HomeMy WebLinkAbout20200252 Ver 1_Riparian Buffer Authorization Request_20200214Original Submittal 2/14/2020
A. Owner/Applicant Information
General Information
Primary Contact Email:* mnelson3336@gmail.com
Please list the contact persons erreil for questions or payment on this project if needed.
Who is submitting the application?* ® Owner
❑ Applicant other than Owner
❑ Agent
Is there an agent working on this application O Yes
but not submitting it? O No
1. Property Owner Information:
.....................................................................................................
la. Name on Recorded Deed:*
1b. Responsible Party:
1c. Mailing Address:*
1d. Telephone: * 2529405167
Mark Preston Nelson
(for Corporations)
Street Address
721 Pungo Shores Drive
Address Line 2
City
State / Province / Region
Belhaven
NC
Festal / Zip Code
(buntry
27810-9392
us
B. Project Information and Prior Project History
le. Email Address:* mnelson33366@gmail.com
Water ResourcesENTAL QUALITY
1. Project Information
..........................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................
la. Name of Project:* 729 Pungo Shores Road - Nelson home
(Subdivision, facility, or establishrrent narre)
1b. Is this a publicly -funded transportation project?*
r Yes
r No
1d. Subdivision Name:
le. Nearest Belhaven
Municipality:
1f. Property Size: 0.13
acres
1g. County (or Counties) where the project is located:*
Beaufort
1h. Property ID# Date of Purchase
7613-39-3724
Tax RN or Parcel id
1 i. Deed Information
Type of Book Book# Page#
Deed F/00567
Map
1j. Attach a copy of the recorded map that indicates when the lot was last platted.
Click the upload button or drag and drop files here to attach docurrent
FDF only
1k. How would you like to provide the Latitude and Longitude information?*
r Address Lookup
r Manually
Latitude * 35.484181 Longitude *-76.603610
11. Is the project located in any of North Carolina's twenty coastal counties?
F Yes
r No
1m. Is the project located within a NC Division of Coastal Management Area of Environmental Concern (AEC)?
r Yes
f No
2. Surface Waters
2a. Name of the nearest body of water to proposed project:*
Pungo River
2b. Water Quality Classification of nearest receiving water:*
SB; NSW
2c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property:*
50
(linear feet only)
3. Project Description:
3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this
application:
Cleared lot in a residential neighborhood, with a previously existing trailer that's
recently been removed, as well as an existing deck (still present).
3b. Attach an 8 % x 11 excerpt from the most recent version of the USGS topographic map indicating the location of the site.
aickthe upload button or drag and drop files hereto attach docurrent
FDF only
3c. Attach an 8 % x 11 excerpt from the most recent version of the published County NRCS Soil Survey Map depicting the
project site.
Click the upload button or drag and drop files here to attach docurrent
FDFony
4. Proposed Activity
............................................................................................ . . .
Provide a detailed description of the proposed activity including its purpose and include the type of equipment to be used:*
Proposed new home/residential construction with additional porch/deck space. No
construction equipment other than tools necessary to build the house/deck.
Attach a site plan as applicable to the project:
aick the upload button or drag and drop files here to attach document
Nelson site plan.pdf 171.11 KB
FDF only
5. Jurisdictional Determinations
5a. Have jurisdictional wetlands or stream determinations by the Corps or State been requested or obtained for this
property/project (including all prior phases) in the past?*
r Yes
4 No
6. Project History
6a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past?*
C- Yes
4 No
7. Future Project Plans
7a. Is this project a phased project?* C Yes
r No
C. Proposed Impacts Inventory
Buffer Impacts
Project is in which protected Basin?*
r Neuse River Basin (15A NCAC 02B.0233)
f Catawba River Basin (15A NCAC 02B.0243)
r Randleman Lake Watershed (15A NCAC 02B.0250)
r Tar -Pamlico River Basin (15A NCAC 02B.0259)
r .Jordan Lake Watershed (15A NCAC 02B.0267)
r Goose Creek Watershed (15A NCAC 02B.0606 & 15A NCAC 02B.0607)
Individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form.
Site# -Reason Stream Name Buffer Impact* Impact Type*IF Zone 1 Zone 2
1 porch/deck
Pungo
Permanent
Allowable
0.00
304.00
rvbp label (e.g. Road :1
River
(P)
Square
Square
Crossing 1)
FbrmorTerrp
Feet
Feet
Total Zone 1 Impacts: 0.00
Total Zone 2 Impacts: 304.00
Total Buffer Impacts: 304.00
r
Comments:
D. Impact Justification and Mitigation
1. Avoidance and Minimization
la. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project.
Deck has been limited to Zone 2 of the riparian buffer. Gutters will be installed to
collect stormwater and then discharged outside the buffer. Also re -using some of
the previously impacted areas inside the buffer.
1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques.*
Guttering of stormwater outside the buffer.
E. Diffuse Flow Plan
1a. What type of SCM are you providing?*
r Level Spreader
r Vegetated Conveyance (lower SHWT)
r Wetland Swale (higher SHWT)
r% Proposed project will not create concentrated stormwater flow through the
buffer
r Other SCM that removed minimum of 30% nitrogen
1 c. Diffuse Flow Documentation * aick the upload button or drag and drop files here to attach docurrent
Nelson SCM Diffuse Flow Documentation. pdf 192.92KB
FDF only
F. Supplementary Information
Environmental Documentation
............
la. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?
C
(-- No
Violations
2a. Is the site in violation of DWR Wetland Rules (15A NCAC 02H .0500), Isolated Wetland Rules (15A NCAC 02H .1300), DWR
Surface Water or Wetland Standards, or Riparian Buffer Rules (15A NCAC 02B .0200)?
f Yes
r No
2b. Is this an after -the -fact buffer authorization application?
r Yes
(-- No
G. Additional Information
Please upload any additional information you would like the Division to consider during application review.
Additional Attachments: Click the upload button or drag and drop files here to attach docurrent
FiDF only
Additional Comments:
H. Sign and Submit
By digitally signing below, I certify that:
o I have given true, accurate, and complete information on this form;
o I agree that submission of this form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic
Transactions Act)
o I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic
Transactions Act');
o I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND
o I intend to electronically sign and submit the application form."
Print Name:* Mark P Nelson
Signature
Submission Date: (Auto populated field)
Initial Review
Is this accepted into the review process?*
Is this project a public transportation
project?*
ID#*
Version:*
Select Reviewer:
Select Reviewing Office*
Has payment been received?*
O Yes O No
O Yes
O No
20200252
Robert Tankard:eads\rbtankard
Washington Regional Office - (252) 946-6481
C No Payment Needed
r Fee Received
r Need Fee - send electronic notification
New --- --
r �
� r
r ►
� r
I
NEW f �
r WOE �
! r
r r
r
F4*ri4
td
Y7. 30
V,5 ! -�
The proposed project will not create concentrated stormwater flow through the buffer.