Loading...
HomeMy WebLinkAboutSW6191102_conveyance swale soil infiltration-S_2/15/2020CONVEYANCE SWALES RETENTION INFILTRATION TIME McPhail Meadows OBJECTIVE: Verify that swales below grade at discharge point will drain within 72 hours SOLUTIONS: Soils infiltration testing (Ksat) and infiltration calculations TIME TO DRAIN: Swale(s) Depth of Swale at Discharge (in) Ksat Time to Drain (hrs) Meets Requirements? 2, 4, S 2 1.0S 1.90 yes 1,3 6 0.20 30.00 yes 6,7 7.8 3.14 2.48 yes 2/15/20 HILLIARD ENGINEERING, PLLC 749 WALKER ROAD SANFORD, NC 27332 NC LICENSE NO. P-0836