Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
20000109 Ver 1_COMPLETE FILE_20000211
c A 1 1 1 1 i 1 PROJECT: OWNER: POWELL DRIVE OFFICE BUILDING RALEIGH, NORTH CAROLINA NEOMONDE ASSOCIATES 3817 BERYL ROAD RALEIGH, NC 27607 DESIGN ELEMENT: I ???H CA(,?p f?'J?a ?Y Dsc - 3 ?J 6.0 -oJ EXTENDED DETENTION STORMWATER WETLAND DESIGNER: Sungate Design Group, P.A. 915A Jones Franklin Road Raleigh, NC 27606 SDG 1 1 r State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original L GENERAL INFORMATION 1. Applicants name (specify the name of the corporation, individual, etc. who owns the project): NEOMODE ASSOCIATES 2. Print Owner/Signing Official's name and title (person legally responsible for facility and compliance): Sam Saleh, General Mahager 3. Mailing Address for person listed in item 2 above: y y Neomode Associates,?3817-Bery1 Road city:_ Raleigh State: NC Zip: 27607 Telephone Number: (q14 ) SUN • 3 t1'r 4. S. y y y y ti ti Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, spec fi'cations, letters, operation and maintenance agreements, etc.): Powell Driret ffice Building Location of Project (street-address): 719 Pnwp11 DriVP , City: Raleigh County: Wake 6. Directions to project (frgm nearest major intersection 600 feet south of intersection of-Hillsborough Street and Powell Drive 0 7. Latitude: 78 - 42' Longitude: . 350 - 47 of project 8. Contact person who can answer questions about the project: Name: Frank Braxton * Telephone Number. 919 i 859-2243 II. PERMIT INFORMATION: . . 1. Specify whether project is (chgclc one): New Renewal. . modification r Form SWU-101 Version'3.99 ' Page 1 of 4 7. How was the off-site impervious area listed above derived?-,'. GiS data. from the City of Raleigh and--field inspection IV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS The following italicized deed restrictions and protective covenants are required to be recorded for all subdivisions, outparcels and future development prior to the sale of any lot. If lot sizes vary significantly, a table listirti .,each lot number, size and the allowable built-upon area for each lot must be provided as an attachmeFtt 1.:., u ,, 1. The fD"ing covenants are intended to ensure ongoing compliance with state stormwater management permit number as issued by the Division of Water Quality. These covenants may not be changed or deleted without the consent of the State. 2. No more than square feet of any lot shall be covered by structures or impervious materials. Impervious materials include asphalt, gravel, concrete, brick, stone, slate or similar material but do not include wood decking or the water surface of swimming pools. 3. Swales shall not be filled in, piped, or altered except as necessary to provide driveway crossings. 4. Built-upon area in excess of the permitted amount requires a state stormwafer management permit ermit niodi cation Prior to construction. 5. All permitted runoff from outparcels or future development shall be directed into the permitted stormwater control system. These connections to the stormwater control system shall be performed in a manner that maintains the integrity and performance of the system as permitted. By your signature below4 you certify that the recorded deed restrictions and protective covenants for this project shall include all the applicable items required above, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the State, and that they will be recorded prior to the sale of any lot. V. SUPPLEMENT FORMS The applicable state stormwater management permit supplement form(s) listed below must be submitted for each BMP specified for this project. Contact the Stormwater and General Permits Unit at (919) 733-5083 for the status and availability of these forms. ` Form SM-102 Wet Detention Basin Supplement Form SWU-103 Infiltration Basin Supplement Form SWU-104 Low Density Supplement Form SWU-105 Curb Outlet System Supplement Form SWU-106 Off-Site System Supplement Form SWU-107 Underground infiltratioriTrench Supplement Form SWU-108 Neuse River Basin Supplement Form SWU-109 Innovative Best Management Practice Supplement Form SWU-101 Version 3.99 Page 3 of 4 STORMWATER TREATMENUMANAGEMENT NARRATIVE POWELL DRIVE OFFICE BUILDING Neomonde Associates 3817 Beryl Road Raleigh, NC 27607 The subject property is a 2.734 acre parcel, located in the City of Raleigh, and zoned for industrial use. As part of the planning process, the Owner was granted (by the Environmental Management Commission, 7/9/98) a conditional variance from the Neuse River Riparian Area rule. As a condition, a Stormwater Management Plan acceptable to the Division of Water Quality is required. The proposed Stormwater Plan for the Powell Drive Office Building will consist of a subsurface conveyance system connected to an Extended Detention Stormwater Wetland. Additionally, the site development will embrace approximately 264 LF of stream relocation and restoration. Due to the site's landscape position, contributing off-site drainage will be included in the calculated designs. NITROGEN LOADING The site's estimated nitrogen loading calculations were obtained from the "Town of Chapel Hill, Stormwater Impact Statement Guidelines" and submitted as an attachment. The estimated nitrogen load for a 2.734 acre industrial use is calculated to be 30.62 lb/yr. The removal efficiency of a detention pond/wetland is estimated to be 30%. The resulting nitrogen load with BMP is calculated to be 21.43 lb/yr. STORMWATER PLAN The site's proposed drainage system will capture the off-site drainage as it enters the site via a catch basin or sheet flow directly into the BMP's forebay. The on-site drainage will be directed toward a series of drop inlets and catch basins and outlet into the BMP's forebay. The culvert outlet will be armored with Class B rip rap to serve as velocity dissipater and scour protection. The forebay will serve as a stilling basin and sediment basin. The pool and forebay shall require routine inspection and maintenance to prevent sediment build up. The forebay is separated from the permanent pool by a small dam/weir and is included in the surface and storage calculations. The permanent pool is designed with varying depths to allow shallows for wetland planting and temporary detention of stormwater runoff. The proposed BMP is an Extended Detention Stormwater Wetland as outlined in the NCDENR "Stormwater Best Management Practices". The base elevation is 288.0, the permanent pool surface elevation is 292.0 with a surface area of 5,006 SF. The required permanent pool surface area based on an SA/DA ratio of 2.61 and a drainage area of 4.15 acres is 4.700 SF. The permanent pool surface area is subdivided 1,749 SF at 0-9" depth, 1,752 SF at 9"-18" depth, 750 SF Forebay and 755 SF Outlet Pool. The storage volume from the 1" rain depth is 10,394 CF and calculated to a surface elevation of 293.75 = primary outlet weir crest. The top of S ti ti POWELL DRIVE OFFICE BUILDING NARRATIVE, PAGE 2 dam elevation is 294.75. A 11/2" galvanized pipe will be installed through the dam and set with inlet invert at elevation 292.0. The draw down time of the 1" rain depth storage is calculated to be 4.91 days. A routing of the post development rainfall events indicated that the proposed weir will handle the 10 and 100 year storm and not overtop the dam. The primary outlet is a 25 feet long weir with Class I rip rap on the backside slope. Manning's with an n-value of 0.104, Z= 3:1, b=25', d=1', s=20%, Td=5.0 calculated to a d10=0.33', V10=2.95fps and a T = 4.12. The rip rap will serve to spread the runoff and reduce the velocity prior to entering the stream. .0 Guidelines Page l of5 Town of Chapel Hill Stormwater Impact Statement Guidelines (Effective January 1, 1997) INTRODUCTION All applications for developments or- subdivisions which create four (4) or more lots and all Special Use Permit applications within the Town of Chapel Hill planning jurisdiction must include a Stormwater Impact Statement. Stormwater Impact Statements submitted to the Town of Chapel Hill shall comply with the Stormwater Impact Statement guidelines. We encourage each applicant to.arrange a pre=application meeting with Town staff to clarify any issues afld to determine -the scope of the analysis. Affirmative exemption to all or part of the requirements of the Stormwater Impact Statement -may be granted by the Town Manager. f SITE ANALYSV? A. site analysis 'shall be. provided with the submittal of a Stormwater Impact Statement. Characteristics of the existing site and proposed development shall include the following: -A. Land use and density; B. Location; C. Phasing and timing of project; and D. Delineation of Resource Conservation Districts, wetlands, Federal/State wildlife lands, and any designated FEMA floodplain/floodway areas. A map or maps shall be included in the Stormwater Impact Statement detailing site location,. existing and .proposed stormdrainage system(s); stormwater detention structures, and Resource Conservation District location(s). The maps must present these existing and proposed conditions at a scale and quality suitable to include all impacted areas (on and off-site) as agreed upon in the initial consultation meeting with Town staff. , Guidelines Page 2 of S IMPACT STATEMENT ANALYSES A. SCOPE OF IMPACTED AREA A pre-application meeting with Town staff is encouraged to determine upstream and downstream limits of study to be included in the Stormwater Impact Statement, and to define study elements required. Possible study elements of concern may include, but are not limited to: 1. Backwater impacts; -2: Effects on-existing- upstream and/or downstream drainage conveyance facilities; 3. Upstream and/or downstream flow volumes; 4. Ability of natural drainage channel to handle additional volumes and velocities; 5. Potential mitigation measures; and 6. Site-specific considerations. B. "HYDROS" STORM-WATER MODEL Acoepted engineering -practice ? e.: "HYDROS", Rational, or SCS Method) will be required with the Stormwater Impact Statement to generate both pre-development and post-development stormwater flow data. Final "HYDROS" calculations and a detailed stormwater management plan must be submitted and approved before a Zoning Compliance Permit (ZCP) for any phase of the proiact will be issued. C. POLLUTANT LOADING Pollutant. loading calculations shall be provided with the - Stormwater Impact Statement. Nonpoint pollution monitoring studies have indicated that annual "per acre" - discharges of urba4, stormwater pollution (nutrients, metals, toxic organic compounds, etc.) are directly related'to the density of impervious surfaces and types of land uses. Because receiving waters such as creeks and ponds are affected by stormwater pollutant. loads, it is important to monitor and inventory the impacts created by new' development. Yearly loads are calculated by multiplying the area of each land .use by the appropriate loading coefficient as provided in Table 1... Required calculations shall include the pollutant loading of total nitrogen, total phosphorus, zinc, and lead. 1 1 1 f 1 y y y y y y y y y Guidelines Page 3 of 5 'T'ABLE 1 Chapel Hill Pollutant Loading Coefficients <ib/acre/yr) * LAND USE TYPE w Density esidenual (< 12% impervious or < 1 unit/acre) TOTAL N 5.2 TOTAL P 0.7 ZINC (Zn).. 0.2 LEAD.(Pb) ( 2 Moderate/High Density Residential (> 12% impervious or > 1 unit/acre) 7.4 1.2 0.5 0.5 Office/institutional 8.8 1.6 0.4 5 Commercial 13.2 1.6 2.1 2.6 Industrial 11.2 1.4 1.6 2.0 Undeveloped/Forest/Open 0.6 0.08 0 0 Pasture _2.6 0.5 0 0 * Values calibrated for the Town of Chapel Hill and based on data from Hartigan (1983), CDM (1989), Haith (1992), and Schueler (1987). In order to perform these loading calculations, the land use types and relative acreage. must first be determined. For example, a proposed development contains 100 residential half acre lots (moderate d&nsity). A 20 acre commercial district is also planned. The remaining tracts (15 acres) will remain undeveloped open space. The total nitrogen loading calculations for this proposed development would be as follows: Moderate Residential - 100 lots x 1/2 acre ......... ' 50 acres. x 7.4 ................................................... ........................... ..... 50 acres - 3701b/yr ?gmmercial - 20 acres x 13.2 .......................................:........ 264 lb/yr Undeveloped - 15 acres x 0.6 ............. ..... 9 lb/yr Total Nitrogen Load ... ................................................................643 lb/yr Reductions in these loading rates can be achieved with various. stormwater Best Management Practices (BMPs). These BMPs include, but are not limited to, detention/retention ponds, stormwater wetlands, grassed swales., filter strips, and natural vegetative buffers.. Previous studies have reported a wide range of pollutant removal efficiency rates for each BMP. Table 2provides a summary of these rates to be used for pollutant reduction calculations. The ,appropriate rate selected for each .calculation 'should reflect design, operation, maintenance plans, and best judgment. 1 1 1 1 i 1 1 1 1 1 1 1 y 1 y Guidelines Page 4 of 5 TABLE 2 Pollutant Removal Efficiency of Urban Stormwater BMPs (Percent Reduction)*. Stormwater BMPs Total N Total P Lead (Pb) Zinc'(Zn) Retention Ponds 40 - 70 50 - 80 60 = 95 30-70 Detention Ponds 10 - 40 40 - 60 50-90., 30 - 60 Wetlands 20 - 30 40 - 60 30 -'790 30 - 80 Grassed Swales 10 - 20 20 - 40 20 - 40 20 - 40 Filter Strip/Buffers 10 - 20 20 - 40 F20-40 20 - 40 * Efficiency rates are approximated from Urtimas and Stahre (1993), Schueler (1987), and Field (1993). For example, grassed swales in sequence with a detention pond have been proposed. for the -previous development scenario. Without stormwater BMPs, the nitrogen loading rate was determined to be 643 lb/year. The proposed detention pond has been designed with asediment forebay; extended detdntion (five days) for the first inch of rainfall, additional storage for runoff from the 10 year storm, a 4:1 length to width ratio, and a comprehensive scheduled maintenance and inspection plan. The grassed swales are designed with less than five (5%) percent slopes, concrete check darns, and a routine mowing and inspection plan. The total nitrogen reduction -rate for the detention pond and grassed swales are selected from Table 2 and estimated to be 35 and 20 percent, respectively. The new projected load for the development -is,*, culated as follows: Total N Reduction with Swaies 643 lb/yr x-0.20 .................................:......129 lb/yr 643 - 129 ................................................. 514 lb/yr Total N Reduction with Detention - 514 lb/yr x 0.35 ................................... ..... 1801b/yr 514 - 180 .......................................334 lb/yr Total N Reduction without BMPs ...............................................................643 Ib/yr Total N Load with BMPs .........................................................................334 lb/yr D. EROSION AND SEDIMENT MANAGEMENT The Stormwater Impact Statement must include a description of the proposed erosion and sediment control measures. This description should include a list of control devices and placements necessary to comply with the requirements of the Chapel Bill Erosion and Sedimentation Control Ordinance which is enforced by the Orange County Sedimentation and Erosion Control Officer. A phasing schedule for construction and/or removal of -proposed. control devices will also be 'required to ensure adequate protection for all--phases of the development. Guidelines Poge 5 of 5 E. MITIGATION MEASURES If calculations indicate that post-development rate of runoff exceeds predevelopment rate, mitigation measures will be recommended. Mitigation measures may also be recommended for those developments that would significantly impact water quality based--on the Stormwater Impact Statement findings. According to the location of the proposed development, trdtigation measures. may include, but are not limited to inlet/outlet control, reinforced channels, stormwater outfalls to open land, curb cuts, grassed swales,, detention facilities, and/or retention facilities. r F. MAINTENANCE AND INSPECTION PLAN The Stormwater Impact Statement for developments proposing stormwater control facilities shall include a maintenance and inspection plan. This plan should detail the types and frequency of inspection and maintenance operations (major and minor), equipment necessary to perform maintenance activities, access to the stormwater control facility, and' disposal methods for contaminated materials should they occur. The parry or parties responsible for maintenance.and details of all bonds, letters of credit, etc., must be placed on record with the Town. If you have any questions regarding these guideline, contact Mr. Michael Neal in the Town Engineering Department at (919) 968-2833. ' REFERENCES. CITED CDM. 1989. Watershed Management Study: Lake Michie and Little River Reservoir Studies. Field, Richard, M.L. O'Shea and K.K. Chin. 1993. Integrated Stormwater Management. Lewis Publishers. Boca Raton, FL. Haith, D.A., et al. 1992. Generalized Watershed Loading Functions: User's Manual. NY. Hartigan, J.P., et al. 1983. Calibration of NPS Model Loading Factors. Journal of Environmental Engineering Division. 109: no. 6 pp. 1259-1272. Schueler, Thomas R. 1987. Controlling Urban' Runoff: A Practice Manual for Planning and Designing Urban BMPs. Metropolitan Washington Council of Governments, Washington, DC. Urbonas, Ben, and P. Stahre. 1993. Stormwater Best Management Practices and Detention. Prentice Hall. Englewood Cliffs, NJ. r i 1. 1 4- 1 1 STORMWATER MANAGEMENT PERMIT APPLICATION FORM Thu form may be photocopied for use as an original GENERAL INFORMATION 1. Applicants name (specify the name of the corporation, individual., etc. who owns the project): NEOMODE ASSOCIATES 2. Print Owner/Signing Official's name and title (person legally responsible for facility and compliance): Sam Saleh, General Mafiager 3. Mailing Address for. person listed in item 2 above: V Neomode Associates, 3817 Beryl Road City:_ Raleigh State: NC Zip: 27607 Telephone Number. ( q I q ) X32% 4. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, spe%fications, letters, operation and maintenance agreements, etc.): Powell Dr retOffice Buildin . S. Location of Project•(street.address)*: 217 PnwPll nrivs City y, _ Bale i h - County: Wake 6. Directions to project (frgm nearest major intersection): 600 feet south of intersection of'Hillis borough Street and Powell Drive 7. Latitude: 780 - 42' Longitude: 350 - 47R of project 8. Contact person who can answer questions about the project: Name: Frank Braxton ' 919 859-2243 Telephone Number. 11. PERMIT INFORMATION: 1. . Specify whether project is (check one--!-New . Renewal.. Form SWU-101 Versionr3.99 ' Page 1 of 4 Modification '•t State of North Carolina Department of Environment and Natural Resources Division of Water Quality 4- y 7. How was the off-site impervious area listed above derived? ;. GIS data . from the City of •Rale•igh and-field inspection i IV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS The following italicized deed restrictions and protective covenants are required to be recorded for all subdivisions, outparcels and future development prior to the sale of any lot. if lot sizes vary significantly, a table Listu .each lot number, size and the allowable built-upon area for each lot must be provided as an attachmeF I. The fgfoowing covenants are intended to ensure ongoing compliance with state stormwater management permit number as issued by the Division of Water Quality. These covenants may not be changed or deleted without the consent of the State. 2. No more than square feet of any lot shall be covered by structures or impervious materials. Impervious materials include asphalt, gravel, concrete, brick, stone, slate or similar material but do not include wood decking or the water surface of swimming pools. 3. Swales shall not be filled in, piped, or altered except as necessary to provide driveway crossings. 4. Built-upon area in excess of the permitted amount requires a state stormwpter management permit modification prior to construction. 5. All permitted runoff from outparcels or future development shall be directed into the permitted stormwater control system. 73tese . connections to the stormwater control system shall be performed in a manner that maintains the integrity and performance of the system as permitted. By your signature befo%W you certify that the recorded deed restrictions and protective covenants for this project shall include all the applicable items required above, that the covenants will be binding on all parties and persons claiming under therm that they will lira with the land, that the required covenants cannot be changed or deleted without concurrence from the State, and that they will be recorded prior to the sale of any lot. V. SUPPLEMENT FORMS 44J The applicable state stormwater management permit supplement form(s) listed below must be submitted for each BMP specified for this project. Contact the Stornwater and General Permits Unit at (919) 733-5083 for the status and availability of these forms. ` Form SWU-102 Form SWU-103 Form SWU-104 Form SWU-105 Form SWU-106 Form SWU-107 Form SWU-108 Form SWU-109 Wet Detention Basin Supplement Infiltration Basin Supplement Low Density Supplement Curb Outlet System Supplement Off-Site System Stipplenient Underground Infiltratidn Trench Supplement Neuse River Basin Supplement Innovative Best Management Practice Supplement Form SWU-101 Version 3.99 Page 3 of 4 STORMWATER TREATMENT/MANAGEMENT NARRATIVE POWELL DRIVE OFFICE BUILDING Neomonde Associates 3817 Beryl Road Raleigh, NC 27607 The subject property is a 2.734 acre parcel, located in the City of Raleigh, and zoned for industrial use. As part of the planning process, the Owner was granted (by the Environmental Management Commission, 7/9/98) a conditional variance from the Neuse River Riparian Area rule. As a condition, a Stormwater Management Plan acceptable to the Division of Water Quality is required. The proposed Stormwater Plan for the Powell Drive Office Building will consist of a subsurface conveyance system connected to an Extended Detention Stormwater Wetland. Additionally, the site development will embrace approximately 264 LF of stream relocation and restoration. Due to the site's landscape position, contributing off-site drainage will be included in the calculated designs. NITROGEN LOADING The site's estimated nitrogen loading calculations were obtained from the "Town of Chapel Hill, Stormwater Impact Statement Guidelines" and submitted as an attachment. The estimated nitrogen load for a 2.734 acre industrial use is calculated to be 30.62 lb/yr. The removal efficiency of a detention pond/wetland is estimated to be 30%. The resulting nitrogen load with BMP is calculated to be 21.43 lb/yr. STORMWATER PLAN The site's proposed drainage system will capture the off-site drainage as it enters the site via a catch basin or sheet flow directly into the BMP's forebay. The on-site drainage will be directed toward a series of drop inlets and catch basins and outlet into the BMP's forebay. The culvert outlet will be armored with Class B rip rap to serve as velocity dissipater and scour protection. The forebay will serve as a stilling basin and sediment basin. The pool and forebay shall require routine inspection and maintenance to prevent sediment build up. The forebay is separated from the permanent pool by a small dam/weir and is included in the surface and storage calculations. The permanent pool is designed with varying depths to allow shallows for wetland planting and temporary detention of stormwater runoff. The proposed BMP is an Extended Detention Stormwater Wetland as outlined in the NCDENR "Stormwater Best Management Practices". The base elevation is 288.0, the permanent pool surface elevation is 292.0 with a surface area of 5,006 SF. The required permanent pool surface area based on an SA/DA ratio of 2.61 and a drainage area of 4.15 acres is 4.700 SF. The permanent pool surface area is subdivided 1,749 SF at 0-9" depth, 1,752 SF at 9"-18" depth, 750 SF Forebay and 755 SF Outlet Pool. The storage volume from the I" min depth is 10,394 CF and calculated to a surface elevation of 293.75 = primary outlet weir crest. The top of POWELL DRIVE OFFICE BUILDING NARRATIVE, PAGE 2 dam elevation is 294.75. A 11/2" galvanized pipe will be installed through the dam and set with inlet invert at elevation 292.0. The draw down time of the 1" rain depth storage is calculated to be 4.91 days. A routing of the post development rainfall events indicated that the proposed weir will handle the 10 and 100 year storm and not overtop the dam. The primary outlet is a 25 feet long weir with Class I rip rap on the backside slope. Manning's with an n-value of 0.104, Z= 3:1, b=25', d=1', s=20%, Td=5.0 calculated to a d l 0=0.3 3', V 10=2.95fps and a T = 4.12. The rip rap will serve to spread the runoff and reduce the velocity prior to entering the stream. 