Loading...
HomeMy WebLinkAboutWQ0041452_Application (FTSE)_202001221 1 k lt DW R _ a a, S State of North Carolina Dcp• rtment of Environmental Quality Division of Water Resources 15A NCAC 02T .0300 — FAST TRACT: SEWER SYSTEM EXTENSION APPLICATION Division of Water Resources FTA 04-16 & SUPPORTING DOCUMENTATION Application Number: W d V _ I t y (to be completed by DWR) All items must be completed or the nnnlicution will be returned 1. APPLICANT INFORMATION: 1. Applicant's name: B&B Country Inn. LLC (company. municipality. HOA. utility. etc.) 2. Applicant type: ❑ Individual ❑ Corporation ❑ General Partnership ❑ Privately -Owned Public Utility ❑ Federal ❑ State. Count% ❑ Municipal ® Other 3. Signature authority's name: Joe Bert~ hill per I5A NCAC 021" .0106(h) Title: Owner 4. Applicant's mailing address: 705 Bermhill Rd Citv: Roxboro State: NC Zip: 27574-� 5. Applicant's contact information: Phone number: (316) 598-I 144 Email Address: hobfarm.ircenturvlink.net 11. PROJECT INFORMATION: I. Project name: B&B Country Inn RV Park 2. Application.Troject status: ® Proposed (Ne%% Permit) ❑ Gxisting Permit/Project If a modification. provide the existing permit number: WQ00 and issued date: If new construction but part ol'a master plan. provide the existing permit number: WQ00 3. County Where project is located: Person 4. Approximate Coordinates (Decimal Degrees): Latitude: 30.450563" Longitude:-78.935754 5. Parcel I D (if applicable): 0918-00-82-6456 (or Parcel ID to closest downstream sewer) III. CONSULTANT INFORMATION: L Professional Engineer: Matt Hastings License Number: 38098 First: Summit Desittin and Engineering Services Mailing address: 606 Broad Street, Suite C City: South Boston State: VA zip: 24592- Phone number: (434) 579-4604 Email Address: matt.hastines-u,summitdc.net IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORiNIATION: I. Facility Name: City of Roxboro W WTP Permit Number: NCO021024 Owner Name: Citv of Roxboro V. RECEIVING DOWNSTREAM SEWER INFORMATION (if different than WWTF): I. Permit Number(s): WQ ----- Downstream (Receiving) Se%%er Size: 8 inch Svslcm_Wide Collection S%,stem Permit Number(s) (ifapplicahle): WQCS00048 Owner Name(s): City of Roxboro rORIVI: FTA 04-16 Page I of5 THE COMPLETED APPLICATION PACKAGE INCLDING ALL SUPPORTING INFORMATION AND MATERIALS, SHOULD BE SENT TO THE APPROPRIATE REGIONAL OFFICE: REGIONAL OFFICE ADDRESS COUNTIES SERVED Asheville Regional Office 2090 US Highway 70 Avery, Buncombe, Burke, Caldwell, Cherokee, Water Duality Section_ Swannanoa, North Carolina 28778 Clay, Graham, Haywood, Henderson, Jackson, (828) 296-4500 Macon, Madison, McDowell, Mitchell, Polk, (828) 299-7043 Fax Rutherford, Swain, Transylvania, Yancey Fayetteville Regional Office 225 Green Street Suite 714 Anson, Bladen, Cumberland, Harnett, Hoke, Water Quality Section Fayetteville, North Carolina 28301-5094 Montgomery, Moore, Robeson, Richmond, (910) 433-3300 Sampson, Scotland (910)486-0707 Fax Alexander, Cabarrus, Catawba, Cleveland, Mooresville Regional Office 610 E. Center Avenue Water Quality Section Mooresville, North Carolina 28115 Gaston, Iredell, Lincoln, Mecklenburg, Rowan, (704) 663-1699 Stanly, Union (704)663-6040 Fax Raleigh Regional Office 1628 Mail Service Center Chatham, Durham, Edgecombe, Franklin, Water Quality Section Raleigh, North Carolina 27699-1628 Granville, Halifax, Johnston, Lee, Nash, (919) 791-4200 Northampton, Orange, Person, Vance, Wake, (919) 788-7159 Fax Warren, Wilson Washington Regional Office 943 Washington Square Mall Beaufort, Bertie, Camden, Chowan, Craven, Water Quality Section Washington, North Carolina 27889 Currituck, Dare, Gates, Greene, Hertford, Hyde, (252) 946-6481 Jones, Lenoir, Martin, Pamlico, Pasquotank, (252) 975-3716 Fax Perquimans, Pitt, Tyrrell, Washington, Wayne Wilmington Regional Office 127 Cardinal Drive Extension Brunswick, Carteret, Columbus, Duplin, New Water Quality Section Wilmington, North Carolina 28405 Hanover, Onslow, Pender (910)796-7215 (910)350-2004 Fax Winston-Salem Regional Office 450 W. Hanes Mill Road