Loading...
HomeMy WebLinkAboutWQ0006060_BIMS Report_20191220Compliance Inspection Report Permit: WQ0006060 SOC: County: Mecklenburg Region: Mooresville Contact Person: Bob Churchill Effective: 06/01/15 Expiration: 05/31/20 owner: Gerdau Ameristeel US Inc Effective: Expiration: Facility: Charlotte Steel Mill 6601 Lakeview Rd Title: Charlotte NC 28269 Phone: 704-596-0361 Ext.3128 Directions to Facility: From Charlotte, take State Highway 115 North past the Brockenbrough Airport approximately 2 miles. Turn left onto Lakeview Road. The facility is the first property on your right. System Classifications: Primary ORC: Certification: Phone: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 12/09/2019 Entry Time: 01:OOPM Primary Inspector: Maria Schutte Secondary Inspector(s): Reason for Inspection: Routine Permit Inspection Type: Closed -Loop Recycle Facility Status: Compliant ❑ Not Compliant Question Areas: Exit Time: 02:25PM Phone: 704-663-1699 Inspection Type: Compliance Evaluation Treatment Flow Measurement -Effluent Treatment Flow Measurement -Influent Miscellaneous Questions Treatment Flow Measurement -Water Treatment Record Keeping Use Records Treatment Lagoons Treatment Sludge Storage/Treatment Treatment Flow Measurement Storage End Use -Reuse Wells (See attachment summary) Page 1 of 5 Permit: WQ0006060 Owner - Facility: Gerdau Ameristeel US Inc Inspection Date: 12/09/2019 Inspection Type : Compliance Evaluation Reason for Visit: Routine Inspection Summary: Mooresville Regional Office (MRO) staff conducted a compliance inspection in conjunction with the permit renewal, on December 9th, 2019. The MRO would like to thank you and your staff for your time during the inspection. Permit records, the two Recycle lagoons, the landfill leachate system and site irrigation well were viewed during this inspection. The facilities appeared appropriately maintained at the time of inspection. The main item of concern, is there is no gauge present to measure water levels at either of the two recycle units. This item was also noted at the last inspection. MRO staff will recommend this item be highlighted as part of the permit renewal to reflect language in the Recycle system rules. This permit is currently in the renewal process with our Central Office staff. Specific questions concerning the renewal process may be directed to: Poonam.Giri@ncdenr.gov, the permit writer assigned to your project. The inspection report should be self-explanatory; however, please contact Maria Schutte by phone (704-235-2184) or email (maria.schutte@ncdenr.gov) with questions. Page 2 of 5 Permit: WQ0006060 Owner - Facility: Gerdau Ameristeel US Inc Inspection Date: 12/09/2019 Inspection Type : Compliance Evaluation Reason for Visit: Routine Type Yes No NA NE Infiltration System ❑ Lagoon Spray, LR ❑ Single Family Spray, LR ❑ Activated Sludge Spray, LR ❑ Reuse (Quality) ❑ Activated Sludge Spray, HR ❑ Activated Sludge Drip, LR ❑ Single Family Drip ❑ Recycle/Reuse Treatment Yes No NA NE Are Treatment facilities consistent with those outlined in the current permit? 0 ❑ ❑ ❑ Do all treatment units appear to be operational? (if no, note below.) 0 ❑ ❑ ❑ Comment: The remediation system is shutdown per UST and contractor guidance. The associated MWs were recommended by UST & contractor for abandonment. Per on -site discussion, it seemed best to leave remediation system language in the permit, until abandonment is completed, because there is no way to tell the system is NOT running/contributing flow to the recycle system. Treatment Flow Measurement -Influent Yes No NA NE Is flowmeter calibrated annually? ❑ 0 ❑ ❑ Is flowmeter operating properly? ❑ ❑ ❑ Does flowmeter monitor continuously? ❑ ❑ ❑ Does flowmeter record flow? ❑ ❑ ❑ Does flowmeter appear to monitor accurately? 