Loading...
HomeMy WebLinkAboutNCG210017_DMR July-Dec_2019 Phone:(252)771-2497 1443 Northside Road Fax:(252)771-6252cnt Elizabeth City, NC 27909 J. W. JONES LUMBER COMPANY, Inc. KILN DRIED PINE - BAND SAWN HARDWOODS RECEIVED JAN 2 3 2020 DENR-LAND QUALITY January 15, 2020 STORMWATER PERMITTING N.C. Division of Energy Mineral and Land Resources—Central Office ATTN: Bradley Bennett 1612 Mail Service Center Raleigh, NC 27699-1612 Dear Sir or Madam: Enclosed are two (2) signed copies of the Semi-Annual Storm Water Discharge Monitoring Report for the second half of 2019,for our facility located at 1443 Northside Road, Elizabeth City, NC 27909. If you have any questions, please feel free to contact me by phone at 252-771-2497, or by email at markd@iwjoneslumber.com. You may also contact our consultant, Lance Layton, of Conversion Technology, Inc. at 770-263-6330 ext. 114. Sincerely, Mark Delosreyes,Vice President Semi-annual Stormwater Discharge Monitoring Report for North Carolina DEMLR General Permit No. NCG210000 Date submitted CERTIFICATE OF COVERAGE NO. NCG210017 SAMPLE COLLECTION YEAR 2019 FACILITY NAME J.W.Jones Lumber Company, Inc. SAMPLE PERIOD ❑Jan-June ®July-Dec COUNTY Pasquotank or ❑ Monthly1 (month) PERSON COLLECTING SAMPLES Mark Delosreyes DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA LABORATORY Analytical Services, Inc. Lab Cert.# 381 ❑Zero-flow ['Water Supply ❑SA Comments on sample collection or analysis: ®Other WS-V;SW PLEASE REMEMBER TO SIGN ON THE REVERSE -* Part A: Stormwater Benchmarks and Monitoring Results (Monitoring is required only if the facility stores exposed accumulations of sawdust, wood chips, bark, mulch, or other similar material on site for longer than seven (7) days.) n No discharge this period?2 Outfall No. Date Sample 24-hour rainfall Collected' amount, (mo/dd/yr) Inches3 Chemical Oxygen Demand Total Suspended Solids Benchmarks===> - - 120 mg/L 100 mg/L or 50 mg/L4 1 6/20/2019 1 <10 52 1 12/8/2019 1 <50 7.5 1 Monthly sampling(instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. 2 For sampling periods with no discharge at any single outfall,you must still submit this discharge monitoring report with a checkmark here. 3 The total precipitation must be recorded using data from an on-site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. °See General Permit text,Table 3, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Note: Results must be reported in numerical format. For example,do not report Below Detection Limit, BDL,<PQL, Non-detect, ND,or other similar non- numerical format. When results are below the applicable limits,they must be reported in the format, "<XX mg/L",where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Permit Date:8/1/2013-7/31/2018 SWU-245, last revised 7/31/2013 Page 1 of 2 Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. No discharge this period?2 Outfall No. Date Sample 24-hour rainfall Collected' amount, Non-polar O&G by EPA Total Suspended Solids (mo/dd/yr) Inches 1664(SGT-HEM) Benchmarks===> _ - 15 mg/L 100 mg/L or 50 mg/L4 Footnotes from Part A also apply to this Part B Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑ NO IF YES, HAVE YOU CONTACTED THE DEMLR REGIONAL OFFICE? YES ❑ NO❑ REGIONAL OFFICE CONTACT NAME: Mail an original and one copy of this DMR, including all"No Discharge"reports, within 30 days of receipt of the lab results(or at end of monitoring period in the case of"No Discharge"reports)to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify,under penalty of law,that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,true,accurate,and complete. I am aware that there are significant penalties for submitting false information,including the possibility of fines and imprisonment for knowing violations." ///S/Zoa6 (Signature of Permittee) (Date) Permit Date:8/1/2013-7/31/2018 SWU-245, last revised 