Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
20140090 Ver 7_New Permit Drawings for discussion today_20200127
Wanucha, Dave From:Dagnino, Carla S Sent:Monday, January 27, 2020 12:49 PM To:Braspennickx, Nicholle M CIV USARMY CESAW (US); Wanucha, Dave Subject:New Permit Drawings for discussion today Attachments:U-2579BA_Permit Modification_2020-01-23.pdf Hi Nicholle and Dave, Please see the attached drawings that I will discuss when I call - around 1:15 PM. Thanks. Carla Carla Dagnino Environmental Coordination and Permitting Group Leader Environmental Analysis Unit NC Department of Transportation 919 707 6110 office cdagnino@ncdot.gov 1598 Mail Service Center Raleigh, NC 27699 -1598 1020 Birch Ridge Drive Raleigh, NC 27610 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. 1 Highway hwa North Carolina Department of Transportation Stormwater Co Highway Stormwater Program STORMWATER MANAGEMENT PLAN (Version 2.08;Released April 2018) FOR NCDOT PROJECTS WBS Element: 34839.1.1 TIP No.: U-2579B County(ies): Forsyth County Page 1 of 2 General Project Information WBS Element: 134839.1.1 TIP Number: U-2579B Project Type: Roadway Relocation Date: 1/14/2020 NCDOT Contact: Amy Euliss Contractor/Designer: Kimley-Horn Address: 375 Silas Creek Parkway Address: 421 Fayetteville Street Wiston-Salem Suite#600 NC 27127-7167 Raleigh,NC,27601 Phone: (336)747-7802 Phone: (919)677-2178 Email: aeuliss@_ncdot.opy Email: dan.robinson@kimley-horn.corn City/Town: Winston-Salem County(ies): Forsyth River Basin(s): Yadkin-Pee Dee CAMA County? No Wetlands within Project Limits? Yes Project Description Project Length(lin.miles or feet): 4.06 miles Surrounding Land Use: (Rural,Farmland,Suburban Neighborhoods di Proposed Project Existing Site Project Built-Upon Area(ac.) N/A ac. N/A ac. Typical Cross Section Description: In each direction there will be 3 12-foot lanes plus a 12-foot paved shoulder with a 22- N/A foot grassed median. Annual Avg Daily Traffic(veh/hr/day): Design/Future: 79880 ADT Year: 2030 Existing: 53560 ADT Year: 2010 General Project Narrative: 9/19/2013-Orginal Submittal (Description of Minimization of Water Winston-Salem Borthern Beltway(Eastern Section)(Future 1-74)from US 158 to 1-40 Bus US421:Grassed Swales were used throughout the Project to treat the stormwater. Quality Impacts) These Grassed Swales have side slopes that are 3:1 or flatter,with many sode slopes being 6:1.have a velocity during the 2-Year Storm or less than 2 feet per second and have a minimum ditch length equivalent to 100 feet per acre of impervious area.In addition to the Grassed Swales,Preformed Scour Holes and Energy Dissipators are used at several locations. 12/13/2019-Revised Submittal Modifications to U-2579B were performed and submitted January 2019.These changes include: -Stormdrain revisions -Proposed 32'3 @ 8'x 9'RCBC Downstream Extension(Sta.45+65-Y4-) -Proposed 41'3 @ 8'x 9'RCBC Upstream Extension(Sta.45+65-Y4-) -Smith Creek Stream Relocation(Sta.47+27 to 67+63-Y4-) -UT to Smith Creek Stream Relocation(Sta.48+60-Y4-) A permit modification was needed for the revisions mentioned above.Included with this revised SMP are updated pipe sizes and flows of two outlets to Preformed Scour Holes (Sta.43+00 and 46+00).All other stormwater features(swales,filter strip,energy dissipators,etc.)were not modified by these 2019 revisions and are not included with this modification.Refer to orginal stormwater management plan for other mitigation efforts. Waterbod Information Surface Water Body(1): Smith Creek NCDWR Stream Index No.: 12-94-12-2-1 NCDWR Surface Water Classification for Water Body Primary Classification: Water Supply III(WS-III) Supplemental Classification: None Other Stream Classification: Impairments: None Aquatic T&E Species? No Comments: NRTR Stream ID: Buffer Rules in Effect: N/A Project Includes Bridge Spanning Water Body? No Deck Drains Discharge Over Buffer? No Dissipator Pads Provided in Buffer? INo Deck Drains Discharge Over Water Body? No (If yes,provide justification in the General Project Narrative) (If yes,describe in the General Project Narrative;if no,justify in the (If yes,provide justification in the General Project Narrative) General Project Narrative) Highway North Carolina Department of Transportation —Stormwater o ,,,,„,_,,, Highway Stormwater Program STORMWATER MANAGEMENT PLAN (Version 2.08;Released April 2018) FOR NCDOT PROJECTS WBS Element: TIP No.: U-2579B County(ies): Forsyth County Page 2 of 2 Preformed Scour Holes and Energy Dissipators Station&Coordinates Drainage Pipe/Structure BMP Sheet (Road and Non Road Surface Energy Dissipator Area Conveyance Dimensions Q10 V10 Associated w/ No. Projects) Water Body Type Riprap Type (ac) Structure (in) (cfs) (fps) Buffer Rules? 25 Sta.43+00-Y4- PSH Class'B' 0.2 Pipe 18 1.3 9.4 No 26 Sta.46+00-Y4- PSH Class'B' 0.3 Pipe 18 1.6 4.1 No Mr Additional Comments I *Refer to the NCDOT Best Management Practices Toolbox(2014),NCDOT Standards,the Federal Highway Administration(FHWA)Hydraulic Engineering Circular No.14(HEC-14),Third Edition,Hydraulic Design of Energy Dissipators for Culverts and Channels(July 2006),as applicable,for design guidance and criteria. r1TOTAL T See Sheet lB For Conventional Plan Sheet Symbols STATE OF NORTH MCA II' � [TAW�O .� �NO. sir SHEETS OLINA N.C.NU-2579BA ]L III / : 5 TIPROJE (y _ y HIGHWAYS �-v ��y �y pIAre PROM.. r.A.FROLNN DH*IUvnod _!,,l a ,c,+•, IL DIVISION ISION OF 1L L� H VV 1 34839.1.10 P.E. .,.. ` D Fi - r 34839.3.11 CONST. 1� _ y 1 4 N ' ; r. -klt - loc. UM `�4 FORSYTH COUNTY v��+�p tr-sx.* „AO 0:\ 4 ,� v ,JV 1% A�vert .4* �, LOCATION: US 421/I-40 BUS/NC 150 IN KERNERSVILLE FROM THE WINSTON-SALEM .>, ,IIICL4.014._ NORTHERN BELTWAY (FUTURE I-74) TO WEST OF S MAIN STREET Z LiTill ; + TYPE OF WORK: GRADING,DRAINAGE, PAVING, AND CULVERT .)!, ,---, „_,,,, , ... , , . A- iw, el - .TIrliiiir- ,4.4,1 `y ', l,7, i +s 1 �� JANUARY 14, 2020 PERMIT DRAWING END TIP PROJECT U-2579BA i,.- �44ii:. , a1Acr \l� �1 �„ V: PERMIT DRAWING MODIFICATION FOR TIE TO TIP PROJECT U-25798 (BY OTHERS) .TNER' I -,-_ SHEET 1 OF 18 -Y4EB- POT Ste.75+00.00 (U-2579BA)= ..�� — — U 25798 -y4VB- POT Sta.75+00.00 U-2579BA)= VICINITY MAP -Y4W8- POT Sta.75+00.00 (U-2579B) , N c„ , ,, .., 4 /r 5 >._ ry\ ��\� CJ rTIP PROJECT U-25798 7 Fr\ I (BY OTHERS) 7) '-' � ` US 421/1-40 BUS/NC 150 Y4RP �:' TODOWNTOO -Y4EB- -J \ - :66.:4-- Y4£-BTO KERAIERSV1LLE • WINSTON-SALEM Y__-.-.-._--.-._._.-. -r-1,r.� _ . :---c_.-.-cam:__ '� TlP PROJECT U-25798 -�� -5ii?HCRE£K= � --_�.-.-- .---- -_.-�_✓ - / = BY orHer+sl 1 �� N / a ��i POND 1 r POD 3 // '.\\ POND 2/r.- ��`\ PROP 32'308'x9' - !(`���� �,'® \ EXTENSION -PROP 5Y(ITH CREEK 'e �I ��\ \\ \1 RE[ACATION /_' .mod�l \� 1 \\ POND 4 BEGIN TIP PROJECT U-2579BA TIE TO TIP PROJECT U-5760 (BY OTHERS) -Y4EB- POT Sta.23+50.00 (U-25798)= -Y4WB- POT Sta.23+50.00 (U-2579B)= -Yl- POT Sto.56+50.00 (U-5760) CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD III THIS PROJECT IS WITHIN THE MUNICIPAL BOUNDARIES OF THE TOWN OF KERNERSVILLE DOCUMENT NOT CONSIDERED FINAL l• . THIS IS A CONTROLLED-ACCESS PROJECT WITH ACCESS LIMITED TO POINTS AS SHOWN ON THE PLANS UNLESS ALL SIGNATURES COMPLETED Y Y HYDRAULICS ENGINEER V GRAPHIC SCALES DESIGN DATA PROJECT LENGTH PLANS PREPARED FOR Kimley»>Horn AADT 2020 = 57,600 THE NCDOT BY: 50` 25 0 50 l00 AADT 2040 = 77,900� LENGTH ROADWAY TIP PROJECT U-2579BA = 0.975 MILES "' mPo '" 4eo'NDR e • K = 650�o TOTAL LENGTH TIP PROJECT U-2579BA = 0.975 MILES 20I8STANDARD SPECIFICATIONS �� �°°w e< cgs PLANS DAN ROBINSON,P.E. P.R. Ellill50 25 0 500 T = 7%* RIGHT OF WAY DATE: PROJECT ENGINEER SIGNATURE: a 4 V 65 MPH ROADWAY DESIGN ENGINEER * (TTST 4% + DUAL 3%) N/A mr < ^^1I RHODES S.HUNT,P.E. p TR''Be O PROFILE (HORIZONTAL) FUNCTIONAL PROJECT DESIGN ENGINEER 0 5 2.5 0 5 �o CLASSIFICATION: LETTING DATE: o JESSICA EARLEY,P.E. N VURBAN FREEWAY APRIL 21,2020 `I PROJECT EXECUTIVE RE. PROFILE (VERTICAL) REGIONAL TIER J . NCDOT PRIORITY PROJECTS TEAM SIGNATURE, _ J m PROJECT REFERENCE NO. SHEET NO. Kimley>>>Horn U-2579BA�NO. HYDRAULIC DESIGN 2C-2 DETAIL °°° RAN 421 FAYETTEVILLE STREET,SUITE 600 ENGINEER RALEIGH,NC 27601 STREAM INTAKE VAULT RIGHT-OF-WAY REV. COKn..EV. (SEE SPECIAL PROVISIONS) *NOT TO SCALE* SLUICE GATE SLUICE GATE SLUICE GATE I (TO BE INSTALLEDR YBLE OTHERS) SLAB LID WITH 2'x 2' 111111 * * SLAB LID WITH 2'x 2' DOCUMENT NOT CONSIDERED FINAL I ACCESS HATCH ACCESS HATCHME UNLESS ALL SIGNATURES COMPLETED - I••I M ��---�� --■-- JANUARY 14, 2020 GLA PERMIT DRAWING — RI::AB; INV=827.88' STEPS @ ,2"O.G. SHEET 2 O F 1 8 (STD.DRWG.840.66) NATURAL STREAM OQ POOL.SEE STREAM-9 `�'� 11111 Wdrali II 12"PVC@0.5% SLOPE. POOL ELEV=827.38' STRUCTURE INV=825.0' l l��=. .�_■ II STRUCTURE INV=825.0' STRUCTURE INV=825.0' 12"INLET PIPE �-(- ��-(I.