Loading...
HomeMy WebLinkAbout20200237 Ver 1_6-P05187_Drainage and SW Calcs_100pct_20200214Drainage & Stormwater Computations Alamance Church Road Improvements Guilford County, NC City of Greensboro Project No. P05187 Contract 2011-067 September 30, 2019 -� SEAL 26971 = _ %NGI N'E . ,,v0 AV- G �011` �``• 10/1 /2019 Prepared By: SUNGATE DESIGN GROUP, P.A. 905 JONES FRANKLIN ROAD ` RALEIGH, NORTH CAROLINA 27606 TEL (919) 859-2243 ENG FIRM LICENSE NO. C-890 TABLE OF CONTENTS Pre/Post Outfall Analysis Page 1-6 Stormwater Off -Site Analysis Map Page 7 Ditch Calculations Page 8 Pipe Data Sheet(s) Page 9 Drainage System Computations Page 10-27 Wet Pond Summary Table Page 28 Wet Pond HydroCAD Report Pre -Development Page 29-36 Wet Pond HydroCAD Report Post -Development Page 37-52 Wet Pond Anti -Float Computation Page 53 PRE/POST ANALYSIS @ STA. -L- 18+50 RT 10/11 /2018 PRE DA C Value Open Water 1.0 0.90 CHANNEL AT INLET OF EXISTING 2@66" RCP's Pre -Construction Post -Construction % Increase Drainage Area (Acres) 159 159 0.0 Composite C Value 0.629 0.631 0.4 Urban Development 147.1 0.65 Time of Concentration (minutes) 60 60 Grass & Shrubs 2.0 0.40 Wooded 8.9 0.30 (NLCD 2011 Values) POST DA C Value Open Water 1.0 0.90 Intensity 2-Year (in/hr) 1.58 1.58 Q2 (cubic feet per second) 158 159 0.4 Flow Depth (ft) 2.95 2.96 Velocity (fps) 5.41 5.42 Intensity 10-Year (in/hr) 2.18 2.18 Urban Development 145.5 0.65 Q10 (cubic feet per second) 218 219 0.4 Grass & Shrubs 2.0 0.40 Flow Depth (ft) 3.421 3.43 Wooded 8.9 0.30 Velocity (fps) 5.871 5.881 1 Added Impervious 1 1.6 0.90 Channel Slope = 0.8% Channel 'n' Value = 0.035 Channel Base = 4' Channel Side Slopes = 2:1 Comments: No significant increase in discharges. 0 PRE/POST ANALYSIS @ STA. -L- 51+75 RT 10/11/2018 PRE DA C Value Impervious Roadway 0.48 0.90 Residential 0.62 0.40 Grass Areas 0.00 0.30 Wooded Areas 0.00 0.20 POST DA C Value Impervious Roadway 0.53 0.90 Residential 0.57 0.40 Grass Areas 0.00 0.30 Wooded Areas 0.00 0.20 OUTLET 0805 - 15" RCP Pre -Construction Post -Construction % Increase Drainage Area (Acres) 1.100 1.100 0.0 Composite C Value 0.62 0.64 Time of Concentration (minutes) 10 10 Intensity 2-Year (in/hr) 4.35 4.35 Q2 (cubic feet per second) 2.96 3.07 3.7 Flow Depth (ft) 0.36 0.36 Velocity (fps) 2.30 2.32 Intensity 10-Year (in/hr) 5.49 5.49 Q10 (cubic feet per second) 3.73 3.87 3.7 Flow Depth (ft) 0.391 0.401 Velocitv (fps) 2.431 2.45 Channel Slope=4.8% Channel 'n' Value=0.045 Channel Base=O' Channel Side Slopes=10:1 Comments: No significant increase in discharge or velocities. Install riprap dissipator pad out pipe outlet. 2 PRE/POST ANALYSIS @ STA. -L- 54+75 RT 10/11 /2018 OUTLET 0818 - 24" RCP Pre -Construction Post -Construction % Increase PRE DA C Value Drainage Area (Acres) 9.100 9.820 7.9 Impervious Roadway 0.24 0.90 Composite C Value 0.51 0.54 Residential 4.36 0.40 Time of Concentration (minutes) 15 15 Mt Zion Church 4.50 0.60 Wooded Areas 0.00 0.20 Intensity 2-Year (in/hr) 3.65 3.65 POST DA C Value Impervious Roadway 0.90 0.90 Q2 (cubic feet per second) 17.01 19.26 13.3 Flow Depth (ft) 1.12 1.18 Velocity (fps) 2.85 2.94 Intensity 10-Year (in/hr) 4.63 4.63 Residential 4.42 0.40 Q10 (cubic feet per second) 21.58 24.44 13.3 Mt Zion Church 4.50 0.60 Flow Depth (ft) 1.24 1.31 Wooded Areas 0.00 0.20 Velocitv (fps) 3.03 3.13 Channel Slope=1.3% Channel 'n' Value=0.045 Channel Base=2' Channel Side Slopes=3:1 Comments: Increase in drainage are due to proposed curb and gutter. Minor increases in discharge and velocities. Install riprap dissipator pad at pipe outlet. 3 PRE/POST ANALYSIS @ STA. -L- 61+70 RT 10/11 /2018 PRE DA C Value Impervious Roadway 0.43 0.90 OUTLET 0904 - 24" RCP Pre -Construction Post -Construction % Increase Drainage Area (Acres) 5.750 5.750 0.0 Composite C Value 0.44 0.48 Residential 5.32 0.40 Time of Concentration (minutes) 10 10 Grass Areas 0.00 0.60 Wooded Areas 0.00 0.20 POST DA C Value Impervious Roadway 0.88 0.90 Intensity 2-Year (in/hr) 4.35 4.35 Q2 (cubic feet per second) 10.94 11.92 8.9 Flow Depth (ft) 1.01 1.04 Velocity (fps) 5.36 5.48 Intensity 10-Year (in/hr) 5.49 5.49 Residential 4.87 0.40 Q10 (cubic feet per second) 13.81 15.04 8.9 Grass Areas 0.00 0.60 Flow Depth (ft) 1.101 1.14 Wooded Areas 0.00 0.20 Velocitv (fps) 5.681 5.81 Channel Slope=4.6% Channel 'n' Value=0.035 Channel Base=O' Channel Side Slopes=2:1 Comments: Minor increases in discharge and velocities. Install riprap dissi ator pad at pipe outlet. 4 PRE/POST ANALYSIS @ STA. -L- 73+50 RT OUTLET 1008, 1037, & 1040 (Pre-BMP Analysis) Pre -Construction Post -Construction % Increase Drainage Area (Acres) 28.630 29.320 2.4 Composite C Value 0.42 0.44 Time of Concentration (minutes) 20 20 Intensity 2-Year (in/hr) 3.27 3.27 Q2 (cubic feet per second) 39.49 42.18 6.8 Flow Depth (ft) 2.06 1.95 Velocitv (fps) 3.50 3.40 Intensity 10-Year (in/hr) 4.20 4.20 Q10 (cubic feet per second) 50.72 54.17 6.8 Flow Depth (ft) 2.35 2.22 Velocitv (fps) 3.74 3.63 Channel Slope=0.9% Channel 'n' Value=0.045 Channel Base=3' Channel Side Slopes=1:1 10/11 /20181 PRE DA C Value Impervious Roadway 1.25 0.90 Residential 27.38 0.40 Grass Areas 0.00 0.30 Wooded Areas 0.00 0.20 POST DA C Value Impervious Roadway 2.34 0.90 Residential 26.98 0.40 Grass Areas 0.00 0.30 Wooded Areas 0.00 0.20 Comments: Increase in drainage area due to proposed curb and gutter. Peak Q2 increase (before BMP) +2.7 cfs. BMP peak Q2 reduction -9.8 cfs. Net change -7.1 cfs. Peak Q10 increase (before BMP) +3.5 cfs. BMP peak Q10 reduction -10.5 cfs. Net change -7.0 cfs. 5 PRE/POST ANALYSIS @ STA. -L- 84+25 RT 10/11 /2018 OUTLET 1105 - 24" RCP Pre -Construction Post -Construction % Increase PRE DA C Value Drainage Area (Acres) 4.040 4.040 0.0 Impervious Roadway 0.70 0.90 Composite C Value 0.49 0.57 17.0 Residential 3.34 0.40 Time of Concentration (minutes) 10 10 Grass Areas 0.00 0.30 Wooded Areas 0.00 0.20 Intensity 2-Year (in/hr) 4.35 4.35 POST DA C Value Impervious Roadway 1.37 0.90 Q2 (cubic feet per second) 8.55 10.01 17.0 Flow Depth (ft) 0.55 0.59 Velocity (fps) 2.79 2.91 Intensity 10-Year (in/hr) 5.49 5.49 Residential 2.67 0.40 Q10 (cubic feet per second) 10.79 12.63 17.0 Grass Areas 0.00 0.30 Flow Depth (ft) 0.47 0.64 Wooded Areas 0.00 0.20 Velocitv (fps) 2.50 3.08 Channel Slope=4.0% Channel 'n' Value=0.045 Channel Base=O' Channel Side Slopes=10:1 Comments: Moderate increases in discharge and velocities. Install riprap dissipator pad at pipe outlet. Increase in Q2 and Q10 peak discharges at this outfall are negated at confluence with Wet Pond outfall due to peak flow reductions achieved by Wet Pond. 6 fc rc E Q I +2 �1 0 N� CV \ I-- r�-)cc M W r) Q Z STORMWATER OFF -SITE ANALYSIS MAP � , , � / � � l J ^ (\ \ / h i ,"� ,,, r—�'` • � ` / ` -� � r ^. �-✓ "� .r'� `„ � .,-. '\--..,.,.. \ � / � ,,.�� �\ ~try SITE 1 FF SITE N IS 4 \ > ; \ j �f l�l �, ��� �� f� r� � �r��� -N, SITE E .AREA = .6 A _ 1 _ ��� h� w L r>� M� d lr �� _S`ITE� I— ----� - lL SITE 2 c DRAI TAL D 1 AC. L �r J j �� G \ `�j s \SITE 2 5 r` �—' �ti A 5.4 _ u' c ) OUTFALL z 2 EA DIVI �? o. �_ \\ , � � � / ,, , , _ J � r ✓ s •� _ � O T^FAC LL �- t�9° ,, ; ' ; � �� I_ �.. � t .-. �.>^� l l ✓ � ---1 j \Jl^✓{ � r � 1 Lrl � ���%F-� �2� \ \� \ \ ,`Jl � 1 Ll rl4 ` _mow •., S 1 1 I r � I ✓ /"J __ V l`>r�, � \> \ ] 1— t` I ^, 4 r� r � �_> / .� i' l / 4 1 � I LJ /^) l L^ll,\ �. ^✓` �r^ rl 1 � \ �^ °� L_ t— 1"\ � 1 '~ f 1 RIBU P i /// f --_ \\`\� f—=—I r J✓rJ \^/ / / \ — 1 �— c' ! / / ` 1 v~_ S. u l \ I :�� J Il POND � —_ '`?° t � —� r 1z1/ ,J \ \S � I-1 l( %a�� /— �� � r I n �, �\�}�."'.,_ \ \z�\ '"� \, C > \ _ '`{ 5 �l\ e / // ✓/ � � r � r � \ / V � 2J � J i v ✓ `/ L U r r — v J r✓ 1 �r �, 7sue_ I I �t / F R I — I g ' \ <'\ °° `--I 1�4 I I u �` h r — _ �� ,' j °_�—� I` I_� % `\ ILJ ILI/ \ r _ Ft \ L, 1 ti e✓i' I I I__ J^ I ' N tr —r L, L — r� & I_J \ I I I_ J o , �: - I RIPAR I ILL, BpFF - PR CA r ri O F L 2 6IF— I ° p•r/, , � /? rig � / ` � < `\ ,T L 1 _ r 1 1 � `- � � � 1 �(p •' J !�' 1 � j \� �� )r \ � J 1 <^ 00 SE D POD° �� \c _ POND ` � �� \ 'SI` D NAVE/ �, ✓ � ` � 1 C� (��, � ems' \ � hS• \ /, (v�\> // ARC r °✓°,\> C 1\ SITE OU FAL O 3 ,�a \ POND `\ \\�`� �I ,n� /< T 3 FF—SITE}•, ALY IS ` EA AR �. � � `,✓ v \ \, r� �;y,\ r; �� y _ ! ; TO 1 .8 AC. SIT 1 ' OUTF OF 3a cat U•, / � _ .'\ \ \ i i Val �^\ r` (/\ s\ /\ \J \ > •� \i \. ✓^ � ��� \`� ,. '\ 1 \ / s\ i /,✓ ri ", �✓ _ > �� � ^ �^ cam\ ��� \ l,l ! U Li % ^ \ ^^ 1 \ti`\ \J V \� '�\� �,^�\ 1 yet _.,.� • �� \ > \� �` � �� /� �l <'/,� � ��'i i ,\ � \ � � J^ ^> mop \ .,) t \ � \ ? L � _.✓ -t I OFF —SITE ANALYSIS > l �'v f <, L� `' �I EA-2.37 AC. ~' 1 ' (\ \'' "\ ✓ 5 ' �1 TAL D — AC. SITE 4 OF — E ANALYSIS SITE D REA= 7.82 AC. AL DA = 95.4 AC. IN 1 "�'�% f 1 \` \ t4• '"`� err' i i J ~ \ t . > i ` yl / /\ 300' 150' 0 300' 600' I I I J SCALE: 1" = 300' C DITCH CALCULATION SHEET DATE: 3/15/2019 SHEET-1-OF-1- I.D. NO. P05187 PROJ. NO.: Alamance Church Rd. COUNTY: Guilford DESIGNED BY: RCH DESCRIPTION: 10-YR DESIGN DITCH CALCS CHECKED BY: JGD w w W z �U J} Q } F uJ W z O Lu Q F U 0 O w Q Q z U- p O Z Lu Q W 0 w Q _ g o > =< o o z O C/) D.A. C Tc I Q % FT FT/S t -L- 21+00 to 22+25 LT 0.40 0.40 5.00 7.00 1.12 0.30 0.61 1.01 0.11 Temp. Matting -L- 28+80 to 30+25 LT 0.36 0.40 5.00 7.00 1.01 0.50 0.53 1.20 0.17 Temp. Matting -L- 30+75 to 31+00 LT 0.13 0.40 5.00 7.00 0.36 6.00 0.09 1.82 0.32 Temp. Matting -L- 31+00 to 31+90 LT 0.20 0.40 5.00 7.00 0.56 5.00 0.12 1.98 0.36 Temp. Matting -L- 33+20 to 34+00 LT 0.37 0.40 5.00 7.00 1.04 4.00 0.36 2.63 0.91 Temp. Matting -L- 37+00 to 37+50 LT 0.20 0.40 5.00 7.00 0.56 8.40 0.22 2.80 1.17 Temp. Matting -L- 71+00 to 71+50 RT 0.50 0.40 5.00 7.00 1.40 8.00 0.36 3.67 1.78 Temp. Matting -L- 71+50 to 71+70 RT 0.50 0.40 5.00 7.00 1.40 1.00 0.53 1.68 0.33 Temp. Matting -L- 74+15 to 76+50 LT 1.77 0.40 10.00 5.60 3.96 1.601 0.72 2.61 0.71 Temp. Matting -Y3- 11+25 to 12+50 LT 0.58 0.401 5.00 7.00 1.62 5.20 0.41 3.24 1.33 Temp. Matting -Y3- 12+50 to 13+25 LT 0.681 0.401 5.001 7.00 1.90 4.40 0.451 3.171 1.231 Temp. Matting -Y3- 13+25 to 13+64 LT 0.681 0.401 5.001 7.00 1.90 2.00 0.521 2.361 0.651 Temp. Matting PIPE DATA SHEET Date: 2/16/2018 Sheet 1 of 1 Project Number: P05187 I.D. No.: County: GUILFORD Designed By: RCH Reviewed By: JGD CL Elev.: 739.4 ft Plan Summary Data Shoulder Drainage Area: 12 AC Alignment: -L- Elev.: 739.3 ft Design Freq.: 25 YR Station: 31+00 Design Disch.: 26 CFS Skew: 90, Design H.W. Elev.: 737.4 FT Size/Type Pipe: Type Entrance: 1 @ 36" RCP -IV HW H.W. H Q100 Discharg.: Q100 Elev.: 28 CFS 737.5 FT Direction of Flow: L-R LSo T.W Overtopping Freq.: +100 YR Hydrological Method. RATIONAL EQ. Inlet Design ev. So 0.48% Design Elev. Overtopping Disch.. 