Loading...
HomeMy WebLinkAbout20120077 Ver 1_401 Application_20120212l & Environmental Consultants, PA ar Ridge Road a Raleigh, North Carolina 27614 a Phone: (919) 846 -5900 a Fax: (919) 846 -9467 www.SandEC.com To: US Army Corps of Engineers Wilmington Regulatory Field Office Attn: Eric Alsmeyer 3331 Heritage Trade Drive, Ste. 105 Wake Forest, NC 27587 From: Debbie Edwards Soil & Environmental Consultants, P.A. 11010 Raven Ridge Road Raleigh, NC 27614 Re: Del Webb- Active Adult Community Raleigh - Durham, Durham County, NC January 27, 2012 S &EC Project #11575.P4 NC Division of Water Quality WebSCaPe Unit Attn: Karen Higgins 512 N. Salisbury Street (9�h floor) Raleigh, NC 27603 On behalf of the applicant Chris Raughley of Pulte Homes Corporation, please find attached a complete application and supplemental information requesting written concurrence from the U.S. Army Corps of Engineers (USACE) and the N.C. Division of Water Quality (NCDWQ) that the activities proposed below may proceed under Nationwide Permits 12, 14 & 29, General Water Quality Certifications 3819, 3820 & 3821 and a Riparian Buffer Authorization. It's important to note that a pre - application meeting was held on July 25, 2011 with the NCDWQ and the USACE. In attendance were Ian McMillan, Amy Chapman and Annette Lucas of the NCDWQ, Eric Alsmeyer of the USACE, Randy King of Pulte Home Corporation and myself. At this meeting we reviewed the site plans and discussed major concerns with the proposed project. To date we feel that we have addressed these concerns and have provided an application for your review and anticipated approvals. Please contact me at (919) 846 -5900 if you have any questions or require additional information. PROJECT SUMMARY Project Name - - - - - -- -- - - Del Webb- Active Adult Community Project Type Residential Subdivision Owner/Applicant Pulte Homes Corporation County Wake & Durham Nearest Town Durham Waterbody Name UT to Little Brier Creek & Lick Creek Basin / Sub -basin 27- 23 -4 -1 & 27-11-(0.5) Index Number 03 -04 -02 Class C, NSW & WS -IV, NSW IMPACT SUMMARY Stream Impact (acres): 0.321 (0.198 Permanent & 0.123 Temporary) Wetland Impact (acres): 0.421 (0.119 Permanent & 0.303 Temporary) Isolated Wetland Impacts (acres): 0.502 Open Water Impact (acres): 0 Total Impact to Waters of the U.S. (acres) 0.742 (0.317 Permanent & 0.426 Temporary) Total Stream Impact (linear feet): 896 (250 Permanent Important & 262 Permanent Unimportant Total Riparian Buffer Impacts (sq. ft.): Zone 1: 62,938 Zone 2: 123,549 Attachments: Pre - construction Notification Application Form Agent Authorization Form NRCS Soil Survey Map & USGS Topographic Map Neuse Buffer Determination Letters (NBRRO 10 -222, 11 -123, 09 -018, 2009 -0522 Appeal letter and 11 -140) Jurisdictional Determination -AID# 2011 -00318 Wetland Survey for Leesville Active Adult Community- Jennifer Burdette EBX Statement of Availability letter- January 18, 2012 Wildlands Engineering Reservation of Credit letter- January 16, 2012 NCEEP In -Lieu Fee Acceptance Letter - January 24, 2012 EBX No Credit Availability Email- January 17, 2012 City of Durham — Proposed 12" Waterline to Serve Del Webb -US 70- January 26, 2012 Offsite Waterline Extension Map -sheet C539 City of Durham - Raleigh Interconnection Project Map -C7 Stormwater Impact Analysis (DWQ only) Level Spreader Worksheets (DWQ only) Stormwater Facility Agreement (DWQ only) Overall Site Plan Index Sheet -Sheet C520 Existing Conditions & Proposed Conditions: Impact Key Index - sheets C521 -0528 Impact Exhibits- sheets C529 -0538 $570 DWQ Application Fee \O�0F W AT�c9QG Office Use Only: Corps action ID no. DWQ project no. Form Version 1.3 Dec 10 2008 Pre - Construction Notification (PCN) Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: ®Section 404 Permit El Section 10 Permit 1b. Specify Nationwide Permit (NWP) number: 12, 14 & 29 or General Permit (GP) number: N/A 1 c. Has the NWP or GP number been verified by the Corps? ® Yes ❑ No 1 d. Type(s) of approval sought from the DWQ (check all that apply): ® 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ® Riparian Buffer Authorization 1e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ❑ Yes ® No For the record only for Corps Permit: ❑ Yes ® No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. ® Yes ❑ No 1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ❑ Yes ® No 1h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ® No 2. Project Information 2a. Name of project: Del Webb - Active Adult Community 2b. County: Durham & Wake 2c. Nearest municipality / town: Durham 2d. Subdivision name: Del Webb 2e. NCDOT only, T.I.P. or state project no: N/A 3. Owner Information 3a. Name(s) on Recorded Deed: See Attached list 3b. Deed Book and Page No. See Attached list 3c. Responsible Party (for LLC if applicable): Chris Raughley VP Land Development, Pulte Home Corporation 3d. Street address: 1225 Crescent Green Drive, Suite 250 3e. City, state, zip: Cary, NC 27518 3f. Telephone no.: 919 - 816 -1100 3g. Fax no.: 919 -816 -1198 3h. Email address: N/A Page 1 of 14 PCN Form — Version 1.3 December 10, 2008 Version 4. Applicant Information (if different from owner) 4a. Applicant is: ❑ Agent ® Other, specify: Owner please send correspondence to both Owner and Agent 4b. Name: Chris Raughley, VP Land Development 4c. Business name (if applicable): Pulte Homes Corporation 4d. Street address: 1225 Crescent Green Drive, Suite 250 4e. City, state, zip: Cary, NC 27518 4f. Telephone no.: 919 -816 -1100 4g. Fax no.: 919 -816 -1198 4h. Email address: N/A 5. Agent/Consultant Information (if applicable) 5a. Name: Debbie Edwards 5b. Business name (if applicable): Soil & Environmental Consultants, PA 5c. Street address: 11010 Raven Ridge Road 5d. City, state, zip: Raleigh, NC 27614 5e. Telephone no.: 919- 846 -5900 5f. Fax no.: 919- 846 -9467 5g. Email address: DEdwards @SandEC.com Page 2 of 14 B. Project Information and Prior Project History 1. Property Identification Parcel ID: 0769 -01 -16 -4591, 0769 -14 -4892, 0769- 01 -26- 4978, 0769 -01 -26 -9080, 0769 -01 -35 -3524, 0769-03-35 - 1a. Property identification no. (tax PIN or parcel ID): 7254, 0769 -03 -24 -8486, 0769 -03 -33 -2232, 0769- 03 -44- 6000, 0769 -04 -52 -7602, 0769 -04 -42 -5588, 0769-03-21 - 3379, 0860 -03 -13 -0809, 0850 -03 -96 -8066 1 b. Site coordinates (in decimal degrees): IMPACT AREA H Latitude: 35.9303 Longitude: - 78.7849 (DD.DDDDDD) (- DD.DDDDDD) 1 c. Property size: t 431.61 acres 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to UT to Little Brier Creek, 27- 33-4 -1 and Lick Creek, 27-11 - proposed project: (0.5) 2b. Water Quality Classification of nearest receiving water: C, NSW and WS -iV,• NSW 2c. River basin: Neuse 03- 04 -02, Hydrologic Unit Code 03020201 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: The existing conditions on site consist of large parcels of forested land, timbered land and rural residential. The general land use in the vicinity of the project is rural residential and forested. 3b. List the total estimated acreage of all existing wetlands on the property: Approximately 0. 563 acres of Jurisdictional Wetlands and 0.523 acres of Isolated Wetlands 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: Approximately 19,297 linear feet of stream 3d. Explain the purpose of the proposed project: The purpose of the proposed project is to construct an Active Adult Residential Community. 3e. Describe the overall project in detail, including the type of equipment to be used: The overall project consists of the construction of an Active Adult Residential Community, including but not limited to: roads, utilities, greenways, stormwater devices, residential structures and associated facilities. The 430+ development will include an off -site access road that connects the southeast portion of the project to the existing TW Alexander Dr. at its intersection with ACC Blvd_ TW Alexander Dr. will be extended to the east and will intersect with a new Collector Road that will be built from Andrews Chapel Road. This Collector road will extend north of Andrews Chapel Road to connect with Leesville Road. This new north -south Collector road is required by the- Wake- Durham Collector Road Plan. TW Alexander will then be extended to the east to install a previously approved stream crossing permitted by the USA CE (SA W -2006- 33046) and the NCDWQ (DWQ Project #20060738/Cert. No. 3598). In addition, the City of Durham is requiring the construction of a pump station and Force Main to connect to the existing City sewer system and a waterline connection to connect to the City water system. The pump station is proposed to the south of the development with the Force Main going through the development, connecting to Leesville Road and ultimately connecting to an existing pump station on the west side of Doc Nichols Road. The waterline will extend along the Collector road, TW Alexander Dr. and ultimately connect to the new City of Durham water main in US 70. This water main will be constructed within the existing Right of Way of existing roads. The crossing of an existing stream on the south side of US 70 will be accomplished at the same time and within the footprint of the permit that the City of Durham obtained for their proposed water interconnection with the City of Raleigh, please see attached sheets C539 and C7 for the waterline location and AID. Equipment to be used will include excavators, bull dozers and other typical equipment used for land clearing, construction and excavating. Page 3 of 14 PCN Form - Version 1.3 December 10. 2008 Version Project Information and Prior Project History 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all prior phases) in the past? ®Yes El No ❑Unknown Comments: 4b. If the Corps made the jurisdictional determination, what type of determination was made? ❑ Preliminary ®Final Comments: Action ID #2011 -00318 4c. If yes, who delineated the jurisdictional areas? Agency /Consultant Company: Soil & Environmental Name (if known): Steven Ball Consultants, PA Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. USA CE-site visits with Eric Alsmeyer on January 6 & June 28, 2011 (Action 1D #2011- 00318). NCDWQ -site visits with Martin Richmond on December 10, 2010 & May 26, 2011 (NBRRO #10 -222, 11 -123 & 11 -140). Additionally, a portion of this project was delineated by Jennifer Burdette, NCDWQ site visits with Lauren Witherspoon on December 30, 2008 & February 12, 2009 (NBRRO/IP #09 -018). The wetland survey for these parcels has been submitted to the USA CE by Jennifer Burdette for verification and signature in August 2011. 5. Project History 5a. Have permits or certifications been requested or obtained for FE]Yes No El Unknown this project (including all prior phases) in the past? 5b. If yes, explain in detail according to "help file" instructions. NIA 6. Future Project Plans 6a. Is this a phased project? ® Yes ❑ No 6b. If yes, explain. The project will be constructed in two phases. Phase I will start construction upon receipt of Approvals, Phase it will be constructed at a later date. Please note that there are parcels within Phase Ii that are identified as Future" at present these areas cannot pursue development review /approval by the City of Durham. This is a result of a 5-yea; no -build moratorium that has been imposed by the City because of timbering activities that did not comply with the City's UDO. Page 4 of 14 C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ® Wetlands ® Streams - tributaries ® Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number — Permanent Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact P or Temporary T if known DWQ — non -404, other acres W -1 ®P ❑ T Lot Fill ISOLATED ® Yes ❑ No ❑ Corps ® DWQ 0.017 W -2 ®P ❑ T Lot Fill ISOLATED ® Yes ❑ No ❑ Corps ® DWQ 0.015 W -3 ®P ❑ T Road ISOLATED ® Yes ❑ No ❑ Corps ® DWQ 0.048 W -3 ® P ❑ T Lot Fill ISOLATED ® Yes ❑ No ❑ Corps ® DWQ 0.237 W -4A ®P ❑ T Lot Fill ISOLATED ® Yes ❑ No ❑Corps ® DWQ 0.006 W4B ®P ❑ T Lot Fill ISOLATED ® Yes ❑ No ❑ Corps ® DWQ 0.002 W -5 ® P [:IT Force Main Easement & ISOLATED ® Yes El Corps 0.009 Greenway ❑ No ®DWQ W -6 ® P ❑ T Road ISOLATED ® Yes ❑ No ❑ Corps ®DWQ 0.008 W -6 ® P ❑ T Lot Fill ISOLATED Yes ❑ No ❑ Corps ® DWQ 0.046 W -7 ®P ❑ T Lot Fill ISOLATED ® Yes ❑ No ❑ Corps ® DWQ 0.009 W -8A ® P ❑ T Road Headwater ® Yes ® Corps 0.015 Weiland ❑ No ❑ DWQ W -8A ®P ❑ T Lot Fill Headwater ® Yes ® Corps 0.043 Wetland ❑ No ❑ DWQ W -8B ® P ❑ T Lot Fill Headwater ® Yes ® Corps 0.047 Wetland ❑ No ❑ DWQ W -9 ® P ❑ T Lot Fill ISOLATED ® Yes ❑ No ❑ Corps ® DWQ 0.023 W -10 ® P ❑ T Road ISOLATED ® Yes ❑ No ❑ Corps ® DWQ 0.004 W -10 ® P ❑ T Lot Fill ISOLATED ® Yes ❑ No ❑ Corps ® DWQ 0.039 W -11 ® P ❑ T Road Headwater ® Yes ® Corps 0.0002 Wetland ❑ No ❑ DWQ W -11 ® P [:IT Lot Fill Headwater ® Yes ® Corps 0.014 Wetland ❑ No ❑ DWQ W -12 ® P ❑ T Lot Fill ISOLATED ® Yes ❑ No ❑ Corps ® DWQ 0.039 Page 5 of 14 PCN Form — Version 1.3 December 10, 2008 Version W -13 ❑ PEI T Force Main impounded ® Yes ® Corps 0.012 Wetland ❑ No ❑ DWQ W -14 ❑ P ® T Force Main Impounded ® Yes ® Corps 0.290 Wetland ❑ No ❑ DWQ 2g. Total wetland impacts 0.923 2h. Comments: Of the 0.923 acres of proposed wetland impacts, 0.502 acres are ISOLATED WETLANDS and 0.421 are JURISDICTIONAL WETLAND IMPACTS. Of the 0.421 acres, 0.119 is permanent. 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number - Permanent (PER) or (Corps - 404, 10 stream length (P) or Temporary (T) intermittent DWQ - non -404, width (linear (INT)? other) (feet) feet) St ( A ) ® P [-I T Road Crossin g UT to Little ❑ PER ® Corps 11 178 Brier Creek ® INT ❑ DWQ S2 (B) ❑ P ® T Sanitary Sewer UT to Little Brier ® PER ® Corps 11 45 Creek ❑ INT ❑ DWQ S3 (C) ® P ❑ T Road Crossing/ UT to Little ❑ PER ® Corps 22 84 Greenway Brier Creek ® INT ❑ DWQ S4 (D) ❑ P ® T Sanitary Sewer UT to Little Brier ® PER ® Corps 10 37 Creek ❑ INT ❑ DWQ S5 (F) El P ®T Aerial Sanitary Sewer/ UT to Little Brier ®PER ®Corps 6 40 Greenway Creek ❑INT ❑DWQ S6 (G) [-I P ® T Aerial Sanitary Sewer/ UT to Little Brier ® PER ® Corps 8 36 Greenway Creek [-I INT ❑DWQ S7 (H) ®P El Road Crossing UT to Little ® PER ® Corps 18 250 Brier Creek ❑ INT El DWQ S8 (l) ❑ P ® T Sanitary Sewer UT to Little Brier ® PER ® Corps 6 31 Creek ❑ INT ❑ DWQ S9 (J) F1 P ®T Sanitary Sewer/ UT to Little Brier ® PER ® Corps 12 40 Greenway Creek [:1 INT El DWQ S10 (K) ❑ P ®T Sanitary Sewer/ UT to Little Brier ® PER ® Corps 19 33 Greenway Creek El INT El DWQ S11 (M) ❑ P ® T Sanitary UT to Little Brier ® PER ® Corps 16 56 Sewer /Force Main Creek ❑ INT ❑ DWQ S12 (N1) ❑ P ® T Force Main Lick Creek ❑ PER ® INT ® Corps ❑ DWQ 1 35 S13 (N2) ❑ P ® T Force Main Lick Creek ® PER ❑ INT ® Corps ❑ DWQ 15 31 3h. Total stream and tributary impacts 896 3i. Comments: Compensatory Mitigation proposed for all permanent stream impacts which total 512 linear feet The USACE will require a 2:1 mitigation ratio for the important/perennial stream impacts which total 500 linear feet and the NCDWQ will require a 1:1 mitigation ratio on all permanent stream impacts with total 512 linear feet As such, the proposed 512 linear feet of compensatory mitigation should cover both the USA CE and the NCDWQ requirements. Page 6 of 14 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individ allv list all open water im acts below. 4a. 4b. 4c. 4d. 4e. Open water impact Name of waterbody number— (if applicable) Type of impact Waterbody type Area of impact (acres) Permanent (P) or Temporary( T 01 ❑P ❑T 02 ❑P ❑T 4f. Total open water impacts 4g. Comments: 5. Pond or Lake Construction If pond or lake construction proposed, then com lete the chart below. 5a 5b. 5c. 5d. 5e. Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID Proposed use or purpose of (acres) number pond Flood ed Filled Excavated Flooded Filled Excavated Flooded P1 P2 5f. Total 5g. Comments: 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: Page 7 of 14 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6a. ® Neuse ❑ Tar - Pamlico ❑ Other: Project is in which protected basin? ❑ Catawba ❑ Randleman 6b. 6c. 6d. 6e. 6f. 6g. Buffer impact number - Reason for impact Buffer Zone 1 impact Zone 2 impact Permanent (P) or Stream name mitigation (square feet) (square feet) Temporary T required? 61 (A) ® P ❑ T Road Crossing UT to Little Brier Creek ® Nos 8,244 4,618 B2 (B) ❑ P ® T Gravity UT to Little Brier ❑ Yes 2,687 1,719 Sewer /Greenway Creek ® No B3 (C) ® P ❑ T Road UT to Little Brier ❑ Yes 3,685 1,946 Crossing /Greenway Creek ® No B4 (D) ❑ P ® T Gravity Sewer UT to Little Brier Creek ® No 2,045 1,249 B5 (E) ® P ❑ T Road Crossing UT to Little Brier Creek No 11,075 6,132 B6 (F) ❑ P ® T Gravity UT to Little Brier ❑ Yes 2,584 2,485 Sewer /Greenway Creek ® No B7 (G) ❑ P ® T Gravity UT to Little Brier ❑ Yes 2,235 1,504 Sewer /Greenway Creek ® No B8 (H) ® P ❑ T Road Crossing UT to Little Brier Creek a No 13,676 12,162 B9 (I) ❑ P ® T Gravity Sewer UT to Little Brier Creek ® Nos 2,061 1,386 B10 (J) ❑ P ® T Gravity UT to Little Brier ❑ Yes 2,602 1,755 Sewer /Greenway Creek ® No 611 (K) ❑ P ®T Gravity Sewer /Force UT to Little Brier ❑ Yes 2,450 1,635 Main /Greenway Creek ® No B12 (M) ❑ P ®T Gravity Sewer /Force UT to Little Brier ❑ Yes 3,512 2,811 Main Creek ® No B13 (N1) ❑ P ® T Force Main Lick Creek ® No 1,983 1,643 B14 (N2) ❑ P ® T Force Main Lick Creek ® Nos 1,805 1,203 PARALLEL ® Yes BUFFER Parallel UT to Little Brier Zone 1 IMPACTS -See Utility /Greenway Creek or Brier only 2,294 81,301 Attached Table Creek ❑ No ®P ®T 6h. Total buffer impacts 62,938 123,549 6i. Comments: The above listed riparian buffer impacts B1 -B13 are the proposed perpendicular crossings (i.e. road/utility/greenway) through the riparian buffer, the last row on this table is a total of the parallel riparian buffer impacts from attached table. Totals that are bold require buffer mitigation. Page 8 of 14 D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. Please see attached Avoidance and Minimization 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. Erosion & Sediment Control plan and measures such as Tree Protection Fencing to protect water quality during construction activities. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ® Yes ❑ No 2b. If yes, mitigation is required by (check all that apply): ® DWQ ® Corps 2c. If yes, which mitigation option will be used for this project? ® Mitigation bank ® Payment to in -lieu fee program ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: EBX Neuse Riparian Buffer Umbrella Mitigation Bank/Rudolph Site and Wildlands Engineering - Wildlands Southeast Holdings 1, LLC 3b. Credits Purchased (attach receipt and letter) Type: Stream & Buffer Quantity: 592 Stream & 908,576 Buffer 3c. Comments: Reservation of credits from two different mitigation banks required to meet compensatory mitigation requirements 4. Complete if Making a Payment to In -lieu Fee Program 4a. Approval letter from in -lieu fee program is attached. ® Yes 4b. Stream mitigation requested: 0 linear feet 4c. If using stream mitigation, stream temperature: ❑ warm ❑ cool ❑cold 4d. Buffer mitigation requested (DWQ only): 0 square feet 4e. Riparian wetland mitigation requested: 0 acres 4f. Non - riparian wetland mitigation requested: 0.92 acres 4g. Coastal (tidal) wetland mitigation requested: 0 acres 4h. Comments: Email provided by EBX indicating total wetland credits needed for project are not available through mitigation bank. 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 9 of 14 PCN Form — Version 1.3 December 10, 2008 Version 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires ® Yes ❑ No buffer mitigation? 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. 6c. 6d. 6e. Zone Reason for impact Total impact Multiplier Required mitigation (square feet) (square feet) Road Crossings E & H Zone 1 and Parallel Utility Impacts 27,045 3 (2 for Catawba) 81,135 to Zone 1 Zone 2 Road Crossings E & H 18,294 1 1.5 27,441 6f. Total buffer mitigation required: 108,576 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund). Payment into a private mitigation bank, please see Section D.3 and attached credit reservation letters from EBX and WiIdlands Engineering. 6h. Comments: Page 10 of 14 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1 a. Does the project include or is it adjacent to protected riparian buffers identified Yes ❑ No within one of the NC Riparian Buffer Protection Rules? 1 b. If yes, then is a diffuse flow plan included? If no, explain why. Comments: See attached Stormwater Impact Analysis, Level Spreader Worksheets and draft Stormwater Facility Agreements and Covenants. Please note ® Yes ❑ No that Durham does not allow bypass channels to be constructed within the riparian buffer, but instead requires installation of Engineered Filter Strips. As such, Level Spreaders LS #7and LS #14 do not have bypass channels. 2. Stormwater Management Plan 45% (As per the project engineer., 2a. What is the overall percent imperviousness of this project? this is a Maximum per a committed element of the development plan) 2b. Does this project require a Stormwater Management Plan? ® Yes ❑ No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: In summary, multiple BMP's located throughout the site will be utilized to accomplish the required onsite nitrogen and phosphorous removal as well as provide peak flow detention for the 1 -, 2- and 10 -yrear rainfall events. For specifics, please see attached Stormwater Impact Analysis. Please note that at this time, the applicant would like to request a conditional 401 Approval allowing the final Stormwater Management Plan Approval and Plan, as approved by Durham, to be submitted to the NCDWQ once received. ® Certified Local Government 2e. Who will be responsible for the review of the Stormwater Management Plan? ❑ DWQ Stormwater Program ❑ DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a. in which local government's jurisdiction is this project? City of Durham ® Phase II 3b. Which of the following locally - implemented stormwater management programs ® NSW ❑ USMP apply (check all that apply): ❑ Water Supply Watershed ❑ Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ® No attached? 4. DWQ Stormwater Program Review ❑ Coastal counties 4a. Which of the following state - implemented stormwater management programs apply [I HQW El ORW (check all that apply): ❑ Session Law 2006 -246 ❑ Other: 4b. Has the approved Stormwater Management Plan with proof of approval been attached? ❑ Yes ❑ No Page 11 of 14 PCN Form — Version 1.3 December 10, 2008 Version 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b. Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 12 of 14 F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1 a. Does the project involve an expenditure of public (federal /state /local) funds or the ❑ Yes ® No use of public (federal /state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes ❑ No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) ❑ Yes ❑ No Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ❑ Yes ® No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after - the -fact permit application? ❑ Yes ® No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ❑ Yes ®No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. We have reviewed the "Draft Internal Policy, Cumulative impacts and the 401 Water Quality Certification and Isolated Wetlands Programs" document prepared by the NC Division of Water Quality on April 10, 2004, version 2.1. The draft states that many private developments are unlikely to cause cumulative impacts, including projects such as urban in -till, most residential subdivisions and small commercial developments as well as agricultural and silvicultural operations. The Del Webb- Active Adult Community project is a residential development. It is important to note that the project is located within Durham County's ETJ, therefore the adjacent properties that have potential for development will have the following regulations to protect downstream waters: 1) the Phase 11 NPDES Stormwater Permit Program, this program includes permitting requirements for Municipal Separate Storm Sewer Systems (MS4s) in addition to post - construction stormwater management requirements, and 2) the Neuse River Basin Riparian Buffer Protection regulations, these regulations require limited development within the riparian buffer area in addition to "diffuse flow" requirements at a minimum and could require Best Management Practices that control nitrogen if diffuse flow cannot be achieved. We anticipate that the DWQ will advise us if any additional information is needed. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non- discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. This project will connect to the City of Durham's Sanitary Sewer System. The Durham Public Works Department will ensure that capacity of their treatment facility will not be exceeded. Page 13 of 14 PCN Form — Version 1.3 December 10, 2008 Version 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or ❑ Yes ® No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ❑ Yes ® No impacts? ❑ Raleigh 5c. If yes, indicate the USFWS Field Office you have contacted. ❑ Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? A file search at the Natural Heritage Program was conducted in December 2010 and again in May 2011. Results indicated that there is one federally protected species and several Significant Natural Heritage Areas and other elemental occurrences of rare plant and animals are located within a 5-mile radius of the property. However, no Significant Natural Heritage Areas and no federally listed or otherwise rare species are documented within the project boundaries. 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ® No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? The proposed project is in Durham County, which is not near any coastal or tidal habitat that would support EFJ (i.e. salt marshes, oyster reefs etc.). 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ❑ Yes ® No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? S &EC completed a record checks at the State Historic Preservation Office and wrote a report. it was found that there are no structures on the property or within a 1 -mile radius of the property listed or eligible on the National Registry of Historic Places. In addition, an Office of State Archaeology (OSA) records check was also performed in December 2010. Staff of the OSA indicated that an archaeological site has been recorded onsite. The site was reported in 1982 to contain a historic structure and various prehistoric and historic artifacts. Ms. Dolores Hall of OSA recommended an evaluation of the site to determine its significance and whether it is eligible to be listed in the National Register. Subsequent to the S &EC report, the applicant requested an evaluation of the potential for historic artifacts or structures related to the 1982 report. This evaluation /report is being reviewed with the OSA. 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA- designated 100 -year floodplain? --TZ Yes ❑ No 8b. If yes, explain how project meets FEMA requirements: As per the project engineer; Flood - fringe impacts are approved as part of the site plan process by Durham. For the proposed impacts within the floodway, a CLOMR will be prepared and submitted to the City of Durham Floodplain Administrator. Durham will then send the approved CLOMR to the North Carolina Flood Plain Mapping Program for Approval. 8c. What source(s) did you use to make the floodplain determination? NC Floodplain Mapping Information System. Debbie Edwards &"t January27, Applicant/Agent's Printed Name Applicant/Agent's Signatur 2012 (Agent's signature is valid only if an authorization letter from the applicant is Date provided.) Page 14 of 14 Del Webb - Parallel Buffer Impact Table January 26, 2012 6b. 6c. 6d. 6e. 6f. 6g. Buffer impact number— Reason for impact Buffer Zone 1 impact Zone 2 impact Permanent (P) or Stream name mitigation (square feet) (square feet) Temporary T required? B1 ®P ❑ T Parallel Utility Little Brier ® Yes 56 0 Creek ❑ No B2 ® P ❑ T Parallel Utility Little Brier 130 0 Creek No B3 ❑ P ®T Parallel Utility Little Brier Creek ❑ Yes ® No 0 14 027 ' B4 ®P ❑ T Parallel Utility Little Brier ❑ Yes 254 0 Creek El No B5 ®P ❑ T Parallel Utility Little Brier ® Yes 29 0 Creek ❑ No B6 ❑ P ®T Parallel Utility Little Brier Creek ❑ Yes ® No 0 7 237 ' B7 ®P ❑ T Parallel Utility Little Brier 115 0 Creek No B8 ® P ❑ T Parallel Utility Little Brier ® Yes 138 0 Creek ❑ No B9 ®P ❑ T Parallel Utility Little Brier ® Yes 23 0 Creek ❑ No B10 ®P ❑ T Parallel Utility Little Brier ®❑ Nos 2 0 Creek B11 ❑ P ®T Parallel Utility UT to Little Brier ❑ Yes 0 1,150 Creek ® No B12 ❑ P ®T Parallel Little Brier ❑ Yes 0 8,363 Utility/Greenway Creek ® No B13 [I P ®T Parallel Little Brier ❑ Yes 0 1,925 Utility/Greenway Creek ® No B14 ❑ P ® T Parallel Utility Little Brier Creek ❑ Yes ® No 0 2,940 B15 ❑ POT Parallel UT to Little Brier ❑ Yes 0 803 Utility /Greenway Creek ® No B16 ❑ P ®T Parallel UT to Little Brier ❑ Yes 0 2,043 Utility /Greenway Creek ® No B17 ❑ P ®T Parallel UT to Little Brier ❑ Yes 0 2,463 Utility/Greenway Creek ® No B18 [:]POT Parallel UT to Little Brier ❑ Yes 0 3,116 Utility /Greenway Creek ® No B19 ❑ P ® T Parallel UT to Little Brier ❑ Yes 0 1,534 Utility/Greenway Creek ® No B20 ❑ P ® T Parallel UT to Little Brier ❑ Yes 0 365 Utility /Greenway Creek ® No B21 ❑ P ® T Parallel UT to Little Brier ❑ Yes 0 591 Utility /Greenway Creek ® No B22 ❑ P ® T Parallel Utility UT to Little Brier ® Nos 0 493 Creek B23 ❑ P ® T Parallel Utility UT to Little Brier ❑ Yes 0 1,757 Creek ® No Page 1 Del Webb - Parallel Buffer Impact Table January 26, 2012 B24 ❑ P ® T Parallel Utility UT to Little Brier ® Yes 0 5,154 Creek No B25 ®P ❑ T Parallel UT to Little Brier ® Yes 15 0 Utility /Greenway Creek ❑ No B26 ❑ P ® T Parallel UT to Little Brier ❑ Yes 0 11,426 Utility /Greenway Creek ® No B27 ® P ❑ T Parallel UT to Little Brier ® Yes 690 0 Utility /Greenway Creek ❑ No B28 ® P ❑ T Parallel UT to Little Brier ® Yes 784 0 Utility /Greenway Creek ❑ No 629 ®P ❑ T Parallel UT to Little Brier ® Yes 18 0 Utility/Greenway Creek ❑ No 1330 ❑ P ®T Parallel UT to Little Brier ❑ Yes 0 547 Utility/Greenway Creek ® No B31 ❑ P ® T Parallel UT to Little Brier ❑ Yes 0 18 Utility /Greenway Creek ® No B32 ❑ P ® T Parallel UT to Little Brier ❑ Yes 0 218 Utility/Greenway Creek ® No B33 ❑ P ®T Parallel UT to Little Brier ❑ Yes 0 3,281 Utility/Greenway Creek ® No B34 ❑ P ® T Parallel Utility UT to Little Brier Creek ® Yes 0 5,584 B35 ®P ❑ T Parallel Utility UT to Little Brier 40 0 Creek El No B36 ❑ P ® T Parallel Utility UT to Little Brier ® Yes 0 2,014 Creek No B37 ❑ P ®T Parallel Utility UT to Little Brier ® Yes 0 557 Creek No B38 ❑ P ® T Parallel Utility UT to Little Brier ® Yes 0 1,362 Creek No B39 []POT Parallel Utility UT to Little Brier ® Yes 0 414 Creek 640 ❑ P ®T Parallel Utility UT to Little Brier El Yes 0 1,190 Z No B41 ❑ P ®T Parallel Utility UT to Lick Creek ® Yes No 0 729 6h. Total buffer impacts 2,294 81,301 Page 2 Del Webb- Active Adult Community Section D. 9.a Avoidance and Minimization January 26, 2012 The applicant contracted with S &EC and another consulting firm to complete a wetland delineation and Neuse River Buffer evaluation for the property in order to identify natural resources so that the project designers could work with the environmental team to design a site plan that would minimize impacts to the maximum extent practicable. JURISDICTIONAL STREAMS /BUFFER IMPACTS: ROAD CROSSINGS: impact Area A is proposing permanent impacts to an unimportant, intermittent stream. This road crossing was designed to cross above important/perennial start point, therefore minimizing impacts to streams with important aquatic function. This crossing is necessary to access the western side of the property, the City of Durham is requiring 2 points of access to the western portion of the project. The second access point will be above the pond and is delayed because of the 5 -year no -build moratorium as mentioned in Section B.6. Impact Area Cis proposing permanent impacts to an unimportant, intermittent stream. This road crossing/greenway trail was designed to cross above important/perennial star` point, therefore minimizing impacts to streams with important aquatic function. This crossing is necessary to provide access to the existing 335' wide high - voltage power line easement. The power company currently crosses the buffered stream by driving through the stream. The installation of this crossing would allow the power line maintenance equipment to cross without further impacts to the stream, avoiding future stream bank degradation and erosion. This crossing would also be shared with the community to provide greenway access between the east and west neighborhoods. Impact Area E is a proposed permanent impact to a feature that was determined to be non jurisdictional by the USACE however 'buffered" by the DWQ. This road crossing was designed to cross at a near perpendicular angle. This crossing is necessary to access an eastern portion of the property. Impact Area H is a proposed permanent impact to an important, perennial. stream. This road crossing is required by the City of Durham. The Wake- Durham collector road plan shows multiple north -south collector roads between Leesville Road and points south of this project. The City has agreed that the construction of this collector road between Leesville Road and TW Alexander would satisfy the requirement for a north -south collector. in fact, this n -s collector will take the place of two collector roads that are shown on the Wake Durham Collector Plan. The collector that is being eliminated is just east of Adventure Trail, and crosses a stream that is larger than the stream that is proposed with the current project. in addition, the Durham Greenway Trail Plan requires a greenway trail along this section of the stream. The proposed pedestrian culvert would provide a safe greenway crossing for the target residents of this proposed community. UTILITES: In addition to gravity sewer, the City of Durham is also requiring a Force Main to be constructed for this project. A new pump station is to be constructed south of the proposed project area (see sheet C528). From the pump station the proposed Force Main will enter the subdivision from the south; it will follow Little Brier Creek and cross the stream at Impact K, run north along the stream and will then connect and run within subdivision roads until it reaches Leesville Road. The proposed Force Main will then run west within the Right -of -Way of Leesville Road and will then turn and run north along Doc Nichols Road within the Right -of- Way approximately 1.5 miles and then run west as shown on the Overall Site Plan Index Map (sheet C520), cross a stream feature and impoundment and connect to an existing pump station. Impact Areas K, M, N1 & N2 are proposed Force Main stream crossings and will be temporary impacts (e.g. open -cut). The gravity sewer will spur off of the Force Main and will connect throughout the property. All of the proposed gravity sewer crossings (i.e. Impact Areas B, D, F, G, 1, J, K and M) will be temporary impacts (e.g. open- cut/aerial). All of the proposed gravity sewer crossings have been designed to be perpendicular crossings (i.e. between 750 and 1050). GREENWAY TRAIL: The proposed greenway trail system will utilize the proposed utility corridor to the maximum extent practical, therefore minimizing impacts to the streams and riparian buffers. it will be a 10' wide paved trail with a maximum of a 2' wide maintained corridor on either side of the paved trail. The paved" trail has been located on the outer limits of the utility corridor therefore leaving minimal permanent, paved areas within the riparian buffer. Where the greenway trail crosses the streams (i.e. Impact Areas S, F, G, J and K) the trails will be bridged or board walked to avoid permanent impacts to the streams. Page 1 Del Webb- Active Adult Community January 26, 2012 WETLAND IMPACTS - JURISDICTIONAL: ROAD CROSSINGS and LOT FILL: impact Area W -8A, W -8B and W -11 are all proposed wetland impact areas. The location of these wetlands necessitates the proposed impacts in order to construct a required road. The difference in the elevation between the existing and proposed grades and their location makes it impractical to avoid impacting the wetlands in these areas adjacent to the proposed roadway fill. UTILITIES: As outlined above, the City of Durham is requiring a Force Main to be constructed for this project. Impact Areas W -13 & W -14 are located on the north side of the project off Doc Nichols Rd. These proposed temporary impacts are necessary to connect the Force Main to an existing pump station on the west side of Lick Creek. WETLAND IMPACTS - ISOLATED: ROAD CROSSINGS and LOT FILL: impact Areas W -1, W -2, W -3, W -4A and 4B, W-6, W -7, W -10 and W- 12 are all proposed wetland impacts to isolated wetlands. The location of these wetlands necessitates the proposed impacts in order to construct the required roads. The differences in the elevation between the existing and proposed grades and their locations make it impractical to avoid impacting the isolated wetlands in these areas adjacent to the proposed roadway fill. UTILITiES/GREENWAY TRAIL: impact Area W -5 is a proposed Force Main/Gravity Sewer and greenway trail crossing to an isolated wetland. The Force Main/Gravity Sewer will be open -cut however the greenway paved trail is proposed to be a permanent impact. STORMWATER BMP: Impact Area W -9 is a proposed impact to an isolated wetland for a stromwater BMP. This proposed impact is necessary because of the topography and the need for a stormwater BMP in this drainage area. With regard to the Regional Conditions of the Nationwide Permits, the applicant is aware of the regional conditions associated with the Nationwide Permits 29, 14 and 12. With respect to residential development conditions (NWP 29- Regional Conditions section 4.0) the applicant does not anticipate any impacts to streams or wetlands for the stormwater management facilities, there are no impact associated with single- family recreation facilities, and the stream classification for this project is C, NSW and WS -IV; NSW (i.e. not Outstanding Resource Waters, High Quality Waters, Coastal Wetlands or wetland adjacent to these waters). With respect to linear transportation crossings (IMPACT AREA "H ") conditions (NWP 14- Regional Conditions section 4.0) this project is not proposing a stream relocation; bank -full flows will be accommodated through the existing bank -full channel cross sectional area or through additional culverts that would receive only bank - full events, unless there is available floodplain then events exceeding bank -full will be accommodated by installing culverts at the floodplain elevation; this permit is not being used in conjunction with a NWP 18 to create an upland area. With respect to utility line activities, (NWP 12- Regional Conditions section 4.0) the applicant does not propose to utilize directional drilling/boring methods because bedrock was found throughout the site and therefore the feasibility and costs associated with drilling /boring would be prohibitive. The applicant recognizes that the proposed temporary impacts for the proposed Force Main and Gravity Sewer line will be for the minimum period of time required to complete the activity and that the stream and wetlands must be returned to their pre - construction elevations and contours. The proposed Force Main and Gravity Sewer line construction corridor is 40 feet wide. All wetland areas will be restored and re- vegetated to pre - construction contours. The proposed Force Main and Gravity Sewer lines will not impact federal channels or Section 10 waters. All rip -rap used will be avoided to the maximum extent possible. Page 2 Environmental Consultants, Road • Raleigh. Norlh Carolina 27614 • Phone: (919) 846 -5900 • Fax: (919) www.SandMcom AGENT AUTHORIZATION FORM All Blanks To Be Filled In By The Contract Purchaser Name: Address: _12tt; CJftSGt,NJ 4&4ftA_0046.STE ?!;'O, QNL42 PC yirl Phone: q 1 i - f 0 1(0 — 1 1 0 0 Project Name /Description: !AV- W V* k Date: aam pwtt�AM The Department of the Army U.S. Army Corps of Engineers, Wilmington District P.O. Box 1890 Wilmington, NC 28402 Attn: Ej[; ; 4� `�Ane k- r -t�„' om Field Office: Re: Wetlands Related Consulting and Permitting To Whom It May Concern I, the current contract purchaser, hereby designate and authorize Soil & Environmental Consultants, PA to act in my behalf as my agent in the processing of permit applications, to famish upon request supplemental information in support of applications, etc. from this day forward. The 't' i"� day of V4c� This notification supersedes any previous correspondence concerning the agent for this project. NOTICE: This authorization, for liability and professional courtesy reasons, is valid only for government officials to enter the property when accompanied by S&EC staff. You should call S &EC to arrange a site meeting prior to visiting the site. Cja!"I 11V4MLA"r -yP I &Na �Et tt�M1? Print Contract Purchasef s Name cc: Ms. Karen Higgins NCDENR - DWQ WeSCAPe Archdale Building 512 N. Salisbury Street, 9th Floor Raleigh, NC 27604 Contract Purch 's §Ignature cc: Ms. Debbie Edwards Soil & Environmental Consultants, PA r7 PROPERTY OWNER INFORMATION PIN: 0769 -01 -16 -4591 PIN: 0769 -03 -14 -4892 BARBARA MARLENE ROSS 5714 LEESVILLE RD DURHAM, NC 27703 DEED BK: 2001 -E DEED PG: 06 PIN: 0769 -03 -35 -7254 TIMOTHY RANDALL CLEMENTS 7416 LEESVILLE RD DURHAM, NC 27703 DEED BK: ' 2007 -E DEED PG: 532 PIN: 0769 -01 -26 -9080 PIN: 0769 -01 -35 -3524 JAMES LARRY CLEMENTS 6204 LEESVILLE RDDURHAM, NC 27703 DEED BK: 2025 DEED PG: 171 DEED BK: 2007 -E DEED PG: 532 PIN: 0769 -03-33 -2232 PIN: 0769 -03 -44 -6000 AIS FORESTRY & FARMING LLC 319 CHAPANOKE RD SUITE 102 RALEIGH, NC 27603 DEED BK: 6563 DEED PG: 256 PIN: 0769 -01 -26 -4978 SANDRA M GOOCH 5814 LEESVILLE RD DURHAM, NC 27703 DEED BK: 991 DEED PG: 224 PIN: 0769 -03 -24 -8486 JOHN N RUSSELL JR 6206 LEESVILLE RD DURHAM, NC 27703 DEED BK: 6066 DEED PG: 964 PIN: 0769 -04 -52 -7602 JAMES F. KEITH 807 ANDREWS CHAPEL RD. DURHAM, NC 27703 DEED BK: 2004 -E DEED PG: 800 PIN: 0769 -04 -42 -5588 CLASSY PROPERTIES 506 ANDREWS CHAPEL RD. DURHAM, NC 27703 DEED BK: 1899 DEED PG: 332 PIN: 0769-03 -21 -3379 CREEKWOOD HWY 70 ALEXANDER LLC 4949 WESTGROVE DR. DALLAS, TX 75248 DEED BK: 5748 DEED PG: 986 PIN: 0860 -03 -13 -0809 RUBY J RANSDELL 303 BROAD ST FUQUAY- VARINA, NC 27526 DEED BK: 386 DEED PG: 141 PIN: 0850 -03-96 -8066 WILLIAM J SHERRON JR JANET H SHERRON 610 HIDDENBROOK DR DURHAM, NC 27703 DEED BK: 5958 DEED PG: 484 �J Y i A, /V A J vq N A/4, 0 T g/J1 ... ....... -46.- 41 n t (A" vvu 'Ji Z All Jr, 4 'U IR Project No. fficjurc I 1:24K L15G5 1 1575.P 1 Topographic Quadrangle Project Mgr.: Leesville Road AAC Soil & Environmental Consultants, PA 56 Pulte Homee, 11010 Raven Ridge Rd.• Raleigh, NC 27614 scale; Durham, NC (919) 846-5900 • (M) 846-9467 Web Pap: www.SandEC.com 1 2,000' 5E Durham Quad 12/20/20 1 Northeril,offsite Sewer' r' Connection'[Insetll •'Wa6 V��• - h WFS r i ! VftL� Mfg wo was tea.-, ► 9 t f s� x r6 1 �.. . _ -J, -.• Vfte WIFE Illi�_r.F_ rC wir r uvsR �1J Wst lMre -"1 J sq,Cr f �M _ CK N E t r� E V7sC� � �� � l� r �I/B�Li Orr,, CrR2 'i'P fj � �r CrG 4 - ! CrBR MR CrS V - Ca r + Project No. Fiepre 2 -NRC5 11575.P I Sod Survey Map Project M.@r•: Leesville Road AAC Soil & Environmental Consultants, PA ss Pulte l-lome5 11010 Raven Ridge Rd. - Raleigh, NC 27614 5cale: Durham, NC (919)846- 5900•(919)846 -9467 I"= I ,320' web Page: www.SandEC.com Wake Co Sheet5 17 418 12/20/20 Durham Co 5heet5 28 4 33 �+ M�ir� \n North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Dee Freeman Governor Director Secretary January 31, 2011 Revised Feb 2, 2011 Steven Ball Soil & Environmental Consultants, PA 11010 Raven Ridge Rd Raleigh, NC 27614 BASIN: ® Neuse 05A NCAC 28.0233) NBRRO#10 -222 Durham County ❑ Tar - Pamlico (15A NCAC 26.0259) ® Ephemeral /Intermittent/Perennial Determination ❑ Isolated Wetland Determination Project Name: Leesville Rd Active Adult Communites Location/Directions: Subject property is undeveloped tracts located on Leesville Rd in Durham County Subject Stream: I TT's to and Brier Creek Date of Determination: December 10, 2010 Feature E/1/P* Not Subject Subject Start@ Stop@a Stream Form Pis. Soil Survey USGS To o A (Brier I Creek) B P I X _- X Throughout I Flag S03 _ r F SO4 X X X X B' C P I X X FI SO4 41 Flag SO Feature A Feature B X X X _ X Pond I X I I X X D D' I P X '__. X . Flag S06 . a�SOS FI - ._: Fl S05 Feature B ��.� � � X X ...M X X Pond 2 X �— � X X E E k - X F E _X X X G E X H e I X � Utisite __...._... —..._ _...__..__, X I E x X J I __... X DWQ Flag 19 21.5 X -- K E X X M E X r N E X _X X � P _ _ . X X 1 North Carolina Division of Water Quality Raleigh Regional Office Surface Water Protection Phone (919) 791 -4200 Customer Service intemet: www.ncwaterquargy.org 1628 Mail Service Center Raleigh. NC 27699 -1628 FAX (919) 5714718 1477-623 -6748 An Equal Opportunity /Af native Acbon Employer— 50% Recydedll0% Post Consumer Paper tkrrlCy Leesville Rd Active Adult Center Durham County January 31, 2011 Page 2 of 2 Feature EII/P* Not Subject Subject Start@ Stop@ Stream Form Pts. Soil Su rve USGS Topo E X X R E X X S E X X T E X X U E X X E/1 1P = Ephemeral ✓IntermittentlPerennia! Explanation; The feature(s) listed above has or have been located on the Soil Survey of Durham County, North Carolina or the most recent copy of the USGS Topographic map at a 1:24,000 scale. Each feature that is checked "Not Subject" has been determined not to be a stream or is not present on the property. Features that are checked "Subject" have been located on the property and possess characteristics that qualify it to be a stream. There may be other streams Iocated on your property that do not show up on the maps referenced above but, still may be considered jurisdictional according to the US Array Corps of Engineers and/or to the Division of Water Quality. This on -site determination shall expire five (5) years from the date of this letter. Landowners or affected parties that dispute a determination made by the DWQ or Delegated Local Authority may request a determination by the Director. An appeal request must be made within sixty (60) days of date of this letter or from the date the affected party (including downstream and/or adjacent owners) is notified of this letter. A request for a determination by the Director shall be referred to the Director in writing c/o Ian McMillan, DWQ Wetlands/401 Unit, 2321 Crabtree Blvd., Raleigh, NC 27604 -2260. If you dispute the Director's determination you may file a petition for an administrative hearing. You must file the petition with the Office of Administrative Hearings within sixty (60) days of the receipt of this notice of decision. A petition is considered filed when it is received in the Office of Administrative Hearings during normal office hours. The Office of Administrative Hearings accepts filings Monday through Friday between the hours of 8:00 am and 5:00 pm, except for official state holidays. To request a hearing, send the original and one (1) copy of the petition to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699 -6714. The petition may also be faxed to the attention of the Office of Administrative Hearings at (919) 733 -3478, provided the original and one (I) copy of the document is received by the Office of Administrative Hearings within five (5) days following the date of the fax transmission. A copy of the petition must also be served to the Department of Natural Resources, c/o Mary Penny Thompson, General Counsel, 1601 Mail Service Center, Raleigh, NC 27699 -1601. This determination is final and binding unless, as detailed above, you ask for a hearing or appeal within sixty (60) days. The owner /future owners should notify the Division of Water Quality (including any other Local, State, and Federal Agencies) of this decision concerning any future correspondences regarding the subject property (stated above). This project may require a Section 404/401 Permit for the proposed activity. Any inquiries should be directed to the Division of Water Quality (Central Office) at (919 )-733 -1786, and the US Army Corp of Engineers (Raleigh Regulatory Field Office) at (919 )-544 -4884. Respectfully, Martin Richma Environmen Specialist cc: Wetlands/ Stormwater Branch, 1650 Mail Service Center, Raleigh NC 27699 -1650 RRO/SWP File Copy ir ° - %6 PIC Cb r, ;ti r wee �+ Cssl- �.�y`\IS:;I "1f �- { •rr ' ` ' `' Ca 's. s1 F.' Wsb I'.. IN FIE WSS WS Jtf, J,,i=yr/"� cJ7 �� fr ®fE CrB SG Why .yj+. �'� i�`,�^''�.0.te%``• . *s 3 _ - Wit• f� i• � ++ a6i P10ject No. Figure 2-MR5 I I s75NI 5aI Survey map r"qP t Mgr.: Leesville Rd Active C 5e Durham Co. NC sue: Pulte Homes • = 1.320 Duftm Co. Ss I M I/1 O Sheet 33 Soil & Environmental Consultants, PA 11010 ftm midge Rd.- Rddgh, NC 37814 (819) 84HU - (919) 84841487 Web Pale: www.SardEC.mm WDEN � North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H Sullins Governor Director July 14, 2011 Steven Ball Soil & Environmental Consultants, PA 11010 Raven Ridge Road Raleigh, NC 27614 Dee Freeman Secretary NB /1PRRO#11 -123 Durham County BASIN: ® Neuse (15A NCAC 2B ,0233) ❑ Tar - Pamlico (15A NCAC 2B .0259) ® Ephemeral /Intermittent/Perennial Determination ❑ isolated Wetland Determination Project Name: Location/Directions: Subject Stream Leesville Rd AAC Add'n Subject property is a residential /undeveloped tract located on west side of Andrews Chapel Rd, south of Leesville Rd in Durham County LIT to Little Brier Creek Date of Determination: May 26, 2011 Feature E /1/P* Not Sub ect Subject Start{ stop a@ Stream Form Pts. Soil Survey USGS Topo A X X B I X FI SOi X X Pond B I X X X C X X D X X E X X ,J *FVVP = Ephemerad�lntermittent /Perennial NOTE: Feature `A' was previously referenced in NBRRO#10 -222 as Feature `P' and is Not Subject Explanation° The feature(s) listed above has or have been located on the Soil Survey of Durham County, North Carolina or the most recent copy of the USGS Topographic map at a 1:24,000 scale. Each feature that is checked "Not Subject" has been determined not to be a stream or is not present on the property. Features that are checked "Subject" have been located on the property and possess characteristics that qualify it to be a stream, There may be other streams located on your property that do not show up on the maps referenced above but, still may be considered jurisdictional according to the US Army Corps of Engineers and/or to the Division of Water Quality. This on -site determination shall expire five (5) years from the date of this letter. Landowners or affected parties that dispute a determination made by the DWQ or Delegated Local Authority may request a determination by the Director. An appeal request must be made within sixty (60) days of date of this letter or from the date the � na YJ North Carolina Division of Water Quality Raleigh Regional Office Surface Water Protection Phone (919) 791 -4200 Custorner Service Intemet: www.nmNalemuallty org 1628 Mail Service Center Raleigh, NC 27699 -1628 FAX (919) 5714718 1-877- 623 -6748 An Equal Opportunity /AtfinraW Adon EmpbW — 50% Recycled/10% Post Consumer Paper Leesville Road AAC Addition Durham County July 14.2011 Page 2 of party (including downstream and/or adjacent owners) is notified of this letter. A request for a determination by the Director shall be referred to the Director in writing clo Ian McMillan, DWQ Wetlands/401 Unit, 1650 Mail Service Center, Raleigh NC 27699 -1650. If you dispute the Director's determination you may file a petition for an administrative hearing. You must rile the petition with the Office of Administrative Hearings within sixty (60) days of the receipt of this notice of decision. A petition is considered filed when it is received in the Office of Administrative Hearings during normal office hours. The Office of Administrative Hearings accepts filings Monday through Friday between the hours of 8:00 am and 5:00 pm, except for official state holidays. To request a hearing, send the original and one (1) copy of the petition to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699 -6714. The petition may also be faxed to the attention of the Office of Administrative Hearings at (919) 733 -3478, provided the original and one (1) copy of the document is received by the Office of Administrative Hearings within five (5) days following the date of the fax transmission. A copy of the petition must also be served to the Department of Natural Resources, c/o Mary Penny Thompson, General Counsel, 1601 Mail Service Center, Raleigh, NC 27699 -1601. This determination is final and binding unless, as detailed above, you ask for a bearing or appeal within sixty (60) days. The owner /future owners should notify the Division of Water Quality (including any other Local, State, and Federal Agencies) of this decision concerning any future correspondences regarding the subject property (stated above). This project may require a Section 4041401 Permit for the proposed activity. Any inquiries should be directed to the Division of Water Quality (Central Office) at (919)-807 -6301, and the US Army Corp of Engineers (Raleigh Regulatory Field Office) at (919)-544 -4884. Respectfully, Martin 4 hmond Environmental Specialist CC.* Wetlands/ Stormwater Branch, 1650 Mail Service Center, Raleigh NC 27699 -1650 RRO /SWP File Copy Ws y Nk waa Fit rM #: Oro i s M F' Vft* �ir r crc WWt Nf tR Poo ww ALL ,p:� '• e, - t � ,s - /" (vii �' .14.�yvv Project NO. �. Njure 2 -NR-05 � 11 11575.VV3 50d Survey pr0ja* Mir.; Leesville Rd AAC Add `n Sofd & Ehvl -mnmeatg COnsultants, PA 55 Durham Co. NC 11010 R&MRdP Rd.- PaWVK MC 27614 (919) 848.5800 ■ (918) 846.8467 9eales: Pulte HOMC5 web Pie: "N. cm I" a 1 320' pLwh2m CO 5011 Survey 3heet 33 _A7'L :14A AWWR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. SuOins Des Freeman Governor Director Secretary Mri-ff mh 9, 2009 Jennifer Burdette 10212 Crectimoor Road Raleigh, WC 27615 ]P/NBRRO#09 -0 19 BASIN . Durham and Wake COU11TLY Neuse River Buffer Determination X Tar - Pamlico Buffer Determination (15A NCAC 2B .0233) (15A NCAC 213.0259) - Ephemerlalftntemitbmt/Perannial Determination X Isolated Wetland Determination X Project Name: —Stephens Property Location/Directions: located south of Leesville Road. west of Andrew QM1 Road, and north of Highway 70 Subject Strom: UT to Little Brier Crack Date of DPter.m;waffPOu.- 12/30108 &ad 2/12/09 .FwabuTa(s) I NO2 Sr.bJW I SuUtct strzt @ Stop( son Survey USG� "P 7OP(i 12ftrMittallIt! pelreenifN A X 331 x PeirennW .61 � gqlld) x x x NA A7. NA X 700 709 101 x 717 x ]%ternitte .t C x (Sru-�BJOUO x X Perennial x - 793 792 x Intermitbet X ! royqty HIMS 729 x m InterAttent IJ 720 2000 x x EftemAttent X x pemInial I dCaro a =06w North Carolina Division of Waller Quality Raleigh Regional 011oe Surface Water Protection Phone (910) M 420 customer service Internot wwwwaterqualltyorg ISM Mafl Service Cantor RaftPk MC 27690A828 FAX (919) 788.7159 877-0256748 An Equal OPPortunVA18rrndweAdion Employer— 50% RecydedMa% Pod Consumer Paper Table continued. Feature(s) Not Subject Subject Stark stop Q Soil Survey USGS Topo Intermittent/ PerenniaV E hemeral G X (throughout) X Intermittent R x Off property 759 X Intermittent H x 2001 2002 x Intermittent X 760 2003 X intermittent H x 2003 X Perennial I X X E hememl J x X Isolated Wetland K X thato bout x Intermittent L x X E hemeral M x X Ephemeral x 452 451 X Intermittent U X 419 X Intermittent P x X E hen�eral X 398 _ x Intermittent R x x Ephemeral S x 395 3% X Intermittent S 394 389 X Intermittent S E" 389 x Perennial T X 370* 1503 X Intermittent T (pond) X x X NA U x 305 X Intermittent v x rthraa .oat x Perennial w X X E .hernend x X x E hemend yY I x Pond omfiet 1504 X x 1ntemitte at X x 104 1 X x peremmirl x 11505 15Q?5 X Intermittent x ]61 x Intermittent ZI x 13" Pond x Intermn -Ittent Zi x 1:7 x x Intermittent Z3 and X x x NA Z2 x X M hemeral 7z x X Ephemeral Z4 x Z4 x Int+erminem zz x x E Lemeral Z6 X x x Ephemeral Z6 ,'pond) x x x NA Z7 x off Property 223 x Pere -vial is x Iaobtted Wetland s - cvnUnWA. Table concluded. Peature(e) Not Subjecii Subject Start @ Stop@ Soil Sarvey USES Tope Intern tte�.t1 Perem"ll E heaeral Z9 X X Wetland Me �: X Ephemeral. Zit I % I X Perennial The isolated wetlands were reviewed on the property. Please see attached map for verified extant and location of all isolated wetlands. Explanation: The feature(s) listed above has ou have been located on the Soil Survey of Durham and Wake County, North Carolina or the most recent copy of the USGS Topogrsphic map at a 1:24,000 scale. Each feature that is checked "Not Subject" has been determined not to be a stream or is not present on the property. Features that are checked "Subject" have been located on the property and possess characteristics that qualify it to be a stream. There may be other streams located on your property that do not show up on the maps referenced above but; still may be considered jurisdictiamal according to the US Army Corps of Engineers and/or to the Division of Water Quality. rids on -site determinrtion ahall expire five (5) ye am fa om the dente of tils letter. Landowners or r-5ected parties that dispute a determinution made by tte DWQ or D al Local Authority that a surface water exists and that it is subject to the buffer role n.ay request a determination by the Director. A request for a determination by the Director shall be referrea io the Dimfor pa writing e% Cyndi Ka>reay , DWQ Wetlands/401 Unit, 2321 Crabtree Blvd., Raleigh, NC 27604 -2260. Individuals that dispWe a determination by the DWQ or Delegated Local Authority that "exempts" a surface water from the buffer rule may ask for an ad judicatury hearlmg. You must act witb!n 60 days of the date that you receive tkb letter. Applicants are hereby notified that the 60-day statutory appeal time does not start until the a �- `�,d! p" (including downstream and adjacent landowuera) la notified of this decision. DWQ recommends thx the applicant conduct this notification in e ruler to be certain that third party appeals are made in a timely manner. To ask fur a hearing, seed a writteru petitions., which conforms to Chapter 150B of the North Carolina General Statutes to the Office of! �d[ministrative Hearings, 671 ► Mail Service Center, Raleigh, N.C. 27699 -6714. This determination ie final and binding ,unless you ask for a hearing withij f0 days. The owner /future ownem r1ould notW the Division of Water Quality (including any other Local, State, and Federal Ageniol -av) of this decision concerning any future correspondences regarding the subject property (stated above). This project may require a Section. 4041401 Permit for the proposed activity. Any irquiries should be directed to the Division of Water Quality (Central Office) at (919) - 733 - 1786, and the UI S Army Corp of Engineers (Raleigh Regulatory Field Office) at `919 )476 -5441. Respectfully, Lauren C. Witherspoon � Environmental Senior Specialist CC: Wetlands/ 184ormwater Branch, 2321 Crabtree Blvd, Suite 250, Raleigh, NC 27504 RRU /SWP File Copy 0 1 1 L GRAPHIC SCALE V 2OW 2OW q" A • W r '4 .7� & 41� rl� IRV 7!:r 4/1 ry US GS LOCATION MAP STRPHEIro, PROPERTY STEP-HENS CENTER, INC. DURHANI, DURHAM & WAKE COU=S, NC _P DATE: &-_17, Topo Qbz-- SOUTHEASTDURNAM BURDETTE LAND CONSUL."ZING LiCle — DRAWN BY- TMB 10212 Qvoftow Road - Raleigh. Nwh CWWrolhM 27613 CHKM BY JAB TelcPhOne (919) 841-9977 — Fm[ 019) 841#909 PROJECT 8234 FIGURE#: I M T` ri ri. IM 4i _F.. � , ��.,k'•�.- r, yr" +.cif �bt� .. .�. 17 X Ire War Av W� �Nf E r — v AtiWsl ft CHI 10 Cr( Qc P 'Mft) C11 'A' �j ILS Gr A TvZ ZA GRAPHIC SCALE DURHA MJI,',VAKE CCUNTY SOIL SURVEY AMP N I" = 1320' a 1321 STEPIENS PROPERTY S TIEPHENS CENTER, INC, L DMIAK DURHAM & WAKE CCOUNUES, MC + DATE. 6-17-08 sHELrr(S):WAlM 17,10 DURHAM 33 w SULT DRAWN BY: TMB CHM BY: JAB 'BURDETTE LAND CON 10212 Crcedm owRoad - R111610, NMth CgroiIU27615 Telephone (919) 941-9977— Fmc (019) 841-9909 PROJECr#.- 8234 FICTURE #: 2 A kv-wj Oft 70rR North Carolina Department of Environment and Natural Resources Division of Water QuaAty Beverly Eaves Perdue Coleen H. Sulins Dee Freeman Govemor Dim Secretary July 6, 2009 DWQ Project # 2009 -0522 Durham & Wake Counties Ms. Jennifer 1Burdette 10212 CreWrnoor Rd Raleigh, NC 21615 Subject Property. Stephens Hwy 70 Property Durham and Wake Counties Neese Riparian Buffer Applicability Appeal Dear Ms. Burdette: On June 29, 2009, at your request, Amy Chapman conducted an on -site determination to review three stream features located on the subject property for applicability to the Neuse Buffer Rules (15A NCAC 2B.0233). Lauren Witherspoon from the Division of WaW Quality (DWQ) Raleigh Regional Office had previously conducted an on -site determination of the streams. In your letL- _abed May 7, 2009 to the Director received by DWQ on May 7, 2009, you requested, an appeal of her determinations as provided within 15A MC-AC 02B .0233(3xa). At yoer request, Amy Chapmmim conducted an appeal of Lauren �V kherspoon's previous determinations as stated v), ove. The foutures are labeled as "T, "Z" and "Z 1" on the attr chod maps initialed by Array Chapman on June 30, 2009. The Division of Water Qua?t (DN YVQ) has determined fiat the follovA ng: Feature "IT' is sobje l ee &,rx Nerve � 12:de from a point offthe property and becomes perennial at the flag labeled "761 ". Feature "Z" labeled as flag "Z" is sraYed 8e the Newe Bq er A&Ap at the flag labeled "Z". This feature is intermittent. Feature "Z 1" i;- &cat subject to The owner (or future owners) should notify the DWQ (and other relevant agencies) of this decision in any futu.*e correspondences concerning this pgnperty. Tyr +'s leBxer only addresses the applicability to the buffer rules and does not approve any activity within the buffers. Nor does this letter approve any activity within Waters of the United Strafes or Waters of the State. If you have any additional questions or require additional information 401 OmeightlExprese Review Pernang Unit 1650 Mad Service Center, Raleigh, North Carolina 27895 -1650 Location: 2321 Crabtree Blvd., Raleigh, North Camrna 27804 Phone: 918-733 -17861 FAX: 919.7338893 Internet htlpJfiQ9c .stata.ncuftvet vKW An Equal Oppodurdty 1 Aftmadve Aclbn Empbyer Carolina Stephens Page 2 of 2 July 6, 2009 please call Amy Chapman at (919) 733 -1756. This determination is subject to review as provided in Articles 3 & 4 of G.S. 150B. Sincerely, Cyndi B. Karoly, Supervisor, 1 OversighVExpiess Unit CBK/ijn -Jeuc Enclosures: Soil Survey Map Surface Waters & Wetlands Evaluation Maps 3A & 3B cc: Lauren Witherspoon, DWQ Raleigh Regional Office File Copy Filoname: 090522StaphensHwy74Propaty (DurhamWake)DET Appeal �.� - � it k *•"�,, �, � y. s � � I • . "'" "7r .t ,t / ` i 'r sw • � ' � • i � +. r ,•` • • i' •A . i�is.F �.J � �. � �•. r • ',,,f I - � r �1 -t I Vl•.0 " ' \, ��.� .'` 1 + .. So J IL tj i4' p .. ) ...1 ''- �,,.,• 210x'•, },• ! lilt t't • i MttF a kilt, ': V. *.`:ii♦ , ;.•"fet�4r12 ,y-r�� ^-� fie_I:;,, f P7•, lV:.t ..s , yJi"#u ♦e ,�'p�,Asa '•�•` i'':�'i• er.S'�' -. -, 1 ,s" i'' 'a 4YY {. W�6C � �"`''�J�i .. _ - � 'S t+t4y"� 'E.�')s3I y r.'t � i '� ♦+.... _ . '1;� ,`' t . . 4) �• l` i r ♦ f e'r'r 1 ♦ t t '•s:, ,. 4 AIA {�1 '' ., s Lrl+j ti �''''t,..4 Yi�.^� _ •� c .- t `�ti �" r + •;c, 34 - �, • r y�j!.i•',. 4>M^ f �� -.MK[ FIt .'.. -� ,� 1• I r'i'- } f R.- .��f'r F :�'•'1 1 ��'r'1 -ti. r1`•�, �Y'�'+",�{ "Q ,g ,tah *�'^ { l _ r�•• l yrlr _•yt yEj '`�•c .,.'1 a;+ 4 ) ;� !!', ..,... @,fi�# °"icy •trt(kpi,d _.FJ.� _..+.. .t i r i ` tt ! a I E fit `•i .) ! ;;� • ' i `t r Y r 9C' , 'te- i. ' r• * GI'f �a // 1F } ,i. 1' �•�( j t •: t! r �.� ' �•tf��,1�6 {]Rf�� f� ~`�^.�+! '� ( 1 t I tit f1,t�p 1 rf�';.�..1 (` j fin�+.l•l ff� (( f�yA.''.� .1 • r 'S ! - w.f ��• ^ti � 1+ ! i 1 �'/ 1]" 1'vr i j 11(! ` // j c '' f b• t r �'. Cil '! 4 r �`4 • r- ��� / .. �.� lti'� �< (..,s" ` -"•'�' �1• ° . -' 4 � as �� 1 � ' .: i .•'•'`• . . /. • i,. •:'•L -. . `la ♦ lj .d � , f � "i"♦' IF +� llnr� �- •..r._. �, / I .'��, _ :. j��l •' ( h <a Y'� �'4�'1 °�''♦' :,\. i Will. '"1 { a, v M �:` •'') (-.,'i � •�. � Itr iiy i /.'. -' °h ♦ i .\ •' it•" y` �j't t 1 i6' ' �' a ^c "' -p"f 1, l:rlC:'Rl "' T' ...�+il.- �i" ^_� n 7 ; • I`t t V a4, r .`' 1 , `L t i?- 4 f GROW=SCALI: DURIWANTAK3 COLTIT, 7CY SOIi, Sl] on, vwgy W p N 7 =150' aazo' 0 qa 07E2H 3, PROPERTY s- fBpl -axgs CaR, INC. D "RR., j',DUR€ AM & WAKE COUNUES,14C T_ DATE- 6-17-W SIME71TS).WAU 17,19 a: -.• �URDE/ L CoNsULTIIVG DURH BY: :1Ai � �— .a��•��..� - + INC. DRAFT My: CFII�'D BY: TAB IRU QeednmmkrRimd- Rokigk Nora Csmi=27&5 f1 ToloP >omne (919) 84I- 9977 --Fke (919) 841• A09 PROJWT #: 8a34 Ir•I U t1'' 2 . g. "" !� I, i ailte�Edi + ��°an'��YJi�' ° Ix :CAIN 7 lot. FrI, 0.0 y" t" I k ol nut gl1j" -. ho I C�- '20j, N TQW41 jq 4 4 YON 0% AVA NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Governor Director July 15, 2011 Steven Ball Soil & Environmental Consultants, PA 11010 Raven Ridge Road Raleigh, NC 27614 Dee Freeman Secretary NBRRO #11 -140 Durham County BASIN: ®Neuse (15A NCAC 2B .0233) ❑ Tar - Pamlico (15A NCAC 213.0259) ❑ EphemeraUlntermittent/Perennial Determination ❑ Isolated Wetland Determination Project Name: 805 Andrews Chapel Rd Durham Location/Directions: Subject property is an undeveloped field located east of Andrews Chapel Rd and bordered to south by Wake/Durham County line. Subject Stream: UT to Little Brier Creek Date of Determination: May 26, 2011 Feature E/1/P* Not Subject Subject Start@ Stop@ Stream Form Pts. Soil Survey USGS To o A I X Flag AO Throughout X aE✓YP = EphemeraUlntermittent /Perennial Explanation: The feature(s) listed above has or have been located on the Soil Survey of Durham County, North Carolina or the most recent copy of the USGS Topographic map at a 1:24,000 scale. Each feature that is checked "Not Subject" has been determined not to be a stream or is not present on the property. Features that are checked "Subject" have been located on the property and possess chargcteristics that qualify it to be a stream. There may be other streams located on your property that do not show up on the maps referenced above but still may be considered jurisdictional according to the US Army Corps of Engineers and/or to the Division of Water Quality. This on -site determination shall expire five (5) years from the date of this letter. Landowners or affected parties that dispute a determination made by the DWQ or Delegated Local Authority may request a determination by the Director. An appeal request must be made within sixty (60) days of date of this letter or from the date the affected party (including downstream and/or adjacent owners) is notified of this letter. A request for a determination by the Director shall be referred to the Director in writing c/o Ian McMillan, ➢DWQ Wetlands/401 Unit, 1650 :Mail Service Center, Raleigh NC 27699 -1650. If you dispute the Director's determination you may file a petition for an administrative hearing, You must Me the petition with the Office of Administrative Hearings within sixty (60) days of the receipt of this notice of deciMn. A rya North Carolina Division of Water Quality Raleigh Regional Office Surface Water Protection Phone (919) 791 -4200 Customer Service Intemet www.mwaterquality.org 1628 Mail Service Center Raleigh, NC 27699 -1628 FAX (919) 571 -4718 1- 877 -623 -6748 An Equal OpportunilylAtfirrnative Action Employer— 50°% RecydedM D% Post Consumer Paper 805 Andrews Chapel Rd Durham County July 15, 2011 Page 2 of 2 petition is considered fled when it is received in the Office of Administrative Hearings during normal office hours. The Office of Administrative Hearings accepts filings Monday through Friday between the hours of 8:00 am and 5:00 pm, except for official state holidays. To request a hearing, send the original and one (1) copy of the petition to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699 -6714. The petition may also be faxed to the attention of the Office of Administrative Hearings at (919) 733 -3478, provided the original and one (1) copy of the document is received by the Office of Administrative Hearings within five (S) days following the date of the fax transmission. A copy of the petition must also be served to the (Department of Natural Resources, c/o Mary Penny Thompson, General Counsel, 1601 Mail Service Center, Raleigh, NC 27699 -1601. This determination is final and binding unless, as detailed above, you ask for a hearing or appeal within sixty (60) days. The owner /future owners should notify the (Division of Water Quality (including any other Local, State, and Federal Agencies) of this decision concerning any future correspondences regarding the subject property (stated above). This project may require a Section 404 /401 Permit for the proposed activity. Any inquiries should be directed to the (Division of Water Quality (Central Office) at (919) -807 -6301, and the US army Corp of Engineers (Raleigh Regulatory Field Office) at (919) -544 -4884. Respectfully, Martin Ric and Environmental Specialist cc: Wetlands/ Stormwater Branch, 1650 Mail Service Center, Raleigh NC 27699 -1650 RRO /SWP File Copy O V- 4F VY Cr B, WsE 1'JSE _ yV ,6 -wsC x } WSB An ME fyvV s C CrB ' , 1 ♦ ,' t �. L CrB 9111 _ sP /+ c c WsB V rC WsB wft WStS D 1 �. ' Mfg CrC: Mf vv-C ; SO CrB CAB r yl rti ' t;4 fC CrC P l ' toe 4 i 0 maw J r LEnyu RW NOTE: ALL DISTANCES AND COORDINATES ARE IN US SURVEY FEET. AREAS WERE COMPUTED USING THE COORDINATE METHOD. ¢ WETLANDS DELINEATED BY BURDETTE LAND CONSULTING, INC. SITE iiT SEE SHEETS 9 -13 FOR COORDINATE POINT TABLES. SEE SHEET 13 FOR ACREAGE SUMMARY.x I1kWM F-4x axone I PM fN� NAM n = 11% Pe n tx Po ne sae- 0 -e —a+ Pa itam M ant-W- -rte J rw ALDWa., DR m F tsY1` em SHEET 2 Be VICINITY MAP N S 5160 leNtNne°`�o,otler w ofwea -aa, NOT TO SCALEpirie'cT s N •n — — sea!i•E so 4110 oser�c aces DLa tr„e® eoulae a �axana _ ^t, TN I= "emu. it p $ pt e• 1 bah ® 400 IL AN N. aa•u F& I3Z g PIN 07419-0-26-541116 p /YY -7YM Flo 193M M (DEED) 888'54 L9t. nX E hr mea- m- ,. -.a•i j n ,n, n r $ ;'I �:s.:,;;,i's l:::;, -.- ids:;; -z v•:.,:. .. �,. �, ,864.40' a M loan ow on SHEET :fWM °""I` _ AS FwESIdTFAVA . LLC F•IQiq�Peeteta. 1{a . a jI n ,eA rose• aamY a mNL -F-,- ro 1 tam ro tnusaJ I t n .. PAI ear- as- u- ---- eee M1 It� i IISAa I aYaa RIM sees ` um A • (10111111 m • ,o •emN, F OW 01114 T. awau ois eFI fyy Sw n w. Fe m yl�---- "rc � rirl' t7 ra t�.tsd �+ SHEET 5 B is / I 4z:mtu�s as WAR > "' 132.3 ACRES±' SHEET (DEED) N86 6927 yy 595.01' - SNEET� EVALUATED SHEET 8 I ills a la•, n isg M t.n Men �y I{{ I JINre1eI11L WX ! ! I Pr nW�N OaM 67A NY Olw- ehaS -Twi 11111 �•� k le) awa I w; I e r 5a4c•w �--I � K;Y_ atea,araoD tuawr eaw u 3� . e1e urF iwse A sm001,40 � R DO 6740. ro wC a t9/f n D� IImYO• n w, n eW : g S w 4M P4 tH 1Y 1•H. ro 1,T ITT -(nF FL lwi•1 �r S'A q$ x n 137, ro Is• 1 Na 1•ffiw d,ss• C; trN OTw- W -0Ya•w r. P1Dw �yns II Pw oTw- ate,- aws'ES� NN//FT a . •0•eI Y. aeYfaN. JII .N NOTE: WETLANDS WERE DELINEATED BY tax' P4 in PC ass n,ai,rov+ BURDETTE LAND CONSULTING, INC. M el. 111"le This cerb'fres that this Copy of this plot accurately depicts the LEGEND boundary of the jurlad,ct,on of Section 404 of the Clean Water Act as determined by the undersigned art this date. Unless there Is a ,',;' V. ., . � change in the law or Our published regu/otions, this determination USACE of Section 404 jurisdiction may be relied upon for o Period not to I TT "Coed Rve years from this date. This determination ,roa made utilizing the opprapriote Regional Supplement to the 1967 Corps of PL Engineers Wettands Delineation Manual.' SF NAME: TITLE: DATE: 1, WADE A. COWERS, PLS NO. L -4639, A NORTH CAROLINA PROFESSIONAL LAND SURVEYOR, DO HEREBY CERTIFY THAT THIS MAP WAS PREPARED UNDER MY SUPERVISION AND SHOWS THE LOCATIONS OF SECTION 404 JURISDICTIONAL AREAS AS DELINEATED BY BURDETTE LAND CONSULTING, INC. OF RALEIGH, NC. Z O (I DATE WADE A. DOWERS, PLS PROFESSIONAL LAND S VEYOR L11- S L.<6.39 U.S. ARMY CORPS OF ENGINEERS TIE TO PROPERTY LINE SQUARE FEET NOW /FORMERLY WETLAND DELINEATION FOR [;LEESVILLE ROAD ACTIVE ADULT COl�llrlljl\1TY BLC(PADI9CP4u1u CRY: COUNTY: STATE: DATE: Dnu" DIMX&M n]N610.2011 �ErHc! 1t4q 1I8S LAM CON80LTAPTBF PC to Tow 4. day s.,Iw Diem Ila•etr: C-.Xm li 8T. 1998 ,',;' V. ., . � bli8 81. Oaa 8t Ph- • (819) 610 -4684 (Bose 2) r" (a9) 1,,- 02 8.1018 NC 81812 them; ee..e.em.eW.m , DRAWN BY: RGO a=O eY: wAG I SHEET 1 OF 13 PFD 1 - CRAP= 80A78 p° 760 p➢➢_ �oO DF 1 Imhhm - mow➢ NOTE: ALL DISTANCES AND COORDINATES ARE IN US SURVEY FEET. USACE AREAS WERE COMPUTED USING THE COORDINATE METHOD. NONJURISDICTIONAI WETLANDS DELINEATED BY BURDETTE LAND CONSULTING, INC. STREAM CHANNEL SEE SHEETS 9 -13 FOR COORDINATE POINT TABLES. (1,776 SF) SEE SHEET 13 FOR ACREAGE SUMMARY. 0 c2 v x ISOLATED WETLANDS #782 — #783 (283 SF) 'his ceetiries that this Copy of this plat accurately depicts the boundary of the jurisdiction of Section 404 of the Clean Water Act as determined by the undersigned on this date. Unless there is a change in the law or our published regulations, this determination of Section 404 jurisdiction may be relied upon for a period not to exceed five years from this dote. This determination was made utilizing the appropriate Regional Supplement to the 7967 Corps of Engineers Wetlands Delineation Manual.^ NAME TITLE: DATE 1, WADE A. COWERS, PLS NO. L -4839, A N097H CAROLINA PROFESSIONAL LAND SURVEYOR, DO HERESY CERTIFY THAT THIS MAP WAS PREPARED UNDER MY SUPERVISION AND SHOWS THE LOCATIONS OF SECTION 404 JURISDICTIONAL AREAS AS DELINEATED BY SURDEFTE LAND CONSUL77NG INC. OF RALEIGH, NC. TE WADE—A. BOWERS, PLSF- PROMSIONAL LAND SURVEYOR LIC, N L -4839 USACE J4. 2 NONJURISDICTIONAL STREAM CHANNEL (651 SF) 4M USACE 4ONJURISDICTIONA1 STREAM CHANNEL (2,766 SF) USACE 14U22 JURISDICTIONAL WETLANDS #4346 — #4354 #4338 — #4345 (1,307 SF) �p6 4609 s2p—!— _. ...... 4141 s� 4146 USACE U.S. ARMY CORPS OF ENGINEERS TT TIE TO One 4117 °'-_. 4111 4116 4146 PROPERTY LINE 4119 - .�" 4145 ISOLATED 4121 ; 41" WETLANDS #001 — #020, `~ 4149 #763 — #781 41 22 4147 4 (12,416 SF) 41 4141 4146 ISOLATED WETLANDS #782 — #783 (283 SF) 'his ceetiries that this Copy of this plat accurately depicts the boundary of the jurisdiction of Section 404 of the Clean Water Act as determined by the undersigned on this date. Unless there is a change in the law or our published regulations, this determination of Section 404 jurisdiction may be relied upon for a period not to exceed five years from this dote. This determination was made utilizing the appropriate Regional Supplement to the 7967 Corps of Engineers Wetlands Delineation Manual.