HomeMy WebLinkAboutNCC200423_ESC Approval Submitted_20200204ROY COOPER
Govemor
MICHAEL S. REGAN
Secretary
S. DANIEL SMITH
Director
n
D
frrVn
North Carolina
Environmental Quality
January 23, 2020
LETTER OF APPROVAL
Maple Leaf Village, LLC
Attention: Christopher Lyons, President
3608 W. Friendly Ave.
Greensboro, NC 27410
RE: Project Name: Maple Leaf Village Pump Line
Acres Approved: 1.8
Project ID: DAVID-2020-028
County: Davidson
Address: Harvey Teague Rd. - Abbots Creek
River Basin: Yadkin -Pee Dee
Submitted By: Jamestown Engineering Group
Date Received by LQS: January 23, 2020
Plan Type: Residential — Express - New
Dear Sir or Madam:
This office has reviewed the subject erosion and sedimentation control plan. We
find the plan to be acceptable and hereby issue this Letter of Approval. The enclosed
Certificate of Approval must be posted at the job site- This plan approval shall
expire three (3) years following the date of approval, if no land -disturbing activity
has been undertaken, as is required by Title 1 SA NCAC 4B .0129.
As of March 1, 2019, all new construction activities are required to complete and
submit an electronic Notice of Intent (NOI) form requesting a Certificate of
Coverage (COC) under the NCGO10000 Construction Stormwater General Permit.
This form MUST be submitted prior to the commencement of any land disturbing
activity on this project. The NOT form may be accessed at deq.nc.gov/NCG01.
Please direct questions about the NOI form to Annette Lucas at
Anne_tte.lucasancderingov or Paul Clark at Paul.clark@ncdenr.gov. After you
submit a complete and correct NOI Form, a COC will be emailed to you within
three business days. Initially, DEMLR will not charge a fee for coverage under the
NCGO 1 permit. However, on or after Mav 1. 2019. a $100 fee will be charged
annually. �_�
i
North Carolina Department of Environmental Quality ! Division of Energy, minerals & Land Resources
Winston-Salem Regional Office 1 450 West Hanes Mih Road, Suite 300 1blinston-Salem, North Carolina 27105
(336) 776-98W
Title 15A NCAC 4B .01 l g a
documentation be kept on file at the job site: ) and the �l pit require that the following
I. The approved E&SC plan as well as any approved 2. The NCG01 permit and the COC, after itisrrece vedeviation.
3. Records of inspections made during the previous 30 days.
North Carolina's Sedimentation Pollution Control Act is e
requiring protection of existin p rformance-oriented,
followin g natural resources and adjoining properties. If,
g the commencement of this project, the erosion and sedimentation
control plan is inadequate to meet the requirements of the Sediment
Control Act of 1973 (North Carolina General Statute 113A- 66), this office
may require revisions to the plan and impleme 51 through anon Pollution
compliance with the Act, ntation of the revisions to ensure
Acceptance and^ 3'
ppffival of this 'plari is conditioned upon
Federal and State water quality laws, regulatioour compliance with
ns, and rules. In
county ordinances or rules may also a ddition, local city or
approval does not supersede any other apply
to this land -disturbing activity. This
Permit or approval.
Please note that this approval is based in Provided in the Financial Part on the accuracy of the information
requested to file an Responsibility Form
amended form if there is an which you provided. You are
on the form, 1n addition, it would be hel ful if you notgie in the information included
starting date for this project. Please noti y fY this office of the proposed
conference. fy us if you plan to have a preco pro] lion
Your cooperation is appreciated.
Sincere y,
Scott_Sin - --
Assistant Regional Engineer
DEMLR
Enclosures: Certificate of Approval
NCG01 Fact Sheet
Cc:
Jamestown Engineering Group
PO Box 365
Jamestown, NC 27282
4Z
a' •P=4
.Olt
° Pq .-
4
4j
.4 ME4
t�
.9 Lo G �'
6
1 M ,
4*
a
4
kn
ca
m