42 CFS H.W. Control Elevation: 737.6 Invert Elev.: 734.0 ft L= 104 ft Outlet Inv. Elev. 733.5 ft Overtopping Elev.: 737.6 FT pecs. Slope: 0.025 Lt. Side Slope 2 PIPE CULVERT ANALYSIS (English) rcp=.012, cmp=.024 [Basf n= 0.012 6 n= 0.045 Rt. Side Sloe 2 Size & Type TW Q Nat. Allow Inlet Control Outlet Control HWJ Vo Remarks SIZE # FREQ ft ft^3/s H.W. H.W. HW/D HW (ft) Ke I d, j(d,+D)/21 ho I H I L*So I HW ELEV. Pi es 36 1 10 3.1 23 3.60 0.8 2.25 0.2 1.51 2.26 3.10 0.302 0.50 2.90 736.90 7.0 FPS OUTLET CONTROL 36 1 25 3.1 26 3.60 0.8 2.43 0.2 1.62 2.31 3.10 0.386 0.50 2.99 736.99 OUTLET CONTROL 36 1 50 3.1 27 3.60 0.8 2.49 0.2 1.66 2.33 3.10 0.416 0.50 3.02 737.02 OUTLET CONTROL 36 1 100 3.1 28 3.60 0.9 2.55 0.2 1.69 2.35 3.10 0.448 0.50 3.05 737.05 OUTLET CONTROL 36 1 200 3.1 65 3.60 1.8 5.40 0.2 2.70 2.85 3.10 2.412 0.50 5.01 739.40 INLET CONTROL 36 1 500 3.1 85 3.60 2.6 7.80 0.2 2.70 2.85 3.10 4.124 0.50 6.72 741.80 INLET CONTROL 36 1 OT 1 3.1 42 3.60 1.1 3.39 0.21 2.14 2.57 3.10 1.007 0.50 3.61 737.61 OUTLET CONTROL HEM RECOMMENDATION: 36" RCP -IV w/ HW Overtops DA at +/- 30+50 -L- LT Elevation = 737.6' DESIGN HW/D = 1.2 HW EL = 1.2 * 3.0 + 734.0 = 737.6' Tail water controlled by D/S driveway overtopping elevation=736.6 at 29+50 -L- RT YDROLOGY: Storm Calculated Q SAY Drainage Area = 12 Ac Q10 = 23.124 23 cfs C = 0.40 Q25 = 25.584 26 cfs Tc = 15 Min Q50 = 26.568 27 cfs Q100 = 28.044 28 cfs Q200 = Q10 x 2.80 = 64.75 65 cfs Q500 = Q10 x 3.66 = 84.634 85 cfs Invert Not Buried 9 CREATE DATE REV. DATE: I.D. NO.: DESCRIPTION: 9/30/2019 Alamance Church Road INLET COMPUTATION SHEET PROJ. NO.: P05187 COUNTY: Guilford DESIGNED BY: REVD BY: RCH JGD LOCATION ROADWAY RUNOFF INLET REMARKS W (n cn w Of af W � �z � z w Z (D Q z O Q c� W LwL O Z Q Q' U m wo Z O Q �- w J wOf w Q- a. � O a O J fn rn O U w c� Q zQ W w� OQ D.A. w LL OW Z W �O �U C _ w€ wci 2 Z O HU T, J Q L z Q H �? I W w Q Q Q �� fn O F5 LL QD.A. O _� � o QC W o Q Q� ~ fn m °�� Q QC Q+ 0 w O cA = w (� wQ H Q z� QI(mx) In ¢ d m m� QB O cn a� a J mz 401 0402 L 12+27 29 Rt CB 726.40 SAG 0.020 0.18 0.90 5.0 5.5 0.9 0.2 1.0 5.9 N/A N/A 401 0403 L 12+54 30 Rt JB TO JB W MH 727.50 0.005 0.160 0.00 0.00 0.0 0.3 0.0 0.3 401 0406 L 12+53 45 Rt JB w/ MH 729.00 0.005 0.050 0.15 0.40 5.0 4.0 0.2 0.0 0.2 401 0410 L 13+29 30 Rt EX Cl 726.50 0.007 0.040 0.09 0.90 5.0 5.5 0.4 0.6 1.1 4.7 1.0 0.1 402 401 0407 L 12+91 45 Rt TB 2GI 727.93 0.005 0.050 0.22 0.60 5.0 5.5 0.7 0.0 0.7 4.0 0.7 0.0 402 401 0404 L 12+23 44 Rt 2GI 727.70 SAG 0.100 0.15 0.40 5.0 5.5 0.3 0.0 0.3 1.0 N/A N/A 401 0405 L 12+53 55 Rt 2GI 728.50 SAG 0.160 0.15 0.50 5.0 5.5 0.4 0.0 0.4 0.7 N/A N/A 401 0411 L 13+99 30 Rt EX CB 726.30 0.003 0.050 0.31 0.90 5.0 5.5 1.5 1.2 2.7 7.3 2.2 0.5 410 401 0408 L 13+24 44 Rt CB 727.83 0.005 0.050 0.02 0.90 5.0 5.5 0.1 0.0 0.1 2.1 0.1 0.0 402 401 0413 L 14+28 42 Rt ADJ Cl 727.35 0.075 0.050 0.78 0.60 5.0 5.5 2.6 0.0 2.6 3.9 2.2 0.3 411 401 0412 L 14+00 CL DI 728.50 0.001 0.060 0.21 0.90 5.0 5.5 1.0 0.0 1.0 5.3 1.0 0.1 410 401 0409 L 13+58 44 Rt CB 727.83 0.070 0.050 0.27 0.60 5.0 5.5 0.9 0.0 0.9 2.6 0.9 0.0 410 401 0414 L 14+60 44 Rt ADJ Cl 727.40 0.075 0.050 0.22 0.90 5.0 5.5 1.1 0.0 1.1 2.8 1.0 0.0 411 506 0505 L 22+88 26 Rt Ex Cl 731.00 0.005 0.050 0.52 0.90 5.0 5.5 2.5 0.1 2.7 6.2 2.3 0.4 EX07 506 0504 L 22+87 40 Lt Collar 732.65 0.070 0.070 0.00 0.00 0.0 0.3 0.0 0.3 506 0503 L 22+88 44 Lt CB 736.33 SAG 0.070 0.28 0.80 5.0 5.5 1.2 0.0 1.2 3.2 N/A N/A 506 0502 L 22+45 45 Lt CB 735.23 0.070 0.070 0.51 0.65 5.0 5.5 1.8 0.0 1.8 2.8 1.8 0.1 EX07 506 0507 L 23+67 44 Lt CB 736.13 0.070 0.070 0.19 0.90 5.0 5.5 0.9 0.0 0.9 2.2 0.9 0.0 505 506 0501 L 22+25 52 Lt 2GI 732.90 SAG 0.330 0.37 0.40 5.0 5.5 0.8 0.0 0.8 0.6 N/A N/A 506 0508 L 24+11 45 Lt CB 735.33 0.070 0.070 0.56 0.80 5.0 5.5 2.5 0.0 2.5 3.1 2.3 0.1 505 509 0511 L 25+67 26 Rt CB 734.03 0.005 0.065 0.04 0.90 5.0 5.5 0.2 0.0 0.2 2.1 0.2 0.0 505 509 0510 L 25+67 34 Lt CB 733.07 0.005 0.025 0.05 0.90 5.0 5.5 0.2 0.0 0.2 2.6 0.2 0.0 514 10 Printed 9/30/2019 CREATE DATE REV. DATE: I.D. NO.: DESCRIPTION: 9/30/2019 Alamance Church Road INLET COMPUTATION SHEET PROJ. NO.: P05187 COUNTY: Guilford DESIGNED BY: REVD BY: RCH JGD LOCATION ROADWAY RUNOFF INLET REMARKS W (n cn w Of af W � �z � z w Z (D Q z O Q c� W LwL O Z Q Q' U m wo Z O Q �- w J wOf w Q- a. � O a O J fn to O U w c� Q zQ W w� OQ D.A. w LL OW Z W �O �U C _ w€ wci 2 Z O HU T, J Q L z Q H �? I W w Q Q �� fn O F5 LL QD.A. O _� � o QC W o Q Q� ~ fn m °�� Q QC Q+ w O cA w (� wQ H Q QI(mx) In ¢ d m QB O (n a� a J 509 0514 L 26+78 34 Lt CB 732.43 SAG 0.025 0.35 0.90 5.0 5.5 1.7 0.0 1.7 7.8 N/A N/A 509 0512 L 25+67 53 Lt CB 734.23 SAG 0.020 0.20 0.90 5.0 5.5 1.0 0.0 1.0 5.5 N/A N/A 509 0515 L 27+50 34 Lt CB 732.43 SAG 0.065 0.45 0.90 5.0 5.5 2.2 0.2 2.4 4.1 N/A N/A 509 0513 L 26+64 56 Lt CB 734.23 SAG 0.025 0.24 0.80 5.0 5.5 1.0 0.0 1.0 7.9 N/A N/A 509 0517 Y3 13+25 15 Rt MDCB 734.06 0.034 0.020 0.15 0.90 5.0 5.5 0.8 0.0 0.8 3.6 0.7 0.1 515 509 0524 L 28+65 27 Lt CB 733.78 0.012 0.059 0.35 0.90 5.0 5.5 1.7 0.1 1.8 3.8 1.7 0.1 515 509 0519 Y3 12+00 15 Rt MDCB 739.41 0.056 0.040 0.10 0.90 5.0 5.5 0.5 0.7 1.1 2.5 1.1 0.0 517 509 0516 Y3 13+25 40 Rt DI 735.50 SAG 0.060 0.44 0.40 5.0 5.5 1.0 0.0 1.0 3.1 N/A N/A 509 0523 L 28+80 46 Lt 2G1 733.40 SAG 0.250 1.04 0.40 5.0 5.5 2.3 0.0 2.3 1.3 N/A N/A 509 0520 Y3 11+20 15 Rt CB 744.46 0.066 0.036 0.77 0.80 5.0 5.5 3.4 0.0 3.4 4.7 2.7 0.7 519 509 0518 Y3 12+00 48 Rt DI 741.00 SAG 0.030 0.11 0.40 5.0 5.5 0.2 0.0 0.2 3.1 N/A N/A 509 0521 Y3 11+19 6 Rt Adi MH 745.14 0.066 0.035 3.96 0.45 10.0 1.9 3.4 0.0 3.4 526 0525 Y4 10+70 15 Lt CB 736.41 0.006 0.021 0.03 0.90 5.0 5.5 0.1 0.0 0.1 1.9 0.1 0.0 515 601 0602 L 31+10 24 Lt MDCB 738.44 0.021 0.040 0.23 0.90 5.0 5.5 1.1 0.2 1.3 3.6 1.2 0.1 524 601 0604 L 32+50 24 Lt CB 742.60 0.034 0.020 0.11 0.90 5.0 5.5 0.5 0.5 1.1 4.5 0.9 0.2 602 601 0603 L 32+84 47 Lt 2G1 745.00 SAG 0.100 2.68 0.40 10.0 5.5 5.9 0.0 5.9 6.8 N/A N/A 601 0606 L 33+50 24 Lt CB 746.55 0.041 0.020 0.28 0.90 5.0 5.5 1.4 0.0 1.4 4.9 1.1 0.2 604 601 0619 L 32+50 24 Rt CB 743.51 0.034 -0.018 0.05 0.90 5.0 5.5 0.2 0.0 0.2 2.9 0.2 0.0 602 601 0605 L 33+20 40 Lt 2G1 745.30 SAG 0.250 0.37 0.40 5.0 5.5 0.8 0.0 0.8 0.6 N/A N/A 601 0607 L 33+50 24 Rt CB 746.73 0.041 0.012 0.24 0.90 5.0 5.5 1.2 0.0 1.2 6.3 0.9 0.3 604 601 0609 L 35+23 24 Lt CB 753.64 0.041 0.020 0.12 0.70 5.0 5.5 0.5 0.0 0.5 2.3 0.5 0.0 606 601 0608 L 35+23 45 Lt DI 11 754.50 SAG 0.100 0.19 0.40 5.0 5.5 0.4 0.0 0.4 2.1 N/A N/A 11 Printed 9/30/2019 CREATE DATE REV. DATE: I.D. NO.: DESCRIPTION: 9/30/2019 Alamance Church Road INLET COMPUTATION SHEET PROJ. NO.: P05187 COUNTY: Guilford DESIGNED BY: REVD BY: RCH JGD LOCATION ROADWAY RUNOFF INLET REMARKS W (n cn w Of af W � �z � z w Z (D Q z O Q c� W LwL O Z Q Q' U m wo Z O Q �- w J wOf w Q- a. � O a O J fn to O CU w c� Q zQ W w� OQ D.A. w LL OW Z W �O �U C _ w€ wci 2 Z O HU T, J Q L z Q H �? I W w Q Q �� fn O F5 LL QD.A. O _� � o QC W o Q Q� ~ fn m °�� Q + QQC 0 w O cA = w (� wQ H Q z� Ql(mx) In ¢ d m m� QB O cn a� a J mz 601 0611 L 36+20 24 Lt CB 757.80 0.042 0.015 0.10 0.90 5.0 5.5 0.5 0.1 0.6 3.3 0.6 0.0 609 601 0610 L 36+20 43 Lt DI 757.00 SAG 0.020 0.69 0.40 5.0 5.5 1.5 0.0 1.5 8.3 N/A N/A 601 0613 L 37+00 24 Lt CB 761.23 0.044 0.016 0.14 0.90 5.0 5.5 0.7 0.2 0.9 4.3 0.8 0.1 611 601 0612 L 37+00 52 Lt OE Pipe 761.10 0.033 0.000 2.92 0.40 10.0 0.6 0.7 0.0 0.7 601 0614 L 37+85 24 Lt CB 764.39 0.044 0.040 0.42 0.90 5.0 5.5 2.1 0.0 2.1 3.9 1.9 0.2 613 601 0617 L 37+00 24 Rt CB 762.00 0.044 -0.016 0.01 0.60 2.0 5.5 0.0 0.0 0.0 1.5 0.0 0.0 607 601 0620 L 39+50 24 Lt CB 772.10 0.044 0.020 0.13 0.90 2.0 5.5 0.6 0.2 0.8 3.3 0.7 0.0 614 601 0701 L 40+48 24 Lt CB 776.40 0.044 0.020 0.06 0.90 5.0 5.5 0.3 0.9 1.2 4.3 1.0 0.2 620 601 0618 L 39+50 24 Rt CB 773.01 0.044 -0.018 0.03 0.60 2.0 5.5 0.1 0.0 0.1 1.9 0.1 0.0 614 601 0702 L 40+48 24 Rt CB 775.58 0.044 0.054 0.13 0.90 5.0 5.5 0.6 0.4 1.1 2.1 1.1 0.0 613 601 0703 L 41+20 24 Lt CB 778.83 0.022 0.017 0.40 0.60 5.0 5.5 1.3 1.2 2.5 8.6 1.6 0.9 701 601 0719 L 40+65 42 Lt DI 777.25 SAG 0.100 0.32 0.40 5.0 5.5 0.7 0.0 0.7 3.0 N/A N/A 601 0704 Y6 10+52 15 Rt CB 781.92 0.021 0.028 0.73 0.60 5.0 5.5 2.4 0.0 2.4 6.2 1.8 0.6 703 601 0705 L 42+07 24 Lt MDCB 782.13 0.022 0.017 0.49 0.60 5.0 5.5 1.6 0.3 1.9 7.6 1.3 0.6 703 601 0706 L 42+07 24 Rt CB 782.37 0.034 0.020 0.07 0.50 5.0 5.5 0.2 1.6 1.8 5.9 1.4 0.4 702 601 0708 L 43+57 34 Lt JB w/ MH 788.50 0.022 0.100 0.00 0.00 0.0 3.1 0.0 3.1 601 0716 L 42+24 23 Rt CB 782.96 0.034 0.020 1.21 0.60 10.0 5.5 4.0 0.0 4.0 8.6 2.4 1.6 706 601 0710 L 44+79 40 Lt Ex MH 793.00 0.022 0.020 0.00 0.00 0.0 0.7 0.0 0.7 601 0707 L 43+57 45 Lt DI 788.20 SAG 0.100 1.96 0.40 10.0 5.5 4.3 0.0 4.3 9.9 N/A N/A 601 0709 L 43+57 24 Lt CB 788.03 0.022 0.020 0.23 0.90 5.0 5.5 1.1 0.3 1.5 6.0 1.1 0.3 705 601 0718 L 46+48 31 Lt MDCB 798.23 0.023 0.008 0.16 0.90 5.0 5.5 0.8 0.2 1.0 8.8 0.7 0.3 709 601 1 0714 rY7 1 13+20 18 Rt MBCB 799.43 0.019 0.007 0.05 0.90 5.0 5.5 0.3 0.5 0.8 8.8 0.6 0.2 718 12 Printed 9/30/2019 CREATE DATE REV. DATE: I.D. NO.: DESCRIPTION: 9/30/2019 Alamance Church Road INLET COMPUTATION SHEET PROJ. NO.: P05187 COUNTY: Guilford DESIGNED BY: REVD BY: RCH JGD LOCATION ROADWAY RUNOFF INLET REMARKS W (n cn w Of af W � �z � z w Z (D Q z O Q c� W LwL O Z Q Q' U m wo Z O Q �- w J wOf w Q- a. � O a O J fn to O U w c� Q zQ W w� OQ D.A. w LL OW Z W �O �U C _ w€ wci 2 Z O HU T, J Q L z Q H �? I W w Q Q �� fn O F5 LL QD.A. O _� � o