLE 153480 N to re F i 9, OUAMITIES ARE EXPRESSED IN CUBIC YARDS w 3 �DD S 3 Z z O x K X ?� \ +pO z O G 0 N _ n O W O J a of o 6 N N Q X y'1" 00-9 .ry 0 O C T C 6 U 5 C o w L m � o E• 0 a° O Cl N I/1 L + 6 o PQ.9'�.yy'D lac 3rvD Ld W J Z � W d y a ��`3��'9'�"``-( 0` �_/ a d L...I ,9 p°' r li � X e�' .✓ \2 LaJ it ��. <. r ! N.•!O� � O C3' CY I? 43 11 x 17 = HALF SCALE 44 11 x 17 = HALF SCALE I CERTIFY THAT THESE PLANS ARE IN COMPLIANCE WITH SEAL L5 00 THE APPLICABLE SECTIONS OFTITLE21, CHAPTER 56_ U 30 0.0 0.0 v_ `9� i m N ° C (�Y N O o d ro aJ ms I C ci a i N t 1 N -5.0 Exieting Grade _50 32 +00 12/30/2011 CHRISTIAN L- GIBSON, P- E- NO- 026273 DATE Z'v ®H m of N 371 -00 01/04/2012- m Mcmri N 4 C P bo DTH ARIES iW V < r Z c 3 O O w ~ DWN £ ) L rL -10.0 -10.0 y O LEFT TOE RIG TOE -5.0 -5.0 -5.0 -5.0 o Q d 3 d m U E t -100 -50 ❑ 50 100 a m M to CI p > Z N [ 1 CO -10.0 R -75 -100' R75 -100 -100 -10.0 R -75 R75 -10 -100 3 m 3: e 3 e ° Jill III iiiiiiiihiiiiiiiiIiiiiiiiir- I hill 111111111111111F in N to in n H Saale -100 -50 D 50 1" = 50' V Scale : 1' = 5' 100 Vertiaol Datum : MLW H Scale -100 -50 0 50 1' = 50' V Saale : 1' = 5' 100 Vertiaol Datum MLW r 3 � 23 +00 12/3D/2011 27 +00 01/04/21D12 31 +00 12/3D/2D11 36 +00 01/04/21D12 0.0 0.0 - - 0.0 0.0 - - 0.0 0.0 - 0.0 3 N a Q a 0 � N O --cc z " p O C � 3 O O U -5.0 -5.0 -5.0 -5.0 -5.o -5.0 -5.0 -5.0 C Q C I�- d d d d m3 G w -10.0 J -10.0 -1010 0 -10.0' -10.0 -10.0 , -10.0' -10.0 -10.0 J -10.0' -10.0 N v m a> R 1-10.01 R I p R -75 R75 R -75 R75 R -75 R75 R -75 R75 C C C o C} p B -100 -50 0 50 100 -100 -50 0 50 100 -100 -50 0 50 100 -100 -50 0 50 100 p @7 H Scale 1" = 50' V Scale 1' = 5' Vertical Datum MLW H Scale 1" = 50' V Scale 1' = 5' Vertical Datum MLW H Scale 1" = 50' V Scale 1' = 5' Vertical Datum MLW H Scale 1" = 50' V Scale 1" = 5' Vertical Datum MLW U ; O p O 22 +00 12/30/2011 26 +00 01/04/2012 30 +00 12/30/2011 35 +00 12/30/2011 t J N a O C T 0.0 - - 0.0 010 - - 0.0 0.0 - 0.0 0.0 - - 0.0 Z - 6 3 p -5.0 -5.0 -5.0 -5.0 -5.0 -5.0 -5.0 -5.0 �. d 1 \R-75 v In m Q E+ 0 0 O`a O N O= OJ OJ p N > O O N V7 3 -10.0 -10.0• -100 -10.0 -100' -100 -10.0 I -10.0• -100 -10.0 -10.0' _100 Z => N a 75 R75 R -75 R75 R -75 R75 R - R75 i1iiiiiiii r- -1 1111 11 111111111 111111111 111 11 1111111 111111 111 hill ... -100 -50 0 50 too -100 -50 D 50 100 -100 -50 0 50 100 -100 -50 0 50 100 H Scale 1 = 50 V Saale : 1 = 5 Vertiaol Datum MLW H Scale 1 - - 50' V Scale : 1' = 5' Verti aal oakum : MLW H Saale 1" = 50' V Scale : 1" = 5' Vertiaol Datum : MLW H Scale : 1' = 50' V Saale : 1' = 5' Vertiaol Mm : MLW 21 +00 12/3D/2011 25 +00 01/04/2D12 29 +00 01/04/2D12 34 +00 12/3D/2D11 0.0- 0.0 D.D- 0.0 0.0- 0.0 0.0 0.0 Ld W -5.0 -5.0 -5.0 -5.0 -5.0 -5.0 -5.0 -5.0 J d d d d -10.0 -1010 -10.0 -10.0 -10.0 -10.0' -10.0 W G R -75 R75 R -75 R75 R -75 R75 R -75 R75 =1 M ` r. 3 -1 I I I I I I I I I I 11 iiiiiiiihii iiiiihiiiiii i r- -i -1 11111111 Jill W r E,, LLJ 30 0 50 50 0 50 so 0 30 50" 0 50 � Z H Scale 1" -1050' V Scale - 5 Vertical Datum MLW H Scale 1" -1050' V Scale - 5 Vertical Mum MLW H Scale 1" -1050' V Scale - 5 Vertical Datum MLW H Scale 1" -1050' V Scale - 5 Vertical Datum MLW � - W 20 +00 12/30/2011 24 +00 12/30/2011 28 +00 01/04/2012 33 +00 01/04/2012 Q 2 I an V) Q 0 ey- L � a H Ig d -5.0 -5.0 -5.0 -5.0 -5.0 -5.0 -510 -5.0 0 oLd -10.0 -1 O.o' -10.0 -10.0 -1oA' -10.0 -10.0 -100' -10.0 -10.0 -1 o.a' -10.0 75 1 1 1 1 1 1 1 1 1 1 1 1 1 R75 R -75 R75 1 -75 R75 R -75 R75 -100 -50 0 50 too -100 -50 0 50 100 -100 -50 D 5D 100 -100 -50 0 50 100 H Scale 1 = 50 V Saale : 1 = 5 Vertiaol oakum MLW H Scale - 50' V Scale : 1' = 5' 1 - Vertiaol Datum : MLW H Saale 1" = 50' V Scale : 1" = 5' Vertiaol Datum : MLW H Scale 1' = 50' V Saale : 1° = 5' Vertiaol Mm : MLW 44 11 x 17 = HALF SCALE :11 11 x 17 = HALF SCALE I CERTIFY THAT THESE PLANS ARE IN COMPLIANCE WITH SEAL L5 co THE APPLICABLE SECTIONS OFTITLE21, CHAPTER 56_ U 30 0.0 0.0 �_ I m N ° C M Na. O o 0 ro aJ ms I C ci a i N t 1 N E.1sting Grade 0.0 CHRISTIAN L. GIBSO P.E.NO.D26273 DATE Z'v ®H N -5.0 _50 66 +00 12/25/2011 , m t!5 71 +00 12/25/2011 j 6 • O m M.fmriao�n = \ c R _ DTH OAS -5.D -5.0 -5.0 -5.0 MIS < i Z O 3 L O GL -10.0 -10.0 C9 C'r 3 o y LEFT TOE RIG TOE Q d c 3 d m U E t -100 -50 ❑ 50 100 ; m O to -10.0 -10.0' -10A -10.0 -1❑.0' -1on O -0 Z N R -75 i 1 R75 R -75 R75 in M Q C > S C 3 m 3 3 ] (] h -15.0 -15.0 -1s.0 -1s.o H Saale -100 -50 0 50 1" = 50' V Saale : 1' = 5• 100 Vertiaol out.- : MLW H Saale -too -50 0 50 1' = 50' V Saale : 1° = 5• too Vertiaol Datum MLW rc r 0.0 0.0 0.0 0.0 0.0 0.0 3 61 +00 12/25/21D11 65 +00 12/25/2011 + 7D 00 12/25/2D11 M 3 O N a c z dn 0 -5.0 -5.0 -.0 •O x K Z V ° c N g CL M % C -10.0 -ion' -10.0 -10.0 -10A' - 10.0 -10.0 -10.0 -, 0.0 d m3 G W R -75 R75 R15 R75 R -75 N v to y R R R 4 -15.0 -100 -50 0 50 100 -15A -15.0 -100 -50 0 50 100 -15A 0 -100 -50 0 50 100 -15A c O 0 a 8 O @7 H Scale 1" = 50' V Scale 1' = 5' Vertical Datum MLW H Scale 1" = 50' V Scale 1' = 5' Verticol Datum MLW H Scale 1" = 50' V Scale 1" = 5' Vertical Datum MLW U 0.0 0.0 0.0 0.0 0.0 0.0 ; 0 ° 40 +00 12/25/2011 60 +00 12/25/2011 64 +00 12/25/2011 69 +00 12/25/2011 N a 0.0 0.0 a E -5.0 0 -5.0 �. d 1 0 0 `a -10.0 -10.0' -10A -10.0 -10.0' -100 -10.0 -10.0 N 2 N > z Z C] R -75 z R75 R -75 R75 R -75 R75 O O N V7 3 -10.0 1 -10.0' -100 Z = 17 N 2 - R -75 R75 -15.0 -1510 -15.0 -15.0 -15.0 -100 -50 0 50 too -100 -50 0 50 100 -100 -50 0 50 100 -100 -50 0 50 100 H Saale 1 = 50 V Saale : 1 = 5 Vertiaol Datum MLW H Saale 1 - - 50' V Saale : 1' = 5• Verti aal Mum : MLW H Saale 1" = 50' V Saale : 1" = 5• Vertiaol Datum : MLW H Saale 1' = 50' V Saale : 1° = 5• Vertiaol Mum : MLW 0.0 0.0 0.0 0.0 0.0 0.0 39 +00 01/04/21D12 59 +00 12/25/2011 63 +00 12/25/2011 68 +00 12/25/21D11 ~ F LJ -5.0 -5.0 -5.0 -5.0 -5.0 W -5.0 -5.0 J -100' -100 -10.0 -10A' -10.0 -10.0 -ion' -10A Qn Z ? R -75 R75 R -75 ? R75 R -75 ? R75 a {9 0 -,OA' -ion W (_, 0 R -75 R75 a M 50 0 50 50 0 5o 0 so 0 30 100 -15-0 -15.0 -0 50" 0 50 -15.0 W r z [y� Z LU H Scale 1" -1050' V Scale - 5 Verticoo Datum MLW H Scale 1" -1050' V Scale - 5 Vertical Datum MLW H Scale 1" -1050' V Scale - 5 Vertica Datum MLW H Scale 1" -1050' V Scale - 5 Vertical Datum MLW J LU 38 +00 01/04/2012 0.0 58 +00 12/25/2011 0.0 G.0 62 +00 12/25/2011 0.0 0.0 67 +00 12/25/2011 0.0 Q I QQn Q 0 o.o - o.❑ a d y a -5.0 -5.D -5.0 -5.0 -5.0 - C F Ii d Ld -5.0 :NR -5.0 0 Ld --150..0 0 -1. -10A -100 . -,❑.❑' -10A -100 . -10.0' -10A o Z R -75 R75 R -75 R75 R -75 R75 -10.0 -10.0• -100 1 R75 -15.0 -15.0 -15.0 -15.0 -15.0 -15.0 -100 -50 0 50 too -100 -50 0 50 1DO -100 -50 0 50 100 -100 -50 0 50 100 H Saale 1 = 50 V Saale : 1 = 5 Vertiaol oakum MLW H Saale 1 - - 50' V Saale : 1' = 5' Vertiaol Mum : MLW H Saale 1" = 50' V Saale : 1" = 5• Vertiaol Datum : MLW H Saale 1' = 50' V Saale : 1' = 5• Vertiaol Mum : MLW :11 11 x 17 = HALF SCALE UI 11 x 17 = HALF SCALE I CERTIFY THAT THESE PLANS ARE IN COMPLIANCE WITH SEAL L5 00 THE APPLICABLE SECTIONS OFTITLE21, CHAPTER 56_ *_ U 30 0.0 0.0 �c�M m A ° C N O o d ro aJ ms I C ci a i N t 1 N -5.0 Extsting Grade _50 0.0 84 +00 12/25/201 1 CHRISTIAN L. GIBSON, P.E.NO.D26273 DATE Z'v ®H m of C,4 6 O m Mau, .1 m = c a 13TH _5.13 -5.0 Li < t Z 0 3 L O _ OAS C'r O CL -10.0 -10.0 I.9 3 o U1 LEFT TOE RIG TOE Q d c 3 I I d m U E t -100 -50 ❑ 50 100 ; m O N -10.0 1 10.0, -ion o p z R 75 i R75 C'1 CO Q C > S C 3 m 3 3 (n (] h -15.0 -15.0 H Saole -100 -50 D 50 1" = 50' V Saale : 1' = 5' 100 Vertiaol Datum : MLW r 0.0 0.0 0.0 0.0 0.0 0.0 3 75 +00 12/25/2011 79 +00 12/25/2011 83 +00 12/25/2011 3 N a M O c Q z dn 0 -5.0 -5.0 -5.0 -$.D -5.0 � O z x K ° O c " v a°, ¢ EM % C -10.0 - 10.0 - 10.0 -1oA' - 10.0 -10.0 -Ion' -10.0 c m3 R -75 R75 R -75 R75 R -75 R75 N v m y R R R ( 4 -15.0 -100 -50 0 50 100 -15A -15.0 -100 -50 0 50 100 -15A -15.0 -100 -50 0 50 100 -1:5A c O C} O 8 O 3 @7 H Scale 1° = 50' V Scale 1° = 5' Vertical Datum :MLW H Scale 1° = 50' V Scale 1° = 5' Vertical Datum :MLW H Scale 1" = 50' V Scale 1° = 5' VerticDl Datum :MLW U o.o ❑.o 0.0 0.0 0.0 ❑.o 0.0 0.0 ; 74 +00 12/25/2011 78 +00 12/25/2011 82 +00 12/25/2011 87 +00 12/25/2011 t J N a O C T o c m Q E 013 -10.0 10.0' -100 -10.0 -10 -100 -100 �tOi N N a i i i z C] R -7 R75 R -75 R75 R -75 R75 R -75 O O N V7 3 Z => to -15.0 -1510 -15.0 -15.0 -15.0 -15.0 -1510 -15.0 -100 -50 0 50 100 -100 -50 D 50 100 -100 -50 0 50 100 -100 -50 0 50 100 H Saale 1 = 50 V Saole : 1 = 5 Vertiaol Datum MLW H Saale 1 - - 50' V Saale : 1' = 5' Vertiaol Datum : MLW H Saole 1" = 50' V Saale : 1" = 5' Vertiaol Datum : MLW H Saale 1' = 50' V Saole : 1° = 5' Vertiaol Datum : MLW 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 73 +00 12/25/2011 77 +00 12/25/2011 81 +00 12/25/2011 86 +00 12/25/2011 F ~ iJ -5.0 -5.0 -5.0 -5.0 -5.13 -5.0 -5.0 -5.0 W J -10.0 -1o.0' -10A -10.0 -100' -10.0 -10.0 d -10.0' -10.0 -10.0 -ton -10.0 Qn Z R- ? R75 R -75 ? R75 R -75 ? R75 R -75 ? R75 a {9 0 W d 0 X Q -15.0 50 D 50 -150 -15.0 50 0 50 -15.0 -15.0 D 30 s -150 -15.0 50 0 50 -15.0 z Ld -u�- H Scale ° - 5 1 ° -11350' V Scale Vertico Datum MLW H Scale ° - 5 1 ° -11350' V Scale Vertical Datum MLW H Scale 1 ° - 5 1" -11350' V Scale Vertical Datum MLW H Scale ° - 5 1 ° -11350' V Scale Vertical Datum MLW A LU 0.0 72 +00 12/25/2011 0.0 0.0 76 +00 12/25/2011 0.0 0.0 80 +00 12/25/2011 0.0 0.0 85 +00 12/25/2011 0.0 0 I Ln C1 Q � x L `a y a -5.13 -5.0 -5.0 -5.0 -5.13 -5.0 -5.0 -5.0 -/ 0 � F d LaJ li CD 0 Ld -10.0 I -1❑.o' -ion -10.0 I -1o.❑' -1oA -ion I -1❑.o' -ion -10.0 I I -1 o.0' -ion o � = = Z R -75 = R75 R -75 R75 R -75 R75 R -7 R75 pp F � pp F -15.13 -15.0 -15.0 -15.0 -15.13 -15.0 -15.13 -15.0 -100 -50 0 50 100 -100 -50 0 50 1130 -100 -50 D SD 100 -100 -50 0 50 100 H Saale 1 = 50 V Saole : 1 = 5 Vertiaol Datum MLW H Saale 1 - - 50' V Saale : 1° = 5' Vertiaol Datum : MLW H Saole 1" = 50' V Saale : 1" = 5' Vertiaol Datum : MLW H Saale 1' = 50' V Saole : 1° = 5' Vertiaol Datum : MLW UI 11 x 17 = HALF SCALE F, 6 ALIGNMENT TABLE OF COORDINATES - BANKS CHANNEL CEMERUNE U NAME EASTING I NORTHING I STATION I RANGE BC -1 Ol - 0.0 0.0 BC -2 2,408,057.8 222,557.4 2,692.4 0.0 BC-3 z,409,545.z 224,617.4 5,233.2 0.0 BC -4 2.419.eze_e 22fi,f afi.6 a.—u I 0.0 B11-5 2,413,056.8 228,612.1 10,723.1 0.0 BC-6 2,418,758.2 230,992.0 15,1320 0.0 HORIZONTAL COORDINATES ARE REFERENCED TO NAD83 I X S O o Q n I I I I I I I I I I� I I I I I I I ry N N N N N NTI -1 X r r x ku � X I CERTIFY THAT THESE PLANS ARE IN COMPLIANCE WITH SEAL THE APPLICABLE SECTIONS OF TITLE21, CHAPTER 56_ CHRISTIAN L_ GIBSON, P_E_ NO- Q26273 DATE X o o N 8 � o s $ iW v $ < e o a \ o a a EN1 �t °o a °o BC-1-4 O' k BC -R3 I I I I I I BC-R2 \ i Sh-. Lire 0&,e y t s} ti • .....Ij y Carolina BM I ` 0.11 0, tip am A- .. 1; ='! 1 r y} 5P _a 4i 'j y. ■ ' tl- 1, 1" a z O)m k 47 11 x 17 = HALF SCALE o ro X l Cardna Rw I.... S.AnCe�son Bhd w I � !1 1 � � � �•� i � 'N L y � ,� 1� �I.� X X 4- F N U 03 m n O J U Ol C� a tjo' a W d 0 O 0- d p7 A c In � J O LLJ ro N�oo M � a aim o � I z CO�� p V N ® W N G� s O] ma o R Z Z c £ 0 C ry M O o d m a m a U m p crl II p m 3 in m (n 3 6 in 3 6 in V) 3 N M O m e a 3 Q 1> Z z 0 O N O Q O = x K z "D 0-13 O N 8 X G N Q U D I�- � O J Q N v ka d a 4j p c c O3 O 6 O N a th J N Q C7 O �m 22, � C 3 3 O �m E L F Q a In Li T c c O p m Q E: L ` a O 0 0 a u N N in T O O V7 3 Q) . Z = � N � ❑ Q F J LLJ W a tjo' a W d N 0- a dy F W � c L I a D � J LLJ o z 48 11 x 17 = HALF SCALE I CERTIFY THAT THESE PLANS ARE IN COMPLIANCE WITH SEAL N Lq u co N ti IV THE APPLICABLE SECTIONS 0FTITLE21 , CHAPTER 56_ _ - i oN 4 3: o IyRv .V O d p7 to O c eq VOLUME TABLULATIONS GRADE -- CHRISTIAN L_ GIBSON, P_E_ NO- Q26273 DATE m Z'v H -q- N L n -10 -0' MLW TOPSAIL CREEK 5 850 aii j t z L r o -10.0' NEW TOPSAIL INLET 90,750 -B.D' MLW �/ � d z mH = N \ p N m m _ BANKS CHANNEL s BeD X ` t Z c \ N TOTAL MATERIAL AVAILABLE 153,480 3 O \ N ~ O o QUANTITIES ARE EXPRESSED IN CUBIC YARDS a ° m Ca.1 � Q1 p N II 00� 8 m I 3 m s 3 3 0 0 v o 0 3 CA a SHE 3 o M < 79 E ENS 0Mp ° N O o 0 3 z 3 x K Q 7 Qx .2 Z° ` 0-0 o c N 8 X 0 1. 2 j�7 tit i M g 4 5 ,0 7 5 i? 7 10 777 qq V, d n- ° o � ° � y° °° g J� $ t 1q 2• �y 'A 7 •,l N v m LI m N A 2 7 C C •0 3 SS N 1 1 1 ]]1 233 11 .6 �lp 15e 9 94 Bb j, 49 4467 43 3•�` 3q 9 1a ,77 4. CA a g 7 q 1(1> a .0 11 g :5 9 .4 ?7 'f O c T c Z 13 6 IZ 11t X B 6 D �, T.6 6.l 1 8 7 Y. In L show Lire [.Me tL i.f e�;. •L; - i , '� _ 4. �O m Q �' t Bw !NN ion , .y.. . .� t o.. r• � toa � `}4p �.� - • � .., � :.b.+s� + Carolina BMl '� l � ''v � S l � � �- �z.'9i`. very jr , � l 'A i i'° - 1 4V r' .•; �' l '�•. � �y i� .i } . LA _ �.'�.y .ti ;�f''�?r .� , rOP _ tip �.� d-�►��. Y..7• .� - Ili. i< a i '_ � '� 'a .i� . Q .. L' ' ":fir =r ...E "^ { .. �,y � Y, '4 � Y 'I' i �s �.,�r• n •[ �'. "#GS _ ` _ I �'" "� V� -: e l .F � mh r }} 7is � � � ' � t • �L�� ! V�' i � Y_ � t� � N l �: � ~ � � IC 41P ..::,j = ��'a x 4 E� t 44r a E �, X Q a � - I ��. � ! 1 � - - iv i J 4.i. ��.. Y f •i p�F, -� � !t 'i 1 . �y tl -, � °.: � . � '� I a � � (rn u3 / W LLI Lj Xro X oy= oc d 0 X o 0 z I? I? 48 11 x 17 = HALF SCALE 11 x 17 = HALF SCALE I CERTIFY THAT THESE PLANS ARE IN COMPLIANCE WITH SEAL L5 00 THE APPLICABLE SECTIONS OFTITLE21, CHAPTER 56_ U 30 0.0 0.0 v_ `9� i m N ° C n N O o d N aJ ms I C ci a i N t 1 N Existing Grade 0.0 CHRISTIAN L. GIBSON, P.E. NO- D26273 DATE Z'v ®H N -5.0 _50 31 +00 01/03/2012 m j 0 = N ° 36 +00 d z o C1/03/2D12 mN = N G m a DTH OAS -5.D -5.0 -5.0 -5.0 i Z 0 L -10.0 _ -10.0 O o y G LEFT TOE RIG TOE Q 0_ 3 I I 1- L -100 -50 ❑ 50 100 O to -10.0 R -40 d R40 -ion -10.0 R-40 d R40 -ion O 0 8 > Z N CO u Q 3 m 3 3 in (n CJ in h -15.0 H Saole -100 -50 D 50 1" = 50' V Saale : 1' = 5' 100 Vertiaol Datum : MLW H Saale -100 -50 0 50 1' = 50' V Saole : 1' = 5' 100 Vertiaol Datum : MLW r on 0.0 an 0.0 0.0 0.0 an 0.0 3 � 22 +00 01//20 26 +00 01/03/2012 30 +00 01/03/2012 35 +00 01/03/2012 9 a z Q z -s.D -5.0 -5.0 - - - -5.0 -S.D -5.0 -5.0 � O 0� x N K X 8 ° O c . -9.0' -9.0 -B.0' M W I`- -10.0 R -40 R40 -10.0 -1 D.0 R -61 R40 -10.0 -10.0 R -40 R40 -10.0 -10.0 R-40 R40 -10.0 m m 3 o W O J Nv m co 4 v -15.0 -100 -50 0 50 100 -15A -15.0 -100 -50 0 50 100 -15A -15.0 -100 -50 0 50 100 -15A -15.0 -100 -51 0 50 100 ° @7 H Scale 1" = 50' V Scale 1' = 5' Vertical Datum MLW H Scale 1" = 50' V Scale 1' = 5' Verticol Datum MLW H Scale 1" = 50' V Scale 1' = 5' Vertical Datum MLW H Scale 1" = 50' V Scale 1" = 5' Vertical Datum MLW U 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 ; 21 +00 01/03/2012 25 +00 01/03/2012 29 01/03/2012 34 +00 01/03/2012 N t O C a 6 Z l° 3 -5..0 -5.0 3 n •� � d �Z pwp v m EU + - - - 9.0' C -100 R -40 -100 -100 I+00 R -4 R -10A -100 R -40 R40 -100 13 IN U N > in O O N V7 3 N -15.0 -15.0 -15.0 -15.0 -15.0 -15.0 -15.0 -15.0 -100 -50 0 50 100 -100 -50 D 50 100 -100 -50 0 50 100 -100 -50 0 50 100 H Saale 1 = 50 V Saole : 1 = 5 Vertiaol Ootum MLW H Saale 1 - - 50' V Saale : 1' = 5' Vertiaol Mm : MLW H Saole 1" = 50' V Saale : 1" = 5' Vertiaol Datum : MLW H Saale 1' = 50' V Saole : 1' = 5' Vertiaol Mm : MLW 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 20 +00 01/03/2012 24 +00 01/03/2012 26 +00 01/03/2012 33 +00 01/03/2012 F J -5.0 -5.0 -S.o -5.0 -5.0 -5.0 -5.0 -5.0 '� z W U Qn -10.0 R -4 a R40 -1010 -1 D.0 R -40 a R40 -10.0 -1o.0 R -59 40 -10.0 -1 D.0 R -40 a R40 -10.0 Z a d z C) W M fir/.� a -15.0 -100 -50 O 50 100 -150 -15.0 -100 -50 0 50 100 -15.0 -15.0 -100 -50 0 50 100 -150 -15.0 -100 -50 0 50 100 -15.0 •5 m LU H Scale 1" - 50' V Scale 1' - 5' Vertical Datum MLW H Scale 1" - 50' V Scale 1' - 5' Vertical Datum MLW H Scale 1" - 50' V Scale 1' - 5' Vertical Datum MLW H Scale 1" - 50' V Scale 1" - 5' Vertical Datum MLW W 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 _ a 19 +0D 01/D3/2012 23 +00 01/03/2D12 27 +00 01/03/2D12 32 +00 01/03/2D12 �% �_ a ry- -5.0 -5.0 -5.0 -5.0 -5.0 -5.0 -5.0 O F d 0 Ld 0' O -10.o R -I4D R4 -ion -10.o R -I4D d R40 -10.0 -ro.o R 170 R40 -ion -10.o R -40 z; R40 -ion v Z -15.0 -15.0 -15.0 -15.0 -15.0 -15.0 -15.0 -100 -50 0 50 100 -100 -50 0 50 100 -100 -50 D SD 100 -100 -50 0 50 100 H Saale 1 = 50 V Saole : 1 = 5 Vertiaol Datum MLW H Saale - 50' V Saale : 1° = 5' 1 - Vertiaol Mm : MLW H Saole 1" = 50' V Saale : 1" = 5' Vertiaol Datum : MLW H Saale 1' = 50' V Saole : 1° = 5' Vertiaol Mm : MLW 11 x 17 = HALF SCALE 11 x 17 = HALF SCALE I CERTIFY THAT THESE PLANS ARE IN COMPLIANCE WITH SEAL L5 00 THE APPLICABLE SECTIONS OFTITLE21, CHAPTER 56_ v_ u 30 ° 0.0 0.0 `9� i m A N O o C d OD ro aJ ms I C ci a i N t 1 9' N -5.0 EA.Mg Grade _50 CHRISTIAN L_ GIBSON, P_E_NO- Q26273 DATE ®H IM � N O M.fmria1 m 6< m = \ G m a DTH ARIES Li r Z c O w ~ DWN £ ) L rL O -10.0 -10.0 o y 1.- LEFT TOE RIG TOE Q d 3 I I d m U E t -100 -50 ❑ 50 100 a m O to 00� [1 m Q 3 a m s 3 3 6 6 O 0.0 0.0 3 40 +00 01/03/2012 9 � z 0 � a -SD -5.0 e O 0_0 X O c - 9.0' -10.0 R -40 R40 -10.0 m 3 G W a J L Nv m d a -15.0 -tan o C} o B -100 -50 0 50 900 a @7 H Scale 1' = 50' V Scale 1' = 5' Vertical Datum MLW U 0.0 0.0 ; J p N 39 +00 01/03/2D12 a O C T N - E a w d •� n �pwp -100 R -40 al R40 -t0A 13 N O N > C] O O Q) to 3 -15.0 -15.0 -100 -50 0 50 100 H Sale 0.0 1- = 50' V Sale - 1- = 5' Vertical Ootum MLW 0.0 0.0 0.0 38 +00 01/03/2012 42 +00 01/03/2012 F J -5.0 -5.0 -5.0 -5.0 Ld z W = _ _gn, ,3A' I o U V) -10.0 R -40 R40 -10.0 -10.0 R -40 _, ❑.❑ Z a Ln W d C) C a c� -15.0 -100 -50 O 50 1o0 -150 -15.0 -100 -50 0 50 -15.0 100 •5 m H Scale 1' - 50' V Scale 1' - 5' Vertical Datum MLW H Scale 1' - 50' V Scale 1' - 5' Vertical Datum MLW J W 0.0 0.0 0.0 0.0 _ a �% 37 +00 01/03/2D12 41 +00 01/03/2D12 0 L_ a -5.0 -5.0 -5.0 -5.0 O F d 0 O -ion R -40 R40 -ion -10.0 R -40 R40 -ion Z -15.0 -15.0 -15.D -15.0 -100 -50 0 50 100 -100 -50 0 50 1DO H Sale 1- = 50' V Sale - 1- = 5' Vertical Oatum MLW H Sale 1- = 50' V Sale : 1- = 5- Verti.al 13 lm MLW 11 x 17 = HALF SCALE SECTION 5.0 Topsail Beach Nourishment Project Appendix Geotechnical Analysis 611 APPENDIX A Section 1 Topsail Beach Nourishment Project Vibracore Logs 6YA GAHAGAN & BRYANT ASSOCIATES O 295 -A N. Green Meadows Dr. Wilmington, NC 28405 ENGINEERS *SURVEYORS Tel: 910.313.3338 Fax: 910.313.6822 Legend for Geotechnical Data Well graded gravels or GW gravel -sand mixtures, little or no fines Poorly graded gravels GP or gravel -sand mixures, wl little or no fines GM ®Silty gravels, gravel - sand -silt mixtures GC Clayey gravels, gravel - sand -clay mixtures [�� Well graded sands or gravelly SW sands, little or no fines Poorly graded sands or SP gravelly sands, little or no fines SM Silty sands, sand silt mixtures SC Clayey sands, sand-clay IN mixtures SW -SM ° Well- graded silty sand SW -GM •p. Well- graded silty gravel Inorganic silts and very fine ML sands, rock flour, sandy silts or clayey silts with slight plasticity [g Inorganic silts, micaceous or MH diatomaceous fine sandy or silty soil, elastic silts OIL 1 Organic silts and organic 1 I silt -clays of low plasticity OH 0Organic clays of medium to high plasticity, organic silts Inorganic clays of low to medium CL plasticity, gravelly clays, sandy clays, silty clays, lean clays CH ®Inorganic clays of high plasticity, fat clays PT �Peat and other highly organic soils SP -SM �A Poorly- graded silty sand TM-SC [a Siltyclayeysand ML -CL Inorganic silty lean clay GM -GC a Clayey silty gravel Note: Information is after ACOE Atlantic Division Manual # 1110 -1 -1 titled Engineering and Design Geotechnical Manual for Surface and Subsurface Investigations 53 DRILLING LOG I DIVISION 1. PROJECT New Topsail Inlet Maintenance Dredging Town of Topsail Beach, North Carolina FNC INFERS * S 1RVEY P•- 2. BORING DESIGNATION i LOCATION COORDINATES TB- 11 -GS -1 X = 2,404,844 Y = 217,096 3. DRILLING AGENCY : CONTRACTOR FILE NO. i Gahagan & Bryant Associates, Inc. 4. NAME OF DRILLER J. Pratt 5. DIRECTION OF BORING i DEG. FROM i BEARING ® VERTICAL i VERTICAL Q INCLINED 6. THICKNESS OF OVERBURDEN 0.0 Ft. 7. DEPTH DRILLED INTO ROCK 0.0 Ft. 8. TOTAL DEPTH OF BORING 1.0 Ft. a ELEV. DEPTH W CLASSIFICATION OF MATERIALS (ft) (ft) W Depths and elevations based on measured value -11.7 0.0 and -light tan, fine to medium grained, wel -12.7 1.0 sorted, very clean quartz sand. Trace shell hash (2 -3 mm) and trace whole shells ( <2 End of Boring M O H c� Cn Cn O a w 0 LL co Cn O a w Q O boring ueslgnailon Its — I I -vs— I INSTALLATION SHEET 1 OF 1 SHEETS 9. SIZE AND TYPE OF BIT 10. COORDINATE SYSTEM/DATUM :HORIZONTAL i VERTICAL North Carolina State Plane NAD 1983 MLW 11. MANUFACTURER'S DESIGNATION OF DRILL 0 AUTO HAMMER Ponar Sampler Q MANUAL HAMMER DISTURBED i UNDISTURBED (UD) 12. TOTAL SAMPLES 13. TOTAL NUMBER CORE BOXES 14. ELEVATION GROUND WATER STARTED i COMPLETED 15. DATE BORING 10 -06 -11 13:53 10 -06 -11 13:54 16. ELEVATION TOP OF BORING -11.7 Ft. 17. TOTAL RECOVERY FOR BORING 1 Ft. 18. SIGNATURE AND TITLE OF INSPECTOR JCP T TARTC§ REMARKS fN N 1Z FORM 1836 MODIFIED FOR THE FLORIDA DEP JUN 02 JUN 04 54 — NuI - v.v - i.v Mean (mm): 0.24, Phi Sorting: 0.52 Fines (230): 0.35% M 5 IW Ili6y 20 7 DRILLING LOG I DIVISION 1. PROJECT am New Topsail Inlet Maintenance Dredging Town of Topsail Beach, North Carolina FNC INFERS * S 1RVEY 2. BORING DESIGNATION i LOCATION COORDINATES TB- 11 -GS -2 X = 2,405,259 Y = 216,974 3. DRILLING AGENCY : CONTRACTOR FILE NO. i Gahagan & Bryant Associates, Inc. 4. NAME OF DRILLER J. Pratt 5. DIRECTION OF BORING i DEG. FROM i BEARING ® VERTICAL i VERTICAL Q INCLINED 6. THICKNESS OF OVERBURDEN 0.0 Ft. 7. DEPTH DRILLED INTO ROCK 0.0 Ft. 8. TOTAL DEPTH OF BORING 1.0 Ft. a ELEV. DEPTH W CLASSIFICATION OF MATERIALS (ft) (ft) W Depths and elevations based on measured vas -9.8 0.0 and -light tan to tan, medium grained, -10.8 1.0 moderately well sorted quartz sand. Abundant shell hash (1 -10 mm) and moderate whole shells (< 5 cm).. End of Boring M O H c� U) U) O a w LL co U) O a w Q O boring ueSlgnaiion Its - "I "I -hJ -Z INSTALLATION SHEET 1 OF 1 SHEETS 9. SIZE AND TYPE OF BIT 10. COORDINATE SYSTEM/DATUM :HORIZONTAL i VERTICAL North Carolina State Plane NAD 1983 MLW 11. MANUFACTURER'S DESIGNATION OF DRILL 0 AUTO HAMMER Ponar Sampler Q MANUAL HAMMER DISTURBED i UNDISTURBED (UD) 12. TOTAL SAMPLES 13. TOTAL NUMBER CORE BOXES 14. ELEVATION GROUND WATER STARTED i COMPLETED 15. DATE BORING 10 -06 -11 13:56 10 -06 -11 13:57 16. ELEVATION TOP OF BORING -9.8 Ft. 17. TOTAL RECOVERY FOR BORING 1 Ft. 18. SIGNATURE AND TITLE OF INSPECTOR JCP o� REC. CQ REMARKS GOfN 1Z FORM 1836 MODIFIED FOR THE FLORIDA DEP JUN 02 JUN 04 55 —NuI - v.v - i.v Mean (mm): 0.63, Phi Sorting: 0.84 Fines (230): 0.20% M 5 IW Ili6y 20 7 DRILLING LOG I DIVISION 1. PROJECT GSA New Topsail Inlet Maintenance Dredging Town of Topsail Beach, North Carolina FNC INFERS * S 1RVEY P 2. BORING DESIGNATION i LOCATION COORDINATES TB- 11 -GS -3 X = 2,405,464 Y = 216,775 3. DRILLING AGENCY : CONTRACTOR FILE NO. i Gahagan & Bryant Associates, Inc. 4. NAME OF DRILLER J. Pratt 5. DIRECTION OF BORING i DEG. FROM i BEARING ® VERTICAL i VERTICAL Q INCLINED 6. THICKNESS OF OVERBURDEN 0.0 Ft. 7. DEPTH DRILLED INTO ROCK 0.0 Ft. 8. TOTAL DEPTH OF BORING 1.0 Ft. a ELEV. DEPTH W CLASSIFICATION OF MATERIALS (ft) (ft) W Depths and elevations based on measured vah, -7.6 0.0 and -light tan to tan, medium grained, we -8.6 1.0 sorted quartz sand. Moderate shell hash (1 -10 mm) and few whole shells (< 2 cm). End of Boring M O H c� U) U) O a w LL co U) O a w Q O boring