HomeMy WebLinkAboutNCC200688_NOI Application_20200220Action History (UTC-05:00) Eastern Time (US & Canada)
Submit by Anonymous User 2/20/2020 7:39:57 AM (NCG01 NOI Submission)
Approve by Garcia, Lauren V 2/20/2020 8:20:16 AM (Review- Construction NOI 22165)
• The task was assigned to Garcia, Lauren V by round robin distribution 2/20/2020 7:40 AM
The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: February 24, 2020 5:00
PM 2/20/2020 7:40 AM
Submit by McCoy, Suzanne 2/20/2020 11:59:48 AM (Payment Verification for NCC200688)
* David Chaparro
• McCoy, Suzanne assigned the task to McCoy, Suzanne 2/20/2020 11:59 AM
The task was assigned to DEMLR NCG01 Payment Team. The due date is: April 2, 2020 5:00 PM
2/20/2020 8:20 AM
.• SThF� ';
1
NORTH CAROLINA
EnrlronmertW quallly
A. Project Information
Part A.
Project Location and Waterbody Information
1. Project Name * Lane Construction Concrete Batch Plant
2. County* Iredell
3. Highway or Street 2201 International Drive
Address * Street narre only is acceptable if no address number assigned yet
4. City or Township* Statesville
5. State * NC
6. Zip Code * 28625
7. Latitude * Enter the latitude in decimal degrees
35.8094
8. Longitude* Enter the longitude in decimal degrees (M. ST be negative)
-80.8488
If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of
North Carolina. Look for the coordinates in the bottom left corner.
9. Date to Begin*
02/26/2020
Estimated Construction Project Start Date
10. Date to End*
03/30/2020
Estimated Construction Project End Cute
11. SIC (Primary)*
Industrial (1541)
Standard Industrial aassification for Developrrent
12. Acres to be
4.18
disturbed*
(including off -site borrow and waste areas)
13. Total site area
4.46
(acres) *
14. Post-
2.70
construction
(Estimated)
impervious area
(acres) *
NCC Project
NCC-IREDE-2020-Lane Construction Concrete Batch Plant
Tracking ID
Assigned automatically
Below you must enter waterbody information for surface waters affected by this project. Please consult
DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please
enter only immediate receiving waterbodies - not waters downstream of those unless the project extends there. You
may enter up to 3 waterbodies if needed.
15a. Receiving Fourth Creek
Wate rbody* Barre of waterbody into which storrrwater runoff will discharge
15b. Waterbody 12-108-20
Index No.* NCWaterbody Index Number
Stormwater V No
discharges will flow r Yes
to additional
wate rs *
16a. Is this project F Yes
subject to the NC r No, not subject to NC SPCA
Sediment Pollution
Control Act?*
B. Permittee Information
Part B. ^
Fternittee Inforrration - Legally Fbsponsible Entity and Individual
Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application
form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same
organization. That person must be a responsible corporate officer who owns or operates the construction activity, such
as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV,
Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part
IV, Section B, Item (6) of that permit.
1. Organization The Lane Construction Corporation
Name *
2. First Name* James
If Corporation, enter Pegistered Agent First Barre
3. Last Name* Seybert
If Corporation, enter Faegistered Agent Last %rre
3b. Title Project Director
4. Permitee E-mail jsseybert@laneconstruct.com
Address *
5. Permittee 704-679-0503
Telephone No.*
6. Permittee Mailing Street Address
Address* 6125 Tyvola Centre Drive
Address Line 2
City State / Frovince / Region
Charlotte NC
Fbstal / Zip Code Country
28217 us
Check box if the rJ Yes
street address the
same as mailing
address
7. Permittee Street
Street Address
Address*
6125 Tyvola Centre Drive
Address Line 2
City
State / Frovince / Fbgion
Charlotte
NC
Fbstal / Zip Code
Country
28217
us
8. Type of
Non -Government
Ownership*
C. Site Contact Information
Part C.
Roject Site Contact Inforrration
....................................................................................................................................................................................................