1 Guidelines Page / of 5 Town of Chapel Hill Stormwater Impact Statement Guidelines (Effective January 1, 1997) " INTRODUCTION All applications for developments or- subdivisions which create four (4) or more lots and all Special Use Permit applications within the Town of Chapel Hill planning jurisdiction must include a Stormwater Impact Statement. Stormwater Impact Statements submitted to the Town of Chapel Hill shall comply with the Stormwater Impact Statement guidelines. We encourage each applicant to arrange a pre-application meeting with Town staff to clarify any issues and to determine "the scope of the analysis. Affirmative exemption to all or part of the requirements of the Stormwater Impact Statement may be granted by the Town Manager. SITE ANALYSIS A. site analysis shall be. provided with the submittal of a Stormwater Impact Statement. Characteristics of the existing site and proposed development shall include the following: A. Land use and density; B. Location; C. Phasing and timing of project; and D. Delineation of Resource Conservation Districts, wetlands, Federal/State wildlife lands, and any designated FEMA floodplain/floodway areas. A map or maps shall be included in the Stormwater Impact Statement detailing site location,. existing and "proposed stormdrainage system(s), stormwater detention structures; and Resource Conservation District location(s). The maps must present these existing and proposed conditions at a scale and quality suitable to include all impacted areas (on and off-site) as agreed upon in the initial consultation meeting with Town staff. Guidelines Page 2 of5 IMPACT STATEMENT ANALYSES A. SCOPE OF IMPACTED AREA A pre-application meeting with Town staff is encouraged to determine upstream and downstream limits of study to be included in the Stormwater Impact Statement, and to define ' study elements required. Possible study elements of concern may include, but are not limited to: 1. Backwater impacts; 2: Effects on existing- upstream and/or downstream drainage conveyance facilities; ' 3. Upstream and/or downstream flow volumes; 4. Ability of natural drainage channel to handle additional volumes and velocities; 5. Potential mitigation measures; and ' 6. Site-specific considerations. B. "HYDROS" STORMWATER MODEL Acoepted engineering practice {i.e.: "HYDROS", Rational, or SCS Method will be required with the Stormwater Impact Statement to generate both pre-development and post-development stormwater flow data. Final "HYDROS" calculations and a detailed stormwater management plan must be submitted and approved before a Zoning Compliance Permit (ZCP) for any phase of the project will be issued. C. POLLUTANT LOADING Pollutant. loading calculations shall be provided with the Stormwater Impact Statement. Non int pollution monitoring studies have indicated that annual "per acre"*- discharges of urba#•. stormwater pollution (nutrients, metals, toxic organic compounds, etc.) are directly related'to the density of impervious surfaces and types of land uses. Because receiving waters such as creeks and ponds are affected. by stormwater pollutant loads, it is important to monitor ' and inventory the impacts created by new' development. Yearly loads are calculated by multiplying the area of each land use by the appropriate loading coefficient as provided in Table 1. Required calculations shall include the pollutant loading of total nitrogen, total phosphorus, zinc, and lead. 7 1 1 1 Guidelines Page 4 of S' TABLE 2 Pollutant removal Efficiency of Urban Stotmwater BMPs (Percent Reduction)*. Stormwater BMPs Total N Total P Lead (Pb) Zinc-(Zn) Retention Ponds 40 - 70 50 - 80 60 = 95 30 - 70 Detention Ponds i0 - 40 40 - 60 50-.901., 30 - 60 Wetlands 20 - 30 40 - 60 30 - 90 30 - 80 Grassed Swales 110-20 20 - 40 20 - 40 20 - 40 Filter Strip/Buffers 10-210 20 - 4,0 20 - 40 20 - 40 Efficiency rates are approximated from Urbonas and Stahre (1993), Schueler (1987), and Field (1993). For example, grassed swales in sequenoe with a detention pond have been proposed, for the -previous development scenario. Without stormwater BMPs, the nitrogen loading rate was determined to be 643 lb/year.. The proposed detention pond has been designed with a sediment forebay; extended detdntion (five days) for the first inch of rainfall, additional storage for runoff from the 10 year storm, a 4:1 length to width ratio, and a comprehensive scheduled maintenance and inspection plan. The grassed swales are designed with less than five (5 %) percent slopes, concrete check dams, and a routine' mowing and inspection plan. The total nitrogen reduction rate for the detention pond and grassed swales are selected from Table 2 and estimated to be 35 and 20 peroent, respectively. The new projected load for the development is calculated as follows: Total N Reduction with Swa'les -643 lb/yr x-0.20 .........................................129 lb/yr 643 - 129 ................................................. 5141b/yr Total N Reduction with Detention - 5141b/yr x 0.35 .........................................180 lb/yr 514 - 180 ....................................... 334 lb/yr Total N Reduction without BMPs ...............................................................643 lb/yr Total N Load with BMPs .........................................................................334 lb/yr D. EROSION AND SEDIMENT MANAGEMENT The Stormwater Impact Statement must include a description of the proposed erosion and sediment control measures. This description should include a list of control devices and placements necessary to comply with the requirements of the Chapel Hill Erosion and Sedimentation Control Ordinance which is enforced by the Orange County Sedimentation and Erosion Control Officer. A phasing schedule for construction and/or removal of proposed control devices will also be required to ensure adequate protection for atl - phases of the development. i r i i i Guidelines Page 5 of 5 E. MITIGATION MEASURES If calculations indicate that post-development rate of runoff exceeds predevelopment rate, mitigation measures will be recommended. Mitigation measures may also be recommended for those developments that would significantly impact water quality basedbn the Stormwater Impact Statement findings. According to the location of the proposed development, mitigation measures. may include, but are not limited to inlet/outlet control, reinforced channels, stormwater outfalls to open land, curb cuts, grassed swales,. detention facilities, and/or retention facilities. F. MAINTENANCE AND INSPECTION PLAN The Stormwater Impact Statement for developments proposing stormwater control facilities shall include a maintenance and inspection plan. This plan should detail the types and frequency of inspection and maintenance operations (major and minor), equipment necessary to perform maintenance activities, access to the stormwater control facility, and disposal methods for contaminated materials should they occur. The party or parties responsible for maintenance. and details of all bonds, letters of credit, etc., must be placed on record with the Town. If you have any questions regarding these guidelines, contact Mr. Michael Neal in the Town Engineering Department at (919) 968-2833. ' REFERENCES CITED CDM. 1989. Watershed Management Study: Lake Michie and Little River Reservoir Studies. Field, Richard, M.L. O'Shea and K.K. Chin. 1993. Integrated Stormwater Management. Lewis Publishers. Boca Raton, FL. Haith, D.A., et al. 1992. Generalized Watershed Loading Functions: User's Manual. NY. Hartigan, J.P., et al. 1983. Calibration of NPS Model Loading Factors. Journal of Environmental Engineering Division. 109: no. 6 pp. 1259-1272. Schueler, Thomas R. 1987. Controlling Urban'Runoff: A Practice Manual for Planning and Designing Urban BMPs. Metropolitan Washington Council of Governments, Washington, DC. Urbonas, Ben, and P. Stahre. 1993. Stormwater Best Management Practices and Detention. Prentice Hall. Englewood Cliffs, NJ. H. REQUIRED ITEMS CHECKLIST II.a. This BMP is an Extended Detention Stormwater Wetland and the depth of pool is limited to 3 feet with a larger area designed to be at a depth of 0-1.5'. II.b. Forebay volume is approximately 20% of the calculated permanent pool volume. In this particular case, the BMP is receiving flow from the adjacent properties and site constraints limited the available area for the total 20% forebay of the designed total basin volume. II.c. The temporary pool provides little storage of the 10 year storm event and is neither designed nor required (by local code) to serve as a runoff control. II.e. A 30-foot vegetative filter is not provided due to site limitations. The primary outlet device is a 25 feet weir with the backside armored with rip-rap to reduce the flow velocity and serve to spread the flow prior to entering the stream. II.f. The basin length to width ratio is 2:1 due to site limitations. II.g. The side slopes above the permanent pool to the top of dam are 3:1. The side slopes above the dam elevation are 2:1 and 3:1 where space allows. II.k. The BMP is located on a single lot that will remain under one ownership. 1 1 1 1 1 1 1 1 1 1 1 WET DETENTION BASIN SUPPLEMENT This form may be photocopied for use as an original DWQ Stormwater Management Plan Review: A complete stormwater management plan submittal includes an application form, a wet detention basin supplement for each basin, design calculations, and plans and specifications showing all basin and outlet structure details. 1. PROJECT INFORMATION Project Name: Powell Drive office Building Contact Person: Frank Braxton Phone Number: (919 ) 859-2243 For projects with multiple basins,. specify which basin this worksheet applies to: elevations Basin Bottom Elevation 288 ft. Permanent Pool Elevation 292 ft. Temporary Pool Elevation 293.75 ft. areas Permanent Pool Surface Area i A 5 ., 0 0 6 4 15 sq. ft. ,.. pra nage rea . ac. Impervious 4pm 2.67 ac. volumes Permanent Pool Volume -6, 887 cu. ft. Temporary Pool Volume 11, 2 3 7 cu. ft. Forebay Volume 1, 300 Cu. ft. Other parameters SAIDA1 2.61 Diameter of Orifice 1.5 in. Design Rainfall 5.6 in.. ...:.Design TSS Remoyal ? .•:. $5 % Permit No. State of North Carolina Department of Environment and Natural Resources Division of Water Quality (to be provided by DWQ) STORMWATER MANAGEMENT PERMIT APPLICATION FORM (floor of the basin) (elevation of the orifice) (elevation of the discharge structure overflow) (water surface area at the orifice elevation) (on-site and off-site drainage to the basin) (on-site and off-site drainage to the basin) (combined volume of main basin and forebay) (volume detained above the permanent pool) (approximately 20% of i@fabvv1=e) PP. V o Lu Vrl c. , (surface area to drainage area ratio from DWQ table) (2 to 5 day temporary . pool draw-down required) 10 yr. SCS (minimum 85% required) Form SWU-102 Rev 3.99 Page 1 of 4 1 Maintenance activities :;hall be performed as follows: 1. After every signific4 nt runoff producing rainfall event and at least monthly: a. Inspect the wet detention basin system for sediment accumulation, erosion, trash accumulation, vegetated cover, and general condition. b. Check and clear the orifice of any obstructions such that drawdown of the temporary pool occurs within 2 to 5 days as designed. 2. Repair eroded areas imm,:diately, re-seed as necessary to maintain good vegetative cover, mow vegetative cover to maintain a maximum height of six inches, and remove trash as needed. 3. Inspect and repair the collection system (i.e. catch basins, piping, swales, nprap, etc.) quarterly to maintain proper functioning. 4. Remove accumulated sediment from the wet detention basin system semi-annually or when depth is reduced to 75% of the originid design depth (see diagram below). Removed sediment shall be disposed of in an appropriate manner and shall be handled in a manner that will not adversely impact water quality (i.e. stockpiling near a wet detention basin or stream, etc.). The measuring device used to e'etermine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 3 feet in the main pond, the sediment shall be removed. When the permanent,pool depth reads 3 feet in the forebay, the sediment shall be removed. BASIN DIAGRAM (fill in the blanks) V Permanent Pool Elevation 292 Sediment Re oval El. 289 75 :. -------------- - Sediment Removal Elevation 289 -- Bottom Ele gion 2.88 96 --------------------------------------------- L25%j Bottom Elevation 288 FOREBAY MAIN POND 5. Remove cattails and other indigenous wetland plants when they cover 50% of the basin surface. These plants shall be encouraged to grow along the vegetated shelf and forebay berm. 6. -If.the.basin must.be.drained for an emergency or to..:perforrn maintenance, the flushing of sediment through the emergency drain shall be minimized to the maximum extent practical. Form SWU402 Rev 3.99 Page 3 of '4 C D 1 1 1 1 1 y y y 1 1 1 y y y y T LOCATION DATA CaT 17, 00_ d o CD LOGa-tk o0J Nt4P ?\t i 00 r O srrE /^V, / O V r 6 Q o 0 ? Q r t:1-7- 0- El 0 o r a p 00 NOT TO SCALE 1 1 a_ ¦ ¦ SOIL SURVEY DATA Cn m C¢C2 n h QI d z N N C O 1 N N m u N i (Joins sheet 4E) -.ai 5 WAKE COUNTY, NORTH CAR01 1 1 1 1 1 1 1 1 t I SITE DRAINAGE DATA 1 1 1 1 1 f 1 0 u I p4 ,r ? ? ? 7,4 9 4? O P: o a? 6 0 4 0 ?, ,, _ , „ _ o ? ssvaag a \ ? ? \ \ \ ? \ \ ? _ IV.LOS d 'd aAO.MlV3 ?JZIVHOSIa O ` N . (? _ 1 C? Ira WO UtI 2JliYH3SIa 4 6" VIC' S ?`' A ` ` - r b z ?.Llsxalxl ir -x IL F r Z z O 140 SM.L U I ? 0 vaxv Rovxlvxa a t- $ -s-- °' -- ?, -r o UaO'IS SSOHO Z ' e ? o gavuo f r'7 ' O. ?. O - ar \ 1 1 -1 ? a a F: xOI.L?'A3'I? d ?- z N N N E. z o xOLLYIs o x F Z U Q -' N M N r ,^ I 1 1 1 1 1. 1 1 1 1 M 1 1 ZI- ? V C, O I ? 7• H w •-- ? jo _0 ?' N ?1 N M M N 0 IA-7 ® CQ cC Z U V Y ?' '?"' ? `` D? On ? QO C U O ? ? ? ? Q U p U (? Q z C:1 .a T n ? .a z ?- v+ ?? ?n cT A ~ N o- m V C m 0 T~ ? 1` ofl A CS _ N . r r i.. H ?o N z .9 Jc S1• -? J? ,o A O U ?? 0 O O D x 0 0 0 p Z E- 0i Z w ? ? ti O ? U o °? • cJ ? c - 6' - 9 ? O a- r r ? r ?? ? ; W ? r r_ q ? - 0 ? ? .00 ? -'.. cJ Q O o Q cJ c? \f% - ap Cf" 0 _ t ._ t1 "M Al, - L - '- -' t c? c=l W O I I A I o? ca F 0 0 a A? v a r M P ? N N ? ? N N ? ?' ? N N cal M N N a- a' a' (sr Aji cT c1' .9 N 9 N N cj ?' N N Al. o CS ? 0 0 Cl) O p 0 0 © (J o 0 4 0 Q p Cl) ° as v0 w q o Q 0 0 0 1 yJ1( a :9 ?- ?'. 1r? v? ? 7r 9 V+ ?r Jt ? p0 ..9 cJ 7 ?r r r, In 40 F _? S cA -, 9 d? I A N N N ? ? N ? ? N N o c ? a p z - -r 40 v Ga c`) c 1 c l C? f G 1 0 1 1 1 1 1 1 1 1 4 1 1 M y M i SCS UNIT HYDROGRAPH 10 YEAR Type.... SCS Unit Hyd. (HYG output) Page 6.10 Name.... DEVELOPED-POST Tag: Dev.10 Event: 10 yr File.... C:\HAESTAD\PPKW\SAMPLE\POWELLDRIVE-POST2.PPW Storm... TypeII 24hr Tag: Dev.10 SCS UNIT HYDROGRAPH METHOD STORM EVENT: 10 year storm Duration = 24.0000 hrs Rain Depth = 5.6000 in Rain Dir = C:\HAESTAD\PPKW\RAINFALL\ Rain File -ID = SCSTYPES.RNF - TypeII 24hr Unit Hyd Type = Default Curvilinear HYG Dir = C:\HAESTAD\PPKW\SAMPLE\ HYG File - ID = POWELLDR.HYG - DEVELOPED-POST Dev.10 Tc = .1000 hrs Drainage Area = 4.050 acres Runoff CN= 93 Calc.Increment= .01333 hrs Out.Incr.= .0833 hrs HYG Volume = 1.611 ac-ft HYDROGRAPH ORDINATES (cfs) Time Output Time increment = .0833 hrs hrs Time on left represents time for first value in each row. --------- ------- 2.4157 ---------- .00 ----------- .00 --------- .01 --------------- .01 ---------- .01 2.8322 .02 .02 .03 .03 .04 3.2487 .04 .04 .05 .05 .06 3.6652 .06 .06 .07 .07 .08 4.0817 .08 .09 .09 .09 .10 4.4982 .10 .11 .11 .12 .12 4.9147 .13 .13 .14 .14 .15 5.3312 .15 .16 .16 .17 .17 5.7477 .18 .18 .19 .20 .20 6.1642 .21 .21 .22 .22 .23 6.5807 .23 .24 .24 .25 .25 6.9972 .26 .26 .27 .27 .28 7.4137 .28 .29 .30 .30 .31 7.8302 .31 .32 .32 .33 .34 8.2467 .36 .37 .39 .41 .42 8.6632 .44 .46 .47 .49 .51 9.0797 .52 .53 .54 .54 .54 9.4962 .55 .56 .58 .60 .63 9.9127 .66 .69 .72 .76 .80 10.3292 .84 .88 .93 .98 1.04 10.7457 1.10 1.17 1.25 1.32 1.43 11.1622 1.56 1.72 1.89 2.06 2.25 11.5787 3.74 6.67 10.80 16.40 26.98 11.9952 23.23 11.68 4.95 3.74 3.23 12.4117 2.80 2.35 2.04 1.86 1.75 12.8282 1.66 1.56 1.46 1.37 1.31 13.2447 1.26 1.21 1.16 1.10 1.05 13.6612 1.01 .98 .94 .90 .86 14.0777 .84 .82 .80 .79 .78 14.4942 .76 .75 .74 .73 .71 14.9107 .70 .68 .67 .66 .65 15.3272 .64 .62 .61 .59 .58 S/N: A21B01706A8C SUNGATE DESIGN GROUP, PA PondPack Ver: 7.0 (325) Compute Time: 08 :50:55 Date: 06-15-2000 Type.... SCS Unit Hyd. (HYG output) Page 6.11 Name.... DEVELOPED-POST Tag: Dev.10 Event: 10 yr File.... C:\HAESTAD\PPKW\SAMPLE\POWELLDRIVE-POST2.PPW Storm... TypeII 24hr Tag: Dev.10 HYDROGRAPH ORDINATES (cfs) Time Output Time increment = .0833 hrs hrs Time on left represents time for first value in each row. -------- 15.7437 - ------------ .57 --------------------- .56 ------------ .54 ---- .53 ------------- .52 16.1602 .51 .51 .50 .50 .49 16.5767 .49 .48 .48 .47 .47 16.9932 .46 .46 .46 .45 .45 17.4097 .44 .44 .43 .43 .42 17.8262 .42 .41 .41 .40 .40 18.2427 .40 .39 .39 .38 .38 18.6592 .37 .37 .36 .36 .35 19.0757 .35 .34 .34 .34 .33 19.4922 .33 .32 .32 .31 .31 19.9087 .30 .30 .29 .29 .29 20.3252 .29 .29 .29 .29 .29 20.7417 .29 .28 .28 .28 .28 21.1582 .28 .28 .28 .28 .28 21.5747 .28 .27 .27 .27 .27 21.9912 .27 .27 .27 .27 .27 22.4077 .27 .27 .26 .26 .26 22.8242 .26 .26 .26 .26 .26 23.2407 .26 .26 .26 .25 .25 23.6572 .25 .25 .25 .25 .25 24.0737 .12 .02 .00 .00 S/N: A21B01706A8C SUNGATE DESIGN GROUP, PA PondPack Ver: 7.0 (325) Compute Time: 08:50:55 Date: 06-15-2000 1 1 1 1 POND VOLUME Type.... Vol: Elev-Volume Page 1.01 Name.... POND File.... C:\HAESTAD\PPKW\SAMPLE\POWELLDRIVE-POST2.PPW Title... Powell Drive Pond Volume USER DEFINED VOLUME RATING TABLE Elevation Volume (ft) (ac-ft) 288.00 .000 289.00 .009 290.00 .024 291.00 .067 292.00 .096 293.00 .224 293.75 .354 294.00 .434 294.75 .524 S/N: A21BO1706A8C SUNGATE DESIGN GROUP, PA PondPack Ver: 7.0 (325) Compute Time: 09:37:18 Date: 06-15-2000 1 1 1 1 1 1 1 1 1 1 1 i- 1 1 r r r 1 L' COMPOSITE OUTFLOW SUMMARY Type.... Composite Rating Curve Name.... OUTLET File.... C:\HAESTAD\PPKW\SAMPLE\POWELLDRIVE-POST2.PPW ***** COMPOSITE OUTFLOW SUMMARY **** WS Elev, Total Q Elev. Q ft cfs -------- 292.00 ------- .00 292.50 .03 293.00 .03 293.25 .03 293.50 .04 293.75 .04 294.00 9.42 294.50 48.76 294.75 75.05 Notes -------- Converge ------------------------- TW Elev Error ft +/-ft Contributing Structures -------- ----- -------------------------- Free Outfall None contributing Free Outfall P Page 2.06 Free Outf all P Free Outfall P Free Outfall P Free Outfall P +ES Free Outfall P +ES ?5 = 2r7IG1?. Free Outfall P +ES Free Outfall P +ES S/N: A21BO1706A8C SUNGATE DESIGN GROUP, PA PondPack Ver: 7.0 (325) Compute Time: 09:38:38 Date: 06-15-2000 Type.... Individual Outlet Curves Page 2.04 Name.... OUTLET File.... C:\HAESTAD\PPKW\SAMPLE\POWELLDRIVE-POST2.PPW RATING TABLE FOR ONE OUTLET TYPE n Structure ID = P (Culvert-Circular) IyL ??1 --------- -- - - ------------------ Mannings open channel maximum capacity: .03 cfs 1 Upstream ID = (Pond Water Surface) DNstream ID = TW (Pond Outfall) WS Elev,Device Q Tail Water Notes --------- WS Elev. ------- Q --------------- ------- TW Elev Converge ----------- -------- ft cfs ft +/-ft Computation Messa ges -------- 292.00 ------- .00 -------- ----- ------- Free Outfall ----------- -------- Upstream HW & DNstream TW < Inv.El 292.50 .03 Free Outfall FULL FLOW ...Lfull=42.51ft Vh=.080ft HL=1.341ft 293.00 .03 Free Outfall FULL FLOW...Lfull=43.84ft Vh=.109ft HL=1.872ft 293.25 .03 Free Outfall FULL FLOW ...Lfull=43.91ft Vh=.123ft HL=2.123ft 293.50 .04 Free Outfall FULL FLOW ...Lfull=43.82ft Vh=.138ft HL=2.370ft 293.75 .04 Free Outfall FULL FLOW ...Lfull=43.96ft Vh=.152ft HL=2.623ft 294.00 .04 Free Outfall FULL FLOW ...Lfull=43.99ft Vh=.167ft HL=2.875ft 294.50 .04 Free Outfall FULL FLOW...Lfull=43.99ft Vh=.195ft HL=3.374ft 294.75 .05 Free Outfall FULL FLOW ...Lfull=43.99ft Vh=.210ft HL=3.625ft S/N: A21B01706A8C SUNGATE DESIGN GROUP, PA PondPack Ver: 7.0 (325) Compute Time: 09:38:38 Date: 06-15-2000 Type.... Individual Outlet Curves Name.... OUTLET File.... C:\HAESTAD\PPKW\SAMPLE\POWELLDRIVE-POST2.PPW RATING TABLE FOR ONE OUTLET TYPE WS Elev,Device Q ---------------- WS Elev. Q ft cfs 292.00 .00 292.50 .00 293.00 .00 293.25 .00 293.50 .00 293.75 .00 294.00 9.38 294.50 48.71 294.75 75.00 Structure ID = ES (Weir-Rectangular) -------------------------------------- Upstream ID = (Pond Water Surface) DNstream ID = TW (Pond Outfall) Tail Water -------------- TW Elev Converge ft +/-ft Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Page 2.05 Notes -------------------------- Computation Messages HW & TW below Inv.E1.=293.750 HW & TW below Inv.E1.=293.750 HW & TW below Inv.E1.=293.750 HW & TW below Inv.E1.=293.750 HW & TW below Inv.El.=293.750 H=.00; Htw=.00; Qfree=.00; H=.25; Htw=.00; Qfree=9.38; H=.75; Htw=.00; Qfree=48.71; H=1.00; Htw=.00; Qfree=75.00; S/N: A21BO1706A8C SUNGATE DESIGN GROUP, PA PondPack Ver: 7.0 (325) Compute Time: 09:38:38 Date: 06-15-2000 1 1 1 1 1 1 f NETWORK SUMMARY 10 YEAR Type.... Executive Summary (Nodes) Page 2.05 Name.... Watershed Event: 10 yr File.... C:\HAESTAD\PPKW\SAMPLE\POWELLDRIVE-POST2.PPW Storm... TypeII 24hr Tag: Dev.10 NETWORK SUMMARY -- NODES (Trun.= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left & Rt) DEFAULT Design Storm File,ID = MYSTORMS.RNQ WakeCounty Storm Tag Name = Dev.10 Data Type, File, ID = Storm Frequency = Total Rainfall Depth= Duration Multiplier = Resulting Duration = Resulting Start Time= Synthetic Storm SCSTYPES.RNF TypeII 24hr 10 yr 5.6000 in 1 24.0000 hrs .0000 hrs Step= .1000 hrs End= 24.0000 hrs Node ID Type DEVELOPED-POST AREA Outfall OUTFALL-STREAM JCT POND IN POND POND OUT POND HYG Vol Qpeak ac-ft Trun. hrs --------- 1.611 - -- --------- 11.9119 1.508 11.9119 1.611 11.9119 1.508 11.9119 Qpeak Max WSEL cfs ft -------- --------- 26.98 25.97 26.98 25.97 294.21 T,y z: f VAM - 19 4.7S V440- C??Sr V6,715 S/N: A21B01706A8C SUNGATE DESIGN GROUP, PA PondPack Ver: 7.0 (325) Compute Time: 08:50:55 Date: 06-15-2000 1 1 y NETWORK SUMMARY 100 YEAR Type.... Executive Summary (Nodes) Page 2.11 Name.... Watershed Event: 100 yr File.... C:\HAESTAD\PPKW\SAMPLE\POWELLDRIVE-POST2.PPW Storm... TypeII 24hr Tag: Dev100 NETWORK SUMMARY -- NODES (Trun.= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left & Rt) DEFAULT Design Storm File,ID = MYSTORMS.RNQ WakeCounty Storm Tag Name = Dev100 Data Type, File, ID = Synthetic Storm SCSTYPES.RNF TypeII 24hr Storm Frequency = 100 yr Total Rainfall Depth= 8.1000 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs HYG Vol Qpeak Qpeak Max WSEL Node ID Type ac-ft Trun. hrs cfs ft ----------------- DEVELOPED-POST ---- AREA ---------- 2.443 -- --------- 11.9119 -------- --------- 40.02 Outfall OUTFALL-STREAM JCT 2.340 11.9952 37.76 POND IN POND 2.443 11.9119 40.02 POND OUT POND 2.340 11.9952 37.76 294.36 1a? of -Dbm -- V14 .15-7 \XUV. 61V_eb _ :_ t9$.77 S/N: A21BO1706ABC SUNGATE DESIGN GROUP, PA PondPack Ver: 7.0 (325) Compute Time: 08:50:55 Date: 06-15-2000 y y POND ROUTED HYDROGRAPH 10 YEAR Type.... Pond Routed HYG (total out) Page 12.92 Name.... File.... POND OUT Tag: Dev.10 C:\HAESTAD\PPKW\SAMPLE\POWELLDRIVE-POST2.PPW Event: 10 yr Storm... TypeII 24hr Tag: Dev.10 POND ROUTED TOTAL OUTFLOW HYG... HYG file = C:\HAESTAD\PPKW\SAMPLE\POWELLDR.HYG HYG ID = POND OUT ?l HYG Tag = Dev.10 ?, 2 p ` ---------------- Peak Discharge = -------------- 25.97 ----- cfs 2C>? Li,. Time to Peak = 11.9119 hrs HYG Volume = ---------------- 1.508 -------------- ac-ft ----- HYDROGRAPH ORDINATES (cfs) Time Output Time increment = .0833 hrs hrs Time on left represents time for first value in each row. --------- I 2.4157 ---------------- .00 -------------- .00 ------------ .00 ------- .00 ------------- .00 2.8322 .00 .00 .00 .00 .00 3.2487 .00 .00 .00 .00 .00 3.6652 .00 .00 .00 .00 .00 4.0817 .00 .00 .00 .00 .00 4.4982 .00 .00 .00 .00 .00 4.9147 .00 .00 .00 .00 .00 5.3312 .00 .00 .00 .00 .00 5.7477 .00 .00 .00 .00 .00 6.1642 .00 .00 .00 .00 .00 6.5807 ( .00 .00 .00 .00 .00 6.9972 .00 .00 .00 .00 .00 7.4137 .00 .00 .00 .00 .00 7.8302 .00 .00 .00 .00 .00 8.2467 .00 .00 .00 .00 .00 8.6632 .00 .00 .00 .00 .00 9.0797 .00 .01 .01 .01 .01 9.4962 .01 .01 .02 .02 .02 9.9127 .02 .02 .03 .03 .03 10.3292 .03 .03 .03 .03 .03 10.7457 .03 .03 .03 .03 .03 11.1622 .03 .03 .03 .04 .04 11.5787 .04 .04 4.93 10.62 25.97 11.9952 24.78 14.63 7.95 5.88 4.50 12.4117 3.65 3.03 2.55 2.20 1.97 12.8282 1.82 1.70 1.59 1.49 1.41 13.2447' 1.34 1.28 1.22 1.17 1.12 13.6612 1.07 1.03 .99 .95 .91 14.0777 .88 .85 .83 .81 .79 14.4942 .78 .77 .75 .74 .73 14.9107 .72 .70 .69 .68 .66 15.3272 .65 .64 .62 .61 .60 15.7437 .58 .57 .56 .55 .53 S/N: A21B01706A8C SUNGATE DESIGN GROUP, PA PondPack Ver: 7.0 (325) Compute Time: 08:50:55 Date: 06-15-2000 Type.... Pond Routed HYG (total out) Name.... POND OUT Tag: Dev.10 File.... C:\HAESTAD\PPKW\SAMPLE\POWELLDRIVE-POST2.PPW Storm... TypeII 24hr Tag: Dev.10 1 aew4 ti ti ti ti ti ti ti Page 12.93 Event: 10 yr HYDROGRAPH ORDINATES (cfs) Time Output Time increment = .0833 hrs hrs Time on left represent s time for first value in each row. --------- - 16.1602 ------------- .52 ------------ .52 ---------------- .51 --------- .50 ----------- .50 16.5767 .49 .49 .49 .48 .48 16.9932 .47 .47 .46 .46 .45 17.4097 ( .45 .44 .44 .43 .43 17.8262 .42 .42 .42 .41 .41 18.2427 .40 .40 .39 .39 .38 18.6592 .38 .37 .37 .36 .36 19.0757 .35 .35 .35 .34 .34 19.4922 ( .33 .33 .32 .32 .31 19.9087 .31 .30 .30 .30 .29 20.3252 .29 .29 .29 .29 .29 20.7417 .29 .29 .28 .28 .28 21.1582 .28 .28 .28 .28 .28 21.5747 .28 .28 .28 .27 .27 21.9912 .27 .27 .27 .27 .27 22.4077 .27 .27 .27 .26 .26 22.8242 .26 .26 .26 .26 .26 23.2407 .26 .26 .26 .26 .25 23.6572 .25 .25 .25 .25 .25 24.0737 .21 .13 .06 .04 .04 24.4902 .04 .04 .04 .04 .04 24.9067 .04 .04 .04 .04 .04 25.3232 .04 .04 .04 .04 .04 25.7397 .04 .04 .04 .04 .04 26.1562 .04 .04 .04 .04 .04 26.5727 .04 .04 .04 .04 .04 26.9892 .04 .04 .04 .04 .04 27.4057 .04 .04 .04 .04 .04 27.8222 .04 .04 .04 .04 .04 28.2387 .04 .04 .04 .04 .04 28.6552 .04 .04 .04 .04 .04 29.0717 .04 .04 .04 .04 .04 29.4882 .04 .04 .04 .04 .04 29.9047 .04 .04 .04 .04 .04 30.3212 .04 .04 .04 .04 .04 30.7377 .04 .04 .04 .04 .04 31.1542 .04 .04 .04 .04 .04 31.5707 .04 .04 .04 .04 .04 31.9872 .04 .04 .04 .04 .04 32.4037 .04 .04 .04 .04 .04 32.8202 .04 .04 .04 .04 .04 33.2367 .04 .04 .04 .04 .04 33.6532 .04 .04 .04 .04 .04 34.0697 .04 .04 .04 .04 .04 34.4862 .04 .04 .04 .04 .04 34.9027 .04 .04 .04 .04 .04 35.3192 .04 .04 .04 .04 .04 S/N: A21BO1706A8C SUNGATE DESIGN GROUP, PA PondPack Ver: 7.0 (325) Compute Time: 