ueslgnailon INSTALLATION SHEET SHEET 1 OF 1 SHEETS 9. SIZE AND TYPE OF BIT 10. COORDINATE SYSTEM/DATUM :HORIZONTAL i VERTICAL North Carolina State Plane NAD 1983 MLW 11. MANUFACTURER'S DESIGNATION OF DRILL 0 AUTO HAMMER Ponar Sampler Q MANUAL HAMMER DISTURBED i UNDISTURBED (UD) 12. TOTAL SAMPLES 13. TOTAL NUMBER CORE BOXES 14. ELEVATION GROUND WATER STARTED i COMPLETED 15. DATE BORING 10 -06 -11 13:58 10 -06 -11 13:59 16. ELEVATION TOP OF BORING -7.6 Ft. 17. TOTAL RECOVERY FOR BORING 1 Ft. 18. SIGNATURE AND TITLE OF INSPECTOR JCP o� REC. CQ REMARKS GOfN 1Z FORM 1836 MODIFIED FOR THE FLORIDA DEP JUN 02 JUN 04 56 —NuI - v.v - i.v Mean (mm): 0.47, Phi Sorting: 0.68 Fines (230): 0.15% M 5 IW Ili6y 20 7 DRILLING LOG I DIVISION 1. PROJECT GSA New Topsail Inlet Maintenance Dredging Town of Topsail Beach, North Carolina FNC INFERS * S 1RVEY P 2. BORING DESIGNATION i LOCATION COORDINATES TB- 11 -GS-4 X = 2,405,753 Y = 216,527 3. DRILLING AGENCY : CONTRACTOR FILE NO. i Gahagan & Bryant Associates, Inc. 4. NAME OF DRILLER J. Pratt 5. DIRECTION OF BORING i DEG. FROM i BEARING ® VERTICAL i VERTICAL Q INCLINED 6. THICKNESS OF OVERBURDEN 0.0 Ft. 7. DEPTH DRILLED INTO ROCK 0.0 Ft. 8. TOTAL DEPTH OF BORING 1.0 Ft. a ELEV. DEPTH W CLASSIFICATION OF MATERIALS (ft) (ft) W Depths and elevations based on measured vah, -6.8 0.0 and -light tan to tan, medium grained, we -7.8 1.0 sorted quartz sand. Moderate shell hash (1 -10 mm) and few whole shells (< 7 cm). End of Boring M O H c� U) U) O a w LL co U) O a w Q O boring ueSlgnaiion I b - "I "I -hJ -4 INSTALLATION SHEET 1 OF 1 SHEETS 9. SIZE AND TYPE OF BIT 10. COORDINATE SYSTEM/DATUM :HORIZONTAL i VERTICAL North Carolina State Plane NAD 1983 MLW 11. MANUFACTURER'S DESIGNATION OF DRILL 0 AUTO HAMMER Ponar Sampler Q MANUAL HAMMER DISTURBED i UNDISTURBED (UD) 12. TOTAL SAMPLES 13. TOTAL NUMBER CORE BOXES 14. ELEVATION GROUND WATER STARTED i COMPLETED 15. DATE BORING 10 -06 -11 14:01 10 -06 -11 14:02 16. ELEVATION TOP OF BORING -6.8 Ft. 17. TOTAL RECOVERY FOR BORING 1 Ft. 18. SIGNATURE AND TITLE OF INSPECTOR JCP o� REC. CQ REMARKS GOfN 1Z FORM 1836 MODIFIED FOR THE FLORIDA DEP JUN 02 JUN 04 57 —NuI - v.v - i.v Mean (mm): 0.40, Phi Sorting: 0.66 Fines (230): 0.20% M 5 IW Ili6y 20 7 DRILLING LOG I DIVISION 1. PROJECT New Topsail Inlet Maintenance Dredging Town of Topsail Beach, North Carolina FNC INFERS * S 1RVEY P•- 2. BORING DESIGNATION i LOCATION COORDINATES TB- 11 -GS -5 X = 2,406,244 Y = 216,253 3. DRILLING AGENCY : CONTRACTOR FILE NO. i Gahagan & Bryant Associates, Inc. 4. NAME OF DRILLER J. Pratt 5. DIRECTION OF BORING i DEG. FROM i BEARING ® VERTICAL i VERTICAL Q INCLINED 6. THICKNESS OF OVERBURDEN 0.0 Ft. 7. DEPTH DRILLED INTO ROCK 0.0 Ft. 8. TOTAL DEPTH OF BORING 1.0 Ft. a ELEV. DEPTH W CLASSIFICATION OF MATERIALS (ft) (ft) W Depths and elevations based on measured value -5.5 0.0 and -light tan, fine to medium grained, wel -6.5 1.0 sorted, very clean quartz sand. Trace shell hash (1 -2 mm).. End of Boring M O H c� U) U) O a w LL co U) O a w Q O boring ueslgnailon Its — I I -vs -S INSTALLATION SHEET 1 OF 1 SHEETS 9. SIZE AND TYPE OF BIT 10. COORDINATE SYSTEM/DATUM :HORIZONTAL i VERTICAL North Carolina State Plane NAD 1983 MLW 11. MANUFACTURER'S DESIGNATION OF DRILL 0 AUTO HAMMER Ponar Sampler Q MANUAL HAMMER DISTURBED i UNDISTURBED (UD) 12. TOTAL SAMPLES 13. TOTAL NUMBER CORE BOXES 14. ELEVATION GROUND WATER STARTED i COMPLETED 15. DATE BORING 10 -06 -11 14:07 10 -06 -11 14:08 16. ELEVATION TOP OF BORING -5.5 Ft. 17. TOTAL RECOVERY FOR BORING 1 Ft. 18. SIGNATURE AND TITLE OF INSPECTOR JCP o� REC. CQ REMARKS GOfN 1Z FORM 1836 MODIFIED FOR THE FLORIDA DEP JUN 02 JUN 04 58 —NuI – v.v - i.v Mean (mm): 0.26, Phi Sorting: 0.38 Fines (230): 0.40% (SP) M 5 IW Ili6y 20 7 DRILLING LOG I DIVISION 1. PROJECT New Topsail Inlet Maintenance Dredging Town of Topsail Beach, North Carolina FNC INFERS * S 1RVEY P•- 2. BORING DESIGNATION i LOCATION COORDINATES TB- 11 -GS -6 X = 2,406,571 Y = 216,189 3. DRILLING AGENCY : CONTRACTOR FILE NO. i Gahagan & Bryant Associates, Inc. 4. NAME OF DRILLER J. Pratt 5. DIRECTION OF BORING i DEG. FROM i BEARING ® VERTICAL i VERTICAL Q INCLINED 6. THICKNESS OF OVERBURDEN 0.0 Ft. 7. DEPTH DRILLED INTO ROCK 0.0 Ft. 8. TOTAL DEPTH OF BORING 1.0 Ft. a ELEV. DEPTH W CLASSIFICATION OF MATERIALS (ft) (ft) W Depths and elevations based on measured value -6.8 0.0 and -light tan, fine to medium grained, wel -7.8 1.0 sorted, very clean quartz sand. Trace shell hash (1 -2 mm).. End of Boring M O H c� U) U) O a w LL co U) O a w Q O boring ueSlgnaiion Its - "I "I -hJ -b INSTALLATION SHEET 1 OF 1 SHEETS 9. SIZE AND TYPE OF BIT 10. COORDINATE SYSTEM/DATUM :HORIZONTAL i VERTICAL North Carolina State Plane NAD 1983 MLW 11. MANUFACTURER'S DESIGNATION OF DRILL 0 AUTO HAMMER Ponar Sampler Q MANUAL HAMMER DISTURBED i UNDISTURBED (UD) 12. TOTAL SAMPLES 13. TOTAL NUMBER CORE BOXES 14. ELEVATION GROUND WATER STARTED i COMPLETED 15. DATE BORING 10 -06 -11 14:11 10 -06 -11 14:12 16. ELEVATION TOP OF BORING -6.8 Ft. 17. TOTAL RECOVERY FOR BORING 1 Ft. 18. SIGNATURE AND TITLE OF INSPECTOR JCP o� REC. CQ REMARKS GOfN 1Z FORM 1836 MODIFIED FOR THE FLORIDA DEP JUN 02 JUN 04 59 —NuI – v.v - i.v Mean (mm): 0.23, Phi Sorting: 0.47 Fines (230): 0.25% (SP) M 5 IW Ili6y 20 7 DRILLING LOG I DIVISION 1. PROJECT am New Topsail Inlet Maintenance Dredging Town of Topsail Beach, North Carolina FNC INFERS * S 1RVEY 2. BORING DESIGNATION i LOCATION COORDINATES TB- 11 -GS -7 X = 2,406,484 Y = 216,036 3. DRILLING AGENCY : CONTRACTOR FILE NO. i Gahagan & Bryant Associates, Inc. 4. NAME OF DRILLER J. Pratt 5. DIRECTION OF BORING i DEG. FROM i BEARING ® VERTICAL i VERTICAL Q INCLINED 6. THICKNESS OF OVERBURDEN 0.0 Ft. 7. DEPTH DRILLED INTO ROCK 0.0 Ft. 8. TOTAL DEPTH OF BORING 1.0 Ft. a ELEV. DEPTH W CLASSIFICATION OF MATERIALS (ft) (ft) W Depths and elevations based on measured vas -6.7 0.0 Sand -light tan, fine grained, very well sort -7.7 1.0 very clean quartz sand.. End of Boring M O H c� Cn Cn O a w 0 LL co Cn O a w Q O boring ueslgnailon INSTALLATION SHEET 1 OF 1 SHEETS 9. SIZE AND TYPE OF BIT 10. COORDINATE SYSTEM/DATUM :HORIZONTAL i VERTICAL North Carolina State Plane NAD 1983 MLW 11. MANUFACTURER'S DESIGNATION OF DRILL 0 AUTO HAMMER Ponar Sampler Q MANUAL HAMMER DISTURBED i UNDISTURBED (UD) 12. TOTAL SAMPLES 13. TOTAL NUMBER CORE BOXES 14. ELEVATION GROUND WATER STARTED i COMPLETED 15. DATE BORING 10 -06 -11 14:15 10 -06 -11 14:16 16. ELEVATION TOP OF BORING -6.7 Ft. 17. TOTAL RECOVERY FOR BORING 1 Ft. 18. SIGNATURE AND TITLE OF INSPECTOR JCP o� REC. CQ REMARKS GOfN 1Z FORM 1836 MODIFIED FOR THE FLORIDA DEP JUN 02 JUN 04 60 —NuI - v.v - i.v Mean (mm): 0.20, Phi Sorting: 0.32 Fines (230): 0.35% (SP) M 5 IW Ili6y 20 7 M O c� U) U) O a w LL co U) O a w Q O DRILLING LOG I DIVISION 1. PROJECT New Topsail Inlet Maintenance Dredging am Town of Topsail Beach, North Carolina FNC INFERS * S 1RVEY 2. BORING DESIGNATION i LOCATION COORDINATES TB- 11 -VB -4 X = 2,404,400 Y = 217,344 3. DRILLING AGENCY i CONTRACTOR FILE NO. American Vibracore Services 4. NAME OF DRILLER S. Kemnuir 5. DIRECTION OF BORING i DEG. FROM i BEARING ® VERTICAL i VERTICAL Q INCLINED 6. THICKNESS OF OVERBURDEN 0.0 Ft. 7. DEPTH DRILLED INTO ROCK 0.0 Ft. 8. TOTAL DEPTH OF BORING 13.5 Ft. a ELEV. DEPTH W CLASSIFICATION OF MATERIALS (ft) (ft) W Depths and elevations based on measured vas -5.0 0.0 Sand -light tan, fine to medium grained, sorted very clean quartz sand. trace shel (SW). 12.2 7.2 Sand -light tan to greyish tan, medium grained, well sorted quartz sand. Moder shell hash (2 -3 mm), trace organics (wo _1A A QA _ sticks). Shell lens (aD -15.8' to - 16.3', (S No Recovery. End of Boring boring ueSlgnaiion I b - "I "I -vb -4 INSTALLATION SHEET 1 OF 1 SHEETS 9. SIZE AND TYPE OF BIT 4.0 In. 10. COORDINATE SYSTEM/DATUM :HORIZONTAL i VERTICAL North Carolina State Plane NAD 1983 MLW 11. MANUFACTURER'S DESIGNATION OF DRILL 0 AUTO HAMMER Vibracore Q MANUAL HAMMER DISTURBED i UNDISTURBED (UD) 12. TOTAL SAMPLES i i 13. TOTAL NUMBER CORE BOXES 14. ELEVATION GROUND WATER STARTED i COMPLETED 15. DATE BORING 10 -04 -11 08:36 10 -04 -11 08:43 16. ELEVATION TOP OF BORING -5.0 Ft. 17. TOTAL RECOVERY FOR BORING 8.9 Ft. 18. SIGNATURE AND TITLE OF INSPECTOR JCP o� REC. CQ REMARKS GOfN well Sample #1, Depth = 0.0'- 7.2' Is, 1 Mean (mm): 0.24, Phi Sorting: 0.40 Fines (230): 0.40% (SP) Sample #2, Depth = 7.2'- 9.4' ate 2 Mean (mm): 0.53, Phi Sorting: 0.96 W) Fines (230): 0.85% LLI SAJ FORM 1836 MODIFIED FOR THE FLORIDA DEP JUN 02 JUN 04 61 M 5 IW lib". 20 7 M O H c� Cn 0 a w 0 LL co U) O a w Q O DRILLING LOG DIVISION 1. PROJECT New Topsail Inlet Maintenance Dredging Town of Topsail Beach, North Carolina FNC INFERS * S 1RVEY P•- 2. BORING DESIGNATION i LOCATION COORDINATES TB- 11 -VB -5 X = 2,403,564 Y = 217,609 3. DRILLING AGENCY CONTRACTOR FILE NO. i American Vibracore Services 4. NAME OF DRILLER S. Kemnuir 5. DIRECTION OF BORING i DEG. FROM i BEARING ® VERTICAL i VERTICAL Q INCLINED 6. THICKNESS OF OVERBURDEN 0.0 Ft. 7. DEPTH DRILLED INTO ROCK 0.0 Ft. 8. TOTAL DEPTH OF BORING 13.0 Ft. a ELEV. DEPTH W CLASSIFICATION OF MATERIALS (ft) (ft) W Depths and elevations based on measured value., -8.0 0.0 Sand -tan, fine to medium grained, very well sorted clean quartz sand. Trace shell hash (1 -2 mm), trace whole shells (< 2 cm), (SW). -177 Q7 ° ol WA Kim Bill No Recovery. End of Boring boringueSlgnaiion Ib-- i - i -vb -o INSTALLATION SHEET 1 OF 1 SHEETS 9. SIZE AND TYPE OF BIT 4.0 In. 10. COORDINATE SYSTEM/DATUM :HORIZONTAL i VERTICAL North Carolina State Plane NAD 1983 MLW 11. MANUFACTURER'S DESIGNATION OF DRILL 0 AUTO HAMMER Vibracore Q MANUAL HAMMER TOTAL SAMPLES 12. DISTURBED i UNDISTURBED (UD) i i 13. TOTAL NUMBER CORE BOXES 14. ELEVATION GROUND WATER STARTED i COMPLETED 15. DATE BORING ' 10 -03 -11 08:48 10 -03 -11 09:00 16. ELEVATION TOP OF BORING -8.0 Ft. 17. TOTAL RECOVERY FOR BORING 9.2 Ft. 18. SIGNATURE AND TITLE OF INSPECTOR JCP o� REC. CQ REMARKS GOfN 1Z FORM 1836 MODIFIED FOR THE FLORIDA DEP JUN 02 JUN 04 62 Sample #1, Depth = 0.0'- 9.2' 1 Mean (mm): 0.24, Phi Sorting: 0.46 Fines (230): 0.30% M 5 IW lib". 20 7 M O 0 c� Cn Cn O a w 0 LL co U) O a w Q O DRILLING LOG DIVISION 1. PROJECT New Topsail Inlet Maintenance Dredging Town of Topsail Beach, North Carolina FNC INFERS * S 1RVEY P•- 2. BORING DESIGNATION i LOCATION COORDINATES TB- 11 -VB -6 X = 2,402,870 Y = 217,470 3. DRILLING AGENCY i CONTRACTOR FILE NO. American Vibracore Services 4. NAME OF DRILLER S. Kemnuir 5. DIRECTION OF BORING i DEG. FROM i BEARING ® VERTICAL i VERTICAL Q INCLINED 6. THICKNESS OF OVERBURDEN 0.0 Ft. 7. DEPTH DRILLED INTO ROCK 0.0 Ft. 8. TOTAL DEPTH OF BORING 11.0 Ft. a ELEV. DEPTH W CLASSIFICATION OF MATERIALS (ft) (ft) W Depths and elevations based on measured values -10.0 0.0 Sand - greyish tan, fine to medium grained, very well sorted quartz sand. Small amounts shell hash (1 -2 mm)., (SW). 14.8 4.8 Sand -grey to greyish tan, medium grained, well sorted quartz sand. Abundant shell hash (1 -3 mm) and shell fragments (< 10 cm)., (SW). -17q 7q o 0 No Recovery. End of Boring boringueSlgnaiion Ib-- i - i -vb -t) INSTALLATION SHEET 1 OF 1 SHEETS 9. SIZE AND TYPE OF BIT 4.0 In. 10. COORDINATE SYSTEM/DATUM :HORIZONTAL i VERTICAL North Carolina State Plane NAD 1983 MLW 11. MANUFACTURER'S DESIGNATION OF DRILL 0 AUTO HAMMER Vibracore Q MANUAL HAMMER TOTAL SAMPLES 12. DISTURBED i UNDISTURBED (UD) i i 13. TOTAL NUMBER CORE BOXES 14. ELEVATION GROUND WATER STARTED i COMPLETED 15. DATE BORING ' 10 -03 -11 07:58 10 -03 -11 08:24 16. ELEVATION TOP OF BORING -10.0 Ft. 17. TOTAL RECOVERY FOR BORING 7.9 Ft. 18. SIGNATURE AND TITLE OF INSPECTOR JCP o� REC. CQ REMARKS GOfN 1Z FORM 1836 MODIFIED FOR THE FLORIDA DEP JUN 02 JUN 04 63 Sample #1, Depth = 0.0'- 4.8' 1 Mean (mm): 0.23, Phi Sorting: 0.42 Fines (230): 0.10% Sample #2, Depth = 4.8'- 7.9' 2 Mean (mm): 0.62, Phi Sorting: 1.14 Fines (230): 0.35% M 5 in Ili6y 20 7 DRILLING LOG D DIVISION 1. PROJECT New Topsail Inlet M Maintenance Dredging Town of Topsail Beach, North Carolina F FNC INFERS * S 1RVEY P•- 2. BORING DESIGNATION i LOCATION COORDINATES TB- 11 -VB -7 X X = 2,402,024 Y = 217,452 3. DRILLING AGENCY C CONTRACTOR FILE NO. i American Vibracore Services 4. NAME OF DRILLER S. Kemnuir 5. DIRECTION OF BORING i DEG. FROM i BEARING ® VERTICAL i i VERTICAL Q INCLINED 6. THICKNESS OF OVERBURDEN 0.0 Ft. 7. DEPTH DRILLED INTO ROCK 0.0 Ft. 8. TOTAL DEPTH OF BORING 14.5 Ft. a ELEV. D DEPTH W W C CLASSIFICATION OF MATERIALS (ft) ( (ft) T M O H c� U) U) a w LL co Cn O a w Q O No Recovery. End of Boring boringueSlgnaiion Ib-- i - i -vb -/ INSTALLATION SHEET 1 OF 1 SHEETS 9. SIZE AND TYPE OF BIT 4.0 In. 10. COORDINATE SYSTEM/DATUM :HORIZONTAL i VERTICAL North Carolina State Plane NAD 1983 MLW 11. MANUFACTURER'S DESIGNATION OF DRILL 0 AUTO HAMMER Vibracore Q MANUAL HAMMER 12. DISTURBED i UNDISTURBED (UD) i i 13. TOTAL NUMBER CORE BOXES 14. ELEVATION GROUND WATER STARTED i COMPLETED 15. DATE BORING 10 -02 -11 08:06 10 -02 -11 08:18 16. ELEVATION TOP OF BORING -7.0 Ft. 17. TOTAL RECOVERY FOR BORING 13.5 Ft. 18. SIGNATURE AND TITLE OF INSPECTOR JCP 0.4 s REC. CQ 4. REMARKS GOfN 1Z FORM 1836 MODIFIED FOR THE FLORIDA DEP JUN 02 JUN 04 64 Sample #1, Depth = 0.0'- 2.9' 1 Mean (mm): 0.40, Phi Sorting: 1.10 Fines (230): 0.65% Sample #2, Depth = 2.9'- 4.8' 2 Mean (mm): 0.27, Phi Sorting: 0.66 Fines (230): 0.25% I M 5 IW Ili6y 20 5 M 0 0 c� 0 0 LL co U) O a w Q O DRILLING LOG I DIVISION 1. PROJECT am New Topsail Inlet Maintenance Dredging Town of Topsail Beach, North Carolina FNC INFERS * S 1RVEY 2. BORING DESIGNATION i LOCATION COORDINATES TB- 11 -VB -7A X = 2,402,024 Y = 217,452 3. DRILLING AGENCY CONTRACTOR FILE NO. i American Vibracore Services 4. NAME OF DRILLER S. Kemnuir 5. DIRECTION OF BORING i DEG. FROM i BEARING ® VERTICAL i VERTICAL Q INCLINED 6. THICKNESS OF OVERBURDEN 0.0 Ft. 7. DEPTH DRILLED INTO ROCK 0.0 Ft. 8. TOTAL DEPTH OF BORING 5.4 Ft. 0 ELEV. DEPTH W CLASSIFICATION OF MATERIALS (ft) (ft) W Depths and elevations based on measured vas -7.0 0.0 Jetted down 7 feet to -14 MLW.. V Sand -tan, fine to medium grained, very well -14.8 7.8 sorted quartz sand. Small amounts of shell hash (1 -2 mm) increasing in abundance down core. Same as Sample #2 taken from TB- 11- VB -7., (SW). Sand -tan, fine to mediume grained, moderately well sorted quartz sand. Abundant shell hash (3 -10 mm) and moderate whole shells (< 8 cm). Layer of reduced shell hash and whole shells @ -15.9' 19.4 12.4 to - 17.0'. Same as Sample 1 taken from TB- 1- VB -7.. (SW). End of Boring boring ueSlgnaiion I b - "I "I -Vb -/A INSTALLATION SHEET 1 OF 1 SHEETS 9. SIZE AND TYPE OF BIT 4.0 In. 10. COORDINATE SYSTEM/DATUM :HORIZONTAL i VERTICAL North Carolina State Plane NAD 1983 MLW 11. MANUFACTURER'S DESIGNATION OF DRILL 0 AUTO HAMMER Vibracore Q MANUAL HAMMER TOTAL SAMPLES 12. DISTURBED i UNDISTURBED (UD) i i 13. TOTAL NUMBER CORE BOXES 14. ELEVATION GROUND WATER STARTED i COMPLETED 15. DATE BORING 10 -02 -11 09:00 10 -02 -11 09:15 16. ELEVATION TOP OF BORING -7.0 Ft. 17. TOTAL RECOVERY FOR BORING 12.4 Ft. 18. SIGNATURE AND TITLE OF INSPECTOR JCP o� REC. CQ REMARKS GOfN 1Z FORM 1836 MODIFIED FOR THE FLORIDA DEP JUN 02 JUN 04 65 Sample #2, Depth = 7.0'- 7.8' 1 1 Sample #1, Depth = 7.8'- 12.4' M 5 in lib". 20 7 M O H c� Cn Cn O a w 0 LL co Cn O a w Q O DRILLING LOG DIVISION 1. PROJECT New Topsail Inlet Maintenance Dredging Town of Topsail Beach, North Carolina FNC INFERS * S 1RVEY P•- 2. BORING DESIGNATION i LOCATION COORDINATES TB- 11 -VB -8 X = 2,401,553 Y = 218,106 3. DRILLING AGENCY CONTRACTOR FILE NO. i American Vibracore Services 4. NAME OF DRILLER S. Kemnuir 5. DIRECTION OF BORING i DEG. FROM i BEARING ® VERTICAL i VERTICAL Q INCLINED 6. THICKNESS OF OVERBURDEN 0.0 Ft. 7. DEPTH DRILLED INTO ROCK 0.0 Ft. 8. TOTAL DEPTH OF BORING 14.0 Ft. a ELEV. DEPTH W CLASSIFICATION OF MATERIALS (ft) (ft) W Depths and elevations based on measured TOTAL SAMPLES value -6.1 0.0 boringueSlgnaiion Ib-- i- i -vb -t9 INSTALLATION SHEET 1 OF 1 SHEETS 9. SIZE AND TYPE OF BIT 4.0 In. 10. COORDINATE SYSTEM/DATUM :HORIZONTAL i VERTICAL North Carolina State Plane NAD 1983 MLW 11. MANUFACTURER'S DESIGNATION OF DRILL 0 AUTO HAMMER Vibracore Q MANUAL HAMMER 12. DISTURBED i UNDISTURBED (UD) i i 13. TOTAL NUMBER CORE BOXES 14. ELEVATION GROUND WATER STARTED i COMPLETED 15. DATE BORING ' 09 -30 -11 15:55 09 -30 -11 16:10 16. ELEVATION TOP OF BORING -6.1 Ft. 17. TOTAL RECOVERY FOR BORING 9 Ft. 18. SIGNATURE AND TITLE OF INSPECTOR JCP 0.4 s REC. CQ 4. REMARKS GOfN Sand -light greyish tan, fine to medium grained, very well sorted quartz sand. Trace Sample #1, Depth = 0.0'- 7.4' shell hash (1 -2 mm). Slightly coarser layer 1 Mean (mm): 0.23, Phi Sorting: 0.38 with increased shell hash from -10.3' to Fines (230): 0.10% (SP) 11.2'., (SW). o -13.5 7.4 Sand -tan, medium grained, well sorted Sample #2, Depth = 7.4'- 9.0' Few whole shells at bottom) of core (< 6 m) 2 Mean (mm): 0.460 Phi Sorting: 0.69 -15.1 9.0 ) Fines (230): 0.60% No Recovery. End of Boring 1Z FORM 1836 MODIFIED FOR THE FLORIDA DEP JUN 02 JUN 04 66 M 5 IW lib". 20 5 DRILLING LOG D DIVISION 1. PROJECT New Topsail Inlet M Maintenance Dredging Town of Topsail Beach, North Carolina F FNC INFERS * S 1RVEY P•- 2. BORING DESIGNATION i LOCATION COORDINATES TB- 11 -VB -9 X X = 2,401,736 Y = 219,385 3. DRILLING AGENCY C CONTRACTOR FILE NO. i American Vibracore Services 4. NAME OF DRILLER S. Kemnuir 5. DIRECTION OF BORING i DEG. FROM i BEARING ® VERTICAL i i VERTICAL Q INCLINED 6. THICKNESS OF OVERBURDEN 0.0 Ft. 7. DEPTH DRILLED INTO ROCK 0.0 Ft. 8. TOTAL DEPTH OF BORING 14.5 Ft. a ELEV. D DEPTH W W C CLASSIFICATION OF MATERIALS (ft) ( (ft) T M O H c� Cn Cn O W 0 LL co Cn O a w Q O No Recovery. End of Boring boringueSlgnaiion Ib-- i - i -vb -y INSTALLATION SHEET 1 OF 1 SHEETS 9. SIZE AND TYPE OF BIT 4.0 In. 10. COORDINATE SYSTEM/DATUM :HORIZONTAL i VERTICAL North Carolina State Plane NAD 1983 MLW 11. MANUFACTURER'S DESIGNATION OF DRILL 0 AUTO HAMMER Vibracore Q MANUAL HAMMER 12. DISTURBED i UNDISTURBED (UD) i i 13. TOTAL NUMBER CORE BOXES 14. ELEVATION GROUND WATER STARTED i COMPLETED 15. DATE BORING ' 09 -29 -11 15:00 09 -29 -11 15:40 16. ELEVATION TOP OF BORING -2.9 Ft. 17. TOTAL RECOVERY FOR BORING 9.1 Ft. 18. SIGNATURE AND TITLE OF INSPECTOR JCP 0.4 s REC. CQ 4. REMARKS GOfN 1Z FORM 1836 MODIFIED FOR THE FLORIDA DEP JUN 02 JUN 04 67 Sample #1, Depth= 0.0'- 2.1' 1 Mean (mm): 0.30, Phi Sorting: 0.75 Fines (230): 0.30% Sample #2, Depth = 2.1'- 5.8' 2 Mean (mm): 0.25, Phi Sorting: 0.50 Fines (230): 0.50% (SP) E M 5 IW Ili6y 20 5 M O 0 c� Cn Cn O a w 0 LL co Cn O a w Q O DRILLING LOG I DIVISION 1. PROJECT New Topsail Inlet Maintenance Dredging GBA Town of Topsail Beach, North Carolina FNC INFERS * S 1RVEY P•- 2. BORING DESIGNATION i LOCATION COORDINATES TB- 11 -VB -10 X = 2,402,169 Y = 220,028 3. DRILLING AGENCY i CONTRACTOR FILE NO. American Vibracore Services 4. NAME OF DRILLER S. Kemnuir 5. DIRECTION OF BORING i DEG. FROM i BEARING ® VERTICAL i VERTICAL Q INCLINED 6. THICKNESS OF OVERBURDEN 0.0 Ft. 7. DEPTH DRILLED INTO ROCK 0.0 Ft. 8. TOTAL DEPTH OF BORING 14.5 Ft. a ELEV. DEPTH W CLASSIFICATION OF MATERIALS (ft) (ft) W Depths and elevations based on measured value -2.1 0.0 Sand -light greyish tan, fine to medium grained, well sorted quartz sand. Small amounts of shell hash (1 -3 mm) and trace whole shells (< 4 cm). Slightly coarser medium grained sand with increased shell hash @ -8.2' to - 9.3'., (SW). -12.0 9.9 ° No Recovery. End of Boring boringueSlgnaiion Ib-- i - i- vb - -iu INSTALLATION SHEET 1 OF 1 SHEETS 9. SIZE AND TYPE OF BIT 4.0 In. 10. COORDINATE SYSTEM/DATUM :HORIZONTAL i VERTICAL North Carolina State Plane NAD 1983 MLW 11. MANUFACTURER'S DESIGNATION OF DRILL 0 AUTO HAMMER Vibracore Q MANUAL HAMMER TOTAL SAMPLES 12. DISTURBED i UNDISTURBED (UD) i i 13. TOTAL NUMBER CORE BOXES 14. ELEVATION GROUND WATER STARTED i COMPLETED 15. DATE BORING ' 09 -29 -11 14:20 09 -29 -11 14:35 16. ELEVATION TOP OF BORING -2.1 Ft. 17. TOTAL RECOVERY FOR BORING 9.9 Ft. 18. SIGNATURE AND TITLE OF INSPECTOR JCP o� REC. CQ REMARKS GOfN 1Z FORM 1836 MODIFIED FOR THE FLORIDA DEP JUN 02 JUN 04 68 Sample #1, Depth = 0.0'- 9.9' 1 Mean (mm): 0.26, Phi Sorting: 0.60 Fines (230): 0.30% M 5 in Ili6y 20 7 M o_ 0 c� Cn Cn O a w 0 LL co Cn O a w Q O DRILLING LOG DIVISION 1. PROJECT New Topsail Inlet Maintenance Dredging Town of Topsail Beach, North Carolina FNC INFERS * S 1RVEY P•- 2. BORING DESIGNATION i LOCATION COORDINATES TB- 11 -VB -11 X = 2,402,863 Y = 220,510 3. DRILLING AGENCY CONTRACTOR FILE NO. i American Vibracore Services 4. NAME OF DRILLER S. Kemnuir 5. DIRECTION OF BORING i DEG. FROM i BEARING ® VERTICAL i VERTICAL Q INCLINED 6. THICKNESS OF OVERBURDEN 0.0 Ft. 7. DEPTH DRILLED INTO ROCK 0.0 Ft. 8. TOTAL DEPTH OF BORING 14.5 Ft. a ELEV. DEPTH W CLASSIFICATION OF MATERIALS (ft) (ft) W Depths and elevations based on measured value -3.7 0.0 Sand -tan, fine to medium grained, very well sorted quartz sand. Trace shell hash (1 -2 -5.5 1.8 mm)., (SW). ° Sand -light grey to greyish tan, fine to medium grained, very well sorted quartz sand. Trace shell hash (1 -2 mm)., (SW). 5ana -grey to aarK grey, very tine to tine -14.4 10.7 grained, moderately well sorted silty sand. Abundant whole shells.. (SW -SM). No Recovery. End of Boring boring ueSlgnaiion I b - -i - i -vb - -i -i INSTALLATION SHEET 1 OF 1 SHEETS 9. SIZE AND TYPE OF BIT 4.0 In. 10. COORDINATE SYSTEM/DATUM :HORIZONTAL i VERTICAL North Carolina State Plane NAD 1983 MLW 11. MANUFACTURER'S DESIGNATION OF DRILL 0 AUTO HAMMER Vibracore Q MANUAL HAMMER DISTURBED i UNDISTURBED (UD) 12. TOTAL SAMPLES 13. TOTAL NUMBER CORE BOXES 14. ELEVATION GROUND WATER STARTED i COMPLETED 15. DATE BORING ' 09 -29 -11 13:45 09 -29 -11 13:58 16. ELEVATION TOP OF BORING -3.7 Ft. 17. TOTAL RECOVERY FOR BORING 10.7 Ft. 18. SIGNATURE AND TITLE OF INSPECTOR JCP 0.4 s REC. CQ 4. REMARKS GOfN LLI SAJ FORM 1836 MODIFIED FOR THE FLORIDA DEP JUN 02 JUN 04 69 I Sample #1, Depth = 1.8'- 9.5' 1 Mean (mm): 0.21, Phi Sorting: 0.33 Fines (230): 0.25% (SP) Sample #2, Depth = 9.5' - 10.7' 2 Mean (mm): 0.29, Phi Sorting: 0.98 Fines (230): 2.25% M 5 in lib". 