^ NAME TITLE: DATE 1, WADE A. COWERS, PLS NO. L -4839, A N097H CAROLINA PROFESSIONAL LAND SURVEYOR, DO HERESY CERTIFY THAT THIS MAP WAS PREPARED UNDER MY SUPERVISION AND SHOWS THE LOCATIONS OF SECTION 404 JURISDICTIONAL AREAS AS DELINEATED BY SURDEFTE LAND CONSUL77NG INC. OF RALEIGH, NC. TE WADE—A. BOWERS, PLSF- PROMSIONAL LAND SURVEYOR LIC, N L -4839 USACE J4. 2 NONJURISDICTIONAL STREAM CHANNEL (651 SF) 4M USACE 4ONJURISDICTIONA1 STREAM CHANNEL (2,766 SF) USACE 14U22 JURISDICTIONAL WETLANDS #4346 — #4354 #4338 — #4345 (1,307 SF) �p6 4609 s2p—!— c�Hl 2 f/fyt M UND CMIAWAM, PC '� "v• " �Ar '0o»»antad to 7We1 Q➢a1tty Bel laa. !•.: ` e 3Lm UcN e,: 0-8070 RBT. 1 ➢ ➢1 ➢110 8L aim at Phase (➢lo) Sfa -46" t, , pr •. (➢tills ➢) Pas (91➢) 6101➢➢ , NC 87119 `4b ➢,e4,w➢e,eeeLasm E h$WLt1' DRAWN BY: XGC CHECKED BY: WAG I SHEET 2 OF 13 LEGEND USACE U.S. ARMY CORPS OF ENGINEERS TT TIE TO PL PROPERTY LINE SF SQUARE FEET N/F NOW /FORMERLY WETLAND DELINEATION FOR LEESVILLE ROAD ACTIVE ADULT COMMUNITY BIQPROJECTNIMS2 CITY: DURHAM COUNTY: DURHAM STATE: I NORTECABOLDIA DATE: I AM 10. 2011 c�Hl 2 f/fyt M UND CMIAWAM, PC '� "v• " �Ar '0o»»antad to 7We1 Q➢a1tty Bel laa. !•.: ` e 3Lm UcN e,: 0-8070 RBT. 1 ➢ ➢1 ➢110 8L aim at Phase (➢lo) Sfa -46" t, , pr •. (➢tills ➢) Pas (91➢) 6101➢➢ , NC 87119 `4b ➢,e4,w➢e,eeeLasm E h$WLt1' DRAWN BY: XGC CHECKED BY: WAG I SHEET 2 OF 13 ISOLATED WETLANDS x'782 — #783 (283 SF) ISOLATED WETLANDS #783 — #785 (94 SF) 0 USACE JURISDICTIONAL STREAM CHANNEL USACE JURISDICTIONAL STREAM CHANNEL 4r10 *4399 , USACE iiNW1 AQAQUAMCC. JURISDICTIONAL � STREAM CHANNEL (234 SF) .eae - m4o w346 �, 48M srArrr MGw 4624 MIN0ML A0 4a„ 4625 vunarR 4m sus n 481 , 461 4a� 4e�1ra 6 4M4 x USACE JURISDICTIONAL STREAM CHANNEL GRew W418 16 16 2 a 1 hwh _ 100 tL NOTE: ALL DISTANCES AND COORDINATES ARE IN US SURVEY FEET. AREAS WERE COMPUTED USING THE COORDINATE METHOD. WETLANDS DELINEATED BY BIIRDETTE LAND CONSULTING, INC. SEE SHEETS 9 -13 FOR COORDINATE POINT TABLES. SEE SHEET 13 FOR ACREAGE SUMMARY. ISOLATED wood WETLANDS 4o6z v`AS 0110 #737 — #757 (2,609 SF) floor 4169 4161 ,4143 Y FUG am 6744 4,63 lea 164 USACE 41574166 JURISDICTIONAL WETLANDS � '� #720 — #736 'Thls certifies that this ropy of this plot accurately depicts the n PC LEGEND boundary of the Jurisdiction of Section 404 of the Clean Water Act SSCC . UMEOW 0-2070 98T. 180a Rio 6L Gil" a< Ph— (619) RO as determined by the undersigned on thie date. Unless there is a -4464 10 Paz (016) alo -8106 Change in the low or our published regulations, this determination USACE U.S. ARMY CORPS OF ENGINEERS of Section 404 jurisdiction may be relied upon for a period not to TT TIE TO exceed five years from this date. This determination was made utilizing the appropriate Regional Supplement to the 7967 corps of PL PROPERTY LINE Engineer& Wetlands Delineation Manual." SF SQUARE FEET N/F NOW /FORMERLY NAME WETLAND DELINEATION VXE. DATE: FOR 1, WADE A. GOWERS, PLS NO. L -4639, A NORTH CAROLINA PROFESSIONAL LAND SURVEYOR, DO HEREBY C£R77FY THAT THIS MAP WAS PREPARED UNDER MY SUPERVISION AND SHOWS THE LOCA770NS OF SEC77ON 404 JURISDICTIONAL AREAS AS DELINEATED BY BURDETTE LAND CONSUL77NG, INC. OF RALEIGH, NC. it A4 Ir WADEA. GOWER PLS PROFESSIONAL LAND SUkVEYOR UC. 9 L -401) LEESVILLE ROAD ACTIVE ADULT COMMUNITY 6Lamolacroll333 CITY: COUNTY: STATE: DATE: DURHAM DURHAM N01l1HCA2DLWA RWIk2011 n PC 'Comm te, ' Naa SSCC . UMEOW 0-2070 98T. 180a Rio 6L Gil" a< Ph— (619) RO -4464 10 Paz (016) alo -8106 Re 2Y612 .,m 6e.....a.7.es.ea Floitl MWN BY: RGC CHEO(ED 9Y: WAG 1 SHEET 3 OF 13 0: \ —MTE\ PHI- 10- 03B \dwB \IEIL4VILLE_USACE_nM AND _SDUTH.dwg REVISED: 00272011 - CHANCES PER CUPW AtR4ll �c USACE JURISDICTIONAL STREAM CHANNEL USACE JURISDICTIONAL STREAM CHANNEL 610 USACE MIN6AAL AQUA JURISDICTIONAL ,A� 4 STREAM CHANNEL (234 SF) g� tl U z USACE JURISDICTIONAL STREAM CHANNEL GROW Sara + a +qp app app >B a1Qf i b h -100 R NOTE: ALL DISTANCES AND COORDINATES ARE IN US SURVEY FEET. AREAS WERE COMPUTED USING THE COORDINATE METHOD. WETLANDS DELINEATED BY BURDETTE LAND CONSULTING, INC. SEE SHEETS 9 -13 FOR COORDINATE POINT TABLES. SEE SHEET 13 FOR ACREAGE SUMMARY. 45 474@ ISOLATED e4000 4747 WETLANDS 4404 F`"a 0M 4148 #737 - X1757 't 4740 (2,609 SF) �D06 4706 47W 4008 5407 1 474 _ 4 4M, 4159 14103 FLAG #744 1 ` a 41 : 164 USACE 4164 ,as 4'574'66 JURISDICTIONAL ' WETLANDS 4 ry , ' J x'720 - #736 * ' m (3,804 SF) 167 „ 1594 USACE 4 4' 41 JURISDICTIONAL 44/1 '4p6 STREAM CHANNEL (603 SF) `This eerbYies that this copy of this plot accurately depicts the WS LAIRD COOMTAM, PC to Tow 40dity swTice boundary of the jurisdiction of Section 404 of the Clean Water Act Pkm ueesee: C-am Sar. 19ae Rio aL an" a Ph9oe (919) 610 -4464 19017, 10 (9l9) a4o -9LOa aelelaL. NC 27414 d.9: e..M..em4e,m4„m as determined by the undersigned on this date. Unless there is a change in the low or our published regulations, this determination USACE of Section 404 jurisdiction may be railed upon for o period not to TT exceed five years from this date. This determination was made utilizing the appropriate Regional Supplement to the 1987 Cofps of PL Engineers Wetlands Delineation Manual.' SF NAME N/F H7LE DATE 1. WADE A DOWERS. PLS NO. L -4639, A NORTH CAROLINA PROFESSIONAL LAND SURVEYOR, DO HEREBY CERTIFY THAT THIS MAP WAS PREPARED UNDER MY SUPERVISION AND SHOWS THE LOCATIONS OF SECTION 404 JURISDIC77ONAL AREAS AS DELINE47ED BY SURDETTE LAND CONSUL77NG, INC. OF RALEIGH, NC. 17,4, ( IQ DA WADE A. GOWERS PLS PROFESSIONAL LAND SURVEYOR LIM # L-4639 USACE JURISDICTIONAL WETLANDS #639 - {643 597 SF) I 4166 4'66 JI 414 �:� 4167 4706 LEGEND U.S. ARMY CORPS OF ENGINEERS TIE TO PROPERTY LINE SQUARE FEET NOW /FORMERLY WETLAND DELINEATION FOR LEESVILLE ROAD ACTIVE ADULT COMMUNITYHI.CIPROlSCT611W CITY: COUNTY: STATE: DATE: DURHAM DURHAM NORTH CAROLINA I xm L%20lI SURVEYED BY 1 ��tw3.! Hy4 WS LAIRD COOMTAM, PC to Tow 40dity swTice °�` ,t= S' , t .... C4reuu►m Pkm ueesee: C-am Sar. 19ae Rio aL an" a Ph9oe (919) 610 -4464 19017, 10 (9l9) a4o -9LOa aelelaL. NC 27414 d.9: e..M..em4e,m4„m DRAWN BY: RGC CHECKED BY: WAG I SHEET 4 OF 13 0:\ - PULTE\ PBh 10- 0SB\ dwg \IEESVIIlE_USACE_W"LAND _SOUTH,dwg REVISED: 067271201 I - CHANGES PER CLIENT PE1�N� J USACE JURISDICTIONAL STREAM CHANNEL 4M USACE +� JURISDICTIONAL STREAM CHANNEL 401 (88,409 SF) alua2uc 11rru o tao tea oa M FIST 1 1wh - 100 A. AM' ALL DISTANCES AND COORDINATES ARE IN US SURVEY FEET. AREAS WERE COMPUTED USING THE COORDINATE METHOD. WETLANDS DELINEATED BY BURDETTE LAND CONSULTING, INC. Q SEE SHEETS 9 -13 FOR COORDINATE POINT TABLES. SEE SHEET 13 FOR ACREAGE SUMMARY. to "This certifies that this copy of this plot accurately depicts the boundary of the jurisdiction of Section 404 of the Clean Water Act as determined by the undersigned on this date. Unless there is a change in the low or our published regulations, this determination USACE of Section 404 jurisdiction may be relied upon for a period not to TT exceed five years from this date. This determination was made util,=ing the appropriate Regional Supplement to the 1987 Corps of PL Engineers Wetlands Dellneatlan Manual.' SF NAME 77TLE.- DATE: 1, WADE A. GOWERS, PLS NO. L -4639, A NORTH CAROLINA PROFESSIONAL LAND SURVEYOR, DO HEREBY CERTIFY THAT THIS MAP WAS PREPARED UNDER MY SUPERVISION AND SHOWS THE LOCATIONS OF SEC77ON 404 JURISDIC77ON4L AREAS AS DELINEATED BY BURD£TTE LAND CONSULTING INC. OF RALEIGH, NC. WADE A. GOWERS, PLS PROFESSIONAL LAND SURVEYOR L IC, 0 Ld639 LEGEND U.S. ARMY CORPS OF ENGINEERS TIE TO PROPERTY LINE SQUARE FEET NOWAORMERLY WETLAND DELINEATION FOR LEESVILLE ROAD ACTIVE ADULT COMMUNITYRLQPR078CTP11352 CITY: COUNTY: STATE DATE: DURHAM DURHAM NORTH CAROLINA I IUNE 10, 2011 Cf�011.'Cl..ri,yfr V.—Mod �COMIXTrII�ITB, PC . 1900 � errs SL mw w Phase (KS) sto -44u 51b -Y108 Vp'tUlSl.• DRAwN BY: REC cNECIfED eY: wAG I SHEET 5 OF 13 z GRAPHIC WWR „a m 1 loch _ IOU tL NOTE: ALL DISTANCES AND COORDINATES ARE IN US SURVEY FEET. AREAS WERE COMPUTED USING THE COORDINATE METHOD. WETLANDS DELINEATED BY BURDETTE LAND CONSULTING, INC. SEE SHEETS 9 -13 FOR COORDINATE POINT TABLES. SEE SHEET 13 FOR ACREAGE SUMMARY. USACE JURISDICTIONAL STREAM CHANNEL L OWN USACE 40 JURISDICTIONAL WETLANDS #787 — #819, *904 — #900 (11,784 SF) USACE JURISDICTIONAL STREAM CHANNEL n4M RAr*M USACE NONJURISDICTIONAL ISOLATED STREAM CHANNEL (1,476 SF) "This certifies that this copy of this plat accurately depicts the boundary of the jurisdicbion of Section 404 of the Clean Water Act as determined by the undersigned an this date. Unless there is a chonge in the law or our published regulations, this determination Of Section 404 jurisdiction may be relied upon for a period not to exceed live years fram this date. This determination was made utilizing the appropriate Regional Supplement to the 1987 Corps of Engineers Wetlands Delineation Manual." USACE TT PL SF LEGEND U.S. ARMY CORPS OF ENGINEERS TIE TO PROPERTY LINE SQUARE FEET NAME: N/F NOW /FORMERLY WETLAND DELINEATION n7LE: DATE • FOR WADE A. DOWERS, PLS NO. L -4839, A NORTH CAROLINA PROFESSIONAL LAND SURVEYOR, DO HEREBY CERTIFY THAT THIS MAP WAS PREPARED UNDER MY SUPERVISION AND SHOWS THE LOCATIONS OF SECTION 404 JURISDICTIONAL AREAS AS DEUNEATED BY SURDETIE LAND CONSULTING, INC. OF RALEIGH, NC. LEESVILLE ROAD ACTIVE ADULT1, COjBRI►�fl<Tl►T7rBT�j li jj��''jjjj��'�j�lJJjl\\lj jl jI BLQPAOi8cronm CRY: DURHAM COUNTY: DURHAM STATE: NMTHCAAOLBIA DATE I AMIk 7011 SURVEYED BY I M IM IC `Ek011 i !14yF .p' ` 'C —mVAed t0 Teta1 q..W 9eevlee' `r 0 it WADE A.GON/ERS, PROt7ESSlONAL LANDS RVEYOR LR« / L�6iA ,�CCc,.Vi� '. 111 ih'eoeI a09 0T0 4 r/y (S(8IIsoLOO9eat. INNS at Ph=* (819) 610 -4184 p•:', s' Reiff. RC 97538 919) Q�s :r� _a` :ec t0Y]uQNfi DRAWNBY:RG: CHEO®BY:WAD SHEET6OF13 I o:—UyTE\ PHI_10- 03B\ dng\ IEESVMLE— USACE_WETLAM—SOU7H.dwg REVISED: 0627/2011 - CHANGES Pot CURL 401 USACE 4Q7 ^� o , o OBOP) 8C� Spo aPo JURISDICTIONAL � u0� STREAM CHANNEL was 1luk � tL eme 49L• 4951 48M NOTE.' ALL DISTANCES AND COORDINATES ARE IN US SURVEY FEET. e08e 4G0F ° AREAS WERE COMPUTED USING THE COORDINATE METHOD. ees7 4011 WETLANDS DELINEATED BY BURDETTE LAND CONSULTING, INC. SEE SHEETS 9 -13 FOR COORDINATE POINT TABLES. r ease 40m SEE SHEET 13 FOR ACREAGE SUMMARY. 4il4 eG11 4M 4°13 4054 + 4888 USACE 4 .001 4W4 JURISDICTIONAL '970 4015 STREAM CHANNEL 4471 407 �1 4W 40,6 4H In AREA WEST OF CREEK BANK NOT EVALUATED n 70 4MI USACE JURISDICTIONAL STREAM CHANNEL USACE JURISDICTIONAL 7 STREAM CHANNEL #717 /(/ /(69 SF) USACE m NONJURISDICTIONAL IIi ISOLATED j766112 STREAM CHANNEL FIAa "17 4302 .nl s,.,o (251 SF) ISOLATED FLAG CM is WETLANDS #709 — #716 (1,352 SF) "This certifies that this Copy of this plot occumtely depiota the boundary of the jurisdiction of Section 404 of the Clean Water Act as determined by the undersigned on this date. Onto" there is o change in the low or our published regulations, this determination of Section 404 jurisdiction may be relied upon for o period not to exceed five years from this date. This determination was mode utilizing the appropriate Regional Supplement to the 1987 Corps of Engineers Wetlands Delineation Manual' NAME: 777LE DATE• 1, WADE A. GOWERS PLS NO. L -4639, A NORTH CAROLINA PROFESSIONAL LAND SURVEYOR, DO HEREBY CERTIFY THAT THIS MAP WAS PREPARED UNDER MY SUPERVISION AND SHOWS 77,4E LOCATIONS OF SECTION 404 JURISDIC77ONAL AREAS AS DELINEATED BY BURDETTE LAND CONSULTING, INC. OF RALEIGH, NC. Z° L TE WADEA GOWERS, PROFESSIONAL LAND SURVEYOR LIC. B L.4B88 ISOLATED WETLANDS #688 — #708 (2,520 SF) 01„0 Ful 1Rl® q►s_ PIwF 1188 LAND CONB[1LTiWrlB, PC LEGEND USACE U.S. ARMY CORPS OF ENGINEERS TT TIE TO PL PROPERTY LINE SF SQUARE FEET N/F NOW /FORMERLY WETLAND DELINEATION FOR LEESVILLE ROAD ACTIVE ADULT COMMUNITY,,,,,, CITY: DURHAM COUNTY: STAT&- DURHAM NOMICARDEM DATE JUNB 142011 q►s_ PIwF 1188 LAND CONB[1LTiWrlB, PC E9i. 1066 6118 8L Gum at Dhow (019) 010 -404 �;.�!.s.. •�,e� (mss _) Fes (610) 610 -WOY RHd[p„ ITC Ei61Y LrO:® �'pOY0 DRAWN BY: RGC ICHECXMUrWAG I SHEET 7 OF 13 06/1X261, - CHANrp_R m rr ll T >o ,1q ,55 55 al h9M ALL DISTANCES AND COORDINATES ARE IN US SURVEY FEET. AREAS WERE COMPUTED USING THE COORDINATE METHOD. WETLANDS DELINEATED BY BURDETTE LAND CONSULTING, INC. SEE SHEETS 9 -13 FOR COORDINATE POINT TABLES. g SEE SHEET 13 FOR ACREAGE SUMMARY. cf a,e USACE JURISDICTIONAL WETLANDS X1669 - X1678 (2,053 SF) 04555 17flY FLAOS1165 USACE ,555 JURISDICTIONAL i 4067 WETLANDS ,08R X1654 - #669 wn (2,519 SF) + ti' 3 ISOLATED 4 WETLANDS 5 ISOLATED X1679 - #687 WETLANDS ++� (1,126 SF) #645 - #653 FuarOM 4 "' ,�Te (993 SF) 4174 41 175 � 4519 4055 HT1 '� 0176 6905+ 4170 FLAG e554 4555 4050 4177 TT PL 04M4 4581 FLAOr545 40� TT PL this certifles that this copy of this plot accurately depicts the I9 LAM +'ANTS, PC 'CRmmlthd to fold quaW O,w"W Ph- U...": C -EO'IO 19YB tills 8L on" 9 s 5 P6me (619) 610 "Al 651fe BI P44s (9181 518 -0102 NC 27618 CsS: ee5ew�o5a® boundary of the jurisdiction of Section 404 of the Clean Water Act DRAWN sy; ROC CHECKED sr: wAG 1 SHEET 8 OF 13 as determined by the undersigned on this date. Unless there is a change in the low or our published regulations, this determination USACE of Section 404 jurisdiction may be relied upon for a period not to TT exceed rive years from this dote. This determination was made utilizing the appropriate Regional Supplement to the 1987 Corps of PL Engineers Wetlands Delineation Manual.' SF N/F NAME: 71'RE, DATE. , WADE A. GOWERS, PLS NO. L -4639, A NORTH CAROLINA PROFESSIONAL LAND SURVEYOR, DO HEREBY ^ERTIFY THAT THIS MAP WAS PREPARED UNDER MY SUPERVISION AND SHOWS THE LOCA77ONS OF SEC7701V 404 JURISDICTIONAL AREAS AS DELINEATED BY 9URDE7TE LAND CONSULTING, INC. OF RALEIGH, NC. 2° tc ATE WAW OL GOWERS, PLS PROFESSIONAL LAND SURVEYOR L/C 11 L4m LEGEND U.S. ARMY CORPS OF ENGINEERS TIE TO PROPERTY LINE SQUARE FEET NOW /FORMERLY WETLAND DFJ RaAT10N FOR LEESVILLE ROAD ACTIVE ADULT COMMUNITYBLQPROIKTY11352 CITY: COUNTY - DATE: DURHAM I DURHAM 1 NOR7E A7CAROUNA I 1=1k2011 I SURVEYED BY ��015 f I!I �� +.. �-.%... r4lY✓ � 6J. 4y¢ 13.' �. c• 4 � I9 LAM +'ANTS, PC 'CRmmlthd to fold quaW O,w"W Ph- U...": C -EO'IO 19YB tills 8L on" 9 s 5 P6me (619) 610 "Al 651fe BI P44s (9181 518 -0102 NC 27618 CsS: ee5ew�o5a® tatuiTr DRAWN sy; ROC CHECKED sr: wAG 1 SHEET 8 OF 13 0:\-PULTE\ PIU- 10- OSB\ dwg \LEESVIUE_USACE- WLTLAND.BOM.dwg Rm-gr.n- tumnnl 1 _ rwAwn- 5ro r, — 'This certifies that this Copy of this plot accurately deplots the POINTTABLE PO4TNAAE NORTHING EAMMG DESCRIPTION 4WD 79732M 2064577.10 CLB.00HANNELOM 4067 797810,94 10846721 CL49 p2 402 793221AB 20INSK63 OLSACNANELem 4WO 795819.48 206464B.89 CLWCK&NNEL0700 40D4 797106.14 1645=08 CL40CHMNELP749 4006 74308&06 20616240 CL 453 CHANNS0740 40M 76i m 20901 &70 CL40 CHANNELp47 4W7 7=0114 2064610.90 CL6ACHINNELp" 4008 792=96 20172.61 CL40CHANIELA46 4W9 79216.1 2064=.81 CL6.00WWNEL0744 417 7141M W=EMM CL42 CHANMOM 4016 704114.16 102079.1 CLaa CHANNEL 4019 79409.47 2063917.1H CL4OCHANNEL 4070 794=70 2083Ma71 CL && CHANNEL 421 794010.44 2983 M.2 CL&V CHAN IELp= 422 79W&AB 183940.01 W84rrf53 4075 7NW1.11 206997a2 OMTTNM 416 MM.N 10805218 CL 10 CHANNEL 416 790817.78 2082B=33 CL6.a CHANNEL 4W? 79MM 2G671"A8 CL9aC 1AMEL 40M 79MOD54 2OMW43 CL flO CHANNEL 419 79271.50 40812.2 CL&&CHANNEL 4040 193MM 202=6.41 CLSa CHANNEL 4041 78311.14 2=2M5.1 CLBa CHANNEL 412 law.95 3COM.31 CLaa CHMMEL 418 7032MA 2DRIMM CLSOCHANNEL 4D44 79719.76 2MMOM CL&OCHANNEL 4046 7=18710 202MOI CL&V CNANIEL 4045 7MIW78 162017.41 CL 10 CHANNEL 4047 7 =19.10 206797731 CLW CWWNEL 4021 7=16128 20WIMM CL10CHANNEL 419 7M/3&1 2M2WA8 CL&OCHAMIEL 4090 7 =107.67 2087=4.41 C140CHANNEi 4061 793M38 20294426 CL4LUCHANNEL 402 79SMSM 2DEN320 CL4DCHANNEL4763 4053 TNUC78 201Mv CLLOCHANNELA69 4064 763310.8 2027=.1 CL6ACHANNEL9T1 401 79331431 2027761 CL 100 CHAME R M 4056 7X29&M 2M4199A8 CL4OCHANNEL4W 4067 792=78 200415&= CL 4.0 CHANNEL#= 40M 7977107 184187.91 CL6a CNAMNEL=61 4059 7922026 18410&13 CL&OCHANNELM00 4000 794208.40 184=&76 CL&OCHANNELAG 4081 792224.7 209WALM CL4a CHANNELAN 402 7221329 2DUM79 CL6a CHNEL96A 40M 721WAD 104042.91 CL6a CHINNELAO 401 7216279 2094094.33 DL&CrCHANMLTTPLdM 4065 7M470M 1=736.3 CL4a CHA/MEL4M9 40M 747474079 208877201 CL40CXANNFL/M9 4087 799=01 70=71721 CL4a CHMNNELNU 4008 70447.N 183797.18 0.4OCHNNEL9 4099 729897 20B08B6A1 CL 6.O CH a*10M 4W0 7924854 2033674.73 CL102 CHANNEL 4071 724X30 2=3 L 7 CLflOCHAXNELOW 422 74233712 2033082" CL16.00HANNELAMB 4073 79L1=41 206930491 OL15AYCHAMELOM 4074 79791 10&7x127 CL12a CHAN4EL8Ml 4079 79579.17 2053USM CL 10.0 CHANNELS= 418 M71&4D 2053539.77 CLIGO CHANNEL46W 40" 70 MOT 10=11.2 CL0.a C7AMEL4M6 4076 792241.44 2M3M121 CL&OCHANNELOW 4074 72n" 2 MM72B CLILWCHANNILOW 4008 717194 2053NM CLWYCHANNELUMs 417 7921M10 1536M" 12.9 CHANNEL T7Pl 4062 72561.97 108264.0 CL &V CHANNEL PAW 4093 70837799 16728208 CL3a CHANNEL 401 712MA4 121&08 CLIOCHANEL 4065 79D dk77 100827414 CL&OCHANNEL A= 7979!29 13=13 CLaOCHAHNEL 4087 723088 20228&71 CLWYCHANAIM 4065 792344.77 2M7MIL22 CL&OCHANNEL 4M 792334.57 187=216 CL7.DCHANNEL 410 72641sT 20813124 CL &a CHANNELp06 411 79017.01 2OWWAD CL&(YCHANNELVW 4008 79218.08 208108.2 CL &0 CHANNELMM 1093 79747.79 153401.06 CLUr CHANNEL3106 4091 78510.16 20624147D CL39 CHANNELA04 4095 7978721 208127.18 CL9ACHANELOM 4098 78639.448 2M243'793 CLSaCIANNELp2 4097 708298.2 202=.2 I CLs.9cHWNas7at 'This certifies that this Copy of this plot accurately deplots the PONTNAME boundary of the jurisdktion of Section 404 of the Clean Water Act EASING as determined by the undersigned on this date. Unless them is a In the low USACE change or our published regulations, this determination of Section 404 jurisdiction may be relied upon for a period not to TT exceed Five years from this date_ This determination was made utilising the appropriate Regional Supplement to the 1987 Corps of PL Engineers Wetlands Delineation MonuaL' SF NAME: 71RE. DATE 1. WADE A. GOWERS PLS NO. L -4639, A NORTH CAROLINA PROFESSIONAL LAND SURVEYOR. DO HEREBY CERTIFY MAT THIS MAP WAS PREPARED UNDER MY SUPERVISION AND SNOWS THE LOCA77ONS OF S£C77ON 404 JURISDICTIONAL ARE4S AS DELINEATED BY BURDET7E LAND CONSUL77NG. INC. OF RALEIGH, NC. POINTTABLE PONTNAME 1,p 1( DA ]E EASING DESCRPTION 4066 WADE A. GOWYMs, PL 27124471!8 CLI O CL&OCNANNE.9MB PROFESSIONAL LAND SURVEYOR LIC N L -41699 POINTTABLE PONTNAME NORTHING EASING DESCRPTION 4066 rNW19 27124471!8 CLI O CL&OCNANNE.9MB 4008 7M27fl 0 2MM4A2 MOD 72471.19 70271.17 CL40ClWMEL/fi0 4101 72IK69 2MMOA0 CLBA CHANNEL0M7 4102 7227&&3 22411AB CLaa CNANNEL48M 4109 7OM25 202=1.54 CL40 CHANNELOW 4104 70M.67 20264624 CL49 CHANNEL6M4 4105 722MM 204167 &65 CLWCHAHNELOM9 4106 7928=08 20271610 CLEVCHANNELM2 4107 79=06M 20274&M CL49 NELOM7 4108 72807-06 20S47d&47 CL&OCIMNEL4 4101 129D7." 202n12D CL 0.0 CHANNELMM 4110 7290822 I0224R CL Ba CHANELMM 4112 724=77 20214&78 t7 4113 7040001 200=12 4W1Tip83 4114 744M 39 W WWA 602 41%6 794664.16 10084008 417 4115 7916=26 melw06 901 4117 7442496 206987&49 0006 4119 7905" 20 MIAS 6008 4119 7944=83 205MO M #= 411 744452LU 12671.01 6WB 4121 78446477 2083 M% 401 4122 744417.2 20932494 0010 4123 7982.04 2MM406 0011 4124 76OSSM 247912692 OM2 4125 7443" 2002MOM 6013 4126 79al3.4 2003000.74 OM4 4127 794=71 2138001.32 4086 4121 7427 &19 2003003.70 4016 4124 79410.73 208M.71 417 4130 704=30 208325M 0018 4131 742/61 2DM9 =.00 1019 4132 74414 &= 2MM722 120Trom 4133 74414.2 Oman ffm TT 401 4134 7942181 20"WAD pM 419 7WON27 2MN412D 4774 4136 7MMM 1089"A6 WM 4187 7942MA6 2009KR 8777 413B 794" 15382.42 979 412 ISCH&M 163906237 9776 4140 79inSM 2MMi0.46 1774 4441 7999226 202890.47 1773 4142 749001 2OB30Ofl14 6772 4143 7442071 208382..41 4771 4214 79"57AB 209389216 871 4146 79"2.2 M83093rl pM Aia 7945MA 2088004.1 4M6 4147 79461&9 20®08234 4767 4146 7466192 2083086.78 4006 41M 79457291 20MBIRM 6708 4160 1 74161.62 2083879.1 411 4152 7249697 20MMM 4812 411 "3=107 208447721 4749 4159 742197 2DUM21 6749 4154 numis 208"65.01 0742 CGS 782331.71 201445.79 0741 4156 79241.6 2064MO C40 4167 713217.30 2094007.9 p= 41M 71727.77 206"7094 an 41W nwa 206137&16 6787 4180 74i237A3 1440&27 p6TTTpp 4181 7481197 164434M 965 412 79320M 206444&74 471 411 792=09 21"71.4 07"TTp44 414 743043.74 20808&83 4S=TTPL 4165 748008.87 308476828 6840 4165 713067.79 20/4790.06 0841 4167 70=23 206470284 0842 4153 708442 & 1M4T72.M =43 TTPL &M= 41" 7218.09 20208.41 169TTPL 4170 72226.2 206831898 WM 4171 7®42.17 203.13 081 4172 7=61.05 20=16A6 084 4174 72272.4 X)88848.32 1M 4174 79228MM 2083390.45 082 4176 722 %T6 208386698 MB1 4175 7211AS I 2002MM 4533 4177 722071 1 206M8.M MMMPL&OW 4178 78274208 1021897 pia LEGEND U.S. ARMY CORPS OF ENGINEERS TIE TO PROPERTY LINE SQUARE FEET NOW /FORMERLY WETLAND DELINEATION FOR LEESVILLE ROAD ACTIVE ADULT COMMUNITY5143�,01130 IDURHAM I DURHAM ' NORi .CAROLINA I AUG 0..201 I +LANi_9 A14'1I! =9 L= Conixn , Fc $�,, ,. >,•,,?t_wi, VaumlLt4d to Note! pstlty 814108' ,;!+ ' h,, •. Arm T108e9K C -am Cw` 182 1998 - .b Bus . OD99 ># 4 eY 941 - P4><9S'e 51 B4L2971m8C 29'012 : 64..w6m4emdam h8lUU61 DRAWN BY: RGC CHEMD BY: WAG I SHEET 8 OF 13 POINTTAMA 0OIKTMIA4: NMIIHN6 FAB71G DESCRIPTION 4175 702313.4 200=35 all 4150 782842M 200220637 W12 All% 707814 202/51.79 0714 4182 70287447 ]08808.88 8715 9708 799361.95 2M2Za M OMTT7= 4195 7052M.70 2064599.26 CLCHANNEL /102 7220035 206141.50 ff=TTCSWOEL 41M 7801478 2054311.18 1727 4167 7316&2 205452409 01122 416 1 7931767 205435382 SIM 41419 70154A0 1 2064403.85 574 4100 7OM41ffi 11 205420.17 6729 4191 753129.71 7064480,46 0726 4192 793M98W 20844440 8727 4192 79811150 2044369 174 4194 70210148 1064950.15 OMWORANNEL 4195 793101AP 700444.95 CLCH47MEL 4196 793E" 7049561 CL CHAMIEL 4197 706179.95 2086MA6 CLOMONEL 4195 RMI&37 '4,64127.72 sMOTTCHMKEL 4129 799437.SB 20MINJ0 8781 420 731308 204361.61 e72 4=1 709137.88 1 20 MA1 sm 424 7111&99 1 2054 sm 42M 793130.7 1 20MM34 2,486 4201 78154.39 704316.41 RMTTCHM94EL 4705 798768/8 295MIM CLGMNNM 420 79118241 10051.11 CLCHANNEL 4207 712197.0 204810.85 CLCHAN9B 4206 71490.07 1063795.05 1870 470 792493.77 20 1 M.95 $671 4210 79757171 R M.4 6075 4211 792540.7 200MAD 6676 4712 7022400 70M744AO 1677 4213 794MOO 203748.23 007877806 4214 72mae8 2063851.7 97877291 4218 7988827 20249.7 6756 4216 79SWA2 102122,93 5795 4217 TMIA7 2002864.4 am 4219 7]&14.02 30575434 sM2 4210 7947&17 1007784 206 47]0 7410.4 74174&0 RR 4741 78375m 2mzmm 20505506 422 79404.43 70124677 074 4223 7941700 106715.61 810 424 790211,40 1067616.7 /Mt 4225 79386.55 3067695.4 70/77515 4776 790755.90 200267872 Moe 427 79SM33 76764&6 0004 4225 7443.74 2007E8Tm 0600 427 110216.92 20668.7 866 480 7421600 20&Nwao 447 4231 7932IWO 26317.6 880 4282 793140M 70416415 860 42U 7417.4 2044724 470 42M 7616.7 2=4700 Sell 455 793/Mm 1®07m Mil 4=. __ 7971637, 22222141 8919 493 1639&6 2062Sw,80 6874 486 74729.66 700284.71 /318 426 793285.6 88228,02 i 8817 4240 737,40.6 &1026735 610 441 74256.13 2052660,4 06/9TTe904 442 7MM7A2 704988.4 495 443 76170.74 206264.6 490 444 7698691 Z0277L7 "M 445 79350074 700276539 09M 420 74300.81 26271139 S50TT96 4247 79227401 20538" 907 4218 77614.6 20661438 0674 420 792"&72 1061600 4713 4130 7902416 162411,0 TOP OF BANK 4251 74232.04 70242.32 TOP OF BANK 462 70=A2 108140603 TOP OF SANK 453 7481,40 7024286 20MM72 474 7424.6 204414 709 OF BAN 4265 73498.7 20844.68 TOP OF OINK 42% 75105.51 36247.30 TOPOFBM4K 457 70722.09 20448.10 TGPOFRAW 4293 784,9 1 7MIROO 1 TOPOF "This certitlss that this Copy of this plot accurately depicts the boundary of the Jurisdiction of Section 404 of the Clean Water Act as determined by the undersigned on this date_ Unless there is a change in the low or our published regulations, this determination Of Section 404 jurisdiction may be roiled upon for a period not to exceed five years from this dote. This determination was made uti Icing the appropriate Regional Supplement to the 1987 Corps of Engineers Wetionds Delineation ManvoL" NAME: TITLE: DA 7E: I, WADE A. GOWERS, PLS NO. L -4639, A NORTH CAROLINA PROFESSIONAL LAND SURVEYOR, DO HEREBY CERTIFY THAT THIS MAP WAS PREPARED UNDER MY SUPERVISION AND SHOWS THE LOC47701VS OF SECTION 404 JURISDICTIONAL AREAS AS DELINEATED BY BURDET77E LAND CONSULTING, INC. OF RALEIGH, NC. ?,10 k( - .. Lk;o= ATE WADE A.00VVERS,PL PROFESSIONAL LAND SURVEYOR UQ 0 L-4639 LEESVILLE ROAD ACTIVE ADULT CONIlVIUNITY BI.C1PIIOE=011352 ' DURHAM 1 DUCOR I NORTA CARM3NA I AM lQ 1011 I wc!''!,�� POINTTABLR PONTWNE NORTNNO FASW 0111IMPlION 4895 7932MM 20205531 TOP 426D 71MM 201=1.88 WETLAND DELINEATION 4281 79320451 2002OM72 IWOFLVM 422 nSM73 209670,48 TOP OF 4788 728371.17 7622746 TOP OF BAM4 4264 7693400 2=77&61 TOP OF SANK 4283 7440,4 2002828.0 TOP OF SANK 4288 793868.86 20MMIAD TOP OF SAW 4262 799105.50 2062572.72 TOP OF SANK 42M 75MANS 2=2M.43 TOP OF BMW 4200 79537234 2062701.26 TOP OF BANK 4270 752225.15 20271 &11 TOP OF BMK 4271 793995.41 106271871 TOP OF BANK i 7993401 2DMM41 TOP OF BANK 4278 703M 11 202274.45 TOP OF RAMC 474 11693.93 2DUMM TOP OF SMIK 4276 79581126 2027621 TOP OF 9ANK 4011 70 304 206224.45 TOP OF BANK 4277 7419.7 2002EM TOP OF BANK 4278 ?"WAD 2062195.61 TOP OF LWK 7834 "M 20791101 TOPOFBINK 4702 70WA1 2002971,41 TOP OF BANK 4211 fawn 2010949.81 TOP OF8MK 422 703=08 2DR M.10 TOP OF BATIK 4203 793a8.93 20MMA4 TOPOFBANK 47,44 740.4 208QWN TOPOFMW 4288 7064014 2083027.47 TOP OF&4XK 424 79544,44 2062&M TOP OF BANK 4787 749{1131 208200676 TOPOF&MM 4288 114460.17 7063101,01 TOP 2E 47M 703434W 203121.11 1M TOP OF 0,43419 450 7854Wm 703142!16 TOP OF DANK 4291 751319.59 7047430 TOP OF BANK 42M 7934044 204195.16 TOP OF BANK 424 7340,48 2093175.21 TOP OF OAW 4224 M416M 204197.00 TOPOFBANK 4295 7948A0 '10421113 TOPOFBANK 4286 70421.54 204781.4 TOPOFLWK 42U 7444.4 742RO TOP OF BANK 4798 7447.43 20MMA9 TOP OF SAMI 449 TIS M.20 208M M TOP OF BANK 480 70007.31 100774 TOP OF SANK 484 7968Mm 20505506 TOP OF WM 434 79WK14 704789.94 TOP OF SANK 484 7595700 700477474 TOP OF 1VXK 4304 795M3A6 7547M.00 TOP OF BANK 43M 7950M91 70/77515 TOP OF BMIK 4300 700131,01 2047010 1W OF BANK 48 700167.6 104717.73 TOP OF BANK 4WD 790140.74 709571.95 IN OF 930 701114 2047644 TOP OF BA1K 4310 7948MM 20474L89 TOP OF BAW 4811 79WAS 706471.05 87M 4112 79502110 704847 97001 418 79M..89 206457600 TOP OF BANK 4M4 79061.44 7046794 TOP OF LANK 4816 74M= 2014WA2 TOP OF BW 416 781477 2046055 TOP OF BMK 4317 7wale 70149.18 %743002 421 79161125 204MBS TOPOFBANK 423 71670.4 680 2061.82 TOPOFOANIT 4224 781651.92 208413.14 TOP OFCANK 791027.20 105443A) TOP OF SMK 48th 79150.20 205414.7 TOP OF BANK 4527 793171.7 2041450 TOP OF BANK 480 7317 &15 206154.4 /74 4821 7144.13 70457715 TOP OF BANK 430 79"4.7 706140.47 TOP OF SANK 40.7+ 71435.4 2295B59.r8 TOP OF BANK 4132 724MaM 1=156¢75 TO BANK 433 7954207 895687.7 TOP OF 5,4 434 79188.46 206 M7.= TOP OF BANK 4331 79491,41 1051&0.55 TOP OF BANK 43W 79MAS 709528.51 TOP OF BANK 4337 754797!1 20MM72 TOP OF BANK 4338 74846 1054=11 61=0 4338 7942 @m 70461636 TOP OF RAMC 4840 79421M 104606,41 TOP OF BANK 4341 704181.76 109514.95 TOP OF BANK 442 7041'21.81 704197,44 TOP OF SA=C LEESVILLE ROAD ACTIVE ADULT CONIlVIUNITY BI.C1PIIOE=011352 ' DURHAM 1 DUCOR I NORTA CARM3NA I AM lQ 1011 I wc!''!,�� LEGEND USACE U.S. ARMY CORPS OF ENGINEERS TT TIE TO PL PROPERTY LINE SF SQUARE FEET N/F NOW /FORMERLY WETLAND DELINEATION 0:\- MTE\ PM- 10- OSH\ dwg \IEESVILLE- USACE- VETIANO_sOUTH dwg FOR LEESVILLE ROAD ACTIVE ADULT CONIlVIUNITY BI.C1PIIOE=011352 ' DURHAM 1 DUCOR I NORTA CARM3NA I AM lQ 1011 I wc!''!,�� 1®8 LAND WNBtWAM, PC %5omm59ted to Tula! 999&4), B4.L6e• a 5 T. 1 B B e SUB 4. can a PLma (919) NO -4696 Its (119) 010-ROB 07&2 7.4g 105W9PB1as.m.e0m 40 v �faiiiNl. DRAWN BY: RGC CHECKED BY: WAG I SHEET 10 OF 13 0:\- MTE\ PM- 10- OSH\ dwg \IEESVILLE- USACE- VETIANO_sOUTH dwg REVISED: 05/27/1011- CHANOE3 PF.R r.I,TF.W PO0/TTABKE Man~ NOWBING I EASIINO ESCAFro 4343 7%10A TT OF 4344 7MMOM 20810899 TOP OF BANK 484 790%38 20644361 TOP OF BANK 4346 764066 203460.33 #761 4947 7%100.67 206446.64 TOP OF BANK 431E 73110617. 2DN44130 TOP OFBANK 449 7%17!.9 20POFBANI[ 430 7%1%36 OFEM 4351 704IMM OF 92446 4362 7944723 TOP OFBAN K 4363 79424621 OFBANiK 4864 7%273.% slow 436 761238.67 204TOP OF BAN 480 79470.2D 2064TOP OF BANK 437 78/33191 2064TOP OF BANK 4358 734970.10 II%4OFBANK 438 7813891 2014OF BANK 430 7944MIO 20%TOP OF&WK 79411.0 2081TOP OF SAM 4347 794MOD 204678.72 TOP OF BANK 430 794457.% 20457477 TOPOFMWK 4364 79443790 2040620 TOP OF BATIK 43 6 47 793.42 2046072 TOP OF BANK 433 79460.67 20341MAT TOPOFBMIN 4887 73036.71 204460.11 TOPOF9MK 4266 796664.75 106138.% 70PCFWXK 480 79460.10 20485476 TOP OF BANK 4370 7%817.17 205107.12 TOP OF BANK 4371 7843590 2061060 8M 4370 7970L74 206408,01 OF 4377 7920617 206465684 OF BANK 4178 792!4.0 2040.76 TOP OFSANK 4379 73232AI 20102.34 TOP OF BANK 433 7%761.34 10640946 OFBNIK 433 79410.0 209467124 OFBANK 4382 794=04 20610604 20D1 4864 79CM48 201720.% TOP OF 4986 7613061 2017480 TOP OFBANK 430 M M6% 10647410 OFBANK 4887 79133.12 20053.31 TOP OF BANK 430 79108.88 406470.!6 !�¢ ------.K 4309 794OM22 20MM 1 TOP OFBANK 430 7%90.3 2047MM OF BANK 4381 793OOA5 209071.19 OF BANK 4840 795=29 204772AB TOP OF BANK 4384 70=85 20647MM TOP OF BANK 43% 7930.0 206473.12 TOP OF BANK 480 79=426 20867MM TOP OFRANK 431 730229 209679.3 TOP OFBANK 4387 7327896 20459.0 OF BANK 438 7324191 2061388,95 TOP OFBANK 480 7324295 2084=80 ArtAOU. 460 790241.13 2041676 TOP OF 44M 7 %3011 20933.% OP OFWIN 44M 7310.10 20410.0 TOP FBAN 4403 7930" 10462.18 TOP OF BANK 444 7031.12 204170.41 TOP OF BAN K 440 7302.3 2016790 TOP OF BANK 4404 792074.02 108/60.1 TOP OF BANK 4407 7001.30 20845MM TOP OF 440 790%618 2014W 6 OP OF BANK 440 7930" 2061825 OF 4410 7307498 2084468.0 OP OF BANK 411 730021 2084474.27 POFBANK 4412 79808.20 20%61.3 OP OFBANK 413 7300.41 208443.E8 POFBANK 4414 733193 20854.79 TOP OFBANK 4415 7935" 20834.76 TOPOFSANK 416 73/B7.20 20187194 075 460 794187.70 39404.70 OFBANK 4501 79037.0 2040712 OF BANK 461 7641e78 2054M 2 OP OF BANK 408 79413.67 2064MA OF BANK 434 7947 54.0 20109.19 BANK 4006 79460.24 20481871 OF BANK 450 764140.94 202M.11 OF BANK 4107 7 %133.20 20477621 OF BANK ON 70413&M 20474211 OF BANK 460 794119,44 20 %74809 OP BANK 4510 7%104.44 2024.6 BANK 411 79402M 20216.61 OP OFBAKK "This Certifies that this copy of this plat omurote /y depicts the boundary of the jurisdiction of Sectlon 404 of the Clean Water Act STATE: as determined by the undersigned on this date. Unless there is a change in the law or our published regulations, this determination USACE of Section 404 jurisdiction may be relied upon for o period not to TT exceed five years from this date. This determination was made utilizing the appropriate Regional Supplement to the 1987 Corps of PL Engineers Wetlands Delineation Manual." SF NAME: 77TLE: WE- 1. WADE A COWERS, PLS NO. L -4639, A NORTH CAROLINA PROFESSIONAL LAND SURVEYOR, 00 HEREBY CERTIFY THAT THIS MAP WAS PREPARED UNDER MY SUPERVISION AND SHOWS THE LOCATIONS OF SEC77ON 404 JURISDIC77ONAL AREAS AS DELINEATED BY BURDE77P LAND CONSUL77NG, INC. OF RALEIGH, NC. It (k, _LLO= DA %E WADEA GOWM KIP PROFESSIONAL LAND SURVEYOR UC # 446U LEGEND U.S. ARMY CORPS OF ENGINEERS TI E TO PROPERTY LINE SQUARE FEET NOW /FORMERLY WETLAND DELIIgEATION FOR LEESVILLE ROAD ACTIVE ADULT COMMUNITYBLCIPR0IECT #13352 CITY: COUNTY: STATE: DATE DURHAM DURHAM NDRTHCAROUNA Am 10. 2@11 SURVEYED BY ��d 1188 LUM CONSULTAM. PC ��9Nit C9a9oeW d t3 Tow Quwky S."., 7178 !,6684: c-9 YBT. 1988 a hue OL 40000 Tit PUM (919) Bto -06@4 Pax (09) 510 -WO@ >� N6eeaaemel6Le� 39iT9) DRAIWN BY: RGC ICHECKMWWAG I SHEET 11 OF13 0:\ -PULTE \PM- 10- 03B \dwg \T.Prramt.TF DSACE_WEflAND -SOUTH.dwg REVISED, D612712011 . CHAWGRR M n7FNT "This certifies that this copy of this plot accurately depicts the COUNW LEGEND boundary of the jurisdiction of Section 404 of the Clean Water Act DURHAM DURHAM as determined by the undersigned an this date. Unless there !e a change in the low or our published regulations, this determination USACE U.S. ARMY CORPS OF ENGINEERS of Section 404 jurisdiction may be relied upon for a period not to TT TIE TO exceed five years from this date. This determination was made utilizing the appropriate Regional Supplement to the 1987 Corps of PL PROPERTY LINE Engineers Wetlands Delineation Alonua6" SF SQUARE FEET . '". ° :. •; :• N/F NOW /FORMERLY NAME: I WETLAND DELINEATION 17 7E' WE FOR 1, WADE A. COWERS, PLS NO. L -4639, A NORTH CAROLINA PROFESSIONAL LAND SURVEYOR, DO HEREBY CERTIFY THAT THIS MAP WAS PREPARED UNDER AfY SUPERVISION AND SHOWS THE LOCATIONS OF SECTION 404 JURISDIC77ONAL AREAS AS DELINEATED BY BURDETTE LAND CONSULTING. INC. OF RALEIGH, NC. O `� %E WADE A. GORERS, PLA PROFESSIML. LAND S&RVEYOR LIC, 0 L46n LEESVILLE ROAD ACTIVE ADULT COMMUNITY9LaFWJ=r11962 CTfY: 1" DRAWN BY: RGC GYIECIEO DY: WAG 1 SHEET 12 0F13 0:\- PULTE\ PM- 10- 03H\ dwg\LEE9pM- USACR-WEnAND -SOUTH.dwy REVISED: 06,2712011 - CHANGES PER cuD rr COUNW STATE: DATE: DURHAM DURHAM I NMMC.AAOLM AM 10, 2011 SURVEYED B�1Yf�p i PIW4 MW �D COI�TAX17% Pi aS+atS I. ,a Pkm Ii=: C -9070 k1+�!pe x97. ! 99e eu. a a1x�d4. ee ftme . '". ° :. •; :• s 9t{ 9j10) uo-- -wag Nc 97629 s..m P...•e..,..d- .c :•a 1" DRAWN BY: RGC GYIECIEO DY: WAG 1 SHEET 12 0F13 0:\- PULTE\ PM- 10- 03H\ dwg\LEE9pM- USACR-WEnAND -SOUTH.dwy REVISED: 06,2712011 - CHANGES PER cuD rr ACREAGE SUMMARY USACE NONJURISDICTIONAL STREAM CHANNEL — 5,193 SF — 0.12 ACRE USACE NONJURISDICTIONAL ISOLATED STREAM CHANNEL — 1,727 SF — 0.04 ACRE USACE JURISDICTIONAL STREAM CHANNEL — 906 SF — 0.02 ACRE USACE JURISDICTIONAL WETLANDS — 22,064 SF — 0.51 ACRE ISOLATED WETLANDS — 21,393 SF — 0.49 ACRE TOTAL — "This certifies that this copy of this plot accurately depicts the boundary of the jurisdiction of Section 404 of the Clean Water Act as determined by the undersigned on this date. Unless there is a change in the low or our published regulations, this determination Of Section 404 jurisdiction may be relied upon for a period not to exceed five years from this date. This determination "a mode utilizing the appropriate Regional Supplement to the 1987 Corps of Engineers Wetlands Delineation Manual." NAME ME DATE' 1, WADE A. GOWERS, PLS NO, L -4639, A NORTH CAROLINA PROFESSIONAL LAND SURVEYOR, DO HEREBY C£R77PY THAT THIS MAP WAS PREPARED UNDER MY SUPERVISION AND SHOWS THE LOCATIONS OF SEC77ON 404 JURISDIC77ONAL AREAS AS DELINEATED BY BURDET I E LAND CONSULTING, INC. OF RALEIGH, NC. -?,b It 3 TE WADEA. GOWERS, PLS PROFESSIONAL LANDS MYOR L"0 L. -1698 51,283 SF — 1.18 ACRE WETLAND DELINEATION FOR LEESVILLE ROAD ADULT COl�l IT1 % MCI PROJECT#113S2 CITY: LEGEND USACE U.S. ARMY CORPS OF ENGINEERS TT TIE TO PL PROPERTY LINE SF SQUARE FEET N/F NOW /FORMERLY WETLAND DELINEATION FOR LEESVILLE ROAD ADULT COl�l IT1 % MCI PROJECT#113S2 CITY: COUNTY: STATE DATE DURHAM DURHAM NGIGHCAROLWA JONE%2011 SURVEYED BY 1188 LAND CON811I.iAHM PC �toew5.i.!l,�r .�,� ':�` :�''; +�¢ "CemmNted 47047 Q,WIIT 8ent0a• Um : CAM ��. '� E 0 T. 1 9 0 8 Gus :1V,Y✓''. . •�� -. 8t. ollu a Ph— (919) 610-"04 Paz (91II) M0-9W0 F..., ... , 9de1Rl, iJC 07018 ee.o: pww�,ya ` 1t1 DRAWN tJr: RGC CHEM eY: WAG 1 SHEET 13 0F13 0:\— MTE\PHI- 10- 03B\dwF\LEEESMLZ— TJSACF WBTIAND�90UTH.dwe REVISED: 068741011- CHANGES PER CLIENT U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action ID. 2011 -00318 County: Durham U.S.G.S. Quad: Southeast Durham NOTIFICATION OF JURISDICTIONAL DETERMINATION Property Owner: See attached Prop. Owner List Agent: Soil and Enyviironmental Consultants, PA Address: Attn: Mr. Steven Ball 11010 Raven Ridge Road w y Raleigh. NC 27614 Telephone No.: 919 -1140 -5900 AYOi9 Property description: Size (acres) Nearest Waterway USGS HUC 237 Little Brier Creels 03020201 Nearest Town Durham„ River Basin Neuse Coordinates N 35.9350 W - 78.789° Location description Proposed Leesville Road Adult Community development assembled tract on the south side of Leesville Road. —2.200 feet east of Doc Nichols Road as shown on the attached plats. Indicate NVIdeh of the Followinn Apply: A. Preliminary Determination ❑ Based on preliminary information, there may be waters of the U.S. including wetlands on the above described property. Wo strongly suggest you have this property inspected to determine the extent of Departnicut of the Army (DA) jurisdiction. To be considered final, a jurisdictional determination must be verified by the Corps. This preliminary determination is not an appealable action under the Regulatory Program Administrative appeal Process ( Reference 33 CFR Part 331). B. Approved Determination ❑ There are Navigable Waters of the United States within the above described property subject to the permit requirements of Section 10 of the Rivers and Harbors Act and Section 404 of the Clean Water Act. Unless there is a change in the law or our published revelations, this determination may be relied upon for a period not to exceed five years from the date of this notification. ® There are waters of the U.S. including wetlands on the above described property subject to the permit requirements of Section 404 of the Clean Water Act (CWA)(33 USC § 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed fire years from the date of this notification. ❑ We strongly suggest you have the waters of the U.S. including wetlands on your property delineated. Due to the size of your property andior our present workload, the Corps may not be able to accomplish this wetland delineation in a timely manner. For a more timely delineation, you may wish to obtain a consultant. To be considered final, any delineation must be verified by the Corps. ❑ The waters of the U.S. including wetlands on your propeM.r have been delineated and the delineation has been verified by the Corps. We strongly suggest you have this delineation surveyed. Upon completion, this survey should be reviewed and verified by the Corps. Once verified, this survey will provide an accurate depiction of all areas subject to MA jurisdiction on your property which, provided there is no change in the law or our published regulations, may be relied upon for a period not to exceed five years. ® The waters of the U.S. including wetlands have been delineated and surveyed and are accurately depicted on the plat signed by the Corps Regulatory Official identified below on May 24, 2011. Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. ❑ There are no waters of the U.S., to include wetlands, present on the above described property which are subject to the permit requirements of Section 404 of the Clean Water Act (33 USC 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed fire years from the date of this notification. Action ID. 2011 -00318 ❑ The property is located in one of the 20 Coastal Counties subject to regulation under the Coastal Area Management Act (CAMA). You should contact the Division of Coastal Management in Washington, NC, at (252) 946 -6481 to determine their requirements. Placement of dredged or fill material within waters of the US and/or wetlands vdthout a Department of the Army permit may constitute a violation of Section 301 of the Clean Water Act (33 USC § 1311). If you have any questions regarding this determination and/or the Corps regulatory program, please contact Eric Alsmever at 919-5—U4884, ext. 23. C. Basis For Determination: The property contains relatively permanent and non - relatively permanent waters. with indicators of ord nga high water marks, stream channels of Little Brier Creek and unnamed tributaries, and abutting wetlands. Little Brier Creek is a tributary of Brier Creek, which is a tributary of Lake Crabtree. a Traditional Naviimble Water. D. Remarks: This JD is based on a site inspection by Eric Alsmever on 116/2011 Two ponds (and two wetlands on the site (P02. P03. VM -S08 and WL -S33) are isolated and were determined to be features not subject to Section 404 E. Attention USDA Program Participants: This delineation/detemiination has been conducted to identify the limits of Corps' Clean Water Act jurisdiction for the particular site identified in this request. The delineation determination may not be valid for the wetland conservation provisions of the Food Security Act of 1985. If you or your tenant are USDA Program participants, or anticipate participation in USDA programs, you should request a certified wetland determination from the local office of the Natural Resources Conservation Service, prior to starting work. F. Appeals Information (This information applies only to approved jurisdictional determinations as indicated in B. above) This correspondence constitutes an approved jurisdictional determination for the above described site. If you object to this determination, you may request an administrative appeal under Corps regulations at 33 CFR part 331. Enclosed you will find a Notification of Appeal Process (NAP) fact sheet and request for appeal (RFA) form. If you request to appeal this determination you must submit a completed RFA form to the following address: District Engineer, Wilmington Regulatory Division Attn:Jean Gibby, Field Office Chief, Raleigh Regulatory Field Office 3331 Heritage Trade Dr., Suite 105 Wake Forest, North Carolina 27587 In order for an RFA to be accepted by the Corps, the Corps must determine that it is complete, that it meets the criteria for appeal under 33 CFR part 331.5, and that it has been received by the District Office within 60 days of the date of the NAP. Should you decide to submit an RFA form, it must be received at the above address by 7122/2011. **It is not necessary to submit an RFA form to the District Office if you do not object to the determination in this correspondence. ** Corps Regulatory Official: Date 5/24/2011 Expiration Date 5/24/2016 Copy fiunished: S&EC; S. Ball NO ,ATION OF ADIVIIIIMTRLATIVE APPEAL 01'T`I 1�: IID':E 3CESS REQUEST FOR APPS , Applicant. See attached Prop. Owner List: Pile Number: 2011 00318 Date: 3/24/2011 Attached is: See Section below INITIAL PROFFERED PERMIT Standard Permit or Letter of permission) A PROFFERED PERMIT Standard Permit or Letter of ermission B PERMIT DENIAL C APPROVED JURISDICTIONAL DETERMINATION D PRELIMINARY JUMSDICTIONAL DETERMINATION E SLCTIDN I - The �ollOOMS 14044fles your rights and options regarding an adminlsttative appeal of the above decision. Additional information may be found at http -/Av- w.usace.army.mif f'CECW/Pageslzeg_materials.aspx or Corps regulations at 33 CFR Part 331. A: JWTIAL PROFFERED PERMIT: You may accept or object to the permit. • ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard permit or acceptance of the LOP means that you accept the permit in its entirety, and Waive 0 rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. • OBJECT: If you object to the permit (Standard or LOP) because of certain terms and conditions therein, you may request that the permit he modified accordingly. You must complete Section II of this form and return the form to the district engineer. Your objections must be received by the district engineer within 60 days of the date of this notice, or you will forfeit your right to appeal the permit in the future. Upon receipt of Your letter, the district eneineer will p,Au,A*p V!1 „Y f1t1;pI.f:IfN! .-A ... ._. __ 3:t. L_ permit to address all of your concerns, (b) modify the permit to address some of your objections, or (c) not modify the permit having determined that the permit should be issued as previously written. After evaluating your objections, the district engineer will sond you a proffered perm — t for your reconsideration, as indicated in Section B below. B: PROFFERED PERMIT: You may accept or appeal the permit ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. APPEAL: If you choose to decline the proffered permit (Standard or LOP) because of certain terms and conditions therein, you may appeal the declined permit under the Corps of Engineers Administrative Appeal Process by completing Section 11 of this form and sending the form to the division engineer. This form must be received by the di,. ision engineer within 60 days of the date of this notice, C: PERMIT DENTAL: You may appeal the denial of permit under the Corps of Engineers Administrative Appeal Process by completing Section H of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. D: APPROVED JURISDICTIONAL DETERMINATION: You may accept or appeal the approved JD or provide new information. • ACCEPT: You do not need to notify the Corps to accept an approved JD. Failure to notify the Corps within 60 days of the date of this notice, means that you accept the approved JD in its entirety-, and waive all rights to appeal the approved JD. • APPEAL: If you disagree with the approved JD, you may appeal the approved JD under the Corps of Engineers Administrative Appeal Process by completing Section lI of this form and sending the form to the district engineer. This form must be received by the division engineer within 60 days of the date of this notice. E: PRELIMINARY JURISDICTIONAL DETERMINATION: You do not need to respond to the Corps regarding the preliminary JD. The Preliminary JD is not appealable. If you wish, you may request an approved JD (which may be appealed), by contacting the Corps district for further instruction, Also you may provide new information for further consideration by the Corps to reevaluate the JD. SECTION II - REQUEST FOR APPEAL or OBJECTIONS TO AN INITIAL PROFFERED PERMIT REASONS FOR APPEAL OR OBJECTIONS: (Describe your reasons for appealing the decision or your objections to an initial proffered permit in clear concise statements. You may attach additional information to this form to clarify where your reasons or objections are addressed in the administrative record.) ADDITIONAL INFORMATION: The appeal is limited to a review of the administrative record, the Corps memorandum for the record of the appeal conference or meeting, and any supplemental information that the review officer has determined is needed to clarify the administrative record. Neither the appellant nor the Corps may add new information or analyses to the record. However, you may provide additional information to clarify the location of information that is already in the administrative record. POINT OF CONTACT FOR QUESTIONS OR INFORMATION: If you have questions regarding this decision If you only have questions regarding the appeal process you and/or the appeal process you may contact: may also contact: Jean Gibby, Field Office Chief Jason Steele U.S. Army Corps of Engineers Administrative Appeals Review Officer Raleigh Regulatory Field Office 60 Forsyth Street, SW (Room 9M10) 3331 Heritage Trade Dr., Suite 105 Atlanta, GA 30303 -8801 Wake Forest, NC 27587 404 -562 -5137 RIGHT OF ENTRY: Your signature below grants the right of entry to Corps of Engineers personnel, and any government consultants, to conduct investigations of the project site during the course of the appeal process. You will be provided a 15 day notice of any site investigation, and will have the opportunity to participate in all site Date: I Telephone number: of appellant or Action ID. 2011 -00318 Leesville Road Assemblage County: Durham Property Owner List Barbara Marlene Ross 5714 Lees -v ille Road Durham, NC 27703 Sandra Mason Gooch 5814 Leesville Road Durham, NC 27703 Ruth Clements Perry 211 Adams Street Durham, NC 27703 AIS Forestry and Farming, LLC Attu: Algie L Stephens 319 Chapanoke Road, Suite 102 Raleigh, NC 27603 John N. Russell, Jr. 6206 Leesville Road Durham, NC 27703 James Larry Clements 6204 Leesville Road Durham, NC 27703 Timothy Randall Clements 7416 Leesville Road Durham, NC 27703 y� d 0 e• aye To na , 1 0rh +000 A UM* ALL DISTANCES AND COORDINATES ARE IN US SURVEY FEET, AREAS WERE COMPUTED LINO THE COORDINATE METHOD. 7C1M1i Ilav N�' MM�O►iee7 r aM 3 m" ' w i jSHEET 2 Ir ------ _ .� i .c c0.a1 vl l � atl�oar 1lfH{f 2®ca* IrSNEET 6'+ i� umc ntl0l aaa iI f1a.1� s 1 1, WHDE A. COWERS PLS NO. L- 4Q,iD• A NORTH CAROLMM PROFESSIONAL LAND 00 NEREBY OEify" THAT TNIS MAP WAS PREPARp LNpER Afr SC*VDMSXW AND SHOW THE LOCATIONS OF SEC110P/ 404 dURFSOACTIOWL AREAS AS DELINEATED BY S&W OF MMA7 i4 Na alaaauuquy, •`qH CARO�''k0 llu)' . Aa � tt� SEAL =QOM0244 U OLGdL4p w w IIWMAM� I � 7N610 SITE* C A IlAM " f Mac N NOT TD SCALE fr ' I J' I ` i Tyr e II r F �i_ I NOTE: WETLANDS WERE DELINEATED BY SOIL AND ENVIRONMENTAL CONSULTANTS, PA. LE M PROPERTY rr SF SQUARE FEET PL TIE TO CL CENTERUNE�E TB TOP BANK AC ACRE WETLAND DELINEATION FOR LEESVILLE ROAD ACTIVE ADULT COMMUNITY OLMHAM VLWHAM 6TAT@ OAT@ 1fOt7aCA00fIISA MM7ARY71, 7011 SURVEYED BY NIBS LAND CONSULTANTS, PC USA 8L Can sa 4A Puma (a1o) dlo -4 14 , NO axis( %iea. DWM BT. ROC S M l OF 14 II _ JURISDICTIONAL WENOS 101 _n JURISDICTIONAL M f #WLOI — #WL07 POND (2,124 Sr) ,,,� (39,007 SF) ow 1a 1 1aa ` 10101 10!11 11 i aN 1 ,0101 foa / ,mos 1®10 , /' � lam % START UNIMPORTANT / I INTERMITTENT STREAM UNIMPORTANT FLAG 0=3 START POINT UNIMPORTANT f INTERMITTENT 1®+ STREAM oar #SO3 — #SO4 lam (9,282 SF) low I ,am 1017 'wo ,oQNf 101 1 ,m■ I ,0a1 lam loan I+ ,..n ,o1w START IMPORTANT tao11 PERENNIAL SM M�,w nA0 cL loan ,ono oa, I 1 low ,ma lap 1 laa� mom SEE SHEET 10.11 OF 14 FOR POINT COORDINATE TABLE. „p SEE SHEET 14 OF 14 FOR ACREAGE SUMMARY. MATCH LINE COORDINATES SHOWN HEREON ARE BASED ON HAD 53, ; ,0,,, I SHEET 2 , SHEET 3 '71'M SOUN�TMOF INE XNSINC110N OF SEECCTTION 404 OF NE OMM CLEAN WATER ACT AS KW41YNED BY THE IBAERSIO11EO ON 7NS DA7L UNLESS THERE IS A CHANCE IN TIE LAW OR OUR P amM REGULAMNS, 7M DETERMINATION OF SMT10N 404 Aimm 10710N MAY BE RELIED UPON FORA PERIOD NOT 70 NCICEED FAE YEARS FROM 'MIS DA7E INIS OETERIONAlION ItlLS MADE U1%=G THE 10" OMWS OF EN6MkHtS WETLANDS DELINEATION MANUAL NAI10. r r DATE -17 ay/ r I. WADE A GOWOM PL4 NO. 1.-4639, A NOR7H CAROLM PROfES'SIOAML LAND SURYEYM 00 HEREBY Cgffr#Y T7MT THIS MAP WAS PROVAM UNDER AIY SUPERVISION AND SHOWS THE LOCATIONS OF SECDON 104 JURISOlCnOML AREAS AS DEGNEA7ED BY SA:EC OF A 4U7ft NO. 1,pNffflff" CANO 4 4L re ..... . ��858� yy ARO�xSBIOWAL f AND Lim 9 L-, m NOTE: WETLANDS WERE DELINEATED BY SOIL AND ENVIRONMENTAL CONSULTANTS, PA. LEGEND PL PROPERTY LINE � SQUARE CC A C� LNE TB TOP BANK WETLAND DELTNEAITON FOR LEESVILLE R�O�A /D�TATC►�T[IJVE ADULT CO17J1�1�J1�J..R 1. IOHCIRWB4t10J/l1R CRY: CDUNT',: frATE: niam DUWL1►1 DURHAM 1Ul78GtA91A 11NUAlY1LE111 SURVEYED BY )W LAND CONSULTANTS PC 6116 SL ODe. 1Nn1et Phfine (010) 610 -DIAL DRAM W. RO I - _ CHECIW BY: WA6 I SHEET 20F 14 MATCH LINE SHEET 2 SEE SHEET 11 14 SHEET 3 OF 14 FOR PORR COORDINATE TABLE, I SE E SHEET 14�OF 14 FOR ACREAGE SUMMARY. COORDINATES SHOW HEREON ME BASED ON NAD as. ORO= oars S� n 8 1 I WAM LOM - 4ILW -4 loon { ISOLATED POND 1092 (1.789 'SF) _ ,0518 ,0500 I � i— I I 1 1 fs- low , 1 MATCH LINE SHEET 3 SHEET 3 SHEET 4 NOTE: WETLANDS WERE DELINEATED BY SOIL AND ENVIRONMENTAL CONSULTANTS, PA. LEGEND PL PROPERTY LINE WL WWEETLANDFEET UARE CL � LINE TO TOP RANK WETLANn DELINEATION FOIL LEESVILLE ROAD ACTIVE ADULT CO S.BC7B0®CYSIdDSWI cur COUMIY STATE: DATE: DURNM DUN" )EMCABOLM JAMMM21.2011 SURVEYED BY NBS LAND CONSULTANTS, PC 611! K. an" eeYaae PIMM (KG) 610 -4464 �Se SY61s rSauM 61ie�5im DRAWN 6Y: ROC QWU 9C WAD 9 *XT 9 OF 14 PSO4 — STRV INTERSECT (25,519 SF) NS OINEFIES TNAT THIS COPY OF THIS PLAT ADCURAIELY DEPICT& THE BOUNDARY OF THE JUR1 LI10N OF SWIM 404 OF 7K WM WATER ACT AS DEIERArNED BY WE UNDEMONED ON IHRT DATE. UNLESS WERE E1 A CNANLTE W THE LAW OR OUR PUBLISHED REOULATONS 'MIS DEIERMI NATON OF SC110N 404 JUItl9D 010 MAY SE RETJED UPON FOR A PENCO NOT TO EMCEED nW YEARS FROM 7X18 DATE, 1NIS DETMNA710N WAS MAZE UMENO THE 1567 OORPS OF 04014M WEM1ANZS(DEELUE�A7M MANUAL RAE o /. DATE' 10 1, WADE A GOWERM PLS NCL 4-4039, A NORTH CAROLINA PROFRSSAONAL LAND SOWYOft DO HEREBY CERWY 7HAT 7To ~ WAS PREPARED twom my SNIPERKSJON AND SHOWS THE =4700 OF SECTION 404 AM=DICTXNML AREAS AS DECMIE TED BY S&EC OF RALEIGH, NC. /,gpl,Uagy r sEAL� NE R.00WIDS� ••rb � M/A10 I.C7 P✓4K>J ONAi L AW SNRVlYQR L K%TI L 4= r. 8 s s SEE SHEET 12,13 OF 14 FOR POW COORDINATE TABLE SEE SHEET 14 OF 14 FOR ACREAGE SUMMARY. lam COORDINATES S14OWN HEREON ARE BASED ON NAD 83. ORO= � Ap ,o It low ,aaa , aeea ,a000 � � ,asi 3i F , e 'A ,art ant � a 10812 wu , e IMPORTANT Q PERENNIAL STREAM �Q LITTLE BRIER CREEK (30,227) SF F MATCH LINE SHEET 3 „w ,ow SHEET 4 a,:R MATCH LINE SHEET 4 ,ana SHEET 6 aaaal I. WAVE A 00M RS. PLS NO. L-4&W. A NGRTM CAROLM I PROPS M& M LAND SURVEY(& DO MEMMY CER77PY 7MAT TMIS AUP WAS PREPARED WVDER MY SUPERVMON AND SNOWS iME L a4MYS OP SECTION or AoirW1141 ARE{S AS DEUW.ATW 8Y S�EO •••UUIgIN1j r • ••�� �ROC�y ; SEAL i3 I-_ L-40M c PRO�ONAL dWR4AYORLlGafL.4osa im IMPORTANT PERENNIAL STREAM STREAM INTERSECT — LITTLE BRIER CREEK (9,381 SF) N07E: WETLANDS WERE DELINEATED BY SOIL AND ENVIRONMENTAL CONSULTANTS, PA. LEGEND Ty Tic TO SF PL PROPERTY UNE WPL WETLANDE FEET CL CENTERLINE TB TOP BANK AO ACRE WETLAND DKUNIZATION FOR LEESVILLE ROAD ACTIVE ADULT COMMUNITY„ „� CRY: COMM SLAT$ Oy�'1$ 1RqIIh11 IIIRIIAf[ 110IINCAA m MMMY24MIl SURVEYED BY MSS LANI CONSULTAN9 , PC S 0w t. ou” SWet 0) 6o-"" a no-cons w)m ST0 mm"l SHEET4OF14 0 :�OLPIC�pIff_10- 098�d*i�al_uni� VBACF�1iS17AIID.dirg 9 ATCH LINE- - _ ' SHEET 3 1 we, p �,mm aam SHEET 5 low t A �;77wr;ore ' �,ow, - -- .-r - woo j TI POOB START IMPORTANT PEIiOOM STREAM IMPORTANT PERENNIAL STREAM #506 - STREAM INTERSECT J (9,703 SF) SEE SHEET 12,14 OF 14 FOR POINT COORDINATE TABLE, SEE SHEET 14 OF 14 FOR ACREAGE SUMMARY. COORDINATES SHOWN HEREON ARE SAM ON NAD B3. mmnc NICRAf no IN L Ieal - M IL 1 1 I MATCH LINE r 1 SHEET 6 1 J! I THIS CIRIIMES THAT =3 COPY OF THIS PLAT ACQKATRY Ov%15 THE BOUNDARY OF 7NE dIPoSD=ON Of SECTION 404 OF THE OEM WATER ALT AS OEIERMI ED BY THE UNDERSHWO ON TNIS DATE. UNLESS 7HERE W A CHANGE N 7HE LAW OR OUR PUBMEp REGlM11DN3 THIS DEIERMNAIM OF SECTION 404 JUR=ICDON MAY DE RELIED UPON FOR A PERIOD NOT TO FAE YFARS FROM THBS DAIS: 11U8 DETERMNAIION IMAB MADE U11=0 Tiff 1087 CORPS Of ENGINEERS riE7LANps DyyE//7.'77D__8��A710N LLAMUAL NAMB GT'W 1. pTLE i` r• DATE: 1. Nf4GE A. COWERS, PLS Na L -40.18 A NORTH 04ROLIN4 PROPESSADNAL L4N0 SURYEYM DD HEREBY CER7NFr THAT THIS At4P W4S PREPARED wom AIr SHOW 374E SUPIRKSWONN E� � SS i .L S OF RALVON. NC. 44 CAS �'a, f SEAL PROPESMONAL LAW a=ROM LIM a Ld9f9 rf �� ISOLATED WETLANDS /S33 - #S43 (762 SF) ,mto FLAG +SOS - START UNIMPORTANT ou++ 1NTERMTTTENT STREAM UNIMPORTANT INTERMITTENT STREAM #SOS - #S06 (4,553 SF) W N r� L~1 1=7 w W `VI (A NOTE: WETLANDS WERE DELINEATED BY SOIL AND ENVIRONMENTAL CONSULTANTS, PA. WETLAND DELINEATION FOR LEESVILLE ROAD ACTIVE ADULT CONNUNITY IIABCNIDI..NR11M CITY: comm. SLAT@ DATA DURNA4N DURHAM 11010 ICAVIOUNA NAMUAu"'mu =VEYED BY IM LAND CONSULTANTS, PC ftm SL ago F"d PLene (919) 510 -44714 �e! ! >b ftx (919) 010 -KOO Iowa ••'' w�owss�er, NO rms Rm m ievame obadA« -- IRDIM BY: ROO MM W. WAG SHEET 5 OF i4 8 i 9 r r m MATCH LINE SHEET 4 'AF F.f. SEE SHEET 13 OF 14 FOR POINT COORDINATE TABLE. SEE SHEET 14 OF 14 FOR ACREAGE SUMMARY. COORDINATES SNOW HEREON ARE RASED ON MAD 61. aaA vim g 1 16 0 R l A1ah . lO0 R. THIS OERIRTES THAT THIS COPY OF INS PLAT ACCURATELY DEPICTS INS BOUNDARY OF THE A11iIS =CN OF SMON 404 OF THE MEAN WATER ACT AS DETFAMI ED BY IHE UNDl ED ONTIII� DATE. UNL THERE IS A MIMICE IN THE ESS LAW Mi OUR PUBLISMkD NECIILA110N4, THIS DEIERIANAIMIN OF SECTION 404 AEON MAY BE REliiO UPON FOR A PERIOD NOT W IDW ED RIVE YEARS FROM THIS DATE THIS WMMNA110N WAS MADE UTIUZHG THE IW7 COMPS OF E"NEERS VETLANDS OEUNFAIM MANUAL MANES TIRE r e. DATE: L MWE A. 00102 5. PLS NO. L-4M A NORTH CAROLNA PROPESMAW. LAND SURVIYM DD HEREBY CERTAY THAT TTOS MAP WAS PRISPARED LNDER AEY SUPDftWON AND SHOWS 7W LOCATiams OF sELflON 404 JURSOWMA14L AREAS AS DELamm BY SiEO OF R4LEI0N. NO. „11111111"" rP,••`tN CARpV �'h� 1 d� SEAL wPROPiiwO ~ AIAL pSSIREV:YIDR LIG / 4I6SB t i=1 W W 1 jMATCH LINE SHEET 5 SHEET 6 0\!1! NOTE. WETLANDS WERE DELINEATED BY SOIL AND ENVIRONMENTAL CONSULTANTS, PA. LEA GENNDD Tr PL MPROPIIITY LINE WLL SQUARE CL CENTERLINE TB TOP BANK ACRE WETLAND DELPMATION FOR IMSVILLE ROAD ACTIVE ADULT CONDIUNITY ITiBC 71101SC1'! 1041S.1YI cur. cmm71C SCATS D47M Din" =mum CA>wm 1ANOARYII.IN1 SURVEYED BY M39 LAND CONSULTANTS, PC &III St am! rav" Phmu (910) 610 -"" �ar.�r1l1!•1° mloNO MIS X1.1 oRAWNSEROC CHEMED". WAG r SNEETSOFI4 S 73� 7X19 Ci7UM THAT IRIS COPY OF 1XIS PLAT ACCURATLY DFF M 7HE BOUNDARY OF THE dIM59IC110N OF ffiC710N 404 OF 7HE CLEAN WATER ACT AS DE1ERMS41D 8Y 11Q: UNDERSIONFb ON THIS DAIS UNLESS TIF21E IS A CHAMOE M INE LAW OR OUR PUBLISHED TIEGRA 1FBS DEMU NIATION OF SMIKN 404 AN4ISOICIION MAY BE F ELIED FOR A PENOD NOT 70 M CM FlQ YEARS FROM 7HI5 OAIE 7M 061104 NATION WAS MADE UTILIZM THE 1057 OORPS OF ENOItEEM WE AMN DLLWMEATFON MANUAL NAME'• • C TITLE DATE 4 MOE A OOWERX PLC NO. L -463W, A CAROLAYA PROFESSIONAL LAND SLWWYOM DO HEREgt' CERTIFY THAT TINS A44P WAS PREPARED UNDER A4y SUPERNSION AND SHOWS THE LOCATIONCS OF SECTION 404 JURL1W9C770AML AREAS AS DELINEATED RY SA" OF RALEMIN, NC. CARa� ,�yS SEAL T ! 21 r L400 4 P)WFOSSIRWAL LAND SU VrYOR L2G 0 L460 MATCH LINE SHEET 8 SHEET 7 /% A -y -0V +�+ ISOLATED "V WETLANDS 1QR7107°' #SO$ — #S12 (638 SF) JURISDICTIONAL WETLANDS =� 019 — #S25 wn.:307m (377 SF) laow T UM mn ,au USTRAMNIPORTANT TTENT STREAM UNIMPORTANT INTERMITTENT STREAM #S19 — TT PL (2,236 SF) NOTE: WETLANDS WERE DELINEATED BY SOIL AND ENVIRONMENTAL CONSULTANTS, PA. LEA TT TIE TO SF SQUARE FEET CL PR NE NE TB WL WETLAND TOP BANK AC ACRE WETLAND DE10RATION FOR LEESVILLE ROAD ACTIVE ADULT COND=l Z lISCNWBICP /lom QTY. CODNI'Y: STATE: DA1$ DURHM DURHAM FR1 mCARM&A IANUARY21,2I11 SURVEYED BY USS LAND CONSULTANTS, PC 8116 WL. GIZa Waist rbeR° (aLS1 aLa -ue4 �'° .•$ '` m eves x(816) ao -sios sr,r r 4wq w wAi�rrw DRAWMBP RZ _ CI£120:D0Yt WAG SHEET70Fi4 I SEE SHEET 10 OF 14 FOR POINT COORDINATE TABLE. SEE SHEET 14 OF 14 FOR ACREAGE SUMMARY, COORDINATES SHOWN HEREON ARE BASED C NAO 63 4MIMWMC NBATW in + soo kWh 100 8 W z w) 1 W V4I W Q {Ii N 7X19 Ci7UM THAT IRIS COPY OF 1XIS PLAT ACCURATLY DFF M 7HE BOUNDARY OF THE dIM59IC110N OF ffiC710N 404 OF 7HE CLEAN WATER ACT AS DE1ERMS41D 8Y 11Q: UNDERSIONFb ON THIS DAIS UNLESS TIF21E IS A CHAMOE M INE LAW OR OUR PUBLISHED TIEGRA 1FBS DEMU NIATION OF SMIKN 404 AN4ISOICIION MAY BE F ELIED FOR A PENOD NOT 70 M CM FlQ YEARS FROM 7HI5 OAIE 7M 061104 NATION WAS MADE UTILIZM THE 1057 OORPS OF ENOItEEM WE AMN DLLWMEATFON MANUAL NAME'• • C TITLE DATE 4 MOE A OOWERX PLC NO. L -463W, A CAROLAYA PROFESSIONAL LAND SLWWYOM DO HEREgt' CERTIFY THAT TINS A44P WAS PREPARED UNDER A4y SUPERNSION AND SHOWS THE LOCATIONCS OF SECTION 404 JURL1W9C770AML AREAS AS DELINEATED RY SA" OF RALEMIN, NC. CARa� ,�yS SEAL T ! 21 r L400 4 P)WFOSSIRWAL LAND SU VrYOR L2G 0 L460 MATCH LINE SHEET 8 SHEET 7 /% A -y -0V +�+ ISOLATED "V WETLANDS 1QR7107°' #SO$ — #S12 (638 SF) JURISDICTIONAL WETLANDS =� 019 — #S25 wn.:307m (377 SF) laow T UM mn ,au USTRAMNIPORTANT TTENT STREAM UNIMPORTANT INTERMITTENT STREAM #S19 — TT PL (2,236 SF) NOTE: WETLANDS WERE DELINEATED BY SOIL AND ENVIRONMENTAL CONSULTANTS, PA. LEA TT TIE TO SF SQUARE FEET CL PR NE NE TB WL WETLAND TOP BANK AC ACRE WETLAND DE10RATION FOR LEESVILLE ROAD ACTIVE ADULT COND=l Z lISCNWBICP /lom QTY. CODNI'Y: STATE: DA1$ DURHM DURHAM FR1 mCARM&A IANUARY21,2I11 SURVEYED BY USS LAND CONSULTANTS, PC 8116 WL. GIZa Waist rbeR° (aLS1 aLa -ue4 �'° .•$ '` m eves x(816) ao -sios sr,r r 4wq w wAi�rrw DRAWMBP RZ _ CI£120:D0Yt WAG SHEET70Fi4 I Ii s MATCH LINE SHEET S SHEET 7 SEE SHEET 13 of a FOR POW COORDINATE TAME. g SEE SHEET 14 OF 14 FOR ACREl1GE SUMMARY. COORDINATES SHOWN HEREON ARE BASED ON NAD BE. SRS xj= $ Q M w t1R rm ■es In ! ttl � 7a6 R I WADE A. DOWERS, PLS NM L-46" A NORM �N+ PROnMSXW4L LAND SURVEYOR DD HEREBY THAT WS MAP WAS PY4EPARm tNaR MY SUPERVIS/O1M AND SHOWS THE LOLYtT70lMS OF SECTIAN 404 JURISOMMOAAAL AREAS AS DEIJNEATED OV SLtEC Or ANLEWC NC. h=. WETLANDS WERE DELINEATED BY SOIL AND ENVIRONMENTAL CONSULTANTS, PA. Tr Tit To EGEND PL PROPERTY LINE WFL DFEET CL CENTERLINE TB TOP BANK AC ACRE WETLAND DELMATTON FOR LEESVILLE ROAD ACTIVE ADULT COMMUNITY„, CftY. CO MM. sun, DAM DAAABAM DURHAM[ CAMMA All LW21,1r11 SURVEYED BY Mss ran coNSMANrs, Pc S (661ie 9L On Burr! Phow (no) no-4"d (RN N W. ROC cwzw. BY: MAD SHEET 9 OF 14 i MATCH LINE SHEET S SHEET 7 SEE SHEET 13 of a FOR POW COORDINATE TAME. g SEE SHEET 14 OF 14 FOR ACREl1GE SUMMARY. COORDINATES SHOWN HEREON ARE BASED ON NAD BE. SRS xj= $ Q M w t1R rm ■es In ! ttl � 7a6 R I WADE A. DOWERS, PLS NM L-46" A NORM �N+ PROnMSXW4L LAND SURVEYOR DD HEREBY THAT WS MAP WAS PY4EPARm tNaR MY SUPERVIS/O1M AND SHOWS THE LOLYtT70lMS OF SECTIAN 404 JURISOMMOAAAL AREAS AS DEIJNEATED OV SLtEC Or ANLEWC NC. h=. WETLANDS WERE DELINEATED BY SOIL AND ENVIRONMENTAL CONSULTANTS, PA. Tr Tit To EGEND PL PROPERTY LINE WFL DFEET CL CENTERLINE TB TOP BANK AC ACRE WETLAND DELMATTON FOR LEESVILLE ROAD ACTIVE ADULT COMMUNITY„, CftY. CO MM. sun, DAM DAAABAM DURHAM[ CAMMA All LW21,1r11 SURVEYED BY Mss ran coNSMANrs, Pc S (661ie 9L On Burr! Phow (no) no-4"d (RN N W. ROC cwzw. BY: MAD SHEET 9 OF 14 SEE SHEET 14 OF 14 FOR POW OOORORNATE TABLE. SEE SHEET 14 OF 14 FOR ACREAGE SUMMARY. COORDINATES SHOW HEREON ARE BASED ON HAD e3. Gv mum g a ja loo m aoo t Yei no R WACE A. QOWFRS. PLS NO. L-49M. A NORTH Gam! MGI PROfES3/ONAL LAND M&TYCK DO HERESY THAT THIS IIUP V44S PREPARED UAIMR MY SUPERVISION AND SHOWS THE LOCA7XM OF SECTION 404 JUR=VT*M4L ARMS AS DELffVEA7ED BY S&W OF mmzm{, NO, „162111108" SEAL ,�� t� OA�I�'•S SEAL FK A P1Ml L6L mRv 3URMEIM1DR LTC 0 L 4m UNIMPORTANT INTERMITTENT STREAM UNFLAGGED (4,332 SF) NOTE: WETLANDS WERE DELINEATED BY SOIL AND ENVIRONMENTAL CONSULTANTS, PA. LEGEND TT TIE TO SF SQUARE FEET PL PROPERTY UNE WL WETLAND CL CENTEAUNE TB TOP BANK AC ACRE WETLAND DETJNEATION FOR LEESVILLE ROAD ACTIVE ADULT COMMITNITY mecrmucro lemn CITY: catff": SPAT$ DAM mnmm DIRNALI wm Aw=m mmu¢Yal.m l SURVEY® BY `&MW %AND CONSULTAM, PC suet �EL Gem etnd Phom (910) &0 -446 R41NBD RC !le18 =,( % 51 mmmBY., ROD O*9=ffl-WAD SHEET 9OF14 J r� SEE SHEET 14 OF 14 FOR POW OOORORNATE TABLE. SEE SHEET 14 OF 14 FOR ACREAGE SUMMARY. COORDINATES SHOW HEREON ARE BASED ON HAD e3. Gv mum g a ja loo m aoo t Yei no R WACE A. QOWFRS. PLS NO. L-49M. A NORTH Gam! MGI PROfES3/ONAL LAND M&TYCK DO HERESY THAT THIS IIUP V44S PREPARED UAIMR MY SUPERVISION AND SHOWS THE LOCA7XM OF SECTION 404 JUR=VT*M4L ARMS AS DELffVEA7ED BY S&W OF mmzm{, NO, „162111108" SEAL ,�� t� OA�I�'•S SEAL FK A P1Ml L6L mRv 3URMEIM1DR LTC 0 L 4m UNIMPORTANT INTERMITTENT STREAM UNFLAGGED (4,332 SF) NOTE: WETLANDS WERE DELINEATED BY SOIL AND ENVIRONMENTAL CONSULTANTS, PA. LEGEND TT TIE TO SF SQUARE FEET PL PROPERTY UNE WL WETLAND CL CENTEAUNE TB TOP BANK AC ACRE WETLAND DETJNEATION FOR LEESVILLE ROAD ACTIVE ADULT COMMITNITY mecrmucro lemn CITY: catff": SPAT$ DAM mnmm DIRNALI wm Aw=m mmu¢Yal.m l SURVEY® BY `&MW %AND CONSULTAM, PC suet �EL Gem etnd Phom (910) &0 -446 R41NBD RC !le18 =,( % 51 mmmBY., ROD O*9=ffl-WAD SHEET 9OF14 I R 1: S' JURIBDICTWNAL VYETIANDM POINTO 0141 WL 111 POINT/ NORTHINB I EAffrM DEBMPTION 10176 79738.67 20940452 POND 10177 708891.08 2MI12.03 Mal TrPOND 1017a 796020.80 2081008.75 WL 02 101179 700989.17 2061683.60 WL89 101180 708687 -41 2061666.78 YML04 16181 78897721 2061665.15 V& N 10189 786848,612 273157097 IAL 08 10183 70049 205164.81 ML Or TT POND 10184 708941.45 209494194 PONp 10186 708937.60 2M92LN POND 101!8 798K4A4 200191851 POND 10187 786,40880 2061916.73 POND 10188 798900.64 208101250 POND JURISDICTIONAL POND POINTO NORTHING EA6TINB IDESCR IP1ION 10178 79086367 2061924.82 POND 10196 77M08654 2891012.1 POND 10187 MON 289101378 POND lain 7n0/A4 20619119 POND 10186 7080" 2061/2956 POND 10194 79MIAS 2731941.04 POND Moo 7969" 20819MAI POND 10790 798943.85 2MN422 POND 10197 7994759 2061076.96 POND 10192 798910.19 2N19n56 POND 10189 7069" 2MMA6 POND 10194 7991329 20000M POND 1019 758736,73 2067061.96 POND 10189 700MM 29204120 POND 10107 77360.15 200100.7m POND 10198 79949.79 120121211684 PDNB 10199 7890957 273x1519 POND 110200 TN6S099 2001742/ POND 10201 79902A3 2=197,85 POND Tom 78971119 20011.49 POND 1003 78977466 21189194.91 POND 1001 784794.43 208919251 POND 1089 79574LIS 200141.12 POND 1006 MAX 20MOBA POND 1007 79739.76 12111214Z34 7107052 A7 10x89 7961110M 2MI2799 2002MU 1 7907125 289218920 206iP3P,97 lama 7985MM 289294.37 i�l 10201 7990.73 273208950 7094 10212 798973.11 20001GA1 20622SL30 lama 799873.14 200730,49 1049 10214 7970181 20007351 1015 79024.31 406201.9 POND 1x19 76678920 20001954 POND 10217 7917150 20620019 POND 10219 7941259 289189444 POND 10219 79134A2 291989.16 POND late 7068" 2891913A2 POND 10x1 7997413 2919" POND POINT TABI F ISOLATED }808 -0812 98 01 -9 S 04 PONT9 NORMNO EA6TN0 I DESCRIPRON 1079 79440&80 2050424,.18 VIA. 12 Tr as 107 1"M78 2093424.98 "L 17 10787 r 20534111,47 D 10758 79ONS1 2093397.18 IML 10 lam 794407.30 .01 WLN 1071 791411,40 2093399.47 POND 10791 79441189 2093101.84 IAL08 10712 7944117.41 206x414.75 POND 1, 89640E A COWERS, PLS Na L -4639, A NORTH CAROLINA PROFESSRDNAL LAND S47rAMOR 00 HEREBY CERTIFY THAT 7HN3 Amp WAS PREPARED LN06R MY SUP7:RKMFON AND SNOWS THE W04MM OF SIECTION 404 VRX=TMNAL ARE46 AS DELINE471D BY SLNEO OF ANAWN, NR Its f C fiEAl�1 PROFEMOMAL fAAw SURVEYOR LOG B "m JU 01 ITREAM 98 01 -9 S 04 PONT 0 NORTHING 8,407925 I DESORIPMN 70222 720MM MOM76 CL STREAM ON lam 7900M 2097425.94 TB 1 r 29241189 TB 10726 7999153 20041422 TB 10228 7881898,46 .01 TB low 79MUM 200401.38 TB 10716 2098/37,46 200240 TS 10221 7901754 20.17189 s7 to 70000 7890189 2088972.68 T8 10231 TML1S 200873,10 18 10282 79910. 200840.94 TB 10783 789894.87 208232LO TS 1034 789694 100106x9 78 10235 79997.11 208MM TB lam 79739.89 208927111 TB 1 7 79949173 200271 To 10228 78947109 TO To 10089 791031 100273,47 TB 110940 79440.0 I TH TB 10741 78/83748 20MIt.79 TB low 7942454 2001051 TO 10243 1 790417.78 200289.89 TB 10189 I 799466.94 07 TB 10248 7003" 20812UM TB 10246 7107052 A7 TB 1047 716x10.19 2002MU TB 10048 7005754 206iP3P,97 in 1 789474.00 2002111.89 701 11273 700957 7094 77390954 1061 791MU 20622SL30 TH 10289 78921951 1049 TB 10209 TB 7 TB 1x94 MIOIL 1012228.89 TB laws 791 .1161 20021750 TB 109 78911182 .20016756 TB 1x37 790T 9A4 200176.83 TB S 7916112 200171.01 STREAM 1020 790201. 20018731 TB 10080 786119650 2082181.71 TB 10281 M107.111 120EMM 10873 TB lam 789411.18 1208223L39 TB lam 7907L68 2004114,44 101 1, 89640E A COWERS, PLS Na L -4639, A NORTH CAROLINA PROFESSRDNAL LAND S47rAMOR 00 HEREBY CERTIFY THAT 7HN3 Amp WAS PREPARED LN06R MY SUP7:RKMFON AND SNOWS THE W04MM OF SIECTION 404 VRX=TMNAL ARE46 AS DELINE471D BY SLNEO OF ANAWN, NR Its f C fiEAl�1 PROFEMOMAL fAAw SURVEYOR LOG B "m JU 01 59131948211 POKT* NORTHING EASTM G DESCRIPTWN 10773 791293,47 MOWA8 III T@ 10704 794949.08 ZM3442.16 TB 23 10706 78422x.14 20Dg1M 7824 10!69 79470890 2089446,41 '524 10767 7947118,40 20044212 TB 10789 794206.17 208x489.12 T8 10799 In794722.47 7MM03 2098/37,46 TO 20 10271 I 794246.76 2098489.31 TB21 INTERMMIWSTREIIM 9 B 09 -0 S 04 POINT* NORTHING EASTING DESCRIPTION 10894 7NW21 2012228.76 I TB lam 796442.89 2002211/51 III T@ 10289 790490 2011=01 TB 10787 79URAI 2014430.70 TS 10489 ?0088.89 200713A5 76 1073 79070.07 200202.14 TB 1070 7939189 2007231.89 TB 1071 7MM03 289424359 TH 10271 708937,00 200207.30 TB lam 7mmm 20087320 TO 1074 7083KU 200270,94 TB 10 79941139 200470.73 T8 lam 794058 2084901.73 TS 10277 709440.110 1MM42 To Tom 7116"M 200275.79 TO lx79 708473.94 x00200.10 TB 1080 761494 ,40 20120M.08 TB 1017 79112.18 2737201.20 TO low 790089.67 20020.0 TO 10097 77366/52 29040A3 I TH 1094 7005" 20076453 TB lam 7908" 2MM3A3 TB 1899 791117.64 2004951 TS 10297 79/99603 20021520 TI 10230 7973'1.71 2972950 TB lam 799121 700272.31 TB 1021 797314.72 20021557 1x91 7731430 200721.14 TH lam 7907.39 igazims Ta lam 7110It6.30 200210.73 TH 7094 77390954 200203.19 TO lam 20029051 T8 1049 787379.91 20021M TB 097 799890.31 29479404 TS lx73 70901.9 200990.9 TB 109 7980612 20112MA9 TH 10900 7991339 200a2JA7 TB la3D1 790019 2007710 TB 1030 70000.37 200199.7o TB 10903 a-1011- TB TB 1 7990101 200417? TB 10873 799B1n 200411.73 TB WETLANDS WERE DELINEATED BY SOIL AND ENVIRONMENTAL CONSULTANTS. PA. LEA TT TIE TO SF SQUARE FEET PL PROPERTY LIKE WL WETLAND CL CENTERLINE TH TOP HANK AC ACRE WETLAND DELINEATION FOR LEESVILLE ROAD ACTIVE ADULT COARIUNITY On0160BCt {11071.18 DDRNML Dumm 14011MCTCAffi8U LRMIM21111 SURVEYED BY 1�9 LAND CONSMAM. PC to 91. Guar 8trrr4 PLr11r (9L9) 530 -4484 Fax ww 1lr1d811�N0 87138 (919) D as •uuwi.,wa...ii r� DRAVIIIIII11PROC as cl BY1.1WB MEET 711 OF 14 IMPORTANT PlRENNIAL0804 - STRFAMI EUT POINrr NORTMO BABMNI. DE80RIP710N 1851 75516512 20=17105 1cnwm 1867 758172M 2064175.03 TB 10401 7St?&m 4065IM72 TB lam TS14l83 2002140.51 TB 10409 75612UT 100414027 TB 10404 79008000 2062123.04 TB 10406 750063.78 2002117.15 TB ' 10106 750045.15 1200124A TS 10407 780020.44 20812385 7B 10408 790000.66 2003IL27 T8 104M 79MO26 4053149.36 To 10410 DEEM 2081502 TB 10411 790W MM 2082176M TB 10412 78M43Aa aMn.75 TB 10413 78515.10 206214113 TS 10414 79009626 1 208212LS TB 10415 YUMA0 12=110AI TB 10416 79BULI9 2062003.73 TS 10417 796651.13 2051080.59 TB 10418 750636.01 4062003.92 TB 10419 79M17A2 206205.81 TS 104" MML24 205305.91 TB 10421 7S774A2 X=M M TB 10474 7575&50 20520=1 TS 10423 785746.66 20MM11 TB 10424 795723/9 200t=25 TB 104M 70MOM 205301&02 TS 10426 79SSA7 2012004A TO 10427 7504251 200195A0 TB 1045 7585.30 2061976.97 TB 10429 75"7.13 20M TS 10430 755818 205193415 TB 10431 75003.64 205151883 TB 10492 75M27 20M9W.13 TS 14093 7567588 20MVNAS TB 10434 755180 205101025 TB lam 796830.43 ZMN1A0 7B 10438 1954MAe 2aMULOS T8 10437 7547&08 209IMEN TS 10438 750447.08 35104602 TS 10435 758126.20 20MS715 T8 10140 7535.19 501060.51 Ts i 10441 78535.5 2S1S8.1S 790 10442 75985716 12051M.14 TB TB 10613 2051 2MUL49 TB 10414 TN WA1 200187&04 TB 10440 7532004 2M M.71 TB 1 7953NA2 20916MAS TO 10417 -70MA4 2087 TB 10445 795367.70 2001820/3 TB 10449 786294A4 2061808.5 TB low 79123.11 205175.79 10461 7540273 2081793.92 TB 10462 7515 &78 BN1808A1 TS 10443 M17MM 200 611.04 TO 10454 7515." 205180638 TB 104M 790151.38 20M743A3 TB 10430 7514699 20517831 711. POINT TABLE IMPOFMANT PERO N& 904-41TRERMINTONOT 10157 I 7511603 208773.94 I TB 10155 1 795106611 MI754A0 1 To 10159 1 706M7A5 2051 78 1 78504300 2N175A7 TS 10151 MMA3 208179784 TS 10482 755151.14 25174334 TB 10153 70MIA6 209170187 TB 10164 70452.43 205175230 TB 1 72498 M 20M732A0 TB 10156 7049MA3 2051717.55 TS 10457 70490821 2pM700.72 TB 70516 79457A7 25105.80 I TS tow 72440601 290157.78 I TS 1x70 764UIO 2001aS.53 1 TB 10471 790&35 11 I TB 10384 AKS4WII =1708A 1 TB 10473 70464696 265 69316 TB 10474 79W4A5 2051 8,82 TB 1047 791592.54 205185788 TB 70479 75180125 2061808.119 TO 10477 20mM6AZ 20SISSM TB 1047a 79"67A11 2SIM.43 TB 10479 100.13 714AB 10400 t704W.02 20517 24.12 TB 10181 20VD7EM "11'1726.18 TB 10036 793802.70 2051 TB 1 1056 2051741&43 TB 10404 78 178.71 TS 1 7506406 78885 TS 1015 LM 20517587 TB 10187 71 20M7SA9 TB INN 7510282 251764.79 TB 104x9 7511000 774.10 TB 10490 1911.16 205 7H 10181 7911111m, 400170401 TE 10482 75517 16 M 75 10088 178.79 2N7500D4 7B 10494 100.5 2051 1 T8 1 7MM43 2N17"A7 TB tam 751253 751.14 TB 104W 75815.15 2051706.5 To 1 75154.10 2081903.14 TB 1045 795251.05 20515111 TB 10500 711535.81 85.97 TS 10651 7953MM 20118" TB lam 794334.75 209185381 TS 10505 705838.78 2051 TB 10504 7=47. 2061 72 TS 1085 MM1.114 2MUL73 TS IOM 7883MM Balm Ts 10507 Town I ?A01142A6 7'8 1055 79644LU 12M43LI7 TB IONS 754765 2051 To 1051 7N/W.18 208 MA11 TB 10511 1 203"m TS 10612 7266" 87738 TD 1081 54 2WIRBA7. TB 1514 7965406 200161111M TB 10815 7911104jif 205157.33 To b KADE A. 001401M. PLS NO. L -4639. A NOR7M PROFESSIOMAL LAND SLANWMM DO NERMY CERMY THAT 7NIS AMP WAS PREPARED NNDAN M' SUPERVIMON AND SHOW 708E LOCATIONS OF SECTION 404 JuRISDI67IOM65L AR04S AS DEL1NfATEO Sr Set£C OF RALEAGH NC. LAW Ago, �4 • ��SEAI 7r�~ 1NAAVEA. PL8 PR0FEV8WWL LAND 8URV1V0R LTC f 024939 IMPORTANT PFRIN 41AL r 804 - 10Bta I 79889708 200185038 I TB 1517 I M017.10 2051917.11 I TB 1 0 70001#A$ 208199DA4 TB .i0519 7960NM 208180131 78 10820 795RUI 2081000.18 TS 1062E 70WA0 2061802.E TB 10534 790872.79 20815303 TS 10623 7 719.08 2062MOM TB 10624 78679080 2NWW.75 TB 10516 786741.30 205156.5 TS 10510 706707.74 2001950.69 -TB 10517 MM" 2051017M TB 1 .5 2 TB 0129 79FM2A2 2051040.95 T8 10830 786827.74 2062048A8 TB 10687 20mM6AZ TB 1Da62 79"67A11 208207578 To 100.13 2951001 TB 10534 796897.37 20VD7EM TS 10036 793802.70 2MM7.73 TB 1056 79580.74 2012MAS 78 10887 79"08, 20m111A1 TB 1 8 205312080 7B 10539 79"".30 20021 TB 1 107 20511 TB 10641 2WWA5 TB 10842 79MS.21 87 To 10543 706053.8/ 20"12216 TB Im" 79001407 20MIlM TB im" 78006934 200211&76 'T8 1 79808981 2DW04A6 78 10047 20531 .94 T8 10549 78612599 205112509 To 1 7516802 205312880 TB 1 75180.91 2053136.13 TB 15309 7520103 20816786 TB NOTE: WETLANDS WERE DELINEATED BY SOIL AND ENVIRONMENTAL CONSULTANTS, PA. LEGEND TT TIE TO SF SQUARE FEET PL PROPERTY LIKE WL WETLAND CL AEN ERUNE 78 TOP BANK WETLAND DELINRATION FOR LEUVILLE ROAD ACTIVE ADULT COMMUNITY 845C12POW6117A.1B C117a. CO[647Y: I BTA78 DAM, DURIMN DURFUW SOe78 CAIRM 101 m"21.7811 SURVEYED BY mI@B LAND CONMMTANM PC 1318 R 01518 strut Phow (919) BW -404 4y p (9dt4 6}we 2"12 71 -0919) Btt1 -91oE IhldBh, 9e�1o1..om DRAW Bri Pao 0411OK D BY: 00 SHEET 110E 14 s s 0 i IMPORTANT PERENNIALS801- STREAMINIFRBECT PORK. NORTHINGI EASTINQ DESCRIPTION 10317 79011113'20024811M TB M STREAMS M 10516 7507091 2a62481A1 TB 10328 79199429 20124322? TB 10827 79491727 2008/1820 TS 10328 791068.10 200389923 TB 10129 791996.01 2062877.72 T6 10830 791914.14 206II78320 TB 10331 794GUM 2062921.73 78 10032 7901&22 232297.94 TB 10333 79081.19 2062261.76 TS 10394 79066.10 2012215.94 T8 10936 79010.88 2052167.16 TB 10336 71067.18 20/217320 T8 10337 794%1.17 2012157.76 TB 10351 7048MM9 2080120.16 TS 10339 7908000 2062097.75 T8 10340 70061.17 2012071.89 TS 10341 7901028 a To 10342 79499426 20620409 T8 10343 794IM04 2032682,011 TB 10344 79094.94 205200679 T8 10316 794994.76 205107A TB 1030 7949" 206197010 TB 10547 794957.97 20619GLO TB 1030 794942.1/ 2081945.0 TB 10949 794927.94 2061920.78 TB 10903 794820.61 2031OW41 TB 10941 794921.16 2011802.1/ T8 10362 79U MM 2081MYAO TB 1030 794M M 2081880.94 TB la394 79494697 2081670A0 T8 103M 7949Y9.M 2081941.80 TS lam 79031603 1201118111.74 103M TB 10947 7900124 203150.18 TB ' 10368 794692.75 2061941.0 T8 10359 791.94.39 2011602.73 T6 10300 781887.67 206177128 TO 10381 79480.18 2061786.70 TS 10362 794947.94 2001726.72 i TH O PORTANTPEPJNIA STREAM INTERBEOTTO LTRFBRIERCREEK POINT# NORTHING I EASTIM6 OESCRIPWN 103M 79400 1 203171603 TB 1064 7904679 12MI 708.68 TB 10473 791SOM 2081698.M T8 10661 79462092 2061706/6 TB low 79494427 2061061127 78 lam 7900020 2061970.19 TB 1004 79477603 2081994.)4 TB 10694 79478618 231994.95 TB 1080 794700AD 208160.88 TB 10667 794116627 231644.94 T6 1963 MOM 23189427 TO 10694 79409421 23181413 TB Iowa 7949MM 209163.67 TS 10861 794684/7 206169678 TB 19382 79464ILM 2031691.94 TB 1394 794941.0 23101.65 TB Pf)IAIT TADI c IMPORTANT POINTS PER®INI/is NOMt M 801- 67REAM BAUM INTERSECT OESCRpTION 10M 794837.66 20/1776.72 To lam 79463LU 206171602 TB 10354 79494079 2061708.66 r 1OM 79060X0 2061722.03 TB 10366 764683.70 -melysm TO 10367 79071.66 ZM17W.12 TB 103M 79062.01 2(6177014 TB 1036 79494220 2061789M 78 10670 79190182 206181126 To 10371 794906.62 2061039.90 TB 10372 791922.15 2MM.57 TB 10875 791968.07 2061689.61 TB 10374 7949026 2061876.97 T8 10375 79496226 206168726. TB 10376 7940494 231n6A4 76 19677 7 2094 18 TB 10376 794=72 2061 90LQIIL TB 10376 790110M 206194685 TB 10380 794967.66 2MINSA3 To 19381 79403920 2XIMA0 TB 1=82 794971.94 2miqm TB 1030 794903.66 206201321 TS 10364 703974.64 2062089.56 TB lam 79090.72 T8 103M 7606276 2WWX To 10387 784980.09 201!01121 TB 1=66 79487625 20MICIA2 T8 loan 703669.66 7032122408 78 10390 78497131 703216421 To lam 7940" 20940829 78 10882 79WO.36 2002196 TB 10894 79494626 290VMI TB 0994 TB 103M 71MWA8 2082516419 TB 10796 7949MA 2002065M TB 10947 79086,0 206b7081 TB 10694 7N M.37 20MOM TB 19317 79496127 20wals TB 1 =1a 79094.71 206206.8E TB IMPORTAMTPENFNN54L 87AE/161 INTERSECT TO LITTLE BIBER CREEK POINT* NORTHNO POINT# I DESCRIPTION 1034 7946KII 103M TB 10694 794942.3 206150A6 TB 10694 701M7.34 2011639.52 T8 103.7 79465428 206161637 TB TOMB 794121.04 208161312 TB 10517 7944W,M 231026.21 TB low 70447620 20111 TB 10671 794447.78 206149927 T8 10672 794447. 