08:50:55 Date: 06-15-2000 Type.... Pond Routed HYG (total out) Page 12.94 Name.... POND OU T Tag: Dev.10 Event: 10 yr File.... C:\HAESTAD\PPKW\SAMPLE\POWELLDRIVE- POST2.PPW Storm... TypeII 24hr Tag: Dev.10 HYDROGRAPH ORDINAT ES (cfs) Time Output Time increm ent = .0833 hrs hrs Ti me on l eft represents time for first value in each row. --------- ------ 35.7357 ------- .04 -------------------- .04 ----------- .04 ----- .04 ------------- .04 36.1522 .04 .04 .04 .04 .04 36.5687 .04 .04 .04 .04 .04 36.9852 .04 .04 .04 .04 .04 37.4017 .04 .04 .04 .04 .04 37.8182 .04 .04 .04 .04 .04 38.2347 .04 .04 .04 .04 .04 38.6512 .04 .04 .04 .04 .04 39.0677 .04 .04 .04 .04 .04 39.4842 .04 .04 .04 .04 .04 39.9007 .04 .04 .04 .04 .04 40.3172 .04 .04 .04 .04 .04 40.7337 .04 .04 .04 .04 .04 41.1502 .04 .04 .04 .04 .04 41.5667 .04 .04 .04 .04 .04 41.9832 .04 .04 .04 .04 .04 42.3997 .04 .04 .04 .04 .04 42.8162 .04 .04 .04 .04 .04 43.2327 .04 .04 .04 .04 .04 43.6492 .04 .04 .04 .04 .04 44.0657 .04 .04 .04 .04 .04 44.4822 .04 .04 .04 .04 .04 44.8987 .04 .04 .04 .04 .04 45.3152 .04 .04 .04 .04 .04 45.7317 .04 .04 .04 .04 .04 46.1482 .04 .04 .04 .04 .04 46.5647 .04 .04 .04 .04 .04 46.9812 .04 .04 .04 .04 .04 47.3977 .04 .04 .04 .04 .04 47.8142 .04 .04 .04 .04 .04 48.2307 .04 .04 .04 .04 .04 48.6472 .04 .04 .04 .04 .04 49.0637 .04 .04 .04 .04 .04 49.4802 .04 .04 .04 .03 .03 49.8967 .03 .03 .03 .03 .03 50.3132 .03 .03 .03 .03 .03 50.7297 .03 .03 .03 .03 .03 51.1462 .03 .03 .03 .03 .03 51.5627 .03 .03 .03 .03 .03 51.9792 .03 .03 .03 .03 .03 52.3957 .03 .03 .03 .03 .03 52.8122 .03 .03 .03 .03 .03 53.2287 .03 .03 .03 .03 .03 53.6452 .03 .03 .03 .03 .03 54.0617 .03 .03 .03 .03 .03 54.4782 .03 .03 .03 .03 .03 54.8947 .03 .03 .03 .03 .03 S/N: A21BO1706A8C SUNGATE DESIGN GROUP, PA PondPack Ver: 7.0 (325) Compute Time: 08:50:55 Da te: 06-15-2000 1 y ti y ti ti ti ti ti ti Type.... Pond Routed HYG (total out) Page 12.95 Name.... POND OUT Tag: Dev.10 Event: 10 yr File.... C:\HAESTAD\PPKW\SAMPLE\POWELLDRIVE-POST2.PPW Storm... TypeII 24hr Tag: Dev.10 HYDROGRAPH ORDINATES (cfs) Time Output Time increment = .0833 hrs hrs Time on left represent s time for first value in each row. --------- - 55.3112 ------------- .03 ------------ .03 ---------------- .03 --------- .03 ----------- .03 55.7277 .03 .03 .03 .03 .03 56.1442 .03 .03 .03 .03 .03 56.5607 ( .03 .03 .03 .03 .03 56.9772 .03 .03 .03 .03 .03 57.3937 .03 .03 .03 .03 .03 57.8102 .03 .03 .03 .03 .03 58.2267 .03 .03 .03 .03 .03 58.6432 .03 .03 .03 .03 .03 59.0597 .03 .03 .03 .03 .03 59.4762 .03 .03 .03 .03 .03 59.8927 .03 .03 .03 .03 .03 60.3092 .03 .03 .03 .03 .03 60.7257 .03 .03 .03 .03 .03 61.1422 .03 .03 .03 .03 .03 61.5587 .03 .03 .03 .03 .03 61.9752 .03 .03 .03 .03 .03 62.3917 .03 .03 .03 .03 .03 62.8082 .03 .03 .03 .03 .03 63.2247 .03 .03 .03 .03 .03 63.6412 .03 .03 .03 .03 .03 64.0577 .03 .03 .03 .03 .03 64.4742 .03 .03 .03 .03 .03 64.8907 .03 .03 .03 .03 .03 65.3072 .03 .03 .03 .03 .03 65.7237 .03 .03 .03 .03 .03 66.1402 .03 .03 .03 .03 .03 66.5567 .03 .03 .03 .03 .03 66.9732 .03 .03 .03 .03 .03 67.3897 .03 .03 .03 .03 .03 67.8062 .03 .03 .03 .03 .03 68.2227 .03 .03 .03 .03 .03 68.6392 .03 .03 .03 .03 .03 69.0557 .03 .03 .03 .03 .03 69.4722 .03 .03 .03 .03 .03 69.8887 .03 .03 .03 .03 .03 70.3052 .03 .03 .03 .03 .03 70.7217 .03 .03 .03 .03 .03 71.1382 .03 .03 .03 .03 .03 71.5547 .03 .03 .03 .03 .03 71.9712 .03 .03 .03 .03 .03 72.3877 .03 .03 .03 .03 .03 72.8042 .03 .03 .03 .03 .03 73.2207 .03 .03 .03 .03 .03 73.6372 .03 .03 .03 .03 .03 74.0537 .03 .03 .03 .03 .03 74.4702 .03 .03 .03 .03 .03 S/N: A21BO1706A8C SUNGATE DESIGN GROUP, PA PondPack Ver: 7.0 (325) Compute Time: 08:50:55 Date: 06-15-2000 Type.... Pond Routed HYG (total out) Page 12.96 Name.... POND OU T Tag: Dev.10 Event: 10 yr File.... C:\HAESTAD\PPKW \SAMPLE\POWELLD RIVE-POST2.PPW Storm... TypeII 24hr Tag: Dev.10 HYDROGRAPH OR DINATES (cfs) Time Output Time i ncrement = .0833 hrs hrs Time on l eft represents time for first value in each row. --------- I--- 74.8867 ---------- .03 --------------- .03 ---------------- .03 ----- .03 ------------- .03 75.3032 .03 .03 .03 .03 .03 75.7197 .03 .03 .03 .03 .03 76.1362 .03 .03 .03 .03 .03 76.5527 .03 .03 .03 .03 .03 76.9692 .03 .03 .03 .03 .03 77.3857 .03 .03 .03 .03 .03 77.8022 .03 .03 .03 .03 .03 78.2187 .03 .03 .03 .03 .03 78.6352 .03 .03 .03 .03 .03 79.0517 .03 .03 .03 .03 .03 79.4682 .03 .03 .03 .03 .03 79.8847 .03 .03 .03 .03 .03 80.3012 ( .03 .03 .03 .03 .03 80.7177 .03 .03 .03 .03 .03 81.1342 .03 .03 .03 .03 .03 81.5507 .03 .03 .03 .03 .03 81.9672 .03 .03 .03 .03 .03 82.3837 .03 .03 .03 .03 .03 82.8002 .03 .03 .03 .03 .03 83.2167 .03 .03 .03 .03 .03 83.6332 .03 .03 .03 .03 .03 84.0497 .03 .03 .03 .03 .03 84.4662 .03 .03 .03 .03 .03 84.8827 .03 .03 .03 .03 .03 85.2992 .03 .03 .03 .03 .03 85.7157 .03 .03 .03 .03 .03 86.1322 .03 .03 .03 .03 .03 86.5487 .03 .03 .03 .03 .03 86.9652 .03 .03 .03 .03 .03 87.3817 .03 .03 .03 .03 .03 87.7982 .03 .03 .03 .03 .03 88.2147 .03 .03 .03 .03 .03 88.6312 .03 .03 .03 .03 .03 89.0477 .03 .03 .03 .03 .03 89.4642 ( .03 .03 .03 .03 .03 89.8807 ( .03 .03 .03 .03 .03 90.2972 .03 .03 .03 .03 .03 90.7137 .03 .03 .03 .03 .03 91.1302 .03 .03 .03 .03 .03 91.5467 .03 .03 .03 .03 .03 91.9632 .03 .03 .03 .03 .03 92.3797 .03 .03 .03 .03 .03 92.7962 .03 .03 .03 .03 .03 93.2127 .03 .03 .03 .03 .03 93.6292 .03 .03 .03 .03 .03 94.0457 .03 .03 .03 .03 .03 S/N: A21B01706A8C SUNGATE DESIGN GROUP, PA PondPack Ver: 7.0 (325) Compute Time: 08:50:55 Da te: 06-15-2000 Type.... Pond Routed HYG (total out) Page 12.97 Name.... POND OUT Tag: Dev.10 Event: 10 yr File.... C:\HAESTAD\PPKW\SAMPLE\POWELLDRIVE-POST2.PPW Storm... TypeII 24hr Tag: Dev.10 HYDROGRAPH ORDINATES (cfs) Time Output Time increment = .0833 hrs hrs Time on left represents time for first value in each row. --------- -------------------------------------------------------------- 94.4622 .03 .03 .03 .03 .03 94.8787 .03 .03 .03 .03 .03 95.2952 .03 .03 .03 .03 .03 95.7117 03 .03 .03 .03 .03 96.1282 ( .03 .03 .03 .03 .03 96.5447 .03 .03 .03 .03 .03 96.9612 .03 .03 .03 .03 .03 97.3777 03 .02 02 .02 .02 97.7942 .02 .02 .02 .02 .02 98.2107 .02 .02 .02 .02 .02 98.6272 .02 .02 .02 .02 .02 99.0437 .02 .02 .02 .02 .02 99.4602 .02 .02 .02 .02 .02 99.8767 .02 .02 .02 .02 .02 100.2932 .02 .02 .02 .02 .02 100.7097 .02 .02 .02 .02 .02 101.1262 .02 .02 .02 .02 .02 101.5427 .02 .02 .02 .02 .02 101.9592 .02 .02 .02 .02 .02 102.3757 .02 .02 .02 .02 .02 102.7922 .02 .02 .02 .02 .02 103.2087 .02 .02 .02 .02 .02 103.6252 .02 .02 .02 .02 .02 104.0417 .02 .02 .02 .02 .02 104.4582 .02 .02 .02 .02 .02 104.8747 .02 .02 .02 .02 .02 105.2912 02 .02 .02 .02 .02 105.7077 .02 .02 .02 .02 .02 106.1242 .02 .02 .02 .02 .02 106.5407 .02 .02 .02 .02 .02 106.9572 02 .02 .02 .02 .02 107.3737 .02 .02 .02 .02 .02 107.7902 .02 .02 .02 .02 .02 108.2067 ( .02 .02 .02 .02 .02 108.6232 02 .02 .02 .02 .02 109.0397 ( .02 .02 .02 .02 .02 109.4562 .02 .02 .02 .02 .02 109.8727 .02 .02 .02 .02 .02 110.2892 02 .02 .02 .02 OZ 110.7057 .02 .02 .02 .02 .02 111.1222 .02 .02 .02 .02 .02 111.5387 .02 .O1 .01 .O1 .O1 111.9552 .01 .01 .01 .01 .01 112.3717 .O1 .O1 .01 .01 .O1 112.7882 .O1 .01 .01 .O1 .O1 113.2047 .01 .01 .01 .01 .01 113.6212 .01 .01 .01 .01 .01 S/N: A21BO1706A8C SUNGATE DESIGN GROUP, PA PondPack Ver: 7.0 (325) Compute Time: 08:50:55 Date: 06-15-2000 y ti ti y ti ti Type.... Pond Routed HYG (total out) Page 12.98 Name.... POND OUT Tag: Dev.10 Event: 10 yr File.... C:\HAESTAD\PPKW\SAMPLE\POWELLDRIVE-POST2.PPW Storm... TypeII 24hr Tag: Dev.10 HYDROGRAPH ORDINATES (cfs) Time Output Time increment = .0833 hrs hrs Time on ----------- left represent - s time for first value in each row. --------- - 114.0377 .01 ------------- .01 ------------------- .01 ----------- .01 ------ .01 114.4542 .01 .O1 .01 .O1 .O1 114.8707 .01 .O1 .01 .01 .01 115.2872 .01 .O1 .01 .O1 .O1 115.7037 .01 .O1 .01 .01 .O1 116.1202 .O1 .O1 .01 .O1 .01 116.5367 ( .O1 .O1 .01 .O1 .O1 116.9532 .01 .O1 .O1 .O1 .O1 117.3697 .O1 .01 .01 .01 .01 117.7862 .O1 .O1 .01 .O1 .O1 118.2027 .01 .01 .01 .01 .01 118.6192 .01 .01 .O1 .01 .01 119.0357 .01 .O1 .01 .O1 .O1 119.4522 .01 .O1 .01 .O1 .O1 119.8687 .01 .O1 .01 .01 .O1 120.2852 .O1 .O1 .O1 .01 .O1 120.7017 .01 .01 .01 .01 .01 121.1182 .O1 .O1 .O1 .01 .O1 121.5347 .01 .O1 .O1 .01 .01 121.9512 .O1 .O1 .01 .O1 .O1 122.3677 .O1 .01 .01 .O1 .O1 122.7842 .01 .01 .O1 .O1 .O1 123.2007 .01 .01 .01 .01 .O1 123.6172 .01 .01 .01 .O1 .O1 124.0337 .01 .O1 .01 .O1 .O1 124.4502 .O1 .O1 .01 .O1 .O1 124.8667 .O1 .O1 .01 .01 .O1 125.2832 .O1 .O1 .O1 .O1 .01, 125.6997 .O1 .O1 .01 .O1 .O1 126.1162 .O1 .O1 .O1 .01 .O1 126.5327 .O1 .01 .01 .O1 .O1 126.9492 .01 .01 .01 .01 .01 127.3657 .01 .01 .01 .01 .O1 127.7822 .01 .O1 .O1 .O1 .O1 128.1987 .01 .O1 .O1 .01 .O1 128.6152 .O1 .O1 .01 .01 .O1 129.0317 .O1 .01 .01 .01 .O1 129.4482 .O1 .O1 .01 .01 .01 129.8647 .O1 .O1 .01 .O1 .O1 130.2812 .O1 .O1 .O1 .O1 .01 130.6977 .01 .O1 .O1 .O1 .O1 131.1142 .01 .01 .01 .01 .O1 131.5307 .01 .01 .01 .O1 .O1 131.9472 .01 .01 .01 .01 .01 132.3637 .O1 .O1 .01 .01 .O1 132.7802 .01 .01 .01 .01 .01 133.1967 .01 .01 .01 .O1 .01 S/N: A21B01706A8C SUNGATE DESIGN GROUP, PA PondPack Ver: 7.0 (325) Compute Time: 08:50:55 Date: 06-15-2000 1 1 Type.... Pond Routed HYG (total out) Name.... POND OUT Tag: Dev.10 File.... C:\HAESTAD\PPKW\SAMPLE\POWELLDRIVE-POST2.PPW Storm... TypeII 24hr Tag: Dev.10 Page 12.99 Event: 10 yr Time hrs 133.6132 134.0297 134.4462 134.8627 135.2792 135.6957 136.1122 136.5287 136.9452 137.3617 137.7782 138.1947 138.6112 139.0277 139.4442 139.8607 140.2772 140.6937 p 141.1102 141.5267 141.9432 L.1CM 142.3597 142.7762 143.1927 ??. 67 ,143.6092 144.0257 144.4422 144.8587 145.2752 145.6917 146.1082 146.5247 146.9412 147.3577 147.7742 148.1907 148.6072 149.0237 149.4402 149.8567 150.2732 150.6897 151.1062 151.5227 151.9392 152.3557 152.7722 y y HYDROGRAPH ORDINATES (cfs) Output Time increment = .0833 hrs Time on left represents time for first value in each row. -------------------------------------------------------------- .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 S/N: A21BO1706A8C SUNGATE DESIGN GROUP, PA PondPack Ver: 7.0 (325) Compute Time: 08:50:55 Date: 06-15-2000 ti ti ti ti ti h Type.... Pond Routed HYG (total out) Name.... POND OUT Tag: Dev.10 File.... C:\HAESTAD\PPKW\SAMPLE\POWELLDRIVE-POST2.PPW Storm... TypeII 24hr Tag: Dev.10 Time hrs 153.1887 153.6052 154.0217 154.4382 154.8547 155.2712 155.6877 156.1042 Page 12.100 Event: 10 yr HYDROGRAPH ORDINATES (cfs) Output Time increment = .0833 hrs Time on left represents time for first value in each row. ------------ .00 --------------- .00 --------- .00 -------------------- .00 ------ .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 S/N: A21BO1706ABC SUNGATE DESIGN GROUP, PA PondPack Ver: 7.0 (325) Compute Time: 08:50:55 Date: 06-15-2000 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 } POND ROUTED HYDROGRAPH 10 YEAR TIME vs ELEV. ti ti ti ti ti ti ti ti ti ti ti ti ti Type.... Time-Elev Name.... POND OUT Tag: Dev.10 File.... C:\HAESTAD\PPKW\SAMPLE\POWELLDRIVE-POST2.PPW Storm... TypeII 24hr Tag: Dev.10 TIME vs. ELEVATION (ft) Page 8.18 Event: 10 yr Time ( Output Time increment = .0833 hrs hrs ( Time on left represents ti me for first value in each row. --------- - 2.4157 --------------- 288.00 -------------- 288.00 ------- 288.00 -------------- 288.01 ----------- 288.02 2.8322 288.03 288.05 288.07 288.09 288.11 3.2487 288.14 288.17 288.21 288.25 288.29 3.6652 288.33 288.38 288.43 288.49 288.54 4.0817 288.60 288.67 288.74 288.81 288.88 4.4982 288.96 289.02 289.08 289.13 289.19 4.9147 289.24 289.30 289.37 289.43 289.50 5.3312 289.57 289.64 289.71 289.79 289.87 5.7477 289.95 290.01 290.04 290.07 290.10 6.1642 290.14 290.17 290.20 290.24 290.27 6.5807 290.31 290.35 290.39 290.43 290.47 6.9972 290.51 290.55 290.59 290.64 290.68 7.4137 290.73 290.77 290.82 290.87 290.91 7.8302 290.96 291.02 291.10 291.17 291.25 8.2467 291.34 291.43 291.52 291.61 291.71 8.6632 291.81 291.92 292.01 292.03 292.06 9.0797 ( 292.09 292.12 292.14 292.17 292.20 9.4962 292.23 292.26 292.29 292.32 292.35 9.9127 292.38 292.42 292.46 292.49 292.53 10.3292 292.58 292.62 292.67 292.72 292.77 10.7457 292.83 292.89 292.95 293.01 293.07 11.1622 293.12 293.19 293.26 293.34 293.42 11.5787 293.54 293.74 • 293.88 294.02 294.21 11.9952 294.20 294.07 Cgf-5f293.96 293.91 293.87 12.4117 293.85 293.83,M7g 293.82 293.81 293.80 12.8282 293.80 293.79 293.79 293.79 293.79 13.2447 293.78 293.78 293.78 293.78 293.78 13.6612 293.78 293.78 293.78 293.77 293.77 14.0777 293.77 293.77 293.77 293.77 293.77 14.4942 293.77 293.77 293.77 293.77 293.77 14.9107 293.77 293.77 293.77 293.77 293.77 15.3272 293.77 293.77 293.77 293.77 293.76 15.7437 293.76 293.76 293.76 293.76 293.76 16.1602 293.76 293.76 293.76 293.76 293.76 16.5767 293.76 293.76 293.76 293.76 293.76 16.9932 293.76 293.76 293.76 293.76 293.76 17.4097 293.76 293.76 293.76 293.76 293.76 17.8262 293.76 293.76 293.76 293.76 293.76 18.2427 293.76 293.76 293.76 293.76 293.76 18.6592 293.76 293.76 293.76 293.76 293.76 19.0757 293.76 293.76 293.76 293.76 293.76 19.4922 293.76 293.76 293.76 293.76 293.76 19.9087 293.76 293.76 293.76 293.76 293.76 20.3252 293.76 293.76 293.76 293.76 293.76 20.7417 293.76 293.76 293.76 293.76 293.76 S/N: A21BO1706A8C SUNGATE DESIGN GROUP, PA PondPack Ver: 7.0 (325) Compute Time: 08:50:55 Date: 06-15-2000 Type.... Time-Elev Page 8.19 Name.... POND OUT Tag: Dev.10 Event: 10 yr File.... C:\HAESTAD\PPKW\SAMPLE\POWELLDRIVE-POST2.PPW Storm... TypeII 24hr Tag: Dev.10 TIME vs. ELEVATION (ft) Time I Output Time increment = .0833 hrs hrs I Time on left represents time for first value in each row. --------- I-------------------------------------------------------------- 21.1582 I 293.76 293.76 293.76 293.76 293.76 21.5747 I 293.76 293.76 293.76 293.76 293.76 21.9912 I 293.76 293.76 293.76 293.76 293.76 22.4077 I 293.76 293.76 293.76 293.76 293.76 22.8242 I 293.76 293.76 293.76 293.76 293.76 23.2407 I 293.76 293.76 293.76 293.76 293.76 23.6572 I 293.76 293.76 293.76 293.76 293.76 24.0737 JJJWIL 293.75 293.75 293.75 293.75 293.75 24.4902 ICS 2-93.75 293.74 293.74 293.74 293.74 24.9067 (--,?r'?93.74 293.74 293.74 293.73 293.73 25.3232 I IP?''1 293.73 293.73 293.73 293.73 293.72 25.7397 IAftp 293.72 293.72 293.72 293.72 293.72 26.1562 IOwn 293.72 293.71 293.71 293.71 293.71 26.5727 I 293.71 293.71 293.71 293.70 293.70 26.9892 I 293.70 293.70 293.70 293.70 293.69 27.4057 I 293.69 293.69 293.69 293.69 293.69 27.8222 ( 293.69 293.68 293.68 293.68 293.68 28.2387 i 293.68 293.68 293.68 293.67 293.67 28.6552 I 293.67 293.67 293.67 293.67 293.66 29.0717 i 293.66 293.66 293.66 293.66 293.66 29.4882 I 293.66 293.65 293.65 293.65 293.65 29.9047 I 293.65 293.65 293.65 293.64 293.64 30.3212 I 293.64 293.64 293.64 293.64 293.63 30.7377 I 293.63 293.63 293.63 293.63 293.63 31.1542 I 293.63 293.62 293.62 293.62 293.62 31.5707 I 293.62 293.62 293.62 293.61 293.61 31.9872 ( 293.61 293.61 293.61 293.61 293.60 32.4037 I 293.60 293.60 293.60 293.60 293.60 32.8202 I 293.60 293.59 293.59 293.59 293.59 33.2367 I 293.59 293.59 293.59 293.58 293.58 33.6532 I 293.58 293.58 293.58 293.58 293.58 34.0697 I 293.57 293.57 293.57 293.57 293.57 34.4862 I 293.57 293.56 293.56 293.56 293.56 34.9027 I 293.56 293.56 293.56 293.55 293.55 35.3192 I 293.55 293.55 293.55 293.55 293.55 35.7357 ( 293.54 293.54 293.54 293.54 293.54 36.1522 ( 293.54 293.54 293.53 293.53 293.53 36.5687 ( 293.53 293.53 293.53 293.53 293.52 36.9852 I 293.52 293.52 293.52 293.52 293.52 37.4017 I 293.52 293.51 293.51 293.51 293.51 37.8182 I 293.51 293.51 293.51 293.50 293.50 38.2347 I 293.50 293.50 293.50 293.50 293.49 38.6512 I 293.49 293.49 293.49 293.49 293.49 39.0677 I 293.49 293.48 293.48 293.48 293.48 39.4842 I 293.48 293.48 293.48 293.47 293.47 39.9007 I 293.47 293.47 293.47 293.47 293.47 S/N: A21B01706A8C SUNGATE DESIGN GROUP, PA PondPack Ver: 7.0 (325) Compute Time: 08:50:55 Date: 06-15-2000 Type.... Time-Elev Name.... POND OUT Tag: Dev.10 File.... C:\HAESTAD\PPKW\SAMPLE\POWELLDRIVE-POST2.PPW Storm... TypeII 24hr Tag: Dev.10 TIME vs. ELEVATION (ft) Page 8.20 Event: 10 yr Time Output Time increment = .0833 hrs hrs Time on left represents time for first value in each row. --------- - 40.3172 --------------- 293.46 ----------- 293.46 ---------- 293.46 -------------- 293.46 ----------- 293.46 40.7337 293.46 293.46 293.45 293.45 293.45 41.1502 293.45 293.45 293.45 293.45 293.44 41.5667 293.44 293.44 293.44 293.44 293.44 41.9832 ( 293.44 293.43 293.43 293.43 293.43 42.3997 293.43 293.43 293.43 293.42 293.42 42.8162 293.42 293.42 293.42 293.42 293.42 43.2327 293.41 293.41 293.41 293.41 293.41 43.6492 293.41 293.41 293.40 293.40 293.40 44.0657 293.40 293.40 293.40 293.40 293.39 44.4822 293.39 293.39 293.39 293.39 293.39 44.8987 293.39 293.38 293.38 293.38 293.38 45.3152 293.38 293.38 293.38 293.37 293.37 45.7317 293.37 293.37 293.37 293.37 293.37 46.1482 293.36 293.36 293.36 293.36 293.36 46.5647 293.36 293.36 293.35 293.35 293.35 46.9812 293.35 293.35 293.35 293.35 293.35 47.3977 293.34 293.34 293.34 293.34 293.34 47.8142 293.34 293.34 293.33 293.33 293.33 48.2307 293.33 293.33 293.33 293.33 293.32 48.6472 293.32 293.32 293.32 293.32 293.32 49.0637 293.32 293.31 293.31 293.31 293.31 49.4802 293.31 293.31 293.31 293.30 293.30 49.8967 293.30 293.30 293.30 293.30 293.30 50.3132 293.29 293.29 293.29 293.29 293.29 50.7297 293.29 293.29 293.29 293.28 293.28 51.1462 293.28 293.28 293.28 293.28 293.28 51.5627 293.27 293.27 293.27 293.27 293.27 51.9792 293.27 293.27 293.26 293.26 293.26 52.3957 293.26 293.26 293.26 293.26 293.25 52.8122 293.25 293.25 293.25 293.25 293.25 53.2287 293.25 293.25 293.24 293.24 293.24 53.6452 293.24 293.24 293.24 293.24 293.23 54.0617 293.23 293.23 293.23 293.23 293.23 54.4782 293.23 293.22 293.22 293.22 293.22 54.8947 293.22 293.22 293.22 293.22 293.21 55.3112 293.21 293.21 293.21 293.21 293.21 55.7277 293.21 293.20 293.20 293.20 293.20 56.1442 293.20 293.20 293.20 293.19 293.19 56.5607 293.19 293.19 293.19 293.19 293.19 56.9772 293.19 293.18 293.18 293.18 293.18 57.3937 293.18 293.18 293.18 293.17 293.17 57.8102 293.17 293.17 293.17 293.17 293.17 58.2267 293.17 293.16 293.16 293.16 293.16 58.6432 293.16 293.16 293.16 293.15 293.15 59.0597 293.15 293.15 293.15 293.15 293.15 S/N: A21BO1706A8C SUNGATE DESIGN GROUP, PA PondPack Ver: 7.0 (325) Compute Time: 08:50:55 Date: 06-15-2000 Type.... Time-Elev Page 8.21 Name.... POND OUT Tag: Dev.10 Event: 10 yr File.... C:\HAESTAD\PPKW\SAMPLE\POWELLDRIVE-POST2.PPW Storm... TypeII 24hr Tag: Dev.10 TIME vs. ELEVATION (ft) Time Output Time increment = .0833 hrs hrs ( Time on left represents time for first value in each row. --------- I- 59.4762 ( --------------- 293.15 ------------ 293.14 ----------- 293.14 ------------- 293.14 ---------- 293.14 59.8927 293.14 293.14 293.14 293.13 293.13 60.3092 293.13 293.13 293.13 293.13 293.13 60.7257 293.13 293.12 293.12 293.12 293.12 61.1422 293.12 293.12 293.12 293.11 293.11 61.5587 293.11 293.11 293.11 293.11 293.11 61.9752 293.11 293.10 293.10 293.10 293.10 62.3917 293.10 293.10 293.10 293.09 293.09 62.8082 293.09 293.09 293.09 293.09 293.09 63.2247 293.09 293.08 293.08 293.08 293.08 63.6412 293.08 293.08 293.08 293.07 293.07 64.0577 293.07 293.07 293.07 293.07 293.07 64.4742 293.07 293.06 293.06 293.06 293.06 64.8907 293.06 293.06 293.06 293.06 293.05 65.3072 293.05 293.05 293.05 293.05 293.05 65.7237 293.05 293.04 293.04 293.04 293.04 66.1402 293.04 293.04 293.04 293.04 293.03 66.5567 293.03 293.03 293.03 293.03 293.03 66.9732 1 293.03 293.03 293.02 293.02 293.02 67.3897 293.02 293.02 293.02 293.02 293.01 67.8062 293.01 293.01 293.01 293.01 293.01 68.2227 293.01 293.01 293.00 293.00 293.00 68.6392 293.00 293.00 293.00 293.00 292.99 69.0557 292.99 292.99 292.99 292.99 292.99 69.4722 292.98 292.98 292.98 292.98 292.98 69.8887 292.97 292.97 292.97 292.97 292.97 70.3052 292.97 292.96 292.96 292.96 292.96 70.7217 292.96 292.96 292.95 292.95 292.95 71.1382 292.95 292.95 292.95 292.94 292.94 71.5547 292.94 292.94 292.94 292.94 292.93 71.9712 1 292.93 292.93 292.93 292.93 292.92 72.3877 292.92 292.92 292.92 292.92 292.92 72.8042 292.91 292.91 292.91 292.91 292.91 73.2207 292.91 292.90 292.90 292.90 292.90 73.6372 ( 292.90 292.90 292.89 292.89 292.89 74.0537 292.89 292.89 292.89 292.88 292.88 74.4702 292.88 292.88 292.88 292.88 292.87 74.8867 292.87 292.87 292.87 292.87 292.87 75.3032 292.86 292.86 292.86 292.86 292.86 75.7197 292.86 292.85 292.85 292.85 292.85 76.1362 292.85 292.85 292.84 292.84 292.84 76.5527 292.84 292.84 292.84 292.83 292.83 76.9692 292.83 292.83 292.83 292.83 292.82 77.3857 292.82 292.82 292.82 292.82 292.82 77.8022 292.81 292.81 292.81 292.81 292.81 78.2187 292.81 292.80 292.80 292.80 292.80 S/N: A21BO1706A8C SUNGATE DESIGN GROUP, PA PondPack Ver: 7.0 (325) Compute Time: 08:50:55 Date: 06-15-2000 y ti y ti y ti y ti ti ti ti ti ti ti ti ti ti ti ti Type.... Time-Elev Page 8.22 Name.... POND OUT Tag: Dev.10 Event: 10 yr File.... C:\HAESTAD\PPKW\SAMPLE\POWELLDRIVE-POST2.PPW Storm... TypeII 24hr Tag: Dev.10 TIME vs. ELEVATION (ft) Time Output Time increment = .0833 hrs hrs Time on left represents time for first value in each row. --------- - 78.6352 --------------- 292.80 ----------- 292.80 ------------ 292.79 ------------ 292.79 ----------- 292.79 79.0517 292.79 292.79 292.79 292.78 292.78 79.4682 292.78 292.78 292.78 292.78 292.77 79.8847 292.77 292.77 292.77 292.77 292.77 80.3012 292.76 292.76 292.76 292.76 292.76 80.7177 292.76 292.75 292.75 292.75 292.75 81.1342 292.75 292.75 292.75 292.74 292.74 81.5507 292.74 292.74 292.74 292.74 292.73 81.9672 292.73 292.73 292.73 292.73 292.73 82.3837 292.72 292.72 292.72 292.72 292.72 82.8002 ( 292.72 292.71 292.71 292.71 292.71 83.2167 292.71 292.71 292.70 292.70 292.70 83.6332 292.70 292.70 292.70 292.70 292.69 84.0497 292.69 292.69 292.69 292.69 292.69 84.4662 292.68 292.68 292.68 292.68 292.68 84.8827 292.68 292.67 292.67 292.67 292.67 85.2992 292.67 292.67 292.67 292.66 292.66 85.7157 292.66 292.66 292.66 292.66 292.65 86.1322 292.65 292.65 292.65 292.65 292.65 86.5487 292.64 292.64 292.64 292.64 292.64 86.9652 292.64 292.64 292.63 292.63 292.63 87.3817 292.63 292.63 292.63 292.62 292.62 87.7982 292.62 292.62 292.62 292.62 292.61 88.2147 292.61 292.61 292.61 292.61 292.61 88.6312 292.61 292.60 292.60 292.60 292.60 89.0477 292.60 292.60 292.59 292.59 292.59 89.4642 292.59 292.59 292.59 292.59 292.58 89.8807 292.58 292.58 292.58 292.58 292.58 90.2972 292.57 292.57 292.57 292.57 292.57 90.7137 292.57 292.57 292.56 292.56 292.56 91.1302 292.56 292.56 292.56 292.55 292.55 91.5467 292.55 292.55 292.55 292.55 292.55 91.9632 292.54 292.54 292.54 292.54 292.54 92.3797 292.54 292.53 292.53 292.53 292.53 92.7962 292.53 292.53 292.53 292.52 292.52 93.2127 292.52 292.52 292.52 292.52 292.52 93.6292 292.51 292.51 292.51 292.51 292.51 94.0457 292.51 292.50 292.50 292.50 292.50 94.4622 292.50 292.50 292.50 292.49 292.49 94.8787 292.49 292.49 292.49 292.49 292.49 95.2952 292.48 292.48 292.48 292.48 292.48 95.7117 292.48 292.48 292.47 292.47 292.47 96.1282 292.47 292.47 292.47 292.47 292.46 96.5447 292.46 292.46 292.46 292.46 292.46 96.9612 292.46 292.45 292.45 292.45 292.45 97.3777 292.45 292.45 292.45 292.45 292.44 S/N: A21B01706A8C SUNGATE DESIGN GROUP, PA PondPack Ver: 7.0 (325) Compute Time: 08:50:55 Date: 06-15-2000 Type.... Time-Elev Page 8.23 Name.... POND OUT Tag: Dev.10 Event: 10 yr File.... C:\HAESTAD\PPKW\SAMPLE\POWELLDRIVE-POST2.PPW Storm... TypeII 24hr Tag: Dev.10 TIME vs. ELEVATION (ft) 1 f 1 1 y y y y y Time I Output Time increment = .0833 hrs hrs Time on left represents time for first value in each row. --------- - 97.7942 --------------- 292.44 ----------- 292.44 ---------- 292.44 --------------- 292.44 ---------- 292.44 98.2107 292.44 292.43 292.43 292.43 292.43 98.6272 292.43 292.43 292.43 292.43 292.42 99.0437 292.42 292.42 292.42 292.42 292.42 99.4602 292.42 292.42 292.41 292.41 292.41 99.8767 292.41 292.41 292.41 292.41 292.41 100.2932 292.40 292.40 292.40 292.40 292.40 100.7097 292.40 292.40 292.40 292.39 292.39 101.1262 292.39 292.39 292.39 292.39 292.39 101.5427 292.39 292.39 292.38 292.38 292.38 101.9592 292.38 292.38 292.38 292.38 292.38 102.3757 292.38 292.37 292.37 292.37 292.37 102.7922 292.37 292.37 292.37 292.37 292.37 103.2087 292.36 292.36 292.36 292.36 292.36 103.6252 292.36 292.36 292.36 292.36 292.35 104.0417 292.35 292.35 292.35 292.35 292.35 104.4582 ( 292.35 292.35 292.35 292.34 292.34 104.8747 292.34 292.34 292.34 292.34 292.34 105.2912 292.34 292.34 292.34 292.33 292.33 105.7077 292.33 292.33 292.33 292.33 292.33 106.1242 292.33 292.33 292.33 292.32 292.32 106.5407 292.32 292.32 292.32 292.32 292.32 106.9572 ( 292.32 292.32 292.32 292.32 292.31 107.3737 ( 292.31 292.31 292.31 292.31 292.31 107.7902 292.31 292.31 292.31 292.31 292.31 108.2067 292.30 292.30 292.30 292.30 292.30 108.6232 292.30 292.30 292.30 292.30 292.30 109.0397 292.30 292.29 292.29 292.29 292.29 109.4562 292.29 292.29 292.29 292.29 292.29 109.8727 292.29 292.29 292.28 292.28 292.28 110.2892 292.28 292.28 292.28 292.28 292.28 110.7057 292.28 292.28 292.28 292.28 292.27 111.1222 292.27 292.27 292.27 292.27 292.27 111.5387 292.27 292.27 292.27 292.27 292.27 111.9552 292.27 292.26 292.26 292.26 292.26 112.3717 292.26 292.26 292.26 292.26 292.26 112.7882 292.26 292.26 292.26 292.26 292.25 113.2047 292.25 292.25 292.25 292.25 292.25 113.6212 292.25 292.25 292.25 292.25 292.25 114.0377 292.25 292.25 292.25 292.24 292.24 114.4542 292.24 292.24 292.24 292.24 292.24 114.8707 292.24 292.24 292.24 292.24 292.24 115.2872 292.24 292.24 292.23 292.23 292.23 115.7037 292.23 292.23 292.23 292.23 292.23 116.1202 292.23 292.23 292.23 292.23 292.23 116.5367 292.23 292.22 292.22 292.22 292.22 S/N: A21BO1706A8C SUNGATE DESIGN GROUP, PA PondPack Ver: 7.0 (325) Compute Time: 08:50:55 Date: 06-15-2000 f ti ti ti ti ti ti ti ti ti ti ti ti ti ti Type.... Time-Elev Page 8.24 Name.... POND OUT Tag: Dev.10 Eve nt: 10 yr File.... C:\HA ESTAD\PPKW\SA MPLE\POWELLDRIVE-POST2.PPW Storm... TypeI I 24hr Tag : Dev.10 TIME vs. ELEVATION (ft) Time Output Time increment = .0 833 hrs hrs Time on left represents time for first value in each row. -- --------- --- 116.9532 ------------- 292.22 ------------ 292.22 -------------- 292.22 ---------- 292.22 -------- 292.22 117.3697 292.22 292.22 292.22 292.22 292.22 117.7862 292.22 292.21 292.21 292.21 292.21 118.2027 292.21 292.21 292.21 292.21 292.21 118.6192 292.21 292.21 292.21 292.21 292.21 119.0357 292.21 292.21 292.20 292.20 292.20 119.4522 292.20 292.20 292.20 292.20 292.20 119.8687 292.20 292.20 292.20 292.20 292.20 120.2852 292.20 292.20 292.20 292.20 292.19 120.7017 292.19 292.19 292.19 292.19 292.19 121.1182 292.19 292.19 292.19 292.19 292.19 121.5347 292.19 292.19 292.19 292.19 292.19 121.9512 ( 292.19 292.18 292.18 292.18 292.18 122.3677 292.18 292.18 292.18 292.18 292.18 122.7842 292.18 292.18 292.18 292.18 292.18 123.2007 292.18 292.18 292.18 292.18 292.18 123.6172 292.17 292.17 292.17 292.17 292.17 124.0337 292.17 292.17 292.17 292.17 292.17 124.4502 292.17 292.17 292.17 292.17 292.17 124.8667 292.17 292.17 292.17 292.17 292.17 125.2832 292.16 292.16 292.16 292.16 292.16 125.6997 ( 292.16 292.16 292.16 292.16 292.16 126.1162 292.16 292.16 292.16 292.16 292.16 126.5327 292.16 292.16 292.16 292.16 292.16 126.9492 292.15 292.15 292.15 292.15 292.15 127.3657 292.15 292.15 292.15 292.15 292.15 127.7822 292.15 292.15 292.15 292.15 292.15 128.1987 292.15 292.15 292.15 292.15 292.15 128.6152 292.15 292.15 292.15 292.14 292.14 129.0317 292.14 292.14 292.14 292.14 292.14 129.4482 292.14 292.14 292.14 292.14 292.14 129.8647 292.14 292.14 292.14 292.14 292.14 130.2812 292.14 292.14 292.14 292.14 292.14 130.6977 292.14 292.13 292.13 292.13 292.13 131.1142 292.13 292.13 292.13 292.13 292.13 131.5307 292.13 292.13 292.13 292.13 292.13 131.9472 292.13 292.13 292.13 292.13 292.13 132.3637 292.13 292.13 292.13 292.13 292.13 132.7802 292.13 292.13 292.12 292.12 292.12 133.1967 292.12 292.12 292.12 292.12 292.12 133.6132 292.12 292.12 292.12 292.12 292.12 134.0297 292.12 292.12 292.12 292.12 292.12 134.4462 292.12 292.12 292.12 292.12 292.12 134.8627 292.12 292.12 292.12 292.12 292.12 135.2792 292.11 292.11 292.11 292.11 292.11 135.6957 292.11 292.11 292.11 292.11 292.11 S/N: A21B01706A8C SUNGATE DESIGN GROUP, PA PondPack Ver: 7.0 (325) Compute Time: 08:50:55 Date: 06-15-2000 Type.... Time-Elev Page 8.26 Name.... File.... POND OUT Tag: Dev.10 C:\HAESTAD\PPKW\SAMPLE\POWELLD RIVE-POST2.PPW Event: 10 yr Storm... TypeII 24hr Tag: Dev.10 TIME vs. ELE VATION (ft) Time Output Time increment = .0833 hrs hrs Time on left represents time for first value in each row. -------- 155.2712 - ------------ ( 292.06 ---------------- 292.06 --------------------- 292.06 292.06 ------------- 292.06 155.6877 ( 292.06 292.05 292.05 292.05 292.05 156.1042 292.05 292.05 292.05 292.05 S/N: A21801706A8C SUNGATE DESIGN GROUP, PA PondPack Ver: 7.0 (325) Compute Time: 08:50:55 Date: 06-15-2000 iJ LMAY 8 W NDS Gt WATE v .?cl?,?N?? PROJECT: '. OWNER: POWELL DRIVE OFFICE BUILDING RALEIGH, NORTH CAROLINA NEOMONDE ASSOCIATES 3817 BERYL ROAD RALEIGH, NC 27607 DESIGN ELEMENT: I CA .10 ?;. 