Alamance, Allegheny, Ashe, Caswell, Davidson, Water Quality Section Suite 300 Davie, Forsyth, Guilford, Rockingham, Randolph, Winston-Salem, North Carolina 27105 Stokes, Suny, Watauga, Wilkes, Yadkin (336)776-9800 3 3 VI. GENERAL REQUIREMENTS I. I f the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and ]Necessity been attached'? [:]Yes ❑No ®NfA 2. If the Applicant is a Developer of lots to be sold, has a Dc%eloner's_Operational Agreement (Fnittil: DEN) been attached? ❑ Yes [-]No ®N/A 3. If the Applicant is a Home/Property Owners' Association. has an Operational Agreement FORM: HOA been attached? [:]Yes [:]No ON. -'A 4. Origin of►waste►cater: (check all that apply): ❑ Residential Owned ❑ Retail (stores. centers, malls) ❑ Car Wash ® Residential Leased ❑ Retail ►►ith food preparation service ❑ Hotel and'or Motels ❑ School / preschool / day care ❑ Medical ; dental ; %eterinarw facilities ❑ Swimming Pool ;Clubhouse ❑ Food and drink facilities ❑ Church ❑ swimming Poollrilter Backwash ❑ Businesses / offices / factories ❑ Nursing Home ❑ Other (Explain in Attachment) 5. Nature ofwastewater: 100 % Domestic/Commercial % Commercial % Industrial (see 15A NCAC 02'r .0103(2O)) 'Is there a Pretreatment Program in effect? ❑ Yes ® No 6. Has a Ilo►v reduction been approved under 15A NCAC 02 r .0114 I ? ❑ Yes ©Na Irves, provide n conv_of flow reduction approval letter 7. Summarize wastewater generated by project: Establishment Type (see 02T.0114(f) Daily Design Flow °'' No. of Units Flow RV Sites 100 gal/day III 11.100 GPD Cabins 240 gal/day 5 1.200 GPD gal/day GPD gal/day GPD gal/ GPD gal/ GPD Total 12.300 GPD I/ a See 15A NCAC 02T .0114(b). d e I and e 2 l'or caveats to ►wastc►tater design flow rates (i.e., minimum flow per dwelling: proposed unknown non-residential development uses; public access facilities located near high public use areas; and residential property located south or cast of -the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G.S. 42A-4). b Per 15A NCAC 02T .0I 14(c), design flow rates for establishments not identified [in table 15A NCAC 02T.01141 shall be determined using available flow data, water using fixtures. occupancy or operation patterns, and other measured data. 8. Wastewater generated by project: 12,300 GPD (per 15A NCAC 02T .0114) / ;� Do not include future flo►►s or previously permitted allocations ✓ If permitted flow is zero, indicate why: ❑ Pump Station or Gravity Sever where Ilo►► will be permitted in subsequent permits that connect to this line ❑ Flow has already been allocated in Permit Number: ❑ Rehabilitation or replacement of existing sewer with no ne►w flow expected ❑ Other (Explain): FORNI: FTA 04-16 Page 2 of VII. GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T .0305 & i11DC (Gravity Sewers)- 1. Summarize gravity sewer to be permitted: Size (inches) Length (feet) Material 8 1588 PVC 6 3466 PVC Section It & III of the MDC for Permitting of Gravity Sewers contains information related to design criteria Section III contains information related to minimum slopes for gravity sewer(s) Oversizing lines to meet minimum slope requirement is not allowed and a violation of the MDC Vill. PUMP STATION DESIGN CRITERIA (If Applicable) —02T .0305 & MDC (Pump Stations/Force plains): COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT 1. Pump station number or name: 2. Approximate Coordinates (Decimal Degrees): Latitude: Longitude: - 3. Design Slow of the pump station: __ millions gallons per day (firm capacity) 4. Operational point(s) of the pump(s): gallons per minute at feet total dynamic head (TDH) 5. Summarize the force main to be permitted (for this Pump Station): Size (inches) Length (feet) Material 6. Power reliability in accordance with 15A NCAC 02T_.0305(h)(1): ❑ Standby power source or pump with automatic activation and telemetry - 15A NCAC 02T .0305(h)(1)(B)_ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day i► Must be permanent to facility Or if the pump station has an average daily flow less than 15,000 gallons per day: ❑ Portable power source with manual activation, quick -connection receptacle and telemetry - I SA NCAC 02T .0305(h)(1)(C) or ❑ Portable pumping unit with plugged emergency pump connection and telemetry - 15A NCAC 02T .0305(h)(1)(C): i It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant (draft agreement) and is compatible with the station. i If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided in the case of a multiple station power outage. 