Loading...
HomeMy WebLinkAboutNC0081621_Program Flow Tracking_20190108 C A R OZr°11111$41;hNORTH 635 Alfred Brown Jr Court SW,P.O.Box 308,Concord,NC 28026-www.ci.concord.nc.us High Performance Living iODDEIE ®®i®®■1111111®! January 8, 2019 NC Department of Environment Quality Division of Water Resources—Water Quality Permitting Section Pretreatment, Emergency Response, and Collection Systems Unit Mr. Michael Parker 610 East Center Avenue, Suite 301 Mooresville,NC 28115 Subject:NCDENR DWQ—Delegated Program Flow Tracking FSTE 10/07 City of Concord Delegated Local Permitting Program RECEIVED Public Wastewater Collection Systems [� Cabarrus County,North Carolina FEB 0 5 2020 NCDEQ/DWR/NPDES Dear Mr.Parker: Please find attached a flow tracking report entitled "City of Concord Annual Flow Tracking (FSTE 10/07)". This flow tracking report provides a list of each public wastewater collection system "Authorization to Construct" permit that was issued during the past ten years and indicates the project permit number, project name, the obligated wastewater flow that was allocated with each permit, the wastewater flow that has been made tributary to the WWTP and the estimated wastewater discharge that is not tributary to the WWTP. In 2019, the City of Concord has issued a total wastewater discharge obligation of 241,855 GPD with a 14,400 GPD tributary wastewater discharge that will be treated and processed by the Water and Sewer Authority of Cabarrus County (WSACC) Wastewater Treatment Plants. The non-tributary wastewater discharge, obligated but not released, is 227,455 GPD. From 2006 through 2019, the City of Concord has a total obligated wastewater discharge of 4,216,228 GPD, a tributary wastewater discharge of 3,634,265 GPD that will be treated and processed by the Water and Sewer Authority of Cabarrus County (WSACC) Wastewater Treatment Plants and a non-tributary wastewater discharge of obligated but not released flow of 581,963 GPD. Please note that the City of Concord was approved on October 8, 2003 to issue permits for the construction and operation of new public gravity sewers, pump stations and force mains and modifications to proposed or existing public gravity sewer lines, pump stations and force mains located within the corporate limits and areas of extraterritorial jurisdiction that the City will own, maintain, and/or operate. The multi jurisdictional interceptors and the wastewater treatment Engineering Phone(704)920-5425 o Fax(704)786-4521 plants that transports and processes the City of Concord's wastewater is maintained and operated by the Water and Sewer Authority of Cabarrus County(WSACC) by contractual agreement. If there are any questions regarding the information presented in this report, please contact me at (704) 920-5401. Sincerely, City of Concord Sue Digitally signed by Sue Hyde Hyde;{ bate:2020.01.29 . 16:23:10-05'00' M. Sue Hyde,P.E. Director of Engineering Enclosures:City of Concord Annual Flow Tracking(FSTE 10/07) cc: Files-Delegated Application Package Booklet. NC Department of Environment Quality Division of Water Resources Mr.Matt Matthews,Section Chef—Surface Water Protection 1611 Mail Service Center Raleigh,NC 27699-1611 NC Department of Environment Quality Division of Water Resources—Water Quality Permitting Section Pretreatment,Emergency Response,and Collection Systems Unit(PERCS) Deborah Gore,PE,Environmental Supervisor 1617 Mail Service Center Raleigh,NC 27699-1617 E-Copy: M.Sue Hyde Engineering Phone(704)920-5425 • Fax(704)7864521 City of Concord Annual Flow Tracking(FSTE 10/07) 2007-2019 Summary WSACC WWTP: Rocky River WWTP WWTP Permit Number: NC0036269 Obligated Flow(GPD) 2007.2019 Tributary Flow Non-Tributary Flow(GPO) (GPO) 2006 559,524 559,524 0 2007 776,041 768,841 7,200 2008 320,053 320,053 0 2009 119,470 119,470 0 2010 48,710 48,710 0 2011 5,817 5,817 0 2012 214,256 214,256 0 2013 90,882 90,862 0 2014 414,689 413,249 1,440 2015 170,874 164,010 6,864 2016 437,732 387,493 50,239 2017 166,005 160,840 5,165 2018 493,610 214,690 278,920 2019 241,605 14,400 227,205 Total 4,059,268 3,482,235 577,033 Reported Information based on the 2006.2007,2008,2009.2010.2011,2012,2013,2014,2015.2016.2017,2018.8 2019 NCDENR DWO Quarterly Reports and 2007,2008,2009,2010.2011,2012,2013,2014.2015,2016.2017,2018 8 2019 Cetficathons City of Concord Annual Flow Tracking(FSTE 10/07) 2007-2019 Summary Muddy Creek WSACC WWTP: WWTP WWTP Permit Number: NC0081621 Obligated Flow(GPD) 2007-2019;GPbDitary Flow Non-Tributary Flow(GPD) 2006 0 0 0 2007 0 0 0 2008 62,770 62,050 720 2009 0 0 0 2010 0 0 0 2011 0 0 0 2012 0 0 0 2013 0 0 0 2014 0 0 0 2015 10,800 7,560 3,240 2016 83,140 62,420 720 2017 0 0 0 2018 0 0 0 2019 250 0 250 Total 156,960 152,030 4,930 Reported information based on the 2006,2007,2008,2009,2010.2011,2012,2013.2014.2015,2016,2017,2018,8 2019 NCDENR DWO Quarterly Reports and 2007,2008,2009,2010,2011,2012,2013,2014,2015,2016.2017,2018 8 2019 Certifications Rocky River&Muddy Creek WWTP Totals Obligated 4,216,228 GPD Obligated 4.216228 MGD Tributary 3,634,265 GPD Tributary 3.634265 MGD Non-Tributary 581,963 GPD Non-Tributary 0.581963 MGD City of Concord Annual Flow Tracking(FSTE 10/07) 2006 Permits ' Receiving Rocky River WWTP WWTP: Permit Number:NC0036269 _ 2007 2007 2008 _ 2008 2009 2009 201C 2011 2011 2012 2012 2013 2011 2014 2014 CYty of ConcoN Perna Tributary Flow Non-Tributary Tributary Flow Non-Tributary Tributary Flow Non-Tributary Tributary Flow Non-Tributary Tributary Flow Non-Tributary Tributary Flow Non-Tributary Tributary Flow Non-Tributary Tributary Flow Non-Tributary City of Concord Project No. No Project Name Obligated Flow(GPO) Maintain type (GPO) Flow(GPD) (GPO) Flow(GPO) (GPO) Flow(GPO) (GPO) Flow(GPO) (GPO) Flow(GPO) (GPO) Flow(GPO) (GPO) Flow(GPD) (GPD) Flow(GPO) Construction Status 2005-029 05-1208542 Indian Run Creek Sewer Trunk 0 Domestic 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100% 2005-033 05-1214544 Christenbury Village B-Meadow Wood 40,680 Domestic 11,160 29,520 18,000 11,520 0 11,520 0 11,520 11,520 0 0 0 0 0 0 0 100% 2005-090 05-1222546 The Villages at Moss Creek Phase 9A 720 Domestic 720 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100% 2006-002 06-0109501 Afton Village Water& Sewer Ext.at Foundry Street 0 Commercial 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100% 2005-011 05-1219545 Concord Christian Center 84nch Sewer Main @ Manor Ave. 570 Domestic 570 0 0 0 0 0 0 0 0 0 _ 0 _ 0 0 0 0 0 100% 2005-074 06-0118503 Laurel Park Subdivision Phase 5&6 45,600 Domestic 45,600 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100% 2005-081 06-0112502 Lowe's at Dale Earnhardt Blvd. 26,980 Commercial 26,980 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100% 2005-084A 06-0120506 Cabarrus Plastics,Inc.(Zion Church Rd.)Sewer Ext. 835 Domestic 835 0 0 0 _ 0 0 0 0 0 0 _ 0 0 0 0 0 0 100% 2003-038 05-1208543 Hearthwood Subdivision 59,400 Domestic 0 59,400 22,200 37,200 0 37,200 0 37,200 17,400 19,800 0 19,800 15,000 4,800 4,800 0 100% 2005-036 06-0120505 Christenbury Village D 31,320 Domestic 17,280 14,040 14,040 0 0 _ 0 0 0 0 0 0 0 0 0 0 0 100% 2005-027 06-0327508 Kings Grant Sewer Replacement 0 Domestic 0 0 0 0 0 0 0 0 0 _ 0 0 0 _ 0 0 0 0 100% 2004-048 06-0118504 Fourth Street Sewer Replacement 0 Domestic 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100% 2006-013 06-0406510 Tribek Shopping Center at Pitts School Rd.