'DS n n 47 ?i ro 1La • Gv G ?S EXTENDED DETENTION STORMWATER WETLAND DESIGNER: Sungate Design Group, P.A. 915A Jones Franklin Road Raleigh, NC 27606 x. S D G ,a?<??3f; _`zL1 sC C CJSEnNi 1 ,?" ??s? •,.a Date Received Fee Paid Permit Number _ State of North Carolina Department of Environmentand Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM 1 This form may be photocopied for use as an original 1. GENERAL INFORMATION 1. Applicants name (specify the name of the corporation, individual, etc. who owns the project): NEOMODE ASSOCIATES ' 2. Print Owner/Signing Official's name and title (person legally responsible for facility and compliance): Sam Saleh, General Manager V V 3. Mailing Address for person listed in item 2 above: i Neomode Associates, 3817 Beryl Road City: Raleigh State: NC Zip: 27607 ' Telephone Number: x'11 Z t3 _ 3 Z-L6, 4. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, spe5 ications, letters, operation and maintenance agreements, etc.): Powell Drive*Office Building 5. Location of Project (street address): ?., 212 Pownil nrivp City:_ Raleigh - County: Wake ' 6. Directions to project (frgm nearest major intersection): 600 feet south of intersection of'Hil'lsborough Street and Powell Drive ° 7. Latitude: 78 - 42' Longitude: 35° - 47,1 of project 8. Contact person who can answer questions about the project: Name: ?1 Frank Braxton ' Telephone Number: ( 919 1 859-2243 II. PERMIT INFORMATION: 1. Specify whether project is (che(* one): R New Renewal Modification r Form SWU-101 Version`3.99 ` ' Page 1 of 4 7. How was the off-site impervious area listed above derived? ,-. GIS data. from the City of Raleigh and-field inspection IV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS The following italicized deed restrictions and protective covenants are required to be recorded for all s4divisions, outparcels and future development prior to the sale of any lot. If lot sizes vary significantly, a ' table listing each lot number, size and the allowable built-upon area for each lot must be provided as an attachmertt: 1. The following covenants are intended to ensure ongoing compliance with state stormwater management permit number as issued by the Division of Water Quality. These covenants may not be changed or deleted without the consent of the State. 2. No more than square feet of any lot shall be covered by structures or impervious materials. ' Impervious materials include asphalt, gravel, concrete, brick, stone, slate or similar material but do not include wood decking or the water surface of swimming pools. 3. Swales shall not be filled in, piped, or altered except as necessary to provide driveway crossings. ' 4. Built-upon area in excess of the permitted amount requires a state stormwater management permit modification prior to construction. 5. All permitted runoff from outparcels or future development shall be directed into the permitted stormwater control system. These connections to the stormwater control system shall be performed in a manner that maintains the integrity and performance of the system as permitted. By your signature belov4 you certify that the recorded deed restrictions and protective covenants for this project ' shall include. all the applicable items required above, that the covenants will be binding on all parties and persons claiming under them, that they will nut with the land, that the required covenants cannot be changed or deleted without concurrence from the State, and that they will be recorded prior to the sale of any lot. V. SUPPLEMENT FORMS Jy J ' The applicable state stormwater management permit supplement form(s) listed below must be submitted for each BMP specified for this project. Contact the Stormwater and General Permits Unit at (919) 733-5083 for the status and availability of these forms. - Form SWU-102 Wet Detention Basin Supplement Form SWU-103 Infiltration Basin Supplement Form SWU-104 Low Density Supplement Form SWU-105 Curb Outlet System Supplement Form SWU406 Off-Site System Supplement Form SWU-107 Underground Infiltratiori Trench Supplement Form SWU-108 Neuse River Basin Supplement Form SWU-109 Innovative Best Management Practice Supplement 1 Form SWU-101 Version 3.99 Page 3 of 4 1 ' STORMWATER TREATMENT /MANAGEMENT NARRATIVE ' POWELL DRIVE OFFICE BUILDING Neomonde Associates 3817 Beryl Road Raleigh NC 27607 , The subject property is a 2.734 acre parcel, located in the City of Raleigh, and zoned for industrial use. As part of the planning process, the Owner was granted (by the Environmental Management Commission, 7/9/98) a conditional variance from the Neuse River Riparian Area rule. As a condition, a Stormwater Management Plan acceptable to the Division of Water Quality is required. The proposed Stormwater Plan for the Powell Drive Office Building will consist of a subsurface conveyance system connected to an Extended Detention Stormwater Wetland. Additionally, the site development will embrace approximately 264 LF of stream relocation and restoration. Due to the site's landscape position, contributing off-site drainage will be included in the calculated designs. NITROGEN LOADING The site's estimated nitrogen loading calculations were obtained from the "Town of Chapel Hill, Stormwater Impact Statement Guidelines" and submitted as an attachment. The estimated nitrogen load for a 2.734 acre industrial use is calculated to be 30.62 lb/yr. The removal efficiency of a detention pond/wetland is estimated to be 30%. The ' resulting nitrogen load with BMP is calculated to be 21.43 lb/yr. STORMWATER PLAN 1 ' The site s proposed drainage system will capture the off-site drainage as it enters the site via a catch basin or sheet flow directly into the BMP's forebay. The on-site drainage will be directed toward a series of drop inlets and catch basins and outlet into the BMP's forebay. The culvert outlet will be armored with Class B rip rap to serve as velocity dissipater and scour protection. The forebay will serve as a stilling basin and sediment basin. The pool and forebay shall require routine inspection and maintenance to prevent sediment build up. The forebay is separated from the permanent pool by a small dam/weir and is included in the surface and storage calculations. The permanent pool is designed with varying depths to allow shallows for wetland planting and temporary detention of stormwater runoff. The proposed BMP is an Extended Detention Stormwater Wetland as outlined in the NCDENR "Stormwater Best Management " Practices . The base elevation is 288.0, the permanent pool surface elevation is 292.0 with a surface area of 4,570 SF. The storage volume from the 1" rain depth is 9,430 CF and calculated to a surface elevation of 293.75 = primary outlet weir crest. The top of " I dam elevation is 294.75. A 11/2 galvanized pipe will be installed through the dam and set with inlet invert at elevation 292.0. The draw down time of the 1" rain depth storage is t 1 i 1 1 1 POWELL DRIVE OFFICE BUILDING NARRATIVE, PAGE 2 hmt o be 4.4 days. A routing of the post development rainfall events indicated that the proposed weir will handle the 10 and 100 year storm and not overtop the dam. The primary outlet is a 25 feet long weir with Class I rip rap on the backside slope. Manning's with an n-value of 0.104, Z= 3:1, b=25', d=1', s=20%, Td=5.0 calculated to a d10=0.33', V+0=2.95fps and aA The rip rap will serve to spread the runoff and reduce the velocity prior to entering the stream. I 11 1:1 t 1 Town of Chapel Hill Stormwater Impact Statement Guidelines (Effective January 1, 1997) Guidelines Page / of S INTRODUCTION ' All applications for developments or subdivisions which create four (4) or more lots and all Special Use Permit applications within the Town of Chapel Hill planning jurisdiction must include a Stormwater Impact Statement. Stormwater Impact Statements submitted to the Town of Chapel Hill shall comply with the Stormwater Impact Statement guidelines. We encourage each applicant to arrange a pre-application meeting with Town staff to clarify any issues and to ' determine the scope of the analysis. Affirmative exemption to all or part of the requirements of the Stormwater Impact Statement may be granted by the Town Manager. SITE ANALYSIS A. site analysis shall be. provided with the submittal of a Stormwater Impact Statement. Characteristics of the existing site and proposed development shall include the following: ?. Land use and density; B. Location; C. Phasing and timing of project; and ' D. Delineation of Resource Conservation Districts, wetlands, Federal/State wildlife lands, and any designated FEMA Iloodplain/floodway areas. A map or maps shall be included in the Stormwater Impact Statement detailing site location,. existing and proposed stormdrainage system(s), Stormwater detention structures, and Resource Conservation District location(s). The maps must present these existing and proposed ' conditions at a scale and quality suitable to include all impacted areas (on and off-site) as agreed upon in the initial consultation meeting with Town staff. ' Guidelines Page 2 of 5 IMPACT STATEMENT ANALYSES A. SCOPE OF IMPACTED AREA ' A pre-application meeting with Town staff is encouraged to determine upstream and downstream limits of study to be included in the Stormwater Impact Statement, and to define study elements required. Possible study elements of concern may include, but are not limited to: ' 1. Backwater impacts; -2. Effects on existing upstream and/orriownstrearri drainage conveyance facilities; 3. Upstream and/or downstream flow volumes; ' 4. Ability of natural drainage channel to handle additional volumes and velocities; 5. Potential mitigation measures; and 6. Site-specific considerations. B. "HYDROS" STORMWATER MODEL Accepted engineering practice {i.e.: "HYDROS", Rational, or SCS Method) will be required with the Stormwater Impact Statement to generate both pre-development and post-development ' stormwater flow data. Final "HYDROS" calculations and a detailed Stormwater management plan must be submitted and approved before a Zoning Compliance Permit (ZCP) for any phase of the project will be issued. f C. POLLUTANT LOADING Pollutant loading calculations shall be provided with the 'Stormwater Impact Statement. ' Noupoint pollution monitoring studies have indicated that annual acre d ? per tscharges of urba4. stormwater pollution (nutrients, metals, toxic organic compounds, etc.) are directly related'to the density of impervious surfaces and types of land uses. Because receiving waters such as creeks and ponds are affected by stormwater pollutant loads, it is important to monitor and inventory the impacts created by new' development. Yearly loads are calculated by ' multiplying the area of each land use by the appropriate loading coefficient as provided in Table 1. Required calculations shall include the pollutant loading of total nitrogen, total ' phosphorus, zinc, and lead. T 1 'J 1 1 11 Guidelines Page 3 of 5 TABLE 1 Chapel Hill Pollutant Loading Coefficients (lb/acre/yr)* LAND USE TYPE Low Density esidenu (<12% impervious or < 1 unit/acre) TOTAL N 5.2 TOTAL P 0.7 ZINC (Zn). 0.2 LEAD.(Pb) 2 Moderate/High Density Residential (> 12% impervious or > I unit/acre) 7.4 1.2 0.5 0.5 Office/institutional 8.8 1.6 0.4 0.5 Commercial 13.2 1.6 2.1 2.6 Industrial 11.2 1.4 1.6 2.0 Undeveloped/Forest/Open 0.6 0.08 0 0 Pasture _2.6 0.5 0 0 * Values calibrated for the Town of Chapel Hill and based on data from Hartigan (1983), CDM (1989), Haith (1992), and Schueler (1987). In order to perform these loading calculations, the land use.types _and relative acreage must first be determined. For example, a proposed development contains 100 residential half acre lots (moderate density). A 20 acre commercial district is also planned. The remaining tracts (15 acres) will remain undeveloped open space. The total nitrogen loading calculations for this proposed development would be as follows: Moderate Residential - 100 lots x 1/2 acre - 50 acres x 7.4 ................................................. 370 lb/yr -Commercial - 20 acres x 13.2 ................................................ 264 lb/yr Undeveloped - 15 acres x 0.6 .................................................... 9 lb/yr Total Nitrogen Load .....................................................................643 lb/yr Reductions in these loading rates can be achieved with various stormwater Best Management Practices (BMPs). These BMPs include, but are not limited to, detention/retention ponds, stormwater wetlands, grassed swales., filter strips, and natural vegetative buffers. Previous studies have reported a wide range of pollutant removal efficiency rates for each BMP. Table 2 provides a summary of these rates to be used for pollutant reduction calculations. The appropriate rate selected for each calculation should reflect design, operation, maintenance {Mans, and best judgment. 1 ?I t 1 Guidelines Page 4 of 5 TABLE 2 Pollutant Removal Efficiency of Urban Stormwater BMPs (Percent Reduction)*. Stormwater BMPs Total N Total P Lead (Pb) Zinc-(Zn) Retention Ponds 40 - 70 50 - 80 60 - 95 30 - 70 Detention Ponds 10 - 40 40 - 60 50 - 90 30 - 60 Wetlands 20 - 30 40 - 60 30 - 190 30 - 80 Grassed Swales W - 20 20 - 40 20 - 40 20 - 40 Filter Strip/Buffers 10 - 20 20 _-4- 20 - 40 20 - 40 • Efficiency rates are approximated from Urbonas and Stahre (1993), Schueler (1987), and Field (1993). For example, grassed swales in sequence with a detention pond have been proposed. for the previous development scenario. Without stormwater BMPs, the nitrogen loading rate was determined to be 643 lb/year. The proposed detention pond has been designed with a sediment forebay, extended detdntion (five days) for the first inch of rainfall, additional storage for runoff from the 10 year storm, a 4:1 length to width ratio, and a comprehensive scheduled maintenance and inspection plan. The grassed swaies are designed with less than five (5%) percent slopes, concrete check dams, and a routine mowing and inspection plan. The total nitrogen reduction -rate for the detention pond and grassed swaies are selected from Table 2 and estimated to be 35 and 20 percent, respectively. The new projected load for the development is calculated as follows: Total N Reduction with Swales 643 lb/yr x-0.20 .............. ....129 lb/yr 1643- 129 ................................................. 514 lb/yr Total N Reduction with Detention - 514 lb/yr x 0.35 ........................................180 lb/yr 514- 180 ............. . 334 lb/yr Total N Reduction without BMPs ..............................................................643 Ib/yr Total N Load with BMPs .........................................................................334 lb/yr D. EROSION AND SEDIMENT MANAGEMENT The Stormwater Impact Statement must include a description of the proposed erosion and sediment control measures. This description should include a list of control devices and placements necessary to comply with the requirements of the Chapel Hill Erosion and Sedimentation Control Ordinance which is enforced by the Orange County Sedimentation and Erosion Control Officer. A phasing schedule for construction and/or removal of proposed control devices will also be required to ensure adequate protection for all phases of the development. IJ Guidelines Page S of S E. MITIGATION MEASURES If calculations indicate that post-development rate of runoff exceeds predevelopment rate, mitigation measures will be recommended. Mitigation measures may also be recommended ' for those developments that would significantly impact water quality based 'on the Stoririwater Impact Statement findings. According to the location of the proposed development, mitigation measures may include, but are not limited to inlet/outlet control, reinforced channels, ' stormwater outfalls to open land, curb cuts, grassed swales, detention facilities, and/or retention facilities. r F. MAINTENANCE AND INSPECTION PLAN The Stormwater Impact Statement for developments proposing stormwater control facilities ' shall include a maintenance and inspection plan. This plan should detail the types and frequency of inspection and maintenance operations (major and minor), equipment necessary to perform maintenance activities, access to the stormwater control facility, and disposal methods for contaminated materials should they occur. The party or parties responsible for maintenance and details of all bonds, letters of credit, etc., must be placed on record with the Town. If you have any questions regarding these guidelines, contact Mr. Michael Neal in the Town Engineering Department at (919) 968-2833. ' REFERS NCES CITED ' CDM. 1989. Watershed Management Study: Lake Michie and Little River Reservoir Studies. Field, Richard, M.L. O'Shea and K.K. Chin. 1993. Integrated Stormwater Management. Lewis Publishers. Boca Raton, FL. ' Haith, D.A., et al. 1992. Generalized Watershed Loading Functions: User's Manual. NY. ' Hartigan, J.P., et al. 1983. Calibration of NPS Model Loading Factors. Journal of Environmental Engineering Division. 109: no. 6 pp. 1259-1272. ' Schueler, Thomas R. 1987. Controlling Urban' Runoff: A Practice Manual for Planning and Designing Urban BMPs. Metropolitan Washington Council of Governments, Washington, DC. ' Urbonas, Ben, and P. Stahre. 1993. Stormwater Best Management Practices and Detention. Prentice Hall. Englewood Cliffs, NJ. i State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original ' I• GENERAL INFORMATION 1. Applicants name (specify the name of the corporation, individual, etc. who owns the project): NEOMODE ASSOCIATES ' 2. Print Owner/Signing Official's name and title (person legally responsible for facility and compliance): Sam Saleh, General Manager ' 3. Mailing Address for person listed in item 2 above: y i Neomode Associates, 3817 Bervl Road r City: Raleigh State: NC Zip: 27607 Telephone Number: L-`? N ) O ti? .,; L25 4. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, sp"tions, letters, operation and maintenance agreements, etc.): Powell DrivP40ffice Buildin 5. Location of Project (street address): 71 7 Pnc.,o ? i nr i va City: Raleigh - County: Wake 6. Directions to project (frgm nearest major intersection): 600 feet south of intersection of Hillsborough Street and Powell Drive ° 7. Latitude: 78 - 42' Longitude: 35° - 471, of project 8. Contact person who can answer questions about the project: Name: ?l Frank Braxton ' Telephone Number: ( 919 ) 859-2243 II. PERMIT INFORMATION: 1. Specify whether protect is (check one. Form SWU-101 Version" 3.99 X. r New Renewal Modification Page 1 of 4 .r ?I 7. How was the off-site impervious area listed above derived? ;<_ GIS data. from the City of Raleigh and-field inspection IV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS The following italicized deed restrictions and protective covenants are required to be recorded for all sufbdivisions, outparcels and future development prior to the sale of any lot. If lot sizes vary significantly, a table listimit each lot number, size and the allowable built-upon area for each lot must be provided as an attachmeftt 1. The fWf1wing covenants are intended to ensure ongoing compliance with state stormwater management permit number as issued by the Division of Water Quality. These covenants ntay riot be changed or deleted without the consent of the State. 2. No more than square feet of any lot shall be covered by structures or impervious materials. Impervious materials include asphalt, gravel, concrete, brick, stone, slate or similar material but do not include wood decking or the water surface of swimming pools. 3. Swales shall not be filled in, piped, or altered except as necessary to provide driveway crossings. 4. Built-upon area in excess of the permitted amount requires a state stormwater management permit modification prior to construction. 5. All permitted runoff from outparcels or future development shall be directed into the permitted stormwater control system. These connections to the stormwater control system shall be performed in a manner that maintains the integrity and performance of the system as permitted. By your signature belpv4 you certify that the recorded deed restrictions and protective covenants for this project shall include. all the applicable items required above, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the State, and that they will be recorded prior to the sale of any lot. V. SUPPLEMENT FORMS V./ J u The applicable state stormwater management permit supplement form(s) listed below must be submitted for each BMP specified for this project. Contact the Stormwater and General Permits Unit at (919) 733-5083 for the status and availability of these forms. ` Form SWU-102 Form SWU-103 Form SWU-104 Form SWU-105 Form SWUA06 Form SWU-107 Form SWU-108 Form SWU-109 Wet Detention Basin Supplement Infiltration Basin Supplement Low Density Supplement Curb Outlet System Supplement Off-Site System Supplement Underground Infiltratiori.Trench Supplement Meuse River Basin Supplement Innovative Best Management Practice Supplement I Form SWU-101 Version 3.99 . Page 3 of 4 C STORMWATER TREATMENUMANAGEMENT NARRATIVE POWELL DRIVE OFFICE BUILDING Neomonde Associates 3817 Beryl Road Raleigh, NC 27607 The subject property is a 2.734 acre parcel, located in the City of Raleigh, and zoned for industrial use. As part of the planning process, the Owner was granted (by the Environmental Management Commission, 7/9/98) a conditional variance from the Neuse River Riparian Area rule. As a condition, a Stormwater Management Plan acceptable to the Division of Water Quality is required. The proposed Stormwater Plan for the Powell Drive Office Building will consist of a subsurface conveyance system connected to an Extended Detention Stormwater Wetland. Additionally, the site development will embrace approximately 264 LF of stream relocation and restoration. Due to the site's landscape position, contributing off-site drainage will be included in the calculated designs. NITROGEN LOADING The site's estimated nitrogen loading calculations were obtained from the "Town of Chapel Hill, Stormwater Impact Statement Guidelines" and submitted as an attachment. The estimated nitrogen load for a 2.734 acre industrial use is calculated to be 30.62 lb/yr. The removal efficiency of a detention pond/wetland is estimated to be 30%. The resulting nitrogen load with BMP is calculated to be 21.43 lb/yr. STORMWATER PLAN The site's proposed drainage system will capture the off-site drainage as it enters the site via a catch basin or sheet flow directly into the BMP's forebay. The on-site drainage will be directed toward a series of drop inlets and catch basins and outlet into the BMP's forebay. The culvert outlet will be armored with Class B rip rap to serve as velocity dissipater and scour protection. The forebay will serve as a stilling basin and sediment basin. The pool and forebay shall require routine inspection and maintenance to prevent sediment build up. The forebay is separated from the permanent pool by a small dam/weir and is included in the surface and storage calculations. The permanent pool is designed with varying depths to allow shallows for wetland planting and temporary detention of stormwater runoff. The proposed BMP is an Extended Detention Stormwater Wetland as outlined in the NCDENR "Stormwater Best Management Practices". The base elevation is 288.0, the permanent pool surface elevation is 292.0 with a surface area of 4,570 SF. The storage volume from the 1" rain depth is 9,430 CF and calculated to a surface elevation of 293.75 = primary outlet weir crest. The top of dam elevation is 294.75. A 11/2" galvanized pipe will be installed through the dam and set with inlet invert at elevation 292.0. The draw down time of the 1" rain depth storage is P POWELL DRIVE OFFICE BUILDING ' NARRATIVE, PAGE 2 calculated to be 4.4 days. A routing of the post development rainfall events indicated that the proposed weir will handle the 10 and 100 year storm and not overtop the dam. The primary outlet is a 25 feet long weir with Class I rip rap on the backside slope. Manning's with an n-value of 0.104, Z= 3:1, b=25', d=1', s=20%, Td=5.0 calculated to a ' d10=0.33', V10=2.95fps and a T =4.12. The rip rap will serve to spread the runoff and reduce the velocity prior to entering the stream. 