HomeMy WebLinkAboutNCC200278_ESC Approval Submitted_20200124ROY COOPER.
Governor
MICHAEL S. REGAN
Secretary
S. DANIEL SMITH
Director
NORTH CAROLINA
Environmental Quality
October 11, 2019
LETTER OF APPROVAL WITH MODIFICATIONS
ABJ Investments, LLC
ATTN: Brian Raynor, Member/Manager
2031 Middle Road
Fayetteville, NC 28312
RE: Project Name: Williams Farm Subdivision
Acres Approved: 13.2
Project ID: HARNE-2020-021
County: Harnett, City: Stewarts Creek,
River Basin: Cape Fear
Stream Classification: Other
Submitted By: 4D Site Solutions, Inc.
Date Received by LQS: September 11, 2019
Plan Type: New
Dear Mr. Raynor:
Address: US Hwy 401
This office has reviewed the subject erosion and sedimentation control plan and hereby issues this Letter of Approval
with Modifications. A list of the modifications and reservations is attached. This plan approval shall expire three (3)
years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A
NCAC 413.0129. Should the plan not perform adequately, a revised plan will be required (G.S. 113A-54.1)(b).
As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent
(NOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction Stormwater General
Permit. This form MUST be submitted and COC issued prior to the commencement of any land disturbing activity on
the above -named project. The NOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the
NOI form to Annette Lucas at Annette.lucas@ncdenr.gov or Paul Clark at Paul.clark@ncdenr.gov. After you submit a
complete and correct NOI Form, a COC will be emailed to you within three business days. Initially, DEMLR will not
charge a fee for coverage under the NCG01 permit. However, a $100 fee will soon be charged annually. This fee is to
be sent to the DEMLR Stormwater Central Office staff in Raleigh.
North Carolina Department of Environmental Quality I Division of Energy. Mineral and Land Resources
Fayetteville Regional Office 1 225 Green street, Suite 7141 Fayetteville, North Carolina 28301
E Q` �
NGRrCN FppU Dr
Rowe 01fim—ai 910.433.3300
Letter of Approval with Modifications
ABJ Investments, LLC
October, 11, 2019
Page 2 of 3
Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the
job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCGO1 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1 (a) of our right of periodic inspection to insure compliance
with the approved plan.
North Carolina's Sedimentation Pollution Control Program is performance -oriented, requiring protection of existing
natural resources and adjoining properties. If, following the commencement of this project, it is determined that the
erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution
Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the
plan and implementation of the revisions to ensure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws,
regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing
activity. This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the Financial
Responsibility Form, which you provided. This permit allows for a land -disturbance, as called for on the application
plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a
revised plan and additional application fee. You are requested to file an amended form if there is any change in the
information included on the form. In addition, it would be helpful if you notify this office of the proposed starting
date for this project. Please notify us if you plan to have a preconstruction conference.
Your cooperation is appreciated.
Sincerely,
Jodi Pace, EI
Regional Engineering Assistant
Land Quality Section
Enclosures: Certificate of Approval
Modifications Required for Approval
NPDES NCGO1 Fact Sheet
cc: Scott Brown, 4D Site Solutions, Inc. (electronic copy)
Ken Slattum, Building Inspector (electronic copy)
Jay Sikes, Building Inspector (electronic copy
Fayetteville Regional Office file
Letter of Approval with Modifications
ABJ Investments, LLC
October, 11, 2019
Page 3 of 3
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: WILLIAM FARM SUBDIVISION
Project ID: HARNE-2020-021
County: Harnett
Provide one full size copy of only the revised plan sheets, showing all the Modifications required for
approval, prior to beginning any land -disturbing activity.
Ref: G.S.113A-54.1 through G.S. 113A-57
Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504
General Permit NCG 010000 NPDES for Construction Activities