Loading...
HomeMy WebLinkAboutWQ0041460_Application (FTSE)_20200131State of North Carolina DWR m Department Environmental Quality Division of Water Resources 15A NCAC 02T .0300 — FAST TRACK SEWER SYSTEM EXTENSION APPLICATION Division of Water Resources FTA 04-16 & SUPPORTING DOCUMENTATION Application Number: N/ d '"( (to be completed byDWR) All items must be completed or the application will be returned I. APPLICANT INFORMATION: 1. Applicant's name: City of Burlington (company, municipality, HOA, utility, etc.) 2. Applicant type: ❑ Individual ❑ Corporation ❑ General Partnership ❑ Privately -Owned Public Utility ❑ Federal ❑ State/County ® Municipal ❑ Other 3. Signature authority's name: Hardin Watkins per 15A NCAC 02T .0106(b) Title: City Manager Envl onent of m ntlal Quality 4. Applicant's mailing address: 425 S. Lexington Ave. Received City: Burlington State: NC Zip: 27215-. 5. Applicant's contact information: Phone number: (316) 222-5050 Email Address: Engineering (a ci.burlington.nc.us II. PROJECT INFORMATION: 1. Project name: Brightwood Farms Phase 4A Section 4D 2. Application/Project status: ® Proposed (New Permit) ❑ Existing Permit/Project If a modification, provide the existing permit number: WQ00_ and issued date: _ If new construction but part of a master plan, provide the existing permit number: W000 3. County where project is located: Guilford 4. Approximate Coordinates (Decimal Degrees): Latitude: 36.071876' Longitude:-79.592049' 5. Parcel ID (if applicable): 0106270 (or Parcel ID to closest downstream sewer) III. CONSULTANT INFORMATION: 1. Professional Engineer: Anthony D. Lester License Number: 19773 Firm: Evans Engineering, Inc. Mailing address: 4609 Dundas Drive City: Greensboro State: NC Zip: 27407 Phone number: (336) 854-8877 Email Address: adl@evans-eng.com IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION: 1. Facility Name: T.Z. OSBORNE Permit Number: NCO047384 Owner Name: City of Greensboro V. RECEIVING DOWNSTREAM SEWER INFORMATION (if different than WWTF): 1. Permit Number(s): W00022153 Downstream (Receiving) Sewer Size: 8 inch System Wide Collection System Permit Number(s) (if applicable): WQCS Owner Name(s): City of Burlington JAN 31 2020 Winston-Salem Regional Office FORM: FTA 04-16 Page I of 5 VI. GENERAL REQUIREMENTS 1. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached? ❑ Yes ❑No ®N/A 2. If the Applicant is a Developer of lots to be sold, has a Developer's Operational Agreement (FORM: DEV) been attached? ❑ Yes ❑No ®N/A 3. If the Applicant is a Home/Pro e�rty Owners' Association, has an Operational Agreement (FORM: FICA) been attached? ❑ Yes ❑No ®N/A 4. Origin of wastewater: (check all that apply): ® Residential Owned ❑ Retail (stores, centers, malls) ❑ Car Wash ❑ Residential Leased ❑ Retail with food preparation/service ❑ Hotel and/or Motels ❑ School / preschool / day care ❑ Medical / dental / veterinary facilities ❑ Swimming Pool /Clubhouse ❑ Food and drink facilities ❑ Church ❑ Swimming Pool/Filter Backwash ❑ Businesses / offices / factories ❑ Nursing Home ❑ Other (Explain in Attachment) 5. Nature of wastewater: 100 % Domestic/Commercial % Commercial _ % Industrial (See 15A NCAC 02T .0103(20)) "Is there a Pretreatment Program in effect? ❑ Yes ❑ No 6. Has a flow reduction been approved under 15A NCAC 02T .01 IMP ❑ Yes ® No ➢ If yes, provide a copy of flow reduction approval letter 7. Summarize wastewater generated by project: Establishment Type (see 021.01140 Daily Design Flow °.b No. of Units Flow Single Family Home (4 Bedrooms) 120 gal/Bedroom 5 2,400 GPD Twinhomes (4 Bedrooms) 120 gal/Bedroom 42 20,160 GPD gal/ GPD gal/ GPD gal/ GPD gal/ GPD Total 22,560 GPD a See 15A NCAC 02T .0114(b),(d), (e)(1) and (e)(2) for caveats to wastewater design flow rates (i.e., minimum flow per dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas; and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G.S. 42A-41. b Per 15A NCAC 02T .0114(c), design flow rates for establishments not identified [in table 15A NCAC 02T.01141 shall be determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data. 8. Wastewater generated by project: 22560 GPD (per 15A NCAC 02T .0114) ➢ Do not include future flows or previously permitted allocations If permitted flow is zero, indicate why: ❑ Pump Station or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line ❑ Flow has already been allocated in Permit Number: ❑ Rehabilitation or replacement of existing sewer with no new flow expected ❑ Other (Explain): FORM: FTA 04-16 Page 2 of 5 