1 M TB lam 794440X1 20614II&V 701070.27 10674 794428.08 201113.3 TB 10676 79gW.3 1 231411117 79 lam 794420M 2031438,91 TB 10977 7940016 231441.44 70 19478 MOIR28 231481.94 TB 10570 I 794479.94 2081/0676 I TB THIS COMES THAT THIS COPY OF TNS PLAT ACCURA1ELY DEPICIS 1HE G"OARY OF 1HE JURNOICTION OF SECTION 404 OF Tiff CLEAN WATER ACT AS DETERMINED BY IKE UNDBABIONEO ON THIS OATS UN.E93 THERE IS A CHANCE IN THE LAW Olt OUR PUBUS1m RECULA701% THIS MWIMINA80N OF SECTION 404 "411OICTIaN MAY BE ROM UPON FOR A PERIOD NOT 70 OMM FIVE TEARS FROM 1NIS DATE INS OETIRWNATICN WAS MME UWZNC THE 1957 CORPS OF ENGINEERS Y1E11.ANDSPn MAW .f Y A1YE DAM 77277').07/ 1, WADE A. OOWE74'S, PLS Na L -4639. A NOR7H C41OLNl PROFESSIONAL LAND SM EYOX DO HEREBY cER7TFY 71427 TFBS MAP 14544 PREPARED Loom MY SUPMMSION AND SHOWS THE L"TMW Of .SEL770N 404 JIAPISDKU70ANL AREAS AS DELINEATED BY SAIEC OP RALEIGH, NC. SE A:N i 'I- L4839 LTC. / L�830 IPM RVITTEN7 STREAM #8 03 - #S D6 POINT# NORTHING FASTING DESCRIPTION 103M 7EMM 208272028 CL STREAMS 06 10307 750023.32 208294/a T8 103011 70M9411 2082701A9 TB 10305 700036.52 2094&77.03 TS D 79091.97 2091642.54 TB 74494TH 2 20525&1. TB 2 764BSW 200205&31 T8 jiG311 3 7045672& 2DII25a 0 TB 4 78062.01 2001109j6 TS 6 701070.27 20113 AS TB 8 794RUI 2062WO TB 10377 70003.13 2092288.20 CLERMS06 10318 70400171 2002480.82 TB 10319 700001.82 20112&13.06 TB lam 794094.94 208204.62 TB 10321 754578.30 206705.64 TB 10322 700017M 2037836.85 18 10628 I 703032.01 2082872.03 TB 7CIM 1 70603024 2002884.04 TB 1026 I TOMC13 200272123 TB WETLANDS WERE DELINEATED BY SOIL AND ENVIRONMENTAL CONSULTANTS, PA. LEGEND TT TIE TO SF SQUARE FEET PL PROPERTY WL WETLAND CL CENTERLINE NE TB TOP BANK AC ACRE WETLAND DEL NEATiON FOR LEESVILLE ROAD ACTIVE ADULT CONMUNITY 41SCPR001C7M10771.W1 CRY. Calllah, STATE DATE MM W4 DURRAI4 IN378f1180184A 1AMW21.7MI SURVMD BY IM LAND CONSULTANTS, PC an SL Gaff B12as6 P6ow (939) MO -401 Bolt. 2) 9611 (919) 618-903 NC Bins p.a..9srns..n CR MNBY: I6NC CHB14= M WAS SHEET12OF14 i P 'ENNYLL BTRFIIM LRTLEBREIt CREEK POINT/ NORMINO I FASTING DEBORPTgN1 10597 794M878 2060669,13 TS 10696 794670.90 95 TB 10959 774950.29 20009199 TS 10800 794676.95 =95958039 SS 10957 704959.67 201M IN TS loam 794956,13 20SOM42 TS to= 794820.397 2951008.95 TS 10804 794814.64 206103.87 TB 10x6 7=767.71 20519582 TH 1060 794796.26 2081114.48 TB 10= 79472932 2061129.09 T8 10808 794M3.62 20g1180.38 TB 10809 TNM1A4 29511I1M TB 10810 794832.30 2081202.42 79 70611 79495BA7 201219.32 TB 10612 70MAS 2081237.91 TS 10618 79497.31 20812MM TB 1W4 794600416 208t323A0 TB IQSI5 794482.34 2081364 TB 1018 79/495.87 2081395. TB 1017 794169419 201377,95 TB 19516 794432.16 208141216 TS 10476 704420AD 2MI43593 TB 10575 794409416 1211614SL17 TB 10810 794378.14 =1M464".II TS 10620 7843MM 206147811 T8 108111 794951.70 2061501'1 TB 10871 7943KX 2081547.10 TB 10624 794349.2 2D6ISSIm TO 10824 78/320.90 2081SM71 TO 10826 784286416 20MMAY TB 1096 794213.95 208/670418 TS 1097 794495410 8792E TB 10825 29516x1.34 TB low 2G19653AS TB 10950- 79µ76A0 290166052 T13 10831 Mj$077 2061950.62 TB 10832 794WYAS 2 =1520.6 TB 10833 79168.19 If" TS 10694 764671.= Z0016aZ= TB 10066 7040 UM 200141.91 TS 10956 79589550 RMWA4 TB 10627 79399417 295799.08 TB to= 793019.18 2001191.67 TB 10639 7936879 206142120 TS 10610 --To-sm 79499.76 211918!977 TO 10=8 7995x.79 195767839 TB 10642 795860.10 2951416.17 T13 10843 799560.81 39951695.33 T8 10611 79581810 208166A4 TS 10945 MINIM 2061714.39 10646 70.SNM 211017=311 TS ' 10647 795749.31 205171L34 I TR 10846 76726.29 =61 89 78 10649 76723.39 2081950.00 To 7955 7674 208189410 TB 10861 7947918 201701.44 TS POINT TABLE PERE NULL STREAM LITTLE BRl R CRIE PODRf NORTHM EAST= DESCR9rnCIN 10952 = 20M44MA9 TTY 10663 798808.$6 2MML12 18 10951 793648,16 2081971.07 TS 10958 7691418 2088164632 TS 1D895 70IMMM 2051916A0 T9 10867 79692►.M 2MISLI3 113 to= 79594636 =MO61.1a TB 10695 795995.95 295195624 TB 10950 70MAR 2M1S3819 TB lom 794004.95 =8361 77 lo6Y 794029.M =NM876 TB 1o= 794o7A1 150853 TS 10954 794M7.31 2MUM TB 106M 79408440 m08IaLI9 TB 1095 794M9A7 91181x6.17 7S 10957 M41AMM 9MIGAN TB to= 794139A4 2081637A4 T9 low 7NIMM 2M B".M 18 1010 784167.74 957.43' TB 10671 Twom 295168327 TB 1 784732.64 2061695,96 To 1 794995.79 2061 T7 10574 7943MA9 2081664.99 TB 10678 200NIM I POD 206154521 TB 0678 24 9061686410 TB 1087 MMIA6 '2061808,20 TB 19578 7&d52= -=4U.0 TB lo6M 794353A 906147044 TB TB 19595 77449995 2 148307 • 108951 79606A4 2081496.36 10895 19562 79µ19A7 39702 TS 1093 794440.95 2661373.9 TS 10954 794495410 206196414 TB 10955 7944KA 295134443 Ts 10954 794472419 2061336.4 TB 10957 79µ76A0 2081327A6 70 19595 754464.01 2064 SONS To Joia 794WYAS 295139631 TB 10950 79168.19 28 274 8 TB lam 764671.= 29511 6.8 7S lQIX2 7'4816.36 2M118t.34 76 10895 7 €, 1.95 195. l8 10194 7�, .71 1 XMINX TB 1080 rrr TB to = 77472839 110800. T8 toil i45i 906116) To 10=8 79476= 2 =1 108= 74774A6 IM 07 TS 10795 7947=14 3=1 TS 1907 1.39 TS 902 not&& 1 7NM2A5 gosomm 19 10764 7NINI= 20M91 1 To 1 794994.91 775 1 7944861 TB 1079 TUB" TB M aRTWIM MAT THIS COPY OF TNIS PLAT ACCURATELY Di71CTS THE BOUNDARY OF 7HE AIR=== OF SE07ION 404 OF THE CIEAN MATER ACT AS DETERMINED BY THE UNOENSIGNIM ON THN DAE. UMISS THERE IS A CRANK N THE LAM OR OUR PUBUSHta RMI ATIONS, THIS DIMPIMINATHN OF SMICIN 404 dBIt801C110N MAY N RELED UPON FOR A PERIOD NOT TO E%CEED FIVE YEARS FI= TM DATE'. T1= DMMMATION WAS MADE UTSIBNG THE 1967 CORPS OF ENGINEERS MERANDS DELPFA7100NN MANUAL mom ME DA71D 1. WADE A. COWVM PLS Na L -4639. A A%XWN CAROW44 PROMSOWL LAND SURVEYOR, DO h%WI 7Y CER77fY 7EWr 77WS At4P V4tiS' PREPARED UNDM A4Y SUPERI?S10N AND SNOWS ENE L=77ONS OF SM71ON 404 JURISDXM"L AREAS AS DDJNEAM BY S4EO OF RALMON. NC. tN CAS[• SEAL�� t , \•'�1 99106�A 0908959 PLO ' PROf�Bl018AL 8'tBBVRYpR LJQ i 42,•4679 NOTE: WETLANDS WERE DELINEATED BY SOIL AND ENVIRONMENTAL CONSULTANTS, PA. LEA IT Tic TO SIF FM PL PROPERTY LINE WL WWETLAANND CL CIEN RUNE TB TOP BANK AC WETLAND DELIN"TIONi FOR LEESVILLE R7O�ADDTAT�CTIVE ADULT COl ►il►l NITY n9cN9Dmcrn9MSM[ c"r. C0111111f: 57411@ DA1L DURMAI4 DURHAM 110LTBG1x181A lA7DALYlI,41l1 SURVEYED BY 1nBt IAND CONSULTAT�iT3, PC (6669161t 9Gnu Bts"d PhoD4 (919) 5LO -4444 4wa�M •.a R1U NC 97619 yh� IVac (919) 510 -9109 Z=M a w womm41.L. 7-1 042411421511: R8C dil= 611: WA0 SHEET 13 t]F 14 -JURIS POND MWO N=NW EABTINO DBSC IrTK94 f 796444.46 20MM931 POND 108114 79543TAO 201131131M POND 1096 795411.x0 2083842.79 POND low 79630A6 POND low 79MM59 =Me96.M 106116 YW02LOO 20MMt.73 POND long 799596.48 20695 6AO POND 10630 7952589 200aY.77 POND 10631 708464470 296379179 POND 10832 795226.07 2pMYNA4 POND low TIM10410 2959484 POND lom 7951 13 20UMAG POND low 795170419 2095701414 POND 1068 M163AT 2953895.99 POND 10957 795130 2o3Mt.92 POND to39 795114A7 2083640M POND 1039 795=416 2053616.91 POND 1040 79x7652 2083609.82 POND 10541 71 200954A2 POND 10542 7960929 2095956416 POND low 7960SM 2953691.64 POND 10844 795044A7 20UBIL12 POND 1046 70=7.17 21153496.09 POND lam 79510656 205346395 POND 10957 796160416 2081MUM POND 10845 796108M 2095143,78 POND low 7961146410 209542947 POND loom 799574.13 208-1422.83 POND 10851 795957.46 2095426.34 POND 10862 79529750 209543812 POD 10695 i 7969556 295348356 I POD 10954 1 79611.36 200NIM I POD low 7oMIMI! 2OM539.03 POD 19595 79MASS 2053689.4 POD 10567 7961.1 208366280 POND IBM 726329,24 - 2089956.74 mm 10M 79584./.39 295951211 POD 1 7063986 2009581.1 POD 10951 79639895 20957089 POND 7089 TN40AB 20113731.M POND 10895 79420A 20957926 POND lam 79642895 2067SCID POND loo T1 208376Am POND 10866 79439.80 2063x4.14 P01D 10957 7=13756 205391729 POND 10958 7M485.12 2063951.9 POND NOTE: WETLANDS WERE DELINEATED BY SOIL AND ENVIRONMENTAL CONSULTANTS, PA. LEA IT Tic TO SIF FM PL PROPERTY LINE WL WWETLAANND CL CIEN RUNE TB TOP BANK AC WETLAND DELIN"TIONi FOR LEESVILLE R7O�ADDTAT�CTIVE ADULT COl ►il►l NITY n9cN9Dmcrn9MSM[ c"r. C0111111f: 57411@ DA1L DURMAI4 DURHAM 110LTBG1x181A lA7DALYlI,41l1 SURVEYED BY 1nBt IAND CONSULTAT�iT3, PC (6669161t 9Gnu Bts"d PhoD4 (919) 5LO -4444 4wa�M •.a R1U NC 97619 yh� IVac (919) 510 -9109 Z=M a w womm41.L. 7-1 042411421511: R8C dil= 611: WA0 SHEET 13 t]F 14 A 9 AC_ REAGE SUMMARY JURISDICTIONAL WETLANDS - 2,501 SF - 0.06 ACRE ISOLATED WETLANDS - 1,400 Sr - 0.03 ACRE JURISDICTIONAL POND - 39,007 SF - 0.90 ACRE ISOLATED POND - 1,789 SF - 0.04 ACRE NON JURISDICTIONAL POND - 87,974 SF - 2.02 ACRE UNIMPORTANT INTERMITTENT STREAM - 18,613 SF - 0.43 ACRE IMPORTANT PERENNIAL STREAM - 75,030 SF - 1.72 ACRE TOTAL - 226,314 SF - 5.20 ACRE NtT3iM BTREAI UNFLAQ0W -f I EASTNG POINT# NORRONO EAATIN6 01104 10701 7"312.06 2064914.71 to 10701 795806.84 2014"0.06 TS 10710 716271.4 2084"7.69 TB 10711 7902MA2 20"937.12 TB 10712 715284.18 201466 TB 10713 701280.14 20"101.0.7 Ts 10714 795MA4 I 2MMAD TB 10715 7 "110.46 12OUB73M TB 10716 7 "151.22 12084043.70 TB 10717 715150./6 2011127.2 TB 10711 705121." 20"10&16 T8 I 10716 7"112" 2054761.79 TO 10720 7950" 2ON777SO TB 10721 793084.3 205478268 T5 107" 7 "1 78 204754.74 TB 1 46 7/610/.74 2064778(16 TB 10146 7 "126.18 2D14791A1 TB 10747 M140A1 11 TB 10740 795156M 10919 TB 10749 7"162.86 201481113 TB 107M 706198.75 20467475 TB 10761 71MMM 20MOIA0 I TB 10752 7952!1.06 9789 TS 10791 715242.17 2084923.18 TB 1074 795270.20 20/1/8124 TB POINT TABLE NK ILAMM POND 1Ai5TLA9m#593 NORTHNB -f I EASTNG US D[BCRFMON POINT# loom 791068.06 1 2OU4Njf C1,38 10101 7/1010.77 1 2092500.15 70 10102 -To-m 7"084.61 A7 To 30 7"91 A6 Al 7/406337 200247DA2 TO 41) 106" 794"721 =240210 7B 10906 794007.10 2004UM T8 1010/ 704091.1 2004MAO 1 TB low 7910".82 2""9831 T841 1 7"01 &it 206?AOB.79 TB42 10900 79401 19 10OW28 TB 1 "10 794018.6 2014.43.6 TB 48 TT PL 10411 10.01 2042434.90 TB 1 9512 794019A2 2062451.17 TB 99T7PL 10813 791019.9 34 TB 10514. 79109&76 2092447.31 TB 34 10815 79408291 2002497.01 TB 10818 1 794094.75 106 "7089 TR35 1MT T"02/A9 201" 82 75 1"16 A9 20tl4 ." TBW 10919 ?"A6 20924 74 TB 37 1"40 .71 72A9 Ttl 10921 - 7NOT.10 1 295MOAT TB 10912 7940409 20921"--1 TB NK ILAMM POND POINTS NOMNO EAffrM P091r# 10160 40129 POND 1 MwAm " 409.99 POND 10671 795"&17 2991390.4 714206.89 10672 7 10"1 lom 7"91 A6 Al pop 10174 TOW.77 2"1270.11 POND 1. WADE A. GOMMA PLS NO. L -4539. A NOMN 08801))0) PROF�xs7ON4L LAND SURWYOk DO HEI7ESY CERTIFY THAI• T74lt9 MAP 11648 PREPARED UNDER MY SUPERNS/ON AND MION9 7HB LOCATIONS OF SECTION 404 LIURSSDIC710N4L AREAS AS DELINEATED BT' S&W OF AMEX% NO, aaa .��► CARp� •, ` SMIL ,P L A. _da 1 0819 -TTPL P091r# I NORYHNG msTm DESCRPI5 10707 7442WO 209142.12 10751 714206.89 2068145.41 Tit 25 10"1 T017&70 2014369. Tax tom 794191.3 209248622 TB 27 10773 7941 1t 2092428.68 TB 10774 7 "111.9 209"28.1 9 10778 7940"A9 200CL12 0 19"8 7NMA7 208338293 1 10777 ?SWIM 2963999.2 2 10779 DO 2093299.11 JTB 10771 79409&90 2092275.35 10150 07 2083296.11 10791 7"090.7 2993981.48 19792 791993,24 2998999 U TB 19798 99899.12 TB 1974 98864." TB 10785 689931 TB 10756 9&939." TB 15759 2:704M.A432MM27 TB 10790 0593".11 TB 10701 663967.9 TB 19791 "336127 TB 1 10794 486 2"89".9 TO 13 171" 7040".02 200= 92 7B 14 206341 TB W 7 "13&15 2982411.11 TB 16 n11209 74197.30 2069431.16 1817 7"19239 7B 18 70MR17 .20M30A2 TB NOTE: WETLANDS WERE DELINEATED BY SOIL AND ENVIRONMENTAL CONSULTANTS, PA. LEGEND TT TIE TO SF SQUARE FEET PL PROPERTY UNE WL WETLAND CL CENTERLINE T8 TOP BANK AC ACRE WETLAND DELINEATION Folk LEESVILLE ROAD ACTIVE ADULT COMMUmTY fim1m,.41 mw1 c"r COWnr 5SAM DATR DURHAM DURHAM 7109MC11f6lm I PUMT141911 SURVEYED BY 1533 LAND CON3ULTANT3, PC 5115 8L Do= 9LreA P1tms (919) 510 -."64 'S ("to 10 eat 010) 510 -9172 SOMP NC 57018 Ma28: g"mm mo.tlst- � ~r„IY/n,Y� __ DRAWN Br ROD 0651 fPWAG SNEET14OF14 Forrest Creek Riparian Buffer Mitigation Bank Rudolph Riparian Buffer Bank Statement of Availability- January 18`', 2012 NC Division of Water Quality U.S. Army Corps of Engineers Ms. Katie Merritt Mr. Monti Matthews 401 Oversight /Express Permitting Unit CESAW -RG -R 1650 Mail Service Center Raleigh Regulatory Field Office Raleigh, NC 27699 -1650 3331 Heritage Trade Center, Suite 105 Wake Forest, NC 27587 Re Project: DEL WEBB DURHAM DEVELOPMENT This document confirms that Pulte Group, Inc. (Applicant) for the DEL WEBB DURHAM DEVELOPMENT has expressed an interest to utilize 512 Linear Feet of Stream MitiEation Credits and 29.424 Square Feet of Riparian Buffer Mitieation Credits from a combination of the EBX Neuse Riparian Buffer Umbrella Mitigation Bank /Rudolph Site and the Forrest Creek Stream and Riparian Buffer Mitigation Bank located in Neuse HUC 03020201. As the Bank Sponsor for both sites, EBX -EM, LLC attests to the fact that mitigation is available for transfer upon permit issuance. Banker will notify applicant if the 512 Stream Mitigation Units and 29,424 Sq. Ft of Buffer Mitieation become considered "At Risk" of not being available prior to permit issuance. Credits are not considered secured until payment in full is received from the applicant resulting in the issuance of a Bill of Sale and Affidavit of Sale by the bank acknowledging that the applicant has fully secured credits from the bank and the Banker has accepted full responsibility for the mitigation obligation requiring the credits /units. The Banker will issue the Affidavit of Sale within ten (10) days of receipt of the balance of the Purchase Price. Banker shall provide to Applicant with a copy of the Affidavit of Sale and a documented copy of the debit of credits from the Bank Official Credit Ledger(s) showing the permit number and the resource type secured by the applicant. A copy of the Affidavit of Sale, with an updated Official Credit Ledger will also be sent to regulatory agencies showing the proper documentation. If any questions need to be answered, please contact me at 239 - 872 -1678 Best Regards Matthew R. Fisher EBX -EM, LLC 909 Capability Drive Suite 3100. Raleigh, NC 27606 I *W" WILDLANDS ENGINEERING January 16, 2012 Mr. Randy King, P.E. Land Planning and Entitlements Manager Pulte Group 1225 Crescent Green Drive Suite 250 Cary NC 27518 Re: Reservation of Riparian Buffer and Nutrient Offset credits for the Del Webb Durham — Leesville Road Active Adult Community project located in Durham County, North Carolina. (Durham site plan case # D1100150) Dear Randy: Wildlands Southeast Holdings I, LLC has reserved 79,152 sq. ft. of Riparian Buffer credits and 15,870 lbs. of Nutrient Offset Credits from the Wildlands Neuse River Riparian Buffer & Nutrient Umbrella Mitigation Bank — Little River Farm Mitigation Site to satisfy the Nutrient Offset mitigation requirements related to the Del Webb Durham — Leesville Road Active Adult Community. The Project is located in Durham County, North Carolina within the service area (HUC 03020201) of the Bank. Buffer credits have been reserved at the price of $.80.00 per sq. ft. and the Nutrient credits at $12.50 per lb. Final transfer of the credits will be made upon full receipt of your payment of $63,321.60 for the Buffer credits and $198,375.00 for the Nutrient credits to Wildlands Southeast Holdings I, LLC, at which time credit transfer certificates verifying your credit purchase will be issued to the municipality approving the impact and the North Carolina Division of Water Quality, with a copy to you for your records. Please send payment directly to Wildlands Southeast Holdings I, LLC at the letter head address. An invoice for this transaction has been attached for your convenience. Wildlands Southeast Holdings I, LLC • 5605 Chapel Hill Road, Suite 122 - Raleigh, NC 27607 � k* 4P WILDLANDS ENGINEERING We appreciate the opportunity to assist you with your mitigation requirements. Please contact me at 919 -851- 9986 ex. 100 or rbugg @wildlandseng.com if you have any questions or need any additional information. Sincerely, 1-1��Ilt-ItE-11� tl� Robert W. Bugg Wildlands Engineering, Inc. Accepted on behalf of Pulte Group pending final approval of the construction impacts by the local municipality: Printed name: Title: Signed: Date: / / Wildlands Southeast Holdings I, LLC • 5605 Chapel Hill Road, Suite 122 • Raleigh, NC 27607 Ecosystem PROGRAM January 24, 2012 Randy King Pulte Homes Corporation 1225 Crescent Green Drive, Suite 250 Cary, NC 27518 Project: Del Webb Adult Active Community Expiration of Acceptance: July 24, 2012 County: Durham The purpose of this letter is to notify you that the North Carolina Ecosystem Enhancement Program ( NCEEP) is willing to accept payment for compensatory mitigation for impacts associated with the above referenced project as indicated in the table below. Please note that this decision does not assure that participation in the NCEEP will be approved by the permit issuing agencies as mitigation for project impacts. It is the responsibility of the applicant to contact these agencies to determine if payment to the NCEEP will be approved. You must also comply with all other state, federal or local government permits regulations or authorizations associated with the proposed activity including SL 2009 -337: An Act to Promote the Use of Compensatory Mitigation Banks as amended by S.L. 2011 -343. This acceptance is valid for six months from the date of this letter and is not transferable. If we have not received a copy of the issued 404 PerxWt/401 Certification/CAMA permit within this time frame, this acceptance will expire. It is the applicant's responsibility to send copies of the permits to NCEEP. Once NCEEP receives a copy of the permit(s) an invoice will be issued based on the required mitigation in that permit and payment must be made prior to conducting the authorized work. The amount of the In Lieu Fee to be paid to NCEEP by an applicant is calculated based upon the Fee Schedule and policies listed at www.nceep.net. Based on the information supplied by you in your request to use the NCEEP, the impacts that may require compensatory mitigation are summarized in the following table. The amount of mitigation required for this impact is determined by permitting agencies. Upon receipt of payment, EEP will take responsibility for providing the compensatory mitigation. The mitigation will be performed in accordance with the N.C. Department of Environment and Natural Resources' Ecosystem Enhancement Program In -Lieu Fee Instrument dated July 28, 2010. Thank you for your interest in the NCEEP. If you have any questions or need additional information, please contact Kelly Williams at (919) 716 -1921. Sincerely, L7 Micha I lison Deputy Director cc: Karen Higgins, NCDWQ Wetlands/401 Unit Eric Alsmeyer, USACE - Raleigh Lauren Witherspoon, NCDWQ - Raleigh Debbie Edwards, agent File kutor!;I�g... Prot", our Ju& asms, Affi R North Carolina Ecosystem Enhancement Program, 1652 Mail Service Center, Raleigh, NC 27699 -1652 / 919 -715 -0476 / www.nceep.net River Basin CU Location Stream (feet) Wetlands (acres) Buffer I (Sq. Ft.) Buffer lI (Sq. Ft.) Cold Cool Warm Riparian Non -Ri arian Coastal Marsh Impact Neuse 03020201 0 0 0 0 0.12 0 0 0 Upon receipt of payment, EEP will take responsibility for providing the compensatory mitigation. The mitigation will be performed in accordance with the N.C. Department of Environment and Natural Resources' Ecosystem Enhancement Program In -Lieu Fee Instrument dated July 28, 2010. Thank you for your interest in the NCEEP. If you have any questions or need additional information, please contact Kelly Williams at (919) 716 -1921. Sincerely, L7 Micha I lison Deputy Director cc: Karen Higgins, NCDWQ Wetlands/401 Unit Eric Alsmeyer, USACE - Raleigh Lauren Witherspoon, NCDWQ - Raleigh Debbie Edwards, agent File kutor!;I�g... Prot", our Ju& asms, Affi R North Carolina Ecosystem Enhancement Program, 1652 Mail Service Center, Raleigh, NC 27699 -1652 / 919 -715 -0476 / www.nceep.net Debbie Edwards From: Randy King <Randy.King @PulteGroup.com> Sent: Tuesday, January 17, 201211:00 AM To: Debbie Edwards Subject: FW: Mitigation Debbie, FYI concerning EBX availability of Non - Riparian Wetland credits. Based on this, I propose to purchase 0.25 acres of credits from NCEEP. Thanks, Randy From: Matt Fisher [mailto:mattfisher @ebxusa.com] Sent: Monday, January 09, 2012 4:55 PM To: Randy King Subject: RE: Mitigation Randy. 0.13 non - riparian wetlands is all we have at this time. I'm sorry. Wish I had more. Matt Fisher Regional Director of New Business Development EBX 239 - 872 -1678 From: Randy King [ma lto : Randy. King @PulteGroup.com] Sent: Wednesday, January 04, 2012 5:22 PM To: Matt Fisher Subject: RE: Mitigation Thanks for correcting that rate Matt. The only other question is that I only need 0.21 acres of non - riparian wetlands. Do you have that amount available? Thanks, Randy From: Matt Fisher [mailto:mattfisher @ebxusa.com] Sent: Wednesday, January 04, 2012 1:07 PM To: Randy King Subject: FW: Mitigation Randy, You mentioned your wetland credits are Non - Riparian. I apologize, below I quoted Riparian. Non Riparian credits are $44,000 per whole credits. Please see below to reflect this. 1 Matt Fisher Regional Director of New Business Development EBX 239 - 872 -1678 CONFIDE: NT IAI ITY NOTICE: This email may contain confidential and privileged material for the sole use of the intended recipient(s). Any review, use, distribution or disclosure by others is strictly prohibited. If you have received this communication in error, please notify the sender immediately by email and delete the message and any file attachments from your computer. Thank you. DURHAM CITY OF DURHAM Water Management Department 1600 MIST LAKE DRIVE I DURHAM, NC 27704 919.560.43811 F 919.560.4479 1869 www.DurhamNC.gov CITY Of MEDICINE January 26, 2012 Randy King, PE Land Planning and Entitlements Manager — Raleigh Division 1225 Crescent Green Drive, Suite 250 Cary, NC 27518 Subject: Proposed 12" Water Line to Serve Del -Webb —US 70 Dear Mr. King, Pulte Homes proposes to construct a 12" water service main from the proposed 24" water transmission main on the south side of US 70. The proposed 12" main will provide water service to portions of Durham's service area north of US 70. When completed, this parallel 12" water service main will be owned and maintained by the City of Durham. Durham previously received a permit for the stream crossing of the 24" line, just south of the culvert that crosses US70. The proposed 12" line will be constructed approximately 4' from the approved 24" line, within the area that was approved for this stream crossing impact. Durham is in support of the 12" main being constructed within the previously approved construction corridor and no additional impacts are proposed outside of the previously approved impact area. Sincerely, Don Greeley, PE, PLS Director Department of Water Management c: Jerry F. Morrone, PE, Engineering Supervisor, City of Durham Department of Water Management Bryant Green, PE, Civil Engineer III, City of Durham Department of Water Management Durham — Where Great Things Happen NO ADDITIONAL IMPACTS SEE SHEET C7 USACE AID# SAW -2009 12" WATERLINE CONNECTION FOR DEL WEBB IS PROPOSED TO PARALLEL THE PREVIOUSLY APPROVED 24" WATERLINE FOR THE CITY OF DURHAM. CONSTRUCTION OF 12" WATERLINE TO TAKE PLACE SIMULTANEOUSLY WITH THE CONSTRUCTION OF THE 24" WATERLINE. NO ADDITIONAL IMPACTS TO JURISDICTIONAL WETLANDS, STREAMS OR BUFFERS ANTICIPATED. FROM METER BOX, WATERLINE WILL CROSS BUFFERED STREAM AS SHOWN ON EXHIBIT C7, CROSS UNDER US -70 AND CONTINUE SOUTHEAST TO THE INTERSECTION OF US -70 AND T.W. ALEXANDER DRIVE. PROPOSED WATERLINE WILL CONTINUE EAST ON T.W. ALEXANDER DRIVE AND WILL THEN TURN NORTH ALONG T.W. ALEUNDER DRIVE AND ACC BOULEVARD CONNECTION DWQ #20060738, VER. 3, USACE AID# SAW- 2006 -33046 PROPOSED Pi DIP A WATER WE L• OJRNAM WATER NH CITY OF DURHAM AND DEVELOPER (DESIEA 6Y MCrcN k CREED EXTENSION N TIE PROS OF DETERIANI IG FOR THE "RALDGN 1� FlNAL LOCATION OF MASTER METER INTERCONNECTION PROJECT -) WE RNA. DLIEWMmAnow TO BE WOE PRIOR TO CONEIRUCIION ■ DRVm n OR PEAMmw OF THE PROPOSED Wes• MA• EITE•MO•• CURRENT PROPOSES NTERCWWITCH OF 1 �. J DURY.AM- RN.EI❑H WATER SYSTEMS CDCa h SY MCIOM N CREED COR THE •RALEIGH NIERCOHNE'CTIOH PROTECT') OPTION 'A' I PCL�N R I FADDNNEDTTD OG ❑ lE WATER 5T51EM5 5 9 vt 7POOpN❑T . 9 , V- PROPOSED T2' RA ECH �( HAM WATER LINE a' OR Sot (T WRITE LINE �OFFSITE ROAD IMPACT MAP Cam• %%SCALE 1" -200 r-- RAN E INTO DEL WEBS ; - [ACTIVE ADULT COMMUNITY \ HS S RVATH F 1EmNIER.TANRPIAMSIRFE201 ' Y ( • DIROIAIANORBICAROLNA97J07 @A _ - -, • P919APOAM F919.4001 Sf PA.B0E9A WAVOKTMNEW37341 . NEW FIRE IM&T 4 F4212fi6.49BO fTYP) o 1lf0RNllf ...... -- jF� - -�1 • www.horvalhonoclaMxcem k I i I ■ I ' NEW FIRE HYDRANT (TYP) IMPA TS INO Lu Q �J K ^' J 1 NEW FILE LL. y ' LLJ W PROPOSED 1Y wxwul ' Q b W V WATER LINE F ce NEW FIRE H yap MAR V" ce r o • ' i OFFSITE WATERLINE t, T a ' SEE INSET 2 k fW0 PIPE. AROUND 110111E DURVIAY AN 10 REMAIN CRY 01 ;,...; M TO TEE TING AND VALVES iS 7o EXISTING PROPOSED 1Y RILMH WATER LINE DEDICATED NZL ANISE BY CRY OF B¢ NEST a ,NB . I I �C% TEN Fl� f, Nr❑rewr �I RAIEpN // ,r 1 EXTENSION ' i! IMPACT MAP ■ 1� ■ S.O. ASSEMBLY Y&VE if ■ 1 �. J • �N_CgRp'�• l y D SCCAA 200 90� \ND LE: 1'= RJD P /N ` i' mcm 1. /° =° l ■ DRANK■r �m ' FS RH / TS ■ LTnrz DECEMBER 20, 2011 ■ wue AS NOTED DRAWING PROVIDED BY: • EwJLTerNa JARROD EDENS • 1121 EDENS LAND CORP • MgTN0. 123 GLENWOOD AVENUE • C539 RALEIGH, N.C. 27603 (919) 706-0550 • email: JARROD.EDENS'IEDENSLAND.COM ■ ■ 4MPACT MARS), DONNI wmlwT ODOR TMIIEN CONSENT S PROHIBITED a \ INSTALL 100 LF STRAW NEAREST TBM: RR SPIKE W/NET LINER AT AREAS POWER POLE WHERE DITCH IS DENUDED ::aci., NOTES: \1. CONTRACTOR TO VERIFY SIZE. DEPTH, MATERIAL AND LOCATION FOR ALL 100 -YR N= 793471.2303 il (SEE DETAIL SHEET D7) EX. 24" RALEIGH WATER LINE UNDERGROUND UTILITIES PRIOR TO THE START OF CONSTRUCTION. FLOODPLAIN xA- E =2057206.0249 - - - - - - - \C\ 24" 90• psao>o ELEV. =383.12' REMOVE PLUG AND CONNECT TO THE UNDERGROUND UTILITIES INDICATED N THE PLANS HAVE BEEN _HS MJ BEND EXISTING WONGE TOR TAKEN FROM INFORMATION MADE AVAILABLE FROM THE VARIOUS UTILITY T ` _ TO MAION) OWNERS AND UTILITIES LOCATED BY ELECTRONIC METHODS DURING DESIGN. \ % r- - ND C BLESCMAY (EXIST WHICH ARE NOT SHOAWNUONETHE PLANS. P LEASE 1$2+00 - ERGROU D TI B ASHOWN. } . +- -. -- - � - - - . CHECK DAM - TVP. - -. .. _ -- - - (SEE DETAIL SHEET D7) --- - -- - --- 20'x10 EXIT PIT --_- -- ! WL_ CONFLICTENTH THE WATER MAIN CONSTRUCTION THE OWNER WALL q TO REALIGN THE WATER MAIN AND - -_ ER WALL NOT CONSIDER MIA MICO OTO REQUEST FLOODWAY \ - °, -� - 5 - OROP INLETPROTEC110N- - TYA 35_ - _ FOR ADDS PENSAITI N DUE THE PRESENCE OF -- -- - -' -'{SEE DELA1l �FFEEY DT) . - CONFLICTING UTILITIES AND CABLES THAT ARE NOT SHOWN N THE PLANS. , _. - -- _ FLO 100 -YR� \ 3. UTILITIES DESIGNED AS (REC) WERE SHOWN ON VARIOUS RECORD DURING DESIGN. CONTRACTOR TO TEST BORE AND JACK 140 LF 36" OD US 70 WEST BOUND LANE \ DRAWINGS AND NOT FIELD LOCATED PIT THESE AREAS AS NECESSARY TO DETERMINE THE PRESENCE AND DEPTH \ STEEL ENCASEMENT PIPE MIN._ ( r OF THESE UTILITIES . NO ADDITIONAL COMPENSATION WILL BE MADE FOR ... _._ _ ___. 0.50" WALL THICKNESS) w/ 140 _ .. _.._ p.._ 3-.___ _ ___.� _ ._. _. _..__ ._ -THESE TEST PITS. LF 24" DI RJ CARRIER PIPE / ^EP REMOVE • (SEE DETAIL SHEET D6). r, 4. REFER TO SPECIFICATIONS FOR RESEEDING IN WETLAND AREAS. _ -I 24" DIP WATER MAIN -- " r - �- -'— - 24" BUTTERFLY VALVE IN MANHOLE _ -- A2 5. RALEIGH STANDARD DETAILS SHALL BE USED FROM THE CONNECTION TO (SEE DETAIL SHEET D5) 24'x24" TEE —G —G— - - ;_ ---- -__ - -- � � � � � THE EX. 24" WATER MAIN AT APPROX STA. 183 +60 UP TO AND INCLUDING PLACE 20 LF APRON OF CLASS I� Ep Ep in THE 24' VALVE BETWEEN THE TWO CONNECTIONS TO THE MASTER METER It P cs _ " - -- -- - -'- -- -- US 70 EAST BOUND LANE - - - -. - -24 "x24' TEE. RIP -RAP 24' DEEP FROM TOP OF �_- _ - - _ _.BANK TO TOP OF BANK _ _- _ _ _ _ SITE AS SHOWN ON SHEET C17 _ _ -- U 'EHGH r vARrA�LE1GH �. 4 EP I PLANS F. __ QQ, WL= ;x1lh3 .- W- 173100 "`aLf--- 1v�- 1W--- 1^I- =W 12 _ \ -__ _ _. -_ -_ - __ ZW;7EiLME .._.__ _ . —_ .. .__, _.. - -_ _- _ . -34 +.. �Ea>E -_ .. 1 @F6P ; \ - - _ _ _ -_ ___.. w THE EDGE E INIMUM WATER BE LO (TS) PAVEM ON T AT ALLOWS FOU FEET W - " �� " - - - -1�` �... -1 \ __ - _... ..- _.. /,. -.... _G�RdR: _.. .. _ -. 34 _34n .i•\ — IA___.. - NSW —WC— W— _ w— WL- W— W— w— W_w_W OF PAVEMENiAORATHE EXIST NGIGRADE WHICHEVT"RCICS OWER _ LL -,' w'_\' 174100 c - 175 +00. - - 7- t �� 177+00;;. 117_8+00 n -- —WL- 12 7. ALL WORK IN DURHAM COUNTY AND A PORTION OF WORK IN WAKE 4 _ ✓...,/ �j ...%�L� �.•� - '' n - - _ _3qg _ - - �` "" - ,y COUNTY SHALL BE OWNED AND OPERATED BY THE CITY OF DURHAM. A W LIJ - '� . �.lJY ,�, r ,, r -t. <_ 'C.�V. -�-T ��- '.- r \ " 7. TI OF WORK IN WAKE COUNTY SHALL BE OWNW ANO OPERATED BY PORTION THE CITY OF RALEIGH. ALL WORK WITHIN WAKE COUNTY SHALL BE U7 f \ _ _ _ __ _ _ - '� ��' T '\ - -- T FENCE TYP -- - PERFORMED IN ACCORDANCE WITH CITY OF RALEIGH DETAILS, REGARDLESS OF OWNERSHIP. SEE DETAIL SHEET C77 FOR THE LIMITS OF OWNERSHIP. SILT - ns RECaaPO R A WNT 58r - 1 -.155, - 'r•.�� \_ (.SEE DETAIL SHEET D7) 1I 1 1' ( ' '� � -� \ ( L \ 24" RESTRAINED JOINT DIP FROM �1 24' 90' MJ BEND 40'x20' ENTRY PIT raw%rcnnue.naD°n- ALL CONSTRUCTION TO BE IN GLEN AND GRUB AS I fl-.'F r \ REQUIRED THIN THE STA. 172 +50 70 STA. 183 +50 ) 45' MJ BEND °EUC CarxEr \� \ \ / /' } "" 24' 11.25' NJ SEND to' TEMPORARY �EUwo>aEp` °mss \ ACCORDANCE WITH ALL CITY OF RALEIGH STANDARDS AND NCTHI ROW \� fFF 24 11.25' MJ BEND CONSTRUCTION - r 24" 45" MJ BEND EASEMENT NS AND NCAOT, IF AND I _ ; \ �j (2) 24" 45' MJ BENDS \ l IIF r / \ MASTER METER SITE \ \ \ p I I \ APPLICABLE \ \ DFlRM MAPS: 3720076800) (SEE p'I l \ \\ F1S#; 37183CVDOIA BFE: 339.8 V //" 40' 0 40' 80' c°ucYWxxSffnn,nwuc n '.. -III ,,7' / /�/ Jf �1�, PLAN EWO OEgEY Q I )(r r• m(HS, wms 1 M ,tNi. itiP 1 J i 1' /� , /, "ry r SCALE: 1 " =40' (Horiz) I SCALE: 1 " =40' r,y 36 0 360 I I I .. ` - -___ EXI GRIXMO ' - -�� -- _. _._ f f{{ T 355 355 4 _ i , 350 35D EX. GAS LME _.._. i.... - - __ i _....,. _ _._ -_ _ i -__ .y._ _ •--_- _ - —I} E %.124' RAL CH LINE WATEIk T — — — EX ROAR PROFAE — — _ _ _ _ ___r r _ -- ._.. ... - -- - -.. A ___ — -._ ..I -. _ ....� _ #_. __ -_ _ _- 1_. -_._ _F___ - _ - - C SCALE: 1 =4 (VERT.) 4' N. 345 345 ' - CCE55 METER SITE DRIVE. _. _.. - _!_.._ 1 -.. _._� PLACE RIP .BNK 20 LF APRON RAP 24' DEEP TO TOP OF OF CLASS FROM TOP OF - BANK }.- .__ - -i - __._i. - -. _ - - -�'Tf ___ _.� {.._ EX f2•..!wA IrR LME . - x fY cas t _ 1. -_- _. - - _ -------- --- -12° MIN I -+- -- - _ - _-j__-_. 24 "DIP WATER MAIN 24" - ' - - -_t ...� - -- --`- .weN I -r -- 340 24' 90' MJ BEND 2' MI - -. - -- ...,_> --`' -- -1 - - -. .--- ' -- - -- - - --- -. 24 "DIP WATER MAIN 1 (2) 24" 45' MJ BENDS - - - -�. _._.. -- ---- _..___•._.. + -.- - -- ! 335 335 24" RESTRAINED JOINT DIP FROM _ .T -- _._ -1 - -- --- -' - -- ' -- - - - - -- ' - -- - -- -- - STA. 172 +50 TO STA. 183 +50 - -+ - 1 - -I- TOM TCH EX STING - i 24"x24" TEE T_ -_ - _- _- -__ -_. _L___ _. __ . -� - __ _ -_ -_ ,- - ___ - - __- _ _ - -__ _- ..... .. - r I i .. r 1 i I ( 330 330 I 24 "BUTTERFLY VALVE MANHOLE __I T- BORE AND ACK 140 LF( 36 - STEEL ENCASEMENT PIPE MIN. 182 +00 183 +00 UTILITY FACILITIES, INCLUDING SIDEWALKS EWA KS A D HANDICAP I - - - - -- 0.50" WALL THICKNESS) W/ 140 - - - -1 -- -- - RAMPS ARE TO BE CONSTRUCTED ON ALL STREETS T -- F -- - -- f -)- -- r-- `- 4'x24- TEE + _ J_ r LF 24" DI RJ CARRIER PIPE _ -_ __- - _ _ _- —•F __ _.__ - -. __- _ -- . ._ - J - - - SEE TAIL SHEET 08 - -_ 24 11.25' MJ BEND �. - -:�- - - -- --i - -- -� -- --} -- - CRY OF WRNM AS SPECIFIED BY CITY CODE. THESE FACIUTIES .. _ _ _. Pl.6l.IC WORKS DEi'ARIwBdi PROVED BY THE CITY OF RALEIGH - ___ ,___ pppgpy� AND SHALL BE 50 INSTALLED UNLESS A CHANGE _ _ -- }- -- - - -- - - "- "- -- _ -- - `' - _ -- I -• 325 24" 11.25' MJ BEND IS AUTHORIZED BY WRITTEN APPS TOLE PUBLIC 25 SANITARY SEWER EASEMENTS ARE E RECORDED DATE PRIOR .. _ _. T -___ _ - -. _F_ -_ _ _.__ ._ _ l _._f __�..- _ _ _ _._ _..__ -- - _. _._,._ -� - .- �. -_- _ -_ _ .. - - -- . TO FINAL ACCEPTING DATE SIGNATURE.E. A DATE CHIEF ENGINEER I T_ -3 -- -� - - -- T __ -- DAZE T I - —� - -- -- —1:- 24" 45' MJ BEND 24 45' MJ BEND -- - PROFILE -!- � I - DIR. OF PUBLIC UTILITIES 320 TRAFFIC ENGINEER 320 SCALE-.l"-401 (HORIZ) 172 +00 173 +00 174 +00 175 +00 176 +00 177 +00 178 +00 1 "- 4'(VERT) 179 +00 180 +00 181 +00 CONSERVATION ENGINEER v1► Ji'TITI► Af i'J,� \/ 1V�'1V1�/1C7 1730 Varsity Drive, SWI 500 CITY OF DURHAM Raleigh, North Carolina z7sos DEPARTMENT OF WATER MANAGEMENT DATE: NAY 2009 SCALE VV 71:5 CNAWN ANH HORIZONTAL: nw 715 RALEIGH INTERCONNECTION PROJECT "� PRDJ 3D>s -D002 liV us 7o CHECKED CAT - „ CHECKED DLIH VERTICAL Cj 7 24 DIP WATER MAIN PR°`' ND" eFa „� Phone: (919)233 -8D91, Fax: (919)233 -8031 IQN� Rn WT, NVdGI faIW1 NVp NNHW MALE YXM3 ttM.d15 0!/]3/Gn C -0342 Us 70 srATOS: B DESIRS N5 DAIS .m www ckimcreed.com STA. 172 +00 TO STA. 183 +50f *PutteGroup' NC Division of Water Quality Vendor Number 42NMS0950 Check Number Check Date 0071725599 12/29/11 Invoice Date Cc Lot Lot Address Opt Acet at C Acct Cat Description Amount DWD WETLAND 12/27/11 Nuffib* P6.7112$50 -heb� G(M I %',Hftn' 1, or P too , nf1.ld.Hh1s Parkway S�ite 0 0001 Preacquisition Land Costs 570.00+ TOTAL 570.00 Please return to: [Insert Permittee's mailing address] STATE OF NORTH CAROLINA COUNTY OF DURHAM THIS AGREEMENT ( "Agreement ") is made among STORMWATER FACILITY AGREEMENT AND COVENANTS (Residential Version) ( "Permittee "), ( "Association "), and the City of Durham, a North Carolina municipal corporation ("City") and is effective on the date of its recordation in the Durham County Register of Deeds. 1. Background and Definitions a. Scope; Purpose. Permittee owns and is developing real property (the "Property ") that, upon completion of development, will contain one or more constructed stormwater improvements (the "Facility /ies ") to control stormwater runoff and pollution from the Property. After construction, Permittee will transfer portions of the Property, including the Facility /ies, to the Association, which will be responsible for perpetual maintenance, annual inspection, repair, reporting to the City, and reconstruction of the Facility /ies. This Agreement sets forth Permittee's obligations to construct the Facility /ies in accordance with the obligations of this Agreement and other City Requirements, inspect and certify the Facility /ies, pay certain monies toward the replacement of the Facility /ies, and establish the Association and its obligations, through legally binding covenants. This Agreement also sets forth the responsibilities of the Association with regard to the Facility /ies. This Agreement is appurtenant to and runs with the Property, described in Section 1(b) below. The purpose of this Agreement is to ensure construction of the Facility /ies per City Requirements, to ensure the perpetual inspection, maintenance, repair, and reconstruction of the Facility /ies by Lot Owners within the Property, and to allow the City in its discretion to enforce these requirements, if necessary, for the benefit of the Lot Owners collectively, and the public at large. b. Propert y to which this Agreement Attaches. The Property is that property shown on the plat entitled and recorded at Plat Book Page Lots (instructions to staff— after the word "lots" indicate either "all" or identify by number the specific Lots subject to this Agreement.), Durham County Register of Deeds. It is generally located and of the intersection of and and is commonly known as It is part or all of the property acquired by Permittee in deeds recorded in Deed Book , Page , Durham County Register of Deeds. The Facility /ies that must be constructed, certified, maintained, inspected annually, repaired, and reconstructed pursuant to this Agreement are located on the following lots on the above described plat and are of the following approximate size and type (SW staff describe below each Facility by its general type such as "wet detention facility" or "wetlands ", the projected approximate size for each, and identify the lot on the above - described plat where each Facility will be -1- located): ii. in. C. Back_ rg ound. This Agreement is intended to comply with City ordinances and policies that implement State and Federal laws that require that development contain stormwater facilities to control runoff and pollution and that such facilities be perpetually maintained and reconstructed. d. Relationship to Ordinances, Policies, and Guidelines. This Agreement supplements other City Requirements. If this Agreement and such City Requirements conflict, the stricter requirements shall control. e. Definitions. The terms in this Agreement have the following definitions: "Association" and "HOA" (the terms being used interchangeably) means the association that has executed this Agreement that was formed by Permiee in compliance with statutory requirements (which may include the North Carolina Nonprofit Corporation Act, NCGS Chapter 55A, and the North Carolina Planned Community Act, NCGS Chapter 47F and successor statutes) for the purpose of owning and maintaining real property and improvements thereon intended for the common benefit of - Lot Owners within the Property -. In the absence of the Association, for whatever reason, the Lot Owners, collectively, shall be considered the Association and shall be responsible for the Association's obligations under this Agreement. The "Association" may also include additional associations or lot owners not shown on the Property where such associations or owners have joined, or have purchased subject to, the obligations of the Association in this Agreement. "City Manager" means the Durham City Manager or a Deputy City Manager to whom authority to execute contracts has been delegated. "City Fund" means "Stormwater Facility Replacement Fund" as defined below. "City Requirements" means the legal obligations and standards set forth in City ordinances, and written City and Public Works policies, guidelines, manuals, protocols, standards, and /or handbooks, as such may be amended from time to time. "Director" means the City's Director of Public Works or the Director of a successor department to the Department of Public Works and any Person to whom the Director's duties have been delegated pursuant to City Requirements. "Facility /ies" means one or more stormwater control device(s) and /or areas that are created for the purpose of detaining and /or treating stormwater. Such facilities may include but are not limited to dry detention areas, wet detention ponds, wetlands, level spreaders and all associated constructed and natural features that allow such devices or areas to function as intended. "Lot" means a lot within the Property, whether developed or undeveloped. "Lot Owner" means the legal owner of any fee simple interest in a Lot. "Permiee" means the party that owns the Property at the time of recordation and that executes this Agreement and successors in interest who take all or a portion of the Property. The term does not include any Person that has only a beneficial interest in the Property. The term also does not include a Person who owns one Lot zoned for single family use where such owner does not own other lots. "Person" includes but is not limited to natural persons, business trusts, joint ventures, governments, governmental subdivisions, governmental agencies, firms, corporations, limited liability companies, associations, partnerships, and other legal entities. "Property" is the land described in Section I(b) above which is owned by the Pennittee and which will be served by the Facility /ies described herein. "Site" means a Lot or parcel within the Property which contains at least one Facility. Where there are multiple Facilities, there shall be multiple Sites. "Stormwater Facility Replacement Fund" (also "City Fund ") is the fund established by the City under ordinance to receive payments from various permittees for future use in the construction, repair, and reconstruction of facilities for which payment into the fund has been made, or for replacement facilities that mitigate the burden on or need for such -2- original facilities. "Transfer" includes sell, convey, assign or alienate all or a portion of an interest in property. 2. Permittee's Obligations to Create HOA; Record Documents and Covenants; Provide Certification; and Make Fund Payment Prior to Transferring Interest in, or Selling any Lots. a. Incorporation of Association; Recording Documents and Covenants. Permittee shall incorporate an Association consisting of all Lot Owners in the Property which Association shall be charged with maintaining and repairing common areas within the Property, of which the Facility /ies shall be a part. Permittee shall create covenants for the Association which comply with this Agreement and which include Exhibit A to this Agreement, the Mandatory Covenant Requirements Regarding Stormwater Facilities. At the same time as the final plat for the Property is filed in the Office of the Register of Deeds for Durham County, and before Transfers of any interest in or Lots within the Property, Permittee shall take the following actions and complete the following additional filings in the Register of Deeds for Durham County, in the order indicated below: i. Finalize this Agreement by inserting the appropriate plat book and page references for the just- recorded plat for the Property in Section 1(b) above and adding any other missing entries or information; ii. Record this Agreement, properly executed by all Parties so as to bind the Permittee, the Association, and the Property; iii. Finalize the covenants for the Property by inserting the plat book and page numbers for the Property, the deed book and page numbers for this Agreement, and necessary language to incorporate Exhibit A of this Agreement into the Covenants; iv. Record the properly executed Covenants for the Property. b. Delivery of Recorded Documents and Attorney Certification. Within 5 working days of completing the steps described in 2(a) above, and prior to Transferring any interest in the Property, including but not limited to the sale of any Lot, and prior to applying for and receiving any building permits for any Lot, Permittee shall deliver to the City's Stormwater Services Division an attorney's certification, as described below, and copies of the properly executed and recorded documents described in (a) above — i.e., the recorded plat, the recorded Agreement, and the recorded covenants for the Property. The attorney certification shall be from an attorney licensed to practice law in the State of North Carolina, in form and substance acceptable to the City that certifies to the following: i. That the Association was properly formed and incorporated in North Carolina in accordance with law; ii. That this Agreement and the Covenants for the Property have been executed by all legally necessary parties, in a legally binding manner, and are binding on the parties and the Property; iii. That the Agreement contains necessary references to the recorded plat for the Property, and that the Covenants for the Property contain necessary references to the recorded plat and the recorded Agreement, and incorporate Exhibit A of this Agreement; iv. That recordation of instruments described above occurred in the following order — plat, then Agreement, then Covenants; V. that the Covenants for the Property require membership for each Lot within the Property (except commonly owned Lots which may be excepted) and a rational allocation of the cost of maintenance, repair, and reconstruction of the Facility /ies amongst all such member Lots exists; vi. that the mandatory dues amounts for the two stormwater funds have been included in the Covenants; vii. that the Covenants provide a process for assessing the Lot Owners for delinquent payments and for additional payments for stormwater costs and enforcing such assessments and that the City is named as a third party with the right to enforce such assessments in lieu of the Association if necessary. C. Payment to Stormwater Facility Replacement Fund. At the time of delivery of the recorded documents and certification, Permittee shall pay the estimated Stormwater Facility Replacement Fund payment, prescribed by City Requirements, which shall equal 25 %o of the estimated cost of constructing the Facility /ies, calculated in accordance with City Requirements. This payment is not intended as a substitute for security that ensures the construction of the Facility /ies, which security may be required at such point in the development process as is specified in City -3- Requirements. Per City Requirements, Permittee may be required to supplement the payment into the Fund Payment upon completion of the Facility /ies, or may be refunded a portion of such payment. d. Payment of Permit Fee(s). At the time of delivery of the recorded documents and certification, Permittee shall pay the Stormwater Permit Fee for each of the Facility /ies, as prescribed by City Requirements. 3. Permittee's Obligations with Regard to Construction of Facility /ies; Denial of Permits in the Event of Noncompliance. a. Construction, Inspection, Certification, and Submission of As -Built Construction Drawings. Permittee shall complete the actions described below for the Facility /ies on such timetable as is specified in City Requirements. i. Construct the Facility /ies in accordance with the construction plans approved by the Department of Public Works and take various steps toward final completion, and finally complete the Facility /ies, in accordance with such timetables and/or deadlines specified in City Requirements; ii. Provide any additional security required by the Director to ensure construction of the Facility /ies if the deadlines described in (i) above have not been met, or in the event that Permittee becomes insolvent or otherwise unable to proceed with construction on the Property; iii. Cause the Facility /ies to be finally inspected and certified by the engineer who designed the Facility or by such other registered NC Professional Engineer acceptable to the City, in accordance with the City's BMP Certifying Engineer Program and other City Requirements; iv. Submit to the Department of Public Works reproducible as -built drawings and as -built calculations acceptable to the Department; V. Complete an operation and maintenance manual for each Facility in accordance with City Requirements; vi. Submit records to the City Stormwater Services Division in accordance with City Requirements documenting construction costs for the Facility, including but not limited to all costs of construction administration; vii. Complete any repairs to the Facility /ies that may be directed in the discretion of the Director; In the event Permittee does not satisfactorily complete the foregoing obligations on such timetable as may be specified by the City, the City may withhold any permits and approvals related to development of the Property or any Lot and may pursue any other remedy available under this Agreement or applicable law. b. Transfer of Site and Facility to Association. After satisfactory completion of the steps described in subsection (a) above, Permittee shall Transfer the Site(s) to the Association(s) which shall, thereafter, become responsible for inspection, maintenance, and reconstruction of the Facility /ies as set forth in Section 4 below. Permittee's transfer of the Site prior to completion of the steps described in (a) above shall not relieve Permittee of its obligations under this Agreement. C. Discharge of Permittee's Obligations; Recordation of Release. Following satisfactory performance of its obligations under this Agreement, Permittee may request a release from the Director in writing. Within 30 calendar days of receipt of such request and receipt of all accompanying documentation and certifications required by the City, upon determination that Permittee has satisfied its obligations, the Director shall issue a release confirming that Permittee has fulfilled its obligations under this Agreement and is discharged from such obligations. Permittee shall record such release at the Durham County Register of Deeds. In its discretion, the City may record any documents indicating that construction of the Facility /ies has been completed and /or that Permittee is released from the obligations of this Agreement. d. Notice to Lot Owners and Successors in Interest to Permittee. Recordation of this Agreement gives notice to all Lot Owners that building permits may be withheld for Lot(s) in which they have an interest in the event of Permittee noncompliance with Section (2) above or this Section (3). In addition, it gives notice to all Persons who may M be considered " Permittee" under the definitions herein that approvals and permits related to development of the Property may be withheld in the event of Permittee noncompliance with this Agreement. 4. Association /Lot Owner Responsibility for Completed Facility /ies a. Association's /Lot Owners' Continuing Permanent Responsibility for Facility /�. Upon release of Permittee as described in Section 3(c) above, or if no release occurs, then upon official notification to the Association from the City, the Association, or in the event there is no legally effective Association, the Lot Owners collectively shall be responsible for inspection, maintenance, repair, reconstruction, and funding for the completed Facility /ies, and shall comply with all City Requirements. The Association shall be responsible for performing these obligations whether or not the Site and/or the Facility /ies have been legally transferred to the Association. The obligations of the Association, or the Lot Owners in the absence of an Association, are further described below. b. Filing of Responsible Officer for Association with City. The Association file with the City's Department of Public Works, and update such filing yearly, the name and contact information of a responsible officer or agent for the Association who is familiar with the maintenance and upkeep of the Facility. The filing shall also be updated when there is a change in the responsible officer or agent. C. Maintenance. The Facility /ies shall be maintained in compliance with City Requirements as they may change from time to time. At the time of recordation of this Agreement these are generally found in the City of Durham's "Owner's Maintenance Guide for Stormwater BMPs Constructed in the City of Durham" and in the operation and maintenance manual prepared specifically for the Facility /ies at the time of completion of construction. (As of October 1, 2007, the current version of the "Owner's Maintenance Guide for Stormwater BMWs Constructed in the City of Durham" can be viewed at or downloaded from the City's website at: http: / /www.durhamnc. _og v /departments/ works /pdf /draft_ owners_maintug ide.pdf) d. Inspections /Reports to City. In accordance with City Requirements, the Association shall cause the Facility /ies to be inspected (i) annually; (ii) after events that cause visual damage to the Facility; and (iii) upon notification by the Director. The inspection shall be performed by a registered North Carolina Professional Engineer or a North Carolina Registered Landscape Architect certified by the City and shall be in compliance with City Requirements. The inspection shall occur annually during the month in which acceptance of the as -built certification for the Facility /ies occurred, or at such other time as may be reasonably directed by the City. The inspection shall be reported to the City as further described below. e. Repair and Reconstruction. The Association shall repair and/or reconstruct the Facility /ies as it determines is necessary, and, additionally, as may be directed by the City, to allow the Facility /ies to function for its /their intended purpose, and to its design capacity. The Association shall provide written reports regarding major repair or reconstruction to the City in accordance with City Requirements. f. Budget Line Items for Stormwater Expenses. The dues of the Association shall include amounts for upkeep and reconstruction of the Facilities and charges for these purposes shall be included in the dues charged to Lots from the point that Lots are charged dues for other common purposes. The Association shall maintain two (2) separate funds in its budget for the Facility /ies. The first ( "Inspection and Maintenance Fund ") shall be for routine, yearly Facility expenditures -- annual inspections, maintenance, and routine repairs — and the funds for this purpose may be maintained as part of the Association's general account. The second ( "Major Reconstruction Fund ") shall be dedicated to a separate, increasing reserve fund that will build over time and provide money for maj or repairs to and eventual reconstruction of the Facility /ies. The Major Reconstruction Fund shall be maintained in an account that is separate from the HOA's general account as described below. At a minimum, the Association shall earmark annually from its collected dues for the Inspection and Maintenance Fund and annually for the Major Reconstruction Fund. These minimum amounts shall be increased annually by 3% per year over the prior year's amount. The Association may set a higher amount in its discretion. The Association shall set a higher amount if the Director determines, in -5- his/her reasonable discretion that additional amounts are necessary to provide for adequate inspections and maintenance or for an adequate reserve fund. The Association shall set dues at a sufficient amount to fund each of the two line items in addition to the Association's other obligations. The Association may compel payment of dues through all remedies provided in the Covenants for the Property or otherwise available under law. g. Assessments /Liens. In addition to payment of dues, each Lot shall be subject to assessments by the Association for the purpose of fulfilling the Association's obligations under this Agreement. Such assessments shall be collected in the manner set forth in the covenants. As allowed under NCGS §47F, or successor statutes, or, for condominiums, as allowed under NCGS 47C, or successor statutes, all assessment remaining unpaid for 30 days or longer shall constitute a lien on the Lot. Such lien and costs of collection may be filed and foreclosed on by the Association. In addition, the Association's rights may, in the discretion of the City, be exercised by the City, as a third party beneficiary of this Agreement and /or as Attorney in Fact for the Association, as provided in Section 7 of this Agreement, without limitation as to other rights the City may have under this Agreement and under law. h. Stormwater Expenditures Receive Highest Priority. Notwithstanding any contrary provisions of the Association's recorded covenants, to the extent not prohibited by law, the inspection, maintenance, repair, and replacement /reconstruction of the Facility /ies shall receive the highest priority (excluding taxes and assessments and other statutorily required expenditures) of all Association expenditures. i. Separate Account for Major Reconstruction Fund; Requirements for Withdrawal. The Association shall maintain the maj or reconstruction fund for the Facility /ies in an account maintained at a bank or other similar institution and such account shall be separate from the Association's general account. The Association shall use the Major Reconstruction Fund only for major repairs and reconstruction of the Facility /ies. The Association's bylaws shall require that signatures of two Association officers are required for withdrawal of funds from the Major Reconstruction Fund. j . Engineer Report prior to Major Repairs and Reconstruction. Prior to withdrawing funds from this account, the Association shall (i) obtain a written report from an engineer approved in accordance with City Requirements regarding repairs or reconstruction needed and approximate cost of such repair or reconstruction; and (ii) submit such report to the Director and notify the Director of the major repairs or reconstruction to be undertaken on the Facility, the proposed date, and the amount to be withdrawn from the Major Reconstruction Fund. In the event of an emergency withdrawal and expenditure of funds from the Major Reconstruction Fund may be made after telephone notification to the Stormwater Services Division of the Department. k. Annual Reports to City_ The Association shall provide to the Director annual reports in substance and form as set forth in City Requirements. This annual report shall be signed by an officer of the Association, who shall attest as to the accuracy of the financial information in such report. If prepared by a professional management company hired to manage the Association's affairs, the report shall so indicate. The Officer's signature and attestation shall be notarized. At a minimum each report shall include: i. the annual Facility /ies inspection report described in Section 4(d) above; ii. a bank or account statement showing the existence of and balance in the separate Major Reconstruction Fund at the time of submission of the report; iii. other information regarding the Facility /ies as may be required under City Requirements; iv. the amount of Association dues being set aside for the current year for each of the two purposes — the Inspection and Maintenance Fund, and the Major Reconstruction Fund. 1. Facility /ies to Remain with Association; Lot Owners' Liability_ To the extent not prohibited by law, the Facility /ies shall remain the property of the Association and may not be conveyed by the Association. In the event the Association ceases to exist or is unable to perform its obligations under this Agreement, all Lot Owners with the exception of those Lots owned by the Association shall be jointly and severally liable to the City to fulfill the Association's obligations under this Agreement. Such Lot Owners shall have the right of contribution from other W owners with each Lot's proportional obligation calculated as set forth in the Covenants for the Association. In addition, the City may exercise the remedies described in Section 7 of the recorded Agreement. This Agreement and all other remedies provided by law. m. No Public Adoption. The City's exercise of rights under this Agreement or under City Requirements does not constitute adoption of the Facility /ies by the City. City regulation is not intended to impede or prohibit the Association or Lot Owners from taking all necessary actions to maintain, repair, and reconstruct the Facility /ies so that they function safely and perform the function for which they were created. 5. Stormwater Facility Replacement Payment and Fund. The Permittee's payment to the Stormwater Facility Replacement Fund ( "City Fund ") shall be calculated, retained, used, and disbursed as provided by ordinance and other City Requirements. The Fund shall be used for the purchase, design, construction, reconstruction, and repair of stormwater facilities that have paid into the Fund or for stormwater facilities that replace or mitigate the need for those facilities for which monies have been paid into the Fund. 6. City Easement /Right of Entry /No City Responsibility Permittee, the Association, and the Lot Owners hereby grant the City a permanent nonexclusive easement over the Site and Facility /ies for inspection, construction, repair, and other work on the Facility. The terms and conditions regarding the use of such easement may be expanded but not limited by recorded declarations regarding the use of such easements. Permittee, the Association, and the Lot Owners also grant the City a permanent nonrevocable nonexclusive right of ingress, egress, and regress over and across all public or private easements on the Property, including but not limited to private roads, for inspection, construction, repair, and other work on the Facility /ies. Permittee and Lot Owners grant the City a permanent nonrevocable nonexclusive right of ingress, egress, and regress over individual Lots solely for response to emergencies, public nuisances, or the imminent threat thereof. In this Section, "the City" includes employees, agents, and contractors of the City. The grant of these rights does not obligate the City to exercise them or to take any other action. 7. Remedies for Violations; Lien on Property; Future Obligations Secured. a. City Performance of Work. If the Permittee and /or Association fail to perform their obligations under this Agreement, the City may send notice to the party (ies) in default demanding performance. If the defaulting party does not cure such default within sixty (60) days from the date notice is mailed, the City may, in the reasonable discretion of the Director, enter the Property and the Site and perform some or all of the defaulting party's obligations under this Agreement. In an emergency the City may perform such work prior to the expiration of the 60 day period. Nothing in this Agreement shall be interpreted to require the City to undertake a party's obligations under this Agreement. b. Repayment of City. The defaulting party shall reimburse the City for its costs in inspecting, constructing, repairing, and reconstructing the Facility /ies. Such costs may include the cost of administration and overhead. The City shall send written notice to the party in default requesting reimbursement for the costs of the work. The defaulting party shall pay all such costs within sixty days of the date he notice is mailed. Any costs not paid to the City within the sixty day period shall be delinquent, and the defaulting party shall be subject to all legal remedies available to the City under law or equity. C. Debt Owed in the Event of Nonpayment; Lien. In the event that the defaulting party does not reimburse the City as required in subsection (b) above, the party shall owe the following additional amounts: interest on such costs at the rate of eight percent (8 %) per annum, collection costs, late payment charges of three hundred dollars ($300) for the first ninety (90) days of default and five hundred dollars ($500) additional charge for each ninety (90) day period thereafter, and reasonable attorneys' fees. The debt may be collected by the City using any remedy authorized by law or -7- in this Agreement. In addition, the debt or a proportional amount thereof calculated using a methodology reflecting number of lots, value of Property, types of uses, or a combination of these factors, as determined in the City's sole discretion, shall be a lien against the Property and the Lots and may be collected as unpaid taxes in accordance with N.C.G.S. 160A -193 or other statutory provisions, with notice as may be required by law. The City may add the debt to any utility bills owed and utilize any remedy provided by law or ordinance for unpaid utility bills. The City may also foreclose on the liens. d. Right to Act for the Association. In addition to all of the remedies set forth herein, if the defaulting party is the Association and payment has become delinquent as described in paragraph (b) the City may, with additional 30 days' written notice to the Association, pursue the right of the Association to repay the amount due, as calculated in accordance with the Articles of Incorporation, Covenants, and Bylaws of the Association. The Association hereby designates, constitutes and appoints the City as the Association's Attorney in Fact for the express and limited purpose of assessing and pursuing collection of such amounts under the conditions and limitations as set forth herein. This appointment is coupled with an interest and is irrevocable as long as this Agreement is in effect. e. Withholding of Permits. In the event the defaulting party is the Permittee, the City may withhold any or all permits or other approvals necessary to complete development of the Property or any Lot until such time as Permittee fulfills such obligations. 8. Release of Lien by Certificate. a. Duty to Furnish a Certificate. On the request of any of the Persons described in subsection (a) (i) below, and upon the condition prescribed by subsection (a) (ii) below, the Director shall furnish a written certificate stating the amount of any monetary liabilities owed pursuant to this Agreement by a party to this Agreement or a Lot Owner. i. Who May Make Request -- Any of the following Persons shall be entitled to request the certificate: A. An owner of the Property; B. An occupant of the Property; C. A Person having a lien on the Property; D. A Person having a legal interest in the Property, including but not limited to a Lot Owner; E. A Person having a contract to purchase or lease the Property or Lot or a Person that has contracted to make a loan secured by the Property or Lot; F. The authorized agent or attorney of any Person described in subdivisions (a) (i) (A) through (E) above. ii. Duty ofPerson Making Request -- The City's duty to furnish a certificate is contingent upon the requester providing the following, as may be specified by the Director: the name of the party regarding whom the certificate is requested; the property regarding which the certificate is requested (the Property as a whole, some portion of the Property, or a Lot); recordation information for the pertinent Agreement; recordation information for pertinent covenants, if the request concerns an Association or Lot; a copy of the first page of this Agreement; a copy of the first page of the Association's Covenants; and payment of the required fee for a certificate. b. Reliance on the Certificate. When a certificate has been issued as provided in subsection(a) above, all monetary liabilities owed pursuant to this Agreement that have accrued against the Site or the Property or the Lot identified in the request for the period covered by the certificate shall cease to be a lien against the identified property for which the certificate has been issued, except to the extent of monetary liabilities stated to be due in the certificate, as to all Persons obtaining such a certificate and their successors in interest who rely on the certificate by doing one or more of the following: i. Paying the amount of monetary liabilities stated therein to be owed; 11 . Purchasing or leasing a portion of the Property; or In iii. Lending money secured by all or part of the Property C. Oral Representations not Effective. Without limiting the effect of this Section, no oral statement made by any City employee as to the amount of monetary liabilities that are owed by the Permittee or a Lot Owner, or are a lien on all or a portion of the Property pursuant to this Agreement, shall be legally effective, or shall bind the City. 9. Warranty. Permittee covenants with the City that Permittee is seized of the Property in fee simple, has the right to convey the same in fee simple, that title is free and clear of all encumbrances, except for those identified in the Opinion of Title furnished to the City as a requirement prior to the City's execution of the Agreement, and that Permittee will warrant and defend the title against the lawful claims of all persons except for the exceptions stated in such opinion of title. 10. Notice. When a notice is required or permitted by this Agreement, it shall be given in writing to the City delivered to the Director of Public Works, 101 City Hall Plaza, Durham, NC 27701, FAX: (919) 560 -4316 or upon the Permittee, at (insert name and address ofPermittee) . Written notice shall be sent by first class mail, and in addition by facsimile, if a fax address can be determined. Parties' addresses may be changed by sending a notice of the new address attached to a copy of the first page and execution pages of this Agreement. 11. No Waiver of Breach. If the City fails to enforce or waives any breach of any obligation or covenant in this Agreement, that failure to enforce or waiver shall not constitute a waiver of any other or future breach of the same or any other obligation or covenant. The City's failure to exercise any right under this Agreement shall not constitute a waiver of that right. 12. Agreement Binding. This Agreement and Covenants shall bind the Association in perpetuity and shall bind Permittee and its successors in interest until the City releases such Permittee as described in Section 3 above. A Lot Owner's obligations and liabilities under this Agreement shall cease upon conveyance of his/her Lot. 13. Amendment of Agreement. Amendments to this Agreement shall be valid only if made in writing and signed by the parties, provided that the Permittee's signature shall not be required if the Permittee has ceased to exist or has been released by the City as provided in Section 3 above. The City Manager may, on behalf of the City, amend this agreement without approval by the City Council. 14. Covenants Herein to Run with the Property. The obligations of this Agreement are a perpetual servitude and appurtenant to and running with the Property, -- the Site, and the Lots. 15. Successors and Assigns. The designation of Permittee, Association and the City shall also include their heirs, assigns, and successors in interest. 16. Liability : Indemnification. a. The approval by the City or any employee of the City of any plans or of any work referred to in this Agreement shall not create any liability in the City or its officers, officials, or employees for the plans or the work. Nothing herein is intended to release any other Person for any liability for those plans or work. b. The performance by the City or any employee of the City of any work allowed under this Agreement shall not create any liability in the City or its officers, officials, or employees for the work. Nothing herein is intended to release any other Person for any liability for that work. C. The Permittee, prior to release from the City, and the Association, after the Facility /ies are constructed shall indemnify the City and its officers and employees for any costs to the City or such Persons resulting from any claims regarding the construction, operation, maintenance, repair, and/or reconstruction of the Facility /ies, or the failure to perform the same. Costs shall include but are not limited to the expense of counsel chosen by and acceptable to the City. 17. Remedies not Exclusive. The provision of specific remedies in this Agreement is not limiting and the City shall have all remedies available in law and in equity to enforce the provisions of this Agreement against the Permittee, the Association, and/or the Lot Owners, and their respective heirs, personal representatives, successors, and assigns. 18. No Third Party Rights. Except as may be explicitly provided in this Agreement, this Agreement is not intended to be for the benefit of any Person other than the parties hereto, the Lot Owners, and their heirs, personal representatives, successors, and assigns. 19. Governmental Functions; Superseding Regulations. Nothing contained in this Agreement shall be deemed or construed to in any way estop, limit, or impair the City from exercising or performing any regulatory, policing, legislative, governmental, or other powers or functions. In addition, this Agreement does not restrict or prevent te h application of ordinances or other enactments which may supplement or supersede the provisions of this Agreement. 20. Choice of Law and Forum. This Agreement shall be deemed made in Durham County, North Carolina and shall be governed by and construed in accordance with the law of North Carolina. The exclusive forum and venue for all actions arising out of this Agreement shall be the North Carolina General Court of Justice, in Durham County. Such actions shall neither be commenced in nor removed to federal court. This section shall not apply to subsequent actions to enforce a judgment entered in actions heard pursuant to this section. 21. Interpretation of this Agreement. Unless the context requires otherwise, the singular includes the plural, the plural includes the singular, and the neuter includes the masculine and feminine. The captions and titles are for convenience only, and are not to be used to interpret the Agreement. The words "include" and "including" mean, respectively, "include but not limited to ", and "including but not limited to ". 