HomeMy WebLinkAbout19850048 Ver 1_Renewal for CAMA Major Permit No. 136-05_20200227Permit Class
RENEWAL/
MAINTENANCE-5
STATE OF NORTH CAROLINA
Department of Environmental Quality
and
Coastal Resources Commission
r
ermt
for
X Major Development in an Area of Environmental Concern
pursuant to NCGS 113A-118
X Excavation and/or filling pursuant to NCGS 113-229
Permit Number
136-85
Issued to PCS Phosphate, P.O. Box 48, Aurora, NC 27806
Authorizing development in Beaufort County at adj. to Pamlico River, at PCS plant barge basin
as requested in the permittee's application coed letter dated 2/7/20
This permit, issued on February 27, 2020 , is subject to compliance'with the application (where consistent
with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may
h,- eiihiant to finr c imnrknnment nr civil action_ or may cause the permit to be null and void.
"""J
1) This Renewal shall be attached to the original of Permit No. 136-85, which was issued to the
permittee on 5/2/85, as well as all subsequent renewals, refinements and modifications, and copies of
all documents shall be readily available on site when a Division representative inspects the project for
compliance.
2) All conditions and stipulations of the active permit remain in force under this Renewal.
(See attached sheet for additional conditions)
This permit action may be appealed by the permittee or
other qualified persons within twenty (20) days of the issuing
date.
This permit must be accessible on -site to Department
personnel when the project is inspected for compliance.
Any maintenance work or project modification not covered
hereunder requires further Division approval.
All work must cease when the permit expires on
February 28, 2025
In issuing this permit, the State of North Carolina agrees
that your project is consistent with the North Carolina Coastal
Management Program.
Signed by the authority of the Secretary of lit ana ine unau
of the Coastal Resources Commission.
Braxton C. Davis, Director
Division of Coastal Management
This permit and its conditions are hereby accepted.
Signature of Permittee
PCS Phosphate
Permit No. 136-85
Page 2 of 2
ADDITIONAL CONDITIONS
Maintenance Clause
3) The Division of Coastal Management shall be notified in writing at least two (2) weeks in advance of
any maintenance work authorized by this permit, and such notification shall include:
A. The number of the original permit.
B. A statement that no dimensional changes are proposed.
C. A copy of the original permit plans with cross -hatching indicating the area to be maintained, the
area to be used for spoil disposal, and the estimated amount of material to be removed. The
location, design and holding capacity of the spoil disposal site shall be approved by a
representative of the Division prior to the initiation of any maintenance dredging activities.
D. The date of map revision and the permittee's signature shown anew on the original plan.
NOTE: The N.C. Division of Water Resources has assigned the proposed project DWR Project No.
1273.
NOTE: The U.S. Army Corp of Engineers has assigned the proposed project COE Action Id. No.
SAWC085-N-007-0236
NOTE: A permit renewal application processing fee of $100 was received by DCM for this project.