&US 29 14,569 Commercial 14,569 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100% 2003-072 06-0530512 Hallstead Subdivision Phase 1 74,160 Domestic 41,600 32,560 32,560 0 0 0 0 0 0 0 0 0 0 0 0 0 100% 2001-005 06-0602513 Corban Street/Ice Plant Sewer Realignment 0 _ Commercial 0 0 0 0 0 _ 0 0 0 0 0 0 0 0 0 0 0 100% 2005-066 06-0530514 Meridian Subdivision 5,760 Domestic 0 5,760 5,760 0 0 0 0 _ 0 0 0 0 0 0 0 0 0 100% 2006-006 06-0303507 The Villages at Moss Creek Phase 9 9,000 Domestic 9,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100% 2005-021 06-0630515 Magnolia Crossing Subdivision Modification 1,680 Domestic 1,680 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100% 2006-024 06-0807517 Cannon Crossroads Shopping Center 46,255 Commercial 46,255 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100% 2006-044 06-0828518 Afton Village Parcel 602/604 23,520 Domestic 11,520 12,000 12,000 0 0 0 0 0 0 0 0 0 0 0 0 0 100% 2006-035 06-0822519 Lowes Motor Speedway Sanitary Sewer Relief Tie-Over 0 Commercial 0 0 0 0 0 0 0 0 0 0 0 0 0 0 _ 0 0 _ 100% 2016 Allocation Reconciled to 2006-014 06-0512511 Chelsea Park Sub.Sewer Extension 0 Domestic 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Zero.Not to be Constructed 100%2016 1440 GPD from 4 2003-082 06-0913520 Skybrook Village North(AKA Laureldale Subdivision Phase 1) 87,840 Domestic 36,720 51,120 _ 26,280 24,840 0 24,840 3,960 20,880 0 20,880 0 22,330 20,880 0 0 0 lots Eliminated 2006-047 06-1003521 Convention Center Plaza _ 50,475 Commercial 50,475 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100% 2006-028 06-0612514 Carl Furr Elementary School Public Water&Sewer Main Ext. 13,200 Commercial 13,200 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100% 2006-029 06-0720516 Oxford Commons Commercial Site 5,960 Commercial 5,960 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100% 2006-034 06-1031523 Concord Retirement Residence at Branchview 21,000 Commercial 0 21,000 21,000 0 0 0 0 0 0 0 0 0 0 0 0 0 100% Concord Interceptor Tie-Over Tower Circle NW Sewer Connection 2006-031 06-1207530 Ph.1 0 Industrial 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100% Irish Buffalo Creek Concord Sewer Tie-Overs Tower Circle NW 2006-031 06-1122527 Ph.2 0 Industrial 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100% Irish Buffalo Creek Concord Sewer Tie-Overs Tower Circle NW 2006-031 06-1130528 Ph.1A 0 Industrial 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100% 2006-031 06-1025522 Irish Buffalo Creek Concord Sewer Tie-Overs Ph.5 0 Industrial 0 0 0 0 0 0 _ 0 _ 0 0 0 0 0 0 0 0 0 100% Total 559,524 334,124 225,400 151,840 73,560 0 73,560 3,960 69,600 28,920 40,680 0 42,130 35,880 4,800 4,800 0 Reported information based on the 2006 NCDENR DWO Quarterly Reports and 2007,2008.2009,2010,2011.2012,2013,2014,2015,2016.2017,2018 8 2019 Certifications 2019 Tributary Total 559,524 2019 Non Tributary Total 0 • City of Concord Annual Flow Tracking(FSTE 10/07) 2007 Permits ReceNing 99WTP:Rocky River W WTP Permit Number,NC0038289 200r 2007 2089 2091 3009 200e 0.1. 2117 2011 2011 0012 2M2 2711 2a13 2014 2411 MI6 2015 2910 2014 201T 2017 2016 2013 201e 201e 000000)0r4 ow WtencvO leek irk Prow rwo blgrW Fa w.�� Tnemry Fww lso00lmry Tneuury Fwl. r10,ery 0010E T40mry nbutin FM neon Tr..,fb. e-T1umry mryF nem mryF Or0abulvl every Fla. Tnem10 nemry Fb Trewav ,lea F aorv0npupn u0,0000 r0we Dun Flo. aonmrcvory ern Fe1. non-rwnwr Conerumon moots emir.)w, O (0aM 2. (OM Flo.(GM (OM) Flo.(GPO) Tnnla.m ow tam T town Fes.(OM) (OM 10.pro Tne vino) rim rim tom inn i0Fo)lave n500)00ol T4 IOFOI Flow(GPO) T 1a10) flew PPIM) T 000) F0.iu2o1 Tributary(GPO) Flo.loa01 T banal 1p.(OM T Fro) Fe.I..a1 2006033 06-1122526 Fullerton Place Subdivision Phase 1 44,640 Domestic 0 44,640 _ 44840 0 0 0 0 0 0 0 0 _ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100% 2008-027 06-1025524 Cabartus County Lew Enforcement Center,Pine 1 7.200 Commercial 0 _ 7200 0 7.200 7200 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100% 2007-003 07-0126502 Ruckus House Learning Center-Moss Plantation Ave.Eat 8,250 Commercial 8,250 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100% 2005-062 06-1220533 International Business Park Phase 2 West 16,000 j0Mviel 16,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100% 100%-4 Lots Removed From Project Scope 2007-005 07-0214505 The Mils at Rocky River Subdivision Phase 1,Pump Station 6 Force Main 27,120 Domestic 9,360 17,780 0 17,760 0 17,760 0 17,760 0 17,780 380 17,400 0 17,400 5,880 11.520 10,080 1,440 0 1,440 0 1,440 0 1,440 0 1,440 Project Closed 2006-023 07-0126503 Hampden Village Subdivision 63,380 Domestic 0 63,360 21.600 41,7130 0 41,780 0 41,760 0 41760 0 41,760 0 41,760 8,480 35,280 14,760 20,520 0 20,520 20,520 0 0 0 0 0 100% 2006-074 07-0227508 Pebblebrook Circle SW Sewer Extension 1,440 Domestic 0 1440 1440 0 D 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100% 2006-068 08-1204529 Roberta Meadows Subdivision 11,880 Domestic 0 11880 11860 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100% 2003-070 06-1212531 Roberta Road Bawer Une B Extension 2,880 Domestic 0 2880 0 _ 2,880 0 2.880 2.880 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100% 2008-056 061212532 Concord Airport Business Park-Section 3 Phase 1 13,769 Commercial 0 13789 3500 10,289 0 10.289 0 10,269 0 10.269 0 10,289 0 10,269 10,269 0 0 0 0 0 0 0 0 0 0 0 100% 2006-049 07-0418511 Oak Ridge Sanitary Sewer Pump Station if29 Abandonment by Sewer Extension 0 Domes9c 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100% 20154092 07-0219507 Poplar Trails Sand Filter Outfal 6,840 Domestic 0 6840 0 8,840 0 _ 6,940 _ 0 _ 6,840 6,840 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100% 2007-019 07-0517512 St Charles Avenue NE Sewer Replacement 0 Domestic 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100% 4.2003-038 06-1104525 Heartwood Subdivision Modification 4,110D Domestic 0 4800 4800 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1e0% 2005-086 07-0614516 Pleasant Oaks Sub.Pi.1,Water Man 6 Gravity Sewer,Pump Station 6 Force Main 23.180 Domestic 0 23180 0 23,180 0 23,180 0 23,180 0 23,180 , 0 23.180 23,180 0 0 0 0 0 0 0 0 0 0 0 0 0 100% 2006-059 06-1026524 Oxford Commons Town Homes Phase 1 28,800 Domestic 0 28800 213800 0 0 0 0 0 0 _ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100% 2006-046 07-0215506 Halstead Subdlvlson Phase 2 96,840 Domestic 0 96,840 0 96,840 0 _ 96,840 0 96.840 0 98,840 0 96,840 0 96,840 0 96,840 0 96,840 0 96.840 0 96,840 96,840 0 0 0 100% 2007-043 07-0607515 The Mils at Rocky River Subdivision Phase 2 38,160 Domestic 0 38,160 0 38,160 0 38,160 16,920 21,240 0 21.240 0 21.240 0 21,240 4,680 16,560 0 16,560 11,520 5040 5040 0 0 0 0 0 85% 2006017 07-0330510 Cedarvale Farm Sub.Ph.1 Water Main,Sewer Main&Pump Station 54,360 Domestic 0 54,360 0 54,360 0 54.360 21,240 33,120 0 33.120 0 33,120 12,240 20,880 10,440 10.440 0 0 10,440 0 0 0 0 0 0 0 100% 2006-029 07-0825518 Oxford Commons Commercial Site Modifications 2 0 _ Commercial 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100% 2007-024 0740630519 Fullerton Place Subdivision Phase 263 53,850 Domestic 0 53.850 20730 33,120 0 33,120 0 33,120 0 33,120 1,920 31,200 0 31,200 0 