HomeMy WebLinkAbout20191641 Ver 1_USACE Permit NWP #39_20200203U.S. ARMY CORPS OF ENGINEERS
WILMINGTON DISTRICT
Action Id. SAW-2019-01217 County: Wake U.S.G.S. Quad: NC -Southeast Durham
GENERAL PERMIT (REGIONAL AND NATIONWIDE) VERIFICATION
Permittee: Hendrick Automotive Group
Gene Cocchi
Address: 6000 Monroe Road, suite 100
Charlotte, NC 28212
Telephone Number: 704-566-3208
E-mail: gene.cocchi(&Hendrickauto.com
Size (acres) 16 Nearest Town Morrisville
Nearest Waterway Sycamore Creek River Basin Neuse
USGS HUC 03020201 Coordinates Latitude: 35.9013
Longitude:-78.7681
Location description: The project site is approximately 16 acres located adjacent to Lumley Road, and bordered to the north by
Glenwood Ave., in the city of Raleigh, Wake County, North Carolina.
Description of projects area and activity: This permit verification allows for 294 linear feet of permanent stream channel impacts
from fill for the construction of a commercial development. Mitigation is required for this proposal.
Applicable Law(s): ® Section 404 (Clean Water Act, 33 USC 1344)
❑ Section 10 (Rivers and Harbors Act, 33 USC 403)
Authorization: NWP 39. Commercial and Institutional Developments
SEE ATTACHED NWP GENERAL, REGIONAL, AND/OR SPECIAL CONDITIONS
Your work is authorized by the above referenced permit provided it is accomplished in strict accordance with the enclosed
Conditions, your application signed and dated 11/27/2019, and the enclosed plans entitled "Reggie Jackson Airport Honda -phase
1, stream impacts exhibit" dated 11/18/2019. Any violation of the attached conditions or deviation from your submitted plans
may subject the permittee to a stop work order, a restoration order, a Class I administrative penalty, and/or appropriate legal
action.
This verification will remain valid until the expiration date identified below unless the nationwide authorization is modified, suspended
or revoked. If, prior to the expiration date identified below, the nationwide permit authorization is reissued and/or modified, this
verification will remain valid until the expiration date identified below, provided it complies with all requirements of the modified
nationwide permit. If the nationwide permit authorization expires or is suspended, revoked, or is modified, such that the activity would
no longer comply with the terms and conditions of the nationwide permit, activities which have commenced (i.e., are under construction)
or are under contract to commence in reliance upon the nationwide permit, will remain authorized provided the activity is completed
within twelve months of the date of the nationwide permit's expiration, modification or revocation, unless discretionary authority has
been exercised on a case -by -case basis to modify, suspend or revoke the authorization.
Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality Certification. You
should contact the NC Division of Water Resources (telephone 919-807-6300) to determine Section 401 requirements.
For activities occurring within the twenty coastal counties subject to regulation under the Coastal Area Management Act (LAMA), prior
to beginning work you must contact the N.C. Division of Coastal Management Morehead City, NC, at (252) 808-2808.
This Department of the Army verification does not relieve the permittee of the responsibility to obtain any other required Federal, State
or local approvals/permits.
If there are any questions regarding this verification, any of the conditions of the Permit, or the Corps of Engineers regulatory program,
please contact James Lastinger at 919-554-4884 ext 32or James.C.Lastinger(a usace.armv.mil.
LASTINGER.JAM Digitally signed by
Cotes Regulatory Official: LASTINGER.JAMES.C.136364 Date: 2/3/2020
Expiration Date of Verification: 03/18/2022 Date:2020.02.03 10:12:15
0-os'oo'
The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we
continue to do so, please complete the Customer Satisfaction Survey located at
http://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0
Copy furnished:
Agent: EMH&T Inc.
Eric Nagy
Address: 301 McCullough Drive, suite 109
Charlotte, NC 28262
Telephone Number: 614-775-4518
E-mail: ena2y(&emht.com
SAW-2019-01217
SPECIAL CONDITIONS
a. In order to compensate for impacts associated with this permit, mitigation shall be provided in accordance
with the provisions outlined on the most recent version of the attached Compensatory Mitigation Responsibility
Transfer Form. The requirements of this form, including any special conditions listed on this form, are hereby
incorporated as special conditions of this permit authorization.
Action ID Number: SAW-2019-01217 County: Wake
Permittee: Hendrick Automotive Group, Gene Cocchi
Project Name: Reuie Jackson Airport Honda
Date Verification Issued: 2/3/2020
Project Manager: James Lastinger
Upon completion of the activity authorized by this permit and any mitigation required by the permit,
sign this certification and return it to the following address:
US ARMY CORPS OF ENGINEERS
WILMINGTON DISTRICT
Attn: James Lastinger
Raleigh Regulatory Office
U.S Army Corps of Engineers
3331 Heritage Trade Drive, Suite 105
Wake Forest, North Carolina 27587
or
James.C.Lastinger@usace.army.mil
Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of
Engineers representative. Failure to comply with any terms or conditions of this authorization may
result in the Corps suspending, modifying or revoking the authorization and/or issuing a Class I
administrative penalty, or initiating other appropriate legal action.
I hereby certify that the work authorized by the above referenced permit has been completed in
accordance with the terms and condition of the said permit, and required mitigation was completed in
accordance with the permit conditions.
Signature of Permittee Date
Compensatory Mitigation Responsibility Transfer Form
Permittee: Hendrick Automotive Group, Gene Cocchi Action ID: SAW-2019-01217
Project Name: Reggie Jackson Airport Honda County: Wake
Instructions to Permittee: The Permittee must provide a copy of this form to the Mitigation Sponsor, either an approved
Mitigation Bank or the North Carolina Division of Mitigation Services (NCDMS), who will then sign the form to verify the
transfer of the mitigation responsibility. Once the Sponsor has signed this form, it is the Permittee's responsibility to ensure
that to the U.S. Army Corps of Engineers (USACE) Project Manager identified on page two is in receipt of a signed copy of this
form before conducting authorized impacts, unless otherwise specified below. If more than one mitigation Sponsor will be
used to provide the mitigation associated with the permit, or if the impacts and/or the mitigation will occur in more than one
8-digit Hydrologic Unit Code (HUC), multiple forms will be attached to the permit, and the separate forms for each Sponsor
and/or HUC must be provided to the appropriate mitigation Sponsors.
Instructions to Sponsor: The Sponsor must verify that the mitigation requirements (credits) shown below are available at the
identified site. By signing below, the Sponsor is accepting full responsibility for the identified mitigation, regardless of
whether or not they have received payment from the Permittee. Once the form is signed, the Sponsor must update the bank
ledger and provide a copy of the signed form and the updated bank ledger to the Permittee, the USACE Project Manager, and
the Wilmington District Mitigation Office (see contact information on page 2). The Sponsor must also comply with all
reporting requirements established in their authorizing instrument.
Permitted Impacts and Compensatory Mitigation Requirements:
Permitted Impacts Requiring Mitigation* 8-digit HUC and Basin: 03020201, Neuse River Basin
Stream Impacts (linear feet)
Wetland Impacts (acres)
Warm
Cool
Cold
Riparian Riverine
FRiparian Non-Riverine
Non -Riparian
Coastal
294
*If more than one mitigation sponsor will be used for the permit, only include impacts to be mitigated by this sponsor.
Compensatory Mitigation Requirements: 8-digit HUC and Basin: 03020201, Neuse River Basin
Stream Mitigation (credits)
Wetland Mitigation (credits)
Warm
Cool
Cold
Riparian Riverine
Riparian Non-Riverine
Non -Riparian
Coastal
441
Mitigation Site Debited: NCDMS
(List the name of the bank to be debited. For umbrella banks, also list the specific site. For NCDMS, list NCDMS. If the NCDMS
acceptance letter identifies a specific site, also list the specific site to be debited).
Section to be completed by the Mitigation Sponsor
Statement of Mitigation Liability Acceptance: I, the undersigned, verify that I am authorized to approve mitigation
transactions for the Mitigation Sponsor shown below, and I certify that the Sponsor agrees to accept full responsibility for
providing the mitigation identified in this document (see the table above), associated with the USACE Permittee and Action
ID number shown. I also verify that released credits (and/or advance credits for NCDMS), as approved by the USACE, are
currently available at the mitigation site identified above. Further, I understand that if the Sponsor fails to provide the
required compensatory mitigation, the USACE Wilmington District Engineer may pursue measures against the Sponsor to
ensure compliance associated with the mitigation requirements.