1 0 0 7 t INTRODUCTION Town of Chapel Hill Stormwater Impact Statement Guidelines (Effective January 1, 1997) Guidelines Page 1 of 5 ' All applications for developments or subdivisions which create four (4) or more lots and all Special Use Permit applications within the Town of Chapel Hill planning jurisdiction must include a Stormwater Impact Statement. Stormwater Impact Statements submitted to the Town of Chapel Hill shall comply with the Stormwater Impact Statement guidelines. We encourage each applicant to arrange a pre-application meeting with Town staff to clarify any issues and to determine the scope of the analysis. Affirmative exemption to all or part of the requirements ' of the Stormwater Impact Statement may be granted by the Town Manager. ' SITE ANALYSIS' A site analysis 'shall be. provided with the submittal of a Stormwater Impact Statement. Characteristics of the existing site and proposed development shall include the following: A. Land use and density; B. Location; C. Phasing and timing of project; and D. Delineation of Resource Conservation Districts, wetlands, Federal/State wildlife ' lands, and any designated FEMA floodplain/floodway areas. ' A map or maps shall be included in the Stormwater Impact Statement detailing site location, existing and proposed stormdrainage system(s), stormwater detention structures, and Resource Conservation District location(s). The maps must present these existing and proposed ' conditions at a scale and quality suitable to include all impacted areas (on and off-site) as agreed upon in the initial consultation meeting with Town staff. Guidelines Page 2 of 5 ' IMPACT STATEMENT ANALYSES A. SCOPE OF IMPACTED AREA ' A pre-application meeting with Town staff is encouraged to determine upstream and downstream limits of study to be included in the Stormwater Impact Statement, and to define ' study elements required. Possible study elements of concern may include, but are not limited to : ' 1. Backwater impacts; .-2. Effects on existing upstream and/or downstream drainage conveyance facilities; 3. Upstream and/or downstream flow volumes; ' 4. Ability of natural drainage channel to handle additional volumes and velocities; 5. Potential mitigation measures; and 6. Site-specific considerations. ' B. "HYDROS" STORMWATER MODEL ' Accepted engineering .practice {i.e.: "HYDROS", Rational, or SCS Method) will be required with the Stormwater Impact Statement to generate both pre-development and post-development stormwater flow data. Final "HYDROS" calculations and a detailed stormwater management plan must be submitted and approved before a Zoning Compliance Permit (ZCP) for any phase of the project will be issued. ' C. POLLUTAN'T' LOADING Pollutant loading calculations shall be provided with the 'Stormwater Impact Statement. Nonpoint pollution monitoring studies have indicated that annual "per acre" discharges of urbat}. stormwater pollution (nutrients, metals, toxic organic compounds, etc.) are directly ' related'to the density of impervious surfaces and types of land uses. Because receiving waters such as creeks and ponds are affected by stormwater pollutant loads, it is important to monitor and inventory the impacts created by new' development. Yearly loads are calculated by ' multiplying the area of each land use by the appropriate loading coefficient as provided in Table 1. Required calculations shall include the pollutant loading of total nitrogen, total ' phosphorus, zinc, and lead. 1 0. F1 TABLE 1 Chapel Hill Pollutant Loading Coefficients (lb/acre/yr)* Guidelines Page 3 of 5 LAND USE TYPE Low Density Residential (< 12% impervious or < 1 unit/acre) TOTAL N 5.2 TOTAL P 0.7 ZINC (Zn) 0.2 LEAD (Pb) 2 Moderate/High Density Residential (> 12% impervious or > 1 unit/acre) 7.4 1.2 0.5 0.5 Office/Institutional 8.8 1.6 0.4 0.5 Commercial 13.2 1.6 2.1 2.6 Industrial 11.2 1.4 1.6 2.0 Undeveloped/Forest/Open 0.6 0.08 0 0 P 2.6 0.5 -1 0 1 0 : * Values calibrated for the Town of Chapel Hill and based on data from Hartigan (1983), CDM (1989), Haith (1992), and Schueler (1987). In order to perform these loading calculations, the land use types _and relative acreage must first be determined. For example, a proposed development contains 100 residential half acre lots (moderate density). A 20 acre commercial district is also planned. The remaining tracts (15 acres) will remain undeveloped open space. The total nitrogen loading calculations for this proposed development would be as follows: ' Moderate Residential 100 lots x 1/2 acre ..................... 50 acres _ ....................... . 50 acres x 7.4 ......................... 370 b/yr 1 ........................ " Commercial - 20 acres x 13.2.......... .................. 264 lb/yr Undeveloped 15 acres x 0.6 .................................................... 9 lb/yr Total Nitrogen Load .. ....................................................................643 lb/yr Reductions in these loading rates can be achieved with various stormwater Best Management Practices (BMPs). These BMPs include, but are not limited to, detention/retention ponds, ' stormwater wetlands, grassed swales, filter strips, and natural vegetative buffers. Previous studies have reported a wide range of pollutant removal efficiency rates for each BMP. Table 2 provides a summary of these rates to be used for pollutant reduction calculations. The ' appropriate rate selected for each calculation should reflect design, operation, maintenance plans, and best judgment. 1 Guidelines Page 4 of S TABLE 2 u C Pollutant removal Efficiency of Urban Stormwater BMPs (Percent Reduction)*. Stormwater BMPs Total N Total P Lead (Pb) Zinc -(Z- n) Retention Ponds 40 - 70 50 - 80 60 - 95 30 - 70 Detention Ponds 10 - 40 40 - 60 50 - 90 ; 30 - 60 Wetlands 20 - 30 40 - 60 30 - 90 30 - 80 Grassed Swales 1-0 - 20 20 - 40 20 - 40 20 - 40 Filter Strip/Buffers 10 - 20 20-4-0 20 - 40 20 - 40 * Efficiency rates are approximated from Urbonas and Stahre (1993), Schueler (1987), and Field (1993). For example, grassed swales in sequence with a detention pond have been proposed. for the -previous development scenario. Without stormwater BMPs, the nitrogen loading rate was determined to be 643 lb/year. The proposed detention pond has been designed with a sediment forebay, extended detdntion (five days) for the first inch of rainfall, additional storage for runoff from the 10 year storm, a 4:1 length to width ratio, and a comprehensive scheduled maintenance and inspection plan. The grassed swaies are designed with less than five (5 %) percent slopes, concrete check darns, and a routine- mowing and inspection plan. The total nitrogen reduction -rate for the detention pond and grassed swaies are selected from Table 2 and estimated to be 35 and 20 percent, respectively. The new projected load for the development is calculated as follows: Total N Reduction with Swales 643 lb/yr x-0.20 ........................................ 1291b/yr 643 - 129 ................................................. 514 lb/yr Total N Reduction with Detention - 514 lb/yr x 0.35 ........................................ 1801b/yr 514- 180 ..................................... 334 lb/yr Total N Reduction without BMPs ..............................................................643 lb/yr Total N Load with BMPs .................,.......................................................334 lb/yr D. EROSION AND SEDIMENT MANAGEMENT The Stormwater Impact Statement must include a description of the proposed erosion and sediment control measures. This description should include a list of control devices and placements necessary to comply with the requirements of the Chapel Hill Erosion and Sedimentation Control Ordinance which is enforced by the Orange County Sedimentation and Erosion Control Officer. A phasing schedule for construction and/or removal of proposed control devices will also be required to ensure adequate protection for allphases of the development. o ' .MITIGATION MEASURES Guidelines Page S f S ' If calculations indicate that post-development rate of runoff exceeds predevelopment rate, mitigation measures will be recommended. Mitigation measures may also be recommended for those developments that would significantly impact water quality based -on the Stormwater Impact Statement findings. According to the location of the proposed development, mitigation measures may include, but are not limited to inlet/outlet control, reinforced channels, stormwater outfalls to open land, curb cuts, grassed swales, detention facilities, and/or retention facilities. ' F. MAINTENANCE AND INSPECTION PLAN The Stormwater Impact Statement for developments proposing stormwater control facilities ' shall include a maintenance and inspection plan. This plan should detail the types and frequency of inspection and maintenance operations (major and minor), equipment necessary to perform maintenance activities, access to the stormwater control facility, and disposal ' methods for contaminated materials should they occur. The party or parties responsible for maintenance and details of all bonds, letters of credit, etc., must be placed on record with the Town. ' If you have any questions regarding these guidelines, contact Mr. Michael Neal in the Town Engineering Department at (919) 968-2833. t 11 REFERENCES CITED ' CDM. 1989. Watershed Management Study: Lake Michie and Little River Reservoir Studies. Field, Richard, M.L. O'Shea and K.K. Chin. 1993. Integrated Stormwater Management. Lewis Publishers. Boca Raton, FL. Haith, D.A., et al. 1992. Generalized Watershed Loading Functions: User's Manual. ' NY. ' Hartigan, J.P., et al. 1983. Calibration of NPS Model Loading Factors. Journal of Environmental Engineering Division. 109: no. 6 pp. 1259-1272. ' Schueler, Thomas R. 1987. Controlling Urban' Runoff: A Practice Manual for Planning and Designing Urban BMPs. Metropolitan Washington Council of Governments, Washington, DC. ' Urbonas, Ben, and P. Stahre. 1993. Stormwater Best Management Practices and Detention. Prentice Hall. Englewood Cliffs, NJ. WET DETENTION BASIN SUPPLEMENT This form may be photocopied for use as an original DWO Stormwater Management Plan Review A complete stormwater management plan submittal includes an application form, a wet detention basin supplement for each basin, design calculations, and plans and specifications showing all basin and outlet structure details. 1. PROJECT INFORMATION Project Name: Powell Drive Office Building Contact Person: Frank Braxton Phone Number: (919 ) 859-2243 For projects with multiple basins, specify which basin this worksheet applies to: ' elevations Basin Bottom Elevation 288 ft. Permanent Pool Elevation 292 ft. Temporary Pool Elevation 293.75 ft. ar eas Permanent Pool Surface Area 4,570 sq. ft. • Drainage Area 4.15 ac. Impervious AKea 2.6 7 ac. volumes ' Permanent Pool Volume 9,535 cu. ft. Temporary Pool Volume 19 , 59 7 cu. ft. Forebay Volume 1 , 31 2 cu. ft. ' Other parameters SA/DA1 2.59 Diameter of Orifice 1.5 in. Design Rainfall 5.6 in. Design TSS Removal 2 .. 85 % Form SWU-102 Rev 3.99 Permit No. State of North Carolina Department of Environment and Natural Resources Division of Water Quality (to be provided by DWQ) STORMWATER MANAGEMENT PERMIT APPLICATION FORM (floor of the basin) (elevation of the orifice) (elevation of the discharge structure overflow) (water surface area at the orifice elevation) (on-site and off-site drainage to the basin) (on-site and off-site drainage to the basin) (combined volume of main basin and forebay) (volume detained above the permanent pool) (approximately 20% of 4f=e) P. 9. vot_uv,c_. (surface area to drainage area ratio from DWQ table) (2 to S day temporary pool draw-down required) 10 yr. SCS (minimum 85% required) Page 1 of 4 fl 0 n II. REQUIRED ITEMS CHECKLIST Il.a. This BMP is an Extended Detention Stormwater Wetland and the depth of pool is limited to 3 feet with a larger area designed to be at a depth of 0-1.5'. II.b. Forebay volume is approximately 20% of the calculated permanent pool volume. In this particular case, the BMP is receiving flow from the adjacent properties and site constraints limited the available area for the total 20% forebay of the designed total basin volume. ' Il.c. The temporary pool provides little storage of the 10 year storm event and is neither designed nor required (by local code) to serve as a runoff control . II.e. A 30-foot vegetative filter is not provided due to site limitations. The primary outlet device is a 25 feet weir with the backside armored with rip-rap to reduce the flow velocity and serve to spread the flow prior to entering the stream. ' II.f. The basin length to width ratio is 2:1 due to site limitations. ' II.g. The side slopes above the permanent pool to the top of dam are 3:1. The side slopes above the dam elevation are 2:1 and 3:1 where space allows. I II.k. The BMP is located on a single lot that will remain under one ownership. 0 ' Maintenance activities shall be performed as follows: ' 1. After every significant runoff producing rainfall event and at least monthly: a. Inspect the wet detention basin system for sediment accumulation, erosion, trash accumulation, ' vegetated cover, and general condition. b. Check and clear the orifice of any obstructions such that drawdown of the temporary pool occurs within 2 to 5 days as designed. 2. Repair eroded areas immediately, re-seed as necessary to maintain good vegetative cover, mow vegetative ' cover to maintain a maximum height of six inches, and remove trash as needed. 3. Inspect and repair the collection system (i.e. catch basins, piping, swales, nprap, etc.) quarterly to ' maintain proper functioning. 4. Remove accumulated sediment from the wet detention basin system semi-annually or when depth is reduced to 75% of the original design depth (see diagram below). Removed sediment shall be disposed ' of in an appropriate manner and shall be handled in a manner that will not adversely impact water quality (i.e. stockpiling near a wet detention basin or stream, etc.). ' The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. ' When the permanent pool depth reads 3 feet in the main pond, the sediment shall be removed. When the permanenfrpool depth reads 3 feet in the forebay, the sediment shall be removed. BASIN DIAGRAM (fill in the blanks) ' Permanent Pool Elevation 292 Sediment Re \Ele al El. 289 75 0 ' ---- -------- -- Sediment Removal Elevation 289 75% Bottom fit-- 288 % --------------------------------------------- ------- Bottom Elevation 288 25% ' FOREBAY MAIN POND I 5. Remove cattails and other indigenous wetland plants when they cover 50% of the basin surface. These plants shall be encouraged to grow along the vegetated shelf and forebay berm. ' 6. If the basin must be drained for an emergency or toPerform maintenance the flushing of sediment through the emergency drain shall be minimized to the maximum extent practical. t Form SWU-102 Rev 3.99 Page 3 of 4 LOCATION DATA ° o Q Nw r.? w Nr. ^ O NYl. I?.A w rte. Nw ?. w m CP O r pfT NM. N? SITE ?? ? od° o a o 0 Q o? a o ? C3 w Din ?. , M IrI? ? a a p a O° ..... NOT TO SCALE Norco ILI SOIL SURVEY DATA 58 'c 0( a v o. (joins Sheet od) . IniAA u4 I'1111niiv Rif wIW r'noni I SITE DRAINAGE DATA 1 1 1 0 11 0 J ?" ITT U ? ^ J SSVdAS a \ \ \ \ \ ? H xdao'daINI A w QVaidS -tj? cs?'- \ Ca U • HOSIQ - (3 p ?- p ?- IVios 3AOI'"VO U aollvHOSIQ d \ ?' \ . ff?? 3rJ2IVH3SIQ n \? (3 \ ` Tj O ® 'l ? ? ? CD O ell 0 ?.LISrI?.I.I1I ? 'I'IV?IIV2i ? ?r _ z •ONOO 0 I - j VaRV ,af)VN V-Ia HdO'IS SSOHO "- O D p ?QV2iD \ 'J' ' \? in a J 7 r NOII.VATI3 r (Y? o- <r t^ c Q? z N N N cr ? r ?? 0 F Z E NOlivsS d x z U o a A *ON iagm _ L r C i y- ? V ~' N N N M ?l 0. 0 0 - t") O r f, \ n rn Q Q o ? ` A U ??' '^ r if v' o :D 46 N\ j N N l? ?I ? ??J o? N d I ( ?? _ 9 ?.L X11 v y/ ?I -6 A O x U ?? :K2 p 0 4 Q 0 .0 Q x 0 0 - 0 Q a _- c, ? o Cl) ?'?? H a N 0 9 ' T ? ? ) - z I W 0 r 1 10 1,7 R -9 r O T- r Q rr O et o o F W O a c? U H _ i r. r.; r W 0 w A A? A - C' b I z ?i a/ ?z A 0 n 9 V7 cn on cr F rya -- f, 1` " \IN N ? ? N cal 1- r? _q x ?-? M cN ? N ? ? ? r N ? N r ? r ? ? ? ? ? o o a p o © Q O p o aJ p an .? ?,, ?- p r - - t9 _ O g ? o ? cr 0 ? _ Q ? 3 ? ? ? ° ? 3 3 3 11 _ te \s ?r ?' a p ?? N N a - ? N or ? ? N ? ? ? c r N cc N a ? Z A Nz # Q Q `l \I \l v - - c- - 1 L ?i w SCS UNIT HYDROGRAPH 10 YEAR Type.... SCS Unit Hyd. (HYG output) Name.... DEVELOPED-POST Tag: 10yr File.... C:\HAESTAD\PPKW\SAMPLE\POWELLDRIVE-POST.PPW SCS UNIT HYDROGRAPH METHOD rl STORM EVENT: 10 year storm Page 5.08 Event: 10 yr Duration = 24.0000 hrs Rain Depth = 5.6000 in Rain Dir = C:\HAESTAD\PP KW\RAINFALL\ Rain File -ID = SCSTYPES.RNF - TypeII 24h r Unit Hyd Type = Default Curvi linear HYG Dir = C:\HAESTAD\PP KW\SAMPLE\ HYG File - ID = WORK _PAD.HYG - DEVELOPED-P OST 10yr Tc = .1000 hrs Drainage Area = 4.050 acres Runoff CN= 93 Calc.Increment= .01333 hrs Out.Incr.= .0500 hrs HYG Volume = 1.616 ac-ft HYDROGRAPH ORDINA TES (cfs) Time Output Time incre ment = .0500 hrs hrs Time on left represents time for first va lue in each row. --------- I- 2.4500 ---------------- .00 --------------- .00 ------------- .00 ------------ .01 ----- .01 2.7000 .01 .01 .02 .02 .02 2.9500 .02 .03 .03 .03 .03 3.2000 .04 .04 .04 .04 .05 3.4500 .05 .05 .05 .06 .06 3.7000 .06 .06 .07 .07 .07 3.9500 .07 .08 .08 .08 .08 4.2000 .09 .09 .09 .10 .10 4.4500 .10 .10 .11 .11 .11 4.7000 .12 .12 .12 .12 .13 4.9500 ( .13 .13 .14 .14 .14 5.2000 .15 .15 .15 .15 .16 5.4500 .16 .16 .17 .17 .17 5.7000 .18 .18 .18 .19 .19 5.9500 .19 .20 .20 .20 .20 6.2000 .21 .21 .21 .22 .22 6.4500 .22 .23 .23 .23 .24 6.7000 .24 .24 .25 .25 .25 6.9500 .26 .26 .26 .27 .27 7.2000 .27 .27 .28 .28 .28 7.4500 .29 .29 .29 .30 .30 7.7000 .30 .31 .31 .31 .32 7.9500 .32 .32 .33 .33 .34 8.2000 .35 .36 .37 .38 .39 8.4500 .40 .41 .42 .43 .44 8.7000 .45 .46 .47 .48 .49 8.9500 ( .50 .51 .52 .53 .53 9.2000 .53 .54 .54 .54 .54 9.4500 .55 .55 .55 .56 .57 9.7000 .59 .61 .62 .64 .66 9.9500 .67 .69 .71 .73 .75 10.2000 .78 .80 .83 .85 .88 ' S/N: A21B01706A8C SUNGATE DESIGN GROUP, PA PondPack Ver: 7.0 (325) Compute Time: 17:12:59 r Date: 04-27-2000 Type.... SCI Unit Hyd. (HYG output) Page 5.09 Name.... DEVELOPED-POST Tag: 10yr Event: 10 yr ' File.... C:\HAESTAD\PPKW\SAMPLE\POWELLDRIVE-POST.PPW HYDROGRAPH ORDINATES (cfs) Time hrs i Time on Output Time left represents increment = .0500 hrs time for first value in each row. -- - --- 10.4500 - .90 --------------- .93 --------------- .96 ------- .99 ------------- 1.03 10.7000 1.07 1.11 1.15 1.19 1.24 ' 10.9500 1.28 1.33 1.38 1.45 1.53 11.2000 1.64 1.73 1.84 1.93 2.05 11.4500 2.14 2.26 2.97 4.20 5.97 11.7000 8.54 11.15 14.49 19.29 26.17 11.9500 26.48 22.95 17.15 8.62 5.34 12.2000 4.18 3.70 3.35 3.11 2.84 12.4500 2.60 2.33 2.15 1.97 1.88 12.7000 1.80 1.75 1.68 1.63 1.57 12.9500 1.51 1.45 1.41 1.36 1.32 13.2000 1.29 1.26 1.22 1.20 1.16 13.4500 1.13 1.10 1.07 1.04 1.02 13.7000 1.00 .98 .95 .93 .91 ' 13.9500 .89 .86 .85 .83 .82 14.2000 .81 .80 .79 .79 .78 14.4500 .77 .76 .76 .75 .74 14.7000 .73 .72 .72 .71 .70 14.9500 .69 .68 .68 .67 .66 15.2000 .65 .65 .64 .63 .62 15.4500 .61 .61 .60 .59 .58 ' 15.7000 .58 .57 .56 .55 .54 15.9500 .54 .53 .52 .52 .51 16.2000 .51 .51 .50 .50 .50 16.4500 .50 .49 .49 .49 .48 ' 16.7000 .48 .48 .48 .47 .47 16.9500 .47 .46 .46 .46 .46 17.2000 .45 .45 .45 .45 .44 17.4500 17.7000 .44 .43 .44 .42 .43 .42 .43 .42 .43 .41 17.9500 .41 .41 .41 .40 .40 18.2000 .40 .39 .39 .39 .39 18.4500 .38 .38 .38 .38 .37 ' 18.7000 .37 .37 .36 .36 .36 18.9500 .36 .35 .35 .35 .34 19.2000 .34 .34 .34 .33 .33 19.4500 .33 .33 .32 .32 .32 ' 19.7000 .31 .31 .31 .31 .30 19.9500 .30 .30 .29 .29 .29 20.2000 .29 .29 .29 .29 .29 20.4500 .29 .29 .29 .29 .29 ' 20.7000 .29 .29 .28 .28 .28 20.9500 .28 .28 .28 .28 .28 21.2000 .28 .28 .28 .28 .28 21.4500 .28 .28 .28 .28 .27 21.7000 .27 .27 .27 .27 .27 21.9500 .27 .27 .27 .27 .27 S/N: A21B01706A8C SUNGATE DESIGN GROUP, PA ' PondPack Ver: 7.0 (325) Compute Time: 17:12:59 Dat e: 04-27-2000 Type.... SCS Unit Hyd. (HYG output) Page 5.10 Name.... DEVELOPED-POST Tag: 10yr Event: 10 yr File.... C:\HAESTAD\PPK W\SAMPLE\POWELL DRIVE-POST.PPW HYDROGRAPH O RDINATES (cfs) Time Output Time increment = .0500 hrs hrs i Time on left represents time for first value in each row. - -- 22.2000 - ---- - .27 --------------- .27 --------------- .27 ------- .27 ------------- .27 22.4500 .27 .27 .27 .26 .26 22.7000 I .26 .26 .26 .26 .26 22.9500 I .26 .26 .26 .26 .26 23.2000 .26 .26 .26 .26 .26 23.4500 I .25 .25 .25 .25 .25 23.7000 .25 .25 .25 .25 .25 23.9500 I .25 .25 .18 .06 .02 24.2000 I .01 .00 .00 S/N: A21BO1706A8C SUNGATE DESIGN GROUP, PA PondPack Ver: 7.0 (325) Compute Time: 17:12:59 Date: 04-27-2000 1 ?I 1 COMPOSITE OUTFLOW SUMMARY Type.... Composite Rating Curve Name.... OUTLET File.... C:\HAESTAD\PPKW\SAMPLE\POWELLDRIVE-POST2.PPW Page 2.06 ***** COMPOSITE OUTFLOW SUMMARY **** WS Elev, Total Q Notes ---------------- ------ -- Converge ------------------------- Elev. Q TW El ev Error ft cfs - ft +/-ft Contributing Structures -------- 292.00 ------ .00 ------ Free -- ----- Outfall -------------------------- None contributing 292.50 .03 Free Outfall P 293.00 .03 Free Outfall P 293.25 293.50 .03 .04 Free Free Outfall Outfall P P 293.75 .04 Free Outfall P +ES 294.00 9.42 Free Outfall P +ES 294.50 48.76 Free Outfall P +ES ?S s 2x71 ?."t. fL 294.75 75.05 Free Outfall P +ES S/N: A21BO1706A8C SUNGATE DESIGN GROUP, PA PondPack Ver: 7.0 (325) Compute Time: 10:44:52 Date: 04-28-2000 Type.... Executive Summary (Nodes) Page 2.05 Name.... Watershed Event: 10 yr File.... C:\HAESTAD\PPKW\SAMPLE\POWELLDRIVE-POST2.PPW Storm... TypeII 24hr Tag: Dev.10 NETWORK SUMMARY -- NODES (Trun.= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left & Rt) DEFAULT Design Storm File,ID = MYSTORMS.RNQ WakeCounty Storm Tag Name = Dev.10 ------------------- Data Type, File, ID --------- = Synthe ----------- tic Storm ------------- SCSTYPES.RNF ---------------- TypeII 24hr Storm Frequency = 10 yr Total Rainfall Depth= 5.6000 in Duration Multiplier = 1 Resulting Duration = 24.000 0 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs En d= 24.0000 hrs HYG Vol Qpeak Qpeak Max WSEL Node ID Type ac-ft Trun. hrs cfs ft ----------------- DEVELOPED-POST - ---- AREA -- - 1.611 - --------- 11.9119 --- --------- 26.98 Outfall OUTFALL-STREAM JCT 1.386 11.9952 25.28 POND IN POND 1.611 11.9119 26.98 POND OUT POND 1.386 11.9952 25.28 294.20 4--- TI *EgL C'L55-r= 29315 S/N: A21601706A8C SUNGATE DESIGN GROUP, PA PondPack Ver: 7.0 (325) Compute Time: 10:45:55 Date: 04-28-2000 1 J t POND VOLUME J Type.... Vol: Elev-Volume Page 1.01 ' Name.... File.... POND C:\HAESTAD\PPKW\SAMPLE\POWELLDRIVE-POST2.PPW Title... Powell Drive Pond Volume ' USER DEFINED VOLUME RATING TABLE Elevation Volume (ft) ----(ac_ft)- 288.00 .000 289.00 .027 ' 290.00 .069 291.00 .130 292.00 .219 293.00 .337 ' 293.75 .450 294.00 .489 294.75 .616 ' S/N: A21B01706A8C SUNGATE DESIGN GROUP, PA PondPack Ver: 7.0 (325) Compute Time: 08:19:55 Date: 05-05-2000 Il I NETWORK SUMMARY 10 YEAR 1 t 1 NETWORK SUMMARY 100 YEAR Type.... Executive Summary (Nodes) Page 2.11 Name.... Watershed Event: 100 yr File.... C:\HAESTAD\PPKW\SAMPLE\POWELLDRIVE-POST2.PPW ---- Storm... TypeII 24hr Tag: Dev100 NETWORK SUMMARY -- NODES (Trun.= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left & Rt) DEFAULT Design Storm File,ID = MYSTORMS.RNQ WakeCounty Storm Tag Name = Dev100 -------------------- Data Type, File, ID --------- = Synthet ---------- ic Storm ------------- SCSTYPES.RNF ---------------- TypeII 24hr Storm Frequency = 100 yr Total Rainfall Depth= 8.1000 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 h rs Step= .1000 hrs En d= 24.0000 hrs HYG Vol Qpeak Qpeak Max WSEL Node ID Type ac_ft Trun. hrs cfs ft - ---- DEVELOPED-POST - ---- AREA - -- - 2.443 - --------- 11.9119 - --------- 40.02 Outfall OUTFALL-STREAM JCT 2.218 11.9952 37.71 POND IN POND 2.443 11.9119 40.02 POND OUT POND 2.218 11.9952 37.71 294.36 Tb'P ?OF i?AM = 2G+-7s ?Ej R Gncq - 293. 