-� 12"INLET PIPE Ii • 6"PORTABLE HOSE SIDE 1 T (F)(CONCRETE)ANTI-FLOATATIONSIDE 2 "PORTABLE SIDE 3 ANTI-FLOATATION MATERIAL(F)(CONCRETE) HOSE MATERIAL(F)(CONCRETE) (TO BE INSTALLED BY OTHERS) A SEE TABLE FOR THICKNESS SEE TABLE FOR THICKNESS (TO BE INSTALLED BY OTHERS) MATERIAL(F)(CONCRETE) SEE TABLE FOR THICKNESS SEE TABLE FOR THICKNESS SEE TABLE FOR THICKNESS PADLOCK BAR SIDE 4 LOCKING DEVICE LIFTING HANDLE (COVER SHOWN IN FLOW LIFTING HANDLE OPEN POSITION) SST POSITIVE LOCKING LATCH 5 NOTES: � 4 p SLAB LID WITH 2'x 2' 1. SLUICE GATE I$FOR INTAKE VAULT AND SHOULD REMIN 1� L '1 HINGEDACCESS HATCH CLOSED DURING NORMAL OPERATION. i r--"""'T �j G PANEL 2. SLUICE GATE SHALL PROVIDE WATERTIGHT SEAL. PROVIDE .I z I , 6"HOSE FOR DIESEL ADEQUATE CLEARANCE FOR INTAKE VAULT OPERATION. 3 I `l -1. SLUICE GATE PUMP TO BE INSTALLED 3. SELECT BOX STANDARD AS REQUIRED TO ACCOMMODATE SLUICE GATE ,L ; `— 12"INLET PIPE BY OTHERS(SEE NOTE 6) AND SLAB LID WITH ACCESS HATCH. 1 I F----1 I p♦ rn II I ALUM. ���� / y 4. ENSURE ACCESS HATCH OPENS FREELY AND WITHOUT INTERFERENCE WITH STEP TREAD, 4 4- T T I I I �♦ TYP 3 a x L____J I.I FRAME, ����` SLUICE GATE. I CAST IN �' LLI111111111 E4 n 0 5.ADJUST FOOTER DIMENSIONS AS NEEDED FOR ANTI-FLOTATION.FOOTER DIMENSIONS + __ [[ ^__Y_ I' a JI I CONCRETE O`�� O Fll CAN BE 5'x 5'x 9'DEEP OR 8'x 8'x 4'DEEP.ANTI-FLOATATION MATERIAL IS REQUIRED Y'. f.Y.: +1 ��� y W AND SHALL BE CONCRETE. R . of ' STEPS�o ,2^O.C. 6.NOT IN CONTRACT.SEE SPECIAL PROVISIONS. STEP TREAD, -�� (STD.DRWG.840.66) AS SHOWN TYP AS SHO, SST HINGES, TYP, 4 MINIMUM DIMENSIONS FOR STREAM INTAKE VAULT DOUBLE DOOR SINGLE DOOR HATCH PROFILE BASIN TOP NOTES: SIDE 2 S B INV.ELEVATION ANTI-FLOATATION CTL.STR. BOTTOM ELEVATION 1. ALL HATCH COMPONENTS SHALL BE SST OR ALUMINUM. STATION (INCHES) (INCHES) CONTROL MATERIAL(F) DIMENSIONS 2. HATCHES SHALL BE WATERPROOF AND RATED FOR 300PSF. 6"MIN. 6"MIN. MINIMUM CONTROL s 3. EXPOSED HARDWARE SHALL BE TAMPER-PROOF. PLAN VIEW ELEV. STRUCTURE STRUCTURE THICKNESS FEET (NA/ x L x H) 4. FALL PROTECTION SHALL BE IN ACCORDANCE WITH OSHA REQUIREMENTS. 5. CONTRACTOR SHALL CONFIRM THAT DIMENSIONS ARE ADEQUATE FOR INSTALLATION, 31+69.64 -SMITH CREEK- 6 6 825.00' 835.82' 827.88' 9.0' 5'X 5'X 10.82' REMOVAL, AND MAINTENANCE OF EQUIPMENT WITH EQUIPMENT MANUFACTURERS. ACCESS HATCH I *NOT TO SCALE* SIDE 4 ANTICIPATED PUMP LOCATION. (TO BE INSTALLED BY OTHERS) CROSS SECTION VIEW LOOKING DOWNSTREAM — • SLAB LID W/ 2'x 2' � ACCESS HATCH SLUICE SEE STREAM PLANS FOR — — — M— — / GATE NATURAL STREA DESIGN / 7 6'PORTABLE HOSE r` (TO BE INSTALLED �•' 5'x5'CONCRETE / BY OTHERS) 835.82' VAULT STRUCTURE / v 12'PIPE W/ DOWNSTREAM SILL N INTAKE SCREEN ELEV 828.887 INV=827.88' / E 0 \ 0 ooto 827.38' ��' 825.00'�///A ° PROJECT REFERENCE NO. SHEET NOcr NOTE JANUARY 14, 2020 U-2579BA 2C-3 THE DETAILS BELOW REPRESENT A PRECAST CONCRETE GRAVITY WALL WITHin PERMIT D RAW I N G NATURAL BOULDER APPEARANCE ALONG FACE(PER PLANS).THIS PRODUCT OR A COMPARABLE PRODUCT CAN BE UTILIZED ON THIS PROJECT.A PRODUCT SHEET 3 O F 8 SUBMITTAL AND DESIGN TO BE APPROVED BY THE ENGINEER WILL BE REQUIRED. 4)=28° I SILTY SAND or CLAYEY SAND 4= 28° I SILTY SAND or CLAYEY SAND LOAD CONDITION A I NO LIVE LOAD SURCHARGE, NO BACK SLOPE, NO TOE SLOPE LOAD CONDITION A I NO LIVE LOAD SURCHARGE, NO BACK SLOPE, NO TOE SLOPE 2 BLO2K HIGH SECTION 3 BLOCK HIGH SECTION (2)28"(710 mm)Blocks PRELIMINARY (3)28"(710 mm)Blocks PRELIMINARY Professional Engineering Design Professional Engineering Design Required for Construction Required for Construction Grade to drain surface Grade to drain surface water away from wall water away from wall Top block Top block Non-woven geotextile fabric(If specified by Middle block(Typical) Engineer based on site soil conditions) Setback=1 5/8"(41 mm) Setback=1 5/g"(41 mm) (5°Wall Batter Angle) Backfill per design requirements. Install (5°Wall Batter Angle) Backfill per design requirements. Install in lifts and compact per project in lifts and compact per project — specifications. specifications. 1 r \\ 28"(710 mm) ��— \� VA V� V� V� V� V� VA 28"(710 mm) '"I y � \% j\\%\\ \\ j\/\\/\\/\\/\\/\ I I , 4 4 j /\//// // A2-6"(0.76 m) / //\ 28° +=28° A 28"(710 mm A: \ � 28"(710 mm) //�//- 0'-6"(152 mm) ,......L.:,► / /i/i- 4,0„(1.22 m) t I�� VAA�AA �A, ! •ry•'r.\ ' \ / / Infill stone(No.57 or equivalent) •.•.:• .•`/\ \ Infill stone(No.57 or equivalent) \ \ •`.••` \\�/\\�/\\ Fill between adjacent blocks(all blocks) �L-- i•, \//\/\. Fill between adjacent blocks(all blocks) •'-/V -le— ,•,• ,,�,•,,,••t,, " 28" ) e;0!/VA/VAV� Fill vertical core slot(PC blocks) > AA 0'-6"(152 mm) v� V / 4 A A VA \ Fill vertical core slot(PC blocks) (710 mm) r. // i %mil ',`_•,•__ • '• / // 0'-6"(152 mm) +" /\ / Stone to extend at least 12"(305 mm) A%/V%/V�%/VA%/V%A%A��/VA�AA%A/A V/AA/A/A/ %A/AA< Stone behind t extend at least 12"(305 mm) fie➢ ,9 A \ / behind blocks. \//\/\\\/\\\/\\\/\\\/\\\/\\\/\\\/\\\/\j\\\/\\/\\\/\\\/\\/\/� Move blocks forward during installation \\�/0'-6"(152 mm) '\\\� (1; �\\ Move blocks forward during installation / / / / / / / / / /,/ / / / / / to engage shear knobs(Typical) // / '/ '/ / '// // to engage shear knobs(Typical) i�/i�/i./i�/i /i�/i./i./i /i‘/i�/ /i�/ ( yP ) % \Ay Vv A//Av Vy %AA ���� Drain(As specified by Engineer) \\\i\//\j/\\j/\\//�\//,//\%/\j/,//.//\/\\j\�i / Non-woven geotextile fabric(If specified by Engineer based on site soil conditions) Solid bottom block Drain(As specified by Engineer) Leveling pad(As specified by Engineer) Solid bottom block Leveling pad(As specified by Engineer) This drawing is for reference only.Determination of the suitability and/or manner of use of any details contained in this document is the sole responsibility of This drawing is for reference only.Determination of the suitability and/or manner of use of any details contained in this document is the sole responsibility of the design engineer of record.Final project designs,including all construction details,shall be prepared by a licensed professional engineer using the actual the design engineer of record.Final project designs,including all construction details,shall be prepared by a licensed professional engineer using the actual conditions of the proposed site. Final wall design must address both internal and external drainage and all modes of wall stability. conditions of the proposed site. Final wall design must address both internal and external drainage and all modes of wall stability. -o 72 DRAWN BY: TITLE: Preliminary Wall Section DRAWN BY: TITLE. Preliminary Wall Section APPROVED BY: APPROVED BY: Silty Sand or Clayey Sand,+=28° Silty Sand or Clayey Sand,it,.28° S DATE: No Live Load Surcharge,No Back Slope,No Toe Slope DATE: No Live Load Surcharge,No Back Slope,No Toe Slope SHEET: FILE: A 28 B 28 36 cad.dwg SHEET: FILE. A_30_B_28_54_cad.dwg N� on NN III \ PROJECT REFERENCE NO. SHEET NO. NOTE: JANUARY 14, 2020 U-2579BA 2C-4 THE DETAILS BELOW REPRESENT A PRECAST CONCRETE GRAVITY WALL WITHLO PERMIT D RAW I N G NATURAL BOULDER APPEARANCE ALONG FACE(PER PLANS).THIS PRODUCT OR A COMPARABLE PRODUCT CAN BE UTILIZED ON THIS PROJECT.A PRODUCT SHEET 4 OF 8 SUBMITTAL AND DESIGN TO BE APPROVED BY THE ENGINEER WILL BE REQUIRED. d= 28° I SILTY SAND or CLAYEY SAND = 28° I SILTY SAND or CLAYEY SAND LOAD CONDITION A I NO LIVE LOAD SURCHARGE, NO BACK SLOPE, NO TOE SLOPE LOAD CONDITION A I NO LIVE LOAD SURCHARGE, NO BACK SLOPE,NO TOE SLOPE 4 BLOCK HIGH SECTION 5 BLOCK HIGH SECTION (3)28"(710 mm)Blocks PRELIMINARY (3)28"(710 mm)Blocks PRELIMINARY (1)41"(1030 mm)Block Professional Engineering Design (2)41"(1030 mm)Blocks Professional Engineering Design Required for Construction Required for Construction Grade to drain surface water away from wall Grade to drain surface water away from wall Top block Top block Setback=1 5/a'(41 mm) 5 (5"Wall Batter Angle) Move blocks forward during installation Setback=1 /a'(41 mm)(5"Wall Batter Angle) to engage shear knobs(Typical) Move blocks forward during installation to engage shear knobs(Typical) / \- / 28°(710 mm) ��/��i/V�ij�i/�i/�i/'i/�i/�i/�i/�! 28 (710 mm) v . •,. \ /% / %VAX VAX VAX X VAX VAX VAX _-- •=28° VAA VAA VAA VAA VA/� ,� / 28"(710 mm) �A� 28"(710 mm) IA/A/A/ 1 >/A/AA t I /V/// Backfill per design requirements. Install 1 '�/v A I'/ //A/�j in lifts and compact per project , ' ' �'V//AA Backfill per design requirements. Install �/ in lifts and compact per project 5'-6"(1.68 m) � \ VA/ V specifications. 2a"(710 mm) �% //�� T-0"(2.13 m) �. �� j specifications. 