VII. GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T .0305 & MDC (Gravity Scwcrs): 1. Summarize gravity sewer to be permitted: Size (inches) Length (feet) Material 8" 1,404 LF VCP 8" 253 DIP ➢ Section II & III of the MDC for Permitting of Gravity Sewers contains information related to design criteria ➢ Section III contains information related to minimum slopes for gravity sewer(s) ➢ Oversizing lines to meet minimum slope requirement is not allowed and a violation of the MDC VIII. PUMP STATION DESIGN CRITERIA (If Applicable) — 02T .0305 & MDC (Pump Stations/Force Mains): COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT I. Pump station number or name: 2. Approximate Coordinates (Decimal Degrees): Latitude: Longitude: -. 3. Design flow of the pump station: _ millions gallons per day (firm capacity) 4. Operational point(s) of the pump(s): gallons per minute at feet total dynamic head (TDH) 5. Summarize the force main to be permitted (for this Pump Station): Size (inches) Length (feet) Material 6. Power reliability in accordance with 15A NCAC 02T .0305(h)(1): ❑ Standby power source or pump with automatic activation and telemetry - 15A NCAC 02T .0305(h)(1)(B).' ➢ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day ➢ Must be permanent to facility Or if the pump station has an average daily flow less than 15,000 gallons per day: ❑ Portable power source with manual activation, quick -connection receptacle and telemetry - 15A NCAC 02T .0305(h)(1)(C) or ❑ Portable pumping unit with plugged emergency pump connection and telemetry - 15A NCAC 02T .0305(h)(1)(C): ➢ It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant (draft agreement) and is compatible with the station. ➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided in the case of a multiple station power outage. FORM: FTA 04-16 Page 3 of 5 IX. SETBACKS & SEPARATIONS — (02B .0200 & 15A NCAC 02T.0305(f)): 1. Does the project comply with all separations found in 15A NCAC 02T.0305(f) & (g) ➢ 15A NCAC 02T.0305(f) contains minimum separations that shall be provided for sewer systems: ® Yes ❑ No Setback Parameter* Separation Required Storm sewers and other utilities not listed below (vertical) 24 inches Water mains (vertical -water over sewer including in benched trenches) 18 inches Water mains (horizontal) 10 feet Reclaimed water lines (vortical - reclaimed over sewer) 18 inches Reclaimed water lines (horizontal - reclaimed over sewer) 2 feet **Any private or public water supply source, including any wells, WS-I waters of Class I or Class II impounded reservoirs used as a source of drinking water 100 feet **Waters classified WS (except WS-I or WS-V), B, SA, ORW, HQW, or SB from normal high water or tide elevation and wetlands see item IX.2 50 feet **Any other stream, lake, impoundment, or ground water lowering and surface drainage ditches 10 feet Any building foundation 5 feet Any basement 10 feet Top slope of embankment or cuts of 2 feet or more vertical height 10 feet Drainages stems and interceptor drains 5 feet Any swimming pools 10 feet Final earth grade (vertical) 36 inches ➢ 15A NCAC 02T.0305(s) contains alternatives where separations in 02T.0305(f) cannot be achieved. ➢ **Stream classifications can be identified using the Division's NC Surface Water Classifications webnaee ➢ If noncompliance with 02T.0305(f) or (a), see Section X of this application 2. Does the project comply with separation requirements for wetlands? (50 feet of separation) ®Yes ❑ No ❑ N/A ➢ See the Division's draft separation requirements for situations where separation cannot be meet ➢ No variance is required if the alternative design criteria specified is utilized in design and construction ➢ As built documents should reference the location of areas effected 3. Does the project comply with setbacks found in the river basin rules per 15A NCAC 02B .0200? ® Yes ❑ No ❑ N/A ➢ This would include Trout Buffered Streams per 15A NCAC 213.0202 4. Does the project require coverage/authorization under a 404 Nationwide or [-]Yes ® No individual permits or 401 Water Quality Certifications? ➢ Information can be obtained from the 401 & Buffer PermittingBranch ranch 5. Does project comply with 15A NCAC 02T.0105(c)(6) (additional permits/certifications)? ® Yes ❑ No Per 15A NCAC 02T.0105(c)(6), directly related environmental permits or certification applications are being prepared, have been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans, stormwater management plans, etc.). 