QC W o Q Q� ~ fn m °�� Q QC Q+ 0 w O cA = w (� wQ H Q z� QI(mx) In ¢ d m m� QB O cn a� a J mz 601 0717 L 47+25 26 Lt Ex. MH 799.50 0.021 0.020 0.00 0.00 0.0 1.5 0.0 1.5 601 0713 Y7 12+57 18 Rt MDCB 799.73 0.011 0.008 0.30 0.90 5.0 5.5 1.5 0.0 1.5 12.8 0.9 0.5 714 601 0711 L 47+42 34 Lt Ex CI 800.20 0.022 0.033 0.08 0.90 5.0 5.5 0.4 0.0 0.4 3.2 0.4 0.0 709 601 0712 L 47+74 49 Lt Ex DI 800.70 SAG 0.100 0.46 0.90 5.0 5.5 2.3 0.0 2.3 6.5 N/A N/A 601 0715 Y7 13+04 19 Lt Ex CB 799.60 SAG 0.020 0.36 0.90 5.0 5.5 1.8 0.0 1.8 11.0 N/A N/A 616 0615 L 31 +05 55 Lt H W 738.00 0.030 0.100 12.28 0.40 15.0 0.3 1.3 0.0 1.3 805 0804 L 51+50 24 Rt CB 796.04 0.020 0.018 0.05 0.90 5.0 5.5 0.2 1.0 1.2 5.9 1.0 0.2 813 805 0802 L 51+50 33 Lt CB 796.61 0.020 0.010 0.14 0.90 5.0 5.5 0.7 0.2 0.9 7.3 0.7 0.2 813 805 0803 L 50+90 24 Rt CB 797.51 0.024 0.018 0.82 0.60 5.0 5.5 2.7 0.0 2.7 8.4 1.7 1.0 804 805 0801 L 50+00 33 Lt CB 799.63 0.024 0.013 0.17 0.90 5.0 5.5 0.9 0.0 0.9 5.7 0.7 0.2 802 818 0815 L 54+69 24 Rt CB 791.10 0.003 0.020 0.09 0.90 5.0 5.5 0.4 0.1 0.6 6.1 0.5 0.0 816 818 0814 L 54+10 24 Rt CB 791.69 0.017 0.020 0.10 0.90 5.0 5.5 0.5 0.4 0.9 5.1 0.8 0.1 815 818 0816 L 54+82 24 Rt CB 791.08 SAG 0.020 0.07 0.90 5.0 5.5 0.4 0.2 0.5 2.3 N/A N/A 818 0822 L 54+72 19 Lt ADJ MH 791.76 0.014 -0.020 0.00 0.00 0.0 0.1 0.0 0.1 818 0813 L 53+50 24 Rt CB 792.47 0.017 0.031 0.35 0.90 5.0 5.5 1.7 0.4 2.2 5.8 1.7 0.4 814 818 0817 L 55+58 24 Rt CB 791.74 0.017 0.020 0.18 0.90 5.0 5.5 0.9 0.0 0.9 4.9 0.8 0.1 816 818 0807 L 54+57 48 Lt Adj CI 792.33 0.040 0.020 0.09 0.90 5.0 5.5 0.4 0.0 0.4 2.0 0.4 0.0 810 818 0810 L 54+75 25 Lt CB 792.07 SAG -0.020 0.02 0.90 5.0 5.5 0.1 0.0 0.1 -22.3 N/A N/A 818 0806 L 54+27 47 Lt Adj CI 792.53 0.040 0.020 0.13 0.90 5.0 5.5 0.7 0.0 0.7 3.0 0.6 0.0 810 818 0808 L 54+75 48 Lt 2G1 790.40 SAG 0.330 2.87 0.40 15.0 5.5 6.3 0.0 6.3 2.2 N/A N/A 818 0812 L 56+25 24 Lt CB 793.65 0.033 0.010 0.16 0.90 5.0 5.5 0.8 0.0 0.8 6.0 0.6 0.2 811 818 0809 L 55+00 48 Lt I DI 790.50 SAG 1 0.100 0.12 0.40 5.0 5.5 0.3 0.0 0.3 1.6 1 N/A N/A 13 Printed 9/30/2019 CREATE DATE REV. DATE: I.D. NO.: DESCRIPTION: 9/30/2019 Alamance Church Road INLET COMPUTATION SHEET PROJ. NO.: P05187 COUNTY: Guilford DESIGNED BY: REVD BY: RCH JGD LOCATION ROADWAY RUNOFF INLET REMARKS W (n Of af Of z z w Z � w LL O Q ZaQ Y ww� Z � w w Q- a O to Of U w d �O Q zIs Q W YO2O D.A. w ZW C _- w€ wc Z T, J Q I W n O F5 LL QD.A. _O on QC o m ° Q QC Q+ 0 w Y A w () Q QI(mx) to mO QB toW J z m 818 0821 L 56+25 40 Lt DI 793.40 SAG 0.250 0.46 0.40 5.0 5.5 1.0 0.0 1.0 1.5 N/A N/A 818 0823 L 55+97 40 Lt DI 793.00 SAG 0.250 0.05 0.40 5.0 5.5 0.1 0.0 0.1 0.3 N/A N/A 818 0824 L 57+48 40 Lt DI 798.00 SAG 0.250 0.58 0.40 5.0 5.5 1.3 0.0 1.3 1.8 N/A N/A 904 0903 L 60+68 24 Rt CB 793.45 0.006 0.020 0.22 0.90 5.0 5.5 1.1 0.0 1.1 7.1 0.9 0.2 905 904 0905 L 61+27 24 Rt CB 793.27 SAG 0.020 0.11 0.90 5.0 5.5 0.5 0.3 0.8 4.6 N/A N/A 904 0902 L 60+68 24 Lt CB 793.45 0.006 0.020 0.08 0.90 5.0 5.5 0.4 0.2 0.6 5.3 0.6 0.1 907 904 0906 L 61+97 24 Rt CB 793.52 0.007 0.020 0.18 0.90 5.0 5.5 0.9 0.0 0.9 6.2 0.8 0.1 905 904 0901 L 60+68 40 Lt DI 792.70 SAG 0.250 1.87 0.40 5.0 5.5 4.1 0.0 4.1 6.7 N/A N/A 904 0820 L 59+71 24 Lt CB 794.53 0.016 0.020 0.33 0.70 5.0 5.5 1.3 0.0 1.3 6.0 1.0 0.2 902 904 0907 L 61+27 24 Lt CB 793.27 SAG 0.020 0.42 0.50 5.0 5.5 1.2 0.2 1.3 7.6 N/A N/A 904 0819 L 59+78 43 Lt DI 794.50 SAG 0.100 0.36 0.40 5.0 5.5 0.8 0.0 0.8 3.2 N/A N/A 904 0908 L 62+05 24 Lt CB 793.58 0.008 0.020 0.10 0.90 5.0 5.5 0.5 0.3 0.8 5.7 0.7 0.1 907 904 0911 L 63+00 24 Lt CB 794.68 0.013 0.020 0.50 0.50 5.0 5.5 1.4 0.0 1.4 6.6 1.1 0.3 908 904 0909 Y9 10+50 20 Rt 2G1 794.40 SAG 0.125 0.48 0.40 5.0 5.5 1.0 0.0 1.0 1.7 N/A N/A 904 0910 Y9 10+50 20 Lt 2G1 794.70 SAG 0.140 1.10 0.50 5.0 5.5 3.0 0.0 3.0 3.1 N/A N/A 1008 1007 L 73+20 26 Rt JB w/ MH 769.00 0.025 0.000 0.00 0.00 0.0 1.5 0.0 1.5 1008 1006 L 72+99 17 Lt CB to TBJB 766.48 0.016 0.030 0.00 0.00 0.0 1.5 0.0 1.5 1008 1033 L 74+15 24 Rt CB 766.53 SAG 0.010 0.02 0.70 5.0 5.5 0.1 0.0 0.1 3.1 N/A N/A 1008 1013 L 73+10 24 Lt CB 765.85 0.014 0.030 0.05 0.90 5.0 5.5 0.2 1.0 1.2 4.7 1.1 0.1 1016 1 008 1005 L 72+87 58 Lt HW 763.00 0.025 0.000 14.08 0.50 15.0 0.2 1.5 0.0 1.5 1008 1016 L 73+97 24 Lt CB 765.13 0.003 0.030 0.18 0.80 5.0 5.5 0.8 0.6 1.4 7.0 1.2 0.2 1019 1008 1019 L 74+15 24 Lt CB 765.02 SAG 0.030 0.11 0.90 5.0 5.5 0.6 0.3 0.9 3.3 N/A N/A 14 Printed 9/30/2019 CREATE DATE REV. DATE: I.D. NO.: DESCRIPTION: 9/30/2019 Alamance Church Road INLET COMPUTATION SHEET PROJ. NO.: P05187 COUNTY: Guilford DESIGNED BY: REVD BY: RCH JGD LOCATION ROADWAY RUNOFF INLET REMARKS W (n cn w Of af W � �z � z w Z (D Q z O Q c� W LwL O Z Q Q' U m wo Z O Q �- w J wOf w Q- a. � O a O J fn to O U w c� Q zQ W w� OQ D.A. w LL OW Z W �O �U C _ w€ wci 2 Z O HU T, J Q L z Q H �? I W w Q Q �� fn O F5 LL QD.A. O _� � o QC W o Q Q� ~ fn m °�� Q QC Q+ 0 w O cA = w (� wQ H Q z� QI(mx) In ¢ d m m� QB O cn a� a J mz 1008 1034 L 74+79 24 Lt CB 765.62 0.009 0.020 0.17 0.90 5.0 5.5 0.8 0.0 0.8 5.7 0.7 0.1 1019 1008 1015 L 74+15 43 Lt 2G1 764.40 SAG 0.250 1.77 0.40 10.0 5.5 3.9 0.0 3.9 2.1 N/A N/A 1008 1022 L 76+10 24 Lt CB 767.91 0.026 0.020 0.10 0.90 5.0 5.5 0.5 0.0 0.5 2.9 0.5 0.0 1034 1008 1014 Y11 12+24 15 Lt CB 765.31 0.011 0.020 0.06 0.80 5.0 5.5 0.3 1.6 1.8 7.9 1.3 0.5 1016 1008 1024 Y12 10+56 15 Rt CB 769.42 0.005 0.013 0.01 0.90 5.0 5.5 0.0 0.0 0.0 1.2 0.0 0.0 1022 1008 1021 L 76+10 24 Rt CB 767.91 0.026 0.020 0.15 0.90 5.0 5.5 0.7 0.3 1.0 4.6 0.9 0.1 1020 1008 1027 Y12 10+56 15 Lt MDCB 770.00 0.005 0.020 0.01 0.80 5.0 5.5 0.1 0.0 0.1 1.3 0.1 0.0 1041 1008 1023 Y12 10+48 15 Rt CB 769.46 SAG 0.010 0.51 0.50 5.0 5.5 1.4 1.1 2.5 27.0 N/A N/A 1008 1020 L 75+57 24 Rt CB 766.95 0.003 0.010 0.04 0.90 5.0 5.5 0.2 0.1 0.3 7.4 0.3 0.0 1019 1008 1028 L 77+25 24 Lt CB 771.15 0.028 0.020 0.06 0.90 5.0 5.5 0.3 0.2 0.5 2.9 0.5 0.0 1022 1008 1041 Y12 10+48 15 Lt MDCB 769.73 SAG 0.020 1.02 0.45 10.0 5.5 2.5 0.0 2.5 13.8 N/A N/A 1008 1031 L 78+00 24 Lt CB 773.28 0.028 0.020 0.24 0.60 5.0 5.5 0.8 0.5 1.3 5.2 1.0 0.2 1028 1008 1018 L 77+25 41 Lt 2G1 770.50 SAG 0.250 0.48 0.50 5.0 5.5 1.3 0.0 1.3 1.0 N/A N/A 1008 1025 Y12 10+00 12 Lt Ex CI 771.90 0.022 0.020 1.09 0.50 5.0 5.5 3.0 0.0 3.0 8.4 1.9 1.1 1023 1008 1029 L 79+00 24 Lt CB 776.11 0.028 0.020 0.48 0.60 5.0 5.5 1.6 0.2 1.8 6.3 1.4 0.5 1031 1008 1032 L 78+00 24 Rt CB 773.28 0.028 0.020 0.27 0.90 5.0 5.5 1.3 0.0 1.3 5.3 1.1 0.3 1021 1008 1030 L 79+88 24 Lt CB 778.60 0.028 0.020 0.39 0.60 5.0 5.5 1.3 0.0 1.3 5.2 1.0 0.2 1029 1037 1036 L 72+50 24 Rt CB 768.38 0.022 -0.030 0.01 0.80 5.0 5.5 0.1 0.0 0.1 3.3 0.1 0.0 1026 1037 1002 L 70+93 24 Rt CB 772.58 0.043 0.010 0.24 0.60 5.0 5.5 0.8 0.2 1.0 6.4 0.8 0.3 1013 1037 1035 L 72+50 24 Lt CB 766.94 0.022 0.030 0.24 0.90 5.0 5.5 1.2 0.0 1.2 4.0 1.0 0.1 1026 1037 0917 L 69+75 24 Rt CB 778.20 0.052 0.020 0.42 0.50 5.0 5.5 1.2 0.3 1.4 4.7 1.2 0.2 1002 1037 1001 L 70+93 24 Lt CB 772.34 0.043 0.020 0.59 0.65 5.0 5.5 2.1 0.3 2.4 6.4 1.7 0.7 1013 15 Printed 9/30/2019 CREATE DATE REV. DATE: I.D. NO.: DESCRIPTION: 9/30/2019 Alamance Church Road INLET COMPUTATION SHEET PROJ. NO.: P05187 COUNTY: Guilford DESIGNED BY: REVD BY: RCH JGD LOCATION ROADWAY RUNOFF INLET REMARKS W (n cn w Of af W � �z � z w Z (D Q z O Q c� W LwL O Z Q Q' U m wo Z O Q �- w J wOf w Q- a. � O a O J fn to O CU w c� Q zQ W w� OQ D.A. w LL OW Z W �O �U C _ w€ wci 2 Z O HU T, J Q L z Q H �? I W w o Q Q �� fn O F5 LL QD.A. O _� � o QC W o Q Q� ~ fn m °�� Q + QQC 0 w O cA = w (� wQ H Q z� Ql(mx) In ¢ d m m� QB O cn a� a J mz 1037 1026 L 72+80 24 Lt CB 766.33 0.018 0.030 0.05 0.90 5.0 5.5 0.2 0.1 0.4 2.0 0.4 0.0 1013 1037 0916 L 69+28 24 Rt CB 780.67 0.052 0.020 0.53 0.45 5.0 5.5 1.3 0.2 1.5 4.8 1.2 0.3 917 1037 0915 L 68+00 24 Rt CB 787.39 0.052 0.020 0.50 0.50 5.0 5.5 1.4 0.0 1.4 4.5 1.1 0.2 916 1037 0914 L 68+00 24 Lt CB 787.39 0.052 0.020 0.34 0.60 5.0 5.5 1.1 0.4 1.5 4.8 1.2 0.3 1001 1037 0913 L 66+35 24 Lt CB 794.02 0.022 0.020 0.42 0.60 5.0 5.5 1.4 0.3 1.7 6.4 1.3 0.4 914 1037 0912 L 65+90 24 Lt CB 794.81 0.012 0.020 0.50 0.50 5.0 5.5 1.4 0.0 1.4 6.7 1.1 0.3 913 1039 1038 L 73+58 242 Rt RISER 763.50 SAG -0.330 0.00 0.00 0.0 15.6 0.0 15.6 7.1 N/A N/A 1040 1017 L 72+04 55 Rt 2G1 766.00 SAG 0.330 0.09 0.40 5.0 5.5 0.2 0.0 0.2 0.2 N/A N/A 1040 1003 L 71+70 55 Rt 2G1-A 767.80 SAG 0.125 0.97 0.40 5.0 5.5 2.1 0.0 2.1 2.8 N/A N/A 1105 1104 L 84+44 24 Rt CB 777.69 SAG 0.020 0.13 0.90 5.0 5.5 0.6 0.1 0.8 4.0 N/A N/A 1105 1102 L 84+44 24 Lt CB 777.65 SAG 0.020 0.24 0.60 5.0 5.5 0.8 0.1 0.9 4.9 N/A N/A 1105 1103 L 83+65 24 Rt CB 778.16 0.012 0.020 0.11 0.90 5.0 5.5 0.5 0.0 0.5 3.9 0.5 0.0 1104 1105 1115 L 85+25 24 Rt CB 778.18 0.011 0.020 0.13 0.90 5.0 5.5 0.6 0.2 0.8 5.2 0.7 0.1 1104 1105 1116 L 85+25 24 Lt CB 778.14 0.011 0.020 0.11 0.60 5.0 5.5 0.4 0.0 0.4 3.0 0.3 0.0 1102 1105 1114 L 83+65 24 Lt CB 778.12 0.012 0.020 0.20 0.60 5.0 5.5 0.6 0.0 0.7 4.7 0.6 0.1 1102 1105 1110 L 86+89 24 Lt CB 780.01 0.011 0.020 0.24 0.70 5.0 5.5 0.9 0.5 1.4 7.0 1.1 0.3 1107 1105 1101 L 82+50 24 Lt CB 779.87 0.016 0.020 0.16 0.70 5.0 5.5 0.6 0.0 0.6 4.0 0.6 0.0 1114 1105 1112 L 88+82 28 Lt DI to JB 783.10 0.011 0.020 0.00 0.00 0.0 1.5 0.0 1.5 1105 1111 L 86+89 24 Rt CB 780.05 0.011 0.020 0.15 0.90 5.0 5.5 0.8 0.3 1.0 5.9 0.9 0.2 1115 1105 1117 L 82+50 42 Lt DI 779.50 SAG 0.250 0.47 0.40 5.0 5.5 1.0 0.0 1.0 1.5 N/A N/A 1105 1113 L 89+70 24 Lt CB 783.22 0.011 0.020 0.77 0.40 5.0 5.5 1.7 0.0 1.7 7.6 1.3 0.4 1110 1105 1119 L 88+82 24 Lt CB 782.25 0.011 0.020 0.28 0.50 5.0 1 5.5 0.8 0.0 0.8 5.0 0.7 0.1 1110 16 Printed 9/30/2019 CREATE DATE REV. DATE: I.D. NO.: DESCRIPTION: 9/30/2019 Alamance Church Road INLET COMPUTATION SHEET PROJ. NO.: P05187 COUNTY: Guilford DESIGNED BY: REVD BY: RCH JGD LOCATION ROADWAY RUNOFF INLET w Z Q Z a w _ W w W w O W Of af W z w z O W O w O J c� Q w LL w€ J Q L Q Q O o Q (� In (n Q Q- zQ OW wci z �� _� Q� w wQ ¢ a� REMARKS (n � �z Z (D Q LwL Q' U �- w a. � O fn to W w� Z W �O 2 Z O Q H fn O � ~ fn m O H Q d m a J cn c� O m J O OQ �U HU �? F5 LL o °�� cA � Q wo wOf CU Q D.A. C T, I QD.A. QC Ql(mx) QB + QQC 1105 1202 L 91+00 24 Lt CB 784.70 0.011 0.020 0.10 0.90 5.0 5.5 0.5 0.0 0.5 3.8 0.5 0.0 1113 1105 1118 L 88+82 24 Rt CB 782.25 0.011 0.020 0.27 0.90 5.0 5.5 1.3 0.0 1.3 6.7 1.1 0.3 1111 1105 1201 L 91+00 45 Lt DI 784.00 SAG 0.050 0.69 0.40 5.0 5.5 1.5 0.0 1.5 9.9 N/A N/A 1205 1206 L 95+38 24 Lt MDCB 780.66 0.028 0.020 0.06 0.90 5.0 5.5 0.3 0.3 0.6 3.0 0.5 0.0 1205 1204 L 94+60 24 Lt CB 783.14 0.025 0.020 0.40 0.60 5.0 5.5 1.3 0.0 1.3 5.5 1.1 0.3 1206 1205 1203 L 94+60 24 Rt. MDCB 783.14 0.025 0.020 0.40 0.60 5.0 5.5 1.3 0.0 1.3 5.5 1.1 0.3 17 Printed 9/30/2019 CREATE DATE: 9/30/2019 STORM DRAIN DESIGN COMPUTATIONS REV. DATE I.D. NO.: PROJ. NO.: P05187 COUNTY: Guilford DESCRIPTION: Alamance Church Road DESIGNED BY REVD BY RCH JGD LOCATION RUNOFF PIPE DESIGN STRUCTURE .