Loading...
HomeMy WebLinkAboutNCS000422_PCSRC Statement 5_20200218Section F: Post -Construction Site Runoff Controls BMP: Maintenance and Repair of SCMs Item: F The Phase II Stormwater Ordinance includes mechanism to require long term maintenance and operation of SCMs installed pursuant of the post -construction stormwater ordinance.