31,200 _ 31,200 0 0 0 0 0 0 0 0 0 100% 2006W9 07-0620517 Bedford Farms Subdivision Phase 1 23,900 Domestic 0 23900 23900 0 0 0 0 0 0 0 _ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100% 2006{61 0740606514 Barrage Road Sewer Aerial Realignment Ph.1 0 Domestic 0 0 _ 0 0 0 0 0 0 0 0 0 0 0 0 0 _ 0 _ 0 0 0 0 0 0 0 0 0 0 100% 2007-060 07-0830525 Gleng rove Sub.Phase 5-12 43.560 Domestic 0 43,560 0 43,560 27,000 16,560 3.960 12,600 10.440 2.160 0 2.1W 0 2,160 720 1,440 0 1.440 0 1,440 _ 0 1.440 0 1,440 0 1,440 100% 2007-055 0740815524 Concord Pavillon at Georye Ules Blvd. 5,362 Commercial 0 5362 5382 0 0 0 0 0 0 0 0 0 0 0 0 _ 0 _ 0 0 0 _ 0 0 0 0 0 0 0 100% 2006-031 07-0108501 Concordlnteroepbr TleOrer Tower Circle,NW Sewer Connection Phase 364A 0 InduWlal 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100% 2007-036 07-0810526 Sapphire Hills Subdivision 21,600 Domestic 0 21600 0 _ 21,800 8,840 12,980 7,580 5,400 5,040 360 0 360 0 380 0 380 0 380 0 360 0 380 0 360 0 380 100%Lot 24 not to be ooretructed 2007-057 07-1029531 Graham Drive SW Sever Relocation Phase 1 0 Commercial 0 0 0 0 _ _ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100% 2007-089 07-1005528 The Mils at Rocky River Sub.Ph.3 Pump Station&Force Main 37,800 Domestic 0 37800 0 37,800 0 37.800 0 37,800 0 _ 37,800 0 37,600 37,800 0 0 0 0 0 0 0 0 0 0 0 0 0 100% Not to be Constructed 2016 Mocebon 2005-065 060821530 Copperfield Phase 2 0 Commercial 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 adjusted toindi te zero Bow. .�w . a vrser ..., Ja p. 2007-009 07-0208504 The Villas at Wlnecoll Subdivision 34,560 Domestic 0 34,560 0 34,560 0 34,560 4,680 29,880 0 29,880 0 29,880 0 29,880 8,280 21,800 0 21,800 0 21,600 17,840 3,960 0 3,960 0 3,960 Project Closed 2005-067 07-0910527 Hackberry Place Sub.Ph.A 8,480 Domestic 0 6480 0 6,480 0 6.480 0 6,480 _ 5,040 _ 1,440 1,440 0 0 0 0 0 0 0 _ 0 0 _ 0 0 0 0 0 0 100% 2004-108 07-604513 The Pointe at St Andrews 14,760 Domestic 0 14760 0 14,760 0 14,760 0 14,760 0 14.780 14,780 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100% 2007-049 07-1114533 Plnsant Oaks Sub.Phase 263 50,400 Domestic 0 50,400 _ 0 50.400 0 _ 50,400 0 _ 50,400 0 50,400 0 50,400 0 50,400 0 50,400 0 50,400 0 50,400 50,400 0 0 0 0 0 100% 2007-07D 07-1008529 Crescent Apartments Ph.1,Public Sewer Ext 0 Domestic _ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 _ 0 0 0 0 _ 0 0 0 0 0 0 100% 2007-056 07-1203534 Pendleton Subdivision Phase 1 21,600 Domestic 0 21,600 0 21,600 0 21,800 0 21,800 0 21,600 0 21,600 0 21,600 0 21,010 0 21,60D 0 21,600 _ 21,600 0 0 0 0 0 100% 2006047 06-1003521 Convention Center Plaza Modification 12.650 Commercial 12.650 0 _ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100% Total 778,041 46.260 729,781 166.652 563,129 42,840 520,289 57,240 463.049 27.360 435,689 18.480 417209 73,220 343,989 46,749 297,240 56,040 230,760 21,960 219240 115200 104.040 96,840 7,200 0 7,200 Neal.enssmn m..a on e2.2.rveoeae uw 0244255 12e02m and MT,22C0 row.2010.2015 M12.2015.2015.2015,2016 MIT.2015.6 2010 unmoeon. 2019 Tributary Total 768.841 2019 Non Tributary Total 7,200 City of Concord Annual Flow Tracking(FSTE 10/07) 2008 Permits Receiving WWTP:Rocky River WWTP Permit Number:NC0036269 2004 2006 2009 2099 231.) 2713 2011 _ _2011 2012 2012 2013 2013 2014 2014 2016 2015 2016 2016 Tributary Flow Non-Tributary Trib utary y Flow Non-Tributary Tributary Fbw Non-Tributary Tributary Flow Non-Tributary 'Tributary Flow Non-Tn0utiry Tributary Flow Non-Tributary Tributary now Non-Tributary Tributary flow Non-Tributary Tributary Floe Non-Tr..., City of Concord holed No. CIry of Concord Parma No. vmpa+Naaw Obrytad Flow(GPO) waataw,tar Type (GPO) Flow(GPO) (GPO) Flow(GPO) IGPG) Flow(GPO) (GPD) Ma,WO) (GPD) Flow(GPO) (GPO) flow(GPO) (GPO) Flow PPM (GPO) Flow(OPG) (GPO) Flow(GPO) Construction Status 2007-073 07-1111532 Great Wolf Lodge of the Carolinas 0 Commercial 0 _ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100% 2007-078 07-1214537 Thunder Road/W'al-Mart at Concord Mills Blvd. 28,288 Commercial 28,288 0 0 0 _ 0 0 _ 0 0 0 0 0 0 0 0 0 0 0 0 100% 2007-020 07-1214536 CAT-Hollard Sewer Outfall 0 Industrial 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100% ✓rajah t:4Osea 3,960 GPD not to be added to system(2016 Flow allocation 2002-038 08-0208502 Kasen Bluff Subdivision 0 Domestic 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Adjusted.) 2007-058 07-1220539 Florence St.NW Sewer Relocation 0 Industrial 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100% 2005-029 05-1208542 Indian Run Creek Sewer Trunk Relocation 0 Domestic/Comm. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100% 2008-001 08-0213503 Cos Mill High School Public Sewer Main Extension 22.500 Commercial 0 22,500 0 22,500 22,500 0 0 0 0 0 0 0 0 0 0 0 0 0 100% 2003-081 D8-0312506 Convention Center Plaza Modification 0 Commercial 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100% 2008-004 08-0303504 Irish Buffalo Creek Concord Tie-Over Terminal Court Phase 6 0 Domestic/Commercial_ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100% 2008-016 08-0415510 SMI's NHRA Drag Racing Facility at Charlotte Motor Speedway 143.000 Commercial 143,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100% 2007-053 07-0726523 The Basin ROC 2100 SW/REE 0100 N Offsite Sewer(Section 2-Gravity Sewer) 0 Domestic/Commercial 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100% 2008-004 08-0501514 Irish Buffalo Creek Concord Tie-Over Tower Circle Phase 7 0 _ Commercial/Domestic 0 0 0 0 0 0 _ 0 0 0 0 0 0 0 0 0 0 0 0 100% Project Closed 59,050 GPD not to be added to 2008-006 08-0410509 Edison Square Commercial(Public) 19,825 Commercial/Domestic 19,825 0 0 0 0 0 0 _ 0 0 0 0 0 0 0 0 0 0 0 system 2008-009 08-0317507 Barrage Road Sewer Aerial Realignment Ph.2&3 _ 0 Domestic/Commercial 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100% 2008-013 08-0501513 Weddiugton Road Commons 23,378 Commercial 0 23,378 23,378 0 0 0 0 0 0 0 0 0 0 _ 0 0 0 D 0 100% 2008-015 08.0407511 Concord Regional Airport(South Development Ph.IB) 3.520 Commercial 0 3,520 0 3,520 3,520 0 0 0 _ 0 0 0 0 0 0 0 0 0 0 100% 2008-010 08-0420512 Christenbunv Corners:Northeast Corner-OutpartN 30,537 Commercial 0 30,537 30,537 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100% 2006-047 08-0611518 Convention Center Plaza Modification 2 6.975 Commercial 6,975 0 0 0 D 0 0 0 0 0 0 0 0 0 0 0 0 0 100% 2004-077 08-0606517 Winding Walk Subdivision,Phase 2 Modification 2 2.880 Domestic 2,880 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100% 2008-018 08-0527516 Brook Ave.&Charter Ct.Outfall Replacement 0 Domestic 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100% 2008-008 08-0404508 Laurel Park Subdivision Phase 6A 9.600 Domestic 0 9,800 0 9,600 0 9,600 0 9,600 0 9,800 0 9,600 9,800 0 0 0 0 0 100% 2005-087 07-0910527 Hackberry Place Subdivision Modification Phase A and Phase B 11.160 Domestic 0 11,160 0 11,160 0 11,160 11,160 0 0 0 0 0 0 0 0 0 0 0 100% 2007-057 07-1029531 Graham Dri.e SW Sewer Relocation Phase 1 and Phase 2 0 Domestic 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100% 2008-034 08-0819523 Coddle Creek Market Loll!