0 ❑ ❑ ❑ Comment: All on -site water is collected for use in the recycle - Cooling Water - systems. There is a flow meter at the landfill leachate building, but flows of stormwater/recycled water are not tracked. Treatment Flow Measurement -Water Use Records Is water use metered? Are the daily average values properly calculated? Comment: Water is used for the coolinq systems onlv and recycled, not irriqated. Treatment Flow Measurement -Effluent Is flowmeter calibrated annually? Is flowmeter operating properly? Does flowmeter monitor continuously? Does flowmeter record flow? Yes No NA NE ❑❑■❑ ❑❑■❑ Yes No NA NE ❑❑■❑ ❑❑■❑ Page 3 of 5 Permit: WQ0006060 Owner - Facility: Gerdau Ameristeel US Inc Inspection Date: 12/09/2019 Inspection Type : Compliance Evaluation Does flowmeter appear to monitor accurately? Comment: This is a closed loop recycle system. There is no effluent. Reason for Visit: Routine ❑❑■❑ Treatment Sludge Storage/Treatment Yes No NA NE Is the aeration operational? ❑ ❑ 0 ❑ Is the aeration pattern even? ❑ ❑ ❑ If required, are Sanitary "Ts" present in tankage? ❑ ❑ 0 ❑ Comment: There are site oil/water separators and mill scale collection areas. Both collection/waste streams are captured for resale/reuse and housed in designated containers/areas until managed/sold by third party vendors. Hualing records were reviewed on -site &/or received by email as proof of appropriate handling. Per previous inspection reports, this facility makes an effort to find reuse for all materials coming from their process. The mill scale is periodically removed from the basins and sold to other businesses for its high Iron Ore content. Residuals from the oil/water separator are hauled off -site for proper disposal by Safety-Kleen. Record Keeping Yes No NA NE Is a copy of current permit available? 0 ❑ ❑ ❑ Are monitoring reports present: NDMR? ❑ ❑ ❑ NDAR? ❑ ❑ ❑ Are flow rates less than of permitted flow? ❑ ❑ ❑ Are flow rates less than of permitted flow? ❑ ❑ ❑ Are application rates adhered to? ❑ ❑ ❑ Is GW monitoring being conducted, if required (GW-59s submitted)? ❑ ❑ ❑ Are all samples analyzed for all required parameters? ❑ ❑ ❑ Are there any 2L GW quality violations? ❑ ❑ ❑ Is GW-59A certification form completed for facility? ❑ ❑ ❑ Is effluent sampled for same parameters as GW? ❑ ❑ ❑ Do effluent concentrations exceed GW standards? ❑ ❑ ❑ Are annual soil reports available? ❑ ❑ ❑ # Are PAN records required? ❑ ❑ ❑ # Did last soil report indicate a need for lime? ❑ ❑ ❑ If so, has it been applied? ❑ ❑ ❑ Are operational logs present? ❑ ❑ ❑ Are lab sheets available for review? ❑ ❑ ❑ Do lab sheets support data reported on NDMR? ❑ ❑ ❑ Do lab sheets support data reported on GW-59s? ❑ ❑ ❑ Are Operational and Maintenance records present? ❑ ❑ ❑ Were Operational and Maintenance records complete? ❑ ❑ ❑ Page 4 of 5 Permit: WQ0006060 Owner - Facility: Gerdau Ameristeel US Inc Inspection Date: 12/09/2019 Inspection Type : Compliance Evaluation Reason for Visit: Routine Has permittee been free of public complaints in last 12 months? ❑ ❑ ❑ Is a copy of the SOC readily available? ❑ ❑ ❑ No treatment units bypassed since last inspection? ❑ 0 ❑ ❑ Comment: There is no land application/irrigation with this permit. Most questions are not applicable. System inspection logs have improved, but should include documentation of water levels at both recycle ponds. End Use -Reuse Yes No NA NE Is the acreage in the permit being utilized? ❑ 1:10 ❑ Does the acreage specified in the permit correspond to the measured acreage at the site? ❑ ❑ ❑ Are all essential units provided in duplicate? ❑ ❑ ❑ Is an automatically activated standby power source available? ❑ ❑ ❑ Is the equalization capacity adequate? ❑ ❑ ❑ Is aerated flow equalization present? ❑ ❑ ❑ Has the turbidity meter been calibrated in the last 12 months? ❑ ❑ ❑ Does the turbidity meter have recording capabilities? ❑ ❑ ❑ Is all flow diverted at the appropriate times? ❑ ❑ ❑ Is all upset wastewater diverted from reuse storage unit? ❑ ❑ 0 ❑ Is all upset wastewater treated, retreated, or disposed of acceptably? ❑ ❑ ❑ Is upset wastewater treated prior to discharge to irrigation storage? ❑ ❑ ❑ Is public access restricted from irrigation area during active site use? ❑ ❑ ❑ If golf course, is a sign posted in plain sight on the club house? ❑ ❑ ❑ Is the cover crop acceptable? ❑ ❑ ❑ Are buffers adequate? 0 ❑ ❑ ❑ Is the site free of ponding/runoff? ❑ ❑ ❑ Is the acreage in the permit being utilized? ❑ ❑ ❑ Is the application equipment acceptable? ❑ ❑ ❑ Is the application area free of limiting slopes? ❑ ❑ ❑ How close is the closest water supply well? ❑ ❑ ❑ Are any supply wells within the CB? ❑ ❑ ❑ Are any supply wells within 250' of the CB? ❑ ❑ ❑ Is municipal water available in the area? ❑ ❑ ❑ Are GW monitoring wells required? ❑ ❑ ❑ Are GW monitoring wells located properly w/ respect to RIB and CB? ❑ ❑ ❑ Are GW monitoring wells properly constructed, including screened interval? ❑ ❑ ❑ Comment: On -site GW monitoring wells are associated with an AST or other DWM managed programs and were NOT constructed for this permit. Page 5 of 5