Loading...
HomeMy WebLinkAbout20191758 Ver 1_Permit Drawings_20190918_20200309See Sheet 9-A For Index of Sheets See Sheet 9-B for Conventlonal Symbols TATE OF NORTH CAROL INA DIVISION OF HIGHWAYS O MARTIN COUNTY S LOCATION. BRIDGE No.71 OVER FLAT SWAMP ON SR H59 TYPE OF WORK: GRADING, DRAINAGE, PAVING, STRUCTURES. WETLAND AND SURFACE WATER IMPACTS PERMIT BEGIN PROJECT 17BP.1.R.86 -L- STA.15 + 00.00 TO SR 11M MEEKS RD. o CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD II. c w, THIS PROJECT IS NOT WITHIN ANY MUNICIPAL BOUNDARIES. N � H �V D n t a i 0 0 P O o � (Vo O ON P LL a FLAT SWAMP FLAT SWAMP END —L— TO ROBERSONFILLE 1159 FLATSWAMP RD QJECT 17BP.I.R.86 -L- STA.18 + 80.00 11 erwrn. 9'1'wTe PaQ1B1,T MIIBR6NC6 raw sxen I�T.�17BP.1.R.86 1713P.1.R.86 PE PERMIT DRAWING SHEET 1 OF 4 NNE NOTE: NO DECK DRAINS ON BRIDGE DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED Prepared in the OJJtce of. Prepared f r: GRAPHIC SCALES DESIGN DATA PROJECT LENGTH ETHERILL HYDRAULICS ENGINEER CAq ADT 2015 — 1,100 ENGINEERING DIVISION OF HIGHWAYS DIVISION I op?.•••55 :�/y ? �OFE °,:> moor $0 25 0 50 100 1223 Jones Franklin Rd. Raleigh, N.C. 27606 113 Ai,port Drive > 4 SEAL o� Q ADT = K = % D = % LENGTH ROADWAY PROJECT 17BP.1.R.86 = 0.058 MILES License No. F-0377 Bus: 919.851.8077 Fax: 919.851.8107 Edenton NC, 27935 i 23999 NE�:•' �°r 9X "5 �o 2012 STANDARD SPECIFICATIONS'•.!'G BOB A. MAY, PE PLANS RIGHT OF WAY DATE: PROJECT ENGINEER LENGTH STRUCTURE PROJECT 17BP.1.R.86 = 0.014 MILES 50 25 0 50 100 T = % * V = 60 MPH * TTST = % DUAL = % DUNE 20, 2019 ROADWAY DESIGN ."N aRar• ENGINEER c °0;1•• • %''% n a TOTAL LENGTH PROJECT 17BP.1.R.86 = 0.072 MILES LETTING DATE: NOVEMBER 20, 2019 ROBERT O'DELL JR. PROFILE (HORIZONTAL) PROJECT DESIGN ENGINEER 10 5 0 10 20 FUNC. CLASS = LOCAL (Subregional Tier) 21116 ppp� RYAN SHOOK,o' NCDOT CONTACT: DIVISION PROJECT ENGINEER PROFILE (VERTICAL) z 0 N -L- PC Sto.10+00.00 -L- PT Sto. 11+46.42 -L- PC Sto. 11+61J9 BARBARA JAMES)'ET AL I CLASS II RIP RAP \ WOODS �e `� I TO SHLD. PT. (TYP.) \ WOODS I TO SR //� 60 REEKS RD. ISTINC R/W .. %ISTING R/W ------------------ _ SR 1159 FLAT SWAMP ROAD 2/'PAVED ROADWAY _T- - - - - - - - - -- - -- - - .X- .. _. .. .. .. _. EXISTING R/W EXISTING R/W 0� 1 \� w000s R c BARBARA JAMES, ET AL -L- PT Sta. /3+33.43 -L- PC Sta. 14+74.93 µ�i� (sEWDETyL A) ITcry T C+- IG 10'J DC 100, 0' 100, GRAPHIC SCALE BEGIN GRADE BEG INL-GR.ADEO.00 6c —L— STA. 15 + 0 0 EL = 46.99 DETAIL A I SPECIAL CUT DITCH IABANDONEDI Notw SmI I Front S. tG! .1 4'3 0T Slope - .cend 3./ D F\wee A. Min. D=1.5 Ft. FROM STA. 15+50 TO STA. 16+55 -L- RT. \ CLASS II RIP RAP TO SHLD PT (TYP) - - 1223 Jones Franklin Rd. PROJECT REFERENCE NO. SHEET NO. YE THHERILL Raleigh, N.C. 27606 ENGINEERING License No. F-0377 17BFJ.R.86 4 RM1V SHEET NO. BUS: 919 8518077 Fax: 919 851 8107 ROADWAY DESIGN TRANSPORTATION PLANNING/DESIGN- BRIDGE/STRUCTURE DESIGN ENGINEERT��S CIVIUSITE DESIGN - GIS/GPS - CONSTRUCTION OBSERVATION -L- PT Sta.21+98.14 FLAT SWAMP STRDETDRE —L— PC Sta. 19+17.80 r r EGN O EST 50 50 CY woogs� I EUGENE ROBERSON WOODS \ 115'DOMIrvION PONER EASEMENT JR E .. 