16 3 5 IX. SETBACKS & SEPARATIONS — (02B .0200 & 15A NCAC 02T .0305(f)): 1. Does the project comply with all separations found in 15A NCAC 02T .0305(f) & (L) ®Yes ❑ No i l5A NCAC 02T.0305tf) contains minimum senarations that shall he nrnvided fnr sewer vuRtemc- Setback Parameter* Separation Required Storm sewers and other utilities not listed below (vertical) 24 inches Water mains (vertical -water over sewer including in benched trenches) 18 inches Water mains (horizontal) 10 feet Reclaimed water lines (vertical - reclaimed over sewer) 18 inches Reclaimed water lines horizontal - reclaimed over sewer) 2 feet "Any private or public water supply source, including any wells, WS-1 waters of Class 1 or Class It impounded reservoirs used as a source of drinking water 100 feet **Waters classified WS (except WS-I or WS-V), B, SA, ORW, HQW, or SB from normal high water (or tide elevation) and wetlands (see item IX.2) 50 feet **Any other stream, lake, impoundment, or ground water lowering and surface drainage ditches 10 feet Any building foundation 5 feet Any basement 10 feet Top slope of embankment or cuts of 2 feel or more vertical height 10 feet Drainage systems and interceptor drains 5 feet Any swimming pools 10 feet Final earth grade (vertical) 36 inches i 15A NCAC 02T.0305(e) contains alternatives where separations in 02T_0305(f) cannot be achieved. i **Stream classifications can be identified using the Division's NC Surface Water Classifications webpage > If noncompliance with 02T.0305(f) or (L). see Section X of this application 2. Does the project comply with separation requirements for wetlands? (50 feet of separation) ®Yes ❑ No ❑ NrA See the Division's draft separation requirements for situations where separation cannot be meet i No variance is required if the alternative design criteria specified is utilized in design and construction %- As built documents should reference the location of areas effected 3. Does the project comply with setbacks found in the river basin rules per 15A NCAC 02B .0200? ® Yes ❑ No ❑ WA This would include Trout Buffered Streams per 15A NCAC 213.0202 4. Does the project require coverage,'authorization under a 404 Nationwide or ® Yes ❑ No individual permits or 401 Water Quality Certifications? Information can be obtained from the 401 & Buffer Permitting Branch 5. Does project comply with 15.A NCAC 02T_0105(c)16) (additional permits. —'certifications)? ® Yes ❑ No Per 15A NCAC_ 02T.0105(c)(6), directly related environmental permits or certification applications arc being prepared, have been applied for, or have been obtained, Issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans, stormwater management plans, etc.)_ 6. Does this project include any sewer collection lines that are deemed "high -priority?" Per 15A NCAC 02T.0402, "high -priority sewer" means "any aerial sewer, sewer contacting surface waters, siphon, or sewer positioned parallel to streambanks that is subject to erosion that undermines or deteriorates the sewer. [:]Yes ® No ❑ N;'A i If yes, include an attachment with details for each line, including type (aerial line, size, material, and location). High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections documented per 15A NCAC 02T.0403(a)(5) or the permitee's individual System -Wide Collection permit. 16 4 5 X. CERTIFICATIONS: I Does the submitted system comply with 15A NCAC 02T the Minimum lhsian C itcrvi for the Permittrnyat' pump suilions and Puree Mains tWag vcrsiun and the Gravin Sever Nliaunurit De it � C rideria t11te5t repel{ant as applicable? ® Yes ❑ No IfNo, complete and submit the Variance/Alternative Design Request application (VADC 10-14) and supporting documents for review. Annrov_sl of the request k required prior to submittal of the Fast Track Application and supporting documeal. 