HomeMy WebLinkAboutNCG170089_COMPLETE FILE - HISTORICAL_20070404STORMWATER- DIVISION CODING SHEET
RESCISSIONS.
PERMIT NO.
DOC TYPE
I, COMPLETE FILE - HISTORICAL
DATE OF
RESCISSION
❑ j OT) y D I
YYYYMMDD
I
Michael F. Easley, Governor
William G. Ross Jr., Secretary
North Carolina Department of Environment and Natural Resources
Alan W. Klimek, P.E. Director
Division of Water Quality
Asheville Regional Office
SURFACE WATER PROTECTION
April 9, 2007
P
L
John Connelly
McDowell Plant
PO Box 250
Marion, NC 28752
SUBJECT: April 4, 2007
Compliance Evaluation Inspection
Galey & Lord Indust-Mcdowell
Permit No: NCG170089
McDowell County
Dear Mr Blalock:
Enclosed please find a copy of the Compliance Evaluation Inspection form from
the inspection conducted on April 4, 2007, The facility was found to be in compliance with
permit NCG170089.
Please refer to the enclosed inspection report for additional observations and
comments. If you or your staff have any questions, please call me at (828) 296-4665.
Sincerely,
�7 x
Starr Silvis
Environmental Engineer
Enclosure
cc: Danny Smith — NPS-ACO
Central Files
Asheville Files
r
2090 U.S. Highway 70, Swannanoa, NC 28778 Telephone: (828) 296-4500 Fax: (828) 299-7043 Customer Service 1 877 623-6748
Nonhcartdina
'lfalurally
Compliance Inspection Report
Permit: NCG170089 Effective: 08/01/04 Expiration: 07/31/09 Owner: Galey & Lord Industries
SOC: Effective: Expiration: Facility: Galey & Lord Indust-Mcdowell
County: McDowell Hwy 70 E
Region: Asheville
Marion NC 28752
Contact Person: Charles A Blalock Phone: 336-665-3002
Directions to Facility:
Primary ORC:
Secondary ORC(s):
On -Site Representative(s):
24 hour contact name
Related Permits:
Inspection Date: 04/04/2007
Primary Inspector: Starr Silvis
Secondary Inspector(s):
John Connelly
Entry Time: 09:30 AM
Certification:
Exit Time: 10:30 AM
Phone:
Phone: 828-652-3448 ext 250
Phone: 828-296-4500
Reason for Inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: Textile Mill Products Slormwater Discharge CDC
Facility Status: ® Compliant [1 Not Compliant
Question Areas:
® Storm water
(See attachment summary)
Page: 1
Permit: NCG170089 Owner - Facility: Galey & Lord Industries
Inspection Date: 04/04/2007 Inspection Type: Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
Monitoring is conducted quarterly, exceeding DWQ requirements for bi-annual sampling. The Stormwater Pollution
Prevention Plan is complete. The plan is reviewed annually. Inspector recommends including documentation of annual
review and a certification of non-stormwater discharge as required by the permit.
The facility does not conduct vehicle maintenance activities. The monitoring forms that are currently being used by the
facility are fine, you do not need to use the state forms unless you are doing analytical monitoring.
Stormwater Pollution Prevention Plan
Does the site have a Stormwater Pollution Prevention Plan?
# Does the Plan include a General Location (USGS) map?
# Does the Plan Include a "Narrative Description of Practices'?
# Does the Plan include a detailed site map including outfall locations and drainage areas?
# Does the Plan include a list of significant spills occurring during the past 3 years?
# Has the facility evaluated feasible alternatives to current practices?
At Does the facility provide all necessary secondary containment?
# Does the Plan include a BMP summary?
# Does the Plan include a Spill Prevention and Response Plan (SPRP)?
# Does the Plan include a Preventative Maintenance and Good Housekeeping Plan?
# Does the facility provide and document Employee Training?
# Does the Plan include a list of Responsible Par y(s)?
# Is the Plan reviewed and updated annually?
# Does the Plan include a Stormwater Facility Inspection Program?
Has the Stormwater Pollution Prevention Plan been implemented?