5 S/N: A21BO1706A8C SUNGATE DESIGN GROUP, PA PondPack Ver: 7.0 (325) Compute Time: 10:45:55 Date: 04-28-2000 11 t I J POND ROUTED HYDROGRAPH 10 YEAR I .'' Type.... Pond Routed HYG (total out) Name.... POND OUT Tag: Dev.10 File.... C:\HAESTAD\PPKW\SAMPLE\POWELLDRIVE-POST2.PPW Storm... TypeII 24hr Tag: Dev.10 1 POND ROUTED TOTAL OUTFLOW HYG... HYG file = C:\HAESTAD\PPKW\SAMPLE\POWELLDR.HYG HYG ID = POND OUT HYG Tag = Dev.10 ----------------------------------- Peak Discharge = 25.28 cfs Time to Peak = 11.9952 hrs HYG Volume = 1.386 ac-ft ----------------------------------- Page 12.90 Event: 10 yr 4&v.?'1 25 ? ?.+. ??L1 R HYDROGRAPH ORDINATES (cfs) Time Output Time increment = .0833 hrs hrs -- - Time on ----------- left represents -- - time for first value in each row. ------- 2.4157 .00 - - ---------- .00 --------- .00 ------------- .00 ------------- .00 2.8322 .00 .00 .00 .00 .00 3.2487 .00 .00 .00 .00 .00 3.6652 .00 .00 .00 .00 .00 4.0817 .00 .00 .00 .00 .00 4.4982 .00 .00 .00 .00 .00 4.9147 .00 .00 .00 .00 .00 5.3312 .00 .00 .00 .00 .00 5.7477 .00 .00 .00 .00 .00 6.1642 .00 .00 .00 .00 .00 6.5807 .00 .00 .00 .00 .00 6.9972 .00 .00 .00 .00 .00 7.4137 .00 .00 .00 .00 .00 7.8302 .00 .00 .00 .00 .00 8.2467 .00 .00 .00 .00 .00 8.6632 .00 .00 .00 .00 .00 9.0797 ( .00 .00 .00 .00 .00 9.4962 .00 .00 .00 .00 .00 9.9127 .00 .00 .00 .00 .00 10.3292 .00 .00 .00 .00 .00 10.7457 .00 .00 .00 .01 .01 11.1622 .01 .02 .03 .03 .03 11.5787 .03 .03 .04 8.01 24.33 11.9952 25.28 15.67 7.35 4.62 3.59 12.4117 3.06 2.62 2.23 1.97 1.82 12.8282 1.72 1.62 1.52 1.42 1.35 13.2447 1.29 1.24 1.19 1.13 1.08 13.6612 1.04 1.00 .96 .93 .89 14.0777 .85 .83 .81 .80 .79 14.4942 .77 .76 .75 .73 .72 14.9107 .71 .69 .68 .67 .65 15.3272 .64 .63 .62 .60 .59 15.7437 58 .56 .55 .54 .52 ' S/N: A21BO1706A8C SUNGATE DESIGN GROUP, PA PondPack Ver: 7.0 (325) Compute Time: 10:45:55 Date: 04-28-2000 Type.... Pond Routed HYG (total out) Page 12.91 Name.... POND OUT Tag: Dev.10 Event: 10 yr File.... C:\HAESTAD\PPKW\SAMPLE\POWELLDRIVE-POST2.PPW Storm... TypeII 24hr Tag: Dev.10 HYDROGRAPH ORDINATES (cfs) Time Output Time increment = .0833 hrs hrs Time on left represents time for first value in each row. --------- -------------------------------------------------------------- 16.1602 .52 .51 .51 .50 .50 16.5767 .49 .49 .48 .48 .47 16.9932 .47 .46 .46 .45 .45 17.4097 ( .44 .44 .44 .43 .43 17.8262 .42 .42 .41 .41 .40 18.2427 .40 .39 .39 .38 .38 18.6592 .37 .37 .37 .36 .36 19.0757 .35 .35 .34 .34 .33 19.4922 .33 .32 .32 .31 .31 19.9087 .31 .30 .30 .29 .29 20.3252 .29 .29 .29 .29 .29 20.7417 .29 .28 .28 .28 .28 21.1582 .28 .28 .28 .28 .28 21.5747 .28 .28 .27 .27 .27 21.9912 .27 .27 .27 .27 .27 22.4077 .27 .27 .27 .26 .26 22.8242 .26 .26 .26 .26 .26 23.2407 .26 .26 .26 .25 .25 23.6572 .25 .25 .25 .25 .25 ' 24.0737 .19 .08 .04 .04 .04 24.4902 .04 .04 .04 .04 .04 24.9067 .04 .04 .04 .04 .04 25.3232 .04 .04 .04 .04 .04 25.7397 ? .04 .04 .04 .04 .04 26.1562 .04 .04 .04 .04 .04 f 26.5727 .04 .04 .04 .04 .04 26.9892 .04 .04 .04 .04 .04 27.4057 .04 .04 .04 .04 .04 27.8222 .04 .04 .04 .04 .04 28.2387 .04 .04 .04 .04 .04 28.6552 .04 .04 .04 .04 .04 ' 29.0717 .04 .04 .04 .04 .04 29.4882 .04 .04 .04 .04 .04 29.9047 .04 .04 .04 .04 .04 30.3212 .04 .04 .04 .04 .04 30.7377 .04 .04 .04 .04 .04 31.1542 .04 .04 .04 .04 .04 31.5707 .04 .04 .04 .04 .04 31.9872 .04 .04 .04 .04 .04 ' 32.4037 .04 .04 .04 .04 .04 32.8202 .04 .04 .04 .04 .04 33.2367 .04 .04 .04 .04 .04 33.6532 ( .04 .04 .04 .04 .04 ' 34.0697 .04 .04 .04 .04 .04 34.4862 .04 .04 .04 .04 .04 34.9027 .04 .04 .04 .04 .04 35.3192 .04 .04 .04 .04 .04 ' S/N: A21BO1706A8C SUNGATE DESIGN GROUP, PA PondPack Ver: 7.0 (325) Compute Time: 10:45:55 Date: 04-28-2000 Type.... Pond Rou ted HYG (total out) Page 12.92 Name.... POND OUT Tag: Dev.10 File.... C:\HAESTAD\PPKW\SAMPLE\POWELLDRIVE- POST2.PPW Event: 10 yr Storm... TypeII 24hr T ag: Dev.10 Time HYDROGRAPH ORDINATES (cfs) Output Time increment = .0833 hrs hrs Ti me on le ft represents time for first va lue in each row. --------- ------ 35.7357 36.1522 -------- .04 .04 ------------------- .04 .04 ------------ .04 .04 ---- .04 .04 ------------- .04 .04 36.5687 .04 .04 .04 .04 .04 36.9852 .04 .04 .04 .04 .04 ' 37.4017 37.8182 .04 .04 .04 .04 .04 .04 .04 .04 .04 .04 38.2347 .04 .04 .04 .04 .04 38.6512 .04 .04 .04 .04 .04 39.0677 .04 .04 .04 .04 .04 39.4842 ( .04 .04 .04 .04 .04 39.9007 .04 .04 .04 .04 .04 40.3172 .04 .04 .04 .04 .04 40.7337 .04 .04 .04 .04 .04 41.1502 .04 .04 .04 .04 .04 41.5667 .04 .04 .04 .04 .04 41.9832 .04 .04 .04 .04 .04 42.3997 .04 .04 .04 .04 .04 42.8162 .04 .04 .04 .04 .04 43.2327 .04 .04 .04 .04 .04 43.6492 44.0657 .04 .04 .04 .04 .04 .04 .04 .04 .04 .04 44.4822 .04 .04 .04 .04 .04 44.8987 .04 .04 .04 .04 .04 45.3152 45.7317 .04 .04 .04 .04 .04 .04 .04 .04 .04 .04 46.1482 .04 .04 .03 .03 .03 46.5647 .03 .03 .03 .03 .03 ' 46.9812 47.3977 .03 .03 .03 .03 .03 .03 .03 .03 .03 .03 47.8142 .03 .03 .03 .03 .03 48.2307 .03 .03 .03 .03 .03 ' 48.6472 49.0637 .03 .03 .03 .03 .03 .03 .03 .03 .03 .03 49.4802 .03 .03 .03 .03 .03 49.8967 .03 .03 .03 .03 .03 50.3132 50.7297 .03 .03 .03 .03 .03 .03 .03 .03 .03 .03 51.1462 .03 .03 .03 .03 .03 51.5627 .03 .03 .03 .03 .03 51.9792 52.3957 .03 .03 .03 .03 .03 .03 .03 .03 .03 .03 52.8122 .03 .03 .03 .03 .03 53.2287 .03 .03 .03 .03 .03 53.6452 .03 .03 .03 .03 .03 ' 54.0617 .03 .03 .03 .03 .03 54.4782 .03 .03 .03 .03 .03 54.8947 .03 .03 .03 .03 .03 S/N: A21B01706A8C SUNGATE DESIGN GROUP, PA PondPack Ver: 7.0 (325) Compute Time: 10:45:55 Dat e: 04-28-2000 11 Type.... Pond Routed HYG (total out) Page 12.93 ' Name.... File.... POND OUT Tag: Dev.10 C:\HAESTAD\PPKW\SAMPLE\POWELLDRIVE- POST2.PPW Event: 10 yr Storm... TypeII 24hr Tag: Dev.10 ' Time HYDROGRAPH ORDINATES (cfs) Output Time increment = .0833 hrs hrs Time on l - eft represents time for first v alue in each row. ' -------- 55.3112 55.7277 - - ----------- .03 .03 -------------------- .03 .03 ----------- .03 .03 ----- .03 .03 ------------- .03 .03 56.1442 .03 .03 .03 .03 .03 56.5607 .03 .03 .03 .03 .03 56.9772 .03 .03 .03 .03 .03 57.3937 .03 .03 .03 .03 .03 57.8102 .03 .03 .03 .03 .03 58.2267 .03 .03 .03 .03 .03 58.6432 .03 .03 .03 .03 .03 ' 59.0597 .03 .03 .03 .03 .03 59.4762 .03 .03 .03 .03 .03 59.8927 .03 .03 .03 .03 .03 60.3092 .03 .03 .03 .03 .03 60.7257 .03 .03 .03 .03 .03 61.1422 .03 .03 .03 .03 .03 ' 61.5587 61.9752 .03 .03 .03 .03 .03 .03 .03 .03 .03 .03 62.3917 .03 .03 .03 .03 .03 62.8082 .03 .03 .03 .03 .03 63.2247 63.6412 .03 .03 .03 .03 .03 .03 .03 .03 .03 .03 64.0577 .03 .03 .03 .03 .03 64.4742 .03 .03 .03 .03 .03 64.8907 65.3072 .03 .03 .03 .03 .03 .03 .03 .03 .03 .03 65.7237 .03 .03 .03 .03 .03 66.1402 .03 .03 .03 .03 .03 ' 66.5567 66.9732 .03 .03 .03 .03 .03 .03 .03 .03 .03 .03 67.3897 .03 .03 .03 .03 .03 67.8062 .03 .03 .03 .03 .03 68.2227 68.6392 .03 .03 .03 .03 .03 .03 .03 .03 .03 .03 69.0557 ( .03 .03 .03 .03 .03 69.4722 .03 .03 .03 .03 .03 69.8887 70.3052 .03 .03 .03 .03 .03 .03 .03 .03 .03 .03 70.7217 .03 .03 .03 .03 .03 71.1382 .03 .03 .03 .03 .03 71.5547 .03 .03 .03 .03 .03 71.9712 .03 .03 .03 .03 .03 72.3877 .03 .03 .03 .03 .03 72.8042 .03 .03 .03 .03 .03 73.2207 .03 .03 .03 .03 .03 73.6372 .03 .03 .03 .03 .03 74.0537 .03 .03 .03 .03 .03 74.4702 .03 .03 .03 .03 .03 ' S/N: A21B01706A8C SUNGATE DESIGN GROUP, PA PondPack Ver: 7.0 (325) Compute Time: 10:45:55 Dat e: 04-28-2000 Type.... Pond Routed HYG (total out) Page 12.94 ' Name.... File.... POND OUT C:\HAESTAD\PPKW\ Tag: Dev.10 SAMPLE\POWELLDRIVE- POST2.PPW Event: 10 yr Storm... TypeII 24hr T ag: Dev.10 ' Time HYDROGRAPH ORDINATES (cfs) Output Time increment = .0833 hrs hrs Time on le ft represents time for first value in each row. -------- 74.8867 75.3032 - -------------- .03 .03 ------------------- .03 .03 ---------- .03 .03 ------ .03 .03 ------------- .03 .03 75.7197 .03 .03 .03 .03 .03 76.1362 .03 .03 .03 .03 .03 76.5527 76.9692 .03 .03 .03 .03 .03 .03 .03 .03 .03 .03 77.3857 .03 .03 .03 .03 .03 77.8022 .03 .03 .03 .03 .03 78.2187 .03 .03 .03 .03 .03 ' 78.6352 .03 .03 .03 .03 .03 79.0517 .03 .03 .03 .03 .03 79.4682 .03 .03 .03 .03 .03 79.8847 .03 .03 .03 .03 .03 ' 80.3012 .03 .03 .03 .03 .03 80.7177 .03 .03 .03 .03 .03 81.1342 .03 .03 .03 .03 .03 81.5507 .03 .03 .03 .03 .03 81.9672 .03 .03 .03 .03 .03 82.3837 .03 .03 .03 .03 .03 82.8002 83.2167 .03 .03 .03 .03 .03 .03 .03 .03 .03 .03 83.6332 .03 .03 .03 .03 .03 84.0497 .03 .03 .03 .03 .03 ' 84.4662 84.8827 .03 .03 .03 .03 .03 .03 .03 .03 .03 .03 85.2992 .03 .03 .03 .03 .03 85.7157 .03 .03 .03 .03 .03 ' 86.1322 86.5487 .03 .03 .03 .03 .03 .03 .03 .03 .03 .03 86.9652 .03 .03 .03 .03 .03 87.3817 .03 .03 .03 .03 .03 ' 87.7982 88.2147 .03 .03 .03 .03 .03 .03 .03 .03 .03 .03 88.6312 .03 .03 .03 .03 .03 89.0477 .03 .03 .03 .02 .02 89.4642 89.8807 .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 90.2972 .02 .02 .02 .02 .02 90.7137 .02 .02 .02 .02 .02 91.1302 91.5467 .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 91.9632 .02 .02 .02 .02 .02 92.3797 .02 .02 .02 .02 .02 92.7962 .02 .02 .02 .02 .02 ' 93.2127 .02 .02 .02 .02 .02 93.6292 .02 .02 .02 .02 .02 94.0457 .02 .02 .02 .02 .02 ' S/N: A21B01706A8C SUNGATE DESIGN GROUP, PA PondPack Ver: 7.0 (325) Compute Time: 10:45:55 Dat e: 04-28-2000 Type.... Pond Routed HYG (total out) Page 12.95 ' Name.... File.... POND OUT Tag: Dev.10 C:\HAESTAD\PPKW\SAMPLE\POWELLDRIVE- POST2.PPW Event: 10 yr Storm... TypeII 24hr Tag: Dev.10 Time HYDROGRAPH ORDINAT Output Time increm ES (cfs) ent = .0833 hrs hrs Time on l ----------- eft represents time for first v alue in each row. -------- 94.4622 94.8787 - -- .02 .02 -------------------- .02 .02 ----------- .02 .02 ----- .02 .02 ------------- .02 .02 95.2952 .02 .02 .02 .02 .02 95.7117 .02 .02 .02 .02 .02 ' 96.1282 96.5447 .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 96.9612 .02 .02 .02 .02 .02 97.3777 .02 .02 .02 .02 .02 97.7942 .02 .02 .02 .02 .02 ' 98.2107 .02 .02 .02 .02 .02 98.6272 .02 .02 .02 .02 .02 99.0437 .02 .02 .02 .02 .02 99.4602 .02 .02 .02 .02 .02 ' 99.8767 .02 .02 .02 .02 .02 100.2932 .02 .02 .02 .02 .02 ' 100.7097 101.1262 ( .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 101.5427 .02 .02 .02 .02 .02 101.9592 .02 .02 .02 .02 .02 ' 102.3757 102.7922 .O1 .01 .01 .O1 .01 .01 .01 .O1 .O1 .O1 103.2087 ( .O1 .01 .01 .O1 .O1 103.6252 .01 .O1 .O1 .O1 .01 ' 104.0417 104.4582 .O1 .01 .O1 .01 .01 .01 .O1 .O1 .O1 .O1 104.8747 .01 .01 .01 .01 .01 105.2912 .01 .01 .01 .01 .01 ' 105.7077 106.1242 .01 .O1 .01 .O1 .01 .01 .01 .O1 .01 .01 106.5407 .01 .01 .01 .01 .01 106.9572 .O1 .01 .O1 .01 .01 107.3737 107.7902 .O1 .01 .O1 .01 .01 .01 .01 .O1 .01 .O1 108.2067 .01 .01 .01 .01 .01 108.6232 .01 .O1 .01 .O1 .O1 ' 109.0397 109.4562 .O1 .01 .O1 .O1 .01 .O1 .01 .O1 .O1 .O1 109.8727 .O1 .01 .O1 .O1 .O1 110.2892 .O1 .O1 .O1 .01 .O1 110.7057 111.1222 .O1 .01 .O1 .01 .O1 .01 .O1 .01 .01 .01 111.5387 .O1 .01 .O1 .01 .O1 111.9552 .O1 .01 .01 .01 .O1 112.3717 .01 .O1 .01 .O1 .O1 ' 112.7882 .01 .O1 .O1 .O1 .O1 113.2047 .O1 .O1 .O1 .01 .O1 113.6212 .O1 .01 .01 .O1 .O1 ' S/N: A21BO1706A8C SUNGATE DESIGN GROUP, PA PondPack Ver: 7.0 (325) Compute Time: 10:45:55 Dat e: 04-28-2000 Type.... Pond Routed HYG (total out) Page 12.96 Name.... File.... POND OUT Tag: Dev.10 C:\HAESTAD\PPKW\SAMPLE\POWELLDRIVE- POST2.PPW Event: 10 yr Storm... TypeII 24hr Tag: Dev.10 ' Time HYDROGRAPH ORDINATES (cfs) Output Time increment = .0833 hrs hrs Time on l eft represents time for first v alue in each row. 1 -------- 114.0377 114.4542 - ------------- .01 .O1 -------------------- .01 .O1 ----------- .01 .O1 ----- .01 .01 ------------- .01 .01 114.8707 .O1 .O1 .O1 .01 .01 115.2872 .O1 .O1 .O1 .01 .O1 ' 115.7037 116.1202 .01 .01 .01 .O1 .O1 .01 .O1 .O1 .01 .01 116.5367 .O1 .O1 .01 .O1 .O1 116.9532 .O1 .01 .O1 .O1 .O1 117.3697 .O1 .01 .O1 .O1 .O1 ' 117.7862 .01 .O1 .O1 .O1 .01 118.2027 .O1 .O1 .01 .01 .01 118.6192 .O1 .O1 .O1 .01 .O1 119.0357 .O1 .O1 .O1 .01 .O1 ' 119.4522 .01 .O1 .O1 .O1 .01 119.8687 .O1 .O1 .O1 .O1 .01 120.2852 .O1 .O1 .O1 .01 .01 ' 120.7017 .01 .O1 .O1 .01 .01 121.1182 .O1 .O1 .01 .O1 .O1 121.5347 .O1 .O1 .O1 .01 .O1 121.9512 122.3677 .O1 .01 .O1 .O1 .O1 .O1 .01 .O1 .01 .O1 122.7842 .O1 .O1 .O1 .01 .01 123.2007 .01 .O1 .O1 .01 .01 123.6172 124.0337 .O1 .O1 .01 .O1 .01 .O1 .01 .01 .O1 .01 124.4502 .01 .01 .01 .01 .01 124.8667 .01 .O1 .01 .O1 .O1 125.2832 125.6997 .01 .O1 .O1 .O1 .O1 .01 .O1 .O1 .01 .O1 126.1162 .O1 .O1 .01 .O1 .01 126.5327 .O1 .01 .01 .01 .01 ' 126.9492 127.3657 .O1 .01 .O1 .O1 .O1 .O1 .01 .O1 .O1 .O1 127.7822 .O1 .01 .O1 .O1 .01 128.1987 ( .O1 .O1 .O1 .01 .01 6D,o,4 AJL 128.6152 .01 .01 .O1 .O1 .01 l rm& Dpi3J 129.0317 129.4482 .O1 .O1 .01 .01 .O1 .01 .O1 .01 .O1 .O1 129.8647 .O1 .01 .01 .01 .O1 0.7'x- 130.2812 .O1 .O1 .O1 .00 .00 ¦ ???`? 30.6977 .00 .00 .00 .00 .00 ¦ `DRAW 131.1142 131.5307 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 v44 131.9472 .00 .00 .00 .00 .00 132.3637 .00 .00 .00 .00 .00 132.7802 .00 .00 .00 .00 .00 133.1967 .010 .00 .00 .00 .00 S/N: A21B01706A8C SUNGATE DESIGN GROUP, PA PondPack Ver: 7.0 (325) Compute Time: 10:45:55 Dat e: 04-28-2000 Type.... Pond Routed HYG (total out) Page 12.97 Name.... File.... POND OUT Tag: Dev.1 C:\HAESTAD\PPKW\SAMPLE\POWELL 0 DRIVE-POST2.PPW Event: 10 yr Storm... TypeII 24hr Tag: Dev.10 Time HYDROGRAPH O Output Time RDINATES (cfs) increment = .0833 hrs hrs Time on l ----- ---- eft represents time for first va lue in each row. -------- 133.6132 134.0297 - --- - .00 .00 -------------- .00 .00 ----------------- .00 .00 ----- .00 .00 ------------- .00 .00 134.4462 .00 .00 .00 .00 .00 134.8627 .00 .00 .00 .00 .00 135.2792 135.6957 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 136.1122 .00 .00 .00 .00 .00 136.5287 .00 .00 .00 .00 .00 136.9452 .00 .00 .00 .00 .00 ' 137.3617 .00 .00 .00 .00 .00 137.7782 .00 .00 .00 .00 .00 138.1947 .00 .00 .00 .00 .00 138.6112 .00 .00 .00 .00 .00 ' 139.0277 .00 .00 .00 .00 .00 139.4442 .00 .00 .00 .00 .00 139.8607 .00 .00 .00 .00 .00 ' 140.2772 .00 .00 .00 .00 .00 140.6937 .00 .00 .00 .00 .00 141.1102 .00 .00 .00 .00 .00 1 141.5267 141.9432 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 142.3597 .00 .00 .00 .00 .00 142.7762 .00 .00 .00 .00 .00 ' 143.1927 .00 .00 .00 .00 .00 1 S/N: A21BO1706A8C SUNGATE DESIGN GROUP, PA PondPack Ver: 7.0 (325) Compute Time: 10:45:55 Date: 04-28-2000 r? POND ROUTED HYDROGRAPH 10 YEAR TIME vs ELEV. Type.... Time-Elev ' Name.... POND OUT Tag: Dev.10 File.... C:\HAESTAD\PPKW\SAMPLE\POWELLDRIVE-POST2.PPW Storm... TypeII 24hr Tag: Dev.10 Time hrs TIME vs. ELEVATION (ft) Page 8.17 Event: 10 yr t 25 I Li Output Time increment = .0833 hrs Time on left represents time for first value in each row. J 2.4157 2.8322 3.2487 3.6652 4.0817 4.4982 4.9147 5.3312 5.7477 6.1642 6.5807 6.9972 7.4137 7.8302 8.2467 8.6632 9.0797 9.4962 9.9127 10.3292 10.7457 11.1622 11.5787 11.9952 12.4117 12.8282 13.2447 13.6612 14.0777 14.4942 14.9107 15.3272 15.7437 16.1602 16.5767 16.9932 17.4097 17.8262 18.2427 18.6592 19.0757 19.4922 19.9087 20.3252 20.7417 I 288.00 288.00 288.00 288.00 288.01 288.01 288.02 288.02 288.03 288.04 288.05 288.06 288.07 288.08 288.10 288.11 288.13 288.15 288.17 288.18 288.21 288.23 288.25 288.27 288.30 288.33 288.35 288.38 288.41 288.44 288.48 288.51 288.55 288.58 288.62 288.66 288.70 288.74 288.79 288.83 288.88 288.92 288.97 289.01 289.05 289.08 289.11 289.15 289.18 289.22 289.26 289.29 289.33 289.37 289.41 289.45 289.49 289.54 289.58 289.63 289.67 289.72 289.77 289.81 289.86 289.91 289.96 290.01 290.05 290.09 290.13 290.17 290.21 290.26 290.30 290.35 290.40 290.46 290.51 290.57 290.63 290.69 290.75 290.81 290.87 290.93 290.99 291.04 291.09 291.13 291.18 291.24 291.29 291.35 291.41 291.47 291.54 291.61 291.68 291.76 291.84 291.93 292.02 292.09 292.17 292.26 292.35 292.46 ?Nk, 292.57 292.70 292.87 293.13 293.53 • ? 293.96 294.19 294.20 294.08 293.95cYP"' 293.87 293.84 293.83 293.82 293.81 293.80 293.80 293.79 293.79 293.79 293.79 293.79 293.78 293.78 293.78 293.78 293.78 293.78 293.78 293.77 293.77 293.77 293.77 293.77 293.77 293.77 293.77 293.77 293.77 293.77 293.77 293.77 293.77 293.77 293.77 293.77 293.77 293.77 293.77 293.77 293.77 293.76 293.76 293.76 293.76 293.76 293.76 293.76 293.76 293.76 293.76 293.76 293.76 293.76 293.76 293.76 293.76 293.76 293.76 293.76 293.76 293.76 293.76 293.76 293.76 293.76 293.76 293.76 293.76 293.76 293.76 293.76 293.76 293.76 293.76 293.76 293.76 293.76 293.76 293.76 293.76 293.76 293.76 293.76 293.76 293.76 293.76 293.76 293.76 293.76 293.76 293.76 293.76 293.76 293.76 293.76 293.76 293.76 293.76 293.76 293.76 293.76 293.76 293.76 293.76 293.76 293.76 S/N: A21BO1706A8C SUNGATE DESIGN GROUP, PA PondPack Ver: 7.0 (325) Compute Time: 10:45:55 Date: 04-28-2000 Type.... Time-Elev Page 8.18 ' Name.... POND OUT Tag: Dev.10 Event: 10 yr File.... C:\HAESTAD\PPKW\SAMPLE\POWELLDRIVE-POST2.PPW Storm... TypeII 24hr Tag: Dev.10 ' TIME vs. ELEVATION (ft) Time Output Time increment = .0833 hrs hrs Time on left represents time for first value in each row. --------- -------------------------------------------------------------- 21.1582 293.76 293.76 293.76 293.76 293.76 21.5747 293.76 293.76 293.76 293.76 293.76 21.9912 293.76 293.76 293.76 293.76 293.76 22.4077 293.76 293.76 293.76 293.76 293.76 22.8242 293.76 293.76 293.76 293.76 293.76 23.2407 293.76 293.76 293.76 293.76 293.76 23.6572 293.76 293.76 293.76 293.76 293.76 ' 24.0737 293.75 ,k 293.75 293.75 293.75 293.75 24.4902 293.74 293.74 293.74 293.74 293.74 24.9067 293.73 293.73 293.73 293.73 293.73 25.3232 293.73 293.72 293.72 293.72 293.72 25.7397 293.72 293.72 293.71 293.71 293.71 26.1562 293.71,N;e 293.71 293.71 293.70 293.70 26.5727 293.70 293.70 293.70 293.69 293.69 26.9892 293.69 0abW 293.69 293.69 293.69 293.68 27.4057 293.68 9pw N 293.68 293.68 293.68 293.68 27.8222 293.67 293.67 293.67 293.67 293.67 28.2387 293.67 293.66 293.66 293.66 293.66 28.6552 293.66 293.66 293.65 293.65 293.65 29.0717 293.65 293.65 293.64 293.64 293.64 29.4882 293.64 293.64 293.64 293.63 293.63 29.9047 293.63 293.63 293.63 293.63 293.62 ' 30.3212 293.62 293.62 293.62 293.62 293.62 30.7377 ( 293.61 293.61 293.61 293.61 293.61 31.1542 293.61 293.60 293.60 293.60 293.60 31.5707 293.60 293.60 293.59 293.59 293.59 31.9872 293.59 293.59 293.59 293.58 293.58 32.4037 293.58 293.58 293.58 293.58 293.57 32.8202 ( 293.57 293.57 293.57 293.57 293.56 33.2367 293.56 293.56 293.56 293.56 293.56 ' 33.6532 293.55 293.55 293.55 293.55 293.55 34.0697 293.55 293.54 293.54 293.54 293.54 34.4862 293.54 293.54 293.53 293.53 293.53 34.9027 293.53 293.53 293.53 293.52 293.52 ' 35.3192 ( 293.52 293.52 293.52 293.52 293.51 35.7357 293.51 293.51 293.51 293.51 293.51 36.1522 293.50 293.50 293.50 293.50 293.50 36.5687 293.50 293.49 293.49 293.49 293.49 ' 36.9852 293.49 293.49 293.48 293.48 293.48 37.4017 293.48 293.48 293.48 293.47 293.47 37.8182 293.47 293.47 293.47 293.47 293.46 38.2347 293.46 293.46 293.46 293.46 293.46 38.6512 293.45 293.45 293.45 293.45 293.45 39.0677 293.45 293.44 293.44 293.44 293.44 39.4842 293.44 293.44 293.43 293.43 293.43 39.9007 293.43 293.43 293.43 293.43 293.42 S/N: A21B01706A8C SUNGATE DESIGN GROUP, PA PondPack Ver: 7.0 (325) Compute Time: 10:45:55 Date: 04-28-2000 Type.... Time-Elev ' Name.... POND OUT Tag: Dev.10 File.... C:\HAESTAD\PPKW\SAMPLE\POWELLDRIVE-POST2.PPW Storm... TypeII 24hr Tag: Dev.10 J Lr] 1 TIME vs. ELEVATION (ft) Page 8.19 Event: 10 yr Time Output Time increment = .0833 hrs hrs Time on left represents time for first value in each row. --------- - 40.3172 ----------- 293.42 ---------------- 293.42 --------- 293.42 -------------- 293.42 ----------- 293.42 40.7337 293.41 293.41 293.41 293.41 293.41 41.1502 293.41 293.40 293.40 293.40 293.40 41.5667 293.40 293.40 293.39 293.39 293.39 41.9832 293.39 293.39 293.39 293.38 293.38 42.3997 293.38 293.38 293.38 293.38 293.37 42.8162 293.37 293.37 293.37 293.37 293.37 43.2327 293.36 293.36 293.36 293.36 293.36 43.6492 293.36 293.36 293.35 293.35 293.35 44.0657 293.35 293.35 293.35 293.34 293.34 44.4822 293.34 293.34 293.34 293.34 293.33 44.8987 293.33 293.33 293.33 293.33 293.33 45.3152 293.32 293.32 293.32 293.32 293.32 45.7317 293.32 293.31 293.31 293.31 293.31 46.1482 293.31 293.31 293.31 293.30 293.30 46.5647 293.30 293.30 293.30 293.30 293.29 46.9812 293.29 293.29 293.29 293.29 293.29 47.3977 293.28 293.28 293.28 293.28 293.28 47.8142 293.28 293.28 293.27 293.27 293.27 48.2307 293.27 293.27 293.27 293.26 293.26 48.6472 293.26 293.26 293.26 293.26 293.25 49.0637 293.25 293.25 293.25 293.25 293.25 49.4802 293.25 293.24 293.24 293.24 293.24 49.8967 293.24 293.24 293.23 293.23 293.23 50.3132 293.23 293.23 293.23 293.22 293.22 50.7297 293.22 293.22 293.22 293.22 293.22 51.1462 293.21 293.21 293.21 293.21 293.21 51.5627 293.21 293.20 293.20 293.20 293.20 51.9792 293.20 293.20 293.20 293.19 293.19 52.3957 293.19 293.19 293.19 293.19 293.18 52.8122 293.18 293.18 293.18 293.18 293.18 53.2287 293.17 293.17 293.17 293.17 293.17 53.6452 293.17 293.17 293.16 293.16 293.16 54.0617 293.16 293.16 293.16 293.15 293.15 54.4782 293.15 293.15 293.15 293.15 293.15 54.8947 293.14 293.14 293.14 293.14 293.14 55.3112 293.14 293.13 293.13 293.13 293.13 55.7277 293.13 293.13 293.13 293.12 293.12 56.1442 293.12 293.12 293.12 293.12 293.11 56.5607 293.11 293.11 293.11 293.11 293.11 56.9772 293.11 293.10 293.10 293.10 293.10 57.3937 293.10 293.10 293.10 293.09 293.09 57.8102 293.09 293.09 293.09 293.09 293.08 58.2267 293.08 293.08 293.08 293.08 293.08 58.6432 ( 293.08 293.07 293.07 293.07 293.07 59.0597 293.07 293.07 293.06 293.06 293.06 ' S/N: A21BO1706A8C SUNGATE DESIGN GROUP, PA PondPack Ver: 7.0 (325) Compute Time: 10:45:55 Date: 04-28-2000 1 . Type.... Time-Elev ' Name.... POND OUT Tag: Dev.10 File.... C:\HAESTAD\PPKW\SAMPLE\POWELLDRIVE-POST2.PPW Storm... TypeII 24hr Tag: Dev.10 1 t 1 TIME vs. ELEVATION (ft) Page 8.20 Event: 10 yr Time Output Time increment = .0833 hrs hrs Time on left represents time for first value in each row. --------- - 59.4762 --------------- 293.06 ------------ 293.06 --------- 293.06 --------------- 293.06 ---------- 293.05 59.8927 293.05 293.05 293.05 293.05 293.05 60.3092 293.05 293.04 293.04 293.04 293.04 60.7257 293.04 293.04 293.03 293.03 293.03 61.1422 293.03 293.03 293.03 293.03 293.02 61.5587 293.02 293.02 293.02 293.02 293.02 61.9752 293.02 293.01 293.01 293.01 293.01 62.3917 293.01 293.01 293.01 293.00 293.00 62.8082 293.00 293.00 293.00 293.00 292.99 63.2247 292.99 292.99 292.99 292.99 292.98 63.6412 292.98 292.98 292.98 292.98 292.97 64.0577 292.97 292.97 292.97 292.97 292.97 64.4742 292.96 292.96 292.96 292.96 292.96 64.8907 292.95 292.95 292.95 292.95 292.95 65.3072 292.94 292.94 292.94 292.94 292.94 65.7237 292.94 292.93 292.93 292.93 292.93 66.1402 292.93 292.92 292.92 292.92 292.92 66.5567 292.92 292.91 292.91 292.91 292.91 66.9732 292.91 292.91 292.90 292.90 292.90 67.3897 292.90 292.90 292.89 292.89 292.89 67.8062 292.89 292.89 292.89 292.88 292.88 68.2227 292.88 292.88 292.88 292.87 292.87 68.6392 292.87 292.87 292.87 292.87 292.86 69.0557 292.86 292.86 292.86 292.86 292.85 69.4722 292.85 292.85 292.85 292.85 292.85 69.8887 292.84 292.84 292.84 292.84 292.84 70.3052 292.83 292.83 292.83 292.83 292.83 70.7217 292.83 292.82 292.82 292.82 292.82 71.1382 292.82 292.81 292.81 292.81 292.81 71.5547 292.81 292.81 292.80 292.80 292.80 71.9712 292.80 292.80 292.79 292.79 292.79 72.3877 292.79 292.79 292.79 292.78 292.78 72.8042 292.78 292.78 292.78 292.78 292.77 73.2207 292.77 292.77 292.77 292.77 292.76 73.6372 292.76 292.76 292.76 292.76 292.76 74.0537 292.75 292.75 292.75 292.75 292.75 74.4702 292.74 292.74 292.74 292.74 292.74 74.8867 292.74 292.73 292.73 292.73 292.73 75.3032 292.73 292.73 292.72 292.72 292.72 75.7197 292.72 292.72 292.72 292.71 292.71 76.1362 292.71 292.71 292.71 292.70 292.70 76.5527 292.70 292.70 292.70 292.70 292.69 76.9692 292.69 292.69 292.69 292.69 292.69 77.3857 292.68 292.68 292.68 292.68 292.68 77.8022 292.68 292.67 292.67 292.67 292.67 78.2187 292.67 292.66 292.66 292.66 292.66 S/N: A21BO1706A8C SUNGATE DESIGN GROUP, PA PondPack Ver: 7.0 (325) Compute Time: 10:45:55 Date: 04-28-2000 1 Type.... Time-Elev Page 8.21 Name.... File.... POND OUT Tag: Dev.10 Event: 10 yr C:\HAESTAD\PPKW\SAMPLE\POWELLDRIVE-POST2.PPW Storm... TypeII 24hr Tag : Dev.10 ' Time I TIME vs. ELEVATION (ft) Output Time increment = .0833 hrs hrs I Time on left represents time for first value in each row. 78.6352 I---------------- I 292.66 ----------- 292.66 ------------- 292.65 ----------- 292.65 ---------- 292.65 79.0517 I 292.65 292.65 292.65 292.64 292.64 79.4682 I 292.64 292.64 292.64 292.64 292.63 79.8847 80.3012 292.63 292.62 292.63 292.62 292.63 292.62 292.63 292.62 292.63 292.62 80.7177 I 292.62 292.61 292.61 292.61 292.61 81.1342 I 292.61 292.61 292.60 292.60 292.60 81.5507 I 292.60 292.60 292.60 292.59 292.59 81.9672 I 292.59 292.59 292.59 292.59 292.58 82.3837 292.58 292.58 292.58 292.58 292.58 82.8002 I 292.57 292.57 292.57 292.57 292.57 83.2167 I 292.57 292.56 292.56 292.56 292.56 83.6332 I 292.56 292.56 292.55 292.55 292.55 84.0497 I 292.55 292.55 292.55 292.54 292.54 84.4662 292.54 292.54 292.54 292.54 292.53 84.8827 292.53 292.53 292.53 292.53 292.53 85.2992 I 292.52 292.52 292.52 292.52 292.52 85.7157 I 292.52 292.51 292.51 292.51 292.51 86.1322 86.5487 I 292.51 I 292.50 292.51 292.50 292.50 292.50 292.50 292.49 292.50 292.49 86.9652 I 292.49 292.49 292.49 292.49 292.48 87.3817 292.48 292.48 292.48 292.48 292.48 87.7982 88.2147 I 292.48 I 292.47 292.47 292.47 292.47 292.46 292.47 292.46 292.47 292.46 88.6312 I 292.46 292.46 292.46 292.46 292.45 89.0477 I 292.45 292.45 292.45 292.45 292.45 89.4642 89.8807 I 292.45 292.44 292.44 292.44 292.44 292.44 292.44 292.43 292.44 292.43 90.2972 292.43 292.43 292.43 292.43 292.43 90.7137 292.42 292.42 292.42 292.42 292.42 91.1302 91.5467 I 292.42 I 292.41 292.42 292.41 292.41 292.41 292.41 292.41 292.41 292.41 91.9632 I 292.40 292.40 292.40 292.40 292.40 92.3797 I 292.40 292.40 292.40 292.39 292.39 1 92.7962 93.2127 I 292.39 I 292.38 292.39 292.38 292.39 292.38 292.39 