20 7 M O 0 C7 Cn Cn O a w 0 LL co Cn O a w Q O DRILLING LOG I DIVISION 1. PROJECT New Topsail Inlet Maintenance Dredging Town of Topsail Beach, North Carolina FNC INFERS * S 1RVEY P•- 2. BORING DESIGNATION i LOCATION COORDINATES TB- 11 -VB -12 X = 2,403,501 Y = 220,577 3. DRILLING AGENCY i CONTRACTOR FILE NO. American Vibracore Services 4. NAME OF DRILLER S. Kemnuir 5. DIRECTION OF BORING i DEG. FROM i BEARING ® VERTICAL i VERTICAL Q INCLINED 6. THICKNESS OF OVERBURDEN 0.0 Ft. 7. DEPTH DRILLED INTO ROCK 0.0 Ft. 8. TOTAL DEPTH OF BORING 14.5 Ft. a ELEV. DEPTH W CLASSIFICATION OF MATERIALS (ft) (ft) W Depths and elevations based on measured value -1.8 0.0 Sand -tan, fine grained, very well sorted -2.9 1.1 quartz sand. Trace shell hash., (SW). Sand - greyish tan, fine grained, very well sorted quartz sand. Trace shell hash. Sand becomes lightly coarser (fine to medium grained) @ -10.7' to - 12.1'., (SW). -191 in � ° No Recovery. End of Boring boringueSlgnaiion Ib-- i - i - vb - -iz INSTALLATION SHEET 1 OF 1 SHEETS 9. SIZE AND TYPE OF BIT 4.0 In. 10. COORDINATE SYSTEM/DATUM :HORIZONTAL i VERTICAL North Carolina State Plane NAD 1983 MLW 11. MANUFACTURER'S DESIGNATION OF DRILL 0 AUTO HAMMER Vibracore Q MANUAL HAMMER TOTAL SAMPLES 12. DISTURBED i UNDISTURBED (UD) i i 13. TOTAL NUMBER CORE BOXES 14. ELEVATION GROUND WATER STARTED i COMPLETED 15. DATE BORING ' 09 -29 -11 11:28 09 -29 -11 11:54 16. ELEVATION TOP OF BORING -1.8 Ft. 17. TOTAL RECOVERY FOR BORING 14.5 Ft. 18. SIGNATURE AND TITLE OF INSPECTOR JCP o.4 E4 REMARKS RC. Cg mN 1 1Z FORM 1836 MODIFIED FOR THE FLORIDA DEP JUN 02 JUN 04 70 Sample #1, Depth = 1.1'- 10.3' 1 Mean (mm): 0.24, Phi Sorting: 0.57 Fines (230): 0.30% (SP) M 5 in Ili6y 20 7 M 0 C7 U) 0 a w LL co U) O a w Q O DRILLING LOG DIVISION 1. PROJECT New Topsail Inlet Maintenance Dredging Town of Topsail Beach, North Carolina FNC INFERS * S 1RVEY P•- 2. BORING DESIGNATION i LOCATION COORDINATES TB- 11 -VB -13 X = 2,403,646 Y = 220,178 3. DRILLING AGENCY CONTRACTOR FILE NO. i American Vibracore Services 4. NAME OF DRILLER S. Kemnuir 5. DIRECTION OF BORING i DEG. FROM i BEARING ® VERTICAL i VERTICAL Q INCLINED 6. THICKNESS OF OVERBURDEN 0.0 Ft. 7. DEPTH DRILLED INTO ROCK 0.0 Ft. 8. TOTAL DEPTH OF BORING 12.5 Ft. a ELEV. DEPTH W CLASSIFICATION OF MATERIALS (ft) (ft) W Depths and elevations based on measured value -8.3 0.0 Sand -light greyish tan to tan (top 1.3' of core is orangish tan in color), fine to medium grained, very well sorted quartz sand. Trace ° shell hash (1 -2 mm), very few whole shells. Clay ball ( -5 cm.) @ - 12.9'. Abundant whole shells at bottom 0.3' of core., (SW). -17R qr, No Recovery. End of Boring 1Z FORM 1836 MODIFIED FOR THE FLORIDA DEP JUN 02 JUN 04 71 boring ueSlgnaiion I b - -i - i -vb - -i S INSTALLATION SHEET 1 OF 1 SHEETS 9. SIZE AND TYPE OF BIT 4.0 In. 10. COORDINATE SYSTEM/DATUM :HORIZONTAL i VERTICAL North Carolina State Plane NAD 1983 MLW 11. MANUFACTURER'S DESIGNATION OF DRILL 0 AUTO HAMMER Vibracore Q MANUAL HAMMER DISTURBED i UNDISTURBED (UD) 12. TOTAL SAMPLES i i 13. TOTAL NUMBER CORE BOXES 14. ELEVATION GROUND WATER STARTED i COMPLETED 15. DATE BORING ' 09 -30 -11 15:12 09 -30 -11 15:25 16. ELEVATION TOP OF BORING -8.3 Ft. 17. TOTAL RECOVERY FOR BORING 9.5 Ft. 18. SIGNATURE AND TITLE OF INSPECTOR JCP o� s REC. CQ REMARKS GOfN Sample #1, Depth = 0.0'- 9.5' 1 Mean (mm): 0.28, Phi Sorting: 0.62 Fines (230): 0.20% M 5 in lib". 20 5 M O H c� Cn Cn W 0 LL co Cn O a w Q O DRILLING LOG I DIVISION 1. PROJECT am New Topsail Inlet Maintenance Dredging Town of Topsail Beach, North Carolina FNC INFERS * S 1RVEY P• 2. BORING DESIGNATION i LOCATION COORDINATES TB- 11 -VB -14 X = 2,404,425 Y = 220,664 3. DRILLING AGENCY CONTRACTOR FILE NO. i American Vibracore Services 4. NAME OF DRILLER S. Kemnuir 5. DIRECTION OF BORING i DEG. FROM i BEARING ® VERTICAL i VERTICAL Q INCLINED 6. THICKNESS OF OVERBURDEN 0.0 Ft. 7. DEPTH DRILLED INTO ROCK 0.0 Ft. 8. TOTAL DEPTH OF BORING 14.5 Ft. a ELEV. DEPTH W CLASSIFICATION OF MATERIALS (ft) (ft) W Depths and elevations based on measured valu -3.0 0.0 Sand -tan to grey, fine to medium grained, very well sorted quartz sand. Trace shell hash., (SW). iRR 19R o 0 No Recovery. End of Boring boring ueSlgnaiion I b - "I "I- vb - "14 INSTALLATION SHEET 1 OF 1 SHEETS 9. SIZE AND TYPE OF BIT 4.0 In. 10. COORDINATE SYSTEM/DATUM :HORIZONTAL i VERTICAL North Carolina State Plane NAD 1983 MLW 11. MANUFACTURER'S DESIGNATION OF DRILL 0 AUTO HAMMER Vibracore Q MANUAL HAMMER TOTAL SAMPLES 12. DISTURBED i UNDISTURBED (UD) i i 13. TOTAL NUMBER CORE BOXES 14. ELEVATION GROUND WATER STARTED i COMPLETED 15. DATE BORING ' 09 -30 -11 14:44 09 -30 -11 14:50 16. ELEVATION TOP OF BORING -3.0 Ft. 17. TOTAL RECOVERY FOR BORING 12.9 Ft. 18. SIGNATURE AND TITLE OF INSPECTOR JCP o� REC. CQ REMARKS GOfN 1Z FORM 1836 MODIFIED FOR THE FLORIDA DEP JUN 02 JUN 04 72 Sample #1, Depth = 0.0'- 12.8' 1 Mean (mm): 0.23, Phi Sorting: 0.49 Fines (230): 0.00% M 5 IW lib". 20 7 M 0 0 c� Cn Cn O W 0 LL co Cn O a w Q O DRILLING LOG DIVISION 1. PROJECT New Topsail Inlet Maintenance Dredging Town of Topsail Beach, North Carolina FNC INFERS * S 1RVEY P•- 2. BORING DESIGNATION i LOCATION COORDINATES TB- 11 -VB -15 X = 2,405,454 Y = 221,106 3. DRILLING AGENCY i CONTRACTOR FILE NO. American Vibracore Services 4. NAME OF DRILLER S. Kemnuir 5. DIRECTION OF BORING i DEG. FROM i BEARING ® VERTICAL i VERTICAL Q INCLINED 6. THICKNESS OF OVERBURDEN 0.0 Ft. 7. DEPTH DRILLED INTO ROCK 0.0 Ft. 8. TOTAL DEPTH OF BORING 14.0 Ft. a ELEV. DEPTH W CLASSIFICATION OF MATERIALS (ft) (ft) W Depths and elevations based on measured values -7.7 0.0 Sand - greyish tan, fine grained, very well sorted quartz sand. Trace shell hash (1 -2 mm) and whole shells (2 -3 cm). Becomes coarser (fine to medium grained sand) @ 12.9' to -14'., (SW). -14.0 6.3 Sand - greyish tan, fine to medium grained, well sorted quartz sand. Abundant shell hash (2 -5 mm)., (SW). -17.5 9.8 o e No Recovery. End of Boring boringueSlgnaiion Ib-- i - i - vb - -io INSTALLATION SHEET 1 OF 1 SHEETS 9. SIZE AND TYPE OF BIT 4.0 In. 10. COORDINATE SYSTEM/DATUM :HORIZONTAL i VERTICAL North Carolina State Plane NAD 1983 MLW 11. MANUFACTURER'S DESIGNATION OF DRILL 0 AUTO HAMMER Vibracore Q MANUAL HAMMER TOTAL SAMPLES 12. DISTURBED i UNDISTURBED (UD) i i 13. TOTAL NUMBER CORE BOXES 14. ELEVATION GROUND WATER STARTED i COMPLETED 15. DATEBOR/NG ' 10 -01 -11 18:53 10 -01 -11 19:03 16. ELEVATION TOP OF BORING -7.7 Ft. 17. TOTAL RECOVERY FOR BORING 9.8 Ft. 18. SIGNATURE AND TITLE OF INSPECTOR JCP o� REC. CQ REMARKS GOfN 1Z FORM 1836 MODIFIED FOR THE FLORIDA DEP JUN 02 JUN 04 73 Sample #1, Depth = 0.0'- 6.3' 1 Mean (mm): 0.34, Phi Sorting: 1.07 Fines (230): 0.30% Sample #2, Depth = 6.3'- 9.8' 2 Mean (mm): 0.82, Phi Sorting: 1.06 Fines (230): 0.25% M 5 in lib". 20 5 Boring Designation TBVC -07 -02 SAJ FORM 1836 MODIFIED FOR THE FLORIDA DEP JUN 02 JUN 04 74 5 BE 67 20 25 DIVISION INSTALLATION SHEET 1 DRILLING LOG OF 1 SHEETS 1. PROJECT CPE'' 9• SIZE AND TYPE OF BIT 3.0 In. Topsail Beach Sand Search 10. COORDINATE SYSTEM /DATUM : HORIZONTAL : VERTICAL North Carolina North Carolina State Plane NAD 1983 NAVD 88 2. BORING DESIGNATION : LOCATION COORDINATES 11. MANUFACTURER'S DESIGNATION OF DRILL Q AUTO HAMMER TBVC -07 -02 X = 2,407,685 Y = 216,446 Pneumatic Q MANUAL HAMMER 3. DRILLING AGENCY CONTRACTOR FILE NO. DISTURBED UNDISTURBED (UD) America Vibracore, Inc. 12. TOTAL SAMPLES 4. NAME OF DRILLER 13. TOTAL NUMBER CORE BOXES Fred Kaub 14. ELEVATION GROUND WATER 5. DIRECTION OF BORING i DEG. FROM i BEARING :STARTED :COMPLETED ® VERTICAL :VERTICAL : Q INCLINED i i 15. DATE BORING : 06 -26 -07 09:13 06 -26 -07 09:16 6. THICKNESS OF OVERBURDEN 0.0 Ft. 16. ELEVATION TOP OF BORING -28.0 Ft. 7. DEPTH DRILLED INTO ROCK 0.0 Ft. 17. TOTAL RECOVERY FOR BORING 17.2 Ft. 18. SIGNATURE AND TITLE OF INSPECTOR 8. TOTAL DEPTH OF BORING 20.0 Ft. KW ELEV. DEPTH o w CLASSIFICATION OF MATERIALS % �J KIL REMARKS (ft) (ft) W Depths and elevations based on measured values REC. OQ -28.0 0.0 1 my Shell Hash calculated from Asual estimate of shell <4.75mm and >2.8mm. SAND, fine grained, quartz, trace shell hash, Sample #1, Depth = 1.5' trace silt, (0.75'x0.5 ") shell fragment @15, 1 Mean (mm):0.16, Phi Sorting:0.72 gray (5Y -6/1), (SP). Shell Hash:1 %, Fines (230):2.40% (SP) -30.1 2.1 SAND, fine grained, quartz, trace shell hash, trace silt, shell hash layer from 4.8' to 5.0', Sample #2, Depth = 5.5' (0.75 "x3.0 ") silt pocket @ 2.1', shell fragment 2 Mean (mm):0.15, Phi Sorting:0.75 (1.0 "x1.5 ") @ 45, (2) 1.0" @ 4.9' and 5.6', dark Shell Hash:1 %, Fines (230):4.44% (SP) gray (5Y -4/1), (SP). 34.2 6.2 Sample #4, Depth = 6.4' Mean (mm):1.82, Phi Sorting:2.42 Shell Hash:25 %, Fines (230):3.34% (SW) -34.8 6.8 SAND, little shell hash, trace shell fragments, trace whole shell, whole shells up to 2.5 ", dark 4 gray 5Y -4/1 (S M. 3 Sample #3, Depth = 7.3' SAND, fine grained, quartz, trace shell fragments, trace shell hash, trace silt, shell -36.2 8.2 Mean (mm):0.17, Phi Sorting:0.73 Shell Hash:1 %, Fines (230):3.23% (SP) hash pockets (1.0 "05') @ 7.2' and (1.0 "x3.0") 6 @ 7.8', 1.5" shell fragment @ 7.3', gray 0 5Y -5/1 (SP). -38.4 10.4 Shelly SAND, little silt, shell component is some shell hash, little shell fragments and trace whole shells up to 2.5 ", (3.0 "x2.5 ") whole shell @ 8.9', gray 5Y -5/1 G . -389 109 -39.6 11.6 o SAND, fine grained, quartz, trace shell hash, trace silt, trace shell fragments up to 1.0 ", (2.0'x0.75 ") shell fragment @ 107, olive gray 5Y -5/2 SP -SM . SAND, fine grained, quartz, little shell hash, trace silt, trace shell fragments up to 1.5 ", (1.0 "x1.5 ") shell fragment @ 11.2', gray 5Y -5/1 SW -SM . SAND, fine grained, quartz, little silt, trace shell hash, 1.0" clay pockets @ 14.4' and 15.3 ", 1.0" -45.2 17.2 rock fragment @ 15.4', olive gray (5Y -4/2), SP -SM . No Recovery. -48.0 20.0 End of Boring SAJ FORM 1836 MODIFIED FOR THE FLORIDA DEP JUN 02 JUN 04 74 5 BE 67 20 25 No Recovery. End of Boring SAJ FORM 1836 MODIFIED FOR THE FLORIDA DEP JUN 02 JUN 04 75 Dill IN 167 5 DUlilly UUZfl lldLlUll I DVIi -Ut -UU DIVISION INSTALLATION SHEET 1 DRILLING LOG OF 1 SHEETS 1. PROJECT CPE'' 9• SIZE AND TYPE OF BIT 3.0 In. Topsail Beach Sand Search 10. COORDINATE SYSTEM /DATUM : HORIZONTAL : VERTICAL North Carolina North Carolina State Plane NAD 1983 NAVD 88 2. BORING DESIGNATION : LOCATION COORDINATES 11. MANUFACTURER'S DESIGNATION OF DRILL Q AUTO HAMMER TBVC -07 -06 X = 2,406,364 Y = 216,577 Pneumatic Q MANUAL HAMMER 3. DRILLING AGENCY CONTRACTOR FILE NO. DISTURBED UNDISTURBED (UD) America Vibracore, Inc. 12. TOTAL SAMPLES 4. NAME OF DRILLER 13. TOTAL NUMBER CORE BOXES Fred Kaub 14. ELEVATION GROUND WATER 5. DIRECTION OF BORING i DEG. FROM i BEARING :STARTED :COMPLETED ® VERTICAL :VERTICAL : Q INCLINED i i 15. DATE BORING : 06 -26 -07 12:45 06 -26 -07 12:51 6. THICKNESS OF OVERBURDEN 0.0 Ft. 16. ELEVATION TOP OF BORING -10.4 Ft. 7. DEPTH DRILLED INTO ROCK 0.0 Ft. 17. TOTAL RECOVERY FOR BORING 9.6 Ft. 18. SIGNATURE AND TITLE OF INSPECTOR 8. TOTAL DEPTH OF BORING 11.6 Ft. KW o �J ELEV. DEPTH w CLASSIFICATION OF MATERIALS % KIL REMARKS (ft) (ft) W Depths and elevations based on measured values REC. OQ -10.4 0.0 J my Shell Hash calculated from Asual estimate of shell <4.75mm and >2.8mm. Sample #1, Depth = 1.5' 1 Mean (mm):0.23, Phi Sorting:0.53 Shell Hash:1 %, Fines (230):1.39% (SP) SAND, fine grained, quartz, trace shell fragments, trace shell hash, trace silt, shell fragments up to 1.0 ", shell hash layers from 3.1' to 3.3' and 4.4' to 45, silt lamina @ 3.3; (1.0 "x15) silt pockets @ 6.0', 8.9', and 9.1', Sample #2, Depth = 5.2' (0.25 "x3 ") shell hash pocket @ 9.2', shell 2 Mean (mm):0.18, Phi Sorting:0.35 fragments (3)(1 "x.75 ") @ 4.3' and (1.0 "x1.5 ") @ Shell Hash:1 %, Fines (230):0.90% (SP) 4.4', (1.0 "x0.75 ") rock fragments @ 3.1'and 37, (2.0 "x1.0 ") whole shell @ 3.2', gray (5Y -6/1), (SP). Sample #3, Depth = 9.0' 3 Mean (mm):0.21, Phi Sorting:0.46 Shell Hash:1 %, Fines (230):1.23% (SP) - ?n n a F .'.'. No Recovery. End of Boring SAJ FORM 1836 MODIFIED FOR THE FLORIDA DEP JUN 02 JUN 04 75 Dill IN 167 5 Boring Designation TBVC -07 -11 SAJ FORM 1836 MODIFIED FOR THE FLORIDA DEP JUN 02 JUN 04 76 5 BE 61 20 25 DIVISION INSTALLATION SHEET 1 DRILLING LOG OF 1 SHEETS 1. PROJECT CPE'' 9• SIZE AND TYPE OF BIT 3.0 In. Topsail Beach Sand Search 10. COORDINATE SYSTEM /DATUM : HORIZONTAL : VERTICAL North Carolina North Carolina State Plane NAD 1983 NAVD 88 2. BORING DESIGNATION : LOCATION COORDINATES 11. MANUFACTURER'S DESIGNATION OF DRILL Q AUTO HAMMER TBVC -07 -11 X = 2,406,765 Y = 216,129 Pneumatic Q MANUAL HAMMER 3. DRILLING AGENCY CONTRACTOR FILE NO. DISTURBED UNDISTURBED (UD) America Vibracore, Inc. 12. TOTAL SAMPLES 4. NAME OF DRILLER 13. TOTAL NUMBER CORE BOXES Fred Kaub 14. ELEVATION GROUND WATER 5. DIRECTION OF BORING i DEG. FROM i BEARING :STARTED :COMPLETED ® VERTICAL :VERTICAL : Q INCLINED i i 15. DATE BORING : 06 -27 -07 09:25 06 -27 -07 09:42 6. THICKNESS OF OVERBURDEN 0.0 Ft. 16. ELEVATION TOP OF BORING -16.0 Ft. 7. DEPTH DRILLED INTO ROCK 0.0 Ft. 17. TOTAL RECOVERY FOR BORING 8.3 Ft. 18. SIGNATURE AND TITLE OF INSPECTOR 8. TOTAL DEPTH OF BORING 10.0 Ft. CD o �J ELEV. DEPTH w CLASSIFICATION OF MATERIALS % KIL REMARKS (ft) (ft) W Depths and elevations based on measured values REC. OQ -16.0 0.0 J my Shell Hash calculated from Asual estimate of shell <4.75mm and >2.8mm. Sample #1, Depth = 4.5' 1 Mean (mm):0.16, Phi Sorting:0.32 Shell Hash:1 °k, Fines (230):1.27 °k (SP) SAND, fine grained, quartz, trace shell hash, trace silt, (2) 0.75" silt pockets @ 7.2', (2) 0.25" clay pockets @ 77, light gray (5Y -7/1), (SP). Sample #2, Depth = 7.0' 2 Mean (mm):0.17, Phi Sorting:0.38 Shell Hash:1 %, Fines (230):1.44% (SP) 24.3 8.3 No Recovery. -26.0 10.0 End of Boring SAJ FORM 1836 MODIFIED FOR THE FLORIDA DEP JUN 02 JUN 04 76 5 BE 61 20 25 Boring Designation TBVC -07 -15 SAJ FORM 1836 MODIFIED FOR THE FLORIDA DEP JUN 02 JUN 04 77 5 BE 61 20 25 DIVISION INSTALLATION SHEET 1 DRILLING LOG OF 1 SHEETS 1. PROJECT CPE'' 9• SIZE AND TYPE OF BIT 3.0 In. Topsail Beach Sand Search 10. COORDINATE SYSTEM /DATUM : HORIZONTAL : VERTICAL North Carolina North Carolina State Plane NAD 1983 NAVD 88 2. BORING DESIGNATION : LOCATION COORDINATES 11. MANUFACTURER'S DESIGNATION OF DRILL Q AUTO HAMMER TBVC -07 -15 X = 2,406,052 Y = 215,803 Pneumatic Q MANUAL HAMMER 3. DRILLING AGENCY CONTRACTOR FILE NO. DISTURBED UNDISTURBED (UD) America Vibracore, Inc. 12. TOTAL SAMPLES 4. NAME OF DRILLER 13. TOTAL NUMBER CORE BOXES Fred Kaub 14. ELEVATION GROUND WATER 5. DIRECTION OF BORING i DEG. FROM i BEARING :STARTED :COMPLETED ® VERTICAL :VERTICAL : Q INCLINED i i 15. DATE BORING : 06 -28 -07 08:35 06 -28 -07 08:45 6. THICKNESS OF OVERBURDEN 0.0 Ft. 16. ELEVATION TOP OF BORING -16.6 Ft. 7. DEPTH DRILLED INTO ROCK 0.0 Ft. 17. TOTAL RECOVERY FOR BORING 8.6 Ft. 18. SIGNATURE AND TITLE OF INSPECTOR 8. TOTAL DEPTH OF BORING 10.0 Ft. CD o �J ELEV. DEPTH w CLASSIFICATION OF MATERIALS % KIL REMARKS (ft) (ft) W Depths and elevations based on measured values REC. OQ -16.6 0.0 J my Shell Hash calculated from Asual estimate of shell <4.75mm and >2.8mm. Sample #1, Depth = 3.5' 1 Mean (mm):0.15, Phi Sorting:0.33 SAND, fine grained, quartz, trace coral, trace Shell Hash:1 %, Fines (230):1.25% (SP) shell fragments, trace shell hash, trace silt, silt distributed in pockets and laminae, shell hash lamina @ 2.0'; (1.0"05') shell fragment @ 8.2', light gray (5Y -7/1), (SP). Sample #2, Depth = 7.1' 2 Mean (mm):0.16, Phi Sorting:0.41 Shell Hash:1 %, Fines (230):1.63% (SP) -25.2 8.6 No Recovery. -26.6 10.0 End of Boring SAJ FORM 1836 MODIFIED FOR THE FLORIDA DEP JUN 02 JUN 04 77 5 BE 61 20 25 Boring Designation TOPCRK -1 DRILLING LOG DIVISION INSTALLATION SHEET 1 OF 1 SHEETS 1. PROJECT 9. SIZE AND TYPE OF BIT 3.0 In. Topsail Beach Renourishment 10. COORDINATE SYSTEM /DATUM HORIZONTAL VERTICAL Topsail Beach, North Carolina North Carolina State Plane NAD 1983 NAVD 88 2. BORING DESIGNATION i LOCATION COORDINATES 11. MANUFACTURER'S DESIGNATION OF DRILL 0 AUTO HAMMER TOPCRK -1 X = 2,402,876 Y = 222,397 Vibracore Q MANUAL HAMMER 3. DRILLING AGENCY CONTRACTOR FILE NO. DISTURBED UNDISTURBED (UD) Gahagan & Bryant Associates, Inc. i 12. TOTAL SAMPLES 4. NAME OF DRILLER 13. TOTAL NUMBER CORE BOXES GBA 14. ELEVATION GROUND WATER 5. DIRECTION OF BORING i DEG. FROM i BEARING 'STARTED i COMPLETED ® VERTICAL i VERTICAL i Q INCLINED i i 15. DATE BORING ' 04 -14 -10 04 -14 -10 6. THICKNESS OF OVERBURDEN 0.0 Ft. 16. ELEVATION TOP OF BORING -7.0 Ft. 7. DEPTH DRILLED INTO ROCK 0.0 Ft. 17. TOTAL RECOVERY FOR BORING 10 Ft. 18. SIGNATURE AND TITLE OF INSPECTOR 8. TOTAL DEPTH OF BORING 11.2 Ft. JMW O ceW GIL ELEV. DEPTH w CLASSIFICATION OF MATERIALS % REMARKS (ft) (ft) W Depths and elevations based on measured values REC. OQ -7.0 0.0 1 men NO RECOVERY. -8.3 1.3 Sample #1, Depth = 0.0'- 8.0' 1 Mean (mm): 0.23, Phi Sorting: 0.43 SAND, fine grain, quartz rich, trace silt, trace Fines (230): 0.05% (SP) shell hash, tan -brown to gray, (SP). -15.0 8.0 ' Sample #2, Depth = 8.0'- 9.3' SILTY SAND, very fine grain, trace quartz, high silt percentage, shell fragments ( <0.5 ") 2 Sample not sieved - -below dredge depth -16.3 9.3 8.4' to 8.6', q ray to black, SM . Sample #3, Depth = 9.3'- 11.2' SAND, fine grain, quartz rich, trace silt, trace -17.9 10.9 shell hash, gray, (SP). 3 Sample not sieved - -below dredge depth NO RECOVERY. End of Boring SAJ FORM 1836 MODIFIED FOR THE FLORIDA DEP JUN 02 JUN 04 78 5 1 N". 20 25 Boring Designation TOPCRK -2 DRILLING LOG DIVISION INSTALLATION SHEET 1 OF 1 SHEETS 1. PROJECT 9. SIZE AND TYPE OF BIT 3.0 In. Topsail Beach Renourishment 10. COORDINATE SYSTEM /DATUM HORIZONTAL VERTICAL Topsail Beach, North Carolina North Carolina State Plane NAD 1983 NAVD 88 2. BORING DESIGNATION i LOCATION COORDINATES 11. MANUFACTURER'S DESIGNATION OF DRILL 0 AUTO HAMMER TOPCRK -2 X = 2,403,849 Y = 222,230 Vibracore Q MANUAL HAMMER 3. DRILLING AGENCY CONTRACTOR FILE NO. DISTURBED UNDISTURBED (UD) Gahagan & Bryant Associates, Inc. i 12. TOTAL SAMPLES 4. NAME OF DRILLER 13. TOTAL NUMBER CORE BOXES GBA 14. ELEVATION GROUND WATER 5. DIRECTION OF BORING i DEG. FROM i BEARING 'STARTED i COMPLETED ® VERTICAL i VERTICAL i Q INCLINED i i 15. DATE BORING ' 04 -14 -10 04 -14 -10 6. THICKNESS OF OVERBURDEN 0.0 Ft. 16. ELEVATION TOP OF BORING -3.1 Ft. 7. DEPTH DRILLED INTO ROCK 0.0 Ft. 17. TOTAL RECOVERY FOR BORING 7.9 Ft. 18. SIGNATURE AND TITLE OF INSPECTOR 8. TOTAL DEPTH OF BORING 12.2 Ft. JMW O ceW ELEV. DEPTH w CLASSIFICATION OF MATERIALS % GIL REMARKS (ft) (ft) W Depths and elevations based on measured values REC. OQ -3.1 0.0 m,n NO RECOVERY. -7.6 4.5 Sample #1, Depth = 0.0'- 12.2' 1 Mean (mm): 0.21, Phi Sorting: 0.41 o Fines (230): 0.00% (SP) SAND, fine grain, quartz rich, trace silt, trace o ; shell hash, gray, (SP). c� C • U a o J • LL a -14.8 11.7 (D. -15.3 12.2 NO RECOVERY. W Z = End of Boring U Y Q 07l W 0 U J_ Q a- 0 U w m J U) 0 H U) 0 W Q J LL SAJ FORM 1836 MODIFIED FOR THE FLORIDA DEP JUN 02 JUN 04 79 M 5 in IINi 20 7 NO RECOVERY. -9.61 3.5 Sample #1, Depth = 0.0'- 10.8' 1 Mean (mm): 0.22, Phi Sorting: 0.50 Fines (230): 0.24% SAND, fine grain, quartz rich, trace silt, trace '- shell hash, gray, (SP). n 6 n D Y i nr_ c nn n • End of Boring SAJ FORM 1836 MODIFIED FOR THE FLORIDA DEP JUN 02 JUN 04 80 M 5 in lib". 20 boring ueslgnailon I vruKK,j DIVISION INSTALLATION SHEET 1 DRILLING LOG OF 1 SHEETS 1. PROJECT 9. SIZE AND TYPE OF BIT 3.0 In. Topsail Beach Renourishment 10. COORDINATE SYSTEM /DATUM HORIZONTAL VERTICAL Topsail Beach, North Carolina North Carolina State Plane NAD 1983 NAVD 88 2. BORING DESIGNATION i LOCATION COORDINATES 11. MANUFACTURER'S DESIGNATION OF DRILL 0 AUTO HAMMER TOPCRK -3 X = 2,404,072 Y = 221,513 Vibracore Q MANUAL HAMMER 3. DRILLING AGENCY CONTRACTOR FILE NO. DISTURBED UNDISTURBED (UD) 12. TOTAL SAMPLES Gahagan & Bryant Associates, Inc. i 4. NAME OF DRILLER 13. TOTAL NUMBER CORE BOXES GBA 14. ELEVATION GROUND WATER 5. DIRECTION OF BORING i DEG. FROM i BEARING 'STARTED i COMPLETED ® VERTICAL i VERTICAL i Q INCLINED i i 15. DATE BORING ' 04 -14 -10 04 -14 -10 6. THICKNESS OF OVERBURDEN 0.0 Ft. 16. ELEVATION TOP OF BORING -6.1 Ft. 7. DEPTH DRILLED INTO ROCK 0.0 Ft. 17. TOTAL RECOVERY FOR BORING 7.5 Ft. 18. SIGNATURE AND TITLE OF INSPECTOR 8. TOTAL DEPTH OF BORING 10.8 Ft. JMW C "J ELEV. DEPTH w CLASSIFICATION OF MATERIALS % Ga REMARKS (ft) (ft) W Depths and elevations based on measured values REC. OR -6.1 0.0 m,n NO RECOVERY. -9.61 3.5 Sample #1, Depth = 0.0'- 10.8' 1 Mean (mm): 0.22, Phi Sorting: 0.50 Fines (230): 0.24% SAND, fine grain, quartz rich, trace silt, trace '- shell hash, gray, (SP). n 6 n D Y i nr_ c nn n • End of Boring SAJ FORM 1836 MODIFIED FOR THE FLORIDA DEP JUN 02 JUN 04 80 M 5 in lib". 20 Boring Designation TOPCRK -4 DRILLING LOG DIVISION INSTALLATION SHEET 1 OF 1 SHEETS 1. PROJECT 9. SIZE AND TYPE OF BIT 3.0 In. Topsail Beach Renourishment 10. COORDINATE SYSTEM /DATUM HORIZONTAL VERTICAL Topsail Beach, North Carolina North Carolina State Plane NAD 1983 NAVD 88 2. BORING DESIGNATION i LOCATION COORDINATES 11. MANUFACTURER'S DESIGNATION OF DRILL 0 AUTO HAMMER TOPCRK -4 X = 2,404,392 Y = 220,849 Vibracore Q MANUAL HAMMER 3. DRILLING AGENCY CONTRACTOR FILE NO. DISTURBED UNDISTURBED (UD) Gahagan & Bryant Associates, Inc. i 12. TOTAL SAMPLES 4. NAME OF DRILLER 13. TOTAL NUMBER CORE BOXES GBA 14. ELEVATION GROUND WATER 5. DIRECTION OF BORING i DEG. FROM i BEARING 'STARTED i COMPLETED ® VERTICAL i VERTICAL i Q INCLINED i i 15. DATE BORING ' 04 -15 -10 04 -15 -10 6. THICKNESS OF OVERBURDEN 0.0 Ft. 16. ELEVATION TOP OF BORING -4.6 Ft. 7. DEPTH DRILLED INTO ROCK 0.0 Ft. 17. TOTAL RECOVERY FOR BORING 7.8 Ft. 18. SIGNATURE AND TITLE OF INSPECTOR 8. TOTAL DEPTH OF BORING 10.4 Ft. JMW O ceW ELEV. DEPTH w CLASSIFICATION OF MATERIALS % GIL REMARKS (ft) (ft) W Depths and elevations based on measured values REC. OQ -4.6 0.0 1 mm NO RECOVERY. -7.3 2.7 Sample #1, Depth = 0.0'- 10.4' 1 Mean (mm): 0.18, Phi Sorting: 0.35 Fines (230): 0.15% (SP) SAND, fine grain, quartz rich, trace silt, trace o shell hash, gray, (SP). i c� C U o a -14.7 10.1 o -150 NO RECOVERY. LL a End of Boring c� J Z Q U Y Q 07l W 0 U CnJ_ Q a- 0 U w m J Cn 0 H Cn Cn 0 W Q J LL SAJ FORM 1836 MODIFIED FOR THE FLORIDA DEP JUN 02 JUN 04 81 M 5 in IINi 20 7 n s -14.3 n Y L _1RR NO RECOVERY. SAND, fine grain, quartz rich, trace silt, shell hash content high, tan - brown, (SP). 8.9 ..'. NO RECOVERY. End of Boring SAJ FORM 1836 MODIFIED FOR THE FLORIDA DEP JUN 02 JUN 04 82 Sample #1, Depth = 0.0'- 10.4' 1 Mean (mm): 0.29, Phi Sorting: 0.89 Fines (230): 0.03% M 5 in lib". 20 boring ueSlgnaiion bimumiV - "I DIVISION INSTALLATION SHEET 1 DRILLING LOG OF 1 SHEETS 1. PROJECT 9. SIZE AND TYPE OF BIT 3.0 In. Topsail Beach Renourishment 10. COORDINATE SYSTEM /DATUM HORIZONTAL VERTICAL Topsail Beach, North Carolina North Carolina State Plane NAD 1983 NAVD 88 2. BORING DESIGNATION i LOCATION COORDINATES 11. MANUFACTURER'S DESIGNATION OF DRILL 0 AUTO HAMMER BNKCHN -1 X = 2,408,189 Y = 222,800 Vibracore Q MANUAL HAMMER 3. DRILLING AGENCY CONTRACTOR FILE NO. DISTURBED UNDISTURBED (UD) 12. TOTAL SAMPLES Gahagan & Bryant Associates, Inc. i 4. NAME OF DRILLER 13. TOTAL NUMBER CORE BOXES GBA 14. ELEVATION GROUND WATER 5. DIRECTION OF BORING i DEG. FROM i BEARING 'STARTED i COMPLETED ® VERTICAL i VERTICAL i Q INCLINED i i 15. DATE BORING ' 04 -14 -10 04 -14 -10 6. THICKNESS OF OVERBURDEN 0.0 Ft. 16. ELEVATION TOP OF BORING -5.4 Ft. 7. DEPTH DRILLED INTO ROCK 0.0 Ft. 17. TOTAL RECOVERY FOR BORING 7.2 Ft. 18. SIGNATURE AND TITLE OF INSPECTOR 8. TOTAL DEPTH OF BORING 10.4 Ft. JMW C "J ELEV. DEPTH w CLASSIFICATION OF MATERIALS % Ga REMARKS (ft) (ft) W Depths and elevations based on measured values REC. OR -5.4 0.0 m,n n s -14.3 n Y L _1RR NO RECOVERY. SAND, fine grain, quartz rich, trace silt, shell hash content high, tan - brown, (SP). 8.9 ..'. NO RECOVERY. End of Boring SAJ FORM 1836 MODIFIED FOR THE FLORIDA DEP JUN 02 JUN 04 82 Sample #1, Depth = 0.0'- 10.4' 1 Mean (mm): 0.29, Phi Sorting: 0.89 Fines (230): 0.03% M 5 in lib". 