2. Professional Fnrineer's Certification. sname from Application Item Ill.1.) that this application for has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications, engineering calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains (latest version). Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design. NOTE — In accordance with General Statutes 143-215.6A and I43-215.6B, any person who knowingly makes any false statement, representation, or cerification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed 510,000, as well as civil penalties up to S25,000 per violation. North Carolina Professional Engineer's seal, signature, and date: ��� .fit i CARO i SEAL 1: 8809" r- r-y`tcrIo3�° 3. Applicant's Certification per 15A NCAC 02T .0106(b): attest that this application far name & title from Application Item 13.) has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if aII required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. I understand that any discharge of wastewater from this non - discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties, injunctive relief, and/or criminal prosecution- I will make no claim against the Division of Water Resources should a condition of this permit be violated. I also understand that if all required parts of this application package are not completed and that if all required supporting information and attachments are not included, ibis application package will be returned to me as incomplete. NOTE — In accordance with General Statutes 143 215.6A and 143-2I5.6B. any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which Fay include a fine not in exceed S 10.000 as well as civil penalties up to S25,000 per violation. Signature: - - } Date: 16.p} FORM: l:TA 04-16 Page 5 of 5 State of North Carolina Department of Environmental Quality Division of Water Resources Flow Tracking for Sewer Extension Applications (FTSE 10-18) Entity Requesting Allocation: B & B Country inn, LLC Project Name for which flow is being requested: B & B Country Inn - RV Park More than one FINE may be required fur a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: Roxboro Wastewater Treatment Facility b. WWTP Facility Permit 9: NC0021024 A11 flows are i►t MGD c. WWTP facility's permitted flow 5.0 d. Estimated obligated flow not yet tributary to the WWTP 0.033 e. WWTP facility's actual avg. flow 2.03 f. Total flow for this specific request 0.014 g. Total actual and obligated flows to the facility 2.077 It. Percent of permitted flow used 41.54 II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP- (A) (B) (C) (D)=(B+C) (E)=(A-D) Design Average Approx. Obligated, Total Pump Daily Current Not Yet Current Flow Pump Station Station Firm Flog•** Avg. Daily Tributary Plus (Name or Permit Capacity, (Firm! p0, Flow, Daily Flow, Obligated Available Number) No. MGD MGD MGD MGD Flow Capacity*** Arrowwood 0.15 0.375 0.063 0.0 0.063 0.087 * The Firm Capacity (design flow) of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service, ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria. ty *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Downstream Facility Name (Sewer)- Roxboro Wastewater Treatment Facility Downstream Permit Dumber: NC0021024 Page I of 6 FTSE 10-18 SUP mr■ JCD 7' �i' �, .1 �rt� � pit• ri "U*4 D ws:Nmire en+n<c SHEiT KO ZIP Cnati'my Inspired - iechnlGally Fsocutod 1 �J1, _11 I�j W4 Meadowland Dr CALCULATED ar 1)lnh= - L, DA E— Hillsao•ourh NC27279 REV 03/03/20 Ph; 919.732-3883 fait; 919.732.6676 CHECKED BY DATE www.summltdo.not E U7F t LrA7A.»