Mitigation Sponsor Name:
Name of Sponsor's Authorized Representative:
Signature of Sponsor's Authorized Representative Date of Signature
Conditions for Transfer of Compensatory Mitigation Credit:
• Once this document has been signed by the Mitigation Sponsor and the USACE is in receipt of the signed form, the
Permittee is no longer responsible for providing the mitigation identified in this form, though the Permittee remains
responsible for any other mitigation requirements stated in the permit conditions.
• Construction within jurisdictional areas authorized by the permit identified on page one of this form can begin only after
the USACE is in receipt of a copy of this document signed by the Sponsor, confirming that the Sponsor has accepted
responsibility for providing the mitigation requirements listed herein. For authorized impacts conducted by the North
Carolina Department of Transportation (NCDOT), construction within jurisdictional areas may proceed upon permit
issuance; however, a copy of this form signed by the Sponsor must be provided to the USACE within 30 days of permit
issuance. NCDOT remains fully responsible for the mitigation until the USACE has received this form, confirming that the
Sponsor has accepted responsibility for providing the mitigation requirements listed herein.
• Signed copies of this document must be retained by the Permittee, Mitigation Sponsor, and in the USACE administrative
records for both the permit and the Bank/ILF Instrument. It is the Permittee's responsibility to ensure that the USACE
Project Manager (address below) is provided with a signed copy of this form.
• If changes are proposed to the type, amount, or location of mitigation after this form has been signed and returned to
the USACE, the Sponsor must obtain case -by -case approval from the USACE Project Manager and/or North Carolina
Interagency Review Team (NCIRT). If approved, higher mitigation ratios may be applied, as per current District guidance
and a new version of this form must be completed and included in the USACE administrative records for both the permit
and the Bank/ILF Instrument.
Comments/Additional Conditions: A letter from NCDMS, confirming they are willing and able to accept the applicant's
compensatory mitigation responsibility, dated 11/19/2019 was included with the preconstruction notification.
This form is not valid unless signed below by the USACE Project Manager and by the Mitigation Sponsor on Page 1. Once
signed, the Sponsor should provide copies of this form along with an updated bank ledger to:1) the Permittee, 2) the USACE
Project Manager at the address below, and 3) the Wilmington District Mitigation Office, Attn: Todd Tugwell, 11405 Falls
of Neuse Road, Wake Forest, NC27587 (email: todd.tugwell@usace.army.mil). Questions regarding this form or any of the
permit conditions may be directed to the USACE Project Manager below.
USACE Project Manager: James Lastinger
USACE Field Office: Raleigh Regulatory Office
US Army Corps of Engineers
3331 Heritage Trade Drive, Suite 105
Wake Forest, North Carolina 27587
Email: James.C.Lastinger@usace.army.mil
LASTI N G E R.J AM E Digitally signed by
LAST I N G E R.J A M ES.C.1363642400
S.C.1363642400 Date: 2020.02.03 10:13:36 -05'00'
USACE Project Manager Signature
2/3/2020
Date of Signature
Current Wilmington District mitigation guidance, including information on mitigation ratios, functional assessments, and
mitigation bank location and availability, and credit classifications (including stream temperature and wetland groupings) is
available at http://ribits.usace.army.miI
Determination of Jurisdiction:
A. ® There are waters on the above described project area that may be subject to Section 404 of the Clean Water Act (CWA) (33
USC § 1344) and/or Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403). This preliminary determination is not an
appealable action under the Regulatory Program Administrative Appeal Process (Reference 33 CFR Part 331). However, you
may request an approved JD, which is an appealable action, by contacting the Corps district for further instruction. Please note, if
work is authorized by either a general or nationwide permit, and you wish to request an appeal of an approved JD, the appeal must
be received by the Corps and the appeal process concluded prior to the commencement of any work in waters of the United States
and prior to any work that could alter the hydrology of waters of the United States.
B. ❑ There are Navigable Waters of the United States within the above described project area subject to the permit requirements of
Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403) and Section 404 of the Clean Water Act (CWA) (33 USC §
1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to
exceed five years from the date of this notification.
C. ❑ There are waters within the above described project area that are subject to the permit requirements of Section 404 of the
Clean Water Act (CWA) (33 USC § 1344). Unless there is a change in the law or our published regulations, this determination
may be relied upon for a period not to exceed five years from the date of this notification.
D. ❑ The jurisdictional areas within the above described project area have been identified under a previous action. Please reference
jurisdictional determination issued DATE. Action ID: FILE NUMBER.
Basis For Determination: See the preliminary jurisdictional determination form dated 01/29/2020.
Remarks: None.
E. Attention USDA Program Participants
This delineation/determination has been conducted to identify the limits of Corps' Clean Water Act jurisdiction for the particular site
identified in this request. The delineation/determination may not be valid for the wetland conservation provisions of the Food Security
Act of 1985. If you or your tenant are USDA Program participants, or anticipate participation in USDA programs, you should request
a certified wetland determination from the local office of the Natural Resources Conservation Service, prior to starting work.
F. Appeals Information (This information applies only to approved jurisdiction determinations as indicated in B and C
above).
This correspondence constitutes an approved jurisdiction determination for the above described site. If you object to this
determination, you may request an administrative appeal under Corps regulations at 33 CFR Part 331. Enclosed you will find a
Notification of Appeal Process (NAP) fact sheet and request for appeal (RFA) form. If you request to appeal this determination you
must submit a completed RFA form to the following address:
US Army Corps of Engineers
South Atlantic Division
Attn: Phillip Shannin, Review Officer
60 Forsyth Street SW, Room 10M15
Atlanta, Georgia 30303-8801
Phone: (404) 562-5137
In order for an RFA to be accepted by the Corps, the Corps must determine that it is complete, that it meets the criteria for appeal
under 33 CFR part 331.5, and that it has been received by the Division Office within 60 days of the date of the NAP. Should you
decide to submit an RFA form, it must be received at the above address by Not applicable.
**It is not necessary to submit an RFA form to the Division Office if you do not object to the determination in this correspondence.**
Corps Regulatory Official:
James Lastinger
Date of JD: 01/29/2020
Expiration Date of JD: Not applicable
LASTINGER.JA Digitally signed by
LASTI NGER.JAMES.C.1363
MES.C.1 363642642400
Date: 2020.02.03 10:14:19
400-05'00'
NOTIFICATION OF ADMINISTRATIVE APPEAL OPTIONS AND PROCESS AND
REQUEST FOR APPEAL
A licant: Hendrick Automotive Grou , Gene Cocchi File Number: SAWAL -2019-01217 Date: 2/3/2020
Attached
is:
See Section below
❑
INITIAL PROFFERED PERMIT Standard Permit or Letter ofpermission)
A
❑
PROFFERED PERMIT Standard Permit or Letter ofpermission)
B
❑
PERMIT DENIAL
C
❑
APPROVED JURISDICTIONAL DETERMINATION
D
®
PRELIMINARY JURISDICTIONAL DETERMINATION
E
SECTION I - The following identifies your rights and options regarding an administrative appeal of the above decision.
Additional information may be found at or http://www.usace.gM.mil/Missions/CivilWorks/RegulatoryProgramandPertnits.aspx
or the Corps regulations at 33 CFR Part 331.
A: INITIAL PROFFERED PERMIT: You may accept or object to the permit.
• ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final
authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your
signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all
rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the
permit.
• OBJECT: If you object to the permit (Standard or LOP) because of certain terms and conditions therein, you may request
that the permit be modified accordingly. You must complete Section II of this form and return the form to the district
engineer. Your objections must be received by the district engineer within 60 days of the date of this notice, or you will
forfeit your right to appeal the permit in the future. Upon receipt of your letter, the district engineer will evaluate your
objections and may: (a) modify the permit to address all of your concerns, (b) modify the permit to address some of your
objections, or (c) not modify the permit having determined that the permit should be issued as previously written. After
evaluating your objections, the district engineer will send you a proffered permit for your reconsideration, as indicated in
Section B below.
B: PROFFERED PERMIT: You may accept or appeal the permit
• ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final
authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your
signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all
rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the
permit.
• APPEAL: If you choose to decline the proffered permit (Standard or LOP) because of certain terms and conditions therein,
you may appeal the declined permit under the Corps of Engineers Administrative Appeal Process by completing Section II of
this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days
of the date of this notice.