-. _ TIME OF C7 H w W p C� w � g p w NUMBER Q � CONCENTRATION z = J W J H W � w Q Q Z a y Q S w Q Y g (min) w Q z J -w w ` Q °U w � z °' �" z �� �y ow �w w z aw m REMARKS �v cn�? J ? �� O 2O E Q wa w U) LU J w w cn TOP, TOP, v w U) 2 a) cz x a) a Z) O 0 IY FROM TO CA a a z O -J w Cl I O INV INV 2 w LU > 00 = w 401 117 0402 0401 2.75 1.88 27 5 7 10 5.6 10.6 726.40 0.00 0.004 24 C E 14.8 5.6 5.65 722.13 720.75 720.65 401 118 0403 0402 2.57 1.72 25 7 10 5.6 9.6 727.50 726.40 0.014 0.007 18 C E 13.0 7.7 6.40 722.73 721.10 720.75 401 116 0406 0403 0.96 0.51 12 5 7 10 5.6 2.9 729.00 727.50 0.082 15 C 9.0 9.4 5.68 724.36 0403 1.61 723.32 722.35 13.0 7.7 401 119 0410 1.21 73 5 6 10 5.6 6.8 726.50 727.50 0.015 0.004 18 C E 4.30 723.27 722.20 721.10 727.93 729.00 401 126 0407 0406 0.51 0.32 34 5 6 10 5.6 1.8 0.005 15 C 4.9 3.7 3.62 724.91 724.31 724.14 401 127 0404 0406 0.15 0.06 28 5 5 10 5.6 0.3 727.70 729.00 0.005 15 C 4.9 2.3 2.75 725.26 724.95 724.81 401 128 0405 0406 0.15 0.08 7 5 5 10 5.6 0.4 728.50 729.00 0.059 15 C 9.0 5.4 2.75 726.22 725.75 725.35 401 120 0411 0410 1.52 1.13 65 5 6 10 5.6 6.3 726.30 726.50 0.009 0.008 15 C E 6.7 6.2 3.50 724.30 722.80 722.20 401 125 0408 0407 0.30 0.19 30 5 6 10 5.6 1.0 727.83 727.93 0.005 15 C 4.9 3.2 3.27 725.00 724.56 724.41 401 121 0413 0411 0.99 0.66 28 5 6 10 5.6 3.7 727.35 726.30 0.037 15 C E 9.0 8.6 2.80 725.57 0412 0.21 724.55 723.50 9.0 8.8 401 123 0411 0.19 27 5 5 10 5.6 1.1 728.50 726.30 0.091 15 C 3.25 725.91 725.25 722.80 727.83 727.83 401 124 0409 0408 0.27 0.16 31 5 5 10 5.6 0.9 0.005 15 C 4.9 3.1 3.00 725.34 724.83 724.66 401 122 0414 0413 0.22 0.19 26 5 5 10 5.6 1.1 727.40 727.35 0.029 15 C E 9.0 5.9 2.10 725.87 725.30 724.55 506 129 0505 0506 2.43 1.79 20 5 6 10 5.6 10.0 731.00 0.00 0.055 0.081 15 S E #8.2# 8.3 5.30 727.62 725.70 724.60 506 130 0504 0505 1.91 1.32 64 6 10 5.6 7.4 732.65 731.00 0.058 0.045 15 S E 8.4 7.7 2.35 731.49 730.30 726.60 506 133 0503 0504 1.91 1.32 4 5 6 10 5.6 7.4 736.33 732.65 0.028 0.045 15 S #5.9# 6.2 5.93 732.26 730.40 730.30 18 Printed 9/30/2019 CREATE DATE: 9/30/2019 STORM DRAIN DESIGN COMPUTATIONS REV. DATE I.D. NO.: PROJ. NO.: P05187 COUNTY: Guilford DESCRIPTION: Alamance Church Road DESIGNED BY REVD BY RCH JGD LOCATION RUNOFF PIPE DESIGN STRUCTURE .-. _ TIME OF C7 H W p C� w � g p w NUMBER Q � CONCENTRATION z w = Q w J W z J H W � ` w Q Q Z a Q y Q S w w Q � Y °' g (min) �� �y J -w w °U aw m z �" z ow �w w z LU REMARKS �v cn�? J ? �� O 2O E Q wa w U) J w w cn TOP, TOP, v w U) 2 a) cz x a) a Z) O 0 IY FROM TO CA a a z O -J w Cl I O INV INV 2 w LU > 00 = w 506 132 0502 0503 0.88 0.48 43 5 6 10 5.6 2.7 735.23 736.33 0.003 15 C 4.1 2.2 4.58 732.36 730.65 730.50 506 134 0507 0503 0.75 0.62 82 5 5 10 5.6 3.5 736.13 736.33 0.005 15 C 4.9 4.5 4.10 732.86 732.03 731.62 506 131 0501 0502 0.37 0.15 19 5 5 10 5.6 0.8 732.90 735.23 0.005 15 C 4.9 0.7 1.95 732.37 730.95 730.85 506 135 0508 0507 0.56 0.45 41 5 5 10 5.6 2.5 735.33 736.13 0.005 15 C 4.9 4.0 3.00 733.27 732.33 732.13 509 115 0511 0509 10.98 6.38 26 5 12 12 5.3 33.8 734.03 0.00 0.029 0.006 30 C 43.0 11.5 9.48 726.58 724.55 723.80 509 114 0510 0511 10.94 6.35 56 5 12 12 5.3 33.7 733.07 734.03 0.030 0.006 30 C 43.0 12.8 6.77 729.04 726.30 724.65 509 111 0514 0510 7.96 4.48 106 5 11 11 5.4 24.1 732.43 733.07 0.005 30 C 31.4 7.0 4.78 729.58 727.65 727.12 509 112 0512 0510 2.94 1.82 18 5 10 10 5.6 10.2 734.23 733.07 0.066 0.008 18 C 13.0 11.5 3.25 732.95 730.98 729.82 509 110 0515 0514 7.37 3.98 66 5 11 11 5.4 21.6 732.43 732.43 0.005 30 C 31.4 6.9 4.25 730.23 728.18 727.85 509 113 0513 0514 0.24 0.19 25 5 5 10 5.6 1.1 734.23 732.43 0.073 15 C 9.0 8.1 3.00 731.90 731.23 729.43 509 108 0517 0515 5.54 2.85 89 5 11 11 5.5 15.6 734.06 732.43 0.021 0.004 24 C 25.0 10.4 3.85 732.04 730.21 728.38 509 109 0524 0515 1.39 0.73 107 5 5 10 5.6 4.1 733.78 732.43 0.009 0.003 15 C 6.5 5.6 3.42 731.45 730.36 729.43 509 106 0519 0517 4.94 2.53 117 5 10 10 5.6 14.1 739.41 734.06 0.048 0.003 24 C 25.0 14.1 3.35 737.55 736.06 730.41 509 107 0516 0517 0.44 0.18 23 5 5 10 5.6 1.0 735.50 734.06 0.094 15 C 9.0 8.7 2.25 733.94 733.25 731.06 509 103 0523 0524 1.04 0.42 22 5 5 10 5.6 2.3 733.40 733.78 0.004 15 C 4.6 2.5 2.75 731.58 730.65 730.56 509 104 0520 0519 4.74 2.40 72 5 10 10 5.6 13.4 744.46 739.41 0.061 0.014 18 C #13# 14.7 3.51 743.06 740.95 736.56 19 Printed 9/30/2019 CREATE DATE: 9/30/2019 STORM DRAIN DESIGN COMPUTATIONS REV. DATE I.D. NO.: PROJ. NO.: P05187 COUNTY: Guilford DESCRIPTION: Alamance Church Road DESIGNED BY REVD BY RCH JGD LOCATION RUNOFF PIPE DESIGN STRUCTURE .-. _ TIME OF C7 H w W p C� w � g p w NUMBER Q � CONCENTRATION z = J W J H W � w Q Q Z a y Q S w Q � Y z °' g �" z (min) w �� Q �y z J -w ow w �w ` Q °U w aw m REMARKS �v cn�? J ? �� O 2O w Q z wa w U) LU w v w U) a) E cz a) J 0 IY FROM TO CA a w O cn w I O TOP, TOP, 2 x a Z) O = w a z -J Cl INV INV 2 w LU > 00 509 105 0518 0519 0.11 0.04 31 5 5 10 5.6 0.2 741.00 739.41 0.076 15 C 9.0 5.4 2.25 739.16 738.75 736.41 509 137 0521 0520 3.96 1.78 6 10 10 10 5.6 10.0 745.14 744.46 0.007 0.008 18 C #9.8# 5.7 3.94 743.62 741.20 741.16 736.41 0.00 526 102 0525 0526 0.03 0.03 20 5 5 10 5.6 0.1 0.021 15 C 9.0 2.9 3.00 733.62 733.41 733.00 601 138 0602 0601 15.70 8.66 71 5 22 22 4.1 35.2 738.44 0.00 0.005 36 C 51.1 7.8 4.58 736.46 733.86 733.50 742.60 738.44 601 75 0604 0602 15.47 8.45 133 5 22 22 4.1 34.5 0.029 0.020 24 C #25# 14.3 4.69 740.67 737.91 734.10 601 76 0603 0604 3.05 1.22 40 10 10 10 5.6 6.8 745.00 742.60 0.062 0.010 15 C 9.0 12.1 2.95 743.64 742.05 739.60 746.55 742.60 601 78 0606 0604 12.26 7.09 97 5 22 22 4.1 29.1 0.037 0.014 24 C #25# 14.8 4.07 744.66 742.48 738.85 601 151 0619 0604 0.05 0.04 44 5 5 10 5.6 0.2 743.51 742.60 0.021 15 C 9.0 3.4 3.00 740.78 740.51 739.60 601 77 0605 0603 0.37 0.15 34 5 5 10 5.6 0.8 745.30 745.00 0.009 15 C 6.6 0.7 2.75 743.66 742.55 742.25 601 79 0607 0606 0.24 0.22 44 5 5 10 5.6 1.2 746.73 746.55 0.005 15 C 4.9 1.0 3.19 744.69 743.55 743.33 601 80 0609 0606 11.74 6.62 170 5 22 22 4.1 27.3 753.64 746.55 0.041 0.012 24 C #25# 15.8 3.85 751.80 749.79 742.80 754.50 753.64 601 81 0608 0609 0.19 0.07 19 5 5 10 5.6 0.4 0.084 15 C 9.0 6.5 2.25 752.75 752.25 750.64 601 82 0611 0609 11.44 6.46 95 5 21 21 4.1 26.8 757.80 753.64 0.042 0.012 24 C #25# 15.0 3.99 755.92 753.81 749.89 601 83 0610 0611 0.69 0.27 17 5 5 10 5.6 1.5 757.00 757.80 0.005 15 C 4.9 1.3 2.25 755.95 754.75 754.66 601 84 0613 0611 10.65 6.10 77 5 21 21 4.2 25.4 761.23 757.80 0.042 0.011 24 C #25# 14.5 3.97 759.23 757.26 754.05 761.10 761. 601 85 0612 0613 2.92 1.17 27 10 10 10 5.6 6.5 0.005 24 C 17.5 2.9 3.10 759.39 758.00 757.86 20 Printed 9/30/2019 CREATE DATE: 9/30/2019 STORM DRAIN DESIGN COMPUTATIONS REV. DATE I.D. NO.: PROJ. NO.: P05187 COUNTY: Guilford DESCRIPTION: Alamance Church Road DESIGNED BY REVD BY RCH JGD LOCATION RUNOFF PIPE DESIGN STRUCTURE .-. _ TIME OF C7 H w W p C� w � g p w NUMBER Q � CONCENTRATION z = J W J H W � w Q Q Z a y Q S w Q � Y z °' g �" z (min) w �� Q �y z J -w ow w �w ` Q °U w aw m REMARKS �v cn�? J ? �� O 2O w Q z wa w U) LU w v w U) a) E cz a) J 0 IY FROM TO CA a w O cn w I O TOP, TOP, 2 x a Z) O = w a z -J C) INV INV 2 w LU > 00 601 86 0614 0613 7.58 4.80 81 5 12 12 5.2 24.9 764.39 761.23 0.038 0.010 24 C 25.0 14.1 3.85 762.53 760.54 757.48 601 152 0617 0613 0.01 0.01 44 2 2 10 5.6 0.0 762.00 761.23 0.017 15 C 9.0 0.0 3.00 759.23 759.00 758.23 772.10 764.39 601 87 0620 0614 7.16 4.42 158 2 12 11 5.5 24.1 0.048 0.010 24 C 25.0 16.2 3.95 770.19 768.15 760.64 601 153 0701 0620 7.00 4.29 94 5 11 11 5.5 23.4 776.40 772.10 0.034 0.009 24 C 25.0 13.5 4.89 773.50 771.51 768.35 601 154 0618 0620 0.03 0.02 44 2 2 10 5.6 0.1 773.01 772.10 0.021 15 C 9.0 2.6 3.00 770.21 770.01 769.10 601 88 0702 0701 0.13 0.11 44 5 5 10 5.6 0.6 775.58 776.40 0.005 15 C 4.9 0.5 3.00 773.51 772.58 772.36 601 89 0703 0701 6.50 4.00 69 5 11 11 5.5 21.9 778.83 776.40 0.035 0.008 24 C 25.0 13.1 3.75 777.21 775.08 772.65 601 147 0719 0701 0.32 0.13 23 5 5 10 5.6 0.7 777.25 776.40 0.068 15 C 9.0 7.1 2.25 775.55 775.00 773.40 601 90 0704 0703 0.73 0.44 40 5 5 10 5.6 2.4 781.92 778.83 0.077 15 C 9.0 10.5 3.00 779.90 778.92 775.83 782.13 778.83 601 91 0705 0703 5.37 3.32 84 5 10 10 5.5 18.3 0.036 0.006 24 C 25.0 13.0 3.93 779.99 778.20 775.18 601 92 0706 0705 1.29 0.76 44 5 10 10 5.6 4.3 782.37 782.13 0.005 0.004 15 C 4.9 3.9 3.20 780.33 779.17 778.95 788.50 782.13 601 93 0708 0705 3.60 2.26 148 10 10 5.6 12.6 0.035 0.012 18 C E 13.0 12.5 4.00 786.59 784.50 779.30 601 140 0716 0706 1.21 0.73 14 10 10 10 5.6 4.1 782.96 782.37 0.043 0.003 15 C 9.0 8.3 3.00 781.25 779.97 779.37 601 94 0710 0708 1.41 1.27 120 7 10 5.6 7.1 793.00 788.50 0.034 0.004 18 C E 13.0 10.7 4.40 789.76 788.60 784.50 601 96 0707 0708 1.96 0.78 8 10 10 10 5.6 4.4 788.20 788.50 0.100 0.004 15 C 9.0 10.0 2.66 786.91 785.54 784.75 788.03 788.50 601 97 0709 0708 0.23 0.21 8 5 5 10 5.6 1.2 0.035 15 C 9.0 0.9 3.00 786.61 785.03 784.75 21 Printed 9/30/2019 CREATE DATE: 9/30/2019 STORM DRAIN DESIGN COMPUTATIONS REV. DATE I.D. NO.: PROJ. NO.: P05187 COUNTY: Guilford DESCRIPTION: Alamance Church Road DESIGNED BY REVD BY RCH JGD LOCATION RUNOFF PIPE DESIGN STRUCTURE .