Loading...
HomeMy WebLinkAbout20200288 Ver 1_Shoreline Stabilization_20200220State of North Carolina Department of Environment and Natural Resources DW Division of Water Resources ,,R Division of Water Resources 15A NCAC 02H .0500 — Water Quality Certification, Shoreline Stabilization FORM: SSGP 10-2013 Shoreline Stabilization Application Form Three copies of the application (including attachments) and the application fee should be sent to: Division of Water Resources 401 & Buffer Permitting Unit 1617 Mail Service Center Raleigh, NC 27699-1617 I. Applicant Information [15A NCAC 02H .0502(a 1. Owner Information Name: _ ) otZO A LAM> ONs Mailing Address: -71 Telephone Number: 980-M-N-I i Fax Number: 1 N E-mail Address: IACION_. .o(�4P�.( yly�oo. C�+yt 2. Agent/ Contact Person Information A signed and dated copy of the Agent Authorization letter (a form can be downloaded here: http://www.saw.usace.army.mil/PortaIS/59/docs/regulatorV/reRdocs/Permits/SAMPLE AGENT AUTH ORIZATION FORM.pdf) must be attached if the Agent has signed this application form. Name: Company Affiliation: Mailing Address: Telephone Number: `704-(o0a-2.( 19 Fax Number: E-mail Address: 1A.rtoa_ \oa.oa 4 Person to receive the Certification Approval: Jlc4op.J LA►R.fc.Sf II. Project Information [15A NCAC 02H .0502(a) & (b 1. Attach a vicinity map (i.e. street map) clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. 2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, structures (buildings, retaining walls, docks, impervious surfaces, FORM: SSGP 10-2013 Page 1 of 3 etc.), rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the diagram provided at the end of this application form. 3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard stick, shovel handle, etc.) 4. Location of the property (where work is to be conducted) County: (Aowl6t*ME'iLNearest Town: Trod Subdivision name or site address (include phase/lot number): a i G 1 e- O n1 �ic-, I e%t� 1 r L o+ *� to Directions to site - please include road names and numbers, landmarks, etc.: &t, t3 10 2q%2-7i i-urJ (4:K -M oi'l (ZsV . tom,_ a�2 v,,W Latitude (in decimal degrees) 35 . 39945 Longitude (decimal degrees) M) • 0109 L I 5. Describe the existing land use or condition of the site at the time of this application (residential, undeveloped, etc.): Mai 1,04- 1,5 L3.1.,WxAami 6. Property size (acres): O • S b1cc`t.-S 7. Lake/ river/ ocean adjacent to property: /_eKe_ 8. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or why it is necessary): 13ew .�2c- Sk.mWie An 9. Will work be conducted from land? From water? ❑ 10. Total amount of disturbance (including all excavation, backfill, rip rap, retaining walls, etc.) below the normal pool lake level/ Normal Water Level in square feet or acres: Zs oo - 3 000 sco.. CA- 11. Total amount of disturbance (including all clearing, back fill, excavation, rip rap, retaining walls, etc.) above the normal pool lake level/ Normal Water Level and 50 feet land -ward in square feet or acres: —7S—T)D — BScD 12. Please describe the vegetation above the normal pool lake level/ Normal Water Level and 50 feet landward to be impacted (number of trees, for instance): 9 eN'+1!! p� c -4t ae-S sue- z1�r s Owne Agent's Signat 15A NCAC 02H .0502(f)) Date 'Agent's signature is valid only if an authorization letter from the owner is provided. FORM: SSGP 10-2013 Page 2 of 3 Full Pond/ NormaLevel Shoreline v` C � La ke f-. I loj (At Full Pond/ Normal Water Level) l.v�sac_s�wnal,�,,a _ 6,1"0 V )-e •f f � - 9 a*t%+-Yfjr, scr-,k*- Qt,ac teas Please approximately sketch the following information on this plan (provide dimensions for each item, such as 10 ft x 100 ft)*: 1. All proposed vegetation clearing 2. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation 3. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation 4. Location of any proposed structures such as buildings, retaining walls, docks, etc. _ _ 5. Location of any excavation or dredging below the Full Pond/ Normal Water Lev elevation 6. Location of construction access corridors e- l�( (. c L(4kQ— r FORM: SSGP 10-2013 1 Page 3 of 3 i ' 4v - zm -m- a .K - U LJ t r� -a. FT 1 151' of y Shoreline ^a.+ f��r � 1 • Mill L Q� f0 J