Loading...
HomeMy WebLinkAbout20200175 Ver 1_401 Application_20200130REPAIR & MAINTENANCE PROJECTS (DIVISION SEVEN) LINEAR ROAD NAME PROJECT RIVER FEET OF DATE COUNTY & # DESCRIPTION BASIN/STREAM PIPE/BRIDGE LATITUDE LONGITUDE NEW NOTES NAME STREAM IMPACTS There will be approx. 150 linear feet of bank stabilization. Project will not exceed Roanoke/Reedy an average of one cubic yard per running 2/17/17 Caswell US 158 Bank Stabilization Fork Creek N/A 36.4049542o N 79.2322392o N Oft foot placed along the bank below ordinary high water. Project will involve no discharge into special aquatic site. All conditions of NW 13 shall apply.