20 APPENDIX A Section 2 Topsail Beach Nourishment Project Vibracore Grain Size Distribution 83 Cn Cn 0 (if a- LU 0 LL Cn Cn Z LU Cn PHI Sieve Sizes -4.25 -4 -3 -2.25 -2 -1.5 -1 -0.5 0 0.5 1 1.5 2 2.5 3 3.5 3.75 4 Standard Sieve Sizes 3/45/8 5/16 4 5 7 10 14 18 25 35 45 60 80 120 170 200 230 Hydrometer 100 0 90 10 80 20 70 30 CD a 60 40 TI m CD Q) 50 50 E 0 LD. 40 60 (D 30 70 20 80 10 90 0 ILI 1 100 100 5 10 5 1 5 0.1 5 0.01 5 0.001 Millimeters Gravel Sand - Silt and Clay Coarse F Fine Coarse Medium Fine Sample Symbol �Elev. (ft)� USCS �% Fines�% Organics�% Carbonates Median Mean Skew Kurt Sort Sample Information #200 -0.39 1 New Topsail Inlet #1 #230 - 0.371 11.70 2.05 1.76 -1.55 7.44 0.75 Project Name: New Topsail Inlet Maintenance Dredging Comments: COMPOSITE Analysis Date: 10-27-11 Depths and elevations based on measured values Analyzed By: JCP Gahagan & Bryant Associates of North Carolina Easting (X, ft): 295-A N. Green Meadows Dr. Northing (Y, ft): Wilmington, NC 28405-3933 07, In 910-313-3338 Horizontal System: NAD 1983 ENGINEERS * SURVEYORS fax 910-313-6822 Vertical System: MILW 84 Cn Cn 0 (if a- LU 0 LL Cn Cn Z LU Cn PHI Sieve Sizes -4.25 -4 -3 -2.25 -2 -1.5 -1 -0.5 0 0.5 1 1.5 2 2.5 3 3.5 3.75 4 Standard Sieve Sizes 3/45/8 5/16 4 5 7 10 14 18 25 35 45 60 80 120 170 200 230 Hydrometer 100 0 90 10 80 20 70 30 CD ) 0 a Q) CD 60 40 TI m (D 50 50 E 0 LD. 40 60 cQ 30 70 20 80 .. ... ... .. ...... . .. ... ... ... ...... . ... ... ... ... ...... ... ... ... .... ...... .... ...... .... ...... .... ...... 10 0 i� - — — 100 100 5 10 5 1 5 0.1 5 0.01 5 0.001 Millimeters Gravel Sand — Silt and Clay Coarse F Fine Coarse Medium Fine Sample Symbol Elev. (ft)� USCS % Fines % Organics % Carbonates� Median Mean Skew Kurt Sort Sample Information #200 -0.35 1 TB- 11 -GS -1 -11.7 #230 - 0.351 11.60 2.15 2.04 -2.07 11.73 0.52 Project Name: New Topsail Inlet Maintenance Dredging Comments: Analysis Date: 10-24-11 Depths and elevations based on measured values Analyzed By: JCP Gahagan & Bryant Associates of North Carolina Easting (X, ft): 2,404,844 295-A N. Green Meadows Dr. Northing (Y, ft): 217,096 Wilmington, NC 28405-3933 In 910-313-3338 Horizontal System: NAD 1983 ENGINEERS * SURVEYORS fax 910-313-6822 Vertical System: MLW 85 Cn 0 (if a- LU 0 LL Cn Cn Z LU Cn PHI Sieve Sizes -4.25 -4 -3 -2.25 -2 -1.5 -1 -0.5 0 0.5 1 1.5 2 2.5 3 3.5 3.75 4 Standard Sieve Sizes 3/45/8 5/16 4 5 7 10 14 18 25 35 45 60 80 120 170 200 230 Hydrometer 100 0 90 10 80 20 70 30 CD a 60 40 TI m CD Q) 50 50 E 0 LD. 40 60 cQ Q) 30 70 20 80 10 90 0 100 100 5 10 5 1 5 0.1 5 0.01 5 0.001 Millimeters Gravel Sand - Silt and Clay Coarse F Fine Coarse Medium Fine Sample Symbol �Elev. (ft)� USCS �% Fines�% Organics�% Carbonates Median Mean Skew Kurt Sort Sample Information #200 -0.20 1 TB- 11 -GS -2 -9.8 #230 - 0.201 11.60 1.07 0.67 0.06 3.42 0.84 Project Name: New Topsail Inlet Maintenance Dredging Comments: Analysis Date: 10-24-11 Depths and elevations based on measured values Analyzed By: JCP Gahagan & Bryant Associates of North Carolina Easting (X, ft): 2,405,259 295-A N. Green Meadows Dr. Northing (Y, ft): 216,974 Wilmington, NC 28405-3933 In 910-313-3338 Horizontal System: NAD 1983 ENGINEERS * SURVEYORS fax 910-313-6822 Vertical System: MLW 86 Cn Cn 0 (if a- LU 0 LL Cn Cn Z LU Cn PHI Sieve Sizes -4.25 -4 -3 -2.25 -2 -1.5 -1 -0.5 0 0.5 1 1.5 2 2.5 3 3.5 3.75 4 Standard Sieve Sizes 3/45/8 5/16 4 5 7 10 14 18 25 35 45 60 80 120 170 200 230 Hydrometer 100 0 90 10 80 20 70 30 CD a 60 40 TI m CD Q) 50 50 E 0 LD. 40 60 cQ Q) 30 70 20 80 ..... . .. ..... . .. ..... . .. ..... .. .. ..... .. .. ..... .. .. ..... .. .. ..... .. .. ..... .. .. ..... .. .. 0 10 90 0 1 100 100 5 10 5 1 5 0.1 5 0.01 5 0.001 Millimeters Gravel Sand - Silt and Clay Coarse F Fine Coarse Medium Fine Sample Symbol Elev. (ft)� USCS % Fines % Organics % Carbonates� Median Mean Skew Kurt Sort Sample Information #200 -0.15 1 TB- 11 -GS -3 -7.6 #230 - 0.151 11.60 1.3 1.1 -1.05 6.43 0.68 Project Name: New Topsail Inlet Maintenance Dredging Comments: Analysis Date: 10-24-11 Depths and elevations based on measured values Analyzed By: JCP Gahagan & Bryant Associates of North Carolina Easting (X, ft): 2,405,464 295-A N. Green Meadows Dr. Northing (Y, ft): 216,775 Wilmington, NC 28405-3933 In 910-313-3338 Horizontal System: NAD 1983 ENGINEERS * SURVEYORS fax 910-313-6822 Vertical System: MLW 87 Cn Cn 0 (if a- LU 0 LL Cn Cn Z LU Cn PHI Sieve Sizes -4.25 -4 -3 -2.25 -2 -1.5 -1 -0.5 0 0.5 1 1.5 2 2.5 3 3.5 3.75 4 Standard Sieve Sizes 3/45/8 5/16 4 5 7 10 14 18 25 35 45 60 80 120 170 200 230 Hydrometer 100 0 90 10 80 20 70 30 CD a 60 40 TI m CD (D 50 50 E 0 LD. 40 60 cQ 30 . . . . . . . . . . . 70 20 80 10 90 ... ... 11 .. .. 0 100 100 5 10 5 1 5 0.1 5 0.01 5 0.001 Millimeters Gravel Sand - Silt and Clay Coarse F Fine Coarse Medium Fine Sample Symbol �Elev. (ft)� USCS �% Fines�% Organics�% Carbonates Median Mean Skew Kurt Sort Sample Information TB- 11 -GS -4 00 020� 11.60 1.52 1.33 -1.31 7.17 Project Name: New Topsail Inlet Maintenance Dredging -6.8 ;"230: 0:20 Comments: Analysis Date: 10-25-11 Depths and elevations based on measured values Analyzed By: JCP Gahagan & Bryant Associates of North Carolina Easting (X, ft): 2,405,753 295-A N. Green Meadows Dr. Northing (Y, ft): 216,527 Wilmington, NC 28405-3933 07, In 910-313-3338 Horizontal System: NAD 1983 ENGINEERS * SURVEYORS fax 910-313-6822 Vertical System: MILW 88 Cn Cn 0 (if a- LU 0 LL Cn Cn Z LU Cn PHI Sieve Sizes -4.25 -4 -3 -2.25 -2 -1.5 -1 -0.5 0 0.5 1 1.5 2 2.5 3 3.5 3.75 4 Standard Sieve Sizes 3/45/8 5/16 4 5 7 10 14 18 25 35 45 60 80 120 170 200 230 Hydrometer 100 0 90 10 80 20 70 30 CD 2) a CD 60 .40 TI m Q) 50 50 E 0 L. 40 60 cQ Q) 30 70 20 80 10 90 0 100 100 5 10 5 1 5 0.1 5 0.01 5 0.001 Millimeters Gravel Sand - Silt and Clay Coarse F Fine Coarse Medium Fine Sample Symbol Elev. (ft)� USCS � % Fines % Organics % Carbonates� Median Mean Skew Kurt Sort Sample Information #200 - 0.401 TB- 11 -GS -5 -5.5 � SP �#230-0.401 11.60 1.96 1.95 -0.11 3.18 0.38 Project Name: New Topsail Inlet Maintenance Dredging Comments: Analysis Date: 10-25-11 Depths and elevations based on measured values Analyzed By: JCP Gahagan & Bryant Associates of North Carolina Easting (X, ft): 2,406,244 295-A N. Green Meadows Dr. Northing (Y, ft): 216,253 Wilmington, NC 28405-3933 In 910-313-3338 Horizontal System: NAD 1983 ENGINEERS * SURVEYORS fax 910-313-6822 Vertical System: MLW 89 Cn Cn 0 (if a- LU 0 LL Cn Cn Z LU Cn PHI Sieve Sizes -4.25 -4 -3 -2.25 -2 -1.5 -1 -0.5 0 0.5 1 1.5 2 2.5 3 3.5 3.75 4 Standard Sieve Sizes 3/45/8 5/16 4 5 7 10 14 18 25 35 45 60 80 120 170 200 230 Hydrometer 100 0 90 10 80 20 70 30 CD ) 0 a Q) CD 60 40 TI m Q) 50 50 E 0 LD. 40 60 cQ Q) 30 R72 RRRR 70 20 80 10 90 0 100 100 5 10 5 1 5 0.1 5 0.01 5 0.001 Millimeters Gravel Sand - Silt and Clay Coarse F Fine Coarse Medium Fine Sample Symbol Elev. (ft)� USCS � % Fines % Organics % Carbonates� Median Mean Skew Kurt Sort Sample Information #200 - 0.251 TB- 11 -GS -6 -6.8 � SP �#230-0.251 11.60 2.21 2.11 -1.56 8.29 0.47 Project Name: New Topsail Inlet Maintenance Dredging Comments: Analysis Date: 10-25-11 Depths and elevations based on measured values Analyzed By: JCP Gahagan & Bryant Associates of North Carolina Easting (X, ft): 2,406,571 295-A N. Green Meadows Dr. Northing (Y, ft): 216,189 Wilmington, NC 28405-3933 07, In 910-313-3338 Horizontal System: NAD 1983 ENGINEERS * SURVEYORS fax 910-313-6822 Vertical System: MLW :aR O Cn Cn 0 (if a- LU 0 LL Cn Cn Z LU Cn PHI Sieve Sizes -4.25 -4 -3 -2.25 -2 -1.5 -1 -0.5 0 0.5 1 1.5 2 2.5 3 3.5 3.75 4 Standard Sieve Sizes 3/45/8 5/16 4 5 7 10 14 18 25 35 45 60 80 120 170 200 230 Hydrometer 100 0 90 10 80 20 70 30 CD a 60 40 TI m CD Q) 50 50 E 0 LD. 40 60 cQ (D 30 70 20 80 10 90 F-1 01 1 1 100 100 5 10 5 1 5 0.1 5 0.01 5 0.001 Millimeters Gravel Sand - Silt and Clay Coarse F Fine Coarse Medium Fine Sample Symbol �Elev. (ft)� USCS �% Fines�% Organics�% Carbonates Median Mean Skew Kurt Sort Sample Information #200 -0.35 1 TB- 11 -GS -7 -6.7 � SP �#230-0.351 11.60 2.32 2.3 -1.38 12.52 0.32 Project Name: New Topsail Inlet Maintenance Dredging Comments: Analysis Date: 10-25-11 Depths and elevations based on measured values Analyzed By: JCP Gahagan & Bryant Associates of North Carolina Easting (X, ft): 2,406,484 295-A N. Green Meadows Dr. Northing (Y, ft): 216,036 Wilmington, NC 28405-3933 In 910-313-3338 Horizontal System: NAD 1983 ENGINEERS * SURVEYORS fax 910-313-6822 Vertical System: MLW U Cn Cn 0 (if a- LU 0 LL Cn Cn Z LU Cn PHI Sieve Sizes -4.25 -4 -3 -2.25 -2 -1.5 -1 -0.5 0 0.5 1 1.5 2 2.5 3 3.5 3.75 4 Standard Sieve Sizes 3/45/8 5/16 4 5 7 10 14 18 25 35 45 60 80 120 170 200 230 Hydrometer 100 0 90 10 80 20 70 30 CID 2) a 60 40 TI m CID 50 50 E 0 LD. 40 60 cQ 30 70 20 80 10 0 0 100 100 5 10 5 1 5 0.1 5 0.01 5 0.001 Millimeters Gravel Sand - Silt and Clay Coarse F Fine Coarse Medium Fine Sample Symbol Elev. (ft)� LISCS % Fines % Organics % Carbonates� Median Mean Skew Kurt Sort Sample Information TB-1 1-VB-4 #1 -5.0 � SP #200 -0.40 1 14.50 2.11 2.04 -1.29 6.67 0.4 Project Name: New Topsail Inlet Maintenance Dredging #230 - 0.401 Comments: Analysis Date: 10-12-11 Depths and elevations based on measured values Analyzed By: JCP Gahagan & Bryant Associates of North Carolina Easting (X, ft): 2,404,400 295-A N. Green Meadows Dr. Northing (Y, ft): 217,344 Wilmington, NC 28405-3933 In 910-313-3338 Horizontal System: NAD 1983 ENGINEERS * SURVEYORS fax 910-313-6822 Vertical System: MLW :ax Cn 0 (if a- LU 0 LL Cn Cn Z LU Cn PHI Sieve Sizes -4.25 -4 -3 -2.25 -2 -1.5 -1 -0.5 0 0.5 1 1.5 2 2.5 3 3.5 3.75 4 Standard Sieve Sizes 3/45/8 5/16 4 5 7 10 14 18 25 35 45 60 80 120 170 200 230 Hydrometer 100 0 90 10 80 20 70 30 CD a 60 40 TI m CD Q) 50 50 E 0 LD. 40 60 cQ Q) 30 70 20 80 10 90 0 100 100 5 10 5 1 5 0.1 5 0.01 5 0.001 Millimeters Gravel Sand - Silt and Clay Coarse F Fine Coarse Medium Fine Sample Symbol �Elev. (ft)� USCS �% Fines�% Organics�% Carbonates Median Mean Skew Kurt Sort Sample Information TB- 11 -VB-4 #2 -12.2 � SW #200 -0.85 1 14.50 1.37 0.91 -0.24 3.14 0.96 Project Name: New Topsail Inlet Maintenance Dredging #230 - 0.851 Comments: Analysis Date: 10-13-11 Depths and elevations based on measured values Analyzed By: JCP Gahagan & Bryant Associates of North Carolina Easting (X, ft): 2,404,400 295-A N. Green Meadows Dr. Northing (Y, ft): 217,344 Wilmington, NC 28405-3933 In 910-313-3338 Horizontal System: NAD 1983 ENGINEERS * SURVEYORS fax 910-313-6822 Vertical System: MLW :ax Cn 0 (if a- LU 0 LL Cn Cn Z LU Cn PHI Sieve Sizes -4.25 -4 -3 -2.25 -2 -1.5 -1 -0.5 0 0.5 1 1.5 2 2.5 3 3.5 3.75 4 Standard Sieve Sizes 3/45/8 5/16 4 5 7 10 14 18 25 35 45 60 80 120 170 200 230 Hydrometer 100 0 90 10 80 20 70 30 CD a Q) CD 60 40 TI m (D 50 50 E 0 LD. 40 60 Q) 0- 30 70 20 80 10 90 0 -i - E-4i 100 100 5 10 5 1 5 0.1 5 0.01 5 0.001 Millimeters Gravel Sand - Silt and Clay Coarse F Fine Coarse Medium Fine Sample Symbol �Elev. (ft)� USCS �% Fines�% Organics�% Carbonates Median Mean Skew Kurt Sort Sample Information #200 -0.30 TB-1 1-VB-5 #1 -8.0 '30 030 8.10 2.11 2.03 -2.16 13.16 0.46 Project Name: New Topsail Inlet Maintenance Dredging Comments: Analysis Date: 10-24-11 Depths and elevations based on measured values Analyzed By: JCP Gahagan & Bryant Associates of North Carolina Easting (X, ft): 2,403,564 295-A N. Green Meadows Dr. Northing (Y, ft): 217,609 Wilmington, NC 28405-3933 In 910-313-3338 Horizontal System: NAD 1983 ENGINEERS * SURVEYORS fax 910-313-6822 Vertical System: MILW El Cn Cn 0 (if a- LU 0 LL Cn Cn Z LU Cn PHI Sieve Sizes -4.25 -4 -3 -2.25 -2 -1.5 -1 -0.5 0 0.5 1 1.5 2 2.5 3 3.5 3.75 4 Standard Sieve Sizes 3/45/8 5/16 4 5 7 10 14 18 25 35 45 60 80 120 170 200 230 Hydrometer 100 -T' 0 90 10 80 20 70 30 CD a I I Q) CD 60 40 TI m Q) 50 50 E 0 LD. 40 60 cQ 30 70 20 80 10 90 0 100 100 5 10 5 1 5 0.1 5 0.01 5 0.001 Millimeters Gravel Sand - Silt and Clay Coarse F Fine Coarse Medium Fine Sample Symbol Elev. (ft)� USCS % Fines % Organics % Carbonates� Median Mean Skew Kurt Sort Sample Information TB-1 1-VB-6 #1 -10.0 #200 -0.10 17.60 2.15 2.09 -1.26 7.66 0.42 Project Name: New Topsail Inlet Maintenance Dredging #230 - 0.101 Comments: Analysis Date: 10-14-11 Depths and elevations based on measured values Analyzed By: JCP Gahagan & Bryant Associates of North Carolina Easting (X, ft): 2,402,870 295-A N. Green Meadows Dr. Northing (Y, ft): 217,470 Wilmington, NC 28405-3933 In 910-313-3338 Horizontal System: NAD 1983 ENGINEERS * SURVEYORS lax 910-313-6822 Vertical System: MLW :aR M 0 0 c� Cn Cn W 0 LL Cn J a Z w w Cn PHI Sieve Sizes -4.25 -4 -3 -2.25 -2 -1.5 -1 -0.5 0 0.5 1 1.5 2 2.5 3 3.5 3.75 4 Standard Sieve Sizes 3/45/8 5/16 4 5 7 10 14 18 25 35 45 60 80 120 170 200 230 Hydrometer 100 0 90 10 80 20 70 30 CD °� CD 60 40 TI m 7 N 50 50 00 0 U m ' 40 60 cQ Q) a 30 70 20 80 10 90 0 Le 100 100 5 10 5 1 5 0.1 5 0.01 5 0.001 Millimeters Sample Symbol Elev. (ft) USCS % Fines % Organics % Carbonates Median Mean Skew Kurt Sort Sample Information TB- 11 -VB -6 #2 14.8 #200 -0.35 17.60 1.4 0.69 0.37 2.22 1.14 Project Name: New Topsail Inlet Maintenance Dredging #230 - 0.35 p Comments: Analysis Date: 10 -14 -11 Depths and elevations based on measured values Analyzed By: JCP Gahagan & Bryant Associates of North Carolina Easting (X, ft): 2,402,870 295 -A N. Green Meadows Dr. Northing (Y, ft): 217,470 7.71r-, \—. Wilmington, NC 28405 -3933 In 910 - 313 -3338 Horizontal System: NAD 1983 ENGINEERS * SURVEYORS fax 910 - 313 -6822 Vertical System: MLW Gravel Sand Silt and Clay Coarse Fine Coarse Medium Fine Cn Cn 0 (if a- LU 0 LL Cn Cn Z LU Cn PHI Sieve Sizes -4.25 -4 -3 -2.25 -2 -1.5 -1 -0.5 0 0.5 1 1.5 2 2.5 3 3.5 3.75 4 Standard Sieve Sizes 3/45/8 5/16 4 5 7 10 14 18 25 35 45 60 80 120 170 200 230 Hydrometer 100 0 90 10 80 20 70 30 CD a Q) CD 60 40 TI m 50 50 E 0 LD. 40 60 Q) 30 70 20 80 10 90 ... .. ... .. 0 [� ........ . . ..... 100 100 5 10 5 1 5 0.1 5 0.01 5 0.001 Millimeters Gravel Sand - Silt and Clay Coarse F Fine Coarse Medium Fine Sample Symbol Elev. (ft)� USCS % Fines � % Organics % Carbonates� Median Mean Skew Kurt Sort Sample Information TB-1 1-VB-7 #1 -7.0 #200 -0.65 17.50 1.83 1.32 -0.55 3.27 1.1 Project Name: New Topsail Inlet Maintenance Dredging #230 - 0.651 Comments: Analysis Date: 10-14-11 Depths and elevations based on measured values Analyzed By: JCP Gahagan & Bryant Associates of North Carolina Easting (X, ft): 2,402,024 295-A N. Green Meadows Dr. Northing (Y, ft): 217,452 Wilmington, NC 28405-3933 In 910-313-3338 Horizontal System: NAD 1983 ENGINEERS * SURVEYORS lax 910-313-6822 Vertical System: MLW N& Cn Cn 0 (if a- LU 0 LL Cn Cn Z LU Cn PHI Sieve Sizes -4.25 -4 -3 -2.25 -2 -1.5 -1 -0.5 0 0.5 1 1.5 2 2.5 3 3.5 3.75 4 Standard Sieve Sizes 3/45/8 5/16 4 5 7 10 14 18 25 35 45 60 80 120 170 200 230 Hydrometer 100 0 90 10 80 20 70 30 CD a 60 CD 40 TI m 50 50 E 0 LD. 40 60 30 70 20 80 10 90 0 100 100 5 10 5 1 5 0.1 5 0.01 5 0.001 Millimeters Gravel Sand - Silt and Clay Coarse F Fine Coarse Medium Fine Sample Symbol �Elev. (ft)� USCS �% Fines�% Organics�% Carbonates Median Mean Kew:=Kurt Sort Sample Information TB- 11 -VB-7 #2 -9.9 #200 -0.25 1 17.50 2.05 1.89 -1.71 � 7.71 0.66 Project Name: New Topsail Inlet Maintenance Dredging #230 - 0.251 Comments: Analysis Date: 10-14-11 Depths and elevations based on measured values Analyzed By: JCP Gahagan & Bryant Associates of North Carolina Easting (X, ft): 2,402,024 295-A N. Green Meadows Dr. Northing (Y, ft): 217,452 Wilmington, NC 28405-3933 In 910-313-3338 Horizontal System: NAD 1983 ENGINEERS * SURVEYORS fax 910-313-6822 Vertical System: MLW :aR Cn Cn 0 (if a- LU 0 LL Cn Cn Z LU Cn PHI Sieve Sizes -4.25 -4 -3 -2.25 -2 -1.5 -1 -0.5 0 0.5 1 1.5 2 2.5 3 3.5 3.75 4 Standard Sieve Sizes 3/45/8 5/16 4 5 7 10 14 18 25 35 45 60 80 120 170 200 230 Hydrometer 100 0 90 10 80 20 70 30 CD 2) a Q) CD 60 40 TI m 50 50 E 0 LD. 40 60 cQ 30 1 1 1 1 1 1 70 20 80 10 90 0 100 100 5 10 5 1 5 0.1 5 0.01 5 0.001 Millimeters Gravel Sand - Silt and Clay Coarse F Fine Coarse Medium Fine Sample Symbol Elev. (ft)� USCS % Fines % Organics % Carbonates� Median Mean Skew Kurt Sort Sample Information TB-1 1-VB-8 #1 -6.1 SP #200 -0.10 11.80 2.2 2.15 -1.14 6.42 0.38 Project Name: New Topsail Inlet Maintenance Dredging #230 - 0.10 Comments: Analysis Date: 10-14-11 Depths and elevations based on measured values Analyzed By: JCP Gahagan & Bryant Associates of North Carolina Easting (X, ft): 2,401,553 295-A N. Green Meadows Dr. Northing (Y, ft): 218,106 Wilmington, NC 28405-3933 In 910-313-3338 Horizontal System: NAD 1983 ENGINEERS * SURVEYORS lax 910-313-6822 Vertical System: MLW :ax Cn Cn 0 (if a- LU 0 LL Cn Cn Z LU Cn PHI Sieve Sizes -4.25 -4 -3 -2.25 -2 -1.5 -1 -0.5 0 0.5 1 1.5 2 2.5 3 3.5 3.75 4 Standard Sieve Sizes 3/45/8 5/16 4 5 7 10 14 18 25 35 45 60 80 120 170 200 230 Hydrometer 100 0 90 10 80 20 70 30 CD 2) Q) CD 60 40 TI m 50 50 E 0 LD. 40 60 cQ 30 1 1 1 1 70 20 . . . . . . 80 10 ...... 90 0 100 100 5 10 5 1 5 0.1 5 0.01 5 0.001 Millimeters Gravel Sand - Silt and Clay Coarse F Fine Coarse Medium Fine Sample Symbol Elev. (ft)� USCS % Fines % Organics % Carbonates� Median Mean Skew Kurt Sort Sample Information TB- 11 -VB-8 #2 -13.5 #200 -0.60 1 11.80 1.36 1.11 0.59 3.58 0.69 Project Name: New Topsail Inlet Maintenance Dredging #230 - 0.601 Comments: Analysis Date: 10-14-11 Depths and elevations based on measured values Analyzed By: JCP Gahagan & Bryant Associates of North Carolina Easting (X, ft): 2,401,553 295-A N. Green Meadows Dr. Northing (Y, ft): 218,106 Wilmington, NC 28405-3933 In 910-313-3338 Horizontal System: NAD 1983 ENGINEERS * SURVEYORS fax 910-313-6822 Vertical System: MLW K11 Cn Cn 0 (if a- LU 0 LL Cn Cn Z LU Cn PHI Sieve Sizes -4.25 -4 -3 -2.25 -2 -1.5 -1 -0.5 0 0.5 1 1.5 2 2.5 3 3.5 3.75 4 Standard Sieve Sizes 3/45/8 5/16 4 5 7 10 14 18 25 35 45 60 80 120 170 200 230 Hydrometer 100 0 90 10 80 20 70 30 CD a 60 40 TI m CD (D 50 50 E 0 LD. 40 60 Q) 30 70 20 80 10 90 0 100 .... .. .. K 100 5 10 5 1 5 0.1 5 0.01 5 0.001 Millimeters Gravel Sand - Silt and Clay Coarse F Fine Coarse Medium Fine Sample Symbol Elev. (ft)� USCS % Fines % Organics % Carbonates� Median Mean Skew Kurt Sort Sample Information TB-1 1-VB-9 #1 -2.9 #200 -0.30 1 8.20 1.99 1.76 -1.69 6.8 0.75 Project Name: New Topsail Inlet Maintenance Dredging #230 - 0.301 Comments: Analysis Date: 10-13-11 Depths and elevations based on measured values Analyzed By: JCP Gahagan & Bryant Associates of North Carolina Easting (X, ft): 2,401,736 295-A N. Green Meadows Dr. Northing (Y, ft): 219,385 Wilmington, NC 28405-3933 07, In 910-313-3338 Horizontal System: NAD 1983 ENGINEERS * SURVEYORS fax 910-313-6822 Vertical System: MLW on Cn Cn 0 (if a- LU 0 LL Cn Cn Z LU Cn PHI Sieve Sizes -4.25 -4 -3 -2.25 -2 -1.5 -1 -0.5 0 0.5 1 1.5 2 2.5 3 3.5 3.75 4 Standard Sieve Sizes 3/45/8 5/16 4 5 7 10 14 18 25 35 45 60 80 120 170 200 230 Hydrometer 100 0 90 10 80 20 70 30 CD a 60 40 TI m CD Q) 50 50 E 0 LD. 40 60 cQ Q) 30 70 20 80 10 ... .. 90 0 100 100 5 10 5 1 5 0.1 5 0.01 5 0.001 Millimeters Gravel Sand - Silt and Clay Coarse F Fine Coarse Medium Fine Sample Symbol �Elev. (ft)� USCS �% Fines�% Organics�% Carbonates Median Mean Skew Kurt Soft Sample Information TB- 11 -VB-9 #2 -5.0 � SP #200 -0.50 8.20 2.12 2.02 -2.44 13.6 Project Name: New Topsail Inlet Maintenance Dredging 30 050 Comments: Analysis Date: 10-13-11 Depths and elevations based on measured values Analyzed By: JCP Gahagan & Bryant Associates of North Carolina Easting (X, ft): 2,401,736 295-A N. Green Meadows Dr. Northing (Y, ft): 219,385 Wilmington, NC 28405-3933 In 910-313-3338 Horizontal System: NAD 1983 ENGINEERS * SURVEYORS fax 910-313-6822 Vertical System: MILW owl Cn Cn 0 (if a- LU 0 LL Cn Cn Z LU Cn PHI Sieve Sizes -4.25 -4 -3 -2.25 -2 -1.5 -1 -0.5 0 0.5 1 1.5 2 2.5 3 3.5 3.75 4 Standard Sieve Sizes 3/45/8 5/16 4 5 7 10 14 18 25 35 45 60 80 120 170 200 230 Hydrometer 100 0 90 10 80 20 70 30 CD 0) a 60 40 TI m CD 50 50 E 0 LD. 40 60 cQ Q) 30 70 20 80 10 . . . . . . 90 0 100 100 5 10 5 1 5 0.1 5 0.01 5 0.001 Millimeters Gravel Sand - Silt and Clay Coarse F Fine Coarse Medium Fine Sample Symbol Elev. (ft)� USCS % Fines % Organics % Carbonates� Median Mean Skew Kurt Sort Sample Information TB-11-VB-10 #1 -2.1 #200 -0.30 1 10.10 2.11 1.97 -2.04 10.62 0.6 Project Name: New Topsail Inlet Maintenance Dredging #230 - 0.301 Comments: Analysis Date: 10-24-11 Depths and elevations based on measured values Analyzed By: JCP Gahagan & Bryant Associates of North Carolina Easting (X, ft): 2,402,169 295-A N. Green Meadows Dr. Northing (Y, ft): 220,028 Wilmington, NC 28405-3933 In 910-313-3338 Horizontal System: NAD 1983 ENGINEERS * SURVEYORS fax 910-313-6822 Vertical System: MLW 103 Cn Cn 0 (if a- LU 0 LL Cn Cn Z LU Cn PHI Sieve Sizes -4.25 -4 -3 -2.25 -2 -1.5 -1 -0.5 0 0.5 1 1.5 2 2.5 3 3.5 3.75 4 Standard Sieve Sizes 3/45/8 5/16 4 5 7 10 14 18 25 35 45 60 80 120 170 200 230 Hydrometer 100 IT 0 90 10 80 20 70 30 CD a 60 40 TI m CD (D 50 50 E 0 LD. 40 60 cQ 30 70 20 80 10 90 ... ... .. ... ...... .. .... ...... 0 100 100 5 10 5 1 5 0.1 5 0.01 5 0.001 Millimeters Gravel Sand - Silt and Clay Coarse F Fine Coarse Medium Fine Sample Symbol Elev. (ft)� USCS % Fines % Organics % Carbonates� Median Mean Skew Kurt Sort Sample Information TB-11-VB-11 #1 -5.5 � SP #200 -0.25 1 7.30 2.33 2.28 -2.02 16.85 0.33 Project Name: New Topsail Inlet Maintenance Dredging #230 - 0.251 Comments: Analysis Date: 10-12-11 Depths and elevations based on measured values Analyzed By: JCP Gahagan & Bryant Associates of North Carolina Easting (X, ft): 2,402,863 295-A N. Green Meadows Dr. Northing (Y, ft): 220,510 Wilmington, NC 28405-3933 In 910-313-3338 Horizontal System: NAD 1983 ENGINEERS * SURVEYORS fax 910-313-6822 Vertical System: MLW 104 Cn 0 (if a- LU 0 LL Cn Cn Z LU Cn PHI Sieve Sizes -4.25 -4 -3 -2.25 -2 -1.5 -1 -0.5 0 0.5 1 1.5 2 2.5 3 3.5 3.75 4 Standard Sieve Sizes 3/45/8 5/16 4 5 7 10 14 18 25 35 45 60 80 120 170 200 230 Hydrometer 100 0 90 10 80 20 70 30 CD a Q) CD 60 40 TI m (D 50 50 E 0 LD. 40 60 cQ 30 70 20 80 10 — — --------- ------ 90 . . ... ... ..................... ..... . ... ... ..... ... ... .. .. ... ... ..... ........ ... .. ... 0 I.E. 11 ... ... 100 100 5 10 5 1 5 0.1 5 0.01 5 0.001 Millimeters Gravel Sand — Silt and Clay Coarse F Fine Coarse Medium Fine Sample Symbol �Elev. (ft)� USCS �% Fines�% Organics�% Carbonates Median Mean Skew Kurt Sort Sample Information TB-11-VB-11 #2 —'� -13.2 #200 -3.05 1 7.30 2.27 1.81 -1.46 6.46 0.98 Project Name: New Topsail Inlet Maintenance Dredging #230 - 2.251 Comments: Analysis Date: 10-13-11 Depths and elevations based on measured values Analyzed By: JCP Gahagan & Bryant Associates of North Carolina Easting (X, ft): 2,402,863 295-A N. Green Meadows Dr. Northing (Y, ft): 220,510 Wilmington, NC 28405-3933 In 910-313-3338 Horizontal System: NAD 1983 ENGINEERS * SURVEYORS fax 910-313-6822 Vertical System: MLW 105 Cn Cn 0 (if a- LU 0 LL Cn Cn Z LU Cn PHI Sieve Sizes -4.25 -4 -3 -2.25 -2 -1.5 -1 -0.5 0 0.5 1 1.5 2 2.5 3 3.5 3.75 4 Standard Sieve Sizes 3/45/8 5/16 4 5 7 10 14 18 25 35 45 60 80 120 170 200 230 Hydrometer 100 0 90 10 80 20 70 30 CD CD 60 40 TI m Q) 50 50 E 0 LD. 40 60 cQ 30 70 20 80 10 90 0 M 100 100 5 10 5 1 5 0.1 5 0.01 5 0.001 Millimeters Gravel Sand - Silt and Clay Coarse F Fine Coarse Medium Fine Sample Symbol Elev. (ft)� USCS % Fines % Organics % Carbonates� Median Mean Skew Kurt Sort Sample Information TB-11-VB-12 #1 -2.9 � SP #200 -0.30 1 7.50 2.13 2.03 -1.8 10.39 0.57 Project Name: New Topsail Inlet Maintenance Dredging #230 - 0.301 Comments: Analysis Date: 10-24-11 Depths and elevations based on measured values Analyzed By: JCP Gahagan & Bryant Associates of North Carolina Easting (X, ft): 2,403,501 295-A N. Green Meadows Dr. Northing (Y, ft): 220,577 Wilmington, NC 28405-3933 07, In 910-313-3338 Horizontal System: NAD 1983 ENGINEERS * SURVEYORS fax 910-313-6822 Vertical System: MLW KPI Cn Cn 0 (if a- LU 0 LL Cn Cn Z LU Cn PHI Sieve Sizes -4.25 -4 -3 -2.25 -2 -1.5 -1 -0.5 0 0.5 1 1.5 2 2.5 3 3.5 3.75 4 Standard Sieve Sizes 3/45/8 5/16 4 5 7 10 14 18 25 35 45 60 80 120 170 200 230 Hydrometer 100 0 90 10 80 20 70 30 CD a 60 40 TI m CD 50 50 E 0 LD. 40 60 cQ Q) 30 1 1 1 1 1 1 1 1 FIN 70 20 80 10 90 .... .. .. L 1 0 ... .. ..... 