22. Severability. Invalidation of any term or provision in this Agreement by a court of competent jurisdiction shall not invalidate the remaining terms and provisions of this Agreement which may be enforced, at the election of the City, as set forth herein. -10- IN WITNESS WHEREOF, the parties hereto have respectively set their hands and seals, or if corporate, have executed this under seal by their proper officers, to be effective as of the date of its recordation in the Durham County Register of Deeds. ATTEST: Signed: Printed Name: Title: Secretary [Affix Corporate Seal] STATE OF (Name of Permittee) Signed: Printed Name: Title: President COUNTY OF I, , a notary public for said county and state, certify that personally appeared before me this day, and acknowledged he or she is Secretary of (Name of Permittee), a corporation, and that by authority duly given and as the act of the corporation, the foregoing contract with the City of Durham was signed in its name by its President, whose name is and attested by him/herself as its said Secretary or Assistant Secretary. This the day of 120 My commission expires: Notary Public -11- ATTEST: Signed: Printed Name: Title: Secretary [Affix Corporate Seal] STATE OF Name of Association Signed: Printed Name: Title: President COUNTY OF I, , a notary public for said county and state, certify that personally appeared before me this day, and acknowledged he or she is Secretary of (Name of Association), a corporation, and that by authority duly given and as the act of the corporation, the foregoing contract with the City of Durham was signed in its name by its President, whose name is and attested by him/herself as its said Secretary or Assistant Secretary. This the day of , 20 My commission expires: Notary Public -12- CITY OF DURHAM ATTEST: ME City Clerk Type or print name person signing for the City: City Manager ACKNOWLEDGMENT BY CITY OF DURHAM Name of other party to the contract: Title of the contract: I, (1) a notary public, certify: (Type or print name of Notary Public) (Type or print name of City Clerk or Deputy City Clerk who attested) personally appeared before me in Durham County, N. C. on this day; (2) I have personal knowledge of her identity; and (3) she acknowledged that by authority duly given and as the act of the City of Durham, the foregoing document was signed in its corporate name by its City Manager, sealed with its corporate seal, and attested by its said City Clerk or Deputy City Clerk. This the day of 120 My commission expires: Notary Public -13- EXHIBIT A TO STORMWATER FACILITY AGREEMENT AND COVENANTS MANDATORY PROVISIONS FOR DECLARATION OF RESTRICTIVE COVENANTS ARTICLE (fill in) Obligations Regarding Stormwater Facilities The Property includes one or more stormwater management facilities (hereafter "Facility /ies ") that is /are the perpetual responsibility of the Association. Such Facilities are the subject of a Stormwater Facility Agreement and Covenants ( "Stormwater Agreement ") between Declarant, the Association, and the City of Durham ( "the City ") that is binding on the Association. The Stormwater Agreement is recorded at DB Page , Durham County Register of Deeds. The Property subject to that Stormwater Agreement is the "Property" referred to in this Article. The Stormwater Facilities must be maintained in accordance with City Requirements, which include all ordinances, policies, standards, and maintenance protocols and in accordance with the recorded Stormwater Agreement. In particular the City's current "Owner's Maintenance Guide for Stormwater BMPs Constructed in the City of Durham" (available at the time of recording this document at hlp: / /www.durhamnc.gov /departments /works /pdf /draft_ owners_maint guide.pdf and the operation and maintenance manual prepared specifically for the Facility /ies contain requirements that apply to the Association's Facilities. Nothing in the remaining Article of these Restrictive Covenants filed by Declarant as part of this Declaration or any subsequent modifications of this Declaration may reduce the Association's or Lot Owners' obligations with regard to the Facility /ies. Such additional covenants may increase the obligations or provide for additional enforcement options. The Stormwater Facility /ies and their location are as follows: (Insert below the description of Facilities and Plat Book citation and Lot identification from Section I (bb) of the Stormwater Agreement) In addition to the above obligations, the Association's obligations with regard to the Facilities are: 1. Inspections /Routine Maintenance. In accordance with City Requirements, the Association shall cause the Facility /ies to be inspected i) annually; and, ii) after major storm events cause visual damage to the Facility; and iii) upon notification from the City to inspect. The inspection shall be performed by a registered North Carolina Professional Engineer or a North Carolina Registered Landscape Architect certified by the City who shall document those things mandated under City Requirements. The inspection shall occur annually during the month in which the Facility /ies as -built certification was accepted by the City, which month may be determined through contact with the City of Durham Department of Public Works, Stormwater Division. The inspection shall be reported to the City as further described below. 2. Repair and Reconstruction. The Association shall repair and/or reconstruct the Facility /ies as it determines is necessary, and, at a minimum, as set forth in City Requirements or as directed by the City to allow the Facility /ies to function for its intended purpose, and to its design capacity. The Association shall provide written reports regarding major repair or reconstruction to the City in accordance with City Requirements. 3. Stormwater Budget Line Items & Funding. The dues of the Association shall include amounts for upkeep and reconstruction of the Facilities which shall be included in dues charged to Lots or members from the point that Lots or members are charged dues for other common purposes. The Association shall maintain two (2) separate funds in its budget for the Facility /ies. The first, the "Inspection and Maintenance Fund," shall be for routine inspection -14- and maintenance expenditures and shall be used for annual inspections, maintenance, and minor repairs. The funds for this purpose may be maintained as part of the Association's general account. The second fund, the "Major Reconstruction Fund," shall be a separate, increasing reserve fund that will build over time and provide money for major repairs to and eventual reconstruction of the Facility /ies. The Major Reconstruction Fund shall be maintained in an account that is separate account from the Association's general account as described below. At a minimum, the Association shall, annually, earmark from its collected dues for the Inspection and Maintenance Fund and for the Major Reconstruction Fund. These minimum amounts shall be increased annually by 3% per year over the prior year's amount. The Association may set a higher amount in its discretion, or if directed by Durham Director of Public Works after an examination of the Facility /ies. The Association shall set dues at a sufficient amount to fund each of the two line items in addition to the Association's other obligations. The Association may compel payment of dues through all remedies provided in these Covenants or otherwise available under law. 4. Assessments /Liens. In addition to payment of dues, each Lot shall be subject to assessments by the Association for the purpose of fulfilling the Association's obligations under this Article and under the Stormwater Agreement. Such assessments shall be collected in the manner set forth in these Covenants. As allowed under NCGS §47F, or successor statutes, or, for condominiums, as allowed under NCGS 47C, or successor statutes, all assessment remaining unpaid for 30 days or longer shall constitute a lien on the Lot. Such lien and costs of collection may be filed and foreclosed on by the Association. In addition, the Association's rights may, in the discretion of the City, be exercised by the City, as a third party beneficiary of the recorded Stormwater Agreement and /or as Attorney in Fact for the Association, as provided in Section 7 of the recorded Stormwater Agreement. 5. Stormwater Expenditures Receive Highest Priority. Notwithstanding any contrary provisions of the covenants of which this Article is a part, to the extent not prohibited by law, the inspection, maintenance, repair, and replacement /reconstruction of the Facility /ies shall receive the highest priority (excluding taxes and assessments and other statutorily required expenditures) of all Association expenditures. 6. Separate Account for Maior Reconstruction Fund. Engineer's Report. The Association shall maintain the Major Reconstruction Fund for the Facility /ies in an account separate from the Association's general account. The Association shall use the Fund only for maj or repairs and reconstruction of the Facility /ies. No withdrawal shall be made from this fund unless the withdrawal is approved by two Association officials who shall execute any documents allowing such withdrawal. Prior to withdrawing funds from this account, the Association shall (i) obtain a written report from an engineer approved in accordance with City Requirements regarding repairs or reconstruction needed and approximate cost of such repair or reconstruction; and (ii) submit such report to the Director of the City's Department of Public Works, and notify the Director of the repairs or reconstruction to be undertaken on the Facility, the proposed date, and the amount to be withdrawn from the Major Reconstruction Fund. In the event of an emergency, withdrawal and expenditure of funds may be made after telephone notification to the Stormwater Services Division of the Department. 7. Annual Reports to City. The Association shall provide to the City annual reports in substance and form as set forth in City Requirements. This annual report shall be signed by an officer of the Association, who shall attest as to the accuracy of the information in such report. If prepared by a professional management company hired to manage the Association's affairs, the report shall so indicate. The Officer's signature and attestation shall be notarized. At a minimum each report shall include: I . the annual Facilities inspections report described in section (1) above; ii. a bank or account statement showing the existence of the separate Major Reconstruction Fund described in Section (6) above and the balance in such fund as of the time of submission of the report; iii. a description of repairs exceeding normal maintenance that have been performed on the Facility /ies in the past year, and the cost of such repairs; iv. the amount of Association dues being set aside for the current year for each of the two stormwater funds — the Inspection and Maintenance Fund and the Major Reconstruction Fund. -15- 8. Facilityhes to Remain with Association; Lot Owners' Liability. To the extent not prohibited by law, the Facility /ies shall remain the property of the Association and may not be conveyed by the Association. In the event the Association ceases to exist or is unable to perform its obligations under this Agreement, all Lot Owners as defined in the Stormwater Agreement referenced above, excluding the Lots owned by the Association, shall be jointly and severally liable to fulfill the Association's obligations under this Agreement. Such Lot Owners shall have the right of contribution from other owners with each Lot's pro rata share being calculated as Lot Owner's proportional obligations are otherwise defined in these Covenants. The City may also exercise the rights described in Section 7 of the recorded Stormwater Agreement and other remedies provided by law. 9. City Rights; Liens Against Owners. hl addition to rights granted to the City by ordinance or otherwise, the City shall have the following rights, generally summarized below, and more explicitly set forth in the Stormwater Agreement referenced above: a. Direct the Association in matters regarding the inspection, maintenance, repair, and /or reconstruction of the Facility /ies; b. If the Association does not perform the work required by ordinance, by these covenants, and by the Stormwater Agreement referenced above, do such work itself, upon 30 days' written notice to the Association. Access the Facility /ies for inspection, maintenance, and repair, crossing as necessary the lot(s) on which the Facility /ies are located and all other private and public easements that exist within the Property subject to these covenants. d. Require reimbursement by the Association of the City's costs in inspecting, maintaining, repairing, or reconstructing the Facility /ies, as provided in the Stormwater Agreement referenced above. Enforce any debts owed by the Association as described in the Stormwater Agreement referenced above against Lot Owners if such debts are not fully paid by the Association. The debt may be allocated to Lot Owners as provided in the other sections of these Covenants, and may be made a lien on each owner's property, may be added to each owner's utility bills, and may result in foreclosure, as provided in Section 7 of the Stormwater Agreement referenced above. 10. No Dissolution. To the extent not prohibited by law, the Association shall not enter into voluntary dissolution unless the Facility is transferred to a person who has been approved by the City and has executed a Stormwater Agreement with the City assuming the obligations of the Association. Under the Stormwater Agreement referenced above, individual Lots and Lot Owners continue to be liable for the Facility /ies in the event the Association is dissolved without a new Stormwater Agreement between the City and a responsible party that is assuming the Association's obligations. 11. No Amendment. Without the prior written consent of the City, which may be given by the Durham City Manager, and notwithstanding any other provisions of these Restrictive Covenants, the Association may not amend or delete this Article with the exception of supplementing its provisions in a more detailed manner to better describe members' or Lot Owners' obligations regarding each other. 12. Stormwater Agreement Supersedes. The Stormwater Agreement referenced above supersedes any limiting provisions contained elsewhere in other Articles of these Covenants. However, such Articles may supplement the obligations of the Association as set forth in that Agreement, and /or the obligations of and remedies against individual Lot Owners or members bound by these Covenants. -16- DEL WEBB DURHAM STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM LEVEL SPREADER - VEGETATED FILTER STRIP (LS -VFS) SUPPLEMENT Applications for: WQ- 1,2,3,4,5,6,8,9, 1 1,12 LS #- 7,13,14 Del Webb Durham Durham, NC Horvath Associates Project Number: 1070 February 2, 2012 `I` CAR ts 64 oil 0 � -�- Y 11645 4 , ,, Qz - 62 Prepared for: Pulte - Del Webb 1225 Crescent Green Drive, Suite 250 Cary, NC 27518 Prepared by: Horvath Associates, PA Engineers - Planners - Landscape Architects 16 Consultant Place, Suite 201 Durham, North Carolina 27707 (919) 490 -4990 � Mh oc�OF Y7 aT�R�G r ��I NCDENR y Y ft, STORMWATER MANAGEMENT PERMIT APPLICATION FORM Percent impervious 401 CERTIFICATION APPLICATION FORM LEVEL SPREADER - VEGETATED FILTER STRIP (LS -VFS) SUPPLEMENT 10 This form must be completely Filled out, printed, initiated, and submitted. I. PROJECT INFORMATION cfs Project name Del Webb - Durham Contact name Lee Murphy Phone number 919 -490 -4990 Date December 20, 2011 Drainage area number WQ -1 II. DESIGN INFORMATION 352.25 The purpose of the LS -VFS Pollutant removal: 40% TSS, 30% TN, 35% TP Slormwater enters LS -VFS from A BMP Type of VFS Engineered filter strip (graded & sodded, slope < 8 %) Explanation of any "Other" responses above If Stormwater Enters the LS -VFS from the Drainage Area Drainage area fe Do not ccmp!ete this section of the form Impervious surface area ft, Do not complete this section of the form. Percent impervious % Do not complete this section of the form. Rational C coofftcient 10 Do not complete this section of the form. Peak flow from the 1 !nlhr storm cfs Do not complete this section of the form. Time of concentration min Do not complete this section of the form. Rainfall intensity, 10 -yr storm in/hr Do not complete this section of the farm. Peak flour from the 10 -yr storm cfs Do not complete this section of the form. Design storm 352.25 fmsl Maximum amounlof flow directed to the LS -VFS ofs Do not complete this section of the form. Is a Flow bypass system going to be used? (Y or N) Do not complete this section of the fomm. Explanation of any "Other" responses above If Stormwater Enters the LS -VFS from a BMP Type of BMP Peak discharge from the BMP during the design storm Peak discharge from the BMP during the 10 -year storm Maximum capacity of a 100 -foot long LS -VFS Peak flow directed to the LS -VFS Is a flow bypass system going to be used? Explanation of any °Other responses above LS "VFS Design Wet detention pond 4.13 cfs 4.13 cfs 10 cfs 4.13 cfs n {Y or Forebay surface area sq ft Depth of forobay at stormwater entry point in Depth of forebay at stormwater exit point in Feet of level lip needed per cfs 10 fVcfs Computed minimum length of the level lip needed 41 ft Length of level lip provided 50 ft Width of VFS 30 ft Elevation at downslope base of level lip 353.75 fmsl Efevation at the end of tha VFS that is farthest from the LS 352.25 fmsl Form SW401 - LS -VFS - 27Ju12011 - Rev.9 page 1 of 3 Slope (from level lip to the end of the VFS) Are any drays present in the VFS? Is there a collector Swale at the end of the VFS? Bypass System Design (if applicable) Is a bypass system provided? fs there an engineered flow splitting device? Dimensions of the channel (see diagram below): W y (flow depth for 10 -year storm) freeboard (during the 10 -year storm) Peak velocity in the channel during the 10 -yr storm Channel lining material Does the bypass discharge through a wetland? Does the channel enter the stream at an angle? Explanation of any "Other" responses above 5.00 % n (Y or N) Ox n (Y or N) n (Y or N) n (Y or N) ft ft fusee Pick one: (Y or N) (Y or N) W ♦ � i III. REQUIRED ITEMS CHECKLIST EDIT Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Requried Item: 1. Plans (1" - 50' or larger) of the entire site showing: - Design at ultimate build -out, Off -site drainage (if applicable), Delineated drainage basins (include Rational C coefficlent per basin), Forebay (if applicable), High flow bypass system, Maintenance access, Proposed drainage easement and public right of way (ROW), and Boundaries of drainage easement. 2. Plan details (1" = 30' or larger) for the level spreader showing: - Forebay (if applicable), High flow bypass system, One foot topo lines between the level lip and top of stream bank, Proposed drainage easement, and Design at ultimate build -out. Initials Page or plan sheet number and any notes: 'yin Much of the information requested is in the submitted "Stormwater 6' '_ ( Impact Analysis ". �Yl"% Detailed construction Drawings are to be evacuated by the City of ,Durham during construction drawing approval. Form SW4O1 - LS -VFS - 27M2O11 - Rev.0 page 2 of 3 3. Section view of the level spreader (1" = 20' or larger) showing: I Detailed construction Drawings are to be evaluated by the City of - Underdrain system (if applicable), Durham during construction drawing approval. Level lip, Upslope channel, and Downslope filter fabric. 4. Plan details of the Bow splitting device and supporting calculations (if applicable). Detailed construction Drawings are to be evaluated by the City of Durham during construction drawing approval. Sp #fitter box calculations are in the SIA. 5. A construction sequence that shows how the level spreader will be protected from Detailed construction Drawings are to be evaluated by the City of sediment until the entire drainage area is stabilized. Durham during construction drawing approval, 6. If a ncn- engineered VFS is being used, then provide a photograph of the VFS showing that no draws are present. 7. The supporting calcu #aeons. See Stormwater Impact Analysis 8. A copy of the signed and notarized operation and maintenance (O &M) agreement. ��_ -I See City of Durham STORMWATER FACILITY AGREEMENT http:ll duftmne. govriichloptpwdlstomlfDocumentstres _stormviater_ag r Form SW401 - LS -VFS - 27Ju12011 - Rev.0 page 3 of 3 ��s� t�] °�04 vrAr�gQq h [ � HCDENR ti Y STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM LEVEL SPREADER - VEGETATED FILTER STRIP (LS -VFS) SUPPLEMENT This form must be completely filled out, printed, initialed, and submitted. 1. PROJECT INFORMATION fucfs Project name Del Webb- Durham Contact name Lee Murphy Phone number 919 -490 -4990 Bate December 20, 2011 Drainage area number WQ -2 II. DESIGN INFORMATION fmsl The purpose of the LS -VFS Pollutant removal: 40% TSS, 30% TN, 35% TP Stormwater enters LS -VFS from A BMP Type of VFS Engineered Ill ter strip (graded & sodded, slope < 8 %) Explanation of any "Other" responses above If Stormwater Enters the LS-VFS from the Drainage Area Drainage area If Do not complete this section of the form. Impervious surface area fe Do not complete this section of the form. Percent impervious % Do not complete this section of the form. Rational C coefficient Do not complete this section of the form. Peak flour from the 1 irAr storm cfs Do not complete this section of the form. Time of concentfation min Do not conmpieto this section of the form. Rainfall intensity, 10 -yr storm inlhr Do not complete this section of the form. Peak flow from the 10 -yr storm cfs Do not complete this section of the form. Design storm Maximum amount of flow directed to the LS -VFS cfs Do not complete this section of the form. Is a flow bypass system going to be used? (Y or N) Do not complete this section of the form. Explanation of any "Other responses above If Stormwator Enters the LS-VFS from a BMP Type of BMP Wet detention pond Peak discharge from the BMP during the design storm 9.56 cfs Peak discharge from the BMP during the 10 -year storm 9.56 cfs Maximum capacity of a 100 -foot tong LS -VFS 10 cfs Peak flow directed to the LS -VFS 9.56 cfs Is a flow bypass system going to be used? n (Y or N) Expiapation of any "Other responses above LS-VFS Design Forebay surface area sq ft Depth of forebay at stormwater entry point in Depth of forebay at stormwater exit point in Feet of level lip needed per cfs 10 fucfs Computed minimum length of the level lip needed 96 it Length of level lip provided 100 €t Width of VFS 30 ft Elevation at downslope base of level lip 365.75 fmsl Elevation at the end of the VFS that is farthest from the LS 364.25 fmsi Form SW401 - LS -VFS - Mul2o11 - Rev.9 page 1 of 3 Slope (from level lip to the end of the VFS) Are any draws present in the VFS? Is there a collector swale at the and of the VFS? Bypass System Design (if applicable) Is a bypass system provided? Is there an engineered flow, spiiltfng device? Dimensions of the channel (see diagram below): M W y (flow depth for 10 -year storm) freeboard (during the 10 -year storm) Peak velocity in the channel during the 10 -yr storm Channel lining material Does the bypass discharge through a wetland? Does the channel enter the stream at an angle? Explanation of any "Other" responses above 5.00 % n (Y or N) N n (Y or N) n (Y or N) n (Y or N) PICK One: W ftlsec (Y or N) (Y or N) i n i III. REQUIRED ITEMS CHECKLIST EDIT Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Requried Item: 1. Plans (1" - 50' or larger) of the entire site showing: - Design at ultimate build -out, Off -site drainage (if applicable), Delineated drainage basins (include Rational C coefficient per basin), Forebay (if applicable), High flow bypass system, Maintenance access, Proposed drainage easement and public right of way (ROW), and Boundaries of drainage easement. 2. Plan details (1" = 30' or larger) for the level spreader showing: - Forebay (if applicable), High Flow bypass system, One foot topo lines between the level lip and top of stream bank, Proposed drainage easement, and Design at ultimate build -out. Initials Page or plan sheet number and any notes: _- Much of the information requested is in the submitted "Stomiwater Impact Analysis'. 'Detailed construction Drawings are to be evaluated by the City of ;Durham during construction drawing approval. I Form SW401 - LS -VFS - 27J02011 - Rev.9 page 2 of 3 3. Section view of the level spreader (1" = 2d' or larger) showing: - Underdrain system (if applicable), Level lip, Upslope channel, and Downsiope filter fabric. 4. Plan details of the flow spIlltng device and supporting calculations (if applicable). 5. A construction sequence that shows bow the level spreaderwill be protected from sediment until the entire drainage area is stabilized. 6. If a non - engineered VFS is being used, then provide a photograph of the VFS showing that no draws are present. 7. The supporting calculations. 8. A copy of the signed and notarized operation and maintenance (0 &M) agreement. Detailed construction Drawings are to be evaluated by the City of Durham during construction drawing approval. Dotailed construction Drawings are to be evaluated by the City of Durham during construction dravring approval. Splitter box calcolat'ons are in the SIA. Dotailed construction Drawings are to be evaluated by the City of Durham during constructon drawing approval. See Stormwater Impact Analysis See City of Durham STORMWATER FACILITY AGREEMENT http: ll durhamnc. gov/ ichlop/ pvidfstorm /Documen[stres—stornnvater agr eement.doc Form SW401 - LS -VFS - 27Jul2011 - Rev.9 page 3 of 3 If Stormwater Enters the LS-VFS from a BMP Type of BMP Peak discharge from the 8MP during the design storm Peak discharge from the BMP during the 10 -year storm Maximum capacity of a 100 -foot long LS-VFS Peak flow directed to the LS-UFS Is a flow bypass system going to be used? Explanation of any "Other" responses above LS-VFS Design Forebay surface area Depth of forebay at slormwater entry point Depth of forebay at stormwater exit point Feet of level lip needed per cfs Computed minimum length of the level lip needed Length of level lip provided Width of VFS Elevation at downslope base of level lip Elevation at the end of tha VFS that is farthest from the i Wet detention pond 0.46 cfs 0.46 cfs 10 cfs 0.46 cis n fY or sq ft in in 10 fvcfs 5 ft 30 ft 30 ft 398.75 fmst 397.25 fmsl Ten feet is the minimum level spreader length. Form SW401 - L &VFS - 27Jut2011 - Rev.9 page 1 of 3 o��f �4ATE99G NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM LEVEL SPREADER - VEGETATED FILTER STRIP (LS -VFS) SUPPLEMENT Tiris form must be completely filled out, printed, initiated, and submitted. I. PROJECT INFORMATION Project name Del Webb- Durham Contact name Lee Murphy Phone number 919- 490 -4990 Date December 20, 2011 Drainage area number W4 -3 II. DESIGN INFORMATION The purpose of the LS-UFS Pollutant removal: 40% TSS, 30% TN, 35% TP Stormwater enters LS-VFS from A 8MP Type of VFS Engineered filter strip (graded 8 sodded, slope < 8 %) Explanation of any "Other" responses above If Stormwater Enters the LS•VFS from the Drainage Area Drainage area fl? Do not complete ibis section of the form. Impervious surface area f? Do not comprelo this section of the form Percent impervious % Do not complete this section of the form Rational C coefficient Do not complete this section of the form. Peak flow from the 1 inlhrstorm cfs Do not complete this section of the form. Time of concentration min Do not complete this section of the form. Rainfall intensity, 10- yrstorm inlhr Do not complete this section of the form. Peak flow from the 10 -yr storm cfs Do not complete this section of the form. Design storm Maximum amount of flaw directed to the LS-VFS cfs Do not complete this section of the form. Is a flow bypass system going to be used? (Y or N) Do not complete this section of the form. Explanation of any "Other' responses above If Stormwater Enters the LS-VFS from a BMP Type of BMP Peak discharge from the 8MP during the design storm Peak discharge from the BMP during the 10 -year storm Maximum capacity of a 100 -foot long LS-VFS Peak flow directed to the LS-UFS Is a flow bypass system going to be used? Explanation of any "Other" responses above LS-VFS Design Forebay surface area Depth of forebay at slormwater entry point Depth of forebay at stormwater exit point Feet of level lip needed per cfs Computed minimum length of the level lip needed Length of level lip provided Width of VFS Elevation at downslope base of level lip Elevation at the end of tha VFS that is farthest from the i Wet detention pond 0.46 cfs 0.46 cfs 10 cfs 0.46 cis n fY or sq ft in in 10 fvcfs 5 ft 30 ft 30 ft 398.75 fmst 397.25 fmsl Ten feet is the minimum level spreader length. Form SW401 - L &VFS - 27Jut2011 - Rev.9 page 1 of 3 Slope (from level lip to the end of the VFS) Are any drays present in the VFS? Is there a collector swale at the end of the VFS? Bypass System Design (if applicable) Is a bypass system provided? Is there an engineered flow splitting device? Dimensions of the channel (see diagram below): M W y (flow depth for 10 -year storm) freeboard (during the 10- yearstorm) Peak velocity in the channel during the 10- yrstorm Channel lining material Does the bypass discharge through a wetland? Does the channel enter the stream at an angle? Explanation of any "Other" responses above 5.00 % n (Y or N) OK n (Y or N) n (Y or N) n (Y or N) fusec Pick one: (Y or N) (Y or N) W i l3 i III. REQUIRED ITEMS CHECKLIST EDIT Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Requried Item: 1. Plans (1" - 50' or larger) of the entire site showing: - Design at ultimate build -out, Off -site drainage (if applicable), Delineated drainage basins (include Rational C coefficient per basin), Fcrebay (if applicable), High Flow bypass system, Maintenance access, Proposed drainage easement and public right of way (ROW), and -Boundaries of drainage easement. 2. Plan details (1" = 30' or larger) for the level spreader showing: - Forebay (if applicable), High flow bypass system. One foot topo lines between the level lip and top of stream bank, Proposed drainage easement, and Design at ultimate build -out. Initials Page or plan sheet number and any notes: Much of the information requested is in the submitted "Stormwater Impact Analysis ". Detailed construction Drawings are to be evaluated by the City of Durham during construction drawing approval. Form SW401 - LS -VFS - 27M2011 - Rev,9 page 2 of 3 Section view of the level spreader (1" = 20' or larger) showing: Undordrain system (If applicable), Level lip, Upslope channel, and Dovrnslope filter fabric. 4. Plan details of the flow splitting device and supporting calculations (if applicable). 5. A construction sequence that shows how the level spreader will be protected from sediment until the entire drainage area is stabilized. 6. If a non - engineered VFS is being used, then provide a photograph of the VFS showing that no draws are present. 7. The supporting calculations. S. A copy of the signed and notarized operation and maintenance (O&M) agreement. x�IDetailed construction Drawings are to be evaluated by the City of Durham during construction drawing approval. Detailed construction Drawings are to be evaluated by the City of Durham during construction drawing approval. Splitter box calculations are in the SIA, s- -� Detailed construction Drawings are to be evaluated by the City of Durham during construction drawing approval. !See Stormwater Impact Analysis See City of Durham STORMWATER FACILITY AGREEMENT http:11durhamnc.govlichloplpwd /storm /Documentslres_stormwater agr eement.dac Farm SW401 - LS -VFS - 27M2011 - Rev.9 page 3 of 3 Form SW401 - LS -VFS - 27,lu12011 - Rev.9 page 1 of 3 of �vnrFy T NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM LEVEL SPREADER - VEGETATED FILTER STRIP (LS -VFS) SUPPLEMENT This form must be completely filled out printed, lnftialed, and submitted. I. PROJECT INFORMATION Project name Del Webb- Durham Contact name Lee Murphy Phone number 919 -490 -4990 Date December 20, 2011 Drainage area number WQ -4 [I, DESIGN INFORMATION The purpose of the LS -VFS Pollutant removal: 40% TSS, 30 % TN, 35% TP Stormuater enters LS -VFS from A 8MP Type of VFS Engineered filter strip (graded & sodded, slope < 8 %) Explanation of any "Other" responses above If Stormwater Enters the LS -VFS from the Drainage Area Drainage area ih Do not complete this section of the form. Impervious surface area ftv Do not complete this section of the form. Percent impervious % Do not complete this section of the form. Rational C coefficient Do not complete this section of the form. Peak flow from the 1 irdhr storm cfs Do not complete this section of the form. Time of concentration min Do not complete this section of the form. Rainfall intensity, 10 -yr storm inlhr Do not complete this section of the form. Peak flow from the 10 -yr storm cis Do not complete this section of the form. Design storm Maximum amount of flour directed to the LS -VFS cis Do not complete this section of the form. Is a flour bypass system going to be used? (Y or N) Do not complete this section of the form. Explanation of any "Other responses above If Stormwaler Enters the LS -VFS from a BMP Type of BMP Wet detention pond Peak discharge from the BMP during the design storm 0.54 cfs Peak discharge from the BMP during the 10 -year storm 0.54 cfs Maximum capacity of a 100 -fool long LS -VFS 10 cfs Peak flow directed to the LS -VFS 0.54 cfs Is a flow bypass system going to be used? n (Y or N) Explanation of any 'Other" responses above LS -VFS Design Forebay surface area sq ft Depth of forebay at stormwater entry point in Depth of forebay at stormwater exit point in Feet of level lip needed per cfs 10 fucfs Computed minimum length of the level lip needed 5 ft Ten feet is the minimum level spreader length. Length of level lip provided 65 ft Width of VFS 30 ft Efevation at downslope base of level lip 375.75 fmsl Elevation at the end of the VFS that is farthest from the LS 374.25 fmsl Form SW401 - LS -VFS - 27,lu12011 - Rev.9 page 1 of 3 Slope (from level lip to the end of the VFS) Are any draws present in the VFS? Is there a collector swale at the and of the VFS? Bypass System Design (if applicable) Is a bypass system provided? Is there an engineered flow splitting device? Dimensions of the channel (see diagram below): M W y (flow depth for 10 -year storm) freeboard (during the 10 -year storm) Peak velocity in the channel during the 10- yrstomi Channel lining material Does the bypass discharge through a wetland? Does the channel enter the stream at an angle? Explanation of any "Other" responses above 5.00 % n (Y or N) OK n (Y or N) n (Y or N) n (Y or N) ftlsec Pick one (Y or N) (Y or N) W V 1� 3 III. REQUIRED ITEMS CHECKLIST EDIT Please indicate the page or plan sheet numbers where the supporting documentation can be found. An Incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Requried Item: 1. Plans (1" - 50' or larger) of the entire site showing: - Design at ultimate build -out, Off -site drainage (if applicable), Doiineated drainage basins (include Rational C coefficlent per basin), Forebay (if applicable), High flow bypass system, Maintenance access, Proposed drainage easement and public right of way (ROW), and Boundaries of drainage easement. 2. Plan details (1" = 30' or larger) for the level spreader showingi - Forebay (if applicable), High flour bypass system, One foot topo lines between the level lip and top of stream bank, Proposed drainage easement, and Design at ultimate build -out. Initials Page or plan sheet number and any notes: Much of the information requested is in the submitted "Stormwater Impact Analysis ". Detailed construction Drawings are to be evaluated by the City of (Durham during construction drawing approval. Form SVV401 - LS -VFS - 27Ju12011 - Rev -9 page 2 of 3 3. Section view of the level spreader (1" = 20' or Larger) showing: • Underdrain system (if applicable), Level lip, Upslope channel, and Down slope filter fabric. 4. Plan details of the flow splitting device and supporting calculations (d applicable). 5. A construction sequence that shows how the level spreader will be protected from sediment until the entire drainage area is stabilized, 6. If a non - engineered VFS is being used, then provide a photograph of the VFS showing that no draws are present. 7. The supporting calculations. 8. A copy of the signed and notarized operation and maintenance (0 &M) agreement. �.'�• Detailed construction Drawings are to be evaluated by the City of Durham during construction drawing approval. iDetailed construction Drawings are to be evaluated by the City of Durham during construction drawing approval. Splitter box calculations are in the SIA. D construction Drawings are to be evaluated by the City of (Durham during construction drawing approval. See Stormwaler Impact Analysis See City of Durham STORMWATER FACILITY AGREEMENT htlp:lldurha mnc. govfchloplpwdlstormlDocumentslres _stormwate r_agr eament.doc Form SW401 - LS -VFS - 27,1ul2011 - Rev.9 page 3 of 3 LS -VFS Design Forebay surface area O�O� W ArF�oG NCDENR a -c STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM LEVEL SPREADER • VEGETATED FILTER STRIP (LS -VFS) SUPPLEMENT This form must be completely filled out, printed, initialed, and submitted. I. PROJECT INFORMATION filcfs Project name Dei Webb - Durham Contact name Lee Murphy Phone number 919 - 490 -4990 Date December 20, 2011 Drainage area number WQ -5 II. DESIGN INFORMATION fmsl The purpose of the LS -VFS Pollutant removal: 40 %TSS, 30% TN. 35 %TP Stormwater enters LS-VFS from A BMP Type of VFS Engineered filler strip (graded & sodded, slope < 8 %) Explanation of any "Other" responses above If Stormwater Enters the Ill from the Drainage Area Drainage area fe Do not complete this section of the form. Impervious surface area fe Do not complete this section of the form. Percent impervious %d Do not complete this section of the form Rational C coefficient Do not complete this section of the form. Peak flow from the 1 inlhr storm cfs Do not complete this section of the form. Time of concentration min Do not complete this section of the foram. Rainfall intensity, 10 -yr storm inlhr Do not complete this section of the form. Peak flovr from the 10 -yr storm cfs Do not complete this section of the form. Design storm Maximum amount of flow directed to the LS-VFS cfs Do not complete this section of the form. Is a flow bypass system going to be used? (Y or N) Do not complete this section of the form. Explanation of any "Other" responses above If Stormwater Enters the LS -VFS from a BMP Type of BMP Wet detention pond Peak discharge from the BMP during the design storm 6.84 cfs Peak discharge from the BMP during the 10 -year storm 6.84 cfs Maximum capacity of a 100 -foot long LS-VFS 10 cfs Peak Flow directed to the LS-VFS 6.84 cfs Is a (low bypass system going to be used? n (Y or N) Explanation of any "Other" responses above LS -VFS Design Forebay surface area sq ft Depth of forebay at stormwater entry point in Depth of forebay at stormwater exit point in Feet of level lip needed per cfs 10 filcfs Computed minimum length of the level lip needed 68 ft Length of level lip provided 100 ft Width of VFS 30 ft Elevation at downslope base of level lip 373.25 fmsl Elevation at the end of the VFS that is farthest from the LS 371.75 fmsl Form SW401 - LS-VFS - 27J02011 - Rev.9 page 1 of 3 Slope (from level lip to the end of the VFS) Are any draws present in the VFS? Is there a collector swale at the end of the VFS? Bypass System Design (if applicable) Is a bypass system provided? Is there an engineered flovv splitting device? Dimensions of the channel (see diagram below): W y (flow depth for 10 -year storm) freeboard (during the 10 -year storm) Peak velocity in the channel during the 10 -yr storm Channel lining material Does the bypass discharge through a wetland? Does the channel enter the stream at an angle? Explanation of any "Other' responses above 5.00 % n (Y or N) OK n (Y or N) n (Y or N) n (Y or N) Pick one: 1V ft It It It ftlsec (Y or N) (Y or N) III. REQUIRED ITEMS CHECKLIST EDIT Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been mot. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Requried Item: 1. Plans (1" - 50' or larger) of the entire site showing: - Design at ultimate build -out, Off -site drainage (if applicable), Delineated drainage basins (include Rational C coefficient per basin), Forebay (if applicable), High flow bypass system, Maintenance access, Proposed drainage easement and public right of way (ROW), and Boundaries of drainage easement. 2. Plan details (1" = 30' or larger) for the level spreader showing: - Forebay (if applicable), High flow bypass system, One foot topo Imes between the level lip and top of stream bank, Proposed drainage easement, and Design at ultimate build -out. Initials Page or plan sheet number and any notes: _ Much of the information requested is in the submitted "Stormwater Impact Analysis ". Detailed construction Drawings are to be evaluated by the City of Durham during construction drawing approval, Form SW401 - LS -VFS - 27Ju12011 - Rev.9 page 2 of 3 3. Section view of the level spreader (1" = 20' or larger) showing: - Underdrain system (if applicable), Level lip, Upslope channel, and Downslope filter fabric. 4. Plan details of the flow spiithhg device and supporting calculations (if applicable). 5. A construction sequence thatshows how the level spreadervrill be protected from sediment until the entire drainage area is stabllized. If a non - engineered VFS is being used, then provide a photograph of the VFS showing that no drays are present. 7. The supporting calculations. 8. A copy of the signed and notarized operation and maintenance (OEM) agreement. Detailed construction Drawings are to be evaluated by the City of Durham during construction drawing approval. Detailed construction Drawings are to be evaluated by the City of Durham during construction drawing approval. Sputter box calculations are in the SIA, �-_ Detailed construction Drawings are to be evaluated by the City of IDurham during construction drawing approval See Stormwaler Impact Analysis See City of Durham STORMWATER FAC {CITY AGREEMENT hUp:l/durhamnc.gov/ich/cp/pwdlstorrn;Docurnentstres—storniwater ag r eement.doc Form SW401 - LS -VFS - 27Ju12011 - Rev.9 page 3 cf 3 AN"A fl? NCDENR a fe STORMWATFR MANAGEMENT PERMIT APPLICATION FORM Percent impervious 401 CERTIFICATION APPLICATION FORM LEVEL SPREADER - VEGETATED FILTER STRIP (LS -VFS) SUPPLEMENT Ttrls form inust be completely fitted out, printed, initialed, and submitted. I. PROJECT INFORMATION cis Project name Del Webb- Durham Contact name Lee Murphy Phone number 919 -490 -4990 Date December 20, 2011 Drainage area number WQ -6 II. DESIGN INFORMATION The purpose of the LS -VFS Pollutant romoval: 40% TSS, 30% TN, 35% TP Stormwater enters LS -VFS from A BMP Type of VFS Engineered filler strip (graded & sodded, slope < 8 %) Explanation of any "Other" responses above If Stormwater Enters the LS -VFS from the Drainage Area Drainage area fl? Do not complete ibis section of the form, Impervious surface area fe Do not complete this section of the form. Percent impervious % Do not complete this section of the form. Rational C coefficient Do not complete this section of the form. Peak flow from the 1 in1hr storm cis Do not complete this section of the form. Time of concentration min Do not complete this secl!'on of the form. Rainfall intensity, 10 -yr storm inlhr Do not complete this section of the farm. Peak flow from the 10 -yr storm cfs Do not complete this section of the form. Design storm Maximum amount of now directed to the LS -VFS cfs Do not complete this section of the form. Is a flow bypass system going to be used? (Y or N) Do not complete this section of the form. Explanation of any "Other" responses above If Stormwater Enters the LS -VFS from a BMP Type of BMP Peak discharge from the BMP during the design storm Peak discharge from the BMP during the 10 -year storm Maximum capacity of a 100 -foot long LS -VFS Peak flow directed to the LS -VFS Is a flow bypass system going to be used? Explanation of any 'Other' responses above LS -VFS Design Forebay surface area Depth of forebay at stormwater entry point Depth of forebay at stormwater exit point Feet of level lip needed per cfs Computed minimum length of the level lip needed Length of level fip provided Width of VFS Elevation at downslope base of level lip Elevation at the end of the VFS that is farthest from the LS Wet detention pond 15.09 cfs 15.09 cfs 10 cfs in cis or sq ft In in 10 fticfs 100 ft 50 ft 30 ft 381.75 fmsl 38025 fmsl Level spreader is too short to handle the Pow. Form SW401 - LS -VFS - 27du12011 - Rev.9 page 1 of 3 Slope (from level lip to the end of the VFS) Are any draws present in the VFS? Is there a collector swale at the end of the VFS? Bypass System Design (if applicable) Is a bypass system provided? Is there an engineered flow splitting device? Dimensions of the channel (see diagram below): M W y (flan depth for 10 -year storm) freeboard (during the 10 -year storm) Peak velocity in the channel during the 10 -yr storm Channel lining material Does the bypass discharge through a wetiand? Does the channel enter the stream at an angle? Explanation of any "Other" responses above 5.00 % n (Y or N) M n (Y or N) n (Y or N) n (Y or N) 0 A. fUsec Pick one: (Y or N) (Y or N) W Ill. REQUIRED ITEMS CHECKLIST EDIT Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Requried Item: 1. Plans (1" - 50' or larger) of the entire site showing: - Design at ultimate build -out, Off -site drainage (if applicable), Delineated drainage basins (include Rational C coefficient per basin), Forebay (if applicable), High flow bypass system, Maintenance access, Proposed drainage easement and public right of way (ROW), and Boundaries of drainage easement 2. Plan details (1" = 30' or larger) for the level spreader showing: • Forebay (if applicable), High flovr bypass system, One foot topo lines between the level lip and top of stream bank. Proposed drainage easement, and Design at ultimate build -out. mtials Page or plan sheet number and any notes: .Much of the information requested is in the submitted "Stormwater �ImpactAnalysis ". _.! Detailed construction Drawings are to be evaluated by the City of Durham during construction drawing approval. Form SW401 - LS -VFS - 27JuM2011 - Rev.9 page 2 of 3 3. Section view of the level spreader (1' = 2U' or larger) showing: - URderdrain system (if applicable), Level lip, Upslope channel, and Downslope filter fabric. 4. Plan details of the flowsplitting device and supporting calculations (if applicable). a- -� Detailed consruction Drawings are to be evaluated by the City of Durham during construction drawing approval. Detailed construction Drawings are to be evaluated by the City of Durham during construction drawing approval. Splitter box calculations are in the SIA. 5. A construction sequence that shows how the level spreader will be protected from x �- Detailed construction Drawings are to be evaluated by the City of sediment until the entire drainage area is stabltized, Durham during construction drawing approval, 6. If a non - engineered VFS is being used, then provide a photograph of the VFS showing that no draws are present. 7. The supporting calculations. Z -. See Stormwater Impact Analysis 8. A copy of the signed and notarized operation and maintenance (0 &M) agreement. See City of Durham STORMWATER FACILITY AGREEMENT ! hUp:fldurhamnc.gov /ichlop /pvrd/ storm /Documentslres_stormwater agr eement.doc Form SW401 - LS -VFS - 27 ON111 - Rev.9 page 3 of 3 ti NCDENR a Y STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM LEVEL SPREADER - VEGETATED FILTER STRIP (LS -VFS) SUPPLEMENT This forin must be coniplefoly filled out, printed, initiated, and submitted. I. PROJECT INFORMATION Project name Del Webb - Durham Contact name Lee Murphy Phone number (919) 490-4990 Date Dember 20, 2011 Drainage area number I II. DESIGN INFORMATION The purpose of the LS -VFS Buffer Rule: Diffuse Flow Stormwater enters LS-VF'S from The drainage area Type of VFS Engineered filter strip (graded & sodded, slope < 8 %) Explanation of any "Other" responses above If Stormwater Enters the LS•VFS from the Drainage Area Drainage area Impervious surface area Percent impervious Rational C coefficient Peak flow from the 1 in/hr storm Time of concentration Rainfall intensity, 10 -yr storm Peak flow from the 10 -yr storm Design storm Maximum amount of flow directed to the LS -VFS Is a Flow bypass system going to be used? Explanation of any 'Other responses above If Stormwater Enters the LS-VFS from a BMP Type of BMP Peak discharge from the BMP during the design storm Peak discharge from the BMP during the 10 -year storm Maximum capacity of a 100 -foot long LS-VF5 Peak flour directed to the LS -VFS Is a flow bypass system going to be used? Explanation of any "Other" responses above LS•VFS Design 96,268 fe 56,192 fe 58.37 % 0.70 1.55 cfs 5.00 min 7.22 in/hr 11.17 cfs 1 inchlhourstorm 1.55 cfs y (Y or N) Do not complete this section of the form. cfs cfs Do not complete this section of the form. 10 cfs cfs Do not compiele this section of the form. (YorI Forebay surface area 150 sq ft Forebay Is adequately sized. Depth of forebay atstormwalerentry point 24 in Depth of forebay at stormvialer exit point 6 in Depth is appropriate. Feat of level Ilp needed per cfs 10 fvcfs Computed minimum length of the level lip needed 16 ft Length of level lip provided 50 ft Width of VFS 30 ft Elevation at downslope base of level lip 391.75 fmsl Elevation at the end of the VFS that is farthest from the LS 390.00 fmsl Form SW401 - LS -VFS - 27Jui2011 - Rev.9 page 1 of 3 Slope (from level tip to the end of the VFS) Are any draws present fn the VFS? Is there a collector Swale at the end of the VFS? Bypass System Design (if applicable) Is a bypass system provided? Is there an engineered flow splitting device? Dimensions of the channel (see diagram below): M W y (flow depth for 10 -year storm) freeboard (during the 10 -year storm) Peak velocity in the channel during the 10 -yr storm Channel lining material Does the bypass discharge through a wetland? Does the channel enter the stream at an angle? Explanation of any "Other" responses above 5.83 % n (Y or N) OK n (Y or N) y (Y or N) y (Y or N) Please provide plan details of flow splitter & supporting talcs Ficx one: %fir inset n (Y or N) (Y or N) 1 � III. REQUIRED ITEMS CHECKLIST EDIT Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Requried item: 1. Plans (1" - 50' or larger) of the entire site showing: - Design at ultimate build -oul, Off -site drainage (if applicable), Delineated drainage basins (include Rational C coefflcient per basin), Forebay (if applicable), High flow bypass system, Maintenance access, Proposed drainage easement and public right of way (ROW), and Boundaries of drainage easement. 2. Plan details (1" = 30' or larger) for the level spreader showiag: - Forebay (if applicable), High flow bypass system, One foot topo lines beNieen the level lip and top of stream bank, Proposed drainage easement, and Design at ultimate build -out. Initials Page or plan sheet number and any notes: ��Much of the information requested is in the submitted "Stormwater Impact Analysis" (S1A) I (Detailed construction drawings are to be evaluated by the City of ,Durham during construction drawing approval. Form M461 - LS -VFS - Mo12011 - Rev.9 page 2 of 3 3. Section view of the level spreader (1" = 20' or larger) showing: - Underdrain system (if applicable), Level iip, Upslope channel, and Downslope filter fabric. 4. Plan details of the flow splitting device and supporting calculations (if applicable). 5. A construction sequence that shows how the level spreader will be protected from sediment until the enfire drainage area is stabilized. 6. If a non - engineered VFS is being used, then provide a photograph of the VFS showing that no draws are present. 7. The suppotng calculations. 8. A copy of the signed and notarized operation and maintenance (OW) agreement. im_ !Detailed construction drawings are to be evaluated by the City of Durham during construction drawing approval. Detailed construction drawings are to be evaluated by the City of Durham during construction drawing approval. Splitter box calculations are in the SW Detailed construction drawings are to be evaluated by the City of Durham during construction drawing approval. 'NA See Stormwater lmpaoct Analysis a/AISee City of Durham Stormwater Facility Agreement at; hffp:tidurha mnc.gov /ich /opf pwd /storm /Documents/res_stormwate r_ag r eement.doc Form SW401 - LS -VFS - 27Jul2011 - Rev.9 page 3 of 3 Ali& o�oF �'� Are9¢c ? y NCDENR p Y STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM LEVEL SPREADER - VEGETATED FILTER STRIP (LS -VFS) SUPPLEMENT This form must be completely filled out, printed, Initialed, and submitted. 1. PROJECT INFORMATION 10 Project name Del Webb- Durham Contact name Lee Murphy Phone number 919 - 490 -4990 Date December 20, 2011 Drainage area number WO -8 II. DESIGN INFORMATION 355.75 The purpose of the LS -VFS Pollutant removal: 40% TSS, 30% TN, 35% TP Stormwater enters LS-VFS from A BMP Type of VFS Engineered filter strip (graded & sodded, slope < 8 %) Explanation of any "Other' responses above If Stormwater Enters the Ill from the Drainage Area Drainage area fe Do not complete this section of the form. Impervious surface area fl? Do not complete this section of the form. Percent impervious % Do not complete this section of the form. Rational C coefficient Do not complete this section of the form. Peak flax from the 1 infhr storm cfs Do not complete this section of the form. Time of concentration min Do not complete this section of the form. Rainfall intensity, 10 -yr storm inlhr Do not complete this section of the form. Peak flow from the 10 -yr storm cfs Do not complete this section of the form, Design storm Maximum amount of flow directed to the LS-VFS cfs Do not complete this section of the form is a flow bypass system going to be used? (Y or N) Do not complete this section of the form. Explanation of any "Other" responses above If Stormwater Enters the i from a BMP Type of BMP Wet detention pond Peak discharge from the BMP during the design storm 6.38 cfs Peak discharge from the 13MP during the 10 -year storm 6.38 cis Maximum capacity of a 100 -foot long LS -VFS 10 cfs Peak flow directed to the LS-VFS 6.38 cfs Is a Flow bypass system going to be used? n (Y or N) Explanation of any "Other' responses above LS-VFS Design Forebay surface area sq ft Depth of forebay at stormwaler entry point in Depth of forebay at stormwater exit point in Feet of level lip needed per cfs 10 fticfs Computed minimum length of the level lip needed 64 f1 Length of level lip provided 95 ft Width of VFS 30 ft Elevation at downslope base of level lip 355.75 fmsl Elevation at the end of the VFS that is farthest from the LS 354.25 1 Form SW401 - LS -VFS - 27Jui2011 - Rev.9 page 1 of 3 Slope (from level lip to the end of the VFS) Are any draws present in the VFS? Is there a collector swale at the end of the VFS? Bypass System Design (if applicable) Is a bypass system provided? Is there an engineered flaw splitting device? Dimensions of the channel (see diagram below): M W y (flow depth for 10 -year storm) freeboard (during the 10 -year storm) Peak velocity in the channel during the 10 -yr storm Channel lining material Does the bypass discharge through a wetland? Does the channel enter the stream at an angle? Explanation of any "Other' responses above 5.00 % n (Y or N) OK n (Y or N) n (Y or N) n (Y or N) ftlsec Pick one: (Y or N) (Y or N) N\r N Ii III. REQUIRED ITEMS CHECKLIST EDIT Piease indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Requried Item: 1. Plans (V - 50' or larger) of the entire site showing: - Design at ultimate build -out, Off -site drainage (if applicable), Delineated drainage basins (include Rational C coefficient per basin), Forebay (if applicable), High flow bypass system, Maintenance access, Proposed drainage easement and public right of way (ROW), and Boundaries of drainage easement. 2. Plan details (1" = Nor larger) for the level spreader showing: - Forebay (if applicable), High flour bypass system, One foot topo lines between the level lip and top of stream bank, Proposed drainage easement, and Design at ultimate build -out. Initials Page or plan sheet number and any notes: Much of the information requested is in the submitted "Stormwater Impact Analysis ". Detailed construction Drawings are to be evaluated by the City of Durham during construction drawing approval Form SW401 - US-VFS - 27Jul2011 - Rev.9 page 2 of 3 3. Section view of the level spreader (1" = 20' or larger) showing: - Underdrain system (if applicable), Level lip, Upslope channel, and Downslope filter fabric. 4. Plan details of the flow splitting device and supporting calculations (if applicable). 5. A construction sequence that shows how the level spreader will be protected from sediment until the entire drainage area is stabilized. 6. If a non - engineered VFS is being used, then provide a photograph of the VFS showing that no draws are present. 7. The supporting calculations. 8. A copy of the signed and notarized operation and maintenance (0 8M) agreement. Detailed construction Drawings are to be evaluated by the City of (Durham during construction drawing approval. Detailed construction Drawings are to be evaluated by the City of Durham during construction drawing approval Splitter box calculations are in the SIA. y' 1 Detailed construction Drawings are to be evaluated by the City of Durham during construction drawing approval. Z See Stormwater Impact Analysis v� See City of Durham STORMWATER FACILITY AGREEMENT http:l /d u rha rnno.goviichtopfpwd /storn-IDocu rnentsfres_stormwater _ ag r eement.doc Form SW401 - LS -VFS - MOM i - Rev.9 page 3 of 3 i� VV/ 1 o�oF c�nrFgoG y Y NCDtWk STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM LEVEL SPREADER - VEGETATED FILTER STRIP (LS -VFS) SUPPLEMENT This form must be completely Wed out, printed, initialed, and submitted. I, PROJECT INFORMATION Project name Del Webb- Durham Contact name Lee Murphy Phone number 919 - 490 -4990 Date December 20, 2011 Drainage area number WO -9 II. DESIGN INFORMATION The purpose of the LS -VFS Pollutant removal: 40% TSS, 30% TN, 35% TP Stormwater enters LS -VFS from A BMP Type of VFS Engineered Wer strip (graded 3 sodded, slope < 8 %) Explanation of any'Other" responses above If Stormwater Enters the LS -VFS from the Drainage Area Drainage area fe Do not complete this section of the form. Impervious surface area fl? Do not complete this section of the form. Percent impervious % Do not complete this section of the form. Rational C coefficient Do not complete this section of the form. Peak flow from the 1 inlhrstorm cfs Do not compfele this section of the form. Time of concentration min Do not complete this section of the form. Rainfall intensity, 10- yrstorm infhr Do not complete this section of the form. Peak flow from the 10 -yr storm cfs Do not complete this section of the form. Design storm Maximum amount of flow directed to the LS -VFS cfs Do not complete this section of the form. Is a Flow bypass system going to be used? (Y or N) Do not complete this section of the form. Exp�anat on of any "Other responses above If Stormwater Enters the LS -VFS from a BMP Type of BMP Peak discharge from the BMP during the design storm Peak discharge from the BMP during the 10 -year storm Maximum capacity of a 100 -foot long LS -VFS Peak flow directed to the LS -VFS Is a flow bypass system going to be used? Explanation of any "Other' responses above LS -VFS Design Forebay surface area Depth of Forebay at stormwater entry point Depth of Forebay at stormwater exit point Feet of level lip needed per cfs Computed minimum length of the level lip needed Length of level tip provided Width of VFS Elevation at downslope base of level lip Elevation at the end of the VFS that Is farthest from the LS Wet detention pond 4,43 cfs 4.43 cfs 10 cfs 4.43 cfs n (Y or sq ft in In 10 fticfs 44 ft 100 ft 30 ft 388.75 fmsl 387.25 fmsl Form SW401 - LS -VFS - 27Ju12011 - Rev.9 page 1 of 3 Slope (from level lip to the end of the VFS) Are any drawls present in the VFS? Is there a collector Swale at the end of the VFS? Bypass System Design (if applicable) Is a bypass system provfdad? Is there an engineered flow splitting device? Dimensions of the channel (see diagram below): M W y (Flow depth for 10 -year storm) freeboard (during the 10 -year storm) Peak velocity in the channel during the 10 -yr storm Channel lining material Does the bypass discharge through a wetland? Does the channel enter the stream at an angle? Explanation of any "Other" responses above 5.00 % n (Y or N) 0( n (Y or N) n (Y or N) n (Y or N) ftlsec Pick one: (Y or N) (Y or N) W N t 0 1 III. REQUIRED ITEMS CHECKLIST EDIT Please indicate the page or plan shoot numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. if the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Requried Item: 1. Plans (1" - 50' or larger) of the entire sile showing: - Design at ultimate build -out, Off -site drainage (if applicable), Delineated drainage basins (include Rational C coefficient per basin), Forebay (if appticabte), High flour bypass system, Maintenance access, Proposed drainage easement and public right of way (ROW), and Boundaries of drainage easement. 2. Plan details (1" = 30' orlarger) for the level spreader showing: - Forebay (if applicable), High flow bypass system, One foot topo lines between the level lip and top of stream bank, Proposed drainage easement, and Design atuilimato build -out. Initials Page or plan sheet number and any notes: Much of the information requested is in the submitted "Stormwater Impact Analysis'. �.� Detailed construction Drawings are to be evaluated by the City of Durham during construction drawing approval. Form SW401 - Ls -VFS - 2?M2011 - Rev.9 page 2 of 3 Section view of the level spreader (1" = 20' or larger) showing: Underdrain system (if applicable), Level lip. Upslope channel, and Downslope filler fabric. 4. Plan details of the flow spiilling device and supporting calculations (if applicable). 5, A construction sequence that shows hour the level spreader will be protected from sediment until the entire drainage area is slab]14ed. If a non - engineered VFS is being used, then provide a photograph of the VFS showing that no draws are present. 7. The supporting calculations. B. A copy of the signed and notarized operation and maintenance (0 &M) agreement. Detailed construction Drawings are to be evaluated by the City of Durham during constmcLon drawing approval. Detailed construction Drawings are to be evaluated by the City of Durham during construction drawing approval. Sputter box calculations y are in the SIA. /`- -'Detailed construction Drawings are to be evaluated by the City of Durham during construction drawing approval. See Stormwater Impact Analysis See City of Durham STORMWATER FACILITY AGREEMENT http:!ldurhamnc. govt ichl oplpwdl storrnlDocumentslres _stormwater_ag r eement.doc Form SW401 - LS -VFS - 27JO2011 - Rev.9 page 3 of 3 AN"Ar 7 -1 NCDENR Depth of forebay at stormwater entry point STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM LEVEL SPREADER - VEGETATED FILTER STRIP (LS -VFS) SUPPLEMENT This form must be completely filled out, prrnted, initialed, and submitted. I. PROJECT INFORMATION filcfs Project name Del Webb- Durham Contact name Lee Murphy Phone number 919A90A990 Date December 20, 2011 Drainage area number WQ -10 II. DESIGN INFORMATION frost The purpose of the LS -VFS Pollutant removal: 40% TSS, 30°% TN, 35% TP Stormwater enters LS -VFS from A BMP Type of VFS Engineered filter strip (graded & sodded, slope < 8 %) Explanation of any "Other" responses above If Stormwater Enters the LS -VFS from the Drainage Area Drainage area fe Do not complete this section of the form. Impervious surface area ff Do not complete this section of the form. Percent impervious % Do not complete this section of the form. Rational C coefficient Do not complete this section of the form. Peak flow from the 1 fnlhr storm cfs Do not complete this section of the form. Time of concentration min Do not complete this section of the form. Rainfall Intensity, 10- yrstorm Whir Do not complete this section of the form. Peak flow from the 10- yrstorm cfs Do not complete this section of the form. Design storm Maximum amount of flow directed to the LS -VFS cfs Do not complete this section of the form. Is a flow bypass system going to be used? (Y or N) Do not complete this section of the form. Explanat on of any "Other" responses above If Stormwater Enters the LS-VFS from a BMP Type of BMP Wet detention pond Peak discharge from the BMP during the design storm 6.3 cfs Peakdischarge from the BMP during the 10- yearstorm 6,3 cfs Maximum capacity of a 100 -foot long LS -VFS 10 cfs Peak flow directed to the LS -VFS 6.3 cfs Is a flow bypass system going to be used? n (Y or N) Explanation of any "Other" responses above LS -VFS Design Forebay surface area sq ft Depth of forebay at stormwater entry point In Depth of forebay at stormwater exit point in Feet of level lip needed per cfs 10 filcfs Computed minimum length of the level lip needed 63 ft Length of level lip provided 100 ft Width of VFS 30 ft Elevation atdownslope base of level lip 379.75 frost Elevation at the end of the VFS that is farthest from the LS 378.25 fmsl Form SW401 - LS -VFS - 27Jut2011 - Rev.9 page 1 of 3 Slope (from level lip to the end of the VFS) Are any draws present in the VFS? is there a collector swage at the and of the VFS? Bypass System Design (if applicable) Is a bypass system provided? Is there an engineered flow splitt ng device? Dimensions of the channel (see diagram below): M W y (flow depth for 10 -year storm) freeboard (during the 10 -year storm) Peak velocity in the channel during the 10 -yr storm Channel lining material Does the bypass discharge through a wetland? Does tho channel enter the stream at an angle? Explanation of any "Other" responses above III, REQUIRED ITEMS CHECKLIST 5.00 % In (Y or N) OK n (Y or N) n (Y or N) n (Y or N) fusec Pick one: (Y or N) (Y or N) W V (during file t 0 -yr stoiiiil 1\4 Itii B EDIT Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Requried Item: 1. Plans (1" - 50' or larger) of the entire site showing: - Design at ultimate build -out, Off -site drainage (if applicable), Delineated drainage basins (include Rational C coefficient per basin), Forebay (if applicable), High flow bypass system, Maintenance access, Proposed drainage easement and public right of way (ROW), and Boundaries of drainage easement. 2. Plan details (1" = 30' or larger) for the level spreader showing: - Forebay (if applicable), High flow bypass system, One foot topo tines between the level lip and top of stream bank, Proposed drainage easement, and Design at ultimate build -out. Initials Page or plan sheet number and any notes: I Much of the information requested is in the submitted "Stormwater ) n lrnpactAnalysW. Y?��I Detailed conshction Drawings are to be evaluated by the City of Durham during construction drawing approval. Form SW401 - LS -VFS - 27Ju12011 - Rev.9 page 2 or 3 3. Section view of the level spreader (1" = 20' or larger) showing: - Underdrain system (if applicable), Level lip, Upslope channel, and Downslope filter fabric. 4. Plan details of the flow splitting device and supporting calculations (if applicable). 5. A construction sequence that shows how the level spreader will be protected from sediment unfit the entire drainage area is stabilized. 6. If a non- enginoered VFS is being used, then provide a photograph of the VFS showing that no draws are present. 7. The supporting calculations. 8. A copy of the signed and notarized operation and maintenance (0 &M) agreement. Detailed constructlon Drawings are to be evaluated by the City of Durham during construction drawing approval. I Detailed construction Drawings are to be evaluated by the City of Durham during construction drawing approval. Splitter box calculations are in the SIA. + Detailed construction Drawings are to be evaluated by the City of Durham during construction drawing approval. � _ See Slormwaler Impact Analysis _ See City of Durham STORMVVATER FACILITY AGREEMENT hUp: l/ durharnncgovlichloplpvrdlstoraVDocuments /res_storrnwater agr eement.doc Fcrm SW401 - LS -VFS - 27Ju12p11 - Rev.S page 3 of 3 ��� a�O� 14p7F9Qy y � NCDENR p Y STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM LEVEL SPREADER - VEGETATED FILTER STRIP (LS -VFS) SUPPLEMENT This form must be completely fitted out, printed, Initialed, and submitted. I. PROJECT INFORMATION fticfs Project name Del Webb- Durham Contact name Lee Murphy Phone number 999- 490 -4990 Date December 20, 2011 Drainage area number WO -11 II. DESIGN INFORMATION fmsl The purpose of the LS -VFS Pollutant removal 40% TSS, 30% TN, 35% TP Stormwater entefs LS -VFS from A 8MP Type of VFS Engineered filter strip (graded & Sodded, slope < 8 %) Explanation of any "Other" responses above If Stormwater Enters the LS -VFS from the Drainage Area Drainage area fe Do not complete this section of the form. Impervious surface area f? Do not complete this section of the form Percent impervious % Do not complete this section of the form Rational C coefficient Do riot complete thfs section of the form. Peak Row from the 1 inmr storm cfs Do not complete this section of the form. Time of concentration min Do not complete this section of the form. Rainfall intensity, 10 -yr storm in1hr Do not complete this section of the form. Peak flow from the 10 -yr storm cfs Do not complete this section of the form. Design storm Maximum amount of flow directed to the LS -VFS cfs Do not complete this section of the farm. Is a Flow bypass system going to be used? (Y or N) Do not complete this secllon of the form. Explanation of any "Other" responses above If Stormwater Enters the LS -VFS from a BMP Type of BMP Wet detention pond Peak discharge from the BMP during the design storm 2.93 cfs Peak discharge from the BMP during the 10 -year storm 2.93 cfs Maximum capacity of a 100 -foot long LS -VFS 10 cfs Peak flour directed to the LS -VFS 2,93 cfs Is a Flow bypass system going to be used? n (Y or N) Explanation of any "Other" responses above LS -VFS Design Forebay surface area sq ft Depth of forebay at stormwater entry point in Depth of forebay at stormwater exit point in Feet of level lip needed per cfs 10 fticfs Computed minimum length of the level lip needed 29 ft Length of level lip provided 100 ft Width of VFS 30 ft Elevation at downslope base of level lip 387.75 fmsl Elevation at the end of the VFS that is farthest from the LS 386.25 fmsl Form SW401 - LS -VFS - 273ul201 t - Rev.9 page 1 of 3 Slope (from level lip to the end of the VFS) Are any draws present in the VFS? Is there a collector swaie at the end of the VFS? Bypass System Design (if applicable) Is a bypass system provided? Is there an engineered flow splitting device? Dimensions of the channel (see diagram below): M W y ((low depth for 10 -year storm) freeboard (during the 10 -year storm) Peak velocity in the channel during the 10- yrstorm Channel lining material Does the bypass discharge through a wetland? Does the channel enter the stream at an angle? Explanation of any "Other" responses above 5.00 % n (Y or N) GK n (Y or N) n (Y or N) n (Y or N) ft fusee Pick one. (Y or N) (Y or N) W III. REQUIRED ITEMS CHECKLIST EDIT Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the appfcant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Requried Item: 1. Plans (1" - 50' or larger) of the entire site showing: - Design at ultimate build -out, Off -site drainage (if applicable), Delineated drainage basins (include Rational C coefficient per basin), Forebay (if applicable), High flow bypass system, Maintenance access, Proposed drainage easement and public right of way (ROW), and Boundaries of drainage easement. 2. Plan details (1" = 30' or larger) for the level spreader showing: - Forebay (if applicable), High flow bypass system, One fool topo lines between the level lip and top of stream bank, Proposed drainage easement, and Design at ultimate build -out. Initials Page or plan sheet number and any notes: (Much of the information requested is in the submitted "Stormwater Impact Analysis ". Detailed constriction Drawings are to be evaluated by the City of (Durham during construction drawing approval. Form SW40i - LS -VFS - 27Ju120i1 - Rev.9 page 2 of 3 Section view of the level spreader (1" = 20' or larger) showing: Underdrain system (if applicable), Level lip, Upsiope channel, and Downslope filter fabric. 4. Plan details of the flow splitting device and supporting calculations (if applicable). 5. A construction sequence that shows how the level spreader will be protected from sediment until the entire drainage area is stabilized. S. If a non - engineered VFS is being used, then provide a photograph of the VFS showing that no draws are present. 7. The supporting calculations. 8. A copy of the signed and notarized operation and maintenance (O8M) agreement. Detailed construction Drawings are to be evaluated by the City of Durham during construction drawing approval. Detailed construction Drawings are to be evaluated by the City of Durham during construction drawing approval. Splitter box calculations are in the SIA. Detailed construction Drawings are to be evaluated by the City of Durham during construction drawing approval. See Slarmwater Impact Anatysis See City of Durham STORMWATER FACILITY AGREEMENT 0' http: lldurhamnc. govAchlcplpwdlstorm /Documentslres_stormwater agr eement.doc Form SW401 - LS -VFS - 27JW2011 - Rev.9 page 3 of 3 ©�� o�oF wnrFggc r NCDENR p STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM LEVEL SPREADER - VEGETATED FILTER STRIP (LS -VFS) SUPPLEMENT This form mast be completely filled oat, printed, initialed, and submitted. I. PROJECT INFORMATION 10 Project name Del Webb- Durham Contact name Lee Murphy Phone number 919- 490 -4990 Date December 20, 2011 Drainage area number INq -12 II. DESIGN INFORMATION 39835 The purpose of the LS -VFS Pollutant removal: 40% TSS, 30% TN, 35% TP Stormwater enters LS-VFS from A BMP Type of VFS Engineered filler strip (graded & sodded, slope < 8 %) Explanation of any "Other' responses above If Stormwater Enters the LS-VFS from the Drainage Area Drainage area f? Do not complete this section of tho form. Impervious surface area f? Do not complete this section of the form. Percent impervious % Do not complete this section of the form. Rational C coefficient Do not complete this secton of the form. Peak flow from the 1 irlhr storm cis Do not complete this section of the form. Time of concentration min Do not complete this section of the form. Rainfall intensity, 10 -yr storm it lhr Do not complete this section of the form. Peak flovr from the 10 -yr storm cfs Do not complete this section of the form. Design storm Maximum amount of flow directed to the LS -VFS cfs Do not complete this section of the form. Is a flow bypass system going to be used? (Y or N) Do not complete this section of the form. Explanation of any "Other responses above If Stormwater Enters the LS-VFS from a BMP Type of BMP Wet detention pond Peak discharge from the BMP during the design storm 1.77 CIS Peak discharge from the BMP during the 10 -year storm 1.77 cfs Maximum capacity of a 100 -foot long LS -VFS 10 cfs Peak flow directed to the LS-VFS 1.77 cfs Is a flow bypass system going to be used? n (Y or N) Explanation of any "Other" responses above LS-VFS Design Fore bay surface area sq ft Depth of forebay at stormwater entry point in Depth of forebay at stormwater exit point in Feet of level lip needed per cfs 10 f1 is Computed minimum length of the level lip needed 18 ft Length of level lip provided 50 ft Width of VFS 30 ft Elevation at tlownslope base of level lip 39835 fmsl Elevatoa at the end of the VFS that is farthest from the LS 305.25 1 Form SW401 - LS -VFS - 27Ju12011 - Rev.9 page 1 of 3 Slope (from level lip to the end of the VFS) Are any draws present in the VFS? Is there a collector %wale at the end of the VFS? Bypass System Design (if applicable) 1s a bypass system provided? Is there an engineered flow splitting device? Dimensions of the channel (see diagram below): M W y (Bow depth for 10 -year storm) freeboard (during the 10 -year storm) Peak velocity in the channel during the 10- yrstorm Channel Lining material Does the bypass discharge through a wetland? Does the channel enter the stream at an angle? Explanation of any °Otherr responses above 5.00 % n (Y or N) 0;< n (Y or N) n (Y or N) n (Y or N) fvsec Pick one: (Y or N) (Y or N) W j 13 y NI. REQUIRED ITEMS CHECKLIST EDIT Please indicate the page or plan sheet numbers where the supporling documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Requried Item: 1. Plans (1" - 50' or larger) of the entire site showing: - Design at ultimate build -out. Off -site drainage (if applicable), Delineated drainage basins (include Rational C coefficient per basin), Forebay (if applicable), High Bow bypass system. Maintenance access, Proposed drainage easement and public right of way (ROW), and Boundaries of drainage easement. 