C: PERMIT DENIAL: You may appeal the denial of a permit under the Corps of Engineers Administrative Appeal Process by
completing Section II of this form and sending the form to the division engineer. This form must be received by the division
engineer within 60 days of the date of this notice.
D: APPROVED JURISDICTIONAL DETERMINATION: You may accept or appeal the approved JD or provide new
information.
• ACCEPT: You do not need to notify the Corps to accept an approved JD. Failure to notify the Corps within 60 days of the
date of this notice, means that you accept the approved JD in its entirety, and waive all rights to appeal the approved JD.
• APPEAL: If you disagree with the approved JD, you may appeal the approved JD under the Corps of Engineers
Administrative Appeal Process by completing Section II of this form and sending the form to the district engineer. This form
must be received by the division engineer within 60 days of the date of this notice.
E: PRELIMINARY JURISDICTIONAL DETERMINATION: You do not need to respond to the Corps regarding the
preliminary JD. The Preliminary JD is not appealable. If you wish, you may request an approved JD (which may be appealed),
by contacting the Corps district for further instruction. Also you may provide new information for further consideration by the
Corps to reevaluate the JD.
SECTION II - REQUEST FOR APPEAL or OBJECTIONS TO AN INITIAL PROFFERED PERMIT
REASONS FOR APPEAL OR OBJECTIONS: (Describe your reasons for appealing the decision or your objections to an initial
proffered permit in clear concise statements. You may attach additional information to this form to clarify where your reasons or
objections are addressed in the administrative record.)
ADDITIONAL INFORMATION: The appeal is limited to a review of the administrative record, the Corps memorandum for the
record of the appeal conference or meeting, and any supplemental information that the review officer has determined is needed to
clarify the administrative record. Neither the appellant nor the Corps may add new information or analyses to the record.
However, you may provide additional information to clarify the location of information that is already in the administrative
record.
POINT OF CONTACT FOR QUESTIONS OR INFORMATION:
If you have questions regarding this decision and/or the
If you only have questions regarding the appeal process you may
appeal process you may contact:
also contact:
District Engineer, Wilmington Regulatory Division
Mr. Phillip Shannin, Administrative Appeal Review Officer
Attn: James Lastinger
CESAD-PDO
Raleigh Regulatory Office
U.S. Army Corps of Engineers, South Atlantic Division
U.S Army Corps of Engineers
60 Forsyth Street, Room 1OM15
3331 Heritage Trade Drive, Suite 105
Atlanta, Georgia 30303-8801
Wake Forest, North Carolina 27587
Phone: (404) 562-5137
RIGHT OF ENTRY: Your signature below grants the right of entry to Corps of Engineers personnel, and any government
consultants, to conduct investigations of the project site during the course of the appeal process. You will be provided a 15 day
notice of any site investigation, and will have the opportuni to participate in all site investi ations.
Date:
Telephone number:
Signature of appellant or agent.
For appeals on Initial Proffered Permits send this form to:
District Engineer, Wilmington Regulatory Division, Attn: James Lastinger, , 69 Darlington Avenue, Wilmington, North
Carolina 28403
For Permit denials, Proffered Permits and Approved Jurisdictional Determinations send this form to:
Division Engineer, Commander, U.S. Army Engineer Division, South Atlantic, Attn: Mr. Phillip Shannin, Administrative
Appeal Officer, CESAD-PDO, 60 Forsyth Street, Room 1OM15, Atlanta, Georgia 30303-8801
Phone: (404) 562-5137
PRELIMINARY JURISDICTIONAL DETERMINATION (PJD) FORM
BACKGROUND INFORMATION
A. REPORT COMPLETION DATE FOR PJD: 2/3/2020
B. NAME AND ADDRESS OF PERSON REQUESTING PJD: Hendrick Automotive Group, Gene Cocchi, 6000
Monroe Road, suite 100, Charlotte, NC 28212
C. DISTRICT OFFICE, FILE NAME, AND NUMBER: Wilmington District, Reggie Jackson Airport Honda,
SAW-2019-01217
D. PROJECT LOCATION(S) AND BACKGROUND INFORMATION: The project site is approximately 16 acres
located adjacent to Lumley Road, and bordered to the north by Glenwood Ave., in the city of Raleigh, Wake County,
North Carolina.
(USE THE TABLE BELOW TO DOCUMENT MULTIPLE AQUATIC RESOURCES AND/OR
AQUATIC RESOURCES AT DIFFERENT SITES)
State: NC County: Wake City: Morrisville
Center coordinates of site (lat/long in degree decimal format): Latitude: 35.9013 Longitude:-78.7681
Universal Transverse Mercator:
Name of nearest waterbody: Sycamore Creek
E. REVIEW PERFORMED FOR SITE EVALUATION (CHECK ALL THAT APPLY):
❑ Office (Desk) Determination. Date:
® Field Determination. Date(s): July 31, 2019
TABLE OF AQUATIC RESOURCES INREVIEW AREA WHICH "MAY BE" SUBJECT TO REGULATORY
JURISDICTION.
Estimated amount of
Type of aquatic
Geographic authority to
Latitude (decimal
Longitude (decimal
aquatic resources in
resources (i.e.,
which the aquatic resource
Site Number
degrees)
degrees)
review area (acreage
wetland vs. non -
"may be" subject (i.e.,
and linear feet, if
wetland waters)
Section 404 or Section
applicable
10/404)
SA
35.9013
-78.7681
294 linear feet
Non -wetland
Section 404
1) The Corps of Engineers believes that there may be jurisdictional aquatic resources in the review
area, and the requestor of this PJD is hereby advised of his or her option to request and obtain an
approved JD (AJD) for that review area based on an informed decision after having discussed the
various types of JDs and their characteristics and circumstances when they may be appropriate.
2) In any circumstance where a permit applicant obtains an individual permit, or a Nationwide General
Permit (NWP) or other general permit verification requiring "pre- construction notification" (PCN), or
requests verification for a non -reporting NWP or other general permit, and the permit applicant has
not requested an AJD for the activity, the permit applicant is hereby made aware that: (1) the permit
applicant has elected to seek a permit authorization based on a PJD, which does not make an official
determination of jurisdictional aquatic resources; (2) the applicant has the option to request an AJD
before accepting the terms and conditions of the permit authorization, and that basing a permit
authorization on an AJD could possibly result in less compensatory mitigation being required or
different special conditions; (3) the applicant has the right to request an individual permit rather than
accepting the terms and conditions of the NWP or other general permit authorization; (4) the applicant
can accept a permit authorization and thereby agree to comply with all the terms and conditions of that
permit, including whatever mitigation requirements the Corps has determined to be necessary; (5)
undertaking any activity in reliance upon the subject permit authorization without requesting an AJD
constitutes the applicant's acceptance of the use of the PJD; (6) accepting a permit authorization (e.g.,
signing a proffered individual permit) or undertaking any activity in reliance on any form of Corps
permit authorization based on a PJD constitutes agreement that all aquatic resources in the review area
affected in any way by that activity will be treated as jurisdictional, and waives any challenge to such
jurisdiction in any administrative or judicial compliance or enforcement action, or in any
administrative appeal or in any Federal court; and (7) whether the applicant elects to use either an AJD
or a PJD, the JD will be processed as soon as practicable. Further, an AJD, a proffered individual
permit (and all terms and conditions contained therein), or individual permit denial can be
administratively appealed pursuant to 33 C.F.R. Part 331. If, during an administrative appeal, it
becomes appropriate to make an official determination whether geographic jurisdiction exists over
aquatic resources in the review area, or to provide an official delineation of jurisdictional aquatic
resources in the review area, the Corps will provide an AJD to accomplish that result, as soon as is
practicable. This PJD finds that there "may be" waters of the U.S. and/or that there "may be"
navigable waters of the U.S. on the subject review area, and identifies all aquatic features in the
review area that could be affected by the proposed activity, based on the following information:
SUPPORTING DATA. Data reviewed for PJD (check all that apply)
Checked items should be included in subject file. Appropriately reference sources below where
indicated for all checked items:
® Maps, plans, plots or plat submitted by or on behalf of the PJD requestor:
Map: entitled "exhibit 6-Lumley Road Project, delineation map"
® Data sheets prepared/submitted by or on behalf of the PJD requestor.
