HomeMy WebLinkAboutNCC200871_ESC Approval Submitted_20200304ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
BRIAN WRENN
Acting Director
NORTH CAROLINA
Environmental Quality
February 20, 2020
LETTER OF APPROVAL WITH MODIFICATIONS AND
PERFORMANCE RESERVATION
North Carolina Arboretum
ATTN: Mr. George Briggs
100 Frederick Law Olmstead Way
Asheville, NC 28806
RE: Project Name: The North Carolina Arboretum Parking Reconfiguration & Expansion
Acres Approved: 8.4
Project ID: BUNCO-2020-009
County: Buncombe
City: Avery Creek Township
Address: Frederick Law Olmstead Way
River Basin: French Broad
Stream Classification: B
Submitted By: Mr. Dana J. Bolden, P.E. and Mr. Joshua T. Karrick, R.L.A.
Date Originally Received by LQS: January 10, 2020
Plan Type: Commercial
Dear Mr. Briggs,
This office has reviewed the subject erosion and sedimentation control plan and hereby
issues this Letter of Approval with Modifications and Performance Reservation. A list of the
modifications and reservation is attached. This plan approval shall expire three (3) years
following the date of approval, if no land -disturbing activity has been undertaken, as is
required by Title 15A NCAC 4B .0129. Should the plan not perform adequately, a revised
plan will be required (G.S. 113A-54.1)(b).
As of April 1, 2019, all new construction activities are required to complete and submit an
electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the
NCGO10000 Construction General Permit. After the form is reviewed and found to be
complete, you will receive a link with payment instructions for the $100 annual permit fee.
After the fee is received, you will receive the COC via email. You MUST obtain the COC prior
to commencement of any land disturbing activity. The eNOI form may be accessed at
deq.nc.gov/NCG01. Please direct questions about the eNOI form to Annette Lucas at
Annette.lucas@ncdenr.gov or Paul Clark at Paul.clark@ncdenr.gov. If the owner/operator
D_EQ�NDIiTM CPAOIJNA
aeaenmem r�mronmmm auaiEry
North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
512 North Salisbury Street 11612 Mail Service Center I Raleigh, North Carolina 27699 1612
919.707.9200
Letter of Approval with Modifications and Performance Reservation
North Carolina Arboretum, Mr. George Briggs
February 20, 2020
Page 2 of 3
of this project changes in the future, the new responsible party is required to apply for
his/her own COC.
Title 15A NCAC 413.0118(a) and the NCG01 permit require that the following documentation
be kept on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic
inspection to insure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Program is performance -oriented,
requiring protection of existing natural resources and adjoining properties. If, following the
commencement of this project, it is determined that the erosion and sedimentation control
plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of
1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions
to the plan and implementation of the revisions to ensure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and
State water quality laws, regulations, and rules. In addition, local city or county ordinances
or rules may also apply to this land -disturbing activity. This approval does not supersede
any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided
in the Financial Responsibility Form, which you provided. This permit allows for a land -
disturbance, as called for on the application plan, not to exceed the approved
acres. Exceeding the acreage will be a violation of this permit and would require a revised
plan and additional application fee. You are requested to file an amended form if there is any
change in the information included on the form. In addition, it would be helpful if you notify
this office of the proposed starting date for this project. Please notify us if you plan to have
a preconstruction conference.
Your cooperation is appreciated.
Sincerely
Mi a Smith
Assistant Regional Engineer
Land Quality Section
Letter of Approval with Modifications and Performance Reservation
North Carolina Arboretum, Mr. George Briggs
February 20, 2020
Page 3 of 3
Enclosures: Certificate of Approval
Modifications Required for Approval
NPDES NCGO1 Fact Sheet
ec: Mr. Dana J. Bolden, P.E. dbolden(@hkbell.com
Mr. Joshua T. Karrick, R.L.A. jkarrick@hkbelLcom
cc: Regional Office file
MODIFICATIONS
Project Name: The North Carolina Arboretum Parking Reconfiguration & Expansion
Project ID: BUNCO-2020-009
County: Buncombe
On or before Friday, 28 February 2020 please address the modifications listed
below. If necessary. please send to this office hard copies of the revised plan sheets
and other documents.
1. On plan sheet EC1 please show within the Limits of Disturbance the inlet protection (IP)
for the 24" drop inlet. This measure is located at northeast section of this plan sheet and
has an invert elevation of 2171.6. {G.S. 113A-57(3)}.
2. Please specify on the plan sheet and provide the product specification sheet for the
straw with net rolled erosion control product to be used on this site. {G.S. 113A-57 (3)).
3. For stabilization, please add a callout on plan sheet EC2 to use a rolled erosion control
product on the steep slopes above the sedimentation basin. {G.S. 113A-57 (3)}.
PERFORMANCE RESERVATION
Please note that the developer is responsible for the control of sediment on -site. if the
approved erosion and sediment control measures prove insufficient, the developer must
take those additional steps necessary to stop sediment from leaving the site. Each
sediment control device must be inspected after each storm event. Maintenance and/or
cleanout is necessary anytime the device is at 50% capacity. {G.S. 113A-54 (1)).
Ref: G.S. 113A-54.1 through G.S. 113A-57
Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504
General Permit NCG 010000 NPDES for Construction Activities
c-
CD
o
F
o
PIZ
O
CD
flo-
CD
OD
►�
4L
O
w
�
UKEATs
CD
♦.}'
C N
ape
`< �
�'
�
�
�
v
��r`
�„�
�
VD
ID
M
4,
�f°F4'.5
lot
C
CD
04
r
Ol
CIQ
O
bd
o