-. _ TIME OF C7 H w W p C� w � g p w NUMBER Q � CONCENTRATION z = J W J H W � w Q Q Z a y Q S w Q Y g (min) w Q z J -w w ` Q °U w � z °' �" z �� �y ow �w w z aw m REMARKS �v cn�? J ? �� O 2O E Q wa w U) LU J w w cn TOP, TOP, v w U) 2 a) cz x a) a Z) O 0 IY FROM TO CA a a z O -J w Cl I O INV INV 2 w LU > 00 = w 601 95 0718 0710 1.41 1.27 167 5 6 10 5.6 7.1 798.23 793.00 0.032 0.004 18 C E 13.0 10.5 4.33 795.31 793.90 788.60 601 100 0714 0718 0.35 0.31 34 5 6 10 5.6 1.8 799.43 798.23 0.029 15 C 9.0 6.8 2.45 797.65 796.98 795.98 601 146 0717 0718 0.91 0.82 75 6 10 5.6 4.6 799.50 798.23 0.035 18 C E 13.0 9.4 3.00 797.49 796.50 793.90 601 101 0713 0714 0.30 0.27 60 5 5 10 5.6 1.5 799.73 799.43 0.005 15 C 4.9 3.5 2.25 798.16 797.48 797.18 601 145 0711 0717 0.91 0.82 16 5 6 10 5.6 4.6 800.20 799.50 0.019 18 C E 13.0 6.7 3.40 797.90 796.80 796.50 601 98 0712 0711 0.46 0.42 33 5 5 10 5.6 2.3 800.70 800.20 0.046 15 C E 9.0 8.5 2.40 799.20 798.30 796.80 601 99 0715 0711 0.36 0.32 61 5 5 10 5.6 1.8 799.60 800.20 0.010 15 C E 6.9 4.7 1.40 798.97 798.20 797.60 616 139 0615 0616 12.28 4.91 104 15 15 15 4.7 23.1 738.00 0.00 0.005 36 C 51.1 7.0 3.98 736.32 734.02 733.50 805 70 0804 0805 1.18 0.82 38 5 9 10 5.6 4.6 796.04 0.00 0.021 0.004 15 C 9.0 7.7 3.24 794.02 792.80 792.00 796.61 796.04 805 68 0802 0804 0.32 0.28 53 5 9 10 5.6 1.6 0.011 15 C 7.5 4.8 3.00 794.28 793.61 793.00 805 69 0803 0804 0.82 0.49 57 5 5 10 5.6 2.8 797.51 796.04 0.026 15 C 9.0 7.4 3.04 795.46 794.47 793.00 805 67 0801 0802 0.17 0.16 147 5 5 10 5.6 0.9 799.63 796.61 0.021 15 C 9.0 5.0 3.00 797.14 796.63 793.61 818 60 0815 0818 9.83 5.47 35 5 15 15 4.7 25.6 791.10 0.00 0.007 0.011 24 C E #20.9# 8.7 5.93 787.57 785.17 784.92 818 72 0814 0815 0.54 0.48 57 5 6 10 5.6 2.7 791.69 791.10 0.009 15 C 6.5 5.0 3.10 789.30 788.59 788.10 818 73 0816 0815 0.25 0.23 10 5 7 10 5.6 1.3 791.08 791.10 0.005 15 C 4.9 3.4 3.10 788.47 787.98 787.93 818 148 0822 0815 8.96 4.68 40 15 15 4.7 21.9 791.76 791.10 0.007 0.008 24 C E #20.2# 7.0 6.32 787.98 785.44 785.17 22 Printed 9/30/2019 CREATE DATE: 9/30/2019 STORM DRAIN DESIGN COMPUTATIONS REV. DATE I.D. NO.: PROJ. NO.: P05187 COUNTY: Guilford DESCRIPTION: Alamance Church Road DESIGNED BY REVD BY RCH JGD LOCATION RUNOFF PIPE DESIGN STRUCTURE .-. _ TIME OF C7 H w W p C� w � g p w NUMBER Q � CONCENTRATION z = J W J H W � w Q Q Z a y Q S w Q � Y z °' g �" z (min) w �� Q �y z J -w ow w �w ` Q °U w aw m REMARKS �v cn�? J ? �� O 2O w Q z wa w U) LU w v w U) a) E cz a) J 0 IY FROM TO CA a w O cn w I O TOP, TOP, 2 x a Z) O = w a z -J Cl INV INV 2 w LU > 00 818 71 0813 0814 0.43 0.39 55 5 5 10 5.6 2.2 792.47 791.69 0.014 15 C 8.3 5.7 3.00 790.33 789.47 788.69 818 74 0817 0816 0.18 0.16 73 5 5 10 5.6 0.9 791.74 791.08 0.009 15 C 6.6 3.8 3.00 789.25 788.74 788.08 792.33 791.76 818 61 0807 0822 4.69 2.88 31 5 10 10 5.6 16.1 0.026 0.020 18 C E #13# 9.1 6.08 789.39 786.25 785.44 818 66 0810 0822 4.26 1.80 4 5 15 15 4.7 8.4 792.07 791.76 0.100 0.022 18 *C* 13.0 4.8 5.77 788.28 786.29 785.94 792.53 792.33 818 59 0806 0807 4.61 2.80 26 5 10 10 5.6 15.7 0.017 0.019 18 C E #13# 8.9 5.83 791.15 786.70 786.25 818 63 0808 0810 2.99 1.20 21 15 15 15 4.7 5.6 790.40 792.07 0.005 18 C 8.0 4.6 3.00 788.70 787.40 787.30 818 65 0812 0810 1.25 0.58 147 5 11 11 5.5 3.2 793.65 792.07 0.008 15 C 6.3 5.1 3.41 791.21 790.24 789.07 818 62 0809 0808 0.12 0.05 23 5 5 10 5.6 0.3 790.50 790.40 0.027 15 C 9.0 0.2 2.25 788.70 788.25 787.65 818 141 0821 0812 1.09 0.43 14 5 11 11 5.5 2.4 793.40 793.65 0.005 15 C 4.9 3.0 2.89 791.38 790.51 790.44 818 149 0823 0821 0.05 0.02 28 5 5 10 5.6 0.1 793.00 793.40 0.005 15 C 4.9 0.1 2.25 791.38 790.75 790.61 818 150 0824 0821 0.58 0.23 121 5 5 10 5.6 1.3 798.00 793.40 0.038 15 C 9.0 7.0 2.25 796.39 795.75 791.15 793.45 0.00 904 47 0903 0904 5.75 2.94 31 5 7 10 5.6 16.5 0.021 0.005 24 C 25.0 9.5 4.79 790.43 788.66 788.00 904 57 0905 0903 0.29 0.26 56 5 7 10 5.6 1.5 793.27 793.45 0.005 15 C 4.9 3.5 3.18 790.61 790.09 789.81 904 58 0902 0903 5.24 2.48 44 5 7 10 5.6 13.9 793.45 793.45 0.005 0.003 24 C 17.3 5.3 4.37 790.93 789.08 788.86 904 56 0906 0905 0.18 0.16 67 5 5 10 5.6 0.9 793.52 793.27 0.005 15 C 4.9 3.1 3.00 791.03 790.52 790.19 904 49 0901 0902 1.87 0.75 14 5 5 10 5.6 4.2 792.70 793.45 0.005 0.004 15 C 4.9 4.3 2.63 791.38 790.07 790.00 23 Printed 9/30/2019 CREATE DATE: 9/30/2019 STORM DRAIN DESIGN COMPUTATIONS REV. DATE I.D. NO.: PROJ. NO.: P05187 COUNTY: Guilford DESCRIPTION: Alamance Church Road DESIGNED BY REVD BY RCH JGD LOCATION RUNOFF PIPE DESIGN STRUCTURE .-. _ TIME OF C7 H w W p C� w � g p w NUMBER Q � CONCENTRATION z = J W J H W � w Q Q Z a y Q S w Q � Y z °' g �" z (min) w �� Q �y z J -w ow w �w ` Q °U w aw m REMARKS �v cn�? J ? �� O 2O w Q z wa w U) LU w v w U) a) E cz a) J 0 IY FROM TO CA a w O cn w I O TOP, TOP, 2 x a Z) O = w a z -J Cl INV INV 2 w LU > 00 904 50 0820 0902 0.69 0.37 94 5 6 10 5.6 2.1 794.53 793.45 0.009 15 C 6.8 4.9 3.20 792.13 791.33 790.45 904 51 0907 0902 2.60 1.29 56 5 7 10 5.6 7.2 793.27 793.45 0.005 0.004 18 C 8.0 4.3 3.41 791.13 789.86 789.58 904 48 0819 0820 0.36 0.14 18 5 5 10 5.6 0.8 794.50 794.53 0.039 15 C 9.0 6.0 2.25 792.78 792.25 791.53 904 52 0908 0907 2.18 1.08 75 5 6 10 5.6 6.1 793.58 793.27 0.005 18 C 8.0 4.1 3.25 791.61 790.33 789.96 904 53 0911 0908 0.50 0.25 92 5 5 10 5.6 1.4 794.68 793.58 0.012 15 C 7.7 4.7 3.00 792.33 791.68 790.58 904 55 0909 0908 1.58 0.74 53 5 5 10 5.6 4.2 794.40 793.58 0.016 0.004 15 C 9.0 7.0 2.95 792.54 791.45 790.58 904 54 0910 0909 1.10 0.55 38 5 5 10 5.6 3.1 794.70 794.40 0.008 15 C 6.2 5.1 2.75 793.02 791.95 791.65 1008 46 1007 1008 21.28 10.98 53 35 15 4.7 51.5 769.00 0.00 0.004 42 C 66.9 7.9 13.30 758.13 755.70 755.50 1008 45 1006 1007 21.26 10.97 45 15 15 4.7 51.4 766.48 769.00 0.015 42 C 90.0 11.0 9.98 759.56 756.50 755.80 1008 157 1033 1007 0.02 0.01 94 5 5 10 5.6 0.1 766.53 769.00 0.006 15 C 5.3 1.5 3.00 763.71 763.53 763.00 1008 34 1013 1006 7.18 3.93 10 5 13 12 5.2 20.5 765.85 766.48 0.100 30 C 43.0 12.2 7.06 760.78 758.79 757.80 1008 44 1005 1006 14.08 7.04 41 15 15 15 4.7 33.1 763.00 766.48 0.017 0.018 24 C #25# 9.2 4.50 760.95 758.50 757.80 1008 33 1016 1013 7.13 3.89 83 5 12 12 5.2 20.2 765.13 765.85 0.005 30 C 31.4 6.8 5.39 761.29 759.74 759.32 1008 30 1019 1016 6.96 3.75 16 5 12 12 5.2 19.5 765.02 765.13 0.005 30 C 31.4 6.7 5.11 761.74 759.91 759.84 1008 29 1034 1019 5.02 2.89 60 5 12 12 5.3 15.3 765.62 765.02 0.008 30 C 40.5 7.4 4.35 762.63 761.27 760.77 1008 31 1015 1019 1.83 0.75 17 10 10 10 5.6 4.2 764.40 765.02 0.005 0.004 15 C 4.9 4.9 2.95 762.65 761.45 761.36 24 Printed 9/30/2019 CREATE DATE: 9/30/2019 STORM DRAIN DESIGN COMPUTATIONS REV. DATE I.D. NO.: PROJ. NO.: P05187 COUNTY: Guilford DESCRIPTION: Alamance Church Road DESIGNED BY REVD BY RCH JGD LOCATION RUNOFF PIPE DESIGN STRUCTURE .-. _ TIME OF C7 H w W p C� w � g p w NUMBER Q � CONCENTRATION z = J W J H W � w Q Q Z a y Q S w Q Y g (min) w Q z J -w w ` Q °U w � z °' �" z �� �y ow �w w z aw m REMARKS �v cn�? J ? �� O 2O E Q wa w U) LU J w w cn TOP, TOP, v w U) 2 a) cz x a) a Z) O 0 IY FROM TO CA a a z O -J w Cl I O INV INV 2 w LU > 00 = w 1008 158 1022 1034 4.85 2.74 128 5 11 11 5.4 14.8 767.91 765.62 0.005 30 C 31.8 6.4 5.88 763.44 762.03 761.37 1008 32 1014 1015 0.06 0.05 40 5 5 10 5.6 0.3 765.31 764.40 0.017 15 C 9.0 0.3 3.00 762.64 762.31 761.65 769.42 767.91 1008 26 1024 1022 4.56 2.48 63 5 10 10 5.6 13.8 0.021 0.003 24 C 25.0 9.9 3.95 767.13 765.47 764.16 1008 28 1021 1022 0.19 0.17 44 5 10 10 5.6 1.0 767.91 767.91 0.005 15 C 4.9 3.1 4.41 764.02 763.50 763.28 1008 25 1027 1024 4.04 2.22 27 5 10 10 5.6 12.4 770.00 769.42 0.029 24 C 25.0 9.6 3.55 768.18 766.45 765.67 1008 136 1023 1024 0.51 0.26 5 5 5 10 5.6 1.4 769.46 769.42 0.008 15 C 6.2 2.0 3.00 767.20 766.46 766.42 766.95 767.91 1008 27 1020 1021 0.04 0.04 50 5 5 10 5.6 0.2 0.005 15 C 4.9 0.8 3.00 764.19 763.95 763.70 1008 24 1028 1027 1.92 1.20 36 5 7 10 5.6 6.7 771.15 770.00 0.008 24 C 21.4 2.6 4.23 768.21 766.92 766.65 1008 169 1041 1027 2.11 1.00 5 10 10 10 5.6 5.6 769.73 770.00 0.019 0.006 15 C 9.0 6.8 2.23 768.61 767.50 767.40 773.28 771.15 1008 23 1031 1028 1.38 0.91 72 5 7 10 5.6 5.1 0.024 0.005 15 C 9.0 8.5 3.42 771.14 769.85 768.15 1008 43 1018 1028 0.48 0.24 16 5 5 10 5.6 1.3 770.50 771.15 0.005 15 C 4.9 3.4 2.75 768.38 767.75 767.67 1008 20 1025 1041 1.09 0.54 89 5 5 10 5.6 3.0 771.90 769.73 0.031 15 C E 9.0 8.3 1.55 771.41 X 770.35 767.60 1008 155 1029 1031 0.87 0.52 97 5 6 10 5.6 2.9 776.11 773.28 0.028 15 C 9.0 7.9 3.10 773.83 773.01 770.28 1008 156 1032 1031 0.27 0.24 44 5 5 10 5.6 1.4 773.28 773.28 0.005 15 C 4.9 1.2 3.00 771.19 770.28 770.05 1008 22 1030 1029 0.39 0.23 85 5 5 10 5.6 1.3 778.60 776.11 0.029 15 C 9.0 6.4 3.00 776.24 775.60 773.11 1037 167 1036 1037 3.84 2.20 69 5 8 10 5.6 12.3 768. 0 0.005 -t ---t0.0 24 C 17.3 6.0 5.73 764.20 762.65 72.362.30 25 Printed 9/30/2019 CREATE DATE: 9/30/2019 STORM DRAIN DESIGN COMPUTATIONS REV. DATE I.D. NO.: PROJ. NO.: P05187 COUNTY: Guilford DESCRIPTION: Alamance Church Road DESIGNED BY REVD BY RCH JGD LOCATION RUNOFF PIPE DESIGN STRUCTURE .