7/31/2013 Page 2 of 2 2019 STORM WATER MONITORING EVENT DATA FOR J. W. JONES LUMBER COMPANY, INC. ELIZABETH CITY, NORTH CAROLINA 1. Date of Sampling 12/8/2019 2. Hours Since Last 0.1" Rainfall: 72+ 3. Storm Information: 3.1 Start of Storm Time: 10:00 PM Meter Reading: 0.0" 3.2 End of Storm Time: 12:30 PM Meter Reading: 1.0" 4. Outfall#1 Information: 4.1 Name of Person Sampling: Mark Delosreyes 4.2 Sample Information: 4.2.1 TSS 8:45 AM Meter Reading: 1.0" 4.2.2 COD 8:46 AM Meter Reading: 1.0" 4.3 Volume Discharge: 1,708,290 Gallons 5. Gallons of New Motor Oil Used Per Month < 50 Gallons Z:\JJE\SWT\SWT19\SWT1219\JJE_SWT1219_EVENTINFO.xls;jp Conversion Technology, Inc. RAINFALL SAMPLING DATA (See Chapter 4.3) PLANT NAME: J.W. Jones Lumber Company — Elizabeth City, NC HOURS SINCE LAST 0.1 INCHES RAIN: > 72_ HRS. (MUST BE >72 HRS) DATE OF STORM EVENT: /2/g/2-o/9 START OF STORM TIME: /b:Cxo am METER READING: 0.00 END OF STORM TIME: 1Z :30 am On METER READING: /- OO NAME OF PERSON(S) SAMPLING: ,4Jcy,-k / e airele1 TELEPHONE NUMBER: ( 2C2 ) 77/_2 /97 EXT. Gallons of New Motor Oil Used per month on average 4 RAINFALL OUTFALL #* SAMPLE ID TIME AM/PM METER READING 1 TSS $: 'f 5 [ oo 1 COD g : c{b 1. oo " *Outfall number as marked in the site drainage map. I +1/nP(1lc! atity Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report For guidance on filling out this form,please visit https://deq.nc.gov/about/divisions/energy-mineral-land-resources/ npdes-stormwater-gps Permit No.: N/C/Z/t /0/0/o/0 /O/ or Certificate of Coverage No.: N/C/G/2_/f /M/0/ f/7/ Facility Name: J14V bv Cony)a44, :nc County: Parotid°4,,k Phone No. 252-77/-Z(./97 Inspector: IwArk Z e/os Date of Inspection: /Z/,//9 Time of Inspection: ; 'fS/i►'h Total Event Precipitation(inches): /. 00 All permits require qualitative monitoring to be performed during a"measurable storm event." A"measurable storm event"is a storm event that results in an actual discharge from the permitted site outfall. The previous measurable storm event must have been at least 72 hours prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter interval is representative for local storm events during the sampling period,and the permittee obtains approval from the local DEMLR Regional Office. By this signature, I certify that this report is accurate and complete to the best of my knowledge: (Signature of Permittee or Designee) 1. Outfall Description: Outfall No. I Structure(pipe, ditch,etc.): OPrn Receiving Stream: Tir%b14?la,y or Pws��tohies A ';v- Describe the industrial activities that occur within the outfall drainage area: Lk n,bv I'lianv►f�G�wr/ Page 1 of 2 SWU-242,Last modified 06/01/2018 2. Color: Describe the color of the discharge using basic colors(red,brown,blue,etc.)and tint. (light, medium,dark)as descriptors: 3. Odor: Describe any distinct odors that the discharge may have(i.e., smells strongly of oil, weak chlorine odor,etc.): /t/0KZ- 4. Clarity: Choose the number which best describes the clarity of the discharge,where 1 is clear and 5 is very cloudy: 1 0 3 4 5 5. Floating Solids: Choose the number which best describes the amount of floating solids in the stormwater discharge,where 1 is no solids and 5 is the surface covered with floating solids: 1 dp, 3 4 5 6. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwater discharge,where 1 is no solids and 5 is extremely muddy: ( 1 ) 2 3 4 5 7. Is there any foam in the stormwater� discharge? 0 Yes + No. 8. Is there an oil sheen in the stormwater discharge? °Yes !No. 9. Is there evidence of erosion or deposition at the outfall? 0 Yes *No. 10. Other Obvious Indicators of Stormwater Pollution: List and describe Note: Low clarity,high solids,and/or the presence of foam,oil sheen,or erosion/deposition may be indicative of pollutant exposure. These conditions warrant further investigation. Page 2 of 2 SWU-242,Last modified 06/01/2018