&8 Water and Wastewater Extension 7,400 Commercial 0 7,400 0 7,400 7,400 0 0 0 0 0 0 0 0 0 0 0 0 0 100% 2008-037 08-0808522 Kinds Way Baptist Church Sewer Extension 2,300 Commercial 0 2,300 0 2,300 0 2,300 0 2,300 0 2,300 0 2,300 0 2,300 0 2,300 2.300 0 100% 2007-053 07-0726523 The Basin ROC 2100 SW/REE 0100 N Offsite Sewer Section 1-Pump Station&Access Road) 0 Domestic 0 0 _ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100% 2008-015 06-0407511 Concord Regional Airport Modification(South Development Phase IB&2) o Commercial 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100% 2006-031 08-1014527 Kiser Woods Subdivision Phase 1-Modification(formerly Kiser Glen Subdivision Phase 1) 0 Domestic 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 _ 0 0 0 100% 2008-026 08-0711520 Wellspring Village 7.250 _ Commercial 0 7,250 0 7,250 0 7,250 0 7,250 0 7,250 0 7,250 0 7,250 0 7,250 7,250 0 100% 2005-038 05-1122541 Christenburr Village C(Toner Crossings)Modification 1,440 Domestic 0 1,440 0 1,440 1,440 0 0 0 0 0 0 0 0 0 0 0 0 0 100% 2006-051 08-1211530 Magnolia Sewer Replacement 0 Domestic 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100% Total 320,053 200,968 119,085 53,915 65,170 34,860 30,310 11,160 19,150 0 19,150 0 19,150 9,600 9,550 0 9,550 9,550 0 Reported etormaticn based on en 2008 NCOENR OWlO Owarindy Reports and 2008.2009.2010.2011.2012.2013.2014.2015.2016.2011.2018.6 2019 CertC,cal,ons 2019 Tributary Total 320,053 2019 Non Tributary Total D City of Concord Annual Flow Tracking(FSTE 10/07) 2008 Permits Receiving WWTP:Muddy Creek WWTP Permit Number:NC0081621 2000 2006 2009 2009 2010 2010 2011 2011 2012 2012 2013 2013 2014 2014 2015 2015 2015 2016 City o&Controls'Project Tributary Flow' Non-Tributary Tributary Flow Non-Tributary Tributary Flow Non-Tributary Tributary Flow Non-Tributary Tributary Flow Non-Tributary Tributary Flow Non-Tributary Tributary Flow Non-Tributary Tributary Flow Non-Tributary Tributary Flow Non-Tributary Na City of Concord Permit No. Protect Name Obligated Flow(GPO) Wastewatar Type (GPO) Flow(GPO) (GPO) Flow(GPO) (GPO) Flow(GPO) (GPO) Flow(GPD) (GPD) Flow(GPO) (GPO) Flow(GPO) (GPO) Flow(GPO) (GPO) Flow(GPO) (GPO) Flow(GPI)) ConsWctlon Status 21ots Nat to be Constructed. 2007-068 07-1204535 Saddlebrook Subdivision Phase 1 60,840 Domestic 0 60840 0 60,840 0 60,840 18.360 42480 13,320 29,160 7,920 21.240 7,560 13680 12,960 720 0 720 Project Cbsed t00% 2004-043 05-1024538 Tucicr Cl.<cutdn,e,on Modification 2 I!tn Domra,c Commerc,ol 1,930 0 0 0 0 0 0 0 0 0 0 0 0 0 _ 0 0 0 0 100% • Total 62,770 1,930 60,1140 0 60,640 0 60,640 16,360 42.480 13,320 29,160 7,920 21,240 7,360 13,610 12,960 720 0 720 Reported lntormebon based on the 2008 NCDENR Dy1O Quarterly Reports and 2008.2009,2010,2011.2012,2013.2014.2015.2016.2017.2018.82019 Certficabons 2019 Tributary Total 62,050 2019 Non Tributary Total 720 City of Concord Annual Flow Tracking(FSTE 10/07) 2010 Permits Receiving WWTP:Rocky River WWTP Permit Number:NC0036269 _ 2010 2010 _ 2011 2011 _ 2012 2012 2013 2013 2014 2014 2015 2015 2016 2016 City of Concortl Permit Tributary Flow Non-Tributary Tributary Flow Non-Tributary Tributary Flow Non-Tributary Tributary Flow Non-Tributary Tributary Flow Non-Tributary Tributary Flow Non-Tributary Tributary Flow Non-Tributary City of Concord Project No. Project Name Construction Status No. (GPD) F Flow(GPO) Floww(GPD) (GPD) Fl ow GPD Obligated Flow(GPD) Wastewater Type (GPD) (GPD) (GPD) Flow(GPD) (GPO) Flow(GPO) (GPO) Flow(GPD) (GPO) Flow(GPD) 2001-005 06-0602513 Corban Streetllce Plant Sewer Realignment Phase 1&2 0 Domestic/Commercial 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100% 2009-054 09-0908513 Cannon Crossroads 8-Inch Sewer Line Extension 11,700 Commercial 0 11,700 0 11,700 11,700 0 0 0 0 0 0 0 0 0 100% 2009-066 09-1130514 Wexford Pointe Apts.Public&Private Water&Sewer 19,705 Domestic 0 19,705 19,705 0 0 0 0 0 0 0 0 0 0 0 100% 2008-063 09-1211515 Walnut Avenue 15-Inch Sanitary Sewer Line Replacement 0 Domestic/Commercial 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100% 2008-023 10-0115501 Brook Avenue&Charter Court Outfall Replacement Phase 2 0 Domestic 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100% 2010-012 10-0302503 East Congregation of Jehovah's Witnesses 795 Commercial 0 795 0 795 0 795 0 795 0 795 795 0 0 0 100% 2010-053 10-0609506 Rocky River Community Church Public&Private Water&Public Wastewater 1,750 Commercial 0 1,750 1,750 0 0 0 0 0 0 0 0 0 0 0 100% 2010-003 10-0909509 Branch Drive 8 Inch Public Sewer 0 Domestic 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100% 2010-039 10-1101511 Poplar Woods Phase 1 Pump Station&Force Main Abandonment 10,080 Domestic 0 10,080 10,080 0 0 0 0 0 0 0 0 0 0 0 100% 2008-029 10-1101512 Pokeberry Trail Sewer Extension 4,680 Domestic 0 4,680 4,680 0 0 0 0 0 0 0 0 0 0 0 100% 2008-009 08-0317507 Burrage Road Sewer Aerial Realignment Phase 2&3 0 Domestic/Commercial 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100e/ 2009-003 09-0122501 Jacobs Landing Town Homes Modification 1 0 Domestic 0 0 0 0 0 0 0 0 0 0 0 0 0 0 20% 2008-004 10-1119516 Irish Buffalo Creek Concord(IBCC)Tie Over,Tower Circle NW-Phase 8 0 Domestic/Commercial _ 0 _ 0 0 0 0 0 0 0 0 0 _ 0 0 0 0 100% Total 48,710 0 48,710 36,215 12,495 11,700 795 0 795 0 795 795 _ 0 0 0 Reported information based on the 2010 NCDENR DWQ Quarterly Reports and the 2010.2011.2012.2013.2014.2015.2016.2017,2016&2019 Certficahons 2019 Tributary Total 48,710 2019 Non Tributary Total 0 City of Concord Annual Flow Tracking(FSTE 10/07) 2009 Permits Receiving W WTP:Rocky River W WTP Permit Number:NC0036269 2009 2009 2?16 2011 2011 2012 2012 2013 2013 2014 2014 2015 2015 2010 2015 Tributary Flow Non-Tributary Tributary Flow Non-Tributary Tributary Flow Non-Tributary Tributary Flow Non-Tributary Tributary Flow Non-Tributary Tributary Flow Non-TrIbutary Tributary Flow Non-Tributary Tributary Flow Non-Tributary City or Concord Project No. City of Concord Parma No. Project Noma Obligated Fbw(GPO) Wastewater Type (GPO) Flow(GPD) (GPO) Flow(GPO) (GPD) Flow(GPD) (GPD) Flow(GPO) (GPO) Flow(GPD) (GPO) Flow(GPD) (GPD) Flow(GPD) (GPO) Flow(GPO) Oonatruetbn ahlue 2007-028 08-0731521 Poplar Tent Rd.24-Inch Water Line&8-Inch Sewer Main Relocation 0 Domestic 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100% 0 Dom/Ind/Commercial 2005-071 08-1205529 Irish Buffalo/Downtown Duffel!Replacement 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100% Irish Buffalo Creek-Zion Church 24-inch Sewer Outfall:Upsize Phase 1&Glen Laurel 2006-060 08-0306505 Manufactured Housing Community 24-inch Gravity Sewer 0 Dom/Ind/Commercial 0 _ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100% 100%permit closed with 43,800 GPD 2009-003 09-0122501 Jacobs Landing Town Homes 11,880 Domestic 0 11,880 0 11,880 0 11,880 0 _ 11,880 11,880 0 0 0 0 0 0 0 nontributary 2005-067 07-0910527 Hackberry Place Subdivision Phase B Modification 2 0 Domestic 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100% 2008-017 09-0311503 Wilson Street NE Sanitary Sewer Replacement 0 Domestic 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100% 2005-091 09-0401504(Permit rescinded) Franklin Avenue Sewer Replacement 0 Domestic(100%) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100% Commercial(4%) 2009-004 09-0202502 Jacobs Landing Commercial Outparcels Water and Wastewater Extension 85,000 Domestic(96%) 0 85,000 0 85,000 0 85,000 0 85,000 85,000 0 0 0 0 0 