-. _ TIME OF C7 H w W p C� w � g p w NUMBER Q � CONCENTRATION z = J W J H W � w Q Q Z a y Q S w Q � Y z °' g �" z (min) w �� Q �y z J -w ow w �w ` Q °U w aw m REMARKS �v cn�? J ? �� O 2O w Q z wa w U) LU w v w U) a) E cz a) J 0 IY FROM TO CA a w O cn w I O TOP, TOP, 2 x a Z) O = w a z -J Cl INV INV 2 w LU > 00 1037 42 1002 1036 3.54 1.93 155 5 8 10 5.6 10.8 772.58 768.38 0.023 0.009 18 C 13.0 10.2 3.91 770.20 768.67 765.13 1037 166 1035 1036 0.28 0.25 44 5 8 10 5.6 1.4 766.94 768.38 0.005 15 C 4.9 1.2 3.96 764.24 762.97 762.75 1037 40 0917 1002 2.71 1.41 115 5 8 10 5.6 7.9 778.20 772.58 0.048 0.013 15 C 9.0 12.5 3.10 776.36 775.10 769.58 1037 41 1001 1002 0.59 0.38 44 5 5 10 5.6 2.2 772.34 772.58 0.005 15 C 4.9 1.9 3.00 770.30 769.34 769.12 1037 165 1026 1035 0.05 0.04 27 5 5 10 5.6 0.2 766.33 766.94 0.005 15 C 4.9 0.2 3.00 764.25 763.33 763.20 1037 39 0916 0917 2.29 1.19 44 5 8 10 5.6 6.7 780.67 778.20 0.054 0.009 15 C 9.0 11.6 3.10 778.82 777.57 775.20 1037 38 0915 0916 1.76 0.96 127 5 7 10 5.6 5.4 787.39 780.67 0.048 0.006 15 C 9.0 11.4 3.62 785.14 783.77 777.67 1037 37 0914 0915 1.26 0.71 44 5 7 10 5.6 4.0 787.39 787.39 0.005 0.003 15 C 4.9 3.3 3.20 785.41 784.19 783.97 1037 36 0913 0914 0.92 0.50 162 5 6 10 5.6 2.8 794.02 787.39 0.040 15 C 9.0 8.9 3.10 791.76 790.92 784.39 794.81 794.02 1037 35 0912 0913 0.50 0.25 42 5 5 10 5.6 1.4 0.019 15 C 9.0 5.5 3.00 792.46 791.81 791.02 1039 168 1038 1039 56 15.6 763.50 0.00 0.008 0.016 24 S 22.0 7.5 6.50 759.33 757.00 756.60 1040 1 1017 1040 1.06 0.42 73 5 5 10 5.6 2.4 766.00 0.00 0.005 15 C 5.0 4.0 2.83 763.89 763.17 762.80 1040 21 1003 1017 0.97 0.39 31 5 5 10 5.6 2.2 767.80 766.00 0.018 15 C 9.0 6.0 4.00 764.66 763.80 763.25 1105 18 1104 1105 4.04 2.32 36 5 9 10 5.6 13.0 777.69 0.00 0.041 0.011 24 S 24.9 8.0 4.91 774.44 772.78 771.30 1105 16 1102 1104 3.68 1.99 44 5 9 10 5.6 11.2 777.65 777.69 0.005 24 C 17.3 4.5 4.45 774.81 773.20 772.98 778.16 777.69 rC 1105 17 1103 1104 0.11 0.09 76 5 5 10 5.6 0.5 0.006 5.5 2.8 3.00 775.55 775.16 774.69 26 Printed 9/30/2019 CREATE DATE: 9/30/2019 STORM DRAIN DESIGN COMPUTATIONS REV. DATE I.D. NO.: PROJ. NO.: P05187 COUNTY: Guilford DESCRIPTION: Alamance Church Road DESIGNED BY REVD BY RCH JGD LOCATION RUNOFF PIPE DESIGN STRUCTURE .-. _ TIME OF C7 H w W p C� w � g p w NUMBER Q � CONCENTRATION z = J W J H W � w Q Q Z a y Q S w Q Y g (min) w Q z J -w w ` Q °U w � z °' �" z �� �y ow �w w z aw m REMARKS �v cn�? J ? �� O 2O E Q wa w U) LU J w w cn TOP, TOP, v w U) 2 a) cz x U a Z) O = Of FROM TO CA a a z O -J w Cl I Q INV INV 2 w _j> 00 1105 159 1115 1104 0.13 0.12 78 5 5 10 5.6 0.7 778.18 777.69 0.006 15 C 5.5 3.0 3.00 775.61 775.18 774.69 1105 14 1116 1102 2.61 1.43 78 5 8 10 5.6 8.0 778.14 777.65 0.009 0.005 18 C E 10.8 6.7 3.74 775.53 774.40 773.70 778.12 777.65 1105 142 1114 1102 0.83 0.42 76 5 7 10 5.6 2.3 0.005 15 C 5.0 4.1 3.10 775.68 775.02 774.63 1105 160 1110 1116 2.50 1.36 161 5 8 10 5.6 7.6 780.01 778.14 0.008 0.004 18 C E 10.2 6.3 4.21 777.05 775.80 774.50 1105 15 1101 1114 0.63 0.30 112 5 5 10 5.6 1.7 779.87 778.12 0.014 15 C 8.2 5.3 3.20 777.36 776.67 775.12 1105 13 1112 1110 2.11 1.06 190 7 10 5.6 5.9 783.10 780.01 0.015 0.007 15 C E 8.5 7.5 4.20 780.27 778.90 776.10 1105 19 1111 1110 0.15 0.14 44 5 5 10 5.6 0.8 780.05 780.01 0.005 15 C 4.9 2.9 3.00 777.52 777.05 776.83 1105 161 1117 1101 0.47 0.19 16 5 5 10 5.6 1.1 779.50 779.87 0.024 15 C 9.0 5.3 2.25 777.82 777.25 776.87 1105 12 1113 1112 1.56 0.67 86 5 7 10 5.6 3.8 783.22 783.10 0.008 15 C 6.2 5.3 3.10 781.00 780.12 779.45 782.25 783.10 1105 163 1119 1112 0.55 0.38 2 5 6 10 5.6 2.1 0.005 15 C 4.9 1.7 3.32 780.28 778.93 778.92 1105 11 1202 1113 0.79 0.36 127 5 5 10 5.6 2.0 784.70 783.22 0.010 15 C 6.9 4.9 3.25 782.21 781.45 780.22 1105 162 1118 1119 0.27 0.24 44 5 5 10 5.6 1.4 782.25 782.25 0.005 15 C 4.9 1.1 3.00 780.32 779.25 779.03 1105 10 1201 1202 0.69 0.28 19 5 5 10 5.6 1.5 784.00 784.70 0.005 15 C 4.9 3.5 2.25 782.45 781.75 781.65 1205 143 1206 1205 0.86 0.54 51 5 6 10 5.6 3.0 780.66 0.00 0.010 15 C 7.0 5.4 2.36 779.04 778.30 777.80 1205 9 1204 1206 0.80 0.48 75 5 6 10 5.6 2.7 783.14 780.66 0.017 15 C 9.0 6.5 3.42 780.63 779.72 778.41 783.14 783.14 1205 8 1203 1204 0.40 0.24 44 5 5 10 5.6 1.3 0.022 15 C 9.0 5.8 2.25 781.53 780.89 779.92 27 Printed 9/30/2019 Wet Pond Summary Table Design Storm Pre -Development Peak Flow Post -Development Peak Flow Wet Pond Peak WS Elevation (cfs) (cfs) (feet) 1 inch 0.22 0.06 761.20 2-yr 13.88 7.19 762.88 5-yr 20.16 14.69 762.20 10-yr 24.94 18.14 763.43 25-yr 32.22 26.26 763.71 50-yr 37.89 32.40 763.83 100-yr 43.76 37.77 763.94 500-yr 58.81 48.54 764.38 28 Wet Pond Type 1124-hr WQV Rainfall=1.00" Prepared by Hewlett-Packard Company Printed 10/16/2018 HydroCAD® 10.00-20 s/n 01918 ©2017 HydroCAD Software Solutions LLC Page 1 Summary for Subcatchment 5S: Pre -Development Condition Runoff = 0.22 cfs @ 12.10 hrs, Volume= 0.036 af, Depth= 0.07" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.10 hrs Type II 24-hr WQV Rainfall=1.00" Area (ac) CN Description 0.510 98 Impervious Roadway 5.700 77 2 acre lots, 12% imp, HSG C 6.210 79 Weighted Average 5.016 80.77% Pervious Area 1.194 19.23% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 50 0.0250 0.17 Sheet Flow, Sheet Grass: Short n= 0.150 P2= 3.38" 1.0 150 0.0250 2.55 Shallow Concentrated Flow, Shallow Unpaved Kv= 16.1 fps 2.1 750 0.0300 5.94 53.45 Channel Flow, Channel Area= 9.0 sf Perim= 12.4' r= 0.73' n= 0.035 0.8 210 0.0090 4.22 76.02 Channel Flow, Outfall Area= 18.0 sf Perim= 11.5' r= 1.57' n= 0.045 8.9 1,160 Total Subcatchment 5S: Pre -Development Condition Hydrograph Time (hours) — Runoff 29 Wet Pond Type 11 24-hr 2-YR Rainfall=3.38" Prepared by Hewlett-Packard Company Printed 10/16/2018 HydroCAD® 10.00-20 s/n 01918 © 2017 HydroCAD Software Solutions LLC Page 2 Summary for Subcatchment 5S: Pre -Development Condition Runoff = 13.88 cfs @ 12.00 hrs, Volume= 0.762 af, Depth= 1.47" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.10 hrs Type II 24-hr 2-YR Rainfall=3.38" Area (ac) CN Description 0.510 98 Impervious Roadway 5.700 77 2 acre lots, 12% imp, HSG C 6.210 79 Weighted Average 5.016 80.77% Pervious Area 1.194 19.23% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 50 0.0250 0.17 Sheet Flow, Sheet Grass: Short n= 0.150 P2= 3.38" 1.0 150 0.0250 2.55 Shallow Concentrated Flow, Shallow Unpaved Kv= 16.1 fps 2.1 750 0.0300 5.94 53.45 Channel Flow, Channel Area= 9.0 sf Perim= 12.4' r= 0.73' n= 0.035 0.8 210 0.0090 4.22 76.02 Channel Flow, Outfall Area= 18.0 sf Perim= 11.5' r= 1.57' n= 0.045 8.9 1,160 Total 1 1 1 1 1 1 N V 3 0 LL Subcatchment 5S: Pre -Development Condition Hydrograph 13.88 cfs 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 12 Time (hours) — Runoff 30 Wet Pond Type 11 24-hr 5-YR Rainfall=4.21 " Prepared by Hewlett-Packard Company Printed 10/16/2018 HydroCAD® 10.00-20 s/n 01918 © 2017 HydroCAD Software Solutions LLC Page 3 Summary for Subcatchment 5S: Pre -Development Condition Runoff = 20.16 cfs @ 12.00 hrs, Volume= 1.105 af, Depth= 2.14" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.10 hrs Type II 24-hr 5-YR Rainfall=4.21" Area (ac) CN Description 0.510 98 Impervious Roadway 5.700 77 2 acre lots, 12% imp, HSG C 6.210 79 Weighted Average 5.016 80.77% Pervious Area 1.194 19.23% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 50 0.0250 0.17 Sheet Flow, Sheet Grass: Short n= 0.150 P2= 3.38" 1.0 150 0.0250 2.55 Shallow Concentrated Flow, Shallow Unpaved Kv= 16.1 fps 2.1 750 0.0300 5.94 53.45 Channel Flow, Channel Area= 9.0 sf Perim= 12.4' r= 0.73' n= 0.035 0.8 210 0.0090 4.22 76.02 Channel Flow, Outfall Area= 18.0 sf Perim= 11.5' r= 1.57' n= 0.045 8.9 1,160 Total Subcatchment 5S: Pre -Development Condition Hydrograph Time (hours) — Runoff 31 Wet Pond Type 11 24-hr 10-YR Rainfall=4.82" Prepared by Hewlett-Packard Company Printed 10/16/2018 HydroCAD® 10.00-20 s/n 01918 © 2017 HydroCAD Software Solutions LLC Page 4 Summary for Subcatchment 5S: Pre -Development Condition Runoff = 24.94 cfs @ 12.00 hrs, Volume= 1.370 af, Depth= 2.65" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.10 hrs Type II 24-hr 10-YR Rainfall=4.82" Area (ac) CN Description 0.510 98 Impervious Roadway 5.700 77 2 acre lots, 12% imp, HSG C 6.210 79 Weighted Average 5.016 80.77% Pervious Area 1.194 19.23% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 50 0.0250 0.17 Sheet Flow, Sheet Grass: Short n= 0.150 P2= 3.38" 1.0 150 0.0250 2.55 Shallow Concentrated Flow, Shallow Unpaved Kv= 16.1 fps 2.1 750 0.0300 5.94 53.45 Channel Flow, Channel Area= 9.0 sf Perim= 12.4' r= 0.73' n= 0.035 0.8 210 0.0090 4.22 76.02 Channel Flow, Outfall Area= 18.0 sf Perim= 11.5' r= 1.57' n= 0.045 8.9 1,160 Total 1 24.94 cfs N V 3 0 LL Subcatchment 5S: Pre -Development Condition Hydrograph Type 1124-h 10-YR Rainfall=4.82" low Length 1'160' Tc=8.9 min 5 50 55 60 65 70 75 80 85 90 95 100 105 110 115 12( Time (hours) — Runoff 32 Wet Pond Type 11 24-hr 25-YR Rainfall=5.73" Prepared by Hewlett-Packard Company Printed 10/16/2018 HydroCAD® 10.00-20 s/n 01918 © 2017 HydroCAD Software Solutions LLC Page 5 Summary for Subcatchment 5S: Pre -Development Condition Runoff = 32.22 cfs @ 12.00 hrs, Volume= 1.780 af, Depth= 3.44" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.10 hrs Type II 24-hr 25-YR Rainfall=5.73" Area (ac) CN Description 0.510 98 Impervious Roadway 5.700 77 2 acre lots, 12% imp, HSG C 6.210 79 Weighted Average 5.016 80.77% Pervious Area 1.194 19.23% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 50 0.0250 0.17 Sheet Flow, Sheet Grass: Short n= 0.150 P2= 3.38" 1.0 150 0.0250 2.55 Shallow Concentrated Flow, Shallow Unpaved Kv= 16.1 fps 2.1 750 0.0300 5.94 53.45 Channel Flow, Channel Area= 9.0 sf Perim= 12.4' r= 0.73' n= 0.035 0.8 210 0.0090 4.22 76.02 Channel Flow, Outfall Area= 18.0 sf Perim= 11.5' r= 1.57' n= 0.045 8.9 1,160 Total Subcatchment 5S: Pre -Development Condition Hydrograph Time (hours) — Runoff 33 Wet Pond Type 11 24-hr 50-YR Rainfall=6.43" Prepared by Hewlett-Packard Company Printed 10/16/2018 HydroCAD® 10.00-20 s/n 01918 © 2017 HydroCAD Software Solutions LLC Page 6 Summary for Subcatchment 5S: Pre -Development Condition Runoff = 37.89 cfs @ 12.00 hrs, Volume= 2.104 af, Depth= 4.07" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.10 hrs Type II 24-hr 50-YR Rainfall=6.43" Area (ac) CN Description 0.510 98 Impervious Roadway 5.700 77 2 acre lots, 12% imp, HSG C 6.210 79 Weighted Average 5.016 80.77% Pervious Area 1.194 19.23% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 50 0.0250 0.17 Sheet Flow, Sheet Grass: Short n= 0.150 P2= 3.38" 1.0 150 0.0250 2.55 Shallow Concentrated Flow, Shallow Unpaved Kv= 16.1 fps 2.1 750 0.0300 5.94 53.45 Channel Flow, Channel Area= 9.0 sf Perim= 12.4' r= 0.73' n= 0.035 0.8 210 0.0090 4.22 76.02 Channel Flow, Outfall Area= 18.0 sf Perim= 11.5' r= 1.57' n= 0.045 N V 3 0 LL 8.9 1,160 Total Subcatchment 5S: Pre -Development Condition Hydrograph 37.89 cfs 0 0 5 10 15 20 25 30 35 off 50 55 60 65 70 75 80 85 90 95 100 105 110 115 12 Time (hours) — Runoff 34 Wet Pond Type 11 24-hr 100-YR Rainfall=7.15" Prepared by Hewlett-Packard Company Printed 10/16/2018 HydroCAD® 