HomeMy WebLinkAbout20121055 Ver 3_13_EB-5539 Signed PCE Nov 2013_20200130NCUO'I' PRCKiR-i—WNI ':'IC CATIsCioRlt k! �XCI,ti'IQ`I (PUL1
-ACTION Cf-MS NP1CA11ON FORM
G. PQ APp,byal
TIP Project. No 1313-5539
Wi3S Moment 45529
red,;ral-Aid Project. N(,. TC:Sp.ti220(6l
P.rofectl)e,ca IPtic,lt
The South Tar Rivet (;recnway (Phase 3) project proposes to eonstnact a tnultt-use bicycle
and pcd,-snian aecnwxy fin :tttpiuxi rtatefy ].5 triles to cunnecl ixistmg grcenways and
sidewalk facilitirs This phase of the South far. RIM Orcenway IS planncd to be a 1 O-foot
pave d path auctjnt boardwalk path from Move Aouievard to Pttt Shect All phase; of rile
South Tar Ww"' (ircenway ate (or will be once eons(mcted) owned c,nd maintained by tale
City jf Cirec,r,villc. 'fhc proposed corridor is sho�kn in Figures 1, 2, a,id 3 Photos along
the existing corridor are shown in leigure 4
Cat(?I,ortcal Exclusion Action (.'iassiiim n•
TYPE I(A) NO DOXFS Checked
X _ TYPE 1(I3) A -NY BOX is Checked
Prepared BL
10. U).13 Jeffrey—W_ IyloorC, I'.f;,, Vice President
Date Kntrley-horn and ASSOCIWS, Inc -
(919) 6"7-21 15, License No 24416
Prepared For'
CtV01—f Gree villc, T`Tth t'atolina -
Reviewed: /
D e Ir.ject Oevelopment & Environmental Avaiy—SIS Unit
North Carolina Depaitni ont of Transportation
Approved By:
�3 _
ll to Is ion Adtuinishator
F'edcral Highway Administration