28"(710 mm) / \ /\ \ / /A Infill stone(No.57 or equivalent) L___ //V/ 1 \-4- s%z% A/ Fill between adjacent blocks(all blocks) �- --- v \ Infill stone(No.57 or equivalent) V___ ,-\j�A; Fill vertical core slot(PC blocks) 4i (1030 mm) IA//y Fill between adjacent blocks(all blocks) I/ //// Stone to extend at least 12"(305 mm) // / Fill vertical core slot(PC blocks) 41"(1030 mm) \ VA" behind blocks. ` Stone 0'-6"(152 mm) �� t/ /�� ��� lA/�AA< behind tblocks.d at least 12"(305 mm) 41"(1030 mm) ///// Middle block(Typical) 0'-6"(152 mm) VAS /0'-6"(152 mm) //v C� ,\/ / Middle block(Typical) // //' / / // / // / ' \ . //// A//�%\� %\VAS/%// // Engineer basedstont site soil conditions)e fabric(If by j�\/0'-"(1 2m m)// ��� A// (Ifspecifiedby / // // \ \/ / Non-woven geotextile fabric //\///�///\///\///\///\////////, ///� 'A/��///\/�/�/��/ ///// /�///\\\//\ // /���/j Engineer based on site soil conditions) Drain(As specified by Engineer) \/i////////////\//\//////// //\/\// /�� \ < \/\\/\/\/\\\, \\,\, \/\\, \\\/\\�\/ Drain(As specified by Engineer) Solid bottom block Solid bottom block Leveling pad(As specified by Engineer) Leveling pad(As specified by Engineer) This drawing is for reference only.Determination of the suitability and/or manner of use of any details contained in this document is the sole responsibility of This drawing is for reference only.Determination of the suitability and/or manner of use of any details contained in this document is the sole responsibility of the design engineer of record.Final project designs,including all construction details,shall be prepared by a licensed professional engineer using the actual the design engineer of record.Final project designs,including all construction details,shall be prepared by a licensed professional engineer using the actual rn conditions of the proposed site. Final wall design must address both internal and external drainage and all modes of wall stability. conditions of the proposed site. Final wall design must address both internal and external drainage and all modes of wall stability. 7 DRAWN BY: TITLE: Preliminary n�j Wall M DRAWN BY: TITLE: Preliminary yy� M q Q M APPROVED BY: • reliminary Wall Section APPROVED BY: • reliminary Wall Section N Silty Sand or Clayey Sand,.=28° Silty Sand or Clayey Sand,41=28° N DATE: No Live Load Surcharge,No Back Slope,No Toe Slope DATE: No Live Load Surcharge,No Back Slope,No Toe Slope B O� SHEET: FILE: A_28_B_41_72_cad.dwg SHEET: FILE. A_28_B_41_90_cad.dwg .,or-, L. c‘IN I- PROJECT REFERENCE NO. SHEET NO. Kimley>>>Horn U-2579BA 2D = T //\\ 421 FAYETTEVILLE RALEIGH,NC E2760UITE 600 HYDRAULICS A LENGINEER OUTLET CHA\NEL IVIPROVEN �oH:TENTS CONS V I .REV Rom. EXISTING GROUND JANUARY 14, 2020 3 0 8'X 9'RCBC 1�) DOWNSTREAM EXTENSION PERMIT D RAW I N G r� EXISTING i `'`AGROUND SHEET 5 OF DOCUMENT NOT CONSIDERED FINAL mil.:-:-.", UNLESS ALL SIGNATURES COMPLETED RETAINING WALL INSTALL 2.0'OF CLASS II RIP RAP •_lIP:.: ALONG INSIDE TOE OF INSTALL 2.0'OF CLASS II RIP RAP RETAINING WALL — ALONG INSIDE TOE OF GEOTEXTILE `APPROX.28'WIDE GEOTEXTILE RETAINING WALL TOE WALL EXCAVATION I STA. 46 +50 —Y4— (RT) DETAIL 2 DETAIL 3 a DETAIL 4 DETAIL 5 FALSE SUMP FALSE SUMP STANDARD BASE DITCH TOE PROTECTION ( Not to Scale) (Not to Scale) in (Not to Scale) N (Not to Scale) `o,�e< o qT F z Median Ditch " GRO�'p94 °t S\oQe ` Outside Ditch Natural Natural ENO ti'• �� 9 2 2.0' Ground 2 T Ground Traffic Flow N0•� 20;1 7 -p/ d (See Chart Below) >-4— 20' GI Min. D= 2 Ft.GI B Geotextile E-S— etc. E-S— etc. B= 3 Ft. d= 1 Ft. S=Ditch Slope Proposed Ditch Slopec Proposed Ditch FROM STA. 32+25 TO 32+70 -Y4- (RT) � P S=Ditch Ditch Grade L Ditch Grade L STA. 29+02 -Y4- (RT) Type of Liner= Class 'B' Rip-Rap 0.0% To 2.0% 20' Over 4.0% To 6.0% 40' STA. 32+14 -Y4- (RT) FROM STA. 40+30 TO 46+30 -Y4- (RT) Over 2.0% To 4.0% 30' Over 6.0% 50' STA. 33+68 -Y4- (RT) STA. 38+89 -Y4- (RT) STA. 29+21 -Y4- (CL), STA. 33+50 -Y4- (CL) STA. 40+39 -Y4- (RT) STA. 36+49 -Y4- (CL), STA. 39+49 -Y4- (CL) STA. 43+14 -Y4- (CL), STA. 46+63 -Y4- (CL) STA. 50+14 -Y4- (CL), STA. 52+64 -Y4- (CL) STA. 56+37 -Y4- (CL), STA. 57+43 -Y4- (CL) STA. 60+79 -Y4- (CL), STA. 63+21 -Y4- (CL) STA. 67+22 -Y4- (CL), STA. 71+21 -Y4- (CL) DETAIL 6 DETAIL 7 DETAIL 8 DETAIL 9 RIP RAP AT EMBANKMENT STANDARD BASE DITCH STANDARD BASE DITCH LATERAL 'V' DITCH WITH BERM (Not to Scale) (Not to Scale) (Not to Scale) (Not to Scale) 10'min. Natural Natural Natural Natural b ��- Ground �•� ry1 Ground Ground �•/ rilN Ground D D Ditch 1.0'min� 1.5' 1 d= d Grade n r Fill 1'�tie To . ?'I D �, H FloodplainT Bench B Min. D= 2 Ft. Geotextile Slope Geotextile �� Min. D= 1.6 Ft. ? Min. D=1.5 Ft. GEOTEXTILE .. Max.d= 2 Ft. Max. d= 1.2 Ft. b=5.0 Ft. B= 10 Ft. B= 8 Ft. H=3.0 Ft. Type of Liner= Class II Rip-Rap Type of Liner= CLASS 'I' Rip-Rap Type of Liner= CLASS 'I' Rip-Rap STA. 57+27 -Y4- (RT) FROM STA 57+60 TO 64+00 -Y4- (RI) FROM STA. 64+00 TO STA. 64+65 -Y4- (RT) FROM STA. 56+06 TO STA. 57+27 -Y4- (RT) STA. 64+65 -Y4- (RT) 0- 0- PROJECT REFERENCE NO. SHEET NO. STREAMBANK SLOPES TO Kimley>>>Horn U-2579BA 2D-2 . DETAIL BE GRADED PER STREAM ©,o,a PM SHEET NO. 421 FAYETTEVILLE STREET,SUITE 600 HYDRAULIC DESIGN BANK STABILIZATION TYPICAL SECTIONS RALEIGH,NC 27601 ENGINEER iS (Not to Scale) t .4I „,..T.,.Y.�. Shoulder r ,o~Fj t Fop e,' Shoulder \ Point 0�1ei i1 �'�� Point ,0' Geotextile JANUARY 14, 2020 Geotextile � ,�-0 PERMIT DRAWING HEADER ROCK,TYP. ,'''i -- B= 11 FT C SET HEADER ROCK BACK SHEET E ET 6 OF 1 DOCUMENT NOT CONSIDERED FINAL BASE SEE PROFILE FOR {I A MINIMUM OF 1/3 WIDTH BUNLESS ALL SIGNATURES COMPLETED FLOW ELEVATION I OF THE FOOTER ROCK ...—...—..—...—..—.—...—..— I .—.—._..—s..—..—..—.- Type of Liner= Class I Rip-Rap ' %:•' s•,O,,< FROM 30+15 STA. TO 32+73 STA. —SMITH CREEK— (LT) — WELL GRADED MIX OF -''- 01.'.. -� EXCAVATED POOLBE FROM 31 +60 STA. TO 32+73 STA. —SMITH CREEK— (RT) CLASS A.CLASS B, 2 MINIMUM •'9''•�4' PER PROFILE AND#57 STONE I... ,,, OOTER ROCK• TYP. ROCKS IN VANE ARM SHOULD HEAD OF TOP OF BOULDERS TO BE FLUSH OF RIFFLE D ETAI L NOT BE GAPPED OR HAVE ANY ELEVATION POINT A WITH TOP THICKNESS WELL GRADED MIX RIFFLE SIGNIFICANT SPACES TOP OF OF (75%) CLASS "A", (10%) CLASS "B", TOE PROTECTION NONWOVEN BANK 3 TOE AND (15%) NO. #57 STONE FABRIC TYPE LLy (Nat to Scale) SECTION A-A II FOR(GEOTEXTILE GEOTEXTILE OE RIF FOR DRAINAG . GOFER ROCK SILL \ P.r DRAINAGE) TYPE 2 !' HEAD of B ` Q� RIFFLE '�at G�aQ e \.�.�1J/NeI� MINIMUM NONWOVEN FABRIC Natural �•• �``7 I -��I--_'�_,O TYPE II (GEOTEXTILE b BOULDERS \ �1'••\`.�'•v�\.�' FOR DRAINAGE) Ground < �i k# � I 1. (SEE ESNOTEIZE) �� ' ••!%•::a 4 SECTION A-A I d FC 2 i� %•�•\�'I•de ••Vm Riffle C COIN FIBER Dmax BANKFULL • (TYP.) Geotextile HEADER .I•• r�. I•.j;!'I, 1 3 Dmax ROCKS • e•• d#•• / FLOW NONWOVEN FABRIC %�•}-.�••�•}-rj t��•}rj• �• 2% TYPE II (GEOTEXTILE •\i Im• \f•Ii \�4Ii rI' b= 2 Ft. FOR DRAINAGE) re: :4! ;.:.:•.•\.•:•:!!Va7 • le.• %• Type of Liner= Class I Rip—Rap FOOTER Ill••I Qi 1.•!.BRA WELL GRADED MIX OF NONWOVEN ROCKS BED ROCK SILL ;.;;I..�F•.�•:•.•;•:• ..".t� CLASS A.CLASS B. f FABRIC TYPE OR J-HOOK VANE�M•'=•�:�•� .f'• �•"• CENTER BOULDER 2"-4 "AND#57 STONE 2'MIN. ROCKS IN VANE ARM SHOULD SEE PLAN \ FROM 23+50 STA. TO 31 +60 STA. II (GEOTEXTILE NOT BE GAPPED OR HAVE ANY �I���I� —SMITH CREEK— DRAINAGE)FOR SIGNIFICANT SPACES TOE OF RIFFLE SECTION B-B SECTION B-B A 18" NOM. THICKNESS WELL GRADED MIX OF (75%) CLASS "A", COIR FIBER (10%) CLASS "B', AND (15%) NO. #57 STONE MATTING (TYP) 1/3 Dmax PLAN VIEW NOTES: 1. DEEPEST PART OF POOL TO BE IN LINE WITH WHERE VANE ARM TIES INTO THE BANK. 2. POOL DEPTH SHOULD BE ACCORDING PROFILE AND TYPICAL SECTIONS. TOE 3. BOULDERS SHALL HAVE A MEAN DIAMETER OF 30" SECTION C-C NOTE: 1. BOULDERS SHOULD BE NATIVE STONES \ WITH A MEAN DIAMETER OF 30" ! REACH OBLONG, WbWf (ft) 28.8 ROCK SILL DETAIL Dnaz (ft) 2.3 NOT TO SCALE BANK GRADING ABOVE RIP RAP PER TYPICAL SECTION WEL OR GRADING ON PLAN CLASSS GRADED, MIX OF 1/3 1/3 1/3 A, CLASS B, BASE BASE BASE w L GRA ED MIX aF AND #57 STONE FLOW FLO FLOW a CONSTRUCT RIFFLE LL DD LASS AryD B RIP RAP p� WITH 1.5•DEEP 1 /� Ir GRADATION OF CLASS A, A ' WATER SURFACE •20'TO �� •� O CLASS B,AND d57 STONE HEAD OF SEE STREAM-7 THRU TOE OF SLOPE ' STREAM-9 FOR ELEVATION 0T=•',� I T, w o 7-TOE OF BANK RIFFLE RIP KEYED-INRAP24"DEEP w . n s Y / �[��Y� Op OF GUDE 4 1 RIFF fr TOE OF RIFFLE /, / BANK HEAD OF 1'MIN PAST TOE I RIFFLE GLIDE INTO CHANNEL BOTTOM POOL RIFFLE SECTION IIIIIMIIIIIIMIO \4 \•, .\„i �., 8'-10' SEE STREAM-7 I w / I /�'• I THRU STREAM-9 11 Ittc •, Iy I • \ SEE STREAM-7 ,.r�A�% 0.*W ?" ••• A•;1rly0\•�\•\\0\•\\V THRU STREAM-9 i�4.,•„.,, i4'? ��•,RIFFLE CLAS GRAND MIx OF HEADER �!«,'l.$42:,0. � * CLASS AF1D B RIP RAP �t�,# A.•.:,• (SEE NONWOVEN BOULDER B `•►',• .:.!, ♦� •' PLAN/PROFILE WATER SURFACE \,.w f:••\•I' \�,I'••;1 FOR B FABRIC TYPE I FOOTER A IA? AITI}.14?"1,�LEFOR II POOL EXCAVATED PER ••..'i•5%.\\�.T.�,.\\•�\ - CONSTRUCT RIFFLE WITH L5'DEEP BOULDER , ) TOE OF SLOPE (GEOTEXTILE KEY IN VANE TO BANK PROFILE •,r�!i a !i;�� ��\•o COIR FIBER GRADATION#57 AIE OF CLASS A.CLASS B.AND FOR MINIMUM OF 4' AT AN i•,a•,�•;i��-•i�q• 0.2•MIN. ELEVATION EQUAL TO -,. MATTING IT P) RIP RAP 24"DEEP C DRAINAGE) . 1 1••.\••• \•C, SEE DETAIL KEYED-IN rn BANKFULL OR SLIGHTLY ,•.. , ,•,•. v, LOWER PpiF ile..,�,:fA�zf00 STREAM- v PLAN VIEW ,:ice � „I• "•i:44' r 1,1iN PAST TOE E A BTOP ANE INTO CHANNEL BOTTOM D TOE OF SLOPE m TOE OF ROE OF iS �pe .a I R PLAN VEW 00` OLD CNN J-HOOK VANE DETAIL CONSTRUCTED RIFFLE ROCK TOE PROTECTION P7. FJ \ NOT TO SCALE NOT TO SCALE NOT TO SCALE o- PROJECT REFERENCE NO. SHEET NO. Kimsey>>>Horn U-2579BA SHEET No 2D-3 LET ©.s 421 FAYETTEVILLE STREET,SUITE 600 HYDRAULIC DESIGN RALEIGH,NC 27601 ENGINEER PJGFIT-OF-WAY REV r ---- JANUARY 14, 2020 PERMIT DRAWING 4 SHEET 7 OF is DOCUMENT NOT CONSIDERED FINAL E c `. UNLESS ALL SIGNATURES COMPLETED Q ������,• ROCK -INSTALL LARGERGERL51 5 RIP AT RAPKOROSM LL ` BANKFULL WIDTH DIAMETER OR LARGER 2/3 BANKFULL TROTH ti ` SIf• ;S S - BANKFULL 4' ` ' IIII III III= WELL GRADED NIX OF CLASS A, II A III-I. -,=' - CLASS B,AND p57 STONE .�,�y}�y.