292.38 292.39 292.38 93.6292 292.38 292.38 292.38 292.37 292.37 94.0457 292.37 292.37 292.37 292.37 292.37 94.4622 94.8787 292.37 292.36 292.37 292.36 292.36 292.36 292.36 292.36 292.36 292.36 95.2952 292.35 292.35 292.35 292.35 292.35 95.7117 I 292.35 292.35 292.35 292.35 292.34 96.1282 I 292.34 292.34 292.34 292.34 292.34 96.5447 I 292.34 292.34 292.34 292.33 292.33 96.9612 I 292.33 292.33 292.33 292.33 292.33 97.3777 I 292.33 292.33 292.32 292.32 292.32 S/N: A21BO1706A8C SUNGATE DESIGN GROUP, PA PondPack Ver: 7.0 (325) Compute Time: 10:45: 55 Date: 04-28-2000 Type.... Time-Elev Name.... POND OUT Tag: Dev.10 File.... C:\HAESTAD\PPKW\SAMPLE\POWELLDRIVE-POST2.PPW Storm... TypeII 24hr Tag: Dev.10 1 TIME vs. ELEVATION (ft) Page 8.22 Event: 10 yr Time Output Time increment = .0833 hrs hrs Time on left represents time for first value in each row. --------- - 97.7942 --------------- 292.32 ------------ 292.32 --------- 292.32 -------------- 292.32 ----------- 292.32 98.2107 292.32 292.32 292.31 292.31 292.31 98.6272 292.31 292.31 292.31 292.31 292.31 99.0437 292.31 292.31 292.30 292.30 292.30 99.4602 292.30 292.30 292.30 292.30 292.30 99.8767 292.30 292.30 292.29 292.29 292.29 100.2932 292.29 292.29 292.29 292.29 292.29 100.7097 292.29 292.29 292.29 292.28 292.28 101.1262 292.28 292.28 292.28 292.28 292.28 101.5427 292.28 292.28 292.28 292.28 292.27 101.9592 292.27 292.27 292.27 292.27 292.27 102.3757 292.27 292.27 292.27 292.27 292.27 102.7922 292.26 292.26 292.26 292.26 292.26 103.2087 292.26 292.26 292.26 292.26 292.26 103.6252 292.26 292.26 292.25 292.25 292.25 104.0417 292.25 292.25 292.25 292.25 292.25 104.4582 292.25 292.25 292.25 292.25 292.24 104.8747 292.24 292.24 292.24 292.24 292.24 105.2912 292.24 292.24 292.24 292.24 292.24 105.7077 292.24 292.24 292.23 292.23 292.23 106.1242 292.23 292.23 292.23 292.23 292.23 106.5407 292.23 292.23 292.23 292.23 292.23 106.9572 292.22 292.22 292.22 292.22 292.22 107.3737 292.22 292.22 292.22 292.22 292.22 107.7902 292.22 292.22 292.22 292.22 292.21 108.2067 292.21 292.21 292.21 292.21 292.21 108.6232 292.21 292.21 292.21 292.21 292.21 109.0397 292.21 292.21 292.21 292.21 292.20 109.4562 292.20 292.20 292.20 292.20 292.20 109.8727 292.20 292.20 292.20 292.20 292.20 110.2892 ( 292.20 292.20 292.20 292.20 292.19 110.7057 292.19 292.19 292.19 292.19 292.19 111.1222 292.19 292.19 292.19 292.19 292.19 111.5387 292.19 292.19 292.19 292.19 292.19 111.9552 292.18 292.18 292.18 292.18 292.18 112.3717 292.18 292.18 292.18 292.18 292.18 112.7882 292.18 292.18 292.18 292.18 292.18 113.2047 292.18 292.18 292.17 292.17 292.17 113.6212 292.17 292.17 292.17 292.17 292.17 114.0377 292.17 292.17 292.17 292.17 292.17 114.4542 292.17 292.17 292.17 292.17 292.17 114.8707 292.16 292.16 292.16 292.16 292.16 115.2872 292.16 292.16 292.16 292.16 292.16 115.7037 292.16 292.16 292.16 292.16 292.16 116.1202 292.16 292.16 292.16 292.16 292.16 116.5367 292.15 292.15 292.15 292.15 292.15 t S/N: A21BO1706A8C SUNGATE DESIGN GROUP, PA PondPack Ver: 7.0 (325) Compute Time: 10:45:55 Date: 04-28-2000 Type.... Time-Elev Name.... POND OUT Tag: Dev.10 File.... C:\HAESTAD\PPKW\SAMPLE\POWELLDRIVE-POST2.PPW Storm... TypeII 24hr Tag: Dev.10 u TIME vs. ELEVATION (ft) Page 8.23 Event: 10 yr Time Output Time increment = .0833 hrs hrs --------- - Time on left represents - time for first value in each row. 116.9532 ----------- 292.15 -------------- 292.15 ---------- 292.15 --------------- 292.15 ---------- 292.15 117.3697 292.15 292.15 292.15 292.15 292.15 117.7862 292.15 292.15 292.15 292.15 292.15 118.2027 292.14 292.14 292.14 292.14 292.14 118.6192 292.14 292.14 292.14 292.14 292.14 119.0357 292.14 292.14 292.14 292.14 292.14 119.4522 292.14 292.14 292.14 292.14 292.14 119.8687 292.14 292.14 292.13 292.13 292.13 120.2852 292.13 292.13 292.13 292.13 292.13 120.7017 292.13 292.13 292.13 292.13 292.13 121.1182 292.13 292.13 292.13 292.13 292.13 121.5347 292.13 292.13 292.13 292.13 292.13 121.9512 292.13 292.12 292.12 292.12 292.12 122.3677 292.12 292.12 292.12 292.12 292.12 122.7842 292.12 292.12 292.12 292.12 292.12 123.2007 292.12 292.12 292.12 292.12 292.12 123.6172 292.12 292.12 292.12 292.12 292.12 124.0337 292.12 292.11 292.11 292.11 292.11 124.4502 292.11 292.11 292.11 292.11 292.11 124.8667 292.11 292.11 292.11 292.11 292.11 125.2832 292.11 292.11 292.11 292.11 292.11 125.6997 292.11 292.11 292.11 292.11 292.11 126.1162 292.11 292.11 292.11 292.11 292.10 126.5327 292.10 292.10 292.10 292.10 292.10 126.9492 292.10 292.10 292.10 292.10 292.10 127.3657 292.10 292.10 292.10 292.10 292.10 127.7822 292.10 292.10 292.10 292.10 292.10 128.1987 292.10 292.10 292.10 292.10 292.10 128.6152 292.10 292.10 292.10 292.10 292.10 129.0317 292.09 292.09 292.09 292.09 292.09 129.4482 292.09 292.09 292.09 292.09 292.09 129.8647 292.09 292.09 292.09 292.09 292.09 130.2812 ( 292.09 292.09 292.09 292.09 292.09 130.6977 292.09 292.09 292.09 292.09 292.09 131.1142 292.09 292.09 292.09 292.09 292.09 131.5307 292.09 292.09 292.09 292.09 292.08 131.9472 292.08 292.08 292.08 292.08 292.08 132.3637 292.08 292.08 292.08 292.08 292.08 132.7802 292.08 292.08 292.08 292.08 292.08 133.1967 292.08 292.08 292.08 292.08 292.08 133.6132 292.08 292.08 292.08 292.08 292.08 134.0297 292.08 292.08 292.08 292.08 292.08 134.4462 292.08 292.08 292.08 292.08 292.08 134.8627 292.08 292.08 292.08 292.07 292.07 135.2792 292.07 292.07 292.07 292.07 292.07 135.6957 292.07 292.07 292.07 292.07 292.07 ' S/N: A21BO1706A8C SUNGATE DESIGN GROUP, PA PondPack Ver: 7.0 (325) Compute Time: 10:45:55 Date: 04-28-2000 . 1--:- Type.... Time-Elev ' Name.... POND OUT Tag: Dev.10 File.... C:\HAESTAD\PPKW\SAMPLE\POWELLDRIVE-POST2.PPW Storm... TypeII 24hr Tag: Dev.10 ' Time hrs ' 136.1122 136.5287 136.9452 137.3617 137.7782 138.1947 138.6112 139.0277 ' 139.4442 139.8607 140.2772 140.6937 141.1102 141.5267 141.9432 ' 142.3597 142.7762 143.1927 n 0 TIME vs. ELEVATION (ft) Page 8.24 Event: 10 yr Output Time increment = .0833 hrs Time on left represents time for first value in each row. 292.07 292.07 292.07 292.07 292.07 292.07 292.07 292.07 292.07 292.07 292.07 292.07 292.07 292.07 292.07 292.07 292.07 292.07 292.07 292.07 292.07 292.07 292.07 292.07 292.07 292.07 292.07 292.07 292.07 292.07 292.07 292.07 292.06 292.06 292.06 292.06 292.06 292.06 292.06 292.06 292.06 292.06 292.06 292.06 292.06 292.06 292.06 292.06 292.06 292.06 292.06 292.06 292.06 292.06 292.06 292.06 292.06 292.06 292.06 292.06 292.06 292.06 292.06 292.06 292.06 292.06 292.06 292.06 292.06 292.06 292.06 292.06 292.06 292.06 292.06 292.06 292.06 292.06 292.06 292.06 292.06 292.06 292.06 292.05 292.05 292.05 292.05 292.05 292.05 292.05 ' S/N: A21BO1706A8C SUNGATE DESIGN GROUP, PA PondPack Ver: 7.0 (325) Compute Time: 10:45:55 1 Date: 04-28-2000 r C 1 7 State of North Carolina Department of Environment and Ncatural Resources Division of Water Quality James B. Hunt, Jr., Governor Bill Holman, Secretary Kerr T. Stevens, Director Mr. Sam Sa.eh General Manager CERTIFIED MAIL-RETURN RECEIPT REQUESTED Neomode Associates 3817 Beryl Road Raleigh, NC 27607 Dear Mr. Sal-,h: NCDENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES April 3, 2000 DWQ Project # 000109 Wake County i The Division of Water Quality has reviewed your plans for the discharge of fill material into 264 linear feet of streams located at Dowell Drive in Wake County for construction of a bakery as described in your application dated February 11, 2000. Insufficient evidence is present in our files to conclude that your project must be built as planned in waters and/or wetlands in accordance with 15A NCAC 2H .0506. Therefore, uniess modifications of the proposal are made as described below, we will have to move toward denial of your 401 Certification as required by 15A NCAC 2H .0507(e) and will place this project on hold as incomplete until we receive this additional information, we are requesting (by copy of this letter) that the U.S. Army Corps of Engineers place your project on administrative hold. Please provide us with information supporting your position that states your project must be constructed. Specifically can you submit plans and calculations detailing the sizing, planning, depths, location and sizes of plunge and exit pools outlet and inlet structures, temporary and permanent pool sizer. An operation and maintenance agreement will also be needed. Any documentation such as maps and narrative that you can supply to address alternative designs for your project may be helpful in our review of your 401 Certification. Also this project will require compensatory mitigation as described in 15A NCAC 2H .0506(h). Please respond within three weeks of the date of this letter by sending a copy of this information to me and one copy to Mr. Todd St. John at 733-9584. If we do not hear from you in three weeks, we will assume that you no longer want to pursue this project and we will consider the project as withdrawn. I can be reached at 919-733-9646 if you have any questions. cer ?o R. Dorney cc: Raleigh DWQ Regional Office -? File Copy Central Files Bill Hamilton; Sungate Design Raleigh Field Office Corps of Engineers Wetlands/401 Unit 1621 Mail Service CenterRaleigh, North Carolina 27669-1621 Telephone 919-733-1786FAX # 733-9959 An Equal Opportunity Affirmative Action Employer 50% :_c•, lc,? 1r post consumer paper Sungate Design Group, RA. ENGINEERING • LANDSCAPE ARCHITECTURE • ENVIRONMENTAL 915-A Jones Franklin Road • Raleigh, NC 27606 • e-mail sungate@mindspring.com • Phone 919.859.2243 • Fax 919.859.6258 March 23, 2000 1. Mr. John Dorney N.C. Division of Water Quality 4401 Reedy Creek Road Raleigh, North Carolina 27607 (iY'oUt' , r• n W??R Q_UALITf SECTII ` , RE: NEOMONDE BAKING COMPANY (Powell Drive, Raleigh, NC) Dear John: On behalf of the Owner (Neomonde Associates) and Contractor (Metrocon, Inc.) I am requesting a progress update regarding the review of the Stormwater Management Plan submitted for the above reference project. If possible, please contact me with any information that would assist my clients with their development schedule. Your attention to this matter is greatly appreciated and please contact me should you have questions or desire additional information. f ectfully, A k Braxton Cc: Sam Saleh, Neomonde Jay Johnson, Metrocon .,. ewn NCDENR DIVISION OF WATER QUALITY March 28, 2000 Memorandum To: John Dorney From: Todd St. John Subject: Neomonde Wake County DWQ# 000109 I have reviewed the stormwater plans for the subject project. Apparently, an e, detention wetland is proposed. However, l will need plan details regarding siz planting, depths, locations and sizes of plunge and exit pools, outlet and inlet temporary and permanent pool sizes as well as calculations. An operation an maintenance agreement is also required. Additionally, the stream relocation plan calls for grade control structures an bank matting. I am concerned that the matting in the streambed may precluc formation of a riffle pool sequence. Grade control may be adequate for stab is not clear if mitigation is required for the impacts. ?4) MEMORANDUM TO: John Dorney Non-Discharge Branch Regional Contact: Charles Brown WO Supervisor: Ken Schuster Date: SUBJECT: WETLAND STAFF REPORT AND RECOMMENDATIONS Facility Name Neomonde Associates c/o Sam Saleh Project Number 00 0109 Recvd From APP Received Date 2/11/00 Recvd By Region Project Type commercial fill County Wake County2 Region Raleigh Certificates Stream Stream Impacts (ft.) Permit Wetland Wetland Wetland Stream Class Acres Feet sm =_ Type Type Impact Score Index Prim. Supp. Basin Req. Req. 0= 26 F-- OO 7 O N F- 27-34-2 F-c -F-NSW 30,402. 0.06 F_ F_ F_ F Mitigation Wetland MitigationType Type Acres Feet Is Wetland Rating Sheet Attached? Q Y Qi N Did you request more info? Q Y 0 N Have Project Changes/Conditions Been Discussed With Applicant? Q Y pQ N Is Mitigation required? p Y Q N Recommendation: Q Issue O Issue/Cond O Deny Provided by Region: Latitude (ddmmss) 354720 Longitude (ddmmss) 784256 cc: Regional Office Central Office Page Number 1 Facility Name Neomonde Associates c/o Sam Saleh County Wake Project Number 00 0109 Regional Contact: Charles Brown Date: Comments (continued from page 1): cc: Regional Office Page Number 2 Central Office } DWQ ID: CORPS ACTION ID: NATIONWIDE PERMIT REQUESTED (PROVIDE NATIONWIDE PERMIT Irj 26 1?- V d7Q? r:,? S ?? ? a^ { PRE-CONSTRUCTION NOTIFICATION APPLICATION FOR NATIONWIDE PERMITS THAT REQLgRE: 1) NOTIFICATION TO THE CORPS -OF ENGINEERS 2) APPLICATION FOR SECTION 401 CERTIFCATION 3) COORDINATION WITH TIM NC DIVISION OF COASTAL MANAGEMENT SEND THE ORIGINAL AND (1) COPY-OF THIS COMPLETED FORM TO THE APPROPRIATE FIELD OFFICE OF THE CORPS OFENOWEERS (SEE AGENCY ADDRESSES SHEET). SEVEN (7) COPIES MUST BE SENT TO THE NC DIVISION OF WATER r T1 ? OUALITY. ATTN: JOHN DORNEY, 4401 REEDY CREEK ROAD, RALEIGH. NC 27607. PLEASE PRINT OR TYPE. 1. OANER,SNAME:___ Neomonde Associates 2. MAILING ADDRESS: 3 817 Beryl Rd. SUBDIVISION NAME CITY: R a l e i g h STATE: N C ZIP CODE: 7 6 0 7 PROTECT LOCATION ADDRESS, Rx'CLUDING SUBDIVISION NAME (IF DIFFERENT FROM MAILING ADDRESS ABOVE): 212 Powell Drive, Raleigh, NC Lot 6, Etta Burke Park 3. 1ELEPHONE NUMBER: (HOME) (WORK) 919-828-3225 4. IF APPLICABLE: AGENT'S NAME OR RESPONSIBLE CORPORATE OFFICIAL, ADDRESS, PHONE NUMBER: Mr-Sam Saleh General Partner 3817 Beryl Rd Raleigh, TIC 27607 Tel.-919-828-3225 5. LOCATION OF WORK (PROVIDE A MAP, PREFERABLY A COPY OF USGS TOPOGRAPHIC MAP OR AERIAL PHOTOGRAPHY WITH SCALE): COUNTY: Wake . NEAREST TOWN: R a 1 e i g h_! SPECIFIC LOCATION (INCLUDE ROAD NZJ1yMF-RS, LANDMARKS. ECT.) Southwest of North Carolina State Fairgrounds Ralei 600 ft. south of intersection of and Powell Drive 6 I M P A C T E D OR NEAREST STREAM5ZIVER: Unnamed tributary to Simmons B r a n c h RIVER BASIN: N e u s e River 7a. IS PROJECT LOCATED NEAR WATER CLASSIFIED AS TROUT, TIDAL SALTWATER, (SA), HIGIi QUALITY WATERS (HQW), OUTSTANDING RESOURSE WATERS {ORW), WATER SUPPLY (WS•I OR WS-II)? YES ( ) NO ( X ) M YES. EXPLAIN: 7b. IS THE PROJECT LOCATED Wt' - IN A NORTH CAROLINA- DIVISION OF COASTAL MANAGEMENT AREA OP ENVIROM£N'['AL CONCERN (AEC)? YES ( ) NO ( X ) 7c. IF TIC PROJECT, LS LOCATED WITHIN A COASTAL COUNTY (SEE PAGE 7 FOR LIST OF COASTAL COUNTIES), WHAT LS THE LAND USE PLAN (LUP) DESiGNATTON? ga. HAVE ANY SEC'T'ION 404 mRMITS BEEN PREVIOUSLY REQUESTED FOR USE ON THIS PROJECT? YES ( ) NO (X ) IF YES, PROVIDE AC'T'ION I.D. NUMBER OF PREVIOUS I'ERMYT AND ANY ADDITIONAL TNFORMAn'ON (INCLUDE PHOTOCOPY OF 401 CERTMCAT'ION): Eb. ARE ADDITIONAL PERMIT REQUESTS EXPT<CTED FOR THIS PROPERTY IN THE PCJ'i'URE? YES.( ) NO (X) IF YES.I)ESCME ANTICIPATED WORK: 9a. ESTIMATED TOTAL. NUMBERS OP ACRES IN TRACT OF LAND: 2. 7 3 a c r e s 9b. ES-(MATED TOTAL NUMBER OF ACRES OF WFTLA14DS LOCATED ON PROTECT SITE: 0.08 acres 10a. NUMBER OF'ACRES OE WETLANDS IMPACTED BY TIC PROPOSED PROTECT BY: FILLING: _ 0. 0 6 4 a c, r e s EXCAVATION: FLOODING: OTHER : DRAINAGE : TOTAL ACRES TO BE IMPACTED: 10b_ (1) STREAh4 CHANNEL TO BE IMPACTED BY THE PROPOSED PROJECT (IF RELOCATED, PROVIDE DISTANCE BOTH BEFORE AND AFTER RELOCATION: LENGTH BEFORE: FT AFTER: ?S-3 FT WIDTH BEFORE (based on normal hioh wear concours): 2'-4' FT AVERAGE DEP'T'H BEFORE: 1-2' Fi' AFB: Proposed 1-2' FT (2) STREAM CHANN -L IMPACTS WRL RESULT FROM: (CHECK ALL THAT APPLY) OPEN CHANNEL RF1,OCATION: X PLACEMENT OF PIPE W CHANNEL- ?. CIiANNEL EXCAVATION: COONSTRUCTION OF A DAM/FI.OODING: OTHER. 11. IF CONSTRUCTION OF A POND IS PROPOSED, WHAT IS THE SIZE OF THE WATERSHED DRAIPIING TO THE POND? WHAT IS THE EXPECTED POND SURFACE AREA? 12. DISCTIP'IION OF PROPOSED WORK INCLUDING DISCUSSION OF TYPE OF MECHANICAL EQUIPMLNT TO BE USED? (ATTACH PLANS: 81/2 BY 11 DRAWINGS ONLY) Excavation of relocated channel by track backhoe and haul truck. Fill of the existing channel and wetlands by track loader and haul truck. 13. PURPOSE OF PROPOSED WORK: Cor struct an o i ?P /ytarPh?tP facility 14. STATE REASONS WHY'IT IS BELIEVED THAT THIS ACTIVITY MUST BE CARRIED OUT IN WETLANDS (INCLUDE ANY MEASURES TAKEN TO MINIMIZE WE71 AND IMPACTS) The wetlands I-Oc,ation on-sits adyprgg1- i-pacted tho I FEB Pr_, '9c? 12-:3::-::F-11 P.13 develop hla ale rpm^ining to allow the site to conform to the existing city regulations. The site's development layout was altered to reduce the impacts on the adjacent st-re.am/wetlands. 15. YOU ARE REQUIRED TO CONTACT THE US FISH AND WILDLIFE SERVICE AND/OR NATIONAL MARINE FISHERIES SERIVE REGARDING THE PRESENCE OF ANY FEDERALY LISTED OR PROPOSED FOR LISTING ENDANGERED OR THREATENED SPECIES OR CRITICAL HABITAT IN THE PERMIT AREA THAT MAY BE AFFECTED BY THE PROPOSED PROJECT. DATE CONTACTED: 16. YOU ARE REQUIRED TO CONTACT THE STATE HISTORIC-PRESERVATION OFFICER (SHPO) REGARDING THE PRESENCE OF HISTORIC PROPERTIES IN THE PERMIT AREA WHICH MAY BE AFFECTED BY THE PROPOSED PROJECT. DATE CONTACTED 17. DOES THE PROJECT INVOLVE AN EXPENDITURE OF PUBLIC FUNDS OT THE USE OF PUBLIC (STATE) LAND? YES ( ) NO ( X) (IF NO, GO TO 16) a. IF YES, DOES THE PROJECT REQUIRE PREPERATION OF AN ENVIRONMENTAL DOCUMENT PURUANT TO THE REQUIREMENTS OF THE NORTH CAROLINA ENVIRONMENTAL POLICY ACT? YES ( ) NO( ) b. IF YES, HAS THE DOCUMENT BEEN REFIEWED THROUGH THE NORTH CAROLINA DEPARTMENT OF ADMINISTRATION STATE CLEARINGHOUSE YES ( ) NO ( ) IF ANSWER 17b IS YES, THEN SUBMIT APPROPRIATE DOCUMENTATIONFROM THE STATE CLEARINGHOUSE WITH THE NORTH CAROLINA ENVIRONMENTAL POLICY ACT. QUESTIONS REGARDING THE STATE CLEARINGHOUSE REVIEW PROCESS SHOULD BE DIRECTED TO MS. CHRYS BAGOETT, DIRECTOR STATE CLEARINGHOUSE, NORT14 CAROLINA DEPARTMENT OF ADMINISTRATION, 116 WEST JONES STREET, RALEIGH. NORTH CAROLINA 27603-8003, TELEPHONE (919) 733-6369. 18. THE FOLLOWING ITEMS SHOULD BE INCLUDED WITH THIS APPLICATION IP PROPOSED ACTIVITY INVOLVES THE DISCHARGE OF EXCAVATED OF FILL MATERIAL INTO WETLANDS: a WETLAND DELINEATION MAP SHOWING ALL WETLANDS, STREAMS, LAKES, AND PONDS ON THE PROPERTY (FOR NATIONWIDE PERMIT NUMBERS 14, 18, 21, 26, 29, AND 38). ALL STREAM (INTERMITTENT-AND PERMANENT) ON THE PROPERTY MUST BE SHOWN ON THE MAP. MAP SCALES SHOULD BE 1 INCH EQUALS SO FEET OF I INCH EQUALS 100 FEET OF THEIR EQUIVALENT. b. IF AVAILABLE, REPRESENTATIVE PHOTOGRAPH OF WETLANDS TO BE IMPACTED BYPRODUCT. c. IF DELINEATION WAS PERFORMED BY A CONSULTANT, INCLUDE ALL DATA SHEETS RELEVANT TO THE PLACEMENT OF THE DELINEATION LINE, d. ATTACK A COPY OF THE STORMWATER MANAGEMENT PLAN IF REQUIRED, e. WHAT IS LAND USE OF SURROUNDING PROPOERTY? North-Office/warehouse South- Residential ' East- Industrial West - Office/warehouse ? y f. IF APPLICABLE, WHAT IS PROPOSED METHOD OF SEWAGE DISPOSAL? City of Raleigh Public Sewer g. SIGNED AND DATED AGENT AUTHORIZATION LETTER, IF APPLICABLE. NOTE: WTLANDS OR WATERS OF THE US MAY NOT BE EMPACTF-D PRIOR TO: I) ISSUANCE OF A SECTION 404 CORPS OF ENGINEERS PERMIT, 2) EITHER THE ISSUANCE OR WAIVER OF A 401 DIVISION OF WATER QUALITY CERTIFICATION, AND 3) (IN THE TWENTY COASTAL COUNTIES ONLY), A LETTER FRONI THE NORTH CAROLINA DIVISION OF COASTAL MANAGEMENT STATING THE PROPOSED ACTIVITY IS CONSISTENT WITH THE NORTH CAROLINA COASTAL MANAGEMENT PROGRAM, OWNER'S/AGENT'S SIGNATURE DATE (AGENT'S SIGNATUPY, VALID ONLY. IF AUTHORIZATION LETTER-FROM THE OWNER IS PROVIDED). w I IFEIIjiEEE??II M IIIIIliI I V,v \ \i \ A3 iy i }\\ \, ,, \ \ t lip \ I } \ } ;? \ 1 ! ?i 11 \ S ! l I \ \ \ 0 t , ? -\ \,ti ?\ \ }1 "'T,?; \} 1 rl V ? 1, ', !? I r ? I , "?•(?' •}\ \'li`}x.,11 i <i,,.. j \ ( 1ti,1 ? _ ?Sfi ?e e ?e a E e q ItEiljit°E?s ? (III, t?E I?,i?'s?! illillil ? F1 'I 'ell C??' \t \t\ tU\ fill ?? 1 1 ? ? ? ? ?,?? 111,11 1 ,1', \ a? ? ? ? •O. OYNNM1010 .100¦ r YYY S •ir0 YYIi p01 a&^ M NO smum AO Ml 1 OmwOOYCOOIOI O A AM k 001[ IOO/VR O M lOpL'Oi a 0.07 pt w M• OMMO f WI1 N111A 07pR O M a IM 1vYnO i Raw ? +t .? g l g Is .O LL .L ra •-7??AwRrw KS??M/?O\IlriRR??IMK*o?nRraiparol?w?RaASAlwlorownW, ? wwwe - a IKJO • a{etc ?I I i if 11 m ..?w ?¦i1 Y I i III ?? E f K g ' •.W/ WIW.ti N•W 01 M \.t ?? PI. ? A.•n.Wr. H tWlttt R /.?.? ? ?.RM bl? 1R Wit W tOW! ? a M K /R W tt l? ?..0 lit pill N.t?ltit t.M tM wr DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS P.O. BOX 1890 WILMINGTON, NORTH CAROLINA 28402-1890 ' 0.0c-) IN REPLY REFER TO June 18, 1998 Regulatory Branch Action ID No. 199820905 Mr. Sam Saleh 3817 Beryl Drive Raleigh, NC 27607 Dear Mr. Saleh: On June 17, 1998, Mr. Todd Tugwell of the Raleigh Regulatory Field Office staff met with your consultant, Mr. James Eisenhardt of Kimley-Horn and Associates, Inc., at your property on Powell Road, adjacent to an unnamed tributary to Simmons Branch, in Raleigh, Wake County, North Carolina. The purpose of this inspection was to verify the delineation of our regulatory jurisdiction pursuant to Section 404 of the Clean Water Act. The inspection revealed that the flagged delineation conducted by Mr. Wendell Overby of Soil and Environmental Consultants, Inc., on December 3, 1997, accurately depicts the boundary of the jurisdiction of Section 404 of the Clean Water Act on your property. Department of the Army permit authorization must proceed any placement of excavated or fill material within any wetlands or waters on your property. Such activity without authorization would be a violation of Federal law. For the purposes of the Corps of Engineers' Regulatory Program, Title 33, Code of Federal Regulations (CFR), Part 330.6, published in the Federal Register on November 22, 1991, lists nationwide permits. Authorization was provided, pursuant to Section 404 of the Clean Water Act, for discharges of dredged or fill material into headwaters and isolated waters (nationwide permit 26). Should the use of nationwide permit 26 be considered for work on the property, any activity involving less than 1/3 acre of impacts to waters of the U.S., including wetlands, is authorized, without prior notification to the District Engineer, provided the conditions of the permit (copy enclosed) are met. Please note that any discharge into these wetlands or waters pursuant to that authorization will be limited by the acreage restriction associated with that permit, to be considered cumulatively with any past impacts to waters and/or wetlands on the property. Linear footage restrictions set forth in nationwide permit 26 regional conditions do not apply to the stream on the property. Enclosed are copies of Wetland Determination Forms, providing specific information obtained at stations on your property. The data on these forms supports the delineation of wetlands on your property. Please note that our regulatory program is subject to change, as is the physical nature of your property. Therefore, this letter is valid for a period of time not longer than five years from the date of issuance, and may be voided at any time should we determine that the regulations governing our program or changes in the physical nature of the property warrant such an action. Questions Raleigh Field extension 26. or comments may be addressed to Mr. Tugwell, Office, Regulatory Division, telephone 919-876-8441 Sincerely, S. Kenneth Jolly Manager, Raleigh Regulatory Field Office Enclosure Copies Furnished (without enclosure): Mr. James Eisenhardt Manager, Environmental Services Kimley-Horn and Associates, Inc. Post Office Box 33068 Raleigh, North Carolina 27636-3068 Mr. Wendell Overby Soil and Environmental Consultant, Inc. 244 West Millbrook Road Raleigh, North Carolina 27609 2 .1 ex September 18, 1998 DENR Mr. Harlan Britt, P.E. JAMEf B. HUNT.IR: Senior Project Manager GOV[RNOR Kimley-Horn and Associates, Inc. x Post Office Box 33068 S" e :; .• Raleigh, North Carolina 27636-2000 NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY 'wAYNC MCDCvrrr . b:.siCRCTARY - Subject: Neomonde Variance Request Dear Mr. Britt: 9-:-'JR., PE. oN HOwARO. Thank you for your letter dated August 23, 1998 in which you expressed ' :?1R>=?roR concerns about the Environmental Management Commission's intentions in ance. We appreciate your bringing this matter to our attention. granting your vari • ?: _ As a result of your concerns, the Environmental Management Commission has t clarified their decisions on the July variance requests. At the beginning of the Commission's September 9, 1998 meeting (when the Commission was approving minutes from their July meeting), Dr. Peterson suggested the following clarification: "We had on our agenda at the last meeting two requests for variances to the Neuse rule for the Neuse buffer rules for projects that met the criteria that we had set up for providing variances. In each case, the projects failed to include the final engineering for what they were going to do to p make up for the lack of the vegetated buffer and how they were going to . treat the water that otherwise would have been treated by the buffer. So t that the variance approvals that we recommended were those that were i = recommended to us by staff and included the requirement that those complete plans be submitted and approved by staff before construction could begin on the projects. ?. That was not made sufficiently clear by the motion that I made at that meeting. And I thought that on Page 11, Item 13, it should be made clear r that what the motion was (and this was a motion and staff - '-= recommendation that had been distributed to all the EMC members in } }y , advance)... in fact the motion suggested by staff including the proviso tlr?