HomeMy WebLinkAboutSW4190901_SuppEZ-2018-Version-2.1.1-2-Signed_1/20/2020SUPPLEMENT-EZ COVER PAGE
FORMS LOADED
FORMS LOADED
Signature of Designer
Date
DRAINAGE AREAS
1
Is this a high density project?
Yes
2
If so, number of drainage areas/SCMs
1
3
Is all/part of this project subject to previous rule
versions?
No
FORMS LOADED
DRAINAGE AREA INFORMATION
Entire Site
1
4
Type of SCM
Sand Filter
5
Total BUA in project (sq ft)
64704 sf
6
New BUA on subdivided lots (subject to
permitting) (sq ft)
7
New BUA outside of subdivided lots (subject to
permitting) (so
27020 sf
8
Offsite - total area (sq ft)
sf
9
Offsite BUA (sq ft)
sf
10
Breakdown of new BUA outside subdivided lots:
Parking (sq ft)
17890 sf
Sidewalk (sq ft)
sf
Roof (sq ft)
7734 sf
Roadway (sq ft)
Future (sq ft)
Other, please specify in the comment box
below (sq ft)
1396 sf
sf
sf
11
New infiltrating permeable pavement on
subdivided lots (sq ft)
sf
12
New infiltrating permeable pavement outside of
subdivided lots (sq ft)
sf
13
Exisitng BUA that will remain (not subject to
permitting) (sq ft)
sf
14
Existing BUA that is already permitted (sq ft) 37,684
15
Existing BUA that will be removed (sq ft)
sf
16
Percent BUA
57%
17
Design storm (inches)
1 in
18
Design volume of SCM (cu ft)
4044 cf
19
Calculation method for design volume
Simple Method
ADDITIONAL INFORMATION
20
Please use this space to provide any additional information about the
drainage area(s):
The Family Dollar site to the south was previously submitted. NCDEQ was
unable to find the plans so we used aerial and survey data to estimate the
BUA. The new sand filter and detention covers both sites.
DRAINAGE AREA INFORMATION
Entire Site
1
4
Type of SCM
5
Total BUA from project (sq ft)
6
1995 rules
SL 2006-246
2008 rules
2017 rules
7
New BUA on subdivided lots (subject to
permitting) (sq ft)
1995 rules
SL 2006-246
2008 rules
2017 rules
8
New BUA outside of subdivided lots (subject
to permitting) (so
1995 rules
SL 2006-246
2008 rules
2017 rules
9
Offsite - total area (sq ft)
1995 rules
SL 2006-246
2008 rules
2017 rules
10
Offsite BUA (sq ft)
1995 rules
SL 2006-246
2008 rules
2017 rules
11
IDesign storm (inches)
1995 rules
SL 2006-246
2008 rules
2017 rules
12
Breakdown of new BUA:
Parking (sq ft)
Sidewalk (sq ft)
Roof (sq ft)
Roadway (sq ft)
Future (sq ft)
Other, please specify in the comment box
below (sq ft)
13
New infiltrating permeable pavement on
subdivided lots (sq ft)
14
New infiltrating permeable pavement outside of
subdivided lots (sq ft)
15
Exisitng BUA that will remain (not subject to
permitting) (sq ft)
16
Existing BUA that is already permitted (sq ft)
17
Existing BUA that will be removed (sq ft)
18
Percent BUA
19
Design volume of SCM (cu ft)
20
Calculation method for design volume
ADDITIONAL INFORMATION
21
Please use this space to provide any additional
information about the drainage area(s):
SAND FILTER
1 Drainage area number 1
2 esign vo ume o cu s
3
Is the SCM sized to treat the SW from all surfaces at build -out?
Yes
4
Is the SCM located away from contaminated soils?
Yes
5
What are the side slopes of the SCM (H:V)?
100:1
6
Does the SCM have retaining walls, gabion walls or other engineered
side slopes?
No
7
Are the inlets, outlets, and receiving stream protected from erosion (10-
year storm)?
Yes
8
Is there an overflow or bypass for inflow volume in excess of the
design volume?
Yes
9
What is the method for dewatering the SCM for maintenance?
Drawdown Orifice
10
If applicable, will the SCM be cleaned out after construction?
Yes
11
Does the maintenance access comply with General MDC (8)?
Yes
12
Does the drainage easement comply with General MDC (9)?
Yes
13
If the SCM is on a single family lot, does (will?) the plat comply with
General MDC (10)?
14
Is there an O&M Agreement that complies with General MDC (11)?
Yes
15
Is there an O&M Plan that complies with General MDC (12)?
Yes
16
Does the SCM follow the device specific MDC?
Yes
17
Was the SCM designedy an NG licenseapro essiona .
es
23
Volume that can be retained in the sediment chamber (cubic feet)
Will there be a permanent pool in the sediment chamber?
2181 cf
24
No
854.20
25
Bottom of the sediment chamber (fmsl)
26
Area of the sediment chamber (square feet)
710 sf
27
Physical depth of the sediment chamber (inches)
36 in
28
Ponding depth in the sediment chamber, above any permanent pool
(inches)
29
lElevation of top of weir between chambers (fmsl)
859.2
Sand Chamber
30
Volume that can be retained in the sand chamber (cubic feet)
2123 cf
31
Bottom of the sand chamber (fmsl)
854.20
32
Area of the sand chamber (square feet)
692 sf
33
Physical depth of the sand chamber (inches)
24 in
34
Ponding depth in the sand chamber, above any permanent pool
(inches)
35
Elevation of the bypass device (fmsl)
859.2
36
Type of bypass device
Weir
37
Mechanism for distributing flow over the sand surface
Weir
38
Sand specification for sand chamber
C33
39
Depth above underdrain pipe (inches)
24 in
40
Will the media be maintained to drain at least two inches per hour at
the sand surface?
Yes
41
Is at least one clean -out pipe provided at the low point of each
junderdrain line?
lWill c can-ou pipes a capped?
INFORMATION
Yes
42
Yes
ADDITIONAL
43
Please use this space to provide any additional information about the
ISand Filter(s):
This design is provided by Storm Trap and the above information is
Sand Filter 1 4:14 PM 1/14/2020