�' �7/� d lb .. — f eigi AR A'\1: } y —I I I '�" . .' IIIIIIIIIIIIIII-III IIIIIIIIIIII IIIIII1' "`�Z` III11 11 11 111 11I 11 111=11 11 I1 I- `' " :tau� ROCK TOE PROTECTION-INSTALL SECTION B-B // `\ �* LARGER SII RIP RAP OR SMALL / 1/3 2/3 HEADER BOULDER,TYP, SET HEADER BOULDER BACK BOULDERS AT BANK TOE.12" BANKFULL BANKFULL SEE PROFILE FOR A MINIMUM OF 1 3 WIDTH DIAMETER OR LARGER WIDTH WIDTH FLOW ELEVATION OF THE FOOTER BOULDER "'! fi .. MEAN BOULDER DEPTH 2300.TO.W` / _ 1 LOW AREA E%CAVATED �A . Vl" r� ►� DOWNSTREAM OF FIRST �F_ MATERIAL BED 1��er STRUCTuRE TO 1/2 BOULDER MEAN /� I`1 1"I I � DIAMETER,TYP, , MTApTERIAL BACKFILL, .=s_ `OI EXCAVATED POOL BED y+y _ BACKFILL*TN 2,0'WIDE x 3,0' �T / .�T DEEP GRADATION OF CLASS A AND �/ m BACKFILL WITH 2,0'WIDE x AO' I2 MINIMUM -S`s';YS _ - B RIP RAP,AND p57 STONE. y�/ FL W DEEP GRADATION OF CLASS A AND r FOOTER BWLDER,TYP, Y" _ NONWOVEN GEOTEXTILE FABRIC TO ir /�3�. iZi *`"i-]•1' _ --FLOW EXCA ATE POOL BE USED BETWEEN BOULDERS AND B RIP RAP,AND p5]STONE. ////// BOULDERS IN VANE ARM SHd1LD LO III_ y '� NONWOVEN GEOTExnLE FABRIC TO / NOT BE GAPPED OR HAVE ANY �` AREAfi� S �V PERPROFILE BACKFILL //BE USED BETWEEN BOULDERS AND SIGNIFICANT SPACES ,mow _ BACKFILLStS1 .` 24�4S iaei III— _ NONWOVENE%CAVATEDTRENCHFORFABRIICVTYPE EINOTE LE FABRIC ' �� -�� ' III III— _ NcEti TIME `DE _ A ROCK yANE CdJSTRUCnON SECTION A-A = - III - FI�TNE D ABRvEN icoTWE I` ' I I III-III III-III III III III-III I=III III-III= A'_...... HEADER ^ —III—III—I I I�1 1 III III III 1 =III-III IIII III—III—III— CAVATED PER lantW POOL E% 4P,�y.� i /� MEAN BWLDER WIDTH III 1 1 1 11=1 1=1 I 1 FOOIER PROFILE TIE VANE ARM INTO , r7,'.: - BOULDER BA 15FUL�E�[VATIO U LESS x �'> `4 K Y IN VANE TO BANK MINIMUM OF THE MA%IMUM ARM SLOE DOES NONWOVEN GEOTE%TILE 4€AT AN ELEVATION EOUA TO `N� NOT ALLOW �: ,4 wE.� FILTER FABRIC TYPE ii BANKFULL OR$LIGHTLY LO R BANKFULL HEADER - # f*p•! BWLDER �tcer^ 1 I 14 : FLOW .. ...1 ... ... ... "=' 'y'" ' SECTION A-A {;0 AK 0,5'-0.75'BACKFILL,TYP. --"— } NOTES: ' FOULDE 1,PLACE GEOTE%nLE ON THE UPSTREAM SIDE OF THE NOTES: BACKFILL WITH 2.0'WIDE x 3.0' I NONWOVEN BOULDER BED OTER MOST UPSTREAM BOULDER SILL IN THE CONSTRUCTED 1,DEEPEST PART OF POOL TO BE IN LINE WITH WHERE DEEP GRADATION OF CLASS A AND 'FF --""111 KEY INTO BANK 4 VANE ARM TES INTO BANKFULL. GEOTEXTILE RIFFLE. B RIP RAP,AND p5]STONE. 2'MIN. FABRIC,TYP, BOULDERS IN VANE ARM SHOULD MIN.4.0'AT AN 2.BWLDER SILLS MAY OVERLAP AND,ANCHOR THE 2.DO NOT E%CADER POOL T00 CLOSE(1-2')T0 FOOTER ROCK. NON�VEN GEOTEXTILE FABRIC TO NOT BE GAPPED OR HAVE ANr 3,CLASS"A"STONE CAN BE USED TO REDUCE VdDS BE U D BETWEEN BWLDERS AND SIGNIFICANT SPACES ELEVATION EQUAL EXCAyATE POOL BOULDER SILL DIRECTLY UPSTREAM. BETWEEN HEADERS AND FOOTERS, BOULDERS SHWLD BACKFILL TO INNER BERM OR I PER PROFILE 3.THE BOULDER SILL SHALL ALL BE CONSTRUCTED TO BE NOT HAVE GAPS SEC.IION B-B SLIGHTLY LOWER SUBMERGED OR COVERED AT LOW FLOWS, 4,COMPACT BANKFULL TO EXTENT POSSIBLE OR AT THE 4,BOULDERS SHELL HAVE A MEAN DIAMETER OF 30". DIRECTION OF THE ENGINEER, 5.POOL DEPTH SHOULD BE A CORDINA TO PROFILE. Q 5.BACKFILL 15%MATERIAL TO BE (AL A,10%CLASS B, 6,BOULDERS SHALL HAVE A EON DIAMETER OF 30 AND 15R NCDOT NO.57 STONEORE(ALLL%BY VOLUME). PLAN VIEW BOULDER ROCK AND ROLL RIFFLE 11' ROCK VANE DETAIL NOT TO SCALE / \ NOT TO SCALE R 13'MIN.FROM EDGE > A COIR FABRIC(TYP) SEE DETAIL INNER BERM ELEVATION SFF PLAN (SEE PLAN,PROFILE,AND TYPICAL SECTIONS) e �p BANKFULL ELEVATION \ f >- POOL PER PROFILE V�/pA� Wppp / MATCH TWICAL sECniR15 To \\ - . LIVE CUTTINGS(PER PLANTING SHEET) '° r�.6ei i - Iy Iy_ gA 6"MAX ABOVE"BASE FLOW" �s• x FIOTEABR GEOTE%TILE ______ _____ V40A �®�lam' \ L R F IC TYPE II ----- -- LARGER BRUSH LAID PERPENDICULAR �y. � 1 EXISTING GROUND �i TIE TO EXISTING GROUND, Qr.A 4 .X4.,4 STREAM GRADING PER PLAN EXISTING GROUND O FLOW �' CUT LINE To AcT As !�� - SEE PLAN SHEET HORIZONT LD BE CONTROL POINTTE �* $44 \ FOR GRADING PROPOSED GROUND AND SHOULD BE HELD TO THE a' BASE/NORMAL FLOW ELEVATION --- ____ HORIZONTAL LOCATION SHOWN A �-,*4 B SEE PLAN NEW FOR ------ IN PLAN VIEW. /` p/ 4$9: EXTENTS OF TOE WOOD- BANKFULL / `�� 4P i 344,41,47'+ EXCAVATED POOL PER PROFILE • DEPTH(SEE BANKFULL BENCH(WIDTH VARIES AS SITE ALLOWS,SEE PLAN SHEET) qW.E%/�-aplaj" `"`TYPICAL CROS .@'O > BRUSH LAID PERPENDICULAR TO THE 24"MIN, FILL GAPS BETWEEN BOULDERS secnoNs) ��•"• A�'I")��F'�(P�`��' STREAM BED AND COMPACTED.TOE WOOD WITH GRADATION OF CLASS A. `M4 �,s't SHALL NOT E%TEND WT INTO CHANNEL CLASS B,AND p57 STONE •V„^". 44,04.4144.4 BEYOND THE GRADES SHOWN IN THE NOTE: C sf ®'�j: TYPICAL CROSS-SECTIONS,PLAN,OR 1, BRUSH SHALL BE A VARIETY OF DIAMETERS AND SHALL 75%BRUSH(STCKS/LEAVES/BRANCHES) 1 E034 CROSS-SECTIONS, BE LAID GENERALLY PERPENDICULAR TO FLOW AND PROPOSED GROUND FILL B BOULDERS AND FILTER FABRIC WITH 25%ON-STE EARTH MATERIAL �OV°® < 4"-8"DIAMETER LOGS LAID COMPACTED BY GIRT. GRADATION OF CLASS A,CLASS B.AND p67 " PERPENDICULAR TO STREAM 2, FIRST LAYER OF BRUSH SHALL BE A BED OF 3" I� LIM85S ABO SET 18"MIN.BELOW THE BED. 30"MEAN DIAMETER BOULDERS,PLACE STONE rsp�� FLOW,FILL VOIDS WITH EARTH 3, LAYERS ABOVE FIRST LAYER SHALL BE]5R BRUSH OF LARGER BOULDERS AS FOOTER ROCKS E ��:/%'%' AND BRUSH, A VARIETY OF SIZES WITH 25%ON SITE MATERIAL (PEACE FOOTER ROCKS BELOW BOTTOM pDj 4. BRUSH ROD GEOIEUGHT UP IN LIFTS. XnLE FABRIC OW G B OLS ELEVATION OF CHANNEL), BWLDERS ARE 1 6 SECTTIIONG ABOvE AND/ORTGRADNG PLAN.PLD PER THE TYPICAL TO BE APPROVED BY ENGINEER PRIOR TO TYPE II INSTALLATION. m OP N TOE WOOD PROTECTION BOULDER TOE PROTECTION Qj NOT TO SCALE NOT TO SCALE m PROJECT REFERENCE NO. SHEET NO. Kimiey>>>Horn U-2579BA No 2D-4 SHEET 421 FAYETTEVILLE STREET,SUITE 600 HYDRAULIC DESIGN RALEIGH,NC 27601 ENGINEER CONS,REV. NEW STREAMBANK SHALL ' UNCOMPACTED BE TREATED AS BACKFILL SPECIFIED IN PLANS 5 Min. 10' 1.5' F<U O FINISH GRADE ALLCONSIDERED ly UNLESS SIGNATURES COMPLETED EXTEND CHANNEL BLOCK = P MIN. OF 2' BEYOND INVERT A OF EXISTING CHANNEL FLOW N ) y1 JANUARY 14, 2020 40-' ?;7 1.4 INVERTCHANNEL > PERMIT DRAWING —\Y— / —*— SHEET 8 OF is /� COMPACTED COMPACTED SECTION A-A BACKFILL BACKFILL IMPERVIOUS SELECT MATERIAL (SEE PROJECT SPECIAL PROVISIONS) 15' MIN. LENGTH UNCOMPACTED BACKFILL 141111111 A \ Q w 11 111)111 BACKFILL ,V In > .. EXISTING P COMPACTED CHANNEL \ NOTES: BACKFILL 1) CHANNEL BLOCK SHALL BE INSTALLED IN ACCORDANCE WITH THE VARIES v. PROJECT SPECIFICATIONS. 2) BLOCK SHOULD BE INSTALLED AT THE INTERFACE BETWEEN EXISTING EXTEND CHANNEL BLOCK �� CHANNEL AND PROPOSED CHANNEL. MIN. OF 2' BEYOND LIMITS SECTION B B 3) OF BOTTHE EXISTIINGTOM OF CK CHANNEL BE A MINIMUM OF 2' BELOW THE INVERT OF EXISTING CHANNEL 4) BLOCK SHOULD EXTEND A MINIMUM OF 2' BEYOND THE LIMITS OF THE EXISTING STREAM CHANNEL. PLAN VIEW STREAM PLUG 5) INSTHETPROJECTTSSPECIFICATIONSTIMMEDIATELYEAFTERALL ERION CONTROL MATING AND SED INAGRADING.CCORANC WITH NOT TO SCALE 6) COMPACT BACKFILL TO EXTENT POSSIBLE OR AT THE DIRECTION OF THE ENGINEER. z-EXISTING GROUND ` \SEE TYPICAL SECTION ~VARIES' r Q / RIP RAP,PLACE LARGER BOULDERS AS BANKFULL ELEVATION FOOTER ROCKS(PLACE FOOTER ROCKS BELOW o EXISTING GROUND o0 1 0'-2 • BOTTOM ELEVATION OF CHANNEL). STREAM FLOW SEE PLAN KEY GRADATION OF CLASS A, BOULDERS SHALL HAVE A MEAN DIAMETER OF 30", _V CLASS B, AND #57 STONE BACKFILL WITH 1.5'DEEP INTO EXISTING BANK GRADATION OF CLASS A,CLASS B, - AND X57 STONE 1'-3' 1.0' — _ -�i � FILTERNL FABRIC YPE II �.=.` FILL GAPS WITH RIP RAP AI" L TYPICAL CROSS SECTION 10, NON-WOVEN — — — _ • I FILTER FABRIC � ����-�� orir TYPE II, TYP. �v — PRE-FORMED dill Miry*"�l�/�y��� �y�� — — — — T — — — —_ SCOUR HOLE. SEE PLAN to- T VARIES PER PROFILE - SEE PLAN NA- PROFILE 72 fd O0- NI, ROCK STEP POOL / NOT TO SCALE PROJECT REFERENCE NO. SHEET NO. CONSTRUCTION LIMIT 813E33 ( 2W ) 2G-1 GROUND LINE SLOPE STAKE POIN ENGINE GEOTECHNICAL T GE (TOP OF SLOPE) ENGINEER ism/�` ROCK GEOTEPLATPLATING (T P) ,2�QOF55ioN�9s 2' �o TOP OF SLOPE E ' SEAL 9': S. �'r1 028893 GEOTEXTILE '` �F')�l A.i..?C ,, I I ���',,e:�......�;:.'. FOR ROCK PLATING •� I I ���v4�14►F ROLL WIDTH I SIGNATURE DATE SIGNATURE DATE :�r� �► SEE GEOTEXTILE "imp�9� OVERLAP DETAIL I I �,'� �', r I DOCUMENT NOT CONSIDERED FINAL l S '1��`�� 2'THICK RIPRAP YIN(TYYP� I UNLESS ALL SIGNATURES COMPLETED 4<'�F9 ' `.',. (SEE NOTE 3) 18"OVERLAP I "'Z',l-10 -V,R`` ON (TYP) I I , EXISTING GROUND F,s, .► �`ti% I I S4� „�� ''_• TOE OF LOPE DITCH I I JANUARY 14, 2020 / 4% .., PERMIT DRAWING �� ���,. =,.,'� 4' 6' TOE OF SLOPE SHEET 9 OF 18 v - - GEOTEXTILE OVERLAP DETAIL ROCK PLATING DETAIL — TYPICAL SECTION FROM STA. 23+50+/— TO 31 +60+/— —SMITH CREEK— SEE STREAM TYPICALS `I (PLAN VIEW) FOR DITCH DETAILS NOTES: I. SEE STREAM PLANS FOR ROCK PLATING LOCATIONS. 2. FOR STANDARD ROCK PLATING,SEE SECTION 275.01OF THE STANDARD SPECIFICATIONS. 3. USE CLASS 2 RIPRAP. > DAM EMBANKMENT N WIDEN BORROW EXCAVATION A MINIMUM 20' WIDE (STREAM RELOCATION) > r EXISTING DAM ROCK PLATING �..�• �' 7 ,-DER ������ ••'� - - _ POND 4 TO REMAIN 1 OR LP�.�Z4,9.. - - , ` W.S.E 842.0' 3� ... t .%- CONSTRUCT TOP OF BLANKET \ - ' _ , \ ��� :•y' DRAIN TO ELEVATION 840 FT. :40" " PROPOSED EMBANKMENT 40::;i:• ' - 5 FT. - i•• ::i::•p: ' _ _ vin 04. o,�•�0 •GEOTEXTILE FOR r.: `'"}'..''