1. Primary Site
David
Contact - First
Name *
2. Primary Site
Chaparro
Contact - Last
Name *
3. Title
Area Project Engineer
4. Site Contact E-
dmchaparro@laneconstruct.com
mail Address*
5. Site Contact
336-518-4671
Telephone No.
6. Organization
The Lane Construction Corporation
Name
7. Site Contact
Street Address
Mailing Address*
6125 Tyvola Centre Drive
Address Line 2
City
Charlotte
Postal / Zip Code
28217
8. Consultant Name
(Optional)
First and Last narre
9. Consultant E-mail
This person will be copied on all correspondence.
10. Consultant
Telephone No.
State / Rovince / Region
NC
Country
us
D. E&SC Plan
Part D. ^
Erosion & Sediment Control (E&SC) Ran Approval Information
......................................................................................................................................................................................................................................................................................................................................
1. Date E&SC Plan 01/30/2020
Approved *
2. E&SC Plan Project STVLE-2020-057
Number/ID * Assigned by agency or local program
3. E&SC Plan f State DEQ Office
Approved by* r Local Program
4. Local Program* Iredell County
Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a
complete application. For linear projects, please also upload a site map showing the overall extent of the project.
5. E&SC Plan LOAM Lane Const Concrete Batch Plant 1-30-20
Approval PDF.PDF 233.73KB
letter/documentation
Mast be RDFfon-rat
Notes (Optional) Frovide any additional information that night help the reviewer better understand how uploaded documents support
the application.
6. NOI Certification 20200220065819728.pdf 51.59KB
Form Mast be RDFfon-rat
This is an Express F No
Review Project* r Yes
E. Certification
North Carolina General Statute 143-215.66 (1) provides that:
Any person who knowingly makes anyfalse statement, representation, or certification in any application, record, report, plan, or other
document filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement
of a material fact in a rulemaking proceeding or contested case under this Artcle; or who falsifies, tampers with, or knowingly renders
inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the
Commission implementing this Artcle shall be guilty ofa Class 2 misdemeanor which may include a fine not to exceed ten thousand
dollars ($10,000).
Under penalty of law, I certify that:
17 I am the person responsible for the construction activities of this project, for
satisfying the requirements of this permit, and for any civil or criminal penalties
incurred due to violations of this permit.
rJ The information submitted in this NOI is, to the best of my knowledge and belief,
true, accurate, and complete based on my inquiry of the person or persons who
manage the system, or those persons directly responsible for gathering the
information.
* 17 I will abide by all conditions of the NCG010000 General Permit and the
approved Erosion and Sediment Control Plan.
* rJ If the Erosion and Sediment Control Plan approved by the delegated program is
not compliant with Part II (Stormwater Pollution Prevention Plan) of the
NCG010000 General Permit. I will nonetheless ensure that all conditions of Part
II of the permit are met on the project at all times.
* 17 I hereby request coverage under the NCG010000 General Permit and
understand that coverage under this permit will constitute the permit
requirements for the discharge(s) and is enforceable in the same manner as an
individual permit.
Specify if you are:* r The Responsible Person named on this Notice of Intent
f Authorized Responsible Person*
Important: The person who electronically signs this Certification above must be the same person who signs the NOI
Certification Form. If that person is signing on behalf of the Permittee, that individual must be an authorized responsible
person within the same organization as the Permittee. *An authorized individual is a responsible corporate officer who
owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager
that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more
information on signatory requirements, see Part IV, Section B, Item (6) of that permit.
Signature
Type Name* James Seybert
Title Project Director
Organization The Lane Construction Corporation
Date * 02/20/2020
F. Tracking and COC Info
NOI Tracking No. 22165
NC Reference No. NCG01-2020-0688
Uses 'count number' variable (incremrented by SP)
Certificate of NCC200688
Coverage (COC) Uses 'count number' variable (incremented by SP)
No.*
Count Number 688
Sequential number for submittal that is incremented by Stored Frocedure
COC Year 2020
Year of date reviewed (used to assign YY digits after "NOC' in COCno.)