® Office concurs with data sheets/delineation report.
❑ Office does not concur with data sheets/delineation report. Rationale:
❑ Data sheets prepared by the Corps:
❑ Corps navigable waters' study:
❑ U.S. Geological Survey Hydrologic
® USGS NHD data.
❑ USGS 8 and 12 digit HUC maps.
® U.S. Geological Survey map(s). Cite scale & quad name: Raleigh Quad
M Natural Resources Conservation Service Soil Survey. Citation: NRCS websoil survey, 2018
® National wetlands inventory map(s). Cite name: USFWS NWI man
❑ State/local wetland inventory map(s):
M FEMA/FIRM maps: City of Raleigh FIRM may
❑ 100-year Floodplain Elevation is: (National Geodetic Vertical Datum of 1929)
M Photographs: ®Aerial (Name & Date): undated
or ❑Other (Name & Date):
❑ Previous determination(s). File no. and date of response letter:
❑ Other information (please specify):
IMPORTANT NOTE: The information recorded on this form has not necessarily been
verified by the Corps and should not be relied upon for later jurisdictional determinations.
LASTINGER.JA
MES.C.1363642
400
Digitally signed by
LASTINGER.JAMES.C.1363
642400
Date: 2020.02.03 10:16:05
-05'00'
Signature and date of Regulatory
staff member completing PJD
01 /29/2020
Signature and date of person requesting PJD
(REQUIRED, unless obtaining the signature is
impracticable)1
1 Districts may establish timeframes for requester to return signed PJD forms. If the requester does not respond within the
established time frame, the district may presume concurrence and no additional follow up is necessary prior to finalizing an
action.
E
Q
CU
0
Q
X
W
to
CD
0
0
0
rn
0
N_
r
m
o_
Iva
-----------------
-
r ,
I� •. . .�•��„ t �.\ \\ \ \\.\ \ \\may\ vet►
CITY OF RALEIGH, WAKE COUNTY, NORTH CAROLINA
M
Lumley Road Project
Delineation Map
Engineers • Surveyors • Planners • Scientists Exhibit 6
5500 New Albany Road, Columbus, OH 43054 SCALE: 1" = 300'
Phone:614.775.4500 Toll Free:888.775.3648
emht.com 0 50 300 600eet Source: Aerial - Bing Aerials
, -
- /
_ - X/ - _ I
' `` '
a, -*,
1!
.� - ,�
�'
1- . _ z
v/ Q x
I O
I `
,
,
„ _
'�� ..�s _ /-1
�.
OS +b / / * t " i ,� ,. 1 , w ;'
„ s /
r
\ , ,
I1� ..` \. '
` ♦- . I
'4 _Vs\I 1 I
,.r
r
\ ♦ ,
y
1 � `f � r1
' �� / r - ,/' a' r NSF BBC I 1 NSF TERRY B. AND DEBORAH O,,/ERTON
p - D.B. 7173 P. 5�2
�% /�a4 / - D.B. 15802 P. 2630
_-_ _- �/ /'' Z" ' / _� - "a PID 768738122 PID 768739476
6.05 ACRES 5.85 ACRES
O
�' �% �` " .� o ... 1 ADDRESS: 67
\ v;,, ADDRESS: 6833 MT. HERMAN RD. 21 MT. HERMAN RD.
,�
- ``
ZONIN . ZONING: IX-3 PK
G IX-3 PK
v,
+ _ r� ��
��
-- �v
I
<<,v
I -
�` _
,," '�
I _ + +
�/ v v
/ ' .,'' v
I I .. I I , I 1
.
LEGEND
I I `� - I '
1I
II
', S ,�',�„ SIM Existing CMP Culvert
I, II II t > I I
'� ---
I
II Existin OHWM of Stream Im acted
I
9 ( P )
4
II
Existing OHWM of Stream (Undisturbed)
k-,
I I 7y; " , - Existing � of Stream (Impacted - 294 LF Total)
Ny l l
STAI STM Proposed Storm Sewer
r' '
1�
111 1�,Y ; \ ` ,Itl
Q Proposed Rip Rap
.. 1 , 11
I
I 1'
1 1 , I , I ,
1 1 1 ' i; - 1 I I' 1 1
I I ' I 1 .� ....
II I' I 1 - 1;II 1`, 1
I 1 1 -'' 1
I 1'I
i'
I 1
I I
' ' ' I .\
--
I I 1 ,I
,\
1 I ,
\ - ��, I ' ,
II
`t
/\ --
a,
,/ _
I
, _
' r= /� / /
.
I
1
\T _ (�
\\ / / / ` `� �`\ ', i \ ', ', /, .�_, _ ,,,_ .. Y_ . x`` ITV / 1 \\ -_-" f16_ �/ -
,
__
f
Y-
- h
_
- --- --
I
/ \ \� v I S -----
y, \ '� A / / / / � / -
,
,
/ / \' -
- -
_ / / �- ---
/ // //\ / / /� / / / \�. \ . t _ I N/E BARBARA GLOVES MAN GUM,,
/ / % \ \ , / / y\ / \�� I GRAPHIC SCALE
/: / / ,' /'� /,' / / , \ / / / ✓ \ /' i . /, \ _ -- _P1D__76883257�
,
/� ' A /,' A / �, - ENE- - -- _
��
r'
/ / � � \ / / / / ,/ \ i / / r \, _ - oO I -- 4.23--ACRES-
r„'''' / ''_- \ / ,/ I / - F ADDRESS: 6701 MT:" HERMAN
`
/ / \ / _ _ ; ' o , - - - - VICINITY MAP
,� , \ / / / / / \ / ' / T - _ b , ZONING:_aX=3-PK
/s ( \ /- / r l- - = = - _ -- Not to Scale
/ / / / /, / 1 , / \, / /`\/ / " - - I 1 inch = 60 feet
j
\ `__ -
.
.
�F - / / / / "
// I \ V/ - r� }, 1 1,- ..0 \
i\ �/ J
/ a
%�
`.
— r
.
T
/ / , / J� \ \
\
,,- ,
�y - '
/ - - 1
-- / / /
.
- \9�
1\/
\� //
` Y
__ --
__
-- — ,
\
/ /
`, �1, `. `'/ / "% \ / / _9 \,-) / /\/ j 1I I III / / \' 1 /\ ' _, \I I ` �� �� 1
j�
/ / / / '( I 1 1\ I Beginning of Jurisdictional
\�
-/- ,i y I I I I I I I / / 1/ \�/ -\
I
,---' N%F RAC£ION DURHAM AIRPORT -/ / / \/ "! / ,' / / /� / /-'--- J / / /\` / - I I am per Field Visit with } - -- �" \ `
At)THORITY - \� --� / / �(,_,/ \ ��� �� \/ '� re }}}�
St
/ \ � � / �p i � / / / Ross Sullivan from USAGE I 1 1\
D.B. 35�`7 P. 486 � --_ ' / / , \ NF / % / /A /', i
I I
/ / /' / '� / �' on Jul 31 2019 -,3� ' , �"''' 1 }.
_ / / /\/ / ,'� - / \/ ��/ Y /; %I�ENDRI AUT OTIVE III'I", 1
',,PID 768�26323 \� / -,- _------' /' /\ / /,'' / 1 1 / o . "'" ' .
/ /"�/ / , %/ I I I I I I I I I I I''I /�� / �/� �/ / / _ , dl UP
1.78 Ac �s-_'---.v Y / / / / / / �/ I I I /�/ I �'� "' j11 }I
I
�j
ADDRESS:.6$01 M#.ERMAN 12{�. / / /__-<--- \�' / ��- - I -I I I I I �� /
��+ ,,/ / >-%\/ / / / / ,/ -- --__ --- - — //� ,v i - PI' 7 2 Q ,W1,'I''11 ,;` ,✓}} 1 -I_
ZONi�1 : I�-PK - A� -/ --- / \i 1, , I I I I I - - �. �r / - �' 1'I ;','
II I
11 I f 'r I I III , a '� / /, 7 w ''I ;' I I j, , 1 \\`\ \\I I \�
---- - \�, \,V / / ///\/ / / i a' /(, I I I I I I Ir " /, / �/ - - --
/ --__/ -f--i A i DRES ;9 ML RD. ;' II
-, // I I I, I I I I
\
_
_ _ _ _ I/ / / /A / , Ex. Parking Lot to i l / �/ o, A Z PK
__ III; �� _Ai , ,/ /\/,-i j j�/ be Utilized During // / / M 3g \
/ , / �/, Phase 1 of / \ . }
--- ---� I
,
1
a_ --` - ; I // , j\ /_-1 � Development -tN�F HLNDRIICK AUtTOMQTIVE I I I , / / - I I } \
/ / _-- - �I I I III I / / / --- } '> / t
f
I- R I } 'I I
o ,' '' / ---a,' ' I I \> /-- - /\ / ---\ - — — — = O I 7`\ I.
