HomeMy WebLinkAboutSW6190901_Supplement-EZ Form_20200226SUPPLEMENT-EZ COVER PAGE
FORMS LOADED
PROJECT INFORMATION
1
Project Name
Project Area ac
Coastal Wetland Area ac
Hoke Landing Phase 2
2
14.57
3
0
4
Surface Water Area ac
0
5
Is this project High or Low Density?
High
6
Does this project use an off -site SCM?
No
COMPLIANCE WITH 02H ,1003(4)
7
'Width of vegetated setbacks provided feet
23
8
lWill the vegetated setback remain vegetated?
Yes
9
Its BUA other that as listed in .1003 4 c-d out of the setback?
Yes
10
lis streambank stabilization proposed on this project?
Yes
NUMBER AND TYPE OF SCMs:
11
Infiltration System
0
12
Bioretention Cell
0
13
Wet Pond
1
14
Stormwater Wetland
Permeable Pavement
0
15
0
16
ISand Filter
0
17
Rainwater Harvesting RWH
0
18
Green Roof
0
19
Level Spreader -Filter Strip LS-F5
0
20
Disconnected Impervious Surface (DIS)
0
21
Treatment Swale
0
22
Dry Pond
0
23
StormFilter
0
24
Silva Cell
D
25
Bayfilter
0
26
Fiiterra
0
FORMS LOADED
CERTIFICATION
27 1 Name and Title:
28 O anization:
29 IStreet address:
31 Phone
32 Email:
PE
Larry King & Assoc., RLS, PA
13_33 Morganton Road, Suite 20,
Fayetteville, NC 28305
— 910-483-4300 T
jnobies@lkanda.com
Certification Statement:
I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or
supervision; that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and
that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent
with the information provided here
`a,6atCAyo
errerrrp
Q 9�
SEAL = -
31459
F°yC'I N E.�'�`�1���:�
9X-LL
Sigt
f D sig r
10-
Date
DRAINAGE AREAS
1
Is this a high density project?
Yes
2
If so, number of drainage areas/SCMs
1
3
Is all/part of this project subject to previous rule
versions?
No
FORMS LOADED
DRAINAGE
AREA INFORMATION
IType of SCM
Total BUA in project (sq ft
New BUA on subdivided lots (subject to permitting)
(sq ft
New BUA outside of subdivided lots (subject to
s
Entire Site
1
4
Wet Detention
Wet Detention
5
503760 sf
228200 sf
6
115586 sf
1 D8538 sf
7permitting)
101266 sf
64127 sf
8
Offsite - total area ft
9
Offsite BUA (sq ft
10
Breakdown of new BUA outside subdivided lots:
Parki sq ft
72524 sf
61740 sf
Sidewalk ft
3028 sf
2387 sf
Roof ft
25714 sf
Roadway s it)
- Future (sq ft
- Other, please specify in the comment box
below (sq ft
11
New infiltrating permeable pavement on
subdivided lots ft
sf
sf
sf
12
New infiltrating permeable pavement outside of
subdivided lots sq ft
sf
286908 sf
sf
13
Exisitng BUA that will remain (not subject to
ermitting) (sq ft
55535 sf
14
Existing BUA that is already permitted ft
sf
sf
15
1 Existing BUA that will be removed (sq ft
sf
16
Percent BUA
79%
78%
17
Desi n storm inches
1 in
1 in
18
Desl n volume of 5CM cu ft
18926 cf
19
Calculation method for design volume
Simple Medthod
Simple Method
ADDITIONAL INFORMATION A.
20
Please use this space to provide any additional information about the
drainage area(s):
"Entire Site" includes all areas within the existing development, the current
proposed development and any future outparcel development. Column 11
represent the areas actually draining to the proposed wet detention
area"Subdivided Lots" are taken to mean outparcels for future or current
1 Drainage area number
2 Design volume of SCM (cu ft)
GENERAL MDC FROM 02H .1050
31 Is the SCM sized to treat the SW from all surfaces at build -out?
1
18327 cf
Fes
Yes
3:1
4
Is the SCM located away from contaminated soils?
5
What are the side slopes of the SCM (H:V)?
6
Does the SCM have retaining walls, gabion wails or other engineered
side slopes?
No
7
Are the inlets, outlets, and receiving stream protected from erosion
(10-year storm)?
Yes
8
Is there an overflow or bypass for inflow volume in excess of the
design volume?
Yes
9
What is the method for dewatering the SCM for maintenance?
Pump (preferred)
10
If applicable, will the SCM be cleaned out after construction?
Yes
11
Does the maintenance access comply with General MDC (8)?
Yes
12
Does the drainage easement comply with General MDC (9)?
Yes
13
If the SCM is on a single family lot, does (will?) the plat comply with
General MDC (10)?
14
Is there an O&M Agreement that complies with General MDC (11)?
Yes
15
Is there an O&M Plan that complies with General MOC (12)?
Yes
16
Does the SCM fo ow the device specific MDC?
Yes
17 Was the SCM designed by an NC licensed professional?
ND MQC FROM 02H.1053
18 Method used
Yes
s
SA/DA
19
Has a stagelstorage table been provided in the calculations?
yes
20
Elevation of the excavated main pool depth (bottom of sediment
removal) (fmsl)
236.00
21
Elevation of the main pool bottom -(top of sediment removal) (fmsl)
237.00
22
Elevation of the bottom of the vegetated shelf (fmsl)
243.60
23
Elevation of the permanent pool (fmsl)
244.00
24
Elevation of the top of the vegetated shelf (fmsl)
244.50
25
Elevation of the temporary pool (fmsl)
245.50
26
Surface area of the main permanent pool (square feet)
8169:1
27
Volume of the main permanent pool (cubic feet)
33845 cf
28
Average depth of the main pool (feet)
4.14 ft
29
_
Average depth equation used
Equation 2
30
If using equation 3, main pool perimeter (feet)
31
If using equation 3, width of submerged veg. shelf (feet)
32
Volume of the forebay (cubic feet)
6487 of
33
Is this 15-20% of the volume in the main pool?
Yes
34
Clean -out depth for forebay (inches)
48 in
35
Design volume of SCM (cu ft)
18327 cf
36
Is the outlet an orifice or a weir?
Orifice
371
If orifice, orifice diameter (inches)
2 in
381
If weir, weir height (inches)
39
If weir, weir length (inches)
40
Drawdown time for the temporary pool (days)
3.5
41
Are the inlet(s) and outlet located in a manner that avoids short-
circuiting?
Yes
42
Are berms or baffles provided to improve the flow path?
No
43
Depth of forebay at entrance (inches)
60 in
44
Depth of forebay at exit (inches)
54 in
45
Does water flow out of the forebay in a non -erosive manner?
Yes
46
Width of the vegetated shelf (feet)
6 ft
47
Slope of vegetated shelf (H:V)
6:1
48
Does the orifice drawdown from below the top surface of the
permanent pool?
Yes
49
Does the pond minimize impacts to the receiving channel from the 1-
yr, 24-hr storm?
Yes
50
Are fountains proposed? (If Y, please provide documentation that
MDC(9) is met.)
No
51
Is a trash rack or other device provided to protect the outlet system?
Yes
52
Are the dam and embankment planted in non -clumping turf grass?
Yes
631
Species of turf that will be used on the dam and embankment
Centipede
54
Hasa planting plan been provided for the vegetat shel .
Yes
ADDITIONAL INFORMATION
Please use this space to provide any additional information about the
55 wet pond(s):
Wet Pond 1 1•rtA am -)17 FYln)A