} ' : i ` '�*•-7• DRAINAGE (TYPE II) "i '• 1% �'••''4-'•_ r-..%:• •:; :;`' Ts c-•'r 5 FT. BLANKET DRAIN TO BE A MINIMUM EXISTING EMBANKMENT OF 12 IN. THICK CONSTRUCTED WITH SELECT GRANULAR MATERIAL TOE PROTECTION. CLASS III TYPE 1 - 2S NATURAL SEE DETAIL SHEET 2D-2 SAND ESTIMATED QUANTITES PAY ITFA1 PAY IINIT DAM EMBANKMENT WIDENING DETAIL SELECT GRANULAR MATERIAL,CLASS III 1,350 CY FRO\A STA. 23+50+/— TO 31+60+/— —SMITH BORROW EXCAVATION (STREAM RELOCATION) 2,750 CY CREEK— GEOTEXTILE FOR DRAINAGE (TYPE II) 1.050 SY ROCK PLATING 3,750 SY Noe�y NORTH CAROLINA NOTES: °Y °'4 DEPARTMENT OF TRANSPORTATION DAM EMBANKMENT 1) FOR DAM EMBANKMENT WIDENING, SEE F'`� �� DIVISION OF HIGHWAYS DAM EMBANKMENT WIDENING PROVISION. WIDENING DETAIL , Yf GEOTECHNICAL REVISIONS PREPARED BY:MHS DATE:10/17/19 \,�, ,, ENGINEERING UNIT NO. BY DATE NO. BY DATE T op TRA' 1 3 REVIEWED BY:ENW DATE:10/17/19 2 4 PERMIT DRAWING MODIFICATION LEGEND JAN UARY 14, OZ O PROJECT REFERENCE NO. SHEET NO. PERMIT DRAWING Kimle >>Horn _ U-2579BA 5 m „� DENOTES IN TEMPORARY ORACE WATER \\ DENOTE WATERTS IN DENOTES/�,/\\\ URFACE WATERTS IN PERMIT DRAWING PREVIOUS U-25798 y WW SHEET NO. IMPACTS (CULVERT IMPACTS) ��' ($TREAMBANK STABILIZATION) MODIFICATION FOR SHEETo O F 8 SHEET 25/26 421 FAYETTEVILLE STREET,SUITE 600 ROADWAY DESIGN PAVEMENT DESIGN ',���/� DENOTES IMPACTS IN SITE 23 AND 28 RALEIGH,NC 27601 ENGINEER ENGINEER �'I\\i\ SURFACE WATER (FILL DENOTES IMPACTS IN \„M `'� cans aevnr xsv. SURFACE WATER \^ C\ \ (FILL IN STREAM) (POND) / 'QP \r\ \s, 51� . 'SITE N23 ry \3\3 f -- \ (PER` 5 IT / ❑ AZ A © \!*\�\ ikr. .. y�/ DOCUMENT NOT CONSIDERED FINAL o e ~� (�'y��''yyff�� UNLESS ALL SIGNATURES COMPLETED Sr �Sf—�... �;7`il`if La \ i \' r © p p p p 0 \ ,. \ i,..„11 ... 14' ,,N,N, Ni• 0 E3' 0 j \ �S \ I s \ 0 ! \ SITE 23A } 0} 0/' p p SITE 22 \ A } / p SITE 23A © £3,c,)j, ^/� \\ _ R RETAIN x x © )( )< X X --X --X- X x xTOWN'a� KERN HS ILL _ .. .. X X"^• X X X JR 9 -- X X X x x I x )( >— Y __ � iV - / -------__i `A� RAP \`4 \C\ _ _ _-----Of 1----_ of 1-- ... / p\ Tj-- � Oi 1____- t HOLE v�' \• �:111, �, RIP RAP I 443 P�— _ __ 6 CP o SCOUR i /mod''—CA SCOUR I— / GP / /io + �,�� HOLE LU A2 0. / RETAIN ,\ � REFAINwy F F F F D� FF �� F H Z O . T TOIT��, N. DETAIN IS'RCPF - - w o <n — SITE 2 -� T- T - �^- w 91f1] ni !IN DI DI N 1- f I I I I I I I I I I I \� I I I co VJ F Cp T OTCB TO 2GI RETAIN CONVERT OTCB TO 2GI N 85'33'45.8°W \ v 9T,o- A 6L'419=4NIC7ti1 ,-REMOVE EX DI pp nn bs LtB... -- �) 7101.Srr3JJ��tlQ >- �1 1' 1 ' 1 '1 .E 1' .1.'I 1' 1 '1 i 1 1 1 1 1 ' I 1 1i 1 ' 1 11 1 1 J '1 E I' 1 '1 1 1' 1 '1 i 1 'RdEM l..+r+'2GI i 1 1 I 1' J-15'BCP-I'- 1' / - 3 1' 1 ' 1 -11 r 1 F I m I I I LL UU -- FS + I ... \ ■ _ 15"aiCP-I�` z T- T -Tz i Z T- iT- i 1=�T f5-i j i 3= LT T T YIRCP$ -Ti s- 'Z -TL 2 LIT� cT FS T t - LJ i.Y- �' .fJtl:J - - z- �. LT- DI TL 1-L-R( I�L Ti- 3 z T- zT -YL 3,- 1-T- T i -T i 1-Lf5urTi s-T- �F T-1- '-T- $ -T (A - ' L L - JI I I I I I� I v� AV I : } RETAIN LL WPLUG,FILL, - \ \ N. ->• I U -� p y 85'33'45.Q� AND ABANDON�� PLUG,FILL, ~tom — __--\ ;-- ----- \ \ I' AND ABANDON _ w rMT REMOVE FES 15"CMP W/ 15"CMP W/ \\� ► \ MTL J COLLAR JB W/ 2GI 14A AL_ O ti�4� _ O IRIS 0H3 I Abilli.. .. .. .. .. Y. — J. J. 2 - ELBOWS—_�=tln0 ,-3 L' `R .. .. .. FES +T. 2 ELB ` ;r ►� -�..�K i(il FS �y 2G1-A 42'rRCP-1 42 RCP-IV ..... ����► 30 RCP IV PM R l `�" imiw / JB W/MH - ��JS j5 COVER JS J$ - JS JS 48"RCP-` l - k 1 r AN SITE 23B PROPOSED 32'3@B'x9'RCBC ���� 7 !�7: DOWNSTREAM EXTENSION 7 E '�f�r%, \ �\ SEE CULVERT PLANS CO1-1 THRU COl-10 >� Y7 \ TOE PROTECTION W/ ' \ CLASS B RIPRAP 5Cg Jf . \ BEGIN SBG EST 130 TONS RETAIN EXISTING 5�J-MHXNI -' -Y4WB-$TA 39+50 RT ,. \ \ EST 265 SY GFD AND USE CAUTION `, ' —o 2k JB W/MH SEE DETAIL&SHEET 2D-1 WHEN INSTALLING i - at,. COVER S'' CHANNEL IMPROVEMENTS1sd. 0 4 4/4. \ \�` OUTLET CHANNEL IMPR VEMENTS' RNJ ACQUIRED W H C II RIP/ TIP PROJ�U-2 -9B T 150 S\ po \ss SEE ATI 70' 0 TDCQUIRE H / 0 ' TI PROJECT 57 B 0 I. .')}.1 W.E.8597 / A1 11`` \1 FISH HATCHERY SI E 'N? 11\ iI / \ . .,, ,_„„„ (PERMIT Q ) ,Fo • -N, OUTL `OFANf�ELi VEM'NTS 36 NC. `A' •\ �, N0 , CIIRI+RAP70L N$ \ �±y\ :ES $Y tFD ('1I TE qBA /\ $BE DETA ET a.1 J lr/ —• P I sI •' P Off►): r/'N (PERMIT �A sa.�a4 ' 1 I PAVED SHOULDER , \ , , . -- \ \N NOTE '1I,f N / sue\ FOR - Y4EB - PROFILE SEE SHEET 8 N. FOR - Y4WB - PROFILE SEE SHEET 10 I I FOR CULVERT PLANS SEE CO/-1 THRU CO/-lO PERMIT DRAWING MODIFICATION LEGEND JANUARY 14, 2020 PROJECT REFERENCE NO. SHEET NO. PERMIT DRAWING Kimle Horn U-2579BA 5 DENOTES„� IMPAOCTSS INE SURFACE WATER // SURFACE WATERTS IN /�,/// SURFOTES ACE WATERTS IN PERMIT DRAWING PREVIOUS U-25798 y R/W SHEET NO. (CULVERT IMPACTS) ��' (STREAMBANK STABILIZATION) MODIFICATION FOR ©=o,s SHEET » OF 18 SHEET 25/26 421 FAYETTEVILLE NC 27601 600 ROADWAY DESIGN PAVEMENT DESIGN II,,',�5�/� ,y�� DENOTES IMPACTS IN SITE 23 AND 28 RALEIGH, 27601 ENGINEER ENGINEER I�'///i'///I ' °7/ DENOTES IMPACTS IN �' \ \ �L COI.' xsv. ,,., SURFACE WATER (POND)SURFACE WATER \ I l 0\ , , (FILL IN STREAM) — I /, , . v/// _. = —_ —` v�`vv. \\v \\ V 'I / �� vN v VvI 4 \v` v — — 'Ji � � Vv1�III'illlillll;j j /Y_ 1 \ — .\ / >/\y _ ``` \ \\ — \ � ,�- �� � SITE �3 \ I ,/ ,,, (\ \ - , A ,�:/01$ /+�// i \\ \\ \ \ \Ilk / \ 4\�\ \\\ i / s '\ \.\\\,,l\\"'�� !i�i i IlFylllll)\ \ \ DOCUMENT NOT CONSIDERED FINAL o \ \ \ \ e \\\ IIntl UNLESS ALL SIGNATURES COMPLETED �I! \m=_ / ///5B / gyp\ \ \ \\\ \ \ Y i i \\ I — — aao— } //// \\\\ \ 6 / /. o ///•/ \ ON, \\\ \ \ \\ \. 1: `ss �i �/ //,lllldll 11—_----__-----),/'//�/'\ Ln I/� pc. / — \\ \ \\ \ \\ O 1 � \\\ � �v / / / \ \ � 'e '// 9 - - ----4,--fi , ‘ a / \ \ 1 i // 7 .t _ . . ///,,, _ \ \ \, \ \ \ ... .. .„., .. \ ,,,.._. ‘..._ , _ , , x.___,_i / , , ,, ,((,,,„\ , ...._ __..„..... ,..___ .... : 1 I ///// / / �. /// / \ s \ \\ \ \ \\ \ \\\\\\ / / \ ..��\ \ �SIT� 2�Ar\\ \ \\ = �' / /'� CY \ -�I III I I I s v .. �,'////2/ yea. / A\\VA \\'.A\_ \\_ a V A L \ � �� ��', _ _ I I \\A�y�S SITE—'-- Al.)o /� a / /oa9 / \ \\ ' \ \\ \ \ \\\ \\ , '\ T\ ) • ;�b =: ,I c \ \' \` 1 \ I II •\ \ r6 ////j//j �. \� \_\ \�\\ \ \\ \ \\\\ \\\\�\\ \\� ^/\� ..�-- 'j` \ 41 \ \\ ��S\ \\ \ \ / _' cy )RETAIN / • �1Ir _ / / .1 \R N. \m \ ` \* the..-rc:1`1.46:.. ' ILL - - ' /�i ..a. \ \ \ \ ti J I /9Y` p , I I wr , / . / r�6 ✓ _ \ \ \ \ \ \E\ rjr / ��a\ t// I <k . 7: \ \RIP -AP \ / m // 3 / -0 --1 / .A, -7'-� - oe\- ,_ �'---�-- --11--- `�9� `��o 0ii d i \ . .isl, '' _. - -� �- � `$ oe,f.L- / I / \ \ I C�\j SCOUR 7 �' \ �I F- / �c�\/ 1 099 / ' ,I^ R \ 1 \ \ I I I R \t� \ ..��+ I LE \ ) / / \I I I- &AG`'T'-,/ O/// ! -- \ \ \ Q \ y I / I 1`n �. HOLE + �-r \\I SCOUR / I / I I �/ I \ \ I 1 �t ''1 11 \ = ,r a �° 1 \ Lu a t \ ///� / /� /( 969 \ I \ \ \ \ I I I / I f \\ \m .,�Y ,.� �, J \ \ 2 \ /// // \ J� / / \ \ \ ro \ I\1\\ \ \ \ RETAIy \ / 6 �� j RETAIN 15 // \ l O w N _, //i'F// /L-,,__ _�„ _-�_ _ 899� J I ) F\ \ i51,Di 1F1111 1I1 I I \\ \ \ �\\ � s'� _ ( I _ ` , / /7/��e \- - ®/ r i \\ \\\\�'a 2 O \ —g /2<-_°.— =!� = �8ay�= 1 I D- - - 11- -�� i_ � -- — -_� R_�- I_ -- _ \ -- •,,f ,A1N IS'RCP� - - '��.--\— --- F\—= w-�_ `- - - -- - -- i i -,r. __�_ - _ - - ar ...;.:. - .. 'DI 1 \ 2 c, + _=06 = -- —g@5= - = a"—� — \L �Ti„7_t _39Er- =- --��—=coo—" �_ _ _-_ �mr l ..,— N F ) E I N , 1 I / \ I \ ` I tea\ \ \I R� ,1I 1 1 I , I N l \ I� `: I\ \ , I I + } �� -O X OTCB TO 2GI) s /1 rnl I(ELIN Y__- 1� 1-�l �_ - _ W b�ie- 1 �O R lOTC�O��GI N Y.'-.3I - 1 'I __�- r BEMB'�E'®.nllr 2GI f _„>_-`-- i r_*_ A- /- - /P-I _1.1 O •\..\=y LO0CS�, _ � e REMOVE EX DI y 1�_� - is^#C '1 l+ yl' --.l -. Ili -1-_ li-A` -F -li _- - ' � ' - F I Lu x ih2F'B-x(/b4 aT- 'i-� -T T+S.IT T T- sr T- -T z. _i��ft�-� i -T\." - ��5 / -T- -511-/V- p'45,8#�/`T��- Tj zT'- 0 T§- T Llf„_R P6 -- z - - . - , r, y l ' __- __ i 1- fA } TES �W rtr..., �Ti �" � i. TL iT �T T- �_LT I RETAIN �rt/ / PL G,FILL,-/--....._ • / \ \ �"J PLUG,FILL, / , Lu i ) / / I �/ Ni 85'33'4 I — AN__ BANDON \ ~t $ lz \ \ i l •/AND ABA�N ON Z _ / 880 - e R FED_ yg - 87� ..�ez - J _ _ _58@-= - LA �9- =- mr—®�• mom- - - - - _ _ _ 11T -- _ - .. .= �1 b - 'L'• .:.._-— o = =— _ — _ - - .Y - Ca a iaE6Vt • _.,,.. . _ _=--moo _ -\ F5 •��T fA ' � :\ l \ 1 \ � - I t. � � � 30 RCP V .:: � Y ` '- - 1 \ \- ' \ - —\— � "r - ` _ - sF :-r,r a< � yam i-Argirp — \ I-I-\ \,\- r \ �1�,`p\' ( �\ \ \�\ 4/ __ '_ _ ,. -;OV. - �o •g . „_ MITH CREEK�.\C �.,,, \\ \ \ \\� ) / `��\ I �\�J,`���\� \ II I 1,.: �'75- _ �n is- JB W/MH ___ JSi/r�- -�.- >..:.�a \kili•� t s\ \ /I/ 11 m 1 \ \ ,\ / COVER42'R • �`- \ ss\\� \ \ \ I1I I // / / /i� \ '4 SITE 23B � �E\ J I \ RTDWS CO1-1M EXTENSION ' \ L- \ \ \s I 3f® / J SEE CULVERT PLANS C01-1 THRU C01-10\ X\,. / 1 \ TOE PROTECTION W/ \ ds\\ \ \\\�\ Y \ I \ '//( OBd I \ \ \ II\w \ CLASS B RIPRAPANI Y} -�098` -�� �n�`'1i';\\ \ I \ 1 _ .— \ I l/o. \ \ -Y4 ST\3�1I \\\\ o� \; \ 5Cg / ) 1,.