� C i VZL �5U E-lf _ �14� kf locj i�!'30a• ('P1� l poi -Lj f�crtlnw� - fa, 3°a'=rF Ef X ���l�f.J1� _ 0•J ��j �S ��r 111. Certification State ment: I I)PREk) certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form certifies that the receiving collection system or treatment works has adequate capacity to transport and treat the proposed new wastewater. rgning Official Signature D to r u� U L 5FI6, tl. w-E-S Title of Signing Official Page 2of6 h1 SE 10-18 State of North Carolina DWP Department of Environmental Quality Division of Water Resources Division of Water Resources Watershed Classification Attachment (WSCAS 01-15) These instructions are to be used when completing form WSCAS for sewer extension projects. Identifying stream classifications that are affected by the project is necessary: • To determine/confirm the minimum separation distance of sewer system components from classified waters as specified in 15A NCAC 2T .0305(f) • To determine/confirm any applicable river basin rules that may affect sewer system components If any portion of the sewer extension comes within 100 feet of any surface water (waterbody) or wetland a completed form is required. Determine the names of surface waters within 100 feet of the project or along the project route and utilize either of the below options to determine stream classification: Finding Stream Classifications (Man or List) A map with designated streams and their associated classifications can be obtained at: http://ncdenr maps arcgis com ands/webappviewer/index.html7id=Ge125ad762gf494694e259c8Odd64265 • Find/select the waterbody and record the river basin(s), stream index number and classifications applicable to the project on the form or A listing of stream classifications based on river basin can be obtained at: httoa/portal.ncdenr.org/web/wq/psLcsu/classifications (see left hand side of webpage) • Select the river basin(s) (hydrological or alphabetically sorted) where your project is located • Locate the name of the identified waterbody on the list for the selected basin • For multiple listings of the same waterbody name in the report, select and verify the location description. The term "source" in the description means the beginning of the waterbody segment (most upstream point) • Record the river basin(s), stream index number and classification applicable to the project on the form Submittal Instructions Label any unnamed tributaries as "UT to stream name" as the waterbody name on form per 15A NCAC 02B .0301(i). See page 2 for additional notes on unnamed streams. Submit a color copy of a USGS Topographic Map to identify the project area and surface waters. Each map or maps must show the location of the sewer system and include location identifiers where the system traverses over or near waterbodies. The map should have location ID's for each different waterbody and corresponding classifications should be recorded. **Note that these instructions do not need to be submitted** MISCELLANEOUS SUPPORTING DOCUMENTS V., v L.A .O 2 tO 4 ex, te:jj[)/'j4j2013 36126'57m92' N 7RO56'09.79* W of" .562 ft SOSID. 1697285 Date Filed: -NIU2111H 8:13:110 ANI Elaine F. Marshall North Carolina Secretary of State State of Nonh Carolina Department of the Secretary of State C2018 108 02527 Limited Liability Company ARTICLES OF ORGANIZATION Pursuant to §57D-2-20 of the General Statutes of North Carolina, the undersigned does hereby submit these Articles of Organization for the purpose of forming a hmited liability company, I. The name of the limited liability company is: B&B Countryi n n, LLC (See Item Iof the instructions for appropriate entity dMgnaiton) 2. The name and address of each person executing these articles of organization is as follows: {State whether each person is executing these articles of organization in die capacity of member, organizer or both by checking all onnlinel+ln L,... %7►. T6:. a��.._ ...—.. I._ —_. A L- .1 , Name Business Address Capacity Eugene C. Berryhill Jr, 705 Berryhill Rd, Roxboro, NC 27574 AMember MOrganizer Joseph B. Berryhill 705 Berryhill Rd, Roxboro NC 27574 ❑>>Member MOrganizer ❑Member []Organizer 3. The name of the initial registered agent is: Eugene C. Berryhill Jr. 4. The street address and county of the initial registered agent office of the limited liability company is; Number and strut 705 Berryhill Rd. city Roxboro State: NC Zip Code; 27574 County Person 5. The mailing_ address, if different from the street address, of the initial registered agent office is: Number and Street City State. KC Zip Code: _ County: 6. Principal office information; (Select either a or b.) a. f✓ The limited liability company has a principal office. ,! The principal office telephone number: 336-597-2584 The street address and county of the principal office of the limited liability company is: Number and street. 