Loading...
HomeMy WebLinkAboutNCC200400_NOI Application_20200203Action History (UTC-05:00) Eastern Time (US & Canada) Subrrit by Anonymous User 1/30/2020 7:52:31 AM (NCG01 NOI Submission) Approve by McCoy, Suzanne 1/31/2020 8:15:24 AM (Review- Construction NOI 21313) • The task was assigned to McCoy, Suzanne by round robin distribution 1/30/2020 7:52 AM The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: February 3, 2020 5:00 PM 1/30/2020 7:52 AM Submit by McCoy, Suzanne 2/3/2020 12:38:59 PM (Payment Verification for NCC200400) * Teramore Development • McCoy, Suzanne assigned the task to McCoy, Suzanne 2/3/2020 12:38 PM The task was assigned to DEMLR NCG01 Payment Team. The due date is: March 13, 2020 5:00 PM 1 /31 /2020 8:15 AM .• SThF� '; 1 NORTH CAROLINA EnrlronmertW quallly A. Project Information Part A. Project Location and Waterbody Information 1. Project Name * Dollar General - Colfax Store #21337 2. County* Guilford 3. Highway or Street National Service Road Address * Street narre only is acceptable if no address number assigned yet 4. City or Township* Colfax 5. State * NC 6. Zip Code * 27235 7. Latitude * Enter the latitude in decimal degrees 36.0816 8. Longitude* Enter the longitude in decimal degrees (M. ST be negative) -79.9915 If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of North Carolina. Look for the coordinates in the bottom left corner. 9. Date to Begin* 02/15/2020 Estimated Construction Project Start Date 10. Date to End* 08/21/2020 Estimated Construction Project End Cute 11. SIC (Primary)* Commercial (1542) Standard Industrial aassification for Developrrent 12. Acres to be 2.22 disturbed* (including off -site borrow and waste areas) 13. Total site area 1.76 (acres) * 14. Post- 0.69 construction (Estimated) impervious area (acres) * NCC Project NCC-GUILF-2020-Dollar General - Colfax Store #21337 Tracking ID Assigned automatically Below you must enter waterbody information for surface waters affected by this project. Please consult DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please enter only immediate receiving waterbodies - not waters downstream of those unless the project extends there. You may enter up to 3 waterbodies if needed. 15a. Receiving East Fork Deep River Waterbody * %rre of waterbody into which stornwater runoff will discharge 15b. Waterbody 17-2-(0.3) Index No.* NCWaterbody Index Nunber Stormwater r No discharges will flow Pf Yes to additional wate rs * 15c. Additional Deep River Receiving Waterbody narre Waterbody 15d. Waterbody 17-(1) Index No. NCWaterbody Index Nunber 15e. Additional Waterbody narre Receiving Waterbody 15f. Waterbody NCWaterbody Index Nunber Index No. 16a. Is this project r Yes subject to the NC r No, not subject to NC SPCA Sediment Pollution Control Act?* B. Permittee Information Part B. ^ Fternittee Inforrration - Legally Fbsponsible Entity and Individual Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same organization. That person must be a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. 1. Organization Teramore Construction Name * 2. First Name* Zach IF Corporation, enter Fbgistered Agent First Barre 3. Last Name* Crumley If Corporation, enter FZegistered Agent Last %rre 3b. Title Senior Vice President 4. Permitee E-mail tglass@teramore.net Address * 5. Permittee 229-516-4289 Telephone No.* 6. Permittee Mailing Street Address Address* PO Box6460 Address Line 2 city State / Frovince / Faegion Thomasville GA Fbstal / Zip Code Country 31758 USA Check box if the r Yes street address the same as mailing address 7. Permittee Street Street Address Address* 165 Big Star Drive Address Line 2 City State / Frovince / Fbgion Thomasville GA Fbstal / Zip Code Country 31757 US 8. Type of Non -Government Ownership* C. Site Contact Information Part C. Roject Site Contact Inforrration .................................................................................................................................................................................................... 1. Primary Site Terry Contact - First Name * 2. Primary Site Fipps Contact - Last Name * 3. Title Project Superintendent 4. Site Contact E- tglass@teramore.net mail Address* 5. Site Contact 910-207-1068 Telephone No. 6. Organization Teramore Construction Name 7. Site Contact Street Address Mailing Address* PO Box6460 Address Line 2 city Thomasville Fbstal / Zip Code 31758 8. Consultant Name (Optional) Jennifer Edwards First and Last nacre 9. Consultant E-mail jennifer@brec.biz This person will be copied on all correspondence. 10. Consultant 336-844-4088 Telephone No. State / Rovince / Region GA Country USA D. E&SC Plan Part D. ^ Erosion & Sediment Control (E&SC) Ran Approval Information ...................................................................................................................................................................................................................................................................................................................................... 1. Date E&SC Plan 01/21/2020 Approved * 2. E&SC Plan Project 19-12-GCCP-09139 Number/ID * Assigned by agency or local program 3. E&SC Plan f State DEQ Office Approved by* r Local Program 4. Local Program* Guilford County Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a complete application. 5. E&SC Plan APPROVED _ESC_PERMIT.pdf 541.91 KB Approval Wst be FDFfornat letter/documentation Notes (Optional) Frovide any additional information that night help the reviewer better understand how uploaded documents support the application. 6. NOI Certification NOI Certification _Colfax.pdf 380.91KB Form Mast be FDFfon-rat This is an Express F No Review Project* r Yes E. Certification North Carolina General Statute 143-215.66 (1) provides that: Any person who knowingly makes anyfalse statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Artcle; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Artcle shall be guilty ofa Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). Under penalty of law, I certify that: 17 I am the person responsible for the construction activities of this project, for satisfying the requirements of this permit, and for any civil or criminal penalties incurred due to violations of this permit. rJ The information submitted in this NOI is, to the best of my knowledge and belief, true, accurate, and complete based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information. * 17 I will abide by all conditions of the NCG010000 General Permit and the approved Erosion and Sediment Control Plan. * rJ If the Erosion and Sediment Control Plan approved by the delegated program is not compliant with Part II (Stormwater Pollution Prevention Plan) of the NCG010000 General Permit. I will nonetheless ensure that all conditions of Part II of the permit are met on the project at all times. * 17 I hereby request coverage under the NCG010000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. Specify if you are:* r The Responsible Person named on this Notice of Intent f Authorized Responsible Person* Important: The person who electronically signs this Certification above must be the same person who signs the NOI Certification Form. If that person is signing on behalf of the Permittee, that individual must be an authorized responsible person within the same organization as the Permittee. *An authorized individual is a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature Type Name* Zach Crumley Title Senior Vice President Organization Teramore Construction Date * 01 /30/2020 F. Tracking and COC Info NOI Tracking No. 21313 NC Reference No. NCG01-2020-0400 Uses 'count number' variable (incremrented by SP) Certificate of NCC200400 Coverage (COC) Uses 'count number' variable (incremented by SP) No.* Count Number 400 Sequential number for submittal that is incremented by Stored Frocedure COC Year 2020 Year of date reviewed (used to assign YY digits after "NOC' in COCno.)