100 100 5 10 5 1 5 0.1 5 0.01 5 0.001 Millimeters Gravel Sand - Silt and Clay Coarse F Fine Coarse Medium Fine Sample Symbol �Elev. (ft)� USCS �% Fines�% Organics�% Carbonates Median Mean Skew Kurt Sort Sample Information TB-11-VB-13 #1 -8.3 #200 -0.20 1 7.70 1.95 1.84 -1.68 8.57 0.62 Project Name: New Topsail Inlet Maintenance Dredging #230 - 0.201 Comments: Analysis Date: 10-24-11 Depths and elevations based on measured values Analyzed By: JCP Gahagan & Bryant Associates of North Carolina Easting (X, ft): 2,403,646 295-A N. Green Meadows Dr. Northing (Y, ft): 220,178 Wilmington, NC 28405-3933 In 910-313-3338 Horizontal System: NAD 1983 ENGINEERS * SURVEYORS fax 910-313-6822 Vertical System: MLW 107 Cn 0 (if a- LU 0 LL Cn Cn Z LU Cn PHI Sieve Sizes -4.25 -4 -3 -2.25 -2 -1.5 -1 -0.5 0 0.5 1 1.5 2 2.5 3 3.5 3.75 4 Standard Sieve Sizes 3/45/8 5/16 4 5 7 10 14 18 25 35 45 60 80 120 170 200 230 Hydrometer 100 0 90 10 80 20 70 30 CD a 60 40 TI m CD Q) 50 50 E 0 LD. 40 60 Q) 30 70 20 80 10 90 0 100 100 5 10 5 1 5 0.1 5 0.01 5 0.001 Millimeters Gravel Sand - Silt and Clay Coarse F Fine Coarse Medium Fine Sample Symbol �Elev. (ft)� USCS �% Fines�% Organics�% Carbonates Median Mean Skew Kurt Sort Sample Information TB-1 1 -VB-14 #1 -3.0 #200 -0.00 1 7.90 2.32 2.13 -1.28 11.45 0.49 Project Name: New Topsail Inlet Maintenance Dredging #230 - 0.001 Comments: Analysis Date: 10-24-11 Depths and elevations based on measured values Analyzed By: JCP Gahagan & Bryant Associates of North Carolina Easting (X, ft): 2,404,425 295-A N. Green Meadows Dr. Northing (Y, ft): 220,664 Wilmington, NC 28405-3933 In 910-313-3338 Horizontal System: NAD 1983 ENGINEERS * SURVEYORS fax 910-313-6822 Vertical System: MLW 108 Cn Cn 0 (if a- LU 0 LL Cn Cn Z LU Cn PHI Sieve Sizes -4.25 -4 -3 -2.25 -2 -1.5 -1 -0.5 0 0.5 1 1.5 2 2.5 3 3.5 3.75 4 Standard Sieve Sizes 3/45/8 5/16 4 5 7 10 14 18 25 35 45 60 80 120 170 200 230 Hydrometer 100 0 90 10 80 20 70 30 CD ) 0 a Q) CD 60 40 TI m Q) 50 50 E 0 LD. 40 60 cQ Q) 30 70 20 80 10 90 0 100 100 5 10 5 1 5 0.1 5 0.01 5 0.001 Millimeters Gravel Sand - Silt and Clay Coarse F Fine Coarse Medium Fine Sample Symbol �Elev. (ft)� USCS �% Fines�% Organics�% Carbonates Median Mean Skew Kurt Sort Sample Information TB-11-VB-15 #1 -7.7 #200 -0.30 1 23.40 1.99 1.56 -1.34 4.25 1.07 Project Name: New Topsail Inlet Maintenance Dredging #230 - 0.301 Comments: Analysis Date: 10-24-11 Depths and elevations based on measured values Analyzed By: JCP Gahagan & Bryant Associates of North Carolina Easting (X, ft): 2,405,454 295-A N. Green Meadows Dr. Northing (Y, ft): 221,106 Wilmington, NC 28405-3933 07, In 910-313-3338 Horizontal System: NAD 1983 ENGINEERS * SURVEYORS fax 910-313-6822 Vertical System: MLW W Cn Cn 0 (if a- LU 0 LL Cn Cn Z LU Cn PHI Sieve Sizes -4.25 -4 -3 -2.25 -2 -1.5 -1 -0.5 0 0.5 1 1.5 2 2.5 3 3.5 3.75 4 Standard Sieve Sizes 3/45/8 5/16 4 5 7 10 14 18 25 35 45 60 80 120 170 200 230 Hydrometer 100 0 90 10 80 20 70 30 CD 2) Q) a 60 40 TI m CD Q) 50 50 E 0 LD. 40 60 cQ Q) 30 70 20 80 10 90 0 100 100 5 10 5 1 5 0.1 5 0.01 5 0.001 Millimeters Gravel Sand — Silt and Clay Coarse F Fine Coarse Medium Fine Sample Symbol �Elev. (ft)� USCS �% Fines�% Organics�% Carbonates Median Mean Skew Kurt Sort Sample Information TB-11-VB-15 #2 —'� -14.0 #200 -0.25 1 23.40 0.6 0.29 0.09 2.47 1.06 Project Name: New Topsail Inlet Maintenance Dredging #230 - 0.251 Comments: Analysis Date: 10-24-11 Depths and elevations based on measured values Analyzed By: JCP Gahagan & Bryant Associates of North Carolina Easting (X, ft): 2,405,454 295-A N. Green Meadows Dr. Northing (Y, ft): 221,106 Wilmington, NC 28405-3933 In 910-313-3338 Horizontal System: NAD 1983 ENGINEERS * SURVEYORS fax 910-313-6822 Vertical System: MLW BER PHI Sieve Sizes -4.25 -4 -3 -2.25 -2 -1.5 -1 -0.5 0 0.5 1 1.5 2 2.5 3 3.53.75 4 Standard Sieve Sizes 3/45/8 5/16 4 5 7 10 14 18 25 35 45 60 80 120 170 200 230 Hydrometer 100 Coarse F Fine C Coarse M Medium F Fine 0 90 10 80 20 70 30 t a o 60 c2 m N 'n 40 T m m c°� 50 0 W 50 m 0 U m W 40 o � ----- ;- 60 J 3 N 30 CO O N 70 N 01 20 80 0 0 10 : - -- -- - ---1 -1 90 U 0 0 100 O N 100 5 10 5 1 5 0.1 5 0.01 5 0.001 a Millimeters w Co J 0 0 J' J = Sample 0 Symbol Elev. (ft) USCS % Fines % Organics % Carbonates Median Mean Skew Kurt Sort Sample Information TBVC -07 -02 #1 D -29.5 SP #zso - z.ao 2.76 2.65 -4.13 25.8 0.72 Project Name: Topsail Beach Sand Search • m o' Comments: w Analysis Date: U) Depths and elevations based on measured values Analyzed By: of 0 CPE Coastal Planning & Engineering Easting (X, ft): 2,407,685 2481 NW Boca Raton Blvd, Boca Raton Northing (Y, ft): 216,446 Q FL 33431 Horizontal System: NAD 1983 Q ph (561) 391 -8102 > fax (561) 391 -9116 W Vertical System: NAVD 88 Gravel S Sand Silt and Clay Coarse F Fine C Coarse M Medium F Fine PHI Sieve Sizes -4.25 -4 -3 -2.25 -2 -1.5 -1 -0.5 0 0.5 1 1.5 2 2.5 3 3.53.75 4 Standard Sieve Sizes 3/45/8 5/16 4 5 7 10 14 18 25 35 45 60 80 120 170 200 230 Hydrometer 100 Coarse F Fine C Coarse M Medium F Fine 0 90 10 80 20 70 30 t a o 60 co (D 40 T c°� m 50 50 0 W m 0 U c W m 40 - - -- 60 a� o G' P J 3 N 30 0 0 N - - -- 70 N O 0' 20 80 0 F r O 10 90 0 0 1 1 1 100 O N 100 5 10 5 1 5 0.1 5 0.01 5 0.001 a Millimeters w Co J U) 0 J J = Sample Symbol Elev. (ft) USCS % Fines % Organics % Carbonates Median Mean Skew Kurt Sort Sample Information TBVC -07 -02 #2 -33.5 SP uz °o = 4 44 2.85 2.72 -3.37 17.43 0.75 Project Name: Topsail Beach Sand Search • Co o' Comments: w Analysis Date: 07 -22 -07 U) Depths and elevations based on measured values Analyzed By: KID of U CPE Coastal Planning & Engineering Easting (X, ft): 2,407,685 2481 NW Boca Raton Blvd, Boca Raton Northing (Y, ft): 216,446 Q FL 33431 Horizontal System: NAD 1983 Q ph (561) 391 -8102 > fax (561) 391 -9116 LU Vertical System: NAVD 88 Gravel S Sand Silt and Clay Coarse F Fine C Coarse M Medium F Fine PHI Sieve Sizes -4.25 -4 -3 -2.25 -2 -1.5 -1 -0.5 0 0.5 1 1.5 2 2.5 3 3.53.75 4 Standard Sieve Sizes 3/45/8 5/16 4 5 7 10 14 18 25 35 45 60 80 120 170 200 230 Hydrometer 100 Coarse Fine Coarse Medium Fine 0 90 10 80 20 70 30 t a o 60 m N 'n 40 T m c°� m 50 50 0 W m 0 U of m w 40 60 o G. J 3 N 30 0 0 70 N 01 20 80 0 i 0 0 10 90 U� S� 0 - 100 O Ni 100 5 10 5 1 5 0.1 5 0.01 5 0.001 a Millimeters w Co J 0 0 J' J = Sample 0 Symbol Elev. (ft) USCS % Fines % Organics % Carbonates Median Mean Skew Kurt Sort Sample Information TBVC -07 -02 #3 -35.3 SP #2030 - 3.231 2.7 2.55 -3.24 18.21 0.73 Project Name: Topsail Beach Sand Search • Co o' Comments: w Analysis Date: 07 -18 -07 U) Depths and elevations based on measured values Analyzed By: PB of 0 CPE Coastal Planning & Engineering Easting (X, ft): 2,407,685 2481 NW Boca Raton Blvd, Boca Raton Northing (Y, ft): 216,446 Q FL 33431 Horizontal System: NAD 1983 Q ph (561) 391 -8102 > fax (561) 391 -9116 LU Vertical System: NAVD 88 Gravel Sand Silt and Clay Coarse Fine Coarse Medium Fine 113 PHI Sieve Sizes -4.25 -4 -3 -2.25 -2 -1.5 -1 -0.5 0 0.5 1 1.5 2 2.5 3 3.53.75 4 Standard Sieve Sizes 3/45/8 5/16 4 5 7 10 14 18 25 35 45 60 80 120 170 200 230 Hydrometer 100 Coarse Fine Coarse Medium Fine 0 90 10 80 20 70 30 t a o 60 c2 m N 'n 40 T m m c°� 50 0 W 50 m 0 U m W 40 o G. 60 J 3 N 30 CO O N 70 N 01 20 80 0 r' 0 0 10 90 U �I 0 0 100 0 N 100 5 10 5 1 5 0.1 5 0.01 5 0.001 a Millimeters w Co J 0 0 J' J = Sample 0 Symbol Elev. (ft) USCS % Fines % Organics % Carbonates Median Mean Skew Kurt Sort Sample Information TBVC -07 -02 #4 -34.4 SW #200-3.511 _ 0.86 0.31 1.85 2.42 Project Name: Topsail Beach Sand Search • m o' Comments: w Analysis Date: 07 -18 -07 U) Depths and elevations based on measured values Analyzed By: PB of 0 CPE Coastal Planning & Engineering Easting (X, ft): 2,407,685 2481 NW Boca Raton Blvd, Boca Raton Northing (Y, ft): 216,446 Q FL 33431 Horizontal System: NAD 1983 Q ph (561) 391 -8102 > fax (561) 391 -9116 W Vertical System: NAVD 88 Gravel Sand Silt and Clay Coarse Fine Coarse Medium Fine 114 PHI Sieve Sizes -4.25 -4 -3 -2.25 -2 -1.5 -1 -0.5 0 0.5 1 1.5 2 2.5 3 3.53.75 4 Standard Sieve Sizes 3/45/8 5/16 4 5 7 10 14 18 25 35 45 60 80 120 170 200 230 Hydrometer 100 0 90 10 80 20 70 30 t a o 60 m N 'n 40 T m m 150 c°� 50 0 W m 0 U of w m o G. 40 60 J 3 N 30 CO 0 N 70 N U' 20 80 0 I 0 0 0 10 90 U I 0 0 100 0 N 100 5 10 5 1 5 0.1 5 0.01 5 0.001 a Millimeters LU Co Gravel Sand Silt and Clay Coarse Fine Coarse Medium Fine o J' J = Sample 0 Symbol Elev. (ft) USCS % Fines % Organics % Carbonates Median Mean Skew Kurt Sort Sample Information TBVC -07 -06 #1 11.9 SP #2030 - 1.39 2.22 2.15 -1.2 7.1 0.53 Project Name: Topsail Beach Sand Search • Co o' Comments: w Analysis Date: 07 -26 -07 wDepths and elevations based on measured values Analyzed By: ST of 0 C PE Coastal Planning & Engineering Easting (X, ft): 2,406,364 2481 NW Boca Raton Blvd, Boca Raton Northing (Y, ft): 216,577 Q FL 33431 Horizontal System: NAD 1983 Q ph (561) 391 -8102 > fax (561) 391 -9116 W Vertical System: NAVD 88 115 PHI Sieve Sizes -4.25 -4 -3 -2.25 -2 -1.5 -1 -0.5 0 0.5 1 1.5 2 2.5 3 3.53.75 4 Standard Sieve Sizes 3/45/8 5/16 4 5 7 10 14 18 25 35 45 60 80 120 170 200 230 Hydrometer 100 Coarse Fine Coarse Medium Fine 0 90 10 80 20 70 30 t a o 60 co (D 40 T m c°� 50 0 W 50 m 0 U c W m 40 60 0 J 3 N 30 0 0 70 - - -- N UI 20 ..... {.. 80 - 0 F I r O U 10 90 U I 0 0 100 O NI 100 5 10 5 1 5 0.1 5 0.01 5 0.001 a Millimeters w Co J U) 0 J J = Sample Symbol Elev. (ft) USCS % Fines % Organics % Carbonates Median Mean Skew Kurt Sort Sample Information TBVC -07 -06 #2 -15.6 SP #230 - 0.90 2.54 2.51 -0.43 5.34 0.35 Project Name: Topsail Beach Sand Search • m of Comments: w Analysis Date: 06 -27 -07 U) Depths and elevations based on measured values Analyzed By: KW /KR of U CPE Coastal Planning & Engineering Easting (X, ft): 2,406,364 2481 NW Boca Raton Blvd, Boca Raton Northing (Y, ft): 216,577 Q FL 33431 Horizontal System: NAD 1983 Q ph (561) 391 -8102 > fax (561) 391 -9116 LU Vertical System: NAVD 88 Gravel Sand Silt and Clay Coarse Fine Coarse Medium Fine PHI Sieve Sizes -4.25 -4 -3 -2.25 -2 -1.5 -1 -0.5 0 0.5 1 1.5 2 2.5 3 3.53.75 4 Standard Sieve Sizes 3/45/8 5/16 4 5 7 10 14 18 25 35 45 60 80 120 170 200 230 Hydrometer 100 Coarse Fine Coarse Medium Fine 0 90 10 80 20 70 30 t a o 60 co (D 40 T m c°� 50 0 W 50 m 0 U m 40 60 W o G. J 3 N 30 0 0 N - - - -- 70 N O U' 20 -- --- - 80 0 F r O 0 10 --------- -- - - - - -- - 90 U �I 0 0 100 O N 100 5 10 5 1 5 0.1 5 0.01 5 0.001 a Millimeters w Co J U) 0 J J = Sample Symbol Elev. (ft) USCS % Fines % Organics % Carbonates Median Mean Skew Kurt Sort Sample Information TBVC -07 -06 #3 -19.4 SP #2030 - 1.231 2.28 2.25 -1.17 7.91 0.46 Project Name: Topsail Beach Sand Search • m o' Comments: w Analysis Date: 07 -22 -07 U) Depths and elevations based on measured values Analyzed By: PB of U CPE Coastal Planning & Engineering Easting (X, ft): 2,406,364 2481 NW Boca Raton Blvd, Boca Raton Northing (Y, ft): 216,577 Q FL 33431 Horizontal System: NAD 1983 Q ph (561) 391 -8102 > fax (561) 391 -9116 W Vertical System: NAVD 88 Gravel Sand Silt and Clay Coarse Fine Coarse Medium Fine 117 PHI Sieve Sizes -4.25 -4 -3 -2.25 -2 -1.5 -1 -0.5 0 0.5 1 1.5 2 2.5 3 3.53.75 4 Standard Sieve Sizes 3/45/8 5/16 4 5 7 10 14 18 25 35 45 60 80 120 170 200 230 Hydrometer 100 Coarse Fine Coarse Medium Fine 0 90 10 80 20 70 30 t a o 60 co (D 40 T c°� m 50 50 0 W m 0 U w m 40 60 o G. J 3 N 30 0 0 N - - -- -- - - - - - 70 N O UI 20 80 0 F 0I O 0 10 - - -- 90 UI I 0 0 100 O NI 100 5 10 5 1 5 0.1 5 0.01 5 0.001 a Millimeters w Co J U) 0 J J = Sample Symbol Elev. (ft) USCS % Fines % Organics % Carbonates Median Mean Skew Kurt Sort Sample Information TBVC -07 -11 #1 -20.5 SP #zso - i.z� 2.63 2.6 -0.6 8.86 0.32 Project Name: Topsail Beach Sand Search • m of Comments: w Analysis Date: 07 -22 -07 U) Depths and elevations based on measured values Analyzed By: PB of U CPE Coastal Planning & Engineering Easting (X, ft): 2,406,765 2481 NW Boca Raton Blvd, Boca Raton Northing (Y, ft): 216,129 Q FL 33431 Horizontal System: NAD 1983 Q ph (561) 391 -8102 > fax (561) 391 -9116 W Vertical System: NAVD 88 Gravel Sand Silt and Clay Coarse Fine Coarse Medium Fine 118 PHI Sieve Sizes -4.25 -4 -3 -2.25 -2 -1.5 -1 -0.5 0 0.5 1 1.5 2 2.5 3 3.53.75 4 Standard Sieve Sizes 3/45/8 5/16 4 5 7 10 14 18 25 35 45 60 80 120 170 200 230 Hydrometer 100 Coarse F Fine C Coarse M Medium F Fine 0 90 10 80 20 70 30 t a o 60 co (D 40 T m 50 50 c°� U) W m 0 U m 40 60 W o G. J 3 N 30 0 0 N -- - - - -- - - -- - -- 70 N O 20 80 0 i 0 0 0 10 90 U I S 0 100 O N 100 5 10 5 1 5 0.1 5 0.01 5 0.001 a Millimeters w Co J U) 0 J J = Sample Symbol Elev. (ft) USCS % Fines % Organics % Carbonates Median Mean Skew Kurt Sort Sample Information TBVC -07 -11 #2 D -23.0 SP #zso - i.aa 2.6 2.54 -2.18 20.19 0.38 Project Name: Topsail Beach Sand Search • m o' Comments: w Analysis Date: 07 -15 -07 U) Depths and elevations based on measured values Analyzed By: KID of U CPE Coastal Planning & Engineering Easting (X, ft): 2,406,765 2481 NW Boca Raton Blvd, Boca Raton Northing (Y, ft): 216,129 Q FL 33431 Horizontal System: NAD 1983 Q ph (561) 391 -8102 > fax (561) 391 -9116 W Vertical System: NAVD 88 Gravel S Sand Silt and Clay Coarse F Fine C Coarse M Medium F Fine 120 PHI Sieve Sizes -4.25 -4 -3 -2.25 -2 -1.5 -1 -0.5 0 0.5 1 1.5 2 2.5 3 3.53.75 4 Standard Sieve Sizes 3/45/8 5/16 4 5 7 10 14 18 25 35 45 60 80 120 170 200 230 Hydrometer 100 —T� 0 90 10 80 20 70 30 t o a 60 40 co (D T coy m 50 50 0 W m 0 U m W 40 60 o G. J 3 N o 30 CO O N 70 N 01 20 80 0 r' 0 0 10 90 U� I 0 0 100 O N 100 5 10 5 1 5 0.1 5 0.01 5 0.001 Millimeters a LU Co Gravel Sand Silt and Clay o Coarse Fine Coarse Medium Fine J' J = Sample Symbol Elev. (ft) USCS % Fines % Organics % Carbonates Median Mean Skew Kurt Sort Sample Information 0 TBVC -07 -15 #1 • -20.1 SP #zso - i.zs 2.71 2.69 -1.72 22.74 0.33 Project Name: Topsail Beach Sand Search Co o' Comments: Analysis Date: 07 -16 -07 w > Depths and elevations based on measured values Analyzed By: JG 0 C PE Coastal Planning & Engineering Easting (X, ft): 2,406,052 2481 NW Boca Raton Blvd, Boca Raton Northing (Y, ft): 215,803 Q FL 33431 Q ph (561) 391 -8102 Horizontal System: NAD 1983 > fax (561) 391 -9116 W Vertical System: NAVD 88 120 PHI Sieve Sizes -4.25 -4 -3 -2.25 -2 -1.5 -1 -0.5 0 0.5 1 1.5 2 2.5 3 3.53.75 4 Standard Sieve Sizes 3/45/8 5/16 4 5 7 10 14 18 25 35 45 60 80 120 170 200 230 Hydrometer 100 Coarse Fine Coarse Medium Fine 0 90 10 80 20 70 30 t a o 60 co (D 40 T c°� m 50 50 0 W m 0 U m W 40 60 o G. J 3 N o 30 CO O N 70 N 01 20 - - -- -- 80 0 0 0 0 10 90 U� �I 0 0 100 O N 100 5 10 5 1 5 0.1 5 0.01 5 0.001 a Millimeters w Co J 0 0 J J = Sample 0 Symbol Elev. (ft) USCS % Fines % Organics % Carbonates Median Mean Skew Kurt Sort Sample Information TBVC -07 -15 #2 -23.7 SP #2030 - 1.631 2.68 2.64 -3.46 41.44 0.41 Project Name: Topsail Beach Sand Search • m o' Comments: w Analysis Date: 07 -16 -07 U) Depths and elevations based on measured values Analyzed By: JG of 0 CPE Coastal Planning & Engineering Easting (X, ft): 2,406,052 2481 NW Boca Raton Blvd, Boca Raton Northing (Y, ft): 215,803 Q FL 33431 Horizontal System: NAD 1983 Q ph (561) 391 -8102 > fax (561) 391 -9116 W Vertical System: NAVD 88 Gravel Sand Silt and Clay Coarse Fine Coarse Medium Fine 121 PHI Sieve Sizes -4.25 -4 -3 -2.25 -2 -1.5 -1 -0.5 0 0.5 1 1.5 2 2.5 3 3.5 3.75 4 Standard Sieve Sizes 3/45/8 5/16 4 5 7 10 14 18 25 35 45 60 80 120 170 200 230 Hydrometer 100 0 90 10 80 20 70 30 CD 0 ) a Q) CD 60 40 TI m (D 50 50 E o 0 CO 1 CD. 40 60 Q) Cn Cn 0 (if 30 a- 70 LU 20 80 Z Z 10 90 T 0 Cn y Z 0 100 100 5 10 5 1 5 0.1 5 0.01 5 0.001 LU LU Millimeters Gravel Sand Silt and Clay Cn a- Coarse Fine Coarse Medium Fine 0 ZE Sample � Symbol Elev. (ft)� USCS % Fines % Organics Carbonates Mean Skew � Kurt Sort Sample Information T TOPCRK-1 #1 -7.0 � SID ##200 - .1 -0.05 1 4.60 2.15 � 2.1 -1.32 � 9.08 Project Name: Topsail Beach Renourishment LU Comments: Analysis Date: YS 05-13-10 Depths and elevations based on measured values Analyzed By: JCP 0 U) Gahagan & Bryant Associates of North Carolina Fasting (X, ft): 2,402,876 Northing (Y, ft): 222,397 Cn �Ll 295-A N. Green Meadows Dr. < 7=:] Wilmington, NC 28405-3933 Horizontal System: NAD 1983 Z < LU ENGINEER In 910-313-3338 Vertical System: NAVD 88 > Cn fax 910-313-6822 122 PHI Sieve Sizes -4.25 -4 -3 -2.25 -2 -1.5 -1 -0.5 0 0.5 1 1.5 2 2.5 3 3.5 3.75 4 Standard Sieve Sizes 3/45/8 5/16 4 5 7 10 14 18 25 35 45 60 80 120 170 200 230 Hydrometer 100 0 90 10 80 20 70 30 CD 2) a CD 60 40 TI m Q) 50 50 E o 0 CO CD. 40 60 Q) Cn Cn 0 (if 30 a- 70 LU 20 80 LU Z- - - - - - - - - - Z 10 90 T 0 Cn y 0 Z 100 100 5 10 5 1 5 0.1 5 0.01 5 0.001 LU LU Millimeters Gravel Sand Silt and Clay Cn a- Coarse Fine Coarse Medium Fine 0 ZE Sample Symbol Elev. (ft)� USCS % Fines % Organics % Carbonates Median Mean Skew Kurt Sort Sample Information T TOPCRK-2 #1 -3.1 SID ##200 - .1 -0.00 1 4.80 2.32 2.27 -1.86 12.4 0.41 Project Name: Topsail Beach Renourishment Comments: Analysis Date: 05-14-10 U) 0_ Depths and elevations based on measured values Analyzed By: JCP 0 U) Gahagan & Bryant Associates of North Carolina Fasting (X, ft): 2,403,849 Northing (Y, ft): 222,230 Cn �Ll 295-A N. Green Meadows Dr. < 7=:] Wilmington, NC 28405-3933 Horizontal System: NAD 1983 Z < LU ENGINEER, In 910-313-3338 Vertical System: NAVID 88 > Cn fax 910-313-6822 123 PHI Sieve Sizes -4.25 -4 -3 -2.25 -2 -1.5 -1 -0.5 0 0.5 1 1.5 2 2.5 3 3.5 3.75 4 Standard Sieve Sizes 3/45/8 5/16 4 5 7 10 14 18 25 35 45 60 80 120 170 200 230 Hydrometer 100 0 90 10 80 20 70 30 (D a (D 60 40 TI m Q) 50 50 E o 0 CO (D. 40 60 Cn Cn 0 (if 30 a- 70 LU 20 80 LU Z Z < 10 90 T Cn Z 0 1 00 100 5 10 5 1 5 0.1 5 0.01 5 0.001 LU LU Millimeters Gravel Sand Silt and Clay Cn a- Coarse Fine Coarse Medium Fine 0 ZE Sample � Symbol Elev. (ft)� USCS % Fines % Organics Carbonates Mean Skew � Kurt Sort Sample Information T TOPCRK-3 #1 -6.1 #200 #230 - 0.241 - 0.241 5.20 2.28 � 2.16 -1.71 � 11.67 0.5 Project Name: Topsail Beach Renourishment Comments: Analysis Date: 05-13-10 Depths and elevations based on measured values Analyzed By: JCP 0 U) Gahagan & Bryant Associates of North Carolina Fasting (X, ft): 2,404,072 Northing (Y, ft): 221,513 Cn �Ll 295-A N. Green Meadows Dr. < 7=:] Wilmington, NC 28405-3933 Horizontal System: NAD 1983 Z < LU ENGINEER, In 910-313-3338 Vertical System: NAVD 88 > Cn fax 910-313-6822 124 PHI Sieve Sizes -4.25 -4 -3 -2.25 -2 -1.5 -1 -0.5 0 0.5 1 1.5 2 2.5 3 3.5 3.75 4 Standard Sieve Sizes 3/45/8 5/16 4 5 7 10 14 18 25 35 45 60 80 120 170 200 230 Hydrometer 100 0 90 10 80 20 70 30 CD . 2 a Q) CD 60 40 TI m Q) 50 50 E o 0 CO CD. 40 60 Cn Cn 0 (if 30 a- 70 LU 20 41 80 LU Z Z 10 90 U t .. ---- Z 0 ... ... -------- 100 100 5 10 5 1 5 0.1 5 0.01 5 0.001 LU LU Millimeters Gravel Sand Silt and Clay Cn a- Coarse Fine Coarse Medium Fine 0 ZE Sample � Symbol Elev. (ft)� USCS % Fines % Organics Carbonates Mean Skew � Kurt Sort Sample Information T TOPCRK-4 #1 -4.6 ##200 � SP #200 230 - 0.151 -0.15 - 0.151 5.80 2.46 � 2.48 -1.47 � 11.45 0.35 Project Name: Topsail Beach Renourishment Comments: Analysis Date: 05-15-10 Depths and elevations based on measured values Analyzed By: JCP 0 U) Gahagan & Bryant Associates of North Carolina Fasting (X, ft): 2,404,392 Northing (Y, ft): 220,849 Cn �Ll 295-A N. Green Meadows Dr. < 7=:] Wilmington, NC 28405-3933 Horizontal System: NAD 1983 Z < LU ENGINEER In 910-313-3338 Vertical System: NAVID 88 > Cn fax 910-313-6822 125 PHI Sieve Sizes -4.25 -4 -3 -2.25 -2 -1.5 -1 -0.5 0 0.5 1 1.5 2 2.5 3 3.5 3.75 4 Standard Sieve Sizes 3/45/8 5/16 4 5 7 10 14 18 25 35 45 60 80 120 170 200 230 Hydrometer 100 0 90 10 80 20 70 30 CD 2) Q) CD 60 40 TI m Q) 50 50 E o 0 CO CD. 40 60 (D Cn Cn 0 (if 30 a- 70 LU 20 80 LU Z 10 -F 90 T U 0 .......... Ip- 100 100 5 10 5 1 5 0.1 5 0.01 5 0.001 LU LU Millimeters Gravel Sand Silt and Clay Cn a- Coarse Fine Coarse Medium Fine 0 ZE Sample Symbol Elev. (ft)� USCS % Fines % Organics % Carbonates Median Mean Skew Kurt Sort Sample Information T BNKCHN-1 #1 -5.4 #200 #230 -0.07 - 0031 1 13.60 2.01 1.77 -1.56 6.14 �008r) Project Name: Topsail Beach Renourishment LU Comments: Analysis Date: YS 05-15-10 o) Depths and elevations based on measured values Analyzed By: JCP 0 U) Gahagan & Bryant Associates of North Carolina Fasting (X, ft): 2,408,189 Northing (Y, ft): 222,800 Cn �Ll 295-A N. Green Meadows Dr. < 7=:] Wilmington, NC 28405-3933 Horizontal System: NAD 1983 Z < LU ENGINEER, In 910-313-3338 Vertical System: NAVID 88 > Cn fax 910-313-6822 KV1 APPENDIX A Section 3 Topsail Beach Nourishment Project Vibracore Granularmetric Reports IMA Granularmetric Report Depths and elevations based on measured values GBA ENGINEERS * SURVEYORS Gahagan & Bryant Associates of North Carolina 295 -A N. Green Meadows Dr. Wilmington, NC 28405 -3933 ph 910 - 313 -3338 fax 910 - 313 -6822 Project Name: New Topsail Inlet Maintenance Dredging Sample Name: New Topsail Inlet #1 Analysis Date: 10 -27 -11 Analyzed B JCP y y: Easting (ft): Northing (ft): Coordinate System: North Carolina State Plane Elevation (ft): USCS: Munsell: Comments: COMPOSITE Dry Weight (g): 100.00 Wash Weight (g): 100.00 Pan Retained (g): 0.34 Sieve Loss (% ): 0.03 Fines (% ): #200 - 0.39 #230 - 0.37 Organics (% ): Carbonates ( %): 11.70 Shells Sieve Number Sieve Size (Phi) Sieve Size (Millimeters) Grams Retained % Weight Retained Cum. Grams Retained C. % Weight Retained 4 -2.25 4.76 2.11 2.11 2.11 2.11 7 -1.50 2.83 0.64 0.64 2.75 2.75 10 -1.00 2.00 0.50 0.50 3.25 3.25 14 -0.50 1.41 0.88 0.88 4.13 4.13 18 0.00 1.00 1.37 1.37 5.50 5.50 25 0.50 0.71 2.08 2.08 7.58 7.58 35 1.00 0.50 4.23 4.23 11.81 11.81 45 1.50 0.35 10.76 10.76 22.57 22.57 60 2.00 0.25 23.60 23.60 46.17 46.17 70 2.25 0.21 21.04 21.04 67.21 67.21 80 2.50 0.18 22.64 22.64 89.85 89.85 100 2.75 0.15 6.82 6.82 96.67 96.67 120 3.00 0.13 2.47 2.47 99.14 99.14 170 3.50 0.09 0.47 0.47 99.61 99.61 200 3.75 0.07 0.00 0.00 99.61 99.61 230 4.00 0.06 0.02 0.02 99.63 99.63 Phi 5 Phi 16 Phi 25 Phi 50 Phi 75 Phi 84 Phi 95 2.69 2.44 2.34 2.05 1.55 1.19 -0.18 Moment Mean Phi Mean mm Sorting Skewness Kurtosis Statistics 1.76 0.30 0.75 -1.55 7.44 128 Granularmetric Report Depths and elevations based on measured values GBA ENGINEERS * SURVEYORS Gahagan & Bryant Associates of North Carolina 295 -A N. Green Meadows Dr. Wilmington, NC 28405 -3933 ph 910 - 313 -3338 fax 910 - 313 -6822 Project