I - V I I I I I I� �' _ ,
----- oo ' - ' �� / / / - — — Il 11\ YX`
4 ,I I I I I I I �, v' / ��
I�
I I I I��
o, _I- -� \\/ , / I / / M ' I 1 \ III
'-.'' / / f2E5 I I 1 I I ' I 1
/\" 81 8P AC I - hj
.
I
w / OHE-�z ) ADDRESS: 9600 LUMLEY ,f7D. �� / �' } }} ;
o ;, - - -
N - __
\ / o \� / / / -- ZONING: IX-3-PK' �S „ 1',1
1 / - �'" A Q Prop. 48 Stream
- o
/ / _/ y y-�""I_I 1 1 1 1 1 1 .I I I I I I I I I I J I f l l l l
I --
I -- / - - I I t3j Bypass Culvert 1 ;°
�\ /'" (.�� I ICI I I I I --- - --__ __ I S �" ; ��s
I I r `/ E- -�-- -- —I I r 1 I C 1 I}
I I I I I I ,i I I a 1 i�' ', I � _ }II
III ,-' � ,'' '' q I , I
'
- . ` � -- _._I 1 I I � 1
I
' - �----------------------- _ __-- - ---- — — — — — — _ I I - g ill "'; I I
ilri _—�_�IIIII'
\ / _ r It -
II -
II
- -
I - / III _I_-} C
oA �I I I I I I i I-_1 I I I I I I I I I ,i I I I I �1 T A� I} --�
- L I I I
I I I I I I ��
I I I-'(
.
/ - ��- -- . �,----------40o-- l` �J Prop. BLDG ( Ia
- - ,' -' tt
V� a II
- - - - � _- � _ - ------ + __' .. , � - - Prop � Underground � � I � . tl,ltl
.
FFE 383.50
11 `
0 - _ -I f- I I I _-- o --- - -� d�';;„
1
�� f I I I f i I I I I I I tiF
I '
- I I 530 1 ;
_
I I I I, I (I I I I 9 LUMLEY ROAD
an
- \ - - - _ LLILL I - III
�1]/�� I �. Detention and (�,
-- ,� !
- ORE_ - --�LL�' I \
- --. - - - ------ - --- --- - ----- - --
-- _ - � - -_ -- - - --- -!-- F :REND i' _ �Itl
1
N� R CK
'- L 1 - - - x--- 6HE— -� - �ir'�' I� -
' S Filter
,-�; < - - _
�.
_ � AUTOMOTIVE ,GROUP'
m ---- D.B. 1329 ''P. 453
I I _ 5
v 8 ,
- 7 HENDRICK AUTOMOTIVE
I
7 2 29
_0 I - I
.� -- -- �� RES
C "�I , - D.B. 13295 P. 453 3
PID
� 2 03 '
- A DRESS: 9530
Q
PID 768825739
a
- 3.12 ACRES - "1
MLEY RD 1 \, � } .
-
` - , ' ` I - �- -_ I Ex. 36" Stream Culvert 1v- Ci
I ,
�, �� , \\ �,'\I __ _, _ _' ADD Z�NING:I IX. 3-PK ;� \\'� -- -- } LP
�� I
RESS• 9540 LUMLEY RD.
J I \` N F RALEIGH DURHAM ZONING: IX-3-PK ---
� I � .21t LF (Non I ''. III\ ��-r
m- NTERNATIONAL _ - Prop. 294 LF - - I �-+ � $
,� I - - of Permanent I --- -- 80 - �, �1
I
Stream Im act - ---- �I a*,
rn - DPID 76i 324317 1 P - }
9 -_ - - -r
, I - 4790.07 ACRES `
�,, ____ �, \\ ''\ `\ \\ , '�. _ ADDRESS: 2800 AIRPORT BLVD - " � �,I\\ NI
__
,S
9
s
I `} I I I
v ZONING.
�� r
\
�.
o _ _ - '�3 - - *,;III.
v 85 - Ill, - 1 -
\' I
T
�\
,"!�!1 --- — - d
$ �1 -3�
G I I I
I
,
I
, I I , I I I \ I
\ , - , ,' I
- - �, ?:.,.. Pro Headwall Outlet S
I
I
\
�� P Il
--- ' ,, Pro Under round a -
.
\
P 9 - with Ri Ra Apron
\ I
,' P
,
.
� _ _ I ,I{I} _ III ,
- I
,_ \ P _
--
o _ _ I Detention and / \ / 31 �,
---
o v� -- \I ' `\ op. Rip Rap Sized --- 1✓ ;1 I _ -
1
Pr
S
0 ,
- �_ , � ,
� \ \ M`�'� s� I per NCDOT Standard I
LI\ I\ \ \ e - _ - __ - N -
�' ; � ,'' Filter
Sad `
\ I
I
0 _ _ tail _
,
,1
I `
,' De 876 02 � }}I
=Prop. Stream Impact Area ---- _ \- ----- -- -
\
\
� I
}
,
I , A, \ _-_-,_ 3 -
- -
� 8 ;�, \ i 1} _�
---
��$ - 9520 LU \
> a , , , _. - � _' ,.., , . A _ - I
0 - -- _ 1293 P
395 395 ,�
,
,
,
go ' III ,- II
I �
I, ,I
co
0
J
3
7
N
V)
0
L
a-
L
w
U
0
0-
E
E
0
Q)
I
a
1,
0
N
i
C
4 Ex. T
a
rn
E
0
4) Ex. Bott
V)
i
0
P
t
x
w
W
4)
N
t
. v A v ' _. ` ' - - -----
v -- ,
9 6
_
v'. --- - - �'I
- I , , - -" - ___ ----- - DD ---
,
,
0.6 S
I t- - ---� - & , R D - _ /
-
__ 1 _ -P
8 �3
R S 5 .LUMLEY
�� N IX 3 �
- _ - 370 0
\ -
- -- -
, \- \ -- - - Sao, ---- --
-- _ ---
_ - ----
_ -- - /
_ - — _ —
,
,
,
_ - - -- - — S 1
- - _ _
,
-� - - -
--
,
r
I I
, I I r
- —.— - - _ _ - _ _ _ -
- — _ � — — — — = — rt — — — _ _ - - --- --- —
_-------- STM ----- --- - - - __ - --___- - ------ - -
FFE - ----------------
-- SS �- ,3�� a
5` �� .
I,UMIEY ROAD `�� y �'
PUBLIC 4.A1�E DIVIDED,''
"� ---- _
I _ , - --
,
r
I
\ tP -- ''
I --
- - -
-__--------- --------- -
.
--==-r-- ----�- _- - - ------------ -- - - -- -
,\I r -
1 ----- -
_ • _ ST -�S
Z3--• � STM STM —
\ - --- ----- - - ---- -
_, '
- _- , -- --- ------ _ - _ - ----------__ �` - -
-------- - - ---- -- -- - - -- -- -----
------ - --- --- -- - - - -- — — — ------ /
T
-- - -- __-- ---- -- -------------- _ .�, -
\ � - - _- - -- - - -------- - - ---- --- -
-� - - -
- - ---
--- _
- - _ A
. `v 1 I - -I I _ _ �y�.� -
' ACT
_ __
,
- _
v i I v - ,'
I
I ,
' ` \ I I _ _
\
I v' _ _
I 1 II ` I v t4� - �� n: ---- _ .r1
,
Iv
I _ ,
I I I
, V
I
I (-o � co ` r) I s I - - - `� - �' v
1n o
'
~ I >V} 1
1 II �', '�� � �. A �'
I I 1L \
<i , — \ - \
Impacts - - -- --- -
I
'I .
, ', I . _ _------- (i)
II I ----"------------ , `o
1 1 \ , \ \\
I I I -------"--- - _.- ��,.. ; -
I
- - S/
-
--
I I I I I 4A �_ _- - A ..