`,x ,.u?,5 + that the plans be submitted and approved by the department before the "- variance took effect." r P.O. BOX 29535, RALEIGH, NORTH CAROLINA 27626-0535 " - PHONE 919-733-5063 FAX 919-733-9919 AN EQUAL OPPORTUNITY /AFFIRMATIvE ACTION EMPLOYER - 50% RECYCLED/10% POST-CONSUMER PAPER 01,'01/1998 06:06 9198469467 S & EC DOineation PCr(ornted by: Soil & Lnvironmental Consultants, Inc. 244 1'Vesl Millbrook Mmd 231 160% Avenue NV-, Valeigh, NC 27609 Hickory, NC 28601 Phone: (919) 846-5900 Phone: (704) 322-6700 DATA FORM ROUTINE WETLAND 1DETERMINATION (1987 COI, Wetlands Delincation Manual) Project/Site: _ /ww?? f2D. _ _ Date: 42-3- `77 .VCaaroNnE ?a CRY County. Applicant/ON'tier: Investigator; State: /JL .. WCN,9Cr. A a Veep - Do normal circumstances exist on the site? Is the site significantly disturbed (A typical situation)? Is the area a potential problem area? (If needed, explain on reverse.) QZE> No Community ID: Yes 10 Transit ID: Yes M Plot ID: - VEGETATION Dominant P nt Species Stratum ndicator 1. Lyt o p us VI&br N/c yS M-R 2.V16VRNu ivurx»rt s Rv cw 3,/ca?rc .4 J,4,00MtR - V9IVO- fi4c 4t.VIGZ?RN?T oo.Y'ro--i . va 5 , C?,! rPU?S ,2v?? ,'ri4C? fi`?t4 6, FifffY inr(/ P?n/N-? S H,QaB ?? 7.??eruSTQym Siwt?IYS? Sy,4vd ?i#[ 8. ominant Plant SPecies 9. AwklS ! 'C_X 1MI A74 1O.Sm?t ?X XDi6'NA. 12P',#ooe_n2ael .4leF -4y/f 13.&-Lw VA ,q 14. Irl G-r-*_11 is. eh?wx SP_ _ 16. Strata indicator 5KRvB fifes V!r?6r rlf- V/ow Fete HCO - 6 ?L _51f Percent of dominant species that are 0131., FACW or FAC (exclud iAg FAC-): g/ Remarks: HYDROLOGY Recorded Data (describe in remarks) Stream, Lake or Tide Gauge Aerial Photographs Other ? No Recorded Data Available Field Observations: Depth of Surface Water: l (it-I.) Depth to Free Water in Pit: 04.6 (ill.) Delith to Saturated Soil D 7?6 y (ill.) PAGE 02 Wetland Hydrology Indicators: Primary Indicators: ? Inundated ? Saturated in Upper 12 Indies Water Marks Drift Lines Sediment Deposits Drainage Patterns in Wetlands Gonda Indicators: (2 or more required) _ ? Oxidtzed Root Cliannels in Upper 12 Indies ? Water-Stained Leaves Local Soil Survey Data FAC Neutral Test Other (explain in remarks) Remarks-. a0 - U1 / A. J J..+ SC)II.S ?'• M.-tp Unit Name (Series and Phase): ?? ctc?l{eB' : Drainage Class: aor? ' Field Observations Taxonomy (Subgroup): --Tv-4;,C-. Cord irm Mapped Type? No Profile Descript Depth Matrix Color Mottle Colors Mottle unsell Moist) (Munsell Moist) Abundance/Contrast (ins,) Horizon . tM' 0r Act ro - 12f Sw?_ /O Y12? G?f . 7 S YR 5/4 jydric Soil Indicators: Texture4 Concretions, St uct? ure etc._ H istosol Concretions 1-listic Epipedon high Organic Content in Surface Layer in Sandy Solt Sulfidic Odor Organic Streaking in Sandy Soils ? Aquic Moisture Regime ? Listed on Local. Hydric Soils List r Reducing Conditions ? Listed on National Hydric Soils List v_. Cleyed or low-Chroma Colors Other (explain fa remarks) Remarks: Wetland Determination (circle yes or no) Hydrophytic Vegetation Present? (SP No Wetland Hydrology Present? (gP No Hydric Soils Present? ' No Is This Sampling Point Within a Wetland? a No Remarks: - palincattorn Performrd by: Soil do l:nvironn.cnlal Consultants, lne. 244 1ti?CSt Klilll,rook triad 2311601% Avenue NC ralcigk, NC ZM9 Hickory, NC 28601 I'llone: (919) 846-5900 Phone. (704) 322-6700 DATA FORM ROUTINE WETLAND DETERMINATION (1987 COC N'Vc(laods 1]clincxlion Manual) Project/Site: Powe'Li 1?_n._ _ _ Date: ?a-3-•y7 Applicant/Owner: NCcr"0-!-> BAKERY County: l,.AKE Investigator: ws?jni-L..1- CV&9 r y State: .HG Do normal circumstances exist on the site? 1 No Is the site significantly disturbed (A typical situation)? Yes 4c Is the area a potential problem area? Yes (if needed, explain'on reverse.) VEGETATION Dominant Plant Species Stratum ndicator 1. iNUS TA49'oA' A 2. U&MC&S A46-4 •-tR L-E k: 3. L_d t/rC9VA JAI`bNICA V/NE FAc 4, L?R?? D?v??'i7?4?lRat>F '1R6f _Ed.C_ 5 r Qvwobw MR4GFL'A -WeF-o Mcl- 6. A RWRu -- •'rRelr r&- 7- 8. Community ID: Transit ID: Plot ID: Dominant Plant Species 9. 10. 11. I2. 13. 14. 15. 16. lratum Indicator Percent of docnittant species tliat are OBL, FACW or CAC (excludinS 1=AC-): . Remarks: HYDROLOGY recorded Data (describe in remarks) Stregim, Lake or Tide Gauge Aerial Photographs Other No-Recorded Data Available Field Observations: Depth of Surface Water: N/R (in.) Depth to Free Water in Pil: _,v1A (i11) ?d Depth to Saturated Soil: N (in ) Wetland Ijydrology lndicatars: Prio,ary Iid'ce ors: Inundated Saturated in Upper 12 Inches Water Marks Drift Lines Sediment Deposits Drainage Patterns in Wetlands onda l lndi ato : (2 or more iedu(red) Oxidized Root Channels in Upper 12 Inches water-Stained Leaves LLocal Soil Survey Data FAC Neutral Test Other (explain in ren.arks) Remarks: Afo /NU/CA7og s OF 1?y?RuLGdy ?? UPLAND ? " dV/ VaI aJJV vv. ..v ?_?.+?..?..+? 1"MVL V..! Mali Unit Name (Series aad Phase): Drainage Class: UJQ?( ..... . Meld Observations Taxonomy (Subgroup): h 66414 lit 464 if Cvi tr:xt Mapped Type? No Profile Description: Ec:Plh (j!)s.) Horizon LiE f Matrix Color Mansell Moist) ? - LoYR ory? H yd ric Soil Indicators: Mottle Colors Mottle (Munse 1 Moist) Abpndance/Contrast Texture, Concret;iorss, Structure etc. SAL C? H istosol Concretions Histic Gpipedon High Qrgazuc Content In Surface Layer in Sandy Soil Sulfidic Odor Organic Strca"-ip, in Sandy Soils Aquic h4oisture Regime Listed on Local Hydric Soils List Reducing Conditions Listed on National Hydric Soils List Gleycd or Loy.'-Chroma Colors Other (explain, in remarks) Remarks: No HYpRiG S01c /NDieAr ?S IN 0/°L/9ND.S , Wedand Determination (circle yes or no) Hydrophytic Vegetation Present? No Wetland Hydrology Present? Yes - CW Hydric Soils Present? Yes MP Is This SamplinG point Within a Wetland? Yes Q> Remarks: SSP r WE O 00 ) O D V O i O e0 a a ?o a 0 Q D [Ell ® o. o IJ " ? M cl a° w ? p o 0 0 00 6 AAP NOT TO SCALE ?locT Attachment cc: Corps of Engineers Raleigh Feld Office Raleigh DWQ Regional Office File copy Central Files Raleigh Division of Land Resources Todd St. John Frank Braxton; Sungate Design Group 'h .4F State of North Carolina Department of Environment and Natural Resources Division of Water Quality r4i;2i James B. Hunt, Jr., Governor NC ENR Bill Holman, Secretary NORTH CAROLINA DEPARTMENT OF Kerr T. Stevens, Director ENVIRONMENT AND NATURAL RESOURCES June 23, 2000 Wake County Mr. Sam Saleh DWQ Project #: 000109 APPROVAL OF 401Quality Certification and ADDITIONAL CONDITIONS and Neuse River Buffer Rules Neomonde Associates 3817 Beryl Road Raleigh, NC 27607 Dear Saleh: You have our approval, in accordance with the attached conditions and those listed below, to place fill material in 264 linear feet of streams, for the purpose of constructing an officelwarehouse complex at lot 6, Etta Burke Park, as you described in your application dated February 11, 2000. After reviewing your application, we have decided that this fill is covered by General Water Quality Certification Number 3108. This certification allows you to use Nationwide Permit Number 26 when the Corps of Engineers issues it. This approval is also valid for the Neuse River buffer rules (15A NCAC 2B .033). In addition, you should get any other federal, state or local permits before you go ahead with your project including (but not limited to) Sediment and Erosion Control, Coastal Stormwater. Non-Discharge and Water Supply Watershed regulations. This approval will expire when the accompanying 404 or CAMA permit expires unless otherwise specified in the General Certification. This approval is only valid for the purpose and design that you described in your application except as modified b! law. If you change your project. you must notify us and you may be required to send us a new application.. If the property is sold, the new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying with all conditions. If total wetland fills for this project (now or in the future) exceed one acre, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h) (6) and (7). This approval shall expire when the corresponding Nationwide Permit expires or as otherwise provided in the General Certification. For this approval to be valid, you must follow the conditions listed in the attached certification and any additional conditions listed below. I . Deed notifications or similar mechanisms shall be placed on all remaining jurisdictional wetlands and waters or areas within 50 feet of all streams and ponds to notify the state in order to assure compliance for future wetland and/or water impact. These mechanisms shall be put in place within 30 days of the date of this letter or the issuance of the 404 Permit (whichever is later). 2. Stormwater shall be directed to flow at non-erosive velocities across the entire protected stream buffers. 3. An additional condition is that the stormwater management plan for stormwater runoff using an extended detention wetland as outlined in your submittal of June 16. 2000 must be implemented. The Operation and Maintenance Agreement must be resubmitted to DWQ for written approval. It must contain a sediment removal schedule that applies to the wetland design in regards to maintenance of proper depths in the 0"-9" and 9"-l8" zones. It must also include statements/schedules regarding the establishment and maintenance of the proposed wetland plants. Also, outlet details must be submitted for written approval by this Office. Also, before any permanent building is occupied at the subject site, the stormwater facilities, as approved by this Office, shall be constructed and operational, and the stormwater management plan, as approved by this Office, shall be implemented. 4. The stream relocation shall be built according to the approved plans before any permanent building on the site is occupied. If the stream relocation becomes unstable, the stream shall be repaired or stabilized using only natural channel design techniques. Rip rap and other hard structures may only be used as temporary repairs if required by the Division of Land Resources. Additionally, all repair designs must be submitted to and receive written approval from this Office before the repair work is performed. If any of the relocated portion of the stream is used as mitigation for stream impacts, that portion shall be preserved in perpetuity through an easement or some other legally binding mechanism. If you do not accept any of the conditions of this certification, you may ask for an adjudicatory, hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition, which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, P.O. Box 27447, Raleigh, N.C. 276 1 1-7447. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please telephone John Dorney at 919-733-9646. Sin I FILE(a sevens Division of Water Quality • Non-Discharge Branch 1621 Mail Service Center Raleigh NC 27669-1621 Telephone 919-733-1786 FAX # 733-9959 An Equal Opportunity Affirmative Action Employer 50% recycled/10% post consumer paper SUNGATE DEStiN GROUP, P.A. 915A JONES FRANKLIN ROAD • ' t? RALEIGH, NORTH CAROLINA 27606 r d 919-859-2243 • FAX 919-859-6258 TO VC???1 ???N¢`-? F s I; NC.'D e?NIZ - "DION<* of Wa Pgain 1(621 MwL Sawicz C t? TLa LI- t ct 4 ) t4 • t.. 2-1(0(c9 - 16 Z.i WE ARE SENDING YOU Attached ? Under separate cover via ? Shop drawings ? Prints ? Plans ? Copy of letter ? Change order ? COPIES DATE NO. DESCRIPTION o , - t LQ ;z::, --- W w-?ps . THESE ARE TRANSMITTED as checked below: ? For approval ? For your use x As requested ? For review and comment ? FORBIDS DUE REMARKS ? Approved as submitted ? Approved as noted ? Returned for corrections ? Resubmit copies for approval ? Submit copies for distribution ? Return corrected prints ? PRINTS RETURNED AFTER LOAN TO US COPY TO SIGNED: TTLOA L --6 (.sxT°a if enclosures are not as noted, kindly notify us at once. DATE (V 1 Q JOB NO. ATTENTION RE: r^ ?'oM ?k 0? 55 oc.i ??. tZ 61JL 1) ?lD 1 the following items: ? Samples ? Specifications P .. ROBERT J RAMSEUR JR 19198286147 09/08 '00 01:05 NO.298 02f07 Prepared by and holdfor: Hobert J. Ramseur, Jr. attorney at Law 211 Six Forks Road, Suite 222 Wake Covnty.NC zt Raleigh, North Carolina 27609 Laura K Riddick. R*platar or ossda i Gc Preastt?d b Rlcordvd 09/02,1ZM 03:50: „F •>? Excise Tax Stamps: $372.00 5t4t• Of NC Raul E,tat¦ Exclue Tax t Z Book Parcel Identification Number: 00206617 e"840 Paps : 02934 - 02639 Description for the Index: Lot 6, Floyd Property NORTH CAROLINA GENERAL WARRANTY DEED THIS DEED made this the _ (n- day of August, 2000, by and between, Neomonde Associates, L.L.C., a North Carolina Limited Liability Company, hereinafter Grantor; and JTC Company, L.L.C., a North Carolina Limited Liability Company whose address is 39QQ Hemsbury Way, Raleigh, North Carolina 27612, hereinafter Grantee. (The designation Grantor and Grantee as used herein shall include said parties, their heirs, successors, and assigns, and shall include singular, plural, masculine, feminine or neuter as required by context.) WITNESSETH, that the Grantor, for a valuable consideration paid by the Grantee, the receipt of which is hereby acknowledged, has and by these presents does grant, bargain, sell and convey unto the Grantee in fee simple, all that certain lot or parcel of land situated in the County of Wake, North. Carolina, and being more particularly described in Exhibit "A" which is attached hereto and incorporated herein by reference for a more complete and accurate description. The aforementioned property was acquired by the Grantor by deeds recorded in Book 8368, Page 843 and Book 6357, page 103, Wake County Registry. TO HAVE AND TO HOLD the aforesaid lot and parcel of land and all privileges and appurtenances thereto belonging to the Grantee in fee simple. And the Grantor covenants with the Grantee, that the Grantor is seized of the premises in fee simple, has the right to convey the same in fee simple, that title is marketable and free and clear of all encumbrances, and that the Grantor will warrant and defend the title against the ------------- ----------- ROBERT J RAMSEUR JR 1919828614( 09/08 '00 01:06 NO.298 03/07 lawful claims of all persons whomsoever. Title to the property hereinabove described is subject to the following exceptions: 1. Ordinary restrictions, easements, and rights of way of record and utility lines, easements and rights of way in existence over, under, or upon the above-described property. 2. Aid Valorem taxes for the year 2000, not yet due or payable. 3. This conveyance is made subject to certain wetlands regulations promulgated by the State of North Carolina and the North Carolina Department of Environment and .L v Natural Resources Division of Water Quality. In accordance with these regulations, a Wetlands 401 Certification is attached as Exhibit "B" and is incorporated herein by reference. IN WITNESS WHEREOF, the Grantor has hereunto set his hand and seal, the day and year first above written. NEOMONDE ASSOCIATES, L.L.C. BY: Member SEAL) (SEAL) BY: Member If ROBERT J RAMSEUR JR 19198286147 09/08 '00 01:06 NO.298 04/07 STATE OF NORTH CAROLINA COUNTY OF WAKE 1, Robert J. Ramseur, Jr., a Notary Public for the State of North Carolina and County of Onslow, do hereby certify that Sam SaJeh, Member ofNeomonde Associates, L.L.C., a North Carolina Limited Liability Company personally appeared before me this day and being duly sworn acknowledged the due execution of the foregoing instrument. Witness my hand and official, seal, this the -t T day of August, 2000, `0\\ 111 i I I1I !f/I/iii `????? pti A M ECG i/i?f/ • (SEAL) .,.... . ,• •? Notary Pu FIc y-- m = My Commission expires: 7-09-01 O '/ 4'/ s! 0111111E ROBERT J RAMSEUR JR 19198286147 09/08 '00 01:07 NO.298 05/07 EXHIBIT A BEGINNING AT an existing iron pipe located at the southwestern corner of Tract A as shown on that map recorded in Book of Maps 1987, Page 1979, Wake County Registry; runs thence along the southern line of the aforementioned Tract A North 63 degrees 01 minutes 16 seconds -East 523.52 feet to an existing iron pipe located in the western right of way fine of Powell Drive, being a sixty foot (60') right of way; runs thence along the western right of way line of Powell Drive South 32 degrees 47 minutes 49 seconds East 223.81 feet to an existing iron pipe; runs thence South 63 degrees 00 r inut& 00 seconds West 546.21 feet to a point; runs thence North 26 degrees 58 minutes 44 seconds West 222.86 feet to an existing iron pipe, said pipe being the point and place of BEGINNING and BEING ALL OF Lot 6, containing 2.73 5 acres, as shown on a snap entitled "Subdivision of Floyd. Property" prepared by Niall Gillespie, R.L.S. and recorded in Book of Maps 1994, Page 1730, Wake County Registry. ROBERT J RAMSEUR JR , L.L.C., Grantee EXHIBIT B "A, portion of this lot has been determined alteration of this wetland shall conform to the regulatory wetland. Any subsequent fill or rce at the requirements of the state wetlands rules adopted by thvzs ?? is to t event additionalowetland fill, time of the proposed alteration. The intent of this pro p . so the property owner should not assume that a future application for fill would be approved application pertaining to said The property owner shall reporthe nded to ensure continued compliance with wetland rules wetland rules. This covenant is anbenefits may be enforced by the State d shall be binding on all parties and o adopted by the State of North Carolina and, therefore, land North Carolina. This covenant`as to°;ln with the persons claiming under them." Grantor: Ncomonde Associates, L.L.C. 3817 Beryl Road Raleigh, North Carolina 27606 Grantee: JTC Company, L.L.C. 3900 Hemsbury Way Raleigh, North Caroling 27612 gY: Neomonde Associates, L.L.C., Grantor --------------------- gy: Neomonde Associates, L.L.C., Grantor By: JTC?Mr BY. JTC it BY C 19198286147 09/08 00 01:07 NO.298 06107 L.L.C., Grantee C7b1,?J L.L.C., Grantee ern NCDENR DIVISION OF WATER QUALITY June 22, 2000 Memorandum To: John Dorney From: Todd St. John Subject: Neomonde r r Wake County aC DWQ# 000109 42P /(asfar !'ev I ' b7(, I have reviewed the stormwater management plan m relocation plan for the subject facility and I believe we can issue the 401 WQ as the stream and stormwater plans are concerned) with the following conditions: o? 1) The Operation and Maintenance Agreement for the tended.defention wetland must be re-submitted to this Office for written approva . It must contain a sediment' %removal schedule that applies to the wetland design in regards to maintenance of proper depths in the 0"-9" and 9"-18" zones. It must also include statements/schedules regarding the establishment and maintenance of the proposed wetland lants. Also, outlet details must be submitted for written approval by this - ice.-- 2) The stream relocation shall be built according to the approved plans before any '-? permanent building on the site is occupied. If the stream relocation becomes unstable, the stream shall be repaired or stabilized using only natural channel design techniques. Rip rap and other hard structures may only be used as temporary repairs if required by the Division of Land Resources. Additionally, all repair designs must be submitted to and receive written approval from this Office before the repair work is performed. If any of the relocated portion of the stream is used as mitigation for stream impacts, that portion shall be preserved in perpetuity through an easement or some other legally binding mechanism. State of North Carolina Department of Environment and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Bill Holman, Secretary Kerr T. Stevens, Director e?? NCDENR Division of Water Quality May 22, 2000 CERTIFIED MAIL-RETURN RECEIPT REQUESTED Mr. Sam Saleh Neomonde Associates 3817 Beryl Road Raleigh, NC 27607 Subject: Neomonde DWQ Project No. 000109 Wake County Dear Mr. Selaeh: The Wetlands Unit staff reviewed the stormwater management plans for the subject project and determined that additional information is necessary to complete the technical review process. The required additional information is as follows: Permanent Water Quality Pool The submitted design does not meet the Division criteria for permanent water quality pool surface area of approximately 4700 based on a SA/DA ratio of 2.61 and a drainage area of 4.15 acres. Please modify the plans to reflect any necessary changes. Also, extended detention wetlands should have a forebay that is 3 feet deep and 15% of the surface area, an exit pool of similar dimensions. The remainder of the wetland should be 0-9 inches deep for 35% of the surface area and 9-18 inches deep for the remainder. Additionally, the wetland should be contoured to maximize flow path (as opposed to maintaining the deepest point in the center and shallow areas all around the margins as shown in the plans). 2. Draw Down Orifice Outlet Please provide plan details, including a longitudinal cross section, for the outlet. 3. Trash Guard Unprotected weir structures will experience clogging problems and increase the maintenance effort required to keep the basin functioning properly. The Division recommended that a trash guard be fitted on weir structures to prevent floating debris from interfering with performance. Access Access to the pond must be adequate to allow for maintenance of the basin and associated structures. Please specify access routes on the engineering plans. 4401 Reedy Creek Road, Raleigh, NC 27607 Telephone 919-733-1786 FAX 919-733-9959 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post-consumer paper SUNGATE DESIGN GROUP, P.A. 915A JONES FRANKLIN ROAD RALEIGH, NORTH CAROLINA 27606 919-859-2243 9 FAX 919-859-6258 TO .1 - - -,I X:' ? P% - e L c.,* -4&,f -? THESE ARE TRANSMITTED as checked below: copies for approval ? Approved as submitted ? Resubmit Y For approval ? Submit copies for distribution ? For your use ? Approved as noted corrected prints ? As requested ? Returned for corrections ? Return > For review and comment F1 ? PRINTS RETURNED AFTER LOAN TO US El FOR BIDS DUE REMARKS COPY TO SIGNED if enclosures are not as noted. kindly notify us at once. M44M @[? CMC M1010vul l the following items: WE ARE SENDING YOU Ix Attached ? Under separate cover via ? Plans ? Samples ? Specifications ? Shop drawings ? Prints ? Copy of letter ? Change order ? ALO- Sungate Design Group, RA, ENGINEERING • LANDSCAPE ARCHITECTURE • ENVIRONMENTAL 915-A Jones Franklin Road • Raleigh, NC 27606 • e-mail sungateCamindspring.com • Phone 919.859.2243 • Fax 919.859.6258 June 15, 2000 Mr. John Dorney Wetlands Unit Supervisor NC DENR Division of Water Quality 4401 Reedy Creek Road Raleigh, NC 27607 RE: POWELL DRIVE OFFICE BUILDING, NEOMONDE ASSOCIATES DWQ PROJECT # 000109, WAKE COUNTY Dear John: We have addressed the Wetlands Unit Staff review comments contained in your letter dated 5/22/00. The Plans and Application have been revised to reflect our changes and herewith resubmitted for your review. Additionally, the following is our response to each of the staff s comments: 1. The permanent pool surface area has been revised to 5,006 SF based on a DA of 4.15 acres and an SA/DA ratio of 2.61. The pool shape has been altered to maximize flow path and subdivide the surface area into the following depths: 0- 9"- 1,749 SF (35%), 9"-18"- 1,752 SF (35%), Forebay- 750 SF (15%) and Outlet Pool- 755 SF (15%). 2. The draw down device is a single 11/2" galvanized pipe connected to the top of a concrete block pier and extended through the pond dam. The inlet end is turned down to prohibit clogging by floating debris. A detail of this device is shown on plan sheet SD-4. 3. The primary outlet for this pond is a 25 feet long weir cut through the pond dam. Due to the size of this structure, a weir was selected in lieu of a typical riser barrel and culvert. The site constraints and post hydrograph indicate that a riser barrel and culvert would provide minor outlet flow prior to topping the weir crest. A trash guard fitted on a spillway (weir) would inhibit the free flow and accumulation behind the weir may cause dam overtop and or breach. No trash guard devise is proposed. 4. This site is a single ownership project on a single lot. The owner is responsible for the maintenance and operation and has direct access to all portion of the proposed pond. A maintenance access route is shown on the plans. 5. The operation and maintenance agreement contained within the Wetland Detention Basin Supplement is included with this submittal. This agreement is signed by the responsible party and notarized. If a separate agreement is required, please provide me with an acceptable prototype. 6. The vortex weirs have been changed to rock and cross vanes. Your attention to this project is greatly appreciated and please call should you have questions or desire additional information. Si' ?e?relyy,, Frank Braxton Cc: Sam Saleh Neomonde Associates Jay Johnson, Metrocon wvv`16 SDG w AL- APR-19-00 03:45 PM SUNGATE.DESIGN.GROUP 6 SUNGATE DESIGN GROUP 915-A JONES FRANKLIN ROAD RALEIGH, NORTH CAROLINA 27606 (919) 859.2243 FAX: (919) 859-6258 T0: 0-kt' FROM:,,, NO.OF PAGES: 2 _ (INCLUDING COVER SHEET) COMMENTS: 659 6259 P.01 - - DATE: 17, 0 Zl FAX #: -?? TIME: URGENT PLEASE ACKNOWLEDGE RECEIPT PLEASE CALL ME PLEASE FORWARD TO: PLEASE NOTIFY: 4 ?oo pry *wlial qc,/oklM, APR-19-00 03:45 PM SUNGATE.DESIGN.GROUP 959 6238 P.02 i f i , M Sun gate Design Group, PA. LW.;WUmW, • AKNCI1frECIURE.t 915-A JC)nes Franklin Road # Ralolph, NC 27606 - email sungale0mindsprino.com - Phone 919.869.2243 -Fax 919.859.6258 April 19, 2000 Mr, John Dorney NCDENR Division of Water Quality Wetlands/401 Unit 1621 Mail Service Center Ralciph, NC 27669-1621 1'dV? RE. DWQ PROJECT #000109, POWELL DRIVE PROJECT NEOMODE ASSOCIATES, RALEIGH, NC Dear Mr, Dorncy: I have received your correspondence of 4/3/00 to Mr. Sam Saleh regarding the supporting documentation for the above referenced project. I am proceeding with final design/calculations and anticipate subr?1ittal during the first week of May. Additionally, I have contacted Mr. Todd St. John with this information/schedule and he suggested that I submit this letter for your reference- I appreciate your attention to this project and please call should you have questions or desire additional information. Sin rely, Frank Braxton Cc: Sam Saleh. Ncomode Associates