Name: New Topsail Inlet Maintenance Dredging Sample Name: TB- 11 -GS -1 Analysis Date: 10 -24 -11 Analyzed B JCP y y: Easting (ft): 2,404,844 Northing (ft): 217,096 Coordinate System: North Carolina State Plane Elevation (ft): -11.7 MLW USCS: Munsell: Comments: Dry Weight (g): 200.00 Wash Weight (g): 200.00 Pan Retained (g): 0.00 Sieve Loss (% ): 0.35 Fines (% ): #200 - 0.35 #230 - 0.35 Organics (% ): Carbonates (% 11.60 Sieve Number Sieve Size (Phi) Sieve Size (Millimeters) Grams Retained % Weight Retained Cum. Grams Retained C. % Weight Retained 4 -2.25 4.76 0.10 0.05 0.10 0.05 7 -1.50 2.83 0.20 0.10 0.30 0.15 10 -1.00 2.00 0.30 0.15 0.60 0.30 14 -0.50 1.41 0.50 0.25 1.10 0.55 18 0.00 1.00 0.80 0.40 1.90 0.95 25 0.50 0.71 0.90 0.45 2.80 1.40 35 1.00 0.50 3.80 1.90 6.60 3.30 45 1.50 0.35 16.50 8.25 23.10 11.55 60 2.00 0.25 42.90 21.45 66.00 33.00 70 2.25 0.21 57.20 28.60 123.20 61.60 80 2.50 0.18 55.60 27.80 178.80 89.40 100 2.75 0.15 16.40 8.20 195.20 97.60 120 3.00 0.13 3.60 1.80 198.80 99.40 170 3.50 0.09 0.50 0.25 199.30 99.65 200 3.75 0.07 0.00 0.00 199.30 99.65 230 4.00 0.06 0.00 0.00 199.30 99.65 Phi 5 Phi 16 Phi 25 Phi 50 Phi 75 Phi 84 Phi 95 2.67 2.45 2.37 2.15 1.81 1.60 1.10 Moment Mean Phi Mean mm Sorting Skewness Kurtosis Statistics 2.04 0.24 0.52 -2.07 11.73 INR] Granularmetric Report Depths and elevations based on measured values GBA ENGINEERS * SURVEYORS Gahagan & Bryant Associates of North Carolina 295 -A N. Green Meadows Dr. Wilmington, NC 28405 -3933 ph 910 - 313 -3338 fax 910 - 313 -6822 Project Name: New Topsail Inlet Maintenance Dredging Sample Name: TB- 11 -GS -2 Analysis Date: 10 -24 -11 Analyzed B JCP y y: Easting (ft): 2,405,259 Northing (ft): 216,974 Coordinate System: North Carolina State Plane Elevation (ft): -9.8 MLW USCS: Munsell: Comments: Dry Weight (g): 200.00 Wash Weight (g): 200.00 Pan Retained (g): 0.00 Sieve Loss (% ): 0.20 Fines (% ): #200 - 0.20 #230 - 0.20 Organics (% ): Carbonates (% 11.60 Sieve Number Sieve Size (Phi) Sieve Size (Millimeters) Grams Retained % Weight Retained Cum. Grams Retained C. % Weight Retained 4 -2.25 4.76 17.70 8.85 17.70 8.85 7 -1.50 2.83 3.70 1.85 21.40 10.70 10 -1.00 2.00 2.10 1.05 23.50 11.75 14 -0.50 1.41 4.60 2.30 28.10 14.05 18 0.00 1.00 9.00 4.50 37.10 18.55 25 0.50 0.71 18.10 9.05 55.20 27.60 35 1.00 0.50 35.60 17.80 90.80 45.40 45 1.50 0.35 66.50 33.25 157.30 78.65 60 2.00 0.25 29.60 14.80 186.90 93.45 70 2.25 0.21 6.40 3.20 193.30 96.65 80 2.50 0.18 5.20 2.60 198.50 99.25 100 2.75 0.15 1.10 0.55 199.60 99.80 120 3.00 0.13 0.00 0.00 199.60 99.80 170 3.50 0.09 0.00 0.00 199.60 99.80 200 3.75 0.07 0.00 0.00 199.60 99.80 230 4.00 0.06 0.00 0.00 199.60 99.80 Phi 5 Phi 16 Phi 25 Phi 50 Phi 75 Phi 84 Phi 95 2.12 1.68 1.45 1.07 0.36 -0.28 Moment Mean Phi Mean mm Sorting Skewness Kurtosis Statistics 0.67 0.63 0.84 0.06 3.42 `16111 Granularmetric Report Depths and elevations based on measured values GBA ENGINEERS * SURVEYORS Gahagan & Bryant Associates of North Carolina 295 -A N. Green Meadows Dr. Wilmington, NC 28405 -3933 ph 910 - 313 -3338 fax 910 - 313 -6822 Project Name: New Topsail Inlet Maintenance Dredging Sample Name: TB- 11 -GS -3 Analysis Date: 10 -24 -11 Analyzed B JCP y y: Easting (ft): 2,405,464 Northing (ft): 216,775 Coordinate System: North Carolina State Plane Elevation (ft): -7.6 MLW USCS: Munsell: Comments: Dry Weight (g): 200.00 Wash Weight (g): 200.00 Pan Retained (g): 0.00 Sieve Loss (% ): 0.15 Fines (% ): #200 - 0.15 #230 - 0.15 Organics (% ): Carbonates (% 11.60 Sieve Number Sieve Size (Phi) Sieve Size (Millimeters) Grams Retained % Weight Retained Cum. Grams Retained C. % Weight Retained 4 -2.25 4.76 6.90 3.45 6.90 3.45 7 -1.50 2.83 1.70 0.85 8.60 4.30 10 -1.00 2.00 1.70 0.85 10.30 5.15 14 -0.50 1.41 2.30 1.15 12.60 6.30 18 0.00 1.00 4.50 2.25 17.10 8.55 25 0.50 0.71 9.40 4.70 26.50 13.25 35 1.00 0.50 23.20 11.60 49.70 24.85 45 1.50 0.35 83.00 41.50 132.70 66.35 60 2.00 0.25 55.80 27.90 188.50 94.25 70 2.25 0.21 5.90 2.95 194.40 97.20 80 2.50 0.18 4.10 2.05 198.50 99.25 100 2.75 0.15 1.00 0.50 199.50 99.75 120 3.00 0.13 0.20 0.10 199.70 99.85 170 3.50 0.09 0.00 0.00 199.70 99.85 200 3.75 0.07 0.00 0.00 199.70 99.85 230 4.00 0.06 0.00 0.00 199.70 99.85 Phi 5 Phi 16 Phi 25 Phi 50 Phi 75 Phi 84 Phi 95 2.06 1.82 1.66 1.30 1.00 0.62 -1.09 Moment Mean Phi Mean mm Sorting Skewness Kurtosis Statistics 1.1 0.47 0.68 -1.05 6.43 11911 l Granularmetric Report Depths and elevations based on measured values GBA ENGINEERS * SURVEYORS Gahagan & Bryant Associates of North Carolina 295 -A N. Green Meadows Dr. Wilmington, NC 28405 -3933 ph 910 - 313 -3338 fax 910 - 313 -6822 Project Name: New Topsail Inlet Maintenance Dredging Sample Name: TB- 11 -GS -4 Analysis Date: 10 -25 -11 Analyzed B JCP y y: Easting (ft): 2,405,753 Northing (ft): 216,527 Coordinate System: North Carolina State Plane Elevation (ft): -6.8 MLW USCS: Munsell: Comments: Dry Weight (g): 200.00 Wash Weight (g): 200.00 Pan Retained (g): 0.00 Sieve Loss (% ): 0.20 Fines (% ): #200 - 0.20 #230 - 0.20 Organics (% ): Carbonates (% 11.60 Sieve Number Sieve Size (Phi) Sieve Size (Millimeters) Grams Retained % Weight Retained Cum. Grams Retained C. % Weight Retained 4 -2.25 4.76 4.00 2.00 4.00 2.00 7 -1.50 2.83 1.40 0.70 5.40 2.70 10 -1.00 2.00 0.50 0.25 5.90 2.95 14 -0.50 1.41 2.50 1.25 8.40 4.20 18 0.00 1.00 3.70 1.85 12.10 6.05 25 0.50 0.71 5.80 2.90 17.90 8.95 35 1.00 0.50 20.40 10.20 38.30 19.15 45 1.50 0.35 57.90 28.95 96.20 48.10 60 2.00 0.25 77.50 38.75 173.70 86.85 70 2.25 0.21 16.40 8.20 190.10 95.05 80 2.50 0.18 7.10 3.55 197.20 98.60 100 2.75 0.15 1.90 0.95 199.10 99.55 120 3.00 0.13 0.50 0.25 199.60 99.80 170 3.50 0.09 0.00 0.00 199.60 99.80 200 3.75 0.07 0.00 0.00 199.60 99.80 230 4.00 0.06 0.00 0.00 199.60 99.80 Phi 5 Phi 16 Phi 25 Phi 50 Phi 75 Phi 84 Phi 95 2.25 1.96 1.85 1.52 1.10 0.85 -0.28 Moment Mean Phi Mean mm Sorting Skewness Kurtosis Statistics 1.33 0.40 0.66 -1.31 7.17 `K91A Granularmetric Report Depths and elevations based on measured values GBA ENGINEERS * SURVEYORS Gahagan & Bryant Associates of North Carolina 295 -A N. Green Meadows Dr. Wilmington, NC 28405 -3933 ph 910 - 313 -3338 fax 910 - 313 -6822 Project Name: New Topsail Inlet Maintenance Dredging Sample Name: TB- 11 -GS -5 Analysis Date: 10 -25 -11 Analyzed B JCP y y: Easting (ft): 2,406,244 Northing (ft): 216,253 Coordinate System: North Carolina State Plane Elevation (ft): -5.5 MLW USCS: SP Munsell: Comments: Dry Weight (g): 200.00 Wash Weight (g): 200.00 Pan Retained (g): 0.00 Sieve Loss (% ): 0.40 Fines (% ): #200 - 0.40 #230 - 0.40 Organics (% ): Carbonates (% 11.60 Sieve Number Sieve Size (Phi) Sieve Size (Millimeters) Grams Retained % Weight Retained Cum. Grams Retained C. % Weight Retained 4 -2.25 4.76 0.00 0.00 0.00 0.00 7 -1.50 2.83 0.00 0.00 0.00 0.00 10 -1.00 2.00 0.00 0.00 0.00 0.00 14 -0.50 1.41 0.00 0.00 0.00 0.00 18 0.00 1.00 0.00 0.00 0.00 0.00 25 0.50 0.71 0.10 0.05 0.10 0.05 35 1.00 0.50 1.30 0.65 1.40 0.70 45 1.50 0.35 18.40 9.20 19.80 9.90 60 2.00 0.25 87.70 43.85 107.50 53.75 70 2.25 0.21 44.20 22.10 151.70 75.85 80 2.50 0.18 34.50 17.25 186.20 93.10 100 2.75 0.15 10.80 5.40 197.00 98.50 120 3.00 0.13 1.90 0.95 198.90 99.45 170 3.50 0.09 0.30 0.15 199.20 99.60 200 3.75 0.07 0.00 0.00 199.20 99.60 230 4.00 0.06 0.00 0.00 199.20 99.60 Phi 5 Phi 16 Phi 25 Phi 50 Phi 75 Phi 84 Phi 95 2.59 2.37 2.24 1.96 1.67 1.57 1.23 Moment Mean Phi Mean mm Sorting Skewness Kurtosis Statistics 1.95 0.26 0.38 -0.11 3.18 133 Granularmetric Report Depths and elevations based on measured values GBA ENGINEERS * SURVEYORS Gahagan & Bryant Associates of North Carolina 295 -A N. Green Meadows Dr. Wilmington, NC 28405 -3933 ph 910 - 313 -3338 fax 910 - 313 -6822 Project Name: New Topsail Inlet Maintenance Dredging Sample Name: TB- 11 -GS -6 Analysis Date: 10 -25 -11 Analyzed B JCP y y: Easting (ft): 2,406,571 Northing (ft): 216,189 Coordinate System: North Carolina State Plane Elevation (ft): -6.8 MLW USCS: SP Munsell: Comments: Dry Weight (g): 200.00 Wash Weight (g): 200.00 Pan Retained (g): 0.00 Sieve Loss (% ): 0.25 Fines (% ): #200 - 0.25 #230 - 0.25 Organics (% ): Carbonates (% 11.60 Sieve Number Sieve Size (Phi) Sieve Size (Millimeters) Grams Retained % Weight Retained Cum. Grams Retained C. % Weight Retained 4 -2.25 4.76 0.00 0.00 0.00 0.00 7 -1.50 2.83 0.00 0.00 0.00 0.00 10 -1.00 2.00 0.10 0.05 0.10 0.05 14 -0.50 1.41 0.30 0.15 0.40 0.20 18 0.00 1.00 0.50 0.25 0.90 0.45 25 0.50 0.71 0.80 0.40 1.70 0.85 35 1.00 0.50 3.00 1.50 4.70 2.35 45 1.50 0.35 12.80 6.40 17.50 8.75 60 2.00 0.25 42.90 21.45 60.40 30.20 70 2.25 0.21 46.10 23.05 106.50 53.25 80 2.50 0.18 66.80 33.40 173.30 86.65 100 2.75 0.15 19.70 9.85 193.00 96.50 120 3.00 0.13 5.70 2.85 198.70 99.35 170 3.50 0.09 0.80 0.40 199.50 99.75 200 3.75 0.07 0.00 0.00 199.50 99.75 230 4.00 0.06 0.00 0.00 199.50 99.75 Phi 5 Phi 16 Phi 25 Phi 50 Phi 75 Phi 84 Phi 95 2.71 2.48 2.41 2.21 1.88 1.67 1.21 Moment Mean Phi Mean mm Sorting Skewness Kurtosis Statistics 2.11 0.23 0.47 -1.56 8.29 134 Granularmetric Report Depths and elevations based on measured values GBA ENGINEERS * SURVEYORS Gahagan & Bryant Associates of North Carolina 295 -A N. Green Meadows Dr. Wilmington, NC 28405 -3933 ph 910 - 313 -3338 fax 910 - 313 -6822 Project Name: New Topsail Inlet Maintenance Dredging Sample Name: TB- 11 -GS -7 Analysis Date: 10 -25 -11 Analyzed B JCP y y: Easting (ft): 2,406,484 Northing (ft): 216,036 Coordinate System: North Carolina State Plane Elevation (ft): -6.7 MLW USCS: SP Munsell: Comments: Dry Weight (g): 200.00 Wash Weight (g): 200.00 Pan Retained (g): 0.00 Sieve Loss (% ): 0.35 Fines (% ): #200 - 0.35 #230 - 0.35 Organics (% ): Carbonates (% 11.60 Sieve Number Sieve Size (Phi) Sieve Size (Millimeters) Grams Retained % Weight Retained Cum. Grams Retained C. % Weight Retained 4 -2.25 4.76 0.00 0.00 0.00 0.00 7 -1.50 2.83 0.00 0.00 0.00 0.00 10 -1.00 2.00 0.00 0.00 0.00 0.00 14 -0.50 1.41 0.00 0.00 0.00 0.00 18 0.00 1.00 0.20 0.10 0.20 0.10 25 0.50 0.71 0.40 0.20 0.60 0.30 35 1.00 0.50 0.60 0.30 1.20 0.60 45 1.50 0.35 1.20 0.60 2.40 1.20 60 2.00 0.25 14.50 7.25 16.90 8.45 70 2.25 0.21 57.60 28.80 74.50 37.25 80 2.50 0.18 90.10 45.05 164.60 82.30 100 2.75 0.15 23.20 11.60 187.80 93.90 120 3.00 0.13 9.30 4.65 197.10 98.55 170 3.50 0.09 2.20 1.10 199.30 99.65 200 3.75 0.07 0.00 0.00 199.30 99.65 230 4.00 0.06 0.00 0.00 199.30 99.65 Phi 5 Phi 16 Phi 25 Phi 50 Phi 75 Phi 84 Phi 95 2.81 2.54 2.46 2.32 2.14 2.07 1.76 Moment Mean Phi Mean mm Sorting Skewness Kurtosis Statistics 2.3 0.20 0.32 -1.38 12.52 1161-1 Granularmetric Report Depths and elevations based on measured values GBA ENGINEERS * SURVEYORS Gahagan & Bryant Associates of North Carolina 295 -A N. Green Meadows Dr. Wilmington, NC 28405 -3933 ph 910 - 313 -3338 fax 910 - 313 -6822 Project Name: New Topsail Inlet Maintenance Dredging Sample Name: TB- 11 -VB -4 #1 Analysis Date: 10 -12 -11 Analyzed B JCP y y: Easting (ft): 2,404,400 Northing (ft): 217,344 Coordinate System: North Carolina State Plane Elevation (ft): -5.0 MLW USCS: SP Munsell: Comments: Dry Weight (g): 200.00 Wash Weight (g): 200.00 Pan Retained (g): 0.00 Sieve Loss (% ): 0.40 Fines (% ): #200 - 0.40 #230 - 0.40 Organics (% ): Carbonates (% 14.50 Sieve Number Sieve Size (Phi) Sieve Size (Millimeters) Grams Retained % Weight Retained Cum. Grams Retained C. % Weight Retained 4 -2.25 4.76 0.00 0.00 0.00 0.00 7 -1.50 2.83 0.00 0.00 0.00 0.00 10 -1.00 2.00 0.00 0.00 0.00 0.00 14 -0.50 1.41 0.00 0.00 0.00 0.00 18 0.00 1.00 0.40 0.20 0.40 0.20 25 0.50 0.71 0.80 0.40 1.20 0.60 35 1.00 0.50 3.10 1.55 4.30 2.15 45 1.50 0.35 10.10 5.05 14.40 7.20 60 2.00 0.25 56.20 28.10 70.60 35.30 70 2.25 0.21 66.10 33.05 136.70 68.35 80 2.50 0.18 47.90 23.95 184.60 92.30 100 2.75 0.15 12.40 6.20 197.00 98.50 120 3.00 0.13 2.20 1.10 199.20 99.60 170 3.50 0.09 0.00 0.00 199.20 99.60 200 3.75 0.07 0.00 0.00 199.20 99.60 230 4.00 0.06 0.00 0.00 199.20 99.60 Phi 5 Phi 16 Phi 25 Phi 50 Phi 75 Phi 84 Phi 95 2.61 2.41 2.32 2.11 1.82 1.66 1.28 Moment Mean Phi Mean mm Sorting Skewness Kurtosis Statistics 2.04 0.24 0.4 -1.29 6.67 1191:1 Granularmetric Report Depths and elevations based on measured values GBA ENGINEERS * SURVEYORS Gahagan & Bryant Associates of North Carolina 295 -A N. Green Meadows Dr. Wilmington, NC 28405 -3933 ph 910 - 313 -3338 fax 910 - 313 -6822 Project Name: New Topsail Inlet Maintenance Dredging Sample Name: TB- 11 -VB -4 #2 Analysis Date: 10 -13 -11 Analyzed B JCP y y: Easting (ft): 2,404,400 Northing (ft): 217,344 Coordinate System: North Carolina State Plane Elevation (ft): -12.2 MLW USCS: SW Munsell: Comments: Dry Weight (g): 200.00 Wash Weight (g): 200.00 Pan Retained (g): 0.30 Sieve Loss (% ): 0.70 Fines (% ): #200 - 0.85 #230 - 0.85 Organics (% ): Carbonates (% 14.50 Sieve Number Sieve Size (Phi) Sieve Size (Millimeters) Grams Retained % Weight Retained Cum. Grams Retained C. % Weight Retained 4 -2.25 4.76 16.10 8.05 16.10 8.05 7 -1.50 2.83 4.50 2.25 20.60 10.30 10 -1.00 2.00 2.20 1.10 22.80 11.40 14 -0.50 1.41 6.50 3.25 29.30 14.65 18 0.00 1.00 8.20 4.10 37.50 18.75 25 0.50 0.71 10.60 5.30 48.10 24.05 35 1.00 0.50 21.50 10.75 69.60 34.80 45 1.50 0.35 40.90 20.45 110.50 55.25 60 2.00 0.25 55.50 27.75 166.00 83.00 70 2.25 0.21 18.00 9.00 184.00 92.00 80 2.50 0.18 10.40 5.20 194.40 97.20 100 2.75 0.15 3.20 1.60 197.60 98.80 120 3.00 0.13 0.70 0.35 198.30 99.15 170 3.50 0.09 0.00 0.00 198.30 99.15 200 3.75 0.07 0.00 0.00 198.30 99.15 230 4.00 0.06 0.00 0.00 198.30 99.15 Phi 5 Phi 16 Phi 25 Phi 50 Phi 75 Phi 84 Phi 95 2.39 2.03 1.86 1.37 0.54 -0.34 Moment Mean Phi Mean mm Sorting Skewness Kurtosis Statistics 0.91 0.53 0.96 -0.24 3.14 1191 FA Granularmetric Report Depths and elevations based on measured values GBA ENGINEERS * SURVEYORS Gahagan & Bryant Associates of North Carolina 295 -A N. Green Meadows Dr. Wilmington, NC 28405 -3933 ph 910 - 313 -3338 fax 910 - 313 -6822 Project Name: New Topsail Inlet Maintenance Dredging Sample Name: TB- 11 -VB -5 #1 Analysis Date: 10 -24 -11 Analyzed B JCP y y: Easting (ft): 2,403,564 Northing (ft): 217,609 Coordinate System: North Carolina State Plane Elevation (ft): -8.0 MLW USCS: Munsell: Comments: Dry Weight (g): 200.00 Wash Weight (g): 200.00 Pan Retained (g): 0.00 Sieve Loss (% ): 0.30 Fines (% ): #200 - 0.30 #230 - 0.30 Organics (% ): Carbonates (% 8.10 Sieve Number Sieve Size (Phi) Sieve Size (Millimeters) Grams Retained % Weight Retained Cum. Grams Retained C. % Weight Retained 4 -2.25 4.76 0.10 0.05 0.10 0.05 7 -1.50 2.83 0.10 0.05 0.20 0.10 10 -1.00 2.00 0.20 0.10 0.40 0.20 14 -0.50 1.41 0.40 0.20 0.80 0.40 18 0.00 1.00 0.70 0.35 1.50 0.75 25 0.50 0.71 1.30 0.65 2.80 1.40 35 1.00 0.50 3.10 1.55 5.90 2.95 45 1.50 0.35 8.90 4.45 14.80 7.40 60 2.00 0.25 54.50 27.25 69.30 34.65 70 2.25 0.21 67.20 33.60 136.50 68.25 80 2.50 0.18 47.80 23.90 184.30 92.15 100 2.75 0.15 11.80 5.90 196.10 98.05 120 3.00 0.13 2.90 1.45 199.00 99.50 170 3.50 0.09 0.40 0.20 199.40 99.70 200 3.75 0.07 0.00 0.00 199.40 99.70 230 4.00 0.06 0.00 0.00 199.40 99.70 Phi 5 Phi 16 Phi 25 Phi 50 Phi 75 Phi 84 Phi 95 2.62 2.41 2.32 2.11 1.82 1.66 1.23 Moment Mean Phi Mean mm Sorting Skewness Kurtosis Statistics 2.03 0.24 0.46 -2.16 13.16 138 Granularmetric Report Depths and elevations based on measured values GBA ENGINEERS * SURVEYORS Gahagan & Bryant Associates of North Carolina 295 -A N. Green Meadows Dr. Wilmington, NC 28405 -3933 ph 910 - 313 -3338 fax 910 - 313 -6822 Project Name: New Topsail Inlet Maintenance Dredging Sample Name: TB- 11 -VB -6 #1 Analysis Date: 10 -14 -11 Analyzed B JCP y y: Easting (ft): 2,402,870 Northing (ft): 217,470 Coordinate System: North Carolina State Plane Elevation (ft): -10.0 MLW USCS: Munsell: Comments: Dry Weight (g): 200.00 Wash Weight (g): 200.00 Pan Retained (g): 0.00 Sieve Loss (% ): 0.10 Fines (% ): #200 - 0.10 #230-0.10 Organics (% ): Carbonates (% 17.60 Sieve Number Sieve Size (Phi) Sieve Size (Millimeters) Grams Retained % Weight Retained Cum. Grams Retained C. % Weight Retained 4 -2.25 4.76 0.20 0.10 0.20 0.10 7 -1.50 2.83 0.00 0.00 0.20 0.10 10 -1.00 2.00 0.00 0.00 0.20 0.10 14 -0.50 1.41 0.20 0.10 0.40 0.20 18 0.00 1.00 0.30 0.15 0.70 0.35 25 0.50 0.71 0.70 0.35 1.40 0.70 35 1.00 0.50 2.40 1.20 3.80 1.90 45 1.50 0.35 9.10 4.55 12.90 6.45 60 2.00 0.25 50.60 25.30 63.50 31.75 70 2.25 0.21 59.10 29.55 122.60 61.30 80 2.50 0.18 55.30 27.65 177.90 88.95 100 2.75 0.15 17.00 8.50 194.90 97.45 120 3.00 0.13 4.20 2.10 199.10 99.55 170 3.50 0.09 0.70 0.35 199.80 99.90 200 3.75 0.07 0.00 0.00 199.80 99.90 230 4.00 0.06 0.00 0.00 199.80 99.90 Phi 5 Phi 16 Phi 25 Phi 50 Phi 75 Phi 84 Phi 95 2.68 2.46 2.37 2.15 1.87 1.69 1.34 Moment Mean Phi Mean mm Sorting Skewness Kurtosis Statistics 2.09 0.23 0.42 -1.26 7.66 1191] Granularmetric Report Depths and elevations based on measured values GBA ENGINEERS * SURVEYORS Gahagan & Bryant Associates of North Carolina 295 -A N. Green Meadows Dr. Wilmington, NC 28405 -3933 ph 910 - 313 -3338 fax 910 - 313 -6822 Project Name: New Topsail Inlet Maintenance Dredging Sample Name: TB- 11 -VB -6 #2 Analysis Date: 10 -14 -11 Analyzed B JCP y y: Easting (ft): 2,402,870 Northing (ft): 217,470 Coordinate System: North Carolina State Plane Elevation (ft): -14.8 MLW USCS: Munsell: Comments: Dry Weight (g): 200.00 Wash Weight (g): 200.00 Pan Retained (g): 0.00 Sieve Loss (% ): 0.35 Fines (% ): #200 - 0.35 #230 - 0.35 Organics (% ): Carbonates (% 17.60 Sieve Number Sieve Size (Phi) Sieve Size (Millimeters) Grams Retained % Weight Retained Cum. Grams Retained C. % Weight Retained 4 -2.25 4.76 29.50 14.75 29.50 14.75 7 -1.50 2.83 5.70 2.85 35.20 17.60 10 -1.00 2.00 4.30 2.15 39.50 19.75 14 -0.50 1.41 6.20 3.10 45.70 22.85 18 0.00 1.00 7.70 3.85 53.40 26.70 25 0.50 0.71 10.10 5.05 63.50 31.75 35 1.00 0.50 13.40 6.70 76.90 38.45 45 1.50 0.35 28.70 14.35 105.60 52.80 60 2.00 0.25 48.60 24.30 154.20 77.10 70 2.25 0.21 21.20 10.60 175.40 87.70 80 2.50 0.18 16.90 8.45 192.30 96.15 100 2.75 0.15 5.40 2.70 197.70 98.85 120 3.00 0.13 1.40 0.70 199.10 99.55 170 3.50 0.09 0.20 0.10 199.30 99.65 200 3.75 0.07 0.00 0.00 199.30 99.65 230 4.00 0.06 0.00 0.00 199.30 99.65 Phi 5 Phi 16 Phi 25 Phi 50 Phi 75 Phi 84 Phi 95 2.47 2.16 1.96 1.40 -0.22 -1.92 Moment Mean Phi Mean mm Sorting Skewness Kurtosis Statistics 0.69 0.62 1.14 0.37 2.22 140 Granularmetric Report Depths and elevations based on measured values GBA ENGINEERS * SURVEYORS Gahagan & Bryant Associates of North Carolina 295 -A N. Green Meadows Dr. Wilmington, NC 28405 -3933 ph 910 - 313 -3338 fax 910 - 313 -6822 Project Name: New Topsail Inlet Maintenance Dredging Sample Name: TB- 11 -VB -7 #1 Analysis Date: 10 -14 -11 Analyzed B JCP y y: Easting (ft): 2,402,024 Northing (ft): 217,452 Coordinate System: North Carolina State Plane Elevation (ft): -7.0 MLW USCS: Munsell: Comments: Dry Weight (g): 200.00 Wash Weight (g): 200.00 Pan Retained (g): 0.00 Sieve Loss (% ): 0.65 Fines (% ): #200 - 0.65 #230 - 0.65 Organics (% ): Carbonates (% 17.50 Sieve Number Sieve Size (Phi) Sieve Size (Millimeters) Grams Retained % Weight Retained Cum. Grams Retained C. % Weight Retained 4 -2.25 4.76 12.70 6.35 12.70 6.35 7 -1.50 2.83 4.50 2.25 17.20 8.60 10 -1.00 2.00 3.30 1.65 20.50 10.25 14 -0.50 1.41 5.00 2.50 25.50 12.75 18 0.00 1.00 6.60 3.30 32.10 16.05 25 0.50 0.71 8.80 4.40 40.90 20.45 35 1.00 0.50 12.00 6.00 52.90 26.45 45 1.50 0.35 23.20 11.60 76.10 38.05 60 2.00 0.25 35.80 17.90 111.90 55.95 70 2.25 0.21 22.60 11.30 134.50 67.25 80 2.50 0.18 33.20 16.60 167.70 83.85 100 2.75 0.15 20.70 10.35 188.40 94.20 120 3.00 0.13 9.20 4.60 197.60 98.80 170 3.50 0.09 1.10 0.55 198.70 99.35 200 3.75 0.07 0.00 0.00 198.70 99.35 230 4.00 0.06 0.00 0.00 198.70 99.35 Phi 5 Phi 16 Phi 25 Phi 50 Phi 75 Phi 84 Phi 95 2.79 2.50 2.37 1.83 0.88 -0.01 Moment Mean Phi Mean mm Sorting Skewness Kurtosis Statistics 1.32 0.40 1.1 -0.55 3.27 MIS Granularmetric Report Depths and elevations based on measured values GBA ENGINEERS * SURVEYORS Gahagan & Bryant Associates of North Carolina 295 -A N. Green Meadows Dr. Wilmington, NC 28405 -3933 ph 910 - 313 -3338 fax 910 - 313 -6822 Project Name: New Topsail Inlet Maintenance Dredging Sample Name: TB- 11 -VB -7 #2 Analysis Date: 10 -14 -11 Analyzed B JCP y y: Easting (ft): 2,402,024 Northing (ft): 217,452 Coordinate System: North Carolina State Plane Elevation (ft): -9.9 MLW USCS: Munsell: Comments: Dry Weight (g): 200.00 Wash Weight (g): 200.00 Pan Retained (g): 0.00 Sieve Loss (% ): 0.25 Fines (% ): #200 - 0.25 #230 - 0.25 Organics (% ): Carbonates (% 17.50 Sieve Number Sieve Size (Phi) Sieve Size (Millimeters) Grams Retained % Weight Retained Cum. Grams Retained C. % Weight Retained 4 -2.25 4.76 0.30 0.15 0.30 0.15 7 -1.50 2.83 0.40 0.20 0.70 0.35 10 -1.00 2.00 0.30 0.15 1.00 0.50 14 -0.50 1.41 1.50 0.75 2.50 1.25 18 0.00 1.00 2.50 1.25 5.00 2.50 25 0.50 0.71 3.40 1.70 8.40 4.20 35 1.00 0.50 8.00 4.00 16.40 8.20 45 1.50 0.35 21.10 10.55 37.50 18.75 60 2.00 0.25 54.70 27.35 92.20 46.10 70 2.25 0.21 42.80 21.40 135.00 67.50 80 2.50 0.18 42.60 21.30 177.60 88.80 100 2.75 0.15 17.60 8.80 195.20 97.60 120 3.00 0.13 3.90 1.95 199.10 99.55 170 3.50 0.09 0.40 0.20 199.50 99.75 200 3.75 0.07 0.00 0.00 199.50 99.75 230 4.00 0.06 0.00 0.00 199.50 99.75 Phi 5 Phi 16 Phi 25 Phi 50 Phi 75 Phi 84 Phi 95 2.68 2.44 2.34 2.05 1.61 1.37 0.60 Moment Mean Phi Mean mm Sorting Skewness Kurtosis Statistics 1.89 0.27 0.66 -1.71 7.71 `IN Granularmetric Report Depths and elevations based on measured values GBA ENGINEERS * SURVEYORS Gahagan & Bryant Associates of North Carolina 295 -A N. Green Meadows Dr. Wilmington, NC 28405 -3933 ph 910 - 313 -3338 fax 910 - 313 -6822 Project Name: New Topsail Inlet Maintenance Dredging Sample Name: TB- 11 -VB -8 #1 Analysis Date: 10 -14 -11 Analyzed B JCP y y: Easting (ft): 2,401,553 Northing (ft): 218,106 Coordinate System: North Carolina State Plane Elevation (ft): -6.1 MLW USCS: SP Munsell: Comments: Dry Weight (g): 199.80 Wash Weight (g): 199.80 Pan Retained (g): 0.00 Sieve Loss (% ): 0.10 Fines (% ): #200 - 0.10 #230-0.10 Organics (% ): Carbonates (% 11.80 Sieve Number Sieve Size (Phi) Sieve Size (Millimeters) Grams Retained % Weight Retained Cum. Grams Retained C. % Weight Retained 4 -2.25 4.76 0.00 0.00 0.00 0.00 7 -1.50 2.83 0.00 0.00 0.00 0.00 10 -1.00 2.00 0.00 0.00 0.00 0.00 14 -0.50 1.41 0.00 0.00 0.00 0.00 18 0.00 1.00 0.20 0.10 0.20 0.10 25 0.50 0.71 0.30 0.15 0.50 0.25 35 1.00 0.50 1.90 0.95 2.40 1.20 45 1.50 0.35 7.20 3.60 9.60 4.80 60 2.00 0.25 40.20 20.12 49.80 24.92 70 2.25 0.21 63.10 31.58 112.90 56.51 80 2.50 0.18 62.00 31.03 174.90 87.54 100 2.75 0.15 20.20 10.11 195.10 97.65 120 3.00 0.13 4.00 2.00 199.10 99.65 170 3.50 0.09 0.50 0.25 199.60 99.90 200 3.75 0.07 0.00 0.00 199.60 99.90 230 4.00 0.06 0.00 0.00 199.60 99.90 Phi 5 Phi 16 Phi 25 Phi 50 Phi 75 Phi 84 Phi 95 2.68 2.47 2.40 2.20 2.00 1.78 1.50 Moment Mean Phi Mean mm Sorting Skewness Kurtosis Statistics 2.15 0.23 0.38 -1.14 6.42 143 Granularmetric Report Depths and elevations based on measured values GBA ENGINEERS * SURVEYORS Gahagan & Bryant Associates of North Carolina 295 -A N. Green Meadows Dr. Wilmington, NC 28405 -3933 ph 910 - 313 -3338 fax 910 - 313 -6822 Project Name: New Topsail Inlet Maintenance Dredging Sample Name: TB- 11 -VB -8 #2 Analysis Date: 10 -14 -11 Analyzed B JCP y y: Easting (ft): 2,401,553 Northing (ft): 218,106 Coordinate System: North Carolina State Plane Elevation (ft): -13.5 MLW USCS: Munsell: Comments: Dry Weight (g): 200.00 Wash Weight (g): 200.00 Pan Retained (g): 0.00 Sieve Loss (% ): 0.60 Fines (% ): #200 - 0.60 #230 - 0.60 Organics (% ): Carbonates (% 11.80 Sieve Number Sieve Size (Phi) Sieve Size (Millimeters) Grams Retained % Weight Retained Cum. Grams Retained C. % Weight Retained 4 -2.25 4.76 13.80 6.90 13.80 6.90 7 -1.50 2.83 0.30 0.15 14.10 7.05 10 -1.00 2.00 0.40 0.20 14.50 7.25 14 -0.50 1.41 1.30 0.65 15.80 7.90 18 0.00 1.00 3.70 1.85 19.50 9.75 25 0.50 0.71 7.90 3.95 27.40 13.70 35 1.00 0.50 31.50 15.75 58.90 29.45 45 1.50 0.35 57.10 28.55 116.00 58.00 60 2.00 0.25 53.30 26.65 169.30 84.65 70 2.25 0.21 14.10 7.05 183.40 91.70 80 2.50 0.18 8.50 4.25 191.90 95.95 100 2.75 0.15 4.80 2.40 196.70 98.35 120 3.00 0.13 1.80 0.90 198.50 99.25 170 3.50 0.09 0.30 0.15 198.80 99.40 200 3.75 0.07 0.00 0.00 198.80 99.40 230 4.00 0.06 0.00 0.00 198.80 99.40 Phi 5 Phi 16 Phi 25 Phi 50 Phi 75 Phi 84 Phi 95 2.44 1.99 1.82 1.36 0.86 0.57 Moment Mean Phi Mean mm Sorting Skewness Kurtosis Statistics 1.11 0.46 0.69 0.59 3.58 144 Granularmetric Report Depths and elevations based on measured values GBA ENGINEERS * SURVEYORS Gahagan & Bryant Associates of North Carolina 295 -A N. Green Meadows Dr. Wilmington, NC 28405 -3933 ph 910 - 313 -3338 fax 910 - 313 -6822 Project Name: New Topsail Inlet Maintenance Dredging Sample Name: TB- 11 -VB -9 #1 Analysis Date: 10 -13 -11 Analyzed B JCP y y: Easting (ft): 2,401,736 Northing (ft): 219,385 Coordinate System: North Carolina State Plane Elevation (ft): -2.9 MLW USCS: Munsell: Comments: Dry Weight (g): 200.00 Wash Weight (g): 200.00 Pan Retained (g): 0.00 Sieve Loss (% ): 0.30 Fines (% ): #200 - 0.30 #230 - 0.30 Organics (% ): Carbonates (% 8.20 Sieve Number Sieve Size (Phi) Sieve Size (Millimeters) Grams Retained % Weight Retained Cum. Grams Retained C. % Weight Retained 4 -2.25 4.76 1.10 0.55 1.10 0.55 7 -1.50 2.83 0.80 0.40 1.90 0.95 10 -1.00 2.00 1.00 0.50 2.90 1.45 14 -0.50 1.41 2.10 1.05 5.00 2.50 18 0.00 1.00 4.40 2.20 9.40 4.70 25 0.50 0.71 6.80 3.40 16.20 8.10 35 1.00 0.50 8.90 4.45 25.10 12.55 45 1.50 0.35 18.80 9.40 43.90 21.95 60 2.00 0.25 57.80 28.90 101.70 50.85 70 2.25 0.21 45.00 22.50 146.70 73.35 80 2.50 0.18 39.10 19.55 185.80 92.90 100 2.75 0.15 9.60 4.80 195.40 97.70 120 3.00 0.13 3.60 1.80 199.00 99.50 170 3.50 0.09 0.40 0.20 199.40 99.70 200 3.75 0.07 0.00 0.00 199.40 99.70 230 4.00 0.06 0.00 0.00 199.40 99.70 Phi 5 Phi 16 Phi 25 Phi 50 Phi 75 Phi 84 Phi 95 2.61 2.39 2.27 1.99 1.55 1.18 0.04 Moment Mean Phi Mean mm Sorting Skewness Kurtosis Statistics 1.76 0.30 0.75 -1.69 6.8 IE161 Granularmetric Report Depths and elevations based on measured values GBA ENGINEERS * SURVEYORS Gahagan & Bryant Associates of North Carolina 295 -A N. Green Meadows Dr. Wilmington, NC 28405 -3933 ph 910 - 313 -3338 fax 910 - 313 -6822 Project Name: New Topsail Inlet Maintenance Dredging Sample Name: TB- 11 -VB -9 #2 Analysis Date: 10 -13 -11 Analyzed B JCP y y: Easting (ft): 2,401,736 Northing (ft): 219,385 Coordinate System: North Carolina State Plane Elevation (ft): -5.0 MLW USCS: SP Munsell: Comments: Dry Weight (g): 200.00 Wash Weight (g): 200.00 Pan Retained (g): 0.00 Sieve Loss (% ): 0.50 Fines (% ): #200 - 0.50 #230 - 0.50 Organics (% ): Carbonates (% 8.20 Sieve Number Sieve Size (Phi) Sieve Size (Millimeters) Grams Retained % Weight Retained Cum. Grams Retained C. % Weight Retained 4 -2.25 4.76 0.00 0.00 0.00 0.00 7 -1.50 2.83 0.30 0.15 0.30 0.15 10 -1.00 2.00 0.00 0.00 0.30 0.15 14 -0.50 1.41 0.50 0.25 0.80 0.40 18 0.00 1.00 1.20 0.60 2.00 1.00 25 0.50 0.71 1.70 0.85 3.70 1.85 35 1.00 0.50 4.30 2.15 8.00 4.00 45 1.50 0.35 9.80 4.90 17.80 8.90 60 2.00 0.25 47.30 23.65 65.10 32.55 70 2.25 0.21 70.20 35.10 135.30 67.65 80 2.50 0.18 49.20 24.60 184.50 92.25 100 2.75 0.15 12.10 6.05 196.60 98.30 120 3.00 0.13 2.40 1.20 199.00 99.50 170 3.50 0.09 0.00 0.00 199.00 99.50 200 3.75 0.07 0.00 0.00 199.00 99.50 230 4.00 0.06 0.00 0.00 199.00 99.50 Phi 5 Phi 16 Phi 25 Phi 50 Phi 75 Phi 84 Phi 95 2.61 2.42 2.32 2.12 1.84 1.65 1.10 Moment Mean Phi Mean mm Sorting Skewness Kurtosis Statistics 2.02 0.25 0.5 -2.44 13.6 i[fi Granularmetric Report Depths and elevations based on measured values GBA ENGINEERS * SURVEYORS Gahagan & Bryant Associates of North Carolina 295 -A N. Green Meadows Dr. Wilmington, NC 28405 -3933 ph 910 - 313 -3338 fax 910 - 313 -6822 Project Name: New Topsail Inlet Maintenance Dredging Sample Name: T13-11413-10#1 Analysis Date: 10 -24 -11 Analyzed B JCP y y: Easting (ft): 2,402,169 Northing (ft): 220,028 Coordinate System: North Carolina State Plane Elevation (ft): -2.1 MLW USCS: Munsell: Comments: Dry Weight (g): 200.00 Wash Weight (g): 200.00 Pan Retained (g): 0.00 Sieve Loss (% ): 0.30 Fines (% ): #200 - 0.30 #230 - 0.30 Organics (% ): Carbonates (% 10.10 Sieve Number Sieve Size (Phi) Sieve Size (Millimeters) Grams Retained % Weight Retained Cum. Grams Retained C. % Weight Retained 4 -2.25 4.76 0.40 0.20 0.40 0.20 7 -1.50 2.83 0.50 0.25 0.90 0.45 10 -1.00 2.00 0.40 0.20 1.30 0.65 14 -0.50 1.41 0.80 0.40 2.10 1.05 18 0.00 1.00 1.30 0.65 3.40 1.70 25 0.50 0.71 2.20 1.10 5.60 2.80 35 1.00 0.50 6.20 3.10 11.80 5.90 45 1.50 0.35 15.80 7.90 27.60 13.80 60 2.00 0.25 48.30 24.15 75.90 37.95 70 2.25 0.21 52.90 26.45 128.80 64.40 80 2.50 0.18 47.60 23.80 176.40 88.20 100 2.75 0.15 16.90 8.45 193.30 96.65 120 3.00 0.13 5.30 2.65 198.60 99.30 170 3.50 0.09 0.80 0.40 199.40 99.70 200 3.75 0.07 0.00 0.00 199.40 99.70 230 4.00 0.06 0.00 0.00 199.40 99.70 Phi 5 Phi 16 Phi 25 Phi 50 Phi 75 Phi 84 Phi 95 2.70 2.46 2.36 2.11 1.73 1.55 0.85 Moment Mean Phi Mean mm Sorting Skewness Kurtosis Statistics 1.97 0.26 0.6 -2.04 10.62 `EIN Granularmetric Report Depths and elevations based on measured values GBA ENGINEERS * SURVEYORS Gahagan & Bryant Associates of North Carolina 295 -A N. Green Meadows Dr. Wilmington, NC 28405 -3933 ph 910 - 313 -3338 fax 910 - 313 -6822 Project Name: New Topsail Inlet Maintenance Dredging Sample Name: TB- 11413 -11 #1 Analysis Date: 10 -12 -11 Analyzed B JCP y y: Easting (ft): 2,402,863 Northing (ft): 220,510 Coordinate System: North Carolina State Plane Elevation (ft): -5.5 MLW USCS: SP Munsell: Comments: Dry Weight (g): 200.00 Wash Weight (g): 200.00 Pan Retained (g): 0.00 Sieve Loss (% ): 0.25 Fines (% ): #200 - 0.25 #230 - 0.25 Organics (% ): Carbonates (% 7.30 Sieve Number Sieve Size (Phi) Sieve Size (Millimeters) Grams Retained % Weight Retained Cum. Grams Retained C. % Weight Retained 4 -2.25 4.76 0.00 0.00 0.00 0.00 7 -1.50 2.83 0.00 0.00 0.00 0.00 10 -1.00 2.00 0.10 0.05 0.10 0.05 14 -0.50 1.41 0.00 0.00 0.10 0.05 18 0.00 1.00 0.20 0.10 0.30 0.15 25 0.50 0.71 0.30 0.15 0.60 0.30 35 1.00 0.50 0.50 0.25 1.10 0.55 45 1.50 0.35 2.40 1.20 3.50 1.75 60 2.00 0.25 18.90 9.45 22.40 11.20 70 2.25 0.21 47.70 23.85 70.10 35.05 80 2.50 0.18 98.80 49.40 168.90 84.45 100 2.75 0.15 21.40 10.70 190.30 95.15 120 3.00 0.13 8.10 4.05 198.40 99.20 170 3.50 0.09 1.10 0.55 199.50 99.75 200 3.75 0.07 0.00 0.00 199.50 99.75 230 4.00 0.06 0.00 0.00 199.50 99.75 Phi 5 Phi 16 Phi 25 Phi 50 Phi 75 Phi 84 Phi 95 2.75 2.50 2.45 2.33 2.14 2.05 1.67 Moment Mean Phi Mean mm Sorting Skewness Kurtosis Statistics 2.28 0.21 0.33 -2.02 16.85 148 Granularmetric Report Depths and elevations based on measured values GBA ENGINEERS * SURVEYORS Gahagan & Bryant Associates of North Carolina 295 -A N. Green Meadows Dr. Wilmington, NC 28405 -3933 ph 910 - 313 -3338 fax 910 - 313 -6822 Project Name: New Topsail Inlet Maintenance Dredging Sample Name: TB- 11413 -11 #2 Analysis Date: 10 -13 -11 Analyzed B JCP y y: Easting (ft): 2,402,863 Northing (ft): 220,510 Coordinate System: North Carolina State Plane Elevation (ft): -13.2 MLW USCS: Munsell: Comments: Dry Weight (g): 200.00 Wash Weight (g): 200.00 Pan Retained (g): 3.60 Sieve Loss (% ): 0.45 Fines (% ): #200 - 3.05 #230 - 2.25 Organics (% ): Carbonates (% 7.30 Sieve Number Sieve Size (Phi) Sieve Size (Millimeters) Grams Retained % Weight Retained Cum. Grams Retained C. % Weight Retained 4 -2.25 4.76 7.00 3.50 7.00 3.50 7 -1.50 2.83 3.80 1.90 10.80 5.40 10 -1.00 2.00 2.10 1.05 12.90 6.45 14 -0.50 1.41 2.00 1.00 14.90 7.45 18 0.00 1.00 2.80 1.40 17.70 8.85 25 0.50 0.71 4.20 2.10 21.90 10.95 35 1.00 0.50 6.30 3.15 28.20 14.10 45 1.50 0.35 12.80 6.40 41.00 20.50 60 2.00 0.25 25.00 12.50 66.00 33.00 70 2.25 0.21 29.00 14.50 95.00 47.50 80 2.50 0.18 63.60 31.80 158.60 79.30 100 2.75 0.15 15.10 7.55 173.70 86.85 120 3.00 0.13 14.60 7.30 188.30 94.15 170 3.50 0.09 5.60 2.80 193.90 96.95 200 3.75 0.07 0.00 0.00 193.90 96.95 230 4.00 0.06 1.60 0.80 195.50 97.75 Phi 5 Phi 16 Phi 25 Phi 50 Phi 75 Phi 84 Phi 95 3.23 2.66 2.47 2.27 1.68 1.15 -1.66 Moment Mean Phi Mean mm Sorting Skewness Kurtosis Statistics 1.81 0.29 0.98 -1.46 6.46 IEl14 Granularmetric Report Depths and elevations based on measured values GBA ENGINEERS * SURVEYORS Gahagan & Bryant Associates of North Carolina 295 -A N. Green Meadows Dr. Wilmington, NC 28405 -3933 ph 910 - 313 -3338 fax 910 - 313 -6822 Project Name: New Topsail Inlet Maintenance Dredging Sample Name: T13-11413-12#1 Analysis Date: 10 -24 -11 Analyzed B JCP y y: Easting (ft): 2,403,501 Northing (ft): 220,577 Coordinate System: North Carolina State Plane Elevation (ft): -2.9 MLW USCS: SP Munsell: Comments: Dry Weight (g): 200.00 Wash Weight (g): 200.00 Pan Retained (g): 0.00 Sieve Loss (% ): 0.30 Fines (% ): #200 - 0.30 #230 - 0.30 Organics (% ): Carbonates (% 7.50 Sieve Number Sieve Size (Phi) Sieve Size (Millimeters) Grams Retained % Weight Retained Cum. Grams Retained C. % Weight Retained 4 -2.25 4.76 0.00 0.00 0.00 0.00 7 -1.50 2.83 0.30 0.15 0.30 0.15 10 -1.00 2.00 0.30 0.15 0.60 0.30 14 -0.50 1.41 0.50 0.25 1.10 0.55 18 0.00 1.00 1.10 0.55 2.20 1.10 25 0.50 0.71 2.10 1.05 4.30 2.15 35 1.00 0.50 3.50 1.75 7.80 3.90 45 1.50 0.35 14.30 7.15 22.10 11.05 60 2.00 0.25 54.20 27.10 76.30 38.15 70 2.25 0.21 47.20 23.60 123.50 61.75 80 2.50 0.18 51.10 25.55 174.60 87.30 100 2.75 0.15 13.70 6.85 188.30 94.15 120 3.00 0.13 8.80 4.40 197.10 98.55 170 3.50 0.09 2.30 1.15 199.40 99.70 200 3.75 0.07 0.00 0.00 199.40 99.70 230 4.00 0.06 0.00 0.00 199.40 99.70 Phi 5 Phi 16 Phi 25 Phi 50 Phi 75 Phi 84 Phi 95 2.80 2.47 2.38 2.13 1.76 1.59 1.08 Moment Mean Phi Mean mm Sorting Skewness Kurtosis Statistics 2.03 0.24 0.57 -1.8 10.39 IW11 Granularmetric Report Depths and elevations based on measured values GBA ENGINEERS * SURVEYORS Gahagan & Bryant Associates of North Carolina 295 -A N. Green Meadows Dr. Wilmington, NC 28405 -3933 ph 910 - 313 -3338 fax 910 - 313 -6822 Project Name: New Topsail Inlet Maintenance Dredging Sample Name: T13-11413-13#1 Analysis Date: 10 -24 -11 Analyzed B JCP y y: Easting (ft): 2,403,646 Northing (ft): 220,178 Coordinate System: North Carolina State Plane Elevation (ft): -8.3 MLW USCS: Munsell: Comments: Dry Weight (g): 200.00 Wash Weight (g): 200.00 Pan Retained (g): 0.00 Sieve Loss (% ): 0.20 Fines (% ): #200 - 0.20 #230 - 0.20 Organics (% ): Carbonates (% 7.70 Sieve Number Sieve Size (Phi) Sieve Size (Millimeters) Grams Retained % Weight Retained Cum. Grams Retained C. % Weight Retained 4 -2.25 4.76 0.50 0.25 0.50 0.25 7 -1.50 2.83 0.40 0.20 0.90 0.45 10 -1.00 2.00 0.50 0.25 1.40 0.70 14 -0.50 1.41 1.00 0.50 2.40 1.20 18 0.00 1.00 2.20 1.10 4.60 2.30 25 0.50 0.71 3.50 1.75 8.10 4.05 35 1.00 0.50 6.00 3.00 14.10 7.05 45 1.50 0.35 23.50 11.75 37.60 18.80 60 2.00 0.25 68.60 34.30 106.20 53.10 70 2.25 0.21 42.10 21.05 148.30 74.15 80 2.50 0.18 36.50 18.25 184.80 92.40 100 2.75 0.15 9.50 4.75 194.30 97.15 120 3.00 0.13 4.40 2.20 198.70 99.35 170 3.50 0.09 0.90 0.45 199.60 99.80 200 3.75 0.07 0.00 0.00 199.60 99.80 230 4.00 0.06 0.00 0.00 199.60 99.80 Phi 5 Phi 16 Phi 25 Phi 50 Phi 75 Phi 84 Phi 95 2.64 2.38 2.26 1.95 1.59 1.38 0.66 Moment Mean Phi Mean mm Sorting Skewness Kurtosis Statistics 1.84 0.28 0.62 -1.68 8.57 IN Granularmetric Report Depths and elevations based on measured values GBA ENGINEERS * SURVEYORS Gahagan & Bryant Associates of North Carolina 295 -A N. Green Meadows Dr. Wilmington, NC 28405 -3933 ph 910 - 313 -3338 fax 910 - 313 -6822 Project Name: New Topsail Inlet Maintenance Dredging Sample Name: T13-11413-14#1 Analysis Date: 10 -24 -11 Analyzed B JCP y y: Easting (ft): 2,404,425 Northing (ft): 220,664 Coordinate System: North Carolina State Plane Elevation (ft): -3.0 MLW USCS: Munsell: Comments: Dry Weight (g): 200.00 Wash Weight (g): 200.00 Pan Retained (g): 0.00 Sieve Loss (% ): 0.00 Fines (% ): #200 - 0.00 #230 - 0.00 Organics (% ): Carbonates (% 7.90 Sieve Number Sieve Size (Phi) Sieve Size (Millimeters) Grams Retained % Weight Retained Cum. Grams Retained C. % Weight Retained 4 -2.25 4.76 4.30 2.15 4.30 2.15 7 -1.50 2.83 0.20 0.10 4.50 2.25 10 -1.00 2.00 0.20 0.10 4.70 2.35 14 -0.50 1.41 0.20 0.10 4.90 2.45 18 0.00 1.00 0.30 0.15 5.20 2.60 25 0.50 0.71 0.70 0.35 5.90 2.95 35 1.00 0.50 1.50 0.75 7.40 3.70 45 1.50 0.35 7.60 3.80 15.00 7.50 60 2.00 0.25 32.60 16.30 47.60 23.80 70 2.25 0.21 31.40 15.70 79.00 39.50 80 2.50 0.18 75.60 37.80 154.60 77.30 100 2.75 0.15 28.00 14.00 182.60 91.30 120 3.00 0.13 13.90 6.95 196.50 98.25 170 3.50 0.09 3.40 1.70 199.90 99.95 200 3.75 0.07 0.10 0.05 200.00 100.00 230 4.00 0.06 0.00 0.00 200.00 100.00 Phi 5 Phi 16 Phi 25 Phi 50 Phi 75 Phi 84 Phi 95 2.88 2.62 2.48 2.32 2.02 1.76 1.17 Moment Mean Phi Mean mm Sorting Skewness Kurtosis Statistics 2.13 0.23 0.49 -1.28 11.45 IM Granularmetric Report Depths and elevations based on measured values GBA ENGINEERS * SURVEYORS Gahagan & Bryant Associates of North Carolina 295 -A N. Green Meadows Dr. Wilmington, NC 28405 -3933 ph 910 - 313 -3338 fax 910 - 313 -6822 Project Name: New Topsail Inlet Maintenance Dredging Sample Name: T13-11413-15#1 Analysis Date: 10 -24 -11 Analyzed B JCP y y: Easting (ft): 2,405,454 Northing (ft): 221,106 Coordinate System: North Carolina State Plane Elevation (ft): -7.7 MLW USCS: Munsell: Comments: Dry Weight (g): 200.00 Wash Weight (g): 200.00 Pan Retained (g): 0.00 Sieve Loss (% ): 0.30 Fines (% ): #200 - 0.30 #230 - 0.30 Organics (% ): Carbonates (% 23.40 Sieve Number Sieve Size (Phi) Sieve Size (Millimeters) Grams Retained % Weight Retained Cum. Grams Retained C. % Weight Retained 4 -2.25 4.76 1.50 0.75 1.50 0.75 7 -1.50 2.83 3.30 1.65 4.80 2.40 10 -1.00 2.00 4.40 2.20 9.20 4.60 14 -0.50 1.41 6.50 3.25 15.70 7.85 18 0.00 1.00 8.20 4.10 23.90 11.95 25 0.50 0.71 9.60 4.80 33.50 16.75 35 1.00 0.50 10.10 5.05 43.60 21.80 45 1.50 0.35 15.80 7.90 59.40 29.70 60 2.00 0.25 41.20 20.60 100.60 50.30 70 2.25 0.21 38.40 19.20 139.00 69.50 80 2.50 0.18 42.70 21.35 181.70 90.85 100 2.75 0.15 11.10 5.55 192.80 96.40 120 3.00 0.13 5.50 2.75 198.30 99.15 170 3.50 0.09 1.10 0.55 199.40 99.70 200 3.75 0.07 0.00 0.00 199.40 99.70 230 4.00 0.06 0.00 0.00 199.40 99.70 Phi 5 Phi 16 Phi 25 Phi 50 Phi 75 Phi 84 Phi 95 2.69 2.42 2.31 1.99 1.20 0.42 -0.94 Moment Mean Phi Mean mm Sorting Skewness Kurtosis Statistics 1.56 0.34 1.07 -1.34 4.25 153 Granularmetric Report Depths and elevations based on measured values GBA ENGINEERS * SURVEYORS Gahagan & Bryant Associates of North Carolina 295 -A N. Green Meadows Dr. Wilmington, NC 28405 -3933 ph 910 - 313 -3338 fax 910 - 313 -6822 Project Name: New Topsail Inlet Maintenance Dredging Sample Name: T13-11413-15#2 Analysis Date: 10 -24 -11 Analyzed B JCP y y: Easting (ft): 2,405,454 Northing (ft): 221,106 Coordinate System: North Carolina State Plane Elevation (ft): -14.0 MLW USCS: Munsell: Comments: Dry Weight (g): 200.00 Wash Weight (g): 200.00 Pan Retained (g): 0.00 Sieve Loss (% ): 0.25 Fines (% ): #200 - 0.25 #230 - 0.25 Organics (% ): Carbonates (% 23.40 Sieve Number Sieve Size (Phi) Sieve Size (Millimeters) Grams Retained % Weight Retained Cum. Grams Retained C. % Weight Retained 4 -2.25 4.76 13.20 6.60 13.20 6.60 7 -1.50 2.83 10.80 5.40 24.00 12.00 10 -1.00 2.00 10.00 5.00 34.00 17.00 14 -0.50 1.41 14.20 7.10 48.20 24.10 18 0.00 1.00 20.70 10.35 68.90 34.45 25 0.50 0.71 23.20 11.60 92.10 46.05 35 1.00 0.50 37.70 18.85 129.80 64.90 45 1.50 0.35 41.40 20.70 171.20 85.60 60 2.00 0.25 17.50 8.75 188.70 94.35 70 2.25 0.21 3.70 1.85 192.40 96.20 80 2.50 0.18 5.90 2.95 198.30 99.15 100 2.75 0.15 0.90 0.45 199.20 99.60 120 3.00 0.13 0.30 0.15 199.50 99.75 170 3.50 0.09 0.00 0.00 199.50 99.75 200 3.75 0.07 0.00 0.00 199.50 99.75 230 4.00 0.06 0.00 0.00 199.50 99.75 Phi 5 Phi 16 Phi 25 Phi 50 Phi 75 Phi 84 Phi 95 2.09 1.46 1.24 0.60 -0.46 -1.10 Moment Mean Phi Mean mm Sorting Skewness Kurtosis Statistics 0.29 0.82 1.06 0.09 2.47 154 of 0 a w of U of F W 2 of Q J Z Z of Q 0 Granularmetric Report Depths and elevations based on measured values CPE° Coastal & 2481 NW Bocla Raton Blvd Boca Raton FL 33431 ph (561) 391 -8102 fax (561) 391 -9116 Project Name: Topsail Beach Sand Search Sample Name: TBVC -07 -02 #1 Analysis Date: Analyzed By: Fasting (ft): 2,407,685 Northing (ft): 216,446 Coordinate System: North Carolina State Plane Elevation (ft): -29.5 NAVD 88 USCS: SP Munsell: Wet - 5Y -6/1 Dry - 5Y -6/1 Washed - 5Y -6/1 Comments: Dry Weight (g): 82.56 Wash Weight (g): 80.84 Pan Retained (g): 0.19 Sieve Loss (%: 0.10 Fines ): #20 /o -2.79 #230 -2.40 Organics (%: Carbonates (%: Shell Hash (%: 1 Sieve Number Sieve Size (Phi) Sieve Size (Millimeters) Grams Retained % Weight Retained Cum. Grams Retained C. % Weight Retained 3/4" -4.25 19.03 0.00 0.00 0.00 0.00 5/8" -4.00 16.00 0.00 0.00 0.00 0.00 7/16" -3.50 11.31 0.00 0.00 0.00 0.00 5/16" -3.00 8.00 0.00 0.00 0.00 0.00 4 -2.25 4.76 0.31 0.38 0.31 0.38 5 -2.00 4.00 0.14 0.17 0.45 0.55 7 -1.50 2.83 0.33 0.40 0.78 0.95 10 -1.00 2.00 0.23 0.28 1.01 1.23 14 -0.50 1.41 0.25 0.30 1.26 1.53 18 0.00 1.00 0.24 0.29 1.50 1.82 25 0.50 0.71 0.35 0.42 1.85 2.24 35 1.00 0.50 0.48 0.58 2.33 2.82 45 1.50 0.35 0.73 0.88 3.06 3.70 60 2.00 0.25 1.54 1.87 4.60 5.57 80 2.50 0.18 11.02 13.35 15.62 18.92 120 3.00 0.13 48.98 59.33 64.60 78.25 170 3.50 0.09 14.44 17.49 79.04 95.74 200 3.75 0.07 1.21 1.47 80.25 97.21 230 4.00 0.06 0.32 0.39 80.57 97.60 Shell Hash calculated from visual estimate of shell <4.75mm and >2.8mm. Phi 5 Phi 16 Phi 25 Phi 50 Phi 75 Phi 84 Phi 95 3.48 3.16 2.97 2.76 2.55 2.39 1.85 Moment Mean Phi Mean mm Sorting Skewness Kurtosis Statistics 2.65 0.16 0.72 -4.13 25.8 IW-1 of 0 a w of U of F W 2 of Q J Z Z of Q 0 Granularmetric Report Depths and elevations based on measured values CPE° Coastal & 2481 NW Bocla Raton Blvd Boca Raton FL 33431 ph (561) 391 -8102 fax (561) 391 -9116 Project Name: Topsail Beach Sand Search Sample Name: TBVC -07 -02 #2 Analysis Date: 07 -22 -07 Analyzed By: KD Fasting (ft): 2,407,685 Northing (ft): 216,446 Coordinate System: North Carolina State Plane Elevation (ft): -33.5 NAVD 88 USCS: SP Munsell: Wet - 5Y -4/1 Dry - 5Y -6/1 Washed - 5Y -6/1 Comments: Dry Weight (g): 91.18 Wash Weight (g): 87.19 Pan Retained (g): 0.07 Sieve Loss (%: 0.00 Fines ): #20 /o -4.98 #230 -4.44 Organics (%: Carbonates (%: Shell Hash (%: 1 Sieve Number Sieve Size (Phi) Sieve Size (Millimeters) Grams Retained % Weight Retained Cum. Grams Retained C. % Weight Retained 3/4" -4.25 19.03 0.00 0.00 0.00 0.00 5/8" -4.00 16.00 0.00 0.00 0.00 0.00 7/16" -3.50 11.31 0.00 0.00 0.00 0.00 5/16" -3.00 8.00 0.00 0.00 0.00 0.00 3.5 -2.50 5.66 0.00 0.00 0.00 0.00 4 -2.25 4.76 0.00 0.00 0.00 0.00 5 -2.00 4.00 0.00 0.00 0.00 0.00 7 -1.50 2.83 0.49 0.54 0.49 0.54 10 -1.00 2.00 0.47 0.52 0.96 1.06 14 -0.50 1.41 0.61 0.67 1.57 1.73 18 0.00 1.00 0.45 0.49 2.02 2.22 25 0.50 0.71 0.49 0.54 2.51 2.76 35 1.00 0.50 0.60 0.66 3.11 3.42 45 1.50 0.35 1.12 1.23 4.23 4.65 60 2.00 0.25 1.77 1.94 6.00 6.59 80 2.50 0.18 7.35 8.06 13.35 14.65 120 3.00 0.13 46.12 50.58 59.47 65.23 170 3.50 0.09 25.50 27.97 84.97 93.20 200 3.75 0.07 1.66 1.82 86.63 95.02 230 4.00 0.06 0.49 0.54 87.12 95.56 Shell Hash calculated from visual estimate of shell <4.75mm and >2.8mm. Phi 5 Phi 16 Phi 25 Phi 50 Phi 75 Phi 84 Phi 95 3.75 3.34 3.17 2.85 2.60 2.51 1.59 Moment Mean Phi Mean mm Sorting Skewness Kurtosis Statistics 2.72 0.15 0.75 -3.37 17.43 I&U] of 0 a w of U of F W 2 of Q J Z Z of Q 0 Granularmetric Report Depths and elevations based on measured values CPE° Coastal & 2481 NW Bocla Raton Blvd Boca Raton FL 33431 ph (561) 391 -8102 fax (561) 391 -9116 Project Name: Topsail Beach Sand Search Sample Name: TBVC -07 -02 #3 Analysis Date: 07 -18 -07 Analyzed By: PB Fasting (ft): 2,407,685 Northing (ft): 216,446 Coordinate System: North Carolina State Plane Elevation (ft): -35.3 NAVD 88 USCS: SP Munsell: Wet - 5Y -5/1 Dry - 5Y -6/1 Washed - 5Y -6/1 Comments: Dry Weight (g): 82.08 Wash Weight (g): 79.47 Pan Retained (g): 0.03 Sieve Loss (%: 0.02 Fines ): #20 /o -3.49 #230 -3.23 Organics (%: Carbonates (%: Shell Hash (%: 1 Sieve Number Sieve Size (Phi) Sieve Size (Millimeters) Grams Retained % Weight Retained Cum. Grams Retained C. % Weight Retained 3/4" -4.25 19.03 0.00 0.00 0.00 0.00 5/8" -4.00 16.00 0.00 0.00 0.00 0.00 7/16" -3.50 11.31 0.00 0.00 0.00 0.00 5/16" -3.00 8.00 0.00 0.00 0.00 0.00 3.5 -2.50 5.66 0.18 0.22 0.18 0.22 4 -2.25 4.76 0.00 0.00 0.18 0.22 5 -2.00 4.00 0.14 0.17 0.32 0.39 7 -1.50 2.83 0.16 0.19 0.48 0.58 10 -1.00 2.00 0.21 0.26 0.69 0.84 14 -0.50 1.41 0.43 0.52 1.12 1.36 18 0.00 1.00 0.39 0.48 1.51 1.84 25 0.50 0.71 0.64 0.78 2.15 2.62 35 1.00 0.50 0.91 1.11 3.06 3.73 45 1.50 0.35 1.63 1.99 4.69 5.72 60 2.00 0.25 2.61 3.18 7.30 8.90 80 2.50 0.18 16.22 19.76 23.52 28.66 120 3.00 0.13 43.46 52.95 66.98 81.61 170 3.50 0.09 11.18 13.62 78.16 95.23 200 3.75 0.07 1.05 1.28 79.21 96.51 230 4.00 0.06 0.21 0.26 79.42 96.77 Shell Hash calculated from visual estimate of shell <4.75mm and >2.8mm. Phi 5 Phi 16 Phi 25 Phi 50 Phi 75 Phi 84 Phi 95 3.49 3.09 2.94 2.70 2.41 2.18 1.32 Moment Mean Phi Mean mm Sorting Skewness Kurtosis Statistics 2.55 0.17 0.73 -3.24 18.21 IM of 0 a w of U of F W 2 of Q J Z Z of Q 0 Granularmetric Report Depths and elevations based on measured values CPE° Coastal & 2481 NW Bocla Raton Blvd Boca Raton FL 33431 ph (561) 391 -8102 fax (561) 391 -9116 Project Name: Topsail Beach Sand Search Sample Name: TBVC -07 -02 #4 Analysis Date: 07 -18 -07 Analyzed By: PB Fasting (ft): 2,407,685 Northing (ft): 216,446 Coordinate System: North Carolina State Plane Elevation (ft): -34.4 NAVD 88 USCS: SW Munsell: Wet - 5Y -4/1 Dry - 5Y -5/1 Washed - 5Y -5/1 Comments: Dry Weight (g): 99.61 Wash Weight (g): 96.33 Pan Retained (g): 0.05 Sieve Loss (%: 0.00 Fines ): #20 /o -3.51 #230 -3.34 Organics (%: Carbonates (%: Shell Hash (%: 25 Sieve Number Sieve Size (Phi) Sieve Size (Millimeters) Grams Retained % Weight Retained Cum. Grams Retained C. % Weight Retained 3/4" -4.25 19.03 0.00 0.00 0.00 0.00 5/8" -4.00 16.00 9.49 9.53 9.49 9.53 7/16" -3.50 11.31 8.88 8.91 18.37 18.44 5/16" -3.00 8.00 6.33 6.35 24.70 24.79 3.5 -2.50 5.66 5.67 5.69 30.37 30.48 4 -2.25 4.76 1.65 1.66 32.02 32.14 5 -2.00 4.00 3.80 3.81 35.82 35.95 7 -1.50 2.83 6.75 6.78 42.57 42.73 10 -1.00 2.00 6.22 6.24 48.79 48.97 14 -0.50 1.41 8.57 8.60 57.36 57.57 18 0.00 1.00 7.30 7.33 64.66 64.90 25 0.50 0.71 5.32 5.34 69.98 70.24 35 1.00 0.50 2.61 2.62 72.59 72.86 45 1.50 0.35 1.45 1.46 74.04 74.32 60 2.00 0.25 1.30 1.31 75.34 75.63 80 2.50 0.18 3.88 3.90 79.22 79.53 120 3.00 0.13 