Loading...
HomeMy WebLinkAbout20121055 Ver 3_13_EB-5539 Signed PCE Nov 2013_20200130NCUO'I' PRCKiR-i—WNI ':'IC CATIsCioRlt k! �XCI,ti'IQ`I (PUL1 -ACTION Cf-MS NP1CA11ON FORM G. PQ APp,byal TIP Project. No 1313-5539 Wi3S Moment 45529 red,;ral-Aid Project. N(,. TC:Sp.ti220(6l P.rofectl)e,ca IPtic,lt The South Tar Rivet (;recnway (Phase 3) project proposes to eonstnact a tnultt-use bicycle and pcd,-snian aecnwxy fin :tttpiuxi rtatefy ].5 triles to cunnecl ixistmg grcenways and sidewalk facilitirs This phase of the South far. RIM Orcenway IS planncd to be a 1 O-foot pave d path auctjnt boardwalk path from Move Aouievard to Pttt Shect All phase; of rile South Tar Ww"' (ircenway ate (or will be once eons(mcted) owned c,nd maintained by tale City jf Cirec,r,villc. 'fhc proposed corridor is sho�kn in Figures 1, 2, a,id 3 Photos along the existing corridor are shown in leigure 4 Cat(?I,ortcal Exclusion Action (.'iassiiim n• TYPE I(A) NO DOXFS Checked X _ TYPE 1(I3) A -NY BOX is Checked Prepared BL 10. U).13 Jeffrey—W_ IyloorC, I'.f;,, Vice President Date Kntrley-horn and ASSOCIWS, Inc - (919) 6"7-21 15, License No 24416 Prepared For' CtV01—f Gree villc, T`Tth t'atolina - Reviewed: / D e Ir.ject Oevelopment & Environmental Avaiy—SIS Unit North Carolina Depaitni ont of Transportation Approved By: �3 _ ll to Is ion Adtuinishator F'edcral Highway Administration