HomeMy WebLinkAbout20181404 Ver 1_Beaufort 135 permit mod request_20200205STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
Roy COOPER
GOVERNOR
Mr. Stephen Lane — Field Representative
NC Division of Environment and Natural Resources
Division of Coastal Management
400 Commerce Avenue
Morehead City, NC 28557
Mr. Garcy Ward — Field Representative
NC Division of Environment and Natural Resources
Division of Water Resources, Washington District Office
943 Washington Square Mall
Washington, North Carolina 27889
Mr. Tom Steffens — Field Representative
U.S. Army Corps of Engineers
Regulatory Field Office
2407 W. 5th St.
Washington, N.C. 27889
1 /30/2020
JAmES H. TRomom III
SECRETARY
Subject: Beaufort Bridge 9135 permit modification and moratorium relief request
CAMA General permit 70443
DWR project number 20181404
USACE permit SAW-2018-2323
Dear Mr. Lane, Mr. Ward, Mr. Steffens,
Regarding the bridge replacement Beaufort 135, Due to a utility conflict the waterline bore will have to be
moved to the LT side of project. The NCDOT is requesting a permit modification to allow the waterline
bore to be done on the other side of bridge. There will be no impacts associated with this request. Please
find attached the revised plans showing the proposed work.
WBS number for this project is 17BP.2. R.88. Should you have additional questions please give me a call
at 252-439-2821.
Sincerely,
Jay Johnson
Mailing Address:
NC DEPARTMENT OF TRANSPORTATION
DIVISION TWO
2815 ROUSE ROAD EXT
KINSTON, NC 28504
Telephone:(252)775-6100
Fax: (252) 830-3352
Customer Service: 1-877-368-4968
Website: www.ncdot.gov
Location:
2815 ROUSE ROAD EXT
KINSTON, NC 28504