10.00-20 s/n 01918 © 2017 HydroCAD Software Solutions LLC Page 7 Summary for Subcatchment 5S: Pre -Development Condition Runoff = 43.76 cfs @ 12.00 hrs, Volume= 2.444 af, Depth= 4.72" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.10 hrs Type II 24-hr 100-YR Rainfall=7.15" Area (ac) CN Description 0.510 98 Impervious Roadway 5.700 77 2 acre lots, 12% imp, HSG C 6.210 79 Weighted Average 5.016 80.77% Pervious Area 1.194 19.23% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 50 0.0250 0.17 Sheet Flow, Sheet Grass: Short n= 0.150 P2= 3.38" 1.0 150 0.0250 2.55 Shallow Concentrated Flow, Shallow Unpaved Kv= 16.1 fps 2.1 750 0.0300 5.94 53.45 Channel Flow, Channel Area= 9.0 sf Perim= 12.4' r= 0.73' n= 0.035 0.8 210 0.0090 4.22 76.02 Channel Flow, Outfall Area= 18.0 sf Perim= 11.5' r= 1.57' n= 0.045 N U 3 0 LL 8.9 1,160 Total Subcatchment 5S: Pre -Development Condition Hydrograph 43.76 cfs 2_L� •� 0- 0 5 10 15 20 25 30 35 Runoff Depth=4.72" Flow Length 1164' To=8.9 min 50 55 60 65 70 75 80 85 90 95 100 105 110 115 12 Time (hours) — Runoff 35 Wet Pond Type 11 24-hr 500-YR Rainfall=8.99" Prepared by Hewlett-Packard Company Printed 10/16/2018 HydroCAD® 10.00-20 s/n 01918 © 2017 HydroCAD Software Solutions LLC Page 8 Summary for Subcatchment 5S: Pre -Development Condition Runoff = 58.81 cfs @ 11.99 hrs, Volume= 3.331 af, Depth= 6.44" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.10 hrs Type II 24-hr 500-YR Rainfall=8.99" Area (ac) CN Description 0.510 98 Impervious Roadway 5.700 77 2 acre lots, 12% imp, HSG C 6.210 79 Weighted Average 5.016 80.77% Pervious Area 1.194 19.23% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 50 0.0250 0.17 Sheet Flow, Sheet Grass: Short n= 0.150 P2= 3.38" 1.0 150 0.0250 2.55 Shallow Concentrated Flow, Shallow Unpaved Kv= 16.1 fps 2.1 750 0.0300 5.94 53.45 Channel Flow, Channel Area= 9.0 sf Perim= 12.4' r= 0.73' n= 0.035 0.8 210 0.0090 4.22 76.02 Channel Flow, Outfall Area= 18.0 sf Perim= 11.5' r= 1.57' n= 0.045 8.9 1,160 Total Subcatchment 5S: Pre -Development Condition Hydrograph Time (hours) — Runoff 36 Wet Pond Type/1 24-hr WQV Rainfall=1.00" Prepared by Hewlett-Packard Company Printed 10/16/2018 HydroCAD®10.00-20 s/n 01918 ©2017 HydroCAD Software Solutions LLC Page 1 Summary for Pond 1 P: Future Condition w/ Wet Pond Inflow Area = 6.210 ac, 37.95% Impervious, Inflow Depth = 0.14" for WQV event Inflow = 0.97 cfs @ 12.02 hrs, Volume= 0.072 of Outflow = 0.06 cfs @ 15.03 hrs, Volume= 0.072 af, Atten= 93%, Lag= 180.1 min Primary = 0.06 cfs @ 15.03 hrs, Volume= 0.072 of Routing by Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.10 hrs Peak Elev= 761.20' @ 15.03 hrs Surf.Area= 6,897 sf Storage= 1,328 cf Plug -Flow detention time= 490.7 min calculated for 0.072 of (100% of inflow) Center -of -Mass det. time= 489.8 min ( 1,402.0 - 912.2 ) Volume Invert Avail.Storage Storage Description #1 761.00' 40,698 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 761.00 6,427 0 0 762.00 8,786 7,607 7,607 763.00 10,244 9,515 17,122 764.00 11,771 11,008 28,129 765.00 13,367 12,569 40,698 Device Routing Invert Outlet Devices #1 Primary 757.00' 24.0" Round DIP _Round 24" L= 56.0' RCP, sq.cut end projecting, Ke= 0.500 Inlet / Outlet Invert= 757.00' / 756.60' S= 0.0071 T Cc= 0.900 n= 0.012, Flow Area= 3.14 sf #2 Device 1 761.00' 3.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 762.50' 108.0" W x 6.0" H Vert. Orifice/Grate C= 0.600 #4 Device 1 763.50' 18.0' long x 0.5' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 #5 Primary 764.00' Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 1.00 Width (feet) 14.00 20.00 Primary OutFlow Max=0.06 cfs @ 15.03 hrs HW=761.20' (Free Discharge) 1=DIP_Round 24" (Passes 0.06 cfs of 27.06 cfs potential flow) 12=Orifice/Grate (Orifice Controls 0.06 cfs @ 1.52 fps) 3=Orifice/Grate ( Controls 0.00 cfs) 4=Broad -Crested Rectangular Weir ( Controls 0.00 cfs) 5=Custom Weir/Orifice ( Controls 0.00 cfs) 37 Wet Pond Type 1124-hr WQV Rainfall=1.00" Prepared by Hewlett-Packard Company Printed 10/16/2018 HydroCAD® 10.00-20 s/n 01918 © 2017 HydroCAD Software Solutions LLC Page 2 N V 3 0 LL 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) — Inflow Primary 38 Wet Pond Type 11 24-hr 2-YR Rainfall=3.38" Prepared by Hewlett-Packard Company Printed 10/16/2018 HydroCAD®10.00-20 s/n 01918 ©2017 HydroCAD Software Solutions LLC Page 3 Summary for Pond 1 P: Future Condition w/ Wet Pond Inflow Area = 6.210 ac, 37.95% Impervious, Inflow Depth = 1.77" for 2-YR event Inflow = 16.96 cfs @ 12.00 hrs, Volume= 0.918 of Outflow = 7.19 cfs @ 12.15 hrs, Volume= 0.918 af, Atten= 58%, Lag= 9.5 min Primary = 7.19 cfs @ 12.15 hrs, Volume= 0.918 of Routing by Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.10 hrs Peak Elev= 762.88' @ 12.15 hrs Surf.Area= 10,076 sf Storage= 15,949 cf Plug -Flow detention time= 379.8 min calculated for 0.918 of (100% of inflow) Center -of -Mass det. time= 379.4 min ( 1,207.5 - 828.1 ) Volume Invert Avail.Storage Storage Description #1 761.00' 40,698 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 761.00 6,427 0 0 762.00 8,786 7,607 7,607 763.00 10,244 9,515 17,122 764.00 11,771 11,008 28,129 765.00 13,367 12,569 40,698 Device Routing Invert Outlet Devices #1 Primary 757.00' 24.0" Round DIP _Round 24" L= 56.0' RCP, sq.cut end projecting, Ke= 0.500 Inlet / Outlet Invert= 757.00' / 756.60' S= 0.0071 T Cc= 0.900 n= 0.012, Flow Area= 3.14 sf #2 Device 1 761.00' 3.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 762.50' 108.0" W x 6.0" H Vert. Orifice/Grate C= 0.600 #4 Device 1 763.50' 18.0' long x 0.5' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 #5 Primary 764.00' Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 1.00 Width (feet) 14.00 20.00 Primary OutFlow Max=6.90 cfs @ 12.15 hrs HW=762.87' (Free Discharge) 1=DIP_Round 24" (Passes 6.90 cfs of 33.39 cfs potential flow) 12=Orifice/Grate (Orifice Controls 0.31 cfs @ 6.37 fps) 3=Orifice/Grate (Orifice Controls 6.59 cfs @ 1.96 fps) 4=Broad -Crested Rectangular Weir ( Controls 0.00 cfs) 5=Custom Weir/Orifice ( Controls 0.00 cfs) 39 Wet Pond Type 11 24-hr 2-YR Rainfall=3.38" Prepared by Hewlett-Packard Company Printed 10/16/2018 HydroCAD® 10.00-20 s/n 01918 © 2017 HydroCAD Software Solutions LLC Page 4 N V 3 0 LL Pond 1 P: Future Condition w/ Wet Pond Hydrograph Time (hours) — Inflow Primary 40 Wet Pond Type/1 24-hr 5-YR Rainfall=4.21 " Prepared by Hewlett-Packard Company Printed 10/16/2018 HydroCAD®10.00-20 s/n 01918 ©2017 HydroCAD Software Solutions LLC Page 5 Summary for Pond 1 P: Future Condition w/ Wet Pond Inflow Area = 6.210 ac, 37.95% Impervious, Inflow Depth = 2.49" for 5-YR event Inflow = 23.62 cfs @ 11.99 hrs, Volume= 1.286 of Outflow = 14.69 cfs @ 12.12 hrs, Volume= 1.286 af, Atten= 38%, Lag= 7.3 min Primary = 14.69 cfs @ 12.12 hrs, Volume= 1.286 of Routing by Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.10 hrs Peak Elev= 763.20' @ 12.11 hrs Surf.Area= 10,547 sf Storage= 19,187 cf Plug -Flow detention time= 291.0 min calculated for 1.286 of (100% of inflow) Center -of -Mass det. time= 290.6 min ( 1,109.2 - 818.6 ) Volume Invert Avail.Storage Storage Description #1 761.00' 40,698 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 761.00 6,427 0 0 762.00 8,786 7,607 7,607 763.00 10,244 9,515 17,122 764.00 11,771 11,008 28,129 765.00 13,367 12,569 40,698 Device Routing Invert Outlet Devices #1 Primary 757.00' 24.0" Round DIP _Round 24" L= 56.0' RCP, sq.cut end projecting, Ke= 0.500 Inlet / Outlet Invert= 757.00' / 756.60' S= 0.0071 T Cc= 0.900 n= 0.012, Flow Area= 3.14 sf #2 Device 1 761.00' 3.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 762.50' 108.0" W x 6.0" H Vert. Orifice/Grate C= 0.600 #4 Device 1 763.50' 18.0' long x 0.5' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 #5 Primary 764.00' Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 1.00 Width (feet) 14.00 20.00 Primary OutFlow Max=14.25 cfs @ 12.12 hrs HW=763.18' (Free Discharge) 1=DIP_Round 24" (Passes 14.25 cfs of 34.41 cfs potential flow) 12=Orifice/Grate (Orifice Controls 0.34 cfs @ 6.89 fps) 3=Orifice/Grate (Orifice Controls 13.92 cfs @ 3.09 fps) 4=Broad -Crested Rectangular Weir ( Controls 0.00 cfs) 5=Custom Weir/Orifice ( Controls 0.00 cfs) Cy Wet Pond Type 11 24-hr 5-YR Rainfall=4.21 " Prepared by Hewlett-Packard Company Printed 10/16/2018 HydroCAD® 10.00-20 s/n 01918 © 2017 HydroCAD Software Solutions LLC Page 6 N V 3 0 LL Pond 1 P: Future Condition w/ Wet Pond Hydrograph Time (hours) — Inflow Primary 42 Wet Pond Type 11 24-hr 10-YR Rainfall=4.82" Prepared by Hewlett-Packard Company Printed 10/16/2018 HydroCAD®10.00-20 s/n 01918 ©2017 HydroCAD Software Solutions LLC Page 7 Summary for Pond 1 P: Future Condition w/ Wet Pond Inflow Area = 6.210 ac, 37.95% Impervious, Inflow Depth = 3.03" for 10-YR event Inflow = 28.59 cfs @ 11.99 hrs, Volume= 1.567 of Outflow = 18.14 cfs @ 12.10 hrs, Volume= 1.567 af, Atten= 37%, Lag= 6.5 min Primary = 18.14 cfs @ 12.10 hrs, Volume= 1.567 of Routing by Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.10 hrs Peak Elev= 763.43' @ 12.10 hrs Surf.Area= 10,903 sf Storage= 21,683 cf Plug -Flow detention time= 241.5 min calculated for 1.565 of (100% of inflow) Center -of -Mass det. time= 244.8 min ( 1,057.9 - 813.0 ) Volume Invert Avail.Storage Storage Description #1 761.00' 40,698 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 761.00 6,427 0 0 762.00 8,786 7,607 7,607 763.00 10,244 9,515 17,122 764.00 11,771 11,008 28,129 765.00 13,367 12,569 40,698 Device Routing Invert Outlet Devices #1 Primary 757.00' 24.0" Round DIP _Round 24" L= 56.0' RCP, sq.cut end projecting, Ke= 0.500 Inlet / Outlet Invert= 757.00' / 756.60' S= 0.0071 T Cc= 0.900 n= 0.012, Flow Area= 3.14 sf #2 Device 1 761.00' 3.