��-:EST 130 TONSRETAIN EXISTING S�MH / . n\ \\ \ \ 1 �) / C I1 \ \, \\ EST 265 SY GFD AND USE CAUTION __��_ 'P'X� ( ` \ } ] g \ SEE DETAIL 55HEET 2D-1 WHEN INSTALLING ,ai pz- -- \ \ \ \ \\\/1 \ \ \ 1I I R \ \l'�J/��///\ \ \ \� t' c \ e �\\\\ \ �,\ \ \ CHANNEL IMPROVEMENTS y �j� �4•14�T — _ � \s \ 1 \ \ \ \ I I \ ' /I\ `�\ \ L�\ \\ \ \ ` \\\\ \\\ s \ \ • OUTLET CHANNEL IMP VE TS _ - R/W AC&UIREe S e Q \NZ'� �\ \\\ \\ I\ \ Imll / hll/( I\� \ \ \ `� \ , \ \ \ 1 \\ \\\ \\ \\\\\\\..,\ s/1`�\\ \\\\ SEE IL,VII''EE'�, // / _ � S '� \• � \ \ \ \ \ I 1 , I i I \ \ , \ \ \ \\\ \\\\ \ \ m\',\ s�` \\\1� TDE Cq/w'RE /• " / : �M,J/ \ I /� // / I I \ 1 \\ \ \ \ \ I\ '\ \ \ \o \ \\ \ .. 1 1 Ir TI OI,FtT 5 •8 /_ /O _ \ \ m\ \ \I I 1 I I I I \\ \ \ \ \., \ I /\ \ \ \\ \1 Irl 1 POND ( l l ///,a // �5/� — — \ �� \ I I \ \ I \ 1' W.E.sse7 / ( / / s �/\� °' I I I \ \ \ \ ' \ \ \ \ • \_ I \ 1\I\ \ FISH HATCHERY ]� /�/ ^ \ m \ \'\, \ I \ I I \ I I \ \ \ \ \'\\\ \ \ ` \\ \ 1 I I I \ \ 1 , I 1\'.. \I'j��l\. 1 SI l✓J ;v e ,' — \ \ \ vv, s 1I( I • :• , , / ,1 . y\ PERMIT , �, FD �, N \ I ..\ \ \,\1 ( \, ( III , \ \ o• _ \ �\ N \ \ \ \ \ ( I _mT9 \, . ( \ ,u \ �; / mw II__ , 11,, ,/ I _ 0 \ \ 6 \ \ �\ a I I 1 I/ I I // / / 111 I \ •��\\\\ OUTL N EL ..IrVEAF`NhS 6: / / 36 \ \ \ \ \\ \• III \\\\\1\\ \ \\ \\\\ \ , \ I § / / /_�// \ I r' \ \ t,. \ M C(e 171'Ekk,10 I ► 1(�/ / 00 °per mll \ i \ \ \\ \\ \ \\ I I 1 I /�y////R' /�/(/ / \ \\\\ ' '\ .\.,,_-',---\�\ \��� /�EEst•r,(k ,'FgI I1 / (\1/T�]/ \ \ '\ \ \\\ • 1 1\ I NMill\\\\ \ �\ \\ '1 \ , ' I\_// /47 //// \\\\ .(_ \ \ .. \:EV DETAIL••I gT' 11°I I / Si TA' ' a� \ \ I mll \ \ \\\\ \ N,*\ \ \\ \ \ \ IIIIIII 1��00" l \ �� ; _ \ 11 I r I ' 1 \ \\ \ \s, \ \� III , , , ) / \\ "g = — \\\\�. � \\� �� 11I / \ .: � , \ 5�,� \ 1 \\ o\ \ \ \ \ \\II I I l4/ , 1 I /' __ \\\\,"�_e, PERMIT S Sint % ' I; / /� \ \ \ \ , \ (1 I / _— --.1:-.---' _=°8g;\\\\\\\\ 4 ` 1 `i. I1 I1 C I PAVED SHOULDER \ \ •\\\ \ \ \ \ \ \ \ 1 \ \ (L III /�� / m0 — sgg , _ _ \\ \�\ I 1 I \ \\11,11P //j�— ! \\\�\\\\\\\\ :41..\ * I : I NOTE : I FOR - Y4EB PROFILE SEE SHEET 8 a� \ \ \ \ \\ \ \ \ \ \ 1 I I \\ \I /11�//l 111 /,, - , _' �;�.°6B= -_Q s�\\\\\\\\\\\\\\\ov•:. A` III,, ) 1 ,�L. 1 1 I \ 1 1 1 ,- �/ , q, // �_- — - '0CB \\ \ \\\� \ I FOR - Y4WB PROFILE SEE SHEET 10 / I I I I I , I I \ I I I), I . \ \ ! I/I I I I I IIII////l( � / — %ii , -�- . \\\\\\\\\\\\�\\\`� \\\\�\ti /I�I ill 1 FOR CULVERT PLANS SEE CO/ l THRU CO/ 10 PERMIT DRAWING MODIFICATION LEGEND . JAN UARY 14, Z020 PROJECT REFERENCE NO. SHEET NO. PERMIT DRAWING Kimle >>Horn U-2579BA L 6 63 SURFAACE WATER '7//� DENOTES IMPACTS IN PERMIT DRAWING MODIFICATION FOR PREVIOUS U-2579B y RAN SHEET NO. FILL IN STREAM �I SURFACE WATER �J ( 1 (POND) SHEET E ET 1 2 O F i s ROADWAY DESIGN PAVEMENT DESIGN _ _ SHEET 26/27 421 FAYETTEVGH,STREET,SUITE 600 ENGINEER ENGINEER SITE 28 RALEIGH,NC 27601 .I�M_a�w..3�. CONST REV 11 P --,'"1-ej 1 I DOCUMENT NOT CONSIDERED FINAL LC) j 1•, Ln O W} UNLESS ALL SIGNATURES COMPLETEDUlf 4' i ! 96,6,E&.01 x�aNC BLCI x .. .. .. x x \-".i - x x x x x x x IZ I x x x x X X -----------03 1--------------03 3 03 1 03 1 03 1 d r 3----„ ` i-t 0!3 03 1 1- Ito,. ,, RIP RAP 30. .a I,. L. 9�% \ 'VA, DI � RETAIN w DI N F F F F Cr----' F F —r 30'RCP RETAIN F F DI 30'RCP w O0 1, - to + o coLn F Z Q PLUG,FILL, \\C' m1� PLUG,FILL o I _ CV Z t AND v.6HNDOIJ 11"° A _ �I�PLUG B N N I I I I I I 11 \' I I I J AND ABANDON N 63 AND ABANDON mllm I I I III I 1 f 2GI REMOVE 2GI N 85'33'45.8°w 3GI-5A RETAIN 2GI �„ru1 ANI I� ` NI Iln H >- 1 1 '- ' ' 15 �tCP-141' 1 'i° ' '1 i 1' N tib 1 ' 1 '1 P 1 J? 1 8E tY�'Omi Y J. l r1 iTR"RCP IVl i 1- 1 i 1 Y li 1]i 1 1 i 1 1 1' 1 i 1 Y I i 1 SLj I i 1 1 1 N r 1'® / , ■ 1'S"�i2CP-`14 , �pNVE�R7 Id11CB T� 2GI 1 �Il /�IJ�'��A Y' VFRT nTfR Tn�fl 1 T T T T T _ t V. ` `- F'®ui T- �15LRC�-IVY -TL 3-T- TT -TL E-T- ET -ESL T- - -T'L (-`� T -T- 'F -TT- T-T- Tr- ,F&T- LT -Tom- =F T- ET- -T L T--T- T-T— Ts, -TL , T-T- T-T -TL -T '-T- T-T -l -T T-1 iNf- ' T L F LT- T T T Lu GRADE TO DRAIN REmOiE �u weweu ea II II 1 Z -' I I I I EX DI \\ TRFNfHI Fcc I RETAIN I .; -' UJ J . PLUG,FILL, PLUG,FILL,�11P - //� y _ MID ABANDON W Im / REMOVE FES IIa�RETAINZ MTL FES— ---- X 15X=C�IV x x T —x 2 I 11`^-z8"R-n T \\�� INSTALLATION x • xy .--��✓✓- REMOVE AP-PROXIMA ray-,, • 3 ' i 3 i I i' ~ — _ LLL 1 85'33'`15.8° AND ARAND1IN _ („) -'v 15"RCP-IV \__ �QLLAR 11 a T^ `; i 2GI - �O OF EXISTING 18"RCP REMOVE FES II INV=648.20' -� fl 15"RCP- ■ re --.en. ' T. • • II,.GI i T x 1 �—x t ;; '; .� i 1 _ I Y g''Jr r- 13 i L SCR 3415S3a 11 i / .. .. i .t - - W4 - li• 24'RCP-IV i 2GI 031611,3 JE, .. .. .. . .. .. .. .. .. F � �.!v-.• •1 _ . AN 1. RCP IV .. .. 1. FA re ..- re�� �� �m `6 D?a=s.+`z7 ' frrF��:Ore /j ��� i' • i i r• �� i i� I�' ,' 'bier"" i'�•\�Ii• I �r:�7Ii"Jvti i' \7-_i�\�_i��"`/i' �° WIT rate \TeJ .iB ,. je R/ .. .. .. .. .. �Te�% ~i... 'Mi�.' ... iT.�}T!t•;.. -_ ._�I ii � _.s. . ____ WA V.112 11:;....1•44 A,,.,k / of / ... , /r il re _- _ _ _ I I - _ -_ to-�� �`. _�I�. _ t„.., '4..•:;',87;:.1.9474:r"...""""Irf'40- 4.410"41 4/ irlW ' .7 •.-••r,4,-gerf Arere-41,k rorreiric r , 4/7/419 -� •.I./.ICI, /_ / i Ii� ''1" I /� _)�l It 9,I i� !.� :. jrAgoo 6. 7 • 144‘i'.:1:',.404 e AV 4"417 � o . CIF .;r.�r��®�..' ,�` , \04.9, : , .01,,,,, 44:fr. ' AL- if": -'' '''' ......., . --.%,...._ • '4 .'. —RM/ ACQUIRED WITH `--- �'.' T �` � i✓ \ TIP PROJECT U-2579B -\ yam s' SITE 2: �� . /����� `< SITE 28 - � ` (PERMIT M Si �3 , (PERMIT MOD) — •� 4,= � ems: ii g4--- .--Al" SITE ; SITE 28C ( -,---,---..--_-- _.__ ,, (PERMIT MOD) \ Js � (PERMIT MOD) N� I \\3 NOTE PAVED SHOULDER : ,,\ • FOR -Y4EB- PROFILE SEE SHEET 9 \ FOR -Y401B- PROFILE SEE SHEET II FOR -Y4RPBD- PROFILE SEE SHEET 12 PERMIT DRAWING MODIFICATION LEGEND ���- 8 I / /� \��� PROJECT REFERENCE NO. SHEET NO. / // - �885- JANUARY 14, 2020 PERMIT DRAWING U-2579BA 6 m DENOTE IMPACTS DENOTES IMPACTS IN lr''' / // / //� PERMIT DRAWING PREVIOUS U-2579B ��e�y or RM/ SHEET NO. (FILL IN STWATERREAM) /�///"" SURFACE WATER fl�// 1/��/ //// ;_ _ _ MODIFICATION FOR '� EV� \� � U c . ROADWAY DESIGN PAVEMENT DESIGN /1 / // SHEET 1 3 O F 1 8 SHEET 26/27 Al FAYEEIGIiNC 011PE 6�0 m ENGINEER ENGINEER lilF lillll'� \ I I I i I \ \ — — to l,,,,, // //, •'// = . \� \\\ \\` \ SITE :, . \\\ \\\\ � �T gg1. \ \ `\ g8°, /� — _�5; \ \%\ \ \ \\\ \\ - — _ '/ / / / ��I /-\\\\\ - \ I mill ' \ \ \��- -895- i/,/ // � 1r/ 1 a/ I it II ( \\\ \\ \ \ \ \ \ \ \ // // / / / / I / \\ \ J. lI 111 . o rb i \\ \ ,'/°// /// )1 / - \''\ I 67o\ \ \\ \\ \ \\\\\\' - - - - ' ' / // / / / \\ 8 _ I Ill// \ \' /--' // /® / �/ 1 / _� )� I ® \\ \ \ \ \ \� -89° — — _ _ _�\ '/ / // / / \\ \\ 1 / I \� I' 1I .. \ \ \ \\ \// / / �_C\®\ \\ \ \\ \ \\ \\\ __ __ _ _=- \ \ _ - ' /j �o / / I I .Ili \ 1 �8�, j 0�/ / / , '. I I i J / \\ \\\ \ — _ _ - `�� _ i �/ /a / / / D \II I I I \ I 1/ �- / /// / _ // / I1g\\\ \\ \\ -- — - 885- - _\ eas \\ // g5/ / / \ \ / / / / �\\�\ DOCUMENT NOT CONSIDERED FINAL \ I I _ — — // ,� J//,'/ / �� I'I ill / /�Il,�� \\ `�� \ \ _ _ — — a / , ,/ / a •0'I l 1O, ��> / .„-- ___.- / / / as° / I/ a l I \ \\\\\s e\ ` — - = - \ \\\\ -_ /� / .--'\ / ) \�( UNLESS ALL SIGNATURES COMPLETED a� I` 1 I I I / /// �i, / / / 875"./ p / •l �m ,..\ \ \ \° \ \ _ / / �S\ \8�g \\ / )/k( \Ill II(I\\ \ — — ;0�i //' \ // � / l/l�///r���\ \o\\\\\ \ \\ __ - _ - 88�_ — _ \ 4— — — / �// \\ \� / I l it l I( IIcp / Ill. , r \ ///i\ /. \,i\ %/%//�` \�\\ �\ \\ \\\ \ \ — — — — \ � \ _ _ / — / ,' J II III �l Ill/ xx i / \� ' / % — °% /i' //,�/ /// , \\\,\ 1\\ \\ \, -____ — — __\ _- _ \ —_ _�. _ - _ a5- — / / / ,.\ \\ \\ i /'/� I I l I ..,.CHL&3SB�' /- // / / - / / // / //////////' \\\\\ \ \\ n' , 0 S I I'I 11 11 l X '-- // //i // / _ / /// /� // eX /' / \ \\\ \: \ \\ i ' -- m_ / / / / \\ \\ _ - 1 l ;(7,p y/0 ,. ,5 j // / � / /i���/j am.%�i/�_ --\„„% � \\\ \ — — _ — — — �= 1 _ � � l / \ \\ \\ — / ; (/ / ®L7 / �o / // / /i / _ \` \\ \\ - - - - - \ --- \ - - - - _ �� l / \\\\ \ �I I(// 1 I `, ��///% \ / .. /r/� /r///%// may - - - - - \\�\\ � \Q \ _ — — — \ - � � / : =%/ /3 \ 880� - _ /i'% / / gb ' -YC�\Xg �hC°� K/�i g � ` \ \ \\\ \ \ass — — — — - - ` ` - / /- �' L//�l� --4�i /�h—/< '-- _mod ' / 1 /j �//'/%f 16'13, \\\,,\ \•\' \�` _ _6 6s-_ - ,.. - - _ B6` -- - -�4,� \` /// 1 s \\ \\;j- - e / \ \ T / / /�! / / / / - % ��J ///i � 'r/ oe. \I \3. \\-a r - -ar.—� -i-- - ess� - � - $ \ 7-\-�- w\\ \ \ /7 j // �r/ \ _ /�/ /\ ii�i�%/ /�/ � — \\�o\\\�\ \ \ems - - - - - — — - _ = 860 �•- \\ — = \\ \ // —\\\\\ \ /l __�'-� s ._ / /65i /gym_/ ab°// /// � -G/ �'" \ \\� DI\\ \ _ — - 860- — _- — \\ \ \\ \ \R / / \\ \ �D H Vf- -�_- _— -� e j i/i F/ dy °� / F \ \ \�aF `_ � _--_ss° \\ ET I- - = - i� // \ \ s\ -70'RCP- --RETAIN DID \a\-� -SRC _/ \\,�� w O - _ - -ass�,_ _ _ = %/ // i \ `\. - �� l "s S\ �- - - - - - ` sO- _ =-sue aao —_ - N } -ate- - - - _ - bB= - —tea _—_ H5� _ ' __ _ —855.=n - - �850'ae - - -� - _ co _ _ - - �. z —c -—_058 _ — - - —OSB —'1 -_ Y- - - -'r;g - - - - _ 11a(1- —:ce -w —.m _ _ �-- -S 2II us Z « \ �__ - _ PLUG,FILL, cA+ 7_p�2, ___,.w_ --- / L.II� PLUG,FItC / 4 ' � ��.PLU ,�/ , \ \ ArvDIGCN 11 v Z a+ A�yp ABANDON /' a- nm''i AND ABANDON / 4) N I I I I I 1� I /I u� /I Nm > ! � 2GI REMOVE 2GI N 85°33 45.8' 3GI-/�' RETAIN 2GI P� A A \ t I //n \ \ A I- _ LLys 6�.. - 4 »ai$ �rry 3�I7D''"� ,OILY`?""a'�.N s 1 ' J_ '1- 1` lam„ C' �1` l.