I
r : I I I , - _ -_-r
Y
,
I
I I 1 I
1 - ` ` • - t' 1 - -
1
_
r I I , , ,_ , - - - /' w
-
,
,
i
,
,
-
,
II ' 1 1 'I ,, ii ---- I ,I - - ---
I , I � 1 \
\ - , - , - - _' -- -
i
-
I - \ - III \\ _ -
- , _ ♦ _ --- ---- __
,
- - "
1 - , , . '� __- ---_- I -
-
,
,
-0+50 0+00 0+50 1 +00 I I ' ' _ _ _ --- ---
,
I ,
; i , i 1 ....------------- I -- ---- ------------ ----
� � y
-
-
3 _ ----- —_, -------
STREAM IMPACTS CROSS SECTION A -A _ _
/ - ------ I ----- ---- a
o- - - _- - --- - '
/ _ - --- -
N / ------
Scale: Horiz: 1" = 60' I
--- _ _
12 Vert: 1" = 6' � - -_ -- � 4 & - _ - y_ _— ---- -
,
I
_ _
�■■■■■■
■■■■■■
■■■■■■■■■■■■■■■
■■■■■■■■■■■
•
MUMM■■■■■■
■■■■■■■■■■
• . : • •
■■■■■■■■■■
■■■■■■■■
• .
■A■■■■■r
.
■■■■■■■■■■■■■
■■■■■■■■■■■■
]■■■■■■■■
■■■■■■■■
■
:.
•
■■■��J
■
••
•
■■■■■
•
■■■■■■■
•�
■■■■■■■
Z
O
rA
w
x
0
a
04
W
A
W
d
=
x
C
Q
Y;
i
a
O
U
Wo
F
°z
�
I�/
F.0
�,
X
w
z H
I"
w
Cr
E�
U
a
O pQ O
a
;-
3
W)a*1
C7
~�I
W
W
0V
g
�
E*
O
w
H
U
_`
�W"
N (V
C � R
C N N
Q•UZ�
N
°� o
0 C L 2
6 "U t
Via$ o
O L -0
0, y
t
0>0c-
tN 04
U.'o°o
4)L.5o
�,U�
,; N U 6
C � C
O n_ o
> C o L
W W M d
E
3
L
DATE
November 18, 2019
SCALE
1"=60'
JOB NO.
20191012
SHEET
I
I
I
1
1
I
I
,
I
1/1
o - - ------ - - :
--
N , --- I
�,
' ` ` 'I _- --------- 1 �- `\
I
I
I I
,
I , I\ , I , , , , "4I -/\ \ \ I, F, 0I 11,4 �I . I,I \,\",\, N\ ,, ,\ , II I\\,)\\II , \I\,, \\, ,�,\,'\\\\\\\$",,I \,\I\ \ \I II "V\ \I,\ " ,\\\ \I-I ,'\ I\ W\I I1\\ I,\\\ I\,I\I 11\\I
/ _ _ ` - I' 1'1 1 1
I . * .** I I � I I� �i \ \ 1\I I ,II , I I ,I ,I , 'I',I
'� / - - - - I 1 I 1
l 0,
,wI,1",,
`` .
\f , i'
f % o 'I
\\\ _ '
I
\. .
, I ; / 1II -1;,I / , - ,.- 1, 11,
. \, 1 _ }.
\ . \\\\
, ` , , �' 1 1
i
\
y , y 75, -, `' / I/ I - -, A4"I4w A1
" 11II '�-,Q1II
1 , '-I\1I,I" 1, �1I-1I" '1,,11``11 -, - ' II I ,1 �',I- ,II 1I,I -1I", -I 'I ,I -
- ,I ��I ,I;,I ', " , I 1, ;�I, '�I I�
1-\I\-,\ -I'I I\ -1\\ �� 4 I, I , I/I \ -\I-\"',,-///IAI- e I///I- I II ',,/ it \ ',- / ,,,, f "/,\"
, \ I 1, I" ,"/1II, - , ,I "\-I,�, -, \,,,�,/1,
-4,,-i, I ,-�//,, -I /- - ,, ,1I- ", ,,,---, - I `�-"I ,1, ,I""",,� - \I �/,t'I 4" //, '�-,I , /1,, ' ,
,$,.\//1/1,\ // /. ,.I
/III/ I ,\ "I,/ /,-II,-/-, / '-, ,- I,,,,,- /,, '
�I1 ;, /� 4,0%� I�h4 -II ii.,��I--- ---- - -�11 2I�. -0I
II
,,/, II �II /I ,I I,�'I 'I A I "/. � II ,II /,/ \ "\ I/ /, ,� I , I, 1I1"I, " /1, /,, I \, "1,',,'\'I ,
", II I I'1,I 111 I / I I,, 1; 1 1 I "I ", ,, I1 I I I "I
,- I / ,,,/ /�,- -I ,I - I - I I II I "I I � , \I \I � \l � , \ I \ \ �I I I � I \ 'I II I, I, ,' I , �II % I �'1I I I�� I ��1 I I I, I �II �l,I , � , I \I,� � ,1, I :I,: I,I II:I ,,,I IIII I �I �I I'- II I 1;,, I
I � �\ "�� \ ',I I , �", II�: , 1 ,, /� / , , / /0"I�4, ,-II ,'1II III
,0\"-11o-1ft64-f -
-I4--
I,IN -/I1 /.-. .
-A- --. - "-I ,�,4, I - II \ IKI I4I
, , I,',' , , , , I 1 1 , 1 1
//- I-�.
l/ �/ ' -----,
i�
{ 1 '//, /�/ - 11J
- l,r \�`\\\\`, -
.. I 11 I
\
-1�-, 1"
I -I I, ,I,
, ,
,
,
,
/'/ , / III I \ -
\ , , ,,, - -
\ / ' , \ , -
/
�/ '` I I "l "-. C N/F� TERRY B. AND DEBORAH 0�/ERTON V ems,' ---- x.
I
v vI,
F B
GCS / _
� I / I - ��< D.B. 7173 P. 532 D.B. 15802 P. 2630 , ,
_` N/ B ,
, . I / �� , _ - - --
------ - �
-/ / �� \ / � I - - - -1%' PID 768738122 `) PID 768739476
' " ,/ 0 / O k _ 6.05 ACRES 85 ACRES
a , ; ,''% / x G \ I I oO 1 ADDRESS ADDRESS: 6721 MT. H Rlvf 1
\ N RD RD.