0 0 100% Industrial(10%) Utility Precast of Concord Ivey Cline Sewer Modification(aka Concord Regional Commercial(70%) 2009-028 09-0521508 Airport South Development Phase 16&2) 0 Domestic(20%) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100% 2007-059 09-0315506 Morrison Road Pump Station and Force Main Elimination 0 Domestic(100%) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100% 2009-037 08-0808522 Hendrick-Concord Collision Center at Ruben Linker Rd. 4,970 Commercial(100%) 0 4,970 0 4,970 0 4,970 4,970 0 0 0 0 0 0 0 0 0 100% ' CC Griffin Middle School(Formerly:Rocky River Middle School)aka Lower Rocky 2009-020 09-0626509 River Elementary School 12,000 Commercial(100%) 0 12,000 12,000 0 0 0 0 0 0 0 0 0 0 0 0 0 100% 2009-019 09-0415506 Crosspointe Baptist Church Private Water Line&Public Sewer 2,100 Commercial(100%) 0 2,100 0 2,100 2,100 0 0 0 0 0 0 0 0 0 0 0 100% 2008-015 08-0407511 Concord Regional Airport Modification 2(South Development Phase 16&2) 3,520 Commercial(100%) 0 3,520 , 3,520 0 0 0 0 0 0 0 0 0 0 0 0 0 100% 2005-038 05-1122541 Christenbury Village C(Tower Crossings)Modification 2 Phase 1&3(2005-038) 0 Domestic 100% 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100% 2009-045 09-0826511 Christenbury Village C Phase 2&4 (2009-045) 0 Domestic 100% 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100% Total 119,470 0 119,470 15,520 103,950 2,100 101,850 4,970 96,880 96,880 0 0 0 0 0 0 0 Reported inforrwoon based on the 2009 NCOENR MO Quarterly Reports and 2009,2010,2011,2012.2013.2014,2015,2014,201),2010,0 2019 Cen,ficabons 2019 Tributary Total 119,470 2019 Non Tributary Total 0 City of Concord Annual Flow Tracking(FSTE 10/07) 2011 Permits Receiving WWTP:Rocky River WWTP Permit Number:NC0036269 2011 2011 2012 2012 2013 2013 2014 2014 2015 2015 2016 2016 City of Concord Project N. City of Concord Permit No. Project Name Tributary Flow Non-Tributary Tributary Flow Non-Tributary Tributary Flow Non-Tributary Tributary Flow Non-Tributary Tributary Flow Non-Tributary Tributary Flow Non-Tributary Construction Status Obligated Flow(GPD) Wastewater Type (GPD) Flow(GPD) (GPO) Flow(GPO) )GPD) Flow(GPD) (GPD) Flow(GPD) (GPD) Flow(GPD) (GPO) Flow(GPD) 2006-052 10-0608505 Larkhaven Outfall 8"Sewer Replacement 0 Domestic/Commercial 0 0 0 0 0 0 0 0 0 0 0 0 100% 2006-052 10-0608505 MOD Larkhaven Outfall 8"Sewer Outfall Phase 1&2 Replacement 0 Domestic/Commercial 0 0 0 0 0 0 0 0 0 0 0 0 100% 2010-056 10-0720507 Concord Shops 8"Wastewater Extension(Weddington Rd&Pitts School Intersection) 642 Commercial 642 0 _ 0 0 0 0 0 0 0 0 0 0 100% 2010-073 10-1105515 Short Street Sewer Replacement 0 Domestic/Commercial 0 0 0 0 0 0 0 0 0 0 0 0 100% 2009-067 11-0216501 Glen Laurel to Zion Church Rd Sewer Upsizing 0 Domestic 0 0 0 0 0 0 0 0 0 0 0 0 100% 2009-068 11-0218502 Cascade Sewer Aerial Elimination 0 Domestic/Commercial 0 0 0 0 r. 0 0 0 0 0 0 0 0 100% 2005-033 05-1214544 Christenbury Village B(Meadow Wood) 1,800 Domestic 1,800 0 0 0 0 0 0 0 0 0 0 0 100% 2011-051 11-0817507 City Place(CVAN)&Sewer Line Relocation at Spring St SW 0 Domestic/Commercial 0 0 0 0 0 0 0 0 0 0 0 0 100% 2011-033 11-0523503 Poplar Tent NE (off George W.Liles)Pub Water&Sewer(Solace Spa) 3,375 Commercial 0 3,375 3,375 0 0 0 0 0 0 - 0 _ 0 0 100% Total 5,817 2,442 3,375 3,375 0 0 0 0 0 0 0 0 0 Reported information based on the 2011 NCDENR DWO Quarterly Reports and 2011,2012,2013,2014,2015,2016,2017,2016 8 2019 Cer5fications 2019 Tributary Total 5,817 2019 Non Tributary Total 0' City of Concord Annual Flow Tracking (FSTE 10/07) 2011 Permits Receiving WWTP: Muddy Creek WWTP Permit Number: NC0081621 2011 2011 2012 2012 2013 2013 2014 2014 City of Concord Project City of Concord Permit No. Project Name Obligated Flow(GPD) Wastewater Type Tributary Flow Non-Tributary Tributary Flow Non-Tributary Tributary Flow Non-Tributary Tributary Flow Non-Tributary Construction No. (GPD) Flow(GPD) (GPD) Flow(GPD) (GPD) Flow(GPD) (GPD) Flow(GPD) Status 2007-068 07-1204535 Saddlebrook Subdivision (Renewel) 0 Domestic 0 0 0 0 0 0 0 0 100% Total 0 0 0 0 0 0 0 0 0 Reported information based on the 2011 NCDENR DWQ Quarterly Reports and 2011,2012,2013, 2014,2015,2016,2017,2018,&2019 Certifications City of Concord Annual Flow Tracking (FSTE 10/07) 2012 Permits Receiving WWTP:Rocky River WWTP Permit Number:NC0036269 2012 2012 2013 2013 2014 2014 2015 2015 2016 2016 City of Concord Project No. City of Concord Permit No. Project Name Tributary Flow Non-Tributary Tributary Flow Non-Trlbutary Tributary Flow Non-Tributary Tributary Flow Non-Tributary Tributary Flow Non-Tributary Construction Status Obligated Flow(GPO) Wastewater Type (GPO) Flow(GPD) (GPD) Flow(GPD) (GPD) Flow(GPD) (GPD) Flow(GPD) (GPD) Flow(GPD) 2011-077 12-0124501 Bell&Corban 12-Inch Sanitary Sewer Replacement 0 Commercial 100% 0 0 0 0 0 0 0 0 0 0 100% NCDOT I-3803B 1-85 Design Build Project—Public 8-inch Sewer Realignment(Poplar 2010-008 11-0726505 Point Commercial&Poplar Point at Odell School Rd)Phase 2 0 Commercial 100% 0 0 0 0 0 0 0 0 0 0 100% NCDOT 1-3803B 1-85 Design Build Project—Public 8-inch Sewer Realignment Poplar 2010-008 11-0726506 Tent Intersection with Goodman Rd.and Ivey Cline Phase 2 0 Commercial 100% 0 0 0 0 0 0 0 0 0 0 100% NCDOT I-3803B 1-85 Design Build Project—Public 8-inch Sewer Extension(Davidson Commercial 70% 2010-008 11-0726506 Hwy.at International Drive) 0 Industrial 30% 0 0 0 0 0 0 0 0 0 0 100% 2011-011 11-1116508 Bexley Village at Concord Mills,Phase 2 87,170 Domestic 100% 0 87,170 87,170 0 0 0 0 0 0 0 100% 2011-016 12-0329505 Georgia St.to Young Ave.Sanitary Sewer Replacement 0 Domestic 100% 0 0 0 0 0 0 0 0 0 0 100% 2012-029 12-0415506 Concord 100 @ Christenbury Corners SE 25,281 Commercial 100% 0 25,281 25,281 0 0 0 0 0 0 0 100% Domestic 90%, 2011-010 12-0719508 Palaside Dr.NE Sewer Replacement 0 Commercial 10% 0 0 0 0 0 0 0 0 0 0 100% 2012-019 12-0711507 Waterstone at Weddington Public&Private Water&Public Sewer 90,755 Domestic 100% 0 90,755 0 90,755 0 90,755 90,755 0 0 0 100% 72%Commercial,28% 2011-028 12-0912510 Odell Drive Sewer Outfall Replacement 0 Domestic 0 0 0 0 0 0 0 0 0 0 100% Domestic 27.48% Commercial 41.49% 2009-050 12-1005512 Cabarrus Ave.Railroad Bridge#266 0 Industrial 31.03% 0 0 0 0 0 0 0 0 0 0 100% 2012-044 12-0727509 Giles America Plant Expansion Public&Private Water and Public Sewer 11,050 Industrial 100% 0 11,050 0 11,050 0 11,050 11,050 0 0 0 100% Domestic 80°/a 2005-091 12-1006513 Franklin Ave NE Sewer Main Relocation 0 Commercial 20% 0 0 0 0 0 0 0 0 0 0 100% Domestic 78.78% Commercial 5.2% 2012-062 12-1119515 Southern Chase Outfall Sewer Upsizing 0 Industrial 16.02% 0 0 0 0 0 _ 0 0 0 0 0 100% Total 214,256 0 214,256 112,451 101,805 0 101,805 101,805 0 0 0 Reported information based on the 2012 NCDENR DWQ Quarterly Reports and 2012,2013,2014.2015,2016.2017,2018.8 2019 Certifications 2019 Tributary Total 214,256 2019 Non Tributary Total 0 City of Concord Annual Flow Tracking (FSTE 10/07) 2013 Permits Receiving WWTP:Rocky River WWTP Permit Number:NC0036269 2013 2013 2014 2014 2015 2015 2016 2016 City of Concord Project No. City of Concord Permit No. Project Name Tributary Flow Non-Tributary Tributary Flow Non-Tributary Tributary Flow Non-Tributary Tributary Flow Non-Tributary Construction Status Obligated Flow(GPD) Wastewater Type (GPD) Flow(GPD) (GPD) Flow(GPO) (GPO) Flow(GPD) (GPO) Flow(GPD) 2010-026 12-1003511 Epworth UMC Outfall 0 Commercial 100% 0 0 0 0 0 0 0 0 100% 2012-070 12-1130516 Cabarrus Charter Academy at Poplar Crossing 8-Inch Public Sewer 15,627 Commercial 100% 15,627 0 0 0 0 0 0 100% 2007-069 13-0117501 The Mills at Rocky River Phase 3-PS&FM 720 Domestic 100% 720 0 0 0 0 0 0 0 100% 2013-009 13-0409502 Sycamore Rd.Ninehave Dr.Sewer Extension 1,680 Commercial 100% 1,680 0 0 0 0 0 0 0 100% 2013-016 13-0412503 Concord Auto Plaza/HMS Auto Mall(aka Hendrick)Public&Private Water,Public Sewer 12,140 Commercial 100% 0 12,140 0 12,140 0 12,140 12,140 0 100% 2011-078 13-0424504 CMC NE Rehabilitation Hospital Public Sewer 12,600 Commercial 100% 12,600 0 0 0 0 0 0 0 100% 2013-023 13-0502505 Carolina International Charter School 14,700 Commercial 100% 0 14,700 14,700 0 0 0 0 0 100% 2011-079 13-0530506 Wilkinson Crt/Rosehaven Ct 6"Sewer Line Replacement 0 Domestic 100% 0 0 0 0 0 0 0 0 100% 2013-024 13-0531507 Cannon School Performing Arts Center 8-Inch Public Sewer 19,375 Commercial 100% 0 19,375 19,375 0 0 0 0 100% 2013-033 13-0708508 West Cabarrus Church Site Improvements Public Water&Sewer 0 Commercial 100% 0 0 0 0 0 0 0 0 100% 2013-034 13-0716509 Quik Trip#1012 6-Inch Public Sewer at George Liles Blvd. 0 Commercial 100% 0 0 0 0 0 0 0 0 100% 2005-038 MOD 3 05-1122541 Mod 3 Christenbury Village C Phase 1&3 8-Inch Modification 3(aka Ph 3B) 14,040 Commercial 100% 0 14,040 14,040 0 0 0 0 0 100% 2006-017 07-0330510 Mod 1 Cedarvale Farm Substation Sewer Main and Pump Station 0 Domestic 100% 0 0 0 0 0 0 0 0 100% Domestic 78.78% Commercial 5.2% 2012-057 13-0918513 Concord Business Park Outfall Upsizing Public 12-Inch Sewer 0 Industrial 16.02% 0 0 0 0 0 0 0 0 100% 2004-053 05-0928535 Modification 2 Cannon Crossing Subdivision Modification 2 aka Southside at Cannon Crossing 8"Public Sewer 0 Domestic 100% 0 0 0 0 0 0 0 0 100% 2009-064 13-1105516 George W.Liles Phase 2 Sewer Main Relocation(Wolf Meadow Outfall) 0 Domestic 100% 0 0 0 0 0 0 0 100% 2008-008 08-0404508 Modification 1 Laurel Park Subdivision Phase 6A Modification 1 0 Domestic 100% 0 0 0 0 0 0 0 0 0% Total 90,882 30,627 60,255 48,115 12,140 0 12,140 12,140 0 Reported information based on the 2013 NCDENR DWQ Quarterly Reports and 2013, 2014,2015,2016,2017,2018,8 2019 Certifications 2019 Tributary Total 90,882 2019 Non Tributary Total 0 City of Concord Annual Flow Tracking(FSTE 01/14) 2014 Permits Receiving WWTP:Rocky River WWTP Permit Number:NC0036269 2014 2014 2015 2016 _ 2016 2016 2017 2017 2018 2018 2016 2019 City of Concord Pmpq Nq City of Concord Penrod No. Project None Flow Non-Tdbohry Tributary Flow Non-Tributary Tributary Flow Non-Tributary Tributary Flow Non•Trlbutary Tributary Flow Non-Tributary Tributary Flow Non-Tributary Construcpon Status Obligated Flow(GPD) Wastewater Typo (GPO) Flow(GPO) (GPO) Flow(GPD) (GPO) Flow(GPO) (GPI) Flow(GPM (GPO) Flow(GPD) (GPOFlow(GPO) 2013-035 13-0830511 The Villages at Skybrook Phase 2&3 Public Sewer 46,800 Domestic 100% 0 46,800 24,480 22,320 21,240 1,080 0 1,080 0 1,080 0 1,080 100% 2013-038 13-0830512 Brookvue Subdivision 8-Inch Public Sewer Extension 123,040 Domestic 100% 39,840 83,200 50,080 33,120 33,120 0 0 0 0 0 0 0 100% 2013-052 13-1031515 The Mills at Rocky River Phase 6 Public 8-Inch Sewer 46,800 Domestic 100% 0 46,800 13,320 33,480 0 33,480 14,040 19,440 19,440 0 0 0 100% 2013-056 13-1231517 Village Dr.8-Inch Sewer Extension _ 3,960 Domestic 100% 0 3,960 3,960 0 0 0 0 0 0 0 0 0 100% Domestic 78.78% Commercial 5.20% 2013-051 14-0113501 Commerce Dr.Sewer Outfali Upsizing 0 Industrial 16.02% 0 0 0 0 0 0 0 0 0 0 0 0 100% 2014-004 14-0129502 Troutman Corners Subdivision 8"Public Sewer 8,814 Commercial 100% 0 8,814 8,814 0 0 0 0 0 0 0 0 0 100% 2014-005 14-0207503 Willow Oaks Crossing(Regency Center)Public Sewer 22,789 Commercial 100% 0 22,789 0 22,789 22,789 0 0 0 0 0 0 0 100% 2014-008 14-0303504 Legacy Concord Apartments Public 8-Inch Sewer Trunk 95,525 Domestic 100% 0 95,525 0 95,525 95,525 0 0 0 0 0 0 0 100% Domestic 76% Commercial 17% 2014-008 18" 14-0303512 Mountain Laurel Sanitary Sewer Line Replacement(Legacy)18-inch Sewer Trunk Upsize 0 Industrial7% 0 0 0 0 0 0 0 0 0 0 0 0 90% Commercial 5.20% 2014-010 14-0331505 Concord Airport Business Park Public Sewer 1,931 Industrial 16.02% 1,931 0 0 0 0 0 0 0 0 0 0 0 100% 2011-065 14-0629509 Southbrook Sewer Duffel!Upsizing 0 Domestic 100% 0 0 0 0 0 0 0 0 0 0 0 0 100% 2006-023 Mod 2 07-0126503 Modification 2 Hampden Village Subdivision Modification 2-Amenity Center Addition and Renewal Mod 2 1,250 Domestic 100% 0 1,260 0 1,250 0 1,250 1,250 0 0 0 0 0 100% 2014-014 14-0730511 Emery Ave.8-Inch Sewer Extension 3,600 Domestic 100% 0 3,600 3,600 0 0 0 0 0 0 0 0 0 100% 2011-063 14-0903513 Cabarrus Co.Boys&Girls Club 8-Inch Public Sewer Replacement 0 Domestic 100% 0 0 0 0 0 0 0 0 0 0 0 0 100% 100% 2014-019 14-0716510 Edison Square Townhomes 8-Inch Public Sewer 60,180 Domestic 100% 0 60,180 0 60,180 24,900 35,280 34,920 360 0 360 0 360 (Project Closed) 2007-024 07-0630519 RENEWAL 2 Fullerton Place Subdivision Phase 2&3 RENEWAL 2 0 Domestic 100% 0 0 0 0 0 0 0 0 0 0 0 0 100% Total 414,689 41,771 372,918 104,254 268,664 197,574 71,090 50,210 20,880 19,440 1,440 0 1,440 Reported information based on the 2014 NCDENR DWO Oua0e0y Reports and 2014,2015,2016,2017,2018,and 2019 Cert4kations 2019 Tributary Total 413,249 2019 Non Tributary Total 1,440 City of Concord Annual Flow Tracking (FSTE 01/14) 2015 Permits Receiving WWTP:Rocky River WWTP Permit Number:NC0036269 2016 2C15 2016 2016 2017 2017 2018 2018 2019 2019 City of Concord Project No. City of Concord Permit No. Project Name Tributary Flow Non-Tributary Tributary Flow Non-Tributary Tributary Flow Non-Tributary Tributary Flow Non-Tributary Tributary Flow Non-Tributary Construction Status Obligated Flow(GPD) Wastewater Type (GPD) Flow(GPD) (GPD) Flow(GPD) (GPD) Flow(GPD) (GPD) Flow(GPO) (GPO) Flow(GPD) 2014-024 14-0820512 RiverOaks Corporate Center 8-Inch Public Sewer 0 Industrial 100% 0 0 0 0 0 0 0 0 0 0 100% 2014-044 14-1001514 Roberta Crossing 8"Public Sewer 33,000 Domestic 100% 0 33,000 0 33,000 0 33,000 33,000 0 0 0 100% 2014-046 14-1007515 Christenbury Corners SW Quadrant Phase 2 Public 8-Inch Sewer 20,080 Commercial 100% 0 20,080 20,080 0 0 0 0 0 0 0 100% 2014-051 15-0114500 The Mills at Rocky River Phase 5B Public 8-Inch Sewer 24,480 Domestic 100% 0 24,480 0 24,480 24,480 0 0 0 0 0 80% 2014-015 15-0217502 Copperfield Market Phase 1 Public Sewer 6,864 Commercial 100% 0 6,864 0 6,864 0 6,864 0 6,864 0 6,864 50 2015-013 15-0319506 Cedarvale Farm Subdivision Ph.2 Public 8-Inch Sewer Main 30,960 Domestic 100% 0 30,960 18,000 12,960 12,960 0 0 0 0 0 100% 2015-016 15-0407508 Mod 1 Park View Subdivision Ph 1 Public 8-Inch Sewer 36,410 Domestic 100% 0 36,410 0 36,410 33,480 2,930 2,930 0 0 0 95% 2007-009 07-0208504 renewal The Villas at Wmecoff Subdivision 0 Renewal-Domestic 0 0 0 0 0 0 0 0 0 0 100% 2014-057 15-0701510 Montford Public 8-Inch Sewer 1,080 Domestic 100% 0 1,080 1,080 0 0 0 0 0 0 0 100% i 2014-045 15-0806511 Rubens Rd.Culvert Replacement/8-Inch Public Sewer Realignment/Replacement 0 Domestic 100% 0 0 0 0 0 0 0 0 0 0 100% 2015-012 15-0316505 Parkside at Skybrook North Phase 3 Public 8-Inch Sewer 18,000 Domestic 100% 0 18,000 9,720 8,280 8,280 0 0 0 0 0 100% 