Loading...
HomeMy WebLinkAbout20121055 Ver 3_03_Rip Rap Outlet Protection_20200130RIP RAP OUTLET PROTECTION Project: I South Tar River Greenway Calculated By: CER Pipe #1 STA: 24+40 -L1- LT DIA: 18 in. Q: 6.5 cfs V:9.30 ft./sec. From DENR Erosion & Sediment Use class a IV] Rip Rap Control Manual Figure 8.06.04: LA = 9 T Do Quanity Calculations: O 3DDo Do + La ~ La Outlet Pad: Rip Rap: Filter Fabric: Metric: Rip Rap 67.5 sf 3 tons 8 sy t= 1 Do = 18 in 3Do = 4.5 ft La = 9 ft Do + La = 10.5 ft use 100lbs/cf tons (metric) Filter Fabric: sq meters RIP RAP OUTLET PROTECTION Project: I South Tar River Greenway Calculated By: CER Pipe #1 STA: 54+46 -L2- LT DIA:24 in. Q: 9.8 cfs V:8.52 ft./sec. From DENR Erosion & Sediment Use class a IV] Rip Rap Control Manual Figure 8.06.04: LA = 13 T Do Quanity Calculations: O 3DDo Do + La ~ La Outlet Pad: Rip Rap: Filter Fabric: Metric: Rip Rap 136.5 sf 7 tons 15 sy t= 1 Do = 24 in 3Do = 6 ft La = 13 ft Do + La = 15 ft use 100lbs/cf tons (metric) Filter Fabric: sq meters RIP RAP OUTLET PROTECTION Project: I South Tar River Greenway Calculated By: CER Pipe #1 STA: 61+82 -L2- LT DIA: 18 in. Q: 1.1 cfs V:6.65 ft./sec. From DENR Erosion & Sediment Use class a IV] Rip Rap Control Manual Figure 8.06.04: LA = 9 T Do Quanity Calculations: O 3DDo Do + La ~ La Outlet Pad: Rip Rap: Filter Fabric: Metric: Rip Rap 67.5 sf 3 tons 8 sy t= 1 Do = 18 in 3Do = 4.5 ft La = 9 ft Do + La = 10.5 ft use 100lbs/cf tons (metric) Filter Fabric: sq meters RIP RAP OUTLET PROTECTION Project: I South Tar River Greenway Calculated By: CER Pipe #1 STA: 81+50 -L3- LT DIA: 18 in. Q: 2.3 cfs V:7.67 ft./sec. From DENR Erosion & Sediment Use class a IV] Rip Rap Control Manual Figure 8.06.04: LA = 9 T Do Quanity Calculations: O 3DDo Do + La ~ La Outlet Pad: Rip Rap: Filter Fabric: Metric: Rip Rap 67.5 sf 3 tons 8 sy t= 1 Do = 18 in 3Do = 4.5 ft La = 9 ft Do + La = 10.5 ft use 100lbs/cf tons (metric) Filter Fabric: sq meters RIP RAP OUTLET PROTECTION Project: I South Tar River Greenway Calculated By: CER Pipe #1 STA: 81+75 -L3- LT DIA: 15 in. Q: 2.0 cfs V:6.80 ft./sec. From DENR Erosion & Sediment Use class a IV] Rip Rap Control Manual Figure 8.06.04: LA = 8 T Do Quanity Calculations: O 3DDo Do + La ~ La Outlet Pad: 52 sf Rip Rap: 3 tons Filter Fabric: 6 sy Metric: Rip Rap t= 1 Do = 15 in 3Do = 3.75 ft La = 8 ft Do + La = 9.25 ft use 100lbs/cf tons (metric) Filter Fabric: sq meters RIP RAP OUTLET PROTECTION Project: I South Tar River Greenway Calculated By: CER Pipe #1 STA: 85+70 -L3- LT DIA:24 in. Q: 13.5 cfs V: 13.80 ft./sec. From DENR Erosion & Sediment Use class a IV] Rip Rap Control Manual Figure 8.06.04: LA = 13 T Do Quanity Calculations: O 3DDo Do + La ~ La Outlet Pad: Rip Rap: Filter Fabric: Metric: Rip Rap 136.5 sf 7 tons 15 sy t= 1 Do = 24 in 3Do = 6 ft La = 13 ft Do + La = 15 ft use 100lbs/cf tons (metric) Filter Fabric: sq meters RIP RAP OUTLET PROTECTION Project: I South Tar River Greenway Calculated By: CER Pipe #1 STA: 88+86 -1-3- LT DIA:24 in. Q: 0.8 cfs V:5.50 ft./sec. From DENR Erosion & Sediment Use class a IV] Rip Rap Control Manual Figure 8.06.04: LA = 9 T Do Quanity Calculations: O 3DDo Do + La ~ La Outlet Pad: Rip Rap: Filter Fabric: Metric: Rip Rap 76.5 sf 4 tons 9 sy t= 1 Do = 24 in 3Do = 6 ft La = 9 ft Do + La = 11 ft use 100lbs/cf tons (metric) Filter Fabric: sq meters RIP RAP OUTLET PROTECTION Project: I South Tar River Greenway Calculated By: CER Pipe #1 STA: 89+35 -L3- LT DIA: 18 in. *Note: 2 @ 18" crossing - Quanty X 1.75 Q: 15.0 cfs V:8.10 ft./sec. From DENR Erosion & Sediment Use class a IV] Rip Rap t = 1 Control Manual Figure 8.06.04: LA = 9 T Do Quanity Calculations: O 3DDo Do + La ~ La Outlet Pad: Rip Rap: Filter Fabric: Metric: Rip Rap 67.5 sf 3 tons 8 sy Do = 18 in 3Do = 4.5 ft La = 9 ft Do + La = 10.5 ft use 100lbs/cf tons (metric) Filter Fabric: sq meters RIP RAP OUTLET PROTECTION Project: I South Tar River Greenway Calculated By: CER Pipe #1 STA: 94+47 -1-3- LT DIA: 18 in. Q: 1.5 cfs V:6.60 ft./sec. From DENR Erosion & Sediment Use class a IV] Rip Rap Control Manual Figure 8.06.04: LA = 9 T Do Quanity Calculations: O 3DDo Do + La ~ La Outlet Pad: Rip Rap: Filter Fabric: Metric: Rip Rap 67.5 sf 3 tons 8 sy t= 1 Do = 18 in 3Do = 4.5 ft La = 9 ft Do + La = 10.5 ft use 100lbs/cf tons (metric) Filter Fabric: sq meters RIP RAP OUTLET PROTECTION Project: South Tar River Greenway Calculated By: CER Pipe #1 STA: 110+64 -1-4- LT DIA: 18 in. Q: 2.3 cfs V:9.06 ft./sec. From DENR Erosion & Sediment Use class a IV] Rip Rap Control Manual Figure 8.06.04: LA = 9 T Do Quanity Calculations: O 3DDo Do + La ~ La Outlet Pad: Rip Rap: Filter Fabric: Metric: Rip Rap 67.5 sf 3 tons 8 sy t= 1 Do = 18 in 3Do = 4.5 ft La = 9 ft Do + La = 10.5 ft use 100lbs/cf tons (metric) Filter Fabric: sq meters