6. Does this project include any sewer collection lines that are deemed "high -priority?" Per 15A NCAC 02T.0402, "high -priority sewer" means "any aerial sewer, sewer contacting surface waters, siphon, or sewer positioned parallel to streambanks that is subject to erosion that undermines or deteriorates the sewer. ❑ Yes ®No ❑ N/A ➢ If yes, include an attachment with details for each line, including type (aerial line, size, material, and location). High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections documented per 15A NCAC 02T.0403(a)(5) or the permitee's individual System -Wide Collection permit. FORM: FTA 04-16 Page 4 of 5 X. CERTIFICATIONS: 1. Does the submitted system comply with 15A NCAC 02T, the Minimum Design Criteria for the Permittingof f Pump Stations and Force Mains (latest version), and the Gravity Sewer Minimum Design Criteria (latest version) as applicable? N Yes ❑ No If No, complete and submit the Variance/Alternative Design Request application (VADC 10-14) and supporting documents for review. Approval of the request is required prior to submittal of the Fast Track Application and supporting documents. 2. Professional Engineer's Certification: 1, ftNT"AA11 ,C/ , L F�$Tf2 attest that this application for (Professional Engineer's name from Application Item III.1.) has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications, engineering calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains (latest version). Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design. NOTE — In accordance with General Statutes 143-215.6A and 143-215.613, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation. North Carolina Professional Engineer's seal, signature, and date: .111\\.Et. CAR (� i 3. Applicant's Certification per 15A NCAC 02T .0106(b): I, Hacd�rt (Signature Authority's name & title frbm Application Went I.3.) SEAL 19773 6I that this application for has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. I understand that any discharge of wastewater from this non - discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties, injunctive relief, and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition of this permit be violated. I also understand that if all required parts of this application package are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. NOTE — In accordance with General Statutes 143-215.6A and 143215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation. Signature: '/� ` V V G�'V 1 �^ Date: FORM: FTA 04-16 Page 5 of 5 State of North Carolina Department of Environmental Quality Division of Water Resources Flow Tracking for Sewer Extension Applications (FTSE 10-18) Entity Requesting Allocation: City of Burlington Project Name for which flow is being requested: Brightwood Farms 4A 4D More than one FTSE ntay be required for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewaterflow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: T Z Osborne b. WWTP Facility Permit #: NCO047384 Al[flows are in MGD c. WWTP facility's permitted flow 40.0 d. Estimated obligated flow not yet tributary to the WWTP CS 0.552 SIU 2.6099 e. WWTP facility's actual avg. flow 29.87 f. Total flow for this specific request 0,02256 g. Total actual and obligated flows to the facility 32.5577 h. Percent of permitted flow used 81.39 II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: (A) (B) (C) (D)=(B+C) (E)=(A-D) Design Obligated, Pump Pump Average Approx. Not Yet Total Current Station Station Firm Daily Flow** Current Tributary Flow Plus (Name or Permit Capacity, * (Firm / pf), Avg. Daily Daily Flow, Obligated Available Number) No. MOD MGD Flow, MOD MOD Flow Capacity*** Rock 0.0384 2.291 0.9164 .538 .34 .878 Stewart 4.896 1.958 0.263 0.034 0.297 1.661 * The Firm Capacity (design flow) of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. *" Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria. **x A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Downstream Facility Name (Sewer): Downstream Permit Number: Page l of 6 FTSE 10-18 III. Certification Statement: I 'I'm N �% f certify to the best of my knowledge that the addition of the vdhime of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the plmming assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form certifies that the receiving collection system or treatment works has adequate capacity to transport and treat the proposed new wastewater. Title Date Page 2 of 6 FFSE 10-18 State of North Carolina Department of Environment and Natural Resources l`X Division of Water Resources Dwislon of \unto n€solnc cs Flow Tracking/Acceptance for Sewer Extension Permit Applications (FTSE 04-16) Enity Requesting Allocation City of Burlington Project Name for which flow is being requested: Brightwood Farm Phase 4A Section 4D More than one FTSE-10107 nay be required for a single project if the owner of the WYVTP is no( responsible far all pump stations along the route of the proposed wastewater flow. 1. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: b. WWTP Facility Permit #: City of Burlington Collection System WQCS00008 All flows are in GPD c. WWTP facility's permitted flow Allocation from Greensboro d. Estimated obligated flow not yet tributary to the WWTP e. WWTP facility's actual avg. flow f. Total flow for this specific request g. Total actual and obligated flows to the facility h. Percent of permitted flow used 11. Complete this section for each pump station you are responsible for along the route of this List pump stations located between the project connection point and the WWTP : None (A) (B) (C) (D)=(B+C) Obligated, Total Design Approx. Not Yet Current Flow Firm Average Daily Current Avg. Tributary Plus Pump Station Capacity, * Flow** Daily Flow, Daily Flow, Obligated Name GPD (Firm/pf), GPD GPD GPD Flow None 900,000 164,688 341,622 22,560 528,870 58.8% (E)=(A-D) Available Capacity*** * The Firm Capacity of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pumpstation divided by a peaking factor (pf) not less than 2.5. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity 5 0. Downstream Facility Name (Sewer) : Brightwood Farms Phase 4A, Section 1 C Downstream Permit Number: WQ0030417 Page 1 of 2 FTSE 04-16 Certification Statement: I, W. Todd Lambert, P.E. certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning asssessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form certifies that the receiving collection system or treatment works has adequate capacity to transport and treat the proposed new wastewater. Signing Official Signature City Engineer Title of Signing Official Date Page 2 of 2 FTSE 04-16 y Printed ft. TOPGI CIOOI Nrtiond G.VVI. H.M6, s (wxn�mpo.com) —Since 1974— Surveyors Planners January 31, 2020 NCDWR ATTN: Justin Henderson Winston-Salem Regional Office Water Quality Section 450 West Hanes Mill Road, Suite 300 Winston-Salem, NC 27105 NC Department of Environmental Quality Received JAN 31 2020 Winston-Salem Regional Office Re: Fast Track Sewer System Extension Application for Brightwood Farms Phase 4A Section 413; Guilford County, NC Justin: Please find attached the sanitary sewer system extension application package for Brightwood Farms Phase 4A Section 41). My submittal package contains the following items: 1. FTA 04-16 Application (One original & One copy) 2. Application Fee Check for $490.00 3. USGS Site Map 4. Street Level Map FTSE Form from the City of Burlington FTSE Form from The City of Greensboro Please process this application for approval. Should there be any questions or comments, please notify me. Thanks for your help. Sincerely, 6kg fi W Anthony D. es r, PE, PLS Vice Preside Evans Engineering, Inc. MrFONY/106.8 NCDWR LETTER/I/31/2020 Henderson, Justin L From: Anthony Lester <adl@evans-eng.com> Sent: Tuesday, February 4, 2020 12:00 PM To: Henderson, Justin L Subject: RE: [External] RE: Brightwood Farms Phase 4A There are 21 duplex units x 8 total bedrooms = 20,160 GPD AND there are 5 regular single family units with 4 bedrooms each ( 5 x 4 bedrooms = 2400 GPD) = 22,560 GPD Total. From: Henderson, Justin L<justin.henderson@ncdenr.gov> Sent: Tuesday, February 04, 2020 11:32 AM To: Anthony Lester <adl@evans-eng.com> Subject: RE: [External] RE: Brightwood Farms Phase 4A Thanks. So my follow-up to that is, are there 21 or 42 duplex units? 21 duplex units X 8 total bedrooms=20,160 GPD 42 duplex units x 8 total bedrooms = 40,320 GPD From: Anthony Lester <adl@evans-eng.com> Sent: Tuesday, February 4, 2020 11:24 AM To: Henderson, Justin L<iustin.henderson@ncdenr.gov> Subject: [External] RE: Brightwood Farms Phase 4A These are two units that are attached. Each will have 4 bedrooms. From: Henderson, Justin L<iustin.henderson@ncdenr.gov> Sent: Tuesday, February 04, 2020 11:18 AM To: Anthony Lester <adl@evans-eng.com> Subject: Brightwood Farms Phase 4A Anthony, Quick questions concerning the subject FTA received by our office: 1) Can you describe what is meant by twinhomes? Is this a duplex that has a total of 4 bedrooms? Thanks for the clarification. Justin Henderson Environmental Specialist II Winston Salem Regional Office Division of Water Resources (336) 776-9701