Comment:
Qualitative Monitoring
Has the facility conducted its Qualitative Monitoring semi-annually?
Comment:
Permit and Qutfalls
# Is a copy of the Permit and the Certificate of Coverage available at the site?
# Were all outfalls observed during the inspection?
# If the facility has representative outfall status, is it properly documented by the Division?
# Has the facility evaluated all illicit (non stormwater) discharges?
Comment:
Yes No NA NE
In❑❑❑
®❑❑❑
®❑❑n
®❑❑❑
®❑❑❑
0 0 ❑ ❑
0 0 0 0
®❑ ❑ ❑
0 0 0 0
❑❑❑
® ❑ ❑ ❑
®❑❑n
®❑nn
V— .I.. a.. aC
Yes No NA NE
®❑❑❑
❑❑®❑
Page: 2
\.N A 3rFA
Michael F. Easley, Governor
March 31, 2006
Galey & Lord Industries
110 Box 35528
Greensboro, NC 27425-0528
Subject: General Stormwater Permit Inspections
Galey & Lord Indust-Mcdowell
Permit No. NCG170089
McDowell County
Dear Sir or Madam:
William G. Ross Jr., Secretary
North Carolina Department of Environment and Natural Resources
Alan W. Klimek, P.E. Director
Division of Water Quality
Your facility holds a general permit from the North Carolina Division of Water Quality to
discharge slormwater associated with industrial activities performed at your facility. Please be
advised that the Asheville Regional Office will be performing NPDES stormwater inspections
sometime in the near future.
If this office has not previously inspected your facility, you should be prepared to demonstrate
compliance with all terms and conditions included in the permit. Specifically, we will be
evaluating the following: your stormwater pollution prevention plan, stormwater outfall
locations, qualitative and analytical monitoring data and any other activities required by your
permit. Please note that any data reported to the State must be analyzed by a facility that has a
North Carolina laboratory certification, either as a full laboratory or as a facility certified to
perform on -site field testing. If you have any questions regarding the generation of your
facility's data, please feel free to call Gary Francies at (828) 296-4677.
Copies of the general permits and accompanying documents can be accessed from the following
webpage: Documents.him#s[ornawatet,GP.
If you have any questions, please contact me in the Asheville Regional Office at (828) 296-4500.
cc: NPS Compliance & Assistance Oversight Unit
SWP-Central Files
ARO Files
Sincerely,
vai v�.�Ja
Roy Davis
Environmental Engineer
NoPhCarolina
✓17nlurn/!y
North Carolina Division of Water Quality 2090 U.S. Hwy 70
Internet: http:])w ,ncwaterquailty.org/
An Equal Opportunity/Affirmative Action Employer
Svannanoa, NC 28778 Phone (828) 296-4500 Fax (828) 299-7043
p State of North Carolina
Department of Environent
and Natural Resources
Division of Water Quality
James B. Hunt, Jr., Governor
Wayne McDevitt, Secretary
Kerr T. Stevens, Director
July 28, 1999
CHARLES A BLALOCK
GALEY & LORD INDUSTRIES INC
P.O. BOX 35528
GREENSBORO. NC 27425
A�
NCDENR
NORTH CAROLINA DEPARTMENT OF
ENVIRONMENT AND NATURAL RESOURCE5
Subject: Reissue - NPDES Stormwater Permit
Galey & Lord Industries Inc
COC Number NCG 170089
McDowell County
Dear Perrnittee:
In response to your renewal application for continued coverage under general permit NCG 170000, the Division of
Water Quality (DWQ) is forwarding herewith the reissued Stormwater general permit. This permit is reissued
pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement
between the state of North Carolina and the U.S. Environmental Protection Agency, dated December 6, 1983.
The following information is included with your permit package:
* A copy of general stormwater permit NCG 170000
* A Stormwater Pollution Prevention Plan (SPPP) Certification Form. Completion of this form is required to
certify that you have developed and implemented the SPPP as per the conditions of the permit. This form
must be completed and returned to the Division within 30 days of receipt of this letter.
DO NOT SEND the SPPP with the signed form.