° �1 '1 2- 1• • • �e I e,:-L l•-J.rI '�_ I 5„ CP I-66 L• _ .1, 6 i. 1-l k -S8 RLP L'_`& _1-, J.i i 1'Z`�tS 2 i-I' efmvOR'f,o T -2G1 fl i i_ 1`- 1__'1 1 l� 1 SL1 1 K 1 '1 i 1 •1 - i• t/1 _ __ __ _ - . _ .. - - 3 __ - _- -- - 85S FRI`T1Tf R-341f,1 - -_ V -- -T— :H t LT-1,-TL "r= `TT3 'r` -TL-�15r11CR-11 TL i-T- --TL -7 s-T 74T- -.ice T "Z r- :7_. : sT " --..-1— -l`i-��-T- ',-T�-- s�S T- T� -1r-` �z -fT- - #---r L T- L °LT - - - - - - z I_ i i GRADE TO DRAIN RE iE m weweu �I=I_ II , p Z �LLI ' II I • I I I EX DI I TRFN['HI FSS I RETAIN _ T 17 W m PLUG FILLa'% �-( 'I, PLUG,HLL, I\ -� / '�Y 85*•3,3'45.8°YY 15"RCP-IV pNn AR n 1v 18"RCP-IV INSTALLATION I REMOVE FES 1 11a�RETAIN Z _ AP ID SBAPIDOPI aI Di p U - - `v 85¢5'RCP-IT - �QLLAR �� \ IY° ->.�--�-- J r_�--_ - ,� -+- ---fin -�- - - - - -- - RCFtOVC APP RJd4TLL1-� ' _- —_��� -_—�--C_ _ 35 L �- -- - ,q- --- ` - ,,c ,., -� _ _. [ 85� :HOC*OF EXISTING-1A„R _ -,_-_RE ..�E S5- - _;gg.,gD•---s �" - F v cl .15"IPA.)/ z�T �re _ 2GI zGr ;ate^— _im- m Ax4. 21 s., �^r.l� • -- / ^:�i x =- 1 a _ - _ .s`n==.e - 1 �.- ,2\ ,: `�� - - _2 ^RCP-IV-=' 2GI O1J rF ���1 3°` -`� - - :_I -3'1�53J . _:5:- �. -- 1_.. .. e>�� / .ti-1 F _ - Sle : sc '/ — _ day_ �� — a.CR—F _ — 1 r-fe - _ _ - iB, - :;;�__ ? e �' 'R` a.`r1t•� e� s7_- en.. •E_ •i-`�T`Ji ".'-�f•� :�• w.- �:iri a��i .`i r� e -ems.. air: .� _ e - � i m re. _- - .� .___ �'ir 4.1 6, 4% _ .7 e.�� . ' ...Ye sS-�v'1�._ a-. -.. —._-...�-4 xxS� Sy..L f , � _�.F•_ - �� 4211, `\- -S:c Ill I - Y , n�' �r _�—�.II�ysw�..�ll��il ''�/ BL Ir,P� "'�— ,`�� :. �� I 7r//4 7,,,, F `E? �'�.�C\— �1 4� • �,F: _�. — .� '� ���iri ir /�.111 I. o./ �b/•�.�'I ve �, a 1►I� �` 4ioutr ' tie:, 'J iT\< a"r�'"�aT. .5e .�'�� � •����� .1�}IAir �Air � �`�-��1,y. �1_ �I - f'a . '�� ,r�• 'n� ' 4. .�irtweir, Az" ___Adr7,1,__.„/„...„...m....--„ ,.• ,* -4r... ", 4,-*'-'7 401100'*;%, - :. . X ...., if ::- / / l'od1492.:1: - ,44_, . ----.-..,N),..4r. / ^'1\\ ' \��1, ♦ i -'1,4'L�__' I'' / ere • \�7�4� / 1 �r,..• . '`•.•: �\\ ae\ fie \ ,. � � �� r / .. ., 1� ' r�`r;� 1 \ \ I " �' � �1 � .,/ I/i # `y _-�..�a-�_EZ v a a•ri7�� ��i Fr.,/ -•IP 4. o �• :'.' , :. ,..ice y 1 \ \ \�i s \ ��4s x�y < J /558/® og9 �� •14/#11; re 40 ' ' %r �,jlris , x Ali .,4- _ /'t //tea® /- '/ \ \�� �" •ay 2 `3 ��' ' rm \ \ 2i, ), - ���.� � 'll� '' 8'�@h .... �a. .7� � "/ ///� / RNJ COUIRED WITH\\ �. \ �'v- '� '- � �/ TIP PROJE T U-2579B \ �\ -t ___,.-"I IL,F,,,....-0- .24- ,•4I,r AI / 411/ \ \ \ \ \.,. i1�� �L II �\ 17 I "��-l.�_ �l- J / 1\\\ '�. • -ss \ \ - _ -ate //di \ - -o[s _ _ \ \ 'a �� -'\d� � \ r /i H/J���"' TT O N -t`\ \\\1\\re, \ \ N. \'''' ..J q� `^ �.- _ \ 4•�R'r' - \ \ \ `\ \\$ \�= `\ \ lip/// /aJ/y90 / / \ J- c \ \ ^ R9 \ =\.-..- \\ ,,9 \^ s \�Vai r, .P1 - •: • _7 ,-858— J+ yle I -�,�� �... �� / / — �� J / - _ � g '� ,�5°- �`/N.__ ___\--\5; ) \ / �tom_ — \g —�\�e\\� — \\\ \\:\ \ •. \ _ �`\0. \.. - \ N 1 I ` 1 I \\ a/ •I / — \ \ \ \ \ g,,\ _ \\ \\ 7� PAVED SHOULDER /i /� - — -g \\\\\ \ \� \ - �$/� i /� = \ ` I 1 \ 1 �f// N / / \ \\ \ r\ - - C. \ NOTE — / /$s /ice_— \\\\\\ \ ,\: i — _0 \ \ \ \ \ Gl//r\ — / — \ ''.\\ \ \ - - \ — _ — — —\ \ \ — / — _ ,/ — _ _ \ \ \ \� _i,-m� - ` \ �} \ , FOR -Y4EB- PROFILE SEE SHEET 9 ///��9 -- -_- \ \\ \ 5�� _ - - - / `\ \\ l \ • \� / _ _ -s9s \ ,_ \��\ 1 ) l I '. FOR -Y4 B- PROFILE SEE SHEET 11 \\-- \ \ \ \ \ / \ \ ) — FOR -Y4RPBD- PROFILE SEE SHEET l2 / / ../..--- — & \ \ \ _ / — — \ o l / / \ gym. \ \ ��`' / PERMIT DRAWING MODIFICATION LEGEND ■ cr PROJECT REFERENCE NO. SHEET NO. JANUARY 14, 2020 PERMIT DRAWING KimleY>>>Horn U-2579BA 7 (FILLOINEST STREAM)S IN %/„/\\\� DENOTES(POE WATERIMPACTS IN j\\\ ;STREDENOAMBANK WATER MODIFICATIONSHEET PERMIT DRAWING O F MODIFICATION FOR PREVIOUS UTES IMPACTS IN -2579B 421 FAYETTEVILLE STREET,SUITE 600 p e ROAENGINEER WAY SIGN PAVEMENTENGINEER DESIGN �� — — SITE 28 SHEET 27 RALEIGH,NC 27601 1... ,� :o�OF REV...EV �y /_ \ I � �lp —_-- a3N 1 W ° � , „�/— \ AJ171a3 0 9r xoadddV �_�@��� 7 w 11 a3NMU 1 3 I I .7 O Ala3d0ad PPII I ti Elf X0861 I o Ln TE 24A J�y o CO I I N�4Y I I o I 7N00.8b 1�y DOCUMENT NOT CONSIDERED FINAL `� I I I � o V C9I I 0 p ail I I UNLESS ALL SIGNATURES COMPLETED 'P/y'yp.-...JI}-�h` / 0© I I I 9 ONBSI 0�.Bb © OiSi II -Y4RPBD- CS Sto.84+04.5/ sr / 0 a I I \ cx�i m I IONOO.Bb r + 1 Y4RPB0 POC Sta.80+00.00 / OD 9£ i — a Q 0 Z hi�x� _, x SITE 24 A`��� //\// ONOSI / /% 3Na781 oJs1 �/ `��O N.p } Ods1 H"'o.ev HW F`�L TH COUNTY //\/// /\/ 0£b —I X 1S£1✓; 2£bMX if�0'N 4�/ KERNERSVILLE _/ / // I fTOif L OJ 1 ! / // ..�U�a700 . . .. X -ifi 0 F NOISE`MA - I w w t � III t m a F F r �� F F F F F F F F IIW ED _ /// F ''-R ou Eii_ oil--- _. oAi Er �l1---- -._--_�A 1_ —�--wi — In F N I F ow I' I I I I I I -"-REMOVE BST a l' 1-40 BUS EBL US 42/SBL 24•BST REMOVE 85„33'45.8' _±1 ---.. Q �..I��T "_'.µye ndi _- ��rvNl ANI Gnv nT(' Tn�fl ---- w 1 1 1 i'�p 1 4 11Ci 1 1 1, 1 1 ± '1 1 1' 1 '+5"RC�1-•IV 1 1 i 1 1' 1 . 1 1 ,L'FSl- ,1' 1 1 '1 1- 1 ' 1 `1 1 1 1 -1 1 1 1 1 1 1 r F51 y'5 Y 1'R 1 1 1 1 1 1 -1 1 1 1 1 1 1 1 1 1 1 5 = - - -2 In FS v �J I f I I I �� - T T T T T •.T...T ,� - -TT T --T fi.. T. -T'- -T fi T� T -.F �T_ -T—T, ---N 85`33'45.8'W - - -- - ° - - T<"Z T T T T • T T --_ _ — t L r r r T r _ T T T 'T T T F T T T S o - -> I I J j 'J,, I N,4a Bus wUL Us 421 NHL 121.ssT I ////// I I I I II I I - I I - I w --- zRETAIN RETAIN `' PLUG,FIL . WW RETAIN\m ~ '1 //a N 85 33 45 zBsz s D - s Z � _ -i REMOVE FES - " I I AR n�m INOV=854.80' {x �Y/ / �N 1 I- I 7f- 5„fR 2GI y END -Y4WB-STA 75 RT ' ' - _ ------ - \ _-----c ---- II �f _ 0„ �: SCRUB X SBG Y 68+ .i>Gij40 o• f �\ m "— V-4i• • •i• •/biti.�e`_•�\^' Jia• •Iii BIZ/•i• alSi •/••• i/•i• •••M\7faVAT- •i•\'•'i•iu•T •iu••104. •� i u T- �` "Y:i All 3 y.»rav MS! ti':':1 t i " 3.:i nsJv_►.f FJ.1 _3 � - J.s�+i�3'�ti�3 �t+�Jv�t.+�-I..i nsY_ - JII \ /'isi/ Ad"r—.7„.„_—_,„1. _ _____ Timmimp,-- -/-----Ve------ :6_.;3.0.,A4 i14 \.__n_=, s,D.s p wAL�.__4___0_i___..,_ -_'-sclmB4 \tg'.'t,).1 $t-„....' ff- Sta.4/+4L74 = "--�t ;� \\ \ \ Y4RPA- S Sto.39+4174 ,�Ii: SITE 28 \, -� , Y4RPA- POC Sto.34+00.00 1 ` / �' .� / r SITE C . : ° ►�/ /, � , -- � ' (PERMIT M I ) ,AdIPIPA r_491 ?Air 41,A *IP-.- t / l . .tat 7/2g VIA` '`.,> �d..iy� \\SI\ miiiiiiiiiiiiiiL �" Af", 4e.s.,.7.1";,', \ \ \ Jam\\ \� , k,., II VS \ A£e=ANi� I ----- _,,,_- ... 41 / / PM ACQUIRED WIT\S 4P TIP PROJECT U-2579B �� U\ c ` TEMPORARY FOR saR.... '• BANK RRnovnoN ‘ i — ,� SITE 28C ��\ \e\ IN 8 4. (PERMIT MOD) ;rv,90 \� \\ NE ND� 3 d3ddn R 3 _ SIT�8 ' f S 7-T,NZ I I PAVED SHOULDER (PERMIT MOD) 3a1a iN I NOTE NOAIL03a10 '7^�-!J/p, ai0"�JUI0 FOR -Y4EB- PROFILE SEE SHEET 9 NO Z8= TDE WITH31bW FOR -Y4WB- PROFILE SEE SHEET II � TIP P145.IE 2579B I FOR -Y4RPA- AIyD -Y4RPBD- PROFILES SEE SHEET 12 PERMIT DRAWING MODIFICATION LEGEND ■ PROJECT REFERENCE NO. SHEET NO. JANUARY 14, 2020 PERMIT DRAWING Kimle >>>Horn U-2579BA 7 LC) DENOTES IMPACTS IN .7,7 A DENOTES IMPACTS IN // DENOTES IMPACTS IN PERMIT DRAWING PREVIOUS U-2579B y ROADWAY DESIGN PAVEMENT DESIGN 'C/ SURFACE WATER SURFACE WATER / SURFACE WATER ©2018 ENGINEER ENGINEER (FILL IN STREAM) (POND) (STREAMBANK STABILIZATION) SHEET 15 OF �s MODIFICATION FOR _ SHEET 27 421 FAYETTE IGH,STREET,SUITE 600 RALEIGH,NC 27601 1 i I I 1 1 \1 1\ I 1%\ `\� __1 ' --___:1"-:::_ j .... / /\/( //17/1/)///i/ > ///////,, , / / i( 1 \ SITE 28 RION,.OFW..a�.. _ _ — / / / _ m z — —_ ,, I I I I �I 1 ) i 1 \ �''— , — — _ ;, e �\ I\� '/Illl0lo\\ i / — _ _ _ —° o= —___ _ �o. _ I 860- - / �/ / ) / s ® I'I /�- �i a —-- — — aaNMMg� /r�-��,,.�}��� yg�.,,�-, C\ I III I o I ( \` . _ _ /_//\�/y / I ////////�/l / asl I r — 8--I 74-__-__ - aao- - - - \ I I' Faav 1_ �-C�,q�--- L� a3 Mu ��/L�/ III II Im I / %/=.'ry./,,�,,'��/ I 1 / I I11I I 2 / / Ip\I �ry / \I I _ — O "1:10a>!�3I IIV'�ttI II IIIII I / \ - g5/ ���_Dr;\ - t""E �2�/�QI 111111 I \ I I ��\.\� \/ / / I // 11I—� 0 ( ` I 7No].ab \ \ Er 1 I I A �y DOCUMENT NOT CONSIDERED FINAL 5 ^ 41 I I 11 I ` \ \ ��\ `��� 0//�y/ /j// / • \ \ I 00 O p UNLESS ALL SIGNATURES COMPLETED I I+Y4/�' ti -I c IIS10.$4+ / fi � � //// // '/7 jf I \ I I / 11\ \ \ \ \ // / c� /1 H I/ I J \/\ I \ /..s, /../ C. oN07.eb1 \ _ 7 5'I I 04k5t , \ -- ,� _Ao — - '1 /]y�j t/lam StP.80 •••• / 1 \ \ / F�. \ V (� m —_—_l. I 1 \ \ \ \ — Yh ( / T' , t I \ 1 / / / aN09.9£ I x . I I ( g 7/' I m I 1 1 \ T\\ °, e 1 I I I I ' \ I �_ w a r p — \ �� / 1 I — rt III Z _ / \ FYI // // / I I J I I / I® \ \ \ /\j/ a' / I �� I 1 \ ,1/ Il 1/ I I l / s% \ xi, 18//III / a / \ I m 1 1 \ \/ / / / I II \ / _ / \ 1 $ e // / m I / / SIT 1 �ro.tr-�ji /Ill ( \ / I lI I I I 1 / ll I I\ /\.</ ��� 5 / aisl \1--=680= = ? \ \\ 1-� \` \1 _ O s �sv r 1 \ I I--� ,•t, II //�I d I It ' /� \ - -BeJ/� __ \\.ice` \ _J / \ ' _�° \��,— - \\ �\ as / l 1 I I I I / , ' 'assv v 11" 0, FGJ wry 11 '^ III I ( ;-�I I A X/ , e£V / I / �/ Ile" N„, ; xr 1 I \ /�/ \ / — / / III _ • � _££ Z�b \ / I I -} ' -7— .,,,,, -- f-, ! S'�I /I I \ & X /, \ / \ / ( `I "\ 6,5 X — ) 0£b / - - EXISOQ; 6 :: so ' HI I I I N0 E.,- L ., 1 _—L�i ' \ / \ \ �\ a/s / / 1 /� / / o ` ^ — / 7\ // I $ \ \ \ \ \\ 1 1 4, _ — - — -, • • -s9 - L - - __� — F-- — A,_—f-,- / - !