2. Plan details (1" = 30' or larger) for the level spreader showing: - Forebay (if applicable), High Bow bypass system, One foot topo lines between the level lip and top of stream bank, Proposed drainage easement, and Design at ultimate build -out. Initials Page or plan sheet number and any notes: IMuch of the information requested is in the submitted "Stormwater Impact Analysis ". Detailed construction Drawings are to be evaluated by the City of Durham during construction drawing approval. Form SW401 - LS-VFS - 27M2011 - Rev.9 page 2 of 3 3. Section view of the level spreader (1" = 20' or larger) showing: - Underdrain system (if applicable), Level lip, Upslope channel, and Oownslope filter fabric. 4. Pan details of the flow splitting device and supporting calculations (if applicable). 5. A construction sequence that shows how the level spreader will be protected from sediment until the entire drainage area is stabilized. 6. If a non - engineered VFS is being used, then provide a photograph of the VFS showing that no draws are present. 7. The supporting calculations. 8. A copy of the signed and notarized operation and maintenance (0$M) agreement. _I Detailed construction Drawings are to be evaluated by the City of (Durham during construction drawing approval. Detailed construoboa Dravrings are to be evaluated by the City of Durham during construction drawing approval Splitter box calculations are in the SIA. Detailed construction Drawings are to be evaluated by the City of Durham during construction drawing approval. _ -I See Stormwaler Impact Analysis See City of Durham STORMWATER FACILITY AGREEMENT http: tfdurhamnc.gov /ichloplpwdlstorm /Documents /res_stormwater agr cement.doc Form SVV401 - LS -VFS - 27JU12011 - Rev.9 page 3 of 3 �yRA NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM LEVEL SPREADER - VEGETATED FILTER STRIP (LS -VFS) SUPPLEMENT This form must be completely filled out, printed, initiated, and submitted. TFih, 7 OGY I, PROJECT INFORMATION 100 Project name Del Webb- Durham Contact name Lee Murphy Phone number (919) 490 -4990 Data December 20, 2011 Drainage area number LS #14 II. DESIGN INFORMATION The purpose of the LS-VFS Pollutant removal: 40% TSS, 30% Ti 35% TP Stormwater enters LS-VFS from The drainage area Type of VFS Engineered filter strip (graded & sodded, slope < 8 %) Explanation of any "Other' responses above If Stormwater Enters the i from the Drainage Area Drainage area Impervious surface area Percent impervious Rational C coefficient Peak flow from the 1 inlhrstorm Time of concentration Rainfall intensity, 10- yrstorm Peak flow from the 10 -yr storm Design storm Maximum amount of flow directed to the LS-VFS Is a Flow bypass system going to be used? Explanation of any "Other" responses above If Stormwater Enters the LS-VFS from a BMP Type of BMP Peak discharge from the BMP during the design storm Peak discharge from the BMP during the 10 -year storm Maximum capacity of a 11 long LS -VFS Peak flour directed to the LS -VFS Is a Flow bypass system going to be used? Explanation of any 'Other responses above LS-VFS Design 109,771 fe 43,560 rye 39.68 % 0.59 1.49 ofs 5.00 min 7.22 inlhr 10.73 ofs 10- yearstorm 10 cfs or Do not complete this section of the form. cfs cfs Do not complete this section of the form. 10 cfs cfs Do not complete this section of the form. (Y or N) Forebay surface area 100 sq ft Forebay is adequately sized. Depth of forebay at stormwater entry point 24 in Depth of Forebay at stormwater exit point 6 in depth is appropriate Feet of level lip needed per cfs 10 fticls Computed minimum length of the level lip needed 100 ft Length of level lip provided 100 It Width of VFS 30 ft Elevation at downslope base of level lip 387.75 fmsl Elevation at the end of the VFS that is farthest from the LS 386.00 fmsl Form SW401 - LS -VFS - 27M2011 - Rev.9 page 1 of 3 Slope (from level lip to the and of the VFS) Are any draws present in the VFS? is there a cc%ctor swale at the end of the VFS? Bypass System Design (if applicable) Is a bypass system provided? Is there an engineered flow splitting device? Dimensions of the channel (see diagram below): M W y (flow depth for 10 -year storm) freeboard (during the 10 -year storm) Peak velocity in the channel during the 10 -yr storm Channel lining material Does the bypass discharge through a wetland? Does the channel enter the stream at an angle? Explanahbn of any 'Other responses above 5.83 % n (Y or N) OK n (Y or N) y (Y or N) y (Y or N) fusec Pick one: n (Y or N) (Y or N) %Nr Please provide plan details of flow splitter & suppoWng talcs. V— r + B III. REQUIRED ITEMS CHECKLIST EDIT Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Requrled Item: 1. Plans (1" • 50' or larger) of the entire site showing: - Design at ultimate build -out, Off4te drainage (if applicable), Defireated drainage basins (include Rational C coefficient per basin), Forebay (if applicable), High flow bypass system, Maintenance access, Proposed drainage easement and public right of way (ROW), and Boundaries of drainage easement. 2. Plan details (1" = 30' or larger) for the level spreader showing: - Forebay (if applicable), High flow bypass system, One foot topo lines between the level lip and top of stream bank, Proposed drainage easement, and Design at ultimate build -out. Initials Page or plan sheet number and any notes: Much of the information requested is in the submitted "Stormwater Impact Analysis" (SIA) ed construction drawings are to be evaluated by the City of m during constructon drawing approval. Form SW401 - LS -VFS - 27M2011 - Rev.9 page 2 of 3 Section view of the level spreader (1" = 20' or larger) showing: Underdrain system (if applicable), Level lip, Upslope channel, and Downslope filter fabric. 4. Plan details of the flow splitting device and supportng calculations (ilapplicable). 5. A construction sequence that shows how the level spreaderwllf be protected from sediment until the entire drainage area is stabilized. 6. If a non - engineered VFS is being used, then provide a photograph of the VFS showing that no draws are present. 7. The supporting calculations. 8. A copy of the signed and notarized operation and maintenance (0 9M) agreement. XVVI— Detailed construction drawings are to be evaluated by the City of Durham during construction drawing approval. Detailed construcBon drawings are to be evaluated by the City of Durham during construction drawing approval. Splitter box calculations are in the SIA. Detailed construction drawings are to be evaluated by the City of Durham during construction drawing approval. NA See Stormwater Impacct Analysis q_ See City of Durham Stormwater Facility Agreement at; http lldurhamnc. govfichlopl pwdlstormlDocuments lres_stormwater_agr eement.doc Form SW401 - LS -VFS - Mu12011 - Rev.9 page 3 of 3 Del Webb STORM WATER IMPACT ANALYSIS Del Webb Leesville Road Durham, North Carolina Horvath Associates Project Number: 1 121 August 4, 2011 Revised November 17, 2011 Revised January 25, 2012 1lfiffl1"11 CA Roe ti • • • IIG45 • ol- 25- 201z- Prepared for: Randy King - Pulte Homes 1225 Crescent Green Drive - Suite 250 Cary, NC 27518 (919) 816-1146 Prepared by: Horvath Associates, P.A. Engineers - Planners - Landscape Architects 16 Consultant Place, Suite 201 Durham, North Carolina 27707 (919) 490 -4990 Table of Contents City of Durham Stormwater Site Plan Checklist Narrative Summary of Results Pre- and Post - Development Peak Runoff Calculations Preliminary BMP Sizing Calculations Nutrient Loading Calculations Required Maps and Information City of Durham Stormwater Site Plan Checklist DURHAM City of Durham Public Works Department Stormwater Services Divisions 101 City Hall Plaza Durham, North Carolina, 27701 1 8 6 9 Telephone (919) 560 -4326 CfiY OF MEDICINE Fax (919) 560 -4316 Design Professional's Signature and Seal Stormwater Services Site Plan and Preliminary Plat Submittal Checklist For each review submittal, including re- submittals, the entire study and submittal checklist shall be submitted. Partial study packages will NOT BE REVIEWED and will be returned with NO REVIEW PERFORMED. Contact Stormwater Services regarding redevelopment or expansion projects for modified requirements. L PROJECT INFORMATION Project Name: Del Webb Previous Project Name, if applicable: N/A PIN: See Below Project Comment Contact Person: Matt Jones Phase: N/A Planning Case Number: D1100150 Phone number ( 919 )490-4990 Fax number: (919 ) 490 -8953 Company Name: Horvath Assocaties, PA II. REQUIRED ITEMS CHECKLIST The following checklist outlines submittal requirements. Initial in the space provided to indicate the following submittal requirements have been met and supporting documentation is attached. PINS: 0769- 03 -44- 6000, 0769- 03 -24- 8486, 0769- 03 -33- 2232,0769 -01 -35 -3524, A. General Requirements 0769- 03 -35- 7254, 0769- 01 -06- 9898, 0769- 01 -26- 9080,0769 -03 -24 -8486, 0769- 03 -42- 5743, 0769 -03 -41 -4971, 0769- 03 -41- 6925,0769 -03 -42 -8030 Applicant's initials MLJ a. Stormwater Impact Analysis (SIA) including narrative report and drainage calculations sealed and signed by North Carolina Professional Engineer. MLJ b. Cape Fear / euse Basm circle one). (If Neuse Basin circled completion of Section D. below is required) MLJ* INSIDE / OUTSIDE (circle one) Water Supply Watershed Overlay. *See Section E (If INSIDE Water Supply Watershed completion of Section E. below is required) MLJ d. Show all City of Durham, Water Supply Watershed and Neuse River Basin Stream Buffers on the plan. Top of bank for the streams have been shown on the plan. Show the 10 -foot no build setback measured from the stream buffer line. Diffuse flow into stream buffers is required for all stream buffers. MLJ e. Durham County Soils Survey, including map reference, with site boundary clearly shown and labeled. The map shall clearly show all streams, soil types and soil type boundaries. MLJ f. USGS 7.5 Minute Quadrangle map, including map reference, with site boundary clearly shown and labeled. The map shall clearly show all streams. MLJ g. Floodplain located on site: es No (circle one). MLJ h. A copy of the effective floodplain map, including panel number and map date, with site boundary clearly shown and labeled has been provided regardless if floodplain is located on the site. Show the floodway, 100 -year floodplain and /or future 100 -year floodplain with base flood elevations (if applicable) on the plan. B. Peak Runoff Rate Increases' MLJ a. Introduction narrative describing site conditions in pre- and post- development conditions including a description of site improvement changes. MLJ b. Drainage area maps (one map for pre- development; one map for post- development) with: X Scale and north arrow. X Sub -basin area(s) delineated with area(s) in acres indicated. X Analysis points clearly identified and labeled. X Segmented TR -55 time of concentration flow paths showing each segment. MLJ c. Methodologies and procedures described. MLJ d. Site plan or grading plan identifying pre- and post- development drainage patterns. MLJ e. Pre- and post- development times of concentration calculated by TR -55 segmented approach. MLJ f. Calculations for the pre- and post- development discharges for the 2- and 10 -year, 24 -hour storm using TR -55, TR -20, HEC-HMS, HEC -1 or Rational Method. MLJ g. Summary of Results provided in the following format (see Example below). BASIN NAME Pre- Developed 2-year discharge Post- Developed 2-year discharge % Increase Pre- Developed 10 year discharge Post - Developed 10 year discharge % Increase Detention Required (Yes/No) Remarks MLJ h. Conclusion providing detailed findings. MLJ i. Stormwater Control Facility (BMP) provided (indicate number of each type of BMP): Constructed Wetland Dry Detention Pond Underground Detention 11 Wet Detention Pond Not required (explanation) 13 Level Spreaders MLJ j. BMP benefits: X Control 2- and 10 -year discharge MLJ k. Downstream Analysis Provided with Findings or Not Required X Other Nutrient Removal Not required: MLJ 1. Downstream Improvements Proposed with a signed notarized agreement (agreement shall be recorded prior to site plan approval) with downstream property owner(s) Y /0 1 See Design Summaries and NCDENR BMP Manual (latest edition) for details and BMP design requirements. C. City of Durham Stream Buffers MLJ a. All streams, both intermittent and perennial, shown on the Durham County Soil Survey and the USGS 7.5 Minute Quadrangle map that drain 25 -acres or more have been shown on the plan. Top of bank for the streams has been shown on the plan. Stream buffers shall be shown from the tops of banks of the streams and a 10 -foot no build setback shall be shown measured from the stream buffer line. Diffuse flow into stream buffers is required. N/A b. A drainage area map showing the 25 -acre point for the streams mentioned in II. C. a. has been provided with a north arrow and scale. D. Neuse Basin Requirements 12 Note: If a single family, duplex or recreational development disturbs <_ 1 acre or a multi - family, office, institutional, commercial or industrial development disturbs <_ 0.5 acres then items b, c, d, and a below are N /A. Additionally, new residential development may be exempt from the 1 -year peak runoff control requirement if impervious area does not exceed 15% and swales and other natural stormwater conveyances are used to maximum extent practicable. ITEMS a. AND f. SHALL BE PROVIDED FOR ALL PROJECTS. MLJ MLJ MLJ MLJ MLJ MLJ a. All streams, both intermittent and perennial, shown on the Durham County Soil Survey or USGS 7.5 Minute Quadrangle map, regardless of drainage area, require a Neuse River Basin Stream Buffer. The tops of banks for the streams have been shown on the plan. The stream buffer has been measured from the tops of banks and the 10 -foot no build setback is shown from the stream buffer. Diffuse flow into stream buffers is required for all stream buffers. b. Pre- and post- development discharge calculations for the 1 -year 24 -hour storm using TR -55, TR -20, HEC -HMS or HEC -1. (1 -year, 24 -hour storm rainfall is 3- inches) c. Summary of Results provided in the following format (see Example below). d. BMP provided (indicate number of each type of BMP for 1 -year detention): Constructed Wetland Dry Detention Pond Underground Detention 11Wet Detention Pond Other (explanation) BMP provided (indicate number of each type of BMP for nitrogen treatment): Bioretention Area Constructed Wetlands Other 13 Level Spreaders (explanation) Not required Sand Filter 11 Wet Detention Pond Not required f. Pre- and post- development nitrogen calculations with City of Durham Nitrogen Spreadsheet. 1 See Section 8.2, Neuse River Basin Performance Standards, for additional details. 2 See Design Summaries and NCDENR BMP Manual (latest edition) for details and BMP design requirements. Pre- Post - Developed Developed Detention BASIN -1-year 1 year % Required NAME discharge discharge Increase (Yes/No) Remarks d. BMP provided (indicate number of each type of BMP for 1 -year detention): Constructed Wetland Dry Detention Pond Underground Detention 11Wet Detention Pond Other (explanation) BMP provided (indicate number of each type of BMP for nitrogen treatment): Bioretention Area Constructed Wetlands Other 13 Level Spreaders (explanation) Not required Sand Filter 11 Wet Detention Pond Not required f. Pre- and post- development nitrogen calculations with City of Durham Nitrogen Spreadsheet. 1 See Section 8.2, Neuse River Basin Performance Standards, for additional details. 2 See Design Summaries and NCDENR BMP Manual (latest edition) for details and BMP design requirements. E. Water Supply Watershed Requirements' MLJ a. Indicate the water supply watershed overlay district(s) the project is located. (Circle all that apply): F /J -A F/J-B E -A E -B M /LR -A M /LR -B N/A b. BMP provided (indicate number of each type of BMP): Bioretention Area Constructed Wetlands Sand Filter Wet Detention Pond Other X Not required MLJ c. Narrative explaining why a BMP is not provided. All developed areas located in the current watershed overlay will be directed away from the overlay in post- development to the on site BMP's. N/A d. All runoff from all impervious surface areas are directed into the BMP. MLJ e. All streams, both intermittent and perennial, shown on the USGS 7.5 Minute Quadrangle map that drain 25 -acres or more have been shown on the plan. Top of bank for the streams has been shown on the plan. Stream buffers shall be shown from the tops of banks of the streams and a 10 -foot no build setback shall be shown measured from the stream buffer line. Diffuse flow into stream buffers is required for all stream buffers. N/A f. A drainage area map showing the 25 -acre point for the streams mentioned in II. E. £ has been provided with a north arrow and scale. 1 See Design Summaries and NCDENR BMP Manual (latest edition) for details and BMP design requirements. Narrative Del Webb STORM WATER IMPACT ANALYSIS 1/25/12 Revisions • A level spreader was added to the outfall for WQ #9 per review comment. • WQ #3 was shifted 3 lots to the west. The drainage areas to WQ #1 and WQ #3 were revised to reflect the new location and the calculations were updated accordingly. 11/17/11 Revisions • Proposed constructed wetlands were converted to water quality ponds and level spreaders were added to the outfall from each pond to provide diffuse flow before entering the stream buffers. • Additional ponds were added based on new site layout. Drainage points were also added to the analysis in a few locations. Please note there are two BMP's that were added that are not analyzed. These are shown for reference and will only have runoff directed to them for future phases. • Constructed Wetland #4 was replaced by Level Spreader #7. General Description Del Webb will be an approximately 296 -acre community south of Leesville Road east of the intersection with Doc Nichols Road. The tracts that will make up the development are currently in the county but will be annexed. The properties are zoned Rural Residential and the land use is a mixture of agricultural, residential, and vacant. The entire project is in the Neuse river basin and the majority of the site is not in a watershed protection district. Approximately 8 acres in the northern portion of the site drains to the F /J -B Watershed Protection District. All impervious surface added in this portion of the site will be directed away from the F /J -B in post - development. There are multiple streams located onsite and FEMA 100 -year floodplain is associated with a few reaches. The development for the site will consist of single - family homes, a clubhouse area, and associated streets and parking. The community will be a dense residential development. Water Quality The development is greater than 42% impervious; therefore, 40% of the required nitrogen and phosphorous removal is required onsite. The required onsite nitrogen and phosphorous removal will be provided by multiple BMP's located throughout the site. All of the required phosphorus removal will be provided by the onsite BMP's, but further nitrogen reduction will be provided through offset payments to NCEEP. The total post - development nitrogen and phosphorous export for the site will not exceed 2.2 Ib /ac /yr and 0.50 Ib /ac /yr respectively. 1 -Year Runoff Analysis There are 9 drainage points, labeled DP's# 1 -6 and 8 -10, where new stormwater discharges will be introduced to a buffered stream. Water quality ponds will be utilized to reduce the post - development peak runoff to below the pre - development rate, as is reflected in the attached analysis, for every point where the increase in runoff from pre- to post - development is greater than 10%, which is every drainage point except DP #5, DP #6, DP #9 and DP# 10. Since runoff from DP's #8, 9 and 10 travels through DP #2's watershed, and runoff from DP's #4, 5, and 5 travels through DP #3's watershed, reaches were modeled to more accurately calculate the time of concentration at DP's #1 and 2. The reaches were modeled using cross sections taken from the channels they represent. The watershed's were modeled with no impervious area in pre - development and no offsite impervious area in post - development due to the difficulty in calculating the impervious area accurately with available data. Aerial photography shows that there is very little impervious area as a percentage of the watershed's and including it would not have a great effect on the curve numbers. This is a conservative assumption because it reduces the pre - development peak flow rates that must also be achieved in post - development. This design meets the City of Durham's requirements. 2- and 10 -Year Runoff Analysis There are three locations where concentrated stormwater runoff will leave the site in post - development. These points are labeled DP #1, DP #2, and DP #7. The onsite water quality ponds will attenuate the peak flow at these points to below the pre - development rate. This is supported by the analysis. Results for the peak flow in the 100 -year rainfall event are also provided to demonstrate that it is lower in post - development, so there are no offsite drainage concerns. This design meets the city of Durham's Requirements. BMP's Two types of BMP's will be located throughout the site to attenuate the peak flow rate of their contributing watershed's and or provide nutrient removal. Eleven water quality ponds will have surface areas large enough to accomplish 85% TSS removal, as calculated using the surface area multipliers, based on average depth and the impervious percentage of their drainage basins. The water quality ponds will utilize low flow orifices that will slowly draw down the temporary pool over a period of 2 -5 days. Level spreaders are designed at the outfall of each BMP and are sized for the 10 -year rainfall runoff. Each level spreader will discharge to an engineered filter strip at a slope of less than 5% that will be planted with grass and maintained in perpetuity. Rainfall runoff in excess of the 10 -year event will bypass the level spreaders by means of the water quality ponds' emergency spillways for all ponds except for WQ #9. Runoff in excess of the 10 -year rainfall event outflow from WQ #9 will bypass it's level spreader by means of a flow splitter box where it will be directed to a separate outfall with a plunge pool upstream of the buffer. Two level spreaders have been designed to provide diffuse flow of the runoff from their contributing drainage basins into a stream buffer. The level spreaders were designed so that their lengths are greater than 10 feet times the peak flow resulting from the 1 -inch per hour rainfall runoff from their watershed, as calculated using the rational method. The level spreaders will discharge to an engineered filter strip at a slope of less than 5% that will be planted with grass and maintained in perpetuity. A flow splitter will be utilized upstream of the level spreader to bypass all flows exceeding the 1 " /hr rainfall event to an existing natural draw. Conclusion Multiple BMP's located throughout the site will be utilized to accomplish the required onsite nitrogen and phosphorous removal as well as provide peak flow detention for the 1 -, 2 -, and 10 -year rainfall events. A nitrogen offset payment will mitigate the additional nitrogen export to reduce the total site nitrogen exports to 2.2 lb/ac/yr. The onsite BMP's will serve to reduce the post - development phosphorus export to below the allowable limit of 0.50 Ibs /ac /yr. Methodology • Drainage basins were delineated using 2 -foot contours for offsite areas and 1 -foot contours onsite. Contours displayed on the drainage maps are 10 -foot and 5 -foot contours for onsite and offsite respectively to increase readability of the maps. Onsite topography is from survey data and offsite topography is from City of Durham Aerial Topography, 1995. • United States Geological Survey Map is the Southwest Durham Quadrangle. • The FEMA Map associated with the site is Map # 3720076900J, effective date May 2, 2006, Panel 0769J. • Peak flows are determined using the NRCS Method, as described in TR -20, in HydroCAD Version 7.1. NRCS Curve Numbers are based upon cover condition and soil type as described below. • Soil data to determine curve numbers in the watershed are from USDA Durham County Soil Map # 33. • Cover conditions for each watershed was determined based on digital maps obtained from the City of Durham, survey information, aerial photography. • Time of concentration calculations were determined using the TR -55 method for sheet flow, shallow concentrated flow, lake flow, and channel flow • The routing analysis for the dry pond was accomplished using HydroCAD Version 7.1 which utilizes the storage- indication method. Summary of Results 1121 SIA -SUMMARY OF RESULTS.xls Summary of Results Matt Jones, El 1/25/2012 1121 - Del Webb 1 -, 2 -, and 10 -Year Runoff Analysis - Summary of Results Basin Name Pre - Developed 1 -Year Discharge Post- Developed 1 -Year Discharge Percent Increase Pre- Developed 2-Year Discharge Post - Developed 2 -Year Discharge Percent Increase Pre- Developed 10 -Year Discharge Post - Developed 10 -Year Discharge Percent Increase Detention Required (Yes /No) DP #1 315.36 512.41 62.48% 466.41 708.99 52.01% 1059.27 1399.58 32.13% YES DP #2 206.86 373.78 80.69% 300.95 516.19 71.52% 674.01 1014.54 50.52% YES DP #3 99.60 210.41 111.2617o N/A N/A N/A N/A N/A 111.2617o YES DP #4 10.83 16.40 51.43% N/A N/A N/A N/A N/A 51.43% YES DP #5 106.23 98.97 -6.83% N/A N/A N/A N/A N/A -6.83% NO DP #6 46.91 49.91 6.40% N/A N/A N/A N/A N/A 6.40% NO DP #7 0.32 10.93 3315.63% 1.00 13.68 N/A 4.93 23.58 3315.63% YES DP #8 56.30 287.56 410.76% N/A N/A N/A N/A N/A 410.76% YES DP #9 88.18 76.05 - 13.76% N/A N/A N/A N/A N/A - 13.76% NO DP #10 73.15 68.80 -5.95% N/A N/A N/A N/A N/A -5.95% NO 100 -Year Runoff Analysis - Summary of Results Nutrient Loading - Summary Nitrogen Pre - Development Loading = 0.48 Post - Development Loading Without Treatment = 6.80 Post - Development Loading After Treatment = 4.01 Post - Development Loading Requiring Offset = 528.69 Payment Required to NCEEP = $343,226.19 Total Payment Required to NCEEP = Phos orus Ibs /acre /yr Ibs /acre /yr Ibs /acre /yr Ibs /yr 0.08 0.78 0.36 Post- Developed $0.00 $343,226.19 Pre - Developed Basin 100 -Year 100 -Year Percent Name Discharge with Increase Discharge Detention DP #1 2034.93 1690.15 - 16.9417o DP #2 1297.26 1155.67 - 10.91% DP #7 13.03 1.37 - 89.49% Nutrient Loading - Summary Nitrogen Pre - Development Loading = 0.48 Post - Development Loading Without Treatment = 6.80 Post - Development Loading After Treatment = 4.01 Post - Development Loading Requiring Offset = 528.69 Payment Required to NCEEP = $343,226.19 Total Payment Required to NCEEP = Phos orus Ibs /acre /yr Ibs /acre /yr Ibs /acre /yr Ibs /yr 0.08 0.78 0.36 0.00 $0.00 $343,226.19 Impervious Area Summary Pre - Development Transportation - Related Imperviou Area (acres) = 0.00 Pre - Development Non - Transportation - Related Imperviou Area (acres) = 1.72 Post - Development Transportation - Related Imperviou Area (acres) = 57.64 Post - Development Non - Transportation - Related Imperviou Area (acres) = 68.36 Pre- and Post - Development Peak Runoff Calculations 16S 11S 7� " TO DP #10 PRE TO DP #9 PRE 9L DP #9 PR� 9S 5R TO DP #8 PRE DP #81910 REACH 5S �D TO DP #2 PRE 1OL iS DP #2 RE t TO #3 PRE 11L � 1S �D 7S 15S JDP#5 PRE TO D #4 PRE 13 L '�-- SS 4R DP #5 PRE TO DP #6 PRE 3L DP #3 PRE DP #4,5, &6 REACH TO DP #1 PRE DP #1 PRE S4 Reach on Link 14S TO DP #7 PRE 1121 - SIA PRE Type// 24 -hr 1 -Year Rainfall= 3.00" Prepared by {enter your company name here} Page 2 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 11/16/2011 Time span =0.00 -25.00 hrs, dt =0.05 hrs, 501 points Runoff by SCS TR -20 method, UH =SCS Reach routing by Stor- Ind +Trans method - Pond routing by Stor -Ind method Subcatchment 1S: TO DP #1 PRE RunoffArea= 63.580 ac Runoff Depth >0.76" Flow Length= 3,173' Tc =23.6 min CN =71 Runoff =42.74 cfs 4.029 of Subcatchment 2S: TO DP #3 PRE Runoff Area = 39.060 ac Runoff Depth >0.37" Flow Length= 2,277' Tc =21.0 min CN =61 Runoff =9.12 cfs 1.188 of Subcatchment 5S: TO DP #2 PRE Runoff Area = 267.910 ac Runoff Depth >0.81" Flow Length = 5,298' Tc =26.7 min CN =72 Runoff= 179.62 cfs 18.040 of Subcatchment 7S: TO DP #5 PRE Runoff Area = 123.330 ac Runoff Depth >0.67" Flow Length= 3,614' Tc =29.0 min CN =69 Runoff =60.45 cfs 6.882 of Subcatchment 8S: TO DP #6 PRE RunoffArea= 79.500 ac Runoff Depth >0.71" Flow Length= 2,455' Tc =25.3 min CN =70 Runoff =46.91 cfs 4.732 of Subcatchment 9S: TO DP #8 PRE RunoffArea= 57.930 ac Runoff Depth >1.02" Flow Length= 2,650' Tc =23.4 min CN =76 Runoff =56.30 cfs 4.900 of Subcatchment 11S: TO DP #9 PRE RunoffArea= 25.760 ac Runoff Depth = 0.58" Flow Length= 1,419' Tc =16.8 min CN =67 Runoff =15.06 cfs 1.256 of Subcatchment 14S: TO DP #7 PRE Runoff Area =4.660 ac Runoff Depth = 0.19" Flow Length =742' Tc =16.5 min CN =55 Runoff =0.32 cfs 0.076 of Subcatchment 15S: TO DP #4 PRE Runoff Area = 13.150 ac Runoff Depth = 0.76" Flow Length= 1,169' Tc =17.2 min CN =71 Runoff =10.83 cfs 0.833 of Subcatchment 16S: TO DP #10 PRE Runoff Area = 63.170 ac Runoff Depth= 1.02" Flow Length= 1,695' Tc =17.6 min CN =76 Runoff =73.15 cfs 5.343 of Reach 4R: DP #4,5, &6 REACH Peak Depth =1.59' Max Vet =4.5 fps Inflow= 113.53 cfs 12.447 of n =0.045 L= 2,375.0' S=0.0080'/' Capacity= 1,201.80 cfs Outflow =95.01 cfs 12.408 of Reach 5R: DP #8,9, &10 REACH Peak Depth =2.07' Max Vet =2.7 fps Inflow= 140.62 cfs 11.499 of n =0.045 L= 2,491.0' S=0.0028'/' Capacity= 1,285.41 cfs Outflow =90.40 cfs 11.446 of Link 3L: DP #1 PRE Link 9L: DP #9 PRE Link 10L: DP #2 PRE I nflow= 315.36 cfs 47.112 of Primary= 315.36 cfs 47.112 of Inflow =88.18 cfs 6.599 of Primary=88.18 cfs 6.599 of I nflow= 206.86 cfs 29.486 of Primary= 206.86 cfs 29.486 of 1121 - SIA PRE Type// 24 -hr 1 -Year Rainfall= 3.00" Prepared by {enter your company name here} Page 3 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 11/16/2011 Link 11L: DP #3 PRE RiilaB3 will e7,' &y:jC7d Inflow =99.60 cfs 13.597 of Primary=99.60 cfs 13.597 of Inflow= 106.23 cfs 11.614 of Primary= 106.23 cfs 11.614 of Total Runoff Area = 738.050 ac Runoff Volume = 47.280 of Average Runoff Depth = 0.77" 1121 - SIA PRE Type// 24 -hr 1 -Year Rainfall= 3.00" Prepared by {enter your company name here} Page 4 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 11/16/2011 Subcatchment 1S: TO DP #1 PRE Runoff = 42.74 cfs @ 12.20 hrs, Volume= 4.029 af, Depth> 0.76" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -Year Rainfall= 3.00" Area (ac) CN Description 14.090 55 Onsite Woods B 9.910 70 Onsite Woods C 11.290 77 Onsite Woods D 1.360 55 Offsite Woods B 0.890 70 Offsite Woods C 22.510 77 Offsite Woods D 3.530 80 Offsite Open D 63.580 71 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) Onsite Woods D 12.4 75 0.0400 0.1 61 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.50" 1.6 415 0.0720 4.3 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 4.1 1,205 0.0380 4.9 19.65 Channel Flow, Area= 4.0 sf Perim= 6.0' r= 0.67' n= 0.045 3.0 945 0.0060 5.3 399.05 Channel Flow, Area= 75.0 sf Perim= 25.0' r= 3.00' n= 0.045 2.5 533 0.0020 3.6 534.69 Channel Flow, Area= 150.0 sf Perim= 40.0' r= 3.75' n= 0.045 23.6 3,173 Total Subcatchment 2S: TO DP #3 PRE Runoff = 9.12 cfs @ 12.20 hrs, Volume= 1.188 af, Depth> 0.37" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -Year Rainfall= 3.00" Area (ac) CN Description 24.380 55 Onsite Woods B 12.000 70 Onsite Woods C 2.050 77 Onsite Woods D 0.630 80 Onsite Open D 39.060 61 Weighted Average 1121 - SIA PRE Type// 24 -hr 1 -Year Rainfall= 3.00" Prepared by {enter your company name here} Page 5 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 11/16/2011 Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 12.4 75 0.0400 0.1 74 Onsite Open C Sheet Flow, 12.370 80 Onsite Open D 42.750 55 Offsite Woods B Woods: Light underbrush n= 0.400 P2= 3.50" 1.7 374 0.0530 3.7 77 Offsite Woods D Shallow Concentrated Flow, 17.880 61 Offsite Open B 0.110 74 Offsite Open C Unpaved Kv= 16.1 fps 1.0 440 0.0780 7.0 28.15 Channel Flow, Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 10.1 Area= 4.0 sf Perim= 6.0' r= 0.67' n= 0.045 5.9 1,388 0.0080 3.9 78.72 Channel Flow, Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 2.1 Area= 20.0 sf Perim= 13.0' r= 1.54' n= 0.045 21.0 2,277 Total Subcatchment 5S: TO DP #2 PRE Runoff = 179.62 cfs @ 12.23 hrs, Volume= 18.040 af, Depth> 0.81" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -Year Rainfall= 3.00" Area (ac) CN Description 13.010 55 Onsite Woods B 1.640 70 Onsite Woods C 34.310 77 Onsite Woods D 1.900 61 Onsite Open B 2.100 74 Onsite Open C 12.370 80 Onsite Open D 42.750 55 Offsite Woods B 2.050 70 Offsite Woods C 73.710 77 Offsite Woods D 17.880 61 Offsite Open B 0.110 74 Offsite Open C 66.080 80 Offsite Open D 267.910 72 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 10.1 75 0.0670 0.1 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.50" 0.9 192 0.0460 3.5 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 2.1 640 0.0280 5.0 29.92 Channel Flow, Area= 6.0 sf Perim= 7.0' r= 0.86' n= 0.045 7.2 2,290 0.0260 5.3 47.92 Channel Flow, Area= 9.0 sf Perim= 9.0' r= 1.00' n= 0.045 5.1 1,259 0.0140 4.1 49.69 Channel Flow, Area= 12.0 sf Perim= 11.0' r= 1.09' n= 0.045 1.3 842 0.0040 10.8 453.63 Channel Flow, Area= 42.0 sf Perim= 23.0' r= 1.83' n= 0.013 26.7 5,298 Total 1121 - SIA PRE Type// 24 -hr 1 -Year Rainfall= 3.00" Prepared by {enter your company name here} Page 6 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 11/16/2011 Subcatchment 7S: TO DP #5 PRE Runoff = 60.45 cfs @ 12.27 hrs, Volume= 6.882 af, Depth> 0.67" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -Year Rainfall= 3.00" Area (ac) CN Description 20.450 55 Onsite Woods B 12.490 70 Onsite Woods C 10.600 77 Onsite Woods D 0.700 61 Onsite Open B 7.700 74 Onsite Open C 9.880 80 Onsite Open D 8.410 55 Offsite Woods B 27.310 70 Offsite Woods C 7.570 77 Offsite Woods D 0.330 61 Offsite Open B 10.370 74 Offsite Open C 7.520 80 Offsite Open D 123.330 69 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 16.3 75 0.0200 0.1 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.50" 1.7 354 0.0450 3.4 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 2.0 600 0.0400 5.0 20.16 Channel Flow, Area= 4.0 sf Perim= 6.0' r= 0.67' n= 0.045 1.2 341 0.0260 4.8 28.83 Channel Flow, Area= 6.0 sf Perim= 7.0' r= 0.86' n= 0.045 4.3 1,310 0.0210 5.1 60.85 Channel Flow, Area= 12.0 sf Perim= 11.0' r= 1.09' n= 0.045 3.5 934 0.0100 4.4 88.02 Channel Flow, Area= 20.0 sf Perim= 13.0' r= 1.54' n= 0.045 29.0 3,614 Total Subcatchment 8S: TO DP #6 PRE Runoff = 46.91 cfs @ 12.22 hrs, Volume= 4.732 af, Depth> 0.71" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type 11 24 -hr 1 -Year Rainfall= 3.00" 1121 - SIA PRE Type// 24 -hr 1 -Year Rainfall= 3.00" Prepared by {enter your company name here} Page 7 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 11/16/2011 Area (ac) CN Description 4.370 55 Onsite Woods D 3.190 70 Onsite Woods C 12.050 55 Offsite Woods B 24.250 70 Offsite Woods C 27.090 77 Offsite Woods D 1.000 61 Offsite Open B 2.520 74 Offsite Open C 5.030 80 Offsite Open D 79.500 70 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 16.3 75 0.0200 0.1 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.50" 2.0 425 0.0470 3.5 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 3.3 985 0.0390 5.0 19.91 Channel Flow, Area= 4.0 sf Perim= 6.0' r= 0.67' n= 0.045 3.7 970 0.0160 4.4 53.12 Channel Flow, Area= 12.0 sf Perim= 11.0' r= 1.09' n= 0.045 25.3 2,455 Total Subcatchment 9S: TO DP #8 PRE Runoff = 56.30 cfs @ 12.18 hrs, Volume= 4.900 af, Depth> 1.02" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -Year Rainfall= 3.00" Area (ac) CN Description 6.050 70 Onsite Woods C 51.880 77 Onsite Woods D 57.930 76 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 14.7 75 0.0260 0.1 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.50" 1.5 364 0.0600 3.9 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 1.5 404 0.0300 4.4 17.46 Channel Flow, Area= 4.0 sf Perim= 6.0' r= 0.67' n= 0.045 0.8 496 9.8 Lake or Reservoir, Mean Depth= 3.00' 4.9 1,311 0.0220 4.4 26.52 Channel Flow, Area= 6.0 sf Perim= 7.0' r= 0.86' n= 0.045 23.4 2,650 Total 1121 - SIA PRE Type// 24 -hr 1 -Year Rainfall= 3.00" Prepared by {enter your company name here} Page 8 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 11/16/2011 Subcatchment 11S: TO DP #9 PRE Runoff = 15.06 cfs @ 12.12 hrs, Volume= 1.256 af, Depth= 0.58" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -Year Rainfall= 3.00" Area (ac) CN Description 11.700 55 Onsite Woods B 14.060 77 Onsite Woods D 25.760 67 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 75 12.4 75 0.0400 0.1 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.50" 3.1 667 0.0490 Woods: Light underbrush n= 0.400 P2= 3.50" 1.3 270 0.0440 3.4 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 2.0 764 0.0620 6.3 25.10 Channel Flow, Area= 4.0 sf Perim= 6.0' r= 0.67' n= 0.045 1.1 310 0.0190 4.8 57.88 Channel Flow, Area= 12.0 sf Perim= 11.0' r= 1.09' n= 0.045 16.8 1,419 Total Subcatchment 14S: TO DP #7 PRE Runoff = 0.32 cfs @ 12.20 hrs, Volume= 0.076 af, Depth= 0.19" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -Year Rainfall= 3.00" Area (ac) CN Description 2.400 55 Offsite Woods B 2.260 55 Onsite Woods B 4.660 55 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 13.4 75 0.0330 0.1 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.50" 3.1 667 0.0490 3.6 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 16.5 742 Total Subcatchment 15S: TO DP #4 PRE Runoff = 10.83 cfs @ 12.12 hrs, Volume= 0.833 af, Depth= 0.76" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type 11 24 -hr 1 -Year Rainfall= 3.00" 1121 - SIA PRE Type// 24 -hr 1 -Year Rainfall= 3.00" Prepared by {enter your company name here} Page 9 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 11/16/2011 Area (ac) CN Description 3.470 55 Onsite Woods B 9.680 77 Onsite Woods D 13.150 71 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) Offsite Woods D 14.5 75 0.0270 0.1 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.50" 1.0 268 0.0820 4.6 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 0.4 163 0.0740 6.9 27.42 Channel Flow, Area= 4.0 sf Perim= 6.0' r= 0.67' n= 0.045 1.3 663 0.0410 8.2 123.34 Channel Flow, Area= 15.0 sf Perim= 11.0' r= 1.36' n= 0.045 17.2 1,169 Total Subcatchment 16S: TO DP #10 PRE Runoff = 73.15 cfs @ 12.11 hrs, Volume= 5.343 af, Depth= 1.02" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -Year Rainfall= 3.00" Area (ac) CN Description 5.980 55 Onsite Woods B 27.330 77 Onsite Woods D 9.020 80 Onsite Open D 7.950 77 Offsite Woods D 12.890 80 Offsite Open D 63.170 76 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 11.0 75 0.0530 0.1 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.50" 1.6 347 0.0520 3.7 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 2.6 750 0.0360 4.8 19.13 Channel Flow, Area= 4.0 sf Perim= 6.0' r= 0.67' n= 0.045 2.4 523 0.0150 3.6 21.90 Channel Flow, Area= 6.0 sf Perim= 7.0' r= 0.86' n= 0.045 17.6 1,695 Total 1121 - SIA PRE Type// 24 -hr 1 -Year Rainfall= 3.00" Prepared by {enter your company name here} Page 10 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 11/16/2011 Reach 4R: DP #4,5, &6 REACH Inflow Area = 215.980 ac, Inflow Depth > 0.69" for 1 -Year event Inflow = 113.53 cfs @ 12.24 hrs, Volume= 12.447 of Outflow = 95.01 cfs @ 12.52 hrs, Volume= 12.408 af, Atten= 16 %, Lag= 16.8 min Routing by Stor- Ind +Trans method, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Max. Velocity= 4.5 fps, Min. Travel Time= 8.8 min Avg. Velocity = 3.1 fps, Avg. Travel Time= 12.7 min Peak Depth= 1.59' @ 12.37 hrs Capacity at bank full= 1,201.80 cfs Inlet Invert= 366.00', Outlet Invert= 347.00' Custom cross - section table, n= 0.045 Length= 2,375.0' Slope= 0.00807' Depth End Area Perim. Storage Discharge (feet) (sq -ft) (feet) (cubic -feet) (cfs) 0.00 0.0 0.0 0 0.00 0.10 0.7 7.5 1,663 0.43 3.00 40.5 21.0 96,188 185.34 6.00 291.0 176.0 691,125 1,201.80 Reach 5R: DP #8,9, &10 REACH Inflow Area = 146.860 ac, Inflow Depth > 0.94" for 1 -Year event Inflow = 140.62 cfs @ 12.14 hrs, Volume= 11.499 of Outflow = 90.40 cfs @ 12.56 hrs, Volume= 11.446 af, Atten= 36 %, Lag= 25.8 min Routing by Stor- Ind +Trans method, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Max. Velocity= 2.7 fps, Min. Travel Time= 15.5 min Avg. Velocity = 1.9 fps, Avg. Travel Time= 22.0 min Peak Depth= 2.07'@ 12.30 hrs Capacity at bank full= 1,285.41 cfs Inlet Invert= 353.00', Outlet Invert= 346.00' Custom cross - section table, n= 0.045 Length= 2,491.0' Slope= 0.00287' Depth End Area Perim. Storage Discharge (feet) (sq -ft) (feet) (cubic -feet) (cfs) 0.00 0.0 0.0 0 0.00 0.10 0.8 8.0 1,993 0.30 3.00 49.5 26.0 123,305 133.11 7.00 379.5 141.0 945,335 1,285.41 1121 - SIA PRE Type// 24 -hr 1 -Year Rainfall= 3.00" Prepared by {enter your company name here} Page 11 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 11/16/2011 Link 3L: DP #1 PRE Inflow Area = 733.390 ac, Inflow Depth > 0.77" for 1 -Year event Inflow = 315.36 cfs @ 12.39 hrs, Volume= 47.112 of Primary = 315.36 cfs @ 12.39 hrs, Volume= 47.112 af, Atten= 0 %, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Link 9L: DP #9 PRE Inflow Area = 88.930 ac, Inflow Depth = 0.89" for 1 -Year event Inflow = 88.18 cfs @ 12.11 hrs, Volume= 6.599 of Primary = 88.18 cfs @ 12.11 hrs, Volume= 6.599 af, Atten= 0 %, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Link 10L: DP #2 PRE Inflow Area = 414.770 ac, Inflow Depth > 0.85" for 1 -Year event Inflow = 206.86 cfs @ 12.31 hrs, Volume= 29.486 of Primary = 206.86 cfs @ 12.31 hrs, Volume= 29.486 af, Atten= 0 %, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Link 11 L: DP #3 PRE Inflow Area = 255.040 ac, Inflow Depth > 0.64" for 1 -Year event Inflow = 99.60 cfs @ 12.51 hrs, Volume= 13.597 of Primary = 99.60 cfs @ 12.51 hrs, Volume= 13.597 af, Atten= 0 %, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Link 13L: DP #5 PRE Inflow Area = 202.830 ac, Inflow Depth > 0.69" for 1 -Year event Inflow = 106.23 cfs @ 12.25 hrs, Volume= 11.614 of Primary = 106.23 cfs @ 12.25 hrs, Volume= 11.614 af, Atten= 0 %, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs 1121 - SIA PRE Type 11 24 -hr 2 -Year Rainfall= 3.50" Prepared by {enter your company name here} Page 12 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 11/16/2011 Time span =0.00 -25.00 hrs, dt =0.05 hrs, 501 points Runoff by SCS TR -20 method, UH =SCS Reach routing by Stor- Ind +Trans method - Pond routing by Stor -Ind method Subcatchment 1S: TO DP #1 PRE RunoffArea= 63.580 ac Runoff Depth >1.06" Flow Length= 3,173' Tc =23.6 min CN =71 Runoff =62.94 cfs 5.636 of Subcatchment 2S: TO DP #3 PRE Runoff Area = 39.060 ac Runoff Depth >0.57" Flow Length= 2,277' Tc =21.0 min CN =61 Runoff =17.55 cfs 1.864 of Subcatchment 5S: TO DP #2 PRE Runoff Area = 267.910 ac Runoff Depth >1.12" Flow Length = 5,298' Tc =26.7 min CN =72 Runoff = 261.66 cfs 25.024 of Subcatchment 7S: TO DP #5 PRE Runoff Area = 123.330 ac Runoff Depth >0.95" Flow Length= 3,614' Tc =29.0 min CN =69 Runoff =92.62 cfs 9.803 of Subcatchment 8S: TO DP #6 PRE RunoffArea= 79.500 ac Runoff Depth >1.01" Flow Length= 2,455' Tc =25.3 min CN =70 Runoff =70.39 cfs 6.678 of Subcatchment 9S: TO DP #8 PRE RunoffArea= 57.930 ac Runoff Depth >1.37" Flow Length= 2,650' Tc =23.4 min CN =76 Runoff =77.55 cfs 6.591 of Subcatchment 11S: TO DP #9 PRE RunoffArea= 25.760 ac Runoff Depth = 0.85" Flow Length= 1,419' Tc =16.8 min CN =67 Runoff =23.76 cfs 1.825 of Subcatchment 14S: TO DP #7 PRE Runoff Area =4.660 ac Runoff Depth = 0.35" Flow Length =742' Tc =16.5 min CN =55 Runoff =1.00 cfs 0.134 of Subcatchment 15S: TO DP #4 PRE Runoff Area = 13.150 ac Runoff Depth= 1.06" Flow Length= 1,169' Tc =17.2 min CN =71 Runoff =15.85 cfs 1.166 of Subcatchment 16S: TO DP #10 PRE Runoff Area = 63.170 ac Runoff Depth= 1.37" Flow Length= 1,695' Tc =17.6 min CN =76 Runoff = 100.39 cfs 7.187 of Reach 4R: DP #4,5, &6 REACH Peak Depth =2.37' Max Vet =4.6 fps Inflow= 172.82 cfs 17.648 of n =0.045 L= 2,375.0' S=0.0080'/' Capacity= 1,201.80 cfs Outflow= 144.68 cfs 17.607 of Reach 5R: DP #8,9, &10 REACH Peak Depth =2.88' Max Vet =2.7 fps Inflow= 196.37 cfs 15.603 of n =0.045 L= 2,491.0' S=0.0028'/' Capacity= 1,285.41 cfs Outflow= 127.33 cfs 15.546 of Link 3L: DP #1 PRE Link 9L: DP #9 PRE Link 10L: DP #2 PRE I nflow= 466.41 cfs 65.678 of Primary= 466.41 cfs 65.678 of Inflow= 124.14 cfs 9.012 of Primary= 124.14 cfs 9.012 of I nflow= 300.95 cfs 40.571 of Primary= 300.95 cfs 40.571 of 1121 - SIA PRE Type 11 24 -hr 2 -Year Rainfall =3.50" Prepared by {enter your company name here} Page 13 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 11/16/2011 Link 11L: DP #3 PRE RiilaB3 will e7,' &y:jC7d Inflow= 152.47 cfs 19.471 of Primary= 152.47 cfs 19.471 of Inflow= 161.40 cfs 16.482 of Primary= 161.40 cfs 16.482 of Total Runoff Area = 738.050 ac Runoff Volume = 65.910 of Average Runoff Depth = 1.07" 1121 - SIA PRE Type 11 24 -hr 2 -Year Rainfall= 3.50" Prepared by {enter your company name here} Page 14 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 11/16/2011 Subcatchment 1S: TO DP #1 PRE Runoff = 62.94 cfs @ 12.19 hrs, Volume= 5.636 af, Depth> 1.06" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type II 24 -hr 2 -Year Rainfall= 3.50" Area (ac) CN Description 14.090 55 Onsite Woods B 9.910 70 Onsite Woods C 11.290 77 Onsite Woods D 1.360 55 Offsite Woods B 0.890 70 Offsite Woods C 22.510 77 Offsite Woods D 3.530 80 Offsite Open D 63.580 71 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) Onsite Woods D 12.4 75 0.0400 0.1 61 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.50" 1.6 415 0.0720 4.3 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 4.1 1,205 0.0380 4.9 19.65 Channel Flow, Area= 4.0 sf Perim= 6.0' r= 0.67' n= 0.045 3.0 945 0.0060 5.3 399.05 Channel Flow, Area= 75.0 sf Perim= 25.0' r= 3.00' n= 0.045 2.5 533 0.0020 3.6 534.69 Channel Flow, Area= 150.0 sf Perim= 40.0' r= 3.75' n= 0.045 23.6 3,173 Total Subcatchment 2S: TO DP #3 PRE Runoff = 17.55 cfs @ 12.18 hrs, Volume= 1.864 af, Depth> 0.57" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type II 24 -hr 2 -Year Rainfall= 3.50" Area (ac) CN Description 24.380 55 Onsite Woods B 12.000 70 Onsite Woods C 2.050 77 Onsite Woods D 0.630 80 Onsite Open D 39.060 61 Weighted Average 1121 - SIA PRE Type 11 24 -hr 2 -Year Rainfall= 3.50" Prepared by {enter your company name here} Page 15 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 11/16/2011 Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 12.4 75 0.0400 0.1 74 Onsite Open C Sheet Flow, 12.370 80 Onsite Open D 42.750 55 Offsite Woods B Woods: Light underbrush n= 0.400 P2= 3.50" 1.7 374 0.0530 3.7 77 Offsite Woods D Shallow Concentrated Flow, 17.880 61 Offsite Open B 0.110 74 Offsite Open C Unpaved Kv= 16.1 fps 1.0 440 0.0780 7.0 28.15 Channel Flow, Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 10.1 Area= 4.0 sf Perim= 6.0' r= 0.67' n= 0.045 5.9 1,388 0.0080 3.9 78.72 Channel Flow, Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 2.1 Area= 20.0 sf Perim= 13.0' r= 1.54' n= 0.045 21.0 2,277 Total Subcatchment 5S: TO DP #2 PRE Runoff = 261.66 cfs @ 12.22 hrs, Volume= 25.024 af, Depth> 1.12" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type II 24 -hr 2 -Year Rainfall= 3.50" Area (ac) CN Description 13.010 55 Onsite Woods B 1.640 70 Onsite Woods C 34.310 77 Onsite Woods D 1.900 61 Onsite Open B 2.100 74 Onsite Open C 12.370 80 Onsite Open D 42.750 55 Offsite Woods B 2.050 70 Offsite Woods C 73.710 77 Offsite Woods D 17.880 61 Offsite Open B 0.110 74 Offsite Open C 66.080 80 Offsite Open D 267.910 72 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 10.1 75 0.0670 0.1 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.50" 0.9 192 0.0460 3.5 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 2.1 640 0.0280 5.0 29.92 Channel Flow, Area= 6.0 sf Perim= 7.0' r= 0.86' n= 0.045 7.2 2,290 0.0260 5.3 47.92 Channel Flow, Area= 9.0 sf Perim= 9.0' r= 1.00' n= 0.045 5.1 1,259 0.0140 4.1 49.69 Channel Flow, Area= 12.0 sf Perim= 11.0' r= 1.09' n= 0.045 1.3 842 0.0040 10.8 453.63 Channel Flow, Area= 42.0 sf Perim= 23.0' r= 1.83' n= 0.013 26.7 5,298 Total 1121 - SIA PRE Type 11 24 -hr 2 -Year Rainfall= 3.50" Prepared by {enter your company name here} Page 16 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 11/16/2011 Subcatchment 7S: TO DP #5 PRE Runoff = 92.62 cfs @ 12.26 hrs, Volume= 9.803 af, Depth> 0.95" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type II 24 -hr 2 -Year Rainfall= 3.50" Area (ac) CN Description 20.450 55 Onsite Woods B 12.490 70 Onsite Woods C 10.600 77 Onsite Woods D 0.700 61 Onsite Open B 7.700 74 Onsite Open C 9.880 80 Onsite Open D 8.410 55 Offsite Woods B 27.310 70 Offsite Woods C 7.570 77 Offsite Woods D 0.330 61 Offsite Open B 10.370 74 Offsite Open C 7.520 80 Offsite Open D 123.330 69 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 16.3 75 0.0200 0.1 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.50" 1.7 354 0.0450 3.4 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 2.0 600 0.0400 5.0 20.16 Channel Flow, Area= 4.0 sf Perim= 6.0' r= 0.67' n= 0.045 1.2 341 0.0260 4.8 28.83 Channel Flow, Area= 6.0 sf Perim= 7.0' r= 0.86' n= 0.045 4.3 1,310 0.0210 5.1 60.85 Channel Flow, Area= 12.0 sf Perim= 11.0' r= 1.09' n= 0.045 3.5 934 0.0100 4.4 88.02 Channel Flow, Area= 20.0 sf Perim= 13.0' r= 1.54' n= 0.045 29.0 3,614 Total Subcatchment 8S: TO DP #6 PRE Runoff = 70.39 cfs @ 12.21 hrs, Volume= 6.678 af, Depth> 1.01" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type 11 24 -hr 2 -Year Rainfall= 3.50" 1121 - SIA PRE Type 11 24 -hr 2 -Year Rainfall= 3.50" Prepared by {enter your company name here} Page 17 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 11/16/2011 Area (ac) CN Description 4.370 55 Onsite Woods D 3.190 70 Onsite Woods C 12.050 55 Offsite Woods B 24.250 70 Offsite Woods C 27.090 77 Offsite Woods D 1.000 61 Offsite Open B 2.520 74 Offsite Open C 5.030 80 Offsite Open D 79.500 70 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 16.3 75 0.0200 0.1 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.50" 2.0 425 0.0470 3.5 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 3.3 985 0.0390 5.0 19.91 Channel Flow, Area= 4.0 sf Perim= 6.0' r= 0.67' n= 0.045 3.7 970 0.0160 4.4 53.12 Channel Flow, Area= 12.0 sf Perim= 11.0' r= 1.09' n= 0.045 25.3 2,455 Total Subcatchment 9S: TO DP #8 PRE Runoff = 77.55 cfs @ 12.18 hrs, Volume= 6.591 af, Depth> 1.37" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type II 24 -hr 2 -Year Rainfall= 3.50" Area (ac) CN Description 6.050 70 Onsite Woods C 51.880 77 Onsite Woods D 57.930 76 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 14.7 75 0.0260 0.1 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.50" 1.5 364 0.0600 3.9 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 1.5 404 0.0300 4.4 17.46 Channel Flow, Area= 4.0 sf Perim= 6.0' r= 0.67' n= 0.045 0.8 496 9.8 Lake or Reservoir, Mean Depth= 3.00' 4.9 1,311 0.0220 4.4 26.52 Channel Flow, Area= 6.0 sf Perim= 7.0' r= 0.86' n= 0.045 23.4 2,650 Total 1121 - SIA PRE Type 11 24 -hr 2 -Year Rainfall= 3.50" Prepared by {enter your company name here} Page 18 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 11/16/2011 Subcatchment 11S: TO DP #9 PRE Runoff = 23.76 cfs @ 12.11 hrs, Volume= 1.825 af, Depth= 0.85" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type II 24 -hr 2 -Year Rainfall= 3.50" Area (ac) CN Description 11.700 55 Onsite Woods B 14.060 77 Onsite Woods D 25.760 67 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 75 12.4 75 0.0400 0.1 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.50" 3.1 667 0.0490 Woods: Light underbrush n= 0.400 P2= 3.50" 1.3 270 0.0440 3.4 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 2.0 764 0.0620 6.3 25.10 Channel Flow, Area= 4.0 sf Perim= 6.0' r= 0.67' n= 0.045 1.1 310 0.0190 4.8 57.88 Channel Flow, Area= 12.0 sf Perim= 11.0' r= 1.09' n= 0.045 16.8 1,419 Total Subcatchment 14S: TO DP #7 PRE Runoff = 1.00 cfs @ 12.15 hrs, Volume= 0.134 af, Depth= 0.35" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type II 24 -hr 2 -Year Rainfall= 3.50" Area (ac) CN Description 2.400 55 Offsite Woods B 2.260 55 Onsite Woods B 4.660 55 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 13.4 75 0.0330 0.1 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.50" 3.1 667 0.0490 3.6 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 16.5 742 Total Subcatchment 15S: TO DP #4 PRE Runoff = 15.85 cfs @ 12.11 hrs, Volume= 1.166 af, Depth= 1.06" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type 11 24 -hr 2 -Year Rainfall= 3.50" 1121 - SIA PRE Type 11 24 -hr 2 -Year Rainfall= 3.50" Prepared by {enter your company name here} Page 19 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 11/16/2011 Area (ac) CN Description 3.470 55 Onsite Woods B 9.680 77 Onsite Woods D 13.150 71 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) Offsite Woods D 14.5 75 0.0270 0.1 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.50" 1.0 268 0.0820 4.6 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 0.4 163 0.0740 6.9 27.42 Channel Flow, Area= 4.0 sf Perim= 6.0' r= 0.67' n= 0.045 1.3 663 0.0410 8.2 123.34 Channel Flow, Area= 15.0 sf Perim= 11.0' r= 1.36' n= 0.045 17.2 1,169 Total Subcatchment 16S: TO DP #10 PRE Runoff = 100.39 cfs @ 12.11 hrs, Volume= 7.187 af, Depth= 1.37" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type II 24 -hr 2 -Year Rainfall= 3.50" Area (ac) CN Description 5.980 55 Onsite Woods B 27.330 77 Onsite Woods D 9.020 80 Onsite Open D 7.950 77 Offsite Woods D 12.890 80 Offsite Open D 63.170 76 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 11.0 75 0.0530 0.1 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.50" 1.6 347 0.0520 3.7 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 2.6 750 0.0360 4.8 19.13 Channel Flow, Area= 4.0 sf Perim= 6.0' r= 0.67' n= 0.045 2.4 523 0.0150 3.6 21.90 Channel Flow, Area= 6.0 sf Perim= 7.0' r= 0.86' n= 0.045 17.6 1,695 Total 1121 - SIA PRE Type 11 24 -hr 2 -Year Rainfall =3.50" Prepared by {enter your company name here} Page 20 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 11/16/2011 Reach 4R: DP #4,5, &6 REACH Inflow Area = 215.980 ac, Inflow Depth > 0.98" for 2 -Year event Inflow = 172.82 cfs @ 12.22 hrs, Volume= 17.648 of Outflow = 144.68 cfs @ 12.50 hrs, Volume= 17.607 af, Atten= 16 %, Lag= 16.7 min Routing by Stor- Ind +Trans method, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Max. Velocity= 4.6 fps, Min. Travel Time= 8.7 min Avg. Velocity = 3.3 fps, Avg. Travel Time= 12.0 min Peak Depth= 2.37'@ 12.36 hrs Capacity at bank full= 1,201.80 cfs Inlet Invert= 366.00', Outlet Invert= 347.00' Custom cross - section table, n= 0.045 Length= 2,375.0' Slope= 0.00807' Depth End Area Perim. Storage Discharge (feet) (sq -ft) (feet) (cubic -feet) (cfs) 0.00 0.0 0.0 0 0.00 0.10 0.7 7.5 1,663 0.43 3.00 40.5 21.0 96,188 185.34 6.00 291.0 176.0 691,125 1,201.80 Reach 5R: DP #8,9, &10 REACH Inflow Area = 146.860 ac, Inflow Depth > 1.27" for 2 -Year event Inflow = 196.37 cfs @ 12.13 hrs, Volume= 15.603 of Outflow = 127.33 cfs @ 12.55 hrs, Volume= 15.546 af, Atten= 35 %, Lag= 25.5 min Routing by Stor- Ind +Trans method, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Max. Velocity= 2.7 fps, Min. Travel Time= 15.4 min Avg. Velocity = 2.0 fps, Avg. Travel Time= 21.1 min Peak Depth= 2.88'@ 12.30 hrs Capacity at bank full= 1,285.41 cfs Inlet Invert= 353.00', Outlet Invert= 346.00' Custom cross - section table, n= 0.045 Length= 2,491.0' Slope= 0.00287' Depth End Area Perim. Storage Discharge (feet) (sq -ft) (feet) (cubic -feet) (cfs) 0.00 0.0 0.0 0 0.00 0.10 0.8 8.0 1,993 0.30 3.00 49.5 26.0 123,305 133.11 7.00 379.5 141.0 945,335 1,285.41 1121 - SIA PRE Type 11 24 -hr 2 -Year Rainfall= 3.50" Prepared by {enter your company name here} Page 21 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 11/16/2011 Link 3L: DP #1 PRE Inflow Area = 733.390 ac, Inflow Depth > 1.07" for 2 -Year event Inflow = 466.41 cfs @ 12.37 hrs, Volume= 65.678 of Primary = 466.41 cfs @ 12.37 hrs, Volume= 65.678 af, Atten= 0 %, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Link 9L: DP #9 PRE Inflow Area = 88.930 ac, Inflow Depth = 1.22" for 2 -Year event Inflow = 124.14 cfs @ 12.11 hrs, Volume= 9.012 of Primary = 124.14 cfs @ 12.11 hrs, Volume= 9.012 af, Atten= 0 %, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Link 10L: DP #2 PRE Inflow Area = 414.770 ac, Inflow Depth > 1.17" for 2 -Year event Inflow = 300.95 cfs @ 12.29 hrs, Volume= 40.571 of Primary = 300.95 cfs @ 12.29 hrs, Volume= 40.571 af, Atten= 0 %, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Link 11 L: DP #3 PRE Inflow Area = 255.040 ac, Inflow Depth > 0.92" for 2 -Year event Inflow = 152.47 cfs @ 12.50 hrs, Volume= 19.471 of Primary = 152.47 cfs @ 12.50 hrs, Volume= 19.471 af, Atten= 0 %, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Link 13L: DP #5 PRE Inflow Area = 202.830 ac, Inflow Depth > 0.98" for 2 -Year event Inflow = 161.40 cfs @ 12.24 hrs, Volume= 16.482 of Primary = 161.40 cfs @ 12.24 hrs, Volume= 16.482 af, Atten= 0 %, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs 1121 - SIA PRE Type 11 24 -hr 10 -Year Rainfall= 5.10" Prepared by {enter your company name here} Page 22 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 11/16/2011 Time span =0.00 -25.00 hrs, dt =0.05 hrs, 501 points Runoff by SCS TR -20 method, UH =SCS Reach routing by Stor- Ind +Trans method - Pond routing by Stor -Ind method Subcatchment 1S: TO DP #1 PRE RunoffArea= 63.580 ac Runoff Depth >2.19" Flow Length= 3,173' Tc =23.6 min CN =71 Runoff = 137.62 cfs 11.616 of Subcatchment 2S: TO DP #3 PRE RunoffArea= 39.060 ac Runoff Depth >1.43" Flow Length= 2,277' Tc =21.0 min CN =61 Runoff =55.04 cfs 4.653 of Subcatchment 5S: TO DP #2 PRE Runoff Area = 267.910 ac Runoff Depth >2.28" Flow Length = 5,298' Tc =26.7 min CN =72 Runoff = 560.84 cfs 50.793 of Subcatchment 7S: TO DP #5 PRE Runoff Area = 123.330 ac Runoff Depth >2.03" Flow Length= 3,614' Tc =29.0 min CN =69 Runoff = 214.73 cfs 20.865 of Subcatchment 8S: TO DP #6 PRE RunoffArea= 79.500 ac Runoff Depth >2.11" Flow Length= 2,455' Tc =25.3 min CN =70 Runoff= 158.16 cfs 13.984 of Subcatchment 9S: TO DP #8 PRE Runoff Area = 57.930 ac Runoff Depth >2.62" Flow Length= 2,650' Tc =23.4 min CN =76 Runoff = 152.99 cfs 12.639 of Subcatchment 11S: TO DP #9 PRE RunoffArea= 25.760 ac Runoff Depth= 1.87" Flow Length= 1,419' Tc =16.8 min CN =67 Runoff =57.21 cfs 4.021 of Subcatchment 14S: TO DP #7 PRE Runoff Area =4.660 ac Runoff Depth= 1.03" Flow Length =742' Tc =16.5 min CN =55 Runoff =4.93 cfs 0.400 of Subcatchment 15S: TO DP #4 PRE Runoff Area = 13.150 ac Runoff Depth= 2.19" Flow Length= 1,169' Tc =17.2 min CN =71 Runoff =34.31 cfs 2.402 of Subcatchment 16S: TO DP #10 PRE Runoff Area = 63.170 ac Runoff Depth= 2.62" Flow Length= 1,695' Tc =17.6 min CN =76 Runoff= 196.22 cfs 13.782 of Reach 4R: DP #4,5, &6 REACH Peak Depth =3.41' Max Vet =4.6 fps Inflow= 395.34 cfs 37.251 of n =0.045 L= 2,375.0' S=0.0080'/' Capacity= 1,201.80 cfs Outflow= 325.24 cfs 37.204 of Reach 5R: DP #8,9, &10 REACH Peak Depth =3.51' Max Vet =3.1 fps Inflow= 397.14 cfs 30.442 of n =0.045 L= 2,491.0' S=0.0028'/' Capacity= 1,285.41 cfs Outflow= 277.46 cfs 30.377 of Link 3L: DP #1 PRE Link 9L: DP #9 PRE Link 10L: DP #2 PRE Inflow= 1,059.27 cfs 134.643 of Primary= 1,059.27 cfs 134.643 of I nflow= 253.43 cfs 17.803 of Primary= 253.43 cfs 17.803 of I nflow= 674.01 cfs 81.170 of Primary= 674.01 cfs 81.170 of 1121 - SIA PRE Type 11 24 -hr 10 -Year Rainfall= 5.10" Prepared by {enter your company name here} Page 23 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 11/16/2011 Link 11L: DP #3 PRE RiilaB3 will e7,' &y:jC7d I nflow= 345.81 cfs 41.858 of Primary= 345.81 cfs 41.858 of I nflow= 370.64 cfs 34.849 of Primary= 370.64 cfs 34.849 of Total Runoff Area = 738.050 ac Runoff Volume = 135.155 of Average Runoff Depth = 2.20" 1121 - SIA PRE Type 11 24 -hr 10 -Year Rainfall= 5.10" Prepared by {enter your company name here} Page 24 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 11/16/2011 Subcatchment 1S: TO DP #1 PRE Runoff = 137.62 cfs @ 12.18 hrs, Volume= 11.616 af, Depth> 2.19" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -Year Rainfall = 5.10" Area (ac) CN Description 14.090 55 Onsite Woods B 9.910 70 Onsite Woods C 11.290 77 Onsite Woods D 1.360 55 Offsite Woods B 0.890 70 Offsite Woods C 22.510 77 Offsite Woods D 3.530 80 Offsite Open D 63.580 71 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) Onsite Woods D 12.4 75 0.0400 0.1 61 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.50" 1.6 415 0.0720 4.3 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 4.1 1,205 0.0380 4.9 19.65 Channel Flow, Area= 4.0 sf Perim= 6.0' r= 0.67' n= 0.045 3.0 945 0.0060 5.3 399.05 Channel Flow, Area= 75.0 sf Perim= 25.0' r= 3.00' n= 0.045 2.5 533 0.0020 3.6 534.69 Channel Flow, Area= 150.0 sf Perim= 40.0' r= 3.75' n= 0.045 23.6 3,173 Total Subcatchment 2S: TO DP #3 PRE Runoff = 55.04 cfs @ 12.16 hrs, Volume= 4.653 af, Depth> 1.43" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -Year Rainfall = 5.10" Area (ac) CN Description 24.380 55 Onsite Woods B 12.000 70 Onsite Woods C 2.050 77 Onsite Woods D 0.630 80 Onsite Open D 39.060 61 Weighted Average 1121 - SIA PRE Type 11 24 -hr 10 -Year Rainfall= 5.10" Prepared by {enter your company name here} Page 25 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 11/16/2011 Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 12.4 75 0.0400 0.1 74 Onsite Open C Sheet Flow, 12.370 80 Onsite Open D 42.750 55 Offsite Woods B Woods: Light underbrush n= 0.400 P2= 3.50" 1.7 374 0.0530 3.7 77 Offsite Woods D Shallow Concentrated Flow, 17.880 61 Offsite Open B 0.110 74 Offsite Open C Unpaved Kv= 16.1 fps 1.0 440 0.0780 7.0 28.15 Channel Flow, Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 10.1 Area= 4.0 sf Perim= 6.0' r= 0.67' n= 0.045 5.9 1,388 0.0080 3.9 78.72 Channel Flow, Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 2.1 Area= 20.0 sf Perim= 13.0' r= 1.54' n= 0.045 21.0 2,277 Total Subcatchment 5S: TO DP #2 PRE Runoff = 560.84 cfs @ 12.21 hrs, Volume= 50.793 af, Depth> 2.28" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -Year Rainfall = 5.10" Area (ac) CN Description 13.010 55 Onsite Woods B 1.640 70 Onsite Woods C 34.310 77 Onsite Woods D 1.900 61 Onsite Open B 2.100 74 Onsite Open C 12.370 80 Onsite Open D 42.750 55 Offsite Woods B 2.050 70 Offsite Woods C 73.710 77 Offsite Woods D 17.880 61 Offsite Open B 0.110 74 Offsite Open C 66.080 80 Offsite Open D 267.910 72 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 10.1 75 0.0670 0.1 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.50" 0.9 192 0.0460 3.5 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 2.1 640 0.0280 5.0 29.92 Channel Flow, Area= 6.0 sf Perim= 7.0' r= 0.86' n= 0.045 7.2 2,290 0.0260 5.3 47.92 Channel Flow, Area= 9.0 sf Perim= 9.0' r= 1.00' n= 0.045 5.1 1,259 0.0140 4.1 49.69 Channel Flow, Area= 12.0 sf Perim= 11.0' r= 1.09' n= 0.045 1.3 842 0.0040 10.8 453.63 Channel Flow, Area= 42.0 sf Perim= 23.0' r= 1.83' n= 0.013 26.7 5,298 Total 1121 - SIA PRE Type 11 24 -hr 10 -Year Rainfall= 5.10" Prepared by {enter your company name here} Page 26 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 11/16/2011 Subcatchment 7S: TO DP #5 PRE Runoff = 214.73 cfs @ 12.24 hrs, Volume= 20.865 af, Depth> 2.03" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -Year Rainfall = 5.10" Area (ac) CN Description 20.450 55 Onsite Woods B 12.490 70 Onsite Woods C 10.600 77 Onsite Woods D 0.700 61 Onsite Open B 7.700 74 Onsite Open C 9.880 80 Onsite Open D 8.410 55 Offsite Woods B 27.310 70 Offsite Woods C 7.570 77 Offsite Woods D 0.330 61 Offsite Open B 10.370 74 Offsite Open C 7.520 80 Offsite Open D 123.330 69 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 16.3 75 0.0200 0.1 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.50" 1.7 354 0.0450 3.4 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 2.0 600 0.0400 5.0 20.16 Channel Flow, Area= 4.0 sf Perim= 6.0' r= 0.67' n= 0.045 1.2 341 0.0260 4.8 28.83 Channel Flow, Area= 6.0 sf Perim= 7.0' r= 0.86' n= 0.045 4.3 1,310 0.0210 5.1 60.85 Channel Flow, Area= 12.0 sf Perim= 11.0' r= 1.09' n= 0.045 3.5 934 0.0100 4.4 88.02 Channel Flow, Area= 20.0 sf Perim= 13.0' r= 1.54' n= 0.045 29.0 3,614 Total Subcatchment 8S: TO DP #6 PRE Runoff = 158.16 cfs @ 12.20 hrs, Volume= 13.984 af, Depth> 2.11" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type 11 24 -hr 10 -Year Rainfall = 5.10" 1121 - SIA PRE Type 11 24 -hr 10 -Year Rainfall= 5.10" Prepared by {enter your company name here} Page 27 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 11/16/2011 Area (ac) CN Description 4.370 55 Onsite Woods D 3.190 70 Onsite Woods C 12.050 55 Offsite Woods B 24.250 70 Offsite Woods C 27.090 77 Offsite Woods D 1.000 61 Offsite Open B 2.520 74 Offsite Open C 5.030 80 Offsite Open D 79.500 70 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 16.3 75 0.0200 0.1 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.50" 2.0 425 0.0470 3.5 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 3.3 985 0.0390 5.0 19.91 Channel Flow, Area= 4.0 sf Perim= 6.0' r= 0.67' n= 0.045 3.7 970 0.0160 4.4 53.12 Channel Flow, Area= 12.0 sf Perim= 11.0' r= 1.09' n= 0.045 25.3 2,455 Total Subcatchment 9S: TO DP #8 PRE Runoff = 152.99 cfs @ 12.17 hrs, Volume= 12.639 af, Depth> 2.62" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -Year Rainfall = 5.10" Area (ac) CN Description 6.050 70 Onsite Woods C 51.880 77 Onsite Woods D 57.930 76 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 14.7 75 0.0260 0.1 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.50" 1.5 364 0.0600 3.9 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 1.5 404 0.0300 4.4 17.46 Channel Flow, Area= 4.0 sf Perim= 6.0' r= 0.67' n= 0.045 0.8 496 9.8 Lake or Reservoir, Mean Depth= 3.00' 4.9 1,311 0.0220 4.4 26.52 Channel Flow, Area= 6.0 sf Perim= 7.0' r= 0.86' n= 0.045 23.4 2,650 Total 1121 - SIA PRE Type 11 24 -hr 10 -Year Rainfall= 5.10" Prepared by {enter your company name here} Page 28 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 11/16/2011 Subcatchment 11S: TO DP #9 PRE Runoff = 57.21 cfs @ 12.10 hrs, Volume= 4.021 af, Depth= 1.87" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -Year Rainfall = 5.10" Area (ac) CN Description 11.700 55 Onsite Woods B 14.060 77 Onsite Woods D 25.760 67 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 75 12.4 75 0.0400 0.1 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.50" 3.1 667 0.0490 Woods: Light underbrush n= 0.400 P2= 3.50" 1.3 270 0.0440 3.4 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 2.0 764 0.0620 6.3 25.10 Channel Flow, Area= 4.0 sf Perim= 6.0' r= 0.67' n= 0.045 1.1 310 0.0190 4.8 57.88 Channel Flow, Area= 12.0 sf Perim= 11.0' r= 1.09' n= 0.045 16.8 1,419 Total Subcatchment 14S: TO DP #7 PRE Runoff = 4.93 cfs @ 12.11 hrs, Volume= 0.400 af, Depth= 1.03" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -Year Rainfall = 5.10" Area (ac) CN Description 2.400 55 Offsite Woods B 2.260 55 Onsite Woods B 4.660 55 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 13.4 75 0.0330 0.1 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.50" 3.1 667 0.0490 3.6 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 16.5 742 Total Subcatchment 15S: TO DP #4 PRE Runoff = 34.31 cfs @ 12.10 hrs, Volume= 2.402 af, Depth= 2.19" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type 11 24 -hr 10 -Year Rainfall = 5.10" 1121 - SIA PRE Type 11 24 -hr 10 -Year Rainfall= 5.10" Prepared by {enter your company name here} Page 29 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 11/16/2011 Area (ac) CN Description 3.470 55 Onsite Woods B 9.680 77 Onsite Woods D 13.150 71 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) Offsite Woods D 14.5 75 0.0270 0.1 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.50" 1.0 268 0.0820 4.6 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 0.4 163 0.0740 6.9 27.42 Channel Flow, Area= 4.0 sf Perim= 6.0' r= 0.67' n= 0.045 1.3 663 0.0410 8.2 123.34 Channel Flow, Area= 15.0 sf Perim= 11.0' r= 1.36' n= 0.045 17.2 1,169 Total Subcatchment 16S: TO DP #10 PRE Runoff = 196.22 cfs @ 12.10 hrs, Volume= 13.782 af, Depth= 2.62" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -Year Rainfall = 5.10" Area (ac) CN Description 5.980 55 Onsite Woods B 27.330 77 Onsite Woods D 9.020 80 Onsite Open D 7.950 77 Offsite Woods D 12.890 80 Offsite Open D 63.170 76 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 11.0 75 0.0530 0.1 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.50" 1.6 347 0.0520 3.7 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 2.6 750 0.0360 4.8 19.13 Channel Flow, Area= 4.0 sf Perim= 6.0' r= 0.67' n= 0.045 2.4 523 0.0150 3.6 21.90 Channel Flow, Area= 6.0 sf Perim= 7.0' r= 0.86' n= 0.045 17.6 1,695 Total 1121 - SIA PRE Type 11 24 -hr 10 -Year Rainfall= 5.10" Prepared by {enter your company name here} Page 30 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 11/16/2011 Reach 4R: DP #4,5, &6 REACH Inflow Area = 215.980 ac, Inflow Depth > 2.07" for 10 -Year event Inflow = 395.34 cfs @ 12.21 hrs, Volume= 37.251 of Outflow = 325.24 cfs @ 12.49 hrs, Volume= 37.204 af, Atten= 18 %, Lag= 16.8 min Routing by Stor- Ind +Trans method, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Max. Velocity= 4.6 fps, Min. Travel Time= 8.7 min Avg. Velocity = 3.6 fps, Avg. Travel Time= 11.1 min Peak Depth= 3.41'@ 12.35 hrs Capacity at bank full= 1,201.80 cfs Inlet Invert= 366.00', Outlet Invert= 347.00' Custom cross - section table, n= 0.045 Length= 2,375.0' Slope= 0.00807' Depth End Area Perim. Storage Discharge (feet) (sq -ft) (feet) (cubic -feet) (cfs) 0.00 0.0 0.0 0 0.00 0.10 0.7 7.5 1,663 0.43 3.00 40.5 21.0 96,188 185.34 6.00 291.0 176.0 691,125 1,201.80 Reach 5R: DP #8,9, &10 REACH Inflow Area = 146.860 ac, Inflow Depth= 2.49" for 10 -Year event Inflow = 397.14 cfs @ 12.12 hrs, Volume= 30.442 of Outflow = 277.46 cfs @ 12.49 hrs, Volume= 30.377 af, Atten= 30 %, Lag= 22.4 min Routing by Stor- Ind +Trans method, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Max. Velocity= 3.1 fps, Min. Travel Time= 13.6 min Avg. Velocity = 2.1 fps, Avg. Travel Time= 19.6 min Peak Depth= 3.51'@ 12.26 hrs Capacity at bank full= 1,285.41 cfs Inlet Invert= 353.00', Outlet Invert= 346.00' Custom cross - section table, n= 0.045 Length= 2,491.0' Slope= 0.00287' Depth End Area Perim. Storage Discharge (feet) (sq -ft) (feet) (cubic -feet) (cfs) 0.00 0.0 0.0 0 0.00 0.10 0.8 8.0 1,993 0.30 3.00 49.5 26.0 123,305 133.11 7.00 379.5 141.0 945,335 1,285.41 1121 - SIA PRE Type 11 24 -hr 10 -Year Rainfall= 5.10" Prepared by {enter your company name here} Page 31 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 11/16/2011 Link 3L: DP #1 PRE Inflow Area = 733.390 ac, Inflow Depth > 2.20" for 10 -Year event Inflow = 1,059.27 cfs @ 12.34 hrs, Volume= 134.643 of Primary = 1,059.27 cfs @ 12.34 hrs, Volume= 134.643 af, Atten= 0 %, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Link 9L: DP #9 PRE Inflow Area = 88.930 ac, Inflow Depth= 2.40" for 10 -Year event Inflow = 253.43 cfs @ 12.10 hrs, Volume= 17.803 of Primary = 253.43 cfs @ 12.10 hrs, Volume= 17.803 af, Atten= 0 %, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Link 10L: DP #2 PRE Inflow Area = 414.770 ac, Inflow Depth > 2.35" for 10 -Year event Inflow = 674.01 cfs @ 12.29 hrs, Volume= 81.170 of Primary = 674.01 cfs @ 12.29 hrs, Volume= 81.170 af, Atten= 0 %, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Link 11 L: DP #3 PRE Inflow Area = 255.040 ac, Inflow Depth > 1.97" for 10 -Year event Inflow = 345.81 cfs @ 12.48 hrs, Volume= 41.858 of Primary = 345.81 cfs @ 12.48 hrs, Volume= 41.858 af, Atten= 0 %, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Link 13L: DP #5 PRE Inflow Area = 202.830 ac, Inflow Depth > 2.06" for 10 -Year event Inflow = 370.64 cfs @ 12.22 hrs, Volume= 34.849 of Primary = 370.64 cfs @ 12.22 hrs, Volume= 34.849 af, Atten= 0 %, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs 1121 - SIA PRE Type 11 24 -hr 100 -Year Rainfall= 7.40" Prepared by {enter your company name here} Page 2 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 11/16/2011 Time span =0.00 -25.00 hrs, dt =0.05 hrs, 501 points Runoff by SCS TR -20 method, UH =SCS Reach routing by Stor- Ind +Trans method - Pond routing by Stor -Ind method Subcatchment 1S: TO DP #1 PRE RunoffArea= 63.580 ac Runoff Depth >4.06" Flow Length= 3,173' Tc =23.6 min CN =71 Runoff = 259.75 cfs 21.524 of Subcatchment 2S: TO DP #3 PRE Runoff Area = 39.060 ac Runoff Depth >2.99" Flow Length= 2,277' Tc =21.0 min CN =61 Runoff = 123.45 cfs 9.746 of Subcatchment 5S: TO DP #2 PRE Runoff Area = 267.910 ac Runoff Depth >4.17" Flow Length = 5,298' Tc =26.7 min CN =72 Runoff= 1,043.49 cfs 93.144 of Subcatchment 7S: TO DP #5 PRE Runoff Area = 123.330 ac Runoff Depth >3.84" Flow Length= 3,614' Tc =29.0 min CN =69 Runoff = 417.94 cfs 39.511 of Subcatchment 8S: TO DP #6 PRE Runoff Area = 79.500 ac Runoff Depth >3.95" Flow Length= 2,455' Tc =25.3 min CN =70 Runoff = 302.44 cfs 26.190 of Subcatchment 9S: TO DP #8 PRE Runoff Area = 57.930 ac Runoff Depth >4.62" Flow Length= 2,650' Tc =23.4 min CN =76 Runoff = 269.95 cfs 22.279 of Subcatchment 11S: TO DP #9 PRE RunoffArea= 25.760 ac Runoff Depth= 3.63" Flow Length= 1,419' Tc =16.8 min CN =67 Runoff= 113.52 cfs 7.790 of Subcatchment 14S: TO DP #7 PRE Runoff Area =4.660 ac Runoff Depth= 2.38" Flow Length =742' Tc =16.5 min CN =55 Runoff =13.03 cfs 0.925 of Subcatchment 15S: TO DP #4 PRE Runoff Area = 13.150 ac Runoff Depth= 4.06" Flow Length= 1,169' Tc =17.2 min CN =71 Runoff =64.17 cfs 4.452 of Subcatchment 16S: TO DP #10 PRE Runoff Area = 63.170 ac Runoff Depth= 4.62" Flow Length= 1,695' Tc =17.6 min CN =76 Runoff = 344.59 cfs 24.295 of Reach 4R: DP #4,5, &6 REACH Peak Depth =4.31' Max Vet =4.6 fps Inflow= 763.40 cfs 70.153 of n =0.045 L= 2,375.0' S=0.0080'/' Capacity= 1,201.80 cfs Outflow= 626.97 cfs 70.097 of Reach 5R: DP #8,9, &10 REACH Peak Depth =4.32' Max Vet =3.2 fps Inflow= 712.29 cfs 54.364 of n =0.045 L= 2,491.0' S=0.0028'/' Capacity= 1,285.41 cfs Outflow= 511.16 cfs 54.286 of Link 3L: DP #1 PRE Link 9L: DP #9 PRE Link 10L: DP #2 PRE Inflow= 2,034.93 cfs 248.796 of Primary= 2,034.93 cfs 248.796 of I nflow= 458.08 cfs 32.085 of Primary= 458.08 cfs 32.085 of I nflow= 1,297.26 cfs 147.429 of Primary= 1,297.26 cfs 147.429 of 1121 - SIA PRE Type 11 24 -hr 100 -Year Rainfall= 7.40" Prepared by {enter your company name here} Page 3 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 11/16/2011 Link 11L: DP #3 PRE RiilaB3 will e7,' &y:jC7d I nflow= 670.73 cfs 79.843 of Primary= 670.73 cfs 79.843 of I nflow= 716.63 cfs 65.701 of Primary= 716.63 cfs 65.701 of Total Runoff Area = 738.050 ac Runoff Volume = 249.856 of Average Runoff Depth = 4.06" 20S 16S 15S TO DP#4 P T 17P �To WQ#6 POST 10L TO #8 POST 9L r1iL WQ #6 DP #2 PO T 2S 14P DF%#4 POST TO P #3 POST wQ #s 18L 4R Q� DP #5 POST DP#4 & 5 REACH 11L 1S DP POST TO DP #1 POST 11 q--__ 3L DP #1 POST S4 Reach on Link Zl2P C13 WQ #2 TO WQ#2 POST 16P Q� (17S WQ #1 TO WQ #1 POST 1121 - SIA DP #1 POST Type// 24 -hr 1 -Year Rainfall= 3.00" Prepared by {enter your company name here} Page 2 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 1/25/2012 Time span =0.00 -25.00 hrs, dt =0.05 hrs, 501 points Runoff by SCS TR -20 method, UH =SCS Reach routing by Stor- Ind +Trans method - Pond routing by Stor -Ind method Subcatchment 1S: TO DP #1 POST RunoffArea= 39.130 ac Runoff Depth = 0.91" Flow Length= 1,986' Tc =18.7 min CN =74 Runoff =38.17 cfs 2.962 of Subcatchment 2S: TO DP #3 POST RunoffArea= 12.170 ac Runoff Depth >0.51" Flow Length= 1,873' Tc =20.4 min CN =65 Runoff =5.03 cfs 0.513 of Subcatchment 13S: TO WQ #2 POST Runoff Area = 38.300 ac Runoff Depth= 1.38" Tc =5.0 min CN =82 Runoff =95.19 cfs 4.401 of Subcatchment 15S: TO WQ #8 POST Runoff Area = 29.200 ac Runoff Depth= 1.82" Tc =5.0 min CN =88 Runoff =94.02 cfs 4.424 of Subcatchment 16S: TO WQ #6 POST Runoff Area =5.050 ac Runoff Depth= 1.82" Tc =5.0 min CN =88 Runoff =16.26 cfs 0.765 of Subcatchment 17S: TO WQ #1 POST Runoff Area= 12.880 ac Runoff Depth= 1.31" Tc =5.0 min CN =81 Runoff =30.50 cfs 1.410 of Subcatchment 20S: TO DP #4 POST Runoff Area =2.120 ac Runoff Depth = 0.30" Flow Length =435' Tc =10.7 min CN =59 Runoff =0.54 cfs 0.054 of Reach 4R: DP #4 & 5 REACH Peak Depth =1.33' Max Vet =4.5 fps Inflow =93.82 cfs 12.108 of n =0.045 L= 2,375.0' S=0.0080'/' Capacity= 1,201.80 cfs Outflow =79.06 cfs 12.048 of Pond 12P: WQ #2 Peak EIev= 372.02' Storage= 120.353 cf Inflow =95.19 cfs 4.401 of Outflow =2.68 cfs 2.145 of Pond 14P: WQ #8 Peak EIev= 359.93' Storage= 124.737 cf Inflow =94.02 cfs 4.424 of Outflow =2.71 cfs 2.207 of Pond 16P: WQ #1 Peak EIev= 361.21' Storage= 38.964 cf Inflow =30.50 cfs 1.410 of Outflow =0.83 cfs 0.660 of Pond 17P: WQ #6 Peak EIev= 384.55' Storage= 20.095 cf Inflow =16.26 cfs 0.765 of Outflow =0.86 cfs 0.445 of Link 3L: DP #1 POST Inflow= 280.09 cfs 50.876 of Primary= 280.09 cfs 50.876 of Link 10L: 1 -Year Primary Outflow Imported from 1121 - SIA DP#2 POST -Link 10L Inflow= 204.25 cfs 30.341 of Primary= 204.25 cfs 30.341 of Link 11 L: DP #3 POST Inflow =84.77 cfs 16.913 of Primary=84.77 cfs 16.913 of 1121 - SIA DP #1 POST Type// 24 -hr 1 -Year Rainfall= 3.00" Prepared by {enter your company name here} Page 3 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 1/25/2012 Link 18L: D 1 -Year Primary Outflow Imported from 1121 - SIA DP #5 POST -Link 5L Inflow =93.19 cfs 11.609 of Primary=93.19 cfs 11.609 of Riil'.tpowm7a°,lleiaIII Inflow =0.95 cfs 0.499 of Primary=0.95 cfs 0.499 of Total Runoff Area = 138.850 ac Runoff Volume = 14.529 of Average Runoff Depth = 1.26" 1121 - SIA DP #1 POST Type// 24 -hr 1 -Year Rainfall= 3.00" Prepared by {enter your company name here} Page 4 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 1/25/2012 Subcatchment 1S: TO DP #1 POST Runoff = 38.17 cfs @ 12.13 hrs, Volume= 2.962 af, Depth= 0.91" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -Year Rainfall= 3.00" Area (ac) CN Description 1.520 55 Onsite Woods B 3.460 70 Onsite Woods C 0.760 77 Onsite Woods D 3.260 61 Onsite Open B 0.430 74 Onsite Open C 0.640 80 Onsite Open D 0.770 98 Onsite Impervious 1.360 55 Offsite Woods B 0.890 70 Offsite Woods C 22.510 77 Offsite Woods D 3.530 80 Offsite Open D 39.130 74 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) Onsite Woods D 12.4 75 0.0400 0.1 74 Sheet Flow, 0.000 80 Onsite Open D 0.940 98 Woods: Light underbrush n= 0.400 P2= 3.50" 0.9 286 0.1000 5.1 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 1.2 562 0.0700 7.9 47.30 Channel Flow, Area= 6.0 sf Perim= 7.0' r= 0.86' n= 0.045 1.7 530 0.0060 5.3 399.05 Channel Flow, Area= 75.0 sf Perim= 25.0' r= 3.00' n= 0.045 2.5 533 0.0020 3.6 534.69 Channel Flow, Area= 150.0 sf Perim= 40.0' r= 3.75' n= 0.045 18.7 1,986 Total Subcatchment 2S: TO DP #3 POST Runoff = 5.03 cfs @ 12.17 hrs, Volume= 0.513 af, Depth> 0.51" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -Year Rainfall= 3.00" Area (ac) CN Description 3.510 55 Onsite Woods B 2.730 70 Onsite Woods C 0.000 77 Onsite Woods D 4.070 61 Onsite Open B 0.920 74 Onsite Open C 0.000 80 Onsite Open D 0.940 98 Onsite Impervious 12.170 65 Weighted Average 1121 - SIA DP #1 POST Type// 24 -hr 1 -Year Rainfall= 3.00" Prepared by {enter your company name here} Page 5 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 1/25/2012 Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 12.4 75 0.0400 0.1 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.50" 0.8 105 0.0190 2.2 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 7.2 1,693 0.0080 3.9 78.72 Channel Flow, Area= 20.0 sf Perim= 13.0' r= 1.54' n= 0.045 20.4 1,873 Total Subcatchment 13S: TO WQ #2 POST [49] Hint: Tc <2dt may require smaller dt Runoff = 95.19 cfs @ 11.96 hrs, Volume= 4.401 af, Depth= 1.38" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -Year Rainfall= 3.00" Area (ac) CN Description 11.530 61 Onsite Open B 7.750 74 Onsite Open C 19.020 98 Onsite Impervious 38.300 82 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 5.0 Direct Entry, Subcatchment 15S: TO WQ #8 POST [49] Hint: Tc <2dt may require smaller dt Runoff = 94.02 cfs @ 11.96 hrs, Volume= 4.424 af, Depth= 1.82" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -Year Rainfall= 3.00" Area (ac) CN Description 4.360 61 Onsite Open B 1.240 74 Onsite Open C 6.270 80 Onsite Open D 17.330 98 Onsite Impervious 29.200 88 Weighted Average 1121 - SIA DP #1 POST Type// 24 -hr 1 -Year Rainfall= 3.00" Prepared by {enter your company name here} Page 6 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 1/25/2012 Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 5.0 Direct Entry, Subcatchment 16S: TO WQ #6 POST [49] Hint: Tc <2dt may require smaller dt Runoff = 16.26 cfs @ 11.96 hrs, Volume= 0.765 af, Depth= 1.82" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -Year Rainfall= 3.00" Area (ac) CN Description 0.230 61 Onsite Open Space, HSG 'B' 2.270 80 Onsite Open Space, HSG 'D' 2.550 98 Onsite Impervious 5.050 88 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 5.0 Direct Entry, Subcatchment 17S: TO WQ #1 POST [49] Hint: Tc <2dt may require smaller dt Runoff = 30.50 cfs @ 11.96 hrs, Volume= 1.410 af, Depth= 1.31" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -Year Rainfall= 3.00" Area (ac) CN Description 5.360 61 Onsite Open B 0.870 74 Onsite Open C 6.650 98 Onsite Impervious 12.880 81 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 5.0 Direct Entry, Subcatchment 20S: TO DP #4 POST Runoff = 0.54 cfs @ 12.07 hrs, Volume= 0.054 af, Depth= 0.30" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type 11 24 -hr 1 -Year Rainfall= 3.00" 1121 - SIA DP #1 POST Type// 24 -hr 1 -Year Rainfall= 3.00" Prepared by {enter your company name here} Page 7 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 1/25/2012 Area (ac) CN Description 1.600 55 Onsite Woods B 0.230 77 Onsite Woods D 0.210 61 Onsite Open B 0.080 80 Onsite Open D 2.120 59 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 9.4 75 0.0800 0.1 Sheet Flow, 0.10 0.7 7.5 1,663 Woods: Light underbrush n= 0.400 P2= 3.50" 1.3 360 0.0470 4.5 9.02 Channel Flow, 6.00 291.0 176.0 691,125 Area= 2.0 sf Perim= 4.0' r= 0.50' n= 0.045 10.7 435 Total Reach 4R: DP #4 & 5 REACH Inflow Area = 185.280 ac, Inflow Depth > 0.78" for 1 -Year event Inflow = 93.82 cfs @ 12.24 hrs, Volume= 12.108 of Outflow = 79.06 cfs @ 12.52 hrs, Volume= 12.048 af, Atten= 16 %, Lag= 16.6 min Routing by Stor- Ind +Trans method, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Max. Velocity= 4.5 fps, Min. Travel Time= 8.8 min Avg. Velocity = 2.6 fps, Avg. Travel Time= 15.1 min Peak Depth= 1.33' @ 12.37 hrs Capacity at bank full= 1,201.80 cfs Inlet Invert= 366.00', Outlet Invert= 347.00' Custom cross - section table, n= 0.045 Length= 2,375.0' Slope= 0.00807' Depth End Area Perim. Storage Discharge (feet) (sq -ft) (feet) (cubic -feet) (cfs) 0.00 0.0 0.0 0 0.00 0.10 0.7 7.5 1,663 0.43 3.00 40.5 21.0 96,188 185.34 6.00 291.0 176.0 691,125 1,201.80 Pond 12P: WQ #2 Inflow Area = 38.300 ac, Inflow Depth = 1.38" for 1 -Year event Inflow = 95.19 cfs @ 11.96 hrs, Volume= 4.401 of Outflow = 2.68 cfs @ 14.89 hrs, Volume= 2.145 af, Atten= 97 %, Lag= 175.6 min Primary = 2.68 cfs @ 14.89 hrs, Volume= 2.145 of Routing by Stor -Ind method, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Peak Elev= 372.02' @ 14.89 hrs Surf.Area= 63,017 sf Storage= 120,353 cf Plug -Flow detention time= 363.3 min calculated for 2.145 of (49% of inflow) Center -of -Mass det. time= 238.2 min ( 1,073.4 - 835.3 ) 1121 - SIA DP #1 POST Type// 24 -hr 1 -Year Rainfall= 3.00" Prepared by {enter your company name here} Page 8 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 1/25/2012 Volume Invert Avail.Storage Storage Description #1 370.00' 561,747 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 370.00 56,196 0 0 372.00 62,949 119,145 119,145 374.00 69,996 132,945 252,090 376.00 77,340 147,336 399,426 378.00 84,981 162,321 561,747 Device Routing Invert Outlet Devices #1 Primary 370.00' 24.0" x 50.0' long Culvert RCP, square edge headwall, Ke= 0.500 #3 Device 1 358.00' Outlet Invert= 369.50' S= 0.01007' Cc= 0.900 n= 0.013 #2 Device 1 378.00' 48.0" Horiz. Orifice /Grate Limited to weir flow C= 0.600 #3 Device 1 370.00' 4.0" Vert. Orifice /Grate C= 0.600 #4 Device 1 371.30' 15.0" Vert. Orifice /Grate C= 0.600 Primary OutFlow Max =2.68 cfs @ 14.89 hrs HW= 372.02' (Free Discharge) L = Culvert (Passes 2.68 cfs of 14.58 cfs potential flow) 2= Orifice /Grate ( Controls 0.00 cfs) 3= Orifice /Grate (Orifice Controls 0.57 cfs @ 6.6 fps) 4= Orifice /Grate (Orifice Controls 2.11 cfs @ 2.9 fps) Pond 14P: WQ #8 Inflow Area = 29.200 ac, Inflow Depth = 1.82" for 1 -Year event Inflow = 94.02 cfs @ 11.96 hrs, Volume= 4.424 of Outflow = 2.71 cfs @ 14.23 hrs, Volume= 2.207 af, Atten= 97 %, Lag= 136.7 min Primary = 2.71 cfs @ 14.23 hrs, Volume= 2.207 of Routing by Stor -Ind method, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Peak Elev= 359.93' @ 14.23 hrs Surf.Area= 68,121 sf Storage= 124,737 cf Plug -Flow detention time= 364.5 min calculated for 2.207 of (50% of inflow) Center -of -Mass det. time= 248.9 min ( 1,062.6 - 813.7 ) Volume Invert #1 358.00' Avail.Storage Storage Description 433,022 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 358.00 61,319 0 0 360.00 68,377 129,696 129,696 362.00 75,754 144,131 273,827 364.00 83,441 159,195 433,022 Device Routing Invert Outlet Devices #1 Primary 358.00' 24.0" x 50.0' long Culvert RCP, square edge headwall, Ke= 0.500 Outlet Invert= 357.50' S= 0.01007' Cc= 0.900 n= 0.013 #2 Device 1 364.00' 48.0" Horiz. Orifice /Grate Limited to weir flow C= 0.600 #3 Device 1 358.00' 4.0" Vert. Orifice /Grate C= 0.600 1121 - SIA DP #1 POST Type// 24 -hr 1 -Year Rainfall= 3.00" Prepared by {enter your company name here} Page 9 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 1/25/2012 #4 Device 1 359.10' 12.0" Vert. Orifice /Grate C= 0.600 Primary OutFlow Max =2.71 cfs @ 14.23 hrs HW= 359.93' (Free Discharge) L = Culvert (Passes 2.71 cfs of 13.70 cfs potential flow) 2= Orifice /Grate ( Controls 0.00 cfs) 3= Orifice /Grate (Orifice Controls 0.56 cfs @ 6.4 fps) 4= Orifice /Grate (Orifice Controls 2.15 cfs @ 3.1 fps) Pond 16P: WQ #1 Inflow Area = 12.880 ac, Inflow Depth = 1.31" for 1 -Year event Inflow = 30.50 cfs @ 11.96 hrs, Volume= 1.410 of Outflow = 0.83 cfs @ 15.16 hrs, Volume= 0.660 af, Atten= 97 %, Lag= 192.1 min Primary = 0.83 cfs @ 15.16 hrs, Volume= 0.660 of Routing by Stor -Ind method, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Peak Elev= 361.21' @ 15.16 hrs Surf.Area= 33,132 sf Storage= 38,964 cf Plug -Flow detention time= 368.7 min calculated for 0.659 of (47% of inflow) Center -of -Mass det. time= 241.7 min ( 1,080.3 - 838.6 ) Volume Invert #1 360.00' Avail.Storage Storage Description 214,441 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 360.00 31,407 0 0 362.00 34,265 65,672 65,672 364.00 37,174 71,439 137,111 366.00 40,156 77,330 214,441 Device Routing Invert Outlet Devices #1 Primary 360.00' 24.0" x 50.0' long Culvert RCP, square edge headwall, Ke= 0.500 Outlet Invert= 359.50' S= 0.01007' Cc= 0.900 n= 0.013 #2 Device 1 366.00' 48.0" Horiz. Orifice /Grate Limited to weir flow C= 0.600 #3 Device 1 360.00' 2.5" Vert. Orifice /Grate C= 0.600 #4 Device 1 360.80' 12.0" Vert. Orifice /Grate C= 0.600 Primary OutFlow Max =0.83 cfs @ 15.16 hrs HW= 361.21' (Free Discharge) L = Culvert (Passes 0.83 cfs of 6.73 cfs potential flow) 2= Orifice /Grate ( Controls 0.00 cfs) 3= Orifice /Grate (Orifice Controls 0.17 cfs @ 5.1 fps) 4= Orifice /Grate (Orifice Controls 0.65 cfs @ 2.2 fps) Routing by Stor -Ind method, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Pond 17P: WQ #6 Inflow Area = 5.050 ac, Inflow Depth = 1.82" for 1 -Year event Inflow = 16.26 cfs @ 11.96 hrs, Volume= 0.765 of Outflow = 0.86 cfs @ 12.97 hrs, Volume= 0.445 af, Atten= 95 %, Lag= 60.6 min Primary = 0.86 cfs @ 12.97 hrs, Volume= 0.445 of Routing by Stor -Ind method, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs 1121 - SIA DP #1 POST Type// 24 -hr 1 -Year Rainfall= 3.00" Prepared by {enter your company name here} Page 10 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 1/25/2012 Peak Elev= 384.55' @ 12.97 hrs Surf.Area= 10,467 sf Storage= 20,095 cf Plug -Flow detention time= 348.6 min calculated for 0.444 of (58% of inflow) Center -of -Mass det. time= 238.2 min ( 1,051.9 - 813.7 ) Volume Invert Avail.Storage Storage Description #1 382.00' 37,291 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 382.00 5,211 0 0 384.00 9,455 14,666 14,666 386.00 13,170 22,625 37,291 Device Routing Invert Outlet Devices #1 Primary 382.00' 18.0" x 50.0' long Culvert RCP, groove end w /headwall, Ke= 0.200 Outlet Invert= 381.50' S= 0.01007' Cc= 0.900 n= 0.013 #2 Device 1 384.50' 48.0" Horiz. Orifice /Grate Limited to weir flow C= 0.600 #3 Device 1 382.00' 1.0" Vert. Orifice /Grate C= 0.600 #4 Device 1 383.50' 4.0" Vert. Orifice /Grate C= 0.600 Primary OutFlow Max =0.83 cfs @ 12.97 hrs HW= 384.54' (Free Discharge) L = Culvert (Passes 0.83 cfs of 12.12 cfs potential flow) 2= Orifice /Grate (Weir Controls 0.39 cfs @ 0.7 fps) 3= Orifice /Grate (Orifice Controls 0.04 cfs @ 7.6 fps) 4= Orifice /Grate (Orifice Controls 0.39 cfs @ 4.5 fps) Link 3L: DP #1 POST Inflow Area = 752.630 ac, Inflow Depth > 0.81" for 1 -Year event Inflow = 280.09 cfs @ 12.33 hrs, Volume= 50.876 of Primary = 280.09 cfs @ 12.33 hrs, Volume= 50.876 af, Atten= 0 %, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Link 10L: DP #2 POST Inflow Area = 435.670 ac, Inflow Depth > 0.84" for 1 -Year event Inflow = 204.25 cfs @ 12.27 hrs, Volume= 30.341 of Primary = 204.25 cfs @ 12.27 hrs, Volume= 30.341 af, Atten= 0 %, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs 1 -Year Primary Outflow Imported from 1121 - SIA DP #2 POST-Link 10L Link 11 L: DP #3 POST Inflow Area = 264.950 ac, Inflow Depth > 0.77" for 1 -Year event Inflow = 84.77 cfs @ 12.51 hrs, Volume= 16.913 of Primary = 84.77 cfs @ 12.51 hrs, Volume= 16.913 af, Atten= 0 %, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs 1121 - SIA DP #1 POST Type// 24 -hr 1 -Year Rainfall= 3.00" Prepared by {enter your company name here} Page 11 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 1/25/2012 Link 18L: DP #5 POST Inflow Area = 178.110 ac, Inflow Depth > 0.78" for 1 -Year event Inflow = 93.19 cfs @ 12.24 hrs, Volume= 11.609 of Primary = 93.19 cfs @ 12.24 hrs, Volume= 11.609 af, Atten= 0 %, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs 1 -Year Primary Outflow Imported from 1121 - SIA DP #5 POST-Link 5L Link 19L: DP #4 POST Inflow Area = 7.170 ac, Inflow Depth > 0.83" for 1 -Year event Inflow = 0.95 cfs @ 12.95 hrs, Volume= 0.499 of Primary = 0.95 cfs @ 12.95 hrs, Volume= 0.499 af, Atten= 0 %, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs 1121 - SIA DP #1 POST Type 11 24 -hr 2 -Year Rainfall= 3.50" Prepared by {enter your company name here} Page 12 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 1/25/2012 Time span =0.00 -25.00 hrs, dt =0.05 hrs, 501 points Runoff by SCS TR -20 method, UH =SCS Reach routing by Stor- Ind +Trans method - Pond routing by Stor -Ind method Subcatchment 1S: TO DP #1 POST RunoffArea= 39.130 ac Runoff Depth= 1.24" Flow Length= 1,986' Tc =18.7 min CN =74 Runoff =53.83 cfs 4.043 of Subcatchment 2S: TO DP #3 POST Runoff Area = 12.170 ac Runoff Depth >0.75" Flow Length= 1,873' Tc =20.4 min CN =65 Runoff =8.40 cfs 0.763 of Subcatchment 13S: TO WQ #2 POST Runoff Area = 38.300 ac Runoff Depth= 1.78" Tc =5.0 min CN =82 Runoff = 122.68 cfs 5.689 of Subcatchment 15S: TO WQ #8 POST Runoff Area = 29.200 ac Runoff Depth= 2.27" Tc =5.0 min CN =88 Runoff = 116.20 cfs 5.520 of Subcatchment 16S: TO WQ #6 POST Runoff Area =5.050 ac Runoff Depth= 2.27" Tc =5.0 min CN =88 Runoff =20.10 cfs 0.955 of Subcatchment 17S: TO WQ #1 POST Runoff Area= 12.880 ac Runoff Depth= 1.71" Tc =5.0 min CN =81 Runoff =39.61 cfs 1.834 of Subcatchment 20S: TO DP #4 POST Runoff Area =2.120 ac Runoff Depth = 0.49" Flow Length =435' Tc =10.7 min CN =59 Runoff =1.14 cfs 0.087 of Reach 4R: DP #4 & 5 REACH Peak Depth =1.98' Max Vet =4.5 fps Inflow= 142.40 cfs 16.967 of n =0.045 L= 2,375.0' S=0.0080'/' Capacity= 1,201.80 cfs Outflow= 120.35 cfs 16.902 of Pond 12P: WQ #2 Peak Elev= 372.41' Storage= 145.521 cf Inflow= 122.68 cfs 5.689 of Outflow =4.78 cfs 3.337 of Pond 14P: WQ #8 Peak EIev= 360.33' Storage= 152.356 cf Inflow= 116.20 cfs 5.520 of Outflow =3.85 cfs 3.154 of Pond 16P: WQ #1 Peak EIev= 361.43' Storage= 46.418 cf Inflow =39.61 cfs 1.834 of Outflow =1.60 cfs 1.057 of Pond 17P: WQ #6 Peak EIev= 384.68' Storage= 21.571 cf Inflow =20.10 cfs 0.955 of Outflow =3.72 cfs 0.618 of Link 3L: DP #1 POST Inflow= 414.48 cfs 70.512 of Primary= 414.48 cfs 70.512 of Link 10L: 2 -Year Primary Outflow Imported from 1121 - SIA DP#2 POST -Link 10L Inflow= 295.37 cfs 41.256 of Primary= 295.37 cfs 41.256 of Link 11 L: DP #3 POST Inflow= 131.13 cfs 24.155 of Primary= 131.13 cfs 24.155 of 1121 - SIA DP #1 POST Type 11 24 -hr 2 -Year Rainfall =3.50" Prepared by {enter your company name here} Page 13 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 1/25/2012 Link 18L: 2 -Year Primary Outflow Imported from 1121 - SIA DP #5 POST -Link 5L Inflow= 138.70 cfs 16.262 of Primary= 138.70 cfs 16.262 of Riil'.tpowm7a°,lleiaIII Inflow =4.75 cfs 0.705 of Primary=4.75 cfs 0.705 of Total Runoff Area = 138.850 ac Runoff Volume = 18.891 of Average Runoff Depth = 1.63" 1121 - SIA DP #1 POST Type 11 24 -hr 2 -Year Rainfall= 3.50" Prepared by {enter your company name here} Page 14 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 1/25/2012 Subcatchment 1S: TO DP #1 POST Runoff = 53.83 cfs @ 12.12 hrs, Volume= 4.043 af, Depth= 1.24" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type II 24 -hr 2 -Year Rainfall= 3.50" Area (ac) CN Description 1.520 55 Onsite Woods B 3.460 70 Onsite Woods C 0.760 77 Onsite Woods D 3.260 61 Onsite Open B 0.430 74 Onsite Open C 0.640 80 Onsite Open D 0.770 98 Onsite Impervious 1.360 55 Offsite Woods B 0.890 70 Offsite Woods C 22.510 77 Offsite Woods D 3.530 80 Offsite Open D 39.130 74 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) Onsite Woods D 12.4 75 0.0400 0.1 74 Sheet Flow, 0.000 80 Onsite Open D 0.940 98 Woods: Light underbrush n= 0.400 P2= 3.50" 0.9 286 0.1000 5.1 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 1.2 562 0.0700 7.9 47.30 Channel Flow, Area= 6.0 sf Perim= 7.0' r= 0.86' n= 0.045 1.7 530 0.0060 5.3 399.05 Channel Flow, Area= 75.0 sf Perim= 25.0' r= 3.00' n= 0.045 2.5 533 0.0020 3.6 534.69 Channel Flow, Area= 150.0 sf Perim= 40.0' r= 3.75' n= 0.045 18.7 1,986 Total Subcatchment 2S: TO DP #3 POST Runoff = 8.40 cfs @ 12.16 hrs, Volume= 0.763 af, Depth> 0.75" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type II 24 -hr 2 -Year Rainfall= 3.50" Area (ac) CN Description 3.510 55 Onsite Woods B 2.730 70 Onsite Woods C 0.000 77 Onsite Woods D 4.070 61 Onsite Open B 0.920 74 Onsite Open C 0.000 80 Onsite Open D 0.940 98 Onsite Impervious 12.170 65 Weighted Average 1121 - SIA DP #1 POST Type 11 24 -hr 2 -Year Rainfall= 3.50" Prepared by {enter your company name here} Page 15 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 1/25/2012 Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 12.4 75 0.0400 0.1 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.50" 0.8 105 0.0190 2.2 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 7.2 1,693 0.0080 3.9 78.72 Channel Flow, Area= 20.0 sf Perim= 13.0' r= 1.54' n= 0.045 20.4 1,873 Total Subcatchment 13S: TO WQ #2 POST [49] Hint: Tc <2dt may require smaller dt Runoff = 122.68 cfs @ 11.96 hrs, Volume= 5.689 af, Depth= 1.78" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type II 24 -hr 2 -Year Rainfall= 3.50" Area (ac) CN Description 11.530 61 Onsite Open B 7.750 74 Onsite Open C 19.020 98 Onsite Impervious 38.300 82 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 5.0 Direct Entry, Subcatchment 15S: TO WQ #8 POST [49] Hint: Tc <2dt may require smaller dt Runoff = 116.20 cfs @ 11.95 hrs, Volume= 5.520 af, Depth= 2.27" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type II 24 -hr 2 -Year Rainfall= 3.50" Area (ac) CN Description 4.360 61 Onsite Open B 1.240 74 Onsite Open C 6.270 80 Onsite Open D 17.330 98 Onsite Impervious 29.200 88 Weighted Average 1121 - SIA DP #1 POST Type 11 24 -hr 2 -Year Rainfall= 3.50" Prepared by {enter your company name here} Page 16 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 1/25/2012 Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 5.0 Direct Entry, Subcatchment 16S: TO WQ #6 POST [49] Hint: Tc <2dt may require smaller dt Runoff = 20.10 cfs @ 11.95 hrs, Volume= 0.955 af, Depth= 2.27" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type II 24 -hr 2 -Year Rainfall= 3.50" Area (ac) CN Description 0.230 61 Onsite Open Space, HSG 'B' 2.270 80 Onsite Open Space, HSG 'D' 2.550 98 Onsite Impervious 5.050 88 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 5.0 Direct Entry, Subcatchment 17S: TO WQ #1 POST [49] Hint: Tc <2dt may require smaller dt Runoff = 39.61 cfs @ 11.96 hrs, Volume= 1.834 af, Depth= 1.71" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type II 24 -hr 2 -Year Rainfall= 3.50" Area (ac) CN Description 5.360 61 Onsite Open B 0.870 74 Onsite Open C 6.650 98 Onsite Impervious 12.880 81 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 5.0 Direct Entry, Subcatchment 20S: TO DP #4 POST Runoff = 1.14 cfs @ 12.06 hrs, Volume= 0.087 af, Depth= 0.49" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type 11 24 -hr 2 -Year Rainfall= 3.50" 1121 - SIA DP #1 POST Type 11 24 -hr 2 -Year Rainfall= 3.50" Prepared by {enter your company name here} Page 17 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 1/25/2012 Area (ac) CN Description 1.600 55 Onsite Woods B 0.230 77 Onsite Woods D 0.210 61 Onsite Open B 0.080 80 Onsite Open D 2.120 59 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 9.4 75 0.0800 0.1 Sheet Flow, 0.10 0.7 7.5 1,663 Woods: Light underbrush n= 0.400 P2= 3.50" 1.3 360 0.0470 4.5 9.02 Channel Flow, 6.00 291.0 176.0 691,125 Area= 2.0 sf Perim= 4.0' r= 0.50' n= 0.045 10.7 435 Total Reach 4R: DP #4 & 5 REACH Inflow Area = 185.280 ac, Inflow Depth > 1.10" for 2 -Year event Inflow = 142.40 cfs @ 12.23 hrs, Volume= 16.967 of Outflow = 120.35 cfs @ 12.50 hrs, Volume= 16.902 af, Atten= 15 %, Lag= 16.5 min Routing by Stor- Ind +Trans method, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Max. Velocity= 4.5 fps, Min. Travel Time= 8.7 min Avg. Velocity = 2.7 fps, Avg. Travel Time= 14.6 min Peak Depth= 1.98'@ 12.36 hrs Capacity at bank full= 1,201.80 cfs Inlet Invert= 366.00', Outlet Invert= 347.00' Custom cross - section table, n= 0.045 Length= 2,375.0' Slope= 0.00807' Depth End Area Perim. Storage Discharge (feet) (sq -ft) (feet) (cubic -feet) (cfs) 0.00 0.0 0.0 0 0.00 0.10 0.7 7.5 1,663 0.43 3.00 40.5 21.0 96,188 185.34 6.00 291.0 176.0 691,125 1,201.80 Pond 12P: WQ #2 Inflow Area = 38.300 ac, Inflow Depth = 1.78" for 2 -Year event Inflow = 122.68 cfs @ 11.96 hrs, Volume= 5.689 of Outflow = 4.78 cfs @ 13.63 hrs, Volume= 3.337 af, Atten= 96 %, Lag= 100.3 min Primary = 4.78 cfs @ 13.63 hrs, Volume= 3.337 of Routing by Stor -Ind method, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Peak Elev= 372.41' @ 13.63 hrs Surf.Area= 64,408 sf Storage= 145,521 cf Plug -Flow detention time= 323.1 min calculated for 3.330 of (59% of inflow) Center -of -Mass det. time= 207.8 min ( 1,035.7 - 827.9 ) 1121 - SIA DP #1 POST Type 11 24 -hr 2 -Year Rainfall= 3.50" Prepared by {enter your company name here} Page 18 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 1/25/2012 Volume Invert Avail.Storage Storage Description #1 370.00' 561,747 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 370.00 56,196 0 0 372.00 62,949 119,145 119,145 374.00 69,996 132,945 252,090 376.00 77,340 147,336 399,426 378.00 84,981 162,321 561,747 Device Routing Invert Outlet Devices #1 Primary 370.00' 24.0" x 50.0' long Culvert RCP, square edge headwall, Ke= 0.500 #3 Device 1 358.00' Outlet Invert= 369.50' S= 0.01007' Cc= 0.900 n= 0.013 #2 Device 1 378.00' 48.0" Horiz. Orifice /Grate Limited to weir flow C= 0.600 #3 Device 1 370.00' 4.0" Vert. Orifice /Grate C= 0.600 #4 Device 1 371.30' 15.0" Vert. Orifice /Grate C= 0.600 Primary OutFlow Max =4.78 cfs @ 13.63 hrs HW= 372.41' (Free Discharge) L = Culvert (Passes 4.78 cfs of 17.85 cfs potential flow) 2= Orifice /Grate ( Controls 0.00 cfs) 3= Orifice /Grate (Orifice Controls 0.63 cfs @ 7.2 fps) 4= Orifice /Grate (Orifice Controls 4.15 cfs @ 3.6 fps) Pond 14P: WQ #8 Inflow Area = 29.200 ac, Inflow Depth = 2.27" for 2 -Year event Inflow = 116.20 cfs @ 11.95 hrs, Volume= 5.520 of Outflow = 3.85 cfs @ 13.81 hrs, Volume= 3.154 af, Atten= 97 %, Lag= 111.0 min Primary = 3.85 cfs @ 13.81 hrs, Volume= 3.154 of Routing by Stor -Ind method, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Peak Elev= 360.33' @ 13.81 hrs Surf.Area= 69,589 sf Storage= 152,356 cf Plug -Flow detention time= 354.3 min calculated for 3.147 of (57% of inflow) Center -of -Mass det. time= 245.2 min ( 1,052.6 - 807.4 ) Volume Invert #1 358.00' Avail.Storage Storage Description 433,022 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 358.00 61,319 0 0 360.00 68,377 129,696 129,696 362.00 75,754 144,131 273,827 364.00 83,441 159,195 433,022 Device Routing Invert Outlet Devices #1 Primary 358.00' 24.0" x 50.0' long Culvert RCP, square edge headwall, Ke= 0.500 Outlet Invert= 357.50' S= 0.01007' Cc= 0.900 n= 0.013 #2 Device 1 364.00' 48.0" Horiz. Orifice /Grate Limited to weir flow C= 0.600 #3 Device 1 358.00' 4.0" Vert. Orifice /Grate C= 0.600 1121 - SIA DP #1 POST Type 11 24 -hr 2 -Year Rainfall =3.50" Prepared by {enter your company name here} Page 19 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 1/25/2012 #4 Device 1 359.10' 12.0" Vert. Orifice /Grate C= 0.600 Primary OutFlow Max =3.85 cfs @ 13.81 hrs HW= 360.33' (Free Discharge) L = Culvert (Passes 3.85 cfs of 17.24 cfs potential flow) 2= Orifice /Grate ( Controls 0.00 cfs) 3= Orifice /Grate (Orifice Controls 0.62 cfs @ 7.1 fps) 4= Orifice /Grate (Orifice Controls 3.23 cfs @ 4.1 fps) Routing by Stor -Ind method, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Peak Elev= 361.43' @ 13.58 hrs Surf.Area= 33,452 sf Storage= 46,418 cf Plug -Flow detention time= 318.7 min calculated for 1.055 of (58% of inflow) Center -of -Mass det. time= 201.3 min ( 1,032.3 - 831.0 ) Volume Invert #1 360.00' Avail.Storage Storage Description 214,441 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Pond 16P: WQ #1 Inflow Area = 12.880 ac, Inflow Depth = 1.71" for 2 -Year event Inflow = 39.61 cfs @ 11.96 hrs, Volume= 1.834 of Outflow = 1.60 cfs @ 13.58 hrs, Volume= 1.057 af, Atten= 96 %, Lag= 97.1 min Primary = 1.60 cfs @ 13.58 hrs, Volume= 1.057 of Routing by Stor -Ind method, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Peak Elev= 361.43' @ 13.58 hrs Surf.Area= 33,452 sf Storage= 46,418 cf Plug -Flow detention time= 318.7 min calculated for 1.055 of (58% of inflow) Center -of -Mass det. time= 201.3 min ( 1,032.3 - 831.0 ) Volume Invert #1 360.00' Avail.Storage Storage Description 214,441 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 360.00 31,407 0 0 362.00 34,265 65,672 65,672 364.00 37,174 71,439 137,111 366.00 40,156 77,330 214,441 Device Routing Invert Outlet Devices #1 Primary 360.00' 24.0" x 50.0' long Culvert RCP, square edge headwall, Ke= 0.500 Outlet Invert= 359.50' S= 0.01007' Cc= 0.900 n= 0.013 #2 Device 1 366.00' 48.0" Horiz. Orifice /Grate Limited to weir flow C= 0.600 #3 Device 1 360.00' 2.5" Vert. Orifice /Grate C= 0.600 #4 Device 1 360.80' 12.0" Vert. Orifice /Grate C= 0.600 Primary OutFlow Max =1.60 cfs @ 13.58 hrs HW= 361.43' (Free Discharge) L = Culvert (Passes 1.60 cfs of 8.84 cfs potential flow) 2= Orifice /Grate ( Controls 0.00 cfs) 3= Orifice /Grate (Orifice Controls 0.19 cfs @ 5.5 fps) 4= Orifice /Grate (Orifice Controls 1.41 cfs @ 2.7 fps) Routing by Stor -Ind method, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Pond 17P: WQ #6 Inflow Area = 5.050 ac, Inflow Depth = 2.27" for 2 -Year event Inflow = 20.10 cfs @ 11.95 hrs, Volume= 0.955 of Outflow = 3.72 cfs @ 12.13 hrs, Volume= 0.618 af, Atten= 81 %, Lag= 10.8 min Primary = 3.72 cfs @ 12.13 hrs, Volume= 0.618 of Routing by Stor -Ind method, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs 1121 - SIA DP #1 POST Type 11 24 -hr 2 -Year Rainfall= 3.50" Prepared by {enter your company name here} Page 20 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 1/25/2012 Peak Elev= 384.68' @ 12.13 hrs Surf.Area= 10,726 sf Storage= 21,571 cf Plug -Flow detention time= 279.3 min calculated for 0.618 of (65% of inflow) Center -of -Mass det. time= 174.8 min ( 982.2 - 807.4 ) Volume Invert Avail.Storage Storage Description #1 382.00' 37,291 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 382.00 5,211 0 0 384.00 9,455 14,666 14,666 386.00 13,170 22,625 37,291 Device Routing Invert Outlet Devices #1 Primary 382.00' 18.0" x 50.0' long Culvert RCP, groove end w /headwall, Ke= 0.200 Outlet Invert= 381.50' S= 0.01007' Cc= 0.900 n= 0.013 #2 Device 1 384.50' 48.0" Horiz. Orifice /Grate Limited to weir flow C= 0.600 #3 Device 1 382.00' 1.0" Vert. Orifice /Grate C= 0.600 #4 Device 1 383.50' 4.0" Vert. Orifice /Grate C= 0.600 Primary OutFlow Max =3.68 cfs @ 12.13 hrs HW= 384.68' (Free Discharge) L = Culvert (Passes 3.68 cfs of 12.65 cfs potential flow) 2= Orifice /Grate (Weir Controls 3.21 cfs @ 1.4 fps) 3= Orifice /Grate (Orifice Controls 0.04 cfs @ 7.8 fps) 4= Orifice /Grate (Orifice Controls 0.42 cfs @ 4.9 fps) Link 3L: DP #1 POST Inflow Area = 752.630 ac, Inflow Depth > 1.12" for 2 -Year event Inflow = 414.48 cfs @ 12.31 hrs, Volume= 70.512 of Primary = 414.48 cfs @ 12.31 hrs, Volume= 70.512 af, Atten= 0 %, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Link 10L: DP #2 POST Inflow Area = 435.670 ac, Inflow Depth > 1.14" for 2 -Year event Inflow = 295.37 cfs @ 12.26 hrs, Volume= 41.256 of Primary = 295.37 cfs @ 12.26 hrs, Volume= 41.256 af, Atten= 0 %, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs 2 -Year Primary Outflow Imported from 1121 - SIA DP #2 POST-Link 10L Link 11 L: DP #3 POST Inflow Area = 264.950 ac, Inflow Depth > 1.09" for 2 -Year event Inflow = 131.13 cfs @ 12.50 hrs, Volume= 24.155 of Primary = 131.13 cfs @ 12.50 hrs, Volume= 24.155 af, Atten= 0 %, Primary outflow = Inflow, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Lag= 0.0 min 1121 - SIA DP #1 POST Type 11 24 -hr 2 -Year Rainfall= 3.50" Prepared by {enter your company name here} Page 21 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 1/25/2012 Link 18L: DP #5 POST Inflow Area = 178.110 ac, Inflow Depth > 1.10" for 2 -Year event Inflow = 138.70 cfs @ 12.23 hrs, Volume= 16.262 of Primary = 138.70 cfs @ 12.23 hrs, Volume= 16.262 af, Atten= 0 %, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs 2 -Year Primary Outflow Imported from 1121 - SIA DP #5 POST-Link 5L Link 19L: DP #4 POST Inflow Area = 7.170 ac, Inflow Depth > 1.18" for 2 -Year event Inflow = 4.75 cfs @ 12.12 hrs, Volume= 0.705 of Primary = 4.75 cfs @ 12.12 hrs, Volume= 0.705 af, Atten= 0 %, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs 1121 - SIA DP #1 POST Type 11 24 -hr 10 -Year Rainfall= 5.10" Prepared by {enter your company name here} Page 22 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 1/25/2012 Time span =0.00 -25.00 hrs, dt =0.05 hrs, 501 points Runoff by SCS TR -20 method, UH =SCS Reach routing by Stor- Ind +Trans method - Pond routing by Stor -Ind method Subcatchment 1S: TO DP #1 POST RunoffArea= 39.130 ac Runoff Depth= 2.44" Flow Length= 1,986' Tc =18.7 min CN =74 Runoff = 109.53 cfs 7.970 of Subcatchment 2S: TO DP #3 POST RunoffArea= 12.170 ac Runoff Depth >1.72" Flow Length= 1,873' Tc =20.4 min CN =65 Runoff =21.87 cfs 1.745 of Subcatchment 13S: TO WQ #2 POST Runoff Area = 38.300 ac Runoff Depth= 3.17" Tc =5.0 min CN =82 Runoff = 214.23 cfs 10.113 of Subcatchment 15S: TO WQ #8 POST Runoff Area = 29.200 ac Runoff Depth= 3.76" Tc =5.0 min CN =88 Runoff = 187.51 cfs 9.159 of Subcatchment 16S: TO WQ #6 POST Runoff Area =5.050 ac Runoff Depth= 3.76" Tc =5.0 min CN =88 Runoff =32.43 cfs 1.584 of Subcatchment 17S: TO WQ #1 POST Runoff Area= 12.880 ac Runoff Depth= 3.07" Tc =5.0 min CN =81 Runoff =70.16 cfs 3.299 of Subcatchment 20S: TO DP #4 POST Runoff Area =2.120 ac Runoff Depth= 1.29" Flow Length =435' Tc =10.7 min CN =59 Runoff =3.78 cfs 0.228 of Reach 4R: DP #4 & 5 REACH Peak Depth =3.24' Max Vet =4.6 fps Inflow= 321.22 cfs 34.664 of n =0.045 L= 2,375.0' S=0.0080'/' Capacity= 1,201.80 cfs Outflow= 266.49 cfs 34.578 of Pond 12P: WQ #2 Peak EIev= 374.10' Storage= 259.427 cf Inflow= 214.23 cfs 10.113 of Outflow =9.56 cfs 7.373 of Pond 14P: WQ #8 Peak EIev= 361.78' Storage= 256.958 cf Inflow= 187.51 cfs 9.159 of Outflow =6.38 cfs 5.863 of Pond 16P: WQ #1 Peak EIev= 362.41' Storage= 79.959 cf Inflow =70.16 cfs 3.299 of Outflow =4.24 cfs 2.454 of Pond 17P: WQ #6 Peak EIev= 385.39' Storage= 29.658 cf Inflow =32.43 cfs 1.584 of Outflow =15.09 cfs 1.203 of Link 3L: DP #1 POST Inflow= 909.12 cfs 139.507 of Primary= 909.12 cfs 139.507 of Link 10L 10 -Year Primary Outflow Imported from 1121 - SIA DP#2 POST -Link 10L Inflow= 632.70 cfs 79.524 of Primary= 632.70 cfs 79.524 of Link 11 L: DP #3 POST Inflow= 289.48 cfs 49.559 of Primary= 289.48 cfs 49.559 of 1121 - SIA DP #1 POST Type 11 24 -hr 10 -Year Rainfall= 5.10" Prepared by {enter your company name here} Page 23 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 1/25/2012 Link 18L: 10 -Year Primary Outflow Imported from 1121 - SIA DP #5 POST -Link 5L Inflow= 306.39 cfs 33.233 of Primary= 306.39 cfs 33.233 of Riil'.tpowm7a°,lleiaIII Inflow =18.86 cfs 1.431 of Primary=18.86 cfs 1.431 of Total Runoff Area = 138.850 ac Runoff Volume = 34.099 of Average Runoff Depth = 2.95" 1121 - SIA DP #1 POST Type 11 24 -hr 10 -Year Rainfall= 5.10" Prepared by {enter your company name here} Page 24 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 1/25/2012 Subcatchment 1S: TO DP #1 POST Runoff = 109.53 cfs @ 12.12 hrs, Volume= 7.970 af, Depth= 2.44" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -Year Rainfall = 5.10" Area (ac) CN Description 1.520 55 Onsite Woods B 3.460 70 Onsite Woods C 0.760 77 Onsite Woods D 3.260 61 Onsite Open B 0.430 74 Onsite Open C 0.640 80 Onsite Open D 0.770 98 Onsite Impervious 1.360 55 Offsite Woods B 0.890 70 Offsite Woods C 22.510 77 Offsite Woods D 3.530 80 Offsite Open D 39.130 74 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) Onsite Woods D 12.4 75 0.0400 0.1 74 Sheet Flow, 0.000 80 Onsite Open D 0.940 98 Woods: Light underbrush n= 0.400 P2= 3.50" 0.9 286 0.1000 5.1 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 1.2 562 0.0700 7.9 47.30 Channel Flow, Area= 6.0 sf Perim= 7.0' r= 0.86' n= 0.045 1.7 530 0.0060 5.3 399.05 Channel Flow, Area= 75.0 sf Perim= 25.0' r= 3.00' n= 0.045 2.5 533 0.0020 3.6 534.69 Channel Flow, Area= 150.0 sf Perim= 40.0' r= 3.75' n= 0.045 18.7 1,986 Total Subcatchment 2S: TO DP #3 POST Runoff = 21.87 cfs @ 12.15 hrs, Volume= 1.745 af, Depth> 1.72" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -Year Rainfall = 5.10" Area (ac) CN Description 3.510 55 Onsite Woods B 2.730 70 Onsite Woods C 0.000 77 Onsite Woods D 4.070 61 Onsite Open B 0.920 74 Onsite Open C 0.000 80 Onsite Open D 0.940 98 Onsite Impervious 12.170 65 Weighted Average 1121 - SIA DP #1 POST Type 11 24 -hr 10 -Year Rainfall= 5.10" Prepared by {enter your company name here} Page 25 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 1/25/2012 Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 12.4 75 0.0400 0.1 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.50" 0.8 105 0.0190 2.2 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 7.2 1,693 0.0080 3.9 78.72 Channel Flow, Area= 20.0 sf Perim= 13.0' r= 1.54' n= 0.045 20.4 1,873 Total Subcatchment 13S: TO WQ #2 POST [49] Hint: Tc <2dt may require smaller dt Runoff = 214.23 cfs @ 11.96 hrs, Volume= 10.113 af, Depth= 3.17" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -Year Rainfall = 5.10" Area (ac) CN Description 11.530 61 Onsite Open B 7.750 74 Onsite Open C 19.020 98 Onsite Impervious 38.300 82 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 5.0 Direct Entry, Subcatchment 15S: TO WQ #8 POST [49] Hint: Tc <2dt may require smaller dt Runoff = 187.51 cfs @ 11.95 hrs, Volume= 9.159 af, Depth= 3.76" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -Year Rainfall = 5.10" Area (ac) CN Description 4.360 61 Onsite Open B 1.240 74 Onsite Open C 6.270 80 Onsite Open D 17.330 98 Onsite Impervious 29.200 88 Weighted Average 1121 - SIA DP #1 POST Type 11 24 -hr 10 -Year Rainfall= 5.10" Prepared by {enter your company name here} Page 26 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 1/25/2012 Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 5.0 Direct Entry, Subcatchment 16S: TO WQ #6 POST [49] Hint: Tc <2dt may require smaller dt Runoff = 32.43 cfs @ 11.95 hrs, Volume= 1.584 af, Depth= 3.76" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -Year Rainfall = 5.10" Area (ac) CN Description 0.230 61 Onsite Open Space, HSG 'B' 2.270 80 Onsite Open Space, HSG 'D' 2.550 98 Onsite Impervious 5.050 88 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 5.0 Direct Entry, Subcatchment 17S: TO WQ #1 POST [49] Hint: Tc <2dt may require smaller dt Runoff = 70.16 cfs @ 11.96 hrs, Volume= 3.299 af, Depth= 3.07" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -Year Rainfall = 5.10" Area (ac) CN Description 5.360 61 Onsite Open B 0.870 74 Onsite Open C 6.650 98 Onsite Impervious 12.880 81 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 5.0 Direct Entry, Subcatchment 20S: TO DP #4 POST Runoff = 3.78 cfs @ 12.04 hrs, Volume= 0.228 af, Depth= 1.29" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type 11 24 -hr 10 -Year Rainfall = 5.10" 1121 - SIA DP #1 POST Type 11 24 -hr 10 -Year Rainfall= 5.10" Prepared by {enter your company name here} Page 27 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 1/25/2012 Area (ac) CN Description 1.600 55 Onsite Woods B 0.230 77 Onsite Woods D 0.210 61 Onsite Open B 0.080 80 Onsite Open D 2.120 59 Weighted Average Tc (min) Length (feet) Slope (ft/ft) Velocity (ft /sec) Capacity Description (cfs) 9.4 75 0.0800 0.1 Sheet Flow, 0.00 0.0 0.0 0 0.00 Woods: Light underbrush n= 0.400 P2= 3.50" 1.3 360 0.0470 4.5 9.02 Channel Flow, 3.00 40.5 21.0 96,188 185.34 Area= 2.0 sf Perim= 4.0' r= 0.50' n= 0.045 10.7 435 Total Reach 4R: DP #4 & 5 REACH Inflow Area = 185.280 ac, Inflow Depth > 2.25" for 10 -Year event Inflow = 321.22 cfs @ 12.21 hrs, Volume= 34.664 of Outflow = 266.49 cfs @ 12.48 hrs, Volume= 34.578 af, Atten= 17 %, Lag= 16.4 min Routing by Stor- Ind +Trans method, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Max. Velocity= 4.6 fps, Min. Travel Time= 8.7 min Avg. Velocity = 3.0 fps, Avg. Travel Time= 13.4 min Peak Depth= 3.24'@ 12.34 hrs Capacity at bank full= 1,201.80 cfs Inlet Invert= 366.00', Outlet Invert= 347.00' Custom cross - section table, n= 0.045 Length= 2,375.0' Slope= 0.00807' Depth End Area Perim. Storage Discharge (feet) (sq -ft) (feet) (cubic -feet) (cfs) 0.00 0.0 0.0 0 0.00 0.10 0.7 7.5 1,663 0.43 3.00 40.5 21.0 96,188 185.34 6.00 291.0 176.0 691,125 1,201.80 Pond 12P: WQ #2 Inflow Area = 38.300 ac, Inflow Depth= 3.17" for 10 -Year event Inflow = 214.23 cfs @ 11.96 hrs, Volume= 10.113 of Outflow = 9.56 cfs @ 13.23 hrs, Volume= 7.373 af, Atten= 96 %, Lag= 76.2 min Primary = 9.56 cfs @ 13.23 hrs, Volume= 7.373 of Routing by Stor -Ind method, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Peak Elev= 374.10' @ 13.23 hrs Surf.Area= 70,380 sf Storage= 259,427 cf Plug -Flow detention time= 320.2 min calculated for 7.373 of (73% of inflow) Center -of -Mass det. time= 224.5 min ( 1,035.9 - 811.5 ) 1121 - SIA DP #1 POST Type 11 24 -hr 10 -Year Rainfall= 5.10" Prepared by {enter your company name here} Page 28 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 1/25/2012 Volume Invert Avail.Storage Storage Description #1 370.00' 561,747 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 370.00 56,196 0 0 372.00 62,949 119,145 119,145 374.00 69,996 132,945 252,090 376.00 77,340 147,336 399,426 378.00 84,981 162,321 561,747 Device Routing Invert Outlet Devices #1 Primary 370.00' 24.0" x 50.0' long Culvert RCP, square edge headwall, Ke= 0.500 #3 Device 1 358.00' Outlet Invert= 369.50' S= 0.01007' Cc= 0.900 n= 0.013 #2 Device 1 378.00' 48.0" Horiz. Orifice /Grate Limited to weir flow C= 0.600 #3 Device 1 370.00' 4.0" Vert. Orifice /Grate C= 0.600 #4 Device 1 371.30' 15.0" Vert. Orifice /Grate C= 0.600 Primary OutFlow Max =9.56 cfs @ 13.23 hrs HW= 374.10' (Free Discharge) L = Culvert (Passes 9.56 cfs of 26.65 cfs potential flow) 2= Orifice /Grate ( Controls 0.00 cfs) 3= Orifice /Grate (Orifice Controls 0.83 cfs @ 9.6 fps) 4= Orifice /Grate (Orifice Controls 8.72 cfs @ 7.1 fps) Pond 14P: WQ #8 Inflow Area = 29.200 ac, Inflow Depth= 3.76" for 10 -Year event Inflow = 187.51 cfs @ 11.95 hrs, Volume= 9.159 of Outflow = 6.38 cfs @ 13.65 hrs, Volume= 5.863 af, Atten= 97 %, Lag= 101.7 min Primary = 6.38 cfs @ 13.65 hrs, Volume= 5.863 of Routing by Stor -Ind method, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Peak Elev= 361.78' @ 13.65 hrs Surf.Area= 74,928 sf Storage= 256,958 cf Plug -Flow detention time= 378.3 min calculated for 5.863 of (64% of inflow) Center -of -Mass det. time= 276.0 min ( 1,069.1 - 793.1 ) Volume Invert #1 358.00' Avail.Storage Storage Description 433,022 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 358.00 61,319 0 0 360.00 68,377 129,696 129,696 362.00 75,754 144,131 273,827 364.00 83,441 159,195 433,022 Device Routing Invert Outlet Devices #1 Primary 358.00' 24.0" x 50.0' long Culvert RCP, square edge headwall, Ke= 0.500 Outlet Invert= 357.50' S= 0.01007' Cc= 0.900 n= 0.013 #2 Device 1 364.00' 48.0" Horiz. Orifice /Grate Limited to weir flow C= 0.600 #3 Device 1 358.00' 4.0" Vert. Orifice /Grate C= 0.600 1121 - SIA DP #1 POST Type 11 24 -hr 10 -Year Rainfall= 5.10" Prepared by {enter your company name here} Page 29 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 1/25/2012 #4 Device 1 359.10' 12.0" Vert. Orifice /Grate C= 0.600 Primary OutFlow Max =6.38 cfs @ 13.65 hrs HW= 361.78' (Free Discharge) L = Culvert (Passes 6.38 cfs of 25.20 cfs potential flow) 2= Orifice /Grate ( Controls 0.00 cfs) 3= Orifice /Grate (Orifice Controls 0.80 cfs @ 9.1 fps) 4= Orifice /Grate (Orifice Controls 5.58 cfs @ 7.1 fps) Routing by Stor -Ind method, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Peak Elev= 362.41' @ 12.77 hrs Surf.Area= 34,866 sf Storage= 79,959 cf Plug -Flow detention time= 267.1 min calculated for 2.449 of (74% of inflow) Center -of -Mass det. time= 174.0 min ( 988.3 - 814.2 ) Volume Invert #1 360.00' Avail.Storage Storage Description 214,441 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Pond 16P: WQ #1 Inflow Area = 12.880 ac, Inflow Depth= 3.07" for 10 -Year event Inflow = 70.16 cfs @ 11.96 hrs, Volume= 3.299 of Outflow = 4.24 cfs @ 12.77 hrs, Volume= 2.454 af, Atten= 94 %, Lag= 48.8 min Primary = 4.24 cfs @ 12.77 hrs, Volume= 2.454 of Routing by Stor -Ind method, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Peak Elev= 362.41' @ 12.77 hrs Surf.Area= 34,866 sf Storage= 79,959 cf Plug -Flow detention time= 267.1 min calculated for 2.449 of (74% of inflow) Center -of -Mass det. time= 174.0 min ( 988.3 - 814.2 ) Volume Invert #1 360.00' Avail.Storage Storage Description 214,441 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 360.00 31,407 0 0 362.00 34,265 65,672 65,672 364.00 37,174 71,439 137,111 366.00 40,156 77,330 214,441 Device Routing Invert Outlet Devices #1 Primary 360.00' 24.0" x 50.0' long Culvert RCP, square edge headwall, Ke= 0.500 Outlet Invert= 359.50' S= 0.01007' Cc= 0.900 n= 0.013 #2 Device 1 366.00' 48.0" Horiz. Orifice /Grate Limited to weir flow C= 0.600 #3 Device 1 360.00' 2.5" Vert. Orifice /Grate C= 0.600 #4 Device 1 360.80' 12.0" Vert. Orifice /Grate C= 0.600 Primary OutFlow Max =4.24 cfs @ 12.77 hrs HW= 362.41' (Free Discharge) L = Culvert (Passes 4.24 cfs of 17.84 cfs potential flow) 2= Orifice /Grate ( Controls 0.00 cfs) 3= Orifice /Grate (Orifice Controls 0.25 cfs @ 7.3 fps) 4= Orifice /Grate (Orifice Controls 3.99 cfs @ 5.1 fps) Routing by Stor -Ind method, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Pond 17P: WQ #6 Inflow Area = 5.050 ac, Inflow Depth= 3.76" for 10 -Year event Inflow = 32.43 cfs @ 11.95 hrs, Volume= 1.584 of Outflow = 15.09 cfs @ 12.06 hrs, Volume= 1.203 af, Atten= 53 %, Lag= 6.2 min Primary = 15.09 cfs @ 12.06 hrs, Volume= 1.203 of Routing by Stor -Ind method, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs 1121 - SIA DP #1 POST Type 11 24 -hr 10 -Year Rainfall= 5.10" Prepared by {enter your company name here} Page 30 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 1/25/2012 Peak Elev= 385.39' @ 12.06 hrs Surf.Area= 12,045 sf Storage= 29,658 cf Plug -Flow detention time= 180.3 min calculated for 1.203 of (76% of inflow) Center -of -Mass det. time= 92.1 min ( 885.2 - 793.1 ) Volume Invert Avail.Storage Storage Description #1 382.00' 37,291 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 382.00 5,211 0 0 384.00 9,455 14,666 14,666 386.00 13,170 22,625 37,291 Device Routing Invert Outlet Devices #1 Primary 382.00' 18.0" x 50.0' long Culvert RCP, groove end w /headwall, Ke= 0.200 Outlet Invert= 381.50' S= 0.01007' Cc= 0.900 n= 0.013 #2 Device 1 384.50' 48.0" Horiz. Orifice /Grate Limited to weir flow C= 0.600 #3 Device 1 382.00' 1.0" Vert. Orifice /Grate C= 0.600 #4 Device 1 383.50' 4.0" Vert. Orifice /Grate C= 0.600 Primary OutFlow Max =15.07 cfs @ 12.06 hrs HW= 385.39' (Free Discharge) L = Culvert (Barrel Controls 15.07 cfs @ 8.5 fps) 2= Orifice /Grate (Passes < 34.34 cfs potential flow) 3= Orifice /Grate (Passes < 0.05 cfs potential flow) 4= Orifice /Grate (Passes < 0.55 cfs potential flow) Link 3L: DP #1 POST Inflow Area = 752.630 ac, Inflow Depth > 2.22" for 10 -Year event Inflow = 909.12 cfs @ 12.27 hrs, Volume= 139.507 of Primary = 909.12 cfs @ 12.27 hrs, Volume= 139.507 af, Atten= 0 %, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Link 10L: DP #2 POST Inflow Area = 435.670 ac, Inflow Depth > 2.19" for 10 -Year event Inflow = 632.70 cfs @ 12.24 hrs, Volume= 79.524 of Primary = 632.70 cfs @ 12.24 hrs, Volume= 79.524 af, Atten= 0 %, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs 10 -Year Primary Outflow Imported from 1121 - SIA DP #2 POST-Link 10L Link 11 L: DP #3 POST Inflow Area = 264.950 ac, Inflow Depth > 2.24" for 10 -Year event Inflow = 289.48 cfs @ 12.48 hrs, Volume= 49.559 of Primary = 289.48 cfs @ 12.48 hrs, Volume= 49.559 af, Atten= 0 %, Primary outflow = Inflow, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Lag= 0.0 min 1121 - SIA DP #1 POST Type 11 24 -hr 10 -Year Rainfall= 5.10" Prepared by {enter your company name here} Page 31 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 1/25/2012 Link 18L: DP #5 POST Inflow Area = 178.110 ac, Inflow Depth > 2.24" for 10 -Year event Inflow = 306.39 cfs @ 12.22 hrs, Volume= 33.233 of Primary = 306.39 cfs @ 12.22 hrs, Volume= 33.233 af, Atten= 0 %, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs 10 -Year Primary Outflow Imported from 1121 - SIA DP #5 POST-Link 5L Link 19L: DP #4 POST Inflow Area = 7.170 ac, Inflow Depth > 2.40" for 10 -Year event Inflow = 18.86 cfs @ 12.04 hrs, Volume= 1.431 of Primary = 18.86 cfs @ 12.04 hrs, Volume= 1.431 af, Atten= 0 %, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs 1121 - SIA DP #1 POST Type 11 24 -hr 100 -Year Rainfall= 7.40" Prepared by {enter your company name here} Page 1 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 1/25/2012 Time span =0.00 -25.00 hrs, dt =0.05 hrs, 501 points Runoff by SCS TR -20 method, UH =SCS Reach routing by Stor- Ind +Trans method - Pond routing by Stor -Ind method Subcatchment 1S: TO DP #1 POST RunoffArea= 39.130 ac Runoff Depth= 4.39" Flow Length= 1,986' Tc =18.7 min CN =74 Runoff= 197.36 cfs 14.324 of Subcatchment 2S: TO DP #3 POST RunoffArea= 12.170 ac Runoff Depth= 3.41" Flow Length= 1,873' Tc =20.4 min CN =65 Runoff =45.13 cfs 3.463 of Subcatchment 13S: TO WQ #2 POST Runoff Area = 38.300 ac Runoff Depth = 5.29" Tc =5.0 min CN =82 Runoff = 348.59 cfs 16.891 of Subcatchment 15S: TO WQ #8 POST Runoff Area = 29.200 ac Runoff Depth = 5.98" Tc =5.0 min CN =88 Runoff = 289.27 cfs 14.558 of Subcatchment 16S: TO WQ #6 POST Runoff Area =5.050 ac Runoff Depth = 5.98" Tc =5.0 min CN =88 Runoff =50.03 cfs 2.518 of Subcatchment 17S: TO WQ #1 POST Runoff Area= 12.880 ac Runoff Depth = 5.18" Tc =5.0 min CN =81 Runoff= 115.29 cfs 5.558 of Subcatchment 20S: TO DP #4 POST Runoff Area =2.120 ac Runoff Depth= 2.79" Flow Length =435' Tc =10.7 min CN =59 Runoff =8.65 cfs 0.492 of Reach 4R: DP #4 & 5 REACH Peak Depth =3.97' Max Vet =4.6 fps Inflow= 625.23 cfs 63.435 of n =0.045 L= 2,375.0' S=0.0080'/' Capacity= 1,201.80 cfs Outflow= 514.74 cfs 63.311 of Pond 12P: WQ #2 Peak Elev= 376.69' Storage= 453.891 cf Inflow= 348.59 cfs 16.891 of Outflow =13.97 cfs 12.556 of Pond 14P: WQ #8 Peak Elev= 363.86' Storage= 421.458 cf Inflow= 289.27 cfs 14.558 of Outflow =8.81 cfs 8.791 of Pond 16P: WQ #1 Peak EIev= 364.09' Storage= 140.300 cf Inflow= 115.29 cfs 5.558 of Outflow =6.64 cfs 4.594 of Pond 17P: WQ #6 Peak EIev= 421.17' Storage= 37.291 cf Inflow =50.03 cfs 2.518 of Outflow =60.25 cfs 2.100 of Link 3L: DP #1 POST Inflow= 1,753.27 cfs 247.014 of Primary= 1,753.27 cfs 247.014 of Link 100 -Year Primary Outflow Imported from 1121 - SIA DP#2 POST -Link 10L Inflow= 1,196.84 cfs 139.975 of Primary= 1,196.84 cfs 139.975 of Link 11 L: DP #3 POST Inflow= 551.79 cfs 88.121 of Primary= 551.79 cfs 88.121 of 1121 - SIA DP #1 POST Type 11 24 -hr 100 -Year Rainfall= 7.40" Prepared by {enter your company name here} Page 2 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 1/25/2012 Link 18L 100 -Year Primary Outflow Imported from 1121 - SIA DP #5 POST -Link 5L Inflow= 603.51 cfs 60.843 of Primary= 603.51 cfs 60.843 of Riil'.tpowm7a°,lleiaIII Inflow =68.51 cfs 2.592 of Primary=68.51 cfs 2.592 of Total Runoff Area = 138.850 ac Runoff Volume = 57.804 of Average Runoff Depth = 5.00" 14S 13S WQ #12 12P TO DP #10 POS ZWQ#12 14L 11S DP #10 OST 12S VTDP#9 POST TO LS #13 POST 11L Cl S TO W� #11 POST 14P 15P � 16S TO WQ #9 POST WQ# 1 WQ #9 9S DP #9 POST 13 L 6R DP #8 TO DP #8 POST Zs DP #8& REACH 18 P Q\ 19S 5S WQ# 10 � 10L TO WQ #10 POST TO DP #2 POST DP #2 POST S4 Reach on Link 1121 - SIA DP #2 POST Type// 24 -hr 1 -Year Rainfall= 3.00" Prepared by {enter your company name here} Page 2 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 11/16/2011 Time span =0.00 -25.00 hrs, dt =0.05 hrs, 501 points Runoff by SCS TR -20 method, UH =SCS Reach routing by Stor- Ind +Trans method - Pond routing by Stor -Ind method Subcatchment 5S: TO DP #2 POST Runoff Area = 269.700 ac Runoff Depth >0.81" Flow Length = 5,298' Tc =26.7 min CN =72 Runoff= 180.82 cfs 18.161 of Subcatchment 9S: TO DP #8 POST Runoff Area= 10.780 ac Runoff Depth= 1.25" Flow Length= 1,735' Tc =13.9 min CN =80 Runoff =17.81 cfs 1.123 of Subcatchment 11S: TO DP #9 POST Runoff Area =7.730 ac Runoff Depth = 0.47" Flow Length= 1,025' Tc =11.4 min CN =64 Runoff =4.07 cfs 0.302 of Subcatchment 12S: TO LS #13 POST Runoff Area =2.520 ac Runoff Depth= 1.45" Tc =5.0 min CN =83 Runoff =6.56 cfs 0.304 of Subcatchment 13S: TO DP #10 POST Runoff Area = 46.460 ac Runoff Depth= 1.13" Flow Length= 1,567' Tc =17.0 min CN =78 Runoff =61.94 cfs 4.370 of Subcatchment 14S: TO WQ #12 Subcatchment 16S: TO WQ #9 POST Subcatchment 17S: TO WQ #11 POST Subcatchment 19S: TO WQ #10 POST Runoff Area =9.120 ac Runoff Depth= 1.52" Tc =5.0 min CN =84 Runoff =24.86 cfs 1.152 of Runoff Area = 49.950 ac Runoff Depth= 1.82" Tc =5.0 min CN =88 Runoff = 160.84 cfs 7.568 of Runoff Area = 23.410 ac Runoff Depth= 1.52" Tc =5.0 min CN =84 Runoff =63.80 cfs 2.958 of Runoff Area= 16.000 ac Runoff Depth= 1.82" Tc =5.0 min CN =88 Runoff =51.52 cfs 2.424 of Reach 6R: DP #8 &9 REACH Peak Depth =1.33' Max Vet =2.6 fps Inflow =89.81 cfs 12.403 of n =0.045 L= 2,491.0' S=0.0028'/' Capacity= 1,285.41 cfs Outflow =56.30 cfs 12.180 of Pond 12P: WQ #12 Peak EIev= 404.18' Storage= 29.586 cf Inflow =24.86 cfs 1.152 of Outflow =0.89 cfs 0.711 of Pond 14P: WQ #11 Peak EIev= 393.44' Storage= 84.222 cf Inflow =63.80 cfs 2.958 of Outflow =1.46 cfs 1.419 of Pond 15P: WQ #9 Peak EIev= 412.25' Storage= 238.181 cf Inflow= 160.84 cfs 7.568 of Outflow =2.54 cfs 2.642 of Pond 18P: WQ #10 Peak EIev= 390.18' Storage= 60.362 cf Inflow =51.52 cfs 2.424 of Outflow =2.87 cfs 1.531 of Link 10L: DP #2 POST Inflow= 204.25 cfs 30.341 of Primary= 204.25 cfs 30.341 of 1121 - SIA DP #2 POST Type// 24 -hr 1 -Year Rainfall= 3.00" Prepared by {enter your company name here} Page 3 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 11/16/2011 Link 11L: DP #9 POST Link 13L: DP #8 Post Link 14L: DP #10 POST Inflow =67.89 cfs 5.688 of Primary=67.89 cfs 5.688 of Inflow =22.23 cfs 6.715 of Primary=22.23 cfs 6.715 of Inflow =62.59 cfs 5.082 of Primary=62.59 cfs 5.082 of Total Runoff Area = 435.670 ac Runoff Volume = 38.363 of Average Runoff Depth = 1.06" 1121 - SIA DP #2 POST Type// 24 -hr 1 -Year Rainfall= 3.00" Prepared by {enter your company name here} Page 4 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 11/16/2011 Subcatchment 5S: TO DP #2 POST Runoff = 180.82 cfs @ 12.23 hrs, Volume= 18.161 af, Depth> 0.81" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -Year Rainfall= 3.00" Area (ac) CN Description 9.890 55 Onsite Woods B 0.160 70 Onsite Woods C 27.600 77 Onsite Woods D 6.760 61 Onsite Open B 1.630 74 Onsite Open C 20.440 80 Onsite Open D 0.640 98 Onsite Impervious 42.750 55 Offsite Woods B 2.050 70 Offsite Woods C 73.710 77 Offsite Woods D 17.880 61 Offsite Open B 0.110 74 Offsite Open C 66.080 80 Offsite Open D 269.700 72 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 10.1 75 0.0670 0.1 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.50" 0.9 192 0.0460 3.5 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 2.1 640 0.0280 5.0 29.92 Channel Flow, Area= 6.0 sf Perim= 7.0' r= 0.86' n= 0.045 7.2 2,290 0.0260 5.3 47.92 Channel Flow, Area= 9.0 sf Perim= 9.0' r= 1.00' n= 0.045 5.1 1,259 0.0140 4.1 49.69 Channel Flow, Area= 12.0 sf Perim= 11.0' r= 1.09' n= 0.045 1.3 842 0.0040 10.8 453.63 Channel Flow, Area= 42.0 sf Perim= 23.0' r= 1.83' n= 0.013 26.7 5,298 Total Subcatchment 9S: TO DP #8 POST Runoff = 17.81 cfs @ 12.06 hrs, Volume= 1.123 af, Depth= 1.25" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type 11 24 -hr 1 -Year Rainfall= 3.00" 1121 - SIA DP #2 POST Type// 24 -hr 1 -Year Rainfall= 3.00" Prepared by {enter your company name here} Page 5 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 11/16/2011 Area (ac) CN Description 0.000 70 Onsite Woods C 1.690 77 Onsite Woods D 0.170 74 Onsite Open C 8.430 80 Onsite Open D 0.490 98 Onsite Impervious 10.780 80 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 8.2 75 0.0400 0.2 77 Offsite Woods D Sheet Flow, 0.000 80 Offsite Open D 7.730 64 Weighted Average Grass: Dense n= 0.240 P2= 3.50" 2.0 456 0.0540 3.7 (ft/ft) (ft /sec) (cfs) Shallow Concentrated Flow, 8.0 75 0.1200 0.2 Sheet Flow, Unpaved Kv= 16.1 fps 1.8 698 0.0450 6.3 37.93 Channel Flow, 3.1 856 0.0170 4.6 54.75 Channel Flow, Area= 6.0 sf Perim= 7.0' r= 0.86' n= 0.045 1.9 506 0.0220 4.4 26.52 Channel Flow, Area= 6.0 sf Perim= 7.0' r= 0.86' n= 0.045 13.9 1,735 Total Subcatchment 11S: TO DP #9 POST Runoff = 4.07 cfs @ 12.06 hrs, Volume= 0.302 af, Depth= 0.47" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -Year Rainfall= 3.00" Area (ac) CN Description 4.180 55 Onsite Woods B 0.000 77 Onsite Woods D 2.040 61 Onsite Open B 0.590 80 Onsite Open D 0.920 98 Onsite Impervious 0.000 77 Offsite Woods D 0.000 80 Offsite Open D 7.730 64 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 8.0 75 0.1200 0.2 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.50" 0.3 94 0.1060 5.2 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 3.1 856 0.0170 4.6 54.75 Channel Flow, Area= 12.0 sf Perim= 11.0' r= 1.09' n= 0.045 11.4 1,025 Total 1121 - SIA DP #2 POST Type// 24 -hr 1 -Year Rainfall= 3.00" Prepared by {enter your company name here} Page 6 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 11/16/2011 Subcatchment 12S: TO LS #13 POST [49] Hint: Tc <2dt may require smaller dt Runoff = 6.56 cfs @ 11.96 hrs, Volume= 0.304 af, Depth= 1.45" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -Year Rainfall= 3.00" Area (ac) CN Description 0.530 61 Onsite Open B 0.990 80 Onsite Open D 1.000 98 Onsite Impervious 2.520 83 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 5.0 Direct Entry, Subcatchment 13S: TO DP #10 POST Runoff = 61.94 cfs @ 12.10 hrs, Volume= 4.370 af, Depth= 1.13" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -Year Rainfall= 3.00" Area (ac) CN Description 1.440 55 Onsite Woods B 0.000 77 Onsite Woods D 0.920 61 Onsite Open B 23.110 80 Onsite Open D 0.150 98 Onsite Impervious 7.950 77 Offsite Woods D 12.890 80 Offsite Open D 46.460 78 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 11.0 75 0.0530 0.1 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.50" 1.6 347 0.0520 3.7 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 2.6 750 0.0360 4.8 19.13 Channel Flow, Area= 4.0 sf Perim= 6.0' r= 0.67' n= 0.045 1.8 395 0.0150 3.6 21.90 Channel Flow, Area= 6.0 sf Perim= 7.0' r= 0.86' n= 0.045 17.0 1,567 Total 1121 - SIA DP #2 POST Type// 24 -hr 1 -Year Rainfall= 3.00" Prepared by {enter your company name here} Page 7 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 11/16/2011 Subcatchment 14S: TO WQ #12 [49] Hint: Tc <2dt may require smaller dt Runoff = 24.86 cfs @ 11.96 hrs, Volume= 1.152 af, Depth= 1.52" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -Year Rainfall= 3.00" Area (ac) CN Description 1.350 61 Onsite Open B 4.210 80 Onsite Open D 3.560 98 Onsite Impervious 9.120 84 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 5.0 Direct Entry, Subcatchment 16S: TO WQ #9 POST [49] Hint: Tc <2dt may require smaller dt Runoff = 160.84 cfs @ 11.96 hrs, Volume= 7.568 af, Depth= 1.82" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -Year Rainfall= 3.00" Area (ac) CN Description 3.940 74 Onsite Open C 22.190 80 Onsite Open D 23.820 98 Onsite Impervious 49.950 88 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 5.0 Direct Entry, Subcatchment 17S: TO WQ #11 POST [49] Hint: Tc <2dt may require smaller dt Runoff = 63.80 cfs @ 11.96 hrs, Volume= 2.958 af, Depth= 1.52" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type 11 24 -hr 1 -Year Rainfall= 3.00" 1121 - SIA DP #2 POST Type// 24 -hr 1 -Year Rainfall= 3.00" Prepared by {enter your company name here} Page 8 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 11/16/2011 Area (ac) CN Description 2.160 61 Onsite Open B 0.100 74 Onsite Open C 13.290 80 Onsite Open D 7.860 98 Onsite Impervious 23.410 84 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 5.0 Direct Entry, Subcatchment 19S: TO WQ #10 POST [49] Hint: Tc <2dt may require smaller dt Runoff = 51.52 cfs @ 11.96 hrs, Volume= 2.424 af, Depth= 1.82" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -Year Rainfall= 3.00" Area (ac) CN Description 2.650 74 Onsite Open C 5.770 80 Onsite Open D 7.580 98 Onsite Impervious 16.000 88 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 5.0 Direct Entry, Reach 6R: DP #8 &9 REACH Inflow Area = 165.970 ac, Inflow Depth > 0.90" for 1 -Year event Inflow = 89.81 cfs @ 12.09 hrs, Volume= 12.403 of Outflow = 56.30 cfs @ 12.51 hrs, Volume= 12.180 af, Atten= 37 %, Lag= 25.1 min Routing by Stor- Ind +Trans method, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Max. Velocity= 2.6 fps, Min. Travel Time= 15.7 min Avg. Velocity = 1.8 fps, Avg. Travel Time= 23.2 min Peak Depth= 1.33'@ 12.24 hrs Capacity at bank full= 1,285.41 cfs Inlet Invert= 353.00', Outlet Invert= 346.00' Custom cross - section table, n= 0.045 Length= 2,491.0' Slope= 0.00287' 1121 - SIA DP #2 POST Type// 24 -hr 1 -Year Rainfall= 3.00" Prepared by {enter your company name here} Page 9 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 11/16/2011 Depth (feet) End Area (sq -ft) Perim. (feet) Storage (cubic -feet) Discharge (cfs) 0.00 0.0 0.0 0 0.00 0.10 0.8 8.0 1,993 0.30 3.00 49.5 26.0 123,305 133.11 7.00 379.5 141.0 945,335 1,285.41 Pond 12P: WQ #12 Inflow Area = 9.120 ac, Inflow Depth = 1.52" for 1 -Year event Inflow = 24.86 cfs @ 11.96 hrs, Volume= 1.152 of Outflow = 0.89 cfs @ 13.82 hrs, Volume= 0.711 af, Atten= 96 %, Lag= 111.8 min Primary = 0.89 cfs @ 13.82 hrs, Volume= 0.711 of Routing by Stor -Ind method, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Peak Elev= 404.18' @ 13.82 hrs Surf.Area= 15,389 sf Storage= 29,586 cf Plug -Flow detention time= 333.6 min calculated for 0.710 of (62% of inflow) Center -of -Mass det. time= 220.4 min ( 1,048.9 - 828.4 ) Volume Invert Avail.Storage Storage Description #1 402.00' 101,706 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 402.00 11,805 0 0 404.00 15,072 26,877 26,877 406.00 18,637 33,709 60,586 408.00 22,483 41,120 101,706 Device Routing Invert Outlet Devices #1 Primary 402.00' 18.0" x 50.0' long Culvert RCP, square edge headwall, Ke= 0.500 Outlet Invert= 401.50' S= 0.01007' Cc= 0.900 n= 0.013 #2 Device 1 408.00' 48.0" Horiz. Orifice /Grate Limited to weir flow C= 0.600 #3 Device 1 402.00' 1.5" Vert. Orifice /Grate C= 0.600 #4 Primary 403.20' 6.0" Vert. Orifice /Grate C= 0.600 Primary OutFlow Max =0.89 cfs @ 13.82 hrs HW= 404.18' (Free Discharge) 1= Culvert (Passes 0.09 cfs of 9.90 cfs potential flow) -2= Orifice /Grate ( Controls 0.00 cfs) 3= Orifice /Grate (Orifice Controls 0.09 cfs @ 7.0 fps) 4= Orifice /Grate (Orifice Controls 0.81 cfs @ 4.1 fps) Pond 14P: WQ #11 Inflow Area = 23.410 ac, Inflow Depth = 1.52" for 1 -Year event Inflow = 63.80 cfs @ 11.96 hrs, Volume= 2.958 of Outflow = 1.46 cfs @ 15.62 hrs, Volume= 1.419 af, Atten= 98 %, Lag= 219.7 min Primary = 1.46 cfs @ 15.62 hrs, Volume= 1.419 of Routing by Stor -Ind method, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs 1121 - SIA DP #2 POST Type// 24 -hr 1 -Year Rainfall= 3.00" Prepared by {enter your company name here} Page 10 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 11/16/2011 Peak Elev= 393.44' @ 15.62 hrs Surf.Area= 60,804 sf Storage= 84,222 cf Plug -Flow detention time= 391.1 min calculated for 1.416 of (48% of inflow) Center -of -Mass det. time= 269.8 min ( 1,098.3 - 828.4 ) Volume Invert Avail.Storage Storage Description #1 392.00' 393,926 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 392.00 56,558 0 0 394.00 62,475 119,033 119,033 396.00 68,657 131,132 250,165 398.00 75,104 143,761 393,926 Device Routing Invert Outlet Devices #1 Primary 392.00' 24.0" x 50.0' long Culvert RCP, square edge headwall, Ke= 0.500 245,310 684,306 Outlet Invert= 391.50' S= 0.01007' Cc= 0.900 n= 0.013 #2 Device 1 398.00' 48.0" Horiz. Orifice /Grate Limited to weir flow C= 0.600 #3 Device 1 392.00' 3.0" Vert. Orifice /Grate C= 0.600 #4 Device 1 392.60' 8.0" Vert. Orifice /Grate C= 0.600 Primary OutFlow Max =1.46 cfs @ 15.62 hrs HW= 393.44' (Free Discharge) L1= Culvert (Passes 1.46 cfs of 8.87 cfs potential flow) �2= Orifice /Grate ( Controls 0.00 cfs) 3= Orifice /Grate (Orifice Controls 0.27 cfs @ 5.5 fps) 4=Orifice/G rate (Orifice Controls 1.19 cfs @ 3.4 fps) Pond 15P: WQ #9 Inflow Area = 49.950 ac, Inflow Depth = 1.82" for 1 -Year event Inflow = 160.84 cfs @ 11.96 hrs, Volume= 7.568 of Outflow = 2.54 cfs @ 17.57 hrs, Volume= 2.642 af, Atten= 98 %, Lag= 336.8 min Primary = 2.54 cfs @ 17.57 hrs, Volume= 2.642 of Routing by Stor -Ind method, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Peak Elev= 412.25' @ 17.57 hrs Surf.Area= 110,730 sf Storage= 238,181 cf Plug -Flow detention time= 421.2 min calculated for 2.642 of (35% of inflow) Center -of -Mass det. time= 296.3 min ( 1,110.0 - 813.7 ) Volume Invert Avail.Storage Storage Description #1 410.00' 1,525,946 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 410.00 101,403 0 0 412.00 109,678 211,081 211,081 414.00 118,237 227,915 438,996 416.00 127,073 245,310 684,306 418.00 136,174 263,247 947,553 420.00 145,534 281,708 1,229,261 422.00 151,151 296,685 1,525,946 1121 - SIA DP #2 POST Type// 24 -hr 1 -Year Rainfall= 3.00" Prepared by {enter your company name here} Page 11 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 11/16/2011 Device Routing Invert Outlet Devices #1 Primary 410.00' 48.0" x 500.0' long Culvert RCP, square edge headwall, Ke= 0.500 51.52 cfs @ 11.96 hrs, Volume= 2.424 of Outlet Invert= 405.00' S= 0.01007' Cc= 0.900 n= 0.013 #2 Device 1 422.00' 60.0" Horiz. Orifice /Grate Limited to weir flow C= 0.600 #3 Device 1 411.00' 8.0" Vert. Orifice /Grate C= 0.600 #4 Device 1 410.00' 5.0" Vert. Orifice /Grate C= 0.600 Primary OutFlow Max =2.54 cfs @ 17.57 hrs HW= 412.25' (Free Discharge) L1 = Culvert (Passes 2.54 cfs of 37.07 cfs potential flow) �2= Orifice /Grate ( Controls 0.00 cfs) 3= Orifice /Grate (Orifice Controls 1.61 cfs @ 4.6 fps) 4=Orifice/G rate (Orifice Controls 0.94 cfs @ 6.9 fps) Routing by Stor -Ind method, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Peak Elev= 390.18' @ 12.89 hrs Surf.Area= 30,531 sf Storage= 60,362 cf Plug -Flow detention time= 283.1 min calculated for 1.528 of (63% of inflow) Center -of -Mass det. time= 176.4 min ( 990.1 - 813.7 ) Volume Invert #1 388.00' MV01 e Description 199,413 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Pond 18P: WQ #10 Inflow Area = 16.000 ac, Inflow Depth = 1.82" for 1 -Year event Inflow = 51.52 cfs @ 11.96 hrs, Volume= 2.424 of Outflow = 2.87 cfs @ 12.89 hrs, Volume= 1.531 af, Atten= 94 %, Lag= 55.9 min Primary = 2.87 cfs @ 12.89 hrs, Volume= 1.531 of Routing by Stor -Ind method, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Peak Elev= 390.18' @ 12.89 hrs Surf.Area= 30,531 sf Storage= 60,362 cf Plug -Flow detention time= 283.1 min calculated for 1.528 of (63% of inflow) Center -of -Mass det. time= 176.4 min ( 990.1 - 813.7 ) Volume Invert #1 388.00' MV01 e Description 199,413 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 388.00 24,927 0 0 390.00 29,985 54,912 54,912 392.00 36,051 66,036 120,948 394.00 42,414 78,465 199,413 Device Routing Invert Outlet Devices #1 Primary 388.00' 24.0" x 50.0' long Culvert RCP, square edge headwall, Ke= 0.500 Outlet Invert= 387.50' S= 0.01007' Cc= 0.900 n= 0.013 #2 Device 1 394.00' 48.0" Horiz. Orifice /Grate Limited to weir flow C= 0.600 #3 Device 1 388.00' 2.5" Vert. Orifice /Grate C= 0.600 #4 Device 1 389.20' 12.0" Vert. Orifice /Grate C= 0.600 Primary OutFlow Max =2.87 cfs @ 12.89 hrs HW= 390.18' (Free Discharge) 't--1 =Culvert (Passes 2.87 cfs of 16.03 cfs potential flow) 12= Orifice /Grate ( Controls 0.00 cfs) 3= Orifice /Grate (Orifice Controls 0.24 cfs @ 6.9 fps) 4=Orifice/G rate (Orifice Controls 2.63 cfs @ 3.4 fps) 1121 - SIA DP #2 POST Type// 24 -hr 1 -Year Rainfall= 3.00" Prepared by {enter your company name here} Page 12 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 11/16/2011 Link 10L: DP #2 POST Inflow Area = 435.670 ac, Inflow Depth > 0.84" for 1 -Year event Inflow = 204.25 cfs @ 12.27 hrs, Volume= 30.341 of Primary = 204.25 cfs @ 12.27 hrs, Volume= 30.341 af, Atten= 0 %, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Link 11 L: DP #9 POST Inflow Area = 65.830 ac, Inflow Depth > 1.04" for 1 -Year event Inflow = 67.89 cfs @ 12.09 hrs, Volume= 5.688 of Primary = 67.89 cfs @ 12.09 hrs, Volume= 5.688 af, Atten= 0 %, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Link 13L: DP #8 Post Inflow Area = 100.140 ac, Inflow Depth > 0.80" for 1 -Year event Inflow = 22.23 cfs @ 12.07 hrs, Volume= 6.715 of Primary = 22.23 cfs @ 12.07 hrs, Volume= 6.715 af, Atten= 0 %, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Link 14L: DP #10 POST Inflow Area = 55.580 ac, Inflow Depth > 1.10" for 1 -Year event Inflow = 62.59 cfs @ 12.10 hrs, Volume= 5.082 of Primary = 62.59 cfs @ 12.10 hrs, Volume= 5.082 af, Atten= 0 %, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs 1121 - SIA DP #2 POST Type 11 24 -hr 2 -Year Rainfall= 3.50" Prepared by {enter your company name here} Page 13 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 11/16/2011 Time span =0.00 -25.00 hrs, dt =0.05 hrs, 501 points Runoff by SCS TR -20 method, UH =SCS Reach routing by Stor- Ind +Trans method - Pond routing by Stor -Ind method Subcatchment 5S: TO DP #2 POST Runoff Area = 269.700 ac Runoff Depth >1.12" Flow Length = 5,298' Tc =26.7 min CN =72 Runoff = 263.40 cfs 25.192 of Subcatchment 9S: TO DP #8 POST Runoff Area= 10.780 ac Runoff Depth= 1.64" Flow Length= 1,735' Tc =13.9 min CN =80 Runoff =23.47 cfs 1.470 of Subcatchment 11S: TO DP #9 POST Runoff Area =7.730 ac Runoff Depth = 0.71" Flow Length= 1,025' Tc =11.4 min CN =64 Runoff =6.86 cfs 0.454 of Subcatchment 12S: TO LS #13 POST Runoff Area =2.520 ac Runoff Depth= 1.86" Tc =5.0 min CN =83 Runoff =8.40 cfs 0.390 of Subcatchment 13S: TO DP #10 POST Runoff Area = 46.460 ac Runoff Depth= 1.50" Flow Length= 1,567' Tc =17.0 min CN =78 Runoff =83.25 cfs 5.797 of Subcatchment 14S: TO WQ #12 Subcatchment 16S: TO WQ #9 POST Subcatchment 17S: TO WQ #11 POST Subcatchment 19S: TO WQ #10 POST Runoff Area =9.120 ac Runoff Depth= 1.94" Tc =5.0 min CN =84 Runoff =31.57 cfs 1.472 of Runoff Area = 49.950 ac Runoff Depth= 2.27" Tc =5.0 min CN =88 Runoff = 198.77 cfs 9.443 of Runoff Area = 23.410 ac Runoff Depth= 1.94" Tc =5.0 min CN =84 Runoff =81.03 cfs 3.778 of Runoff Area= 16.000 ac Runoff Depth= 2.27" Tc =5.0 min CN =88 Runoff =63.67 cfs 3.025 of Reach 6R: DP #8 &9 REACH Peak Depth =1.79' Max Vet =2.7 fps Inflow= 122.53 cfs 16.340 of n =0.045 L= 2,491.0' S=0.0028'/' Capacity= 1,285.41 cfs Outflow =77.43 cfs 16.065 of Pond 12P: WQ #12 Peak EIev= 404.72' Storage= 38.132 cf Inflow =31.57 cfs 1.472 of Outflow =1.16 cfs 0.985 of Pond 14P: WQ #11 Peak EIev= 393.82' Storage= 107.845 cf Inflow =81.03 cfs 3.778 of Outflow =1.89 cfs 1.881 of Pond 15P: WQ #9 Peak EIev= 412.79' Storage= 299.436 cf Inflow= 198.77 cfs 9.443 of Outflow =3.09 cfs 3.253 of Pond 18P: WQ #10 Peak EIev= 390.65' Storage= 74.951 cf Inflow =63.67 cfs 3.025 of Outflow =3.94 cfs 2.109 of Link 10L: DP #2 POST Inflow= 295.37 cfs 41.256 of Primary= 295.37 cfs 41.256 of 1121 - SIA DP #2 POST Type 11 24 -hr 2 -Year Rainfall= 3.50" Prepared by {enter your company name here} Page 14 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 11/16/2011 Link 11L: DP #9 POST Link 13L: DP #8 Post Link 14L: DP #10 POST Inflow =92.48 cfs 7.627 of Primary=92.48 cfs 7.627 of Inflow =30.52 cfs 8.713 of Primary=30.52 cfs 8.713 of Inflow =84.22 cfs 6.783 of Primary=84.22 cfs 6.783 of Total Runoff Area = 435.670 ac Runoff Volume = 51.021 of Average Runoff Depth = 1.41" 1121 - SIA DP #2 POST Type 11 24 -hr 2 -Year Rainfall= 3.50" Prepared by {enter your company name here} Page 15 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 11/16/2011 Subcatchment 5S: TO DP #2 POST Runoff = 263.40 cfs @ 12.22 hrs, Volume= 25.192 af, Depth> 1.12" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type II 24 -hr 2 -Year Rainfall= 3.50" Area (ac) CN Description 9.890 55 Onsite Woods B 0.160 70 Onsite Woods C 27.600 77 Onsite Woods D 6.760 61 Onsite Open B 1.630 74 Onsite Open C 20.440 80 Onsite Open D 0.640 98 Onsite Impervious 42.750 55 Offsite Woods B 2.050 70 Offsite Woods C 73.710 77 Offsite Woods D 17.880 61 Offsite Open B 0.110 74 Offsite Open C 66.080 80 Offsite Open D 269.700 72 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 10.1 75 0.0670 0.1 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.50" 0.9 192 0.0460 3.5 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 2.1 640 0.0280 5.0 29.92 Channel Flow, Area= 6.0 sf Perim= 7.0' r= 0.86' n= 0.045 7.2 2,290 0.0260 5.3 47.92 Channel Flow, Area= 9.0 sf Perim= 9.0' r= 1.00' n= 0.045 5.1 1,259 0.0140 4.1 49.69 Channel Flow, Area= 12.0 sf Perim= 11.0' r= 1.09' n= 0.045 1.3 842 0.0040 10.8 453.63 Channel Flow, Area= 42.0 sf Perim= 23.0' r= 1.83' n= 0.013 26.7 5,298 Total Subcatchment 9S: TO DP #8 POST Runoff = 23.47 cfs @ 12.06 hrs, Volume= 1.470 af, Depth= 1.64" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type 11 24 -hr 2 -Year Rainfall= 3.50" 1121 - SIA DP #2 POST Type 11 24 -hr 2 -Year Rainfall= 3.50" Prepared by {enter your company name here} Page 16 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 11/16/2011 Area (ac) CN Description 0.000 70 Onsite Woods C 1.690 77 Onsite Woods D 0.170 74 Onsite Open C 8.430 80 Onsite Open D 0.490 98 Onsite Impervious 10.780 80 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 8.2 75 0.0400 0.2 77 Offsite Woods D Sheet Flow, 0.000 80 Offsite Open D 7.730 64 Weighted Average Grass: Dense n= 0.240 P2= 3.50" 2.0 456 0.0540 3.7 (ft/ft) (ft /sec) (cfs) Shallow Concentrated Flow, 8.0 75 0.1200 0.2 Sheet Flow, Unpaved Kv= 16.1 fps 1.8 698 0.0450 6.3 37.93 Channel Flow, 3.1 856 0.0170 4.6 54.75 Channel Flow, Area= 6.0 sf Perim= 7.0' r= 0.86' n= 0.045 1.9 506 0.0220 4.4 