* Five copies of the Analytical Monitoring form and five copies of the Qualitative Monitoring form
* A copy of a Technical Bulletin for the general permit which outlines changes in the permit, key requirements,
and addresses frequently asked questions
* A Certificate of Coverage
Your coverage under this general permit is not transferable except after notice to DWQ. The Division may require
modification or revocation and reissuance of the Certificate of Coverage. This permit does not affect the legal
requirements to obtain other permits which may be required by DENR or relieve the perminee from responsibility
for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or
decree.
If you have any questions regarding this permit package please contact Darren England of the Central Office
Stormwater and General Permits Unit at (919) 733-5083, ext. 545 -
Sincerely,
for Kerr T. Stevens
cc: Central Files
Stormwater and General permits Unit Files
Asheville Regional Office
1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Telephone 919-733.5083 Fax 919-733-9919
An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper
•
0
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG170000
CERTIFICATE OF COVERAGE No. NCG170089
STORMWATER DISCHARGES
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and
regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the
Federal Water Pollution Control Act, as amended.
GALEY & LORD INDUSTRIES INC
is hereby authorized to discharge stormwater from a facility located at
GALEY & LORD INDUSTRIES INC
I -I W Y 70 EAST
MARION
MCDOWELLCOUNTY
to receiving waters designated as Forsyth Creek in the Catawba River Basin
in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, 11, III,
IV, V, and VI of General Permit No. NCG170000 as attached.
This certificate of coverage shall become effective August 1, 1999.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this day July 28, 1999.
for Kerr 1'. Stevens, Director
Division of Water Quality
By Authority of the Environmental Management Commission
State of North Carotin
Department of Envirollbent
and Natural Resources ) ��
Division of Water Quality
James B. Hunt, Jr., Governor
Wayne McDevitt, Secretary
A. Preston Howard, Jr., P.E., Director
March 15, 1999
CERTIFIED MAIL
RETURN RECEIPT REQUESTED
CHARLES A BLALOCK
GALEY & LORD INDUSTRIES INC
P.O. BOX 35528
GREENSBORO, NC 27425
1I
NCDENR
NORTH CAROLINA DEPARTMENT OF
ENVIRONMENT AND NATURAL RESOURCES
Subject: FINAL NOTICE
�m
t_
~„lallr" vr�l-
ASt¢ Al 0,
NPDES Stormwater Permit
Galey & Lord Industries Inc
COC Number NCG 170089
McDowell County
Dear Permittee:
Your facility is currently covered for stormwater discharge under General Permit NCG 170000. This permit will
expire on July 31, 1999. North Carolina General Statute 143.215.1(c) requires that an application for permit
coverage renewal be filed in a timely manner. A prior notice of renewal was sent for this site on January 12, 1999.
To date, no response has been received by the Division of Water Quality (DWQ). In order to assure your
continued coverage under the general permit, you must apply to DWQ for renewal of your permit coverage.
Enclosed you will find a general permit renewal application form. This form serves two purposes. First, it is an
application for renewal of your permit coverage. Second, it serves as an invoice for the $80.00 permit fee. The
application must be completed and returned with the required fee by April 5, 1999 in order to assure continued
coverage under the general permit.
Recent legislation modified the fee structure for DWQ permits. Your general permit fee has been changed to an
annual fee of $80.00. A copy of the new fee schedule is enclosed in this package.
Failure to request renewal by April 5, 1999 will result in a civil assessment of at least $250.00. Larger penalties
may be assessed depending on the delinquency of the request. Discharge of stormwater from your facility without
coverage under a valid stormwater NPDES permit would constitute a violation of NCGS 143-215.1 and could
result in assessments of civil penalties of up to $10,000 per day.
If you have any questions regarding the permit renewal procedures please contact Jim Reid of the Asheville
Regional Office at 828-251-6208 or Darren England of the Central Office Stormwater Unit at (919) 733-5083, ext.
545
Sincerely,
Bradley Bennett, Supervisor
Stormwater and General Permits Unit
cc: Central Files
C-Asheville_ Regional Office— —
P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-5083 FAX 919-733-9919
An Equal Opportunity Affirmative Action Employer 50% recydedl 10% post -consumer paper