HomeMy WebLinkAboutNCS000422_PCSRC Statement 8_20200218Section F: Post -Construction Site Runoff Controls
BMP: Strategies
Item: B
Strategies which include SCMs appropriate of the MS4.
The Phase II Stormwater ordinance adopted by the town describes compliance with 15A NCAC
02H Section .1000.