�/� . *1. t r / � MA � AN
r
/ ZONING IX ' Z IX PK
>
:.A \ '1 -3H PK - -
6833 MT
n
11
�' /
4„
ONING: 3 � 1`
-`; , 1 \1
4, y,r, - l 'I� I ° °'
,II
- / (% / J I 1
���///,
I
- ----- , ,' ,'�'„ ' I - ----
/t 5
r
v ,,�
, , s� „ v
l? `
\ \ ;�^ _ _02,-0-�,�>-.-ML-N'��.=-M---N7a.:N �U0.EVL00Qo_1�Qa>V6(V0r9-2�02i1_2-);:1i-))))))):.11 ) , I,,1I-/,I-1 /,/',\,- -1 -1. /.,I,,,,,,4--, 1/, 1-� ,iI--i,/ 1i- ,I""\ -/4, \I-,1L",, ,iI-,, -,. IZ.-1\I-7I - I,\/,/ ,-I , "-% \N, 1l,"I1\-, 9-0 �I /,N/ // -1,1%"1,,I"-/- I/-O, \" -1",,,-- ,/ ---\ j-,,I,/o/-I--\ ,,,/ " --,,,/I \ - --I .M-,-" -,1-t" ,",\,, ",- ,-
" o - -
, I /o \,, r-, , -II �\I""I1-"11, " I , -, \,,I, I-, " ,I I�,I I -f'I/\-/I //\ ,,'",13%\/I\"/ �/, \1"II, \ - I \, \
-,", -IZ, 1 -,/�
3, 1I-/I-I'I �\ " I,-4I,,,,,Fl- \ ,--* \/\ \I\11I , -I-I "\�"I- \/ ,- , \-, I - / ,1
,\- II /,, I -- , -\II-,\ I\-0I, -\ ,-,I -, , -,0d --',,-I.,1
1 w fy
I \ 1I -/s1v- --I V1I1.\ ./\6-\ I., -- II/ - -I-1\I I.-*- - I 11 ,\II-I1\I"Ii1 -'"�-I I, '",\, lI- 11,, I I T I\ II I II I-L \ - ,1IWIII \ --I-\ \ , II 1 II Ii1ii,e1,&I 1-\1 -,- \I " II ,I\ , \ '0\ \ 1\\\I�7�,I\1-\,"�'\I'----\ * I11-1.- 1\' 1-\ II 1\,"\I, \ -I �I, - ,-\ ,I " , -\,\/-1,--'
- -- ------ -I ----- -I - -----1- ---- \ I -\- --\I -\I 1-1-1--I,--1"I-i\I-I-i!ii," /\-,--I-1- I\-1-1--I -I, '17--0 ,1--,---/ �I 1--\/-.-1-!I I I4\- \I - \ I�\>-� 1\ I , 1-II \ \ -,lI,\ 1 o\ 1-iI,\l,I �I\ \�I \\ \,'-\ w Z",,\- 1I \ \,1, 1� -\I,1 \,- I \I, \ I- -\ -I 1 \I1II I-- -\-"1""",-\ - -- \\- -,I- , -1-,- ,--� --1--/1- ,1 ,---- I/ -- / -,
�,,\I" \ .I I \",I I \ II,,-" \\,-I,�, I, 11,c', 1 \ ,I \" MI `I,',z��I\) IN (FI itt Z41-I/ - *� �0 t,1-g0 -1I0"1 II . I ;�"4 ,�I 0\IO-I,1 / - \\ �\\I, \\ -II", - I -\ - ,---I-\ - 1 - - -- ,---- II --- I ,-\ :- \--- \--,IfO,,/ "" -I, ,I,1= --I---,II -S- - -4,/ 1I 1-I-1, ,\, 1
\I\ I -,'- .-I---I '--- \-- --1I\,Z 1I,1,1- 7 I- ,-\ \-\-,
\ -\ I/- I -/-, I -I\ II I , - I' ---I\ V\-II\I--I \-/"1,I1 1, ---- \I\ - ,\ 1I- --�--1e---�-l---l/1\ ---I,-I '\--
NI, - -a 1I 1I -\',,," \ '-: " -/I,N I I -I - -\/I (-'\�,I-- - I
\I�- �-I�I-I/, "/��\,1,/-� -I ,- I III --1\ 1 ,\- -,_I, -,_-1-- I I-17II -, I- - \ 1:, I, -1II ,\ --- ,I1-,1III. ,1� /I - I- ,I' I - -\ /- I -I_\I, , 1--6'-I\ �II--I" I X ------I-�11-,'"
1- I-" \,-I\/-1\� --V1I>,I, , -I -I \/ II- �;\ ) --///I I/ *// !!, -,/1/--I\I I I1-'II -,\- II-,
--"I, --* -\I-
- -�I,-1l, I ,II Io� //I-I,--t,1--1// -\
--"// " \�-'--t-,I,\'\ -,-�--/�---/ I- - -II
I I-I/--I1--- -- ,/ --j /- --II .-
,z/��-, 1� 1'--- \ ,z\
--I1, /-- ,--�I,�-11--\,,\ ,,I �,
-/I1 - I � .-I -I - II �1I'-- \,11 \'I \II I,1 I-I� , 1-'."-c�4IU pI ,- I \- III -1-\
\" ,'-"M-\1-1 \Ind-�\ �/ - �� � - - -� , I--�-\-I < ,-� ---�- -1I1
I�, I I, �\-(--
-I-1\\I I"-b.I1\\, - II \\).- \I\\-�\ '\- --
J(
/ s , 1 _ _ - -
,
I
j
I
1,,IIII , 1'I,II I , I- -,-,,',-, 1
, ,1
,I
II I-
, ,
i , \
-; sty+ \ �►; --
-- \
1 I � � 40Q
i / -
J
, \ \ - - - - I `9�
` _ i ,,
/ / ,
-
1 a,: ,, , -
i
/ \ - ,
--
/ \ f
, \ \I - l,l I F GRAPHIC SCALE
t; /� BARBARA GLOVE MANGUM-"
- q\,--1`\1-'"--I'I,-!/A I I I-1l,I1l"\, I�,1I1,1i*l
1l -I ,III - \"I ,,t ,�- "I,,I 1/"\ -1�1�,.I;I".�rI\I,11�.1�-,I-\01"/1,.I,�\.�I.;! 1.�-
��� ,\III
1, I-I�/��'I,1, -�I 1 ,,,�\
1
1
- A /
v „
I _ _�� - -
- � � � '� - I' � � D B 5566 P 50
e; \ \ I\ \ I 3257 - 0 30 60 120
-- I \ - --__ D4.23 ACRES
a,,;,,, \ \1I „-- - ------ --. t \I, ADDRESS: 6701 MT." HERMAN
Q
/ \ i I C; I , = VICINITY MAP
� RD
II 1
II
, \ 1
, 9
s `' \' / --' - Not to Scale
\ -- - _ - 1 inch 60 feet
\ - - `�' -
i- \ ZOMNG: aX 3 PK
\ - - ---- -
-- - -
�I V - - v - --- _,
• ' , - - -
/ - '' ,
I
_ -- -- I I --------- _ _ -°
I
/ _ -- -
/ Z C" \ I '1 _ go- - ' +
\ �_ �_, --- - A \
r� I v
Ex. Parking Lot To Be \ - \
, I -\
\
Demolished on This
A -, �It -
� v y v A\ � `
,,
\
Side of Fut. Lumley _ ��
_
I
♦ \ O _ _ - -
Road & Land To Be ;", \ - I �1
:'
,
/I\ Purchase By Airport I 385\
- -
\
1
-
/ / - - ' III
/ ' , ` `,'
\�
,��,
--- - -
� � _ \ Q 1�%
r. ,
11-1
�. / I '.. \ - 11 \ ,'� IIt11~-1 111 / 1\',I II
1
III
II
\
\
\ I
,' -
► I _ I
, \ I
I I 1 , 1
,
1 I I � \ IM /' � I
'� I
0<_- \ .- , / N F ND OM I I 1 I ---- \\���, �/ \S� , I
11� . �/ I , ` I � I
/ O T Beginning of Jurisdictional - ---- - A `' �P I 1
Z
-'- N/F RALEIGH DURHAM AIRPORT � 2 P I ream er Fed Visit with �
I SRoss S llivan from USACE - \�1�
At)THORITY ��� - 7629879 _ I _ -"
I
,
D.B. 351\7 P. 486 , , - 1\ (� ..I I 1
r � ,- � onJ y32019 \ V _,
' RES � A � � ,I,'1 '
I �,
`,PID 768�26323 1
1.78 AC VS- I -_,/ �-T ' 010C LU R D I UPU 'I;11 �11 \
. ' RE
ul 1 �� �E II t
N T OTI E
--- G
ADDRESS: ` 6\901 M#. ERMAN PD. �+ NI IX-3- D B. 1 2 5 ` ,1'1'' ' I�'; ��
ZONI�iC: IX<3-PK I _-_ PI 7 u, W+ III
/, 2
e
----' - D
,�I I�?�I.�- ,.�--, -1,"I" --_--,-/ ,,-I- [" 1-V-II/I1I II-D -'7) -"I,I \/I,-1\ - ,I " /- I '/ "l'W� , , , 1,,- ,I I II _\II ,: ,---�,I-I--,1�" I- I1/1, -"� �\-/\ "-It J i�\II-�: . 1IU'\ � 1 \ I I /I- 1I I- , - IIG:I I\I -:I,R� � �OI U-P .� Ir-//.,--7/�III ;.I ,--J--.--7-1-�-I- .- ,M./-+
' � I
I i I DRES .� g M R1 I, I ,
- ,------• ,' 1 , I I "I
II - ----- -/--
,
M Z N PK
' 38
\ -- -
1
- ,� , .-, - 1111,4 ----
,
,
/ _/` II I 1 \ I \ 11
''' Y� I I I�. v� - ----- _ �_ I - \I t I 1' I II \II 1,
i
II
I
r /
,- i
' l
' -----
I I;,
I
4
rn
- _
` , , K / / .1 • ��\'/` ' ', ', \------------ --- I - - - /Y, - - \_, II\,` ,II \1 11'I
/ , VV _
_,-- ,. /yam
O %%
\I f - r` 1 , I '' Ix
P
n V -- - - �� 8�. '' I I vi� ;vpia
I _ \
---- \ \
� � �' r 4 Steam
\
I i I v � � � I� , I I I I �51
9
--- cn -- '
,
/ 1
,
\
I -
♦ ♦ \_: - -
, i , - , \ - ` (fI ` �, DIP
1 c� �I q 5
\
\
1
o1
I > � - I , � ,v �'.m vIII
-
I
Q) _ _
i � _ - �-�\-------- - - -_ -%----- ° ,- '� .....:Pro . BLDG � s, �,\I �1;
__ -
--- \ STM - -- _ un -
----- \ 1 ,
o - \\\ , D tent and a nd° 111I add°,
\ -----.
