HomeMy WebLinkAboutNCC190168_MODIFICATION Supporting Documents_20200121ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
S. DANIEL SMITH
Interim Director
NORTH CAROLINA
Environmental Quality
January 8, 2020
LETTER OF APPROVAL WITH MODIFICATIONS
Piedmont Natural Gas
Attn: Mr. Aaron Weldon, Project Manager
4720 Piedmont Row Drive
Charlotte, NC 28210
RE: Project Name: PNG Line 439 - Winterville, NC
Project ID: Pitt-2019-017
County: Pitt Acres Approved: 244 (27 additional)
Address: Nash Joyner Road City: Winterville
River Basin: Neuse and Tar -Pamlico
Date Received by LQS: January 6, 2020
Submitted By: Brown and Caldwell Plan Type: Revised/Express
Dear Sir,
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to
be acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval must
be posted at the job site. This plan approval shall expire three (3) years following the date of
approval, if no land -disturbing activity has been undertaken, as is required by Title 1 SA NCAC
413 .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an
electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the
NCGO10000 Construction Stormwater General Permit. This form MUST be submitted prior to the
commencement of any land disturbing activity on the above named project. The NOI form may be
accessed at deq.nc.gov/NCG01. Please direct questions about the NOI form to Annette Lucas at
Annette. lucas{c�r�,ncdenr.gov or Paul Clark at Paul.clark@ncdenr.gov. After you submit a
complete and correct NOI Form, a COC will be emailed to you within three business days,
Initially, DEMLR will not charge a fee for coverage under the NCGO1 permit. However, a $100
fee will soon be charged annually. This fee is to be sent to the DEMLR Stormwater Central
Office staff in Raleigh.
Title 15A NCAC 413.0118(a) and the NCGO1 permit require that the following documentation be
kept on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCGOI permit and the COC, once it is received.
3. Records of inspections made during the previous 30 days.
D�., - North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
O�J/� Washington itegional Office i 943 Washington Square Mall I Washington, North Carolina 27889
Nd3TH CNiOLiNh 1�
Da M-fflol Enwam�enu� ova¢\ �`'� 252.946.6481
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection
to ensure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring
protection of existing natural resources and adjoining properties. If, following the commencement
of this project, the erosion and sedimentation control plan is inadequate to meet the requirements
of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51
through 66), this office may require revisions to the plan and implementation of the revisions to
insure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State
water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may
also apply to this land -disturbing activity. This approval does not supersede any other permit or
approval.
Please note that this approval is based in part on the accuracy of the information provided in the
Financial Responsibility Form, which you provided. You are requested to file an amended form
if there is any change in the information included on the form. In addition, it would be helpful if
you notify this office of the proposed starting date for this project. Please notify us if you plan to
have a preconstruction conference.
Please be advised that a rule to protect and maintain existing buffers along watercourses in the
Neuse River Basin became effective on July 22, 1997. The Neuse River Riparian Area Protection
and Maintenance Rule (15A NCAC 213.0233) applies to the 50-foot wide zone directly adjacent to
surface waters (intermittent streams, perennial streams, lakes, ponds, and estuaries) in the Neuse
River Basin.
Please be advised that a rule to protect and maintain existing buffers along watercourses in the
Tar -Pamlico River Basin became effective on January 1, 2000. The Tar -Pamlico River Riparian
Area Protection and Maintenance Rule (15A NCAC 213.0259) applies to a 50 (horizontal) foot
wide zone along all perennial and intermittent streams, lakes, ponds and estuaries in the Tar -
Pamlico River basin.
For more information about the riparian area rule, please contact the Division of Water Quality's
Wetland/401 Unit at 919-807-6300, or DWQ in our regional office at 252-946-6481.
Sincerely,
Samir Dumpor, PE
Regional Engineer
cc w/o enc: Aaron Weldon, Piedmont Natural Gas (email)
Sarah Jones, PhD, Brown and Caldwell (email)
Arvind Narayanan, PE, Brown and Caldwell (email)
WaRO Division of Water Resources
1. The developer is responsible for the control of sediment on -site. If the approved erosion
and sedimentation control measures prove insufficient, the developer must take those
additional steps necessary to stop sediment from leaving this site (NCGS 113A-57(3)).
Each sediment storage device must be inspected after each storm event (NCGS 113A-
54.1(e)). Maintenance and/or clean out is necessary anytime the device is at 50% capacity.
All sediment storage measures will remain on site and functional until all grading and final
landscaping of the project is complete (15A NCAC 04B .0113).
2. The developer is responsible for obtaining all permits and approvals necessary for the
development of this project prior to the commencement of this land disturbing activity.
This could include our agency's Stormwater regulations and the Division of Water
Resources' enforcement requirements within Section 401 of the Clean Water Act, the U.S.
Army Corps of Engineers' jurisdiction of Section 404 of the Clean Water Act, the Division
of Coastal Management's CAMA requirements, the Division of Solid Waste
Management's landfill regulations, the Environmental Protection Agency and/or The U.S.
Army Corps of Engineers jurisdiction of the Clean Water Act, local County or
Municipalities' ordinances, or others that may be required. This approval cannot supersede
any other permit or approval.
3. Adequate and appropriate measures must be properly installed downstream, within the
limits of disturbance, of any land disturbing activity to prevent sediment from leaving the
limits of disturbance, entering existing drainage systems, impacting an on -site natural
watercourse or adjoining property. (NCGS I I3A-57)
PROJECT INFORMATION SHEET
APPROVAL DATE: January 8, 2020
RESPONSIBLE PARTY: Piedmont Natural Gas
PROJECT NAME: PNG Line 439 - Winterville, NC
COUNTY: Pitt NO.: Pitt-2019-017
OFF -SITE BORROW
AND/OR DISPOSAL SITE: NO.:
START-UP DATE:
CONTRACTOR:
ON -SITE CONTACT:
ON -SITE PHONE NO.:
OFFICE PHONE NO.:
COMPLETE & RETURN THIS FORM
PRIOR TO THE START OF CONSTRUCTION TO:
N.C.D.E.Q.
LAND QUALITY SECTION
ATTN: James Edwards
943 WASHINGTON SQUARE MALL
WASHINGTON, NORTH CAROLINA 27889
james.edwards@ncdenr.gov