0%Domestic 2007-043 07-0607515 Mod 2 The Mills Subdivision Phase 2 Public Sewer Modification 2 0 Renewal/Reduction 0 0 0 0 0 0 0 0 0 0 95% 2015-037(2008-015) 08-0407511 Modification 3 Concord Regional Airport South Development Terminal Building Mod cation 3(South Development 0 100%Commercial 0 0 0 0 0 0 0 0 0 0 100% - 2014-045 15-0806511 Rubens Rd.8-Inch Sewer Line Replacement 0 Domestic 100% 0 0 0 0 0 0 0 0 0 10% 2003-051 Mod 1 03-1117506 Mod.1 Ramsgate Subdivision Public Sewer Extension Ph.3 Modification 1 0 Domestic 100% 0 0 0 0 0 0 0 0 0 0 100% Total 170,874 0 170,874 48,880 121,994 79,200 42,794 35,930 6,864 0 6,864 Reported information based on the 2015 NCDENR DWO Quarterly Reports,and 2015.2016.2017.2016.and 2019 Certifications 2019 Tributary Total 164,010 2019 Non Tributary Total 6,864 City of Concord Annual Flow Tracking (FSTE 01/14) 2015 Permits Receiving WWTP:Muddy Creek WWTP Permit Number:NC0081621 2015 2015 2016 _ 2016 2017 2017 2018 2018 2019 2019 Tributary Flow Non-Tributary Tributary Flow Non-Tributary Tributary Flow Non-Tributary Tributary Flow Non-Tributary Tributary Flow Non-Tributary City of Concord Project No. City of Concord Permit No. Project Name Obligated Flow PD (GPO) Wastewater Type (GPD) Flow(GPD) (G ) Flow(GPDConstruction Status ) (GPD) Flow(GPD) (GPO) Flow(GPD) (GPD) Flow)GPD( 2014-016 14-0528506 Old Midland Sewer Extension Phase 1 10,800 Domestic 100% 0 10,800 7,560 3,240 0 3,240 0 3,240 0 3,240 50% 2004-043 05-1024538 Tucker Chase Subdivision Modification 3 (Public Sewer Permit Renewal Only) 0 Domestic 100% 0 0 0 0 0 0 0 0 0 0 95% 2014-047 14-1020516 Bethel Park Public Sewer 0 Domestic 100% 0 0 0 0 0 0 0 0 0 0 100% Total 10,800 0 10,800 7,560 3,240 0 3,240 0 3,240 0 3,240 Reported information based on the 2015 NCDENR DWQ Quarterly Reports;and 2015,2016,2017,2018,and 2019 Certifications 2019 Tributary Total 7,560 2019 Non Tributary Total 3,240 City of Concord Annual Flow Tracking (FSTE 01/14) 2016 Permits Receiving WWTP:Rocky River WWTP Permit Number:NC0036269 2016 2016 2017 2017 2018 2018 2019 2019 City of Concord Project No. City of Concord Permit No. Project Name Tributary Flow Non-Tributary Tributary Flow(GPD) Non-Tributary Tributary Flow Non-Tributary Tributary Flow Non-Tributary Construction Status Obligated Flow(GPD) Wastewater Type (GPD) Flow(GPD) Flow(GPD) (GPD) Flow(GPD) (GPD) Flow(GPD) 2015-006 15-0224503 Legends Apartments Public 8-Inch Sewer Extension 0 Domestic 100% 0 0 0 0 0 0 0 0 100% 2015-040 15-0813513 Christenbury Sewer Extension Line 170 0 Commercial 100% 0 0 0 0 0 0 0 0 100% 2015-053 15-0921516 Bedford Farms Subdivision Ph 2 11,040 Domestic 100% 0 11,040 11,040 0 0 0 0 0 100% 2015-057 15-1030518 Odell School Landings Sewer 30,799 Commercial 100% 0 30,799 0 30,799 0 30,799 30,799 100% 2015-033 15-1105519 Concord Ridge Apartments Public 8-Inch Sewer Extension 20,640 Domestic 100% 0 20,640 20,640 0 0 0 0 0 100% ' 2008-005 15-1123520 Kings Crossing Sewer Outfall Ph 1 Sewer Improvements(Havencrest Outfall) 0 Domestic 100% 0 0 0 0 0 0 0 0 100% 2015-008 15-1124521 Mod 1 Shamrock Street Sewer Replacement Mod 1 0 Domestic 100% 0 0 0 0 0 0 0 0 100% 2013-025d 15-1125522 Treasure Dr.Public 8-Inch Sewer Relocation 0 Domestic 100% 0 0 0 0 0 0 0 0 100% 2015-069 15-1215523 Axalta Customer Experience Center Public 8-Inch Sewer Main Extension 875 Commercial 100% 0 875 875 0 0 0 0 0 100% 2015-071 15-1228524 Cedarvale Farms Subdivision Ph 2-Sect 2 Public 8-Inch Sewer Main 45,360 Domestic 100% 0 45,360 10,440 34,920 34,920 0 0 0 100% 2015-050 15-1228525 Settlers Landing Townhomes Public 8-Inch Sewer Main 29,520 Domestic 100% 0 29,520 29,520 0 0 0 0 0 100% 100%(Note-5 lots with a flow allocation 1800 gpd eliminated from 2007-052 16-0202502 The Mills Ph 4 Public 8-Inch Sewer 53,280 Domestic 100% 0 53,280 0 53,280 27,000 26,280 24,480 1,800 project.) 2015-052 16-0205503 The Seasons at Poplar Tent Offsite Public 18-Inch Sewer 0 Domestic 100% 0 0 0 0 0 0 0 0 100% 2015-064 08-0808522 Mod 3 Cabarrus Charter High School Sewer_Ruben Linker PS Mod 3 19,125 Commercial 100% 19,125 0 0 0 0 0 0 0 100% 2015-034 04-0309505 Mod 1 Concord Mills Mall Restaurant Pads 10-Inch Public Sewer 23,840 Commercial 100% 0 23,840 23,840 0 0 0 0 0 100% 2016-007 16-0328504 Hunton Forest Ph 1 Public 8-Inch Sewer Main 45,200 Domestic 100% 0 45,200 45,200 0 0 0 0 0 100% 2015-058 16-0401505 Fedex Ground Distribution Center Public 8-Inch Sewer Extension 13,425 Industrial 100% 0 13,425 13,425 0 0 0 0 0 100% 2016-020 16-0414506 QuikTrip 1021 Sewer Extension 13,483 Commercial 100% 0 13,483 13,483 0 0 0 0 0 100% 2016-021 16-0415507 The Villages at Skybrook North Ph 2-2 Public 8-Inch Sewer Main 32,760 Domestic 100% 0 32,760 9,720 23,040 23,040 0 0 0 100% 2007-056 mod 1 07-1203534 Mod 1 Pendleton Subdivision Ph 1 Mod 1 0 Domestic 100% 0 0 0 0 0 0 0 0 100% 2016-026 16-0504508 Goodson Place SW Public 8-Inch Sewer Extension 1,080 Domestic 100% 1,080 0 0 0 0 0 0 0 100% 2014-046 ph 2 16-0517509 Concord Mills at Christenbury Ph 2 Public 8-Inch Sewer Main 11,425 Commercial 100% 0 11,425 11,425 0 0 0 0 0 100% 2016-035 16-0706511 Colonial Square Ph 2 Public 8-Inch Sewer 8,800 Commercial 100% 0 8,800 8,800 0 0 0 0 0 100% Industrial 91.6% 2016-032 16-0722512 Concord Airport Business Park Ph 3 Public Sewer Extension(1100 GPD Addional) 31,000 Commercial 8.4% 0 31,000 0 31,000 _ 31,000 0 0 0 100% 2016-025 16-0802514 Lantana Subdivision Public 8-Inch Sewer Main 37,800 Domestic 100% 0 37,800 2,160 35,640 18,000 17,640 0 17,640 95% 2016-043 16-0728513 Poplar Cove Subdivision Public 8-Inch Sewer Main 8,280 Domestic 100% 0 8,280 0 8,280 8,280 0 0 0 100% Total 437,732 20,205 417,527 200,568 216,959 142,240 74,719 24,480 50,239 Reported information based on the 2016 NCDENR DWQ Quarterly Reports and 2016,2017,2018,and 2019 Certifications ' 2019 Tributary Total 387,493 2019 Non Tributary Total 50,239 City of Concord Annual Flow Tracking (FSTE 01/14) 2016 Permits Receiving WWTP: Muddy Creek WWTP Permit Number: NC0081621 2016 2016 2017 2017 2017 2018 2019 2019 Cityof Concord Project No. Cityof Concord Permit No. Project Name Obligated Flow Tributary Flow Non-Tributary Tributary Flow Non-Tributary Tributary Flow Non-Tributary Tributary Flow Non-Tributary 1 9 (GPO) Wastewater Type (GPD) Flow(GPD) (GPO) Flow(GPD) (GPO) Flow(GPD) (GPD) Flow(GPD) Construction Status 2016-033 16-0613510 InterTape Polymer Public 8-Inch Sewer 8,260 Industrial 100% 0 8,260 8,260 0 0 0 0 0 100% 100%(Note-2 lots with a flow allocation of 720 gpd Fox Creek(Aka:Brentwood and Saddlebrook Phase 2)Subdivision Public 8-Inch total was eliminated from 2015-011 15-0309504 Sewer Extension 74,880 Domestic 100% 0 74,880 0 74,880 31,680 43,200 42,480 720 project.) Total 83,140 0 83,140 8,260 74,880 31,680 43,200 42,480 720 Reported information based on the 2016 NCDENR DWQ Quarterly Reports and 2016,2017,2018,and 2019 Certifications 2019 Tributary Total 82,420 2019 Non Tributary Total 720 City of Concord Annual Flow Tracking (FSTE 01/14) 2017 Permits Receiving WWTP: Rocky River WWTP Permit Number: NC0036269 2017 2017 2018 2018 2019 2019 Tributary Flow Non-Tributary Tributary Flow Non-Tributary Tributary Flow Non-Tributary City of Concord Project No. City of Concord Permit No. Project Name Construction Status Obligated Flow(GPD) Wastewater Type (GPD) Flow(GPD) (GPD) Flow(GPD) (GPD) Flow(GPD) 2015-004 