26.52 Channel Flow, Area= 6.0 sf Perim= 7.0' r= 0.86' n= 0.045 13.9 1,735 Total Subcatchment 11S: TO DP #9 POST Runoff = 6.86 cfs @ 12.05 hrs, Volume= 0.454 af, Depth= 0.71" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type II 24 -hr 2 -Year Rainfall= 3.50" Area (ac) CN Description 4.180 55 Onsite Woods B 0.000 77 Onsite Woods D 2.040 61 Onsite Open B 0.590 80 Onsite Open D 0.920 98 Onsite Impervious 0.000 77 Offsite Woods D 0.000 80 Offsite Open D 7.730 64 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 8.0 75 0.1200 0.2 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.50" 0.3 94 0.1060 5.2 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 3.1 856 0.0170 4.6 54.75 Channel Flow, Area= 12.0 sf Perim= 11.0' r= 1.09' n= 0.045 11.4 1,025 Total 1121 - SIA DP #2 POST Type 11 24 -hr 2 -Year Rainfall= 3.50" Prepared by {enter your company name here} Page 17 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 11/16/2011 Subcatchment 12S: TO LS #13 POST [49] Hint: Tc <2dt may require smaller dt Runoff = 8.40 cfs @ 11.96 hrs, Volume= 0.390 af, Depth= 1.86" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type II 24 -hr 2 -Year Rainfall= 3.50" Area (ac) CN Description 0.530 61 Onsite Open B 0.990 80 Onsite Open D 1.000 98 Onsite Impervious 2.520 83 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 5.0 Direct Entry, Subcatchment 13S: TO DP #10 POST Runoff = 83.25 cfs @ 12.10 hrs, Volume= 5.797 af, Depth= 1.50" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type II 24 -hr 2 -Year Rainfall= 3.50" Area (ac) CN Description 1.440 55 Onsite Woods B 0.000 77 Onsite Woods D 0.920 61 Onsite Open B 23.110 80 Onsite Open D 0.150 98 Onsite Impervious 7.950 77 Offsite Woods D 12.890 80 Offsite Open D 46.460 78 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 11.0 75 0.0530 0.1 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.50" 1.6 347 0.0520 3.7 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 2.6 750 0.0360 4.8 19.13 Channel Flow, Area= 4.0 sf Perim= 6.0' r= 0.67' n= 0.045 1.8 395 0.0150 3.6 21.90 Channel Flow, Area= 6.0 sf Perim= 7.0' r= 0.86' n= 0.045 17.0 1,567 Total 1121 - SIA DP #2 POST Type 11 24 -hr 2 -Year Rainfall= 3.50" Prepared by {enter your company name here} Page 18 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 11/16/2011 Subcatchment 14S: TO WQ #12 [49] Hint: Tc <2dt may require smaller dt Runoff = 31.57 cfs @ 11.96 hrs, Volume= 1.472 af, Depth= 1.94" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type II 24 -hr 2 -Year Rainfall= 3.50" Area (ac) CN Description 1.350 61 Onsite Open B 4.210 80 Onsite Open D 3.560 98 Onsite Impervious 9.120 84 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 5.0 Direct Entry, Subcatchment 16S: TO WQ #9 POST [49] Hint: Tc <2dt may require smaller dt Runoff = 198.77 cfs @ 11.95 hrs, Volume= 9.443 af, Depth= 2.27" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type II 24 -hr 2 -Year Rainfall= 3.50" Area (ac) CN Description 3.940 74 Onsite Open C 22.190 80 Onsite Open D 23.820 98 Onsite Impervious 49.950 88 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 5.0 Direct Entry, Subcatchment 17S: TO WQ #11 POST [49] Hint: Tc <2dt may require smaller dt Runoff = 81.03 cfs @ 11.96 hrs, Volume= 3.778 af, Depth= 1.94" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type 11 24 -hr 2 -Year Rainfall= 3.50" 1121 - SIA DP #2 POST Type 11 24 -hr 2 -Year Rainfall= 3.50" Prepared by {enter your company name here} Page 19 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 11/16/2011 Area (ac) CN Description 2.160 61 Onsite Open B 0.100 74 Onsite Open C 13.290 80 Onsite Open D 7.860 98 Onsite Impervious 23.410 84 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 5.0 Direct Entry, Subcatchment 19S: TO WQ #10 POST [49] Hint: Tc <2dt may require smaller dt Runoff = 63.67 cfs @ 11.95 hrs, Volume= 3.025 af, Depth= 2.27" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type II 24 -hr 2 -Year Rainfall= 3.50" Area (ac) CN Description 2.650 74 Onsite Open C 5.770 80 Onsite Open D 7.580 98 Onsite Impervious 16.000 88 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 5.0 Direct Entry, Reach 6R: DP #8 &9 REACH Inflow Area = 165.970 ac, Inflow Depth > 1.18" for 2 -Year event Inflow = 122.53 cfs @ 12.08 hrs, Volume= 16.340 of Outflow = 77.43 cfs @ 12.50 hrs, Volume= 16.065 af, Atten= 37 %, Lag= 24.8 min Routing by Stor- Ind +Trans method, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Max. Velocity= 2.7 fps, Min. Travel Time= 15.6 min Avg. Velocity = 1.8 fps, Avg. Travel Time= 22.7 min Peak Depth= 1.79'@ 12.24 hrs Capacity at bank full= 1,285.41 cfs Inlet Invert= 353.00', Outlet Invert= 346.00' Custom cross - section table, n= 0.045 Length= 2,491.0' Slope= 0.00287' 1121 - SIA DP #2 POST Type 11 24 -hr 2 -Year Rainfall =3.50" Prepared by {enter your company name here} Page 20 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 11/16/2011 Depth (feet) End Area (sq -ft) Perim. (feet) Storage (cubic -feet) Discharge (cfs) 0.00 0.0 0.0 0 0.00 0.10 0.8 8.0 1,993 0.30 3.00 49.5 26.0 123,305 133.11 7.00 379.5 141.0 945,335 1,285.41 Pond 12P: WQ #12 Inflow Area = 9.120 ac, Inflow Depth = 1.94" for 2 -Year event Inflow = 31.57 cfs @ 11.96 hrs, Volume= 1.472 of Outflow = 1.16 cfs @ 13.70 hrs, Volume= 0.985 af, Atten= 96 %, Lag= 104.3 min Primary = 1.16 cfs @ 13.70 hrs, Volume= 0.985 of Routing by Stor -Ind method, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Peak Elev= 404.72' @ 13.70 hrs Surf.Area= 16,349 sf Storage= 38,132 cf Plug -Flow detention time= 343.8 min calculated for 0.985 of (67% of inflow) Center -of -Mass det. time= 237.6 min ( 1,059.1 - 821.5 ) Volume Invert Avail.Storage Storage Description #1 402.00' 101,706 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 402.00 11,805 0 0 404.00 15,072 26,877 26,877 406.00 18,637 33,709 60,586 408.00 22,483 41,120 101,706 Device Routing Invert Outlet Devices #1 Primary 402.00' 18.0" x 50.0' long Culvert RCP, square edge headwall, Ke= 0.500 Outlet Invert= 401.50' S= 0.01007' Cc= 0.900 n= 0.013 #2 Device 1 408.00' 48.0" Horiz. Orifice /Grate Limited to weir flow C= 0.600 #3 Device 1 402.00' 1.5" Vert. Orifice /Grate C= 0.600 #4 Primary 403.20' 6.0" Vert. Orifice /Grate C= 0.600 Primary OutFlow Max =1.16 cfs @ 13.70 hrs HW= 404.72' (Free Discharge) 1= Culvert (Passes 0.10 cfs of 11.93 cfs potential flow) -2= Orifice /Grate ( Controls 0.00 cfs) 3= Orifice /Grate (Orifice Controls 0.10 cfs @ 7.8 fps) 4= Orifice /Grate (Orifice Controls 1.06 cfs @ 5.4 fps) Pond 14P: WQ #11 Inflow Area = 23.410 ac, Inflow Depth = 1.94" for 2 -Year event Inflow = 81.03 cfs @ 11.96 hrs, Volume= 3.778 of Outflow = 1.89 cfs @ 15.40 hrs, Volume= 1.881 af, Atten= 98 %, Lag= 206.4 min Primary = 1.89 cfs @ 15.40 hrs, Volume= 1.881 of Routing by Stor -Ind method, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs 1121 - SIA DP #2 POST Type 11 24 -hr 2 -Year Rainfall =3.50" Prepared by {enter your company name here} Page 21 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 11/16/2011 Peak Elev= 393.82' @ 15.40 hrs Surf.Area= 61,943 sf Storage= 107,845 cf Plug -Flow detention time= 393.0 min calculated for 1.878 of (50% of inflow) Center -of -Mass det. time= 275.5 min ( 1,097.0 - 821.5 ) Volume Invert Avail.Storage Storage Description #1 392.00' 393,926 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 392.00 56,558 0 0 394.00 62,475 119,033 119,033 396.00 68,657 131,132 250,165 398.00 75,104 143,761 393,926 Device Routing Invert Outlet Devices #1 Primary 392.00' 24.0" x 50.0' long Culvert RCP, square edge headwall, Ke= 0.500 245,310 684,306 Outlet Invert= 391.50' S= 0.01007' Cc= 0.900 n= 0.013 #2 Device 1 398.00' 48.0" Horiz. Orifice /Grate Limited to weir flow C= 0.600 #3 Device 1 392.00' 3.0" Vert. Orifice /Grate C= 0.600 #4 Device 1 392.60' 8.0" Vert. Orifice /Grate C= 0.600 Primary OutFlow Max =1.89 cfs @ 15.40 hrs HW= 393.82' (Free Discharge) L1= Culvert (Passes 1.89 cfs of 12.66 cfs potential flow) �2= Orifice /Grate ( Controls 0.00 cfs) 3= Orifice /Grate (Orifice Controls 0.31 cfs @ 6.3 fps) 4=Orifice/G rate (Orifice Controls 1.58 cfs @ 4.5 fps) Pond 15P: WQ #9 Inflow Area = 49.950 ac, Inflow Depth = 2.27" for 2 -Year event Inflow = 198.77 cfs @ 11.95 hrs, Volume= 9.443 of Outflow = 3.09 cfs @ 17.48 hrs, Volume= 3.253 af, Atten= 98 %, Lag= 331.6 min Primary = 3.09 cfs @ 17.48 hrs, Volume= 3.253 of Routing by Stor -Ind method, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Peak Elev= 412.79' @ 17.48 hrs Surf.Area= 113,073 sf Storage= 299,436 cf Plug -Flow detention time= 425.2 min calculated for 3.253 of (34% of inflow) Center -of -Mass det. time= 299.5 min ( 1,106.9 - 807.4 ) Volume Invert Avail.Storage Storage Description #1 410.00' 1,525,946 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 410.00 101,403 0 0 412.00 109,678 211,081 211,081 414.00 118,237 227,915 438,996 416.00 127,073 245,310 684,306 418.00 136,174 263,247 947,553 420.00 145,534 281,708 1,229,261 422.00 151,151 296,685 1,525,946 1121 - SIA DP #2 POST Type 11 24 -hr 2 -Year Rainfall= 3.50" Prepared by {enter your company name here} Page 22 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 11/16/2011 Device Routing Invert Outlet Devices #1 Primary 410.00' 48.0" x 500.0' long Culvert RCP, square edge headwall, Ke= 0.500 Outflow = 3.94 cfs @ 12.70 hrs, Volume= Outlet Invert= 405.00' S= 0.01007' Cc= 0.900 n= 0.013 #2 Device 1 422.00' 60.0" Horiz. Orifice /Grate Limited to weir flow C= 0.600 #3 Device 1 411.00' 8.0" Vert. Orifice /Grate C= 0.600 #4 Device 1 410.00' 5.0" Vert. Orifice /Grate C= 0.600 Primary OutFlow Max =3.09 cfs @ 17.48 hrs HW= 412.79' (Free Discharge) L1= Culvert (Passes 3.09 cfs of 53.32 cfs potential flow) �2= Orifice /Grate ( Controls 0.00 cfs) 3= Orifice /Grate (Orifice Controls 2.03 cfs @ 5.8 fps) 4=Orifice/G rate (Orifice Controls 1.06 cfs @ 7.7 fps) Pond 18P: WQ #10 Inflow Area = 16.000 ac, Inflow Depth = 2.27" for 2 -Year event Inflow = 63.67 cfs @ 11.95 hrs, Volume= 3.025 of Outflow = 3.94 cfs @ 12.70 hrs, Volume= 2.109 af, Atten= 94 %, Lag= 44.7 min Primary = 3.94 cfs @ 12.70 hrs, Volume= 2.109 of Routing by Stor -Ind method, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Peak Elev= 390.65' @ 12.70 hrs Surf.Area= 31,948 sf Storage= 74,951 cf Plug -Flow detention time= 269.8 min calculated for 2.109 of (70% of inflow) Center -of -Mass det. time= 170.5 min ( 977.9 - 807.4 ) Volume Invert #1 388.00' MV01 e Description 199,413 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 388.00 24,927 0 0 390.00 29,985 54,912 54,912 392.00 36,051 66,036 120,948 394.00 42,414 78,465 199,413 Device Routing Invert Outlet Devices #1 Primary 388.00' 24.0" x 50.0' long Culvert RCP, square edge headwall, Ke= 0.500 Outlet Invert= 387.50' S= 0.01007' Cc= 0.900 n= 0.013 #2 Device 1 394.00' 48.0" Horiz. Orifice /Grate Limited to weir flow C= 0.600 #3 Device 1 388.00' 2.5" Vert. Orifice /Grate C= 0.600 #4 Device 1 389.20' 12.0" Vert. Orifice /Grate C= 0.600 Primary OutFlow Max =3.94 cfs @ 12.70 hrs HW= 390.65' (Free Discharge) L1= Culvert (Passes 3.94 cfs of 18.83 cfs potential flow) 12= Orifice /Grate ( Controls 0.00 cfs) 3= Orifice /Grate (Orifice Controls 0.26 cfs @ 7.7 fps) 4=Orifice/G rate (Orifice Controls 3.68 cfs @ 4.7 fps) 1121 - SIA DP #2 POST Type 11 24 -hr 2 -Year Rainfall= 3.50" Prepared by {enter your company name here} Page 23 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 11/16/2011 Link 10L: DP #2 POST Inflow Area = 435.670 ac, Inflow Depth > 1.14" for 2 -Year event Inflow = 295.37 cfs @ 12.26 hrs, Volume= 41.256 of Primary = 295.37 cfs @ 12.26 hrs, Volume= 41.256 af, Atten= 0 %, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Link 11 L: DP #9 POST Inflow Area = 65.830 ac, Inflow Depth > 1.39" for 2 -Year event Inflow = 92.48 cfs @ 12.09 hrs, Volume= 7.627 of Primary = 92.48 cfs @ 12.09 hrs, Volume= 7.627 af, Atten= 0 %, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Link 13L: DP #8 Post Inflow Area = 100.140 ac, Inflow Depth > 1.04" for 2 -Year event Inflow = 30.52 cfs @ 12.07 hrs, Volume= 8.713 of Primary = 30.52 cfs @ 12.07 hrs, Volume= 8.713 af, Atten= 0 %, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Link 14L: DP #10 POST Inflow Area = 55.580 ac, Inflow Depth > 1.46" for 2 -Year event Inflow = 84.22 cfs @ 12.10 hrs, Volume= 6.783 of Primary = 84.22 cfs @ 12.10 hrs, Volume= 6.783 af, Atten= 0 %, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs 1121 - SIA DP #2 POST Type 11 24 -hr 10 -Year Rainfall= 5.10" Prepared by {enter your company name here} Page 24 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 11/16/2011 Time span =0.00 -25.00 hrs, dt =0.05 hrs, 501 points Runoff by SCS TR -20 method, UH =SCS Reach routing by Stor- Ind +Trans method - Pond routing by Stor -Ind method Subcatchment 5S: TO DP #2 POST Runoff Area = 269.700 ac Runoff Depth >2.28" Flow Length = 5,298' Tc =26.7 min CN =72 Runoff = 564.58 cfs 51.132 of Subcatchment 9S: TO DP #8 POST Runoff Area= 10.780 ac Runoff Depth= 2.98" Flow Length= 1,735' Tc =13.9 min CN =80 Runoff =42.71 cfs 2.677 of Subcatchment 11S: TO DP #9 POST Runoff Area =7.730 ac Runoff Depth= 1.65" Flow Length= 1,025' Tc =11.4 min CN =64 Runoff =17.91 cfs 1.060 of Subcatchment 12S: TO LS #13 POST Runoff Area =2.520 ac Runoff Depth= 3.26" Tc =5.0 min CN =83 Runoff =14.46 cfs 0.686 of Subcatchment 13S: TO DP #10 POST Runoff Area = 46.460 ac Runoff Depth= 2.80" Flow Length= 1,567' Tc =17.0 min CN =78 Runoff= 156.98 cfs 10.828 of Subcatchment 14S: TO WQ #12 Subcatchment 16S: TO WQ #9 POST Subcatchment 17S: TO WQ #11 POST Subcatchment 19S: TO WQ #10 POST Runoff Area =9.120 ac Runoff Depth= 3.36" Tc =5.0 min CN =84 Runoff =53.63 cfs 2.555 of Runoff Area = 49.950 ac Runoff Depth= 3.76" Tc =5.0 min CN =88 Runoff = 320.75 cfs 15.668 of Runoff Area = 23.410 ac Runoff Depth= 3.36" Tc =5.0 min CN =84 Runoff= 137.66 cfs 6.559 of Runoff Area= 16.000 ac Runoff Depth= 3.76" Tc =5.0 min CN =88 Runoff= 102.74 cfs 5.019 of Reach 6R: DP #8 &9 REACH Peak Depth =3.07' Max Vet =2.8 fps Inflow= 232.15 cfs 28.810 of n =0.045 L= 2,491.0' S=0.0028'/' Capacity= 1,285.41 cfs Outflow= 153.62 cfs 28.391 of Pond 12P: WQ #12 Peak EIev= 406.48' Storage= 69.811 cf Inflow =53.63 cfs 2.555 of Outflow =1.77 cfs 1.697 of Pond 14P: WQ #11 Peak EIev= 395.18' Storage= 195.079 cf Inflow= 137.66 cfs 6.559 of Outflow =2.93 cfs 3.048 of Pond 15P: WQ #9 Peak EIev= 414.63' Storage= 513.805 cf Inflow= 320.75 cfs 15.668 of Outflow =4.43 cfs 4.786 of Pond 18P: WQ #10 Peak EIev= 392.19' Storage= 127.984 cf Inflow= 102.74 cfs 5.019 of Outflow =6.30 cfs 4.028 of Link 10L: DP #2 POST Inflow= 632.70 cfs 79.524 of Primary= 632.70 cfs 79.524 of 1121 - SIA DP #2 POST Type 11 24 -hr 10 -Year Rainfall= 5.10" Prepared by {enter your company name here} Page 25 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 11/16/2011 Link 11L: DP #9 POST Link 13L: DP #8 Post Link 14L: DP #10 POST Inflow= 178.31 cfs 14.272 of Primary= 178.31 cfs 14.272 of Inflow =54.61 cfs 14.539 of Primary=54.61 cfs 14.539 of Inflow= 158.58 cfs 12.526 of Primary= 158.58 cfs 12.526 of Total Runoff Area = 435.670 ac Runoff Volume = 96.184 of Average Runoff Depth = 2.65" 1121 - SIA DP #2 POST Type 11 24 -hr 10 -Year Rainfall= 5.10" Prepared by {enter your company name here} Page 26 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 11/16/2011 Subcatchment 5S: TO DP #2 POST Runoff = 564.58 cfs @ 12.21 hrs, Volume= 51.132 af, Depth> 2.28" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -Year Rainfall = 5.10" Area (ac) CN Description 9.890 55 Onsite Woods B 0.160 70 Onsite Woods C 27.600 77 Onsite Woods D 6.760 61 Onsite Open B 1.630 74 Onsite Open C 20.440 80 Onsite Open D 0.640 98 Onsite Impervious 42.750 55 Offsite Woods B 2.050 70 Offsite Woods C 73.710 77 Offsite Woods D 17.880 61 Offsite Open B 0.110 74 Offsite Open C 66.080 80 Offsite Open D 269.700 72 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 10.1 75 0.0670 0.1 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.50" 0.9 192 0.0460 3.5 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 2.1 640 0.0280 5.0 29.92 Channel Flow, Area= 6.0 sf Perim= 7.0' r= 0.86' n= 0.045 7.2 2,290 0.0260 5.3 47.92 Channel Flow, Area= 9.0 sf Perim= 9.0' r= 1.00' n= 0.045 5.1 1,259 0.0140 4.1 49.69 Channel Flow, Area= 12.0 sf Perim= 11.0' r= 1.09' n= 0.045 1.3 842 0.0040 10.8 453.63 Channel Flow, Area= 42.0 sf Perim= 23.0' r= 1.83' n= 0.013 26.7 5,298 Total Subcatchment 9S: TO DP #8 POST Runoff = 42.71 cfs @ 12.06 hrs, Volume= 2.677 af, Depth= 2.98" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type 11 24 -hr 10 -Year Rainfall = 5.10" 1121 - SIA DP #2 POST Type 11 24 -hr 10 -Year Rainfall= 5.10" Prepared by {enter your company name here} Page 27 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 11/16/2011 Area (ac) CN Description 0.000 70 Onsite Woods C 1.690 77 Onsite Woods D 0.170 74 Onsite Open C 8.430 80 Onsite Open D 0.490 98 Onsite Impervious 10.780 80 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 8.2 75 0.0400 0.2 77 Offsite Woods D Sheet Flow, 0.000 80 Offsite Open D 7.730 64 Weighted Average Grass: Dense n= 0.240 P2= 3.50" 2.0 456 0.0540 3.7 (ft/ft) (ft /sec) (cfs) Shallow Concentrated Flow, 8.0 75 0.1200 0.2 Sheet Flow, Unpaved Kv= 16.1 fps 1.8 698 0.0450 6.3 37.93 Channel Flow, 3.1 856 0.0170 4.6 54.75 Channel Flow, Area= 6.0 sf Perim= 7.0' r= 0.86' n= 0.045 1.9 506 0.0220 4.4 26.52 Channel Flow, Area= 6.0 sf Perim= 7.0' r= 0.86' n= 0.045 13.9 1,735 Total Subcatchment 11S: TO DP #9 POST Runoff = 17.91 cfs @ 12.04 hrs, Volume= 1.060 af, Depth= 1.65" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -Year Rainfall = 5.10" Area (ac) CN Description 4.180 55 Onsite Woods B 0.000 77 Onsite Woods D 2.040 61 Onsite Open B 0.590 80 Onsite Open D 0.920 98 Onsite Impervious 0.000 77 Offsite Woods D 0.000 80 Offsite Open D 7.730 64 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 8.0 75 0.1200 0.2 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.50" 0.3 94 0.1060 5.2 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 3.1 856 0.0170 4.6 54.75 Channel Flow, Area= 12.0 sf Perim= 11.0' r= 1.09' n= 0.045 11.4 1,025 Total 1121 - SIA DP #2 POST Type 11 24 -hr 10 -Year Rainfall= 5.10" Prepared by {enter your company name here} Page 28 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 11/16/2011 Subcatchment 12S: TO LS #13 POST [49] Hint: Tc <2dt may require smaller dt Runoff = 14.46 cfs @ 11.95 hrs, Volume= 0.686 af, Depth= 3.26" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -Year Rainfall = 5.10" Area (ac) CN Description 0.530 61 Onsite Open B 0.990 80 Onsite Open D 1.000 98 Onsite Impervious 2.520 83 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 5.0 Direct Entry, Subcatchment 13S: TO DP #10 POST Runoff = 156.98 cfs @ 12.09 hrs, Volume= 10.828 af, Depth= 2.80" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -Year Rainfall = 5.10" Area (ac) CN Description 1.440 55 Onsite Woods B 0.000 77 Onsite Woods D 0.920 61 Onsite Open B 23.110 80 Onsite Open D 0.150 98 Onsite Impervious 7.950 77 Offsite Woods D 12.890 80 Offsite Open D 46.460 78 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 11.0 75 0.0530 0.1 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.50" 1.6 347 0.0520 3.7 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 2.6 750 0.0360 4.8 19.13 Channel Flow, Area= 4.0 sf Perim= 6.0' r= 0.67' n= 0.045 1.8 395 0.0150 3.6 21.90 Channel Flow, Area= 6.0 sf Perim= 7.0' r= 0.86' n= 0.045 17.0 1,567 Total 1121 - SIA DP #2 POST Type 11 24 -hr 10 -Year Rainfall= 5.10" Prepared by {enter your company name here} Page 29 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 11/16/2011 Subcatchment 14S: TO WQ #12 [49] Hint: Tc <2dt may require smaller dt Runoff = 53.63 cfs @ 11.95 hrs, Volume= 2.555 af, Depth= 3.36" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -Year Rainfall = 5.10" Area (ac) CN Description 1.350 61 Onsite Open B 4.210 80 Onsite Open D 3.560 98 Onsite Impervious 9.120 84 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 5.0 Direct Entry, Subcatchment 16S: TO WQ #9 POST [49] Hint: Tc <2dt may require smaller dt Runoff = 320.75 cfs @ 11.95 hrs, Volume= 15.668 af, Depth= 3.76" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -Year Rainfall = 5.10" Area (ac) CN Description 3.940 74 Onsite Open C 22.190 80 Onsite Open D 23.820 98 Onsite Impervious 49.950 88 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 5.0 Direct Entry, Subcatchment 17S: TO WQ #11 POST [49] Hint: Tc <2dt may require smaller dt Runoff = 137.66 cfs @ 11.95 hrs, Volume= 6.559 af, Depth= 3.36" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type 11 24 -hr 10 -Year Rainfall = 5.10" 1121 - SIA DP #2 POST Type 11 24 -hr 10 -Year Rainfall= 5.10" Prepared by {enter your company name here} Page 30 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 11/16/2011 Area (ac) CN Description 2.160 61 Onsite Open B 0.100 74 Onsite Open C 13.290 80 Onsite Open D 7.860 98 Onsite Impervious 23.410 84 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 5.0 Direct Entry, Subcatchment 19S: TO WQ #10 POST [49] Hint: Tc <2dt may require smaller dt Runoff = 102.74 cfs @ 11.95 hrs, Volume= 5.019 af, Depth= 3.76" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -Year Rainfall = 5.10" Area (ac) CN Description 2.650 74 Onsite Open C 5.770 80 Onsite Open D 7.580 98 Onsite Impervious 16.000 88 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 5.0 Direct Entry, Reach 6R: DP #8 &9 REACH Inflow Area = 165.970 ac, Inflow Depth > 2.08" for 10 -Year event Inflow = 232.15 cfs @ 12.08 hrs, Volume= 28.810 of Outflow = 153.62 cfs @ 12.47 hrs, Volume= 28.391 af, Atten= 34 %, Lag= 23.5 min Routing by Stor- Ind +Trans method, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Max. Velocity= 2.8 fps, Min. Travel Time= 15.0 min Avg. Velocity = 1.9 fps, Avg. Travel Time= 21.5 min Peak Depth= 3.07'@ 12.22 hrs Capacity at bank full= 1,285.41 cfs Inlet Invert= 353.00', Outlet Invert= 346.00' Custom cross - section table, n= 0.045 Length= 2,491.0' Slope= 0.00287' 1121 - SIA DP #2 POST Type 11 24 -hr 10 -Year Rainfall= 5.10" Prepared by {enter your company name here} Page 31 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 11/16/2011 Depth (feet) End Area (sq -ft) Perim. (feet) Storage (cubic -feet) Discharge (cfs) 0.00 0.0 0.0 0 0.00 0.10 0.8 8.0 1,993 0.30 3.00 49.5 26.0 123,305 133.11 7.00 379.5 141.0 945,335 1,285.41 Pond 12P: WQ #12 Inflow Area = 9.120 ac, Inflow Depth= 3.36" for 10 -Year event Inflow = 53.63 cfs @ 11.95 hrs, Volume= 2.555 of Outflow = 1.77 cfs @ 13.80 hrs, Volume= 1.697 af, Atten= 97 %, Lag= 110.6 min Primary = 1.77 cfs @ 13.80 hrs, Volume= 1.697 of Routing by Stor -Ind method, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Peak Elev= 406.48' @ 13.80 hrs Surf.Area= 19,566 sf Storage= 69,811 cf Plug -Flow detention time= 374.7 min calculated for 1.694 of (66% of inflow) Center -of -Mass det. time= 272.9 min ( 1,078.6 - 805.7 ) Volume Invert Avail.Storage Storage Description #1 402.00' 101,706 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 402.00 11,805 0 0 404.00 15,072 26,877 26,877 406.00 18,637 33,709 60,586 408.00 22,483 41,120 101,706 Device Routing Invert Outlet Devices #1 Primary 402.00' 18.0" x 50.0' long Culvert RCP, square edge headwall, Ke= 0.500 Outlet Invert= 401.50' S= 0.01007' Cc= 0.900 n= 0.013 #2 Device 1 408.00' 48.0" Horiz. Orifice /Grate Limited to weir flow C= 0.600 #3 Device 1 402.00' 1.5" Vert. Orifice /Grate C= 0.600 #4 Primary 403.20' 6.0" Vert. Orifice /Grate C= 0.600 Primary OutFlow Max =1.77 cfs @ 13.80 hrs HW= 406.48' (Free Discharge) 1= Culvert (Passes 0.12 cfs of 16.44 cfs potential flow) -2= Orifice /Grate ( Controls 0.00 cfs) 3= Orifice /Grate (Orifice Controls 0.12 cfs @ 10.1 fps) 4= Orifice /Grate (Orifice Controls 1.65 cfs @ 8.4 fps) Pond 14P: WQ #11 Inflow Area = 23.410 ac, Inflow Depth = 3.36" for 10 -Year event Inflow = 137.66 cfs @ 11.95 hrs, Volume= 6.559 of Outflow = 2.93 cfs @ 15.48 hrs, Volume= 3.048 af, Atten= 98 %, Lag= 211.6 min Primary = 2.93 cfs @ 15.48 hrs, Volume= 3.048 of Routing by Stor -Ind method, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs 1121 - SIA DP #2 POST Type 11 24 -hr 10 -Year Rainfall= 5.10" Prepared by {enter your company name here} Page 32 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 11/16/2011 Peak Elev= 395.18' @ 15.48 hrs Surf.Area= 66,130 sf Storage= 195,079 cf Plug -Flow detention time= 407.5 min calculated for 3.042 of (46% of inflow) Center -of -Mass det. time= 292.2 min ( 1,098.0 - 805.7 ) Volume Invert Avail.Storage Storage Description #1 392.00' 393,926 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 392.00 56,558 0 0 394.00 62,475 119,033 119,033 396.00 68,657 131,132 250,165 398.00 75,104 143,761 393,926 Device Routing Invert Outlet Devices #1 Primary 392.00' 24.0" x 50.0' long Culvert RCP, square edge headwall, Ke= 0.500 245,310 684,306 Outlet Invert= 391.50' S= 0.01007' Cc= 0.900 n= 0.013 #2 Device 1 398.00' 48.0" Horiz. Orifice /Grate Limited to weir flow C= 0.600 #3 Device 1 392.00' 3.0" Vert. Orifice /Grate C= 0.600 #4 Device 1 392.60' 8.0" Vert. Orifice /Grate C= 0.600 Primary OutFlow Max =2.93 cfs @ 15.48 hrs HW= 395.18' (Free Discharge) L1 = Culvert (Passes 2.93 cfs of 22.35 cfs potential flow) �2= Orifice /Grate ( Controls 0.00 cfs) 3= Orifice /Grate (Orifice Controls 0.41 cfs @ 8.4 fps) 4=Orifice/G rate (Orifice Controls 2.52 cfs @ 7.2 fps) Pond 15P: WQ #9 Inflow Area = 49.950 ac, Inflow Depth= 3.76" for 10 -Year event Inflow = 320.75 cfs @ 11.95 hrs, Volume= 15.668 of Outflow = 4.43 cfs @ 17.97 hrs, Volume= 4.786 af, Atten= 99 %, Lag= 361.2 min Primary = 4.43 cfs @ 17.97 hrs, Volume= 4.786 of Routing by Stor -Ind method, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Peak Elev= 414.63' @ 17.97 hrs Surf.Area= 121,000 sf Storage= 513,805 cf Plug -Flow detention time= 444.1 min calculated for 4.786 of (31 % of inflow) Center -of -Mass det. time= 308.0 min ( 1,101.1 - 793.1 ) Volume Invert Avail.Storage Storage Description #1 410.00' 1,525,946 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 410.00 101,403 0 0 412.00 109,678 211,081 211,081 414.00 118,237 227,915 438,996 416.00 127,073 245,310 684,306 418.00 136,174 263,247 947,553 420.00 145,534 281,708 1,229,261 422.00 151,151 296,685 1,525,946 1121 - SIA DP #2 POST Type 11 24 -hr 10 -Year Rainfall= 5.10" Prepared by {enter your company name here} Page 33 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 11/16/2011 Device Routing Invert Outlet Devices #1 Primary 410.00' 48.0" x 500.0' long Culvert RCP, square edge headwall, Ke= 0.500 102.74 cfs @ 11.95 hrs, Volume= 5.019 of Outlet Invert= 405.00' S= 0.01007' Cc= 0.900 n= 0.013 #2 Device 1 422.00' 60.0" Horiz. Orifice /Grate Limited to weir flow C= 0.600 #3 Device 1 411.00' 8.0" Vert. Orifice /Grate C= 0.600 #4 Device 1 410.00' 5.0" Vert. Orifice /Grate C= 0.600 Primary OutFlow Max =4.43 cfs @ 17.97 hrs HW= 414.63' (Free Discharge) L1 = Culvert (Passes 4.43 cfs of 98.04 cfs potential flow) �2= Orifice /Grate ( Controls 0.00 cfs) 3= Orifice /Grate (Orifice Controls 3.05 cfs @ 8.7 fps) 4=Orifice/G rate (Orifice Controls 1.38 cfs @ 10.1 fps) Routing by Stor -Ind method, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Peak Elev= 392.19' @ 12.66 hrs Surf.Area= 36,667 sf Storage= 127,984 cf Plug -Flow detention time= 277.9 min calculated for 4.028 of (80% of inflow) Center -of -Mass det. time= 198.0 min ( 991.1 - 793.1 ) Volume Invert #1 388.00' MV01 e Description 199,413 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Pond 18P: WQ #10 Inflow Area = 16.000 ac, Inflow Depth= 3.76" for 10 -Year event Inflow = 102.74 cfs @ 11.95 hrs, Volume= 5.019 of Outflow = 6.30 cfs @ 12.66 hrs, Volume= 4.028 af, Atten= 94 %, Lag= 42.4 min Primary = 6.30 cfs @ 12.66 hrs, Volume= 4.028 of Routing by Stor -Ind method, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Peak Elev= 392.19' @ 12.66 hrs Surf.Area= 36,667 sf Storage= 127,984 cf Plug -Flow detention time= 277.9 min calculated for 4.028 of (80% of inflow) Center -of -Mass det. time= 198.0 min ( 991.1 - 793.1 ) Volume Invert #1 388.00' MV01 e Description 199,413 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 388.00 24,927 0 0 390.00 29,985 54,912 54,912 392.00 36,051 66,036 120,948 394.00 42,414 78,465 199,413 Device Routing Invert Outlet Devices #1 Primary 388.00' 24.0" x 50.0' long Culvert RCP, square edge headwall, Ke= 0.500 Outlet Invert= 387.50' S= 0.01007' Cc= 0.900 n= 0.013 #2 Device 1 394.00' 48.0" Horiz. Orifice /Grate Limited to weir flow C= 0.600 #3 Device 1 388.00' 2.5" Vert. Orifice /Grate C= 0.600 #4 Device 1 389.20' 12.0" Vert. Orifice /Grate C= 0.600 Primary OutFlow Max =6.30 cfs @ 12.66 hrs HW= 392.19' (Free Discharge) 't--1 =Culvert (Passes 6.30 cfs of 27.03 cfs potential flow) 12= Orifice /Grate ( Controls 0.00 cfs) 3= Orifice /Grate (Orifice Controls 0.33 cfs @ 9.7 fps) 4=Orifice/G rate (Orifice Controls 5.97 cfs @ 7.6 fps) 1121 - SIA DP #2 POST Type 11 24 -hr 10 -Year Rainfall= 5.10" Prepared by {enter your company name here} Page 34 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 11/16/2011 Link 10L: DP #2 POST Inflow Area = 435.670 ac, Inflow Depth > 2.19" for 10 -Year event Inflow = 632.70 cfs @ 12.24 hrs, Volume= 79.524 of Primary = 632.70 cfs @ 12.24 hrs, Volume= 79.524 af, Atten= 0 %, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Link 11 L: DP #9 POST Inflow Area = 65.830 ac, Inflow Depth > 2.60" for 10 -Year event Inflow = 178.31 cfs @ 12.08 hrs, Volume= 14.272 of Primary = 178.31 cfs @ 12.08 hrs, Volume= 14.272 af, Atten= 0 %, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Link 13L: DP #8 Post Inflow Area = 100.140 ac, Inflow Depth > 1.74" for 10 -Year event Inflow = 54.61 cfs @ 12.06 hrs, Volume= 14.539 of Primary = 54.61 cfs @ 12.06 hrs, Volume= 14.539 af, Atten= 0 %, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Link 14L: DP #10 POST Inflow Area = 55.580 ac, Inflow Depth > 2.70" for 10 -Year event Inflow = 158.58 cfs @ 12.09 hrs, Volume= 12.526 of Primary = 158.58 cfs @ 12.09 hrs, Volume= 12.526 af, Atten= 0 %, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs 1121 - SIA DP #2 POST Type 11 24 -hr 100 -Year Rainfall= 7.40" Prepared by {enter your company name here} Page 1 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 11/16/2011 Time span =0.00 -25.00 hrs, dt =0.05 hrs, 501 points Runoff by SCS TR -20 method, UH =SCS Reach routing by Stor- Ind +Trans method - Pond routing by Stor -Ind method Subcatchment 5S: TO DP #2 POST Runoff Area = 269.700 ac Runoff Depth >4.17" Flow Length = 5,298' Tc =26.7 min CN =72 Runoff = 1,050.47 cfs 93.766 of Subcatchment 9S: TO DP #8 POST Runoff Area= 10.780 ac Runoff Depth = 5.06" Flow Length= 1,735' Tc =13.9 min CN =80 Runoff =71.51 cfs 4.550 of Subcatchment 11S: TO DP #9 POST Runoff Area =7.730 ac Runoff Depth= 3.31" Flow Length= 1,025' Tc =11.4 min CN =64 Runoff =36.97 cfs 2.131 of Subcatchment 12S: TO LS #13 POST Runoff Area =2.520 ac Runoff Depth = 5.41" Tc =5.0 min CN =83 Runoff =23.31 cfs 1.135 of Subcatchment 13S: TO DP #10 POST Runoff Area = 46.460 ac Runoff Depth= 4.84" Flow Length= 1,567' Tc =17.0 min CN =78 Runoff = 269.25 cfs 18.736 of Subcatchment 14S: TO WQ #12 Subcatchment 16S: TO WQ #9 POST Subcatchment 17S: TO WQ #11 POST Subcatchment 19S: TO WQ #10 POST Runoff Area =9.120 ac Runoff Depth = 5.52" Tc =5.0 min CN =84 Runoff =85.64 cfs 4.196 of Runoff Area = 49.950 ac Runoff Depth = 5.98" Tc =5.0 min CN =88 Runoff = 494.84 cfs 24.903 of Runoff Area = 23.410 ac Runoff Depth = 5.52" Tc =5.0 min CN =84 Runoff = 219.83 cfs 10.770 of Runoff Area= 16.000 ac Runoff Depth = 5.98" Tc =5.0 min CN =88 Runoff= 158.51 cfs 7.977 of Reach 6R: DP #8 &9 REACH Peak Depth =3.52' Max Vet =3.1 fps Inflow= 398.08 cfs 46.793 of n =0.045 L= 2,491.0' S=0.0028'/' Capacity= 1,285.41 cfs Outflow= 281.16 cfs 46.209 of Pond 12P: WQ #12 Peak EIev= 410.06' Storage= 101.706 cf Inflow =85.64 cfs 4.196 of Outflow =25.44 cfs 2.710 of Pond 14P: WQ #11 Peak EIev= 397.20' Storage= 334.789 cf Inflow= 219.83 cfs 10.770 of Outflow =4.00 cfs 4.307 of Pond 15P: WQ #9 Peak EIev= 417.25' Storage= 846.207 cf Inflow= 494.84 cfs 24.903 of Outflow =5.83 cfs 6.455 of Pond 18P: WQ #10 Peak EIev= 394.64' Storage = 199.413 cf Inflow= 158.51 cfs 7.977 of Outflow =29.99 cfs 6.769 of Link 10L: DP #2 POST Inflow= 1,196.84 cfs 139.975 of Primary= 1,196.84 cfs 139.975 of 1121 - SIA DP #2 POST Type 11 24 -hr 100 -Year Rainfall= 7.40" Prepared by {enter your company name here} Page 2 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 11/16/2011 Link 11L: DP #9 POST Link 13L: DP #8 Post Link 14L: DP #10 POST I nflow= 310.88 cfs 24.713 of Primary= 310.88 cfs 24.713 of I nflow =87.79 cfs 22.080 of Primary=87.79 cfs 22.080 of I nflow= 271.60 cfs 21.446 of Primary= 271.60 cfs 21.446 of Total Runoff Area = 435.670 ac Runoff Volume = 168.164 of Average Runoff Depth = 4.63" 7S TO D #5 POST 9S 6P Q �O W #5 POST C4S 4S WQ #5 O LS #7 POST 5L 2L Q\ 8S DP #5 POST DP #6 POST 8P TO DP #6 POST WQ #4 11 S 10S TO WQ #4 7P TO WQ #3 POST WQ #3 6L DP #7 POST Subcat Reach on Link Drainage Diagram for 1121 - SIA DP #5 POST Prepared by {enter your company name here} 1/25/2012 HydroCAD® 7.10 s/n 003899 © 2005 Hydro CAD Software Solutions LLC 1121 - SIA DP #5 POST Type// 24 -hr 1 -Year Rainfall= 3.00" Prepared by {enter your company name here} Page 2 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 1/25/2012 Time span =0.00 -25.00 hrs, dt =0.05 hrs, 501 points Runoff by SCS TR -20 method, UH =SCS Reach routing by Stor- Ind +Trans method - Pond routing by Stor -Ind method Subcatchment 4S: TO LS #7 POST Runoff Area =2.200 ac Runoff Depth= 1.59" Tc =5.0 min CN =85 Runoff =6.26 cfs 0.291 of Subcatchment 7S: TO DP #5 POST RunoffArea= 77.380 ac Runoff Depth >0.71" Flow Length= 3,614' Tc =29.0 min CN =70 Runoff =41.51 cfs 4.606 of Subcatchment 8S: TO DP #6 POST Runoff Area = 76.390 ac Runoff Depth >0.76" Flow Length= 2,455' Tc =25.3 min CN =71 Runoff =49.07 cfs 4.840 of Subcatchment 9S: TO WQ #5 POST Runoff Area= 18.290 ac Runoff Depth= 1.74" Tc =5.0 min CN =87 Runoff =56.61 cfs 2.651 of Subcatchment 10S: TO WQ #3 POST Runoff Area =3.210 ac Runoff Depth= 1.66" Tc =5.0 min CN =86 Runoff =9.54 cfs 0.445 of Subcatchment 11S: TO WQ #4 RunoffArea =3.850 ac Runoff Depth= 1.38" Tc =5.0 min CN =82 Runoff =9.57 cfs 0.442 of Pond 6P: WQ #5 Peak Elev= 376.34' Storage= 65.573 cf Inflow =56.61 cfs 2.651 of Outflow =3.03 cfs 1.668 of Pond 7P: WQ #3 Peak Elev= 399.64' Storage= 12.792 cf Inflow =9.54 cfs 0.445 of Outflow =0.22 cfs 0.214 of Pond 8P: WQ #4 Peak Elev= 385.09' Storage= 12.564 cf Inflow =9.57 cfs 0.442 of Outflow =0.23 cfs 0.203 of Link 2L: DP #6 POST Inflow =49.91 cfs 5.132 of Primary=49.91 cfs 5.132 of Link 5L: DP #5 POST Inflow =93.19 cfs 11.609 of Primary=93.19 cfs 11.609 of Link 6L: DP #7 POST Inflow =0.22 cfs 0.214 of Primary=0.22 cfs 0.214 of Total Runoff Area = 181.320 ac Runoff Volume = 13.275 of Average Runoff Depth = 0.88" 1121 - SIA DP #5 POST Type// 24 -hr 1 -Year Rainfall= 3.00" Prepared by {enter your company name here} Page 3 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 1/25/2012 Subcatchment 4S: TO LS #7 POST [49] Hint: Tc <2dt may require smaller dt Runoff = 6.26 cfs @ 11.96 hrs, Volume= 0.291 af, Depth= 1.59" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -Year Rainfall= 3.00" Area (ac) CN Description 0.490 61 Onsite Open B 0.420 74 Onsite Open C 1.290 98 Onsite Impervious 2.200 85 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 5.0 Direct Entry, Subcatchment 7S: TO DP #5 POST Runoff = 41.51 cfs @ 12.27 hrs, Volume= 4.606 af, Depth> 0.71" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -Year Rainfall= 3.00" Area (ac) CN Description 5.640 55 Onsite Woods B 2.260 70 Onsite Woods C 0.510 77 Onsite Woods D 5.160 61 Onsite Open B 1.990 74 Onsite Open C 1.450 80 Onsite Open D 2.780 98 Onsite Impervious 8.410 55 Offsite Woods B 25.590 70 Offsite Woods C 5.370 77 Offsite Woods D 0.330 61 Offsite Open B 10.370 74 Offsite Open C 7.520 80 Offsite Open D 77.380 70 Weighted Average 1121 - SIA DP #5 POST Type// 24 -hr 1 -Year Rainfall= 3.00" Prepared by {enter your company name here} Page 4 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 1/25/2012 Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 16.3 75 0.0200 0.1 55 Offsite Woods B Sheet Flow, 24.250 70 Offsite Woods C 27.090 77 Offsite Woods D Woods: Light underbrush n= 0.400 P2= 3.50" 1.7 354 0.0450 3.4 74 Offsite Open C Shallow Concentrated Flow, 5.030 80 Offsite Open D 76.390 71 Weighted Average Unpaved Kv= 16.1 fps 2.0 600 0.0400 5.0 20.16 Channel Flow, 16.3 75 0.0200 0.1 Sheet Flow, Area= 4.0 sf Perim= 6.0' r= 0.67' n= 0.045 1.2 341 0.0260 4.8 28.83 Channel Flow, 3.3 985 0.0390 5.0 19.91 Channel Flow, Area= 6.0 sf Perim= 7.0' r= 0.86' n= 0.045 4.3 1,310 0.0210 5.1 60.85 Channel Flow, Area= 12.0 sf Perim= 11.0' r= 1.09' n= 0.045 3.5 934 0.0100 4.4 88.02 Channel Flow, Area= 20.0 sf Perim= 13.0' r= 1.54' n= 0.045 29.0 3,614 Total Subcatchment 8S: TO DP #6 POST Runoff = 49.07 cfs @ 12.22 hrs, Volume= 4.840 af, Depth> 0.76" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -Year Rainfall= 3.00" Area (ac) CN Description 1.340 55 Onsite Woods B 0.880 70 Onsite Woods C 1.140 61 Onsite Open B 0.540 74 Onsite Open C 0.550 98 Onsite Impervious 12.050 55 Offsite Woods B 24.250 70 Offsite Woods C 27.090 77 Offsite Woods D 1.000 61 Offsite Open B 2.520 74 Offsite Open C 5.030 80 Offsite Open D 76.390 71 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 16.3 75 0.0200 0.1 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.50" 2.0 425 0.0470 3.5 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 3.3 985 0.0390 5.0 19.91 Channel Flow, Area= 4.0 sf Perim= 6.0' r= 0.67' n= 0.045 3.7 970 0.0160 4.4 53.12 Channel Flow, Area= 12.0 sf Perim= 11.0' r= 1.09' n= 0.045 25.3 2,455 Total 1121 - SIA DP #5 POST Type// 24 -hr 1 -Year Rainfall= 3.00" Prepared by {enter your company name here} Page 5 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 1/25/2012 Subcatchment 9S: TO WQ #5 POST [49] Hint: Tc <2dt may require smaller dt Runoff = 56.61 cfs @ 11.96 hrs, Volume= 2.651 af, Depth= 1.74" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -Year Rainfall= 3.00" Area (ac) CN Description 0.990 61 Onsite Open B 2.330 74 Onsite Open C 6.290 80 Onsite Open D 8.680 98 Onsite Impervious 18.290 87 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 5.0 Direct Entry, Subcatchment 10S: TO WQ #3 POST [49] Hint: Tc <2dt may require smaller dt Runoff = 9.54 cfs @ 11.96 hrs, Volume= 0.445 af, Depth= 1.66" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -Year Rainfall= 3.00" Area (ac) CN Description 1.620 74 Onsite Open Space HSG 'C' 1.590 98 Onsite Impervious 3.210 86 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 5.0 Direct Entry, Subcatchment 11S: TO WQ #4 [49] Hint: Tc <2dt may require smaller dt Runoff = 9.57 cfs @ 11.96 hrs, Volume= 0.442 af, Depth= 1.38" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type 11 24 -hr 1 -Year Rainfall= 3.00" 1121 - SIA DP #5 POST Type// 24 -hr 1 -Year Rainfall= 3.00" Prepared by {enter your company name here} Page 6 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 1/25/2012 Area (ac) CN Description 0.860 61 Onsite Open Space, HSG 'B' 1.240 74 Onsite Open Space, HSG 'C' 1.750 98 Oniste Impervious 3.850 82 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 5.0 Direct Entry, Routing by Stor -Ind method, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Peak Elev= 376.34' @ 12.96 hrs Surf.Area= 30,067 sf Storage= 65,573 cf Plug -Flow detention time= 283.7 min calculated for 1.665 of (63% of inflow) Center -of -Mass det. time= 175.6 min ( 993.2 - 817.6 ) Volume Invert Avail.Storage Storage Description Pond 6P: WQ #5 Inflow Area = 18.290 ac, Inflow Depth = 1.74" for 1 -Year event Inflow = 56.61 cfs @ 11.96 hrs, Volume= 2.651 of Outflow = 3.03 cfs @ 12.96 hrs, Volume= 1.668 af, Atten= 95 %, Lag= 60.2 min Primary = 3.03 cfs @ 12.96 hrs, Volume= 1.668 of Routing by Stor -Ind method, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Peak Elev= 376.34' @ 12.96 hrs Surf.Area= 30,067 sf Storage= 65,573 cf Plug -Flow detention time= 283.7 min calculated for 1.665 of (63% of inflow) Center -of -Mass det. time= 175.6 min ( 993.2 - 817.6 ) Volume Invert Avail.Storage Storage Description #1 374.00' 185,453 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 374.00 25,756 0 0 376.00 29,559 55,315 55,315 378.00 32,514 62,073 117,388 380.00 35,551 68,065 185,453 Device Routing Invert Outlet Devices #1 Primary 374.00' 24.0" x 50.0' long Culvert CMP, square edge headwall, Ke= 0.500 Outlet Invert= 373.50' S= 0.01007' Cc= 0.900 n= 0.013 #2 Device 1 380.00' 48.0" Horiz. Orifice /Grate Limited to weir flow C= 0.600 #3 Device 1 374.00' 2.5" Vert. Orifice /Grate C= 0.600 #4 Device 1 375.30' 12.0" Vert. Orifice /Grate C= 0.600 Primary OutFlow Max =3.03 cfs @ 12.96 hrs HW= 376.34' (Free Discharge) L = Culvert (Passes 3.03 cfs of 17.36 cfs potential flow) 2= Orifice /Grate ( Controls 0.00 cfs) 3= Orifice /Grate (Orifice Controls 0.25 cfs @ 7.2 fps) 4= Orifice /Grate (Orifice Controls 2.79 cfs @ 3.6 fps) 1121 - SIA DP #5 POST Type// 24 -hr 1 -Year Rainfall= 3.00" Prepared by {enter your company name here} Page 7 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 1/25/2012 Pond 7P: WQ #3 Inflow Area = 3.210 ac, Inflow Depth = 1.66" for 1 -Year event Inflow = 9.54 cfs @ 11.96 hrs, Volume= 0.445 of Outflow = 0.22 cfs @ 15.47 hrs, Volume= 0.214 af, Atten= 98 %, Lag= 210.6 min Primary = 0.22 cfs @ 15.47 hrs, Volume= 0.214 of Routing by Stor -Ind method, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Peak Elev= 399.64' @ 15.47 hrs Surf.Area= 8,256 sf Storage= 12,792 cf Plug -Flow detention time= 392.2 min calculated for 0.213 of (48% of inflow) Center -of -Mass det. time= 274.0 min ( 1,095.3 - 821.3 ) Volume Invert #1 398.00' Avail.Storaae Storaae Description 54,432 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 398.00 7,336 0 0 400.00 8,457 15,793 15,793 402.00 9,643 18,100 33,893 404.00 10,896 20,539 54,432 Device Routing Invert Outlet Devices #1 Primary 398.00' 18.0" x 50.0' long Culvert RCP, square edge headwall, Ke= 0.500 Outlet Invert= 397.50' S= 0.01007' Cc= 0.900 n= 0.013 #2 Device 1 403.00' 48.0" Horiz. Orifice /Grate Limited to weir flow C= 0.600 #3 Device 1 398.00' 1.0" Vert. Orifice /Grate C= 0.600 #4 Device 1 398.90' 3.0" Vert. Orifice /Grate C= 0.600 Primary OutFlow Max =0.22 cfs @ 15.47 hrs HW= 399.64' (Free Discharge) L1= Culvert (Passes 0.22 cfs of 8.00 cfs potential flow) 12= Orifice /Grate ( Controls 0.00 cfs) 3= Orifice /Grate (Orifice Controls 0.03 cfs @ 6.1 fps) 4=Orifice/G rate (Orifice Controls 0.19 cfs @ 3.8 fps) Pond 8P: WQ #4 Inflow Area = 3.850 ac, Inflow Depth = 1.38" for 1 -Year event Inflow = 9.57 cfs @ 11.96 hrs, Volume= 0.442 of Outflow = 0.23 cfs @ 15.66 hrs, Volume= 0.203 af, Atten= 98 %, Lag= 221.8 min Primary = 0.23 cfs @ 15.66 hrs, Volume= 0.203 of Routing by Stor -Ind method, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Peak Elev= 385.09' @ 15.66 hrs Surf.Area= 12,535 sf Storage= 12,564 cf Plug -Flow detention time= 385.3 min calculated for 0.203 of (46% of inflow) Center -of -Mass det. time= 259.8 min ( 1,095.0 - 835.3 ) Volume Invert Avail.Storage Storage Description #1 384.00' 94,675 cf Custom Stage Data (Prismatic)Listed below (Recalc) 1121 - SIA DP #5 POST Type// 24 -hr 1 -Year Rainfall= 3.00" Prepared by {enter your company name here} Page 8 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 1/25/2012 Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 384.00 10,490 0 0 386.00 14,238 24,728 24,728 388.00 17,408 31,646 56,374 390.00 20,893 38,301 94,675 Device Routing Invert Outlet Devices #1 Primary 384.00' 15.0" x 50.0' long Culvert RCP, square edge headwall, Ke= 0.500 Outlet Invert= 383.50' S= 0.01007' Cc= 0.900 n= 0.013 #2 Device 1 390.00' 48.0" Horiz. Orifice /Grate Limited to weir flow C= 0.600 #3 Device 1 384.00' 1.0" Vert. Orifice /Grate C= 0.600 #4 Device 1 384.70' 4.0" Vert. Orifice /Grate C= 0.600 Primary OutFlow Max =0.23 cfs @ 15.66 hrs HW= 385.09' (Free Discharge) L = Culvert (Passes 0.23 cfs of 3.83 cfs potential flow) 2= Orifice /Grate ( Controls 0.00 cfs) 3= Orifice /Grate (Orifice Controls 0.03 cfs @ 4.9 fps) 4= Orifice /Grate (Orifice Controls 0.20 cfs @ 2.3 fps) Link 2L: DP #6 POST Inflow Area = 78.590 ac, Inflow Depth > 0.78" for 1 -Year event Inflow = 49.91 cfs @ 12.22 hrs, Volume= 5.132 of Primary = 49.91 cfs @ 12.22 hrs, Volume= 5.132 af, Atten= 0 %, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Link 5L: DP #5 POST Inflow Area = 178.110 ac, Inflow Depth > 0.78" for 1 -Year event Inflow = 93.19 cfs @ 12.24 hrs, Volume= 11.609 of Primary = 93.19 cfs @ 12.24 hrs, Volume= 11.609 af, Atten= 0 %, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Link 6L: DP #7 POST Inflow Area = 3.210 ac, Inflow Depth > 0.80" for 1 -Year event Inflow = 0.22 cfs @ 15.47 hrs, Volume= 0.214 of Primary = 0.22 cfs @ 15.47 hrs, Volume= 0.214 af, Atten= 0 %, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs 1121 - SIA DP #5 POST Type 11 24 -hr 2 -Year Rainfall= 3.50" Prepared by {enter your company name here} Page 9 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 1/25/2012 Time span =0.00 -25.00 hrs, dt =0.05 hrs, 501 points Runoff by SCS TR -20 method, UH =SCS Reach routing by Stor- Ind +Trans method - Pond routing by Stor -Ind method Subcatchment 4S: TO LS #7 POST Runoff Area =2.200 ac Runoff Depth= 2.02" Tc =5.0 min CN =85 Runoff =7.90 cfs 0.370 of Subcatchment 7S: TO DP #5 POST RunoffArea= 77.380 ac Runoff Depth >1.01" Flow Length= 3,614' Tc =29.0 min CN =70 Runoff =62.43 cfs 6.500 of Subcatchment 8S: TO DP #6 POST RunoffArea= 76.390 ac Runoff Depth >1.06" Flow Length= 2,455' Tc =25.3 min CN =71 Runoff =72.37 cfs 6.771 of Subcatchment 9S: TO WQ #5 POST Runoff Area= 18.290 ac Runoff Depth= 2.18" Tc =5.0 min CN =87 Runoff =70.43 cfs 3.326 of Subcatchment 10S: TO WQ #3 POST Runoff Area =3.210 ac Runoff Depth= 2.10" Tc =5.0 min CN =86 Runoff =11.94 cfs 0.561 of Subcatchment 11S: TO WQ #4 RunoffArea =3.850 ac Runoff Depth= 1.78" Tc =5.0 min CN =82 Runoff =12.33 cfs 0.572 of Pond 6P: WQ #5 Peak Elev= 376.88' Storage= 81.898 cf Inflow =70.43 cfs 3.326 of Outflow =4.20 cfs 2.320 of Pond 7P: WQ #3 Peak EIev= 400.05' Storage= 16.228 cf Inflow =11.94 cfs 0.561 of Outflow =0.28 cfs 0.277 of Pond 8P: WQ #4 Peak EIev= 385.34' Storage= 15.803 cf Inflow =12.33 cfs 0.572 of Outflow =0.32 cfs 0.301 of Link 2L: DP #6 POST Inflow =73.43 cfs 7.141 of Primary=73.43 cfs 7.141 of Link 5L: DP #5 POST Inflow= 138.70 cfs 16.262 of Primary= 138.70 cfs 16.262 of Link 6L: DP #7 POST Inflow =0.28 cfs 0.277 of Primary=0.28 cfs 0.277 of Total Runoff Area = 181.320 ac Runoff Volume = 18.101 of Average Runoff Depth = 1.20" 1121 - SIA DP #5 POST Type 11 24 -hr 2 -Year Rainfall= 3.50" Prepared by {enter your company name here} Page 10 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 1/25/2012 Subcatchment 4S: TO LS #7 POST [49] Hint: Tc <2dt may require smaller dt Runoff = 7.90 cfs @ 11.96 hrs, Volume= 0.370 af, Depth= 2.02" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type II 24 -hr 2 -Year Rainfall= 3.50" Area (ac) CN Description 0.490 61 Onsite Open B 0.420 74 Onsite Open C 1.290 98 Onsite Impervious 2.200 85 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 5.0 Direct Entry, Subcatchment 7S: TO DP #5 POST Runoff = 62.43 cfs @ 12.26 hrs, Volume= 6.500 af, Depth> 1.01" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type II 24 -hr 2 -Year Rainfall= 3.50" Area (ac) CN Description 5.640 55 Onsite Woods B 2.260 70 Onsite Woods C 0.510 77 Onsite Woods D 5.160 61 Onsite Open B 1.990 74 Onsite Open C 1.450 80 Onsite Open D 2.780 98 Onsite Impervious 8.410 55 Offsite Woods B 25.590 70 Offsite Woods C 5.370 77 Offsite Woods D 0.330 61 Offsite Open B 10.370 74 Offsite Open C 7.520 80 Offsite Open D 77.380 70 Weighted Average 1121 - SIA DP #5 POST Type 11 24 -hr 2 -Year Rainfall= 3.50" Prepared by {enter your company name here} Page 11 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 1/25/2012 Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 16.3 75 0.0200 0.1 55 Offsite Woods B Sheet Flow, 24.250 70 Offsite Woods C 27.090 77 Offsite Woods D Woods: Light underbrush n= 0.400 P2= 3.50" 1.7 354 0.0450 3.4 74 Offsite Open C Shallow Concentrated Flow, 5.030 80 Offsite Open D 76.390 71 Weighted Average Unpaved Kv= 16.1 fps 2.0 600 0.0400 5.0 20.16 Channel Flow, 16.3 75 0.0200 0.1 Sheet Flow, Area= 4.0 sf Perim= 6.0' r= 0.67' n= 0.045 1.2 341 0.0260 4.8 28.83 Channel Flow, 3.3 985 0.0390 5.0 19.91 Channel Flow, Area= 6.0 sf Perim= 7.0' r= 0.86' n= 0.045 4.3 1,310 0.0210 5.1 60.85 Channel Flow, Area= 12.0 sf Perim= 11.0' r= 1.09' n= 0.045 3.5 934 0.0100 4.4 88.02 Channel Flow, Area= 20.0 sf Perim= 13.0' r= 1.54' n= 0.045 29.0 3,614 Total Subcatchment 8S: TO DP #6 POST Runoff = 72.37 cfs @ 12.21 hrs, Volume= 6.771 af, Depth> 1.06" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type II 24 -hr 2 -Year Rainfall= 3.50" Area (ac) CN Description 1.340 55 Onsite Woods B 0.880 70 Onsite Woods C 1.140 61 Onsite Open B 0.540 74 Onsite Open C 0.550 98 Onsite Impervious 12.050 55 Offsite Woods B 24.250 70 Offsite Woods C 27.090 77 Offsite Woods D 1.000 61 Offsite Open B 2.520 74 Offsite Open C 5.030 80 Offsite Open D 76.390 71 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 16.3 75 0.0200 0.1 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.50" 2.0 425 0.0470 3.5 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 3.3 985 0.0390 5.0 19.91 Channel Flow, Area= 4.0 sf Perim= 6.0' r= 0.67' n= 0.045 3.7 970 0.0160 4.4 53.12 Channel Flow, Area= 12.0 sf Perim= 11.0' r= 1.09' n= 0.045 25.3 2,455 Total 1121 - SIA DP #5 POST Type 11 24 -hr 2 -Year Rainfall= 3.50" Prepared by {enter your company name here} Page 12 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 1/25/2012 Subcatchment 9S: TO WQ #5 POST [49] Hint: Tc <2dt may require smaller dt Runoff = 70.43 cfs @ 11.96 hrs, Volume= 3.326 af, Depth= 2.18" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type II 24 -hr 2 -Year Rainfall= 3.50" Area (ac) CN Description 0.990 61 Onsite Open B 2.330 74 Onsite Open C 6.290 80 Onsite Open D 8.680 98 Onsite Impervious 18.290 87 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 5.0 Direct Entry, Subcatchment 10S: TO WQ #3 POST [49] Hint: Tc <2dt may require smaller dt Runoff = 11.94 cfs @ 11.96 hrs, Volume= 0.561 af, Depth= 2.10" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type II 24 -hr 2 -Year Rainfall= 3.50" Area (ac) CN Description 1.620 74 Onsite Open Space HSG 'C' 1.590 98 Onsite Impervious 3.210 86 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 5.0 Direct Entry, Subcatchment 11S: TO WQ #4 [49] Hint: Tc <2dt may require smaller dt Runoff = 12.33 cfs @ 11.96 hrs, Volume= 0.572 af, Depth= 1.78" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type 11 24 -hr 2 -Year Rainfall= 3.50" 1121 - SIA DP #5 POST Type 11 24 -hr 2 -Year Rainfall= 3.50" Prepared by {enter your company name here} Page 13 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 1/25/2012 Area (ac) CN Description 0.860 61 Onsite Open Space, HSG 'B' 1.240 74 Onsite Open Space, HSG 'C' 1.750 98 Oniste Impervious 3.850 82 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 5.0 Direct Entry, Pond 6P: WQ #5 Inflow Area = 18.290 ac, Inflow Depth = 2.18" for 2 -Year event Inflow = 70.43 cfs @ 11.96 hrs, Volume= 3.326 of Outflow = 4.20 cfs @ 12.77 hrs, Volume= 2.320 af, Atten= 94 %, Lag= 49.0 min Primary = 4.20 cfs @ 12.77 hrs, Volume= 2.320 of Routing by Stor -Ind method, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Peak Elev= 376.88' @ 12.77 hrs Surf.Area= 30,859 sf Storage= 81,898 cf Plug -Flow detention time= 270.9 min calculated for 2.320 of (70% of inflow) Center -of -Mass det. time= 170.8 min ( 982.0 - 811.1 ) Volume Invert Avail.Storage Storage Description #1 374.00' 185,453 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 374.00 25,756 0 0 376.00 29,559 55,315 55,315 378.00 32,514 62,073 117,388 380.00 35,551 68,065 185,453 Device Routing Invert Outlet Devices #1 Primary 374.00' 24.0" x 50.0' long Culvert CMP, square edge headwall, Ke= 0.500 Outlet Invert= 373.50' S= 0.01007' Cc= 0.900 n= 0.013 #2 Device 1 380.00' 48.0" Horiz. Orifice /Grate Limited to weir flow C= 0.600 #3 Device 1 374.00' 2.5" Vert. Orifice /Grate C= 0.600 #4 Device 1 375.30' 12.0" Vert. Orifice /Grate C= 0.600 Primary OutFlow Max =4.20 cfs @ 12.77 hrs HW= 376.88' (Free Discharge) L = Culvert (Passes 4.20 cfs of 20.32 cfs potential flow) 2= Orifice /Grate ( Controls 0.00 cfs) 3= Orifice /Grate (Orifice Controls 0.27 cfs @ 8.0 fps) 4= Orifice /Grate (Orifice Controls 3.93 cfs @ 5.0 fps) 1121 - SIA DP #5 POST Type 11 24 -hr 2 -Year Rainfall =3.50" Prepared by {enter your company name here} Page 14 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 1/25/2012 Pond 7P: WQ #3 Inflow Area = 3.210 ac, Inflow Depth = 2.10" for 2 -Year event Inflow = 11.94 cfs @ 11.96 hrs, Volume= 0.561 of Outflow = 0.28 cfs @ 15.29 hrs, Volume= 0.277 af, Atten= 98 %, Lag= 200.3 min Primary = 0.28 cfs @ 15.29 hrs, Volume= 0.277 of Routing by Stor -Ind method, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Peak Elev= 400.05' @ 15.29 hrs Surf.Area= 8,487 sf Storage= 16,228 cf Plug -Flow detention time= 396.6 min calculated for 0.277 of (49% of inflow) Center -of -Mass det. time= 280.3 min ( 1,095.0 - 814.7 ) Volume Invert #1 398.00' Avail.Storaae Storaae Description 54,432 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 398.00 7,336 0 0 400.00 8,457 15,793 15,793 402.00 9,643 18,100 33,893 404.00 10,896 20,539 54,432 Device Routing Invert Outlet Devices #1 Primary 398.00' 18.0" x 50.0' long Culvert RCP, square edge headwall, Ke= 0.500 Outlet Invert= 397.50' S= 0.01007' Cc= 0.900 n= 0.013 #2 Device 1 403.00' 48.0" Horiz. Orifice /Grate Limited to weir flow C= 0.600 #3 Device 1 398.00' 1.0" Vert. Orifice /Grate C= 0.600 #4 Device 1 398.90' 3.0" Vert. Orifice /Grate C= 0.600 Primary OutFlow Max =0.28 cfs @ 15.29 hrs HW= 400.05' (Free Discharge) L1= Culvert (Passes 0.28 cfs of 9.36 cfs potential flow) 12= Orifice /Grate ( Controls 0.00 cfs) 3= Orifice /Grate (Orifice Controls 0.04 cfs @ 6.8 fps) 4=Orifice/G rate (Orifice Controls 0.24 cfs @ 4.9 fps) Pond 8P: WQ #4 Inflow Area = 3.850 ac, Inflow Depth = 1.78" for 2 -Year event Inflow = 12.33 cfs @ 11.96 hrs, Volume= 0.572 of Outflow = 0.32 cfs @ 15.08 hrs, Volume= 0.301 af, Atten= 97 %, Lag= 187.1 min Primary = 0.32 cfs @ 15.08 hrs, Volume= 0.301 of Routing by Stor -Ind method, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Peak Elev= 385.34' @ 15.08 hrs Surf.Area= 13,010 sf Storage= 15,803 cf Plug -Flow detention time= 379.4 min calculated for 0.301 of (53% of inflow) Center -of -Mass det. time= 260.4 min ( 1,088.3 - 827.9 ) Volume Invert Avail.Storage Storage Description #1 384.00' 94,675 cf Custom Stage Data (Prismatic)Listed below (Recalc) 1121 - SIA DP #5 POST Type 11 24 -hr 2 -Year Rainfall =3.50" Prepared by {enter your company name here} Page 15 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 1/25/2012 Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 384.00 10,490 0 0 386.00 14,238 24,728 24,728 388.00 17,408 31,646 56,374 390.00 20,893 38,301 94,675 Device Routing Invert Outlet Devices #1 Primary 384.00' 15.0" x 50.0' long Culvert RCP, square edge headwall, Ke= 0.500 Outlet Invert= 383.50' S= 0.01007' Cc= 0.900 n= 0.013 #2 Device 1 390.00' 48.0" Horiz. Orifice /Grate Limited to weir flow C= 0.600 #3 Device 1 384.00' 1.0" Vert. Orifice /Grate C= 0.600 #4 Device 1 384.70' 4.0" Vert. Orifice /Grate C= 0.600 Primary OutFlow Max =0.32 cfs @ 15.08 hrs HW= 385.34' (Free Discharge) L = Culvert (Passes 0.32 cfs of 5.01 cfs potential flow) 2= Orifice /Grate ( Controls 0.00 cfs) 3= Orifice /Grate (Orifice Controls 0.03 cfs @ 5.5 fps) 4= Orifice /Grate (Orifice Controls 0.29 cfs @ 3.3 fps) Link 2L: DP #6 POST Inflow Area = 78.590 ac, Inflow Depth > 1.09" for 2 -Year event Inflow = 73.43 cfs @ 12.21 hrs, Volume= 7.141 of Primary = 73.43 cfs @ 12.21 hrs, Volume= 7.141 af, Atten= 0 %, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Link 5L: DP #5 POST Inflow Area = 178.110 ac, Inflow Depth > 1.10" for 2 -Year event Inflow = 138.70 cfs @ 12.23 hrs, Volume= 16.262 of Primary = 138.70 cfs @ 12.23 hrs, Volume= 16.262 af, Atten= 0 %, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Link 6L: DP #7 POST Inflow Area = 3.210 ac, Inflow Depth > 1.04" for 2 -Year event Inflow = 0.28 cfs @ 15.29 hrs, Volume= 0.277 of Primary = 0.28 cfs @ 15.29 hrs, Volume= 0.277 af, Atten= 0 %, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs 1121 - SIA DP #5 POST Type 11 24 -hr 10 -Year Rainfall= 5.10" Prepared by {enter your company name here} Page 16 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 1/25/2012 Time span =0.00 -25.00 hrs, dt =0.05 hrs, 501 points Runoff by SCS TR -20 method, UH =SCS Reach routing by Stor- Ind +Trans method - Pond routing by Stor -Ind method Subcatchment 4S: TO LS #7 POST Runoff Area =2.200 ac Runoff Depth= 3.46" Tc =5.0 min CN =85 Runoff =13.24 cfs 0.634 of Subcatchment 7S: TO DP #5 POST RunoffArea= 77.380 ac Runoff Depth >2.11" Flow Length= 3,614' Tc =29.0 min CN =70 Runoff= 140.84 cfs 13.610 of Subcatchment 8S: TO DP #6 POST Runoff Area = 76.390 ac Runoff Depth >2.19" Flow Length= 2,455' Tc =25.3 min CN =71 Runoff = 158.56 cfs 13.956 of Subcatchment 9S: TO WQ #5 POST Runoff Area= 18.290 ac Runoff Depth= 3.66" Tc =5.0 min CN =87 Runoff= 115.07 cfs 5.581 of Subcatchment 10S: TO WQ #3 POST Runoff Area =3.210 ac Runoff Depth= 3.56" Tc =5.0 min CN =86 Runoff =19.77 cfs 0.952 of Subcatchment 11S: TO WQ #4 RunoffArea =3.850 ac Runoff Depth= 3.17" Tc =5.0 min CN =82 Runoff =21.53 cfs 1.017 of Pond 6P: WQ #5 Peak Elev= 378.74' Storage= 141.797 cf Inflow= 115.07 cfs 5.581 of Outflow =6.84 cfs 4.487 of Pond 7P: WQ #3 Peak EIev= 401.45' Storage= 28.646 cf Inflow =19.77 cfs 0.952 of Outflow =0.42 cfs 0.435 of Pond 8P: WQ #4 Peak EIev= 386.29' Storage= 28.994 cf Inflow =21.53 cfs 1.017 of Outflow =0.54 cfs 0.545 of Link 2L: DP #6 POST Inflow= 160.32 cfs 14.590 of Primary= 160.32 cfs 14.590 of Link 5L: DP #5 POST Inflow= 306.39 cfs 33.233 of Primary= 306.39 cfs 33.233 of Link 6L: DP #7 POST Inflow =0.42 cfs 0.435 of Primary=0.42 cfs 0.435 of Total Runoff Area = 181.320 ac Runoff Volume = 35.750 of Average Runoff Depth = 2.37" 1121 - SIA DP #5 POST Type 11 24 -hr 10 -Year Rainfall= 5.10" Prepared by {enter your company name here} Page 17 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 1/25/2012 Subcatchment 4S: TO LS #7 POST [49] Hint: Tc <2dt may require smaller dt Runoff = 13.24 cfs @ 11.95 hrs, Volume= 0.634 af, Depth= 3.46" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -Year Rainfall = 5.10" Area (ac) CN Description 0.490 61 Onsite Open B 0.420 74 Onsite Open C 1.290 98 Onsite Impervious 2.200 85 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 5.0 Direct Entry, Subcatchment 7S: TO DP #5 POST Runoff = 140.84 cfs @ 12.24 hrs, Volume= 13.610 af, Depth> 2.11" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -Year Rainfall = 5.10" Area (ac) CN Description 5.640 55 Onsite Woods B 2.260 70 Onsite Woods C 0.510 77 Onsite Woods D 5.160 61 Onsite Open B 1.990 74 Onsite Open C 1.450 80 Onsite Open D 2.780 98 Onsite Impervious 8.410 55 Offsite Woods B 25.590 70 Offsite Woods C 5.370 77 Offsite Woods D 0.330 61 Offsite Open B 10.370 74 Offsite Open C 7.520 80 Offsite Open D 77.380 70 Weighted Average 1121 - SIA DP #5 POST Type 11 24 -hr 10 -Year Rainfall= 5.10" Prepared by {enter your company name here} Page 18 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 1/25/2012 Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 16.3 75 0.0200 0.1 55 Offsite Woods B Sheet Flow, 24.250 70 Offsite Woods C 27.090 77 Offsite Woods D Woods: Light underbrush n= 0.400 P2= 3.50" 1.7 354 0.0450 3.4 74 Offsite Open C Shallow Concentrated Flow, 5.030 80 Offsite Open D 76.390 71 Weighted Average Unpaved Kv= 16.1 fps 2.0 600 0.0400 5.0 20.16 Channel Flow, 16.3 75 0.0200 0.1 Sheet Flow, Area= 4.0 sf Perim= 6.0' r= 0.67' n= 0.045 1.2 341 0.0260 4.8 28.83 Channel Flow, 3.3 985 0.0390 5.0 19.91 Channel Flow, Area= 6.0 sf Perim= 7.0' r= 0.86' n= 0.045 4.3 1,310 0.0210 5.1 60.85 Channel Flow, Area= 12.0 sf Perim= 11.0' r= 1.09' n= 0.045 3.5 934 0.0100 4.4 88.02 Channel Flow, Area= 20.0 sf Perim= 13.0' r= 1.54' n= 0.045 29.0 3,614 Total Subcatchment 8S: TO DP #6 POST Runoff = 158.56 cfs @ 12.20 hrs, Volume= 13.956 af, Depth> 2.19" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -Year Rainfall = 5.10" Area (ac) CN Description 1.340 55 Onsite Woods B 0.880 70 Onsite Woods C 1.140 61 Onsite Open B 0.540 74 Onsite Open C 0.550 98 Onsite Impervious 12.050 55 Offsite Woods B 24.250 70 Offsite Woods C 27.090 77 Offsite Woods D 1.000 61 Offsite Open B 2.520 74 Offsite Open C 5.030 80 Offsite Open D 76.390 71 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 16.3 75 0.0200 0.1 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.50" 2.0 425 0.0470 3.5 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 3.3 985 0.0390 5.0 19.91 Channel Flow, Area= 4.0 sf Perim= 6.0' r= 0.67' n= 0.045 3.7 970 0.0160 4.4 53.12 Channel Flow, Area= 12.0 sf Perim= 11.0' r= 1.09' n= 0.045 25.3 2,455 Total 1121 - SIA DP #5 POST Type 11 24 -hr 10 -Year Rainfall= 5.10" Prepared by {enter your company name here} Page 19 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 1/25/2012 Subcatchment 9S: TO WQ #5 POST [49] Hint: Tc <2dt may require smaller dt Runoff = 115.07 cfs @ 11.95 hrs, Volume= 5.581 af, Depth= 3.66" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -Year Rainfall = 5.10" Area (ac) CN Description 0.990 61 Onsite Open B 2.330 74 Onsite Open C 6.290 80 Onsite Open D 8.680 98 Onsite Impervious 18.290 87 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 5.0 Direct Entry, Subcatchment 10S: TO WQ #3 POST [49] Hint: Tc <2dt may require smaller dt Runoff = 19.77 cfs @ 11.95 hrs, Volume= 0.952 af, Depth= 3.56" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -Year Rainfall = 5.10" Area (ac) CN Description 1.620 74 Onsite Open Space HSG 'C' 1.590 98 Onsite Impervious 3.210 86 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 5.0 Direct Entry, Subcatchment 11S: TO WQ #4 [49] Hint: Tc <2dt may require smaller dt Runoff = 21.53 cfs @ 11.96 hrs, Volume= 1.017 af, Depth= 3.17" Runoff by SCS TR -20 method, UH =SCS, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Type 11 24 -hr 10 -Year Rainfall = 5.10" 1121 - SIA DP #5 POST Type 11 24 -hr 10 -Year Rainfall= 5.10" Prepared by {enter your company name here} Page 20 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 1/25/2012 Area (ac) CN Description 0.860 61 Onsite Open Space, HSG 'B' 1.240 74 Onsite Open Space, HSG 'C' 1.750 98 Oniste Impervious 3.850 82 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft /sec) (cfs) 5.0 Direct Entry, Routing by Stor -Ind method, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Peak Elev= 378.74' @ 12.72 hrs Surf.Area= 33,635 sf Storage= 141,797 cf Plug -Flow detention time= 281.1 min calculated for 4.487 of (80% of inflow) Center -of -Mass det. time= 201.4 min ( 997.8 - 796.4 ) Volume Invert Avail.Storage Storage Description Pond 6P: WQ #5 Inflow Area = 18.290 ac, Inflow Depth= 3.66" for 10 -Year event Inflow = 115.07 cfs @ 11.95 hrs, Volume= 5.581 of Outflow = 6.84 cfs @ 12.72 hrs, Volume= 4.487 af, Atten= 94 %, Lag= 45.8 min Primary = 6.84 cfs @ 12.72 hrs, Volume= 4.487 of Routing by Stor -Ind method, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Peak Elev= 378.74' @ 12.72 hrs Surf.Area= 33,635 sf Storage= 141,797 cf Plug -Flow detention time= 281.1 min calculated for 4.487 of (80% of inflow) Center -of -Mass det. time= 201.4 min ( 997.8 - 796.4 ) Volume Invert Avail.Storage Storage Description #1 374.00' 185,453 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 374.00 25,756 0 0 376.00 29,559 55,315 55,315 378.00 32,514 62,073 117,388 380.00 35,551 68,065 185,453 Device Routing Invert Outlet Devices #1 Primary 374.00' 24.0" x 50.0' long Culvert CMP, square edge headwall, Ke= 0.500 Outlet Invert= 373.50' S= 0.01007' Cc= 0.900 n= 0.013 #2 Device 1 380.00' 48.0" Horiz. Orifice /Grate Limited to weir flow C= 0.600 #3 Device 1 374.00' 2.5" Vert. Orifice /Grate C= 0.600 #4 Device 1 375.30' 12.0" Vert. Orifice /Grate C= 0.600 Primary OutFlow Max =6.84 cfs @ 12.72 hrs HW= 378.74' (Free Discharge) L = Culvert (Passes 6.84 cfs of 29.25 cfs potential flow) 2= Orifice /Grate ( Controls 0.00 cfs) 3= Orifice /Grate (Orifice Controls 0.35 cfs @ 10.4 fps) 4= Orifice /Grate (Orifice Controls 6.48 cfs @ 8.3 fps) 1121 - SIA DP #5 POST Type 11 24 -hr 10 -Year Rainfall= 5.10" Prepared by {enter your company name here} Page 21 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 1/25/2012 Pond 7P: WQ #3 Inflow Area = 3.210 ac, Inflow Depth = 3.56" for 10 -Year event Inflow = 19.77 cfs @ 11.95 hrs, Volume= 0.952 of Outflow = 0.42 cfs @ 15.44 hrs, Volume= 0.435 af, Atten= 98 %, Lag= 209.3 min Primary = 0.42 cfs @ 15.44 hrs, Volume= 0.435 of Routing by Stor -Ind method, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Peak Elev= 401.45' @ 15.44 hrs Surf.Area= 9,315 sf Storage= 28,646 cf Plug -Flow detention time= 412.9 min calculated for 0.435 of (46% of inflow) Center -of -Mass det. time= 296.6 min ( 1,096.3 - 799.7 ) Volume Invert #1 398.00' Avail.Storaae Storaae Description 54,432 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 398.00 7,336 0 0 400.00 8,457 15,793 15,793 402.00 9,643 18,100 33,893 404.00 10,896 20,539 54,432 Device Routing Invert Outlet Devices #1 Primary 398.00' 18.0" x 50.0' long Culvert RCP, square edge headwall, Ke= 0.500 Outlet Invert= 397.50' S= 0.01007' Cc= 0.900 n= 0.013 #2 Device 1 403.00' 48.0" Horiz. Orifice /Grate Limited to weir flow C= 0.600 #3 Device 1 398.00' 1.0" Vert. Orifice /Grate C= 0.600 #4 Device 1 398.90' 3.0" Vert. Orifice /Grate C= 0.600 Primary OutFlow Max =0.42 cfs @ 15.44 hrs HW= 401.45' (Free Discharge) L1= Culvert (Passes 0.42 cfs of 13.97 cfs potential flow) 12= Orifice /Grate ( Controls 0.00 cfs) 3= Orifice /Grate (Orifice Controls 0.05 cfs @ 8.9 fps) 4=Orifice/G rate (Orifice Controls 0.37 cfs @ 7.5 fps) Pond 8P: WQ #4 Inflow Area = 3.850 ac, Inflow Depth= 3.17" for 10 -Year event Inflow = 21.53 cfs @ 11.96 hrs, Volume= 1.017 of Outflow = 0.54 cfs @ 14.87 hrs, Volume= 0.545 af, Atten= 97 %, Lag= 174.8 min Primary = 0.54 cfs @ 14.87 hrs, Volume= 0.545 of Routing by Stor -Ind method, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Peak Elev= 386.29' @ 14.87 hrs Surf.Area= 14,705 sf Storage= 28,994 cf Plug -Flow detention time= 395.0 min calculated for 0.545 of (54% of inflow) Center -of -Mass det. time= 281.9 min ( 1,093.4 - 811.5 ) Volume Invert Avail.Storage Storage Description #1 384.00' 94,675 cf Custom Stage Data (Prismatic)Listed below (Recalc) 1121 - SIA DP #5 POST Type 11 24 -hr 10 -Year Rainfall= 5.10" Prepared by {enter your company name here} Page 22 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 1/25/2012 Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 384.00 10,490 0 0 386.00 14,238 24,728 24,728 388.00 17,408 31,646 56,374 390.00 20,893 38,301 94,675 Device Routing Invert Outlet Devices #1 Primary 384.00' 15.0" x 50.0' long Culvert RCP, square edge headwall, Ke= 0.500 Outlet Invert= 383.50' S= 0.01007' Cc= 0.900 n= 0.013 #2 Device 1 390.00' 48.0" Horiz. Orifice /Grate Limited to weir flow C= 0.600 #3 Device 1 384.00' 1.0" Vert. Orifice /Grate C= 0.600 #4 Device 1 384.70' 4.0" Vert. Orifice /Grate C= 0.600 Primary OutFlow Max =0.54 cfs @ 14.87 hrs HW= 386.29' (Free Discharge) L = Culvert (Passes 0.54 cfs of 7.50 cfs potential flow) 2= Orifice /Grate ( Controls 0.00 cfs) 3= Orifice /Grate (Orifice Controls 0.04 cfs @ 7.2 fps) 4= Orifice /Grate (Orifice Controls 0.50 cfs @ 5.8 fps) Link 2L: DP #6 POST Inflow Area = 78.590 ac, Inflow Depth > 2.23" for 10 -Year event Inflow = 160.32 cfs @ 12.20 hrs, Volume= 14.590 of Primary = 160.32 cfs @ 12.20 hrs, Volume= 14.590 af, Atten= 0 %, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Link 5L: DP #5 POST Inflow Area = 178.110 ac, Inflow Depth > 2.24" for 10 -Year event Inflow = 306.39 cfs @ 12.22 hrs, Volume= 33.233 of Primary = 306.39 cfs @ 12.22 hrs, Volume= 33.233 af, Atten= 0 %, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs Link 6L: DP #7 POST Inflow Area = 3.210 ac, Inflow Depth > 1.63" for 10 -Year event Inflow = 0.42 cfs @ 15.44 hrs, Volume= 0.435 of Primary = 0.42 cfs @ 15.44 hrs, Volume= 0.435 af, Atten= 0 %, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00 -25.00 hrs, dt= 0.05 hrs 1121 - SIA DP #5 POST Type 11 24 -hr 100 -Year Rainfall= 7.40" Prepared by {enter your company name here} Page 1 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 1/25/2012 Time span =0.00 -25.00 hrs, dt =0.05 hrs, 501 points Runoff by SCS TR -20 method, UH =SCS Reach routing by Stor- Ind +Trans method - Pond routing by Stor -Ind method Subcatchment 4S: TO LS #7 POST Runoff Area =2.200 ac Runoff Depth = 5.64" Tc =5.0 min CN =85 Runoff =20.96 cfs 1.033 of Subcatchment 7S: TO DP #5 POST Runoff Area = 77.380 ac Runoff Depth >3.95" Flow Length= 3,614' Tc =29.0 min CN =70 Runoff = 270.02 cfs 25.491 of Subcatchment 8S: TO DP #6 POST Runoff Area = 76.390 ac Runoff Depth >4.06" Flow Length= 2,455' Tc =25.3 min CN =71 Runoff = 298.87 cfs 25.861 of Subcatchment 9S: TO WQ #5 POST Runoff Area= 18.290 ac Runoff Depth = 5.87" Tc =5.0 min CN =87 Runoff= 178.99 cfs 8.942 of Subcatchment 10S: TO WQ #3 POST Runoff Area =3.210 ac Runoff Depth = 5.75" Tc =5.0 min CN =86 Runoff =31.01 cfs 1.538 of Subcatchment 11S: TO WQ #4 Runoff Area =3.850 ac Runoff Depth = 5.29" Tc =5.0 min CN =82 Runoff =35.04 cfs 1.698 of Pond 6P: WQ #5 Peak EIev= 560.62' Storage= 185.453 cf Inflow= 178.99 cfs 8.942 of Outflow= 206.18 cfs 7.664 of Pond 7P: WQ #3 Peak EIev= 403.07' Storage= 44.585 cf Inflow =31.01 cfs 1.538 of Outflow =1.37 cfs 0.683 of Pond 8P: WQ #4 Peak EIev= 387.68' Storage= 50.959 cf Inflow =35.04 cfs 1.698 of Outflow =0.76 cfs 0.794 of Link 2L: DP #6 POST Inflow= 301.65 cfs 26.894 of Primary= 301.65 cfs 26.894 of Link 5L: DP #5 POST Inflow= 603.51 cfs 60.843 of Primary= 603.51 cfs 60.843 of Link 6L: DP #7 POST Inflow =1.37 cfs 0.683 of Primary=1.37 cfs 0.683 of Total Runoff Area = 181.320 ac Runoff Volume = 64.563 of Average Runoff Depth = 4.27" Preliminary BMP Sizing Calculations 1 121 - WQ #1 Sizing.xls Surface Area Calcs (85 %TSS) 1121 - Del Webb WQ #1 - Required Surface Area Drainage Area to Basin = 12.88 acres Impervious Area to Basin = 6.65 acres Impervious Percentage = 520 Avereage Depth (Volume /SA) = 3.00 ft Interpolation to Determine SA /DA Ratio Impervious Lower Boundary 5070 Site % impervious 527o Upper Boundary 6070 Average Depth (Vol /SA) (ft) 3.0 3.0 3.0 2.06 2.06 2.06 2.12 2.12 2.12 2.40 2.40 2.40 SA /DA = 2.12 Surface Area Required = 11,869 sf Surface Area Provided = 31,407 sf Matt Jones, El 1/25/2012 <- from table below <- interpolated <- from table below Surface Area (SA) to Drainage Area (DA) Ratio for Permanent Pool Sizing to Achieve 85 Percent TSS Pollutant Removal Efficiency in the Piedmont (From NCDWQ Stormwater BMP Manual, July 20071 Percent Impervious Cover 3.0 Permanent Pool Average Depth (ft) 4.0 5.0 6.0 7.0 8.0 9.0 10% 0.59 0.49 0.43 0.35 0.31 0.29 0.26 20% 0.97 0.79 0.70 0.59 0.51 0.46 0.44 30% 1.34 1.08 0.97 0.83 0.70 0.64 0.62 40% 1.73 1.43 1.25 1.05 0.90 0.82 0.77 50% 2.06 1.73 1.50 1.30 1.09 1.00 0.92 60% 2.40 2.03 1.71 1.51 1.29 1.18 1.10 70% 2.88 2.40 2.07 1.79 1.54 1.35 1.26 80% 3.36 2.78 2.38 2.10 1.86 1.60 1.42 90% 3.74 3.10 2.66 2.34 2.11 1.83 1.67 1 121 - WQ# 1 Sizing.xls Above NP Volume Normal Pool Top of Berm 1121 - Del Webb WQ #1 - Above Normal Pool Volume Storage Volume Stage /Storage Calculations 1.0 2.0 3.0 4.0 5.0 6.0 Stage (ft) 7.0 Runoff Volume Simple Me Drainage Area (A) = 12.88 Impervious Area = 6.65 Impervious Fraction (IA) = 0.52 Rainfall Depth (RD) = 1.00 Rv = 0.51 Storage = KS *Stageb KS = 31083.00 b = 1.0755 -thod Acres Acres Inch (Rv = 0.05 +0.9* IA) Runoff Volume (V) = 1 24063 cf (V = 3630 *Rp *Rv*A) Water Quality Volume Stage Calculation Stage Required to Detain WQ Volume = 0.79 Contour Average 360.79 ft Contour 361.00 ft Incremental Cumulative Stage Surface Contour Elevation Volume Volume Area Surface Area (ft) (ft) (sf) (sf) (co (co 360.0 0.0 31407 0 0 0 362.0 2.0 34265 32836 65672 65672 364.0 4.0 37174 35720 71439 137111 366.0 6.0 40156 38665 77330 214441 1.0 2.0 3.0 4.0 5.0 6.0 Stage (ft) 7.0 Runoff Volume Simple Me Drainage Area (A) = 12.88 Impervious Area = 6.65 Impervious Fraction (IA) = 0.52 Rainfall Depth (RD) = 1.00 Rv = 0.51 Storage = KS *Stageb KS = 31083.00 b = 1.0755 -thod Acres Acres Inch (Rv = 0.05 +0.9* IA) Runoff Volume (V) = 1 24063 cf (V = 3630 *Rp *Rv*A) Water Quality Volume Stage Calculation Stage Required to Detain WQ Volume = 0.79 ft Elevation Required to Detain WQ Volume = 360.79 ft Actual Orifice Elevation = 361.00 ft Temporary Pool Volume Provided = 31083 cf Temporary Pool Surface Area Provided = 33430 sf Matt Jones, El 1/25/2012 1121 - WQ #1 Sizing.xls Drawdown Orifice Sizing 1121 - Del Webb WQ #1 - Drawdown Orifice Sizing Orifice Diameter= 2.50 in Area of Orifice = 0.03 sf Orifice Invert = 360.00 ft KS = 31083.00 b = 1.0755 CD= 0.6 CW = 3.0 g = 32.2 ft /s2 Matt Jones, El 1/25/2012 Water Surface Elevation (ft) Volume Stored (cf) Incremental Orifice Flow (cfs) Average Orifice Flow (cfs) Incremental Volume Drawn Down (cfs) Incremental Time (s) 361.00 31083 0.155 360.91 28143 0.148 0.151 2940 19415 360.82 25225 0.139 0.143 2918 20358 360.74 22330 0.130 0.135 2895 21476 360.65 19461 0.121 0.126 2869 22829 360.56 16622 0.111 0.116 2839 24519 360.47 13816 0.099 0.105 2805 26717 360.38 11050 0.087 0.093 2766 29755 360.29 8333 0.072 0.079 2718 34383 360.21 5677 0.058 0.065 2656 40901 360.12 3108 0.025 0.042 2569 61498 Step Increment = 0.09 ft End Goal = 3108.30 cf Maximum Orifice Flow = 0.15 cfs Drawdown Time = 3.49 days 1 121 - WQ #2 Sizing.xls Surface Area Calcs (85 %TSS) 1121 - Del Webb WQ #2 - Required Surface Area Drainage Area to Basin = 38.3 acres Impervious Area to Basin = 19.02 acres Impervious Percentage = 50% Avereage Depth (Volume /SA) = 3.00 ft Interpolation to Determine SA /DA Ratio Impervious Lower Boundary 407o Site % impervious 5070 Upper Boundary 5070 Average Depth (Vol /SA) (ft) 3.0 3.0 3.0 1.73 1.73 1.73 2.05 2.05 2.05 2.06 2.06 2.06 SA /DA = 2.05 Surface Area Required = 34,181 sf Surface Area Provided = 56,196 sf Matt Jones, El 11/16/2011 <- from table below <- interpolated <- from table below Surface Area (SA) to Drainage Area (DA) Ratio for Permanent Pool Sizing to Achieve 85 Percent TSS Pollutant Removal Efficiency in the Piedmont (From NCDWQ Stormwater BMP Manual, July 20071 Percent Impervious Cover 3.0 Permanent Pool Average Depth (ft) 4.0 5.0 6.0 7.0 8.0 9.0 10% 0.59 0.49 0.43 0.35 0.31 0.29 0.26 20% 0.97 0.79 0.70 0.59 0.51 0.46 0.44 30% 1.34 1.08 0.97 0.83 0.70 0.64 0.62 40% 1.73 1.43 1.25 1.05 0.90 0.82 0.77 50% 2.06 1.73 1.50 1.30 1.09 1.00 0.92 60% 2.40 2.03 1.71 1.51 1.29 1.18 1.10 70% 2.88 2.40 2.07 1.79 1.54 1.35 1.26 80% 3.36 2.78 2.38 2.10 1.86 1.60 1.42 90% 3.74 3.10 2.66 2.34 2.11 1.83 1.67 1 121 - WQ #2 Sizing.xls Above NP Volume Normal Pool Top of Berm 600000 500000 400000 v F 300000 w 200000 100000 0 0.0 1121 - Del Webb WQ #2 - Above Normal Pool Volume Storage Volume Stage /Storage Calculations Storage Volume 2.0 4.0 6.0 8.0 10.0 Stage (ft) Runoff Volume Simple Me Drainage Area (A) = 38.30 Impervious Area = 19.02 Impervious Fraction (IA) = 0.50 Rainfall Depth (RD) = 1.00 Rv = 0.50 Storage = KS *Stageb KS = 54496.00 b = 1 1.1156 thod Acres Acres Inch (Rv = 0.05 +0.9 *IA Runoff Volume (V) = 1 69090 cf (V = 3630 *Rp *Rv*A) Water Quality Volume Stage Calculation Stage Required to Detain WQ Volume = 1.24 ft Contour Average Actual Orifice Elevation = 371.30 ft Contour Incremental Cumulative Stage Surface Contour Elevation Volume Volume Area Surface Area (ft) (ft) (so (so (co (cf) 370.0 0.0 56196 0 0 0 372.0 2.0 62949 59573 119145 119145 374.0 4.0 69996 66473 132945 252090 376.0 6.0 77340 73668 147336 399426 378.0 8.0 84981 81161 162321 561747 Storage Volume 2.0 4.0 6.0 8.0 10.0 Stage (ft) Runoff Volume Simple Me Drainage Area (A) = 38.30 Impervious Area = 19.02 Impervious Fraction (IA) = 0.50 Rainfall Depth (RD) = 1.00 Rv = 0.50 Storage = KS *Stageb KS = 54496.00 b = 1 1.1156 thod Acres Acres Inch (Rv = 0.05 +0.9 *IA Runoff Volume (V) = 1 69090 cf (V = 3630 *Rp *Rv*A) Water Quality Volume Stage Calculation Stage Required to Detain WQ Volume = 1.24 ft Elevation Required to Detain WQ Volume = 371.24 ft Actual Orifice Elevation = 371.30 ft Temporary Pool Volume Provided = 73026 cf Temporary Pool Surface Area Provided = 62668 sf Matt Jones, El 11/16/2011 1 121 - WQ #2 Sizing.xls Drawdown Orifice Sizing 1121 - Del Webb WQ #2 - Drawdown Orifice Sizing Orifice Diameter= Area of Orifice = Orifice Invert = KS = b= CD= CW _ g= 4.00 in 0.09 sf 370.00 ft 54496.00 1.1156 0.6 3.0 32.2 ft /s` Matt Jones, El 11/16/2011 Water Surface Elevation (ft) Volume Stored (cf) Incremental Orifice Flow (cfs) Average Orifice Flow (cfs) Incremental Volume Drawn Down (cfs) Incremental Time (s) 371.30 73026 0.447 371.19 65951 0.424 0.436 7076 16235 371.07 58953 0.400 0.412 6998 16978 370.96 52040 0.374 0.387 6913 17858 370.85 45222 0.346 0.360 6819 18928 370.73 38508 0.316 0.331 6713 20270 370.62 31915 0.283 0.299 6594 22027 370.51 25460 0.245 0.264 6455 24487 370.39 19172 0.199 0.222 6288 28320 370.28 13094 0.147 0.173 6078 35087 370.17 7303 0.067 0.107 5791 54112 Step Increment = 0.11 ft End Goal = 7302.64 cf Maximum Orifice Flow = 0.44 cfs Drawdown Time = 2.94 days 1 121 - WQ #3 Sizing.xls Surface Area Calcs (85 %TSS) 1121 - Del Webb WQ #3 - Required Surface Area Drainage Area to Basin = 3.21 acres Impervious Area to Basin = 1.59 acres Impervious Percentage = 50% Avereage Depth (Volume /SA) = 3.00 ft Interpolation to Determine SA /DA Ratio Impervious Lower Boundary 407o Site % impervious 5070 Upper Boundary 5070 Average Depth (Vol /SA) (ft) 3.0 3.0 3.0 1.73 1.73 1.73 2.04 2.04 2.04 2.06 2.06 2.06 SA /DA = 2.04 Surface Area Required = 2,859 sf Surface Area Provided = 7,336 sf Matt Jones, El 1/25/2012 <- from table below <- interpolated <- from table below Surface Area (SA) to Drainage Area (DA) Ratio for Permanent Pool Sizing to Achieve 85 Percent TSS Pollutant Removal Efficiency in the Piedmont (From NCDWQ Stormwater BMP Manual. Julv 20071 Percent Impervious Cover 3.0 Permanent Pool Average Depth (ft) 4.0 5.0 6.0 7.0 8.0 9.0 10% 0.59 0.49 0.43 0.35 0.31 0.29 0.26 20% 0.97 0.79 0.70 0.59 0.51 0.46 0.44 30% 1.34 1.08 0.97 0.83 0.70 0.64 0.62 40% 1.73 1.43 1.25 1.05 0.90 0.82 0.77 50% 2.06 1.73 1.50 1.30 1.09 1.00 0.92 60% 2.40 2.03 1.71 1.51 1.29 1.18 1.10 70% 2.88 2.40 2.07 1.79 1.54 1.35 1.26 80% 3.36 2.78 2.38 2.10 1.86 1.60 1.42 90% 3.74 3.10 2.66 2.34 2.11 1.83 1.67 1 121 - WQ #3 Sizing.xls Above NP Volume Normal Pool Top of Berm 1121 - Del Webb WQ #3 - Above Normal Pool Volume Storage Volume Stage /Storage Calculations Storage = KS *Stageb KS = 7218.10 b = 1.1237 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Stage (ft) Runoff Volume Simple Mi Drainage Area (A) = 3.21 Impervious Area = 1.59 Impervious Fraction (IA) = 0.50 Rainfall Depth (RD) = 1.00 Rv = 0.50 Ahod Acres Acres Inch (Rv = 0.05 +0.9* IA) Runoff Volume (V) = 1 5777 cf (V = 3630 *Rp *Rv*A) Water Quality Volume Stage Calculation Stage Required to Detain WQ Volume = 0.82 Contour Average 398.82 ft Contour 398.90 ft Incremental Cumulative Stage Surface Contour Elevation Volume Volume Area Surface Area (ft) (ft) (sf) (sf) (co (co 398.0 0.0 7336 0 0 0 400.0 2.0 8457 7897 15793 15793 402.0 4.0 9643 9050 18100 33893 404.0 6.0 10896 10270 20539 54432 Storage = KS *Stageb KS = 7218.10 b = 1.1237 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Stage (ft) Runoff Volume Simple Mi Drainage Area (A) = 3.21 Impervious Area = 1.59 Impervious Fraction (IA) = 0.50 Rainfall Depth (RD) = 1.00 Rv = 0.50 Ahod Acres Acres Inch (Rv = 0.05 +0.9* IA) Runoff Volume (V) = 1 5777 cf (V = 3630 *Rp *Rv*A) Water Quality Volume Stage Calculation Stage Required to Detain WQ Volume = 0.82 ft Elevation Required to Detain WQ Volume = 398.82 ft Actual Orifice Elevation = 398.90 ft Temporary Pool Volume Provided = 6412 cf Temporary Pool Surface Area Provided = 8006 sf Matt Jones, El 1/25/2012 1 121 - WQ #3 Sizing.xls Drawdown Orifice Sizing 1121 - Del Webb WQ #3 - Drawdown Orifice Sizing Orifice Diameter= Area of Orifice = Orifice Invert = KS = b= CD= CW _ g= 1.00 in 0.01 sf 398.00 ft 7218.10 1.1237 0.6 3.0 32.2 ft /s` Matt Jones, El 1/25/2012 Water Surface Elevation (ft) Volume Stored (cf) Incremental Orifice Flow (cfs) Average Orifice Flow (cfs) Incremental Volume Drawn Down (cfs) Incremental Time (s) 398.90 6412 0.024 398.82 5788 0.023 0.024 624 26270 398.74 5171 0.022 0.023 617 27303 398.66 4562 0.021 0.021 609 28501 398.59 3962 0.019 0.020 600 29918 398.51 3372 0.018 0.019 590 31631 398.43 2793 0.016 0.017 579 33769 398.35 2227 0.015 0.015 566 36554 398.27 1677 0.013 0.014 550 40421 398.19 1146 0.010 0.011 531 46398 398.12 641 0.007 0.009 504 57912 Step Increment = 0.08 ft End Goal = 641.22 cf Maximum Orifice Flow = 0.02 cfs Drawdown Time = 4.15 days 1 121 - WQ #4 Sizing.xls Surface Area Calcs (85 %TSS) 1121 - Del Webb WQ #4 - Required Surface Area Drainage Area to Basin = 3.85 acres Impervious Area to Basin = 1.75 acres Impervious Percentage = 45% Avereage Depth (Volume /SA) = 3.00 ft Interpolation to Determine SA /DA Ratio Impervious Lower Boundary 407o Site % impervious 457o Upper Boundary 5070 Average Depth (Vol /SA) (ft) 3.0 3.0 3.0 1.73 1.73 1.73 1.91 1.91 1.91 2.06 2.06 2.06 SA /DA = 1.91 Surface Area Required = 3,203 sf Surface Area Provided = 10,490 sf Matt Jones, El 11/16/2011 <- from table below <- interpolated <- from table below Surface Area (SA) to Drainage Area (DA) Ratio for Permanent Pool Sizing to Achieve 85 Percent TSS Pollutant Removal Efficiency in the Piedmont (From NCDWQ Stormwater BMP Manual, July 20071 Percent Impervious Cover 3.0 Permanent Pool Average Depth (ft) 4.0 5.0 6.0 7.0 8.0 9.0 10% 0.59 0.49 0.43 0.35 0.31 0.29 0.26 20% 0.97 0.79 0.70 0.59 0.51 0.46 0.44 30% 1.34 1.08 0.97 0.83 0.70 0.64 0.62 40% 1.73 1.43 1.25 1.05 0.90 0.82 0.77 50% 2.06 1.73 1.50 1.30 1.09 1.00 0.92 60% 2.40 2.03 1.71 1.51 1.29 1.18 1.10 70% 2.88 2.40 2.07 1.79 1.54 1.35 1.26 80% 3.36 2.78 2.38 2.10 1.86 1.60 1.42 90% 3.74 3.10 2.66 2.34 2.11 1.83 1.67 1 121 - WQ #4 Sizing.xls Above NP Volume Normal Pool Top of Berm 1nnnnn w 80000 V w 60000 bA 0 40000 20000 0 0.0 1121 - Del Webb WQ #4 - Above Normal Pool Volume Storage Volume Stage /Storage Calculations Storage Volume 1.0 2.0 3.0 4.0 5.0 6.0 Stage (ft) 7.0 Runoff Volume Simple Mi Drainage Area (A) = 3.85 Impervious Area = 1.75 Impervious Fraction (IA) = 0.45 Rainfall Depth (RD) = 1.00 Rv = 0.46 Storage = KS *Stageb KS = 10568.00 b = 1 1.2184 Ahod Acres Acres Inch (Rv = 0.05 +0.9* IA) Runoff Volume (V) = 1 6416 cf (V = 3630 *Rp *Rv*A) Water Quality Volume Stage Calculation Stage Required to Detain WQ Volume = 0.66 Contour Average 384.66 ft Contour 384.70 ft Incremental Cumulative Stage Surface Contour Elevation Volume Volume Area Surface Area (ft) (ft) (sf) (sf) (co (cf) 384.0 0.0 10490 0 0 0 386.0 2.0 14238 12364 24728 24728 388.0 4.0 17408 15823 31646 56374 390.0 6.0 20893 19151 38301 94675 Storage Volume 1.0 2.0 3.0 4.0 5.0 6.0 Stage (ft) 7.0 Runoff Volume Simple Mi Drainage Area (A) = 3.85 Impervious Area = 1.75 Impervious Fraction (IA) = 0.45 Rainfall Depth (RD) = 1.00 Rv = 0.46 Storage = KS *Stageb KS = 10568.00 b = 1 1.2184 Ahod Acres Acres Inch (Rv = 0.05 +0.9* IA) Runoff Volume (V) = 1 6416 cf (V = 3630 *Rp *Rv*A) Water Quality Volume Stage Calculation Stage Required to Detain WQ Volume = 0.66 ft Elevation Required to Detain WQ Volume = 384.66 ft Actual Orifice Elevation = 384.70 ft Temporary Pool Volume Provided = 6843 cf Temporary Pool Surface Area Provided = 11911 sf Matt Jones, El 11/16/2011 1 121 - WQ #4 Sizing.xls Drawdown Orifice Sizing 1121 - Del Webb WQ #4 - Drawdown Orifice Sizing Orifice Diameter= Area of Orifice = Orifice Invert = KS = b= CD= CW _ g= 1.00 in 0.01 sf 384.00 ft 10568.00 1.2184 0.6 3.0 32.2 ft /s` Matt Jones, El 11/16/2011 Water Surface Elevation (ft) Volume Stored (cf) Incremental Orifice Flow (cfs) Average Orifice Flow (cfs) Incremental Volume Drawn Down (cfs) Incremental Time (s) 384.70 6843 0.021 384.64 6142 0.020 0.021 701 33680 384.58 5455 0.019 0.020 687 34686 384.52 4783 0.018 0.019 672 35844 384.46 4128 0.017 0.018 655 37202 384.40 3491 0.016 0.016 637 38828 384.34 2874 0.014 0.015 617 40835 384.28 2280 0.013 0.014 594 43417 384.22 1713 0.011 0.012 567 46947 384.17 1178 0.009 0.010 535 52290 384.11 684 0.007 0.008 494 62194 Step Increment = 0.06 ft End Goal = 684.32 cf Maximum Orifice Flow = 0.02 cfs Drawdown Time = 4.93 days 1 121 - WQ #5 Sizing.xls Surface Area Calcs (85 %TSS) 1121 - Del Webb WQ #5 - Required Surface Area Drainage Area to Basin = 18.3 acres Impervious Area to Basin = 8.68 acres Impervious Percentage = 47% Avereage Depth (Volume /SA) = 3.00 ft Interpolation to Determine SA /DA Ratio Impervious Lower Boundary 407o Site % impervious 4776 Upper Boundary 5070 Average Depth (Vol /SA) (ft) 3.0 3.0 3.0 1.73 1.73 1.73 1.98 1.98 1.98 2.06 2.06 2.06 SA /DA = 1.98 Surface Area Required = 15,746 sf Surface Area Provided = 25,756 sf Matt Jones, El 11/16/2011 <- from table below <- interpolated <- from table below Surface Area (SA) to Drainage Area (DA) Ratio for Permanent Pool Sizing to Achieve 85 Percent TSS Pollutant Removal Efficiency in the Piedmont (From NCDWQ Stormwater BMP Manual, July 20071 Percent Impervious Cover 3.0 Permanent Pool Average Depth (ft) 4.0 5.0 6.0 7.0 8.0 9.0 10% 0.59 0.49 0.43 0.35 0.31 0.29 0.26 20% 0.97 0.79 0.70 0.59 0.51 0.46 0.44 30% 1.34 1.08 0.97 0.83 0.70 0.64 0.62 40% 1.73 1.43 1.25 1.05 0.90 0.82 0.77 50% 2.06 1.73 1.50 1.30 1.09 1.00 0.92 60% 2.40 2.03 1.71 1.51 1.29 1.18 1.10 70% 2.88 2.40 2.07 1.79 1.54 1.35 1.26 80% 3.36 2.78 2.38 2.10 1.86 1.60 1.42 90% 3.74 3.10 2.66 2.34 2.11 1.83 1.67 1 121 - WQ #5 Sizing.xls Above NP Volume Normal Pool Top of Berm 1121 - Del Webb WQ #5 - Above Normal Pool Volume Storage Volume Stage /Storage Calculations Storage Volume Storage = KS *Stageb 200000 — K - 25747.00 y = 25747x' 099' 5 — w 150000 RZ = 0.9999 b = 1.0955 V m 100000 O N 50000 0 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Stage (ft) Runoff Volume Simple Me Drainage Area (A) = 18.30 Impervious Area = 8.68 Impervious Fraction (IA) = 0.47 Rainfall Depth (RD) = 1.00 Rv = 0.48 -thod Acres Acres Inch (Rv = 0.05 +0.9* IA) Runoff Volume (V) = 1 31679 cf (V = 3630 *Rp *Rv*A) Water Quality Volume Stage Calculation Stage Required to Detain WQ Volume = 1.21 Contour Average 375.21 ft Contour 375.30 ft Incremental Cumulative Stage Surface Contour Elevation Volume Volume Area Surface Area (ft) (ft) (sf) (sf) (co (cf) 374.0 0.0 25756 0 0 0 376.0 2.0 29559 27658 55315 55315 378.0 4.0 32514 31037 62073 117388 380.0 6.0 35551 34033 68065 185453 Storage Volume Storage = KS *Stageb 200000 — K - 25747.00 y = 25747x' 099' 5 — w 150000 RZ = 0.9999 b = 1.0955 V m 100000 O N 50000 0 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Stage (ft) Runoff Volume Simple Me Drainage Area (A) = 18.30 Impervious Area = 8.68 Impervious Fraction (IA) = 0.47 Rainfall Depth (RD) = 1.00 Rv = 0.48 -thod Acres Acres Inch (Rv = 0.05 +0.9* IA) Runoff Volume (V) = 1 31679 cf (V = 3630 *Rp *Rv*A) Water Quality Volume Stage Calculation Stage Required to Detain WQ Volume = 1.21 ft Elevation Required to Detain WQ Volume = 375.21 ft Actual Orifice Elevation = 375.30 ft Temporary Pool Volume Provided = 34320 cf Temporary Pool Surface Area Provided = 28921 sf Matt Jones, El 11/16/2011 1 121 - WQ #5 Sizing.xls Drawdown Orifice Sizing 1121 - Del Webb WQ #5 - Drawdown Orifice Sizing Orifice Diameter= 2.50 in Area of Orifice = 0.03 sf Orifice Invert = 374.00 ft KS = 25747.00 b = 1.0955 CD= 0.6 CW = 3.0 g = 32.2 ft /s2 Matt Jones, El 11/16/2011 Water Surface Elevation (ft) Volume Stored (cf) Incremental Orifice Flow (cfs) Average Orifice Flow (cfs) Incremental Volume Drawn Down (cfs) Incremental Time (s) 375.30 34320 0.179 375.19 31034 0.171 0.175 3286 18767 375.07 27778 0.161 0.166 3256 19604 374.96 24555 0.152 0.157 3223 20588 374.84 21369 0.141 0.146 3186 21767 374.73 18224 0.130 0.135 3145 23219 374.62 15125 0.117 0.124 3099 25075 374.50 12081 0.103 0.110 3044 27574 374.39 9104 0.087 0.095 2978 31225 374.27 6210 0.067 0.077 2894 37402 374.16 3432 0.040 0.054 2777 51900 Step Increment = 0.11 ft End Goal = 3432.03 cf Maximum Orifice Flow = 0.18 cfs Drawdown Time = 3.21 days 1 121 - WQ #6 Sizing.xls Surface Area Calcs (85 %TSS) 1121 - Del Webb WQ #6 - Required Surface Area Drainage Area to Basin = 5.05 acres Impervious Area to Basin = 2.55 acres Impervious Percentage = 50% Avereage Depth (Volume /SA) = 3.00 ft Interpolation to Determine SA /DA Ratio Impervious Lower Boundary 5070 Site % impervious 5070 Upper Boundary 6070 Average Depth (Vol /SA) (ft) 3.0 3.0 3.0 2.06 2.06 2.06 2.08 2.08 2.08 2.40 2.40 2.40 SA /DA = 2.08 Surface Area Required = 4,569 sf Surface Area Provided = 5,211 sf Matt Jones, El 11/16/2011 <- from table below <- interpolated <- from table below Surface Area (SA) to Drainage Area (DA) Ratio for Permanent Pool Sizing to Achieve 85 Percent TSS Pollutant Removal Efficiency in the Piedmont (From NCDWQ Stormwater BMP Manual, July 20071 Percent Impervious Cover 3.0 Permanent Pool Average Depth (ft) 4.0 5.0 6.0 7.0 8.0 9.0 10% 0.59 0.49 0.43 0.35 0.31 0.29 0.26 20% 0.97 0.79 0.70 0.59 0.51 0.46 0.44 30% 1.34 1.08 0.97 0.83 0.70 0.64 0.62 40% 1.73 1.43 1.25 1.05 0.90 0.82 0.77 50% 2.06 1.73 1.50 1.30 1.09 1.00 0.92 60% 2.40 2.03 1.71 1.51 1.29 1.18 1.10 70% 2.88 2.40 2.07 1.79 1.54 1.35 1.26 80% 3.36 2.78 2.38 2.10 1.86 1.60 1.42 90% 3.74 3.10 2.66 2.34 2.11 1.83 1.67 1 121 - WQ #6 Sizing.xls Above NP Volume Normal Pool Top of Berm 40000 30000 V d b 20000 O i+ 10000 0 0.0 Matt Jones, El 11/16/2011 1121 - Del Webb WQ #6 - Above Normal Pool Volume Storage Volume Stage /Storage Calculations Storage Volume 1.0 2.0 3.0 4.0 Stage (ft) Storage = KS *Stageb KS = 5767.90 - b = 1.3464 5.0 Runoff Volume Simple M4 Drainage Area (A) = 5.05 Impervious Area = 2.55 Impervious Fraction (IA) = 0.50 Rainfall Depth (RD) = 1.00 Rv = 0.50 Ahod Acres Acres Inch (Rv = 0.05 +0.9 *IA) Runoff Volume (V) = 1 9247 cf (V = 3630 *Rp *Rv*A Water Quality Volume Stage Calculation Stage Required to Detain WQ Volume = 1.42 Contour Average 383.42 ft Contour 383.50 ft Incremental Cumulative Stage Surface Contour Elevation Volume Volume Area Surface Area (ft) (ft) (sf) (sf) (cf) (cf) 382.0 0.0 5211 0 0 0 384.0 2.0 9455 7333 14666 14666 386.0 4.0 13170 11313 22625 37291 Storage Volume 1.0 2.0 3.0 4.0 Stage (ft) Storage = KS *Stageb KS = 5767.90 - b = 1.3464 5.0 Runoff Volume Simple M4 Drainage Area (A) = 5.05 Impervious Area = 2.55 Impervious Fraction (IA) = 0.50 Rainfall Depth (RD) = 1.00 Rv = 0.50 Ahod Acres Acres Inch (Rv = 0.05 +0.9 *IA) Runoff Volume (V) = 1 9247 cf (V = 3630 *Rp *Rv*A Water Quality Volume Stage Calculation Stage Required to Detain WQ Volume = 1.42 ft Elevation Required to Detain WQ Volume = 383.42 ft Actual Orifice Elevation = 383.50 ft Temporary Pool Volume Provided = 9957 cf Temporary Pool Surface Area Provided = 8937 sf 1 121 - WQ #6 Sizing.xls Drawdown Orifice Sizing 1121 - Del Webb WQ #6 - Drawdown Orifice Sizing Orifice Diameter= Area of Orifice = Orifice Invert = KS = b= CD= CW _ g= 1.00 in 0.01 sf 382.00 ft 5767.90 1.3464 0.6 3.0 32.2 ft /s` Matt Jones, El 11/16/2011 Water Surface Elevation (ft) Volume Stored (cf) Incremental Orifice Flow (cfs) Average Orifice Flow (cfs) Incremental Volume Drawn Down (cfs) Incremental Time (s) 383.50 9957 0.032 383.38 8874 0.030 0.031 1082 34877 383.25 7825 0.029 0.030 1049 35409 383.13 6811 0.027 0.028 1014 36008 383.01 5834 0.026 0.027 977 36694 382.89 4898 0.024 0.025 936 37490 382.76 4006 0.022 0.023 892 38436 382.64 3162 0.020 0.021 844 39596 382.52 2373 0.018 0.019 789 41078 382.39 1647 0.016 0.017 726 43104 382.27 996 0.013 0.014 651 46206 Step Increment = 0.12 ft End Goal = 995.65 cf Maximum Orifice Flow = 0.03 cfs Drawdown Time = 4.50 days 1 121 - LS #7 Sizing.xls Level Spreader Flow and Length 1121 - Del Webb LS #7 Calculations Composite C Value Calculation Matt Jones, El 11/16/2011 Cover Condition C Value E92 Portion of Total Area Weighted C Value Impervious (Streets) 0.95 0.58 0.55 Open HSG 'D' 0.35 0.42 0.15 Total 2.21 Total 0.70 Composite C Value = 0.70 1 in /hr Ratinal Flow Calculation Intensity = 1.00 in /hr Rational Flow Equation Q=C xIxA cfs Q = 0.70 x 1.00 x 2.21 = 1.55 cfs Total Flow to Level Spreader = 1.55 cfs Level Spreader Length Calculations Level Spreader Length Multiplier = 10 ft /cfs Length of Level Spreader Required = 15 ft Length of Level Spreader Provided = 50 ft 1121 - Del Webb Level Spreader #7 Flow Splitter Peak Flow = 1.55 cfs Pipe to Level Spreader Invert = 390.00 feet WSE = 390.90 feet Diameter of Pipe to Level Spreader = 8.00 inches Discharge Coefficient (Cd) = 0.60 g = 32.20 ft /s /s Submerged Area (a) = 0.35 ft2 Effective Head (h) = 0.90 feet Q = Cd *a *�2 *g *h Orifice Flow (Q) = 1 1.59 cfs Bypass Weir Elevation = 390.90 1 121 - WQ #8 Sizing.xls Surface Area Calcs (85 %TSS) 1121 - Del Webb WQ #8 - Required Surface Area Drainage Area to Basin = 29.2 acres Impervious Area to Basin = 17.33 acres Impervious Percentage = 59% Avereage Depth (Volume /SA) = 3.00 ft Interpolation to Determine SA /DA Ratio Impervious Lower Boundary 5070 Site % impervious 5970 Upper Boundary 6070 Average Depth (Vol /SA) (ft) 3.0 3.0 3.0 2.06 2.06 2.06 2.38 2.38 2.38 2.40 2.40 2.40 SA /DA = 2.38 Surface Area Required = 30,245 sf Surface Area Provided = 61,138 sf Matt Jones, El 11/16/2011 <- from table below <- interpolated <- from table below Surface Area (SA) to Drainage Area (DA) Ratio for Permanent Pool Sizing to Achieve 85 Percent TSS Pollutant Removal Efficiency in the Piedmont (From NCDWQ Stormwater BMP Manual, July 20071 Percent Impervious Cover 3.0 Permanent Pool Average Depth (ft) 4.0 5.0 6.0 7.0 8.0 9.0 10% 0.59 0.49 0.43 0.35 0.31 0.29 0.26 20% 0.97 0.79 0.70 0.59 0.51 0.46 0.44 30% 1.34 1.08 0.97 0.83 0.70 0.64 0.62 40% 1.73 1.43 1.25 1.05 0.90 0.82 0.77 50% 2.06 1.73 1.50 1.30 1.09 1.00 0.92 60% 2.40 2.03 1.71 1.51 1.29 1.18 1.10 70% 2.88 2.40 2.07 1.79 1.54 1.35 1.26 80% 3.36 2.78 2.38 2.10 1.86 1.60 1.42 90% 3.74 3.10 2.66 2.34 2.11 1.83 1.67 1 121 - WQ #8 Sizing.xls Above NP Volume Normal Pool Top of Berm 1121 - Del Webb WQ #8 - Above Normal Pool Volume Storage Volume Stage /Storage Calculations Storage Volume Storage = KS *Stageb 500000 K - 60508.00 400000 Y = 601 --- 09" 5 — w R = 0.9998 b = 1.0953 V w 300000 oa 0 200000 100000 0 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Stage (ft) Runoff Volume Simple Me Drainage Area (A) = 29.20 Impervious Area = 17.33 Impervious Fraction (IA) = 0.59 Rainfall Depth (RD) = 1.00 Rv = 0.58 -thod Acres Acres Inch (Rv = 0.05 +0.9* IA) Runoff Volume (V) = 1 61917 cf (V = 3630 *Rp *Rv*A) Water Quality Volume Stage Calculation Stage Required to Detain WQ Volume = 1.02 Contour Average 359.02 ft Contour 359.10 ft Incremental Cumulative Stage Surface Contour Elevation Volume Volume Area Surface Area (ft) (ft) (sf) (sf) (co (cf) 358.0 0.0 61319 0 0 0 360.0 2.0 68377 64848 129696 129696 362.0 4.0 75754 72066 144131 273827 364.0 6.0 83441 79598 159195 433022 Storage Volume Storage = KS *Stageb 500000 K - 60508.00 400000 Y = 601 --- 09" 5 — w R = 0.9998 b = 1.0953 V w 300000 oa 0 200000 100000 0 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Stage (ft) Runoff Volume Simple Me Drainage Area (A) = 29.20 Impervious Area = 17.33 Impervious Fraction (IA) = 0.59 Rainfall Depth (RD) = 1.00 Rv = 0.58 -thod Acres Acres Inch (Rv = 0.05 +0.9* IA) Runoff Volume (V) = 1 61917 cf (V = 3630 *Rp *Rv*A) Water Quality Volume Stage Calculation Stage Required to Detain WQ Volume = 1.02 ft Elevation Required to Detain WQ Volume = 359.02 ft Actual Orifice Elevation = 359.10 ft Temporary Pool Volume Provided = 67166 cf Temporary Pool Surface Area Provided = 66879 sf Matt Jones, El 11/16/2011 1 121 - WQ #8 Sizing.xls Drawdown Orifice Sizing 1121 - Del Webb WQ #8 - Drawdown Orifice Sizing Orifice Diameter= Area of Orifice = Orifice Invert = KS = b= CD= CW _ g= 4.00 in 0.09 sf 358.00 ft 60508.00 1.0953 0.6 3.0 32.2 ft /s` Matt Jones, El 11/16/2011 Water Surface Elevation (ft) Volume Stored (cf) Incremental Orifice Flow (cfs) Average Orifice Flow (cfs) Incremental Volume Drawn Down (cfs) Incremental Time (s) 359.10 67166 0.406 359.00 60736 0.384 0.395 6430 16272 358.91 54365 0.362 0.373 6371 17084 358.81 48058 0.337 0.349 6307 18055 358.71 41822 0.311 0.324 6235 19248 358.62 35667 0.282 0.296 6155 20766 358.52 29603 0.250 0.266 6064 22795 358.42 23646 0.213 0.232 5957 25723 358.33 17818 0.187 0.200 5828 29096 358.23 12153 0.111 0.149 5664 37961 358.13 6717 0.049 0.080 5437 67845 Step Increment = 0.10 ft End Goal = 6716.61 cf Maximum Orifice Flow = 0.40 cfs Drawdown Time = 3.18 days 1 121 - WQ #9 Sizing.xls Surface Area Calcs (85 %TSS) 1121 - Del Webb WQ #9 - Required Surface Area Drainage Area to Basin = 49.95 acres Impervious Area to Basin = 23.82 acres Impervious Percentage = 48% Avereage Depth (Volume /SA) = 3.00 ft Interpolation to Determine SA /DA Ratio Impervious Lower Boundary 407o Site % impervious 487o Upper Boundary 5070 Average Depth (Vol /SA) (ft) 3.0 3.0 3.0 1.73 1.73 1.73 1.98 1.98 1.98 2.06 2.06 2.06 SA /DA = 1.98 Surface Area Required = 43,162 sf Surface Area Provided = 101,403 sf Matt Jones, El 11/16/2011 <- from table below <- interpolated <- from table below Surface Area (SA) to Drainage Area (DA) Ratio for Permanent Pool Sizing to Achieve 85 Percent TSS Pollutant Removal Efficiency in the Piedmont (From NCDWQ Stormwater BMP Manual, July 20071 Percent Impervious Cover 3.0 Permanent Pool Average Depth (ft) 4.0 5.0 6.0 7.0 8.0 9.0 10% 0.59 0.49 0.43 0.35 0.31 0.29 0.26 20% 0.97 0.79 0.70 0.59 0.51 0.46 0.44 30% 1.34 1.08 0.97 0.83 0.70 0.64 0.62 40% 1.73 1.43 1.25 1.05 0.90 0.82 0.77 50% 2.06 1.73 1.50 1.30 1.09 1.00 0.92 60% 2.40 2.03 1.71 1.51 1.29 1.18 1.10 70% 2.88 2.40 2.07 1.79 1.54 1.35 1.26 80% 3.36 2.78 2.38 2.10 1.86 1.60 1.42 90% 3.74 3.10 2.66 2.34 2.11 1.83 1.67 1121 - WQ #9 Sizing.xls Above NP Volume Normal Pool Top of Berm 1121 - Del Webb WQ #9 - Above Normal Pool Volume Storage Volume Stage /Storage Calculations Contour Elevation (ft) Stage (ft) Contour Surface Area (SO Average Contour Surface Area (SO Incremental Volume (cf) Cumulative Volume (cf) 410.0 0.0 101403 0 0 0 412.0 2.0 109678 105541 211081 211081 414.0 4.0 118237 113958 227915 438996 416.0 6.0 127073 122655 245310 684306 418.0 8.0 136174 131624 263247 947553 4200 . 10.0 1 145534 1 140854 1 281708 1 1229261 422.0 1 12.0 1 151151 1 148343 1 296685 1 1525946 Storage Volume Storage = KS *Stageb 2000000 y = 96578x""' 8 KS = 96578.00 I=. I . 1500000 ' b = 1.1028 d � 1000000 O v' 500000 0 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 Stage (ft) Runoff Volume (V) = 1 86886 cf (V = 3630 *Rp *Rv *A) Water Quality Volume Stacie Calculation Stage Required to Detain WQ Volume = 0.91 ft Elevation Required to Detain WQ Volume = 410.91 ft Actual Orifice Elevation = 411.00 ft Temporary Pool Volume Provided = 96578 cf Temporary Pool Surface Area Provided = 106506 sf Matt Jones, El 11/16/2011 Runoff Volume Simple Method Drainage Area (A) = 49.95 Acres Impervious Area = 23.82 Acres Impervious Fraction (IA) = 0.48 Rainfall Depth (RD) = 1.00 Inch Rv= 0.48 (Rv = 0.05 +0.9 *IA) Runoff Volume (V) = 1 86886 cf (V = 3630 *Rp *Rv *A) Water Quality Volume Stacie Calculation Stage Required to Detain WQ Volume = 0.91 ft Elevation Required to Detain WQ Volume = 410.91 ft Actual Orifice Elevation = 411.00 ft Temporary Pool Volume Provided = 96578 cf Temporary Pool Surface Area Provided = 106506 sf Matt Jones, El 11/16/2011 1 121 - WQ #9 Sizing.xls Drawdown Orifice Sizing 1121 - Del Webb WQ #9 - Drawdown Orifice Sizing Orifice Diameter= Area of Orifice = Orifice Invert = KS = b= CD= CW _ g= 5.00 in 0.14 sf 410.00 ft 96578.00 1.1028 0.6 3.0 32.2 ft /s` Matt Jones, El 11/16/2011 Water Surface Elevation (ft) Volume Stored (cf) Incremental Orifice Flow (cfs) Average Orifice Flow (cfs) Incremental Volume Drawn Down (cfs) Incremental Time (s) 411.00 96578 0.584 410.91 87291 0.551 0.568 9287 16365 410.82 78095 0.515 0.533 9196 17247 410.74 68999 0.477 0.496 9096 18322 410.65 60013 0.436 0.457 8985 19671 410.56 51152 0.390 0.413 8861 21442 410.47 42432 0.339 0.365 8720 23921 410.39 33877 0.301 0.320 8555 26764 410.30 25521 0.205 0.253 8356 33083 410.21 17416 0.122 0.163 8105 49702 410.12 9658 0.055 0.088 7758 88073 Step Increment = 0.09 ft End Goal = 9657.80 cf Maximum Orifice Flow = 0.57 cfs Drawdown Time = 3.64 days 1 121 - WQ #10 Sizing.xls Surface Area Calcs (85 %TSS) 1121 - Del Webb WQ #10 - Required Surface Area Drainage Area to Basin = 15.99 acres Impervious Area to Basin = 7.58 acres Impervious Percentage = 47% Avereage Depth (Volume /SA) = 3.00 ft Interpolation to Determine SA /DA Ratio Impervious Lower Boundary 407o Site % impervious 4776 Upper Boundary 5070 Average Depth (Vol /SA) (ft) 3.0 3.0 3.0 1.73 1.73 1.73 1.97 1.97 1.97 2.06 2.06 2.06 SA /DA = 1.97 Surface Area Required = 13,752 sf Surface Area Provided = 24,297 sf Matt Jones, El 11/16/2011 <- from table below <- interpolated <- from table below Surface Area (SA) to Drainage Area (DA) Ratio for Permanent Pool Sizing to Achieve 85 Percent TSS Pollutant Removal Efficiency in the Piedmont (From NCDWQ Stormwater BMP Manual, July 20071 Percent Impervious Cover 3.0 Permanent Pool Average Depth (ft) 4.0 5.0 6.0 7.0 8.0 9.0 10% 0.59 0.49 0.43 0.35 0.31 0.29 0.26 20% 0.97 0.79 0.70 0.59 0.51 0.46 0.44 30% 1.34 1.08 0.97 0.83 0.70 0.64 0.62 40% 1.73 1.43 1.25 1.05 0.90 0.82 0.77 50% 2.06 1.73 1.50 1.30 1.09 1.00 0.92 60% 2.40 2.03 1.71 1.51 1.29 1.18 1.10 70% 2.88 2.40 2.07 1.79 1.54 1.35 1.26 80% 3.36 2.78 2.38 2.10 1.86 1.60 1.42 90% 3.74 3.10 2.66 2.34 2.11 1.83 1.67 1 121 - WQ# 10 Sizing.xls Above NP Volume Normal Pool Top of Berm 1121 - Del Webb WQ #10 - Above Normal Pool Volume Storage Volume Stage /Storage Calculations 250000 200000 w V w 150000 bA 0 100000 N 50000 0 0.0 1.0 Storage Volume y = 23859x1.1n9 R = 0.9996 2.0 3.0 4.0 Stage (ft) 5.0 6.0 7.0 Runoff Volume Simple Me Drainage Area (A) = 15.99 Impervious Area = 7.58 Impervious Fraction (IA) = 0.47 Rainfall Depth (RD) = 1.00 Rv = 0.48 Storage = KS *Stageb KS = 23859.00 b = 1.1779 -thod Acres Acres Inch (Rv = 0.05 +0.9* IA) Runoff Volume (V) = 1 27666 cf (V = 3630 *Rp *Rv*A) Water Quality Volume Stage Calculation Stage Required to Detain WQ Volume = 1.13 Contour Average 389.13 ft Contour 389.20 ft Incremental Cumulative Stage Surface Contour Elevation Volume Volume Area Surface Area (ft) (ft) (sf) (sf) (co (cf) 388.0 0.0 24297 0 0 0 390.0 2.0 29985 27141 54282 54282 392.0 4.0 36051 33018 66036 120318 394.0 6.0 42414 39233 78465 198783 250000 200000 w V w 150000 bA 0 100000 N 50000 0 0.0 1.0 Storage Volume y = 23859x1.1n9 R = 0.9996 2.0 3.0 4.0 Stage (ft) 5.0 6.0 7.0 Runoff Volume Simple Me Drainage Area (A) = 15.99 Impervious Area = 7.58 Impervious Fraction (IA) = 0.47 Rainfall Depth (RD) = 1.00 Rv = 0.48 Storage = KS *Stageb KS = 23859.00 b = 1.1779 -thod Acres Acres Inch (Rv = 0.05 +0.9* IA) Runoff Volume (V) = 1 27666 cf (V = 3630 *Rp *Rv*A) Water Quality Volume Stage Calculation Stage Required to Detain WQ Volume = 1.13 ft Elevation Required to Detain WQ Volume = 389.13 ft Actual Orifice Elevation = 389.20 ft Temporary Pool Volume Provided = 29575 cf Temporary Pool Surface Area Provided = 29030 sf Matt Jones, El 11/16/2011 1 121 - WQ #10 Sizing.xls Drawdown Orifice Sizing 1121 - Del Webb WQ #10 - Drawdown Orifice Sizing Orifice Diameter= 2.50 in Area of Orifice = 0.03 sf Orifice Invert = 388.00 ft KS = 23859.00 b = 1.1 779 CD= 0.6 CW = 3.0 g = 32.2 ft /s2 Matt Jones, El 11/16/2011 Water Surface Elevation (ft) Volume Stored (cf) Incremental Orifice Flow (cfs) Average Orifice Flow (cfs) Incremental Volume Drawn Down (cfs) Incremental Time (s) 389.20 29575 0.172 389.10 26608 0.164 0.168 2967 17694 388.99 23690 0.155 0.159 2918 18329 388.89 20826 0.146 0.150 2864 19069 388.79 18020 0.136 0.141 2806 19948 388.68 15278 0.125 0.130 2741 21021 388.58 12610 0.113 0.119 2669 22375 388.48 10024 0.100 0.107 2586 24171 388.38 7536 0.086 0.093 2488 26744 388.27 5168 0.067 0.076 2368 30957 388.17 2957 0.044 0.056 2211 39765 Step Increment = 0.10 ft End Goal = 2957.47 cf Maximum Orifice Flow = 0.17 cfs Drawdown Time = 2.78 days 1 121 - WQ #11 Sizing.xls Surface Area Calcs (85 %TSS) 1121 - Del Webb WQ #11 - Required Surface Area Drainage Area to Basin = 23.41 acres Impervious Area to Basin = 7.86 acres Impervious Percentage = 340 Avereage Depth (Volume /SA) = 3.00 ft Interpolation to Determine SA /DA Ratio Impervious Lower Boundary 307o Site % impervious 347o Upper Boundary 407o Average Depth (Vol /SA) (ft) 3.0 3.0 3.0 1.34 1.34 1.34 1.48 1.48 1.48 1.73 1.73 1.73 SA /DA = 1.48 Surface Area Required = 15,086 sf Surface Area Provided = 56,558 sf Matt Jones, El 11/16/2011 <- from table below <- interpolated <- from table below Surface Area (SA) to Drainage Area (DA) Ratio for Permanent Pool Sizing to Achieve 85 Percent TSS Pollutant Removal Efficiency in the Piedmont (From NCDWQ Stormwater BMP Manual, July 20071 Percent Impervious Cover 3.0 Permanent Pool Average Depth (ft) 4.0 5.0 6.0 7.0 8.0 9.0 10% 0.59 0.49 0.43 0.35 0.31 0.29 0.26 20% 0.97 0.79 0.70 0.59 0.51 0.46 0.44 30% 1.34 1.08 0.97 0.83 0.70 0.64 0.62 40% 1.73 1.43 1.25 1.05 0.90 0.82 0.77 50% 2.06 1.73 1.50 1.30 1.09 1.00 0.92 60% 2.40 2.03 1.71 1.51 1.29 1.18 1.10 70% 2.88 2.40 2.07 1.79 1.54 1.35 1.26 80% 3.36 2.78 2.38 2.10 1.86 1.60 1.42 90% 3.74 3.10 2.66 2.34 2.11 1.83 1.67 1 121 - WQ# 1 1 Sizing.xls Above NP Volume Normal Pool Top of Berm 1121 - Del Webb WQ #11 - Above Normal Pool Volume Storage Volume Stage /Storage Calculations 500000 400000 w V w 300000 oa 0 200000 100000 0 0.0 1.0 Storage Volume y = 5585 1X1.0814 Rz = 0.9999 2.0 3.0 4.0 Stage (ft) 5.0 6.0 7.0 Runoff Volume Simple Me Drainage Area (A) = 23.41 Impervious Area = 7.86 Impervious Fraction (IA) = 0.34 Rainfall Depth (RD) = 1.00 Rv = 0.35 Storage = KS *Stageb KS = 55851.00 b = 1 1.0874 Ahod Acres Acres Inch (Rv = 0.05 +0.9* IA) Runoff Volume (V) = 1 29928 cf (V = 3630 *Rp *Rv*A) Water Quality Volume Stage Calculation Stage Required to Detain WQ Volume = 0.56 Contour Average 392.56 ft Contour 392.60 ft Incremental Cumulative Stage Surface Contour Elevation Volume Volume Area Surface Area (ft) (ft) (sf) (sf) (co (cf) 392.0 0.0 56558 0 0 0 394.0 2.0 62475 59517 119033 119033 396.0 4.0 68657 65566 131132 250165 398.0 6.0 75104 71881 143761 393926 500000 400000 w V w 300000 oa 0 200000 100000 0 0.0 1.0 Storage Volume y = 5585 1X1.0814 Rz = 0.9999 2.0 3.0 4.0 Stage (ft) 5.0 6.0 7.0 Runoff Volume Simple Me Drainage Area (A) = 23.41 Impervious Area = 7.86 Impervious Fraction (IA) = 0.34 Rainfall Depth (RD) = 1.00 Rv = 0.35 Storage = KS *Stageb KS = 55851.00 b = 1 1.0874 Ahod Acres Acres Inch (Rv = 0.05 +0.9* IA) Runoff Volume (V) = 1 29928 cf (V = 3630 *Rp *Rv*A) Water Quality Volume Stage Calculation Stage Required to Detain WQ Volume = 0.56 ft Elevation Required to Detain WQ Volume = 392.56 ft Actual Orifice Elevation = 392.60 ft Temporary Pool Volume Provided = 32047 cf Temporary Pool Surface Area Provided = 58081 sf Matt Jones, El 11/16/2011 1121 - WQ #11 Sizing.xls Drawdown Orifice Sizing 1121 - Del Webb WQ #10 - Drawdown Orifice Sizing Orifice Diameter= Area of Orifice = Orifice Invert = KS = b= CD= CW _ g= 3.00 in 0.05 sf 392.00 ft 55851.00 1.0874 0.6 3.0 32.2 ft /s` Matt Jones, El 11/16/2011 Water Surface Elevation (ft) Volume Stored (cf) Incremental Orifice Flow (cfs) Average Orifice Flow (cfs) Incremental Volume Drawn Down (cfs) Incremental Time (s) 392.60 32047 0.163 392.55 28994 0.154 0.158 3053 19296 392.49 25966 0.144 0.149 3028 20372 392.44 22967 0.133 0.138 3000 21684 392.39 19998 0.121 0.127 2968 23334 392.34 17065 0.109 0.115 2933 25505 392.28 14172 0.094 0.101 2893 28554 392.23 11326 0.083 0.089 2846 32148 392.18 8537 0.056 0.070 2789 40067 392.12 5820 0.033 0.045 2717 60814 392.07 3205 0.015 0.024 2615 109689 Step Increment = 0.05 ft End Goal = 3204.74 cf Maximum Orifice Flow = 0.16 cfs Drawdown Time = 4.42 days 1 121 - WQ #12 Sizing.xls Surface Area Calcs (85 %TSS) 1121 - Del Webb WQ #12 - Required Surface Area Drainage Area to Basin = 9.12 acres Impervious Area to Basin = 3.56 acres Impervious Percentage = 39% Avereage Depth (Volume /SA) = 3.00 ft Interpolation to Determine SA /DA Ratio Impervious Lower Boundary 307o Site % impervious 397o Upper Boundary 407o Average Depth (Vol /SA) (ft) 3.0 3.0 3.0 1.34 1.34 1.34 1.69 1.69 1.69 1.73 1.73 1.73 SA /DA = 1.69 Surface Area Required = 6,723 sf Surface Area Provided = 11,806 sf Matt Jones, El 11/16/2011 <- from table below <- interpolated <- from table below Surface Area (SA) to Drainage Area (DA) Ratio for Permanent Pool Sizing to Achieve 85 Percent TSS Pollutant Removal Efficiency in the Piedmont (From NCDWQ Stormwater BMP Manual, July 20071 Percent Impervious Cover 3.0 Permanent Pool Average Depth (ft) 4.0 5.0 6.0 7.0 8.0 9.0 10% 0.59 0.49 0.43 0.35 0.31 0.29 0.26 20% 0.97 0.79 0.70 0.59 0.51 0.46 0.44 30% 1.34 1.08 0.97 0.83 0.70 0.64 0.62 40% 1.73 1.43 1.25 1.05 0.90 0.82 0.77 50% 2.06 1.73 1.50 1.30 1.09 1.00 0.92 60% 2.40 2.03 1.71 1.51 1.29 1.18 1.10 70% 2.88 2.40 2.07 1.79 1.54 1.35 1.26 80% 3.36 2.78 2.38 2.10 1.86 1.60 1.42 90% 3.74 3.10 2.66 2.34 2.11 1.83 1.67 1 121 - WQ# 12 Sizing.xls Above NP Volume Normal Pool Top of Berm 1121 - Del Webb WQ #12 - Above Normal Pool Volume Storage Volume Stage /Storage Calculations 120000 100000 80000 v 60000 40000 20000 0 0.0 1.0 Storage Volume y = 11566x""" RZ = 0.9995 2.0 3.0 4.0 5.0 6.0 Stage (ft) 7.0 Runoff Volume Simple Mi Drainage Area (A) = 9.12 Impervious Area = 3.56 Impervious Fraction (IA) = 0.39 Rainfall Depth (RD) = 1.00 Rv = 0.40 Storage = KS *Stageb KS = 11566.00 b = 1 1.2072 Ahod Acres Acres Inch (Rv = 0.05 +0.9* IA) Runoff Volume (V) = 1 13286 cf (V = 3630 *Rp *Rv*A) Water Quality Volume Stage Calculation Stage Required to Detain WQ Volume = 1.12 Contour Average 403.12 ft Contour 403.20 ft Incremental Cumulative Stage Surface Contour Elevation Volume Volume Area Surface Area (ft) (ft) (sf) (sf) (co (cf) 402.0 0.0 11805 0 0 0 404.0 2.0 15072 13439 26877 26877 406.0 4.0 18637 16855 33709 60586 408.0 6.0 22483 20560 41120 101706 120000 100000 80000 v 60000 40000 20000 0 0.0 1.0 Storage Volume y = 11566x""" RZ = 0.9995 2.0 3.0 4.0 5.0 6.0 Stage (ft) 7.0 Runoff Volume Simple Mi Drainage Area (A) = 9.12 Impervious Area = 3.56 Impervious Fraction (IA) = 0.39 Rainfall Depth (RD) = 1.00 Rv = 0.40 Storage = KS *Stageb KS = 11566.00 b = 1 1.2072 Ahod Acres Acres Inch (Rv = 0.05 +0.9* IA) Runoff Volume (V) = 1 13286 cf (V = 3630 *Rp *Rv*A) Water Quality Volume Stage Calculation Stage Required to Detain WQ Volume = 1.12 ft Elevation Required to Detain WQ Volume = 403.12 ft Actual Orifice Elevation = 403.20 ft Temporary Pool Volume Provided = 14414 cf Temporary Pool Surface Area Provided = 14500 sf Matt Jones, El 11/16/2011 1 121 - WQ #12 Sizing.xls Drawdown Orifice Sizing 1121 - Del Webb WQ #12 - Drawdown Orifice Sizing Orifice Diameter= Area of Orifice = Orifice Invert = KS = b= CD= CW _ g= 1.50 in 0.01 sf 402.00 ft 11566.00 1.2072 0.6 3.0 32.2 ft /s` Matt Jones, El 11/16/2011 Water Surface Elevation (ft) Volume Stored (cf) Incremental Orifice Flow (cfs) Average Orifice Flow (cfs) Incremental Volume Drawn Down (cfs) Incremental Time (s) 403.20 14414 0.063 403.10 12945 0.060 0.062 1468 23847 403.00 11505 0.057 0.059 1440 24577 402.89 10095 0.054 0.055 1410 25416 402.79 8718 0.050 0.052 1377 26399 402.69 7378 0.047 0.049 1340 27575 402.59 6078 0.043 0.045 1300 29022 402.48 4825 0.038 0.041 1253 30878 402.38 3626 0.033 0.036 1199 33401 402.28 2491 0.028 0.031 1134 37183 402.18 1441 0.020 0.024 1050 44050 Step Increment = 0.10 ft End Goal = 1441.35 cf Maximum Orifice Flow = 0.06 cfs Drawdown Time = 3.50 days 1 121 - LS# 13 Sizing.xls Level Spreader Flow and Length 1121 - Del Webb LS #13 Calculations Composite C Value Calculation Matt Jones, El 11/16/2011 Cover Condition C Value E52 Portion of Total Area Weighted C Value Impervious (Streets) 0.95 0.40 0.38 Open HSG 'D' 0.35 0.60 0.21 Total 2.52 Total 0.59 Composite C Value = 0.59 1 in /hr Ratinal Flow Calculation Intensity = 1.00 in /hr Rational Flow Equation Q=C xIxA cfs Q = 0.59 x 1.00 x 2.52 = 1.48 cfs Total Flow to Level Spreader = 1.48 cfs Level Spreader Length Calculations Level Spreader Length Multiplier = 10 ft /cfs Length of Level Spreader Required = 15 ft Length of Level Spreader Provided = 100 ft 1121 - Del Webb Level Spreader #13 Flow Splitter Peak Flow = 1.48 cfs Pipe to Level Spreader Invert = 392.00 feet WSE = 392.80 feet Diameter of Pipe to Level Spreader = 8.00 inches Discharge Coefficient (Cd) = 0.60 g = 32.20 ft /s /s Submerged Area (a) = 0.35 ft2 Effective Head (h) = 0.80 feet Q = Cd *a *�2 *g *h Orifice Flow (Q) = 1 1.50 cfs Bypass Weir Elevation = 392.80 Nutrient Loading Calculations 1121 - Nutrient Loading Calculations.xls Pre - Development 1121 - Del Webb Durham Nitrogen Export Calculations Pre - Development Matt Jones, El 11/16/2011 (1) (2) (3) (4) (5) (3') (6) (5) Area Average EMC of TN Prod ucf of * *1 Average EMC of Prod ucf of Type of Land Cover (Acres) 0.43 + 7.7 I (m9 /L) Columns (2) (3) 0.46 + 8.3 TP (mg /L) Columns (2) and (4) (3') and (6) Transportation Impervious 0.00 0.48 2.60 0.00 0.51 0.19 0.00 Non - Transportation Impervious 1.72 0.48 2.60 2.13 0.51 0.11 0.10 Managed Pervious 28.22 0.48 1.36 18.25 0.51 0.28 4.02 Wooded Pervious 261.78 0.48 0.95 118.23 0.51 0.14 18.65 Total Area = 291.72 TN Loading (Ibs /yr) 138.60 TP Loading 22.77 _ (Ibs /yr) _ Fraction of Total Area = 0.01 = 1 TN Export Coef 0.48 TP Export Coef 0.08 (Ibs /ac /yr) _ (Ibs /ac /yr) _ 1121 - Nutrient Loading Calculations.As Post - Development Overall 1121 - Del Webb Durham Nitrogen Export Calculations Post - Development Without Treatment Matt Jones, El 11/16/2011 (1) (2) (3) (4) (5) (S) (6) (5) Product of Product of Area Average EMC of Average EMC Type of Land Cover 0.43 + 7.7 *I Columns (2) 0.46 + 8.3 *I Columns (2) (Acres) TN (mg /L) of TP (mg /L) (3) and (4) (3') and (6) Transportation Impervious 57.64 3.76 2.60 562.85 4.04 0.19 44.30 Non - Transportation Impervious 68.36 3.76 2.60 667.53 4.04 0.11 30.42 Managed Pervious 105.78 3.76 1.36 540.31 4.04 0.28 119.80 Wooded Pervious 59.94 3.76 0.95 213.87 4.04 0.14 33.94 TN Loading (Ibs /yr) TP Loading Total Area = 291.72 _ 1984.57 (Ibs /yr) = 228.46 TN Export Coef TP Export Coef Fraction of Total Area = 0.43 = 1 (Ibs /ac /yr) _ 6.80 (Ibs /ac /yr) _ 0.78 Allowable Nitrogen Export = 2.20 Ibs /ac /yr Allowable Phosphorous Export = 0.50 Ibs /ac /yr Excess Nitrogen Export = 4.60 Ibs /ac /yr Excess Phosphorous Export = 0.28 Ibs /ac /yr Amount of Nitrogen Requiring Treatment = 1342.78 Ibs /yr Amount of Phosphorous Requiring Treatment = 82.60 Ibs /yr Minimum Onsite Treatment Required = 40% Amount of Nitrogen That Must Be Removed by Onsite BMPs = 537.11 Ibs /yr Amount of Phosphorous That Must Be Removed by Onsite BMPs = 33.04 Ibs /yr 1121 - Del Webb Durham Nitrogen Removed by WQ Ponds Total Area Draining to Water Quality Ponds (1) (2) (3) (4) (5) (3') (6) (5) Area * Average EMC of Product of * Average EMC of Prod ucf of Type of Land Cover (Acres) 0.43 + 7.7 I TN (mg /L) Columns (2) (3) 0.46 + 8.3 I TP (mg /L) Columns (2) and (4) (3') and (6) Transportation Impervious 40.16 4.14 2.60 431.77 4.45 0.19 33.98 Non - Transportation Impervious 60.31 4.14 2.60 648.40 4.45 0.11 29.55 Managed Pervious 108.33 4.14 1.36 609.22 4.45 0.28 135.09 Wooded Pervious 0.00 4.14 0.95 0.00 4.45 0.14 0.00 Total Area = 208.80 TN Loading (Ibs /yr) 1689.39 TP Loading 198.62 _ (Ibs /yr) = Fraction of Total Area = 0.48 = 1 TN Export Coef 8.09 TP Export Coef 0.95 (Ibs /ac /yr) _ (Ibs /ac /yr) = Nitrogen Loading to WQ Ponds = 1689.39 Ibs /yr Phosphorous Loading to WQ Ponds = 198.62 �Ibs/yr WQ Pond Nirogen Removal Rafe = 25% WQ Pond Phosphorus Removal Rafe = 40% Nitrogen Removed by WQ Ponds = 422.35 Ibs /yr Phosphorous Removed by WQ Ponds = 79.45 �Ibs/yr Nitrogen Loading to Level Spreaders with EFS in Series = 1267.04 Ibs /yr Phosphorus Loading to Level Spreaders with EFS in Series = 119.17 Ilbs/yr LS /EFS Nirogen Removal Rafe = 30% LS /EFS Phosphorus Removal Rafe = 35% Nitrogen Removed by LS /EFS = 380.11 Ibs /yr Phosphorous Removed by LS /EFS = 41.71 Ilbs/yr 1121 - Del Webb Durham Nitrogen Removed by WQ Ponds Total Area Draining to Level Spreaders (1) (2) (3) (4) (5) (3') (6) (5) Area *1 Average EMC of TN Product of *1 Average EMC of Product of Type of Land Cover (Acres) 0.43 + 7.7 (mg /L) Columns (2) (3) 0.46 + 8.3 TP (mg /L) Columns (2) and (4) (3') and (6) Transportation Impervious 1.22 4.17 2.60 13.24 4.50 0.19 1.04 Non - Transportation Impervious 1.08 4.17 2.60 11.72 4.50 0.11 0.53 Managed Pervious 2.43 4.17 1.36 13.79 4.50 0.28 3.06 Wooded Pervious 0.00 4.17 0.95 0.00 4.50 0.14 0.00 Total Area = 4.73 TN Loading (Ibs /yr) = 38.76 TP Loading 4.64 (Ibs /yr) _ Fraction of Total Area = 0.49 = 1 TN Export Coef (Ibs /ac /yr) 8.19 TP Export Coef 0.98 _ (Ibs /ac /yr) _ Nitrogen Loading to Level Spreaders with EFS = 38.76 Ibs /yr Phosphorus Loading to Level Spreaders with EFS = 4.64 Ibs /yr LS /EFS Nirogen Removal Rate = 30% LS /EFS Phosphorus Removal Rate = 25% Nitrogen Removed by BMP= 11.63 Ibs /yr Phosphorous Removed by BMP = 1.16 Ibs /yr 1 121 - Nutrient Loading Calculations.As Post - Development Summary 1121 - Del Webb Durham Nutrient Loading Summary Post - development Nutrient Loading Total Post - Development Nitrogen Loading = 1984.57 Ibs /yr Total Post - Development Phosphorus Loading = 228.46 Ibs /yr Total Nitrogen Removal Required onsite = 537.11 Ibs /yr Total Phosphorus Removal Required onsite = 33.04 Ibs /yr Nutrient Removal by Onsite BMP's Nitrogen Removed by WQ Ponds = 422.35 Ibs /yr Phosphorus Removed by WQ Ponds = 79.45 Ibs /yr Nitrogen Removed by LS /EFS in Series = 380.1 1 Ibs /yr Phosphorus Removed by LS /EFS in Series = 41.71 Ibs /yr Nitrogen Removed by Stand Alone Level Spreaders with EFS = 1 1.63 Ibs /yr Nitrogen Removed by Stand Alone Level Spreaders with EFS = l .l 6 Ibs /yr Total Nitrogen Removed by BMP's = 814.09 Ibs /yr Total Phosphorous Removed by BMP's = 122.32 Ibs /yr Amount of Required Nitrogen Treatment Provided On -site = 61� Amount of Required Phosphorus Treatment Provided On -site = 148 Remaining Treatment Total Site Nitrogen Loading After Treatment = 1170.48 Ibs /yr Total Site Phosphorous Loading After Treatment = 106.14 Ibs /yr Total Unit Nitrogen Loading After Treatment = 4.01 Ibs /ac /yr Total Unit Phosphorous Loading After Treatment = 0.36 Ibs /ac /yr Excess Unit Nitrogen Loading = 1.81 Ibs /ac /yr Excess Unit Phosphorous Loading = N/A Ibs /ac /yr Nitrogen Loading Requiring Offset payment = 528.69 Ibs /yr Phosphorous Loading Requiring Offset payment = N/A Ibs /yr NCEEP Nitrogen Offset Fee as of 7/1/11 = $21.64 /lb NCEEP Phosphorous Offset Fee as of 7/1/11 = $134.23 /lb Nutrient Offset Period = 30 years NCEEP Nitrogen Offset Fee = $343,226.19 NCEEP Phosphorous Offset Fee = N/A Total NCEEP Offset Payment = $343,226.19 Matt Jones, El 11/16/2011 Required Maps and Information u11IIIIIIII IUIU I� VIII . ■ w IIII III 111 1 1 1 „'a u 1 III,, III. .'Itllllllpll III „.. IIIIhIh11911111111j ���� ..ell ...IIIIIL. ll „' „III lu .. I 1111 ullulll ., „, ,. "111. 1 USGS MAP S GS 1 SCALE: 111 = 500' 11 1 I � ■T 1 IIIIII °° III IIIIIII 'III ,., .IIIL. .' III ._ 11 .III III IIIIII,. II IV ell Ill1 111 ihIIIIIIIhI111111I11° I �IIW .I,IU1111 111 mu1pl Illlul ....... IIIIIIII III ul 91 �P u' IIII L. II' Ills I II ,,,III II „, ell Ill ■ „ II ul "u ell pIIIII 1 ,11 �11 IIIIIIII III p "' I IIIIIIIII Iu ur ^" ,IIL'I'ull'llm IIPIWI UVV III1lgllpll III^ 1 IU 1u hllmllllllll ''Ih1 L111111111111 „, IIII'u ,II 'III IIIIII ,1111 r 1 hl1 lu ���, u1 1 u ,..���, VIII ��Illillll III 1 u1u ��� 1 II VI VIII III11 I 1 ....IIIIIIIIIIIII ... VIIIIIII��������.,,, ������� „������������� „����.. ������ �� II III IIIIIIIIIIIII IIIIIIIIIIIII . • „ ^' „, IIII IY „,�� „..,I• �. ��� „�� , �� a VIII hill IIf 111. ".IIIIIIIII ■ I II II II u u II ■ III ,,II rrl8d "I u, 1'Ilgl'Ilul''I I VIII d IIVII IIIIIII II ..II • H�RVATH .VIII IIIIIIL 1...1111 111 ,III. 11 . ... 11 ii. II A S S d C I A T E S °11,11 ,' „,II„ „,III, ° ^ „^ IIIIIII ...IIII IIII- IIIIIIIIIIIIIIII II II III �� ”' "' • 16C NS lILTANT PLACE,SIIIIE`Al II ���uI �..��� ���� IIIIIIIIIII... '���. �����.����..��� Sul...,,,,, ����.... .����������������������������I� • RO —M NOOCAE .SU . TELM 1AP LI L21 „I II EE— P423,266,4990 11423,266,5]W u�i..u. IIIIIII ''.��lul..,, III • wwWY�nwlNmmtlTeso■n mwuI ... ...mui iiiiiiiiiwll.mwuu" °iI "'III„ „ulis.,m °1 I IIIIIIIIIIIII �' "' "'lll.� uu,uuu IIIIII IIIIIIIVumulll ° °01IIII ii,.Il uJu1111 .. IIII II I II IIIIIIIIIIIIIIII 1. 11'1'' 'III' L II III IIIIIII II III II °6111IIIIIIIIII UI IIII IIIIIIII . II u1u1 Iq °6a II .,, III IIIIIIIIIII° ° °," ACTIVE ADULT °III,IIIIIIIIIIII II hIIIIIl1 COMMUNITY luulllllllll . 1 u II +' II 61, .IIIL IIII 111 ullq 111,111, ���.�� lu 1'111 LEESVILLE ROAD ILI DURHAM IIII III I,IIIIIdull 111111 I IIII° 1 "IIII NORTH CAROLINA II °Ile °'' ^ "' " „,II, L..IIIIII IIII I IIL. cull . .II I IIII II II,IIIIgI • USGS I 1 MAP ullpl�dIIIIIIIIIP�� ,��lul�ll,'ll �rald,, r�llullll L” ^III I II II 1191 'l rI11111111111I III IIIIII 111'...... ul Vu .IIIIIIIII IIh1 u11 .' IIII „IIIIII " " °.'^ IIL,,, .,,II h1 11' II III „I,,,,... ■ III .IIII ., 'u IIII „1 „III' IIII L.. uIIIIIIIII” II III uu IVI" 1 „„ 1''uIIIIIIIlllmggll ° 11 u11lllll Illlll rll ' „,L, IP ° "'unl. „„ °IIIIIII IIII l ill III�� .IIII � "'III IOIIIOIm mu uyl,yV L. hl III h1 .Illdf IIII 4111 rr Iu 1 vl .IIII III. u', „dl IVVII '' �,..�, 1h1 IIg1 uu I Ilullll II . , �I III mn IIIIII �..I,,.,, „,,,,,,,11111 IIIppV11 L,.. ��� ...� „, °pIIIi1u111Il1IIlII1 •IIII lu I. .L. 11glgl VI I I uoIIIIIIIIuuW ol'`S�IIIIIIIUOU ^ uullllllllll�llllluml ,IIIIIIII,IIIIIII ..IIIL.. „ „„ „,„ „11111111 u11IIIIIhuIIIlu1' „ „II,,° ",,,,,,,,,,,,,IIIIII hullllll 11„ II a u III I I IIIIIIIII "'I'll'ly u 'Vl�mu L� I III ullll II. I III III IIOi''LII m IIIUI Iglu r., m����� '6;�ill'OiIUI�u111uwI,lu�,,,1 � IIIII II II 5,,, +III •IIII I���II,I'ulllulliu llllulluull" ��„ ��� ,ILL,..������������...�IIIr�I IIII 1 „pl ul III II'I� .III lu Ilul I III lull uoll uu11I II I II lull) Illlu ��� ����� w � II �, ,� �� „�, IIIIIIIIIIIIIIIIIIIII Illllllulllu ��� 1111u11 ll����������� a �� •IIII uu1 .,,.,,,,Il,r^ IIII ul 1 IId s III °III° ell I IIIiuyu u `'m Illplllll III u IIII ' Pll I .. „'111, 1 IIII 1111111 1 9111,,.. ,, IIIIII a .I 1 IL. dIlllb 111111111 •IIII„ „ „, "'I,1 11, +I' °I I II 1111 1 IIII III u ' III .IIII IIIIV 1911 IIII 1111 11 1puppol Illllm .... 1 ul IIII Im,11 I llpllllll 11dIIIlIIIIU. IVI' °I °IUpp Illlul 11 I III 11 111 911 II IL,, , III hu1. l 111 IIIII I "I 111 111 a (IIII IIII V1111 Illlull 1111111111 1 I u,.,, L .....1..11.1 ....I. lI lu luul III Ills IIII. I I 11111 °III °11111u dl Vu ���i'I IIIIIII IIIIII 111,umuIIv111 IIII I � vl °hq 114 uu° Illuum ^� „� III 111 a IV puuuuuuuumul ^I uoIIIIIm .,,1 „ " "' V lull Iq1 111 ^I q1 II, u a 14 III, 1111 '1 „„ III„ b II° ,d° .u11111I11 °I'Ip1 1 'I °I III III 1111 a °61IU11111 I III IU . • oaAwn an enKxeoar, ,1 II II 1 1111 Ills myuVlll u 1 M LJ III o..E 11/4/2010 o�Ea 1.1 =500' z 0 250 500 1000 I� .}10067 (� 1 SCALE: 1” -500' ll $nf�NGJ I H ASSOCIATES, PA ANY REPRODUCTION WITHOUT PRIOR WRITTEN CONSENT IS PROHIBITED �'�' y- i��>.- -,s`. � v-�< � � s sn :t.: �� �. �>�r, r- � f'„ e_ r � i� • r�,�E �� �� cW • � e 7- � ��`�? - *` a, i- ^F, � i - vv� r�.v.�•e't >� ssra� v,.v a- ?' r - ,cf�._ .'jam: ��. ti " -- •es`�_ _ _ > y'; �.,,� ,t_r�yF'si>F::w -s _ 3 y-i '�� - � .� "mss _ '3 � -#�. -�E - ".,C`sti.Yr,c.:• w..3;.: ��:.� '=.G }<_ � - �?��`�x -_.w� s ,� �: -� ������ - � S.v''"_ "u-. -. ��. - � _, -sue _ •_''' _ rc > �>E.s ;'' -=r2i r - {_ �•L�= L - "�]'� 3c' ��i�'�1 - Am mg HORVATH _ "� - •= a�-'� y - �� - - °s. _ ` _ -mot - -/ _ ,< -`�' -v{� `��' ,r. �� .. -..��- _ -'�':> ,R: - -�zc�• � r'kv c�''� _tx ..2.� � - ..'YSl: >c:,. ~+-L�'�f' �"�_ ,S- )� {. -z _ -7 a �' _ - zr� - v� .Z • <�£e�. _ _ . '�`�zZS�?Q�,�r �`,� � • �� •sac '�- ? .-vim- - �. _� -• `. S._ ,_ � . n, � � �. \ate - ". � r-' ' r-c.^ � ,� 'L '. /- - - ,yitb - z._ =34•- .r;.a= z'.._�w- _..z,•. -.�- `i,. �t,y s'r -r '� ^ .ti�'3�.}ft�> _ � r� - -�x`E- % �'.�li:s s< �� A $ $ 0 C I A T E $ " '� a•` _ 5�!� �������� _ - 'S �� ` � _t. =_'"" - z F tivc� -� r=id �.fi _ �"��a' �" � `�"� _ if -� r y - a.:Y "{ tct'F- ff` - ,5- - _uA• - - l -: /�'" S / - a C` -': f la COt :5u 70.1it PIP.CE �1TE2]1 c .� ?. �_ s - a, �� � � -.�� •�� � ';;- i fi -9„oE - - , 8� � r �!. e u�a a a � - � r `� ' � � Y- .•�,'. �,-= 3.. - _ < � :a.�� - -�'- - � `t�c i' r v ` a��'�,s`rs , �,� oi, t �o��rl ai 7 7 ' - �! J>^ - ��, <Y- X .3. � a2`. ^.._S' 4 _ _ �`'� � ua::` �'•`�`-' •� ✓: � '�1 '�y$.'���.- `��,°�-�1 xP_�h,<- 5.. f_ . F P919A7OA;S4 1959.47ObG53 .a�ti _ vl.," F" _ '�'> _--� _.- ✓j -.- ` v? S'C �� - S37 NA4 f,EI 51Fffi PY ELl2] <><.: - `y �° ,c:. - .>r,` )c _ Y '�- •-. f - -. 1 Kam. `�' "l �_{, CNAI k=G.y1B.':MEE 374)1 'C - 1ta .,.'...1 -.�.s - .l _ �= ?' - �S]; �-^� `y, 5 ".vT \ Ems.: _ �,'f -" -- • ,T Vv ty -� > ~"� 4 ' ��� r=� �:� � ''-- G= l,:- :.�,3.J �`r a!l _ 5 f e13255.5rS? t e - 6�� _- . �. �� :�=:� _ - - era '�. - ixrr -s:� i - -� - =�'1`-• -� •. -- f;-x�_ .� ' -'�'rz - _ = 5,-.: `� _ ,``- _ -� . -Q s - � w � '.3, .� ... _ D _ ' ?'� � _ :'L�f.`P^ '� .1• �S �\ �.. 4� � „- ��� I �;;`_hG __ !_ s. _ ,t k- .Y� y- ��'[ � � a � a, '.� _ r -mil �s: � - '� �s -�`.- _ ti•'�:rc��?• -,� .. � a - ',a` -�-"`- s >u _3 �.� ,`�Y .ter -i:t r�?T„ --� c c` a ':L' t � a"c"��- "— l". - =-,3 f: � _ _ '� �' 'm c` -� ii--"' Sf ''ti � � .�. � � �`-' - �'�, •y - ;t 1� �3'� -6 ,mot- x� --� +F > �::° ■ -'' s,. - ��`' „1. - �'�"� r-? = f^- �--- �r.-t� v- .i'wv..Cs •.rte _ a Jw�; "��"._Tv: fF ��4-x� �. "`s�? /`- �,� - "` _c.�. -. , tom_ _ - t. xx� �- - �• ��� �?<. �,`F . •,� r �G ,.�-�; _ r �. -e:�'- ''Vii; s' y; ,_ = � >. R - r. c c.,..•. �'�_° 2: =. .a��' �i�" c_.- _'"r<aY _5,�•.< ',�•�• _�-.- s � t;" .���Y.��;,- '�a ,� "i ` f � -.r�'L f'�'".>� '�".Y�- "'il+ti�' v�cG.} •'i''i.��' �'yc- = ` -�iFSY ''-U' a`)�� �> .j-:: _v:F..: ^- � '. - - � -�: x - �=4'.�Yi =��,�• _ �� DEL WEBB - 3'� Y �3 p `�' 'Y �` .'4 r�'t '�i-S 'it ��"'�. ti -�'l' � /:'� », t J> '_ "}. "mow✓ - _ - K- - _ _"'Z4'c:� -. � �'3?, -''_ .' '''�s .- ;� =� e "�,c.`:: ;�,• �a fir" �:� _ -_ram _ `-4S� - - t, - K 4s' - - _ �a: : ,fi)� tom„ f �_ � � Gn':k -• _ � { ) �- �.i t,�"` J _ - $.,�tt 51�" i� L� vim, � =v-• i c`�.,�`� -�ha. fi .��" - tr� � f r -_ >'s�''i,. � �� - - - ' � , < % ; � -� - - v i - . Y . ✓L �S �sF /�` . r-.� -�✓�te.�` a • . }_�zS " x D , -- , `-� - ~G' `Z ' - -� ��, <. - ?} x - ` _ � . � ':- G`'} .y i- . � '- : ''}�.: `�i � !r� . � t - ? e y r.r3 - 'te: � s< -r.-"r N�, . .• ` -� . : ,� � L,L :•�C��S- '.rr� t .��,��{Q�: •. - ��. : - �-����r� y- r C = .` ' -k +�. - - ,r^ � �J�i t%� 1.',i>� ;- r ro � t J. :s, s -! ice _ '`% � i�"t. �' x : Y _ -.x. � � T �r ' �- .. z 3 Y : « ' mo)' t � = �. �`€ ' :`: � : ,'� f -r�'_�'. '•9<r : ' w�rf� -lt .'1F�`�T-. `•�. . LEESVILLE ROAD DURHAM no-us NORTH CAROLINA - 3 - � SOIL MAP a <� �•�, b , `n - �:. r� - � &"- h= ��:•�,. ter, --C. c �- •a-y= ter'- s � _. -a-, ,a t , r- s s - " �• .- .r_A^- - '2r� fib. -.:cs- 's�Is" C- iF.. �• `� -�z.- ��'�, . _:� , � , ` � ' <�" �, - :s� c,�`�- � �.' tom. •> k � - -��- �f• _ r� ..� r y �.: fti` ;;mot 'ice e. - tix3 .rs_..ti' .>.• ,»-r 5, .<s� �.�'., _ �",s y-�'� - 1 `.' �; mss.. • z,: - „r- > _ '-� _ T >�_ - ;-.. : Yr'- • -:�zW � �r - MR- ISM, -4th �L^ �, -<^^- �:,_'� - ..ic..•:,� S. - 4 ....:,- - ^� i./, � ? .. .� Ai"z --µ t �;.fs�`r -.:a; _ -,P� T � _.a _ ^ + -a�fs. :�,w ,k-:� � 7..,� _Sts= �` .� Sara /� - ",- •c`t,` . - - - - - �,. rte• 4 - ,Ffc.-:- >73 � �z� � . - - .. }., ii'-'� ' .�i�,..- Y � -�!• - _�•� -v_ _ .r -ice' '<� � - - ' °..fir- : � < _ - ��s�'r': � ^ =t s� •. s.^'_ �- _ :� r: � __ _LPL` M M 1. ..�. ?i_ €?.cs <-•a :3�; ' r t . t -.1 / � - `a.,- s..yc• , :'srr�:� " -:C-� ..s: :- a c . _. _. si_ iF%;c ��'z �� J,:r �f. .� - i \� SY o.G4': r�n�f�:w -F._.. :- r��`., •h_ :2 "�,- /vr:4� >�. -::- f _ "=�- 1 ." ;r.�"°'�� w --Y "° -t - ';•- iS -<<> -r _ _ ':� zf_.� ,y r -, , .r___ �� - ,'""J, �o�' -... ,:Cam '.> - -a :`-;`: � �:�f .,e .>,'•'��,�:Y;rs����< -� re .a,..:s. 4sti¢., - -U. ^F --� ". - $+ -c`• -. t^�l^_5.� t_ `, vr�: F.i -. ..�3"d-� -S' .Ca+MfN:�'R- r-�"" >, - s �L, -''-�. _� -•.>- - _ ,-� , �C. 6-� -'' ,� - � ."-cam - ,�` � ' z - ==-z `� - � � -`�- •_.� -.� - �� M �.. , --.� . �, ..fir: =� - �� - � -^ate _ - �„-�.� �••' :�s-- c_ _3== : �k i-. ` + � c?s"/a -e ..:. `� S*'ca.. '�raS'' :f:�,o•`- „r: w,,, �- �'3-` � . c e.�? ' -`4a., '• .�' 7k_ _ � � `. ,tea - _,Z' . Z.c'- � "��._. �,c- -- � k' f- -•�. - >.'_ - t: .sy -. �a sue. r�3'c`, x _ zG'�„ .cwi. -.'-> . �5 �M` _.y y `'- `;�_.'- f! `ta - � .� - +'f ':Y:. , ti _ ^«mss,. , <• � -,.\ '� - - �`- .c+'. -°"-c- GH � a'F �.Y: \`4 11 - .5'.... '3: G'7•,. - -,^ r.�cS.,.. Y`.Y N" a ' ,�` 'l ^ - > ham_- :�•: -",�- _ Emma s,x�y��� � :•-� . � " 'S, - r.r' •$�` -�- ° ?a.. ' , unA, �-J" "'x;, .`-{ -- 'ti - h . [k�,,F" ` - 2 Y .tip Z Z..Y.�. ' -.ti . 4a�'r • ,- use.' � : � > - - �- r% :� s <.: _ .<.�'^`ti"`'�"�,„- - - --- -`�- }`-'y^ -.ter- = r. �` .-<. '_a`` ' "i� - : � � y •r - � rn_ -.�. ;_.t„ .:��. -- � L -.,x .,ate - -. - '�%3 - £ - � _ T � L; -� - � - SF d'` -!- `'i._ - `,fi:• - - •fir -.. i'r6 ��' - :.s - ,`� � mac.. _ * � _. •. -.�$'= ' 3; `.v r., < �'. 7 - ..sc -' �. -c:y�: ` .fir,: �M � �-�ZZ - - -�Y -cZ'zr . `rr- '�.�"•. _ c- c.�".�` -%-� _ "� n.. ��,- s:�''= � ';`� -�' q�x .r -r "��. _. �. �. c•0.c.�s:_ r 8 ' � � �.' - - .?.rte'? x - �'fi `% _ . � _. .,M• _ `� '.�'�`' � -:-T :", s,.-:.9n - "� <� -mss `"do-- -x" �� - - oiv1L.1 on•E 8/412011 lulE SOIL DATA IS FROM USDA Q L MAP ,`= SOIL SURVEY FOR DURHAM 0 250 500 1000 Z F °�'�112, COUNTY, SHEET NUMBER 33 SMl SCALE: 1" =500' SCALE: 1"= 500' S M I QOOPYAA>lii 2007 TM DOMWDff AND THE DEM ARE THE PR0PERi1' OF HOWAEH ASSOm Es, PA ANY REPROOL 110H NT Mff PRIOR M4dT1E}E CONSENT IB PROHMM Y� m x k.ri m n i = S•1C- � r - ■ L ■ 1 N 0 a m m m b. Aj �$ HORVATH �1 —I Auixg, A S S 0 C I A T E S _ _ 16CO NSULTANTPLACE,SUEAI • •- {1 _ _ • DURHAM, NORTHCAROLIN42 _ J' 'ti' +'. .� .y{ P9194904990 F919 4908953 • — YL[ • —MARCETSTREET.SUE- �. _ • CHATTANOOGA,TENN0EEW" P4232&4990 f 423,2&&5 TY 49 WNWHVTVNIXmtlTesmn � is •= —'. � �- - - ACTIVE ADULT COMMUNITY fl9� ■ ■ LEESVILLE ROAD DURHAM -r. NORTH CAROLINA �. ` �; •� FEMA -- _ �� - E. - ,�� �.�+ � 1 -_ �•�t? -- -- - MAP Rpm x•' 6 may... _ - y - R �._ a j ` ; • _ - _ _ - r �'+, Cyi �s � F ti � • •s � O y _ _ v 4 - SWE 7 % - m' . rt, - yC• _ +y . S F I mill I I �MLJe ' oA.E 11/4/2010 FEMA MAP FEMA MAP NUMBER: 3720076900) F 1 SCALE: I" - 5001 EFFECTIVE DATE: MAY 2, 2006 Z 0 250 500 1000 snF Ram 1067 SCALE, 1" -500' F1 ®COPYRIGHT 2007 THIS DOCUNENT AND THE DESIGN AID THE PROPERTY OF HORVATH ASSOCIATES. PA ANY REPRODUCTION WITHOUT PRIOR WRITTEN CONSENT IS PROHIBITED ' / '-- I 1 � � �4 -' v ) /-I-- \ � ti /� �\ \ r 1 / \ � I I ; - -f; -/ / /rr -- , 4 \ \ �J\ --\- r. � f \, � IN'�:7 ) // I ( 7 ) rte` \\ \� _(\ �- \ �ir F(\ r / \ �— \ \_ // III -', -1- " -1 *11/ / / / I '- � � � o / ,\\ —� \ / \\ r � � ��/� �� t ^ L \ \ �' ) \ \ \ / �1 �� � f '// r f , : • � �`� > X11 'i f l° \ (�� I r % \ \ 1 �\ —� � —f / -, / /l �� t \ 1 \ / �4\ \\ (—\b\ 1 I \ /i \ ( � — — � I \ _ / l 1 — l 1 f �� // / / " \ \�� / `f�,_¢___ „ / \ \ .\ r �,/ > > r� , -\\\ \ \ �\ \ r- � --, -/ ,5� /f1 � J ^ �<<- / t �\ i \ \ \� \ / J \ r // i� J \ I r J V' \ I �- \ \ -'-<-z' ' / � \ [ — ,-,- i � Q \" - U. \ \ rte' / J 1 / _'' - / \ X/ � / ( � � l 1 � �)\� P 1 � ��� � �� 1 � --� r, II � � ;; S -� ) \ } \ 1 � � \ 1\ } I � \ L \ � ` � 1 (( / � � � / / 1 r \ / I \ \ / '` 1 1 \\ \\ �\ II \ \ \ " \ `� / f l l / ,— \\ �/ �� \ (/ t 1 , 1-� \ <\ I \\ -- > 1 X11 1 \ �� \ :/ ( ( V / / \ 1"e Z- / //JJJJII ' \ I 1 \ \ L , / /^ / / // l I 1 / l \ ) \ \i IIf/ r �� \ \ ! \r I y V \ �J �� I r / c \ `\ 1 / 1/ /\ \ j \ -�-� r / / I I r \\ i —'I �'' / / /i\\ f 1 i ��) }/ r ( �)"' \ ( �`-�\ \\ ( \\ 1 S l � \\ \ \ !`l // (I \ \ �-- 1 / ,I I / \ f I ,,, // {/ / \ / /J --� � � -' J 1 1 I 1 -, ./ \ \\� L \ / f S �� ' �3 -jam 11 J \ )'"j '{ / 1 1 ,\X ��� ��� \ \ , . I - f l l l / / \\ I /I \ 1 / III /,�\ \ , \ > / I J (r \ \ \ / �)'/ % / Z -- f ,� -\ I \ t ,- 1 /' I I 1 t -, — -- -N : 1 ( (\ _ 1 / ) � f / ,, _j \ �- \ 11 / // I 1 \ / / J \� \ /" / / \ I / /� f ; II I_, / ;; / \ \ �' I� \ 1 : �- jjy 1 / �� -- -- / I I t� \ 1 V / ,\57 )r \ \ / / /�) '\\ \\ \ I -, �`` / / / -'1 i I `1 l 1 ,� 1 { / �\ �% 11 // / r \ � /�/ e \ � f � ----, � \, �n \ \ 1 ✓ ■ ( 7 `� '1Z J /\-t \\' � �� 1 / r , ; r $"" J; ; ` I ," �\ -.� / I \ I / \ f (+ �� -^�.- �� �r f� �� / / 1 \ V ) ---\I. \ \ /` /,/ I I } �. �\ 1 ( / } \\� a 1; ; ; /-, r , . \ J ( Ir, , , ; f,' ` \ ,/ \ \� -/ �\ \ \ \\- / / �/r / I / / ,� _ __ , -, 1 I } ( \ \� / I -� l ( z - � �; `� �,, I° � -°;,, \ ,% 1 r� I 1 IV) J ,\ r \ /, l t / < < `. \ I k .� �r \� / I- �I� A ��/ i TC rn �* \\� J _ - ,y Y r l r 17 i I/ r . <<� _ \� /i �� r' r/� \ \ \ 1 J/ / '/ f � l I \ / / / 1 I ( . \ 1 _ SHEET FL W C II J ■ i - -- - - - - -� LENGTH 75' r / % \\\� :] � N" / -\-\,,-,\\-\-,-,, . e ( __s 'I-, --) \\ ----, .',' ) ( L-r , , `�" ---, I ' I I, \ K — -- e�) / - � 1-4 — ) / -- — � � -- --\ \\ "- , �� "', -" --, -- -I— ----, ,,)/ / ) � ", ---�) / -/ / / ) '\ ) x I-- " ) �--� "�� I � '-- j ---7�� I "- - � � \ '� --),j ( / - - ) /' � ) i ( � \ ( ) \\'�\�� --- - ---, \.--, -/ /- \ N�\\"'\� �) , '-\ '-- -*--, -- -- / ? � � / � --) �/ i)� / f I I -1 / // , -- - I 'A� j / \ I I -1-1 � -"' ) ---) >\) -1 r- \1-1 --- . - --��� // / ) \ � I I �' .1 / j I / � .� "- � \ --�' I / , j j / \ / / 1 f r 7 ✓ \ \ 1� rr <� 1 - - -- - - -- T� PATH - -40 - ter' /� �/r� �- ks 4-1 �o . / / 1 / ` �' / �°/ 1 l \ \ \ ■ `\ �/ 3 / /-="`1 Irr `� fi , u rr, r `� ` , \ �„"" , +l ♦ I � "" _/ ` Q / /�/ / , \ I „> �, u� _ li C-ONCENTRIATEI��L�W `� �/ \` 1 1 l / \�\ 1 - -f i r r N T 9 -Tr rl ` �_ -� % � � \�r� / \ , / % �� / ) �/ \ 1 \ • C \� \ � � \(j)\ + I � L- I II r Ir 4 \ v � = - -- �` �j // / / ��\ / 1 I � 1 \ \ ) i 11 1L -- _ — \ -17 - - ---- —� `rte T/ —� -- \ \/J /f/ ! - -�7�I �1 I II \ " r 1 L' I J I I ? r S 1lI -- �`i j / / , ■ II /`' (�� �\ \ \ / / / /�' ---�Z J - IZ ' r //�� ,I�j �` \ pn I I I�/ J / �: + -L� i ' 1 ! /// / -.-.. 1 /I / // / / // Ir ` \ ( / f \ r III \ ( \ /� /'�' f`�- \\1 L II /I -' / ` j jL I , 11� �` %' / LJ III ( 'oA n f t ^.-�" / �,/ /I �� r/i � � \ / /L r I' �\ / \ 1 I I 1 1 ✓ \ r \ � J II 1 I /'� ( 1 �� ) `� / / a III \�I /^ y ' 4 \� i� �/'h -'r I mil n % ..,� �' �'� %I _� ` I b i P# � V I 1 e { ..\i ., / / J / / / / ' V I // / ~ l` l� \// q / / \�J- Y/` I \�� \ \ft 11 I r 1 11 n �' l 1 ?r I ' I / ,/ n5 /1/ r -� / l \ l / ` , ) ■ / II / / �/ _ / /" \I 1 A H 11 11 I r / - - - - -- ` A1F A� i>3 1 I % C' A Y9 f�'o �/ ) 'L \, t f 1 r J~ \ { / / I (1 \ I / / f �- I C ii FIL \ J i 1 J �` `'7 d K J� �; \ '•• \ Z- — _\ \ /\ 1) l / / f / l `l / \� / / / - / 111 "' i �� �� l 'I " I �N� / % ') i 4 F�ET „�tow� , ', . / \ / _' / -- \ — '- / \ 1 }� / \S` C /�r ■ r1 \ \ \ / / / �\ \ \ \ iii j /'/ / -_ \L LE GTH = b \ \I1I , ✓ ` `T \ ` ' EW _ \ \ . / \ // (/ ( / l \ 1(\ \ l\\ \ \ \ 1 / �/ + / �\\ � \\ ,J/ l �'\r � �� /�1�� / I/ I ' 1 \ �i \` wJr/ 3/ '1 ` \ �\ �..4 \ r r / � {/ / �_ l� ( / '` \ \� / \ �\ ) / / I I / \ ■ -V -/ \ \ I /f �/ �� \ La \ ` `, "ki / l \ /� J �/% l r \C�}N LENFA,�t !a/ F W� ^ �` , \ J \ � � I I l \ \ ! V --� \ y\ 1 � l l �� 1 I i J +, r� \ C \ \H 47' �- �\ \d C v r / ` !( I f \ /` �\ 4 \ r /' `y � J/ /i eJ /, \ �, � St,, +,+ t \� \ �' , 4 4 � \ �1 \ ;I \\ 1 -/ r -\ 1 / \ \ 1 / \ vM / I _ / � \ `S:` \� � I t ��� �\\� // �\� � (, _ r � „ / ^ �' ,� r,� � � � r) i G / f� . _ �. � ' � N JI , ,� \ , �, 1 1 �� ( \ \ 1 1 � �) � \ \ \A( \\ ` \ \ } � � -0 / ,, \ / \ // r ti 1 \\ r >� 1 1 -� ,,, 'i a \ \ ,�\ _ 1/ -fir / ( .� �� I �\ l \ I 1/ _ _ . ' 1 (� L / r / , y�,/ / ` 1 l s -�/ S ,� �,� i 1. •.`.` P �PERTY LINE (TY I 1 \ l �I l \ \ 1 �r / ` �\ �\ V 1� �� / '\ \ \ 11 J { _ rT �TH r� �/ r r /` f /' �4 �\� r \ / �� I ��l \ \ ` �I / \ �` :\ \. \ -� ), ” a \ "� rr% ' II /r\ SHALLd FLOW \ / I �� ( �_ �� f ii / J \ ( �� / \ ` ■ Dft �`� L TH = 75' / i l j T�PATH • 11 �� \ _}} r / r l /� r II �� ) I I / \ /rte / 1 / \ \ \\\ JjJ /� /T�/ ~� tp, �LJ' /I �i i / 1 r �/ % 1 % r G1�ANNEL LOW J/ 1 �- `� -t \ •1� \ ii f�� \�- /\ ( l l ( / \ 1 A l /r i f /-" / \ \ % iJ - \r ,�` !/ ` / III �i �� ♦ \ < C / (�� \ C \ �• �` ��I�` y II / \ // I - \ / r ■ r, iN q 1 `..r T f'1TH r-� \� >� ;-,- r l l / f \ r,-r ,� l / , ( / �, \ J _ � \ / h r L 1 "LI 'r \\ ,/ II l r ` �n 1 ♦ \ ��5�� 11 I r 1I r ) V I ~/f _ r� / ''/ 1( i`-- 'i' / i \ I�-'',� / 1 �1i1 / E)�-4ATEDFLOW ) � i � � - � I� � \ -- -: \ \� \ `'C� � 1 / � 11 M_ \°� ��F i� ��fi f� // l� /� /� \ / �� � � i • aft /i I( _- - -'i -- I/ ri��� f �- / -\ 11111 / r', / 1 f TN /���� \, / / IC.' T \ Z I'4 < r.- , _ _ ( v 11,11 / ( - — r r �J► �, j / c --�- \ \+' l �.'' '`�� �;r / >Q r _/ 1T, I r, l ` -/� 1 \ r p�, I // 1�E ~ \ J ` TC PATH _-i f \ (1 +` `! �► \ \ (� J l (} \ \ \ \ \ / �\ ! \�1 I • \ I \ :',�' �� / ` � ( � ii it r � 1 r -/ �_IJ ! \ `� f � 1� \ �� J // / ��� f ../ r } SHE FFL / � : � ,1� \ '-► \ J I I � / \> \ • } �,(,� j �`; f r ✓ , " \� J I'' /� ii `'- i11 1 , ` \. f " �" f � AR€A = 5 7'� 1 I r � (�( ��'�� ` f /� NGTjI x`75' \ iti \ /� , � / / 7/� \ �� \ ° it " _ \ ,1'- >- - -- -�i 4 �\ j c�\ I , _' ' J`I �\ / / / L � �\ l \ l / -, 1 �� �C�iPNOK F 7 1 �1�1 ��� �� \ ` " �.Y �► � %��\ \ C �y I f `l ----� f; 1 (�� ` �\ % / ` ■ I - v 4 a .\/ "\ i 1j ` ` 1 1 'I / .1 l \ y/ �l '- 1 f j�r� \� / :� \ i , \\ r % I % � � ` 1 \ / 'I ' =''l�� n ' - -� 1` ,� J .� �"' _ 3 i % \ \ \ 'I� �I�� r 5 l I 1 �� I �, /` TC P H / % II \ \�' \ �,\ , 1 �..�.r. f / J 1 ` /'\__^ �/ \ \ r ( ■ _�✓ ; II J - ��y --� I�- Il'C'� � //�� f NC'NNTRATEDFLbW �JI \ / �� t 1 `\�` .� '� ;+ � / _� /, i } `\ 1 TC1PATH ;11 i �� t/ i l \fi �� %// ) I ( / , L NGTH 364' 1 ` i , f \ \� r H \ > 1 ��r ^� �( 1\ \ \ \ / 1 ■ u \ I i. �� I CHA NEL LOW = / ` / �� I \ ''r ✓i // * -- / , 1"� / \ '� �-- -r\ / HE ET FL000/ , � r 1 < \\ \ 1 ii ii -k i�� if i , --� �� LENQrTH D, -- 1 /f f � (` 1 r J�� �` 1 // l ` I I I f ��` f ` I / \ f \�\ ) ' \ ' \\� � \ ■ ` \ \ `�\ G \ / � / ' J \ \ l / f ' C / ENGTH �5' ( \ J .�� �" -L ■ °f / ✓ / , i�l �� - ' r 1 I 1 l /� 1 , / L� ` \ TCii \ �-- /1 TC�ATH ` `� �i �-- �,l � ; 1 l /l � /� J �- ! \ r {J�AL�N L FLO 7- \ (-�\ � r t• \ � 11 IL � -\1 / J �� / \ v" \ i \' ' f / / % ^'� I TG �1fiTH f _ /COIGCE TRA D FL Z \ 1 �\ r / I ii �/ ----) ' , \ \ / I I / \ � J 1 / / � / / l - �r ) LENGT 409 �` I EN = 354' „� ■ iaa� �' 1l r I r \, ' I l ✓ I J / I LA�If€ F O ^� q ��-h/� �/ t ,,,� '_ \ G- 7� / \ / l i � / \ �-- - kNG - r- �-% 1 \ \ n r �' \\� 3 • \� \\ l \ \ - / I ) I \ \-J / \ it'?AT 1 f �\ � -� J T f ,� \ ` � �� \ \ \ f`� / \ \,\\ , - /CH NEL�Fi/O / '�J f ' .�� 1 �� - �� t / / r ( f � r ��I \ \ \ --- • / ♦ _ «f _ _ 1 .,� I �� \ L/ 1 r \ r ���41N5 1+� J` f 1 l PATHS `� S \ \ 1 \ \ \t" � \ \ � _ �� �1 J \ - /L "-� w. / / ���/ �' r /.Y.S AL�-� t',- ;( ; , / �\ I { l ` % CHANNF.6FE0 / _ \ \ \ 1 \ / ■ \ 'j , \ ` \' Y<TC DP #2 / ` \ J z /f (( ( \ �--��----- 9`b �-- -\ t. 5- r — ti I `\ / — �` \ r✓- \�\ \ AREA = _ _ ,. .� \ __ _ �,, I 1 �N �fH = 600' _ l r \ \ ■ \ �' - ` \\ r ' ` f -� �/ l J L �- / .' / �, FE -PATH �`'� �_ ^` \ i �I`1 0 � \ � ��r�5\ \� �� \� ��s r �r �.� $- -� �! _� / �� �� -_r� , ( r ��J�l r /" ICHANNE LOW �` f \ ■ ` / / � �--"'\ �I \ >� .r� / l f _r �.-- r/i � --� -- ) � ` / 1 l I LENGTH 341't \ / \ 1-1 `� / - -, / 1 1 / r ` / ,\„ �-•\ --�- �- r/ 5 r' - ✓lam/ , \�� �� �L'J P ~ / l I 1 t -11 � J`` / / / j� _ ) j / 1 ■ '' / \ / ) r / F] 1 �/� / / �J T PATI I �` "\'^/ f / �' / f �f �` �EJr' = i 31�1W �pf �- \ CHA N F CW~' ' -�-� -\ �l / ,� �~ \ \ \ \ ,' / ( / r �,' \ / / �� CH LF Vr \ \ l I. l f -� t,"_ �' 1 �- --� 0, �I-IEET FLO ��\ -�NIU1 }-" \ / / r � r— ' �, \ \ I � / ,'/ ,� \ / / / / -\\ \ \ / 1 / ,"'�"'-' f -r S ,r .-` LENGTH =�75' \ I' / r i "� � j ■ /Y I J 1 / / LEN T 1 9 1 r f -' ✓' .\ / Fr I � \. � �� THJ 1 l `\ \'''' `� II / \ v 1 / / / \ I\ \ `' J�. 1f '� ' �[. f f T H \�-, 1 \ /r' / / �--\ \ %�� �s I rlE O / v �` \ \V,\ `/ it I� \ / ! -;w \ \ I/\ r �-'-- ��� i .f /�C€14 TH =A5' i I / w11TI�ATED F� �,//)))) ) r/ —� � / // ; / , ■ e \.`1 Il \ �- I \ J \ , \ \\ cy s. tom` N� J "� \ �� 2a8: / � so / / -� / / \- ( \ � ■ r `. i \ �i \ (I1I _/ _ \ / \ \\ \ ` C N,> E R 4�TE� FLOW /�� 'pr ` �- ~'` \ {C �hi\� v'/ / /// t I\ � ' / / \ , J `; \ / \ ^ " n ` \ / I \ \ \ \\ ✓'L �I'1.' Ic (� f � Y / / l NN LTV // ) -- S � r / \ / ' \` \\ \\ \ \ f \ = == J _ — �� \ 1 ( I / / G / / \ 1 e \\ �'� \1 .� �� ` r N j I f \' I L N 1 �' / / �' i S V` , / ` \ PATH �^ j l \ \ �\ / / f ■ /i', l \,\`\ I i \ 1 / / '� r' -ter l — / / 'ar� /N/ ( / P `` �]FI$ I f 4 \\ '/ / 'r '. --" -,- �,- `( ON ENTER�A DF W \ TCP TH `: / // , \ b / ` \ ' \ L _ C C' l \ RCA �1/ / / ` I 1 / ��'e' L TH - 4 _ J / %1 /. �l \ ") � I L \ ; S f �i ' <f f \ \ _ / �j 1 \ � / // \ "A, �SHEE FLOW ' / / l � ■ :',/ `,`� \ 1 / / ` \ ` \ \ 1 (� �_ \ ' / / r� r / // LEN H =75' \ / ~ /`� \�'''� / \ ~ l / / �) f 7* _' .� H Nf LFL_ VrU I / i TC PATH , / 1 \ 1 \ \` — ♦ = 'ice - X05' 1 �� (� 4 I��j �, j 1 1 ���`� L DPI Ir _. J , /'f I I'll 0 GH(�NNELFLOW \ f / , //� r \ I • `\ J %) 1 I r T`i: l'ATH� �' .^�,.� �i //+�J1/ f / ( e� (( �/ \ ,4t ""� J' —� ; t LENGTH\= 970' J I /� �; '\1 r ` i '\ �J `v�'.`\\,� / } \ \ / /i'' %� I f l / \ ' ,�� // `EH�NNF�IFL� \ `�/ F� /�1 _� { \ I �j - 34� Q' �� ,� �r� \� \ \ /CHANNEL LOW / I / \ `< , �, \ ` \ . / / f 1 \ rl-r \ / �/ / ICJ P LENG - 485' 1■■ I ■ �`� / srr _ D \ \ \ % <� NGTH = 842' ��P / r.f ,/ iL`�AT �p \ y� y.+- % �/ / _\ i% \ ,� \\ �` -', ; : n/ �\ °� ; /�,; / Df�AI E AREA CI�NDIARY (TYP] _ / f , l \ ` _ — -' - j '�r'�e� � r �� -ew FCbw� ��♦ -1 �� `� Jam- / /j /�� ���-. ��� `� �,RE'A - 79.50�4C \ / = �► 1 I / � \' sm �-1 \' �'�>'- \\� , \` \ \`I �\ � \ "\ f /'' / / f / 111111 J 1 \ C (� ^1� �____ fig L�7V� � ) l -- �/ �� �-- \ \ `T �R- 6� / ( , / I / ( ■ . - -\ : � 11 \II +� `•`,:�I I /i; 1 r / \ / l _ �. \.�J t �� t < < \ i�k� s \ \ �, , �t\. 1 y a ELI (\ r !� \ 4 \I ( /- _\ I / -- / ,'- — � �� ` / ( \` /,, a I ,,1/ - - -- -- ` - -�- _ , ( / \ /I \ ♦ 1 1 \� N TI . r �---- ��' �- \ \ �� �,► \ / / ��"� ) / l 7 ■ : %:J \ \ ,' / \ ti\ \ \ � TC TH `-r' // �- — —, r t. f �, \ Q ) ■ 11 .a \\ / `\` \ .\ \ \ I / I \ \ \ \ \ S� NNEL DW ) I `� /- �^ / �! r '-\ /-r - '\ \ \0y\�` L� ` , � wo .Z.P' l \ \ L �`\ J \\ \ LF,PiGTF 4� J I '1 / / \ '!�\ > ti+� �G / / ( ■ \. \. > '� \ \ �\ \\ \ \ �+ ;� / ~ \ \ j I l / l \ �-- r ✓ �i 1�, ,-- — (- \- .ice �\ \ l \ \— ,...� w \ ��, /113 v / ` , / A / � �,`\ \ � Ll / � \ \ \\ > ) 1 ` � � \ �\ % � � � I � �TrF4L AiLi.��� r —`� r � � �. �� `, RE1A - � � � ' ` / i� L_ I / / ��' '' , -, , ,v ( r \ \ `�`\ \ II /� \ f 1 / I '\ \ \ \ 1 l 1 f / �., /�� IAf1N` W,�� �l f J I� � � \ Q � - ( 1 - -- �/ / ( I `: \` \`. /' \ % `\ / 1 \ \ / / I \ \ \ \ I �,� f LEN�TAj'= 0' ` - ,I �� \V fry -\ `�\ vI \ \ \ I • 1\ 11- - f--, / / i� /� \ I \ L , , \ - r \ / i �7 DP I /� PJ # / `� `/ ^ j f � r �. P ✓ \ -� " " Y r / / % ■ \ z- / \ / RE-A = 63-55 -A A X06 &, / —1 4C ATi`r�T_ � --- J / f ) 1 1 Imo- \ 4 \' \ - ) \ \ - \ ` , \N \/ \ 6t,7"� \ I �/ ,61 CON�eENTRA El ¢W /� rte^` - f / yy l � ^ 1 �/ ['� / / I \ / r I / % �1 \�\ `: �� r J \ r U. S rr � � �// J�� f ;; \� \ ; / �- jjy 1 / -- -- / r s `/; I, ��� -� l I z ' \ ` I �\ 1 �' �IJ ♦� ' - / / `�� 1 YI l r I� -- r -mrl, it /JJ MR in o el �♦ �1F Ll J r��, �� / \ , / / / ) �/ StJ \�[T)` \ `I\ (/\ I I \ • A// to lr��Jll 1 i __JL_ -s -- _ - - -\ 7 -- llr X11I �n s' . , 7 11 J _` � II� ♦ r J(-r - II 1 On i' / I 11 "S / \ /f `` J 1' r 11 , r1 -- ` \ \. 1 , ���_ri ♦ 12 ,7� Y � � 1 11 /r(` 1 /\ 1 Ij c �J\j � �� � /OM 10 i ; r 1� \\ / ,1 \ \ \ i �1 \ �' ( 1 { \ \ • J `J r 1, j l \ �,\ \ l 1 t�, \% \ / I , 4 -•,� t ! ;' % r r- /� // � I ) r � I r�"��i� 1 '� \�( � � � ti � ,� • � � \ � r >� --� 1 1 % 1, (� � � � ! � , „r �_ � ;� / ` , r � ;�_ s � s� -J� r) s ,�, r-„� / � • ( �; 1. 1 � ,, � � l \ ) I I � I / l \ � � � \ 1 �r _ter,,/ J1 / ` \�• ,� \� V � 1� � �,/ 1� ;. � ` I( � j l _ � � 1 . _ _ � r ._�/ J � , , � �+ • f / 1 '� �.� ` i ; II f- \ � � � I � I ��l / \ \ l v / / yv' l C \ `:� 1 �� 1} � ` � \ � ) / � � � I `/ ❑ \ r r � ' , 1 mac... 9 � � `` / / � I� 1 � � e �,r: \ I I � � ( // / \ ` II ` ■ 7 \ �� \ � �9' � 1 r , i ; / �'Zi d ,� � \ ° 1 � 1, / J/ `� 1 � � /-' � � V� �\ � � • ,l , ' a, ^ \ �� \ � � � � 1 � ` l I / \ � � \ \ / l / /� = � 1 � i1 / r"i \ � /.�. ` r i may'= -�. � _\ p `, \ 'rc III \ / l � 1 f ■ Iii �l / �f` j� /I ' aF� 1� '�� ( / C l � � \ \ �� ` 1 ■ ,; It I / ,� I , � 1 r - r)4 fJ �' [ / _yy '~ ' �� %' �' ^. /' /, Dr E, ;j; � 'Q--L ,�- \ \ J 1 1 \ \1 \ \ 1 % ( 1` f ■ I � Jf ' /���\�_ / ` L� (���♦ ii � i\ "/ � r (�� ./ /til^3\, ✓ �' I \. �_- %�. ` ;I ° > 1 ! \ n / 1.1V %��''l I � l I � r \ %� - i. ` 11 �� I' � �jl � / y � l ��\ , I \ht `�� \ J \+ 1/ r r ■ 11 f � ;;r f i ._J �; �� r 1 '� -- ,•.` � � � ` I � 4 ' i � ' -, � , , / 1 ''', � \ +, 1 ,.._._. � � I 1 ` 1 � � '�' • � \� � rte/ _ 1 `I ;' J` , ,;�, J _ail 1, LJ 1 �� I \ (, l ; ;;� /. I; 1 \ \�\`, `� f J 17 ✓� Y \ ` l L". ; � � � I I \ \ �� ,• / l (_ } "` i � ;�r � � ^ � / �`��` � � .J � � � � \ � i. r'he� \ `, � � � \ J C ■ I Imp \ \ ♦ ` \F"� s \ \ �`--I� 371 PROPATY LIN TYPj \ / ` I r \c' r --�� j j ♦iF \ \ J ■ '\ � ^/ \, � � � � � \V � L� // 1 � `S � J ' �\ ''' ~ ,' �tl / � �� •fir, ,fir � ��� \ � \ �� ■ *0 10 \� \ r� \� .,� \ \� �t9 `/ r \ `yam ��� //� / �r / ` .1/, �.� ` \ ■ ILI- / f I \ I , =; AINAGE AAA BOUNDARY TYPj i' J , ■ '' =�, ;' \\��: � '`,�� � 11 � � \ �,�, ;, / /` \� / 1 �►' ,�_ . ; � � � r � � ' � � � �,,� 1 � f ) / /�,l �i� 4 � � fry v- J.-- -� I I, � r � � J -,� � 1 �,�� ; � ';�, f � J . JI wall M 1 \ \�� • . _\ —1-4 1 l ■ 10 go ma va 10 \ \ 1 1 1 \ I / Ilk LI G I �. \ \ --�°- � � /ice �:`:` � - - _- _ � -- _ _ � ='y_ _ _ -- - I 1 1 ` -- , S � S � (���� �., � •� -...► .� 1 l / / } 1 \ / � � - -.� - it T F -7) / _ 4/ l / A �> ' IF r "/A Q '1 �POST-DEVELOPMENT OVERALL LAYOUT MAP SW2 JSCALE' V" 400' 0 200 400 800 � I SCALE: 1"= 400' ©COPYRIGHT 2008 THIS DOCUMENT AND THE DESIGN ARE THE PROPERTY OF HORVATH ASSOCIATES, P.A. ANY REPRODUCTION WITHOUT PRIOR WRITTEN CONSENT IS PROHIBITED ■ ■ ■ ■ ■ HORVATH ASSOCIATE S 16 CONSULTANT PLACE,SUTTE 201 DURHAM, NORTH CAROLINA 27707 P 919.490.4990 F 919.490.8953 537 MARKET STREET, SUITE LL20 CHATTAN OOGA, TE NN ESSE E 37402 P 423.266.4990 F 423.266.5700 www.horvathassociates.com z m o m °QQ w 0 ■ POST - DEVELOPMENT OVERALL LAYOUT MAP 11/17/2011 1 I 1 ST SITE PLAN REVIEW I MJ 1/26/2012 �2 1 2ND SITE PLAN REVIEW I MJ I DRAWN BY: CHECKED BY: MLJ DATE 8 -4 -2011 SCALE 1 "= 400' PROJECT NO. 1121 M:14 :11063 SW2 IL Lu = J Ja � J >z L u W L Q 1 Q ■ POST - DEVELOPMENT OVERALL LAYOUT MAP 11/17/2011 1 I 1 ST SITE PLAN REVIEW I MJ 1/26/2012 �2 1 2ND SITE PLAN REVIEW I MJ I DRAWN BY: CHECKED BY: MLJ DATE 8 -4 -2011 SCALE 1 "= 400' PROJECT NO. 1121 M:14 :11063 SW2 / i • .� /,Sra� oiioz0000; /,,,� ;./ -��/ /; -,ii/ __,: � " °;,rte /:/ oomi, / / /or -,,,,_ _,,,�, j poi- %'� /v`,�io // o/ "/ : / r� o!o . ,. EA 269.70 ■� f���t�... �,.,,. �� /o� %i, � /i,.. �� / /i, / % %a,. � /r. % /m,.,, j��� % % /io.,.,. �� /,,: � /�,. ,,, ���i ��..00 / / / %������ ���j��jmi0 / /j /. / / /r,_r,.ri. . /� / % %im .,�� � �.. _. %d /„ % / �j.. /. % / / /iio.,,... -hlk "A&YELOPMENT DRAIN ©COPYRIGHT 2008 THIS DOCUMENT AND THE DESIGN ARE THE PROPERTY OF HORVATH ASSOCIATES, P.A. ANY REPRODUCTION WITHOUT PRIOR WRITTEN CONSENT IS PROHIBITED HORVATH ASSOCIATE S 16 CONSULTANT PLACE,SUITE 201 DURHAM, NORTH CAROLINA 27707 P 919.490.4990 F 919.490.8953 537 MARKET STREET, SUITE LL20 CHATTAN OOGA, TE NN ESSE E 37402 P 423.266.4990 F 423.266.5700 www.horvathassociates.com Q Z m o m aQ w 0U ■ ■ POST- DEVELOPMENT DRAINGAGE MAP #1 11/17/2011 1 I 1 ST SITE PLAN REVIEW I MJ 1/26/2012 A2 1 2ND SITE PLAN REVIEW I MJ I I DRAWN BY: CHECKED BY: MLJ DATE 8 -4 -2011 SCALE 1 " = 200' PROJECT NO. 1121 SHEET NO. SW3 0!�_ W J 'o � J > Z Lu W W Q J Q ■ ■ POST- DEVELOPMENT DRAINGAGE MAP #1 11/17/2011 1 I 1 ST SITE PLAN REVIEW I MJ 1/26/2012 A2 1 2ND SITE PLAN REVIEW I MJ I I DRAWN BY: CHECKED BY: MLJ DATE 8 -4 -2011 SCALE 1 " = 200' PROJECT NO. 1121 SHEET NO. SW3 / s �i r � l I go ♦ % 95 WQ 9 /' o, AV 01 v -MIT f]Lm 1 II'i■� 7 l/ 'l �►����m _mm� rMEl #3 \\ ►i P :. II I � 1 1 — ��;I 1 �- I ♦��s � � f f I —�. 1 1, 4* �- NX X TC PATH / \ \ ■ SHEET FLOW LENGTH = 75' I ■ \ �- • / TC PATH �� / \ • CONCENT ED FLOW �� , �/ \ ■ LENG H= 354' , • ELFL0 60W LENGTH ��F��,�� \ ■ T PATH LE TH =341' � � � - - � � , � _ ■ AREA= 2. ACS 1 _ / , / ■ 85 \ / TC PATH / � r � ■ / CONCENTRATED FLOW , N LENGTH =425' , ■ #DP# I TC PATH ` / /// ■ CHANNELFLOW TC PATH / / ■ 1 l 1( LENGTH = 970' \ / SHEET FLOW / /# TC PA LENGTH = 75' /� ■ 111 1 \ HANNELFLOW J LENGTH = 985' _ / ,, • TO # 6 \ ,'# - • AREA= - 76'S9 AC / i ■ W f z =71A C-4,60- ■ • ♦7 10 ♦AW ��W goo OP I q a �'S P L � ■ 4 / PROPERTY LINE (TYP) ���� / ■ f/ ■ i 4f DRAINAGE AREA BOUNDARY (TYP) ■ � � � / 0 1 200 .� / I / 400 . SCALE: 1 "= 200'. ■ f EVELGPMENT D�AIN GE MAP #2 . W4 SCAL : 1"- 00' ■ E5 ■ ©COPYRIGHT 2008 THIS DOCUMENT AND THE DESIGN ARE THE PROPERTY OF HORVATH ASSOCIATES, P.A. ANY REPRODUCTION WITHOUT PRIOR WRITTEN CONSENT IS PROHIBITED HORVATH ASSOCIATE S 16 CONSULTANT PLACE,SUITE 201 DURHAM, NORTH CAROLINA 27707 P 919.490.4990 F 919.490.8953 537 MARKET STREET, SUITE LL20 CHATTAN OOGA, TE NN ESSE E 37402 P 423.266.4990 F 423.266.5700 www.horvathassociates.com Z m o co Q Q w 0U I■ 71 POST- DEVELOPMENT DRAINGAGE MAP #2 11/17/2011 1 I 1 ST SITE PLAN REVIEW I MJ 1/26/2012 2ND SITE PLAN REVIEW I MJ I I DRAWN BY: CHECKED BY: MLJ DATE 8 -4 -2011 SCALE 1 " = 200' PROJECT NO. 1121 SHEET NO. SW4 0!�_ Lu J Ja � J >z w w w Q J Q I■ 71 POST- DEVELOPMENT DRAINGAGE MAP #2 11/17/2011 1 I 1 ST SITE PLAN REVIEW I MJ 1/26/2012 2ND SITE PLAN REVIEW I MJ I I DRAWN BY: CHECKED BY: MLJ DATE 8 -4 -2011 SCALE 1 " = 200' PROJECT NO. 1121 SHEET NO. SW4