1 E -- PYL1O -- UPPOfitT — —T— — B 2GI -- — —T— - -- 2 �F W E DEJ ' �F ` J I WOODS m sT.TN r F WOODS LAT SWA EST.S SY GEOTE% - IIE'DOMINION ➢m WOOD W POWER EASEMENT I o STxu'EM E-YATION EST- C 1 - BRIDGE ^71 _ 3-SPAN CONCRETE AND WOOD WITH 4 WOODEN WINGWALLS LOW WOOD BEAM=45.93' TOP OF WATER TO LOW BEAM BRIDGE CLEARANCE=7.02' THE HISTORIC HIGH WATER MARK COULD NOT BE DETERMINED BY PHYSICAL OR PAROLE EVIDENCE ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ WE NOON■■■ W.M. ■■■■NONEIN iiioiiolilili� Iy •11 i■PI 15 7:Srlro�un II ■�-------------�EE■1 E rrm■1<Ti—nniiiiiii■■■■ EL 47.26'EI! I I I[!I' ■F7 L EI[71Id1111181 ■E IVC 80'Ia!Tosiiilow iiio mr■1 . rtrlEaaa•mmum rrE■rE■rr■rrrr■E■1 ■■■■■■■■■■■■■■■■■■■■■■■■ ........................ EE . --EMI 10 11 12 13 14 15 16 ■■■■■■■■■EEEEEEEEEE■ 1■i'a imm■■■■■■■■■■■■ENONE EE■ ■■■■■■■■ ■■NONE NOON ■■■I ■■I 1■Zo■uu■■■■■■■■■■■■■ we "JI■L\c�■■■■EEEEE■ i•1JiA■E■■■■EEEEE■ 1■E�71L1M. ■■■■EEEEE■ on 00 00 ME lmomm ..EN■.■. ii 020 ; -- - - - ---NEI MEN MEN ----------W■■■■■■■E■■■■■I ■■■■■■■■■l ■i. �■■■■■■■■■■I ��t1, A • w :■■::■■:::1 ■■■����IIII .�--�.---; iii 11 iii I iii ., mum ■■■EE■E ■■.EEEEEI mom / ■■■■iii ■■■■■11 ■■■■E■1 I ■■■I ■■■I E■■■■■■■■1 ■■■■■■1 ■■■I • SUC Ht UIUNAL l 1t H MEETS WITHIN 20MPH 17 18 19 20 O EUGENE ROBERSON TO ROBERSONVILLE R 1159 FLAT I,SWAMP ROPD 20' PAVED ROAf1rNAY CULTIVATED -L- POT Sto. 23+40.49 PERMIT DRAWING SHEET 2 OF 4 SEE SHEET Sl— THRU S—? FOR STRUCTURE PLANS SKETCH SHOWING PAVEMENT /STRUCTURE RELATIONSHIP BEG. BRIDGE END BRIDGE —L— STA. 16+38.32 —L— STA. 17+08.32 GREU TL-3 PE -III TYP III GREU TL-3 211 GREU TL-3 TYPE -II TYPE -III GREU TL-3 -L- PT SI115T•82515 N JC46V,-E BEG. APP. SLAB END APP. SLAB -L- STA. 16+26.32 -L- STA. 17+20.32 BRIDGE HYDRAULIC DATA DESIGN DISCHARGE = 1400 CFS DESIGN FREQUENCY = 25 YRS DESIGN HW ELEVATION = 45.4 FT BASE DISCHARGE = 2100 CFS BASE FREQUENCY = l00 YRS BASE HW ELEVATION = 46.3 FT OVERTOPPING DISCHARGE = 2400 CFS OVERTOPPING FREQUENCY= 100+ YRS OVERTOPPING ELEVATION = 46.5 FT = FT DATE OF SURVEY = 11712019 W.S. ELEVATION AT DATE OF SURVEY = 39.7 FT 21 22 23 50 40 30 20 10 WETLAND PERMIT IMPACT SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Site No. Station (From/To) Structure Size / Type Permanent Fill In Wetlands (ac) Temp. Fill In Wetlands (ac) Excavation in Wetlands (ac) Mechanized Clearing in Wetlands (ac) Hand Clearing in Wetlands (ac) Permanent SW impacts (ac) Temp. SW impacts (ac) Existing Channel Impacts Permanent (ft) Existing Channel Impacts Temp. (ft) Natural Stream Design (ft) 1 -L- 16+37 to 17+09 72' Bridge (no impacts) TOTALS*: 0 0 0 *Rounded totals are sum of actual impacts NOTES: 2013 1024