FFE 383 50 vv I
- - _ --- a I
__, 9530 LUMLEY ROAD 1 a
\ 1
1 y
1'I
L ` , \ , \ I
,
\
- - - N - -
i
\
z --- - � -- - -_ -- v , � /F ,HENDgiCK , �`_ - "
1
S Filter
.. --- _
� �. AUTOMOTIVE ,GROUP' � _ ` I\� T ,
m } \ - - - -- - - - D.B. 13295'/P. 45',3 `<9 - I r � _- I
N/F,-HENDRICK AUTOMOTIVE
. 1 , , . - \ ---- ----- 1,
o PID 76$$27929 I ,
c "81\ \ D.B. 13295 P. 453 \ b 3 ;a
2 03 ACRES
ADDRESS: 9530 I Sao -
PID 768825739 - ay
o \\ " II -
1
_ ` �- LUMLEY RD , '`v ��� v - I 11 1
- - 3.12 ACRES \ 1,
-, 1 1 vI -- ZONING:I IX� 3-PK Ex. 36 Stream Culvert - -' , , 1 , T v` (ii
ADD RD. -Impact) RESS: 9540 LUMLEY �,'�
'` '` I. 11 I A\ v, , V I
, � 1 ZONING: IX-3-PK - �I1"I�v, b
_ Prop. 294 LF ,
84. - 1
� .21 t LF (Non I
\
\ -- 38
o_ I�, f P rmanent -
\ I\ 11 \ ` Stream Impact - - - - - ----- - -- - I'`
\ 1 1
s, 5M' � I I 1
, \
- -- y o
�, - - r
1 S /F I H AM _ - - III
.: � O!
,
E 0 I�,
-
I I I
rn ------
- ;� �` `� - - - ,� ; I v, vow �
o I
B. 5 3
I `, I
. ", � �\ S PID 7 7 4 - � ; I I - d
I A , . ` ' _ i
v
,
T
z• I /\ 4790.0 R -� - d
V I ' - . , 1 ---' ��. �� \ S 28 0 AIR 0 L D - �/� \ICI 3,S-
- / ��. V ,' I'1 �Q Prop. Headwall Outlet I -
i� -- \ - - Rip ap Apron ", 9
i', o - ,. t onr andn \ /3� I , 1\VI
'- �� Z NING•
I s
ProOp U d
E �, -- ize - -
eten ,
o - v� Sa d Filter - 1
\
1 \
with
- � � �-, ,� I Prop. Rip Rap S• d \ IIIvv I ��
L
-' -- \ - -- -- etail 8706.02ta _ 1 N` 7 ��.
M
0
-Prop. Stream Impact Area 4 \ 1I 4-
1 ,1
1
1
I
I
38 I I' --�
1
v / I
I . 11
' V I
1
' ' V , I I -
I I,I
\\ \ . I I / \
\
,� I 8 - "I 9520 LU \ 1
,
' / L ,
--- o - ��
1
0, 395 395 - - -- _ 1293
9 J+� 9
`
o - -
rb D
\
,
- - \ - -- \ Z- __ ----- 3 ORS 58 D. - _ R
I - -r- S - N 3-_
8 - I , - 1 I
MLEY
3 1vv A "_ = ---- - - I I - _ �/
390 -- - � -- _ , ,' - --------- -
,
�- - -
,
,
Z
�T���� _ I - - - -
i
_ - _ _ ` ------
--- -- - ------ -- -- - __ ------ -- - -- _-- - ,_- ---- -
�, T - - - - - - - - - - - - - = _ -
rop. Grade/Bldg. FFE �' - - - - ---------------------
X 385 \�_, �`-��� �1I� ---- �3�� r4�
S W �`
rn - , I / Q CSv �� `, , A
- - i , ' LUM Y ROAD,II0 _ \ --- � ,PUBL-IC 4 LANE DIVIDED,-' \ _ -
\ _
a -
I
- - - - - - -
380 --- __ --_ _-__ - _ _ - - ---- - -- -- -------------- - - - - ^
�M�,
------\------ -
- -------- - - - - - - ---- -
-
- - -- \---- - - - - - - -- -
V-II - --- _ - - --- --- --_
-
- - -- -- - - - - -- - , -+ __
- - - - -- ;
- ---
II
1 I -- /- -----' -- -- 1 \
OI
I : ; , AM -
\
1 375 375 I I I , I I 1 , I ,\ - - - .- , ---- -- - --- ,-' 1
,
,
rn� ,,'" -^- ------ -- - , --
o Ex. Grade I 8S ^� I ,,,,�,� ---- -
_ '"`
-- --1 ------------ I- - -----\ "-, -- 1-,1 ,-, ","I'I 'I , - -" ,, I ,-- II " ,, I - ,,,--- II "-I1 " I"
NW-k
1 I I I I , , . , ' - -
N 3 �_ _ ,� _----
/ I 11
c�
I
o Ex. To of Bank �o L co 1 I I I s - -- - o I 1
f I.
---�-41--I---1,-,r"T*-,- ,,&A71---`1-'* I ', -i, -I--*-f1,
p o "' I ------ --' �, , v
370 I 1 I --------- 1�
._ I II 1\ I 1 ' - _ II' i \ \
I
1, I� ',; \ ..r
1 1 I 1 _ , _ ' I � , I I
rop. Stream Impacts 1, 1 ' -- - �� I ! 1 1 1 1 I I ---- --- .-- .o. , �� -
v
. ,., + _ _+
o u
,
Ex. Bottom of Bank 1 ' ' '�
, , i
,
,
,
' I I I \ ` '
,
,
-, ,, , , , ' ilk /
,
, I
_ -- - 1 '. I \
365 365 ; I I , I ---------- -- III'- /
Y
I
W ----------- 1 1,
1 '
/ , I I 1 - -- I 1\
' ' ' 1 1 ' 1 I\ 1 I I - ----------.- -.--- I '?'--_--------------- ---- \`,
l I I I 1 ,
`
` I \ --
_
,
360 360 - -�' 4
(n , ___--------_.-- _- __-
I, � 1 i 1 \ , , , \ I `` \ `� , ` I 1 - - - _ I WAS
i
,
,,'''
�F
o- - - - - -- ----- -------
-0+50 0+00 0+50 1+00 - '" - - �--I'I
`
- ' - - _---------
u
3 / 1 - -- ----- - ,
STREAM IMPACTS CROSS SECTION A -A I -
o - __ - I ES
---- _ -- -- - -
N / --------- ---------- - -
I
- T
Scale: Horiz:l"=60' - -__- ------ ----- 1.ONo additional stream or stream buffer impacts are proposed with Phase 2.
-
ab 1 I ,' This phase is shown for reference only.
Vert. 1 6
rn I - -_-- II I 2. The uture Lumle Road alignment is based on preliminary plans provided by
o ,, , ---- -- - - --"* ♦ _ WK Dickson on September 26, 2019. Final alignment is subject to change.
N , -
- ---
1 I A, v -, I
,,
I
`�
O
al
9
cn
W
A
W
d
=
x
C
Q
jl
QQ
(
,)
W
Z
Q
Q
4^
z
a
O
0
�
04
U
�/O
HW
^
~
z
A.-.+
W
Ho0
�D �*
j�..�j
-'!!!�
�
U
OxU 0-0"Ior-�*400
�W
O
3
Z
4
r '�
`� W
C
w
C
N
W
O
w
V1
�*
0.0
U
U
A*
N (V
E � i
C N N
o'uZ�
N
`9.
O
C N
NO 08 U"
Q d 8 �
° L
Zn
a > 0 -
tN rnW
U. o"�
4)nDo :� ;�
vi U ..
orn_o
>cos
W W M d
E
11
W
DATE
November 17, 2019
SCALE
lit =60'
JOB NO.
20191012
SHEET
1/1