Loading...
HomeMy WebLinkAbout20200252 Ver 1_Riparian Buffer Authorization Request_20200214Original Submittal 2/14/2020 A. Owner/Applicant Information General Information Primary Contact Email:* mnelson3336@gmail.com Please list the contact persons erreil for questions or payment on this project if needed. Who is submitting the application?* ® Owner ❑ Applicant other than Owner ❑ Agent Is there an agent working on this application O Yes but not submitting it? O No 1. Property Owner Information: ..................................................................................................... la. Name on Recorded Deed:* 1b. Responsible Party: 1c. Mailing Address:* 1d. Telephone: * 2529405167 Mark Preston Nelson (for Corporations) Street Address 721 Pungo Shores Drive Address Line 2 City State / Province / Region Belhaven NC Festal / Zip Code (buntry 27810-9392 us B. Project Information and Prior Project History le. Email Address:* mnelson33366@gmail.com Water ResourcesENTAL QUALITY 1. Project Information .......................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... la. Name of Project:* 729 Pungo Shores Road - Nelson home (Subdivision, facility, or establishrrent narre) 1b. Is this a publicly -funded transportation project?* r Yes r No 1d. Subdivision Name: le. Nearest Belhaven Municipality: 1f. Property Size: 0.13 acres 1g. County (or Counties) where the project is located:* Beaufort 1h. Property ID# Date of Purchase 7613-39-3724 Tax RN or Parcel id 1 i. Deed Information Type of Book Book# Page# Deed F/00567 Map 1j. Attach a copy of the recorded map that indicates when the lot was last platted. Click the upload button or drag and drop files here to attach docurrent FDF only 1k. How would you like to provide the Latitude and Longitude information?* r Address Lookup r Manually Latitude * 35.484181 Longitude *-76.603610 11. Is the project located in any of North Carolina's twenty coastal counties? F Yes r No 1m. Is the project located within a NC Division of Coastal Management Area of Environmental Concern (AEC)? r Yes f No 2. Surface Waters 2a. Name of the nearest body of water to proposed project:* Pungo River 2b. Water Quality Classification of nearest receiving water:* SB; NSW 2c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property:* 50 (linear feet only) 3. Project Description: 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Cleared lot in a residential neighborhood, with a previously existing trailer that's recently been removed, as well as an existing deck (still present). 3b. Attach an 8 % x 11 excerpt from the most recent version of the USGS topographic map indicating the location of the site. aickthe upload button or drag and drop files hereto attach docurrent FDF only 3c. Attach an 8 % x 11 excerpt from the most recent version of the published County NRCS Soil Survey Map depicting the project site. Click the upload button or drag and drop files here to attach docurrent FDFony 4. Proposed Activity ............................................................................................ . . . Provide a detailed description of the proposed activity including its purpose and include the type of equipment to be used:* Proposed new home/residential construction with additional porch/deck space. No construction equipment other than tools necessary to build the house/deck. Attach a site plan as applicable to the project: aick the upload button or drag and drop files here to attach document Nelson site plan.pdf 171.11 KB FDF only 5. Jurisdictional Determinations 5a. Have jurisdictional wetlands or stream determinations by the Corps or State been requested or obtained for this property/project (including all prior phases) in the past?* r Yes 4 No 6. Project History 6a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past?* C- Yes 4 No 7. Future Project Plans 7a. Is this project a phased project?* C Yes r No C. Proposed Impacts Inventory Buffer Impacts Project is in which protected Basin?* r Neuse River Basin (15A NCAC 02B.0233) f Catawba River Basin (15A NCAC 02B.0243) r Randleman Lake Watershed (15A NCAC 02B.0250) r Tar -Pamlico River Basin (15A NCAC 02B.0259) r .Jordan Lake Watershed (15A NCAC 02B.0267) r Goose Creek Watershed (15A NCAC 02B.0606 & 15A NCAC 02B.0607) Individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. Site# -Reason Stream Name Buffer Impact* Impact Type*IF Zone 1 Zone 2 1 porch/deck Pungo Permanent Allowable 0.00 304.00 rvbp label (e.g. Road :1 River (P) Square Square Crossing 1) FbrmorTerrp Feet Feet Total Zone 1 Impacts: 0.00 Total Zone 2 Impacts: 304.00 Total Buffer Impacts: 304.00 r Comments: D. Impact Justification and Mitigation 1. Avoidance and Minimization la. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project. Deck has been limited to Zone 2 of the riparian buffer. Gutters will be installed to collect stormwater and then discharged outside the buffer. Also re -using some of the previously impacted areas inside the buffer. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques.* Guttering of stormwater outside the buffer. E. Diffuse Flow Plan 1a. What type of SCM are you providing?* r Level Spreader r Vegetated Conveyance (lower SHWT) r Wetland Swale (higher SHWT) r% Proposed project will not create concentrated stormwater flow through the buffer r Other SCM that removed minimum of 30% nitrogen 1 c. Diffuse Flow Documentation * aick the upload button or drag and drop files here to attach docurrent Nelson SCM Diffuse Flow Documentation. pdf 192.92KB FDF only F. Supplementary Information Environmental Documentation ............ la. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? C (-- No Violations 2a. Is the site in violation of DWR Wetland Rules (15A NCAC 02H .0500), Isolated Wetland Rules (15A NCAC 02H .1300), DWR Surface Water or Wetland Standards, or Riparian Buffer Rules (15A NCAC 02B .0200)? f Yes r No 2b. Is this an after -the -fact buffer authorization application? r Yes (-- No G. Additional Information Please upload any additional information you would like the Division to consider during application review. Additional Attachments: Click the upload button or drag and drop files here to attach docurrent FiDF only Additional Comments: H. Sign and Submit By digitally signing below, I certify that: o I have given true, accurate, and complete information on this form; o I agree that submission of this form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act) o I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); o I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND o I intend to electronically sign and submit the application form." Print Name:* Mark P Nelson Signature Submission Date: (Auto populated field) Initial Review Is this accepted into the review process?* Is this project a public transportation project?* ID#* Version:* Select Reviewer: Select Reviewing Office* Has payment been received?* O Yes O No O Yes O No 20200252 Robert Tankard:eads\rbtankard Washington Regional Office - (252) 946-6481 C No Payment Needed r Fee Received r Need Fee - send electronic notification New --- -- r � � r r ► � r I NEW f � r WOE � ! r r r r F4*ri4 td Y7. 30 V,5 ! -� The proposed project will not create concentrated stormwater flow through the buffer.