` = _ _____ — — —_===oee �L < --- — -_ —B� O 'el 'T, _ igi' / u- -r --E o�=---- — _-FL-— .01=— - - - - -- - - - - - - �'-f$--ar°--- -_ -�-��er---1 —y�P----sari— — — —T- ' ' N 9// m e �_ I 7 -1'- I/ / I II ' I r m' I I F REMOVE BST V ll 1-40`BUS EBL US 4 SBL 2C BST REMOVE $5�33�45.84W -� A 'v t �\ „., ui \ Tv ANlfnnv nTf� �(;I II nNl N N _-71--I—IFS—r„ii 7G�1—T r_-1-.., 1 ,1 _-ay /11r-y„i i 45"-RC,IY.l —1 I__-,__.1 1=�_ - --. -_ - _ - 1 � _ _ -•1-- li -1 111 I 1'. 1- `-1- f' I1 1 1--` --__. 1 c- s- 1 __RRs� to _ ./ y } '� I I �/ //S,4 I'40 BUS WpL US 421 NBL/24'BST / PLUG f I f I 1,I' I I I / I I 1 I 7' I / -- \ 7 I UJ RETAINS RETAIN�// //p \ I 4PID s®n�ipC6`i m \ N SJ��.3 4S.S°I, \ \ I eETAIb m \ \ II\ 6, \ N \-� 7 \II$ -1 1,„, REMf1VE - r— "60. 4;80'= - _ \� ini—oe \ - SM- - '° T�15� _ �$b= -_ - - - 88 i ` rnxxa- _ -�,i 2G1 �,L —- .-v - �"— — _ - 'o - _ - -------1-_-- —_ ���- _ — '' e 8�`� C -1- _ :ram �, _ __ r\ - ,f.. �r� = __ -.rs- - =yac ..-L— / —� "----1.-.. / 1 \\ °'\ L / a' SC' e i 'e' I \ a .1�100.,, fi '- ,��— _ —7 ` as- -/55— .1\' c eao `.J- 1 1 .`1s 1.2 0// \_\ -.t.. _x \ D SBG -Y -STA 68+ RT 60,_ 0 L �_ , / 1 _ ti...- �/ _ \ s6 �J t��' Y?7 B d . ses -.-: '. �s - 4" i .. r--L-, ��l . ..,-/.N ..,-. lil.i?\�L i.w.I 9�f '.— — _ — — ` /" Y — _��\ \ \ J �� \ \ \ �F -.�c�z � r t '' .-` rs� r'Y�.^Iv wr' �r�rr� .:'�.efl .t� _ — =- ` M.'� m^tit / — —86 / - \ ? l '_ �('I J)�' f _ ar 5 J8.1"91tve . fjorAmo Y►a A -,.�..-B- a .. y.- .. 65J .. a'J '-. d�//1 �/ Il l ,® \ / .� l>/, \ I 1 I I I I 1 11_ • 1\ \^ - \� �� _ eb .. ^, .+"-`� 6 J1 g5:. ¢ 1,..__, 1 ) e Y ��� 4 �111\ \ 098 FY4 � . \i.i' t0. i4/: _ ��J I (\ 1 o"'i/ eE /8� \\ I / \ \ a \\ \ o t / ''�naw� '.. _-- ,� � \ �� �11 \ n 1 < v i- ,�� / �. � / Y4RP.�'is s;(/Sto.39¢4G � J i— �� /'� � \,l � \� 1\ \ � ils,3�e �� � '.\ �\���� -vT` ! J \ :_.:'.\I\ 4v' ga.68f8T.L3 _ a-��\\ j \ i \ �\ \ I \\ \\ \ ✓ 1 �`�y ) I \ Sys ->a —, ,-. y A \ 24 # -�' -�-� rose ,, / / I I.-- -1 a I --, vAA \\ /vim .s ' "0.--S .,j= ----_____---------_----77-=,' \ ' I QQ > S ,I.f,Fa. �T .\•\I �, �\ /' �, SITE �lt- fao /1. r \ /. .\ raj g.`pII� _I d I \ \� (L� /I/�J �PTI ��I 6' \\� 7 04, ' �c.1�1 :" 'k \ \ s _ _ _ J� 1� ii /� / r rm ' j I / 11$ `-9 \� 5 (7/) \(I \ — �� nt S A 4 — _V I✓ :/ f/ / v e5o / 11 / 1 I / ( ss v -I I 5- I I A\ � _s l .r ��� * �. _ — s8 l _ / \I �B Ill I I I I I l �Av I� 1 \, ____------ \ _ _ Al,s I .p I i\:. b\ `.\ _ _ / - 65. J/ 'V1\ 7 / \ / 1 , _ / _ ati \ \ ,,_� i _.I. _ I� ' >•V ��• .0: ���\\ `\\fie �' � ��. - - 855= I '1gyv/ $ -\ oIIII l I ( I I / \ 1�� \ ___ \15.. \ \ -i i jOirL \ ef . s. .. Ale r, i -� 84-\�` /' `gyp ,—,\ &`i //.•,( —r_ 4 \ (_ °"-� /JI a t\ /' \ ✓ // /J / 855� /\/ / � J% �� — r\ \ \;\. �' \ '\sue \� s �\ \` \\ J / \\ �° • / I /� 6r` \I\111 \ ` f1 \..' I �\ ,//i �, / (\\ \\� 1 �/ //�%. / I �ro f'ic/ � � \�' �..... �0 :' \ p. , ` \\ \ es\ \ ` ) \0 \Isb . ` / /s° /ice 1 \ I\\'I\1 ^ ✓ \/ / `// l 1 ` � // //// /� \ \, ,11(\��_'-.j -- . � e; \ ;=�i �� \ /1 v I � // I � F�\ \\I �, \I \ � \/ a� �/ �/ \� \��\ \ / /q�1 \ 1 i-- \ .,„ \\ `� �, ..,E y 1 \m ' I m\ ( \ \ \ \ ^\\ �_ I /;d w\ >s9\ _ /,\ ti J /-� \i - 1 I I Sfg — �E� \ L. \\- I I 1 I III ( � \\� ;j l,1/'// -/ \ ��—/�'///aid, f , I \ �;\ � _ ���`1 a \ EASE NT N III > \ 0( 1 $ I \ \ 1 �� /' \ \\\ \ \/— -�/ �/ \//i I \ 1 \\ / / //. - /I \ J• �5 \ \\ eK REQUIRED I III I I I I 111 \ "\�o� B// // % \ \ 1 / / \/ // 845 —�o / SITE- 28C` ) '� ��� ��` \\ � � �.E.a IIII I ,� I\� III1 s )� \�s,`� —a^8%� < <I ` �� / /� �a�4/ d _ _ PERMIT MOl =�� � \ � $m ,/ ( I I --� / ( �,Sb\ N)1: ,/ I / I o % �j1 \� \\`I \`m\�� '/���; \4 8\ Ml�� ` � I \� 5° /i� ,/ lr NJraa2o— — 3dan \ I 1 I I / \ I 1 1 - - J/ S j I \ _7 — I \ D —�3 \)\� 7)I I / J; \ - ;I \ I \,a \ / 1 I \ I I I 1 \\� � — "- _ - ../'--- \ _ 1 obs- \ / ill � I £6'�b1�9Af(1 ( I ' �I \I \ 8 1 I I / - - - -840 - - _ —84n- -\ - - \ \ `\ .0 SITE 28 1 I 1 I S \b=3^n I I /� / - — = —_ _ -- \ l; \ \ B \ \\ /� // _ 5=\ \ �/ _ PAVED SHOULDER / — l` 'E VIIT MOD) v 'vIII 111I111 aal dlpli: ,,//! — v S,_ _ v ��_ / / ( , / / /'`�— / \ I I "I 4 I / 3�I ),,,,,, \\ 1 / �/ NOTE 835_ / NO ar / "- m4 Ou0Ja10 � -I - \- / / / FOR -Y4E8- PROFILE SEE SHEET 9 i v �e //II'11111 V 1II`// i 1 1 84/4-TDE/' j WI-1'1W" I \ 1�v7 \ �,R\ / / / / FOR -Y4WB- PROFILE SEE SHEET II i - \ / I I 1 I / o F//1 I g TT P�84o tL2 �\ ;\ \\ 1 e, / FOR -Y4RPA- AND —Y4RPBD- PROFILES SEE SHEET 12 iv' I rlllll� I;/Ib I,fIII�1I/I)I - / >w 1��� ;\®_ I( ll// / WETLAND PERMIT IMPACT SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Hand Existing Existing Permanent Temp Excavation Mechanized Clearing Permanent Temporary Channel Channel Natural Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts Stream No. (From/To) Size/Type Wetlands Wetlands Wetlands in Wetlands wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft) 1 28+00-Y- ROAD FILL 0.03 <0.01 0.02 0.02 142 2 16+00-Y1 RPD- ROAD FILL-INTERMITTENT 0.01 109 ROAD FILL-PERENNIAL 0.02 208 STREAMBANK STABILIZATION <0.01 <0.01 10 37 3 21+56-25+22-Y1- 2 @ 7'x 6'RCBC 0.06 <0.01 438 33 3A 17+36-21+53-Y1- DETOUR-ROAD FILL 0.08 545 3B 20+55-21+32-Y1- DETOUR-ROAD FILL 0.03 194 4 501+51-503+21 -L- ROAD FILL 0.03 <0.01 493 18 STREAMBANK STABILIZATION <0.01 <0.01 9 31 5 503+85-507+80-L- ROAD FILL 0.05 <0.01 740 22 5A 507+39-509+64-L- ROAD FILL 0.01 306 6 523+00-L- ROAD FILL 0.03 <0.01 0.02 <0.01 312 42 7 527+00-L- ROAD FILL 0.52 0.01 ROAD FILL-POND 0.59 8 559-75-L- 2 @ 10'x 6'RCBC 0.06 <0.01 442 53 STREAMBANK STABILIZATION <0.01 <0.01 58 44 9 560+75-L- ROAD FILL 0.03 0.01 10 560+50-568+74-L- ROAD FILL 0.01 0.07 <0.01 783 22 10A 566+84-572+75-L- ROAD FILL 0.05 684 11 615+00-L- 3 @ 10'x 9'RCBC 0.43 0.02 808 57 11A 19+76-21+44-Y4RPBD- CHANNEL CHANGE 0.08 0.01 223 41 12 15+84-18+86-Y4RPBD- CHANNEL CHANGE 0.01 0.02 88 205 TOTALS: I 0.62 I 0.00 I <0.01 I 0.05 I I 1.53 I 0.19 I 5,853 I 1,344 NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS U-2579 B Forsyth County Winston Salem Northern Beltway (Eastern Section)(Future 1-74) SHEET 62 of 64 JANUARY 14, 2020 PERMIT DRAWING SHEET 16 OF 18 WETLAND PERMIT IMPACT SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Hand Existing Existing Permanent Temp Excavation Mechanized Clearing Permanent Temporary Channel Channel Natural Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts Stream No. (From/To) Size/Type Wetlands Wetlands Wetlands in Wetlands wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft) 13 20+00-21+40-Y4RPBD- ROAD FILL 0.33 14 629+95-635+90-L- ROAD FILL 0.04 0.05 688 15 636+32-641+55-L- ROAD FILL 0.18 0.04 332 ROAD FILL-POND 2.38 15A 644+00-645+00-L- ROAD FILL <0.01 108 16 643+56-644+61-L- ROAD FILL <0.01 104 ROAD FILL-POND 0.16 17 663+65-667+00-L- ROAD FILL 0.09 <0.01 0.06 928 18 667+15-L- 3 @ 12'x 10'RCBC 0.06 0.02 377 67 STREAMBANK STABILIZATION 0.02 0.01 80 59 19 668+50-L- ROAD FILL 0.47 0.01 20 687+80-691+59-L- ROAD FILL 0.03 163 ROAD FILL-POND 0.85 450 21 22+50-Y1- ROAD FILL 0.02 22 40+50 -Y4- OUTLET PAD 0.01 23 45+65 1,4 CULVERT-EXTENSION 0.06 0 400 32 0.02 0.06 64 89 23A 44+95-45+18-Y4- ROAD FILL <0.01 57 23B 45+07-46+34-Y4- ROAD FILL 0.01 135 24 80+73-81+57-Y4RPBD- ROAD FILL 0.02 202 24A 80+50-81+51-Y4RPBD- ROAD FILL 0.06 25 37+31-Y4RPA- 30"RCP <0.01 73 STREAMBANK STABILIZATION <0.01 <0.01 21 16 TOTALS: 1.20 0.02 3.67 0.03 3,268 142 450 i 11/19/2018 Revisions shown in red text. NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS U-2579 B Forsyth County Winston Salem Northern Beltway (Eastern Section)(Future 1-74) SHEET 63 of 64 JANUARY 14, 2020 PERMIT DRAWING SHEET 17 OF 18 WETLAND AND SURACE WATER IMPACTS SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Hand I Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts Stream No. (From/To) Size/Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft) 26 29+16-31+12-4RPC- ROAD FILL-POND 0.38 27A 104+63-107+53-Y4- ROAD FILL 0.02 205 27B 107+60-Y4- 42"WELDED STEEL 0.05 0.01 <0.01 130 14 27C 107+58-108+44-Y4- 30"RCP <0.01 116 28 cn.grLGa.nn v�P# 002 0a5 365 1-88 29 145+62-Y4- ROAD FILL <0.01 30 64+34-Y4- STREAMBANK STABILIZATION <0.01 28 31 557+28-L- STREAMBANK STABILIZATION <0.01 21 2018 Permit Modifications 23 44+10 to 47+96-Y4- 3 @ 8'x 9'RCBC EXTENSION 0.06 151 _ STREAMBANK STABILIZATION 0.02 0.01 55 30 2 @ 10'x 10'RCBC and 28 47+96 to 56+84-Y4- 1 @ 10'x 8'RCBC 0.50 2233 2085 SMITH CREEK RELOCATION IN TDE (SEE PERMIT SHEET 7) 0.01 76 42 STREAMBANK STABILIZATION IN TDE (SEE PERMIT SHEET 7) 0.03 132 28A 48+16 to 48+65-Y4- UT TO SMITH CREEK RELOCATION 0.01 80 28B 48+84 to 53+86-Y4- DRAIN POND 1.62 28C 54+20 to 67+00-Y4- DRAIN POND 6.20 09/18/2019 Permit Modifications 8A STREAM RELOCATION 144 40 SUBTOTALS,THIS PAGE: I 0.05 I I I <0.01 I I 8.87 I 0.01 I 3371 I 84 I 2511 SUBTOTALS,PAGE 1 I 0.62 I I <0.01 I 0.05 I I 1.53 I 0.19 I 5853 I 1344 I SUBTOTALS,PAGE 2 I 1.20 I I I 0.02 I I 3.67 I 0.03 I 3268 I 142 I 450 TOTALS: I 1.87 I I <0.01 I 0.08 I I 14.07 I 0.23 I 12492 I 1570 I 2961 11/19/2018 Revisions shown in red text. 10/1/2019 Revisions shown in green text. NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS 12/13/2019 Revisions shown in orange text. U-2579 B Forsyth County 09/18/2019 Revisions shown in blue text. Winston Salem Northern Beltway (Eastern Section)(Future I-74) Reeised 2018 Feb SHEET 64 OF 64 JANUARY 14, 2020 PERMIT DRAWING SHEET 18 OF 18