15-0126501 Christenbury Corners NE Lot C Public 8-Inch Sewer 0 Commercial 100% 0 0 0 0 0 0 100% Commercial 100% °2014-020 15-0915515 Concord Traffic Management Center 8-Inch Sewer 350 0 350 0 350 0 350 100/o Domestic 63% /o 2015-051 16-1102515 Accent Avenue SW 8-Inch Sewer Outfall 8,612 Commercial 37% 0 8,612 8,612 0 0 0 100% Domestic 75% Commercial 6% 2014-027 16-1118516 Zemosa Acres Sewer Main Relocation 0 Industrial 19% 0 0 0 0 0 0 100% 2016-046 16-0202517 Farmwood Blvd.Public 8-Inch Sewer 2,160 Domestic 100% 2,160 0 0 0 0 0 100% 2015-070 17-0503501 Allen Mills Subdivision Phase 1 Public 8-Inch Sewer 77,828 Domestic 100% 0 77,828 38,520 39,308 39,308 0 100% 2014-028 17-0505502 Wyoming Dr.Culvert Replacement/8-Inch Sewer Relocation 0 Domestic 100% 0 0 0 0 0 0 100% Domestic 30% Commercial 60% 2014-017 17-0525503 1-85 Widening Y-line Public Sewer Relocation(I-3802A Exit 55-63) 0 Industrial 10% 0 0 0 0 0 0 90% 2017-016 17-0530504 Covenant Classical School Public Sewer 3,375 Domestic 100% 0 3,375 0 3,375 0 3,375 100% 2017-018 17-0613505 Modern Nissan Bldg.Addition and 12"Sewer Relocation 0 Commercial 100% 0 0 0 0 0 0 100% 2017-019 17-0614507 Villages at Skybrook North Ph 4 5,040 Domestic 100% 0 5,040 5,040 0 0 0 100% 2017-020 17-0620508 Granary Oaks(Formerly:Tarleton Place)Public 8-Inch Sewer Main 26,400 Domestic 100% 0 26,400 26,400 0 0 0 100% 2017-021 17-0613506 Bedford Farms Subdivision Phase 3 16,320 Domestic 100% 0 16,320 16,320 0 0 0 100% 2017-025 17-0811509 Park View Subdivision Ph 2A 6,840 Domestic 100% 0 6,840 0 6,840 6,840 0 100% 2017-034 17-0825510 Duvier Subdivision Sewer Ext at Office Drive SW 1,440 Domestic 100% 0 1,440 0 1,440 0 1,440 100% 2006-046 07-0215506 Mod.1 Hallstead Subdivision Phase 2 Public Sewer Main Mod.1 0 Domestic 100% 0 0 0 0 0 0 100% 2007-061 08-0626519 Woodbridge Subdivision 17,640 Domestic 100% 0 17,640 17,640 0 0 0 100% 2014-044 14-1001514 Mod 1 Roberta Crossing Subdivision Mod 1 0 Domestic 100% 0 0 0 0 0 0 100% Total 166,005 2,160 163,845 112,532 51,313 46,148 5,165 Reported information based on the 2017 NCDENR DWQ Quarterly Reports and 2017,2018,and 2019 Certifications 2019 Tributary Total 160,840 5,165 2019 Non Tributary Total City of Concord Annual Flow Tracking (FSTE 01/14) 2018 Permits Receiving WWTP:'Rocky River WWTP Permit Number: NC0036269 2018 2018 2019 2019 City of Concord Project No. City of Concord Permit No. Project Name Tributary Flow Non-Tributary Tributary Flow(GPD) Non-Tributary Construction Status Obligated Flow(GPD) Wastewater Type (GPD) Flow(GPD) Flow(GPD) 2017-043 18-0123502 Weddington Rd Cabarrus County High School Public Sewer 0 School/Domestic 100% 0 0 0 0 95% 2017-046 17-1205514 Bedford Farms Subdivision Phase 4 23,040 Domestic 100% 0 23,040 0 23,040 40% Domestic 63% Commercial 2018-004 18-0228503 Cannon Offices 0 37% 0 0 0 0 100% 2017-037 17-0920511 Villages at Skybrook North Ph 3-2 16,560 Domestic 100% 0 16,560 16,560 0 100% 2017-030 17-1204513 Edenton at Cox Mill Public Sewer 37,080 Domestic 100% 0 37,080 37,080 0 100% 2018-014 18-0328506 Park View Ph 2B 29,520 Domestic 100% 0 29,520 10,080 19,440 40% 2008-039 18-0319504 Pendleton Ph 2-3 Public 8-Inch Sewer 30,600 Domestic 100% 0 30,600 19,080 11,520 50% 2016-044 16-0728513 Roberta Ridge Subdivision Public 8-Inch Sewer Main 74,410 Domestic 100% 9,360 65,050 36,250 28,800 75% 2016-047 18-0322505 Hunton Forest Subdivision Phase 2-3 130,080 Domestic 100% 13,440 116,640 37,920 78,720 50% 2018-022 18-0611508 Fryling Ave.Subdivision-Sylvan St.SW Sewer Extension 2,880 Domestic 100% 0 2,880 0 2,880 100% 2018-043 18-0809511 Allen Mills Subdivision Ph 2 95,040 Domestic 100% 0 95,040 22,320 72,720 45% 2018-044 18-0828512 The Mills at Rocky River Phase 2C 54,400 Domestic 100% 0 54,400 12,600 41,800 50% 2018-055 18-1026516 Frank Liske Park Lower Parking Restroom Public Extension 0 Park/Domestic 100% 0 0 0 0 100% 2016-005 15-1123520 Mod 1 Havencrest Ct.Culvert Replacement 0 Domestic 100% 0 0 0 0 45% Total 493,610 22,800 470,810 191,890 278,920 Reported information based on the 2018 NCDENR DWQ Quarterly Reports and the 2018 and 2019 Certifications 2019 Tributary Total 214,690 2019 Non Tributary Total 278,920 City of Concord Annual Flow Tracking (FSTE 01/14) 2018 Permits Receiving WWTP: Muddy Creek WWTP Permit Number: NC0081621 2018 201E Tributary Flow Non-Tributary City of Concord Project No. City of Concord Permit No. Project Name Obligated Flow (GPD) Flow(GPD) Construction Status (GPD) Wastewater Type Fox Creek Subdivision Public 8-Inch Sewer Extension Mod 1 (Previously known as Saddlebrook Subdivision Phase 2 Public 8-Inch Sewer 2015-011 Mod 1 15-0309504 Mod 1 Extension) 0 Domestic 100% 0 0 100% Total 0 0 0 Reported information based on the 2018 NCDENR DWQ Quarterly Reports and the 2018 and 2019 Certifications 2019 Tributary Total 0 2019 Non Tributary Total 0 City of Concord Annual Flow Tracking (FSTE 01/14) 2019 Permits Receiving WWTP: Rocky River WWTP Permit Number: NC0036269 2019 2019 Tributary Flow Non-Tributary City of Concord Project No. City of Concord Permit No. Project Name (GPD) Flow(GPD) Construction Status Obligated Flow(GPD) Wastewater Type 100% (Flow Allocated in the NCDEQ Priv sewer 2018-039 18-0723510 Poplar Pointe Townhomes(Public Sewer) 0 Domestic 100% 0 0 permit.) 2018-060 18-1129518 Kensley Subdivision 14,400 Domestic 100% 14,400 0 100% 2018-061 19-0115501 The Wayforth (Villas at Concord) 48,600 Domestic 100% 0 48,600 60% 2019-005 19-0220505 Courtyards at Poplar Tent 32,190 Domestic 100% 0 32,190 80% 2016-040 18-0612509 U-5806 Concord Mills Blvd Flyover 0 Commercial 100% 0 0 45% 2017-026 18-0919513 Chadbourne Avenue NW Culvert Replacement 0 Domestic 100% 0 0 0% 2017-026 18-0919514 Chelwood Culvert Replacement-Sewer Relocation 0 Domestic 100% 0 0 0% 2018-054 18-1029517 Haven at Rocky River 67,200 Domestic 100% 0 67,200 25% Domestic 48% - 2019-001 18-0228503 Mod 1 Tuckers Walk Subdivision Ph 1 (Aka: Cannon Office) 6,740 Commercial 52% 0 6,740 45% 2019-003 19-0204503 Cypress Village 30,600 Domestic 100% 0 30,600 30% Domestic-Commercial 2018-013 19-0613509 Odell Corners Off-Site Sewer Outfall (Aka: Odell Commons) 0 100% 0 0 90% 2019-029 19-0614510 Ascendum Machinery 875 Industrial 100% 0 875 50% 2019-018 19-0618511 Shoppes at Derita 25,160 Commercial 100% 0 25,160 90% 2018-034 19-1008513 Emery Village Apartments 15,840 Domestic 100% 0 15,840 50% 40% (Flow Allocated in the NCDEQ Priv sewer 2019-026 19-1025514 Carvana (Aka: Project Wavy) Public Sewer Extension 0 Industrial 100% 0 0 permit.) Total 241,605 14,400 227,205 Reported information based on the 2019 NCDENR DWQ Quarterly Reports and 2019 Certifications 2019 Tributary Total 14,400 2019 Non Tributary Total 227,205 City of Concord Annual Flow Tracking (FSTE 01/14) 2019 Permits Receiving WWTP: Muddy Creek WWTP Permit Number: NC0081621 2019 2019 City of Concord Project No. City of Concord Permit No. Project Name Obligated Flow Tributary Flow Non-Tributary Construction Status (GPD) Wastewater Type (GPD) Flow(GPD) Wyntree Subdivision (Aka:Bethel Park Subdivision) 8-Inch Public 2014-047 19-0628512 Sewer 0 Domestic 100% 0 0 90% 2019-008 19-0226506 PVG Trucking (Midland) 250 Industrial 100% 0 250 5% Total 250 0 250 Reported information based on the 2019 NCDENR DWQ Quarterly Reports and 2019 Certifications 2019 Tributary Total 0 2019 Non Tributary Total 250