11.72 11.77 90.94 91.30 170 3.50 0.09 4.57 4.59 95.51 95.89 200 3.75 0.07 0.60 0.60 96.11 96.49 230 4.00 0.06 0.17 0.17 96.28 96.66 Shell Hash calculated from visual estimate of shell <4.75mm and >2.8mm. Phi 5 Phi 16 Phi 25 Phi 50 Phi 75 Phi 84 Phi 95 3.40 2.69 1.76 -0.94 -2.98 -3.64 -4.12 Moment Mean Phi Mean mm Sorting Skewness Kurtosis Statistics -0.86 1.82 2.42 0.31 1.85 158 of 0 a w of U of F W 2 of Q J Z Z of Q 0 Granularmetric Report Depths and elevations based on measured values CPE° Coastal & 2481 NW Bocla Raton Blvd Boca Raton FL 33431 ph (561) 391 -8102 fax (561) 391 -9116 Project Name: Topsail Beach Sand Search Sample Name: TBVC -07 -06 #1 Analysis Date: 07 -26 -07 Analyzed By: ST Fasting (ft): 2,406,364 Northing (ft): 216,577 Coordinate System: North Carolina State Plane Elevation (ft): -11.9 NAVD 88 USCS: SP Munsell: Wet - 5Y -6/1 Dry - 5Y -7/2 Washed - 5Y -7/1 Comments: Dry Weight (g): 90.86 Wash Weight (g): 89.60 Pan Retained (g): 0.00 Sieve Loss (%: 0.00 Fines ): #20 /o -1.42 #230 -1.39 Organics (%: Carbonates (%: Shell Hash (%: 1 Sieve Number Sieve Size (Phi) Sieve Size (Millimeters) Grams Retained % Weight Retained Cum. Grams Retained C. % Weight Retained 3/4" -4.25 19.03 0.00 0.00 0.00 0.00 5/8" -4.00 16.00 0.00 0.00 0.00 0.00 7/16" -3.50 11.31 0.00 0.00 0.00 0.00 5/16" -3.00 8.00 0.00 0.00 0.00 0.00 3.5 -2.50 5.66 0.00 0.00 0.00 0.00 4 -2.25 4.76 0.00 0.00 0.00 0.00 5 -2.00 4.00 0.00 0.00 0.00 0.00 7 -1.50 2.83 0.06 0.07 0.06 0.07 10 -1.00 2.00 0.04 0.04 0.10 0.11 14 -0.50 1.41 0.04 0.04 0.14 0.15 18 0.00 1.00 0.11 0.12 0.25 0.27 25 0.50 0.71 0.52 0.57 0.77 0.84 35 1.00 0.50 1.80 1.98 2.57 2.82 45 1.50 0.35 7.02 7.73 9.59 10.55 60 2.00 0.25 16.28 17.92 25.87 28.47 80 2.50 0.18 44.12 48.56 69.99 77.03 120 3.00 0.13 18.10 19.92 88.09 96.95 170 3.50 0.09 1.35 1.49 89.44 98.44 200 3.75 0.07 0.13 0.14 89.57 98.58 230 4.00 0.06 0.03 0.03 89.60 98.61 Shell Hash calculated from visual estimate of shell <4.75mm and >2.8mm. Phi 5 Phi 16 Phi 25 Phi 50 Phi 75 Phi 84 Phi 95 2.95 2.67 2.48 2.22 1.90 1.65 1.14 Moment Mean Phi Mean mm Sorting Skewness Kurtosis Statistics 2.15 0.23 0.53 -1.2 7.1 I&VI of 0 a w of U of F W 2 of Q J Z Z of Q 0 Granularmetric Report Depths and elevations based on measured values CPE° Coastal & 2481 NW Bocla Raton Blvd Boca Raton FL 33431 ph (561) 391 -8102 fax (561) 391 -9116 Project Name: Topsail Beach Sand Search Sample Name: TBVC -07 -06 #2 Analysis Date: 06 -27 -07 Analyzed By: KW /KR Fasting (ft): 2,406,364 Northing (ft): 216,577 Coordinate System: North Carolina State Plane Elevation (ft): -15.6 NAVD 88 USCS: SP Munsell: Wet - 5Y -6/1 Dry - 5Y -7/1 Washed - 5Y -7/1 Comments: Dry Weight (g): 77.68 Wash Weight (g): 77.00 Pan Retained (g): 0.01 Sieve Loss (%: 0.00 Fines ): #20 /o -0.95 #230 -0.90 Organics (%: Carbonates (%: Shell Hash (%: 1 Sieve Number Sieve Size (Phi) Sieve Size (Millimeters) Grams Retained % Weight Retained Cum. Grams Retained C. % Weight Retained 3/4" -4.25 19.03 0.00 0.00 0.00 0.00 5/8" -4.00 16.00 0.00 0.00 0.00 0.00 7/16" -3.50 11.31 0.00 0.00 0.00 0.00 5/16" -3.00 8.00 0.00 0.00 0.00 0.00 4 -2.25 4.76 0.00 0.00 0.00 0.00 5 -2.00 4.00 0.00 0.00 0.00 0.00 7 -1.50 2.83 0.00 0.00 0.00 0.00 10 -1.00 2.00 0.00 0.00 0.00 0.00 14 -0.50 1.41 0.01 0.01 0.01 0.01 18 0.00 1.00 0.01 0.01 0.02 0.02 25 0.50 0.71 0.02 0.03 0.04 0.05 35 1.00 0.50 0.06 0.08 0.10 0.13 45 1.50 0.35 0.23 0.30 0.33 0.43 60 2.00 0.25 3.76 4.84 4.09 5.27 80 2.50 0.18 31.92 41.09 36.01 46.36 120 3.00 0.13 36.94 47.55 72.95 93.91 170 3.50 0.09 3.81 4.90 76.76 98.81 200 3.75 0.07 0.19 0.24 76.95 99.05 230 4.00 0.06 0.04 0.05 76.99 99.10 Shell Hash calculated from visual estimate of shell <4.75mm and >2.8mm. Phi 5 Phi 16 Phi 25 Phi 50 Phi 75 Phi 84 Phi 95 3.11 2.90 2.80 2.54 2.24 2.13 1.97 Moment Mean Phi Mean mm Sorting Skewness Kurtosis Statistics 2.51 0.18 0.35 -0.43 5.34 1[:111 of 0 a w of U of F W 2 of Q J Z Z of Q 0 Granularmetric Report Depths and elevations based on measured values CPE° Coastal & 2481 NW Bocla Raton Blvd Boca Raton FL 33431 ph (561) 391 -8102 fax (561) 391 -9116 Project Name: Topsail Beach Sand Search Sample Name: TBVC -07 -06 #3 Analysis Date: 07 -22 -07 Analyzed By: PB Fasting (ft): 2,406,364 Northing (ft): 216,577 Coordinate System: North Carolina State Plane Elevation (ft): -19.4 NAVD 88 USCS: SP Munsell: Wet - 5Y -6/1 Dry - 5Y -6/1 Washed - 5Y -6/1 Comments: Dry Weight (g): 87.22 Wash Weight (g): 86.17 Pan Retained (g): 0.01 Sieve Loss (%: 0.01 Fines ): #20 /o -1.25 #230 -1.23 Organics (%: Carbonates (%: Shell Hash (%: 1 Sieve Number Sieve Size (Phi) Sieve Size (Millimeters) Grams Retained % Weight Retained Cum. Grams Retained C. % Weight Retained 3/4" -4.25 19.03 0.00 0.00 0.00 0.00 5/8" -4.00 16.00 0.00 0.00 0.00 0.00 7/16" -3.50 11.31 0.00 0.00 0.00 0.00 5/16" -3.00 8.00 0.00 0.00 0.00 0.00 3.5 -2.50 5.66 0.00 0.00 0.00 0.00 4 -2.25 4.76 0.00 0.00 0.00 0.00 5 -2.00 4.00 0.00 0.00 0.00 0.00 7 -1.50 2.83 0.01 0.01 0.01 0.01 10 -1.00 2.00 0.04 0.05 0.05 0.06 14 -0.50 1.41 0.05 0.06 0.10 0.12 18 0.00 1.00 0.10 0.11 0.20 0.23 25 0.50 0.71 0.21 0.24 0.41 0.47 35 1.00 0.50 0.62 0.71 1.03 1.18 45 1.50 0.35 3.22 3.69 4.25 4.87 60 2.00 0.25 15.57 17.85 19.82 22.72 80 2.50 0.18 42.51 48.74 62.33 71.46 120 3.00 0.13 22.52 25.82 84.85 97.28 170 3.50 0.09 1.23 1.41 86.08 98.69 200 3.75 0.07 0.05 0.06 86.13 98.75 230 4.00 0.06 0.02 0.02 86.15 98.77 Shell Hash calculated from visual estimate of shell <4.75mm and >2.8mm. Phi 5 Phi 16 Phi 25 Phi 50 Phi 75 Phi 84 Phi 95 2.96 2.74 2.57 2.28 2.02 1.81 1.50 Moment Mean Phi Mean mm Sorting Skewness Kurtosis Statistics 2.25 0.21 0.46 -1.17 7.91 11.1 of 0 a w of U of F W 2 of Q J Z Z of Q 0 Granularmetric Report Depths and elevations based on measured values CPE° Coastal & 2481 NW Bocla Raton Blvd Boca Raton FL 33431 ph (561) 391 -8102 fax (561) 391 -9116 Project Name: Topsail Beach Sand Search Sample Name: TBVC -07 -11 #1 Analysis Date: 07 -22 -07 Analyzed By: PB Fasting (ft): 2,406,765 Northing (ft): 216,129 Coordinate System: North Carolina State Plane Elevation (ft): -20.5 NAVD 88 USCS: SP Munsell: Wet - 5Y -7/1 Dry - 5Y -6/1 Washed - 5Y -7/1 Comments: Dry Weight (g): 90.57 Wash Weight (g): 89.44 Pan Retained (g): 0.02 Sieve Loss (%: 0.00 Fines ): #20 /o -1.34 #230 -1.27 Organics (%: Carbonates (%: Shell Hash (%: 1 Sieve Number Sieve Size (Phi) Sieve Size (Millimeters) Grams Retained % Weight Retained Cum. Grams Retained C. % Weight Retained 3/4" -4.25 19.03 0.00 0.00 0.00 0.00 5/8" -4.00 16.00 0.00 0.00 0.00 0.00 7/16" -3.50 11.31 0.00 0.00 0.00 0.00 5/16" -3.00 8.00 0.00 0.00 0.00 0.00 3.5 -2.50 5.66 0.00 0.00 0.00 0.00 4 -2.25 4.76 0.00 0.00 0.00 0.00 5 -2.00 4.00 0.00 0.00 0.00 0.00 7 -1.50 2.83 0.01 0.01 0.01 0.01 10 -1.00 2.00 0.00 0.00 0.01 0.01 14 -0.50 1.41 0.01 0.01 0.02 0.02 18 0.00 1.00 0.00 0.00 0.02 0.02 25 0.50 0.71 0.01 0.01 0.03 0.03 35 1.00 0.50 0.03 0.03 0.06 0.06 45 1.50 0.35 0.13 0.14 0.19 0.20 60 2.00 0.25 1.45 1.60 1.64 1.80 80 2.50 0.18 29.87 32.98 31.51 34.78 120 3.00 0.13 52.01 57.43 83.52 92.21 170 3.50 0.09 5.54 6.12 89.06 98.33 200 3.75 0.07 0.30 0.33 89.36 98.66 230 4.00 0.06 0.06 0.07 89.42 98.73 Shell Hash calculated from visual estimate of shell <4.75mm and >2.8mm. Phi 5 Phi 16 Phi 25 Phi 50 Phi 75 Phi 84 Phi 95 3.23 2.93 2.85 2.63 2.35 2.22 2.05 Moment Mean Phi Mean mm Sorting Skewness Kurtosis Statistics 2.6 0.16 0.32 -0.6 8.86 I"M of 0 a w of U of F W 2 of Q J Z Z of Q 0 Granularmetric Report Depths and elevations based on measured values CPE° Coastal & 2481 NW Bocla Raton Blvd Boca Raton FL 33431 ph (561) 391 -8102 fax (561) 391 -9116 Project Name: Topsail Beach Sand Search Sample Name: TBVC -07 -11 #2 Analysis Date: 07 -15 -07 Analyzed By: KD Fasting (ft): 2,406,765 Northing (ft): 216,129 Coordinate System: North Carolina State Plane Elevation (ft): -23.0 NAVD 88 USCS: SP Munsell: Wet - 5Y -7/1 Dry - 5Y -7/1 Washed - 5Y -7/1 Comments: Dry Weight (g): 96.15 Wash Weight (g): 94.81 Pan Retained (g): 0.02 Sieve Loss (%: 0.02 Fines ): #20 /o -1.48 #230 -1.44 Organics (%: Carbonates (%: Shell Hash (%: 1 Sieve Number Sieve Size (Phi) Sieve Size (Millimeters) Grams Retained % Weight Retained Cum. Grams Retained C. % Weight Retained 3/4" -4.25 19.03 0.00 0.00 0.00 0.00 5/8" -4.00 16.00 0.00 0.00 0.00 0.00 7/16" -3.50 11.31 0.00 0.00 0.00 0.00 5/16" -3.00 8.00 0.00 0.00 0.00 0.00 3.5 -2.50 5.66 0.00 0.00 0.00 0.00 4 -2.25 4.76 0.00 0.00 0.00 0.00 5 -2.00 4.00 0.04 0.04 0.04 0.04 7 -1.50 2.83 0.00 0.00 0.04 0.04 10 -1.00 2.00 0.01 0.01 0.05 0.05 14 -0.50 1.41 0.07 0.07 0.12 0.12 18 0.00 1.00 0.04 0.04 0.16 0.16 25 0.50 0.71 0.12 0.12 0.28 0.28 35 1.00 0.50 0.18 0.19 0.46 0.47 45 1.50 0.35 0.49 0.51 0.95 0.98 60 2.00 0.25 3.39 3.53 4.34 4.51 80 2.50 0.18 33.45 34.79 37.79 39.30 120 3.00 0.13 52.06 54.14 89.85 93.44 170 3.50 0.09 4.74 4.93 94.59 98.37 200 3.75 0.07 0.14 0.15 94.73 98.52 230 4.00 0.06 0.04 0.04 94.77 98.56 Shell Hash calculated from visual estimate of shell <4.75mm and >2.8mm. Phi 5 Phi 16 Phi 25 Phi 50 Phi 75 Phi 84 Phi 95 3.16 2.91 2.83 2.60 2.29 2.17 2.01 Moment Mean Phi Mean mm Sorting Skewness Kurtosis Statistics 2.54 0.17 0.38 -2.18 20.19 I of 0 a w of U of F W 2 of Q J Z Z of Q 0 Granularmetric Report Depths and elevations based on measured values CPE° Coastal & 2481 NW Bocla Raton Blvd Boca Raton FL 33431 ph (561) 391 -8102 fax (561) 391 -9116 Project Name: Topsail Beach Sand Search Sample Name: TBVC -07 -15 #1 Analysis Date: 07 -16 -07 Analyzed By: JG Fasting (ft): 2,406,052 Northing (ft): 215,803 Coordinate System: North Carolina State Plane Elevation (ft): -20.1 NAVD 88 USCS: SP Munsell: Wet - 5Y -7/1 Dry - 5Y -7/1 Washed - 5Y -7/1 Comments: Dry Weight (g): 83.57 Wash Weight (g): 82.57 Pan Retained (g): 0.00 Sieve Loss (%: 0.07 Fines ): #20 /o -1.35 #230 -1.25 Organics (%: Carbonates (%: Shell Hash (%: 1 Sieve Number Sieve Size (Phi) Sieve Size (Millimeters) Grams Retained % Weight Retained Cum. Grams Retained C. % Weight Retained 3/4" -4.25 19.03 0.00 0.00 0.00 0.00 5/8" -4.00 16.00 0.00 0.00 0.00 0.00 7/16" -3.50 11.31 0.00 0.00 0.00 0.00 5/16" -3.00 8.00 0.00 0.00 0.00 0.00 3.5 -2.50 5.66 0.00 0.00 0.00 0.00 4 -2.25 4.76 0.00 0.00 0.00 0.00 5 -2.00 4.00 0.00 0.00 0.00 0.00 7 -1.50 2.83 0.04 0.05 0.04 0.05 10 -1.00 2.00 0.01 0.01 0.05 0.06 14 -0.50 1.41 0.00 0.00 0.05 0.06 18 0.00 1.00 0.01 0.01 0.06 0.07 25 0.50 0.71 0.04 0.05 0.10 0.12 35 1.00 0.50 0.03 0.04 0.13 0.16 45 1.50 0.35 0.06 0.07 0.19 0.23 60 2.00 0.25 0.59 0.71 0.78 0.94 80 2.50 0.18 18.34 21.95 19.12 22.89 120 3.00 0.13 53.30 63.78 72.42 86.67 170 3.50 0.09 9.71 11.62 82.13 98.29 200 3.75 0.07 0.30 0.36 82.43 98.65 230 4.00 0.06 0.08 0.10 82.51 98.75 Shell Hash calculated from visual estimate of shell <4.75mm and >2.8mm. Phi 5 Phi 16 Phi 25 Phi 50 Phi 75 Phi 84 Phi 95 3.36 2.98 2.91 2.71 2.52 2.34 2.09 Moment Mean Phi Mean mm Sorting Skewness Kurtosis Statistics 2.69 0.15 0.33 -1.72 22.74 IBEI of 0 a w of U of F W 2 of Q J Z Z of Q 0 Granularmetric Report Depths and elevations based on measured values CPE° Coastal & 2481 NW Bocla Raton Blvd Boca Raton FL 33431 ph (561) 391 -8102 fax (561) 391 -9116 Project Name: Topsail Beach Sand Search Sample Name: TBVC -07 -15 #2 Analysis Date: 07 -16 -07 Analyzed By: JG Fasting (ft): 2,406,052 Northing (ft): 215,803 Coordinate System: North Carolina State Plane Elevation (ft): -23.7 NAVD 88 USCS: SP Munsell: Wet - 5Y -7/1 Dry - 5Y -7/1 Washed - 5Y -7/1 Comments: Dry Weight (g): 91.49 Wash Weight (g): 90.07 Pan Retained (g): 0.02 Sieve Loss (%: 0.04 Fines ): #20 /o -1.75 #230 -1.63 Organics (%: Carbonates (%: Shell Hash (%: 1 Sieve Number Sieve Size (Phi) Sieve Size (Millimeters) Grams Retained % Weight Retained Cum. Grams Retained C. % Weight Retained 3/4" -4.25 19.03 0.00 0.00 0.00 0.00 5/8" -4.00 16.00 0.00 0.00 0.00 0.00 7/16" -3.50 11.31 0.00 0.00 0.00 0.00 5/16" -3.00 8.00 0.00 0.00 0.00 0.00 3.5 -2.50 5.66 0.00 0.00 0.00 0.00 4 -2.25 4.76 0.14 0.15 0.14 0.15 5 -2.00 4.00 0.00 0.00 0.14 0.15 7 -1.50 2.83 0.00 0.00 0.14 0.15 10 -1.00 2.00 0.01 0.01 0.15 0.16 14 -0.50 1.41 0.03 0.03 0.18 0.19 18 0.00 1.00 0.02 0.02 0.20 0.21 25 0.50 0.71 0.03 0.03 0.23 0.24 35 1.00 0.50 0.06 0.07 0.29 0.31 45 1.50 0.35 0.18 0.20 0.47 0.51 60 2.00 0.25 1.77 1.93 2.24 2.44 80 2.50 0.18 23.93 26.16 26.17 28.60 120 3.00 0.13 53.26 58.21 79.43 86.81 170 3.50 0.09 10.03 10.96 89.46 97.77 200 3.75 0.07 0.44 0.48 89.90 98.25 230 4.00 0.06 0.11 0.12 90.01 98.37 Shell Hash calculated from visual estimate of shell <4.75mm and >2.8mm. Phi 5 Phi 16 Phi 25 Phi 50 Phi 75 Phi 84 Phi 95 3.37 2.98 2.90 2.68 2.43 2.26 2.05 Moment Mean Phi Mean mm Sorting Skewness Kurtosis Statistics 2.64 0.16 0.41 -3.46 41.44 1".11 Granularmetric Report Depths and elevations based on measured values EN[iINEERB * Sl1RVEYORS Gahagan & Bryant Associates of North Carolina 295 -A N. Green Meadows Dr. Wilmington, NC 28405 -3933 ph 910 - 313 -3338 fax 910 - 313 -6822 Project Name: Topsail Beach Renourishment Sample Name: TOPCRK -1 #1 Analysis Date: 05 -13 -10 Analyzed B JCP y y: Easting (ft): 2,402,876 Northing (ft): 222,397 Coordinate System: North Carolina State Plane Elevation (ft): -7.0 NAVD 88 USCS: SP Munsell: Comments: Dry Weight (g): 363.70 Wash Weight (g): 364.60 Pan Retained (g): 0.20 Sieve Loss (% ): 0.25 Fines (% ): #200 - 0.05 #230 - 0.05 Organics (% ): Carbonates (% 4.60 Sieve Number Sieve Size (Phi) Sieve Size (Millimeters) Grams Retained % Weight Retained Cum. Grams Retained C. % Weight Retained 4 -2.25 4.76 0.00 0.00 0.00 0.00 7 -1.50 2.83 0.00 0.00 0.00 0.00 10 -1.00 2.00 0.10 0.03 0.10 0.03 14 -0.50 1.41 0.50 0.14 0.60 0.16 18 0.00 1.00 0.70 0.19 1.30 0.36 25 0.50 0.71 1.40 0.38 2.70 0.74 35 1.00 0.50 3.60 0.99 6.30 1.73 45 1.50 0.35 12.30 3.38 18.60 5.11 60 2.00 0.25 103.10 28.35 121.70 33.46 70 2.25 0.21 98.50 27.08 220.20 60.54 80 2.50 0.18 97.40 26.78 317.60 87.32 100 2.75 0.15 33.80 9.29 351.40 96.62 120 3.00 0.13 9.90 2.72 361.30 99.34 170 3.50 0.09 1.90 0.52 363.20 99.86 200 3.75 0.07 0.30 0.08 363.50 99.95 230 4.00 0.06 0.00 0.00 363.50 99.95 Phi 5 Phi 16 Phi 25 Phi 50 Phi 75 Phi 84 Phi 95 2.71 2.47 2.38 2.15 1.85 1.69 1.48 Moment Mean Phi Mean mm Sorting Skewness Kurtosis Statistics 2.1 0.23 0.43 -1.32 9.08 111.%1 Granularmetric Report Depths and elevations based on measured values EN[iINEERB * Sl1RVEYORS Gahagan & Bryant Associates of North Carolina 295 -A N. Green Meadows Dr. Wilmington, NC 28405 -3933 ph 910 - 313 -3338 fax 910 - 313 -6822 Project Name: Topsail Beach Renourishment Sample Name: TOPCRK -2 #1 Analysis Date: 05 -14 -10 Analyzed B JCP y y: Easting (ft): 2,403,849 Northing (ft): 222,230 Coordinate System: North Carolina State Plane Elevation (ft): -3.1 NAVD 88 USCS: SP Munsell: Comments: Dry Weight (g): 270.20 Wash Weight (g): 271.50 Pan Retained (g): 0.50 Sieve Loss (% ): 0.30 Fines (% ): #200 - 0.04 #230 - 0.00 Organics (% ): Carbonates (% 4.80 Sieve Number Sieve Size (Phi) Sieve Size (Millimeters) Grams Retained % Weight Retained Cum. Grams Retained C. % Weight Retained 4 -2.25 4.76 0.00 0.00 0.00 0.00 7 -1.50 2.83 0.00 0.00 0.00 0.00 10 -1.00 2.00 0.10 0.04 0.10 0.04 14 -0.50 1.41 0.20 0.07 0.30 0.11 18 0.00 1.00 0.60 0.22 0.90 0.33 25 0.50 0.71 0.50 0.19 1.40 0.52 35 1.00 0.50 2.30 0.85 3.70 1.37 45 1.50 0.35 5.90 2.18 9.60 3.55 60 2.00 0.25 30.20 11.18 39.80 14.73 70 2.25 0.21 64.80 23.98 104.60 38.71 80 2.50 0.18 105.50 39.05 210.10 77.76 100 2.75 0.15 43.40 16.06 253.50 93.82 120 3.00 0.13 13.90 5.14 267.40 98.96 170 3.50 0.09 2.50 0.93 269.90 99.89 200 3.75 0.07 0.20 0.07 270.10 99.96 230 4.00 0.06 0.10 0.04 270.20 100.00 Phi 5 Phi 16 Phi 25 Phi 50 Phi 75 Phi 84 Phi 95 2.81 2.60 2.48 2.32 2.11 2.01 1.56 Moment Mean Phi Mean mm Sorting Skewness Kurtosis Statistics 2.27 0.21 0.41 -1.86 12.4 Iff- A Granularmetric Report Depths and elevations based on measured values EN[iINEERB * Sl1RVEYORS Gahagan & Bryant Associates of North Carolina 295 -A N. Green Meadows Dr. Wilmington, NC 28405 -3933 ph 910 - 313 -3338 fax 910 - 313 -6822 Project Name: Topsail Beach Renourishment Sample Name: TOPCRK -3 #1 Analysis Date: 05 -13 -10 Analyzed B JCP y y: Easting (ft): 2,404,072 Northing (ft): 221,513 Coordinate System: North Carolina State Plane Elevation (ft): -6.1 NAVD 88 USCS: Munsell: Comments: Dry Weight (g): 297.70 Wash Weight (g): 298.00 Pan Retained (g): 0.50 Sieve Loss (% ): 0.17 Fines (% ): #200 - 0.24 #230 - 0.24 Organics (% ): Carbonates (% 5.20 Sieve Number Sieve Size (Phi) Sieve Size (Millimeters) Grams Retained % Weight Retained Cum. Grams Retained C. % Weight Retained 4 -2.25 4.76 1.10 0.37 1.10 0.37 7 -1.50 2.83 0.40 0.13 1.50 0.50 10 -1.00 2.00 0.10 0.03 1.60 0.54 14 -0.50 1.41 0.40 0.13 2.00 0.67 18 0.00 1.00 0.60 0.20 2.60 0.87 25 0.50 0.71 1.60 0.54 4.20 1.41 35 1.00 0.50 3.00 1.01 7.20 2.42 45 1.50 0.35 13.10 4.40 20.30 6.82 60 2.00 0.25 66.40 22.30 86.70 29.12 70 2.25 0.21 50.90 17.10 137.60 46.22 80 2.50 0.18 96.30 32.35 233.90 78.57 100 2.75 0.15 41.20 13.84 275.10 92.41 120 3.00 0.13 18.60 6.25 293.70 98.66 170 3.50 0.09 3.10 1.04 296.80 99.70 200 3.75 0.07 0.20 0.07 297.00 99.76 230 4.00 0.06 0.00 0.00 297.00 99.76 Phi 5 Phi 16 Phi 25 Phi 50 Phi 75 Phi 84 Phi 95 2.85 2.60 2.47 2.28 1.91 1.71 1.29 Moment Mean Phi Mean mm Sorting Skewness Kurtosis Statistics 2.16 0.22 0.5 -1.71 11.67 I11-N Granularmetric Report Depths and elevations based on measured values EN[iINEERB * Sl1RVEYORS Gahagan & Bryant Associates of North Carolina 295 -A N. Green Meadows Dr. Wilmington, NC 28405 -3933 ph 910 - 313 -3338 fax 910 - 313 -6822 Project Name: Topsail Beach Renourishment Sample Name: TOPCRK -4 #1 Analysis Date: 05 -15 -10 Analyzed B JCP y y: Easting (ft): 2,404,392 Northing (ft): 220,849 Coordinate System: North Carolina State Plane Elevation (ft): -4.6 NAVD 88 USCS: SP Munsell: Comments: Dry Weight (g): 273.60 Wash Weight (g): 273.90 Pan Retained (g): 0.40 Sieve Loss (% ): 0.11 Fines (% ): #200 - 0.15 #230 - 0.15 Organics (% ): Carbonates (% 5.80 Sieve Number Sieve Size (Phi) Sieve Size (Millimeters) Grams Retained % Weight Retained Cum. Grams Retained C. % Weight Retained 4 -2.25 4.76 0.00 0.00 0.00 0.00 7 -1.50 2.83 0.00 0.00 0.00 0.00 10 -1.00 2.00 0.00 0.00 0.00 0.00 14 -0.50 1.41 0.00 0.00 0.00 0.00 18 0.00 1.00 0.20 0.07 0.20 0.07 25 0.50 0.71 0.50 0.18 0.70 0.26 35 1.00 0.50 0.80 0.29 1.50 0.55 45 1.50 0.35 2.60 0.95 4.10 1.50 60 2.00 0.25 10.30 3.76 14.40 5.26 70 2.25 0.21 17.90 6.54 32.30 11.81 80 2.50 0.18 122.00 44.59 154.30 56.40 100 2.75 0.15 69.50 25.40 223.80 81.80 120 3.00 0.13 41.00 14.99 264.80 96.78 170 3.50 0.09 8.00 2.92 272.80 99.71 200 3.75 0.07 0.40 0.15 273.20 99.85 230 4.00 0.06 0.00 0.00 273.20 99.85 Phi 5 Phi 16 Phi 25 Phi 50 Phi 75 Phi 84 Phi 95 2.97 2.79 2.68 2.46 2.32 2.27 1.97 Moment Mean Phi Mean mm Sorting Skewness Kurtosis Statistics 2.48 0.18 0.35 -1.47 11.45 IM-4 Granularmetric Report Depths and elevations based on measured values EN[iINEERB * Sl1RVEYORS Gahagan & Bryant Associates of North Carolina 295 -A N. Green Meadows Dr. Wilmington, NC 28405 -3933 ph 910 - 313 -3338 fax 910 - 313 -6822 Project Name: Topsail Beach Renourishment Sample Name: BNKCHN -1 #1 Analysis Date: 05 -15 -10 Analyzed B JCP y y: Easting (ft): 2,408,189 Northing (ft): 222,800 Coordinate System: North Carolina State Plane Elevation (ft): -5.4 NAVD 88 USCS: Munsell: Comments: Dry Weight (g): 297.20 Wash Weight (g): 297.60 Pan Retained (g): 0.10 Sieve Loss (% ): 0.13 Fines (% ): #200 - 0.07 #230 - 0.03 Organics (% ): Carbonates (% 13.60 Sieve Number Sieve Size (Phi) Sieve Size (Millimeters) Grams Retained % Weight Retained Cum. Grams Retained C. % Weight Retained 4 -2.25 4.76 1.20 0.40 1.20 0.40 7 -1.50 2.83 2.70 0.91 3.90 1.31 10 -1.00 2.00 2.90 0.98 6.80 2.29 14 -0.50 1.41 4.70 1.58 11.50 3.87 18 0.00 1.00 6.30 2.12 17.80 5.99 25 0.50 0.71 8.10 2.73 25.90 8.71 35 1.00 0.50 16.90 5.69 42.80 14.40 45 1.50 0.35 33.00 11.10 75.80 25.50 60 2.00 0.25 70.60 23.76 146.40 49.26 70 2.25 0.21 50.00 16.82 196.40 66.08 80 2.50 0.18 56.40 18.98 252.80 85.06 100 2.75 0.15 28.30 9.52 281.10 94.58 120 3.00 0.13 12.70 4.27 293.80 98.86 170 3.50 0.09 3.00 1.01 296.80 99.87 200 3.75 0.07 0.20 0.07 297.00 99.93 230 4.00 0.06 0.10 0.03 297.10 99.97 Phi 5 Phi 16 Phi 25 Phi 50 Phi 75 Phi 84 Phi 95 2.77 2.49 2.37 2.01 1.48 1.07 -0.23 Moment Mean Phi Mean mm Sorting Skewness Kurtosis Statistics 1.77 0.29 0.89 -1.56 6.14 `INII APPENDIX A Section 4 Topsail Beach Nourishment Project Vibracore Photographs IVA a� ENGINEERS w SURVEYORS 7"77lq7 172 IMBA ENGINEERS * SURVEYORS OBA ENGINEERS * $LIRVEYORS 173 a ENGINEERS * SURVEYORS ORA ENGINEERS * SURVEYORS 174 OBA ENGINEERS * SURVEYORS A } =aim m OBA ENGINEERS * SURVEYORS OBA ENGINEERS * SURVEYORS tr� _ Al 175 GSA ENGINEERS * SURVEYORS Q ENGINEERS * SURVEYORS :• - ` -- •' KPI GOA ERGWEERS * SURVEYORS 43BA GSA ENGINEERS * SURVEYORS • f ENGINEERS * SURVEYORS ZVI F;--� L .A 177 GBA ENGINEERS * SURVEYORS ?� 3_ m an m m m m m m m m GBA GBA ENGINEERS * SURVEYORS re� 43BA ENGINEERS * SURVEYORS 178 ENGINEERS f SURVEYORS ENGINEERS * SURVEYORS ENGINEERS * SURVEYORS ENGINEERS * SURVEYORS Le 179 TBIF EIiG]H E pf25 * Sl1RVEYOI2S ELEV- 180 GSA ENGINEERS * SURVEYORS 438A ENGINEERS * SURVEYORS 181 182 GOA ENGINEERS * SURVEYORS 430A ENGINEERS * SURVEYORS 183 400A ENGINEERS * SURVEYORS GBA ENGINEERS * SURVEYORS ODA 184 GSA ENGINEERS * SURVEYORS 423A ENr,jNEERS * SURVEYORS 4- 185 430A ENGINEERS * SURVEYORS AS GBA EN$fNEERS * SURVEYORS I m 43BA ENrfNEERS * SURVEYORS m w'. . %m..%% a ENGINEERS * SURVEYORS �� -.mac. • -' V G ENGINEERS * SURVEYORS GSA ENGINEERS * SURVEYORS 187 188 GBA ow m m m ODA ENGINEERS * SURVEYORS 189 GOA ENGINEERS * SURVEYORS . _• � fir. .r • � �. - - � -. 4 ENGINEERS * SURVEYORS i. aY7, GSA ENGINEERS * SURVEYORS NEEL Kil GBA ENGINEERS * SURVEYORS 430A ENGINEERS * SURVEYORS mommm on ODA ENGINEERS * SURVEYORS • + SL Iff, 193 a� ENGINEERS * SURVEYORS . -pia -�°� •r n•s-. "�.t' '� ------�- GSA ENGINEERS * SURVEYORS ---- 194 43BA ENGINEERS * SURVEYORS 195 GSA ENGINEERS * SURVEYORS 43BA li ENGINEERS * SURVEYORS %- lam' a ENGINEERS * SURVEYORS - -mmmm- . m 430A ENGINEERS * SURVEYORS KPI 430A ENGINEERS * SURVEYORS . . m UPSAIL =BEACH - 'DPSAIL- CREEK =Trsarpie _r EV- NAVD88- ❑PSAIL =BEACH - 'OPSAIL-CREEK - - TOPCRK -i - ELEVNAVD$8- TOPSAIL '--BEACH TOPSAIL CREEK TOPCRK -1 C� ►1 1•I•� OPSAIL =BEACH 'OPSAIL- CREEK = TOPCRK -1 -- - - ::La-ELEV=.NAVD'.8-W----- OPSAIL =BEACH OPSAIL CREEK TOPCRK -I=- I6.o'- = IB:O•= SAIL =BEACH _- SAIL CREEK UF'SAIL -BEACH - 'DPSAIt -CREEK I UP5AIL= BEACH - -- TDPSAIL CREEK - - ELEV =NAVD88_ DPSAIL= BEA-CH TDPSAIt CREEK= TDP,CRK -Z- - - _s:a` =- = 10.0•— - ELEV NAVD88 -- On^ ENGINEERS * SURVEYORS - - - - - - - - - - - - - - - - - - - - 408A ENGINEERS * SURVEYORS 200 ENGINEERS * SURVEYORS V - - - - - - - - - - TOPSAIL =BEACH MF I OPSAIL-CREek TOP,CRK -3 _ OPSAIL =BEACH 'OPSAIL CREEK - TOPCRK -3 -- Ur5A1L -t LACH— - 'OPSAIL CREEK --TnPCRk -� -- V o8$ ENGINEERS * SURVEYORS 202 428A i ENGINEERS * SURVEYORS =�fM Mti mmmm m m �aA ENGINEERS * SURVEYORS - - EMOINEERS * SURVEYORS mYmYm m m 203 ENGINEERS * SURV @TORS R 204 ENGINEERS * SURVEYORS V QPSAIL=BEACH- ANKS�CHANNEL- 6NKCHN -1 - -- -5.4 -- �-ELEV- NAV088- - 4NKS�CHANNEL - = HNKCHN -i t!LM- mttAC -H S-CHANNEL� - IKCHN -1 1= NAVD8$ _■ml i- CHANNEL �V :NAV DB�� as^ ENGINEERS * SURVEVORy MOM 206 ENGINEERS • SURVEyc as