705 Berryhill Rd. city; Roxboro NC State; zip cede: 27574 county: Person BUSINESS REGISTRATION DIVISION P_O. BOX 29622 Raleigh, NC 27626-0622 (Revised august. 2017) Forrn L•01 7 S The mailine address, if different from the street address, of the principal office of the company is: Number and Street: City: State: Zip Code: County: b. ❑ The limited liability company does not have a principal office Any other provisions which the limited liability company elects to include (e.g., the purpose of the entity) are attached. (Optional): Listing of Company Officials (See instructions on the importance of listing the company officials in the 9_ (Optional): Please provide a business e-mail address PCIVaCN Redaction The Secretary of State's Office will a -mail the business automatically at tiic addicss provided above at no cost when a document is fired. The e-mail provided will not be viewable on the w•ebsiie. For more information an why this service is offered, please see the instructions for this document. 10, These articles will be effective upon filing, unless a future date is specified - This is the 12 day of Apnl 12018 Lawz C_ _&�k k- Signature ELgene C. Sarryhill Jr. Member C710 Type or Print Namc and Title The below space to be used if more than one organizer or member is listed in Item #2 above. A 46 Z"±1 �11- Signature Joseph B. Berryhill Member con Ty—peand Print l ame an Title Signature, Type and Pnnt Name and Title NOTE: 1. Filing fee is S 125. This document must be filed with the Secretary' of State. BUSINESS REGISTRATION DIVISION P.O. BOX 29622 Raleigh, NC 27626-0622 (Revised August 2017) Farm L-01 G15 Dapimment Homepagee ���' #�-�• 's•�*"��`�e+tea ���i. ,•4 *fr : i, 'J�, +' L '�. qa ,Y* .'Y ii °1`�{ .. . f "''y•Y'� raw w e } :�r t 4_••U,yyi. ya•Kti :;�.ti ��i • S P y �i F' r �S�.H=��1(LF h' +}.. � _ Ta�- ��Y.-.' 3''ht�y„i���•�r"'rt• T�:*� '.'±T�r,t r#^ 1'. Si �i� + .r ,�=c-,' ; V f `r�I +�'rl�:J'7L'C 1�fi�•�4w }7+• 7�"i61'��� �'. +y�� �L{.a#lam �r' '.'�'Y,✓� �:':`:y��/i,'�rrttz rr^ P� .,may J5 �'Y� • _%� Latitude and Longitude of a Point a «�. Clear! Resat Remove Last B,ue Marker Center Red Marker Get the Latitude and Longitude of a Point W;on you uck an Inc map, move lho marker or enter an address 11to iat rude and Sang Wde cocrdinates of the point are msel"ed to the boxes 1ur'c51 LaldudenJ575F3 LorNJdude FFF5357ri F#; Show Point from Latitude and Longitude USe fts if you knmw tho tat -ludo and Iongrluclo coordinates of a Pa1nt and want to Use: + lot N Lat or E Lorw - for S Lat or W Long Example:.40 GGWC;;0 •74 044G36 Nate: Your entef should not have any embedded Spates DecimalONg Latitude Deumai Deg Lon%ludo Straw N;nt TOPOI map printed an 04/12/19 from " Untitled. tp&' z NATIONAL 11 af 1-7 r 4-n GEOGRAPHIC M 6-M 9R 04VEVII) 04 12 2019 02.45 OWNERSHIP 5413117 1 PROPERTY DESCRIPTION TAX DESCRIPTION MAP NUMBER RD7! B & B COUNTRY INN LLC '26.45 ACRES WOODSDALE A58 74 RECORD NUMBER' 452 705 BERRYHILL RD PLATBOOKIPAGE/DATE 16 580 ROUTE: WO 110 014 ROXBORO, NC 27574 -674 2 DEED: 979 647 5 11 2018 NB: 00000 00000 77 000 BOSTON RD ROXBORO LISTER: PLC 11/S/2014 REVIEWER: PLC 116 2014 TOPO STREET I NOTES I AC NBHD I ICHGD LAND F15 1 264500 , LAND CLASS SIZE_EIASERATE • ACF • AQ] . AD] RATE _ UNI'i'5 = LNOVALUR I21XCLEARED1 1.150 3375 1.OS 1.00 3544. 