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 762.50' 108.0" W x 6.0" H Vert. Orifice/Grate C= 0.600 #4 Device 1 763.50' 18.0' long x 0.5' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 #5 Primary 764.00' Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 1.00 Width (feet) 14.00 20.00 Primary OutFlow Max=18.11 cfs @ 12.10 hrs HW=763.43' (Free Discharge) 1=DIP_Round 24" (Passes 18.11 cfs of 35.25 cfs potential flow) 12=Orifice/Grate (Orifice Controls 0.36 cfs @ 7.31 fps) 3=Orifice/Grate (Orifice Controls 17.76 cfs @ 3.95 fps) 4=Broad -Crested Rectangular Weir ( Controls 0.00 cfs) 5=Custom Weir/Orifice ( Controls 0.00 cfs) 43 Wet Pond Type 11 24-hr 10-YR Rainfall=4.82" Prepared by Hewlett-Packard Company Printed 10/16/2018 HydroCAD® 10.00-20 s/n 01918 © 2017 HydroCAD Software Solutions LLC Page 8 N w V 3 0 LL Pond 1 P: Future Condition w/ Wet Pond Hydrograph Time (hours) — Inflow Primary 44 Wet Pond Type/1 24-hr 25-YR Rainfall=5.73" Prepared by Hewlett-Packard Company Printed 10/16/2018 HydroCAD®10.00-20 s/n 01918 ©2017 HydroCAD Software Solutions LLC Page 9 Summary for Pond 1 P: Future Condition w/ Wet Pond Inflow Area = 6.210 ac, 37.95% Impervious, Inflow Depth = 3.86" for 25-YR event Inflow = 36.08 cfs @ 11.99 hrs, Volume= 1.997 of Outflow = 26.26 cfs @ 12.09 hrs, Volume= 1.996 af, Atten= 27%, Lag= 6.1 min Primary = 26.26 cfs @ 12.09 hrs, Volume= 1.996 of Routing by Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.10 hrs Peak Elev= 763.71' @ 12.09 hrs Surf.Area= 11,326 sf Storage= 24,766 cf Plug -Flow detention time= 195.6 min calculated for 1.995 of (100% of inflow) Center -of -Mass det. time= 198.9 min ( 1,005.1 - 806.2 ) Volume Invert Avail.Storage Storage Description #1 761.00' 40,698 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 761.00 6,427 0 0 762.00 8,786 7,607 7,607 763.00 10,244 9,515 17,122 764.00 11,771 11,008 28,129 765.00 13,367 12,569 40,698 Device Routing Invert Outlet Devices #1 Primary 757.00' 24.0" Round DIP _Round 24" L= 56.0' RCP, sq.cut end projecting, Ke= 0.500 Inlet / Outlet Invert= 757.00' / 756.60' S= 0.0071 T Cc= 0.900 n= 0.012, Flow Area= 3.14 sf #2 Device 1 761.00' 3.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 762.50' 108.0" W x 6.0" H Vert. Orifice/Grate C= 0.600 #4 Device 1 763.50' 18.0' long x 0.5' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 #5 Primary 764.00' Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 1.00 Width (feet) 14.00 20.00 Primary OutFlow Max=25.73 cfs @ 12.09 hrs HW=763.70' (Free Discharge) 1=DIP_Round 24" (Passes 25.73 cfs of 36.10 cfs potential flow) 12=Orifice/Grate (Orifice Controls 0.38 cfs @ 7.72 fps) 3=Orifice/Grate (Orifice Controls 21.00 cfs @ 4.67 fps) 4=Broad -Crested Rectangular Weir (Weir Controls 4.35 cfs @ 1.24 fps) 5=Custom Weir/Orifice ( Controls 0.00 cfs) 45 Wet Pond Type 11 24-hr 25-YR Rainfall=5.73" Prepared by Hewlett-Packard Company Printed 10/16/2018 HydroCAD® 10.00-20 s/n 01918 ©2017 HydroCAD Software Solutions LLC Page 10 N w V 3 0 LL — Inflow Primary 46 Wet Pond Type/1 24-hr 50-YR Rainfall=6.43" Prepared by Hewlett-Packard Company Printed 10/16/2018 HydroCAD®10.00-20 s/n 01918 ©2017 HydroCAD Software Solutions LLC Page 11 Summary for Pond 1 P: Future Condition w/ Wet Pond Inflow Area = 6.210 ac, 37.95% Impervious, Inflow Depth = 4.51" for 50-YR event Inflow = 41.86 cfs @ 11.99 hrs, Volume= 2.333 of Outflow = 32.40 cfs @ 12.08 hrs, Volume= 2.333 af, Atten= 23%, Lag= 5.3 min Primary = 32.40 cfs @ 12.08 hrs, Volume= 2.333 of Routing by Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.10 hrs Peak Elev= 763.83' @ 12.07 hrs Surf.Area= 11,512 sf Storage= 26,154 cf Plug -Flow detention time= 171.1 min calculated for 2.331 of (100% of inflow) Center -of -Mass det. time= 174.3 min ( 976.1 - 801.8 ) Volume Invert Avail.Storage Storage Description #1 761.00' 40,698 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 761.00 6,427 0 0 762.00 8,786 7,607 7,607 763.00 10,244 9,515 17,122 764.00 11,771 11,008 28,129 765.00 13,367 12,569 40,698 Device Routing Invert Outlet Devices #1 Primary 757.00' 24.0" Round DIP _Round 24" L= 56.0' RCP, sq.cut end projecting, Ke= 0.500 Inlet / Outlet Invert= 757.00' / 756.60' S= 0.0071 T Cc= 0.900 n= 0.012, Flow Area= 3.14 sf #2 Device 1 761.00' 3.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 762.50' 108.0" W x 6.0" H Vert. Orifice/Grate C= 0.600 #4 Device 1 763.50' 18.0' long x 0.5' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 #5 Primary 764.00' Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 1.00 Width (feet) 14.00 20.00 Primary OutFlow Max=30.86 cfs @ 12.08 hrs HW=763.80' (Free Discharge) 1=DIP_Round 24" (Passes 30.86 cfs of 36.42 cfs potential flow) 12=Orifice/Grate (Orifice Controls 0.39 cfs @ 7.87 fps) 3=Orifice/Grate (Orifice Controls 22.12 cfs @ 4.92 fps) 4=Broad -Crested Rectangular Weir (Weir Controls 8.35 cfs @ 1.56 fps) 5=Custom Weir/Orifice ( Controls 0.00 cfs) 47 Wet Pond Type 11 24-hr 50-YR Rainfall=6.43" Prepared by Hewlett-Packard Company Printed 10/16/2018 HydroCAD® 10.00-20 s/n 01918 © 2017 HydroCAD Software Solutions LLC Page 12 N w V 3 0 LL Pond 1 P: Future Condition w/ Wet Pond Hydrograph Time (hours) — Inflow Primary 48 Wet Pond Type 11 24-hr 100-YR Rainfall=7.15" Prepared by Hewlett-Packard Company Printed 10/16/2018 HydroCAD®10.00-20 s/n 01918 ©2017 HydroCAD Software Solutions LLC Page 13 Summary for Pond 1 P: Future Condition w/ Wet Pond Inflow Area = 6.210 ac, 37.95% Impervious, Inflow Depth = 5.19" for 100-YR event Inflow = 47.81 cfs @ 11.99 hrs, Volume= 2.684 of Outflow = 37.77 cfs @ 12.06 hrs, Volume= 2.683 af, Atten= 21 %, Lag= 4.3 min Primary = 37.77 cfs @ 12.06 hrs, Volume= 2.683 of Routing by Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.10 hrs Peak Elev= 763.94' @ 12.06 hrs Surf.Area= 11,673 sf Storage= 27,373 cf Plug -Flow detention time= 155.8 min calculated for 2.683 of (100% of inflow) Center -of -Mass det. time= 155.3 min ( 953.2 - 797.9 ) Volume Invert Avail.Storage Storage Description #1 761.00' 40,698 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 761.00 6,427 0 0 762.00 8,786 7,607 7,607 763.00 10,244 9,515 17,122 764.00 11,771 11,008 28,129 765.00 13,367 12,569 40,698 Device Routing Invert Outlet Devices #1 Primary 757.00' 24.0" Round DIP _Round 24" L= 56.0' RCP, sq.cut end projecting, Ke= 0.500 Inlet / Outlet Invert= 757.00' / 756.60' S= 0.0071 T Cc= 0.900 n= 0.012, Flow Area= 3.14 sf #2 Device 1 761.00' 3.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 762.50' 108.0" W x 6.0" H Vert. Orifice/Grate C= 0.600 #4 Device 1 763.50' 18.0' long x 0.5' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 #5 Primary 764.00' Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 1.00 Width (feet) 14.00 20.00 Primary OutFlow Max=36.35 cfs @ 12.06 hrs HW=763.89' (Free Discharge) 1=DIP_Round 24" (Passes 36.35 cfs of 36.72 cfs potential flow) 12=Orifice/Grate (Orifice Controls 0.39 cfs @ 8.01 fps) 3=Orifice/Grate (Orifice Controls 23.10 cfs @ 5.13 fps) 4=Broad -Crested Rectangular Weir (Weir Controls 12.85 cfs @ 1.82 fps) 5=Custom Weir/Orifice ( Controls 0.00 cfs) 49 Wet Pond Type 11 24-hr 100-YR Rainfall=7.15" Prepared by Hewlett-Packard Company Printed 10/16/2018 HydroCAD® 10.00-20 s/n 01918 © 2017 HydroCAD Software Solutions LLC Page 14 N w V 3 0 LL Pond 1 P: Future Condition w/ Wet Pond Hydrograph Time (hours) — Inflow Primary 50 Wet Pond Type/1 24-hr 500-YR Rainfall=8.99" Prepared by Hewlett-Packard Company Printed 10/16/2018 HydroCAD®10.00-20 s/n 01918 ©2017 HydroCAD Software Solutions LLC Page 15 Summary for Pond 1 P: Future Condition w/ Wet Pond Inflow Area = 6.210 ac, 37.95% Impervious, Inflow Depth = 6.94" for 500-YR event Inflow = 62.98 cfs @ 11.99 hrs, Volume= 3.593 of Outflow = 48.54 cfs @ 12.07 hrs, Volume= 3.593 af, Atten= 23%, Lag= 4.8 min Primary = 48.54 cfs @ 12.07 hrs, Volume= 3.593 of Routing by Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.10 hrs Peak Elev= 764.38' @ 12.06 hrs Surf.Area= 12,374 sf Storage= 32,691 cf Plug -Flow detention time= 120.2 min calculated for 3.590 of (100% of inflow) Center -of -Mass det. time= 123.2 min ( 913.0 - 789.9 ) Volume Invert Avail.Storage Storage Description #1 761.00' 40,698 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 761.00 6,427 0 0 762.00 8,786 7,607 7,607 763.00 10,244 9,515 17,122 764.00 11,771 11,008 28,129 765.00 13,367 12,569 40,698 Device Routing Invert Outlet Devices #1 Primary 757.00' 24.0" Round DIP _Round 24" L= 56.0' RCP, sq.cut end projecting, Ke= 0.500 Inlet / Outlet Invert= 757.00' / 756.60' S= 0.0071 T Cc= 0.900 n= 0.012, Flow Area= 3.14 sf #2 Device 1 761.00' 3.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 762.50' 108.0" W x 6.0" H Vert. Orifice/Grate C= 0.600 #4 Device 1 763.50' 18.0' long x 0.5' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 #5 Primary 764.00' Custom Weir/Orifice, Cv= 2.62 (C= 3.28) Head (feet) 0.00 1.00 Width (feet) 14.00 20.00 Primary OutFlow Max=46.64 cfs @ 12.07 hrs HW=764.32' (Free Discharge) 1=DIP_Round 24" (Inlet Controls 38.02 cfs @ 12.10 fps) 12=Orifice/Grate (Passes < 0.42 cfs potential flow) 3=Orifice/Grate (Passes < 27.09 cfs potential flow) 4=Broad -Crested Rectangular Weir (Passes < 43.88 cfs potential flow) 5=Custom Weir/Orifice (Weir Controls 8.63 cfs @ 1.82 fps) 51 Wet Pond Type 11 24-hr 500-YR Rainfall=8.99" Prepared by Hewlett-Packard Company Printed 10/16/2018 HydroCAD® 10.00-20 s/n 01918 © 2017 HydroCAD Software Solutions LLC Page 16 N w V 3 0 LL — Inflow Primary 52 Flotation for Rectangular Concrete Stucture Structure Type: Wet Basin -L- 73+50 RT Project: P05187 - Alamance Church Rd Location: City of Greensboro Exterior Length of Structure Exterior Width of Structure Height of Structure (to invert) Wall and Standard Base Thickness Pipe Volume Deductions Volume of Concrete Weight of Structure Unit Weight of Water Unit Weight of concrete Uplift force Safety factor Uplift Force with safety factor Additional Weight Required Additional Volume of Concrete Required Minimum Additional Base Thickness Required Additional Base Provided Total Weight of Structure Antifloat Requirements Satisfied 5.00 (feet) 5.00 (feet) 6.50 (feet) 0.50 (feet) 4.60 (cubic feet) 66.4 (cubic feet) 9960 (Ibs) 62.4 (Ibs/cf) 150.0 (Ibs/cf) 10920 (Ibs) 1.2 13104 (Ibs) 3144 (Ibs) 21.0 0.84 (feet) 1.0 (feet) 13710 (Ibs) YES User Inputs 53