Loading...
HomeMy WebLinkAbout20091242 Ver 1_More Info Received_20091120I P Duke Energy, November 19, 2009 o1\ - I Ms. Cyndi Karoly North Carolina Department of Environment and Natural Resources Division of Water Quality 1650 Mail Service Center Raleigh NC 27699-1650 Subject: Belews Creek Steam Station (BCSS) - Stokes County Permanent Pumping Systems Withdrawal of Water from Dan River to Belews Lake Dear Ms. Karoly: DUKE ENERGY CORPORATION 526 South Church Street Charlotte, NC 28202 Mailing Address: P 0 Box 1006 Charlotte, NC 28201-1006 As requested per receipt of your letter dated 18 November 2009 related to the incorrect application permitting fee concerning the on-going review of the proposed permanent pumping facility, enclosed is a check for the $570.00 application fee. Staff review of the five copies of the preconstruction notification (PCN) forwarded with the previous submittal is needed as soon as possible in order to have the system available in November 2010 for operation on as needed basis per available river flow. Should you have questions regarding submittal of the previous information or wish to meet to coordinate agency reviews, please call me at (980) 373-5710. Sincerely, Ronald E. Lewis Water Management Enclosures cc w/o enclosures: Mr. Andy Williams, US Army Corps of Engineers Raleigh Regulatory Field Office, 331 Heritage Trade Drive, Wake Forest, NC 27587 Mr. Gill Vinzani, NCDENR Division of Water Quality 1617 Mail Service Center, Raleigh, NC 27699-1617 Mr. R. Scott Ehrhardt, Dewberry & Davis, 551 Piney Forest Rd., Danville, VA 24540 Ms. Sue Homewood, NDENR Division of Water Quality, Winston Salem Regional Office, 585 Waughtown St., Winston -Salem, NC 27107 www. duke-energy. com