1.150 407 2 31XWOODED 1 25.300 1689 1.0f 1.0 1772' 25.300 4483 ACREAGE FACTOR: FRONTAGE FACTOR: LAND VALUE 4890 !t OTHER FEATURES i SIZE � BASERAT—ETCOND t AQ] RATE UNITS VALUE — L OTHER FEATURES VALUE: FOUNDATION XTR_XTRNISH ROOF TYPE ROOF MTRL SIZE/QTY STHT BDRM WALL FIN IH FL HEAT&AIR HEAT F EL BLDIN iF IMPROVEMENT TYPE: GRADE: I AYB: EYB:j I CONDITION: DIMENSIONS: STRUCTURE SKETCH -SF}• STHT = AREA RATE 'If GRDE + HEAT +' EXWL I' WLHT =11AD]RATE ' AREA = RPCN • DEPF • CNDF=.TR-VALU HSF T5F RPCN-/HSF VALU-/H5F STRUCTURE VALUE CARD VALUE 48908 VALUATION THIS CARD + OTHER CARD = VALUE PREY-VAL P-N% OTHER CARDS VALUE LAND 48908 48908 14100 0.29 TOTAL VALUE 4890 OTHER FEAT 0 0 0 000 STRUCTURE 0 0 0 000 T TAL 4B908 48908 14100 3,47 TAX YEAR: 2019 APPRAISED VALUE 4890 Person n N REV LYEAR.2013 DEFERRED VALUE 0 TAXABLE VALUE 4R94 Find Your HUC 12 Diz-A HUC (5,-,waarshrd) aswlwos 27 .01 N' }ygrm,+Jlcr HAnn+fc '.d 1 yra• k�. r �� » t'aC" a rr. Ca H, �w• *c P,ey - c•� v -i��. .. y,.;.. �.t .crlan �EC;Cti :.'] �E7 a.pr �+ , �r'+t,Yi Ira-Y^+-cam•*�r+p+-� h,a++�l'+la I:�t+erau .. M'. Y}� a'r. a KISUMt4lT DESIGN AND ENGINEERING SERVICES SANITARY SEWER SUBMITTAL DOCUMENTS B&B COUNTRY INN, LLC. RV PARK PROJECT#: 18-0226 ORIGINAL SUBMITTAL: DECEMBFR 2019 REVISED 03/03/2020 OWNERIAPPLICANT: B&B COUNTRY INN, LLC ENGINEER/CONSULTANT: Matt Hastings, PE Summit Design and Engineering 606 Broad Street, Suite C South Boston, VA 24589 P (434)5794604 / f (434)575-0617 tnan.hast ings it sumin iide.net SUMMARY: B&B Country Inn, LLC is in the process of developing a RV park on a 26.45 acre parcel on the north side of Roxboro off Boston Rd in Person County. The approved development is for I I I RV sites and 5 cabins. Although this has been approved they are not likely to build more than I cabin and 45 lots in the foreseeable future. This is the northern most road loop on the plans. Additional lots or cabins will be built as needed in the future. Cashion, Ted f D� �� From: Andrew Oakley <aoakley@cityofroxboro.com> Sent: Monday, February 24, 2020 10:31 AM To: Cashion, Ted Subject: [External) Re: B&B Country Inn RV Park fast track sewer extension application ■ External email. Do not elide links or open attu:hments.unless you verif-y, Send all'sris'—''-p1douem011 as an attat lment to e ort No problem on flow. Sent from my iPhone On Feb 24, 2020, at 10:03 AM, Cashion, Ted <ted.cashion@ncdenr.gov> wrote: ***CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe.*** Matt, Joe, and Andrew, We are reviewing the subject application and have a question or 2 . Matt — please supply the downstream sewer permit number and the system wide collection system permit number as required in item V of the application. Item VI.7 notes the RV site daily design flow as 120 gpd. The 2T rules allow for 100 end/campsite. Do you want to use the 120 gpd/campsite; or the 2T value of 100 gal/campsite? Campgrounds with water and sewer hookups 100 al cam site Also, the flow calculation for the 5 cabins is incorrect. It appears the correct flow would be 5 x 240 gpd = 1200 gpd. (not 1,020 gpd). Please submit a revised page 2 with all corrections needed. Andrew, we'll need your approval to the flow changes. Do you approve of these changes to the flow volumes? Mr. Berryhill, as the applicant, we'll need your approval also on the changes to the application. An email response approving these changes is fine. Thx, ted Ted Cashion Cashion, Ted From: Matt Hastings, PE <matt.hastings@summitde.net> Sent: Tuesday, March 3, 2020 9:58 AM To: Cashion, Ted; 'aoakley@cityofroxboro.com' (aoakley@cityofroxboro.com) Cc: Robinson, Jason; hobfarm@centurylink.net Subject: [External] RE: B&B Country Inn RV Park fast track sewer extension application Externals WIL 60 rioIfts or."n.attach ents uri ess.* v+Oy. Send all-susp[claus email as ab attathmerit to Andy, Are you ok with 100 gpd? That should be more than sufficient for an RV spot. If you are ok with it I'll revise the application. Also do you have the downstream sewer permit number WQ???????? I found the collection system number WQCS00048 number but can't find the other number and the WWTP doesn't have it either. Let me know. Thanks Matt Hastings, PE Land Development Department Manager - VA Tel: 434-575-0617 Fax: 919=732-6676 Cell: 434-579-4604 SUMt11T DESIGN AND ENGINEERING SERVICES From: Cashion, Ted <ted.cashion@ncdenr.gov> Sent: Monday, February 24, 202010:04 AM To: Matt Hastings, PE <matt.hastings@summitde.net>;'aoakley@cityofroxboro.com' (aoakley@cityofroxboro.com) <aoakley@cityofroxboro.com> Cc: Robinson, Jason <jason.t.robinson@ncdenr.gov>; hobfarm@centurylink.net Subject: B&B Country Inn RV Park fast track sewer extension application Matt, Joe, and Andrew, We are reviewing the subject application and have a question or 2 . Matt — please supply the downstream sewer permit number and the system wide collection system permit number as required in item V of the application. Item VI. 7 notes the RV site daily design flow as 120 gpd. The 2T rules allow for 100 gpd/campsite. Do you want to use the 120 gpd/campsite; or the 2T value of 100 gal/campsite? Campgrounds with water and sewer hookups 100 gal/campsite Also, the flow calculation for the 5 cabins is incorrect. It appears the correct flow would be 5 x 240 gpd = 1200 gpd. (not 1,020 gpd). Please submit a revised page 2 with all corrections needed. Andrew, we'll need your approval to the flow changes. Do you approve of these changes to the flow volumes? Mr. Berryhill, as the applicant, we'll need your approval also on the changes to the application. An email response approving these changes is fine. Thx, ted Ted Cashion Water Quality Regional Operations Division of Water Resources NC Department of Environmental Quality Raleigh Regional Office 919-791-4254 ted.cashion( ncdenr.eov 1628 Mail Service Center Raleigh, NC 27699-1628 3800 Barrett Drive Raleigh, NC 27609 �DEEQ` r Iarp.ar:TMni tf imructwatal p;.sS� Subscribe to Collection System & Sewer Permitting Updates Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. Cashion, Ted From: Matt Hastings, PE <matt.hastings@summitde.net> Sent: Tuesday, March 3, 2020 11:11 AM To: Cashion, Ted; 'aoakley@cityofroxboro.com' (aoakley@cityofroxboro.com) Cc: Robinson, Jason; hobfarm@centurylink.net Subject: (External] RE: B&B Country Inn RV Park fast track sewer extension application Attachments: Sewer Calcs.pdf � 'ernAl,email: Do notdI& hks or open attachments uriless you verify.. $eAd all suspicious email as an attathmenbto ��?PJ#a�;rarn�,n e.eov Ted, Here is the updated package. Andy informed me that he already told you he was ok with the flows. Let me know if you need more. Thanks Matt Hastings, PE Land Development Department Manager - VA Tel: 434-575-0617 Fax: 919-732-6676 Cell: 434-579-4604 SUI'�*ltllT DESIGN AND ENGINEERING SERVICES From: Cashion, Ted <ted.cashion@ncdenr.gov> Sent: Monday, February 24, 202010:04 AM To: Matt Hastings, PE <matt.hastings@summitde.net>;'aoakley@cityofroxboro.com' (aoakley@cityofroxboro.com) <aoakley@cityofroxboro.com> Cc: Robinson, Jason <jason.t.robinson@ncdenr.gov>; hobfarm@centurylink.net Subject: B&B Country Inn RV Park fast track sewer extension application Matt, Joe, and Andrew, We are reviewing the subject application and have a question or 2 . Matt — please supply the downstream sewer permit number and the system wide collection system permit number as required in item V of the application. Item VI.7 notes the RV site daily design flow as 120 gpd. The 2T rules allow for 100 gpd/campsite. Do you want to use the 120 gpd/campsite; or the 2T value of 100 gal/campsite? Cam rounds with water and sewer hooku s 100 ai cam site Also, the flow calculation for the 5 cabins is incorrect. It appears the correct flow would be 5 x 240 gpd =1200 gpd. (not 1,020 gpd). Please submit a revised page 2 with all corrections needed. Andrew, we'll need your approval to the flow changes. Do you approve of these changes to the flow volumes? Mr. Berryhill, as the applicant, we'll need your approval also on the changes to the application. An email response approving these changes is fine. Thx, ted Ted Cashion Water Quality Regional Operations Division of Water Resources NC Department of Environmental Quality Raleigh Regional Office 919-791-4254 ted.cashionPncdenr.eoy 1628 Mail Service Center Raleigh, NC 27699-1628 3800 Barrett Drive Raleigh, NC 27609 �D- �E �Eq �Vt13S :'M11t C1 (T1YfpfRltP:ll �:IF�� Subscribe to Collection Sygtem & Sewer_ Permitting Updates Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation.