Loading...
HomeMy WebLinkAbout20200088 Ver 1_I 40 permit plans_20200127T4� rwmww PENDER COUNTY — I-40 EASTBOUND CHANNEL REALIGNMENT AND FLOODPLAIN BENCH CONSTRUCTION WBS. 15403,1071014 LAT0 34.5631689 LONGOa — 7 7.89694 8 PLAN VIEW � SITE I: PROPOSED - 72' OF BENEFICIAL PERMANENT STREAM IMPACTS PROPOSED EXCAVATE NEW to ELEVATION = 7.0 SITE 2: PROPOSED - 42' OF BENEFICIAL PERMANENT STREAM CHANNEL REALIGNMENT. - 25 LF TO ELEVATIO = 7.25 - ELEVATION = 7.48 PROPOSED FLOODPLAIN BENCH ELEVATION = 7.55 PROPOSED GROUTED RIPRAP W/ FLOWABLE Ff EXISTING OVERFLOW 724 STEEL PIPE INVERT = 9.60 IMPACTS lw a * i PROPOSED EXCAVATE NEW CHANNEL REALI --W-' -_.* Z30 LF TO ELEVATION = 7.6Q GRAPHIC SCALE ' 30' 0' 30' 60' SCALE 1" = 30' EXISTING MAIN FLOW BOX CULVERT INVERT = 7.60