Loading...
HomeMy WebLinkAboutNCC200479_ESC Approval Submitted_20200207ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH Interim Director NORTH CAROLINA Environmental Quality April 16, 2019 LETTER OF APPROVAL Ace Development Group, LLC Jonathan Acevedo, President 728 Kensington Park Road Fayetteville, NC 28311 RE: Project Name: Belmont Estates Subdivision Acres Approved: 5.3 Project ID: CUMBE-2019-134 County: Cumberland, City: Linden Address: Ramsey Street River Basin: Cape Fear Stream Classification: Other Submitted by: Scot Brown Date Received by LQS: April 2, 2019 Plan Type: Residential Dear Mr. Acevedo: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and herebyissue this Letter of Approval. The enclosed Certificate of Approval must be posted at the job site. This plan shall expire three (3) years following the date of approval, if no land disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction Stormwater General Permit. This form MUST be submitted and COC issued prior to the commencement of any land disturbing activity on the above -named project. The NOI form may be accessed at deq.nc.govINCG01. Please direct questions about the NOI form to Annette Lucas at Annette. lucas nedenr. Fov or Paul Clark at P_aul.clarkgncdenr.gov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for coverage under the NCGO1 permit. However, on or after June 1, 2019, a $100 fee will be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: �DE Q0 �!ipil l:m_nR I:r efl4'="�3�a3� pNalliY North Carolina DeparCment of Environmental Qualtty I Uivisron of Energy. Mineral and Land Resources Fayetteville Regional Office 1 225 Green Street, Suite T34 Fayetteville, Nor"ti: Carniina 28301 910,433,3300 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 30 days. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. This permit allows for a land -disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. Any addition in impervious surface, over that already noted on the approved plan, would also require a revised plan to verify the appropriateness of the erosion control measures and the stormwater retention measures. (GS I I3A-54.1(b)). In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, Chris Baker Assistant Regional Engineer DEMLR - Fayetteville Regional Office Enclosures: Certificate of Approval cc: Scott Brown, 4D Site Solutions, Inc. - electronic copy Michael Naylor, Cumberland County Inspections Office — electronic copy Fayetteville Regional Office